2 WECC Annual Progress Report Alberta Electric System Operator Date: April, 2017 Prepared by: AESO - Transmission Planning Prepared for: Technical Studies Committee, WECC cc: Planning Coordination Committee, WECC Version: 1

3 Contents Abbreviations... iii 1 Completed Projects Projects Under Construction System Projects Project 786 Edmonton Region 240 kv Line Upgrades In service Project 787 Southern Alberta Transmission Reinforcement Updated... 2 Project 811 Central East Area Transmission Development Updated... 4 Project 813 Red Deer Area Transmission Development Updated Project 850 South and West of Edmonton Transmission Development Updated Project 1354 Foothills Area Transmission Development 138 kv Transmission Line between ENMAX SS-65 and ENMAX SS Connection Projects Projects Pending Approval System Projects Project 1781 Provost to Edgerton & Nilrem to Vermilion Transmission System Reinforcement Project Hanna Region Transmission Development Phase Project 1456 Calgary Downtown Transmission Reinforcement Connection Projects Project Naturener Wild Rose Wind Farm - Updated Project Naturener Wild Rose Wind Farm Phase 2 - Updated Project 1590 Fort McMurray West 500 kv Line Updated Projects in the Planning Process System Projects Project 1785 Grande Prairie Loop Transmission Reinforcement Project 1784 Rycroft Transmission Reinforcement Connection Projects Project 515 Heritage Energy Centre Project 1080 Old Elm & Pothole Creek Wind Farm Update Project 1290 Whitetail Peaking Station Project 1321 Three Creeks Power Plant - Update Project ATCO Power Heartland Generating Station - Updated Project 1440 Genesee Generating Station - Unit 4 (G4) and Unit 5 (G5) Update Project 1477 TransAlta Sundance 7 Combined Cycle Power Plant Cancelled Project 1478 Rocky Mountain Power ASSISt Cancelled Project 1467 H.R. Milner 2 (M2) Generator Cancelled Project 1567 Sharp Hills Wind Farm Project 1885 Joss Wind Power Northern Lights New Project 1724 BowArk Energy Echo Wind Power Cancelled Project 1734 Suncor Forty Mile Wind Farm New Project 1767 Renewable Energy Systems Canada (RESC) Forty Mile Wind Power Plant New22 Project 1800 Capital Power Whitla Wind Power Facility - New Project 1812 Suncor Forty Mile WAGF Phase 2 - New Project 1861 Enterprise Bighorn WAGF New Project 1875 EDF EN Red Rock WAGF New Project 1896 EDF EN Cypress WAGF New Page i

4 Project 1924 ENMAX Zephyr Wind New Project 1797 RES Oyen Wind New Project 1760 EDF EN Fort Saskatchewan WAGF New Project 1761 EDF EN Hand Hills WAGF New Project 1827 Suncor Cogeneration Project New Page ii

5 Abbreviations AESO AUC EATL FATD GLEC HVDC km kv MATL MVA MVAr PBEC SASR SPS STS SVC VAR WATL Alberta Electric System Operator Alberta Utilities Commission Eastern Alberta Transmission Line Foothills Area Transmission Development Goose Lake to Etzikom Coulee high-voltage direct current kilometres kilovolt Montana Alberta Tie-Line Megavolt-ampere Megavolt-ampere reactive Picture Butte to Etzikom Coulee System Access Service Request Special protection systems System Transmission Service static VAR compensator volt-ampere reactive Western Alberta Transmission Line Page iii

6 1 Completed Projects The following projects have been completed since the release of the 2015 progress report. P737 North South Transmission Reinforcement (WATL and EATL HVDC lines) P1117 Foothills Area Transmission Development East (FATD East) P719 ENMAX Shepard Energy Centre Power Station 2 Projects Under Construction Needs Information Documents and Facility Applications have been approved by the Alberta Utilities Commission for the following projects. Construction are ongoing or set to begin. 2.1 System Projects Project 786 Edmonton Region 240 kv Line Upgrades In service The project is in service. The next steps are to obtain final cost reports and commence its closure in Q An overview of the project is provided below for reference. Increase the capacity of lines 908L and 909L up to the summer rating of the primary conductor (2 x 477 kcmil) by replacing the conductor on the small conductor section (first 4 km of line east of Sundance 310P) Increase the capacity rating of line 902L up to the summer rating of the primary conductor (2 x 477 kcmil) by replacing the conductor on the small conductor sections of line 902L (first 4 km of line east of Wabamun 19S and first 4 km of line east of Sundance 310P) Construct 12 km of new double circuit 240 kv line with one side strung east from Keephills 320P to the 904L-908L-909L confluence point west of Stony Plain. This construction is required to move the termination point of 908L from Sundance 310P to Keephills 320P and add two associated 240 kv breakers at Keephills 320P. Swap the connections of lines 904L and 908L at the 904L-908L-909L confluence point south of Jasper 805S in order to move the termination point of line 904L from Wabamun 19S to Sundance 310P Install Special Protection Systems (SPS) for three double circuit tower failure events (Category C5) Install a 240 kv 600 MVA phase shifting transformer on line 9L57 and three associated 240 kv breakers. The preferred location is the proposed Livock station north of Brintnell. Rebuild the 41 km east-west single circuit wood pole sections of line 904L (Jasper to Wabamun) using a 2 x 1033 kcmil conductor. Ongoing negotiations with land owners in the area have delayed work completion. Rebuild the 6 km east-west single circuit wood pole section of line 904L (Jasper to Petrolia) using a 2 x 1033 kcmil conductor. Increase the capacity of both sections of line 904L out of Jasper 805S up to the summer rating of the primary conductor (2 x 477 kcmil) by replacing the conductor on the small section (12 km of line south of Jasper 805S). Page 1

7 Transmission Facility Operator (TFO) Contacts AltaLink Joe Napora EPCOR Wilf Behr Vladimir Lopez Project Manager, Transmission Projects Calgary, AB, T2P 0L (direct) Project 787 Southern Alberta Transmission Reinforcement Updated The project involves the implementation of a 240 kv loop in the Southern Alberta region to allow for future connection of wind power and to move this power to the Calgary area through three power corridors: from Whitla to West Brooks in the east from Peigan/Windy Flats to Foothills in the center from Goose Lake to Langdon in the west, through the existing 500 kv transmission line 1201L The project is operational with the exception of several components that are either not proceeding or are being amended, as indicated in the project overview provided below. Components that are being amended are pending further technical assessments and could be in service by 2022, depending on regulatory progress. Connection studies conducted for this system project do not indicate any negative impact on the transfer capability of WECC Path 1. This project consists of the following lines: 911L replaced by a transmission line from Foothills to Peigan (Windy Flats). The line is a 240 kv double circuit with 50% series compensation. Each circuit is rated with a summer/winter capacity of approximately 980/980 MVA. (Commissioned) A new 240 kv double circuit line, approximately 150 km in length, will run from Cassils (west of Brooks) to Bowmanton (northeast of Medicine Hat). Each circuit is rated at a summer/winter capacity of approximately 980/980 MVA. (Commissioned) Construction of a new 240 kv switching station at a location known as Milo Junction, and conversion of two existing three-terminal lines (Langdon West Brooks North Lethbridge) into six two-terminal lines. (Commissioned) Page 2

8 A new 240 kv double circuit line, approximately 80 km in length, from Bowmanton (Medicine Hat) to Whitla, connecting the wind farms in the south. Each circuit is rated at a summer/winter capacity of approximately 980/980 MVA. (Commissioned) A new Chapel Rock 500/240 kv substation that cuts in and out of existing 500 kv line 1201L. The station will include two 1200 MVA 500/240 kv transformers, two 240 kv 100 MVAr capacitor banks and a +200/-100 MVAr SVC, and one 45 MVAr shunt reactor. (In the process of being amended) A new 240 kv double circuit transmission line connecting Chapel Rock Castle Rock Ridge Goose Lake. The line will have a rated summer/winter capacity of approximately 980/1200 MVA. (In the process of being amended) Addition of a 138 kv phase shifting transformer between Coleman and Pincher Creek. (Commissioned) A new 240 kv double circuit transmission line connecting Ware Junction Langdon with a rated summer/winter capacity of 980/1200 MVA and 50% series compensation. (Cancelled) Addition of two 240/138 kv 400 MVA transformers at the new Windy Flats station near existing Peigan 59S station. (Commissioned) A new Journault 240 kv substation at Etzikom Coulee to connect future wind farms. (Not Proceeding) Interconnect Picture Butte (MATL) to Etzikom Coulee (PBEC) substation with double circuit 240 kv line, one side strung. (Not Proceeding) Interconnect Goose Lake with Etzikom Coulee (GLEC) substation with double circuit 240 kv, one side strung. (Not Proceeding) TFO Contact Sharmen Andrew, P.Eng. Senior Project Manager AltaLink Management Ltd rd Avenue SE Calgary, AB, T2A 7W7 Tel: (403) Mobile: (403) Dale Bergman Project Manager, Transmission Projects Calgary, AB, T2P 0L (direct) dale.bergman@aeso.ca Page 3

