Dawes Substation Project

Size: px
Start display at page:

Download "Dawes Substation Project"

Transcription

1 Dawes Substation Project Why are you receiving this project information package? March 2013 New transmission facilities are needed in the Fort McMurray area. ATCO Electric has been directed by the Alberta Electric System Operator (AESO) to prepare a facilities proposal for the new development as part of the Algar Area System Development. As part of the facility application process, ATCO Electric is assessing site and route options for these facilities. We have prepared this summary for landowners, occupants, agencies and interested parties located near the proposed power transmission facilities. This package provides important project information and outlines our public consultation process. We invite any comments, questions or concerns you may have. Please refer to page six for our contact information and details. Project Overview The Dawes substation project is needed to provide reinforcement to the existing Fort McMurray 144-kilovolt (kv) transmission system and support future transmission system developments in the area. If approved, the project will involve building a new substation, approximately three kilometres of new 240-kV transmission line, approximately two kilometres of 144-kV transmission line, a 47 metre (m) telecommunication tower, and one diesel backup generator. Included in this package: Project information brochure Reply form and postage paid envelope Alberta Electric System Operator (AESO) Need Overview document Alberta Utilities Commission (AUC) brochure Public Involvement in Needs or Facilities Applications Maps and drawings Dawes Substation Project 1

2 Project Need and Details Dawes Substation When upgrades to Alberta s electrical system are needed, they are identified by the Alberta Electric System Operator (AESO). The Dawes substation project is necessary to provide reinforcement to the existing Fort McMurray 144-kilovolt transmission system and support future transmission system developments in the area. The AESO has identified the need for a new substation in order to meet the increased demand for electricity. If approved, the proposed Dawes substation (to be called 2011S) will be located approximately 50 km southwest of Fort McMurray. The preliminary location for the substation is on the southeast quarter of Section W4M and the southwest quarter of Section W4M. The substation will include: The AESO is an independent, not-for-profit organization responsible for the safe, reliable and economic planning and operation of the provincial transmission grid. For more information about why this project is needed, please refer to the AESO s Need Overview included with this package, or visit If you have any questions or concerns about the need for this project you may contact the AESO directly or you can make your concerns known to an ATCO Electric representative who will communicate them to the AESO on your behalf. one 240/144-kilovolt (kv) transformer three 240-kV circuit breakers three 144-kV circuit breakers one diesel backup generator one 47 m telecommunication tower and related electrical and communications equipment Site and Route Selection The proposed site for the Dawes substation was chosen to ensure: suitable site conditions (level, well-drained) good access sufficient space for initial development and incoming lines adequate setback from adjacent development and environmentally sensitive areas We have identified a preliminary route option for the transmission lines. Route options were selected to: minimize impacts to environmentally sensitive areas such as watercourses, wet or steep areas, wildlife habitat, recreational use and other sensitive areas such as designated historical sites minimize fragmentation to oil sand leases follow existing road allowances, linear disturbances, other right-of-ways or property boundaries wherever possible minimize impacts on built-up areas, highways, oil and gas operations and communication facilities Other site and route options may be considered if identified through our consultation process. Dawes Substation Project 2

3 240-Kilovolt (kv) Transmission Line 240 kv H-Frame Single-Circuit Structure If approved, the project will involve the construction of approximately three kilometres (km) of new 240-kilovolt (kv) single-circuit transmission line. The new line will connect the proposed Dawes substation (to be called 2011S) to an existing transmission line (called 9L07), effectively dividing the existing transmission line into two parts. The portion of the existing line to the north of the proposed substation will retain the name 9L07. The remaining portion of the existing line to the south of the substation will be renamed 9L89. Due to these upgrades, a portion of the existing line will no longer be needed, as shown on the enclosed map. This segment of the existing transmission line will be removed and the area reclaimed, where necessary. Materials removed from the transmission line will be reused by ATCO Electric or recycled according to local, provincial and federal regulations and guidelines. The newly constructed single-circuit transmission line will consist of three conductor wires and two overhead shield wires on steel or wood pole structure. Typical structure design will be based on the H-frame structure shown on the right. These structures will be approximately 20 m - 23 m tall. The typical distance between structures will range from 120 m to 300 m. Non-typical structures with taller or additional poles and/or anchors may be required where the line ends or bends, at corners, and to maneuver around and over obstacles. In all cases, minimum clearance will meet or exceed the requirements of provincial safety regulations. Approximate Dimensions Height m Max. width m Distance between structures to 300 m Dawes Substation Project 3

4 144 Kilovolt (kv) Transmission Line 144 kv Double Circuit Structure If approved, the project will involve the construction of approximately two kilometres (km) of new 144-kilovolt (kv) double-circuit transmission line. The new line (to be called 7L170) will connect the proposed Dawes substation (to be called 2011S) to an existing transmission line (called 7L36). The newly constructed double-circuit transmission line will consist of two sets of three conductor wires plus one overhead shield wire strung on steel pole structure. Typical design will be based on the structure shown on the right. These structures will be supported by guy wires and will range from 21 m to 23 m tall. The typical distance between structures will range from 120 m to 150 m. Non-typical structures with taller or additional poles and/or anchors may be required where the line ends or bends, at corners, and to maneuver around and over obstacles. In all cases, minimum clearance will meet or exceed the requirements of provincial safety regulation. Facilities Application Process Once feedback has been considered and the transmission line route and substation location has been finalized, ATCO Electric will submit a facilities application to the Alberta Utilities Commission (AUC) to obtain approval for the construction and operation of the proposed transmission facilities. For more information about how you can participate in the process, please refer to the enclosed AUC brochure entitled Public Involvement in Needs or Facilities Applications. Approximate Dimensions Height m Max. Width m Distance between structures to 150 m Dawes Substation Project 4

5 Typical Right-of-Way Transmission lines are located in corridors that have been cleared of brush and other obstacles. These areas are called a right- of-way. A right-of-way must have a minimum width to ensure safety and allow for construction and ongoing access for maintenance purposes. The width of the right-of-way, and the position of transmission structures within it, will depend on a variety of factors, including the type of structure that is used. The typical right-of-ways associated with this project are shown below. Details may change as designs are finalized. Dawes Substation Project 5

6 Proposed Timeline*: April 2013 Consultation with landholders and agencies June 2013 Submission of the facilities application to the Alberta Utilities Commission (AUC) January 2014 If approval is granted by the AUC, construction will commence November 2014 Facilities completed and operating *Timing may be adjusted to reflect final plans Contact Us ATCO Electric Albertans count on us for the safe, reliable and costeffective delivery of electricity to their homes, farms and businesses. We have delivered electricity to Albertans for more than 85 years. Headquartered in Edmonton, ATCO Electric has 38 service offices serving nearly two-thirds of the province in northern and east-central Alberta. We help keep the lights on across the province by building, operating and maintaining approximately 72,000 kilometres of transmission and distribution power lines. We also operate an additional 10,000 kilometres of distribution power lines on behalf of Rural Electrification Associations. We are committed to responsible development and environmental practices. We conduct an open and transparent consultation process, carefully considering the impacts to landowners, communities and the environment. Your comments and concerns are important to us. Please contact us toll free: or direct: Dani Koleyak, Project Planner ATCO Electric Street Edmonton, AB T5J 2V6 Phone: Fax: Website: Dawes Substation Project 6

