W&OD TRAIL BRIDGE OVER LEE HIGHWAY I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237)
|
|
- Bethany Lamb
- 5 years ago
- Views:
Transcription
1
2 W&OD TRAIL BRIDGE OVER LEE HIGHWAY A COMPONENT OF THE I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237) October 11, 2018 Bill Cuttler, PE (VDOT District Construction Engineer, Northern Virginia District) Mark Gibney, PE, PMP (VDOT Design-Build Project Manager) Erin Foley, PE (HDR Inc. W&OD Trail Bridge Designer) Durant Walters, PE, DBIA (The Lane Construction Company Design-Build Project Manager)
3 Tonight s Meeting Project Team Introductions Background Preliminary Bridge Design Final Bridge Design Project Schedule / Next Steps Construction Impacts to Drivers, Trail Users, and Neighbors Overall Project Update Questions and Answers Virginia Department of Transportation 3
4 Project Team Project Owner / Contract Administrator Design-Build Team Federal Oversight Partners/Stakeholders Virginia Department of Transportation 4
5 Project Overview I-66 Eastbound Widening: Dulles Connector Road (Route 267) to Fairfax Drive (Route 237) W&OD Trail Bridge over Lee Highway (U.S. Route 29) Elements Being Presented Today I-66 Eastbound Direct Access to Metro (West Falls Church Station) I-66/Route 7 Interchange Improvements Virginia Department of Transportation 5
6 Project Location New W&OD Trail Bridge Virginia Department of Transportation 6
7 Design Public Hearings Held on December 5 & 8, 2016 Previous Conceptual Rendering Virginia Department of Transportation 7
8 Stakeholder Outreach and Input Arlington County City of Falls Church NOVA Parks Direct-Impact Communities Bicycle and Pedestrian Stakeholder Groups Public Workshops / Open Houses April 5, 2017 May 2, 2017 June 13, 2017 Virginia Department of Transportation 8
9 Public Workshops Design Elements Considered on April 5, May 2, and June 13, 2017 Abutment aesthetics Pier shape and aesthetics Bridge color Fence/railing Lighting Virginia Department of Transportation 9
10 Preliminary Design: W&OD Trail Bridge over Lee Hwy Previously Presented at June 13, 2017 Open House Previous Conceptual Renderings Bridge Deck at Night Virginia Department of Transportation 10
11 Preliminary Design: W&OD Trail Bridge over Lee Hwy Previously Presented at June 13, 2017 Open House Looking South along U.S. Route 29 Looking West from Fairfax Dr Ramp Over I-66 Previous Conceptual Renderings Virginia Department of Transportation 11
12 Final Design: W&OD Trail Bridge over Lee Hwy Updates: V Piers to be Open (per Community Input) Except for two piers furthest from Lee Highway due to size, which will receive recessed board form architectural treatment Coal Trestle Interpretive Area/Sign Relocated (per NOVA Parks Request) All other elements remain as previously presented at June 13, 2017 Open House for W&OD Trail Bridge Virginia Department of Transportation 12
13 Final Design: W&OD Trail Bridge over Lee Hwy Key Requirements: VDOT 17 ft (min) vertical clearance over Lee Highway (Route 29) NOVA Parks Minimum 20 ft wide bridge deck, clear of obstructions Minimum 12 ft vertical clearance above bridge deck for service equipment Arlington County Minimum 20 ft wide horizontal clearance from edge of curb on Fairfax Drive (Fire Lane) for emergency access to adjacent building Maintain future trail connectivity to WMATA s East Falls Church Metro Station Dominion Energy Virginia Minimum 25.5 ft vertical clearance from bridge deck Minimum 20 ft vertical clearance from fence/railing Virginia Department of Transportation 13
14 Final Design: W&OD Trail Bridge over Lee Hwy Street Views (Renderings) of Final Bridge Design Looking South along Lee Hwy & Open V Pier Design Looking West from Fairfax Dr Ramp Over I-66 & Open V Pier Design Renderings Only Virginia Department of Transportation 14
15 Final Design: W&OD Trail Bridge over Lee Hwy Various Views (Renderings) of Final Design Elements View from Fairfax Drive (Fire Lane) & Open V Pier Design Bridge Deck at Dusk Renderings Only Virginia Department of Transportation 15
16 Final Design: W&OD Trail Bridge over Lee Hwy Landscaping Plan Renderings Only Virginia Department of Transportation 16
17 Overall Project Schedule (I-66 Eastbound Widening) Anticipated Schedule Contract Award/NTP January 8, 2018 Begin Construction June 2018 Begin Right of Way Acquisition August 2018 Construction Completed (except Landscaping and Signal Work on Lee Highway) November 2020 Landscaping and Signal Work Completed October 2021 Virginia Department of Transportation 17
