1 APPENDIX A CONNECTION ASSESSMENT

2

3

4 : FortisAlberta Inc. Plamondon 5S Capacity Increase Contents Executive Summary.... Introduction Project Project Overview Load Component Generation Component Study Scope Study Objectives Studies Performed Report Overview Criteria, System Data, and Study Assumptions Criteria, Standards, and Requirements AESO Reliability Criteria Authoritative Documents (ADs) Load and Generation Assumptions Load Assumptions Generation Assumptions Intertie Flow Assumptions..... System Projects..... Customer Connection Projects Facility Ratings and Shunt Elements Voltage Profile Assumptions.... Study Methodology Study Objectives Study Scenarios Connection Studies Carried Out Power Flow Analysis Contingencies Studied Voltage Stability (PV) Analysis Contingencies Studied.... Pre-Connection System Assessment Pre-Connection Power Flow Analysis Scenario # 06 SP Pre-Connection Scenario # 06 WP Pre-Connection Connection Alternative Overview Connection Alternatives Examined Connection Alternatives Not Selected for Further Studies Connection Alternatives Selected for Further Studies Technical Analysis of the Connection Alternative Preferred Alternative Power Flow Analysis Voltage Stability Analysis Conclusions.... Project Interdependencies Summary and Conclusion... AESO Project Number: P60 March, 06

5 : FortisAlberta Inc. Plamondon 5S Capacity Increase Attachments Attachment A Attachment B Attachment C Pre-Connection Power Flow Analysis Results Post-Connection Power Flow Analysis Results Post-Connection Voltage Stability Analysis Results Figures Figure : Transmission system in Athabasca / Lac La Biche area... Tables Table -: Post-Contingency Voltage Deviation Guidelines for Low Voltage Busses... 0 Table : Area Forecast Load (0 LTO)... 0 Table : Dispatch levels of Existing Generators in the Study Area... 0 Table : Summary of System Projects Included in the Study Cases... Table 5: Summary of Customer Connection Projects in the Study Area... Table 6: Summary of Transmission Line Ratings in the study area... Table : Summary of Transformer Ratings... Table 8: Summary of Shunt Elements in the Study Area... Table 9: Summary of Voltage at Key Nodes in the Study Area... Table 0: Summary of Study Scenario Assumptions... 5 Table : Summary of Studies Performed... 6 Table : Summary of Pre-Connection System Performance Pre-connection, Scenario #... 8 Table : Summary of Pre-Connection System Performance Pre-connection, Scenario #... 8 Table : Summary of Post-Connection System Performance Scenario #... Table 5: Summary of Post-Connection System Performance Scenario #... Table 6: Post-Connection System PV Analysis for five worst contingencies Post-connection, Scenario #... AESO Project Number: P60 March, 06

6 : FortisAlberta Inc. Plamondon 5S Capacity Increase Executive Summary Project Overview FortisAlberta Inc. (FortisAlberta), in its capacity as the legal owner of distribution facilities (DFO), has submitted a system access service request (SASR) to the Alberta Electric System Operator (AESO) to meet FortisAlberta s distribution reliability criteria and serve load growth in the Plamondon area. The SASR includes a request for a Rate DTS, Demand Transmission Service, contract capacity increase from 5.9 MW to 8. MW for the system access service provided at the existing Plamondon 5S substation, and a request for transmission development (collectively, the Project). The DFO also requested upgrades to the existing Plamondon 5S substation. The scheduled in-service date for the Project is November, 06. This report details the system performance studies undertaken to assess the impact of the Project on the Alberta interconnected electric system (AIES). Existing System The Project is geographically located in the AESO planning area of Athabasca / Lac La Biche (Area ), which is part of the AESO Northeast Planning Region. The Athabasca / Lac La Biche area is surrounded by the planning areas of Fort McMurray (Area 5), Cold Lake (Area 8), Vegreville (Area 56), Fort Saskatchewan (Area ), Edmonton (Area 60), Wabamun (Area 0), Swan Hills (Area 6), and High Prairie (Area ). From a transmission system perspective, the Athabasca / Lac La Biche area mainly consists of 8/ kv transmission systems. The area is also served by a 0 kv network through the Heart Lake 898S substation, located in the Athabasca / Lac La Biche area, and the North Barrhead 69S and North Calder S substations, which are located in surrounding planning areas. Study Summary Study area for the Project The study area for the Project consists of the Athabasca / Lac La Biche area and the tie lines connecting the area to the rest of the AIES (6L, 9L90, 9L, 9L, 9L8, L, 9L, 9L, and LA808). All transmission facilities within the study area were studied and monitored to assess the impact of the Project on the AIES, including any violations of the Reliability Criteria (as defined in Section.). Studies performed for the Project Power flow analysis was performed for the 06 winter peak (WP) and 06 summer peak (SP) pre-connection and post-connection scenarios. Voltage stability analysis was performed only for the 06 WP post-connection scenario. AESO Project Number: P60 March, 06

7 : FortisAlberta Inc. Plamondon 5S Capacity Increase Results of the pre-connection studies No Reliability Criteria violations were observed for any of the pre-connection study scenarios. Connection alternative examined for the Project FortisAlberta, as the DFO in the Plamondon area, examined and ruled out the use of load shifting and distribution system upgrades to meet FortisAlberta s distribution reliability criteria and to serve load growth in the area. This report examined three transmission alternatives to meet the DFO s request. Alternative : Upgrade the existing Plamondon 5S substation by adding a 8/5 kv transformer with a minimum transformation capacity of 0 MVA, and by adding a 8 kv circuit breaker. Alternative : Upgrade the existing Lac La Biche 5S substation, including adding a 8/5 kv transformer with a minimum transformation capacity of approximately 0 MVA. Alternative : Upgrade the existing Waupisoo 05S substation, including adding a 8/5 kv transformer with a minimum transformation capacity of approximately 0 MVA. Connection alternative selected for further examination Alternative was selected for further study. The DFO indicated that Alternative and Alternative did not satisfy the DFO s distribution planning criteria. The DFO determined that Alternative and Alternative were not technically acceptable; therefore, Alternative and Alternative were not selected for further study. Results of the post-connection studies The following is a summary of the results of the post-connection studies: Category A (N-G-0) conditions Under Category A conditions, no Reliability Criteria violations were observed for any of the postconnection scenarios. Category B (N-G-) contingency conditions Under Category B contingency conditions, no Reliability Criteria violations were observed for any of the post-connection scenarios. Conclusions and Recommendation Based on the study results, Alternative is technically viable. The connection assessment indicates that the Project will not adversely impact the performance of the AIES. It is recommended to proceed with the Project using Alternative as the preferred option to respond to the DFO s request for system access service. For Alternative, a transformer size of MVA would be recommended based on good electric industry practice and under advisement from the legal owner of transmission facilities regarding its asset management and inventory practices. AESO Project Number: P60 5 March, 06

8 : FortisAlberta Inc. Plamondon 5S Capacity Increase. Introduction This presents the results of the study conducted to assess the impact of the Project (as defined below) on the performance of the Alberta interconnected electric system (AIES).. Project.. Project Overview FortisAlberta Inc. (FortisAlberta), in its capacity as the legal owner of distribution facilities (DFO), has submitted a system access service request (SASR) to the Alberta Electric System Operator (AESO) to meet FortisAlberta s distribution reliability criteria and to serve load growth in the Plamondon area. The SASR includes a request for a Rate DTS, Demand Transmission Service, contract capacity increase from 5.9 MW to 8. MW for the system access service provided at the existing Plamondon 5S substation, and a request for transmission development (collectively, the Project). The DFO also requested upgrades to the existing Plamondon 5S substation. The scheduled in-service date (ISD) for the Project is November, Load Component The expected power factor is 0.9 The DFO has requested a Rate DTS contract capacity increase from 5.9 MW to 8. MW for the system access service provided at the existing Plamondon 5S substation... Generation Component There is no generation component associated with the Project... Study Scope... Study Objectives The objectives of the study are the following: Assess the impact of the Project on the performance of the AIES. Identify any violations of the relevant criteria, standards or requirements of the AESO, both pre- and post-connection of the Project. Recommend mitigation measures, if required, to enable the reliable connection of the Project to the AIES.... Study Area Description The Project is geographically located in the AESO planning area of Athabasca / Lac La Biche (Area ), which is part of the AESO Northeast Planning Region. The Athabasca / Lac La Biche AESO Project Number: P60 6 March, 06

