1 Dust Control Update Dale C. Heglund, PE/PLS NDAOGPC Sept 18, 2014 Williston

2

3

4

5 Presenter on behalf of the investigators: Dale C. Heglund, PE/PLS NDLTAP Director Investigators: Daba S. Gedafa, Ph.D., P.E., UND Harvey Gullicks, Ph.D., P.E., UND

6 Unpaved roads are the largest source of particulate air pollution in the United States Effects of dust from unpaved roads: Stunting plant growth due to the shading effect and clogging of the plant s pores Nuisance and health problems such as hay fever and allergies Reduction in visibility and causing driving hazards for drivers Increasing particulate loading of lakes and streams after precipitation 6

7 Due to the increased traffic volumes related to energy sector in western North Dakota, dust along the many unpaved roads is causing many complaints Farmers and ranchers complain that dust from unpaved roads due to heavy trucks has stunted crops, damaged pasture, and caused allergic reactions in livestock There is a need to measure the amount of dust and its effect on crops & livestock 7

8 Literature review of the effect of dust from unpaved roads on crops and livestock Measure and compare dust from unpaved roads in five counties in North Dakota considering traffic, material type, and weather conditions Determine the effect of dust from unpaved roads on crops and livestock using survey 8

9 County Intersection Traffic Counter Location Cass Co. 2 and Co. 11, Grandin 500 ft south of intersection Grand Forks Mountrail McKenzie Co. 5 and 10 th St, Manvel 101 st Ave NW and 63 rd St NW, White Earth 155 th Ave NW & 36 th St NW, Cartwright 500 ft south of intersection 500 ft north of intersection 500 ft south of intersection Williams Co. 8 & Co. 15, Ray 500 ft north of intersection 9

10 .*=Metal post with mason jars at 2, 3, and 4 ft locations 10

11 .*=Metal post with mason jars at 2, 3, and 4 ft locations11

12 *=Metal post with mason jars at 2, 3, and 4 ft locations 12

13 *=Metal post with mason jars at 2, 3, and 4 ft locations 13

14 *=Metal post with mason jars at 2, 3, and 4 ft locations 14

15 Standard quart size jars 15

16 16

17 The amount of dust from unpaved roads in five counties have been collected monthly using mason jars at 2, 3, and 4 ft on each metal posts that are at 30, 60, 120, 240, and 480 ft from the center of major unpaved road on both sides July-August August-September September-October will be collected in October Traffic counters have been used to collect traffic volume, traffic speed, and vehicle length Survey data will be used to determine the effect of dust and livestock on crop yield and livestock 17

18

19 7.0 July-August Dust* Cass Grand Forks Mountrail McKenzie Williams 6.0 Average Dust per Post (grams) East West East West East West East West East West Distance from the Center of Major Unpaved Roads in East-West Directions * Preliminary Results. Detailed Analysis will be conducted 19

20 9.0 August-September Dust* Cass Grand Forks Mountrail McKenzie Williams Average Dust per Post (grams) East West East West East West East West East West Distance from Center of Major Unpaved Road in East-West Directions * Preliminary Results. Detailed Analysis will be conducted 20

21 July-September Vehicle Volume August September Number of Vehicles N S N S N S N S N S Cass Grand Forks Mountrail McKenzie Williams Driving Direction in Each County 21

22 July-August Vehicle Speed Results Average Min Max Speed (mph) N S N S N S N S N S Cass Grand Forks Mountrail McKenzie Williams Driving Direction in Each County 22

23 August-September Vehicle Speed Results Average Min Max Speed (mph) N S N S N S N S N S Cass Grand Forks Mountrail McKenzie Williams Driving Direction in Each County 23

24 Williams and McKenzie sites have high traffic and dust amount as compared to the three other counties There has been a significant traffic increase at McKenzie site from August-September as compared to July-August Dust from Mountrail site is negligible for August- September may be because of dust suppressants and lesser traffic as compared to the other western counties Maximum speed that is higher than interstate speed limit has been measured 24

25 Collecting dust and traffic data in October Analyze dust and traffic data in detail Consider weather, material types, and dust suppressants if any Gather and analyze survey results from farmers and ranchers to determine the effect of dust on crop yield and livestock Submit report on October 31 st and make closing presentation in November 25

26 North Dakota Association of Oil and Gas Producing Counties for funding this project County Highway Engineers County Extension Services for sharing addresses for survey 26

27 Contact: Daba S. Gedafa, Ph.D., P.E. University of North Dakota Office Phone:

28

29

30

31

32

33

34

35

36

37

38 NDLTAP Partnering with the NDDOT and the NDAOGPC to enhance our local transportation system.

39

Western ND Meeting. February 19, 2014 Grant Levi, NDDOT Director

Western ND Meeting. February 19, 2014 Grant Levi, NDDOT Director Western ND Meeting February 19, 2014 Grant Levi, NDDOT Director 1 Traffic Trends in North Dakota 2 Truck Traffic 2008 3 Truck Traffic 2012 4 Average Daily Traffic 5 ND Vehicle Miles Traveled Statewide