18 W&OD Trail Bridge Construction Schedule Anticipated Schedule Begin Bridge Construction Early 2019 End Bridge Construction Summer 2020 End Improvements Below Bridge (Adjacent Ground Surface Trail) Fall/Winter 2020 Adjacent Landscaping Fall 2021 Virginia Department of Transportation 18
19 Traffic Impacts What Drivers Can Expect Lee Hwy & Fairfax Drive (Fire Lane) Early 2019 Summer 2020 Fairfax Drive (Fire Lane) closed to thru traffic for duration of bridge construction Emergency access maintained via easily moved elements (or drive over/through) Lee Highway short-term closures/traffic stoppage (20 minutes max) when bridge girders/beams are erected Some operations such as bridge construction, paving, and pavement markings may require lane closures on side streets Public notification via distribution and/or project website (prior to shifting traffic) Virginia Department of Transportation 19
20 Nighttime Work What Neighbors Can Expect Vicinity of Lee Hwy / Fairfax Drive (Fire Lane) / W&OD Trail Noisy activities such as pile driving will be avoided at night when possible Noise to expect at night includes back-up alarms on equipment and trucks (necessary to protect worker safety, especially in tight work zones) Lighting of the construction work area will be directed to minimize light pollution for nearby residents Public notifications via and/or project website prior to major traffic switches or nighttime work Virginia Department of Transportation 20
21 Pedestrian/Bicyclist Impacts What Trail Users Can Expect W&OD Trail Early 2019 Fall 2020 Temporary Trail Re-Alignment (within NOVA Parks property) to permit bridge construction Temporary detour (with directional signage) during girder/overhead activity W&OD short-term closures/traffic stoppage (20 minutes max) during nighttime when bridge beams are erected over Lee Hwy Public notification via distribution and/or project website (prior to shifting traffic) Virginia Department of Transportation 21
22 Pedestrian/Bicyclist Impacts Detour for Trail Users Virginia Department of Transportation 22
23 Pedestrian/Bicyclist Impacts Detour for Trail Users Virginia Department of Transportation 23
24 Project Update Eastbound Widening construction status Final noise study: anticipated completion late 2018 Noise barrier construction: anticipated Summer 2019 Summer 2020 Phase 1A (Temporary Shoulder Work) Completed September 2018 I-66 Eastbound Direct Access to Metro: anticipated construction Summer 2019 Summer 2020 Phase 1B (Inside Widening) Construction through Summer 2019 Virginia Department of Transportation 24
25 Project Updates and Information Find project information and sign up for updates and lane closure alerts Contact Information Phone (toll-free): Virginia Department of Transportation 25
26 Virginia Department of Transportation 26
Janice Fortunato Senior Director Business Partnerships
Janice Fortunato Senior Director Business Partnerships What are Megaprojects? They are large-scale projects distinguished by cost, complexity and the potential impact on the community. Collectively, these
More informationI-405 Sepulveda Pass Improvements Project
I-405 Sepulveda Pass Improvements Project Community Meeting November 15, 2012 1 Wilshire Segment Overview of Wilshire Segment There are a total of 23 bridges being constructed on this project; almost half
More informationRolling Road (Route 638) Widening Project
Rolling Road (Route 638) Widening Project From: 0.369 Mile North of Fairfax County Parkway (Route 286) To: Old Keene Mill Road (Route 644) State Project No. 0638-029-156, P104, R204, C504; UPC 5559 Public
More informationSOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015
SOUTHERN GATEWAY Transportation and Trinity River Project Committee 11 May 2015 Southern Gateway Project History Began in 2001 as a Major Investment Study [ MIS ], Schematic, and Environmental Assessment
More informationFREQUENTLY ASKED QUESTIONS
THE PROJECT Last updated on 9/8/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on
More informationPurple Line Extension, Section 2 Southern California Edison, Phase I
Purple Line Extension, Section 2 Southern California Edison, Phase I 1 Agenda Advance Utility Relocation (AUR) Schedule Southern California Edison (SCE) overview Street Impacts Sunday work: 10am-6pm Left
More informationPurple Line Extension, Section 2 Southern California Edison, Phase I June 7, 2017
Purple Line Extension, Section 2 Southern California Edison, Phase I June 7, 2017 Agenda Advance Utility Relocation (AUR) Schedule Southern California Edison (SCE) overview Street Impacts Sunday work:
More informationUpdate on Transportation Activities in Fairfax County
Update on Transportation Activities in Fairfax County Transportation Roundtable Dulles Area Transportation Association June 13, 2018 Tom Biesiadny, Director Fairfax County Continuing Project Implementation
More informationFREQUENTLY ASKED QUESTIONS
THE PROJECT Last updated on 2/19/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on
More informationExpo Light Rail Line Project Status Update Meeting Holman United Methodist Church January 27, 2011
Project Status Update Meeting Project Status Update Meeting Holman United Methodist Church January 27, 2011 Phase 1 Project Description Phase 1 from Downtown Los Angeles to Culver City: 8.6 mile corridor
More information2014 Fall Asphalt Conference October 7, 2014 Richmond, VA Review of Virginia s 2013 Work Zone Crash Statistics
2014 Fall Asphalt Conference October 7, 2014 Richmond, VA Review of Virginia s 2013 Work Zone Crash Statistics David Rush WZ Safety Program Manager Traffic Engineering Division Review of Virginia s 2013
More information30-Day Look Ahead Summary August 2011
Wilshire Segment 30-Day Look Ahead Summary August 2011 DWP and SCE Utility Relocation Sepulveda reduced to one lane in each direction, Constitution to Ohio, 9pm to 6am Westbound Wilshire reduced to one
More informationBasic Project Information
FY 2015-16 PROJECT DESCRIPTION FORM (7B) Submitting Agency: Fairfax County Basic Project Information Project Title: South Van Dorn Street and Franconia Road Interchange 7B Project Type (check one): Roadway
More informationCONFEDERATION LINE EAST SEGMENT
The O-Train Confederation Line project is the first stage in Ottawa s future light rail network. The 12.5 kilometre electric rail system will replace existing diesel powered buses, providing rapid transit
More informationNORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP): SEGMENT 3. April 19, 2018 NHHIP April 19, 2018
NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP): SEGMENT 3 April 19, 2018 NHHIP OVERVIEW NHHIP divided into 3 Segments: Segment 1: I-45: Beltway 8 to I-610 (9 mi) 45 Segment 2: I-45: I-610 to I-10 (3
More informationWentzville Parkway South Phase 2 & 2A
Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total
More informationPublic Information Workshop
Public Information Workshop Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 29, 2018 Welcome to the Public Information Workshop for Harborview Road Project Development and Environment (PD&E)
More informationI-4 Beyond the Ultimate. Florida Transportation Builders Association January 18, 2019
I-4 Beyond the Ultimate Florida Transportation Builders Association January 18, 2019 FDOT District 5 Improving Mobility & Safety in Central Florida FDOT District 5 is: Designing and building a better Interstate
More informationMobility Corridor Updates. Transit & Active Transportation Projects
Mobility Corridor Updates Transit & Active Transportation Projects Laura Cornejo, DEO Regional Planner Regional Operator Metro is LA County s Regional Builder/Funder Rail Bus Service (Metro/Muni/Local)
More informationExposition Light Rail Transit Project
Exposition Light Rail Transit Project Project Status Update Meeting West End Corridor Segment C Culver City Senior Center May 27, 2010 Phase 1 Project Description 8.6 mile corridor from Downtown Los Angeles
More informationODOT District Two Monthly Construction Update
Ohio Department of Transportation Construction Update DISTRICT 2 KIRK SLUSHER, P.E., ACTING DEPUTY DIRECTOR 317 East Poe Rd. Bowling Green, Ohio 43402-1330 www.transportation.ohio.gov/dist2 ODOT District
More informationSH 249 IN GRIMES COUNTY. Open House April 3, 2014
SH 249 IN GRIMES COUNTY Open House April 3, 2014 Meeting Agenda Purpose of Meeting Today: Review the purpose and need for the SH 249 Grimes County project Review the proposed project and alternatives Discuss
More informationWOODVILLE HIGHWAY (SR 363) PD&E STUDY From Capital Circle Southeast To Paul Russell Road FPID NUMBER: Public Hearing
WOODVILLE HIGHWAY (SR 363) PD&E STUDY From Capital Circle Southeast To Paul Russell Road FPID NUMBER: 424009-3 Public Hearing May 9, 2013 This Public Hearing is being held in accordance with the Federal-aid
More informationConstruction Noise Memorandum
Construction Noise Memorandum To: Ms. Paula Daneluk Date: June 13, 2013 Development Impact 9370 Studio Court, Suite 160 Elk Grove, CA 95758 From: Paul Bollard Bollard Acoustical Consultants, Inc. 3551
