A Methodology to Compute Roundabout Corridor Travel Time

Size: px
Start display at page:

Download "A Methodology to Compute Roundabout Corridor Travel Time"

Transcription

1 A Methodology to Compute Roundabout Corridor Travel Time By Zachary Bugg, Ph.D* Kittelson & Associates, Inc.** Tel: (443) zbugg@kittelson.com Bastian Schroeder, Ph.D, PE Institute for Transportation Research and Education North Carolina State University Campus Box 8601 Raleigh, NC Tel: (919) bastian_schroeder@ncsu.edu Pete Jenior, PE, PTOE Kittelson & Associates, Inc. Tel: (410) pjenior@kittelson.com Marcus Brewer, PE Texas A&M Transportation Institute 2935 Research Parkway College Station, TX Tel: (979) m-brewer@tamu.edu Lee Rodegerdts, PE Kittelson & Associates, Inc. Tel: (503) lrodegerdts@kittelson.com Submitted for publication and presentation at the 94 th Annual Meeting of the Transportation Research Board, January 11-15, 2015 Word Count: 5,497 text words plus 2,000 for figures/tables (8 x 250) = 7,497 total *Corresponding Author ** Kittelson & Associates, Inc. 36 S Charles St, Suite 1920 Baltimore, MD 21201

2 Bugg, Schroeder, Jenior, Brewer, Rodegerdts ABSTRACT Urban and suburban arterials with roundabouts in series are becoming more prevalent in North America. While the Highway Capacity Manual (HCM) currently provides a methodology for computing the segment travel time of urban streets with various forms of intersection control, it does not provide a similar procedure for corridors with interdependent roundabouts. This methodology is necessary to evaluate roundabout corridor performance, and it allows the practitioner to compare both roundabout and signalized treatments for the same series of intersections. This paper presents a series of models intended to predict arterial travel time for a corridor with roundabouts, including a free-flow speed (FFS) model, a model to predict the length of the roundabout influence area (or RIA, the area where geometric delay is incurred), a model for geometric delay, and models for impeded delay and average travel speed. These models were calibrated with data from seven existing roundabout corridors. The resulting models suggest that while FFS is a function of segment length, posted speed limit, and central island diameter, the RIA length and geometric delay are functions of the FFS itself, as well as other geometric elements. The impeded delay and average travel speed are functions of traffic congestion and FFS. After validating the models with travel time data from two additional roundabout corridors not used in model development, the authors present a framework for incorporating the travel time prediction procedure into the HCM urban streets analysis

3 Bugg, Schroeder, Jenior, Brewer, Rodegerdts INTRODUCTION Traffic on urban and suburban arterials is typically signalized at major intersections, but many transportation agencies are increasingly looking to roundabouts as an alternative to signalized or two-way stop-controlled intersections as a safety improvement and as a means to reduce delay during off-peak periods. This trend has extended to arterials with roundabouts in series, which are becoming more prevalent across the United States. Roundabout Corridor Description As defined in this paper, a roundabout corridor includes a series of three or more roundabouts that function interdependently on an arterial. An example is displayed in Figure FIGURE 1 Roundabout Corridor in Golden, Colorado. (1) Arterials such as the one displayed in Figure 1 would normally be analyzed using the urban streets facility and segment procedures explained in Chapters 16 and 17 of the Highway Capacity Manual (2). However, the HCM currently only allows for the analysis of independent roundabouts (Chapter 21) and does not account for their effect on corridor travel time, platoon dispersion, access management, and other elements. The HCM 2010 also does not incorporate the effects of closely-spaced roundabouts on arterial operational performance. Research Objective The objective of this research is to understand the effect of a series of roundabouts on arterial performance, specifically considering the performance measures of corridor travel time and percent free flow speed. The authors intend to develop a model to predict roundabout corridor performance based on geometric and operational elements and construct a methodology for operational performance evaluation analogous to the urban streets methodology presented in the HCM. The research presented here is also contained in NCHRP Report 772: Evaluating the

4 Bugg, Schroeder, Jenior, Brewer, Rodegerdts Performance of Corridors with Roundabouts (3), which is the result of NCHRP Project While this paper focuses on the model development and implementation of the methodology into the HCM, the reader will be referred to NCHRP Report 772 for details on data collection, model calibration, and model sensitivity analysis. This paper is organized as follows: literature review, methodology, results, implementation, conclusion, and references. Literature Review The transportation profession has an extensive body of knowledge for traffic operations at isolated roundabouts and urban corridors with signalized intersections. Little research has been published on traffic operations of roundabout corridors, but it can be principally divided into safety research and operational research. Emissions, non-motorized transportation modes, constructability, and corridor context are additional considerations that could provide differentiating characteristics between corridor types. Roundabouts have well-documented safety benefits compared to other traffic control types, and these safety benefits are the predominant attractiveness of roundabouts compared to signalized intersections (4, 5, 6, 7). Safety relationships of isolated roundabouts are likely to transfer to roundabout corridors; there are no known specific characteristics of roundabouts in series that diminish the safety performance of the roundabout itself. One key differentiating consideration between corridor types may be safety at midblock access points. Opportunities to use U-turns at roundabouts could potentially eliminate left turns to or from driveways along the corridor, and reduced conflicts at these driveways would positively influence corridor safety. Depending on the spacing of the roundabouts, segment operating speeds could be reduced compared to signalized corridors and, therefore, could reduce crash severity. A crash study of a half-mile roundabout corridor consisting of four roundabouts in Golden, Colorado (Figure 1) indicated a steep decline in crash rates after roundabout installation (8). Between 1996 and 2004, crash rates declined by 88%, from 5.9 to 0.4 crashes per million vehicle miles. Injury crashes were reduced from 31 in the three years prior to installation to one in the 4.5 years after a 93% decline. Isebrands et al. (9) reviewed a corridor in Brown County, Wisconsin, and found that total crashes at one of the Wisconsin roundabouts were reduced by one per year, and injury crashes were nearly eliminated. Roundabout corridors have unique operational characteristics compared to their signalized intersection counterparts. Fundamentally, the notion of moving platoons of vehicles to maximize the performance of signalized intersections is not applicable to roundabouts, where gap acceptance principles allow more dispersed flows to mingle within the intersections. Travel time is a natural performance measure for roundabout and signalized corridors. Roundabouts have greater geometric delay compared to signalized intersections by virtue of their shape; therefore, defining travel time performance measures is of paramount interest. According to Akçelik (10), geometric delay is determined as a function of approach and exit cruise speeds as well as negotiation speeds, which depend on the geometry of the roundabout. Akçelik added that steps could be taken to approximate the value of geometric delay and add it to the control delay computed by the HCM procedure. The Golden, Colorado study also reviewed operating speeds, travel times, and sales tax revenue along the corridor (8). The study concluded that installing the roundabouts resulted in lower speeds between major intersections in the corridor, but travel times also decreased compared to when the corridor was signalized, indicating a decrease in control delay. The

