Download "Connection Engineering Study Report for AUC Application: AESO Project # 1674"

Transcription

1 APPENDIX A CONNECTION ASSESSMENT

2

3

4 Connection Engineering Study Report for AUC Application: AESO Project # 1674 Executive Summary Project Overview FortisAlberta Inc. (FortisAlberta) submitted a System Access Service Request (SASR) to the Alberta Electric System Operator (AESO) to increase the Rate Demand Transmission Service (DTS) from 17.4 MW to 21.1 MW at the existing Cooking Lake 522S substation in the Edmonton area (the Project). The requested In-Service Date (ISD) for the Project is July 1, Existing System The Project is located in the AESO planning area of Edmonton (Area 60) as part of the AESO Edmonton Region. The existing constraints in Edmonton Region are managed in accordance with Section of the ISO Rules, Real Time Transmission Constraint Management (TCM Rule). The Cooking Lake 522S substation is connected to the 138 kv transmission system south and southeast of the City of Edmonton which is closely tied to the 138 kv system in the AESO Wetaskiwin Planning Area (Area 31). The Cooking Lake 522S substation load is fed primarily from the following four sources. 1. East Edmonton 38S 240/138 kv substation which is connected to Bretona 45S and Nisku 149S substations by 138 kv transmission lines; 2. Transmission line 174L connecting the North Holden 395S substation to the Bardo 197S substation; 3. Bigstone 86S substation; and 4. Transmission line 739L from the Acheson 305S substation to the Devon 14S substation. Study Summary Study Area for the Project The study area for the Project consists of the Edmonton and Wetaskiwin planning areas, including the tie lines connecting two planning areas to the Alberta Interconnected Electrical System (Study Area). All transmission facilities within the Study Area were studied and monitored for violations of the Reliability Criteria (further described in Section 2.1). The two 138 kv transmission lines connecting the Study Area to the rest of the AIES (namely, transmission lines 739L and 174L) were also studied and monitored to identify any violations of the Reliability Criteria. Studies Performed for the Project Load flow analysis was performed for the 2017 summer peak (SP) and winter peak (WP) pre- Project and post-project scenarios, with the 2017 AIES topology in the Study Area to determine the Project impact on the Alberta Interconnected Electrical System (AIES). Voltage stability RP Page

5 Connection Engineering Study Report for AUC Application: AESO Project # 1674 analysis was performed for the 2017 WP post-project scenario to identify violations, if any, of the voltage stability criteria. Results of the pre-project Studies The pre-project study results and applicable mitigation measures are summarized below and detailed in Table E SP Category A (N-G-0) conditions No Reliability Criteria violations were observed under Category A conditions for the 2017 SP scenario. Category B (N-G-1) conditions No voltage criteria violations were identified under Category B conditions for the 2017 SP scenario. Several transmission line flows above summer continuous ratings were observed; these are existing conditions and currently managed by real time operational practices. Voltage deviations observed at the St. Albert 99S substation are also a known condition managed by real time operational practices. The approved South and West of Edmonton Area Transmission Development (SWEATD) 1, which includes reconfiguring the 138 kv system east of the City of Edmonton, is planned to alleviate thermal loadings above summer continuous ratings and voltage deviations by Q WP Category A (N-G-0) conditions No Reliability Criteria violations were observed under Category A conditions for the 2017 WP scenario. Category B (N-G-1) conditions No Reliability Criteria violations were observed under Category B conditions for the 2017 WP scenario. Voltage deviations observed at the St. Albert 99S substation are currently managed by real time operational practices and will be mitigated by SWEATD, planned for Q Table E-1 Overview of Pre-Project Study Results Condition Scenario Results Mitigation measure Contingency Result Category A 2017 SP WP Category B 2017 SP Loss of the 240/138kV transformer at Bigstone Thermal loading above continuous ratings Currently managed by real time operational practices 1 The South and West Edmonton Area Transmission Reinforcement Needs Identification Document, approved by the Alberta Utilities Commission under Approval No. U , is available at: RP Page

6 Connection Engineering Study Report for AUC Application: AESO Project # 1674 Condition Scenario Results Mitigation measure Contingency 86S substation 2 Result below short-term rating on the 138 kv transmission line Loss of the 138 kv transmission line 780L Loss of the 138 kv transmission line 604L Loss of the 138 kv transmission line 739L Loss of the 138 kv transmission line 1045L Thermal loading above continuous ratings below short-term rating on the 138 kv transmission line 780L Thermal loading above continuous ratings below short-term rating on the 138 kv transmission line Thermal criteria violation on the 138 kv transmission line Thermal loading above continuous ratings below short-term rating on the 138 kv transmission line Thermal loading above continuous ratings below short-term rating on the 240 kv transmission line 905L Currently managed by real time operational practices Currently managed by real time operational practices Currently managed by real time operational practices Currently managed by real time operational practices Currently managed by real time operational practices 2017 WP Connection alternatives examined for the Project FortisAlberta examined and ruled out the use of distribution-based solutions to serve the additional load. This connection engineering study report (Report) will examine the following transmission alternatives to serve the requested 21.1 MW DTS capacity at the Cooking Lake 522S substation. Alternative 1 Upgrade the Cooking Lake 522S Substation Add a second 138/25 kv transformer, rated at 25/33/42 MVA, one 25 kv feeder breaker, and associated equipment at the Cooking Lake 522S substation. 2 While the loss of the 240/138kV transformer at Bigstone 86S substation is considered a Category B (N-G-1) event, this event would in fact result in the simultaneous loss of the 240 kv bus, the 240 kv transmission lines 914L (to the Gaetz 87S substation) and 914L (to the Ellerslie 89S), the 138 kv bus and the 138 kv transmission lines 805L (to Pigeon 964S) and 803L/804L (to Wetaskiwin 40S) due to the Bigstone 240 kv/138 kv bus configuration. RP Page

7 Connection Engineering Study Report for AUC Application: AESO Project # 1674 Alternative 2 Upgrades at the Blackmud 155S Substation Install a new 25 kv feeder breaker at the Blackmud 155S substation. Connection alternatives selected for further examination Alternative 1 was selected for further study. In its Need for Development report (DFO Report) 3, FortisAlberta, the distribution facility owner, concluded that: Alternative 1 would address the distribution reliability and capacity concerns for the distribution system connected to the Cooking Lake 522S substation; and Alternative 2 would also address the capacity concerns but not the distribution reliability issues at the Cooking Lake 522S substation due to insufficient transformation capacity at adjacent substations. Therefore, Alternative 2 is not a technically acceptable solution and was not selected for further studies. Results of the post-project studies The post-project study results are summarized below and detailed in Table E-2.The noted thermal violations and voltage deviations will be managed by real time operational procedures until completion of the SWEATD, planned for Q SP Category A (N-G-0) conditions No Reliability Criteria violations were observed under Category A conditions for the 2017 SP scenario. Category B (N-G-1) conditions No voltage criteria violations were identified under Category B conditions for the 2017 SP scenario. The same pre-project Category B transmission line flows above summer continuous ratings were observed; these are existing conditions and currently managed by real time operational practices. The same pre-project Category B voltage deviations at the St. Albert 99S substation were observed under the post-project 2017 SP scenario. The Project had no material impact on the system performance WP Category A (N-G-0) conditions No Reliability Criteria violations were observed under Category A conditions for the 2017 WP scenario. 3 FortisAlberta Need for Development Cooking Lake 522S Upgrade, dated June 24, 2015 is filed under separate cover. RP Page

8 Connection Engineering Study Report for AUC Application: AESO Project # 1674 Category B (N-G-1) conditions No Reliability Criteria violations were observed under Category B conditions for the 2017 WP scenario. The pre-project voltage deviations at the St. Albert 99S substation were also observed post- Project. The Project had no material impact on the system performance. Table E-2 Overview of Post-Project Study Results Condition Scenario Results Mitigation measure Contingency Result Category A 2017 SP WP Loss of the 240/138kV transformer at Bigstone 86S substation 4 Thermal loading above continuous ratings below short-term rating on the 138 kv transmission line Thermal loading above continuous ratings below short-term rating on the 138 kv transmission line 780L Currently managed by real time operational practices Currently managed by real time operational practices Category B 2017 SP Loss of the 138 kv transmission line 780L Thermal loading above continuous ratings below short-term rating on the 138 kv transmission line Currently managed by real time operational practices Loss of the 138 kv transmission line 604L Thermal criteria violation on the 138 kv transmission line Currently managed by real time operational practices Loss of the 138 kv transmission line 739L Thermal loading above continuous ratings below short-term rating on the 138 kv transmission line Currently managed by real time operational practices Loss of the 138 kv transmission line 1045L Thermal loading above continuous ratings below short-term rating on the 240 kv transmission line 905L Currently managed by real time operational practices 2017 WP While the loss of the 240/138kV transformer at Bigstone 86S substation is considered a Category B (N-G-1) event, this event would in fact result in the simultaneous loss of the 240 kv bus, the 240 kv transmission lines 914L (to the Gaetz 87S substation) and 914L (to the Ellerslie 89S), the 138 kv lines 805L (to Pigeon 964S) and 803L/804L (to Wetaskiwin 40S) due to the Bigstone 240 kv/138 kv bus configuration. RP Page

9 Connection Engineering Study Report for AUC Application: AESO Project # 1674 Mitigation Measures As indicated in Table E-1, Reliability Criteria violations that were identified in the pre-project studies are currently managed by real time operational practices. As indicated in Table E-2, Reliability Criteria violations that were identified in the post-project studies will continue to be managed by real time operational practices. These observed N-1 thermal loadings above continuous ratings will be addressed with the completion of the SWEATD project. Recommendation The studies demonstrate that the connection of the Project would not adversely impact the performance of the AIES. Consequently, the AESO recommends proceeding with the Project by adding a second transformer at the Cooking Lake 522S substation. RP Page