9 : FortisAlberta Inc. Plamondon 5S Capacity Increase area is surrounded by the planning areas of Fort McMurray (Area 5), Cold Lake (Area 8), Vegreville (Area 56), Fort Saskatchewan (Area ), Edmonton (Area 60), Wabamun (Area 0), Swan Hills (Area 6), and High Prairie (Area ). From a transmission system perspective, the Athabasca / Lac La Biche area mainly consists of 8/ kv transmission systems. The area is also served by a 0 kv network through the Heart Lake 898S substation, located in the Athabasca / Lac La Biche area, and the North Barrhead 69S and North Calder S substations, which are located in surrounding planning areas. The study area for the Project consists of the Athabasca/Lac La Biche area. The study area also includes the tie lines connecting this planning area to neighbouring planning areas. All transmission facilities within the study area were studied and monitored to assess the impact of the Project on the AIES, including any violations of the Reliability Criteria (as defined in Section.). Figure : Transmission system in Athabasca / Lac La Biche area 5 - Fort McMurray 9L55 (to McMillan 885S) 9L ROUND HILL 85S 9L90 (to Leismer S) IPIATIK 6S 6L (to Pike 0S) 9L (to Mitsue S) L0 (to Sarah Lake S) 0 - Wabamun 905L (to Wabamun 9S) NORTH BARRHEAD 69S 9L CHERHILL 8S 06L (to Sundance 0P) - Athabasca / Lac La Biche L L FLATBUSH 500S Westlock (WST) WESTLOCK 8S L (to Junction) NORTH ST. ALBERT S L GRASSLAND 8S APF Athabasca (AFG) COLINTON 59S 9L 898L 60 - Edmonton L CLYDE 50S N.W. CARDIFF 9S 9S 90L (to Poundmaker) NORTH CALDER S 90L 0L 6L (to Lamoureux S) 96L CASTLE DOWNS 0CV5 (to Victoria 5S) 90L (to Lamoureux S) FLAT LAKE S 96AL 6L BOYLE 56S ABEE S WEASEL CREEK 9S WAUPISOO 05S LA808 (to 808AL Junction) L - Fort Sask. PLAMONDON 5S 8L THOMPSON 0S 9L (to Whitby Lake 89S) 9L960/9L96 (to Deerland S) 88AL 88L LAC LA BICHE 5S Other Generator HEART LAKE 898S 9L 9L8 L 89L WHITEFISH LAKE 85S 8 or kv Substation 0 kv Substation 500 kv Substation This diagram contains a simplified version of the system configuration. Normally Open Line Technical detail has been simplified for illustration purposes. It does not indicate geographical locations of facilities. Currency Date: L6 9L 8L WINEFRED 88S (to Marguerite Lake 86S) 8/ kv 5L KIRBY 65S 8 - Cold Lake P60 Area Transmission System 8/ kv Double Circuit 0 kv 0 kv Double Circuit P60 Project Area AESO Planning Areas... Existing Constraints Currently, constraints in the Northeast Region of the AIES are managed in accordance with the procedures set out in Section 0. of the ISO rules, Real Time Transmission Constraint Management (TCM Rule). AESO Project Number: P60 March, 06

10 : FortisAlberta Inc. Plamondon 5S Capacity Increase... AESO Long-Term Plans The AESO 05 Long-term Transmission Plan (05 LTP) includes the following system developments in the Athabasca / Lac La Biche area in the near term (by 00) : Add new 8 kv line between Abee and Waupisoo substations Rebuild 8 kv line between North Calder and Viscount substations in north Edmonton and onto Cardiff substation near Morinville to higher capacity... Studies Performed The following studies were performed for the pre-connection analysis: Power flow analysis (Category A conditions and Category B contingencies) The following studies were performed for the post-connection analysis: Power flow analysis (Category A conditions and Category B contingencies) Voltage stability analysis (Category A conditions and Category B contingencies).. Report Overview The Executive Summary provides a high-level summary of the report and its conclusions. Section provides an introduction of the Project. Section describes the criteria, system data, and study assumptions used in this study. Section presents the study methodology used in this study. Section discusses the pre-connection system assessment. Section 5 presents the connection alternatives examined. Section 6 provides a technical analysis of the postconnection system assessment for the alternatives selected for further study. Section discusses project interdependencies. Section 8 presents the conclusions and recommendations of this study. The 05 LTP document is available on the AESO website. The 05 LTP identifies the near-term transmission developments in the Athabasca / Lac La Biche area on page 5. AESO Project Number: P60 8 March, 06

11 : FortisAlberta Inc. Plamondon 5S Capacity Increase. Criteria, System Data, and Study Assumptions.. Criteria, Standards, and Requirements.. AESO Reliability Criteria The Transmission Planning (TPL) Standards, which are included in the Alberta Reliability Standards, and the AESO s Transmission Planning Criteria Basis and Assumptions (collectively, the Reliability Criteria) were applied to evaluate system performance under Category A system conditions (i.e., all elements in-service) and following Category B contingencies (i.e., single element outage), prior to and following the studied alternatives. Below is a summary of Category A and Category B system conditions. Category A, often referred to as the N-0 condition, represents a normal system with no contingencies and all facilities in service. Under this condition, the system must be able to supply all firm load and firm transfers to other areas. All equipment must operate within its applicable rating, voltages must be within their applicable range, and the system must be stable with no cascading outages. Category B events, often referred to as an N- or N-G- with the most critical generator out of service, result in the loss of any single specified system element under specified fault conditions with normal clearing. These elements are a generator, a transmission circuit, a transformer, or a single pole of a DC transmission line. The acceptable impact on the system is the same as Category A. Planned or controlled interruptions of electric supply to radial customers or some local network customers, connected to or supplied by the faulted element or by the affected area, may occur in certain areas without impacting the overall reliability of the interconnected transmission systems. To prepare for the next contingency, system adjustments are permitted, including curtailments of contracted firm (non-recallable reserved) transmission service electric power transfers. The TPL standards, TPL-00-AB-0 and TPL-00-AB-0, have referenced Applicable Ratings when specifying the required system performance under Category A and Category B events. For the purpose of applying the TPL standards to the studies documented in this report, Applicable Ratings are defined as follows: Seasonal continuous thermal rating of the line s loading limits. Highest specified loading limits for transformers. For Category A conditions: Voltage range under normal operating condition per AESO Information Document ID# 00-00RS. For the busses not listed in ID#00-00RS, Table - in the Transmission Planning Criteria Basis and Assumptions applies. For Category B conditions: The extreme voltage range values per Table - in the Transmission Planning Criteria Basis and Assumptions. Desired post-contingency voltage change limits for three defined post event timeframes as provided in Table -, below. Filed under a separate cover AESO Project Number: P60 9 March, 06

12 : FortisAlberta Inc. Plamondon 5S Capacity Increase Table -: Post-Contingency Voltage Deviation Guidelines for Low Voltage Busses Parameter and Reference Point Post Transient (Up to 0 sec.) Time Period Post Auto Control (0 sec. to 5 min.) Post Manual Control (Steady State) Voltage deviation from steady state at low voltage bus ±0% ±% ±5%... Authoritative Documents (ADs) The AESO information document ID# 00-00RS, General Operating Practices Voltage Control, which relates to Section 0. of the ISO rules, Maintaining Network Voltage, was applied to establish the pre-contingency voltage profile in the study area and its vicinity... Load and Generation Assumptions... Load Assumptions Table presents the AESO 0 Long-term Outlook (0 LTO) corporate forecast for the Athabasca / Lac La Biche area (Area ) at time of area peak. Table : Area Forecast Load (0 LTO) Area Name and Season Area Athabasca / Lac La Biche AIL (w/o losses) Summer peak 9.0 Winter peak 0 Summer peak 0,8.0 Winter peak,5.0 Forecast Load (MW) Generation Assumptions Table provides the study area generation assumptions used in the study scenarios. ALPAC is considered to be the critical generating unit for the purpose of the studies, and is assumed offline for the power flow and voltage stability analyses. Table : Dispatch levels of Existing Generators in the Study Area Generator Name Generator ID Maximum Capacity (MW) Dispatch Level in the Study Scenarios (MW) 06 SP 06 WP DAPP (Westlock G) 8 ALPAC offline offline ALPAC.9 0. ALPAC AESO Project Number: P60 0 March, 06

13 : FortisAlberta Inc. Plamondon 5S Capacity Increase Generator Name Generator ID Maximum Capacity (MW) Dispatch Level in the Study Scenarios (MW) ALPAC Intertie Flow Assumptions The Alberta-BC, Alberta-Montana, and Alberta-Saskatchewan intertie points are deemed to be too far away to have any material impact on the assessment of the requested connection. Therefore the intertie flows were dispatched the same as in the AESO s base cases. The Western Alberta Transmission HVDC Line (WATL) and the Eastern Alberta Transmission HVDC Line (EATL) assumptions were expected to have minimal impact for the connection studies. Therefore, HVDC assumptions are kept consistent with that in the AESO planning base cases and not adjusted for this study... System Projects Table identifies the system transmission projects that were included in the studies. Table : Summary of System Projects Included in the Study Cases Project ID Description ISD 0 Christina Lake Area Development In Service.. Customer Connection Projects Table 5 identifies customer connection projects in the study area. Table 5: Summary of Customer Connection Projects in the Study Area Planning Area Queue Position* Project Number Project Name Planned ISD Modelled** in the Study cases Fortis Colinton 59S Transformer Addition Q-06 No*** 8 66 Fortis Boyle 56S Upgrade Q-06 No*** Notes: * Per the AESO Connection Queue posted in February 06. ** These projects are dispatched per the load and generation levels set out in Section.. and Section... *** The scope of these projects is equipment addition without a Rate DTS increase. These connection projects will not affect the results of this connection assessment or the conclusions and recommendations contained in this report. AESO Project Number: P60 March, 06

14 : FortisAlberta Inc. Plamondon 5S Capacity Increase.5. Facility Ratings and Shunt Elements Table 6 to AESO Project Number: P60 March, 06

15 : FortisAlberta Inc. Plamondon 5S Capacity Increase Table 8 provide the ratings of the existing key transmission facilities in the Athabasca planning area (area ). Table 6: Summary of Transmission Line Ratings in the study area Transmission Lines Summer Rating (MVA) Winter Rating (MVA) 8L (Lac La Biche 5S to Plamondon 5S) 8L (Plamondon 5S to Waupisoo 05S) 6L (Waupisoo 05S to Boyle 56S) L (Boyle 56S to Colinton 59S) 86 9 L (Colinton 59S to Clyde 50S) L (Clyde 50S to NW Cardiff 9S) L (NW Cardiff 9S to Viscount 9S) L (Clyde 50S to Westlock 8S) L (Westlock 8S to North Barrhead 69S) L (Lac La Biche 5S to Whitby Lake 89S) L (Lac La Biche 5S to 88L Tap) L (88L Tap to Heart Lake 898S) 9 6 9L (Whitefish Lake 85S to Heart Lake 898S) L8 (Whitefish Lake 85S to Heart Lake 898S) L (Heart Lake 898S to Ipiatik Lake 6S) 9 6L (Ipiatik Lake 6S to Pike 0S) 9 Table : Summary of Transformer Ratings Station Name and Number Transformer MVA Rating Heart Lake 898S T-0/8kV 00 North Barrhead 69S T-0/8kV 9 North Calder S T6 0/8 kv 8 AESO Project Number: P60 March, 06