5 Bugg, Schroeder, Jenior, Brewer, Rodegerdts analysis also revealed much less delay at business access points. While adjacent businesses are often concerned about corridor reconfiguration and access management adjustments, the development around the corridor flourished after installation of the roundabouts. This consisted of an additional 75,000 square feet of retail/office space, resulting in a 60% increase in sales tax revenue along the corridor after installation. METHODOLOGY The following sections describe the methodology used to develop the models for roundabout corridor travel time, including site selection, data collection and extraction, and model development (including formulation of the models and model calibration). Data Collection and Extraction At least three methods were available to develop a model framework for roundabout corridor travel time: Analytically, through the use of the HCM models. This would make use of the existing methodology but is limited by the applicability of the current HCM methodology, given that it does not support the interaction of closely-spaced roundabouts. Using data from microsimulation. This technique would supply a heavy amount of data but would also require extensive calibration with field data so that the output from microsimulation yields realistic results. Manually-collected field data. Given the presence of dozens of roundabout corridors in the United States identified as part of the initial efforts of NCHRP Project , the authors concluded that developing models from empirical data is the best approach. GPS devices were used to collect travel time data at these sites, and the reader is referred to NCHRP Report 772 for more details on the data collection procedure (3). To maximize model applicability and range of the dataset, the authors selected sites for data collection representing a variety of characteristics and conditions. Using these considerations, nine roundabout corridors from across the United States were identified. Two of these sites, both in Carmel, Indiana, were reserved for model validation. Table 1 lists each site where data was collected, including the route name, geographic location, number of roundabouts along the corridor, number of lanes on the arterial, number of circulating lanes in the roundabouts, length of the corridor, type of area (commercial, residential, or rural), whether the corridor includes a roundabout (also called raindrop) interchange, year(s) the corridor was constructed, type/presence of restrictive median, and peak hour traffic volume on the arterial.

6 Bugg, Schroeder, Jenior, Brewer, Rodegerdts TABLE 1 Summary of Study Sites Corridor Location # of Roundabouts Arterial # of Lanes Roundabout # of Lanes Length (mi) Area Type Includes Interchange? Built Median Peak Hour Traffic Volume on Arterial (vph) MD-216 Scaggsville, MD Commercial Yes 2002, 2009 Raised 1,600-2,100 La Jolla Blvd San Diego, CA Commercial No Raised 1,000-1,500 Borgen Blvd Gig Harbor, WA Commercial/ Residential Yes Varies 1,000-2,000 SR-539 Whatcom County, WA Rural No 2010 Cable 800 Golden Rd Golden, CO Commercial No , 2004 Avon Rd Avon, CO Commercial Yes 1997 SR-67 Malta, NY Commercial/ Residential Raised with openings Raised with one opening 1,000-1,400 1,300-1,800 Yes Raised 600-1,200 Spring Mill Rd* Carmel, IN Residential No Some 1,100-1,600 Old Meridian St* Carmel, IN * indicates site reserved for model validation Commercial/ Residential No 2006 Mostly raised 500-1,200

7 Bugg, Schroeder, Jenior, Brewer, Rodegerdts During data collection, the authors identified two types of data that were crucial to the development of corridor travel time models. These elements are based on characteristics used in the HCM urban streets analysis procedure. The types of data are as follows: 1. Site-specific data Roundabout geometry (Inscribed Circle Diameter, Central Island Diameter, entry and exit radii) Roundabout spacing Presence of raised median Driveway density Grade Posted speed limit Circulating speed 2. Time-of-day-dependent data Entering volume Circulating volume Volume-to-capacity ratio To be consistent with the HCM urban streets procedure but also to organize the modeling effort to best consider the effects on travel speed of elements within the corridor, the authors proposed a new methodology to partition each corridor into a series of roundabout segments and sub-segments. Essentially, the method distinguishes whether a vehicle is upstream or downstream of a roundabout yield line. Figure 2 illustrates this approach; two roundabouts (RBT1 and RBT2) are separated by (Urban Street) Segment B. For the purpose of analysis, Segment B is divided into sub-segments B1 and B2, where B1 corresponds to the downstream influence of RBT1, and B2 corresponds to the upstream influence of RBT2. The upstream subsegment of RBT1 is consequently labeled A1 (portion of Segment A associated with RBT1), and the downstream sub-segment of RBT labeled C2 (portion of Segment C associated with RBT2).

8 Bugg, Schroeder, Jenior, Brewer, Rodegerdts FIGURE 2 Segment Definitions for Roundabout Corridor Travel Time Modeling. The HCM Chapter 17 defines an urban street segment as the sum of the downstream and upstream sub-segments of two adjacent roundabouts (e.g. B1 plus B2). Similarly, the HCM Chapter 21 defines a roundabout segment as the sum of the upstream and downstream segment of the same roundabout (e.g. A1 plus B1). In developing the models, the upstream and downstream sub-segments are evaluated separately for two primary reasons: (1) this allows aggregation of model results from both HCM Chapter 17 and 21, and (2) the operational effects of the two are hypothesized to be different. To illustrate the latter point, the shaded areas in Figure 2 represent the theoretical areas of geometric delay for upstream and downstream sub-segments. Geometric delay in this case is defined as the difference between segment free-flow speed (FFS) and the unimpeded trajectory speed across the sub-segment length. A trajectory that does not encounter any interaction with other vehicles (e.g. by yielding at the roundabout or braking between intersections) is considered unimpeded. The exhibit makes evident that geometric delay for the upstream roundabout subsegment (gray lines) is arguably much less than for the downstream sub-segment (black crosshatch marks), as the latter includes significant travel distance at the geometricallyconstrained circulating speed. Consistent with these sub-segment definitions, all variables are defined on a sub-segment basis. This includes variables such as the FFS, with each roundabout having a potentially different upstream (A1) and downstream (B1) FFS. Coincidentally, the downstream FFS of RBT1 (B1) is the same as the upstream FFS of RBT2 (B2). 239

9 Bugg, Schroeder, Jenior, Brewer, Rodegerdts Data Exploration The GPS data obtained from the data collection effort allowed the authors to plot the speed profile for each series of travel time trajectories. The speed profiles for each corridor typically resembled the graph displayed in Figure 3. This speed profile, taken from the MD-216 roundabout corridor, displays speed on the vertical axis and distance on the horizontal axis. Each line plotted on the graph represents a different travel time trajectory FIGURE 3 Speed Profile Example. Note that under unimpeded conditions, each driver travels along the corridor at his or her chosen FFS and then slows to a comfortable speed to enter the roundabout. After exiting the roundabout, the driver then accelerates back to FFS. This led to two major observations: 1. The extent of the area in which geometric delay is incurred, dubbed the roundabout influence area (RIA) by the authors, varies by roundabout (Figure 3). 2. The maximum speed which drivers reach and maintain between roundabouts, dubbed the mid-segment running speed, varies by segment and can be as high as the free-flow speed for the entire corridor. Model Development Using the site-specific and time-of-day-dependent elements identified in the previous section, the authors developed models for FFS, RIA length, geometric delay, impeded delay, and average travel speed. The first three models are considered site-level models because they are not sensitive to time-of-day variability in traffic patterns (e.g. volume). In other words, the RIA,