More information

Transportation accomplishments

Transportation accomplishments 1 1 Welcome Transportation accomplishments Federal Funding State Funding Challenges Future Projects 2 Transportation Project: The NDDOT had a record construction season in 2011. Completed $595.6 million

More information

Michigan. Traffic. Profile

Michigan. Traffic. Profile June 2014 Revised 5/11/15 Michigan 2013 Traffic Crash Profile Reporting Criteria Please pay particular attention to the wording when interpreting the three levels of data gathered for this report. Crash

More information

Prescription Drug Monitoring Program Facts, Figures, and Trends 4 th Quarter 2018

Prescription Drug Monitoring Program Facts, Figures, and Trends 4 th Quarter 2018 Prescription Drug Monitoring Program Facts, Figures, and Trends 4 th Quarter 218 North Dakota Board of Pharmacy Kathy Zahn, RPhTech, CPhT, PDMP Program Administrator 196 E. Broadway Ave Bismarck, ND 5851

More information

Michigan. Traffic. Profile

Michigan. Traffic. Profile June 2014 Revised 5/11/15 Michigan 2013 Traffic Crash Profile Reporting Criteria Please pay particular attention to the wording when interpreting the three levels of data gathered for this report. Crash

More information

City of Grand Forks Staff Report

City of Grand Forks Staff Report City of Grand Forks Staff Report Service/Safety Committee December 15, 2015 City Council December 21, 2015 Agenda Item: Amendment No. 1 to Engineering Services Agreement with CPS for City Project No. 7143,

More information

MPO Staff Report Technical Advisory Committee: July 12, 2017

MPO Staff Report Technical Advisory Committee: July 12, 2017 MPO Staff Report Technical Advisory Committee: July 12, 2017 RECOMMENDED ACTION: 2 nd TAC Meeting with Kimley-Horn/WSB in Updating the Street/Highway Element of 2045 Metropolitan Transportation Plan. Matter

More information

Kent County Traffic Crash Data & Year Trends. Reporting Criteria

Kent County Traffic Crash Data & Year Trends. Reporting Criteria May 2015 Revised 3/16/2016 2014 Reporting Criteria Please pay particular attention to the wording when interpreting the three levels of data gathered for this report. Crash The Crash Level analyzes data

More information

NDDOT Truck Harmonization Study

NDDOT Truck Harmonization Study NDDOT Truck Harmonization Study Upper Great Plains Transportation Institute North Dakota State University North Dakota Association of County Engineers January 21, 2016 Bismarck ND Ramkota Hotel Tim Horner,

More information

Delaware County Engineer s Office

Delaware County Engineer s Office Delaware County Engineer s Office JANUARY 2017 County Engineer Responsibility Serve as engineer to the Board of County Commissioners and 18 Boards of Township Trustees for roads, bridges and land surveying

More information

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition Welcome Meetings 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition 6:30 to 8:00 p.m. - Open House Why is Highway 212 Project Important? Important Arterial Route Local Support Highway 212

More information

Michigan State Police (MSP) Traffic Safety Network Traverse Bay Area

Michigan State Police (MSP) Traffic Safety Network Traverse Bay Area June 2016 Revised 2/15/2017 2015 Reporting Criteria Please pay particular attention to the wording when interpreting the three levels of data gathered for this report. Crash The Crash Level analyzes data

More information

Monthly Cooling and Heating Degree Day Data

Monthly Cooling and Heating Degree Day Data Andrew M. Cuomo, Governor Francis J. Murray, Jr., NYSERDA President and CEO Energy Efficiency and Energy Innovation and Energy Education and Energy and the Energy Data, Planning Renewable Programs Business

More information

UTC Region 5 Meeting. Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority

UTC Region 5 Meeting. Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority UTC Region 5 Meeting Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority April 20, 2017 JJ Kringstad - North Dakota Pipeline Authority 2 Bakken-Three Forks Formations Mature

More information

Highway 23 New London Access & Safety Assessment. Public Open House #2 October 3, :00 to 7:00 PM

Highway 23 New London Access & Safety Assessment. Public Open House #2 October 3, :00 to 7:00 PM Public Open House #2 October 3, 2017 5:00 to 7:00 PM Highway 9 OVERVIEW OF ASSESSMENT Assessment Limits Highway 23 from County Road 40 to North Shore Dr Purpose: Identify opportunities to reduce serious

More information

Michigan State Police (MSP) Post 21 - Metro North

Michigan State Police (MSP) Post 21 - Metro North June 2018 Revised 8/3/2018 2017 Reporting Criteria Please pay particular attention to the wording when interpreting the three levels of data gathered for this report. Crash The Crash Level analyzes data

More information

Traffic Safety Network Huron Valley

Traffic Safety Network Huron Valley June 2018 Revised 8/3/2018 2017 Reporting Criteria Please pay particular attention to the wording when interpreting the three levels of data gathered for this report. Crash The Crash Level analyzes data

More information

Quarterly Hogs and Pigs

Quarterly Hogs and Pigs Quarterly Hogs and Pigs ISSN: 19-11 Released September 26, 2014, by the National Agricultural Statistics Service (NASS), Agricultural Statistics Board, United s Department of Agriculture (USDA). United