9 2.1.3 Project 811 Central East Area Transmission Development Updated The following components of the Central East Area Transmission Development project are in service. New Bourque 970S substation 144 kv line from Bourque 970S to Mahihkan 837S 144 kv line from Marguerite Lake 826S to Wolf Lake 822S Line 7L24 termination at Bonnyville 700S 144 kv line from Bourque 970S to Wolf Lake 822S 144 kv line from Bourque 970S to Leming Lake 715S 240 kv line (operated at 144 kv) from Bonnyville 700S to Bourque 970S Bonnyville 700S transformer addition St. Paul Area upgrades: Watt Lake 956S St. Paul 707S and 7L139/7L70 in/out 7LA92 tap off to Watt Lake 956S Whitby Lake 819S 144kV circuit breaker addition Vermillion 710S Substation Upgrade Heisler Area upgrades Heisler 764S and line 7LA701 tap off Kitscoty 6L06 decommissioning Line 7L701 clearance mitigation Kitscoty 705S and lines 7L14/7L130 lines in and out Line 7L53/7L117 clearance mitigation Several components of approved NID are not listed here and are no longer required. In December 2016, the AESO filed an amendment with the AUC to cancel these components and we are awaiting approval. Page 4

10 2.1.4 Project 813 Red Deer Area Transmission Development Updated The Red Deer Area Transmission Development project will be implemented in two stages. The following overview focusses on the major components in Stage I of the project. The timing of Stage II will be determined by the future load projections and/or a new generator application in the area. Stage I Split lines 768L and 778L and re-terminate at Red Deer North 217S (add 1 breaker, use 1 existing breaker) (Complete) Stage II Modify Gaetz 87S (add 2 breakers, use 1 existing breaker) (Complete) Add second auto-transformer at Benalto 17S (Complete) Add one 50 MVAr 138 kv capacitor bank at Joffre 535S (Complete) Add one 50 MVAr 138 kv capacitor bank at Prentiss 276S (Complete) Add one 27.6 MVAr 138 kv capacitor bank at Ellis 332S (Complete) Re-build 5 km of 138 kv transmission line 80L from South Red Deer 194S (use existing breaker) to North Red Deer 217S (use existing breaker) (Complete) Re-build 5 km (including 1 km of underground) of 138 kv transmission line 80L from South Red Deer 194S (use existing breaker) to Red Deer 63S (use existing breaker) (Complete) Re-build 29 km of 138 kv transmission line 755L from Red Deer 63S (use existing breaker) to Piper Creek 247S (use existing breaker) to Joffre 535S (use existing breaker) (Complete) Re-build 33 km of 138 kv transmission line 717L (now lines 637L and 648L) from Red Deer 63S (use existing breaker) to Sylvan Lake (use existing breaker) to Benalto (use existing breaker) (Complete) Construct a new Johnson 281S 240/138 kv substation with 240 kv double circuit (200 m) from line 918L, 2 km of 138 kv double-circuit to line 80L, and a connection to line 166L (Complete and Commissioned) Construct a new 240/138 kv Wolf Creek 288S substation with 240 kv double circuit (200 m) from line 910L, and 4 km of double-circuit 138 kv line to Ponoka 331S (use existing breaker from salvage of D13 and D16) to connect to line 883L (Complete) Construct a new 240/138 kv Hazelwood 287S station on the 240 kv line 924L (In Progress) Add 13 km of 138 kv transmission line from Lacombe 212S (add 1 breaker) to Ellis 332S (add 1 breaker) (In Progress) Salvage 53 km of 138 kv transmission line 80L from Red Deer 63S to Innisfail 214S (Not Started) Salvage 23 km of 138 kv transmission line 80L from Ponoka 331S to West Lacombe 958S (this will be less by the approx. 5 km of salvage now part of Wolf Creek (CP44)) (Not Started) Salvage 40 km of 716L from Wetaskiwin 40S to Ponoka 331S. The length of line will be reduced by the approx. 5 km of salvage that is now part of Wolf Creek (CP44) (Not Started) The timing of stage II (rebuilding of existing 1line 166L to higher capacity) is linked to a milestone of load in the area reaching 825 MW and/or a new generator application in the area. The recent load forecast indicates the Red Deer region load will not reach this level in the next 20 year period. No work will be done on Stage II until this milestone is met. Page 5

11 The Needs Identification Document (NID) was filed with the AUC in July 2011 and approved in April The in-service dates are for the project components are in stages, with the first date in Facilities Applications were also filed in stages. As indicated above several reinforcements are already in service. TFO Contact Darren Bonar Project Manager AltaLink rd Avenue SE (direct) (mobile) darren.bonar@altalink.ca Ed Mayer Project Manager, Transmission Projects (direct) ed.mayer@aeso.ca Project 850 South and West of Edmonton Transmission Development Updated The NID was filed with the AUC in December 2012 and approved in December Facilities Applications of AltaLink were approved in Q The expected in-service date is December This project addresses the need for development in the area South and West of Edmonton. The approved alternative includes the following reinforcements, which are under construction: A new Harry Smith 367S 240/138 kv substation south of Stony Plain with two 240/138 kv 400 MVA transformers. The substation will be connected by an in and out connection to line 1043L between Keephills 320P and Petrolia 816S. A new Saunders Lake 289S 240/138 kv station north of Leduc with two 240/138 kv 400 MVA transformers. The substation will be connected by an in and out connection to line 910L between Ellerslie 89S and Wolf Creek 288S, and connected by an in and out connection to line 914L between Ellerslie 89S and Bigstone 86S. A new 25 km 138 kv line from line 780L to Cooking Lake, and reconfiguration A new 13 km 138 kv line from Harry Smith 369S to East Stoney Plain 434S Two new 13 km 138 kv lines from Harry Smith 367S to Acheson 305S Two new 1 km 138 Kv lines from Saunders Lake 289S to connect lines 780L and 868L Normally open operation of line 133L between Wabamun 19S and the 243L tap New capacitor banks at Leduc 325S (27 MVAr) Page 6

12 TFO Contact Aaron Pais Project Manager AltaLink rd Avenue SE Calgary, AB T2A 7W Ed Mayer Project Manager, Transmission Projects (direct) Project 1354 Foothills Area Transmission Development 138 kv Transmission Line between ENMAX SS-65 and ENMAX SS-41 The AESO identified the need for the Foothills Transmission Area Development ( FATD ) system development in the Calgary, High River, and Okotoks Areas in its Long-term Transmission System Plan. On July 5, 2012, the AESO filed with the Alberta Utilities Commission (AUC) for approval of the NID for the FATD East (AESO project 1117) on proposed transmission expansions in the vicinities of Southeast Calgary, Okotoks and High River. As mentioned earlier, FATD East project is in service. This project is supplementary to the FATD East project (AESO P1117) for the purpose of alleviating residual capacity constraints up to the 2019 timeframe in the area. The project also restores the connectivity between ENMAX SS-26 and ENMAX SS-32 substations. The proposed developments include: Construct a 138 kv transmission line between ENMAX SS-65 substation and ENMAX SS-41 substation via ENMAX SS-54 substation; Augmentation to ENMAX SS-65 and SS-41 substations for terminations of the new 138 kv circuit to ENMAX SS-54 substation; Restore 138 kv connectivity between SS-26 and SS-32 substations. The expected in-service date for the transmission developments is Q TFO Contact Aidan Gannon Project Manager ENMAX Corporation Avenue SE Calgary, AB T2G 4S (Direct) Page 7

13 (Cell) Roghoyeh Salmeh Project Manager, Transmission System Projects (direct) 2.2 Connection Projects There are currently no customer connection projects under construction at this time that are major generation projects 200 MW and above, or load connection on the bulk system in proximity to WECC Path 1. Page 8

14 3 Projects Pending Approval 3.1 System Projects The following projects are pending NID or Facility Application approval from the AUC Project 1781 Provost to Edgerton & Nilrem to Vermilion Transmission System Reinforcement The NID was filed with the AUC in December 2016 and approval is pending. The expected in service date is March This project has the following major components: 240 kv line (operated at 144 kv) from Nilrem 574S (AltaLink) to new Drury 2007S (ATCO) A new 144 kv Drury 2007S substation 240 kv line (operated at 138 kv) from Hansman Lake 650S to Edgerton 899S (In AltaLink s service area) Ed Mayer Project Manager, Transmission Projects (direct) ed.mayer@aeso.ca Project Hanna Region Transmission Development Phase 2 The Hanna Region Transmission Development Project is designed to reinforce the transmission system in the region in order to meet the projected wind aggregated generating facilities and future load growth, in particular, pipeline pumping loads. AML and ATCO are transmission facility owners (TFOs) as this area is serviced by these two TFOs. The major components of this project consist of: String second side on the 240 kv double circuit line from Oakland to Lanfine and related alterations at Oakland 946S and Lanfine 959S Cordell 755S to Halkirk switching station, new double circuit 240 kv line (one side strung) and related alterations String second side on the 240 kv double circuits line from Oakland 946S to Coyote Lake 963S and related alterations at Oakland 946S and Lanfine 959S. Additionally, the following components are designed to reinforce the local network: Convert the existing Hanna 763S station to a 144 kv station Add a 144 kv line from Coyote Lake 963S to Hanna 763S and related alterations Add a second 300 MVA 240/144 kv transformer at Pemukan 932S Add a second 300 MVA 240/144 kv transformer at Lanfine 959S Page 9