10 Connection Engineering Study Report for AUC Application: AESO Project # 1674 Contents Executive Summary Introduction Project Project Overview Generation Component Study Scope Study Objectives Study Area Studies Performed Report Overview Criteria, System Data, and Study Assumptions Criteria, Standards, and Requirements Transmission Planning Standards and Reliability Criteria AESO Rules Study Scenarios Load and Generation Assumptions Load Assumptions Generation Assumptions Intertie Flow Assumptions System Projects Customer Connection Projects Facility Ratings and Shunt Elements Voltage Profile Assumptions Study Methodology Connection Studies Carried Out Load Flow Analysis Contingencies Studied Voltage Stability (PV) Analysis Contingencies Studied Pre-Project System Assessment Pre-Project Load Flow Analysis Summer Peak 2017 SP, Scenario Winter Peak 2017 WP, Scenario Connection Alternatives Overview Connection Alternatives Identified Connection Alternatives Selected for Further Studies Connection Alternatives Not Selected for Further Studies Technical Analysis of the Connection Alternatives Load Flow Alternative Summer Peak 2017SP, Scenario Winter Peak 2017WP, Scenario Voltage Stability RP Page

11 Connection Engineering Study Report for AUC Application: AESO Project # Alternative Winter Peak 2017WP, Scenario Mitigation Measures Project Interdependencies Summary and Conclusion RP Page

12 Connection Engineering Study Report for AUC Application: AESO Project # 1674 Attachments Attachment A Pre-Project Load Flow Diagrams (Scenarios 1 to 2) Attachment B Post-Project Load Flow Diagrams (Scenarios 1 to 2) Attachment C Alternative 1: Voltage Stability Diagrams (Scenarios 4) Figures Figure 1-1: Existing Study Area Transmission System Figure 1-2: Edmonton Region Transmission System Future Configuration Tables Table 1.2-1: Summary of System Projects in the Study Area Table 2.1-1: Post Contingency Voltage Deviation Guidelines Table 2.2-1: List of the Connection Study Scenarios Table 2.3-1: Forecast Area Load (2014 LTO at Edmonton Region Peak) Table 2.3-2: Local Generation (MW) in the Study Cases Table 2.5-1: Summary of Customer Connection Assumptions Table 2.6-1: Summary of Transmission Line Ratings in the Study Area (MVA on 138 kv Base) Table 2.6-2: Summary of Transformer Ratings in the Study Area Table 2.6-3: Summary of Shunt Elements in the Study Area Table 2.7-1: Operating Voltages at Key Nodes in the Study Area and Vicinity Table 3.1-1: Summary of Studies Performed Table 4.1-1: Summary of System Performance (Element Loading) [2017SP Pre-Project N-G-1 Line Loading Above Continuous rating] Table 4.1-2: Summary of System Performance (Voltage Deviation) [2017SP Pre-Project N-G-1] Table 4.1-3: Summary of System Performance (Voltage Deviation) [2017WP Pre-Project N-G-1] Table 6.1-1: Summary of System Performance (Element Loading) [Scenario SP Post-Project N-G-1 Line Loading Above Continuous Rating] Table 6.1-2: Summary of System Performance for Scenario 3 (Voltage Deviation) Table 6.1-3: Summary of System Performance for Scenario 4 (Voltage Deviation) Table 6.2-1: Scenario 4: 2017 WP Voltage stability analysis results (Minimum transfer = 16.7 MW) RP Page

13 Connection Engineering Study Report for AUC Application: AESO Project # Introduction FortisAlberta has requested a 3.7 MW increase to its Cooking Lake 522S substation rate Demand Transmission Service (DTS). This Report recommends the connection alternative to serve the requested increase and presents the results of the study conducted to analyze the Project connection impact on the performance of the AIES Project Project Overview FortisAlberta Incorporated (FortisAlberta) has submitted a System Access Service Request (SASR) to the Alberta Electric System Operator (AESO) for increasing the Demand Transmission Service (DTS) from the existing value of 17.4 MW to 21.1 MW by July 2017 at the existing Cooking Lake 522S substation. The requested In-Service Date (ISD) for the Project is July 1, The existing DTS at the Cooking Lake 522S substation is 17.4 MW. The requested load addition is 3.7 MW by July The load will be studied assuming a 0.9 power factor (pf) lagging. Load Type: Comprised of farm, rural residential, small commercial and light industrial loads. FortisAlberta s SASR did not indicate plans for a future load increase at the Cooking Lake 522S substation Generation Component There is no generation component associated with the Project Study Scope Study Objectives The objective of the study is as follows: 1. Assess the impact of the Project connection on the AIES. 2. Examine the Project connection alternatives. 3. Recommend the Project connection alternative and any mitigation measures to address system performance concerns, if any, to enable the reliable integration of the Project into the AIES. RP Page

14 Connection Engineering Study Report for AUC Application: AESO Project # Study Area Study Area Description The Project is located in the AESO Edmonton Planning Area (Area 60) which forms part of the Edmonton Region. The Study Area consists of the Edmonton and Wetaskiwin Planning Areas, including the tie lines connecting two planning areas to the rest of the Alberta Interconnected Electrical System AIES. All transmission facilities within the two planning areas were studied and monitored for violations of the Reliability Criteria, further described in Section The two 138 kv transmission lines connecting the Study Area to the rest of the AIES, namely transmission lines 739L and 174L, were also studied and monitored to identify any violations of the Reliability Criteria. Figure 1-1: Existing Study Area Transmission System RP Page

15 Connection Engineering Study Report for AUC Application: AESO Project # Existing Constraints The existing Remedial Action Scheme (RAS), Bigstone (T86S) Reverse Power/Undervoltage Scheme (#121), is used to avoid power flow from the 138 kv to 240 kv bus at the Bigstone 86S substation to mitigate potential thermal overloads in neighbouring 138 kv transmission systems. The existing constraints in Edmonton Region are managed in accordance with the TCM Rule AESO Long-Term Transmission Plans (LTP) Figure 1-2 shows a schematic representation of the bulk transmission system expected in Q in the Edmonton Region after completion of the SWEATD. The SWEATD, described in Table 1.2-1, is not expected to be in service until Q and therefore was not modeled in the study scenarios presented in this Report. Table 1.2-1: Summary of System Projects in the Study Area Project Name Project Description Projected in-service date Status in Study NID filed; Energization 1 - Harry Smith Sub SWEATD South and West Edmonton Area Transmission Development Energization 2 - New Saunders Lake 240/138kV Substation; re-terminate 910L, 914L, 780L & 858L at Saunders Lake; build lines between Nisku & proposed Saunders Lake; and reconfiguration of affected substations. Energization 3 - New 138kV Lines from 780L to Cooking Lake & 174L; and reconfiguration of affected substations Q Not included Energization 4 - Open 133L from Wabamun to 234L tap 5 - New Capacitor Bank at Leduc 325S Energization RP Page

16 Connection Engineering Study Report for AUC Application: AESO Project # 1674 Figure 1-2: Edmonton Region Transmission System Future Configuration Studies Performed The following studies were performed for the pre-project analysis: Power Flow analysis (Categories A and B for 2017 SP and 2017 WP study scenarios) The following studies were performed for the post-project analysis: Power Flow analysis (Categories A and B for 2017 SP and 2017 WP study scenarios) Voltage Stability analysis (Category A and B for 2017 WP study scenario) 1.3. Report Overview The Executive Summary provides a high-level summary of the study and its conclusions. Section 1 introduces this Report. Section 2 describes the reliability criteria, system data, and other study assumptions used in this study. Section 3 describes the methodology used for this study. Section 4 discusses the pre-project assessment of the system. Section 5 presents all the connection alternatives contemplated. Section 6 provides a technical analysis of the connection alternatives considered for further study. Section 7 identifies any interdependencies this project may have. Section 8 presents the summary and conclusions of this study. RP Page

17 Connection Engineering Study Report for AUC Application: AESO Project # Criteria, System Data, and Study Assumptions 2.1. Criteria, Standards, and Requirements Transmission Planning Standards and Reliability Criteria The Transmission Planning (TPL) Standards, which are included in the Alberta Reliability Standards, and the AESO s Transmission Planning Criteria Basis and Assumptions (collectively, Reliability Criteria) 5 will be applied to evaluate system performance under Category A system conditions (i.e., all elements in-service) and following Category B (i.e., single element outage) and Category C5 contingencies (i.e., double circuit common tower outage), prior to and following the studied alternatives. Below is a summary of Category A, Category B and Category C5 system conditions. Category A, often referred to as the N-0 condition, represents a normal system with no contingencies and all facilities in service. Under this condition, the system must be able to supply all firm load and firm transfers to other areas. All equipment must operate within its applicable rating, voltages must be within their applicable range, and the system must be stable with no cascading outages. Category B events, often referred to as an N-1 or N-G-1 with the most critical generator out of service, result in the loss of any single specified system element under specified fault conditions with normal clearing. These elements are a generator, a transmission circuit, a transformer, or a single pole of a DC transmission line. The acceptable impact on the system is the same as Category A. Planned or controlled interruptions of electric supply to radial customers or some local network customers, connected to or supplied by the faulted element or by the affected area, may occur in certain areas without impacting the overall reliability of the interconnected transmission systems. To prepare for the next contingency, system adjustments are permitted, including curtailments of contracted firm (non-recallable reserved) transmission service electric power transfers. The Alberta Reliability Standards include the Transmission Planning (TPL) standards that specify the desired system performance under different contingency categories with respect to the Applicable Ratings. The transmission system performance under various system conditions is defined in Appendix 1 of the TPL standards. For the purpose of applying the TPL standards to this study, the Applicable Ratings shall mean: Seasonal continuous thermal rating of the line s loading limits. Highest specified loading limits for transformers. 5 Filed under separate cover RP Page