16 : FortisAlberta Inc. Plamondon 5S Capacity Increase Table 8: Summary of Shunt Elements in the Study Area Bus Number Bus Name Area Name Blk Steps Blk Bstep (Mvar) Blk Steps Blk Bstep (Mvar) 8.00 ATHABASC ATHABASC LAC LA 8.00 ATHABASC WINEFRE 8.00 ATHABASC 0 WAUP 8.00 ATHABASC ATHABASC Voltage Profile Assumptions The AESO ID# 00-00RS is used to establish normal system (i.e., pre-contingency) voltage profiles for key area busses prior to commencing any studies. Table - of the Transmission Planning Criteria Basis and Assumptions applies for all the busses not included in the ID# 00-00RS. These voltages will be utilized to set the voltage profile for the study base cases prior to power flow analysis. The key bus voltages for the study area for the project are shown in Table 9. Table 9: Summary of Voltage at Key Nodes in the Study Area Substation Nominal Voltage (kv) Minimum Operating Limit (kv) Desired Range (kv) Maximum Operating Limit (kv) Whitefish Lake 85S Heart Lake 898S North Barrhead 69S North Calder S Lac La Biche 5S AESO Project Number: P60 March, 06

17 : FortisAlberta Inc. Plamondon 5S Capacity Increase. Study Methodology.. Study Objectives The objectives of the study are the following: Assess the impact of the Project on the performance of the AIES. Identify any violations of the relevant criteria, standards or requirements of the AESO, both pre- and post-connection of the Project. Recommend mitigation measures, if required, to enable the reliable integration of the project to the AIES... Study Scenarios Table 0 summarizes the study scenarios used for the connection studies. Table 0: Summary of Study Scenario Assumptions Scenario No. Year/Season Load Pre-connection System Project Load (MW) 06 SP WP 5.9 Post-connection system 06 SP WP 8... Connection Studies Carried Out Power flow and voltage stability studies were performed using 06 SP and 06 WP scenarios. The following studies were performed for the pre-connection analysis: Power flow analysis (Category A conditions and Category B contingencies) The following studies were performed for the post-connection analysis: Power flow analysis (Category A conditions and Category B contingencies) Voltage stability analysis (Category A conditions and Category B contingencies) Since completion of the studies, the ISD of the Project has changed from September 06 to November 06. The change in ISD does not have a material impact on the study results and the conclusions and recommendations contained in this report. AESO Project Number: P60 5 March, 06

18 : FortisAlberta Inc. Plamondon 5S Capacity Increase Table : Summary of Studies Performed Scenario(s) Studied Pre- Connection Post- Connection Studies Performed System Conditions Studied,, Power Flow Category A and B - Voltage Stability Category A and B.. Power Flow Analysis Pre- and post-connection power flow analysis was conducted to identify thermal overloads or transmission voltage violations per the Reliability Criteria, and to identify any deviations from the desired limits in Table -. The purpose of the power flow analysis is to quantify any incremental violations in the study area after the Project is connected. Point-of-delivery (POD) low voltage bus deviations were assessed by first locking all tap changers and area capacitors to identify any post-transient voltage deviations above 0%. Tap changers were then allowed to move while capacitors remained locked to determine if any voltage deviations above % were found in the area. Once all taps and capacitor controls were allowed to adjust, voltage deviations above 5% were reported for both the pre-connection and post-connection networks. PSS/E contingency power flow analysis function was used as the study tool.... Contingencies Studied The study includes all Category B contingencies (8 kv and above) within the study area and the tie lines from the study area to the surrounding areas. For the power flow analysis, the study area was monitored for voltage criteria violations and thermal violations under Category A conditions and under Category B contingency conditions. The studied contingencies include all transmission single outages (Category B contingencies) within the study area, including the tie lines connecting the study area to surrounding planning areas..5. Voltage Stability (PV) Analysis The objective of the voltage stability analysis is to determine the ability of the network to maintain voltage stability at all the busses in the system under normal and abnormal system conditions. The Power-Voltage (PV) curve is a representation of voltage change as a result of increased power transfer between two systems. The reported incremental transfers will be to the collapse point. As per the AESO requirements, no assessment based upon other criteria such as minimum voltage will be made at the PV minimum transfer. Voltage stability analysis for post-connection scenarios will be performed. For load connection projects, the load level modelled in post-connection scenarios are the same or higher than in pre-connection scenarios. Therefore, voltage stability analysis for pre-connection scenarios will only be performed if postconnection scenarios show voltage stability criteria violations. AESO Project Number: P60 6 March, 06

19 : FortisAlberta Inc. Plamondon 5S Capacity Increase The voltage stability analysis was performed according to the Western Electricity Coordinating Council (WECC) Voltage Stability Assessment Methodology. WECC voltage stability criteria states, for load areas, post-transient voltage stability is required for the area modeled at a minimum of 05% of the reference load level for system normal conditions (Category A) and for single contingencies (Category B). For this standard, the reference load level is the maximum established planned load. Typically, voltage stability analysis is carried out assuming the worst case scenarios in terms of loading. The voltage stability analysis was performed by increasing load in the Athabasca area, and increasing the corresponding generation in Wabamun Planning Area (Area 0)..5.. Contingencies Studied The voltage stability analysis was performed for Category A conditions and all Category B contingencies (8 kv and above) within the study area and the tie lines from the study area to the surrounding areas. AESO Project Number: P60 March, 06

20 : FortisAlberta Inc. Plamondon 5S Capacity Increase. Pre-Connection System Assessment.. Pre-Connection Power Flow Analysis The pre-connection system is defined as the system configuration without the Project. The steady-state performance of the pre-connection system was assessed under the 06 SP and 06 WP study scenarios. The power flow analyses were based on the criteria, system data and study assumptions as described in Section... Scenario # 06 SP Pre-Connection No Reliability Criteria violations were observed under Category A conditions. No Reliability Criteria violations were observed under Category B contingency conditions. The results of the power flow analysis are summarized in Table and shown in the power flow diagrams in Attachment A. Table : Summary of Pre-Connection System Performance Pre-connection, Scenario # Contingency Thermal Overloads Voltage Performance N-0: Normal Operation None Acceptable N-: All studied contingencies None Acceptable... Scenario # 06 WP Pre-Connection No Reliability Criteria violations were observed under Category A conditions. No Reliability Criteria violations were observed under Category B contingency conditions. The results of the power flow analysis are summarized in Table and shown in the power flow diagrams in Attachment A. Table : Summary of Pre-Connection System Performance Pre-connection, Scenario # Contingency Thermal Overloads Voltage Performance N-0: Normal Operation None Acceptable N-: All studied contingencies None Acceptable AESO Project Number: P60 8 March, 06

21 : FortisAlberta Inc. Plamondon 5S Capacity Increase 5. Connection Alternative 5.. Overview FortisAlberta, as the DFO in the Plamondon area, examined and ruled out the use of load shifting and distribution system upgrades to meet FortisAlberta s distribution reliability criteria and serve load growth in the area. 5 This report examined three transmission alternatives to meet the DFO s request Connection Alternatives Examined Below is a description of the developments associated with each transmission alternative examined for the Project. Alternative Upgrade the Plamondon 5S substation Alternative involves upgrading the existing Plamondon 5S substation by adding a 8/5 kv transformer Add a 8/5 kv transformer with a minimum transformation capacity of 0 MVA; Add a 8 kv circuit breaker Alternative Upgrade the Lac La Biche 5S substation Alternative involves upgrading the existing Lac La Biche 5S substation, including adding a 8/5 kv transformer with a minimum transformation capacity of approximately 0 MVA. Alternative Upgrade the Waupisoo 05S substation Alternative involves upgrading the existing Waupisoo 05S substation, including adding a 8/5 kv transformer with a minimum transformation capacity of approximately 0 MVA Connection Alternatives Not Selected for Further Studies The DFO indicated that Alternative and Alternative did not satisfy the DFO s distribution planning criteria. The DFO determined that Alternative and Alternative were not technically acceptable; therefore, Alternative and Alternative were not selected for further study. 5 The DFO s analysis is reported in sections and 5 of the FortisAlberta Need for Development, Plamondon 5S Upgrade report, which is filed under a separate cover. 6 This alternative reflects more up to date engineering design than the alternative identified in the FortisAlberta Need for Development, Plamondon 5S Upgrade report, which is filed under a separate cover. AESO Project Number: P60 9 March, 06

22 : FortisAlberta Inc. Plamondon 5S Capacity Increase 5... Connection Alternatives Selected for Further Studies Alternative was selected for further studies. AESO Project Number: P60 0 March, 06

23 : FortisAlberta Inc. Plamondon 5S Capacity Increase 6. Technical Analysis of the Connection Alternative 6.. Preferred Alternative 6.. Power Flow Analysis The power flow analyses were based on the criteria, system data and study assumptions as described in Section Scenario # 06 SP Post-Connection No Reliability Criteria violations were observed under Category A conditions. No Reliability Criteria violations were observed under Category B contingency conditions. The results of the power flow analysis are summarized in Table and shown in the power flow diagrams in Attachment B. Table : Summary of Post-Connection System Performance Scenario # Contingency Thermal Overloads Voltage Performance N-0: Normal Operation None Acceptable N-: All studied contingencies None Acceptable 6... Scenario # 06 WP Post-Connection No Reliability Criteria violations were observed under Category A conditions. No Reliability Criteria violations were observed under Category B contingency conditions. The results of the power flow analysis are summarized in Table 5 and shown in the power flow diagrams in Attachment B. Table 5: Summary of Post-Connection System Performance Scenario # Contingency Thermal Overloads Voltage Performance N-0: Normal Operation None Acceptable N-: All studied contingencies None Acceptable 6... Voltage Stability Analysis Voltage stability analysis was conducted using the 06 WP post-connection scenario to investigate the system active power margins after the Project under Category A conditions and Category B contingency conditions. The total load of 0 MW in the Athabasca area was considered as the starting point of the PV analysis. The sink sub-system includes all loads in the AESO Project Number: P60 March, 06