More information

Michigan State Police (MSP) Post 21 - Metro North

Michigan State Police (MSP) Post 21 - Metro North October 2017 2016 Reporting Criteria Please pay particular attention to the wording when interpreting the three levels of data gathered for this report. Crash The Crash Level analyzes data related to crash

More information

2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS. Eastside Transportation Partnership September 9, 2016

2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS. Eastside Transportation Partnership September 9, 2016 2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS Eastside Transportation Partnership September 9, 2016 1 2 PSRC 2016 Project Selection Process 2018-2020 Estimated FHWA Funds Available: (Summary)

More information

Quarterly Hogs and Pigs

Quarterly Hogs and Pigs Quarterly Hogs and Pigs ISSN: 949-92 Released September 27, 208, by the National Agricultural Statistics Service (NASS), Agricultural Statistics Board, United s Department of Agriculture (USDA). United

More information

Van Buren County Traffic Crash Data & Year Trends. Reporting Criteria

Van Buren County Traffic Crash Data & Year Trends. Reporting Criteria May 2015 Revised 3/16/2016 2014 Reporting Criteria Please pay particular attention to the wording when interpreting the three levels of data gathered for this report. Crash The Crash Level analyzes data

More information

Appendix J Traffic Impact Study

Appendix J Traffic Impact Study MRI May 2012 Appendix J Traffic Impact Study Level 2 Traffic Assessment Limited Impact Review Appendix J [This page was left blank intentionally.] www.sgm-inc.com Figure 1. Site Driveway and Trail Crossing

More information

Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs)

Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs) Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs) 26 th Annual Transportation Research Conference Saint Paul RiverCentre May 20, 2015 Presentation Outline

More information

Wheat Marketing Situation

Wheat Marketing Situation Wheat Marketing Situation Prepared by: Darrell L. Hanavan Executive Director Colorado Wheat Administrative Committee If you would like to receive an email when this report is updated, email gmostek@coloradowheat.org

More information

February 2015 Frost Law Meeting

February 2015 Frost Law Meeting February 2015 Frost Law Meeting www.co.mountrail.nd.us Road and Bridge Department Jana Heberlie, County Engineer PO Box 275 8103 61 st St NW Stanley, ND 58784 Phone 701.628.2390 Meeting Agenda Introductions

More information

ODOT District Two Monthly Construction Update

ODOT District Two Monthly Construction Update Ohio Department of Transportation Construction Update DISTRICT 2 KIRK SLUSHER, P.E., ACTING DEPUTY DIRECTOR 317 East Poe Rd. Bowling Green, Ohio 43402-1330 www.transportation.ohio.gov/dist2 ODOT District

More information

MEMORANDUM. Observational survey of car seat use, 2017

MEMORANDUM. Observational survey of car seat use, 2017 MEMORANDUM Darelis López Rosario, Esq. Executive Director Traffic Safety Commission Carlos Torija Estudios Técnicos, Inc. October 5, 2017 Observational survey of car seat use, 2017 The Traffic Safety Commission

More information

Welcome. Highway 23 Gap New London to Paynesville. Open House. - Please Sign In -

Welcome. Highway 23 Gap New London to Paynesville. Open House. - Please Sign In - Highway Gap New London to Paynesville Welcome Highway Gap New London to Paynesville Open House - Please Sign In - There is no formal presentation, but representatives are available to answer your questions.

More information

STH 60 Northern Reliever Route Feasibility Study Report

STH 60 Northern Reliever Route Feasibility Study Report #233087 v3 STH 60 Northern Reliever Route Feasibility Study Report Washington County Public Works Committee Meeting September 28, 2016 1 STH 60 Northern Reliever Route Feasibility Study Hartford Area Development

More information

METRO Light Rail Update

METRO Light Rail Update American Society of Highway Engineers METRO Light Rail Update Brian Buchanan Director, Design and Construction October 13, 2009 1 High Capacity Transit System 2 20-Mile Light Rail Line 3 Operations Operations

More information

Washtenaw County Traffic Crash Data & Year Trends. Reporting Criteria

Washtenaw County Traffic Crash Data & Year Trends. Reporting Criteria June 2018 Revised 8/3/2018 2017 Reporting Criteria Please pay particular attention to the wording when interpreting the three levels of data gathered for this report. Crash The Crash Level analyzes data

More information

Heavy Commercial Volumes at Selected Piezo and Wim Sites( )

Heavy Commercial Volumes at Selected Piezo and Wim Sites( ) Heavy Commercial Volumes at Selected Piezo and Wim Sites(2004-2011) Minnesota Department of Transportation Traffic Forecast and Analysis Section April 2012 \ Piezo and WIM Analysis Piezos record vehicle

More information

Washtenaw County Traffic Crash Data & Year Trends. Reporting Criteria

Washtenaw County Traffic Crash Data & Year Trends. Reporting Criteria June 2017 Revised 10/3/17 2016 Reporting Criteria Please pay particular attention to the wording when interpreting the three levels of data gathered for this report. Crash The Crash Level analyzes data

More information

Evaluation of Cedar Rapids Automated Traffic Enforcement Report - Primary Highway System

Evaluation of Cedar Rapids Automated Traffic Enforcement Report - Primary Highway System Evaluation of Cedar Rapids Automated Traffic Enforcement Report - Primary Highway System Introduction: Automated traffic enforcement (ATE) is one of many safety countermeasures that can be used to enhance