18 Connection Engineering Study Report for AUC Application: AESO Project # 1674 For Category A conditions: Voltage range under normal operating condition should follow the AESO Information Document ID# RS. For the busses not listed in ID# RS, Table 2-1 in the Transmission Planning Criteria Basis and Assumptions applies. For Category B conditions: The extreme voltage range values per Table 2-1 in the Transmission Planning Criteria Basis and Assumptions. Desired post-contingency voltage change limits for three defined post event timeframes as provided in Table Table 2.1-1: Post Contingency Voltage Deviation Guidelines Parameter and reference point Voltage deviation from steady state at POD low voltage bus. Post Transient (up to 30 sec) Time Period Post Auto Control (30 sec to 5 min) Post Manual Control (Steady State) ±10% ±7% ±5% AESO Rules The AESO Voltage Control Practice ID # RS will be applied to establish precontingency voltage profiles in the Study Area. The TCM Rule will be followed in setting up the study scenarios and assessment of the impact of the Project connection. In addition, due regard will be given to the AESO s Connection Study Requirements and the AESO s Generation and Load Interconnection Standard. The Reliability Criteria is the basis for planning the AIES. The transmission system will normally be designed to meet or exceed the Reliability Criteria under credible worst-case loading and generation conditions Study Scenarios Table provides a list of the study scenarios. Scenarios 1 and 2 are the pre-project scenarios for 2017 SP and 2017 WP; scenarios 3 and 4 are the post-project scenarios for 2017 SP and 2017 WP with the requested 3.7 MW DTS increase at the Cooking Lake 522S substation. A power factor of 0.9 lagging was used for the new Project load. Table 2.2-1: List of the Connection Study Scenarios Scenario Year/Season Load Condition Cooking Lake 522S Load (MW) SP Pre-Project WP Pre-Project SP Post Project WP Post-Project 21.1 RP Page

19 Connection Engineering Study Report for AUC Application: AESO Project # 1674 Scenario Year/Season Load Condition Cooking Lake 522S Load (MW) WP Post-Project Load and Generation Assumptions Load Assumptions The Study Area and Region load forecasts used for this connection study is shown in Table and is from the AESO 2014 Long-term Outlook (2014 LTO). In this study the active power to reactive power ratio in the base case scenarios was maintained when developing the study scenarios. Table 2.3-1: Forecast Area Load (2014 LTO at Edmonton Region Peak) Area or Region Name and Season Forecast Peak Load (MW) 2017 Wetaskiwin (Area 31) Wabamun (Area 40) Edmonton (Area 60) Edmonton Region (Areas 31, 40 and 60) AIL w/o Losses SP 140 WP 161 SP 176 WP 219 SP 1889 WP 1933 SP 2206 WP 2313 SP WP Generation Assumptions The generation conditions for this connection study are described in Table The study identified the Battle River 5 Generator at Battle River 757S substation in the Alliance/Battle River area as the critical generator and it is turned off to represent the N-G study condition for all analyses. RP Page

20 Connection Engineering Study Report for AUC Application: AESO Project # 1674 Table 2.3-2: Local Generation (MW) in the Study Cases 2017 SP 2017 WP Plant Name Bus Number Area PMax (MW) Unit Net Generation 6 (MW) Unit Net Generation 6 (MW) Cloverbar GT Cloverbar GT Cloverbar GT U of A ST Total Intertie Flow Assumptions The dispatch level of the British Columbia, Montana Alberta Tie Line and Saskatchewan interties are deemed to be too far away to have an effect on the assessment of the proposed connection. The flows in the Study Area are not influenced by the AIES HVDC facilities. As a result, the intertie and HVDC assumptions are kept consistent with the AESO planning base cases and are not adjusted for this study System Projects No transmission system long-term projects were included in the study cases. The SWEATD, described in Section , is not expected to be in service until Q and therefore was not modeled in the study scenarios presented in this Report Customer Connection Projects The list of the customer projects included in the study is shown in Table Table 2.5-1: Summary of Customer Connection Assumptions Planning Area Queue Position* Planned In- Service Date Project Name Project # Gen (MW) Load (MW) Included/Excluded from Studies Feb 1, ~2021 Fortis New Anthony Henday Substation Genesee Generating Units 4 (G4) and 5 (G5) Excluded Excluded May 14, 2016 Fortis Cargill Camrose Canola Included 6 Unit net Generation refers to Gross Generating unit MW output less Unit Service Load. RP Page

21 Connection Engineering Study Report for AUC Application: AESO Project # 1674 Planning Area Queue Position* Planned In- Service Date Project Name Project # Gen (MW) Load (MW) Included/Excluded from Studies Plant Oct 14, Jul 6, Jun 24, Nov 1, Jun 24, Apr 1, 2017 Imperial Oil Strathcona Refinery Cogeneration Project Fortis Leduc Transformer and Breakers Addition ASTC Power Sundance 3 Uprate Fortis Broadmoor 420S Upgrade EPCOR Dome Substation D84 Feeder Reactor Addition Fortis Cooking Lake 522A Capacity Increase Included Included Included Included Included Included * Per the AESO Connection Queue posted in April Project 1442 and Project 1440 are not planned to be in service until after the Project and so were excluded from the study Facility Ratings and Shunt Elements The transmission facilities owner (TFO) provided the ratings of the existing transmission lines (Table 2.6-1) and the existing transformers (Table 2.6-2) in the Study Area. Line ID Table 2.6-1: Summary of Transmission Line Ratings in the Study Area (MVA on 138 kv Base) Line Description Voltage Class (kv) Nominal Rating (MVA) Short-term 7 Rating (MVA) Summer Winter Summer Winter 897L East Edmonton 38S - Bretona 45S L Bretona 45S - Cooking Lake 522S L Cooking Lake 522S - Bardo 197S L Bardo 197S - North Holden 395S L North Holden 395S - Strome 223S L Bardo 197S - Kingman Tap L Kingman Tap - East Camrose 285S L East Camrose 285S - Ervick 542S L Ervick 542S - Trueweld Tap L Trueweld Tap - Wetaskiwin 40S When line loading in post Category B contingency is observed to exceed nominal rating and is less than the Short-term (emergency) rating, it is assumed that AESO and TFO operating practices can manage the constraint within the time requirements of TFO short time (emergency) rating. RP Page

22 Connection Engineering Study Report for AUC Application: AESO Project # 1674 Line ID Line Description Voltage Class (kv) Nominal Rating (MVA) Short-term 7 Rating (MVA) Summer Winter Summer Winter 858L Wetaskiwin 40S - Nisku 149S L East Edmonton 38S - Nisku 149S Table 2.6-2: Summary of Transformer Ratings in the Study Area Substation Name and Number Transformer ID Transformer Voltages (kv) MVA Rating East Edmonton 38S 38ST1 240/ ST4 240/ Bigstone 86S 86ST1 240/ The details of shunt elements in the Study Area are given in Table Table 2.6-3: Summary of Shunt Elements in the Study Area Capacitors Reactors Substation Name and Number Voltage Class (kv) Number of Switched Shunt Blocks Total at Nominal Voltage (MVAr) Status in Study (on or off) 2017 SP 2017 WP Number of Switched Shunt Blocks Total at Nominal Voltage (MVAr) Status in Study (on or off) 2017 SP 2017 WP (MVAr) (MVAr) (MVAr) (MVAr) East Edmonton 38S x MVAr (on) (on) Nisku x 30 MVAr (on) 30 (on) Voltage Profile Assumptions The AESO Voltage Control Practice ID # RS is used to establish normal system (i.e. pre-contingency) voltage profiles for key area busses prior to commencing any studies. Table 2-1 of the Transmission Planning Criteria Basis and Assumptions applies for all the busses not included in the ID RS. These voltages were utilized to set the voltage profile for the study base cases prior to load flow analysis. A list of operating voltages for the key buses in the Study Area and its vicinity are listed in Table RP Page

23 Connection Engineering Study Report for AUC Application: AESO Project # 1674 Table 2.7-1: Operating Voltages at Key Nodes in the Study Area and Vicinity AESO ID RS Bus No. and Name Nominal Voltage (kv) Minimum Operating Limit (kv) Desired Range (kv) Maximum Operating Limit (kv) 136 E EDMON E EDMON BIGSTON4 240 N/A BIGSTON ACHESON The 240 kv system is operated as required to maintain the 138 kv voltage within operating limits. RP Page

24 Connection Engineering Study Report for AUC Application: AESO Project # Study Methodology 3.1. Connection Studies Carried Out The studies carried out for this connection study are identified in Table The critical generator identified for this study was Battle River 5 Generator unit at Battle River 757S substation. Scenario and Condition Table 3.1-1: Summary of Studies Performed Project 1674 The Cooking Lake 522S substation Load (MW) Generation (MW) System Conditions Load Flow Voltage Stability SP Pre-project Category A and Category B Included WP Pre-Project Category A and Category B Included SP Post-Project Category A and Category B Included WP Post-Project Category A and Category B Included Included WP Post-Project Category A Load Flow Analysis Load flow analysis will be completed for all study scenarios to identify any thermal or transmission voltage violations as per the Reliability Criteria. Transformer tap and switched shunt reactive compensation devices such as shunt capacitors and reactors will be locked and continuous shunt devices will be enabled when performing Category B load flow analysis. POD low voltage bus deviations will also be assessed by first locking all tap changers and area capacitors to identify any post-transient voltage deviations above 10%. Tap changers will then be allowed to adjust, while shunt reactive compensating devices remained locked to determine if any voltage deviations above 7% would occur in the area. Once all taps and shunt reactive compensating devices have been adjusted, voltage deviations above 5% will be reported, for both the pre-project and post-project networks Contingencies Studied Load flow analysis was performed for the Category A condition and all Category B contingencies in the Edmonton (Area 60) and Wetaskiwin (Area 31) planning areas, including ties to surrounding areas for all pre- and post-project scenarios. RP Page