7 Algar Area System Development Why is Development Needed? The Alberta Electric System Operator (AESO) is responsible for the safe, reliable and efficient planning and operation of the transmission system. Industrial development in the area southwest of the city of Fort McMurray is increasing electricity demand. The AESO has identified the need for transmission system reinforcement consisting of a new 144 kv source substation and associated equipment. Fort McMurray Athabasca River Clearwater River The AESO is proposing to develop the new Dawes 2011S 240/144 kv substation, connected to the existing 240 kv line 9L07 in the vicinity of the existing Algar 875S substation. This will provide needed reinforcement to the existing Fort McMurray 144 kv transmission system, and support future transmission system developments in the area. The AESO will file a needs identification document with the Alberta Utilities Commission (AUC) in the summer of Gregoire Lake In separate applications called facilities applications, ATCO Electric Ltd., the transmission facility owner (TFO) in the area, will describe the specific routes and sites it proposes to implement the transmission system development, and request approval from the AUC to construct and operate the specific transmission facilities. Gregoire Lake Proposed Development Areas The shaded area on the above map indicates the approximate area where the need for transmission development has been identified. The transmission facility owner will propose specific substation sites and transmission line routes that may extend beyond the area shown. Fort McMurray, Alberta

8 Who is the Alberta Electric System Operator? The AESO is an independent, not-for-profi t organization acting in the public interest of all Albertans. The AESO has no fi nancial interest or investment of any kind in the power industry. Alberta s transmission system is planned and operated by the AESO. The AESO s role is to maintain safe, reliable and efficient operation of the transmission system, sometimes referred to as the Alberta Interconnected Electric System (AIES). The AESO s planning responsibility includes determining the need for transmission system development and the manner in which that need is met. The AESO is also mandated to facilitate the interconnection of qualified market participants to the AIES. When the AESO identifies a need for new or upgraded transmission lines, substations or other equipment associated with the transmission system, and has determined how it proposes to address this need, the AESO prepares a Needs Identification Document (NID) with this information and files it with the Alberta Utilities Commission (AUC) for approval. The AESO will direct the transmission facility owner (TFO) in the area to begin work on the project. AESO AND TFO ROLES The AESO operates the provincial transmission system so that all Albertans can count on safe and reliable electricity to power our homes and businesses each and every day. The AESO also carefully plans upgrades to the system to ensure we keep pace with Alberta s growing demand for power. ATCO Electric Ltd. (ATCO) is the TFO in the project area. While the AESO is responsible for identifying that transmission system development is needed, ATCO is responsible for detailed siting and routing, constructing, operating and maintaining the associated transmission facilities. REGULATORY PROCESS AESO Process AESO Identifies Need for Transmission Development AESO Consultation (Mailouts, Open Houses, Meetings) AESO Applies to AUC for Approval of Need* AESO directs the TFO to file Facility Application The AESO will direct ATCO to file facilities applications with the AUC which will include detailed descriptions and locations of the proposed transmission facilities. There are four major TFOs in Alberta: ATCO Electric Ltd. AltaLink Management Ltd. EPCOR Utilities Inc. ENMAX Power Corporation Alberta Utilities Commission Process Approval of Need To Learn More About the Regulatory Process: Please contact the Alberta Utilities Commission (AUC): WEB: utilitiesconcerns@auc.ab.ca PHONE: (dial before the 10-digit number to be connected toll-free from anywhere in Alberta) TFO Process TFO Consultation, Detailed Design, Routing and Siting TFO Applies to the AUC for Approval of Siting and Routing, and to Construct and Operate Approval of Siting and Routing, and to Construct and Operate * Need for specified Critical Transmission Infrastructure projects are approved by the Lieutenant Governor In Council (LGIC)

9 Power Lingo The electricity industry has a language all its own. Did you know? TRANSMISSION SYSTEM The transmission system comprises the high-voltage lines, towers and equipment (generally 69kV and above) that transmit electricity from generators to lower voltage systems that distribute electricity to cities, towns, rural areas and large industrial customers. ALBERTA INTERCONNECTED ELECTRIC SYSTEM (AIES) The system of interconnected transmission power lines and generators managed by the AESO, that ensures the supply of electricity matches the demand for power every second. RELIABILITY Electric system reliability is the ability of a system to respond to the changing demand for power from consumers. It also describes a system s ability to withstand sudden disturbances, like bad weather or unanticipated equipment failure. SUBSTATION Substations are the connection point between high-voltage transmission lines and the lower voltage power lines that connect directly to homes and businesses. KILOWATT (KW) AND KILOWATT HOUR (KWH) Power is measured in watts. One kilowatt equals 1,000 watts. Imagine 10 lamps lit with 100 watt bulbs for one hour. At the end of the hour, you will have used one kilowatt hour of electricity. Electricity retailers typically bill households in kilowatt hours. NEEDS IDENTIFICATION DOCUMENT (NID) A Needs Identification Document describes either the conditions that will affect the operation and performance of the transmission system or the need to improve the efficiency of the transmission system, and indicates how these will be addressed. Siting of facilities and routing of transmission lines are determined later in the Regulatory Process. The AESO facilitates Alberta s fair, effi cient and openly competitive wholesale electricity market, which in 2010 had about 164 participants and approximately $8 billion in annual energy transactions. Every two years the AESO conducts a full mock disaster recovery exercise with over 200 industry participants to simulate full recovery of the grid from a province-wide blackout. Electricity demand in Alberta has increased 36% since 2000 and is expected to grow 2.4% per year until AESO forecasts show that growth in Alberta s economy will increase 2.5% per year over the next 20 years.

10 Other Projects in the Area The following is a list of other projects in your area that you may have heard about or that may be coming soon. Each of these will follow the Regulatory Process, with the AESO submitting needs identification documents and TFOs submitting facilities applications to the AUC for approval. Christina Lake Area 240 kv Transmission System Development Transmission system development is needed in the Christina Lake area to serve future industrial growth. Planned developments include three new 240 kv substations, approximately km of 240 kv transmission line and modifications at several existing substations. The Christina Lake Needs Identification Document (NID) was approved by the AUC in April Chard 658S Substation Connection ATCO Electric Ltd. has requested connection of Enbridge Inc. s proposed Chard 658S substation to the transmission system in the Christina Lake area. The request requires the development of a short, single-circuit 144 kv transmission line, between Enbridge s proposed Chard substation and the existing line 7L114 in the area. The Chard 658S Substation Connection NID was approved by the AUC in April Halfway 2014S Substation ATCO Electric Ltd. has requested an increase in transmission capacity to serve growing electricity demand south of the city of Fort McMurray. ATCO s request can be addressed by developing a new 144/4.16 kv substation and associated equipment to be connected to the existing 7L97 transmission line by a new single circuit 144 kv transmission line. Kinosis 856S Substation Modification ATCO Electric Ltd. has requested transmission system access to serve electricity demand in the area southeast of the city of Fort McMurray. ATCO s request can be addressed by modifying the existing Kinosis 856S substation by adding a new 25 kv breaker and relocating and replacing other equipment within the substation. For More Information The AESO appreciates your views on the need for transmission system development and your comments are encouraged. If you have any questions or suggestions regarding the need for the proposed transmission system development in the area southwest of the city of Fort McMurray or the AESO s application regarding this need, please contact: Mark Sears-Gamache AESO Stakeholder Relations stakeholder.relations@aeso.ca PHONE: ADDRESS: 2500, 330 5th Avenue SW Calgary, Alberta T2P 0L4 To learn more about the complex electricity industry and its importance to our quality of life and the province s economic well-being, please visit REV 0512