More information

Making Mobility Better, Together

Making Mobility Better, Together Making Mobility Better, Together Austin Transportation Department Gordon Derr, P.E., for Robert J. Spillar, P.E Director, Austin Transportation Department 1 AUSTIN TRANSPORTATION DEPARTMENT Our Mission

More information

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange I-820 (East) Project Description Fort Worth District Reconstruct Southern I-820/SH 121 Interchange I-820 from approximately 2,000 feet north of Pipeline Road/Glenview Drive to approximately 3,200 feet

More information

GATTIS SCHOOL RD / SH 130 SUBDIVISION

GATTIS SCHOOL RD / SH 130 SUBDIVISION AMISTAD DR MEADOWILD DR NO. DESCRIPTION INDEX ROYAL BURGESS DR. E NAKOMA SITE SH 130 CITY LIMITS LITTLE LAKE RD KAATZ LN ESTATE DR DANA DR MARJORIE DR 1 COVER 2 PRELIMINARY PLAT 3 EXISTING CONDITIONS 4

More information

ODOT District Two Monthly Construction Update

ODOT District Two Monthly Construction Update Ohio Department of Transportation Construction Update DISTRICT 2 KIRK SLUSHER, P.E., ACTING DEPUTY DIRECTOR 317 East Poe Rd. Bowling Green, Ohio 43402-1330 www.transportation.ohio.gov/dist2 ODOT District

More information

EVALUATION RESULT OF THE ALERT-2 RURAL INTERSECTION CONFLICT WARNING SYSTEM

EVALUATION RESULT OF THE ALERT-2 RURAL INTERSECTION CONFLICT WARNING SYSTEM EVALUATION RESULT OF THE ALERT-2 RURAL INTERSECTION CONFLICT WARNING SYSTEM Taek M. Kwon, Ph.D University of Minnesota Duluth Victor Lund (St. Louis County), Robert Ege, Alan Rindels (MnDOT) Outline Introduction

More information

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

MEMO VIA  . Ms. Amy Roth DPS Director, City of Three Rivers. To: MEMO To: Ms. Amy Roth DPS Director, City of Three Rivers VIA EMAIL From: Michael J. Labadie, PE Julie M. Kroll, PE, PTOE Brandon Hayes, PE, P.Eng. Fleis & VandenBrink Date: January 5, 2017 Re: Proposed

More information

Business Advisory Committee. July 7, 2015

Business Advisory Committee. July 7, 2015 Business Advisory Committee July 7, 2015 1 Today s Topics Outreach Update TI #1 and 2: Target Field Station Connection to I-94: Recommendation 85 th Station Configuration 93 rd Station Configuration DEIS

More information

INFRASTRUCTURE AND TRANSPORTATION ADVERTISING SCHEDULE 2015/2016 CONSTRUCTION AND MATERIAL SUPPLY TENDERS

INFRASTRUCTURE AND TRANSPORTATION ADVERTISING SCHEDULE 2015/2016 CONSTRUCTION AND MATERIAL SUPPLY TENDERS INFRASTRUCTURE AND TRANSPORTATION ADVERTISING SCHEDULE 2015/2016 CONSTRUCTION AND MATERIAL SUPPLY TENDERS Manitoba Infrastructure and Transportation Contract Services Branch 1630-215 Garry Street Winnipeg,

More information

Over-Dimensional Vehicle Restriction Study for US 129 in TN

Over-Dimensional Vehicle Restriction Study for US 129 in TN Over-Dimensional Vehicle Restriction Study for US 129 in TN July 30,2015 TDOT Region 1 US 129 Location Map US 129 Topography and Scenery Operational and Safety Study August 2014, US129 Operational and

More information

Historical count data from Page 7-14

Historical count data from Page 7-14 Project Background The annual Lawrence count data was collected following the National Bicycle & Pedestrian Documentation Project (NBPDP) methodology (http://bikepeddocumentation.org). The project aims

More information

Monthly bulletin. November Monthly bulletin VDMA. Economic and Statistic Affairs

Monthly bulletin. November Monthly bulletin VDMA. Economic and Statistic Affairs November 2017 Economic and Statistic Affairs Incoming orders in Germany Mechanical engineering Volume index 2015 = 100 140 130 120 110 100 90 80 70 60 Domestic Foreign 2008 2009 2010 2011 2012 2013 2014

More information

Economic Viability and Environmental Sustainability Dimensions of Passenger Rail Service Integration for Commuter and Casino Traffic on the Gulf Coast

Economic Viability and Environmental Sustainability Dimensions of Passenger Rail Service Integration for Commuter and Casino Traffic on the Gulf Coast Economic Viability and Environmental Sustainability Dimensions of Passenger Rail Service Integration for Commuter and Casino Traffic on the Gulf Coast ITS 3C Summit: Mobile, Alabama, September 14-17, 2014

More information

Basic Project Information

Basic Project Information FY 2015-16 PROJECT DESCRIPTION FORM (7B) Submitting Agency: Fairfax County Basic Project Information Project Title: South Van Dorn Street and Franconia Road Interchange 7B Project Type (check one): Roadway