15 Add a second 200 MVA 240/144 kv transformer at Hansman Lake 650S Nilrem 574S station capacitor banks addition Hansman Lake 650S station capacitor banks addition Metiskow 648S station capacitor bank additions Add one new 5 MVAR, 72 kv capacitor bank at Youngstown 772S substation Add one new 2.4 MVAR, 25 kv capacitor bank at Coronation 773S substation Decommission line 6L44 (Rowley 768S to Big Valley 778S) and line 6L22 (Michichi Creek 802S to Rowley 768S) As per NID approval, the requested in-service date for Phase 2 is during In light of a change in system conditions (i.e., modest growth in load demand and uncertainty regarding wind development), the AESO is presently reviewing the need as well as timing of the components through staging process. The project is on hold until these studies are finalized. Ed Mayer Project Manager, System Projects (direct) ed.mayer@aeso.ca Project 1456 Calgary Downtown Transmission Reinforcement On November 18, 2015, the AESO filed its NID for Transmission System Reinforcement in Downtown Calgary with the AUC. On June 1, 2016, the AUC approved the AESO s NID. ENMAX is the TFO in the area. While the AESO is responsible for identifying that transmission system development is needed, ENMAX is responsible for detailed siting and routing, constructing, operating and maintaining the associated transmission facilities. ENMAX is currently in the process of obtaining its required regulatory approvals The Downtown Calgary Area is a sub-area of the AESO s Calgary Planning Area (Area 6). The load in the Downtown Calgary Area is supplied by an existing local 138 kv transmission network, which comprises three 138 kv substations: ENMAX No. 1, No. 5 and No. 8 substations, and the associated 138 kv transmission lines connecting to these three substations. This project addresses an identified need for a new 138 kv transmission circuit to serve the forecast load growth in the downtown Calgary area. The project scope includes: Construction of a new 138 kv single circuit to interconnect ENMAX No.2 and No.8 substations Install the required equipment at the ENMAX No.2 and No.8 substations to facilitate reliable Integration of the new 138 kv circuit into the Alberta Interconnected Electric System. ENMAX plans to file the Facility Application by end of September The project in-service date is Q Page 10

16 TFO Contact Kevin Neithercut Sr. Engineer, Transmission Planning ENMAX Corporation Avenue SE Calgary, AB T2G 4S (Direct) Roghoyeh Salmeh Project Manager, System Projects (direct) 3.2 Connection Projects The projects listed in this section are customer connection projects. These are either major generation projects with 200 MW and above or load connection on the bulk system in proximity to the WECC Path Project Naturener Wild Rose Wind Farm - Updated Wild Rose 1, a 210 MW wind-powered generating facility, is comprised of 70 x 3 MW wind turbine generators with a collector substation located approximately 45 km southeast of the City of Medicine Hat. This wind power plant will be connected from the Wild Rose 547S station to the Elkwater 264S station via a single circuit 240 kv line. The proposed in-service date for the interconnection of Wild Rose 1 is August 1,2018. The Facilities Application was approved by the Alberta Utilities Commission on March 21, TFO Contact Nick Kabongo Project Manager AltaLink rd Avenue SE Calgary, AB T2A 7W nick.kabongo@altalink.ca Rick Marshall Project Manager, Transmission Connection Projects (direct) rick.marshall@aeso.ca Page 11

17 3.2.2 Project Naturener Wild Rose Wind Farm Phase 2 - Updated Wild Rose 2, a 189 MW wind-powered generating facility, is comprised of 63 x 3 MW wind turbine generators with a collector substation located approximately 30 km south of the City of Medicine Hat. In the near future, the wind power facility will be expanded to have a total of 204 MW installed capacity. This wind power plant will be connected from the Eagle Butte 274S station to the Elkwater 264S station via a single circuit 240 kv line. The proposed in-service date for the interconnection of Wild Rose 2 is August 1, The Facilities Application was approved by the Alberta Utilities Commission on March 21, TFO Contact Nick Kabongo Project Manager AltaLink rd Avenue SE Calgary, AB T2A 7W nick.kabongo@altalink.ca Rick Marshall Project Manager,Transmission Connection Projects (direct) rick.marshall@aeso.ca Page 12

18 3.2.3 Project 1590 Fort McMurray West 500 kv Line Updated The project was part of Project 838 Fort McMurray Area Transmission Bulk System Reinforcement. The project consists primarily of one 500 kv AC line from Sunnybrook station to the new Thickwood 500/240 kv station in the Fort McMurray area with a target operation date of June The project was competitively procured as required by legislation, and Alberta PowerLine Ltd. (consortium) was selected by the AESO in December 2014 as bid winner. Alberta PowerLine Ltd. Filed its Facility Application with the AUC on December 1, 2015 and received approval on February 10, As this project was approved through legislation, a transmission need approval was not required from the AUC. Pauline McLean Director, Competitive Process Renewables Development & Sustainability (direct) pauline.mclean@aeso.ca Page 13

19 4 Projects in the Planning Process The following projects are on the project list or in the connection queue that have yet to file applications to the Alberta Utilities Commission. 4.1 System Projects The projects listed in this section are transmission system enhancement projects. Reconsideration of transmission development in the NW and Central planning regions is under review in light of the Government s recently announced Climate Leadership Plan Project 1785 Grande Prairie Loop Transmission Reinforcement The Grande Prairie Loop 144kV system is connected to the NW transmission network of the AIES through three existing 144 kv transmission lines. The project s need is to reinforce the load serving capability of the local Grande Prairie Loop; it calls for the construction of a new 144 kv single circuit transmission line from Clairmont Lake 811S to Poplar Hill 790S substation for an approximate length of 42.8 km. The AESO recently completed its Participant Involvement Program (PIP) activities and is planning to file NID application with the AUC in Q Vladimir Lopez Project Manager, System Projects Calgary, AB, T2P 0L (direct) vladimir.lopez@aeso.ca ATCO Contact Rosaria Obazee Project Manager, Transmission Projects ATCO Electric Ltd. 14 th Floor, St. Edmonton, AB T5J 2V (direct) rosaria.obazee@atco.com Project 1784 Rycroft Transmission Reinforcement The Rycroft Area is connected to the NW transmission network of the AIES through two existing 144 kv transmission lines. At one end, the Rycroft Area connects to Clairmont Lake 811S substation through 7L68 and to the West Peace River 793S substation in the north-end through 7L75, The existing system in Rycroft study area is capable of serving the current load under N-0 and N-1 conditions. Historical load growth since 2010 has been approximately flat, with 66 MW winter peak ( WP ) and 58 MW summer peak ( SP ) load. However, ATCO DFO has submitted three System Access Service Requests ( SASRs ) to collectively serve 38 MW of new load in the area by Two of these Demand for Transmission Service ( DTS ) increases are at existing substations in the Rycroft study area and one for serving load at Page 14

20 a new substation (21 MW DTS). Without transmission reinforcement, the Rycroft study area load will exceed the capability of the existing transmission system under N-1 conditions. This project will address the load serving capability of the study area. The AESO is currently completing a VAR Support Study for the project and is expected to obtain NIDlevel cost estimates and a land impact assessment by mid-may The plan is to complete consultation by the end of Q Vladimir Lopez Project Manager, System Projects Calgary, AB, T2P 0L (direct) vladimir.lopez@aeso.ca ATCO Contact Rosaria Obazee Project Manager, Transmission Projects ATCO Electric Ltd. 14 th Floor, St. Edmonton, AB T5J 2V (direct) rosaria.obazee@atco.com 4.2 Connection Projects The projects listed in this section are customer connection projects. These are either major generation projects with 200 MW and above or load connection on the bulk system in proximity to the WECC Path Project 515 Heritage Energy Centre The proposed Heritage wind farm is a 350 MW wind farm planned to be connected to the Alberta Interconnected Electric System through Heritage Hill 110S collector substation connected to the adjacent Fidler 312S station in the Pincher Creek area. The requested in-service date for the project is October 15, GFO Contact Francis Wang Executive Director, Transmission Business Management NextEra Energy Resources, LLC 700 Universe Blvd, Juno Beach, FL Page 15

21 Craig Killoran Project Manager Transmission Connection Projects (direct) Project 1080 Old Elm & Pothole Creek Wind Farm Update The customer is considering a 60 MW wind farm located in the Glenwood area close to Magrath 225S. The customer is currently investigating the feasibility of a connection into the Alberta Interconnected Electric System through a 138 kv line into Magrath 225S. The requested in-service date for the project is December 31, GFO Contact Marc Stachiw Old Elm Wind Farm Ltd. #1320, th Ave SW Calgary, Alberta T2R 0C stachiwm@telus.net Craig Killoran Project Manager, Transmission Connection Projects (direct) craig.killoran@aeso.ca Project 1290 Whitetail Peaking Station Enbridge Inc. has proposed to construct the Whitetail Peaking Station as a new point of supply. The plant consists of 4 x 50 MW gas-fired peaking units. The project is to be developed in one stage with an in-service date of October 1, The power plant is located in the Peace River planning area (Area 19) approximately 13.5 km north of the existing Wesley Creek 834S station and will be connected via t-tap to 7L106. Page 16