11 REPLY FORM DAWES SUBSTATION PROJECT Street, Edmonton, Alberta, T5J 2V6 CONTACT INFORMATION Date (DD/MM/YYYY): First Name: Last Name: Company/Organization Name (if applicable): Mailing Address: Please help us identify new contacts You were contacted about this project because ATCO Electric identified you or your company/organization as having a land interest in the vicinity of the project. Is there anyone else associated with your property, such as other owners, renters or occupants, who we should also contact? If so, please provide the name(s) and contact information below: City/Town: Province: Postal Code: Home Phone: Cell Phone: Business Phone: Fax: I would like to receive all future correspondence about this project by (If this is your preference, please check the box) ABOUT PRIVACY: The information on this form is being collected to help identify potential concerns with proposed alterations and the location of proposed power transmission facilities, to facilitate communications about the project, and to comply with our obligations to the Alberta Utilities Commission. This information may be provided to the Alberta Utilities Commission, other electric facility owners or the Surface Rights Board. Information relating to the need for the facilities may be provided to the Alberta Electric System Operator. Enquiries or concerns about ATCO Electric's privacy policies can be directed to Tony Melnychuk, privacy officer (address above), phone Please list any residences, buildings or other areas on your property that should be avoided: I am not aware of any residences, buildings, facilities, or areas on my property that should be avoided (If this statement applies to you, please check the box) LOCATION DESCRIPTION (If you require additional space, please attach a separate sheet) Please share any comments or concerns that you have about the project: HOW TO SUBMIT: Please use the enclosed envelope to return by mail or fax to If you would like more information about the project, please contact us toll free or by consultation@atcoelectric.com.

12 Public Involvement In Needs Or Facilities Applications The Alberta Utilities Commission (AUC) is committed to ensuring that Albertans whose rights may be directly and adversely affected by a needs, or a utility facilities application, is informed of the application and have the opportunity to have his/her concerns heard, understood and considered. If you believe an application may directly and adversely affect you, you can become involved in the AUC application process. This pamphlet explains how.

13 Summary of the AUC application process Step 1 Public consultation (prior to application to the AUC) Step 2 Application made to the AUC Step 3 AUC issues notice of application (or hearing) Step 4 Interested parties make submissions or objections (If no submissions are made the AUC will continue to process the application) Step 5 Opportunity for consultation and negotiation AUC issues notice of hearing (if not already issued in Step 3) Step 6 Public hearing Step 7 AUC decision Needs: Approval of application or Return to applicant or Denial of application Facilities: Approval of application or Approval of application with conditions or Denial of application Step 8 Right to appeal (by applicant or dissatisfied persons) Step 9 Approvals, construction and operation of facility (if approved) 2

14 AUC s role in needs and facilities applications The Alberta Utilities Commission (AUC or Commission) regulates transmission lines, electric substations, power generation facilities (i.e. power plants including wind turbines) and gas utility pipelines in Alberta. The AUC is committed to ensuring that Albertans whose rights may be directly and adversely affected by an application for these facilities is informed of the application and has the opportunity to have their concerns heard, considered and understood. Transmission needs and utility facilities applications Approvals from the AUC are required for the construction, operation, alteration and decommissioning of transmission lines and electric substations. These include: Approval of the need for transmission upgrades.* Approval of the route and location of transmission facilities. (* The Electric Statutes Amendment Act gives the provincial cabinet responsibility for approving the need for specified critical transmission infrastructure projects.) Sometimes an application for needs approval is considered together with an application for a utility facilities approval in a single hearing, or separate hearings may be held to consider each application. Power generation facilities and gas utility pipelines Approvals from the AUC are required for the construction, operation, alteration and decommissioning of power generation and gas utility pipeline facilities in Alberta. If you believe that you have rights that may be directly and adversely affected by the decision of the AUC on an application relating to a transmission line or electric substation, a power generation facility or a gas utility pipeline you can become involved in the AUC application process. This pamphlet explains how. A summary of our process is on the page to the left. The rest of this brochure explains each of the steps. 3

15 Step 1: Public consultation prior to application Prior to making an application to the Commission on the need for transmission changes, or for a proposed facility, the applicant is required to conduct meaningful public consultation in the area of the proposed needs, or facilities project(s), so that concerns may be raised, properly addressed and if possible, resolved. The Commission has set out requirements for applicants to follow regarding public consultation about needs applications for transmission changes. The AUC also has requirements for public consultation for utility facilities applications in respect of power plants, substations, transmission lines and industrial system designations, set out in AUC Rule 007. The requirements for gas pipeline consultation and notification are set out in AUC Rule 020. AUC Rule 007 and Rule 020 can be found on the AUC website at Potentially-affected parties are strongly encouraged to participate in the initial public consultation, as early involvement in informal discussions with an applicant may lead to greater influence on project planning. 4

16 Step 2: Application to the Alberta Utilities Commission After the applicant has conducted its public consultation process, it should take into consideration what it learned during consultations and make any amendments it sees as necessary and reasonable to its proposal. The applicant then makes an application to the Alberta Utilities Commission. Applicants must identify in their application any unresolved objections or concerns that they are aware of from the public consultation process. Meaningful public participation through a fair, open and transparent process is important and necessary if the AUC is to reach sound and principled decisions. 5

17 Parties wanting to become a participant in an AUC proceeding must make a written submission to the AUC. Step 3: Public notification The Commission will issue a notice of application when it receives an application that, in the Commission s opinion, may directly and adversely affect the rights of one or more people. The notice is typically published in local newspapers. The notice will provide key dates, contacts and information on how to participate for those who are interested in becoming involved in the application process. Step 4: Public participation If you wish to participate in a proceeding, you must make a written submission to the Commission in accordance with the AUC s notice of application. Submissions must contain: A brief description of your concern with or interest in the application, in particular how approval of the application may directly and adversely affect you. A brief explanation of your position, on what decision you feel the AUC should take, including why you believe that the Commission should accept your recommendation. The Commission will consider your submission and decide whether you are a person who may be directly and adversely affected by the proposed project. If you are, an AUC public hearing may be held. 6

18 Subject to the Freedom of Information and Protection of Privacy Act, all documents filed in respect of an application must be placed on the public record and are accessible through the AUC website. If you wish to keep any information in a document confidential, you must make a request for confidentiality to the Commission. To do this, contact the lead application officer specified in the notice of application, before filing the document in question. AUC filing systems Documents associated with applications are stored and accessed through the AUC s electronic filing systems. The AUC would appreciate receiving submissions through its electronic filing services on our website, however submissions may also be made through mail, or fax. More information on the electronic filing services can be found on the AUC s website at or by calling Electronic Filing Services. Please see the back cover of this pamphlet for contact information. Financial assistance If a party may be potentially directly and adversely affected by a proposed facility, they can apply to be reimbursed for reasonable costs incurred in support of their participation in a Commission proceeding. Details regarding recovery of participants costs are described in AUC Rule 009: Rules on Local Intervener Costs, available on the AUC s website at 7

19 Step 5: Consultation and negotiation The Commission supports ongoing efforts to reach a positive outcome for the applicant and all affected parties. The Commission encourages the applicant and those who have filed submissions to continue to attempt to resolve any outstanding issues. Sometimes in utility facilities applications, the applicant may suggest that it enter into an alternative dispute resolution (ADR) process to resolve any outstanding issues. In an ADR process, the applicant and the participants agree to meet with an independent third party who will facilitate discussions between the parties in an attempt to reach an agreement. 8

20 ADR is neither mandatory nor binding on either party. However, it can be an effective tool to try and resolve issues in an amicable environment and manner. If all concerns can be satisfactorily resolved this may eliminate the need for a formal hearing. However, if there continue to be unresolved issues after further discussions with participants, typically those matters will be addressed at an AUC public hearing. Early involvement in discussion with the applicant may lead to greater influence on project planning. 9