More informationPurple Line Extension Section 1 Construction Community Meeting April 19, 2018
Purple Line Extension Section 1 Construction Community Meeting April 19, 2018 1 Agenda Section 1 MOW 64 Facility Project Construction Updates: Wilshire/Western Wilshire/La Brea Wilshire/Fairfax Wilshire/La
More informationARLINGTON COUNTY, VIRGINIA
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of April 24, 2004 DATE: April 14, 2004 SUBJECT: Arlington Boulevard (U.S. 50) Bridge Deck Replacement at Washington Boulevard - Overhead Utility
More informationDoran Street and Broadway/Brazil Grade Separation Project
Doran Street and Broadway/Brazil Grade Separation Project Public Outreach Meeting October 4, 2017 Agenda Introductions Project Overview Grade Separation Alternative Traffic Report Update Interim Condition
More informationMobility Corridor Updates. Transit & Active Transportation Projects
Mobility Corridor Updates Transit & Active Transportation Projects Manjeet Ranu, SEO East San Fernando Valley Transit Corridor Metro Board LPA selection: June 2018 Recently awarded $200 million in Senate
More informationI-405 Sepulveda Pass Improvements Project
I-405 Sepulveda Pass Improvements Project 26, 2012 Click to edit Master title January style Community Advisory Committee 1 Community Meeting Schedule for 2012 26-Jan CAC, Final Meeting Feb 22-Mar Community
More informationClick to edit Master text styles
I-405 Sepulveda Pass Improvements Project Quarterly Community Meeting November 17, 2011 1 Wilshire Segment 2 Quarterly Community Meetings 2012 Month Meeting(s) February 16 May 17 Quarterly Quarterly August
More informationALTERNATIVE PROJECT DELIVERY
ALTERNATIVE PROJECT DELIVERY Varuna Singh SH 288 IN HARRIS COUNTY SH 288 in Harris County SEGMENT 1: 8 New Tolled Direct Connectors at SH 288 and Beltway 8 Existing traffic uses frontage roads today to
More informationClearlake Road (State Road 501) Project Development & Environment (PD&E) Study
Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study FROM MICHIGAN AVENUE TO INDUSTRY ROAD BREVARD COUNTY, FLORIDA Financial Project ID No: 433605-1-22-01 Federal Aid Project
More informationKendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study
Florida Department of Transportation District Six Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study What
More informationSouth Gloucestershire Challenge Fund and Cycle Ambition Fund
South Gloucestershire Challenge Fund and Cycle Ambition Fund The Challenge Fund A4174 scheme is coordinated and delivered by South Gloucestershire Council who were awarded 14 million pounds from the Department
More informationCorridor Management Committee. March 7, 2012
Corridor Management Committee March 7, 2012 2 Today s Topics SWLRT Project Office Update Engineering Services Procurement Update Legislative Leadership Tour Annual New Starts Report Update on Proposed
More informationI-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange
I-820 (East) Project Description Fort Worth District Reconstruct Southern I-820/SH 121 Interchange I-820 from approximately 2,000 feet north of Pipeline Road/Glenview Drive to approximately 3,200 feet
More informationS.M. Wright Project (I-45, US 175, SH 310) and Road to Work Opportunity Program. Transportation and Trinity River Project Committee May 23, 2016
635 S.M. Wright Project (I-45, US 175, SH 310) and Road to Work Opportunity Program Transportation and Trinity River Project Committee May 23, 2016 Project Scope Increase safety by removing the existing
More informationSOUTH ACCESS TO THE GOLDEN GATE BRIDGE DOYLE DRIVE DOYLE DRIVE. Doyle Drive Presentation Golden Gate Bridge Board Meeting July 24, 2009
DOYLE DRIVE Doyle Drive Presentation Golden Gate Bridge Board Meeting July 24, 2009 Presentation Overview Introduction Project Acceleration Construction Contracts Construction Activities Lane and Road
More informationODOT District Two Monthly Construction Update
Ohio Department of Transportation Construction Update DISTRICT 2 KIRK SLUSHER, P.E., ACTING DEPUTY DIRECTOR 317 East Poe Rd. Bowling Green, Ohio 43402-1330 www.transportation.ohio.gov/dist2 ODOT District
More informationI-405 Sepulveda Pass Improvements Project Wilshire Ramps Reconstruction
metro.net/works I-405 Sepulveda Pass Improvements Project Wilshire Ramps Reconstruction We re working to create safer, smoother interchanges. Project Overview The primary goal of the I-405 Sepulveda Pass
More informationHowever, due to the location, all garage parkers will need to continue to use the South end garage for entrance and exit.