More information

NORTH DAKOTA PETROLEUM COUNCIL NORTH DAKOTA S GAME-CHANGING OIL SHALE RESOURCE

NORTH DAKOTA PETROLEUM COUNCIL NORTH DAKOTA S GAME-CHANGING OIL SHALE RESOURCE THE BAKKEN NORTH DAKOTA S GAME-CHANGING OIL SHALE RESOURCE The Bakken is a Big Area 11,000 Sq Miles Williston Basin NORTH DAKOTA PETROLEUM www.northdakotaoilcan.com COUNCIL www.ndoil.org The Bakken Upper

More information

External Market Factors Impacting US Soybean Meal

External Market Factors Impacting US Soybean Meal External Market Factors Impacting US Soybean Meal USSEC Luncheon International Production and Processing Expo January 3, 213 Atlanta, GA Paul Smolen Presentation Objectives Examine the economic drivers

More information

Wheat. Historic Estimates North Dakota. ~~ite MemortaJ Book Colfectior1. Otvision of AgrfcuJwral Economics t ics No.

Wheat. Historic Estimates North Dakota. ~~ite MemortaJ Book Colfectior1. Otvision of AgrfcuJwral Economics t ics No. 378. 784 t ics No. 33 A4727 33 October 197 4 North Dakota Wheat ~~ite MemortaJ Book Colfectior1 Otvision of AgrfcuJwral Economics Historic Estimates 1955-1970 North Dakota State University Agricultural

More information

DEVELOPMENT AGREEMENT APPLICATION MULTI-UNIT RESIDENTIAL DEVELOPMENT FOURTH STREET NEAR BEDFORD HIGHWAY SUBMITTED BY: LYDON LYNCH ARCHITECTS

DEVELOPMENT AGREEMENT APPLICATION MULTI-UNIT RESIDENTIAL DEVELOPMENT FOURTH STREET NEAR BEDFORD HIGHWAY SUBMITTED BY: LYDON LYNCH ARCHITECTS DEVELOPMENT AGREEMENT APPLICATION MULTI-UNIT RESIDENTIAL DEVELOPMENT FOURTH STREET NEAR BEDFORD HIGHWAY NOVEMBER 30, 2017 SUBMITTED BY: LYDON LYNCH ARCHITECTS TABLE OF CONTENTS LETTER OF INTRODUCTION PROJECT

More information

AGRICULTURAL SOURCES (Adopted November 15, 2001; Amended September 16, 2004)

AGRICULTURAL SOURCES (Adopted November 15, 2001; Amended September 16, 2004) RULE 8081 AGRICULTURAL SOURCES (Adopted November 15, 2001; Amended September 16, 2004) 1.0 Purpose The purpose of this rule is to limit fugitive dust emissions from agricultural sources. 2.0 Applicability

More information

3 rd Quarter Summary of Meteorological and Ambient Air Quality Data Kennecott Utah Copper Monitoring Stations. Prepared for:

3 rd Quarter Summary of Meteorological and Ambient Air Quality Data Kennecott Utah Copper Monitoring Stations. Prepared for: 3 rd Quarter 2018 Summary of Meteorological and Ambient Air Quality Data Kennecott Utah Copper Monitoring Stations Prepared for: Prepared by: Mr. Bryce C. Bird Director Division of Air Quality 195 North

More information

Liquid Fertilizer Spill CHS Mitchell, SD Case #16SP102901

Liquid Fertilizer Spill CHS Mitchell, SD Case #16SP102901 Liquid Fertilizer Spill CHS Mitchell, SD Case #16SP102901 On 10-29-2015, at 1:30PM, Bryan Tipton, Program Specialist with the SDDA requested that Sherrie Petersen, AG Inspector, investigate 2700 gallons

More information

CONNECTED AND AUTOMATED TRANSPORTATION AND THE TEXAS AV PROVING GROUNDS PARTNERSHIP

CONNECTED AND AUTOMATED TRANSPORTATION AND THE TEXAS AV PROVING GROUNDS PARTNERSHIP CONNECTED AND AUTOMATED TRANSPORTATION AND THE TEXAS AV PROVING GROUNDS PARTNERSHIP Christopher Poe, Ph.D., P.E. Assistant Director, Connected and Automated Transportation Strategy Texas A&M Transportation

More information

Crestmont Development Update 2017 AGM

Crestmont Development Update 2017 AGM Crestmont Development Update 2017 AGM West Crestmont West Crestmont Will be built in phases finally reaching about 524 residential units. Rough grading for phases 9 & 10 already underway. First show home

More information

Appendix H TRAFFIC IMPACT ANALYSIS

Appendix H TRAFFIC IMPACT ANALYSIS Appendix H TRAFFIC IMPACT ANALYSIS Teichert Boca Quarry Expansion Traffic Impact Analysis Prepared for Teichert Aggregates Prepared by TRANSPORTATION CONSULTANTS, INC. LSC Transportation Consultants, Inc.