25 Connection Engineering Study Report for AUC Application: AESO Project # Voltage Stability (PV) Analysis The objective of the Power-Voltage (PV) curve is to determine the ability of the network to maintain voltage stability at all the busses in the system under normal and abnormal system conditions. The PV curve is a representation of voltage change as a result of increased power transfer between two systems. The reported incremental transfers will be to the collapse point. As per the AESO requirements, no assessment based upon other criteria such as minimum voltage will be made at the PV minimum transfer. Voltage stability analysis for the post-project scenarios will be performed. For load connection projects, the load level modelled in post- Project scenarios are the same or higher than in pre-project scenarios. Therefore, voltage stability analysis for pre-project scenarios will only be performed if post-project scenarios show voltage stability criteria violations. Voltage stability (PV) analysis will be performed according to the Western Electricity Coordinating Council (WECC) Voltage Stability Assessment Methodology. The voltage stability criteria states, for load areas, post-transient voltage stability is required for the area modeled at a minimum of 105% of the reference load level for system normal conditions (Category A) and for single contingencies (Category B). For this standard, the reference load level is the maximum established planned load. Typically, voltage stability analysis is carried out assuming the worst case scenarios in terms of loading. The voltage stability analysis was performed by increasing load in AESO s Wetaskiwin Planning area (Area 31) and the following substations in AESO s Edmonton Planning area (Area 60): Bretona 45S, Cooking Lake 522S, Devon 14S, Blackmud 155S, Nisku 149S and Leduc 325S, and increasing the corresponding generation in the following AESO Planning Areas: The Calgary planning area (Area 6) The Fort MacLeod planning area (Area 53) The Lethbridge planning area (Area 54) The Glenwood planning area (Area 55) As per the voltage stability criteria, post transient techniques (all tap changers, all discrete capacitors locked, but static var compensators will be allowed to adjust) will used in applying the criteria and this information is reflected in all tables and graphs. Also for this analysis, no limits will be selected for the generation sources, non-negative active power constant MVA loads will be enforced and the existing power factor for the reference will be maintained Contingencies Studied Voltage stability analysis was performed for the Category A condition and all Category B contingencies in Edmonton (Area 60) and Wetaskiwin (Area 31) planning areas, including ties to surrounding areas for all pre- and post-project scenarios. RP Page

26 Connection Engineering Study Report for AUC Application: AESO Project # Pre-Project System Assessment 4.1. Pre-Project Load Flow Analysis Category A: Summer Peak 2017 SP, Scenario 1 No Reliability Criteria violations were observed under Category A conditions for the 2017 WP scenario. Category B: No transmission voltage criteria violations were found under Category B in this scenario. Transmission line flows above the summer continuous ratings were identified for the Category B contingencies shown in Table and illustrated in the plots in Attachment A. The identified line flows, including the flow marginally above short-term rating on transmission line under contingency of 604L (Nisku 149S to Blackmud 155S), are currently managed by real time operational practices. The voltage deviations observed at the St. Albert 99S substation, shown in Table 4.1-2, are known conditions currently managed by real time operational practices. The approved SWEATD, which includes reconfiguring the 138 kv system east of the City of Edmonton, is planned to alleviate the identified transmission line flows above the summer continuous ratings and the voltage deviations by Q Table 4.1-1: Summary of System Performance 9 (Element Loading) [2017SP Pre-Project N-G-1 Line Loading Above Continuous rating] Contingency Limiting Branch Continuous Line Rating (MVA) Shortterm 10 Rating (MVA) Load Flow 11 (MVA) Pre-Project Normal Operation None % MVA Loading 86ST1 (Bigstone 86S 240/138 kv transformer) (North Calder 37S to Inland Cement Tap) 780L (East Edmonton 38S to Nisku 149S) All line flows of load flow analysis are reported as percentage loading relative to normal line rating as shown in Table minute summer emergency rating (MVA). 11 Load flow (MVA) is current expressed as MVA (ie. S = 3 x Vbase x Iactual). RP Page

27 Connection Engineering Study Report for AUC Application: AESO Project # 1674 Contingency 780L (East Edmonton 38S to Nisku 149S) 604L (Nisku 149S to Blackmud 155S) 739L Acheson 305S to Stony Plain 434S 1045L (Jasper 805S to Sundance 310P) Limiting Branch (North Calder 37S to Inland Cement Tap) (North Calder 37S to Inland Cement Tap) (North Calder 37S to Inland Cement Tap) 905L (North Calder 37S to Wabamun 19S) Continuous Line Rating (MVA) Shortterm 10 Rating (MVA) Load Flow 11 (MVA) Pre-Project % MVA Loading Table 4.1-2: Summary of System Performance (Voltage Deviation) [2017SP Pre-Project N-G-1] Contingency Substation Name and Number Bus No. Nominal kv Initial Voltage (kv) Voltage Deviations for POD Busses Only Post Transient (kv) % Change Post Auto (kv) % Change Steady State (kv) % Change for POD busses (North Calder 37S to St. Albert 99S) St. Albert 99S St. Albert 99S Category A: Winter Peak 2017 WP, Scenario 2 No Reliability Criteria violations were observed under Category A conditions in this scenario. Category B: Under Category B conditions, no thermal or transmission voltage criteria violations were found in this scenario. Voltage deviations observed at the St. Albert 99S substation, shown in Table 4.1-3, are known conditions currently managed by real time operational practices. The approved SWEATD, which includes reconfiguring the 138 kv system east of the City of Edmonton, is planned to alleviate these voltage deviations by Q Power flow analysis is illustrated in the plots in Attachment A. RP Page

28 Connection Engineering Study Report for AUC Application: AESO Project # 1674 Table 4.1-3: Summary of System Performance (Voltage Deviation) [2017WP Pre-Project N-G-1] Contingency Substation Name and Number Bus No. Nominal kv Initial Voltage (kv) Voltage Deviations for POD Busses Only Post Transient (kv) % Change Post Auto (kv) % Change Steady State (kv) % Change for POD busses (North Calder 37S to St. Albert 99S) St. Albert 99S St. Albert 99S RP Page

29 Connection Engineering Study Report for AUC Application: AESO Project # Connection Alternatives. Overview In its DFO Report, FortisAlberta examined and ruled out the use of distribution-based solutions to address the project requirements. 12 This Report examined two transmission alternatives to serve the Project, as detailed in Section Connection Alternatives Identified Two alternatives were examined in this Report. A description of the developments associated with each alternative is provided below. Alternative 1 Upgrades at the Cooking Lake 522S Substation A new 25/33/42 MVA 138/25 kv transformer, one 25 kv feeder breaker and associated equipment would be installed at the Cooking Lake 522S substation. Alternative 2 Upgrades at the Blackmud 155S Substation A new 25 kv feeder breaker would be installed at the Blackmud 155S substation, coupled with the associated distribution upgrades Connection Alternatives Selected for Further Studies Alternative 1 was selected for further study. In its DFO Report, FortisAlberta concluded that Alternative 1 would address the distribution reliability and capacity concerns for the distribution system connected to the Cooking Lake 522S substation Connection Alternatives Not Selected for Further Studies FortisAlberta reported that while Alternative 2 would also address the capacity concerns for the distribution system connected to the Cooking Lake 522S substation, it would not address the area distribution reliability issues due to insufficient transformation capacity at adjacent substations. Therefore, Alternative 2 is not a technically acceptable solution and was not selected for further studies. 12 The DFO s analysis is included in section of the DFO Report. RP Page

30 Connection Engineering Study Report for AUC Application: AESO Project # Technical Analysis of the Connection Alternatives 6.1. Load Flow Alternative 1 The following is a summary of the Alternative 1 load flow analysis. Category A: Summer Peak 2017SP, Scenario 3 No Reliability Criteria violations were observed under Category A conditions in the 2017 SP scenario. Category B: The same pre-project Category B thermal loadings above summer continuous ratings were observed under the post-project 2017 SP scenario as shown in Table and illustrated in the plots in Attachment B. The pre-project voltage deviations at the St. Albert 99S substation were also observed post-project in the 2017 SP scenario as shown in Table The Project had no material impact on the system performance. The identified thermal loadings above summer continuous ratings and voltage deviations are being managed by real time operational practices until mitigated by the SWEATD planned for Q Table 6.1-1: Summary of System Performance 13 (Element Loading) [Scenario SP Post-Project N-G-1 Line Loading Above Continuous Rating] Contingency Limiting Branch Continuous Line Rating (MVA) Shortterm Rating (MVA) Load Flow 14 (MVA) Pre- Project % Loading 15 Load Flow (MVA) Post- Project % Loading % Loading Difference Post-Pre 86ST1 (Bigstone 86S 240/138 kv transformer) (North Calder 37S to Inland Cement Tap) 780L (East Edmonton 38S to Nisku 149S) All line flows of load flow analysis are reported as percentage loading relative to normal line rating as shown in in Table Load flow (MVA) is current expressed as MVA (ie. S = 3 x Vbase x Iactual). 15 % loading is current expressed as MVA (ie. S = 3 x Vbase x Iactual). RP Page

31 Connection Engineering Study Report for AUC Application: AESO Project # 1674 Contingency Limiting Branch Continuous Line Rating (MVA) Shortterm Rating (MVA) Load Flow 14 (MVA) Pre- Project % Loading 15 Load Flow (MVA) Post- Project % Loading % Loading Difference Post-Pre 780L (East Edmonton 38S to Nisku 149S) 604L (Nisku 149S to Blackmud 155S) 739L Acheson 305S to Stony Plain 434S 1045L (Jasper 805S to Sundance 310P) (North Calder 37S to Inland Cement Tap) (North Calder 37S to Inland Cement Tap) (North Calder 37S to Inland Cement Tap) 905L (North Calder 37S to Wabamun 19S) Table 6.1-2: Summary of System Performance for Scenario 3 (Voltage Deviation) Contingency Substation Name and Number Bus No. Nominal kv Initial Voltage (kv) Post Transient (kv) Voltage Deviations for POD Busses Only % Change Post Auto (kv) % Change Post Manual (kv) % Change (North Calder 37S to St. Albert 99S) St. Albert 99S St. Albert 99S Category A: Winter Peak 2017WP, Scenario 4 No Reliability Criteria violations were observed under Category A conditions in the 2017 WP scenario. Category B: No Reliability Criteria violations were observed under Category A conditions in the 2017 WP scenario. The results for the load flow are illustrated in the plots in Attachment B. The pre-project voltage deviations at the St. Albert 99S substation were also observed post- Project in the 2017 WP scenario as shown in Table The Project had no material impact on the system performance. The identified voltage deviations are being managed by real time operational practices until mitigated by the SWEATD planned for Q RP Page