22 TFO Contact Nilesh Rana Project Manager, Transmission Projects ATCO Electric Street Edmonton, AB T5J 2V6 Ph: Cell: Craig Killoran Project Manager Transmission Connection Projects 2500, 330-5th Ave SW Calgary, AB, T2P 0L (direct) Project 1321 Three Creeks Power Plant - Update Three Creeks Power has proposed to build a new Cogeneration Facility approximately 16 km northeast of the existing 240 kv Wesley Creek 834S station in the northwest region of Alberta. The requested in service date for the project is September 1, TFO Contact Sridhar Rao Project Manager, Transmission Projects ATCO Electric Street Edmonton, AB T5J 2V6 Ph: Cell: Craig Killoran Project Manager, Transmission Connection Projects 2500, 330-5th Ave SW Calgary, AB, T2P 0L (direct) craig.killoran@aeso.ca Page 17

23 4.2.5 Project ATCO Power Heartland Generating Station - Updated On March 8, 2013, ATCO Power Canada Ltd. ( ATCO Power ) Canada Ltd. submitted a System Access Service Request (SASR) to the AESO proposing to construct a combined cycle power station called ATCO Heartland Generation Station. The project will consist of one natural gas-fired turbine and one steam turbine, with a requested Supply Transmission Service (STS) contract of 510 MW. The facility is planned to be connected to the Josephburg 410S substation near the City of Fort Saskatchewan. The expected in-service date of this project is November 1, TFO Contact Leanna Wysiecki AltaLink Management Ltd th Street SE Calgary, AB T2A 6W leanna.wysiecki@altalink.ca Steve Palmer Transmission Connection Projects (direct) (mobile) steve.palmer@aeso.ca Project 1440 Genesee Generating Station - Unit 4 (G4) and Unit 5 (G5) Update On April 30, 2013, the AESO received a system access service request (SASR) from Capital Power L.P. to connect two 505 MW natural gas-fired combined cycle blocks (Capital Power Energy Centre - CPEC) to the AIES at the Genesee power generation site. Each combined cycle block will consist of two gas turbine generators (GTG) and associated steam turbine generator (STG), all on one shaft driving one electrical generator. CPEC indicated that the gross generation capacity is expected to be up to 1010 MW for both combined cycle blocks, which could be developed in stages. The study assumes that the gross capacity of the proposed generating station is 1010 MW. The customer has also requested Demand Transmission Service (DTS) of 50 MW for station load service. On March 16, 2016, the AESO applied to the AUC for approval of a NID to expand Genesee 330P Substation to connect the Genesee Generating Station units 4 and 5 to the Alberta Interconnected Electric System. Subsequently, on March 26, 2016, the AUC approved the NID and issued Substation Permit and License and Connection Order to EPCOR Page 18

24 The transmission facility in-service date is currently expected to be February Commercial operation dates for generation are August 2020 for Genesee 4, and December 2021 for Genesee 5. However, CPEC indicated that this date is subject to change due to market conditions. TFO Contact Mark Bensted EPCOR Distribution and Transmission Inc. 2000, Street NW Edmonton AB (780) Tana Lailan Transmission Connection Projects (direct) Project 1477 TransAlta Sundance 7 Combined Cycle Power Plant Cancelled TransAlta MidAmerican (TAMA) Partnership is proposing to construct approximately 850 MW Sundance 7 generating facility in the vicinity of LSD W5M. The site is located near existing TransAlta generating facilities near Wabamun. Sundance 7 will be a combined cycle power plant consisting of two gas turbine-generators (GT) of approximately 295 MW capacity (345 MVA, 0.85 p.f.) and a single steam turbine-generator (ST) of approximately 345 MW (405 MVA, 0.85 pf). The gross output is approximately 943 MW with an STS capacity of 850 MW. The maximum gross capacity at an average summer temperature of 15.3 degrees Celsius is 818 MW and the net output is 797 MW. The anticipated in service date is June 2018 and the commercial operation date is targeted as January The customer has indicated that this date is subject to change due to market conditions. TFO Contacts: AltaLink Management Ltd. Mark Reid (Account Manager) rd Avenue SE Calgary AB mark.reid@altalink.ca : Tana Lailan Transmission Connection Projects (direct) tana.lailan@aeso.ca Page 19

25 4.2.8 Project 1478 Rocky Mountain Power ASSISt Cancelled Rocky Mountain Power Inc. submitted a System Access Service Request (SASR) to the AESO on September 4, 2013 proposing the development of a compressed air energy storage (CAES) facility. The project is known as Alberta Saskatchewan Intertie Storage (ASISt) and is located in the Lloydminster planning area (AESO planning area 13). The ASISt project is proposed as a 135 to 160 MW compressed air energy storage project using salt caverns for the energy storage with potential up to 300 MW. The air cavern storage will be designed for 24 to 60 hours of continuous operation at rated capacity. ASISt is planned to connect to either 138 kv or 240 kv system in the AESO s Central Region Plan. The facility will potentially have the capability to operate as Power Source (generating) or as Power Sink (compressing). The study will assess and determine the generation and compression final capacities by taking into consideration the existing system topology in proposed alternatives. The requested in service date is December 31, : Tana Lailan Transmission Connection Projects (direct) tana.lailan@aeso.ca Project 1467 H.R. Milner 2 (M2) Generator Cancelled Maxim Power Corp. (MAXIM) is proposing to install two natural gas-fired turbines and two steam turbines operating as two blocks in a 1GT on 1ST configuration. This facility expansion, to be named Maxim Power Milner 2 Expansion (M2), will be located near existing H.R. Milner generating plant in NW Alberta. The base load gross generation capacity for this facility is approximately 538 MW. The project will be completed in two 269 MW phases, for a total of 538 MW. The target In-Service-Date (ISD) for Phase 1 is November 1, Phase 2 ISD target is November 1, MAXIM anticipates approximately 2 x 8.6 MW (17.2 MW) for station service and auxiliary loads when the unit is operational. : Gerardo Marquez Transmission Connection Projects (direct) gerardo.marquez@aeso.ca Project 1567 Sharp Hills Wind Farm On June 4, 2014 Sharp Hills Wind Farm Ltd. filed a SASR with the AESO to connect a 300 MW wind power generating facility to the Alberta Interconnected Electric System. On October 16, 2015, the EDP Renewables SH Project Limited Partnership (EDPR) became the legal owner of the project. Sharp Hills wind farm will be located in the Hanna planning area (Area 42) in the Central East Planning Region. The facility is located within ATCO Electric Ltd. service area. The requested in-service date is December 31, The EDPR is planning to file its generator plant application by July/August of After that the AESO will proceed with filing the NID application with the AUC (targeting October, 2017). Page 20

26 Tana Lailan Transmission Connection Projects (direct) Project 1885 Joss Wind Power Northern Lights New On November 1,2016, Joss Wind Power Inc. requested system access service to install a 400 MW wind power generating facility in the Swan Hills planning area (Area 26). This new point of supply will be located in the Swan Hills Planning Area 26, north of ATCO s existing Louise Creek 809S station. The requested in-service date for the proposed generation facility is September 1, 2019 with planned commercial operation date of December 1, Craig Killoran Project Manager, Transmission Connection Projects 2500, 330-5th Ave SW Calgary, AB, T2P 0L (direct) craig.killoran@aeso.ca Project 1724 BowArk Energy Echo Wind Power Cancelled On December 8, 2015 BowArk Energy Limited ( BowArk ) submitted a System Access Service Request to the AESO requesting a connection of its wind power facility to the grid. The project is to be located in the Hanna planning area (area 42). BowArk is applying for 300 MW of generation capacity with a requested In-Service-Date (ISD) of December 1, BowArk has also expressed interest in alternatively reducing the plant capacity to only 144 MW and connect to the 138 kv side of the Lanfine 959S substation in the event that sufficient capacity for a 300 MW plant cannot be found at 240 kv. : Craig Killoran Project Manager Transmission Connection Projects 2500, 330-5th Ave SW Calgary, AB, T2P 0L (direct) craig.killoran@aeso.ca Project 1734 Suncor Forty Mile Wind Farm New On January 6, 2016 Suncor Energy submitted a System Access Service Request to the AESO to connect their proposed 200 MW wind farm to the grid. The proposed wind farm is in the Medicine Hat planning area (Area 4). Suncor has requested an in-service date of Q Page 21

27 Rick Marshall Project Manager, Transmission Connection Projects (direct) Project 1767 Renewable Energy Systems Canada (RESC) Forty Mile Wind Power Plant New On February 5, 2016 RESC submitted a System Access Service Request to the AESO requesting connection of its 350 MW wind power facility to the grid located in the Medicine Hat planning area (Area 4). RESC has requested an in-service date of Q Doug Walker Project Co-ordinator, Transmission Connection Projects (direct) doug.walker@aeso.ca Project 1800 Capital Power Whitla Wind Power Facility - New On May 25, 2016 Capital Power submitted a System Access Service Request to the AESO requesting connection of its 300 MW wind power facility to the grid located in the Medicine Hat planning area (Area 4). The project has a requested an in-service date of Q Mark Appelt Project Manager, Transmission Connection Projects (direct) mark.appelt@aeso.ca Project 1812 Suncor Forty Mile WAGF Phase 2 - New On July 4, 2016 Capital Power submitted a System Access Service Request to the AESO requesting connection of its 200 MW wind power facility to the grid located in the Medicine Hat planning area (Area 4). The project has a requested an in-service date of May 1, Page 22