More information

Essex Junction Train Station Access and Scoping Study Discussion of Transportation Alternatives

Essex Junction Train Station Access and Scoping Study Discussion of Transportation Alternatives Essex Junction Train Station Access and Scoping Study Discussion of Transportation Alternatives Village of Essex Junction Chittenden County Regional Planning Commission, Inc. Scott & Partners Architectural

More information

Proposal for a Traffic Management Policy. National Committee for Economic Development (NCED) 18 th August 2004

Proposal for a Traffic Management Policy. National Committee for Economic Development (NCED) 18 th August 2004 Proposal for a Traffic Management Policy National Committee for Economic Development (NCED) 18 th August 2004 Transport & Economy GDP Rs 1,400 billion Contribution of Transport Rs 170 billion (12%) Employment

More information

SH 249 IN GRIMES COUNTY. Open House April 3, 2014

SH 249 IN GRIMES COUNTY. Open House April 3, 2014 SH 249 IN GRIMES COUNTY Open House April 3, 2014 Meeting Agenda Purpose of Meeting Today: Review the purpose and need for the SH 249 Grimes County project Review the proposed project and alternatives Discuss

More information

Transportation & Traffic Engineering

Transportation & Traffic Engineering Transportation & Traffic Engineering 1) Project Description This report presents a summary of findings for a Traffic Impact Analysis (TIA) performed by A+ Engineering, Inc. for the Hill Country Family

More information

Speed Evaluation Saw Mill Drive

Speed Evaluation Saw Mill Drive Speed Evaluation Saw Mill Drive Prepared for: Mount Laurel Township Burlington County, New Jersey Prepared by: Dana Litwornia Litwornia & Associates, Inc. Transportation, Traffic & Environmental Engineering

More information

Public Meeting. SD Highway 28 From US81 W 11 miles through Lake Norden Hamlin County PH 0028(37)329 PCN 04JY

Public Meeting. SD Highway 28 From US81 W 11 miles through Lake Norden Hamlin County PH 0028(37)329 PCN 04JY Public Meeting SD Highway 28 From US81 W 11 miles through Lake Norden Hamlin County PH 0028(37)329 PCN 04JY Neil Schochenmaier, PE Road Design Engineering Supervisor March 16, 2017 Purpose of the Meeting

More information

MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER

MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER To provide and maintain a reliable real-time traffic operations system, in coordination with county stakeholders, that enables a safe, efficient,

More information

Child Protection and Permanency. Monthly Screening and Investigation Report September 2015

Child Protection and Permanency. Monthly Screening and Investigation Report September 2015 Child Protection and Permanency Monthly Screening and Investigation Report tember Allison Blake, Ph.D., L.S.W. Commissioner October 16, Data in this report is preliminary and may differ from any final

More information

P3 PROJECT PIPELINE: STATUS - AUGUST 2016

P3 PROJECT PIPELINE: STATUS - AUGUST 2016 FLAGSTAFF FACILITY Swap of current ADOT facilities in Flagstaff for new space in a repurposed Harkins theatre. Construction work on new ADOT facility will begin in fall. Expected move-in date for ADOT

More information

Wentzville Parkway South Phase 2 & 2A

Wentzville Parkway South Phase 2 & 2A Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total

More information

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study Florida Department of Transportation District Six Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study What

More information

Economic and Commodity Market Outlook

Economic and Commodity Market Outlook Economic and Commodity Market Outlook August 12, 2016 By Robert Coats, Ph.D. Professor Economics Department of Agricultural Economics and Agribusiness Division of Agriculture University of Arkansas System

More information

Southern Windsor County 2016 Traffic Count Program Summary April 2017

Southern Windsor County 2016 Traffic Count Program Summary April 2017 Southern Windsor County 2016 Traffic Count Program Summary April 2017 The Southern Windsor County Regional Planning Commission (the RPC ) has been monitoring traffic at 19 locations throughout the southern

More information

New Jersey Turnpike Authority Interchange 6 to 9 Widening Program

New Jersey Turnpike Authority Interchange 6 to 9 Widening Program New Jersey Turnpike Authority Interchange 6 to 9 Widening Program Tuesday, September 18, 2007 Public Hearings: Time: 5:00 PM - 8:00 PM Wednesday, September 19, 2007 Senior Center 3 Municipal Drive Bordentown,

More information

Edmonton Region Commodity Flow Study

Edmonton Region Commodity Flow Study A Joint Alberta Transportation, City of Edmonton and Economic Development Edmonton Venture Supported by: Alberta Motor Transport Association (AMTA) Alberta Capital Region Alliance (ACRA) Page 1 27,748

More information

MAP OR PHOTO. Public Meeting & Open House July 23, Project Roadway Limits From: FM 1957 To: FM 471. Counties Bexar & Medina

MAP OR PHOTO. Public Meeting & Open House July 23, Project Roadway Limits From: FM 1957 To: FM 471. Counties Bexar & Medina Public Meeting & Open House July 23, 2013 Project Roadway Limits From: FM 1957 To: FM 471 MAP OR PHOTO Counties Bexar & Medina 1 I. Project History II. III. IV. Project Overview Project Alternatives Response

More information

Speed Limit Study: Traffic Engineering Report

Speed Limit Study: Traffic Engineering Report Speed Limit Study: Traffic Engineering Report This report documents the engineering and traffic investigation required by Vermont Statutes Annotated Title 23, Chapter 13 1007 for a municipal legislative