32 Connection Engineering Study Report for AUC Application: AESO Project # 1674 Table 6.1-3: Summary of System Performance for Scenario 4 (Voltage Deviation) Contingency Substation Name and Number Bus No. Nominal kv Initial Voltage (kv) Post Transient (kv) Voltage Deviations for POD Busses Only % Change Post Auto (kv) % Change Post Manual (kv) % Change (North Calder 37S to St. Albert 99S) St. Albert 99S St. Albert 99S Voltage Stability Alternative Winter Peak 2017WP, Scenario 4 Voltage stability analysis was performed for the 2017 WP scenario. The reference load level for the Wetaskiwin Planning Area (Area 31) and the load in the following substations in the Edmonton Planning Area (Area: Bretona 45S, Cooking Lake 522S, Devon 14S, Blackmud 155S, Nisku 149S and Leduc 325S is MW. The minimum incremental load transfer for the Category B contingencies is 5.0% of the reference load or 16.7 MW to meet the voltage stability criteria (0.05 x MW = 16.7 MW). Table summarizes the voltage stability results for Category A and the worst five contingencies for voltage stability transfer margins. The voltage stability diagrams are shown in Attachment C. Table 6.2-1: Scenario 4: 2017 WP Voltage stability analysis results (Minimum transfer = 16.7 MW) Contingency From To Maximum incremental transfer (MW) Meets 105% transfer criteria? N-G System Normal 320 Yes 604L Nisku 149S Blackmud 155S 140 Yes 897L East Edmonton 38S Bretona 45S 140 Yes 86ST1 Bigstone 86S 240/138 kv transformer 160 Yes 780L East Edmonton 38S Nisku 149S 180 Yes 730L Bardo 197S East Camrose 285S 220 Yes RP Page

33 Connection Engineering Study Report for AUC Application: AESO Project # Mitigation Measures The load flow analysis identified that, 780L, and 905L transmission line flows could be above summer continuous ratings under the studied Category B contingencies in the 2017 SP pre- and post-project scenarios. The identified thermal loadings are currently, and will continue to be, managed by real time operational practices until alleviated by the SWEATD project, planned for Q RP Page

Connection Engineering Study Report for AUC Application: EPCOR Clover Bar 25 kv Breaker Addition

Connection Engineering Study Report for AUC Application: EPCOR Clover Bar 25 kv Breaker Addition Connection Engineering Study Report for AUC Application: EPCOR Clover Bar 25 kv Breaker Addition Executive Summary Project Overview EPCOR Distribution & Transmission Inc. (EDTI), in its capacity as the

More information

Engineering Study Report: FortisAlberta Inc. Plamondon 353S Capacity Increase. Contents

Engineering Study Report: FortisAlberta Inc. Plamondon 353S Capacity Increase. Contents APPENDIX A CONNECTION ASSESSMENT : FortisAlberta Inc. Plamondon 5S Capacity Increase Contents Executive Summary.... Introduction... 6. Project... 6.. Project Overview... 6.. Load Component... 6.. Generation

More information

Executive Summary. Project Overview. Existing System. Study Summary

Executive Summary. Project Overview. Existing System. Study Summary APPENDIX A CONNECTION ASSESSMENT Connection Engineering Study Report for AUC Application: Hornbeck 345S Substation Executive Summary Project Overview FortisAlberta Inc. (FortisAlberta), in its capacity

More information

THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS

THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS 2/27/2018 ELECTRIC TRANSMISSION PLANNING Table of Contents Table of Contents... 2 Executive

More information

Final Draft Report. Assessment Summary. Hydro One Networks Inc. Longlac TS: Refurbish 115/44 kv, 25/33/ General Description

Final Draft Report. Assessment Summary. Hydro One Networks Inc. Longlac TS: Refurbish 115/44 kv, 25/33/ General Description Final Draft Report Assessment Summary Hydro One Networks Inc. : Refurbish 115/44 kv, 25/33/42 MVA DESN Station CAA ID Number: 2007-EX360 1.0 General Description Hydro One is proposing to replace the existing

More information

DFO STATEMENT OF NEED REPORT

DFO STATEMENT OF NEED REPORT APPENDIX E DFO STATEMENT OF NEED REPORT Table of Contents 1.0 Executive Summary... 1 2.0 Description of the Area... 2 2.1 Geographic Study Area... 2 2.2 2016 System Configuration... 2 3.0 Area Loading

More information

ATTACHMENT - DFO STATEMENT OF NEED

ATTACHMENT - DFO STATEMENT OF NEED ATTACHMENT - DFO STATEMENT OF NEED Table of Contents Executive Summary... 3 1. Description of the Area... 5 1.1 Geographic Study Area... 5 1.2 Current System Configuration... 7 1.3 Distributed Generation...

More information

100 MW Wind Generation Project

100 MW Wind Generation Project A subsidiary of Pinnacle West Capital Corporation 100 MW Wind Generation Project CUSTOMER FINAL Feasibility Study Results By Transmission Planning, APS December 21, 2007 Executive Summary This Feasibility

More information

Project #148. Generation Interconnection System Impact Study Report

Project #148. Generation Interconnection System Impact Study Report Project #148 Generation Interconnection System Impact Study Report June 05, 2012 Electric Transmission Planning Table of Contents Table of Contents... 2 Executive Summary... 3 Energy Resource Interconnection

More information

Interconnection System Impact Study Report Request # GI

Interconnection System Impact Study Report Request # GI Executive Summary Interconnection System Impact Study Report Request # GI-2008-23 34 MW Solar Generation Ranch at Hartsel, Colorado Public Service Company of Colorado Transmission Planning August 19, 2010

More information

SPS Planning Criteria and Study Methodology

SPS Planning Criteria and Study Methodology SPS Planning Criteria and Study Methodology SPS subscribes to the Southwest Power Pool ("SPP") Reliability Criteria, which incorporates compliance with the appropriate North American Electric Reliability

More information

EL PASO ELECTRIC COMPANY (EPE) FACILITIES STUDY FOR PROPOSED HVDC TERMINAL INTERCONNECTION AT NEW ARTESIA 345 KV BUS

EL PASO ELECTRIC COMPANY (EPE) FACILITIES STUDY FOR PROPOSED HVDC TERMINAL INTERCONNECTION AT NEW ARTESIA 345 KV BUS EL PASO ELECTRIC COMPANY (EPE) FACILITIES STUDY FOR PROPOSED HVDC TERMINAL INTERCONNECTION AT NEW ARTESIA 345 KV BUS El Paso Electric Company System Operations Department System Planning Section May 2004

More information

Service Requested 150 MW, Firm. Table ES.1: Summary Details for TSR #

Service Requested 150 MW, Firm. Table ES.1: Summary Details for TSR # Executive Summary Firm point to point transmission service has been requested by Transmission Service Request (TSR) #75669514, under the SaskPower Open Access Transmission Tariff (OATT). The TSR consists

More information

Transmission Coordination and Planning Committee 2014 Q4 Stakeholder Meeting. December 18, 2014

Transmission Coordination and Planning Committee 2014 Q4 Stakeholder Meeting. December 18, 2014 Transmission Coordination and Planning Committee 2014 Q4 Stakeholder Meeting December 18, 2014 Agenda 1. Introductions 2. TCPC Policies 3. BHCE Planning Department Update 4. 2014 LTP Study Results 5. Stakeholder

More information

System Impact Study Report

System Impact Study Report Report For: NTE Carolinas II, LLC ( Customer ) Queue #: 42432-01 Service Location: Rockingham County, NC Total Output: 477 MW (summer) / 540 MW (winter) Commercial Operation Date: 12/1/2020 42432-01 SIS

More information

Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood

Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood Prepared for: SCE&G Fossil/Hydro June 30, 2008 Prepared by: SCE&G Transmission Planning Table of Contents

More information

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015 No. Comment Submitted ISO Response Date Q&A Posted 1 Will the ISO consider proposals that are not within the impedance range specified? Yes. However, the benefits estimated and studies performed by the

More information

Interconnection Feasibility Study Report GIP-226-FEAS-R3

Interconnection Feasibility Study Report GIP-226-FEAS-R3 Interconnection Feasibility Study Report GIP-226-FEAS-R3 System Interconnection Request #226 70 MW Wind Generating Facility Kings County (L-6013) 2010 07 21 Control Centre Operations Nova Scotia Power

More information

ATTACHMENT Y STUDY REPORT

ATTACHMENT Y STUDY REPORT Attachment Y Study Edwards Unit 1: 90 MW Coal Retirement December 31, 2012 ATTACHMENT Y STUDY REPORT 7/5/2013 PUBLIC / EXECUTIVE SUMMARY MISO received an Attachment Y Notification of Potential Generation

More information

Interconnection Feasibility Study Report GIP-023-FEAS-R1. Generator Interconnection Request # MW Wind Generating Facility Inverness (L6549), NS

Interconnection Feasibility Study Report GIP-023-FEAS-R1. Generator Interconnection Request # MW Wind Generating Facility Inverness (L6549), NS Interconnection Feasibility Study Report GIP-023-FEAS-R1 Generator Interconnection Request # 23 100 MW Wind Generating Facility Inverness (L6549), NS February 16, 2006 Control Centre Operations Nova Scotia

More information

Generator Interconnection System Impact Study For

Generator Interconnection System Impact Study For Generator Interconnection System Impact Study For Prepared for: January 15, 2015 Prepared by: SCE&G Transmission Planning Table of Contents General Discussion... Page 3 I. Generator Interconnection Specifications...