28 Rick Marshall Project Manager, Transmission Connection Projects (direct) Project 1861 Enterprise Bighorn WAGF New On September 7, 2016 Enterprise submitted a System Access Service Request to the AESO requesting connection of its 325 MW wind power facility to the grid located in the Stavely planning area (Area 49). The project has a requested an in-service date of Q Craig Killoran Project Manager, Transmission Connection Projects 2500, 330-5th Ave SW Calgary, AB, T2P 0L (direct) craig.killoran@aeso.ca Project 1875 EDF EN Red Rock WAGF New On October 14, 2016 EDF EN submitted a System Access Service Request to the AESO requesting connection of its 250 MW wind power facility to the grid located in the Medicine Hat planning area (Area 4). The project has a requested an in-service date of October 1, Mark Appelt Project Manager, Transmission Connection Projects (direct) mark.appelt@aeso.ca Project 1896 EDF EN Cypress WAGF New On November 22, 2016 EDF EN submitted a System Access Service Request to the AESO requesting connection of its 250 MW wind power facility to the grid located in the Medicine Hat planning area (Area 4). The project has a requested an in-service date of October 1, Page 23

29 Mark Appelt Project Manager, Transmission Connection Projects (direct) Project 1924 ENMAX Zephyr Wind New On October 14, 2016 ENMAX submitted a System Access Service Request to the AESO requesting connection of its 200 MW wind power facility to the grid located in the Vauxhall planning area (Area 52). The project has a requested an in-service date of Q Doug Walker Project Manager, Transmission Connection Projects (direct) doug.walker@aeso.ca Project 1797 RES Oyen Wind New On May 16, 2016 Renewable Energy Systems Canada Inc (RES) submitted a System Access Service Request to the AESO requesting connection of its 220 MW wind power facility to the grid located in the Hanna planning area (Area 42). The project has a requested an in-service date of June 28, Doug Walker Project Manager, Transmission Connection Projects (direct) doug.walker@aeso.ca Project 1760 EDF EN Fort Saskatchewan WAGF New On March 15, 2016 EDF EN Canada Development Inc. (EDF) submitted a System Access Service Request to the AESO requesting a connection for a new 300 MW wind aggregated generation facility to the grid located in the Fort Saskatchewan (Area 33) area. The requested in-service date for this project is October 1, Page 24

30 Charlie Hogarth Project Manager, Transmission Connection Projects 2500, 330 5th Avenue SW Calgary, AB, T2P 0L (direct) Project 1761 EDF EN Hand Hills WAGF New On March 15, 2016 EDF EN Canada Development Inc. (EDF) submitted a System Access Service Request to the AESO requesting a connection for a new 200 MW wind aggregrated generation facility to the grid located in the Sheerness (Area 43) area. The requested in-service date for this project is October 1, Charlie Hogarth Project Manager, Transmission Connection Projects 2500, 330 5th Avenue SW Calgary, AB, T2P 0L (direct) Charlie.hogarth@aeso.ca Project 1827 Suncor Cogeneration Project New On July 29, 2016, Suncor Energy Inc. (Suncor) submitted a SASR to the AESO for the addition of generation at their Base Plant in Fort McMurray. The project will add approximately 700 MW (2 x 350 MW) gas turbines to their current generation capacity. Suncor has requested an in-service date of July 1, Steve Palmer Project Manager, Transmission Connection Projects 2500, 330 5th Avenue SW Calgary, AB, T2P 0L (direct) steve.palmer@aeso.ca Page 25

WECC Annual Progress Report Alberta Electric System Operator (AESO)

WECC Annual Progress Report Alberta Electric System Operator (AESO) WECC Annual Progress Report Alberta Electric System Operator (AESO) Date: March 15, 2013 Prepared by: Ping-Kwan Keung, Ata Rehman System Planning Prepared for: Technical Studies Committee WECC cc: Planning

More information

Central East Region Transmission Development Needs Identification Document

Central East Region Transmission Development Needs Identification Document Executive Summary As part of its mandate, the ( AESO ) is responsible for planning the transmission system within the province of Alberta as set out in the Electric Utilities Act, SA 2003 c E-5.1 ( EUA

More information

Connection Engineering Study Report for AUC Application: AESO Project # 1674

Connection Engineering Study Report for AUC Application: AESO Project # 1674 APPENDIX A CONNECTION ASSESSMENT Connection Engineering Study Report for AUC Application: AESO Project # 1674 Executive Summary Project Overview FortisAlberta Inc. (FortisAlberta) submitted a System

More information

Kettle River Transmission Project

Kettle River Transmission Project April 2012 Why are you receiving this project information package? New transmission facilities are needed in the Fort McMurray area. ATCO Electric has been directed by the Alberta Electric System Operator

More information

Bohn to Kettle River Transmission Project

Bohn to Kettle River Transmission Project April 2012 Why are you receiving this project information package? New transmission facilities are needed in the Fort McMurray area. ATCO Electric has been directed by the Alberta Electric System Operator

More information

Electric system improvements near you

Electric system improvements near you Electric system improvements near you Red Deer Area Transmission Development Stage 1 substation upgrades April 2011 Volume 1 Did you know? The average four-person family in Alberta today has 20 instant-on

More information

conversation SHAPE the May 2015 The AUC

conversation SHAPE the May 2015 The AUC SHAPE the conversation May 2015 Thickwood Hills Transmission PROJECT The Thickwood Hills Transmission Project is needed to connect planned critical transmission infrastructure, that will reinforce the

More information

Connection Engineering Study Report for AUC Application: EPCOR Clover Bar 25 kv Breaker Addition

Connection Engineering Study Report for AUC Application: EPCOR Clover Bar 25 kv Breaker Addition Connection Engineering Study Report for AUC Application: EPCOR Clover Bar 25 kv Breaker Addition Executive Summary Project Overview EPCOR Distribution & Transmission Inc. (EDTI), in its capacity as the

More information

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L82

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L82 Decision 21447-D01-2016 August 23, 2016 Decision 21447-D01-2016 Proceeding 21447 Application 21447-A001 August 23, 2016 Published by the: Fifth Avenue Place, Fourth Floor, 425 First Street S.W. Calgary,

More information

240 kv To Ware Junction 132S To Oakland 946S 9L934 9L97 901T 250/ 75/100/125 MVA To Sheerness 807S To Sheerness 807S To Cordel 755S 9L100 To Ware Junction 132S 9L950 9L99 To W. Brooks 28S 9L933 (re-teminated

More information

List of Circuits (R6.1 PRC-023-AB-2)

List of Circuits (R6.1 PRC-023-AB-2) (R6.1 PRC-023-AB-2) The list of circuits that the Alberta Electric System Operator ( AESO ) must maintain pursuant to requirement R6.1 of Alberta Reliability Standard PRC-023-AB-2 Transmission Relay Loadability,

More information

Currant Lake Transmission Project

Currant Lake Transmission Project Currant Lake Transmission Project September 2010 Why are you receiving this project information package? New transmission facilities are needed in the Monitor area of southeastern Alberta. ATCO Electric

More information

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L79. October 18, 2016

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L79. October 18, 2016 Decision 21481-D01-2016 October 18, 2016 Alberta Utilities Commission Decision 21481-D01-2016 Proceeding 21481 Application 21481-A001 October 18, 2016 Published by the: Alberta Utilities Commission Fifth

More information

Alberta Electric System Operator Needs Identification Document Application. Mowat 2033S Substation

Alberta Electric System Operator Needs Identification Document Application. Mowat 2033S Substation Decision 21781-D01-2016 Alberta Electric System Operator Needs Identification Document Application Facility Applications September 7, 2016 Alberta Utilities Commission Decision 21781-D01-2016: Alberta

More information

Engineering Study Report: FortisAlberta Inc. Plamondon 353S Capacity Increase. Contents

Engineering Study Report: FortisAlberta Inc. Plamondon 353S Capacity Increase. Contents APPENDIX A CONNECTION ASSESSMENT : FortisAlberta Inc. Plamondon 5S Capacity Increase Contents Executive Summary.... Introduction... 6. Project... 6.. Project Overview... 6.. Load Component... 6.. Generation

More information

Alberta Electric System Operator Saleski Transmission Project Needs Identification Document

Alberta Electric System Operator Saleski Transmission Project Needs Identification Document Decision 2013-127 Alberta Electric System Operator Saleski Transmission Project Needs Identification Document ATCO Electric Ltd. Saleski 901S Substation and 144-kV Transmission Line 7L142 Facility Application

More information

Status of PNM s Completed Transmission Construction Projects 11/30/2017

Status of PNM s Completed Transmission Construction Projects 11/30/2017 Status of s Completed Transmission Construction Projects Second Tah Ta Hey 115/345 kv Transformer Yah Ta Hey Switching Station On January 9, 2015, filed with the NMPRC under NMPRC Rule 440 information

More information

Executive Summary. Project Overview. Existing System. Study Summary

Executive Summary. Project Overview. Existing System. Study Summary APPENDIX A CONNECTION ASSESSMENT Connection Engineering Study Report for AUC Application: Hornbeck 345S Substation Executive Summary Project Overview FortisAlberta Inc. (FortisAlberta), in its capacity

More information

DFO STATEMENT OF NEED REPORT

DFO STATEMENT OF NEED REPORT APPENDIX E DFO STATEMENT OF NEED REPORT Table of Contents 1.0 Executive Summary... 1 2.0 Description of the Area... 2 2.1 Geographic Study Area... 2 2.2 2016 System Configuration... 2 3.0 Area Loading

More information

Decision (Errata) Access Pipeline Inc. Errata to Decision Temporary Generation at Smoky Lake Pump Station.