10 Bugg, Schroeder, Jenior, Brewer, Rodegerdts geometric delay, and FFS models are considered to be fixed over time for a specific roundabout approach. On the other hand, the impeded delay and average travel speed models are operational-level models that consider traffic volumes and volume-to-capacity ratios. Conceptually, these latter two models may use one or more of the site-level models as inputs, where, for example, the average travel speed may be a function of the free-flow speed and the RIA estimated in earlier models. In the HCM 2010 Chapter 17, the average travel speed is estimated as a function of the segment running speed and the various sources of delay. The motivation for the formulation of a separate average travel speed model here is based on a desire to verify the applicability of the Chapter 17 method to roundabout corridors. The authors assembled a dataset by calculating geometric and operational parameters for each roundabout approach from seven of the nine roundabout corridors listed in Table 1, leaving the two Carmel corridors out for validation purposes. Each approach was partitioned into subsegments, as shown in Figure 2. The total dataset included 62 roundabout approaches, with each providing an upstream and a downstream sub-segment. Some approaches were excluded due to (a) overlapping influence areas, or (b) a short upstream or downstream sub-segment length at the end of the roundabout corridor. In the case of overlapping influence areas, these approaches were only excluded from the RIA models; these approaches were used in other models like the FFS prediction model. For the short sub-segments, the GPS travel-time vehicles were not able to accelerate to their desired speeds (even in free-flow conditions), because of a nearby intersection or turnaround point. After excluding selected approaches, the remaining dataset included 49 upstream and 52 downstream roundabout sub-segments. The models were developed using the SAS general liner model with a forward selection procedure, and separate models were developed for upstream and downstream segment data. Several individual models were developed for each dependent variable, and then the authors selected a preferred model for each based on goodness-of-fit, simplicity, statistical significance of the independent variables within the model, and general sense of the model within the context of an urban streets analysis. RESULTS This section explains the results of the model calibration and validation efforts. The detailed results for each model (RIA, geometric delay, FFS, average travel speed, and impeded delay) are presented separately, and then the validation results are presented. Roundabout Influence Area After comparing several models obtained from the regression effort, the authors recommend the following sub-models for roundabout influence area length: RIA upstream = * S f 21.1 * S c (1) RIA downstream = * S f 22.5* S c (2) where RIA upstream = upstream roundabout influence area length (ft), RIA downstream = downstream roundabout influence area length (ft), S f = free-flow speed (mph), and S c = circulating speed (mph).

11 Bugg, Schroeder, Jenior, Brewer, Rodegerdts The upstream sub-model has an R 2 of 28.9%, while the downstream sub-model has an R 2 of 71.4%. All terms in the model were statistically significant (p<0.05). The model shows that the RIA length is primarily related to the FFS along the sub-segment as well as the circulating speed (i.e. the minimum unimpeded speed) within the roundabout. For a given sub-segment, as the FFS increases, the RIA length predicted by the model also increases, but this length decreases as the circulating flow in the roundabout adjacent to the segment increases. This is intuitive because it suggests that roundabouts necessitating a greater decrease in speed (as indicated by a large difference between the FFS and circulating speed) should be associated with a longer RIA. Geometric Delay The authors recommended the following sub-models for geometric delay after comparing several models obtained from the regression effort: Delay geom, upstream = *S f 0.21*S c (3) Delay geom, downstream = min{ *S f * ICD *(1/S c -1/S f ),0} (4) where Delay geom, upstream = upstream geometric delay (s/veh), Delay geom, downstream = downstream average geometric delay (s/veh), ICD = inscribed circle diameter (ft), S f = free-flow speed (mph), and S c = circulating speed (mph). The upstream sub-model has an R 2 of 31.5%, while the downstream sub-model has an R 2 of 79.4%. All terms in the model were statistically significant (p<0.05). An interaction term between the FFS, circulating speed, and inscribed circle diameter was also used to model geometric delay with positive results for the downstream geometric delay sub-model. This circulating delay term, shown in Figure 4, is based on the difference between FFS and circulating speed. Intuitively, this term applies to the downstream geometric delay, as it includes the geometric delay within the circle.

12 Bugg, Schroeder, Jenior, Brewer, Rodegerdts FIGURE 4 Illustration of Circulating Delay Term. The geometric delay could be partially explained by the FFS along the segment and the circulating speed within the roundabout. These relationships were similar to those in the RIA model in that a higher FFS along a sub-segment would cause the model to predict a higher geometric delay, but a higher circulating speed within the adjacent roundabout would lower the predicted geometric delay. This is also intuitive, as drivers should experience more geometric delay at a roundabout necessitating a greater decrease in speed. Note that is also necessary to add a boundary condition (minimum value of zero geometric delay) to Equation 4, since low FFS (under 30 mph) on downstream sub-segments will typically result in very low geometric delays. Free Flow Speed The following sub-models were developed for upstream and downstream FFS: S f,upstream = *L *S *CID 4.73*OL (5) S f,downstream = *L *S *CID 4.43*OL (6) where S f,upstream = upstream free-flow speed (mph), S f,downstream = downstream free-flow speed (mph), L = sub-segment length (ft), S = posted speed limit (mph), CID = central island diameter (ft), and OL = dummy variable for overlapping roundabout influence areas, i.e. OL = 1 if the roundabout influence area of the sub-segment is longer than the sub-segment length, 0 otherwise.

13 Bugg, Schroeder, Jenior, Brewer, Rodegerdts The FFS model possesses the strongest fit of any models developed, with an R 2 of 90% for the upstream sub-model and 93% for the downstream sub-model. All terms in the model were significant (p<0.05). FFS was intuitively found to related to the segment length, the posted speed limit along the segment, and the central island diameter of the adjacent roundabout, as well as whether the segment was an overlapping segment. Specifically, the FFS was found to increase with the posted speed, segment length, and central island diameter, but the model assigned a significant penalty (minus 4.5 to 5.0 mph) to the FFS of sub-segments within segments with overlapping RIAs. Average Travel Speed The authors investigated the average speed along the sub-segments of the roundabout corridor, considering traffic characteristics such as the level of congestion. The average travel speed along each sub-segment was calculated for the upstream and downstream segments to calibrate several models. This model is an optional step in the implementation of this procedure in the HCM 2010 Chapter 17, as the existing procedure already contains a step to estimate the average travel speed, considering FFS, delays, and other factors. The following are the sub-models for upstream and downstream average travel speed: S average,upstream = *S f 18.2*v/c (7) S average,downstream = *S f 5.4*v/c (8) where S average,upstream = average travel speed for the upstream sub-segment (mph), S average,downstream = average travel speed for the downstream sub-segment (mph), S f = free-flow speed (mph), and v/c = volume-to-capacity ratio for the downstream roundabout, i.e. the roundabout adjacent to an upstream sub-segment or downstream of (not adjacent to) a downstream sub-segment. The upstream sub-model has an R 2 of 76%, while the downstream sub-model has an R 2 of 83%. All terms in the model were statistically significant (p<0.01). The model indicates that average travel speed is chiefly related to the FFS and volume-tocapacity ratio of the downstream roundabout. Thus, a sub-segment with a higher FFS would experience a higher average speed, but an increase in volume-to-capacity ratio would lower the average speed within the sub-segment. In the application of this model, the FFS would be calculated from the FFS model. The volume-to-capacity ratio is calculated using entering volume and the theoretical roundabout capacity calculated from the equations in the HCM. Impeded Delay Finally, the authors investigated the average impeded delay incurred to each driver at each roundabout by calibrating a delay model for the time-of-day dataset. The impeded delay is defined as the delay experienced due to interaction with other vehicles, yielding at entry, and queuing effects, but it does not include the geometric delay calculated above. The authors determined the impeded delay for each sub-segment by taking the difference between the average travel time and the unimpeded travel time. The impeded delay is a function of these elements: the upstream impeded delay is a function of FFS, the volume-to-capacity ratio, and the