24 : FortisAlberta Inc. Plamondon 5S Capacity Increase Athabasca area. The source system was formed by the generation in the Wabamun area (Area 0). The voltage stability analysis confirms that there are no voltage stability criteria violations after the Project. The voltage stability margins under Category A conditions and for the five worst contingencies under Category B system conditions are listed in Table 6. The PV plots are presented in Attachment C. Table 6: Post-Connection System PV Analysis for five worst contingencies Post-connection, Scenario # Operation Conditions 06 WP Forecasted load (MW) 05% Margin (MW) Nose Point (MW) Meets Voltage Criteria? N-0: Normal Operation. YES N-: 8L (Lac La Biche 5S to Plamondon 5S). YES N-: 8L (Plamondon 5S to Waupisoo 05S) YES N-: 6L (Waupisoo 05S to Boyle 56S) YES N-: 0L (Boyle 56S to Colinton 59S) 06.0 YES N-: L (Colinton 59S to Clyde 50S) 8.5 YES 6.. Conclusions Power flow results indicate that there are no thermal criteria violations or voltage criteria violations prior to and after the Project. The study results confirm that the voltage stability margin of the study area meets the AESO requirement after the Project. AESO Project Number: P60 March, 06

25 : FortisAlberta Inc. Plamondon 5S Capacity Increase. Project Interdependencies No project interdependencies were identified. AESO Project Number: P60 March, 06

26 : FortisAlberta Inc. Plamondon 5S Capacity Increase 8. Summary and Conclusion Project Overview The DFO has submitted a SASR to the AESO to meet the DFO s distribution reliability criteria and to serve load growth in the Plamondon area. The SASR includes a request for a Rate DTS, Demand Transmission Service, contract capacity increase from 5.9 MW to 8. MW for the system access service provided at the existing Plamondon 5S substation, and a request for transmission development (collectively, the Project). The DFO also requested upgrades to the existing Plamondon 5S substation. The scheduled in-service date for the Project is November, 06. This report detailed the system performance studies undertaken to assess the impact of the Project on the Alberta interconnected electric system (AIES). Conclusions and Recommendation Based on the study results, Alternative is technically viable. The connection assessment indicates that the Project will not adversely impact the performance of the AIES. It is recommended to proceed with the Project using Alternative as the preferred option to respond to the DFO s request for system access service. For Alternative, a transformer size of MVA would be recommended based on good electric industry practice and under advisement from the legal owner of transmission facilities regarding its asset management and inventory practices. AESO Project Number: P60 March, 06

27 : FortisAlberta Inc. Plamondon 5S Capacity Increase Attachment A: Pre-Connection Power Flow Analysis Results AESO Project Number: P60 March, 06

28 R 0..R 6.0.R -. 9 ALPAC R ALPAC FLATLK WAUP PLAMOND ST THOMP N BARRH CLYDE LAC LA N CALDE 50 WHITBY Project 60 Plamondon 5S - Capacity Increase FIGURE A- - SYSTEM NORMAL 06 SP PRE-CONNECTION TUE, OCT :6 kv: <=5.000 <=.500 <= <=8.000 <=0.000 >0.000

29 R 0. 8.R 6.0.0R -. 9 ALPAC R ALPAC FLATLK WAUP PLAMOND ST THOMP N BARRH CLYDE LAC LA N CALDE 50 WHITBY Project 60 Plamondon 5S - Capacity Increase FIGURE A- - CONTINGENCY 8L 06 SP PRE-CONNECTION TUE, OCT :6 kv: <=5.000 <=.500 <= <=8.000 <=0.000 >0.000

30 R R 6.0 R ALPAC R ALPAC FLATLK WAUP PLAMOND ST THOMP N BARRH CLYDE LAC LA N CALDE 50 WHITBY Project 60 Plamondon 5S - Capacity Increase FIGURE A- - CONTINGENCY 8L- 06 SP PRE-CONNECTION TUE, OCT :6 kv: <=5.000 <=.500 <= <=8.000 <=0.000 >0.000

31 R R R ALPAC R ALPAC FLATLK WAUP PLAMOND ST THOMP N BARRH CLYDE LAC LA N CALDE 50 WHITBY Project 60 Plamondon 5S - Capacity Increase FIGURE A- - CONTINGENCY 6L 06 SP PRE-CONNECTION TUE, OCT :6 kv: <=5.000 <=.500 <= <=8.000 <=0.000 >0.000

32 R 0..8R 6.0.R -. 9 ALPAC R ALPAC FLATLK WAUP PLAMOND ST THOMP N BARRH CLYDE LAC LA N CALDE 50 WHITBY Project 60 Plamondon 5S - Capacity Increase FIGURE A-5 - CONTINGENCY 0L 06 SP PRE-CONNECTION TUE, OCT :6 kv: <=5.000 <=.500 <= <=8.000 <=0.000 >0.000

33 R 0..8R 6.0.R ALPAC R ALPAC FLATLK WAUP PLAMOND ST THOMP N BARRH CLYDE LAC LA N CALDE 50 WHITBY Project 60 Plamondon 5S - Capacity Increase FIGURE A-6 - CONTINGENCY L 06 SP PRE-CONNECTION TUE, OCT :6 kv: <=5.000 <=.500 <= <=8.000 <=0.000 >0.000

34 R 0..R 6.0.R ALPAC R ALPAC FLATLK WAUP PLAMOND ST THOMP N BARRH CLYDE LAC LA N CALDE 50 WHITBY Project 60 Plamondon 5S - Capacity Increase FIGURE A- - CONTINGENCY 9L 06 SP PRE-CONNECTION TUE, OCT : kv: <=5.000 <=.500 <= <=8.000 <=0.000 >0.000

35 R 0..5R 6.0.8R ALPAC R ALPAC FLATLK WAUP PLAMOND ST THOMP N BARRH CLYDE LAC LA N CALDE 50 WHITBY Project 60 Plamondon 5S - Capacity Increase FIGURE A-8 - CONTINGENCY L 06 SP PRE-CONNECTION TUE, OCT : kv: <=5.000 <=.500 <= <=8.000 <=0.000 >0.000

36 R 0..8R 6.0.R -. 9 ALPAC R ALPAC FLATLK WAUP PLAMOND ST THOMP N BARRH CLYDE LAC LA N CALDE 50 WHITBY Project 60 Plamondon 5S - Capacity Increase FIGURE A-9 - CONTINGENCY 88L 06 SP PRE-CONNECTION TUE, OCT : kv: <=5.000 <=.500 <= <=8.000 <=0.000 >0.000

37 R 9..9R.9.R ALPAC R.0. 9 ALPAC FLATLK WAUP PLAMOND ST THOMP N BARRH CLYDE LAC LA N CALDE 50 WHITBY Project 60 Plamondon 5S - Capacity Increase FIGURE A-0 - SYSTEM NORMAL 06 WP PRE-CONNECTION TUE, OCT : kv: <=5.000 <=.500 <= <=8.000 <=0.000 >0.000

38 R 9..R.9 6.6R ALPAC R ALPAC FLATLK WAUP PLAMOND ST THOMP N BARRH CLYDE LAC LA N CALDE 50 WHITBY Project 60 Plamondon 5S - Capacity Increase FIGURE A- - CONTINGENCY 8L 06 WP PRE-CONNECTION TUE, OCT : kv: <=5.000 <=.500 <= <=8.000 <=0.000 >0.000

39 R 9. 6.R.9 9.R ALPAC R ALPAC FLATLK WAUP PLAMOND ST THOMP N BARRH CLYDE LAC LA N CALDE 50 WHITBY Project 60 Plamondon 5S - Capacity Increase FIGURE A- - CONTINGENCY 8L- 06 WP PRE-CONNECTION TUE, OCT : kv: <=5.000 <=.500 <= <=8.000 <=0.000 >0.000

40 R 9..R.9 6.9R ALPAC R ALPAC FLATLK WAUP PLAMOND ST THOMP N BARRH CLYDE LAC LA N CALDE 50 WHITBY Project 60 Plamondon 5S - Capacity Increase FIGURE A- - CONTINGENCY 6L 06 WP PRE-CONNECTION TUE, OCT : kv: <=5.000 <=.500 <= <=8.000 <=0.000 >0.000

41 R 9. 5.R.9 8.6R ALPAC R ALPAC FLATLK WAUP PLAMOND ST THOMP N BARRH CLYDE LAC LA N CALDE 50 WHITBY Project 60 Plamondon 5S - Capacity Increase FIGURE A- - CONTINGENCY 0L 06 WP PRE-CONNECTION TUE, OCT : kv: <=5.000 <=.500 <= <=8.000 <=0.000 >0.000

42 R 9..6R.9.R ALPAC R ALPAC FLATLK WAUP PLAMOND ST THOMP N BARRH CLYDE LAC LA N CALDE 50 WHITBY Project 60 Plamondon 5S - Capacity Increase FIGURE A-5 - CONTINGENCY L 06 WP PRE-CONNECTION TUE, OCT : kv: <=5.000 <=.500 <= <=8.000 <=0.000 >0.000

43 R 9..8R.9.6R ALPAC R ALPAC FLATLK WAUP PLAMOND ST THOMP N BARRH CLYDE LAC LA N CALDE 50 WHITBY Project 60 Plamondon 5S - Capacity Increase FIGURE A-6 - CONTINGENCY 9L 06 WP PRE-CONNECTION TUE, OCT : kv: <=5.000 <=.500 <= <=8.000 <=0.000 >0.000