We apologize for any inconvenience that this construction may cause and appreciate your patience while we work hard to improve The Crescent for our customers. Effective Tuesday, July 28 Shoring for the
More informationUS 67 WIDENING PROJECT
US 67 WIDENING PROJECT From Belt Line Rd. to I-20 History & Background The US 67 improvements from Belt Line Rd to I-20 were originally part of TxDOT s Southern Gateway project, studied as part of the
More informationPomona Rotary December 19, 2017
Pomona Rotary December 19, 2017 Los Angeles County s population will grow by 5.9% to 10.7 million by 2024 During that same period, the San Gabriel Valley will grow by 7.6% to more than 1.5 million; taking
More informationI-405 Sepulveda Pass Improvements Project. Community Advisory Committee July 28, 2011
I-405 Sepulveda Pass Improvements Project Community Advisory Committee July 28, 2011 1 Wilshire Segment 2 Wilshire Segment (National to Waterford) Ramp and Wall Construction at Sepulveda/Wilshire Intersection
More informationProject Status Update January 2017
Project Status Update January 2017 1 What is the Purple Line? A new 16 mile east-west light rail line Operates mostly on the surface with 21 stations Connects New Carrollton in Prince George s County and
More informationBackground Information about the Metrobus 29 Lines Study
Background Information about the Metrobus 29 Lines Study Questions Overview of Existing Service Q. Why is the study being conducted? A. The 29 Lines provide an important connection between Annandale and
More informationEast Link Extension. September 16, Bel-Red Conclusion to Final Design Open House Public Involvement Summary
East Link Extension September 16, 2014 Bel-Red Conclusion to Final Design Open House Public Involvement Summary Table of contents 1 Background 2 Overview 2 Notification 3 Open House Overview 4 Comment
More informationBART Silicon Valley. Berryessa Extension Project Community Update. October 27, 2010
BART Silicon Valley Berryessa Extension Project Community Update October 27, 2010 1 Agenda Welcome and Introductions Program and Project Background Project Status Project and Station Details Current and
More informationWillamette River Transit Bridge. Portland - Milwaukie Light Rail Willamette River Bridge Willamette River Bridge Advisory Committee
Portland - Milwaukie Light Rail Willamette River Bridge Willamette River Bridge Advisory Committee 05.28.09 09 Bridge Type - Cost Vertical Clearance Bicycle Pedestrian Path Width Bridge Type - Cost WRBAC
More informationLos Angeles World Airports. LAX Landside Transportation Program
Los Angeles World Airports LAX Landside Transportation Program 1 Existing Conditions Not Enough Curb Space Mode Conflicts Limited Roadways 2 3 Problem Today All airport users must rely on an inefficient
More informationEXCEPTION TO STANDARDS REPORT
EXCEPTION TO STANDARDS REPORT PROJECT DESCRIPTION AND NEED The project is located in Section 6, Township 23 North, Range 9 East and Section 31 Township 24 North, Range 9 East, in the Town of Stockton,
More informationNeighbourdhood Committee NDG / Westmount / Montréal-Ouest. March 28, 2018
Neighbourdhood Committee NDG / Westmount / Montréal-Ouest March 28, 2018 2 Presentation Outline Feedback on questions Green Strip development - consultation Noise surveys Montréal-Ouest Updates work and
More informationSH 249 PUBLIC MEETING DESIGN CHANGES FROM FM 2920 TO HARDIN STORE ROAD
SH 249 PUBLIC MEETING DESIGN CHANGES FROM FM 2920 TO HARDIN STORE ROAD Lone Star College, Tomball Campus December 8, 2015 Open House 5:30-7:30 pm National Environmental Policy Act The environmental review,
More informationTransportation Improvement Program (TIP) Candidate Project List for Public Review
2011-2014 Transportation Improvement Program (TIP) Candidate List for Public Review Table 1 Annual Listing Of Federal Aid Obligation For Federal Fiscal Year 2010 North Dakota s Number Transit 410083 Transit
More informationRichmond Area MPO Regional Priority Transportation Projects
Regional Priority Transportation Projects September 27, 2007 HANOVER GOOCHLAND ASHLAND POWHATAN RICHMOND HENRICO NEW KENT CHESTERFIELD CHARLES CITY 9211 Forest Hill Avenue, Suite 200 Richmond, Virginia
More informationOttawa LRT Stage 2. McKellar Park Information Session