14 Bugg, Schroeder, Jenior, Brewer, Rodegerdts entering flow rate, and the downstream impeded delay is a function of FFS, volume-to-capacity ratio, segment length, median length, and curb length across the segment: Delay impeded,upstream = *S f *v/c 0.03*V ent (9) Delay impeded,downstream = *S f + 3.1*v/c *L 0.001*L m *L c (10) where Delay impeded,upstream = average upstream impeded delay (s/veh), Delay impeded,downstream = average upstream impeded delay (s/veh), V ent = entering volume at the roundabout adjacent to the segment (vph), L = sub-segment length (ft), L m = length of sub-segment with restrictive median (ft), L c = length of sub-segment with curb (ft), S f = free-flow speed (mph), and v/c = volume-to-capacity ratio for the downstream roundabout, i.e. the roundabout adjacent to an upstream sub-segment or downstream of (not adjacent to) a downstream sub-segment. The upstream sub-model has an R 2 of 67%, while the downstream sub-model has an R 2 of 56%. All terms in the model were statistically significant (p<0.1), with the terms in the upstream sub-model being more significant (p<0.01). The upstream sub-model suggests drivers will experience more delay at a roundabout with a high level of congestion (indicated by a high volume-to-capacity ratio), but a roundabout with a higher level of entering flow will incur a lower amount of delay. This latter relationship may seem counterintuitive but should be interpreted along with the volume-to-capacity ratio term. Like the geometric delay model, a segment with a higher FFS is associated with greater impeded delay. For the downstream sub-segments, the FFS, sub-segment length, curb length, and volume-to-capacity ratio all increased the delay, but an increase in median length led to a decrease in the predicted delay. This last relationship may be due to the sample size or range of median lengths. Model Validation This section describes the results of the model validation effort. Two roundabout corridors, both from Carmel, Indiana, were withheld from the calibration dataset and were instead used to validate the models. By applying the HCM 2010 Chapters 16 and 17 methodologies, integrated with modifications for the roundabout nodes, the authors determined the corridor travel time and average speed for the two corridors. Figure 5 displays the results of the validation effort for the first corridor, Old Meridian Street. This corridor is unique to the dataset because it contains an internal signalized intersection between two of the roundabouts.

15 Bugg, Schroeder, Jenior, Brewer, Rodegerdts FIGURE 5 Validation Results for Old Meridian Street. The validation results suggest a close match of the predicted FFS for both northbound and southbound routes, with an error of 0.6 mph and 1.2 mph, respectively. For the average travel speed estimation, the northbound results for the a.m. and p.m. peak match the fieldobserved data with an error of 2.1 mph (8.0%) and 0.2 mph (0.8%) difference. For the southbound route, the average travel speed estimates are lower than the field observed data by 5.4 mph (17.0%) and 2.5 mph (9.2%) for the a.m. and p.m. peak, respectively. This difference in average travel speed translates to a difference in travel times of 0.0 and 0.2 minutes for northbound a.m. and p.m. peak, and 0.6 and 0.5 minutes for the southbound routes.

16 Bugg, Schroeder, Jenior, Brewer, Rodegerdts Figure 6 displays the validation results for the Spring Mill Road corridor FIGURE 6 Validation Results for Spring Mill Road. The Spring Mill corridor validation shows a close match between the model and field estimates. The model slightly overestimated the FFS and the average travel speed by approximately 2 to 5 mph across the four analyzed routes. This translates to a slight underestimation of travel time for three of the routes by 0.2 to 0.8 minutes. However, the resulting percent FFS measure proved to be within 10% of the field-observed data for all routes, which is explained because the error in FFS and average travel speed was in the same direction. HCM IMPLEMENTATION Figure 7 illustrates the calculation framework for applying the models within a given segment. The framework should be applied separately for each upstream and downstream sub-segment before eventually aggregating to the segment level. Further aggregation to the facility level can be performed using the urban streets analysis procedure in HCM 2010 Chapter 17. The framework is divided into computational steps A through L, with reference being made to the corresponding steps in HCM 2010 Chapter 17 for urban street segments at the appropriate time.

17 Bugg, Schroeder, Jenior, Brewer, Rodegerdts FIGURE 7 Roundabout Travel Time Calculation Methodology. First, the analyst gathers input data, and the FFS is calculated based on the posted speed limit, sub-segment length, and central island diameter of the roundabout, with the assumption that overlapping RIAs are not present. On a portion of a roundabout corridor between two roundabouts (i.e. not a first or last segment), the calculation is performed for a downstream subsegment and the upstream sub-segment. Using the model-predicted FFS and the circulating speed within the roundabout, the RIA length is calculated for both sub-segments. The analyst must then check whether the RIAs of the sub-segments overlap. If so, this necessitates a recalculation of the FFS with the overlap (OL) term set equal to 1, which will cause the predicted FFS to decrease. After the final sub-segment FFS is determined, the analyst selects the controlling FFS for each segment. Because the FFS is defined as being measured at the segment mid-point, the same FFS must be used for a downstream sub-segment and the next upstream sub-segment. In this