21 Step 6: The public hearing process The public hearing process provides an opportunity for those who were unable to resolve their concerns with the applicant to express their views directly to a Commission panel. Those persons who the Commission has determined may be directly and adversely affected by the proposed application are entitled to participate in the hearing. The Commission publishes a notice of hearing in newspapers distributed in the local area, in major Alberta daily newspapers and on the AUC website at Copies of the notice are also mailed to the applicant and participants. The notice of hearing sets out the deadlines for various steps in the process, including the process and timelines for filing written submissions and for preparing questions to be answered by the applicant or other participants. An AUC public hearing operates similarly to a court proceeding and is a quasi-judicial process. The hearing is open to the general public. Participants in a hearing can either represent themselves or be represented by legal counsel. In addition, participants may hire experts to assist in preparing and presenting evidence to support their position. Persons who hire legal counsel or technical experts must be aware that while reimbursement for the costs of legal and technical assistance may be available, recovery of costs is subject to the Commission assessing the value of the contribution provided by counsel and technical experts. People with similar interests and positions are expected to work together to ensure that any expenditures on outside legal or technical assistance are efficiently spent and not duplicated. 10

22 Step 7: The decision After hearing a needs application the Commission either approves the application, denies the application, or sends the application back to the applicant with suggestions for change. After hearing a utility facilities application, the AUC has three options in reaching a decision: approve the application as applied for, approve it with conditions, or deny it. The AUC endeavors to release decisions within 90 days from the close of the record. Decisions are issued in the form of a public written decision report that summarizes the Commission s findings and includes its final decision. All Commission decision reports are available to any member of the public on the Commission s website ( or by calling the AUC s Information Services. Please see the back cover of this pamphlet for contact information. 11

23 Step 8: Right to appeal A participant in a hearing who is dissatisfied with the decision of the Commission may request that the Commission review and vary its decision. Such a request must follow the procedure set out in the Commission s Rule 016: Review and Variance of Commission Decisions. A dissatisfied participant may also file a leave to appeal motion in the Court of Appeal of Alberta within 30 days from the date the decision is issued. All Commission decision reports are available to any member of the public on the Commission s website ( or by calling Information Services. See the back cover of this pamphlet for contact information. 12

24 Step 9: Construction and operation Any applicant that receives a licence or permit to build and operate a facility from the Commission must adhere to any conditions that were set out in the Commission s decision. If you notice something during the construction or operational phases of a project that concerns you, bring this to the applicant s attention. If you are not satisfied with the response you receive, please bring your concerns to the attention of the AUC Consumer Relations. See back cover of this pamphlet for contact information. 13

25 Useful resources: - Rule 001: Rules of Practice - Rule 007: Rules Respecting Applications for Power Plants, Substations, Transmission Lines, and Industrial System Designations - Rule 009: Rules on Local Intervener Costs - Rule 020: Rules Respecting Gas Utility Pipelines - About the AUC brochure - AUC electronic filing services brochure - Local intervener costs brochure - Understanding gas utility pipeline regulation in Alberta 14

26 Notes: 15

27 AUC contact information: Other contacts: Facilities Division Phone: and ask to speak to the Facilities Division Consumer Relations Phone: , or Information Services Phone: , or Electronic Filing (E-Filing) Services Phone: , or Surface Rights Board (Land Compensation and Negotiation) Phone: Alberta Environment (Land Conservation and Reclamation) Phone: Alberta Electric System Operator (AESO) Phone: Calgary - Head Office Fifth Avenue Place East Fourth Floor, 425 First Street S.W. Calgary, Alberta T2P 3L8 Phone: * Fax: *Dial prior to the 10 digit numbers for toll-free access anywhere in Alberta. This brochure provides general information about public involvement in needs and utility facilities applications before the AUC. Specific participation opportunities and requirements may differ depending on the type of application. Edmonton Office HSBC Building Tenth Floor, Street Edmonton, Alberta T5J 2Y2 Phone: * Fax: Updated March 2012

Bohn to Kettle River Transmission Project

Bohn to Kettle River Transmission Project April 2012 Why are you receiving this project information package? New transmission facilities are needed in the Fort McMurray area. ATCO Electric has been directed by the Alberta Electric System Operator

More information

Kettle River Transmission Project

Kettle River Transmission Project April 2012 Why are you receiving this project information package? New transmission facilities are needed in the Fort McMurray area. ATCO Electric has been directed by the Alberta Electric System Operator

More information

Currant Lake Transmission Project

Currant Lake Transmission Project Currant Lake Transmission Project September 2010 Why are you receiving this project information package? New transmission facilities are needed in the Monitor area of southeastern Alberta. ATCO Electric

More information

Willingdon Substation Decommission

Willingdon Substation Decommission November 2012 Why are you receiving this project information package? New transmission facilities have been proposed in central east Alberta. As a result, some existing facilities are no longer needed.

More information

conversation SHAPE the May 2015 The AUC

conversation SHAPE the May 2015 The AUC SHAPE the conversation May 2015 Thickwood Hills Transmission PROJECT The Thickwood Hills Transmission Project is needed to connect planned critical transmission infrastructure, that will reinforce the

More information

Grizzly Bear Creek Wind Power Plant Connection Needs Identification Document

Grizzly Bear Creek Wind Power Plant Connection Needs Identification Document APPENDIX C AESO PIP Grizzly Bear Creek Wind Power Plant Connection Needs Identification Document 1.0 Participant Involvement Program (PIP) From December 2015 to May 2016, the AESO conducted a Participant

More information

Alberta Electric System Operator Needs Identification Document Application. Mowat 2033S Substation

Alberta Electric System Operator Needs Identification Document Application. Mowat 2033S Substation Decision 21781-D01-2016 Alberta Electric System Operator Needs Identification Document Application Facility Applications September 7, 2016 Alberta Utilities Commission Decision 21781-D01-2016: Alberta

More information

Alberta Electric System Operator Saleski Transmission Project Needs Identification Document

Alberta Electric System Operator Saleski Transmission Project Needs Identification Document Decision 2013-127 Alberta Electric System Operator Saleski Transmission Project Needs Identification Document ATCO Electric Ltd. Saleski 901S Substation and 144-kV Transmission Line 7L142 Facility Application

More information

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L82

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L82 Decision 21447-D01-2016 August 23, 2016 Decision 21447-D01-2016 Proceeding 21447 Application 21447-A001 August 23, 2016 Published by the: Fifth Avenue Place, Fourth Floor, 425 First Street S.W. Calgary,

More information

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L79. October 18, 2016

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L79. October 18, 2016 Decision 21481-D01-2016 October 18, 2016 Alberta Utilities Commission Decision 21481-D01-2016 Proceeding 21481 Application 21481-A001 October 18, 2016 Published by the: Alberta Utilities Commission Fifth

More information

Included in this Stakeholder Information Package:

Included in this Stakeholder Information Package: Who can you contact for more information? Yellowhead Area Transmission Reinforcement: TERA Environmental Consultants Dave Sare Phone: 403-538-5734 Email: dsare@teraenv.com Drayton Valley Area AltaLink

More information

APPENDIX C PARTICIPANT INVOLVEMENT PROGRAM (PIP)

APPENDIX C PARTICIPANT INVOLVEMENT PROGRAM (PIP) APPENDIX C PARTICIPANT INVOLVEMENT PROGRAM (PIP) Stirling Wind Project Connection PIP Summary 1.0 Participant Involvement Program (PIP) 1.1 PIP Design The AESO s Participant Involvement Program (PIP) is

More information

APPENDIX C - AESO PIP SUMMARY

APPENDIX C - AESO PIP SUMMARY APPENDIX C - AESO PIP SUMMARY Whitla Wind Facility Connection PIP Summary 1.0 Participant Involvement Program (PIP) 1.1 PIP Design The AESO s Participant Involvement Program (PIP) is designed to notify

More information

Coalspur Mines (Operations) Ltd.