More information

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario April 18 th, 2017 Mr. Kevin Yemm Vice President, Land Development Richraft Group of Companies 2280 St. Laurent Boulevard, Suite 201 Ottawa, Ontario (Tel: 613.739.7111 / e-mail: keviny@richcraft.com) Re:

More information

City of Grand Forks Staff Report

City of Grand Forks Staff Report City of Grand Forks Staff Report Committee of the Whole December 1, 016 City Council December 19, 016 Agenda Item: Bids for City Project No. 7551 Lift Station No. 17 & 17A Rehabilitation Submitted by:

More information

Marion County Board of County Commissioners

Marion County Board of County Commissioners Marion County Board of County Commissioners Office of the County Engineer 412 SE 25th Ave. Ocala, FL 34471 Phone: 352-671-8686 Fax: 352-671-8687 DEVELOPMENT REVIEW COMMITTEE WAIVER REQUEST FORM Date: 08/04/2016

More information

ITEM 13 - NOTICE May 20, 2009

ITEM 13 - NOTICE May 20, 2009 ITEM 13 - NOTICE May 20, 2009 Notice of Proposed Amendment to the 2009 CLRP and FY 2010-2015 TIP to include the Closure of the I-395 Southbound Exit Ramp to 3rd Street NW, the Reconfiguration of the Southbound

More information

August 2, 2010 Public Meeting

August 2, 2010 Public Meeting Public Meeting LYMMO Expansion Alternatives Analysis Study Purpose of study is to provide a fresh look at potential LYMMO expansion, following Federal Transit Administration (FTA) Alternatives Analysis

More information

Puerto Rico Observational Survey of Seat Belt Use, 2017

Puerto Rico Observational Survey of Seat Belt Use, 2017 Puerto Rico Observational Survey of Seat Belt Use, 2017 Final Report Submitted to: Traffic Safety Commission of Puerto Rico September 29, 2017 TABLE OF CONTENT Introduction... 3 Methodology... 3 FINDINGS...

More information

Beneficial Use Designations for Stream Reaches: Minnesota River - Mankato Watershed ( )

Beneficial Use Designations for Stream Reaches: Minnesota River - Mankato Watershed ( ) Beneficial Use Designations for Stream Reaches: Minnesota River - Mankato Watershed (07020007) Beneficial Use Legend 1A Domestic Consumption (does not require treatment) 1B Domestic Consumption (requires

More information

UPPER GREEN RIVER OZONE INVESTIGATION (O3i) LUMAN AND PARADISE ROAD TRAFFIC COUNT STUDY 03/05/2009 AND 06/09/2009. Study Summary.

UPPER GREEN RIVER OZONE INVESTIGATION (O3i) LUMAN AND PARADISE ROAD TRAFFIC COUNT STUDY 03/05/2009 AND 06/09/2009. Study Summary. UPPER GREEN RIVER OZONE INVESTIGATION (O3i) LUMAN AND PARADISE ROAD TRAFFIC COUNT STUDY 03/05/2009 AND 06/09/2009 Study Summary Prepared for WYOMING DEPARTMENT OF ENVIRONMENTAL QUALITY 122 West 25 th Street

More information

HIGHWAY 28 FUNCTIONAL DESIGN

HIGHWAY 28 FUNCTIONAL DESIGN HIGHWAY 28 FUNCTIONAL DESIGN PUBLIC OPEN HOUSE #1 WEDNESDAY, MARCH 12, 2014 Stantec Presenters: Brad Vander Heyden, Project Engineer Neal Cormack, Project Manager Dave Parker, Project Engineer Beth Thola,

More information

Crane Inspection Log. Mailing Address: P.O. Box Tulsa, OK Phone: (918) Fax: (918)

Crane Inspection Log. Mailing Address: P.O. Box Tulsa, OK Phone: (918) Fax: (918) 999978000 Crane Inspection Log Mailing Address: P.O. Box 581510 Tulsa, OK 74158-1510 Physical Address: 4707 North Mingo Road Tulsa, OK 74117-5904 Phone: (918) 836-0463 Fax: (918) 834-5979 www.autocrane.com

More information

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS... Crosshaven Drive Corridor Study City of Vestavia Hills, Alabama Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA... 3 Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

More information

PUBLIC INFRASTRUCTURE PROJECTS

PUBLIC INFRASTRUCTURE PROJECTS PUBLIC INFRASTRUCTURE PROJECTS FM 664 / OVILLA ROAD WIDENING & IMPROVEMENTS FM 664 / OVILLA ROAD CONNECTS US 287 WITH I-45 (SOURCE: TEXAS DEPARTMENT OF TRANSPORTATION. 2016 FM 664 / OVILLA ROAD WIDENING

More information

LOCAL CLIMATOLOGICAL DATA

LOCAL CLIMATOLOGICAL DATA ILLINOIS STATE WATER SURVEY DIVISION URBANA, ILLINOIS ISWS MP-21 Archive SWS0964 Illinois State Water Survey LOCAL CLIMATOLOGICAL DATA FDR HILLSBORO, IL. 1901-1962 LOCAL CLIMATOLOGICAL DATA 1901-1962 HILLSBORO