18 Bugg, Schroeder, Jenior, Brewer, Rodegerdts procedure, the lower of the two free-flow speeds controls and is selected as the FFS value for the entire segment. Next, this procedure uses HCM Chapter 17 Step 2 to estimate the segment running time, followed by roundabout-specific models to estimate geometric delay and impeded delay. Next, the sub-segment performance measures are aggregated to the HCM Chapter 17 segment level (Step J), and Chapter 17 Step 7 is used to determine the average travel speed on the segment. From the average travel speed, the level of service is estimated for the urban street segment with roundabouts. The facility LOS (HCM Chapter 16) and overall corridor travel time are then obtained by aggregating the performance of individual segments, consistent with the procedure for signalized corridors. Model Updates After the models were developed, the authors updated the models to make them more suitable for integration with the HCM urban streets analysis procedure. Specifically, the average travel speed models, while useful for comparison of the results with the existing methodology, were developed independently from the existing HCM Chapter 17 procedure. Thus, they are optional within the framework presented in Figure 7. Additionally, the downstream impeded delay model was updated to the following model: Delay impeded,downstream = *V T *L 0.001*L m *L c (11) where V T = the through-movement volume (vph) along the downstream sub-segment, and all other terms are previously defined. While the first model resulted in a better fit, this model is more intuitive because it removes the term for v/c ratio, an element that, in practice, will be difficult to predict or explain for the downstream portion of the impeded delay. CONCLUSION The modeling efforts described in this paper indicate that a series of simple linear models could be used to successfully describe the relationship between the components of roundabout corridor travel time (roundabout influence area, geometric delay, free-flow speed, average travel speed, and impeded delay) and the geometric and operational elements of a roundabout corridor. The data were modeled separately for upstream sub-segments and downstream sub-segments, and most of the models could explain over 70% of the variability in the data. A few of the models could be used to compute components of other models; e.g. the estimated FFS is an explanatory variable in the other four models. After completing the model development of all predictive models, the authors performed a validation exercise intended to verify that the proposed methodology results in satisfactory performance results. The authors presented an external validation of the methodology through application to two corridors in Carmel, Indiana. Both corridors were excluded from model development and thus represent a true validation of the methodology. The resulting percent FFS estimates matched the field-observed data within 10% for Spring Mill Road (all four routes) and for the northbound routes on Old Meridian Street. The Old Meridian Street southbound routes matched within a 20% difference, but this corridor also contains an internal signalized intersection between two of the roundabouts. After validation, the authors present a step-by-step framework for calculation of roundabout corridor travel time in a manner consistent with the existing HCM 2010 Chapter 17

19 Bugg, Schroeder, Jenior, Brewer, Rodegerdts methodology. This framework is intended to be used to incorporate the models into a future version of the Highway Capacity Manual. ACKNOWLEDGEMENT This paper is based on research conducted during NCHRP Project : Evaluating the Performance of Corridors with Roundabouts. The authors would like to thank the project panel for valuable feedback, as well as the state DOTs for supplying data and participating in interviews during the project. REFERENCES 1. Google Maps < Accessed Transportation Research Board. Highway Capacity Manual Transportation Research Board of the National Academies, Washington, DC, Rodegerdts, L. A., P.M. Jenior, Z. H. Bugg, B. L. Ray, B. J. Schroeder, and M. A. Brewer. NCHRP Report 772: Evaluating the Performance of Corridors with Roundabouts. Transportation Research Board of the National Academies, Washington, DC, Gross, F. C. Lyon, B. Persaud, and R. Srinivasan. Safety Effectiveness of Converting Signalized Intersections to Roundabouts. Presented at the Transportation Research Board 91 st Annual Meeting. Transportation Research Board of the National Academies, Washington, DC, Rodegerdts, L., J. Bansen, C. Tiesler, J. Knudsen, E. Myers, M. Johnson, M. Moule, B. Persaud, C. Lyon, S. Hallmark, H. Isebrands, R. B. Crown, B. Guichet, and A. O Brien. NCHRP Report 672: Roundabouts: An Informational Guide, 2nd ed. Transportation Research Board of the National Academies, Washington, D.C., Rodegerdts, L., M. Blogg, E. Wemple, E. Myers, M. Kyte, M. P. Dixon, G. F. List, A. Flannery, R. Troutbeck, W. Brilon, N. Wu, B. N. Persaud, C. Lyon, D. L. Harkey, and D. Carter. NCHRP Report 572: Roundabouts in the United States. Transportation Research Board of the National Academies, Washington, D.C., Persaud, B., R. Retting, P. Garder, and D. Lord. Safety Effect of Roundabout Conversions in the United States: Empirical Bayes Observational Before-After Study. Transportation Research Record Transportation Research Board of the National Academies, Washington, DC, Ariniello, A.J. Are Roundabouts Good for Business? LSC Transportation Consultants, Inc., Denver, CO. December < Accessed June Isebrands, H., S. Hallmark, E. Fitzsimmons, and J. Stroda. Toolbox to Evaluate the Impacts of Roundabouts on a Corridor or Roadway Network. Report No. MN/RC Minnesota Department of Transportation, St. Paul, MN, Akcelik, R. An Assessment of the Highway Capacity Manual 2010 Roundabout Capacity Model. Proceedings, 2011 Transportation Research Board International Roundabout Conference. Transportation Research Board of the National Academies, Carmel, IN, 2011.

Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs)

Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs) Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs) 26 th Annual Transportation Research Conference Saint Paul RiverCentre May 20, 2015 Presentation Outline

More information

Mr. Kyle Zimmerman, PE, CFM, PTOE County Engineer

Mr. Kyle Zimmerman, PE, CFM, PTOE County Engineer Los Alamos County Engineering Division 1925 Trinity Drive, Suite B Los Alamos, NM 87544 Attention: County Engineer Dear Kyle: Re: NM 502 Transportation Corridor Study and Plan Peer Review Los Alamos, New

More information

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS February 2018 Highway & Bridge Project PIN 6754.12 Route 13 Connector Road Chemung County February 2018 Appendix

More information

MEMORANDUM. Figure 1. Roundabout Interchange under Alternative D

MEMORANDUM. Figure 1. Roundabout Interchange under Alternative D MEMORANDUM Date: To: Liz Diamond, Dokken Engineering From: Subject: Dave Stanek, Fehr & Peers Western Placerville Interchanges 2045 Analysis RS08-2639 Fehr & Peers has completed a transportation analysis

More information

ACCIDENT MODIFICATION FACTORS FOR MEDIAN WIDTH

ACCIDENT MODIFICATION FACTORS FOR MEDIAN WIDTH APPENDIX G ACCIDENT MODIFICATION FACTORS FOR MEDIAN WIDTH INTRODUCTION Studies on the effect of median width have shown that increasing width reduces crossmedian crashes, but the amount of reduction varies

More information

JCE 4600 Basic Freeway Segments

JCE 4600 Basic Freeway Segments JCE 4600 Basic Freeway Segments HCM Applications What is a Freeway? divided highway with full control of access two or more lanes for the exclusive use of traffic in each direction no signalized or stop-controlled

More information

The Highway Safety Manual: Will you use your new safety powers for good or evil? April 4, 2011

The Highway Safety Manual: Will you use your new safety powers for good or evil? April 4, 2011 The Highway Safety Manual: Will you use your new safety powers for good or evil? April 4, 2011 Introductions Russell Brownlee, M.A. Sc., FITE, P. Eng. Specialize in road user and rail safety Transportation

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. T R A F F I C I M P A C T S T U D Y King Soopers #116 Thornton, Colorado Prepared for Galloway & Company

More information

Traffic Engineering Study

Traffic Engineering Study Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested

More information

APPENDIX C ROADWAY BEFORE-AND-AFTER STUDY

APPENDIX C ROADWAY BEFORE-AND-AFTER STUDY APPENDIX C ROADWAY BEFORE-AND-AFTER STUDY The benefits to pedestrians and bus patrons are numerous when a bus bay is replaced with a bus bulb. Buses should operate more efficiently at the stop when not