Coalspur Mines (Operations) Ltd. Decision 22744-D01-2017 Application for an Exemption Under Section 24 of the Hydro and Electric Energy Act October 5, 2017 Alberta Utilities Commission Decision 22744-D01-2017 Application for an Exemption

More information

Brion Energy Corporation

Brion Energy Corporation Decision 20907-D01-2015 MacKay River Commercial Project October 29, 2015 Alberta Utilities Commission Decision 20907-D01-2015 MacKay River Commercial Project Proceeding 20907 Application 20907-A001 October

More information

Wainwright 51S Substation Connection Enhancement Needs Identification Document

Wainwright 51S Substation Connection Enhancement Needs Identification Document APPENDIX C AESO PIP Wainwright 51S Substation Connection Enhancement Needs Identification Document 1.0 Participant Involvement Program (PIP) From October 2015 to July 2016 the AESO conducted a Participant

More information

Weasel Creek Transmission Project

Weasel Creek Transmission Project Weasel Creek Transmission Project October 2010 Why are you receiving this project information package? New transmission facilities are needed in the Waskatenau area of central Alberta. ATCO Electric has

More information

FOOTHILLS AREA TRANSMISSION DEVELOPMENT SOUTH CALGARY PROJECT

FOOTHILLS AREA TRANSMISSION DEVELOPMENT SOUTH CALGARY PROJECT FOOTHILLS AREA TRANSMISSION DEVELOPMENT SOUTH CALGARY PROJECT Proposed 138kV Transmission Line Photo courtesy of The City of Calgary Project Overview The demand for power is increasing as Calgary continues

More information

Electric system improvements near you

Electric system improvements near you Electric system improvements near you Red Deer Area Transmission Development Stage 1 substation upgrades April 2011 Volume 1 Did you know? The average four-person family in Alberta today has 20 instant-on

More information

FOOTHILLS AREA TRANSMISSION DEVELOPMENT SOUTH CALGARY PROJECT

FOOTHILLS AREA TRANSMISSION DEVELOPMENT SOUTH CALGARY PROJECT FOOTHILLS AREA TRANSMISSION DEVELOPMENT SOUTH CALGARY PROJECT Proposed 138kV Transmission Line Photo courtesy of The City of Calgary Project Overview The demand for power is increasing as Calgary continues

More information

Decision (Errata) Access Pipeline Inc. Errata to Decision Temporary Generation at Smoky Lake Pump Station.

Decision (Errata) Access Pipeline Inc. Errata to Decision Temporary Generation at Smoky Lake Pump Station. Decision 2011-424 (Errata) Access Pipeline Inc. Errata to Decision 2011-424 Temporary Generation at Smoky Lake Pump Station January 4, 2012 The Alberta Utilities Commission Decision 2011-424 (Errata):

More information

University of Alberta

University of Alberta Decision 2012-355 Electric Distribution System December 21, 2012 The Alberta Utilities Commission Decision 2012-355: Electric Distribution System Application No. 1608052 Proceeding ID No. 1668 December

More information

SOUTHWEST CALGARY RING ROAD (SWCRR)

SOUTHWEST CALGARY RING ROAD (SWCRR) PROJECT OVERVIEW Alberta Transportation has started planning for the construction of the SW portion of the road that will complete the Calgary Ring Road. The completion of the SWCRR requires the relocation

More information

Green Stocking Transmission Project

Green Stocking Transmission Project August 2010 Green Stocking Transmission Project Why are you receiving this project information package? New transmission facilities are needed in northeastern Alberta. ATCO Electric has direction from

More information

Decision Blaze Energy Ltd. Application for an Exemption under Section 24 of the Hydro and Electric Energy Act.

Decision Blaze Energy Ltd. Application for an Exemption under Section 24 of the Hydro and Electric Energy Act. Decision 2014-108 Application for an Exemption under Section 24 of the Hydro and Electric Energy Act April 17, 2014 The Alberta Utilities Commission Decision 2014-108: Application for an Exemption under

More information

High Prairie Area 144 kv Transmission Upgrade Project

High Prairie Area 144 kv Transmission Upgrade Project June 11 High Prairie Area 144 kv Transmission Upgrade Project Why are you receiving this project information package? New transmission facilities are needed in the High Prairie area to increase the electrical

More information

Our proposal is to replace the existing pipeline with a new pipeline, to ensure the continued safe transportation of refined petroleum products.

Our proposal is to replace the existing pipeline with a new pipeline, to ensure the continued safe transportation of refined petroleum products. PROJECT INFORMATION LETTER: MARCH 2016 Alberta Products Pipe Line Ltd. APPL Replacement Project ABOUT OUR PROJECT The Alberta Products Pipe Line Ltd. (APPL) system carries refined fuel products such as

More information

Watt Lake Transmission Project

Watt Lake Transmission Project June 2011 Watt Lake Transmission Project Why are you receiving this project information package? New transmission facilities are needed in Central East Alberta (Willingdon area). ATCO Electric has direction

More information

welcome to the BC Hydro community open house

welcome to the BC Hydro community open house welcome to the BC Hydro community open house Dawson Creek/ Chetwynd Area Transmission ProjecT Open House welcome Dawson Creek/Chetwynd Area Transmission Project (DCAT) The purpose of this open house is

More information

Sheridan 2085S Substation. Needs Identification Document

Sheridan 2085S Substation. Needs Identification Document APPENDIX C AESO PIP Sheridan 2085S Substation Needs Identification Document 1.0 Participant Involvement Program (PIP) From May 2016 to October 2016, the AESO conducted a Participant Involvement Program

More information

Evaluating Stakeholder Engagement

Evaluating Stakeholder Engagement Evaluating Stakeholder Engagement Peace River October 17, 2014 Stakeholder Engagement: The Panel recognizes that although significant stakeholder engagement initiatives have occurred, these efforts were

More information

WOLVERINE TO BHP JANSEN NEW TRANSMISSION LINE PROJECT FALL 2017

WOLVERINE TO BHP JANSEN NEW TRANSMISSION LINE PROJECT FALL 2017 WOLVERINE TO BHP JANSEN NEW TRANSMISSION LINE PROJECT FALL 2017 TODAY WE LL TALK ABOUT Our challenges and how we re meeting them Why we re building this project Our planning process and considerations

More information

Explaining AER Setbacks

Explaining AER Setbacks Explaining AER Setbacks This EnerFAQs explains setbacks in the energy industry, how they are determined, and how they may affect Albertans and their communities. What is a setback? A setback is the absolute

More information

Merger of the generator interconnection processes of Valley Electric and the ISO;

Merger of the generator interconnection processes of Valley Electric and the ISO; California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Karen Edson Vice President, Policy & Client Services Date: August 18, 2011 Re: Decision on Valley Electric

More information

New Ulm Public Utilities. Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities

New Ulm Public Utilities. Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities New Ulm Public Utilities Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities INDEX Document Review and History... 2 Definitions... 3 Overview... 3 Application

More information

Decision The City of Calgary. 30-kW Solar Power Plant. March 8, 2012

Decision The City of Calgary. 30-kW Solar Power Plant. March 8, 2012 Decision 2012-065 30-kW Solar Power Plant March 8, 2012 The Alberta Utilities Commission Decision 2012-065: 30-kW Solar Power Plant Application No. 1607869 Proceeding ID No. 1563 March 8, 2012 Published

More information

NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 17(2017)

NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 17(2017) NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. (0) 0 0 IN THE MATTER OF the Electrical Power Control Act,, SNL, Chapter E-. (the EPCA ) and the Public

More information

Decision on Merced Irrigation District Transition Agreement

Decision on Merced Irrigation District Transition Agreement California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Karen Edson, Vice President Policy & Client Services Date: March 13, 2013 Re: Decision on Merced Irrigation

More information

Alberta Energy and Utilities Board. Application to Construct and Operate Transmission Facilities

Alberta Energy and Utilities Board. Application to Construct and Operate Transmission Facilities Alberta Energy and Utilities Board Application to Construct and Operate Transmission Facilities Albian Sands Energy Inc. August 17, 2007 APPLICATION Shell Canada Limited (Shell), as operator, on behalf

More information

Marguerite Lake to Wolf Lake Transmission Project

Marguerite Lake to Wolf Lake Transmission Project February 2011 Marguerite Lake to Wolf Lake Transmission Project LAKELAND COUNTY Why are you receiving this project information package? MARGUERITE LAKE TO WOLF LAKE TRANSMISSION PROJECT WOLF LAKE BONNYVILLE

More information

ENERGY STRATEGY FOR YUKON. Independent Power Production Policy

ENERGY STRATEGY FOR YUKON. Independent Power Production Policy ENERGY STRATEGY FOR YUKON Independent Power Production Policy May 20, 2014 Page 2 of 11 BACKGROUND The Government of Yukon released the Energy Strategy for Yukon in January 2009. The strategy sets out

More information

Joint Operating Procedures for First Nations Consultation on Energy Resource Activities

Joint Operating Procedures for First Nations Consultation on Energy Resource Activities Joint Operating Procedures for First Nations Consultation on Energy Resource Activities October 31, 2018 Contents Revision History... iv Definitions of Key Terms... v 1 Background... 1 2 Roles and Responsibilities...

More information

Wal-Mart Canada Corp.

Wal-Mart Canada Corp. Decision 2010-596 New 500-kW Emergency Back-up Generator for Wal-Mart Perishable Foods Distribution Centre Balzac, Alberta December 17, 2010 ALBERTA UTILITIES COMMISSION Decision 2010-596: Wal-Mart Canada

More information

Grid Energy Storage: Policies

Grid Energy Storage: Policies Grid Energy Storage: Policies John Martin, P. Eng. Senior Tariff and Special Projects Advisor Alberta Electric System Operator (AESO) IEEE Northern Canada Section PES/IAS Chapter Seminar, 21 Nov 2017,

More information

Direct Energy Regulated Services

Direct Energy Regulated Services Decision 23986-D01-2018 Application for True-Up of the 2017 and 2018 Interim Rates for the Default Rate Tariff and the Regulated Rate Tariff December 4, 2018 Alberta Utilities Commission Decision 23986-D01-2018

More information

Application for Commission Approval to Construct a Generating Station Pursuant to Public Utilities Article Section and

Application for Commission Approval to Construct a Generating Station Pursuant to Public Utilities Article Section and Application for Commission Approval to Construct a Generating Station Pursuant to Public Utilities Article Section 7-207.1 and 7-207.2 APPLICABILITY The Public Service Commission of Maryland ( Commission

More information

Yukon s Independent Power Production Policy

Yukon s Independent Power Production Policy Yukon s Independent Power Production Policy Updated October 2018 BACKGROUND The Government of Yukon (YG) released the Energy Strategy for Yukon in January 2009. The strategy sets out YG s energy priorities,

More information

best to you all Gail Carbiener Page 1 of 5

best to you all Gail Carbiener Page 1 of 5 Please accept this attachment as my up dated response to the B2H DEIS. If this is not acceptable, please let me know. Nice meeting last Monday in Boardman. 300316 best to you all Gail Carbiener 2 Page

More information

Information Packet Kissimmee Utility Authority Customer-Owned Renewable Generation Interconnection And Net Metering Program

Information Packet Kissimmee Utility Authority Customer-Owned Renewable Generation Interconnection And Net Metering Program Information Packet Kissimmee Utility Authority Customer-Owned Renewable Generation Interconnection And Net Metering Program As part of our commitment to support renewable energy, Kissimmee Utility Authority

More information

BACS APPROVED BUREAU SCHEME SUPPORT GUIDELINES

BACS APPROVED BUREAU SCHEME SUPPORT GUIDELINES BACS APPROVED BUREAU SCHEME SUPPORT GUIDELINES VERSION 8.2 May 2017 CONTENTS 1 DOCUMENT INFORMATION 4 1.1 VERSION HISTORY 4 1.2 DOCUMENT REVIEWERS 4 1.3 COPYRIGHT STATEMENT 4 2 CONFIDENTIALITY 4 3 INTRODUCTION

More information

Consumer Guidelines for Electric Power Generator Installation and Interconnection

Consumer Guidelines for Electric Power Generator Installation and Interconnection Consumer Guidelines for Electric Power Generator Installation and Interconnection Habersham EMC seeks to provide its members and patrons with the best electric service possible, and at the lowest cost

More information

BC Hydro writes in compliance with Exhibit A-4 to provide its Final Submission in respect of the Application (Exhibit B-1).

BC Hydro writes in compliance with Exhibit A-4 to provide its Final Submission in respect of the Application (Exhibit B-1). Ken Duke Solicitor & Counsel Phone: 604-623-3623 Fax: 604-623-3606 bchydroregulatorygroup@bchydro.com April 30, 2014 Sixth Floor 900 Howe Street Vancouver, BC V6Z 2N3 Dear Ms. Hamilton: RE: (BCUC) British

More information

Western Alberta Transmission Line (WATL) HVDC Project

Western Alberta Transmission Line (WATL) HVDC Project Submission for the ACEC Canada Canadian Consulting Engineering Awards 2016 Western Alberta Transmission Line (WATL) HVDC Project Submitted by Teshmont Consultants LP as a Consultant to AltaLink Attachment

More information

Chirmorie Wind Farm Grid Connection

Chirmorie Wind Farm Grid Connection Chirmorie Wind Farm Grid Connection Welcome Welcome to this public exhibition regarding our proposals to construct a new 132 kilovolt (kv) overhead line (OHL) supported by wood poles to connect the proposed

More information

Inactive Well Compliance Program (IWCP)

Inactive Well Compliance Program (IWCP) Inactive Well Compliance Program (IWCP) Year Two Final Report In addition to Bulletin 2014-19, Alberta Energy Regulator (AER) July 2017 The Alberta Energy Regulator s (AER) Inactive Well Compliance Program

More information

Southern California Edison Rule 21 Storage Charging Interconnection Load Process Guide. Version 1.1

Southern California Edison Rule 21 Storage Charging Interconnection Load Process Guide. Version 1.1 Southern California Edison Rule 21 Storage Charging Interconnection Load Process Guide Version 1.1 October 21, 2016 1 Table of Contents: A. Application Processing Pages 3-4 B. Operational Modes Associated

More information

City of Washington, Kansas Electric Department. Net Metering Policy & Procedure For Customer-Owned Renewable Energy Resources

City of Washington, Kansas Electric Department. Net Metering Policy & Procedure For Customer-Owned Renewable Energy Resources Ordinance No. 743 Exhibit A City of Washington, Kansas Electric Department Net Metering Policy & Procedure For Customer-Owned Renewable Energy Resources Page 1 of 7 1. INTRODUCTION The provisions of this

More information

Submission on the Wellington Town Belt Bill. Local Government and Environment Select Committee Parliament Buildings Wellington

Submission on the Wellington Town Belt Bill. Local Government and Environment Select Committee Parliament Buildings Wellington Wellington Electricity Lines Ltd 2 Submission on the Wellington Town Belt Bill To: Name: Local Government and Environment Select Committee Parliament Buildings Wellington Wellington Electricity Lines Limited

More information

Montgomery Township Community Energy Aggregation

Montgomery Township Community Energy Aggregation Montgomery Township Community Energy Aggregation MCEA Round 2 Program Announcement! The Township of Montgomery is excited to announce another Montgomery Community Energy Aggregation program (MCEA Round

More information

Reactive Power Requirements and Financial Compensation. Addendum to Draft Final Proposal

Reactive Power Requirements and Financial Compensation. Addendum to Draft Final Proposal Reactive Power Requirements and Financial Compensation July 21, 2016 Table of Contents 1. Introduction... 3 2. Changes to Proposal... 4 3. Plan for Stakeholder Engagement... 4 4.... 4 6. Next Steps...