44 R 9..8R.9.R ALPAC R.0. 9 ALPAC FLATLK WAUP PLAMOND ST THOMP N BARRH CLYDE LAC LA N CALDE 50 WHITBY Project 60 Plamondon 5S - Capacity Increase FIGURE A- - CONTINGENCY L 06 WP PRE-CONNECTION TUE, OCT : kv: <=5.000 <=.500 <= <=8.000 <=0.000 >0.000

45 R 9. 5.R.9 8.0R ALPAC R ALPAC FLATLK WAUP PLAMOND ST THOMP N BARRH CLYDE LAC LA N CALDE 50 WHITBY Project 60 Plamondon 5S - Capacity Increase FIGURE A-8 - CONTINGENCY 88L 06 WP PRE-CONNECTION TUE, OCT : kv: <=5.000 <=.500 <= <=8.000 <=0.000 >0.000

46 : FortisAlberta Inc. Plamondon 5S Capacity Increase Attachment B: Post-Connection Power Flow Analysis Results AESO Project Number: P60 March, 06

47 R R R ALPAC R ALPAC FLATLK WAUP PLAMOND ST THOMP N BARRH CLYDE PLAMOND LAC LA N CALDE 50 WHITBY Project 60 Plamondon 5S - Capacity Increase FIGURE B- - SYSTEM NORMAL 06 SP POST-CONNECTION TUE, OCT :5 kv: <=5.000 <=.500 <= <=8.000 <=0.000 >0.000

Connection Engineering Study Report for AUC Application: AESO Project # 1674

Connection Engineering Study Report for AUC Application: AESO Project # 1674 APPENDIX A CONNECTION ASSESSMENT Connection Engineering Study Report for AUC Application: AESO Project # 1674 Executive Summary Project Overview FortisAlberta Inc. (FortisAlberta) submitted a System

More information

Connection Engineering Study Report for AUC Application: EPCOR Clover Bar 25 kv Breaker Addition

Connection Engineering Study Report for AUC Application: EPCOR Clover Bar 25 kv Breaker Addition Connection Engineering Study Report for AUC Application: EPCOR Clover Bar 25 kv Breaker Addition Executive Summary Project Overview EPCOR Distribution & Transmission Inc. (EDTI), in its capacity as the

More information

Executive Summary. Project Overview. Existing System. Study Summary

Executive Summary. Project Overview. Existing System. Study Summary APPENDIX A CONNECTION ASSESSMENT Connection Engineering Study Report for AUC Application: Hornbeck 345S Substation Executive Summary Project Overview FortisAlberta Inc. (FortisAlberta), in its capacity

More information

THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS

THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS 2/27/2018 ELECTRIC TRANSMISSION PLANNING Table of Contents Table of Contents... 2 Executive

More information

DFO STATEMENT OF NEED REPORT

DFO STATEMENT OF NEED REPORT APPENDIX E DFO STATEMENT OF NEED REPORT Table of Contents 1.0 Executive Summary... 1 2.0 Description of the Area... 2 2.1 Geographic Study Area... 2 2.2 2016 System Configuration... 2 3.0 Area Loading

More information

Project #148. Generation Interconnection System Impact Study Report

Project #148. Generation Interconnection System Impact Study Report Project #148 Generation Interconnection System Impact Study Report June 05, 2012 Electric Transmission Planning Table of Contents Table of Contents... 2 Executive Summary... 3 Energy Resource Interconnection

More information

Interconnection System Impact Study Report Request # GI

Interconnection System Impact Study Report Request # GI Executive Summary Interconnection System Impact Study Report Request # GI-2008-23 34 MW Solar Generation Ranch at Hartsel, Colorado Public Service Company of Colorado Transmission Planning August 19, 2010

More information

ATTACHMENT - DFO STATEMENT OF NEED

ATTACHMENT - DFO STATEMENT OF NEED ATTACHMENT - DFO STATEMENT OF NEED Table of Contents Executive Summary... 3 1. Description of the Area... 5 1.1 Geographic Study Area... 5 1.2 Current System Configuration... 7 1.3 Distributed Generation...

More information

Transmission Coordination and Planning Committee 2014 Q4 Stakeholder Meeting. December 18, 2014

Transmission Coordination and Planning Committee 2014 Q4 Stakeholder Meeting. December 18, 2014 Transmission Coordination and Planning Committee 2014 Q4 Stakeholder Meeting December 18, 2014 Agenda 1. Introductions 2. TCPC Policies 3. BHCE Planning Department Update 4. 2014 LTP Study Results 5. Stakeholder

More information

Dunvegan Hydroelectric Project. For Glacier Power Limited. Preliminary Interconnection Study

Dunvegan Hydroelectric Project. For Glacier Power Limited. Preliminary Interconnection Study ` Dunvegan Hydroelectric Project For Glacier Power Limited Preliminary Interconnection Study Prepared by Pung Toy, P. Eng. and Ata Rehman, P. Eng. September 24, 2004 Table of Contents Table of Contents...

More information

Service Requested 150 MW, Firm. Table ES.1: Summary Details for TSR #

Service Requested 150 MW, Firm. Table ES.1: Summary Details for TSR # Executive Summary Firm point to point transmission service has been requested by Transmission Service Request (TSR) #75669514, under the SaskPower Open Access Transmission Tariff (OATT). The TSR consists

More information

SPS Planning Criteria and Study Methodology

SPS Planning Criteria and Study Methodology SPS Planning Criteria and Study Methodology SPS subscribes to the Southwest Power Pool ("SPP") Reliability Criteria, which incorporates compliance with the appropriate North American Electric Reliability

More information

Interconnection Feasibility Study Report GIP-226-FEAS-R3

Interconnection Feasibility Study Report GIP-226-FEAS-R3 Interconnection Feasibility Study Report GIP-226-FEAS-R3 System Interconnection Request #226 70 MW Wind Generating Facility Kings County (L-6013) 2010 07 21 Control Centre Operations Nova Scotia Power

More information

100 MW Wind Generation Project

100 MW Wind Generation Project A subsidiary of Pinnacle West Capital Corporation 100 MW Wind Generation Project CUSTOMER FINAL Feasibility Study Results By Transmission Planning, APS December 21, 2007 Executive Summary This Feasibility

More information

Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting

Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting BHE Wyoming Q4 Stakeholder Meeting November 17, 2016 @ 1:00PM MT Black Hills Energy Service Center 409 Deadwood Avenue, Rapid

More information

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI Executive Summary Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI-2003-2 Xcel Energy Transmission Planning January 2004 This Interconnection Feasibility

More information

Interconnection Feasibility Study Report GIP-023-FEAS-R1. Generator Interconnection Request # MW Wind Generating Facility Inverness (L6549), NS

Interconnection Feasibility Study Report GIP-023-FEAS-R1. Generator Interconnection Request # MW Wind Generating Facility Inverness (L6549), NS Interconnection Feasibility Study Report GIP-023-FEAS-R1 Generator Interconnection Request # 23 100 MW Wind Generating Facility Inverness (L6549), NS February 16, 2006 Control Centre Operations Nova Scotia

More information

Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood

Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood Prepared for: SCE&G Fossil/Hydro June 30, 2008 Prepared by: SCE&G Transmission Planning Table of Contents

More information

ATTACHMENT Y STUDY REPORT

ATTACHMENT Y STUDY REPORT Attachment Y Study Edwards Unit 1: 90 MW Coal Retirement December 31, 2012 ATTACHMENT Y STUDY REPORT 7/5/2013 PUBLIC / EXECUTIVE SUMMARY MISO received an Attachment Y Notification of Potential Generation

More information

Central East Region Transmission Development Needs Identification Document

Central East Region Transmission Development Needs Identification Document Executive Summary As part of its mandate, the ( AESO ) is responsible for planning the transmission system within the province of Alberta as set out in the Electric Utilities Act, SA 2003 c E-5.1 ( EUA

More information

System Impact Study Report

System Impact Study Report Report For: NTE Carolinas II, LLC ( Customer ) Queue #: 42432-01 Service Location: Rockingham County, NC Total Output: 477 MW (summer) / 540 MW (winter) Commercial Operation Date: 12/1/2020 42432-01 SIS

More information

Generator Interconnection System Impact Study For

Generator Interconnection System Impact Study For Generator Interconnection System Impact Study For Prepared for: January 15, 2015 Prepared by: SCE&G Transmission Planning Table of Contents General Discussion... Page 3 I. Generator Interconnection Specifications...