More information

Traffic Capacity Models for Mini-roundabouts in the United States: Calibration of Driver Performance in Simulation

Traffic Capacity Models for Mini-roundabouts in the United States: Calibration of Driver Performance in Simulation 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 Traffic Capacity Models for Mini-roundabouts in the United States:

More information

FIELD APPLICATIONS OF CORSIM: I-40 FREEWAY DESIGN EVALUATION, OKLAHOMA CITY, OK. Michelle Thomas

FIELD APPLICATIONS OF CORSIM: I-40 FREEWAY DESIGN EVALUATION, OKLAHOMA CITY, OK. Michelle Thomas Proceedings of the 1998 Winter Simulation Conference D.J. Medeiros, E.F. Watson, J.S. Carson and M.S. Manivannan, eds. FIELD APPLICATIONS OF CORSIM: I-40 FREEWAY DESIGN EVALUATION, OKLAHOMA CITY, OK Gene

More information

Traffic Signal Volume Warrants A Delay Perspective

Traffic Signal Volume Warrants A Delay Perspective Traffic Signal Volume Warrants A Delay Perspective The Manual on Uniform Traffic Introduction The 2009 Manual on Uniform Traffic Control Devices (MUTCD) Control Devices (MUTCD) 1 is widely used to help

More information

GEOMETRIC PARAMETERS Affecting Capacity ICD 2

GEOMETRIC PARAMETERS Affecting Capacity ICD 2 Single Lane Roundabouts Geometric Design in Context -Urban versus Rural 1 GEOMETRIC PARAMETERS Affecting Capacity ICD 2 Effective Geometry V = Approach Road half width 3 E = Entry Width L = Effective Flare

More information

Effect of Police Control on U-turn Saturation Flow at Different Median Widths

Effect of Police Control on U-turn Saturation Flow at Different Median Widths Effect of Police Control on U-turn Saturation Flow at Different Widths Thakonlaphat JENJIWATTANAKUL 1 and Kazushi SANO 2 1 Graduate Student, Dept. of Civil and Environmental Eng., Nagaoka University of

More information

APPENDIX B Traffic Analysis

APPENDIX B Traffic Analysis APPENDIX B Traffic Analysis Rim of the World Unified School District Reconfiguration Prepared for: Rim of the World School District 27315 North Bay Road, Blue Jay, CA 92317 Prepared by: 400 Oceangate,

More information

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015 Memo To: From: Adrian Soo, P. Eng. Markham, ON : 165620021 Date: Reference: E.C. Row Expressway, Dominion Boulevard Interchange, Dougall Avenue Interchange, and Howard 1. Review of Interchange Geometry

More information

Evaluation of Renton Ramp Meters on I-405

Evaluation of Renton Ramp Meters on I-405 Evaluation of Renton Ramp Meters on I-405 From the SE 8 th St. Interchange in Bellevue to the SR 167 Interchange in Renton January 2000 By Hien Trinh Edited by Jason Gibbens Northwest Region Traffic Systems

More information

COMPARISON OF FREE FLOW SPEED ESTIMATION MODELS

COMPARISON OF FREE FLOW SPEED ESTIMATION MODELS COMPARISON OF FREE FLOW SPEED ESTIMATION MODELS Usman Tasiu Abdurrahman 1, Othman Che Puan 2* Muttaka Na iya Ibrahim 3 1,2,3 Faculty of Civil Engineering, Universiti Teknologi Malaysia, 81310 Skudai, Johor,

More information

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Traffic Impact Analysis. Alliance Cole Avenue Residential Site Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Traffic Impact Analysis Alliance Cole Avenue Residential Site Dallas, Texas February 15, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064524900 Registered Firm F-928 Traffic Impact Analysis

More information

INTERSECTION CONTROL EVALUATION

INTERSECTION CONTROL EVALUATION INTERSECTION CONTROL EVALUATION Trunk Highway 22 and CSAH 21 (E Hill Street/Shanaska Creek Road) Kasota, Le Sueur County, Minnesota November 2018 Trunk Highway 22 and Le Sueur CSAH 21 (E Hill Street/Shanaska

More information

Spatial and Temporal Analysis of Real-World Empirical Fuel Use and Emissions

Spatial and Temporal Analysis of Real-World Empirical Fuel Use and Emissions Spatial and Temporal Analysis of Real-World Empirical Fuel Use and Emissions Extended Abstract 27-A-285-AWMA H. Christopher Frey, Kaishan Zhang Department of Civil, Construction and Environmental Engineering,

More information

Low Speed Design Criteria for Residential Streets Andrew J. Ballard, P.E. and David M. Haldeman, E.I.T.

Low Speed Design Criteria for Residential Streets Andrew J. Ballard, P.E. and David M. Haldeman, E.I.T. Low Speed Design Criteria for Residential Streets Andrew J. Ballard, P.E. and David M. Haldeman, E.I.T. Background The City of San Antonio receives many complaints regarding speeding in residential areas.

More information

Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County.

Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County. Subarea Study Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project Final Version 1 Washington County June 12, 214 SRF No. 138141 Table of Contents Introduction... 1 Forecast Methodology

More information

Pembina Emerson Border Crossing Interim Measures Microsimulation

Pembina Emerson Border Crossing Interim Measures Microsimulation Pembina Emerson Border Crossing Interim Measures Microsimulation Final Report December 2013 Prepared for: North Dakota Department of Transportation Prepared by: Advanced Traffic Analysis Center Upper Great

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

Project Title: Using Truck GPS Data for Freight Performance Analysis in the Twin Cities Metro Area Prepared by: Chen-Fu Liao (PI) Task Due: 9/30/2013

Project Title: Using Truck GPS Data for Freight Performance Analysis in the Twin Cities Metro Area Prepared by: Chen-Fu Liao (PI) Task Due: 9/30/2013 MnDOT Contract No. 998 Work Order No.47 213 Project Title: Using Truck GPS Data for Freight Performance Analysis in the Twin Cities Metro Area Prepared by: Chen-Fu Liao (PI) Task Due: 9/3/213 TASK #4:

More information

Acceleration Behavior of Drivers in a Platoon

Acceleration Behavior of Drivers in a Platoon University of Iowa Iowa Research Online Driving Assessment Conference 2001 Driving Assessment Conference Aug 1th, :00 AM Acceleration Behavior of Drivers in a Platoon Ghulam H. Bham University of Illinois

More information

Lecture 4: Capacity and Level of Service (LoS) of Freeways Basic Segments. Prof. Responsável: Filipe Moura

Lecture 4: Capacity and Level of Service (LoS) of Freeways Basic Segments. Prof. Responsável: Filipe Moura Lecture 4: Capacity and Level of Service (LoS) of Freeways Basic Segments Prof. Responsável: Filipe Moura Engenharia de Tráfego Rodoviário Lecture 4 - Basic Freeway segments 1 CAPACITY AND LEVEL OF SERVICE