Decision (Errata) Access Pipeline Inc. Errata to Decision Temporary Generation at Smoky Lake Pump Station. Decision 2011-424 (Errata) Access Pipeline Inc. Errata to Decision 2011-424 Temporary Generation at Smoky Lake Pump Station January 4, 2012 The Alberta Utilities Commission Decision 2011-424 (Errata):

More information

Dunvegan Hydroelectric Project. For Glacier Power Limited. Preliminary Interconnection Study

Dunvegan Hydroelectric Project. For Glacier Power Limited. Preliminary Interconnection Study ` Dunvegan Hydroelectric Project For Glacier Power Limited Preliminary Interconnection Study Prepared by Pung Toy, P. Eng. and Ata Rehman, P. Eng. September 24, 2004 Table of Contents Table of Contents...

More information

Appendix D Black Hills Project Summary

Appendix D Black Hills Project Summary Page 1 of 28 Appendix D Black Hills Project Summary Table of Contents Black Hills Project Summary... D-1 Boone-Nyberg 115 kv Project... D-3 Rattlesnake Butte 115 kv Substation Terminal... D-6 Fountain

More information

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY California Independent System Operator Memorandum To: ISO Operations (MRTU) Committee From: Armando J. Perez, Director of Grid Planning cc: ISO Board of Governors ISO Officers Date: April 29, 2005 Re:

More information

Willingdon Substation Decommission

Willingdon Substation Decommission November 2012 Why are you receiving this project information package? New transmission facilities have been proposed in central east Alberta. As a result, some existing facilities are no longer needed.

More information

Alternatives for meeting the need for transmission improvement described

Alternatives for meeting the need for transmission improvement described Alternatives for meeting the need for transmission improvement described 240 kv Alternative Looped System Southern Alberta Transmission Reinforcement For more information please contact the AESO at 1.888.866.2959,

More information

Attached is Idaho Power s 2013 WECC Annual Progress Report. Please contact me if you have any questions.

Attached is Idaho Power s 2013 WECC Annual Progress Report. Please contact me if you have any questions. March 8, 2013 David Franklin Chair, Technical Studies Subcommittee Southern California Edison 1 Innovation Way Pomona, CA 91768 MHanson@idahopower.com (208) 388-2253 Enoch Davies Western Electricity Coordinating

More information

RE: Application for Alteration of Vermilion Substation 710S 144 kv Equipment Addition, 72 kv Equipment Removal, and Fence Expansion

RE: Application for Alteration of Vermilion Substation 710S 144 kv Equipment Addition, 72 kv Equipment Removal, and Fence Expansion October 12, 2011 Don Popowich, Director, Facilities Alberta Utilities Commission Fifth Avenue Place, 4th floor, 425-1 Street SW Calgary, Alberta, T2P 3L8 Dear Sir: RE: Application for Alteration of Vermilion

More information

Grizzly Bear Creek Wind Power Plant Connection Needs Identification Document

Grizzly Bear Creek Wind Power Plant Connection Needs Identification Document APPENDIX C AESO PIP Grizzly Bear Creek Wind Power Plant Connection Needs Identification Document 1.0 Participant Involvement Program (PIP) From December 2015 to May 2016, the AESO conducted a Participant

More information

Alberta Remedial Actions Schemes

Alberta Remedial Actions Schemes Alberta Remedial Actions s Date: Oct. 31, 2018 20 Anderson 801s 240 kv Line 9L933, 9L934 and 9L950 Thermal Protection to Sheerness Plant ATCO Electric, Other MP Mitigates overloads on each line by sending

More information

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015 No. Comment Submitted ISO Response Date Q&A Posted 1 Will the ISO consider proposals that are not within the impedance range specified? Yes. However, the benefits estimated and studies performed by the

More information

Black Hills Project Summary

Black Hills Project Summary 2016 Rule 3627 Report Black Hills Project Summary Page 1 of 38 Black Hills Project Summary Colorado PUC E-Filings System D 1 2016 Rule 3627 Report Black Hills Project Summary Page 2 of 38 Category Transmission

More information

APPENDIX C - AESO PIP SUMMARY

APPENDIX C - AESO PIP SUMMARY APPENDIX C - AESO PIP SUMMARY Whitla Wind Facility Connection PIP Summary 1.0 Participant Involvement Program (PIP) 1.1 PIP Design The AESO s Participant Involvement Program (PIP) is designed to notify

More information

100 MW Wind Generation Project

100 MW Wind Generation Project A subsidiary of Pinnacle West Capital Corporation 100 MW Wind Generation Project CUSTOMER FINAL Feasibility Study Results By Transmission Planning, APS December 21, 2007 Executive Summary This Feasibility

More information

APPENDIX C PARTICIPANT INVOLVEMENT PROGRAM (PIP)

APPENDIX C PARTICIPANT INVOLVEMENT PROGRAM (PIP) APPENDIX C PARTICIPANT INVOLVEMENT PROGRAM (PIP) Stirling Wind Project Connection PIP Summary 1.0 Participant Involvement Program (PIP) 1.1 PIP Design The AESO s Participant Involvement Program (PIP) is

More information

Western Area Power Administration Rocky Mountain Region Annual Progress Report. Projects. Weld Substation Stage 04

Western Area Power Administration Rocky Mountain Region Annual Progress Report. Projects. Weld Substation Stage 04 Western Area Power Administration Rocky Mountain Region 2014 Annual Progress Report Projects Weld Substation Stage 04 Lovell Yellowtail 115-kV rebuild Curecanti 230/115-kV 150 MVA transformer Terry Ranch

More information

Included in this Stakeholder Information Package:

Included in this Stakeholder Information Package: Who can you contact for more information? Yellowhead Area Transmission Reinforcement: TERA Environmental Consultants Dave Sare Phone: 403-538-5734 Email: dsare@teraenv.com Drayton Valley Area AltaLink

More information

ATTACHMENT - DFO STATEMENT OF NEED

ATTACHMENT - DFO STATEMENT OF NEED ATTACHMENT - DFO STATEMENT OF NEED Table of Contents Executive Summary... 3 1. Description of the Area... 5 1.1 Geographic Study Area... 5 1.2 Current System Configuration... 7 1.3 Distributed Generation...

More information

FOOTHILLS AREA TRANSMISSION DEVELOPMENT SOUTH CALGARY PROJECT

FOOTHILLS AREA TRANSMISSION DEVELOPMENT SOUTH CALGARY PROJECT FOOTHILLS AREA TRANSMISSION DEVELOPMENT SOUTH CALGARY PROJECT Proposed 138kV Transmission Line Photo courtesy of The City of Calgary Project Overview The demand for power is increasing as Calgary continues

More information

PSE Attachment K Puget Sound Area Transmission Meeting

PSE Attachment K Puget Sound Area Transmission Meeting PSE Attachment K Puget Sound Area Transmission Meeting Stephanie Lu Senior Engineer December 15, 2011 Agenda Attachment K Review Economic Studies Process PSE Planning Process and Assumptions PSE Projects

More information

Transmission Planning & Engineering P.O. Box MS 3259 Phoenix, Arizona

Transmission Planning & Engineering P.O. Box MS 3259 Phoenix, Arizona Transmission Planning & Engineering P.O. Box 53933 MS 3259 Phoenix, Arizona 85072-3933 March 9, 2016 Mr. Philip Augustin Chair, WECC Technical Studies Subcommittee Mr. Enoch Davies WECC Technical Staff

More information

welcome to the BC Hydro community open house

welcome to the BC Hydro community open house welcome to the BC Hydro community open house Dawson Creek/ Chetwynd Area Transmission ProjecT Open House welcome Dawson Creek/Chetwynd Area Transmission Project (DCAT) The purpose of this open house is

More information

Pacific Gas and Electric Company s 2013 Annual Progress Report

Pacific Gas and Electric Company s 2013 Annual Progress Report March 14, 2013 Mr. David Franklin Chair, WECC Technical Studies Subcommittee Southern California Edison 1 Innovation Way Pomona, CA 91768 Mr. Enoch Davies WECC Technical Staff 155 North 400 West Salt Lake

More information

SOUTHWEST CALGARY RING ROAD (SWCRR)

SOUTHWEST CALGARY RING ROAD (SWCRR) PROJECT OVERVIEW Alberta Transportation has started planning for the construction of the SW portion of the road that will complete the Calgary Ring Road. The completion of the SWCRR requires the relocation

More information

FOOTHILLS AREA TRANSMISSION DEVELOPMENT SOUTH CALGARY PROJECT

FOOTHILLS AREA TRANSMISSION DEVELOPMENT SOUTH CALGARY PROJECT FOOTHILLS AREA TRANSMISSION DEVELOPMENT SOUTH CALGARY PROJECT Proposed 138kV Transmission Line Photo courtesy of The City of Calgary Project Overview The demand for power is increasing as Calgary continues