Ottawa LRT Stage 2 McKellar Park Information Session Stage 2 Background Approved unanimously by Ottawa City Council in July 2015 East to Place d Orléans, west to Bayshore and Baseline, and south to Bowesville
More informationExhibit A Sound Transit Board Resolution R Selecting the bicycle, pedestrian, and parking access improvements to be built for the Puyallup
Exhibit A Sound Transit Board Resolution R2016-07 Selecting the bicycle, pedestrian, and parking access improvements to be built for the Puyallup Access Improvement Project. RESOLUTION NO. R2016-07 Selecting
More informationI-90 ALLSTON INTERCHANGE A MULTIMODAL TRANSPORTATION PROJECT PUBLIC INFORMATION MEETING
I-90 ALLSTON INTERCHANGE A MULTIMODAL TRANSPORTATION PROJECT PUBLIC INFORMATION MEETING DECEMBER 8, 2015 JACKSON MANN COMMUNITY CENTER Meeting Agenda Welcome & Introductions Introduce Concept 3K West Station
More informationMichigan Division Federal Highway Administration Update
Federal Highway Administration Update Ted Burch, P.E. Assistant Division Administrator FHWA Michigan Division 2010 Michigan Bridge Conference Topics ARRA Update Scour Evaluation & POAs Load Rating & Posting
More informationPurple Line Extension. Rodeo Station AUR MOA October 24, 2017
Purple Line Extension Rodeo Station AUR MOA October 24, 2017 1 Agenda Project Overview Section 2 Pre-Construction Updates Rodeo Drive Station Advance Utility Relocation (AUR) SCE Phase I, underway SCE
More informationPurple Line Extension Updates on La Cienega and Rodeo Stations December 13, 2017
Purple Line Extension Updates on La Cienega and Rodeo Stations December 13, 2017 1 Agenda Project Overview Section 1 Construction Updates Wilshire/La Cienega Station La Cienega Decking Decking Overview
More informationQuarterly Update Meeting
Quarterly Update Meeting December 6, 2011 www.dcstreetcar.com / hotline: (855)413-2954 Agenda I. Welcome II. System Overview III. Project Update IV. Upcoming Meetings V. Stay Connected Provided by DC Streetcar
More informationSummary of the Alcoa Highway Redevelopment Project
Appendix B Summary of the Alcoa Highway Redevelopment Project By Marcia Finfer, October 2009 The Timberlake community, along with numerous other concerned citizen groups (including the Lakemoor Hills community)
More informationI-225 Rail Line Iliff and Florida Stations Information Meeting
I-225 Rail Line Iliff and Florida Stations Information Meeting May 15, 2013 FasTracks and I-225 Rail Line Update Chuck Culig I-225 Rail Line Project Manager Chris Hinton I-225 Rail Line Deputy Project
More informationUS 50/SOUTH SHORE COMMUNITY REVITALIZATION PROJECT
US 50/SOUTH SHORE COMMUNITY REVITALIZATION PROJECT April 25, 2012 Tahoe Transportation District (TTD) Tahoe Transportation District (TTD) established 1980 as Bi-State Agency TTD Goals Implement Transportation
More informationCity of Grand Forks Staff Report
City of Grand Forks Staff Report Service/Safety Committee December 15, 2015 City Council December 21, 2015 Agenda Item: Amendment No. 1 to Engineering Services Agreement with CPS for City Project No. 7143,
More informationCITY OF BEVERLY HILLS STAFF REPORT
Meeting Date: July 7, 2011 To: From: Subject: CITY OF BEVERLY HILLS STAFF REPORT Honorable Mayor & City Council Pamela Mottice Muller, Director of Emergency Management 405 Closure Attachments: 1. 1-405
More informationNovember 6, Agenda
Ohio Canal Interceptor Tunnel OCIT-2 Site OCITConstruction Update Public Meeting November 6, 2014 2:00 pm November 6, 2014 Agenda OCIT Project Overview Purpose Noise Basics Noise Mitigation Measures Vibration
More informationRevised Strategy for Downtown Parking
Revised Strategy for Downtown Parking December 4, 2017 Council Workshop Presented by Jennifer McCoy, P.E., City Traffic Engineer City-Owned Parking Today 3,500 metered parking spaces Parking meters charge
More informationHighway 23 New London Access & Safety Assessment. Public Open House #2 October 3, :00 to 7:00 PM
Public Open House #2 October 3, 2017 5:00 to 7:00 PM Highway 9 OVERVIEW OF ASSESSMENT Assessment Limits Highway 23 from County Road 40 to North Shore Dr Purpose: Identify opportunities to reduce serious
More information2019 New Transit Service Plan