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS Emerald Isle Commercial Development Prepared by SEPI Engineering & Construction Prepared for Ark Consulting Group, PLLC March 2016 I. Executive Summary A. Site Location The Emerald

More information

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Results

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Results NDSU Dept #2880 PO Box 6050 Fargo, ND 58108-6050 Tel 701-231-8058 Fax 701-231-6265 www.ugpti.org www.atacenter.org Interstate Operations Study: Fargo-Moorhead Metropolitan Area 2025 Simulation Results

More information

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Output

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Output NDSU Dept #2880 PO Box 6050 Fargo, ND 58108-6050 Tel 701-231-8058 Fax 701-231-6265 www.ugpti.org www.atacenter.org Interstate Operations Study: Fargo-Moorhead Metropolitan Area 2015 Simulation Output Technical

More information

INDUSTRIAL DEVELOPMENT

INDUSTRIAL DEVELOPMENT INDUSTRIAL DEVELOPMENT Traffic Impact Study Plainfield, Illinois August 2018 Prepared for: Seefried Industrial Properties, Inc. TABLE OF CONTENTS Executive Summary 2 Introduction 3 Existing Conditions

More information

Denise Marshall Northumberland County

Denise Marshall Northumberland County 144 Front Street West, Suite 655 Toronto, ON M5J L7 Tel: (416) 847-0005 Fax: (905) 88-1557 www.hdrinc.com www.itransconsulting.com File:.0 Memorandum To: Cc: From: Denise Marshall Northumberland County

More information

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition Welcome Meetings 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition 6:30 to 8:00 p.m. - Open House Why is Highway 212 Project Important? Important Arterial Route Local Support Highway 212

More information

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily 5.8 TRAFFIC, ACCESS, AND CIRCULATION This section describes existing traffic conditions in the project area; summarizes applicable regulations; and analyzes the potential traffic, access, and circulation

More information

Driveway Spacing and Traffic Operations

Driveway Spacing and Traffic Operations Driveway Spacing and Traffic Operations ABSTRACT JEROME S. GLUCK, GREG HAAS, JAMAL MAHMOOD Urbitran Associates 71 West 23rd Street, 11th Floor New York, NY 10010 urbitran@ix.netcom.com HERBERT S. LEVINSON

More information

Roundabout Modeling in CORSIM. Aaron Elias August 18 th, 2009

Roundabout Modeling in CORSIM. Aaron Elias August 18 th, 2009 Roundabout Modeling in CORSIM Aaron Elias August 18 th, 2009 Objective To determine the best method of roundabout implementation in CORSIM and make recommendations for its improvement based on comparisons

More information

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017 Bennett Pit Traffic Impact Study J&T Consulting, Inc. Weld County, Colorado March 3, 217 Prepared By: Sustainable Traffic Solutions, Inc. http://www.sustainabletrafficsolutions.com/ Joseph L. Henderson,

More information

Are Roundabout Environmentally Friendly? An Evaluation for Uniform Approach Demands

Are Roundabout Environmentally Friendly? An Evaluation for Uniform Approach Demands 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Are Roundabout Environmentally Friendly? An Evaluation for Uniform Approach Demands Meredith Jackson Charles E. Via, Jr. Department of

More information

Technical Memorandum Analysis Procedures and Mobility Performance Measures 100 Most Congested Texas Road Sections What s New for 2015

Technical Memorandum Analysis Procedures and Mobility Performance Measures 100 Most Congested Texas Road Sections What s New for 2015 Technical Memorandum Analysis Procedures and Mobility Performance Measures 100 Most Congested Texas Road Sections Prepared by Texas A&M Transportation Institute August 2015 This memo documents the analysis

More information

MULTILANE HIGHWAYS. Highway Capacity Manual 2000 CHAPTER 21 CONTENTS

MULTILANE HIGHWAYS. Highway Capacity Manual 2000 CHAPTER 21 CONTENTS CHAPTER 2 MULTILANE HIGHWAYS CONTENTS I. INTRODUCTION...2- Base Conditions for Multilane Highways...2- Limitations of the Methodology...2- II. METHODOLOGY...2- LOS...2-2 Determining FFS...2-3 Estimating

More information

Introduction and Background Study Purpose

Introduction and Background Study Purpose Introduction and Background The Brent Spence Bridge on I-71/75 across the Ohio River is arguably the single most important piece of transportation infrastructure the Ohio-Kentucky-Indiana (OKI) region.

More information

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014. King County Metro Columbia Street Transit Priority Improvements Alternative Analysis Downtown Southend Transit Study May 2014 Parametrix Table of Contents Introduction... 1 Methodology... 1 Study Area...

More information

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards 9.00 Introduction and Goals 9.01 Administration 9.02 Standards 9.1 9.00 INTRODUCTION AND GOALS City streets serve two purposes that are often in conflict moving traffic and accessing property. The higher

More information

Restricted Crossing U-Turn (RCUT) Intersection Concept, Case Studies, and Design Guide ITE Midwest Annual Meeting June 30, 2015 Branson, MO

Restricted Crossing U-Turn (RCUT) Intersection Concept, Case Studies, and Design Guide ITE Midwest Annual Meeting June 30, 2015 Branson, MO Restricted Crossing U-Turn (RCUT) Intersection Concept, Case Studies, and Design Guide 2015 ITE Midwest Annual Meeting June 30, 2015 Branson, MO Wei Zhang, Ph.D., P.E. Program Manager, Intersection Safety

More information

Road User Cost Analysis

Road User Cost Analysis Road User Cost Analysis I-45 Gulf Freeway at Beltway 8 Interchange CSJ #500-03-382 1994 Texas Transportation Institute ROAD USER COST ANALYSIS CSJ #500-03-382 The Texas Department of Transportation (TxDOT)

More information

Sight Distance. A fundamental principle of good design is that

Sight Distance. A fundamental principle of good design is that Session 9 Jack Broz, PE, HR Green May 5-7, 2010 Sight Distance A fundamental principle of good design is that the alignment and cross section should provide adequate sight lines for drivers operating their

More information

Capacity and Level of Service for Highway Segments (I)

Capacity and Level of Service for Highway Segments (I) Capacity and Level of Service for Highway Segments (I) 1 Learn how to use the HCM procedures to determine the level of service (LOS) Become familiar with highway design capacity terminology Apply the equations

More information

CHARACTERIZATION AND DEVELOPMENT OF TRUCK LOAD SPECTRA FOR CURRENT AND FUTURE PAVEMENT DESIGN PRACTICES IN LOUISIANA

CHARACTERIZATION AND DEVELOPMENT OF TRUCK LOAD SPECTRA FOR CURRENT AND FUTURE PAVEMENT DESIGN PRACTICES IN LOUISIANA CHARACTERIZATION AND DEVELOPMENT OF TRUCK LOAD SPECTRA FOR CURRENT AND FUTURE PAVEMENT DESIGN PRACTICES IN LOUISIANA LSU Research Team Sherif Ishak Hak-Chul Shin Bharath K Sridhar OUTLINE BACKGROUND AND