More information

2012 LOCAL TRANSMISSION PLAN:

2012 LOCAL TRANSMISSION PLAN: Colorado PUC E-Filings System 2012 LOCAL TRANSMISSION PLAN: TRANSMISSION COORDINATION AND PLANNING COMMITTEE ANNUAL TRANSMISSION ASSESSMENT FOR BLACK HILLS/COLORADO ELECTRIC UTILITY COMPANY, L.P., D/B/A

More information

List of Circuits (R6.1 PRC-023-AB-2)

List of Circuits (R6.1 PRC-023-AB-2) (R6.1 PRC-023-AB-2) The list of circuits that the Alberta Electric System Operator ( AESO ) must maintain pursuant to requirement R6.1 of Alberta Reliability Standard PRC-023-AB-2 Transmission Relay Loadability,

More information

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation Prepared by: Entergy Services, Inc. T & D Planning L-ENT-17A 639 Loyola Avenue New Orleans, LA 70113 Rev Issue Date

More information

Midway/Monument Area TTC Study

Midway/Monument Area TTC Study Midway/Monument Area TTC Study (includes the following lines: Midway Geesen 115 kv, Geesen Falcon 115 kv, Falcon Fuller 115 kv, Fuller Black Squirrel 115 kv, and Black Squirrel Monument 115 kv) Johnny

More information

Final Draft Report. Assessment Summary. Hydro One Networks Inc. Longlac TS: Refurbish 115/44 kv, 25/33/ General Description

Final Draft Report. Assessment Summary. Hydro One Networks Inc. Longlac TS: Refurbish 115/44 kv, 25/33/ General Description Final Draft Report Assessment Summary Hydro One Networks Inc. : Refurbish 115/44 kv, 25/33/42 MVA DESN Station CAA ID Number: 2007-EX360 1.0 General Description Hydro One is proposing to replace the existing

More information

GENERAL DIRECTION SOUGHT AND SPECIFIC QUESTIONS TO BE ANSWERED

GENERAL DIRECTION SOUGHT AND SPECIFIC QUESTIONS TO BE ANSWERED DATE: June 28, 2011 STAFF: Brian Janonis Brian Moeck, PRPA Pre-taped staff presentation: none WORK SESSION ITEM FORT COLLINS CITY COUNCIL SUBJECT FOR DISCUSSION Electric Transmission Update. EXECUTIVE

More information

EL PASO ELECTRIC COMPANY (EPE) FACILITIES STUDY FOR PROPOSED HVDC TERMINAL INTERCONNECTION AT NEW ARTESIA 345 KV BUS

EL PASO ELECTRIC COMPANY (EPE) FACILITIES STUDY FOR PROPOSED HVDC TERMINAL INTERCONNECTION AT NEW ARTESIA 345 KV BUS EL PASO ELECTRIC COMPANY (EPE) FACILITIES STUDY FOR PROPOSED HVDC TERMINAL INTERCONNECTION AT NEW ARTESIA 345 KV BUS El Paso Electric Company System Operations Department System Planning Section May 2004

More information

Stability Study for the Mt. Olive Hartburg 500 kv Line

Stability Study for the Mt. Olive Hartburg 500 kv Line Stability Study for the Mt. Olive Hartburg 500 kv Line Peng Yu Sharma Kolluri Transmission & Distribution Planning Group Energy Delivery Organization Entergy Sevices Inc April, 2011 New Orleans, LA 1.

More information

Project #94. Generation Interconnection System Impact Study Report Revision

Project #94. Generation Interconnection System Impact Study Report Revision Project #94 Generation Interconnection System Impact Study Report Revision October 2, 2009 Electric Transmission Planning Table of Contents Table of Contents...2 Executive Summary...3 Energy Resource Interconnection

More information

SMUD 2014 Ten-Year Transmission Assessment Plan. Final. December 18, 2014

SMUD 2014 Ten-Year Transmission Assessment Plan. Final. December 18, 2014 SMUD 2014 Ten-Year Transmission Assessment Plan Final December 18, 2014 I CONTENTS Executive Summary... III 1 Introduction... 2 1.1 Reliability Criteria and Guidelines... 2 1.2 Load Forecast... 2 1.3 Demand

More information

Interconnection Feasibility Study Report GIP-222-FEAS-R3

Interconnection Feasibility Study Report GIP-222-FEAS-R3 Interconnection Feasibility Study Report GIP-222-FEAS-R3 System Interconnection Request #222 48 MW Steam Generating Facility Pictou County (53N) 2010 07 30 Control Centre Operations Nova Scotia Power Inc.

More information

Feasibility Study Report

Feasibility Study Report Generator Interconnection Request Feasibility Study Report For: Customer --- Service Location: Rutherford County Total Output: 79.2 MW Commercial Operation Date: 9/1/2014 In-Service Date (if given): 9/1/2014

More information

SYSTEM IMPACT STUDY EC300W ERIS FINAL REPORT. El Paso Electric Company

SYSTEM IMPACT STUDY EC300W ERIS FINAL REPORT. El Paso Electric Company SYSTEM IMPACT STUDY EC300W ERIS FINAL REPORT Prepared for: El Paso Electric Company Prepared by: Engineers, LLC 1526 Cole Boulevard Building 3, Suite 150 Lakewood, CO 80401 (303) 395-4018 FOREWORD This

More information

Interconnection Feasibility Study Report GIP-157-FEAS-R2

Interconnection Feasibility Study Report GIP-157-FEAS-R2 Interconnection Feasibility Study Report GIP-157-FEAS-R2 System Interconnection Request #157 100.5 MW Wind Generating Facility Guysborough County (L-6515) 2009 09 14 Control Centre Operations Nova Scotia

More information

Feasibility Study. Customer Kingman Area Photovoltaic Generation Project Interconnection

Feasibility Study. Customer Kingman Area Photovoltaic Generation Project Interconnection Feasibility Study Customer Kingman Area Photovoltaic Generation Project Interconnection October, 2009 October 2009 i EXECUTIVE SUMMARY CONCLUSION Customer has requested network resource interconnection

More information

DETOUR GOLD CORPORATION SYSTEM IMPACT ASSESSMENT FOR DETOUR LAKE PROJECT

DETOUR GOLD CORPORATION SYSTEM IMPACT ASSESSMENT FOR DETOUR LAKE PROJECT DETOUR GOLD CORPORATION SYSTEM IMPACT ASSESSMENT FOR DETOUR LAKE PROJECT Report No.: RP-160388-02-141-0001 CAA ID No. 2010-380 Rev. 01 Prepared by: AMEC Americas Limited Energy and Mining Division Power

More information

Interconnection Feasibility Study Report Request # GI Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado

Interconnection Feasibility Study Report Request # GI Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado Executive Summary Interconnection Feasibility Study Report Request # GI-2016-6 Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado Public Service Company of Colorado Transmission

More information

MILLIGAN SOLAR PROJECT

MILLIGAN SOLAR PROJECT February 16, 2009 Page 1 of 18 A subsidiary of Pinnacle West Capital Corporation MILLIGAN SOLAR PROJECT FINAL Feasibility Study Report APS Contract 52115 Prepared by: Arizona Public Service Company Transmission

More information

Black Hills Project Summary

Black Hills Project Summary 2016 Rule 3627 Report Black Hills Project Summary Page 1 of 38 Black Hills Project Summary Colorado PUC E-Filings System D 1 2016 Rule 3627 Report Black Hills Project Summary Page 2 of 38 Category Transmission

More information

Falcon-Midway 115 kv Line Uprate Project Report

Falcon-Midway 115 kv Line Uprate Project Report Falcon-Midway 115 kv Line Uprate Project Report 12/1/2008 1 Background The function of this project is to uprate the 26.7 miles of Tri-State s 115 kv line between Midway and Falcon substations from 50

More information

AMERICAN ELECTRIC POWER 2017 FILING FERC FORM 715 ANNUAL TRANSMISSION PLANNING AND EVALUATION REPORT PART 4 TRANSMISSION PLANNING RELIABILITY CRITERIA

AMERICAN ELECTRIC POWER 2017 FILING FERC FORM 715 ANNUAL TRANSMISSION PLANNING AND EVALUATION REPORT PART 4 TRANSMISSION PLANNING RELIABILITY CRITERIA AMERICAN ELECTRIC POWER 2017 FILING FERC FORM 715 ANNUAL TRANSMISSION PLANNING AND EVALUATION REPORT PART 4 TRANSMISSION PLANNING RELIABILITY CRITERIA AEP Texas (comprised of its Central and North Divisions

More information

New 115 kv Disconnect Switches at Bloomsburg MTS

New 115 kv Disconnect Switches at Bloomsburg MTS 115 kv Line tap from C9 to Bloomsburg MTS & New Bus Tie Switch CAA ID Number: 2007-EX353 Final Draft ASSESSMENT SUMMARY 1. GENERAL DESCRIPTION Norfolk TS and Bloomsburg MTS are supplied by a single 115

More information

CUSTOMER/ TWIN ARROWS PROJECT

CUSTOMER/ TWIN ARROWS PROJECT A subsidiary of Pinnacle West Capital Corporation CUSTOMER/ TWIN ARROWS PROJECT V1 Facility Study Report APS Contract 52149 Prepared by: Arizona Public Service Company Transmission & Distribution Asset

More information

Appendix D Black Hills Project Summary

Appendix D Black Hills Project Summary Page 1 of 28 Appendix D Black Hills Project Summary Table of Contents Black Hills Project Summary... D-1 Boone-Nyberg 115 kv Project... D-3 Rattlesnake Butte 115 kv Substation Terminal... D-6 Fountain

More information

Feasibility Study Report

Feasibility Study Report Report For: Orion Renewable Resources LLC ( Customer ) Queue #: Service Location: Rockingham County, NC Total Output Requested By Customer: 100 MW Commercial Operation Date Requested By Customer: 11/1/2019

More information

Feasibility Study for the Q MW Solar Project

Feasibility Study for the Q MW Solar Project Feasibility Study for the Q171 74.5 MW Solar Project August 2018 Bulk Transmission Planning, Florida i This document and any attachments hereto ( document ) is made available by Duke Energy Florida, LLC

More information

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015 No. Comment Submitted ISO Response Date Q&A Posted 1 Will the ISO consider proposals that are not within the impedance range specified? Yes. However, the benefits estimated and studies performed by the

More information

Generation Interconnection Feasibility Study For XXXXXXXXXXXXXXXXXXXXXX MW generator at new Western Refinary Substation

Generation Interconnection Feasibility Study For XXXXXXXXXXXXXXXXXXXXXX MW generator at new Western Refinary Substation Generation Interconnection Feasibility Study For XXXXXXXXXXXXXXXXXXXXXX 131-250 MW generator at new Western Refinary Substation System Planning Section April, 2005 TABLE OF CONTENT 1 EXECUTIVE SUMMARY

More information

Gateway South Transmission Project

Gateway South Transmission Project Phase 1 Comprehensive Progress Report Volume 1 - Technical Report Report Prepared by PacifiCorp Transmission Planning Department November 21, 2008 WECC1-V4 Phase 1 Comprehensive Progress Report Executive

More information

Functional Specification Revision History

Functional Specification Revision History Functional Specification Revision History Revision Description of Revision Author Date B0 For comments Yale Zhou January 26, 2016 B1 Updated as per comments Yale Zhou February 1, 2016 Final issuance Yale

More information

NorthernLights HVDC Project

NorthernLights HVDC Project WECC COMPREHENSIVE PROGRESS REPORT December 4, 2008 Prepared for TransCanada by Ben Williams TABLE OF CONTENTS EXECUTIVE SUMMARY... III 1.0 BACKGROUND & INTRODUCTION... 1 1.1 BACKGROUND... 1 1.2 INTRODUCTION...