More information

BC Hydro System 2011 Annual Progress Report

BC Hydro System 2011 Annual Progress Report March 1, 2011 Mr. Kyle R. Kohne, Chairman WECC Technical Studies Subcommittee Bonneville Power Administration P.O. Box 491 MS, TPP-OPP-3 Vancouver, WA 98666 Mr. Kent Bolton WECC Technical Staff 155 North

More information

March 7, Subject: Southern California Edison 2011 Annual Progress Report

March 7, Subject: Southern California Edison 2011 Annual Progress Report March 7, 2011 Mr. Kyle Kohne Mr. Kent Bolton Chair, WECC Technical Studies Subcommittee WECC Technical Staff Bonneville Power Administration University of Utah Research Park P.O. Box 61409 615 Arapeen

More information

NOVA Gas Transmission Ltd. Appendix 2: 2013 Facility Status Update (December)

NOVA Gas Transmission Ltd. Appendix 2: 2013 Facility Status Update (December) Appendix 2: Facility Status Update () This section describes the current status of facilities that were applied for, are under construction or have been placed on-stream since the 2012 Annual Plan was

More information

Illinois State Report

Illinois State Report July 2016 Illinois State Report Table of Contents 1. Planning Generation Portfolio Analysis Transmission Analysis Load Forecast Gas Pipeline Information 2 Executive Summary (July 2016) Existing Capacity:

More information

Interconnection Feasibility Study Report GIP-023-FEAS-R1. Generator Interconnection Request # MW Wind Generating Facility Inverness (L6549), NS

Interconnection Feasibility Study Report GIP-023-FEAS-R1. Generator Interconnection Request # MW Wind Generating Facility Inverness (L6549), NS Interconnection Feasibility Study Report GIP-023-FEAS-R1 Generator Interconnection Request # 23 100 MW Wind Generating Facility Inverness (L6549), NS February 16, 2006 Control Centre Operations Nova Scotia

More information

BC Hydro System 2016 Annual Progress Report

BC Hydro System 2016 Annual Progress Report March 11, 2016 Philip Augustin, P.E. Chair, Technical Studies Subcommittee 503-464-7783 philip.augustin@pgn.com Mr. Enoch Davies WECC Technical Staff 155 North 400 West, Suite 200 Salt Lake City, UT 84103-1114

More information

Supplemental Report on the NCTPC Collaborative Transmission Plan

Supplemental Report on the NCTPC Collaborative Transmission Plan Supplemental Report on the NCTPC 2007-2017 Collaborative Transmission Plan May 16, 2008 1 Table of Contents I. Executive Summary...1 II. Richmond-Fort Bragg Woodruff Street 230 kv Line...2 II.A. Need for

More information

Review Of The Cost. From The Transmission Facilities Cost Monitoring Committee. december 2012 REPORT

Review Of The Cost. From The Transmission Facilities Cost Monitoring Committee. december 2012 REPORT Review Of The Status Of Major Transmission Projects In Alberta From The Transmission Facilities Monitoring Committee december 2012 REPORT All persons reading or otherwise making use of this document or

More information

Managing California s Electrical Supply System after the shut down of San Onofre Nuclear Generating Station

Managing California s Electrical Supply System after the shut down of San Onofre Nuclear Generating Station Managing California s Electrical Supply System after the shut down of San Onofre Nuclear Generating Station East Asian Alternative Energy Futures Workshop By the Nonproliferation Policy Education Center

More information

THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS

THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS 2/27/2018 ELECTRIC TRANSMISSION PLANNING Table of Contents Table of Contents... 2 Executive

More information

Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment

Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment For NPCC Governmental / Regulatory Affairs Advisory Group May 21 st, 2009 ON IT Executive Summary Engineers from Con

More information

March 18, Subject: Imperial Irrigation District 2014 Annual Progress Report - Rev 1

March 18, Subject: Imperial Irrigation District 2014 Annual Progress Report - Rev 1 Energy Division P.O. Box 937 333 E. Barioni Blvd. Imperial, CA 92251 www.iid.com March 18, 2014 Mr. Tracy Rolstad Chair, WECC Technical Studies Subcommittee Senior Power System Consultant Avista System

More information

New Mexico Transmission Expansion Concepts For Wind Resources

New Mexico Transmission Expansion Concepts For Wind Resources New Mexico Transmission Expansion Concepts For Wind Resources May 2008 Update Electric Services Transmission Operations FOREWORD This document contains PNM s latest concepts for expanding the transmission

More information

PJM Generator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study September 2008

PJM Generator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study September 2008 PJM enerator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study 504744 September 2008 PJM Interconnection 2008. All rights reserved R60 Robison Park-Convoy 345kV Impact Study eneral

More information

Wainwright 51S Substation Connection Enhancement Needs Identification Document

Wainwright 51S Substation Connection Enhancement Needs Identification Document APPENDIX C AESO PIP Wainwright 51S Substation Connection Enhancement Needs Identification Document 1.0 Participant Involvement Program (PIP) From October 2015 to July 2016 the AESO conducted a Participant

More information

Merger of the generator interconnection processes of Valley Electric and the ISO;

Merger of the generator interconnection processes of Valley Electric and the ISO; California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Karen Edson Vice President, Policy & Client Services Date: August 18, 2011 Re: Decision on Valley Electric

More information

Local Transmission Plan. October 11, 2013 Revised August 25, 2014

Local Transmission Plan. October 11, 2013 Revised August 25, 2014 Local Transmission Plan October 11, 2013 Revised August 25, 2014 2 Central Hudson s System Zone G: Majority of Central Hudson s load Zone E: One small distribution substation Interconnections with Consolidated

More information

MILLIGAN SOLAR PROJECT

MILLIGAN SOLAR PROJECT February 16, 2009 Page 1 of 18 A subsidiary of Pinnacle West Capital Corporation MILLIGAN SOLAR PROJECT FINAL Feasibility Study Report APS Contract 52115 Prepared by: Arizona Public Service Company Transmission

More information

Alberta Electricity System Overview

Alberta Electricity System Overview Alberta Electricity System Overview 1 Powering Alberta s Future Key Electricity Outcomes Alberta s electricity system needs to change to meet the needs of tomorrow. This plan will create a modern electricity

More information

Entergy Gulf States, Inc. (Texas) Proposed Transmission Reliability Projects

Entergy Gulf States, Inc. (Texas) Proposed Transmission Reliability Projects Entergy Gulf States, Inc. (Texas) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 14, 2005 1 2004-06 EGSI-TX Transmission Western Region Reliability

More information

Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting

Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting BHE Wyoming Q4 Stakeholder Meeting November 17, 2016 @ 1:00PM MT Black Hills Energy Service Center 409 Deadwood Avenue, Rapid

More information

Interconnection Feasibility Study Report GIP-084-FEAS-R2

Interconnection Feasibility Study Report GIP-084-FEAS-R2 Interconnection Feasibility Study Report GIP-084-FEAS-R2 System Interconnection Request #84 50 MW Wind Generating Facility Pictou County (L-7004) August 17, 2007 Control Centre Operations Nova Scotia Power

More information

Energy storage - two Canadian Case Studies ESA Annual Conference, Washington, June 4th. Alex Bettencourt Managing Director

Energy storage - two Canadian Case Studies ESA Annual Conference, Washington, June 4th. Alex Bettencourt Managing Director Energy storage - two Canadian Case Studies ESA Annual Conference, Washington, June 4th Alex Bettencourt Managing Director National Association Made Up of Entire Industry Utilities Industry Academia / R&D

More information

Western Area Power Administration

Western Area Power Administration 2014/15 Integrated System (IS) 890 Local Planning Stakeholder Meeting #2 Western Area Power Administration Upper Great Plains Region Transmission Planning Stakeholder Meeting Wednesday, December 10 th,

More information

Interconnection Feasibility Study Report Request # GI Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado

Interconnection Feasibility Study Report Request # GI Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado Executive Summary Interconnection Feasibility Study Report Request # GI-2016-6 Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado Public Service Company of Colorado Transmission

More information

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI Executive Summary Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI-2003-2 Xcel Energy Transmission Planning January 2004 This Interconnection Feasibility

More information

3 Existing National Grid

3 Existing National Grid 3 Existing National Grid 3.1 Introduction 3.2 Load and generation 3.1 Introduction This chapter provides an overview of New Zealand s existing National Grid as at 28 February 2012 with respect to load

More information

Transmission Planning. WECC 2014 Progress Report. March 14, 2014

Transmission Planning. WECC 2014 Progress Report. March 14, 2014 Transmission Planning WECC 2014 Progress Report March 14, 2014 Report Prepared By: Dennis Stevens -TPP (360) 619-6821 BPA TS TPP 2014-022 Page 1 Table of Contents 1 Introduction... 1 2 Planned Transmission

More information

Interconnection Feasibility Study Report GIP-157-FEAS-R2

Interconnection Feasibility Study Report GIP-157-FEAS-R2 Interconnection Feasibility Study Report GIP-157-FEAS-R2 System Interconnection Request #157 100.5 MW Wind Generating Facility Guysborough County (L-6515) 2009 09 14 Control Centre Operations Nova Scotia

More information

The Application of Power Electronics to the Alberta Grid

The Application of Power Electronics to the Alberta Grid The Application of Power Electronics to the Alberta Grid Peter Kuffel, Michael Paradis ATCO Electric APIC May 5, 2016 Power Electronics Semiconductor devices used in power transmission systems Types: Thyristor

More information

National Grid s 2017 Local Transmission Plan

National Grid s 2017 Local Transmission Plan National Grid s 2017 Local Transmission Plan Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line.