More information

W&OD TRAIL BRIDGE OVER LEE HIGHWAY I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237)

W&OD TRAIL BRIDGE OVER LEE HIGHWAY I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237) W&OD TRAIL BRIDGE OVER LEE HIGHWAY A COMPONENT OF THE I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237) October 11, 2018 Bill Cuttler, PE

More information

VIRGINIA RAILWAY EXPRESS MANASSAS PARK STATION PARKING EXPANSION. Public Meeting June 20, 2017

VIRGINIA RAILWAY EXPRESS MANASSAS PARK STATION PARKING EXPANSION. Public Meeting June 20, 2017 MANASSAS PARK STATION PARKING EXPANSION Public Meeting June 20, 2017 1 AGENDA Project Status Schematic Design Circulation Traffic Analysis Proposed Garage Location Next Steps Cost Estimate 2 PROJECT PHASES

More information

LAX Specific Plan Amendment Study. CONCEPT DEVELOPMENT Public Meeting Series #5 August 23 & 26, 2006

LAX Specific Plan Amendment Study. CONCEPT DEVELOPMENT Public Meeting Series #5 August 23 & 26, 2006 LAX Specific Plan Amendment Study CONCEPT DEVELOPMENT Public Meeting Series #5 August 23 & 26, 2006 Agenda Background on public planning process Regional planning update LAWA progress on settlement commitments

More information

MONTHLY CLIMATOLOGICAL SUMMARY for JAN NAME: WMREC CITY: STATE: ELEV: 600 ft LAT: 39 38' 31" N LONG: 77 44' 00" W

MONTHLY CLIMATOLOGICAL SUMMARY for JAN NAME: WMREC CITY: STATE: ELEV: 600 ft LAT: 39 38' 31 N LONG: 77 44' 00 W MONTHLY CLIMATOLOGICAL SUMMARY for JAN. 2015 1 34.8 45.2 3:30p 22.1 5:30a 30.2 0.0 0.00 4.8 24.0 4:00p WSW 2 34.9 44.3 3:00p 24.0 12:00m 30.1 0.0 0.00 2.4 17.0 10:30a W 3 33.0 37.8 12:00m 23.3 1:00a 32.0

More information

US 81 Bypass of Chickasha Environmental Assessment Public Meeting

US 81 Bypass of Chickasha Environmental Assessment Public Meeting US 81 Bypass of Chickasha Environmental Assessment Public Meeting March 14, 2013 Introductions ODOT FHWA SAIC Meeting Purpose Present need for bypass Provide responses to 10/04/11 public meeting comments

More information

INVESTIGATION OF THE MOTORCYCLIST/Car Driver COLLISION. RECONSTRUCTION REPORT July 31, 2010

INVESTIGATION OF THE MOTORCYCLIST/Car Driver COLLISION. RECONSTRUCTION REPORT July 31, 2010 INVESTIGATION OF THE MOTORCYCLIST/Car Driver COLLISION RECONSTRUCTION REPORT July 31, 2010 1. Introduction This two-vehicle collision occurred May 22, 2007, at about 4:30 p.m., on Prospect Street, in Ewing,

More information

North Dakota Oil and Gas Update. North Dakota Petroleum Council October 2014

North Dakota Oil and Gas Update. North Dakota Petroleum Council October 2014 North Dakota Oil and Gas Update North Dakota Petroleum Council October 2014 ND Crude Transportation March 2014 October 2014 FLARING Gas Flaring situation REGULATORY ACTIVITIES CRUDE BY RAIL Project

More information

Purpose and Need Report

Purpose and Need Report Purpose and Need Report State Highway (SH) 29 From Southwestern Boulevard to SH 95 Williamson County, Texas (CSJ: 0337-02-045) Prepared by Blanton & Associates, Inc. Date: November, 2015 The environmental

More information

ARIZONA ALTERNATIVE FUEL CORRIDOR NOMINATION FAST ACT 1423

ARIZONA ALTERNATIVE FUEL CORRIDOR NOMINATION FAST ACT 1423 ARIZONA ALTERNATIVE FUEL CORRIDOR NOMINATION FAST ACT 1423 This proposal represents recommended highway segments for alternative fuel corridors for the State of Arizona. Included in this document are the

More information

APPENDIX 6A. Air Quality Monitoring Results

APPENDIX 6A. Air Quality Monitoring Results APPENDIX 6A Air Quality Results Introduction summarises the monitoring data that was used to determine the air quality baseline conditions for the SD2 Project. Air quality monitoring has been carried

More information

* Numbers are only as accurate as the reporting agency has provided National School Bus Loading & Unloading Survey

* Numbers are only as accurate as the reporting agency has provided National School Bus Loading & Unloading Survey The National School Bus Loading and Unloading Survey is a collection of fatality accident records provided by the state agencies responsible for school transportation safety and/ or accident records*.

More information

Community Meeting Station Elements

Community Meeting Station Elements Community Meeting Station Elements North Metro Rail Line September 25, 2014 1 RRP Shawn Plichta Design Build Coordination Manager 2 RTD Jane Donovan Deputy Project Manager 3 The RTD FasTracks Plan 122

More information