More information

Falcon-Midway 115 kv Line Uprate Project Report

Falcon-Midway 115 kv Line Uprate Project Report Falcon-Midway 115 kv Line Uprate Project Report 12/1/2008 1 Background The function of this project is to uprate the 26.7 miles of Tri-State s 115 kv line between Midway and Falcon substations from 50

More information

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation Prepared by: Entergy Services, Inc. T & D Planning L-ENT-17A 639 Loyola Avenue New Orleans, LA 70113 Rev Issue Date

More information

Interconnection Feasibility Study Report GIP-222-FEAS-R3

Interconnection Feasibility Study Report GIP-222-FEAS-R3 Interconnection Feasibility Study Report GIP-222-FEAS-R3 System Interconnection Request #222 48 MW Steam Generating Facility Pictou County (53N) 2010 07 30 Control Centre Operations Nova Scotia Power Inc.

More information

Feasibility Study Report

Feasibility Study Report Generator Interconnection Request Feasibility Study Report For: Customer --- Service Location: Rutherford County Total Output: 79.2 MW Commercial Operation Date: 9/1/2014 In-Service Date (if given): 9/1/2014

More information

Midway/Monument Area TTC Study

Midway/Monument Area TTC Study Midway/Monument Area TTC Study (includes the following lines: Midway Geesen 115 kv, Geesen Falcon 115 kv, Falcon Fuller 115 kv, Fuller Black Squirrel 115 kv, and Black Squirrel Monument 115 kv) Johnny

More information

TRANSMISSION PLANNING CRITERIA

TRANSMISSION PLANNING CRITERIA CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003-3502 Effective Date: TRANSMISSION PLANNING CRITERIA PURPOSE This specification describes Con Edison s Criteria for assessing

More information

Interconnection Feasibility Study Report Request # GI Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado

Interconnection Feasibility Study Report Request # GI Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado Executive Summary Interconnection Feasibility Study Report Request # GI-2016-6 Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado Public Service Company of Colorado Transmission

More information

Supplemental Report on the NCTPC Collaborative Transmission Plan

Supplemental Report on the NCTPC Collaborative Transmission Plan Supplemental Report on the NCTPC 2007-2017 Collaborative Transmission Plan May 16, 2008 1 Table of Contents I. Executive Summary...1 II. Richmond-Fort Bragg Woodruff Street 230 kv Line...2 II.A. Need for

More information

PJM Generator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study September 2008

PJM Generator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study September 2008 PJM enerator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study 504744 September 2008 PJM Interconnection 2008. All rights reserved R60 Robison Park-Convoy 345kV Impact Study eneral

More information

Interconnection Feasibility Study Report GIP-157-FEAS-R2

Interconnection Feasibility Study Report GIP-157-FEAS-R2 Interconnection Feasibility Study Report GIP-157-FEAS-R2 System Interconnection Request #157 100.5 MW Wind Generating Facility Guysborough County (L-6515) 2009 09 14 Control Centre Operations Nova Scotia

More information

New 115 kv Disconnect Switches at Bloomsburg MTS

New 115 kv Disconnect Switches at Bloomsburg MTS 115 kv Line tap from C9 to Bloomsburg MTS & New Bus Tie Switch CAA ID Number: 2007-EX353 Final Draft ASSESSMENT SUMMARY 1. GENERAL DESCRIPTION Norfolk TS and Bloomsburg MTS are supplied by a single 115

More information

El PASO ELECTRIC COMPANY 2014 BULK ELECTRIC SYSTEM TRANSMISSION ASSESSMENT FOR YEARS

El PASO ELECTRIC COMPANY 2014 BULK ELECTRIC SYSTEM TRANSMISSION ASSESSMENT FOR YEARS El Paso Electric Company El PASO ELECTRIC COMPANY 2014 BULK ELECTRIC SYSTEM TRANSMISSION ASSESSMENT FOR YEARS 2015 2024 A Review on System Performance Following Extreme Bulk Electric System Events of the

More information

AMERICAN ELECTRIC POWER 2017 FILING FERC FORM 715 ANNUAL TRANSMISSION PLANNING AND EVALUATION REPORT PART 4 TRANSMISSION PLANNING RELIABILITY CRITERIA

AMERICAN ELECTRIC POWER 2017 FILING FERC FORM 715 ANNUAL TRANSMISSION PLANNING AND EVALUATION REPORT PART 4 TRANSMISSION PLANNING RELIABILITY CRITERIA AMERICAN ELECTRIC POWER 2017 FILING FERC FORM 715 ANNUAL TRANSMISSION PLANNING AND EVALUATION REPORT PART 4 TRANSMISSION PLANNING RELIABILITY CRITERIA AEP Texas (comprised of its Central and North Divisions

More information

Interconnection Feasibility Study Report GIP-084-FEAS-R2

Interconnection Feasibility Study Report GIP-084-FEAS-R2 Interconnection Feasibility Study Report GIP-084-FEAS-R2 System Interconnection Request #84 50 MW Wind Generating Facility Pictou County (L-7004) August 17, 2007 Control Centre Operations Nova Scotia Power

More information

PJM Generator Interconnection R81 Emilie (Fords Mill) MW Impact Study Re-Study

PJM Generator Interconnection R81 Emilie (Fords Mill) MW Impact Study Re-Study PJM Generator Interconnection R81 Emilie (Fords Mill) 100.9 MW Impact Study Re-Study August 2008 DMS # 498781 General Queue R81 Emilie (Fords Mills) is a Fairless Energy, LLC request to obtain an additional

More information

CUSTOMER/ TWIN ARROWS PROJECT

CUSTOMER/ TWIN ARROWS PROJECT A subsidiary of Pinnacle West Capital Corporation CUSTOMER/ TWIN ARROWS PROJECT V1 Facility Study Report APS Contract 52149 Prepared by: Arizona Public Service Company Transmission & Distribution Asset

More information

Gateway South Transmission Project

Gateway South Transmission Project Phase 1 Comprehensive Progress Report Volume 1 - Technical Report Report Prepared by PacifiCorp Transmission Planning Department November 21, 2008 WECC1-V4 Phase 1 Comprehensive Progress Report Executive

More information

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI Executive Summary Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI-2003-2 Xcel Energy Transmission Planning January 2004 This Interconnection Feasibility

More information

TOLTEC POWER PARTNERSHIP TOLTEC POWER PROJECT INTERCONNECTION STUDY SYSTEM IMPACT STUDY

TOLTEC POWER PARTNERSHIP TOLTEC POWER PROJECT INTERCONNECTION STUDY SYSTEM IMPACT STUDY TOLTEC POWER PARTNERSHIP TOLTEC POWER PROJECT INTERCONNECTION STUDY SYSTEM IMPACT STUDY January 7, 2002 Prepared by Jorge Chacon (Consultant) Tucson Electric Power Company Ed Beck ii EXECUTIVE SUMMARY

More information

Alberta Electric System Operator Needs Identification Document Application. Mowat 2033S Substation

Alberta Electric System Operator Needs Identification Document Application. Mowat 2033S Substation Decision 21781-D01-2016 Alberta Electric System Operator Needs Identification Document Application Facility Applications September 7, 2016 Alberta Utilities Commission Decision 21781-D01-2016: Alberta

More information

Stability Study for the Mt. Olive Hartburg 500 kv Line

Stability Study for the Mt. Olive Hartburg 500 kv Line Stability Study for the Mt. Olive Hartburg 500 kv Line Peng Yu Sharma Kolluri Transmission & Distribution Planning Group Energy Delivery Organization Entergy Sevices Inc April, 2011 New Orleans, LA 1.

More information

SYSTEM IMPACT STUDY EC300W ERIS FINAL REPORT. El Paso Electric Company

SYSTEM IMPACT STUDY EC300W ERIS FINAL REPORT. El Paso Electric Company SYSTEM IMPACT STUDY EC300W ERIS FINAL REPORT Prepared for: El Paso Electric Company Prepared by: Engineers, LLC 1526 Cole Boulevard Building 3, Suite 150 Lakewood, CO 80401 (303) 395-4018 FOREWORD This

More information

Project #94. Generation Interconnection System Impact Study Report Revision

Project #94. Generation Interconnection System Impact Study Report Revision Project #94 Generation Interconnection System Impact Study Report Revision October 2, 2009 Electric Transmission Planning Table of Contents Table of Contents...2 Executive Summary...3 Energy Resource Interconnection

More information

Generation Interconnection Feasibility Study For XXXXXXXXXXXXXXXXXXXXXX MW generator at new Western Refinary Substation

Generation Interconnection Feasibility Study For XXXXXXXXXXXXXXXXXXXXXX MW generator at new Western Refinary Substation Generation Interconnection Feasibility Study For XXXXXXXXXXXXXXXXXXXXXX 131-250 MW generator at new Western Refinary Substation System Planning Section April, 2005 TABLE OF CONTENT 1 EXECUTIVE SUMMARY

More information

Dunvegan Hydroelectric Project. For Glacier Power Limited. Preliminary Interconnection Study

Dunvegan Hydroelectric Project. For Glacier Power Limited. Preliminary Interconnection Study ` Dunvegan Hydroelectric Project For Glacier Power Limited Preliminary Interconnection Study Prepared by Pung Toy, P. Eng. and Ata Rehman, P. Eng. September 24, 2004 Table of Contents Table of Contents...