More information

City of, Kansas Electric Department. Net Metering Policy & Procedures for Customer-Owned Renewable Energy Resources

City of, Kansas Electric Department. Net Metering Policy & Procedures for Customer-Owned Renewable Energy Resources Ordinance No. Exhibit A ----------------------------------------- City of, Kansas Electric Department Net Metering Policy & Procedures for Customer-Owned Renewable Energy Resources -------------------------------------

More information

Your Friendly and Caring Member Cooperative. Consumer Guidelines for Electric Power Generator Installation and Interconnection

Your Friendly and Caring Member Cooperative. Consumer Guidelines for Electric Power Generator Installation and Interconnection Your Friendly and Caring Member Cooperative Consumer Guidelines for Electric Power Generator Installation and Interconnection Your electric cooperative seeks to provide its members and patrons with the

More information

Rhode Island Division of Public Utilities and Carriers & Office of Energy Resources. Power Sector Transformation

Rhode Island Division of Public Utilities and Carriers & Office of Energy Resources. Power Sector Transformation 1 Rhode Island Division of Public Utilities and Carriers & Office of Energy Resources Power Sector Transformation Notice of Inquiry into the Electric Utility Business Model and Request for Stakeholder

More information

Umatilla Electric Cooperative Net Metering Rules

Umatilla Electric Cooperative Net Metering Rules Umatilla Electric Cooperative Net Metering Rules Version: July 2017 Umatilla Electric Cooperative NET METERING RULES Rule 0005 Scope and Applicability of Net Metering Facility Rules (1) Rule 0010 through

More information

DFO STATEMENT OF NEED REPORT

DFO STATEMENT OF NEED REPORT APPENDIX E DFO STATEMENT OF NEED REPORT Table of Contents 1.0 Executive Summary... 1 2.0 Description of the Area... 2 2.1 Geographic Study Area... 2 2.2 2016 System Configuration... 2 3.0 Area Loading

More information

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM Sheet 1 FITCHBURG GAS AND ELECTRIC LIGHT COMPANY SCHEDULE NM Applicability The following tariff provisions shall be applicable to a Host Customer, as defined herein, that requests net metering services

More information

Solar-Wind Specific Request for Proposals

Solar-Wind Specific Request for Proposals Program Description Solar-Wind Specific Request for Proposals Power Production from Green Resources in North Carolina 04/19/2006 NC GreenPower (NCGP) is a statewide program designed to improve the quality

More information

Utilities (Technical Regulation) (Electricity Transmission Supply Code) Approval 2016 (No 1)*

Utilities (Technical Regulation) (Electricity Transmission Supply Code) Approval 2016 (No 1)* Australian Capital Territory Utilities (Technical Regulation) (Electricity Transmission Supply Code) Approval 2016 (No 1)* Disallowable instrument DI2016 189 made under the Utilities Technical Regulation

More information

Vantage to Pomona Heights Transmission Project Frequently asked questions

Vantage to Pomona Heights Transmission Project Frequently asked questions Vantage to Pomona Heights Transmission Project Frequently asked questions These are some frequently asked questions regarding the proposed Vantage to Pomona Heights transmission line project. General What

More information

Decision D Finlay Group. Complaint Regarding FortisAlberta Inc. Distribution Line Rebuild Project. February 3, 2016

Decision D Finlay Group. Complaint Regarding FortisAlberta Inc. Distribution Line Rebuild Project. February 3, 2016 Decision 20799-D01-2016 Complaint Regarding FortisAlberta Inc. Distribution Line Rebuild Project February 3, 2016 Alberta Utilities Commission Decision 20799-D01-2016 Proceeding 20799 Application 20799-A001

More information

Proposed New ISO Rules Section Version 2.0 Generating Unit Technical Requirements ( New ISO Rules Section Version 2.

Proposed New ISO Rules Section Version 2.0 Generating Unit Technical Requirements ( New ISO Rules Section Version 2. Stakeholder Comment and Rationale Form AESO AUTHORITATIVE DOCUMENT PROCESS Stakeholder Consultation Draft 2012-11-29 Proposed New ISO Rules Section 502.5 Version 2.0 Generating Unit Technical Requirements

More information

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS.

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS. 25.211. Interconnection of On-Site Distributed Generation (DG). (a) (b) (c) Application. Unless the context indicates otherwise, this section and 25.212 of this title (relating to Technical Requirements

More information

Electrical District No. 3 SOLAR Q & A

Electrical District No. 3 SOLAR Q & A D3 Electrical District No. 3 SOLAR Q & A What are some things I should consider before going solar? Leasing verses owning: Know the Pros and Cons of each, as well as the Short-term and Long-Term effects

More information

DEPARTMENT OF TRANSPORTATION. Agency Information Collection Activities; Approval of a New Information

DEPARTMENT OF TRANSPORTATION. Agency Information Collection Activities; Approval of a New Information This document is scheduled to be published in the Federal Register on 03/21/2017 and available online at https://federalregister.gov/d/2017-05523, and on FDsys.gov DEPARTMENT OF TRANSPORTATION [4910-EX-P]

More information

Advice Pertaining to ERC Resolution No.16 and the Role of Hybrid Generation Advice with respect to specific questions from PIPPA

Advice Pertaining to ERC Resolution No.16 and the Role of Hybrid Generation Advice with respect to specific questions from PIPPA Advice Pertaining to ERC Resolution No.16 and the Role of Hybrid Generation Advice with respect to specific questions from PIPPA George Horvath george.horvath@aecom.com Month Day, Year Part A Introduction

More information

a) The 2011 Net Metering and Buyback Tariff for Emission Free, Renewable Distributed Generation Serving Customer Load

a) The 2011 Net Metering and Buyback Tariff for Emission Free, Renewable Distributed Generation Serving Customer Load Memorandum To: Municipal Light Advisory Board; Municipal Light Board; file From: Belmont Light Staff Date: June 19, 2014 Re: Solar PV Distributed Generation 1. Background & Summary Belmont Light supports

More information

2015 AER Survey of Albertans and Stakeholders. Executive Summary

2015 AER Survey of Albertans and Stakeholders. Executive Summary 2015 AER Survey of Albertans and Stakeholders Executive Summary 2015 AER Survey of Albertans: Executive Summary July 2015 Published by Alberta Energy Regulator Suite 1000, 250 5 Street SW Calgary, Alberta

More information

RATE ORDER 2015 UNIFORM ELECTRICITY TRANSMISSION RATES January 08, 2015

RATE ORDER 2015 UNIFORM ELECTRICITY TRANSMISSION RATES January 08, 2015 Ontario Energy Board Commission de l énergie de l Ontario IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15 (Schedule B); AND IN THE MATTER OF a motion by the Ontario Energy Board to

More information

2017 Colorado Phase 2 Regulatory Rate Review Frequently asked questions

2017 Colorado Phase 2 Regulatory Rate Review Frequently asked questions 1 What did Black Hills Energy file? We submitted a Phase 2 Rate Review proposal to the Colorado Public Utilities Commission (PUC) to complete the two-step process of updating electric rates, which were

More information

This page is intentionally left blank.