More information

2016 Load & Capacity Data Report

2016 Load & Capacity Data Report Caution and Disclaimer The contents of these materials are for information purposes and are provided as is without representation or warranty of any kind, including without limitation, accuracy, completeness

More information

ATCO ELECTRIC LTD. (Transmission System) SERVICE QUALITY AND RELIABILITY PERFORMANCE, MEASURES AND INDICES Revision 0

ATCO ELECTRIC LTD. (Transmission System) SERVICE QUALITY AND RELIABILITY PERFORMANCE, MEASURES AND INDICES Revision 0 ATCO ELECTRIC LTD. (Transmission System) SERVICE QUALITY AND RELIABILITY PERFORMANCE, MEASURES AND INDICES 2018-04-24 - Revision 0 EUB Decision 2007-071 Board Direction 52 For questions or comments regarding

More information

Service Requested 150 MW, Firm. Table ES.1: Summary Details for TSR #

Service Requested 150 MW, Firm. Table ES.1: Summary Details for TSR # Executive Summary Firm point to point transmission service has been requested by Transmission Service Request (TSR) #75669514, under the SaskPower Open Access Transmission Tariff (OATT). The TSR consists

More information

Functional Specification Revision History

Functional Specification Revision History Functional Specification Revision History Revision Description of Revision Author Date B0 For comments Yale Zhou January 26, 2016 B1 Updated as per comments Yale Zhou February 1, 2016 Final issuance Yale

More information

Pacific Gas and Electric Company s Revised 2015 Annual Progress

Pacific Gas and Electric Company s Revised 2015 Annual Progress March 02, 2015 Mr. Tracy Rolstad Chair, WECC Technical Studies Subcommittee Avista PO Box 3727 MSC-16 1411 East Mission Ave Spokane, WA 99220-3727 Mr. Enoch Davies WECC Technical Staff 155 North 400 West

More information

Sub Regional RTEP Committee - Southern. August 19, 2011

Sub Regional RTEP Committee - Southern. August 19, 2011 Sub Regional RTEP Committee - Southern August 19, 2011 2011 RTEP Analysis Summary 2010 2015 Project Updates 2016 Analysis NERC Category A, B NERC Category C (N-1-1 in progress) Load Deliverability Generator

More information

Pacific Gas and Electric Company s Revised 2016 Annual Progress

Pacific Gas and Electric Company s Revised 2016 Annual Progress March 06, 2016 Mr. Philip Augustin Chair, WECC Technical Studies Subcommittee Mr. Enoch Davies WECC Technical Staff 155 North 400 West Salt Lake City, UT 84103-1114 Subject: Report Pacific Gas and Electric

More information

City of Palo Alto (ID # 6416) City Council Staff Report

City of Palo Alto (ID # 6416) City Council Staff Report City of Palo Alto (ID # 6416) City Council Staff Report Report Type: Informational Report Meeting Date: 1/25/2016 Summary Title: Update on Second Transmission Line Title: Update on Progress Towards Building

More information

State Regulatory Affairs and Local Relations Update. ATC Customer Meeting November 19, 2009

State Regulatory Affairs and Local Relations Update. ATC Customer Meeting November 19, 2009 State Regulatory Affairs and Local Relations Update ATC Customer Meeting November 19, 2009 Project Certification Steve Parker Manager State Regulatory Affairs CA/CPCN Applications (Filed/Ordered/Under

More information

2013 ANNUAL PROGRESS REPORT

2013 ANNUAL PROGRESS REPORT March 1, 2013 Mr. David Franklin, Chairman WECC Technical Studies Subcommittee Southern California Edison 1 Innovation Way Pomona, CA 91768-2560 Mr. Enoch Davies WECC Technical Staff 155 North 400 West,

More information

Interconnection System Impact Study Report Request # GI

Interconnection System Impact Study Report Request # GI Executive Summary Interconnection System Impact Study Report Request # GI-2008-23 34 MW Solar Generation Ranch at Hartsel, Colorado Public Service Company of Colorado Transmission Planning August 19, 2010

More information

Michigan Thumb Loop Transmission Line Project

Michigan Thumb Loop Transmission Line Project Michigan Thumb Loop Transmission Line Project ITC Holdings Corp. Simon Whitelocke VP., Regulatory and External Affairs October 30, 2013 What is Transmission? The electric transmission system is the network

More information

PSCo 10-Year Transmission Plan/20-Year Scenario Assessment

PSCo 10-Year Transmission Plan/20-Year Scenario Assessment PSCo 10-Year Transmission Plan/20-Year Scenario Assessment May 2009 This report contains transmission planning data that may be conceptual in nature and is subject to change. The transmission projects

More information

Updates. Pat Reiten President and CEO, PacifiCorp Transmission

Updates. Pat Reiten President and CEO, PacifiCorp Transmission PacifiCorp Transmission and Regional Updates Pat Reiten President and CEO, PacifiCorp Transmission PacifiCorp Transmission Overview 16,400 circuit-miles of transmission lines 12,685 MW record peak demand

More information

REVIEW OF THE COST STATUS OF MAJOR TRANSMISSION PROJECTS IN ALBERTA

REVIEW OF THE COST STATUS OF MAJOR TRANSMISSION PROJECTS IN ALBERTA REVIEW OF THE COST STATUS OF MAJOR TRANSMISSION PROJECTS IN ALBERTA From The Transmission Facilities Cost Monitoring Committee DECEMBER 2013 REPORT Review of the Cost Status of Major Transmission Projects

More information

WOLVERINE TO BHP JANSEN NEW TRANSMISSION LINE PROJECT FALL 2017

WOLVERINE TO BHP JANSEN NEW TRANSMISSION LINE PROJECT FALL 2017 WOLVERINE TO BHP JANSEN NEW TRANSMISSION LINE PROJECT FALL 2017 TODAY WE LL TALK ABOUT Our challenges and how we re meeting them Why we re building this project Our planning process and considerations

More information

15 Nelson-Marlborough Regional Plan

15 Nelson-Marlborough Regional Plan 15 Nelson-Marlborough Regional Plan 15.1 Regional overview 15.2 Nelson-Marlborough transmission system 15.3 Nelson-Marlborough demand 15.4 Nelson-Marlborough generation 15.5 Nelson-Marlborough significant

More information

Transmission Improvements Plan for 575 MW Network Service Request Wansley CC 7 Generation Facility (OASIS # ) Georgia Transmission Corporation

Transmission Improvements Plan for 575 MW Network Service Request Wansley CC 7 Generation Facility (OASIS # ) Georgia Transmission Corporation Transmission Improvements Plan for 575 MW Network Service Request CC 7 Generation Facility (OASIS # 143556) Georgia Transmission Corporation November 11, 2010 CC7 TIP 11-11-2010 (2).docx PROBLEM STATEMENT

More information

Power Purchase and Grid Connection Procedures

Power Purchase and Grid Connection Procedures Building Your Biogas System Workshop and Grid Connection Procedures Aidan Foss. amfoss@ieee.org ANF Energy Solutions DG grid connection specialists No project ownership Current projects Biogas 21 Landfill

More information

2018 Annual Progress Report to WECC Pacific Gas and Electric Company

2018 Annual Progress Report to WECC Pacific Gas and Electric Company 2018 Annual Progress Report to WECC Pacific Gas and Electric Company Waiver of Significant Transmission Project Status Table 1 and 2 update the planned transmission and generation projects, respectively,

More information

Case 13-M Edic to New Scotland 345 kv Transmission Line and Hurley Avenue PARs Project (ED-NS/HA) Article VII Filing ED-NS/HA

Case 13-M Edic to New Scotland 345 kv Transmission Line and Hurley Avenue PARs Project (ED-NS/HA) Article VII Filing ED-NS/HA Submission of Indicated New York Transmission Owners For Authority to Construct and Operate Electric Transmission Facilities in Multiple Counties in New York Case 13-M-0457 Edic to New Scotland 345 kv

More information

South Dakota 890 Study

South Dakota 890 Study South Dakota 890 Study September 16, 2011 South Dakota 890 Study Presentation of 890 Study results from 2011 Includes WAPA suggested system improvements and timelines Stakeholder Feedback Questions? 2

More information

Dawes Substation Project

Dawes Substation Project Dawes Substation Project Why are you receiving this project information package? March 2013 New transmission facilities are needed in the Fort McMurray area. ATCO Electric has been directed by the Alberta

More information

Public Service Company of Colorado Transmission Projects Status. CCPG May 5, 2016

Public Service Company of Colorado Transmission Projects Status. CCPG May 5, 2016 Public Service Company of Colorado Transmission Projects Status CCPG May 5, 2016 1 Transmission Ownership Colorado 2016 Transmission Planning Drivers Load Service / Near-Term (1-5 years) TPL Studies (5

More information

Updates and Modifications to Report

Updates and Modifications to Report QUARTERLY COMPLIANCE REPORT (OCTOBER 2016) OF SOUTHERN CALIFORNIA EDISON COMPANY (U 338-E) REGARDING STATUS OF TRANSMISSION PROJECTS AND GENERATION INTERCONNECTION PROJECTS Pursuant to Commission Decision

More information