More information

SMUD 2014 Ten-Year Transmission Assessment Plan. Final. December 18, 2014

SMUD 2014 Ten-Year Transmission Assessment Plan. Final. December 18, 2014 SMUD 2014 Ten-Year Transmission Assessment Plan Final December 18, 2014 I CONTENTS Executive Summary... III 1 Introduction... 2 1.1 Reliability Criteria and Guidelines... 2 1.2 Load Forecast... 2 1.3 Demand

More information

Western Area Power Administration Sierra Nevada Region

Western Area Power Administration Sierra Nevada Region Western Area Power Administration Sierra Nevada Region 2014 Annual Ten-Year Transmission Plan Assessment Report November 20, 2014 For information or questions regarding this Transmission Assessment Report,

More information

Central East Region Transmission Development Needs Identification Document

Central East Region Transmission Development Needs Identification Document Executive Summary As part of its mandate, the ( AESO ) is responsible for planning the transmission system within the province of Alberta as set out in the Electric Utilities Act, SA 2003 c E-5.1 ( EUA

More information

Interconnection System Impact Study Final Report February 19, 2018

Interconnection System Impact Study Final Report February 19, 2018 Interconnection System Impact Study Final Report February 19, 2018 Generator Interconnection Request No. TI-17-0225 248.4 MW (Alternate Project Output of 217.35 MW) Wind Energy Generating Facility In Goshen

More information

DUKE ENERGY PROGRESS TRANSMISSION SYSTEM PLANNING SUMMARY

DUKE ENERGY PROGRESS TRANSMISSION SYSTEM PLANNING SUMMARY DUKE ENERGY PROGRESS TRANSMISSION SYSTEM PLANNING SUMMARY Transmission Department Transmission Planning Duke Energy Progress TABLE OF CONTENTS I. SCOPE 3 II. TRANSMISSION PLANNING OBJECTIVES 3 III. TRANSMISSION

More information

2012 LOCAL TRANSMISSION PLAN:

2012 LOCAL TRANSMISSION PLAN: Colorado PUC E-Filings System 2012 LOCAL TRANSMISSION PLAN: TRANSMISSION COORDINATION AND PLANNING COMMITTEE ANNUAL TRANSMISSION ASSESSMENT FOR BLACK HILLS/COLORADO ELECTRIC UTILITY COMPANY, L.P., D/B/A

More information

Facilities Study for Alberta to US Available Transfer Capability

Facilities Study for Alberta to US Available Transfer Capability Facilities Study for Alberta to US Available Transfer Capability Report No: NPP2002-05 June 3, 2002 System Planning & Grid Operations, Transmission Line of Business Engineering Services Executive Summary

More information

Feasibility Study Report

Feasibility Study Report Report For: Fresh Air Energy II, LLC ( Customer ) Queue #: Service Location: Chester County, SC Total Output Requested By Customer: 74.5 MW Commercial Operation Date Requested By Customer: 1/7/2019 Feasibility

More information

Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting

Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting BHE Wyoming Q4 Stakeholder Meeting November 17, 2016 @ 1:00PM MT Black Hills Energy Service Center 409 Deadwood Avenue, Rapid

More information

Q217 Generator Interconnection Project

Q217 Generator Interconnection Project Q217 Generator Interconnection System Impact Study APS Contract No. 52588 By Arizona Public Service Company Transmission Planning November 25, 2013 Version 2.0 Prepared by Utility System Efficiencies,

More information

Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers

Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers Puget Sound Area Study Team Bonneville Power Administration, Puget Sound Energy, Seattle City Light,

More information

Interconnection Feasibility Study Report GIP-IR373-FEAS-R1

Interconnection Feasibility Study Report GIP-IR373-FEAS-R1 Interconnection Feasibility Study Report GIP-IR373-FEAS-R1 Generator Interconnection Request 373 109.5 MW Wind Generating Facility South Canoe Lake, NS Mar. 2, 2012 Control Centre Operations Nova Scotia

More information

2017 Interim Area Transmission Review of the New York State Bulk Power Transmission System

2017 Interim Area Transmission Review of the New York State Bulk Power Transmission System 2017 Interim Area Transmission Review of the New York State Bulk Power Transmission System A Draft Report by the New York Independent System Operator October 24, 2017 - DRAFT DRAFT PURPOSES ONLY NYISO

More information

GENERAL DIRECTION SOUGHT AND SPECIFIC QUESTIONS TO BE ANSWERED

GENERAL DIRECTION SOUGHT AND SPECIFIC QUESTIONS TO BE ANSWERED DATE: June 28, 2011 STAFF: Brian Janonis Brian Moeck, PRPA Pre-taped staff presentation: none WORK SESSION ITEM FORT COLLINS CITY COUNCIL SUBJECT FOR DISCUSSION Electric Transmission Update. EXECUTIVE

More information

Consulting Agreement Study. Completed for Transmission Customer

Consulting Agreement Study. Completed for Transmission Customer Completed for Transmission Customer Proposed Resource & Transmission Carbon County, MT & 230 kv Transmission in North Wyoming August 2016 Table of Contents 1.0 Description... 1 2.0 Overall Assumptions...

More information

15 Nelson-Marlborough Regional Plan

15 Nelson-Marlborough Regional Plan 15 Nelson-Marlborough Regional Plan 15.1 Regional overview 15.2 Nelson-Marlborough transmission system 15.3 Nelson-Marlborough demand 15.4 Nelson-Marlborough generation 15.5 Nelson-Marlborough significant

More information

DETOUR GOLD CORPORATION SYSTEM IMPACT ASSESSMENT FOR DETOUR LAKE PROJECT

DETOUR GOLD CORPORATION SYSTEM IMPACT ASSESSMENT FOR DETOUR LAKE PROJECT DETOUR GOLD CORPORATION SYSTEM IMPACT ASSESSMENT FOR DETOUR LAKE PROJECT Report No.: RP-160388-02-141-0001 CAA ID No. 2010-380 Rev. 01 Prepared by: AMEC Americas Limited Energy and Mining Division Power

More information

SYSTEM IMPACT RESTUDY H252W ERIS REPORT. El Paso Electric Company

SYSTEM IMPACT RESTUDY H252W ERIS REPORT. El Paso Electric Company SYSTEM IMPACT RESTUDY H252W ERIS REPORT Prepared for: El Paso Electric Company Prepared by: Engineers, LLC 1526 Cole Boulevard Building 3, Suite 150 Lakewood, CO 80401 (303) 395-4018 FOREWORD This report

More information

NorthernLights HVDC Project

NorthernLights HVDC Project WECC COMPREHENSIVE PROGRESS REPORT December 4, 2008 Prepared for TransCanada by Ben Williams TABLE OF CONTENTS EXECUTIVE SUMMARY... III 1.0 BACKGROUND & INTRODUCTION... 1 1.1 BACKGROUND... 1 1.2 INTRODUCTION...

More information

Interconnection Feasibility Study Report GIP-369-FEAS-R1

Interconnection Feasibility Study Report GIP-369-FEAS-R1 Interconnection Feasibility Study Report GIP-369-FEAS-R1 System Interconnection Request #369 50 MW Wind Generating Facility Cumberland County (L-6513) 2012-02-09 Control Centre Operations Nova Scotia Power

More information

Appendix D Black Hills Project Summary

Appendix D Black Hills Project Summary Page 1 of 28 Appendix D Black Hills Project Summary Table of Contents Black Hills Project Summary... D-1 Boone-Nyberg 115 kv Project... D-3 Rattlesnake Butte 115 kv Substation Terminal... D-6 Fountain

More information

Feasibility Study Report

Feasibility Study Report Report For: Orion Renewable Resources LLC ( Customer ) Queue #: Service Location: Rockingham County, NC Total Output Requested By Customer: 100 MW Commercial Operation Date Requested By Customer: 11/1/2019

More information

Feasibility Study. Customer Kingman Area Photovoltaic Generation Project Interconnection

Feasibility Study. Customer Kingman Area Photovoltaic Generation Project Interconnection Feasibility Study Customer Kingman Area Photovoltaic Generation Project Interconnection October, 2009 October 2009 i EXECUTIVE SUMMARY CONCLUSION Customer has requested network resource interconnection

More information

Black Hills Project Summary

Black Hills Project Summary 2016 Rule 3627 Report Black Hills Project Summary Page 1 of 38 Black Hills Project Summary Colorado PUC E-Filings System D 1 2016 Rule 3627 Report Black Hills Project Summary Page 2 of 38 Category Transmission

More information

MILLIGAN SOLAR PROJECT

MILLIGAN SOLAR PROJECT February 16, 2009 Page 1 of 18 A subsidiary of Pinnacle West Capital Corporation MILLIGAN SOLAR PROJECT FINAL Feasibility Study Report APS Contract 52115 Prepared by: Arizona Public Service Company Transmission

More information

XXXX. Knob Hill Wind Farm Project. Interconnection System Impact Study

XXXX. Knob Hill Wind Farm Project. Interconnection System Impact Study XXXX Knob Hill Wind Farm Project Report No. August 2010 British Columbia Hydro and Power Authority British Columbia Hydro and Power Authority 2010. All rights reserved.. DISCLAIMER OF WARRANTY, LIMITATION

More information

Georgia Transmission Corporation Georgia Systems Operations Corporation

Georgia Transmission Corporation Georgia Systems Operations Corporation Georgia Transmission Corporation Georgia Systems Operations Corporation Reactive Power Requirements for Generating Facilities Interconnecting to the Georgia Integrated Transmission System with Georgia

More information

Kettle River Transmission Project

Kettle River Transmission Project April 2012 Why are you receiving this project information package? New transmission facilities are needed in the Fort McMurray area. ATCO Electric has been directed by the Alberta Electric System Operator

More information

Feasibility Study for the Q MW Solar Project

Feasibility Study for the Q MW Solar Project Feasibility Study for the Q171 74.5 MW Solar Project August 2018 Bulk Transmission Planning, Florida i This document and any attachments hereto ( document ) is made available by Duke Energy Florida, LLC

More information

4,1 '~ ~ ~ 1I1f lc/)~ul I Central Electricity Authority

4,1 '~ ~ ~ 1I1f lc/)~ul I Central Electricity Authority ,.,.;i')!i,:;;',;~~~. 'ffrff mm I Government of India ~ ~.I Ministry of Power 4,1 '~ ~ ~ 1I1f lc/)~ul I Central Electricity Authority III ~~~~~~I"1",~~1 ;J' :. r System Planning & Project Appraisal Division

More information

Q95 Vicksburg 69kV. System Impact Study. APS Contract No Arizona Public Service Company Transmission Planning.