Agenda Item 7.2 2019 New Transit Service Plan Draft Proposal VTA Board of Directors January 2019 Background: Next Network Plan and Today s Plan Early 2016 Transit Choices report and the ridership-coverage
More informationBusiness Advisory Committee. November 3, 2015
Business Advisory Committee November 3, 2015 1 Today s Topics DEIS Cost Estimate 2 Assumptions Revised Cost Estimate Revised Project Scope Cost Estimate Overview Position Statement Discussion Municipal
More informationMaryland Gets to Work
I-695/Leeds Avenue Interchange Reconstruction Baltimore County Reconstruction of the I-695/Leeds Avenue interchange including replacing the I-695 Inner Loop bridges over Benson Avenue, Amtrak s Northeast
More informationCrestmont Development Update 2017 AGM
Crestmont Development Update 2017 AGM West Crestmont West Crestmont Will be built in phases finally reaching about 524 residential units. Rough grading for phases 9 & 10 already underway. First show home
More informationCity of San Juan Capistrano Agenda Report
12/16/214 82 City of San Juan Capistrano Agenda Report TO: FROM: DATE: SUBJECT: Karen P. Brust, City Manag4(?1-- Keith Van Der Maaten, P.E., Public Works and Utilities Directo Prepared by: George Alvarez,
More informationThe Eastern Connector Study November, 2007 planning for the future
The Eastern Connector Study November, 2007 planning for the future In late 2006, Albemarle County and the City of Charlottesville jointly initiated the Eastern Connector Corridor Study. The Project Team
More informationGuam Transportation Program Project Updates. Joanne M.S. Brown Director Carl Dominguez Deputy Director February 6, 2012
Guam Transportation Program Project Updates Joanne M.S. Brown Director Carl Dominguez Deputy Director February 6, 2012 Agenda Road Construction Highlights Ongoing Construction Route 17 Rehabilitation and
More informationFY 2018 I-66 Commuter Choice Program Presentation to the Northern Virginia Transportation Commission May 3,
FY 2018 I-66 Commuter Choice Program Presentation to the Northern Virginia Transportation Commission May 3, 2018 www.novatransit.o rg 703-524-3322 Presentation Overview I-66 Commuter Choice Program Overview
More informationSTH 60 Northern Reliever Route Feasibility Study Report
#233087 v3 STH 60 Northern Reliever Route Feasibility Study Report Washington County Public Works Committee Meeting September 28, 2016 1 STH 60 Northern Reliever Route Feasibility Study Hartford Area Development
More informationYour comments count!
WELCOME Identifying Solutions Between I-495 and the Roosevelt Bridge Schedule 6:30-8:30 p.m. Open House Review the presentation boards and talk to the project s technical staff about the study in an open
More informationContinued coordination and facilitation with City of Austin staff on documentation of processes to permit construction activities at the site.
Project Manager Ed Collins LJA Engineering, Inc. Transportation Planning Manager 5316 Highway 290 West Austin Public Infrastructure Group Austin, TX 78735 (512) 762-6301 cell (512) 439-4757 office CARTS
More informationRECOMMENDATION PAPER TO THE DULLES CORRIDOR COMMITTEE
DULLES RAIL RECOMMENDATION PAPER TO THE DULLES CORRIDOR COMMITTEE ANALYSIS OF ALTERNATIVE AIRPORT ALIGNMENTS FOR METRORAIL AT WASHINGTON DULLES INTERNATIONAL AIRPORT MARCH 2011 PURPOSE This paper presents
More informationReston Transportation Strategy July 9, 2018
Reston Transportation Strategy July 9, 2018 Background: On February 11, 2014, the Board of Supervisors adopted the Reston Phase I Comprehensive Plan Amendment for the core areas of Reston between Sunset
More informationPrince William County Department of Transportation 4th Quarter Joint Mobility Report January 8, 2019
Prince William County Department of Transportation 4th Quarter Joint Mobility Report January 8, 2019 Projects Completed in 2018 Traffic Signal and Telegraph and Horner Dumfries Road Dual Left Projects
More informationRocky Mount. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation
2020 Transportation Plan Developed by the Transportation Planning Division of the Virginia Department of Transportation in cooperation with the U.S. Department of Transportation, Federal Highway Administration
More informationDecision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L79. October 18, 2016