More information

TRANSMISSION PLANNING CRITERIA

TRANSMISSION PLANNING CRITERIA CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003-3502 Effective Date: TRANSMISSION PLANNING CRITERIA PURPOSE This specification describes Con Edison s Criteria for assessing

More information

DUKE ENERGY PROGRESS TRANSMISSION SYSTEM PLANNING SUMMARY

DUKE ENERGY PROGRESS TRANSMISSION SYSTEM PLANNING SUMMARY DUKE ENERGY PROGRESS TRANSMISSION SYSTEM PLANNING SUMMARY Transmission Department Transmission Planning Duke Energy Progress TABLE OF CONTENTS I. SCOPE 3 II. TRANSMISSION PLANNING OBJECTIVES 3 III. TRANSMISSION

More information

Feasibility Study Report

Feasibility Study Report Report For: Fresh Air Energy II, LLC ( Customer ) Queue #: Service Location: Chester County, SC Total Output Requested By Customer: 74.5 MW Commercial Operation Date Requested By Customer: 1/7/2019 Feasibility

More information

FIRSTENERGY S PROPOSED SOLUTION AND REQUEST FOR CONSTRUCTION DESIGNATION

FIRSTENERGY S PROPOSED SOLUTION AND REQUEST FOR CONSTRUCTION DESIGNATION PJM RTEP - Artificial Island Area FIRSTENERGY S PROPOSED SOLUTION AND REQUEST FOR CONSTRUCTION DESIGNATION Part 1 Report REDACTED VERSION FirstEnergy Corp. Energy Delivery, Transmission Planning and Protection

More information

TOLTEC POWER PARTNERSHIP TOLTEC POWER PROJECT INTERCONNECTION STUDY SYSTEM IMPACT STUDY

TOLTEC POWER PARTNERSHIP TOLTEC POWER PROJECT INTERCONNECTION STUDY SYSTEM IMPACT STUDY TOLTEC POWER PARTNERSHIP TOLTEC POWER PROJECT INTERCONNECTION STUDY SYSTEM IMPACT STUDY January 7, 2002 Prepared by Jorge Chacon (Consultant) Tucson Electric Power Company Ed Beck ii EXECUTIVE SUMMARY

More information

Supplemental Report on the NCTPC Collaborative Transmission Plan

Supplemental Report on the NCTPC Collaborative Transmission Plan Supplemental Report on the NCTPC 2007-2017 Collaborative Transmission Plan May 16, 2008 1 Table of Contents I. Executive Summary...1 II. Richmond-Fort Bragg Woodruff Street 230 kv Line...2 II.A. Need for

More information

Consulting Agreement Study. Completed for Transmission Customer

Consulting Agreement Study. Completed for Transmission Customer Completed for Transmission Customer Proposed Resource & Transmission Carbon County, MT & 230 kv Transmission in North Wyoming August 2016 Table of Contents 1.0 Description... 1 2.0 Overall Assumptions...

More information

Western Area Power Administration Sierra Nevada Region

Western Area Power Administration Sierra Nevada Region Western Area Power Administration Sierra Nevada Region 2014 Annual Ten-Year Transmission Plan Assessment Report November 20, 2014 For information or questions regarding this Transmission Assessment Report,

More information

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC OCTOBER 22, 2014 Emera Maine s Local System Plan Bangor Hydro District Needs Assessment/Potential Solutions Local Planning Advisory Committee Meeting E M i R t ti Emera Maine Representative: Jeffrey Fenn,

More information

Interconnection Feasibility Study Report GIP-369-FEAS-R1

Interconnection Feasibility Study Report GIP-369-FEAS-R1 Interconnection Feasibility Study Report GIP-369-FEAS-R1 System Interconnection Request #369 50 MW Wind Generating Facility Cumberland County (L-6513) 2012-02-09 Control Centre Operations Nova Scotia Power

More information

Outer Metro 115 kv Transmission Development Study. (Scott Co, Carver Co and Hennepin Co)

Outer Metro 115 kv Transmission Development Study. (Scott Co, Carver Co and Hennepin Co) Outer Metro 115 kv Transmission Development Study. (Scott Co, Carver Co and Hennepin Co) Participants: Great River Energy Xcel Energy Inc. Executive Summary This study is done to address various load serving

More information

Alberta Electric System Operator Needs Identification Document Application. Mowat 2033S Substation

Alberta Electric System Operator Needs Identification Document Application. Mowat 2033S Substation Decision 21781-D01-2016 Alberta Electric System Operator Needs Identification Document Application Facility Applications September 7, 2016 Alberta Utilities Commission Decision 21781-D01-2016: Alberta

More information

Q95 Vicksburg 69kV. System Impact Study. APS Contract No Arizona Public Service Company Transmission Planning.

Q95 Vicksburg 69kV. System Impact Study. APS Contract No Arizona Public Service Company Transmission Planning. A subsidiary of Pinnacle West Capital Corporation Q95 Vicksburg 69kV System Impact Study APS Contract No. 52246 By Arizona Public Service Company Transmission Planning December 1, 2010 Version 2.6 Final

More information

Facilities Study for Alberta to US Available Transfer Capability

Facilities Study for Alberta to US Available Transfer Capability Facilities Study for Alberta to US Available Transfer Capability Report No: NPP2002-05 June 3, 2002 System Planning & Grid Operations, Transmission Line of Business Engineering Services Executive Summary

More information

ATCO ELECTRIC LTD. (Transmission System) SERVICE QUALITY AND RELIABILITY PERFORMANCE, MEASURES AND INDICES Revision 0

ATCO ELECTRIC LTD. (Transmission System) SERVICE QUALITY AND RELIABILITY PERFORMANCE, MEASURES AND INDICES Revision 0 ATCO ELECTRIC LTD. (Transmission System) SERVICE QUALITY AND RELIABILITY PERFORMANCE, MEASURES AND INDICES 2018-04-24 - Revision 0 EUB Decision 2007-071 Board Direction 52 For questions or comments regarding

More information

City of Palo Alto (ID # 6416) City Council Staff Report

City of Palo Alto (ID # 6416) City Council Staff Report City of Palo Alto (ID # 6416) City Council Staff Report Report Type: Informational Report Meeting Date: 1/25/2016 Summary Title: Update on Second Transmission Line Title: Update on Progress Towards Building

More information

SYSTEM IMPACT RESTUDY H252W ERIS REPORT. El Paso Electric Company

SYSTEM IMPACT RESTUDY H252W ERIS REPORT. El Paso Electric Company SYSTEM IMPACT RESTUDY H252W ERIS REPORT Prepared for: El Paso Electric Company Prepared by: Engineers, LLC 1526 Cole Boulevard Building 3, Suite 150 Lakewood, CO 80401 (303) 395-4018 FOREWORD This report

More information

OCTOBER 17, Emera Maine Representative: Jeffrey Fenn, P.E., LR/SGC Engineering LLC

OCTOBER 17, Emera Maine Representative: Jeffrey Fenn, P.E., LR/SGC Engineering LLC OCTOBER 17, 2018 Emera Maine s Local System Plan Bangor Hydro District Needs Assessment/Potential Solutions Local Planning Advisory Committee Meeting Emera Maine Representative: Jeffrey Fenn, P.E., LR/SGC

More information

PJM Generator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study September 2008

PJM Generator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study September 2008 PJM enerator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study 504744 September 2008 PJM Interconnection 2008. All rights reserved R60 Robison Park-Convoy 345kV Impact Study eneral

More information

AQUILA NETWORKS WESTPLAINS ENERGY COLORADO CATEGORY C CONTINGENCY STUDIES

AQUILA NETWORKS WESTPLAINS ENERGY COLORADO CATEGORY C CONTINGENCY STUDIES AQUILA NETWORKS WESTPLAINS ENERGY COLORADO CATEGORY C CONTINGENCY STUDIES 2008-2012 April 2008 Table of Contents 1.0 INTRODUCTION... 2 2.0 RESULTS... 2 2.1 CATEGORY C NO SOLVE CASES... 2 2.2 CATEGORY C

More information

Interconnection Feasibility Study Report GIP-IR373-FEAS-R1

Interconnection Feasibility Study Report GIP-IR373-FEAS-R1 Interconnection Feasibility Study Report GIP-IR373-FEAS-R1 Generator Interconnection Request 373 109.5 MW Wind Generating Facility South Canoe Lake, NS Mar. 2, 2012 Control Centre Operations Nova Scotia

More information

TransWest Express Project

TransWest Express Project TransWest Express Project Phase One--Feasibility Study Final Study Report November 2006 A subsidiary of Pinnacle West Capital Corporation Executive Summary On October 21, 2005 Arizona Public Service Company

More information

15 Nelson-Marlborough Regional Plan

15 Nelson-Marlborough Regional Plan 15 Nelson-Marlborough Regional Plan 15.1 Regional overview 15.2 Nelson-Marlborough transmission system 15.3 Nelson-Marlborough demand 15.4 Nelson-Marlborough generation 15.5 Nelson-Marlborough significant

More information

Q217 Generator Interconnection Project

Q217 Generator Interconnection Project Q217 Generator Interconnection System Impact Study APS Contract No. 52588 By Arizona Public Service Company Transmission Planning November 25, 2013 Version 2.0 Prepared by Utility System Efficiencies,