This page is intentionally left blank. This page is intentionally left blank. Bipole III Southern Ground Electrode Line Route Selection Introduction Manitoba Hydro has recently selected a route for the southern ground electrode line (Map 1).

More information

Interconnection Process for Generation Systems

Interconnection Process for Generation Systems Interconnection Process for Generation Systems I. INTRODUCTION...1 II. GENERAL INFORMATION...2 A. Definitions...2 B. Nodak Electric Cooperative, Inc. Generation Interconnection Contacts...3 C. Engineering

More information

HydroGenerations PROGRAM HANDBOOK

HydroGenerations PROGRAM HANDBOOK HydroGenerations PROGRAM HANDBOOK TABLE OF CONTENTS Please ensure you are reading the most recent version of this handbook by visiting the NV Energy website, www.nvenergy.com/hydro. Contents HydroGenerations

More information

Proposed Dounreay - Mybster 275 kv / 132 kv

Proposed Dounreay - Mybster 275 kv / 132 kv Background Scottish Hydro-Electric Transmission Ltd (SHETL) is proposing a new 275 kilovolt (kv) (1 kilovolt = 1000volts) double circuit overhead line (OHL) between the Dounreay sub station and the new

More information

City of Lethbridge ELECTRIC UTILITY. Electric Distribution Tariff Rate Schedule

City of Lethbridge ELECTRIC UTILITY. Electric Distribution Tariff Rate Schedule City of Lethbridge ELECTRIC UTILITY Electric Distribution Tariff Rate Schedule City of Lethbridge Bylaw 5789 Effective: January 1, 2013 City of Lethbridge Infrastructure Services Electric Utility Document

More information

THE CONNECTICUT LIGHT AND POWER COMPANY dba EVERSOURCE ENERGY AND THE UNITED ILLUMINATING COMPANY

THE CONNECTICUT LIGHT AND POWER COMPANY dba EVERSOURCE ENERGY AND THE UNITED ILLUMINATING COMPANY THE CONNECTICUT LIGHT AND POWER COMPANY dba EVERSOURCE ENERGY AND THE UNITED ILLUMINATING COMPANY Virtual Net Metering Application Effective November 18, 2016 This application form addresses virtual net

More information

Powering Sydney s Future

Powering Sydney s Future Powering Sydney s Future Frequently Asked Questions December 2017 Project background Q: Why is this project needed? A: Inner Sydney is one of the most critical parts of the NSW electricity network. However,

More information

H 7366 S T A T E O F R H O D E I S L A N D

H 7366 S T A T E O F R H O D E I S L A N D LC0000 01 -- H S T A T E O F R H O D E I S L A N D IN GENERAL ASSEMBLY JANUARY SESSION, A.D. 01 A N A C T RELATING TO PUBLIC UTILITIES AND CARRIERS - MUNICIPAL STREETLIGHT INVESTMENT ACT Introduced By:

More information

Reforming the TAC and Retail Transmission Rates. Robert Levin California Public Utilities Commission Energy Division August 29, 2017

Reforming the TAC and Retail Transmission Rates. Robert Levin California Public Utilities Commission Energy Division August 29, 2017 Reforming the TAC and Retail Transmission Rates. Robert Levin California Public Utilities Commission Energy Division August 29, 2017 1 CPUC Staff Rate Design Proposals Restructure the High-Voltage TAC

More information

Summer Reliability Assessment Report Electric Distribution Companies Perspective

Summer Reliability Assessment Report Electric Distribution Companies Perspective Energy Association of Pennsylvania Summer Reliability Assessment Report Electric Distribution Companies Perspective to the Pennsylvania Public Utility Commission June 9, 2011 Harrisburg, PA Terrance J.

More information

A detailed copy of the proposed tariff application can be downloaded from Kenya Power and the ERC websites /

A detailed copy of the proposed tariff application can be downloaded from Kenya Power and the ERC websites   / PRESS STATEMENT The Kenya Power & Lighting Company Limited (KPLC) has submitted an Application to the Energy Regulatory Commission (ERC) for approval of the proposed Electricity Tariffs and Tariff Structures

More information

Examinations of Working Places in Metal and Nonmetal Mines. AGENCY: Mine Safety and Health Administration, Labor.

Examinations of Working Places in Metal and Nonmetal Mines. AGENCY: Mine Safety and Health Administration, Labor. This document is scheduled to be published in the Federal Register on 05/22/2017 and available online at https://federalregister.gov/d/2017-10474, and on FDsys.gov 4520.43-P DEPARTMENT OF LABOR Mine Safety

More information

County of Sonoma Agenda Item Summary Report

County of Sonoma Agenda Item Summary Report County of Sonoma Agenda Item Summary Report Agenda Item Number: 22 (This Section for use by Clerk of the Board Only.) Clerk of the Board 575 Administration Drive Santa Rosa, CA 95403 To: Board of Directors

More information

Behavioral Research Center (BRC) User Guide

Behavioral Research Center (BRC) User Guide Behavioral Research Center (BRC) User Guide Last Updated: September 2014 2 Table of Contents Important Contacts... 3 Introduction to the BRC... 4 BRC s Facilities and Resources... 5 Using the BRC s Research

More information

City of Palo Alto (ID # 6416) City Council Staff Report

City of Palo Alto (ID # 6416) City Council Staff Report City of Palo Alto (ID # 6416) City Council Staff Report Report Type: Informational Report Meeting Date: 1/25/2016 Summary Title: Update on Second Transmission Line Title: Update on Progress Towards Building

More information

Contents. Solar Select TM Frequently Asked Questions

Contents. Solar Select TM Frequently Asked Questions Solar Select TM Frequently Asked Questions Contents Program Overview and How Solar Select Works... 1 Participation Requirements... 3 Cost and Payment... 4 Solar Production... 5 Development, Equipment,

More information

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY California Independent System Operator Memorandum To: ISO Operations (MRTU) Committee From: Armando J. Perez, Director of Grid Planning cc: ISO Board of Governors ISO Officers Date: April 29, 2005 Re:

More information

Functional Specification Revision History

Functional Specification Revision History Functional Specification Revision History Revision Description of Revision Author Date B0 For comments Yale Zhou January 26, 2016 B1 Updated as per comments Yale Zhou February 1, 2016 Final issuance Yale

More information

OFFICIAL IPCO Policy Document

OFFICIAL IPCO Policy Document Policy Name: IPCO consultation process Version: 1.0 Date: August 2018 1. Context i. IPCO will always seek to engage with stakeholders where such engagement is consistent with our statutory obligations

More information

ENERGY STRATEGY FOR YUKON. Net Metering Policy DRAFT FOR CONSULTATION

ENERGY STRATEGY FOR YUKON. Net Metering Policy DRAFT FOR CONSULTATION ENERGY STRATEGY FOR YUKON Net Metering Policy DRAFT FOR CONSULTATION February 2011 Page 1 of 4 BACKGROUND The Yukon government released the Energy Strategy for Yukon in January 2009. The Energy Strategy

More information

JEA Distributed Generation Policy Effective April 1, 2018

JEA Distributed Generation Policy Effective April 1, 2018 Summary This JEA Distributed Generation Policy is intended to facilitate generation from customer-owned renewable and non-renewable energy generation systems interconnecting to the JEA electric grid. The

More information