Q95 Vicksburg 69kV. System Impact Study. APS Contract No Arizona Public Service Company Transmission Planning. A subsidiary of Pinnacle West Capital Corporation Q95 Vicksburg 69kV System Impact Study APS Contract No. 52246 By Arizona Public Service Company Transmission Planning December 1, 2010 Version 2.6 Final

More information

ATCO ELECTRIC LTD. (Transmission System) SERVICE QUALITY AND RELIABILITY PERFORMANCE, MEASURES AND INDICES Revision 0

ATCO ELECTRIC LTD. (Transmission System) SERVICE QUALITY AND RELIABILITY PERFORMANCE, MEASURES AND INDICES Revision 0 ATCO ELECTRIC LTD. (Transmission System) SERVICE QUALITY AND RELIABILITY PERFORMANCE, MEASURES AND INDICES 2018-04-24 - Revision 0 EUB Decision 2007-071 Board Direction 52 For questions or comments regarding

More information

Western Area Power Administration Sierra Nevada Region

Western Area Power Administration Sierra Nevada Region Western Area Power Administration Sierra Nevada Region 2013 Annual Ten-Year Transmission Plan Assessment Report December 1, 2013 For information or questions regarding this Transmission Assessment Report,

More information

Alternatives for meeting the need for transmission improvement described

Alternatives for meeting the need for transmission improvement described Alternatives for meeting the need for transmission improvement described 240 kv Alternative Looped System Southern Alberta Transmission Reinforcement For more information please contact the AESO at 1.888.866.2959,

More information

AQUILA NETWORKS WESTPLAINS ENERGY COLORADO CATEGORY C CONTINGENCY STUDIES

AQUILA NETWORKS WESTPLAINS ENERGY COLORADO CATEGORY C CONTINGENCY STUDIES AQUILA NETWORKS WESTPLAINS ENERGY COLORADO CATEGORY C CONTINGENCY STUDIES 2008-2012 April 2008 Table of Contents 1.0 INTRODUCTION... 2 2.0 RESULTS... 2 2.1 CATEGORY C NO SOLVE CASES... 2 2.2 CATEGORY C

More information

Merchant Transmission Interconnection PJM Impact Study Report. PJM Merchant Transmission Request Queue Position X3-028.

Merchant Transmission Interconnection PJM Impact Study Report. PJM Merchant Transmission Request Queue Position X3-028. Merchant Transmission Interconnection PJM Impact Study Report For PJM Merchant Transmission Request Queue Position X3-028 Breed 345 kv October/2014 System Impact Study Breed 345 kv Merchant Transmission

More information

TransWest Express Project

TransWest Express Project TransWest Express Project Phase One--Feasibility Study Final Study Report November 2006 A subsidiary of Pinnacle West Capital Corporation Executive Summary On October 21, 2005 Arizona Public Service Company

More information

XXXXXXXXXXXXXXXXXXXXXXXXX TRANSMISSION/GENERATION FEASIBILITY STUDY FATAL FLAW AND FEASIBILITY ANALYSIS

XXXXXXXXXXXXXXXXXXXXXXXXX TRANSMISSION/GENERATION FEASIBILITY STUDY FATAL FLAW AND FEASIBILITY ANALYSIS XXXXXXXXXXXXXXXXXXXXXXXXX TRANSMISSION/GENERATION FEASIBILITY STUDY FATAL FLAW AND FEASIBILITY ANALYSIS System Operations Department System Planning Section June 2001 TABLE OF CONTENTS 1.0 Executive Summary...Page

More information

EL PASO ELECTRIC COMPANY (EPE) GENERATOR INTERCONNECTION SYSTEM IMPACT STUDY FOR PROPOSED XXXXXXXXXXXXXXXXXX GENERATION ON THE AMRAD-ARTESIA 345 KV

EL PASO ELECTRIC COMPANY (EPE) GENERATOR INTERCONNECTION SYSTEM IMPACT STUDY FOR PROPOSED XXXXXXXXXXXXXXXXXX GENERATION ON THE AMRAD-ARTESIA 345 KV EL PASO ELECTRIC COMPANY (EPE) GENERATOR INTERCONNECTION SYSTEM IMPACT STUDY FOR PROPOSED XXXXXXXXXXXXXXXXXX GENERATION ON THE AMRAD-ARTESIA 345 KV LINE El Paso Electric Company System Planning Department

More information

The Long-Range Transmission Plan

The Long-Range Transmission Plan The Long-Range Transmission Plan 2015 2025 Matt Koenig Presentation to ESPWG / TPAS October 29 th, 2015 Long-Range Transmission Plan Driver of the Plan is to maintain local reliability 10-year planning

More information

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC OCTOBER 22, 2014 Emera Maine s Local System Plan Bangor Hydro District Needs Assessment/Potential Solutions Local Planning Advisory Committee Meeting E M i R t ti Emera Maine Representative: Jeffrey Fenn,

More information

FIRSTENERGY S PROPOSED SOLUTION AND REQUEST FOR CONSTRUCTION DESIGNATION

FIRSTENERGY S PROPOSED SOLUTION AND REQUEST FOR CONSTRUCTION DESIGNATION PJM RTEP - Artificial Island Area FIRSTENERGY S PROPOSED SOLUTION AND REQUEST FOR CONSTRUCTION DESIGNATION Part 1 Report REDACTED VERSION FirstEnergy Corp. Energy Delivery, Transmission Planning and Protection

More information

15 Nelson-Marlborough Regional Plan

15 Nelson-Marlborough Regional Plan 15 Nelson-Marlborough Regional Plan 15.1 Regional overview 15.2 Nelson-Marlborough transmission system 15.3 Nelson-Marlborough demand 15.4 Nelson-Marlborough generation 15.5 Nelson-Marlborough significant

More information

Reasonableness Test RT 015 /11 Salisbury Substation 11kV Feeders

Reasonableness Test RT 015 /11 Salisbury Substation 11kV Feeders Reasonableness Test RT 015 /11 Salisbury Substation 11kV Feeders Reasonableness Test: Salisbury Substation 11kV Feeders DISCLAIMER The purpose of this document is to inform customers, Interested Parties,

More information

Bohn to Kettle River Transmission Project

Bohn to Kettle River Transmission Project April 2012 Why are you receiving this project information package? New transmission facilities are needed in the Fort McMurray area. ATCO Electric has been directed by the Alberta Electric System Operator

More information

Generation Interconnection Impact Study Results for Eurus Energy America Corporation s Eurus Combine Hills I, LLC Power Project.

Generation Interconnection Impact Study Results for Eurus Energy America Corporation s Eurus Combine Hills I, LLC Power Project. Generation Interconnection Impact Study Results for Eurus Energy America Corporation s Eurus Combine Hills I, LLC Power Project April 23, 2003 Introduction Eurus originally requested an interconnection

More information

XXXX. Kokish River Hydroelectric Project. Interconnection System Impact Study

XXXX. Kokish River Hydroelectric Project. Interconnection System Impact Study XXXX Kokish River Hydroelectric Project Report No. August 2010 British Columbia Hydro and Power Authority British Columbia Hydro and Power Authority 2010. All rights reserved.. DISCLAIMER OF WARRANTY,

More information

Sub Regional RTEP Committee Western Region ATSI

Sub Regional RTEP Committee Western Region ATSI Sub Regional RTEP Committee Western Region ATSI February 20, 2019 1 ATSI Needs Stakeholders must submit any comments within 10 days of this meeting in order to provide time necessary to consider these

More information

Operational Planning Study Report. RTA to BCH transfer limit updates For Kitimat 4 Capacitor Banks

Operational Planning Study Report. RTA to BCH transfer limit updates For Kitimat 4 Capacitor Banks Operational Planning Study Report RTA to BCH transfer limit updates For Kitimat 4 Capacitor Banks Report No. T&S Planning 2013-062 British Columbia Hydro and Power Authority British Columbia Hydro and

More information

Final System Impact Study for. Sierra Pacific Industries 31 MW Generation Project. Mount Vernon, WA. November 16, 2006

Final System Impact Study for. Sierra Pacific Industries 31 MW Generation Project. Mount Vernon, WA. November 16, 2006 Final System Impact Study for Sierra Pacific Industries 31 MW Generation Project Mount Vernon, WA November 16, 2006 Puget Sound Energy, Inc. Electric Transmission Department 1 1. Introduction On October

More information

Rocky Mountain Power Exhibit RMP (RAV-4SD) Docket No Witness: Rick A. Vail BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH

Rocky Mountain Power Exhibit RMP (RAV-4SD) Docket No Witness: Rick A. Vail BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH Rocky Mountain Power Exhibit RMP (RAV-4SD) Docket No. 17-035-40 Witness: Rick A. Vail BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH ROCKY MOUNTAIN POWER Exhibit Accompanying Supplemental Direct

More information

Interconnection Feasibility Study Report Request # GI

Interconnection Feasibility Study Report Request # GI A. Executive Summary Interconnection Feasibility Study Report Request # GI-2011-04 587 MW Combined Cycle 2x1 Generators Cherokee Station, Denver, Colorado Public Service Company of Colorado Transmission

More information

Electric system improvements near you

Electric system improvements near you Electric system improvements near you Red Deer Area Transmission Development Stage 1 substation upgrades April 2011 Volume 1 Did you know? The average four-person family in Alberta today has 20 instant-on

More information

APPENDIX E: Project Need and Description

APPENDIX E: Project Need and Description APPENDIX E: Project Need and California ISO/MID E-1 Intentionally left blank California ISO/MID E-2 Tyler 60 kv Shunt Capacitor Installation of a 2x10 MVAR capacitor bank at Tyler 60 kv bus Objectives

More information