More information

PJM Generator Interconnection R81 Emilie (Fords Mill) MW Impact Study Re-Study

PJM Generator Interconnection R81 Emilie (Fords Mill) MW Impact Study Re-Study PJM Generator Interconnection R81 Emilie (Fords Mill) 100.9 MW Impact Study Re-Study August 2008 DMS # 498781 General Queue R81 Emilie (Fords Mills) is a Fairless Energy, LLC request to obtain an additional

More information

Feasibility Study for the Q MW Solar Project

Feasibility Study for the Q MW Solar Project Feasibility Study for the Q174 74.5 MW Solar Project August 2018 Bulk Transmission Planning, Florida i This document and any attachments hereto ( document ) is made available by Duke Energy Florida, LLC

More information

CONNECTION ASSESSMENT & APPROVAL PROCESS. Cardinal Substation Modification of 115kV Substation

CONNECTION ASSESSMENT & APPROVAL PROCESS. Cardinal Substation Modification of 115kV Substation CONNECTION ASSESSMENT & APPROVAL PROCESS ASSESSMENT SUMMARY Applicant: Project: Cardinal Substation Modification of 115kV Substation CAA ID: 2002 EX071 Long Term Forecasts & Assessments Department\ Consistent

More information

El PASO ELECTRIC COMPANY 2014 BULK ELECTRIC SYSTEM TRANSMISSION ASSESSMENT FOR YEARS

El PASO ELECTRIC COMPANY 2014 BULK ELECTRIC SYSTEM TRANSMISSION ASSESSMENT FOR YEARS El Paso Electric Company El PASO ELECTRIC COMPANY 2014 BULK ELECTRIC SYSTEM TRANSMISSION ASSESSMENT FOR YEARS 2015 2024 A Review on System Performance Following Extreme Bulk Electric System Events of the

More information

Guide. Services Document No: GD-1401 v1.0. Issue Date: Title: WIND ISLANDING. Previous Date: N/A. Author: Heather Andrew.

Guide. Services Document No: GD-1401 v1.0. Issue Date: Title: WIND ISLANDING. Previous Date: N/A. Author: Heather Andrew. Guide Department: Interconnection Services Document No: GD-1401 v1.0 Title: WIND ISLANDING Issue Date: 11-24-2014 Previous Date: N/A Contents 1 PURPOSE... 2 2 SCOPE AND APPLICABILITY... 2 3 ROLES AND RESPONSIBILITIES...

More information

Header. Reasonableness Test RT 007/11 Balhannah & Uraidla 66 / 33 kv Substations. RT Balhannah and Uraidla - Final Draft Page 1 of 8

Header. Reasonableness Test RT 007/11 Balhannah & Uraidla 66 / 33 kv Substations. RT Balhannah and Uraidla - Final Draft Page 1 of 8 Header Reasonableness Test RT 007/11 Balhannah & Uraidla 66 / 33 kv Substations RT 007-11 Balhannah and Uraidla - Final Draft Page 1 of 8 DISCLAIMER The purpose of this document is to inform customers,

More information

Western Area Power Administration Sierra Nevada Region

Western Area Power Administration Sierra Nevada Region Western Area Power Administration Sierra Nevada Region 2013 Annual Ten-Year Transmission Plan Assessment Report December 1, 2013 For information or questions regarding this Transmission Assessment Report,

More information

Interconnection System Impact Study Final Report February 19, 2018

Interconnection System Impact Study Final Report February 19, 2018 Interconnection System Impact Study Final Report February 19, 2018 Generator Interconnection Request No. TI-17-0225 248.4 MW (Alternate Project Output of 217.35 MW) Wind Energy Generating Facility In Goshen

More information

NEWFOUNDLAND AND LABRADOR HYDRO GULL ISLAND TO SOLDIERS POND HVDC INTERCONNECTION DC SYSTEM STUDIES VOLUME 1

NEWFOUNDLAND AND LABRADOR HYDRO GULL ISLAND TO SOLDIERS POND HVDC INTERCONNECTION DC SYSTEM STUDIES VOLUME 1 Page 1 of 76 NEWFOUNDLAND AND LABRADOR HYDRO GULL ISLAND TO SOLDIERS POND HVDC INTERCONNECTION DC SYSTEM STUDIES VOLUME 1 Page 2 of 76 NEWFOUNDLAND AND LABRADOR HYDRO GULL ISLAND TO SOLDIERS POND HVDC

More information

Interconnection Feasibility Study Report GIP-084-FEAS-R2

Interconnection Feasibility Study Report GIP-084-FEAS-R2 Interconnection Feasibility Study Report GIP-084-FEAS-R2 System Interconnection Request #84 50 MW Wind Generating Facility Pictou County (L-7004) August 17, 2007 Control Centre Operations Nova Scotia Power

More information

XXXXXXXXXXXXXXXX Transmission Interconnection Feasibility Study

XXXXXXXXXXXXXXXX Transmission Interconnection Feasibility Study XXXXXXXXXXXXXXXX Transmission Interconnection Feasibility Study System Operations Department System Planning Section March 2002 Table of Contents: 1.0 EXECUTIVE SUMMARY 4 2.0 COST ESTIMATES 8 2.1 Cost

More information

Illinois State Report

Illinois State Report July 2016 Illinois State Report Table of Contents 1. Planning Generation Portfolio Analysis Transmission Analysis Load Forecast Gas Pipeline Information 2 Executive Summary (July 2016) Existing Capacity:

More information

REDACTED. Eastside Needs Assessment Report Transmission System King County. Redacted Draft. October 2013 Puget Sound Energy

REDACTED. Eastside Needs Assessment Report Transmission System King County. Redacted Draft. October 2013 Puget Sound Energy Eastside Needs Assessment Report Transmission System King County Redacted Draft October 2013 Puget Sound Energy Report prepared by: Thomas J. Gentile, P.E. Quanta Technology Donald J. Morrow, P.E. Quanta

More information

Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers

Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers Puget Sound Area Study Team Bonneville Power Administration, Puget Sound Energy, Seattle City Light,

More information

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC OCTOBER 22, 2015 Emera Maine s Local System Plan Bangor Hydro District Needs Assessment/Potential Solutions Local Planning Advisory Committee Meeting Emera Maine Representative: Jeffrey Fenn, P.E., SGC

More information

15 Nelson-Marlborough Regional Plan

15 Nelson-Marlborough Regional Plan 15 Nelson-Marlborough Regional Plan 15.1 Regional overview 15.2 Nelson-Marlborough transmission system 15.3 Nelson-Marlborough demand 15.4 Nelson-Marlborough generation 15.5 Nelson-Marlborough significant

More information

PSE Attachment K Puget Sound Area Transmission Meeting

PSE Attachment K Puget Sound Area Transmission Meeting PSE Attachment K Puget Sound Area Transmission Meeting Stephanie Lu Senior Engineer December 15, 2011 Agenda Attachment K Review Economic Studies Process PSE Planning Process and Assumptions PSE Projects

More information

Alberta Remedial Actions Schemes

Alberta Remedial Actions Schemes Alberta Remedial Actions s Date: Oct. 31, 2018 20 Anderson 801s 240 kv Line 9L933, 9L934 and 9L950 Thermal Protection to Sheerness Plant ATCO Electric, Other MP Mitigates overloads on each line by sending

More information

Main Transmission System Planning Guideline

Main Transmission System Planning Guideline Main Transmission System Planning Guideline February, 2005 Page i Rev 1.0 15/04/04 NOTICE COPYRIGHT 2000 TRANS POWER NEW ZEALAND LIMITED ALL RIGHTS RESERVED The information contained in the report is protected

More information

XXXX. Knob Hill Wind Farm Project. Interconnection System Impact Study

XXXX. Knob Hill Wind Farm Project. Interconnection System Impact Study XXXX Knob Hill Wind Farm Project Report No. August 2010 British Columbia Hydro and Power Authority British Columbia Hydro and Power Authority 2010. All rights reserved.. DISCLAIMER OF WARRANTY, LIMITATION

More information

MULTIPLE LINE OUTAGES IN THE MOUNT ENGLAND TARONG AREA IN QUEENSLAND, 13 FEBRUARY 2017

MULTIPLE LINE OUTAGES IN THE MOUNT ENGLAND TARONG AREA IN QUEENSLAND, 13 FEBRUARY 2017 MULTIPLE LINE OUTAGES IN THE MOUNT ENGLAND TARONG AREA IN QUEENSLAND, 13 FEBRUARY 2017 REVIEWABLE OPERATING INCIDENT REPORT UNDER THE NATIONAL ELECTRICITY RULES Published: 3 August 2017 INCIDENT CLASSIFICATIONS

More information

Maddox Creek to Southwest Lima 345kV New Transmission Line November 15, 2016

Maddox Creek to Southwest Lima 345kV New Transmission Line November 15, 2016 New Transmission Line November 15, 2016 The enclosed information is proprietary to PSE&G and is provided solely for your use. It should not be copied, reproduced, or shared with others without PSE&G s

More information

COLORADO SPRINGS UTILITIES RESPONSE TO Xcel ENERGY INTERCONNECTION SYSTEM IMPACT STUDY REQUEST # GI , RESTUDY 1 (August 6, 2009)

COLORADO SPRINGS UTILITIES RESPONSE TO Xcel ENERGY INTERCONNECTION SYSTEM IMPACT STUDY REQUEST # GI , RESTUDY 1 (August 6, 2009) COLORADO SPRINGS UTILITIES RESPONSE TO Xcel ENERGY INTERCONNECTION SYSTEM IMPACT STUDY REQUEST # GI-2007-12, RESTUDY 1 (August 6, 2009) On June 15, 2009 Xcel Energy released a restudy of a System Impact