Decision 21481-D01-2016 October 18, 2016 Alberta Utilities Commission Decision 21481-D01-2016 Proceeding 21481 Application 21481-A001 October 18, 2016 Published by the: Alberta Utilities Commission Fifth
More informationProject Description: Georgia Department of Transportation Public Information Open House Handout PI#(s): , County: Muscogee
Why We Are Here: GDOT s Transportation Improvement Act (TIA) Office, the City of Columbus, and the project delivery team are here this evening to display and answer questions concerning the proposed roadway
More informationTURNPIKE SYSTEM. Summary information from: Texas Department of Transportation GENERAL INFORMATION & SYSTEM MAP JOA REALTY
GENERAL INFORMATION & SYSTEM MAP TURNPIKE SYSTEM Summary information from: Texas Department of Transportation www.texastollways.com Joa Realty JoaRealty.com Email: help@joarealty.com Office: 512.480.8384
More informationCommittee Report. Transportation Committee. Business Item No
Committee Report Business Item No. 2015-280 Transportation Committee For the Metropolitan Council meeting of December 9, 2015 Subject: METRO Blue Line Extension (Bottineau Light Rail Transit) Revised Scope
More informationSafeTrack Plan. DRAFT May 6, 2016 Public Reference Document
SafeTrack Plan May 6, 2016 Public Reference Document 1 Track Access Demands Continue to Increase Productive 10% Setup 5% Trains Operating 85% NTSB Recommendations Deferred Maintenance FTA Safety Directives
More informationDART Priorities Overview
City of Dallas Transportation and Trinity River Project Committee DART Priorities Overview Gary C. Thomas President/Executive Director August 10, 2015 City of Dallas Transportation & Trinity River Committee
More informationPublic Works. Capital Projects FY
Public Works Capital Projects FY 2015-17 Projects Completed FY 2014 All Done Projects! Residential and Collector Street Paving Lower Westside Arterial Street Rehab: Front, River St South, Soquel Hwy 1
More informationPurple Line Extension Section 1 Construction Community Meeting January 17, 2019
Purple Line Extension Section 1 Construction Community Meeting January 17, 2019 1 Agenda Section 1 MOW 64 Facility Project Construction Updates: Fossils Project-wide Tunneling Wilshire/Western Wilshire/La
More informationJune 9, The County Board of Arlington, Virginia. Ron Carlee, County Manager
June 9, 2003 TO: FROM: SUBJECT: The County Board of Arlington, Virginia Ron Carlee, County Manager Amendments to the Arlington County Code 14.2-34 to limit parking of commercial vehicles, motor homes,
More informationMississauga Bus Rapid Transit Preliminary Design Project
Mississauga Bus Rapid Transit Preliminary Design Project PUBLIC INFORMATION CENTRE OCTOBER 2008 WELCOME The Mississauga Bus Rapid Transit (BRT) Project Thank you for attending this Public Information Centre.
More informationIMPROVEMENT CONCEPTS
IMPROVEMENT CONCEPTS for the South Novato Transit Hub Study Prepared by: January 11, 2010 DKS Associates With Wilbur Smith Associates IMPROVEMENT CONCEPTS Chapter 1: Introduction 1. INTRODUCTION The strategic
More informationTransportation Committee Revised Project Scope and Cost Estimate. November 23, 2015
Transportation Committee Revised Project Scope and Cost Estimate November 23, 2015 1 Today s Topics Revised Project Scope Revised Cost Estimate Municipal Approval Action 2 3 Revised Project Scope Project
More informationAppendix B. Tier 2 Final Environmental Assessment I-66 Transit/TDM Technical Report
Tier 2 Final Environmental Assessment I-66 Transit/TDM Technical Report Appendix B Bus Bay, Maintenance, and Storage Capacity Analysis Technical Memorandum FINAL MAY 2016 INTRODUCTION This technical memorandum
More informationMETRO Light Rail Update
American Society of Highway Engineers METRO Light Rail Update Brian Buchanan Director, Design and Construction October 13, 2009 1 High Capacity Transit System 2 20-Mile Light Rail Line 3 Operations Operations
More informationExpo Light Rail Line. Expo Line Community Meeting Final Phase 2 Construction Update Santa Monica June 2015
Expo Line Community Meeting Final Phase 2 Construction Update Santa Monica June 2015 Meeting Purpose and Format Meeting Purpose and Format The purpose of tonight s meeting is to: Provide a final update
More information