More information

TRAFFIC PARKING ANALYSIS

TRAFFIC PARKING ANALYSIS TRAFFIC PARKING ANALYSIS NAPA FLEA MARKET COUNTY OF NAPA Prepared for: Tom Harding Napa-Vallejo Flea Market 33 Kelly Road American Canyon, CA 9453 Prepared by: 166 Olympic Boulevard, Suite 21 Walnut Creek,

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

Transportation & Traffic Engineering

Transportation & Traffic Engineering Transportation & Traffic Engineering 1) Project Description This report presents a summary of findings for a Traffic Impact Analysis (TIA) performed by A+ Engineering, Inc. for the Hill Country Family

More information

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

MEMO VIA  . Ms. Amy Roth DPS Director, City of Three Rivers. To: MEMO To: Ms. Amy Roth DPS Director, City of Three Rivers VIA EMAIL From: Michael J. Labadie, PE Julie M. Kroll, PE, PTOE Brandon Hayes, PE, P.Eng. Fleis & VandenBrink Date: January 5, 2017 Re: Proposed

More information

EFFECT OF WORK ZONE LENGTH AND SPEED DIFFERENCE BETWEEN VEHICLE TYPES ON DELAY-BASED PASSENGER CAR EQUIVALENTS IN WORK ZONES

EFFECT OF WORK ZONE LENGTH AND SPEED DIFFERENCE BETWEEN VEHICLE TYPES ON DELAY-BASED PASSENGER CAR EQUIVALENTS IN WORK ZONES EFFECT OF WORK ZONE LENGTH AND SPEED DIFFERENCE BETWEEN VEHICLE TYPES ON DELAY-BASED PASSENGER CAR EQUIVALENTS IN WORK ZONES Madhav V. Chitturi (Corresponding author) Graduate Student, Department of Civil

More information

US 81 Bypass of Chickasha Environmental Assessment Public Meeting

US 81 Bypass of Chickasha Environmental Assessment Public Meeting US 81 Bypass of Chickasha Environmental Assessment Public Meeting March 14, 2013 Introductions ODOT FHWA SAIC Meeting Purpose Present need for bypass Provide responses to 10/04/11 public meeting comments

More information

RE: A Traffic Impact Statement for a proposed development on Quinpool Road

RE: A Traffic Impact Statement for a proposed development on Quinpool Road James J. Copeland, P.Eng. GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 May 31, 2018 Ellen O Hara, P.Eng. Project Engineer DesignPoint Engineering & Surveying Ltd. 200 Waterfront

More information

March 2, 2017 Integrating Transportation Planning, Project Development, and Project Programming

March 2, 2017 Integrating Transportation Planning, Project Development, and Project Programming COORDINATION WITH VDOT DISTRICTS TO DELIVER IMPLEMENTABLE IMPROVEMENT PROJECTS March 2, 2017 Integrating Transportation Planning, Project Development, and Project Programming PRESENTATION OUTLINE What

More information

A Gap-Based Approach to the Left Turn Signal Warrant. Jeremy R. Chapman, PhD, PE, PTOE Senior Traffic Engineer American Structurepoint, Inc.

A Gap-Based Approach to the Left Turn Signal Warrant. Jeremy R. Chapman, PhD, PE, PTOE Senior Traffic Engineer American Structurepoint, Inc. A Gap-Based Approach to the Left Turn Signal Warrant Jeremy R. Chapman, PhD, PE, PTOE Senior Traffic Engineer American Structurepoint, Inc. March 5, 2019 - The problem: Existing signalized intersection

More information

Shirk Road at State Route 198 Interchange Analysis Tulare County, California

Shirk Road at State Route 198 Interchange Analysis Tulare County, California Shirk Road at State Route 198 Interchange Analysis Tulare County, California DRAFT REPORT Prepared By Tulare County Association of Governments (TCAG) April 2013 Table of Contents Introduction:... 3 Project

More information

Costco Gasoline Fuel Station Transportation Characteristics

Costco Gasoline Fuel Station Transportation Characteristics Exhibit A MEMORANDUM Date: May 23, 2013 Project #: I-10 To: Jennifer Murillo, Costco Wholesale Terry Odle, Mulvanny G2 Architecture From: Sonia Hennum, PTOE Project: Subject: Signal Hill Costco Gasoline

More information

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND Prepared for: Department of Public Works Anne Arundel County Prepared by: URS Corporation 4 North Park Drive, Suite 3 Hunt Valley,

More information

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS TRAFFIC IMPACT STUDY FEBRUARY 214 OA Project No. 213-542 TABLE OF CONTENTS 1. INTRODUCTION...

More information

Trip Generation & Parking Occupancy Data Collection: Grocery Stores Student Chapter of Institute of Transportation Engineers at UCLA Spring 2014

Trip Generation & Parking Occupancy Data Collection: Grocery Stores Student Chapter of Institute of Transportation Engineers at UCLA Spring 2014 Trip Generation & Parking Occupancy Data Collection: Grocery Stores Student Chapter of Institute of Transportation Engineers at UCLA Spring 2014 Page 1 Introduction The UCLA Institute of Transportation

More information

Emergency Signal Warrant Evaluation: A Case Study in Anchorage, Alaska

Emergency Signal Warrant Evaluation: A Case Study in Anchorage, Alaska Emergency Signal Warrant Evaluation: A Case Study in Anchorage, Alaska by Jeanne Bowie PE, Ph.D., PTOE and Randy Kinney, PE, PTOE Abstract The Manual on Uniform Traffic Control Devices (MUTCD), Chapter

More information

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS... Crosshaven Drive Corridor Study City of Vestavia Hills, Alabama Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA... 3 Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

More information

Roundabout Feasibility Study SR 44 at Grand Avenue TABLE OF CONTENTS

Roundabout Feasibility Study SR 44 at Grand Avenue TABLE OF CONTENTS Roundabout Feasibility Study SR 44 at Grand Avenue TABLE OF CONTENTS Introduction and Executive Summary... 1 Existing Conditions... 3 Intersection Volume Conditions... 5 Intersection Operations... 9 Safety

More information

Simulating Trucks in CORSIM

Simulating Trucks in CORSIM Simulating Trucks in CORSIM Minnesota Department of Transportation September 13, 2004 Simulating Trucks in CORSIM. Table of Contents 1.0 Overview... 3 2.0 Acquiring Truck Count Information... 5 3.0 Data

More information

Downtown One Way Street Conversion Technical Feasibility Report

Downtown One Way Street Conversion Technical Feasibility Report Downtown One Way Street Conversion Technical Feasibility Report As part of the City s Transportation Master Plan, this report reviews the technical feasibility of the proposed conversion of the current

More information

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject TECHNICAL MEMORANDUM To Kumar Neppalli Traffic Engineering Manager Town of Chapel Hill From Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. Cc HNTB Project File: 38435 Subject Obey Creek TIS 2022

More information

Independence Institute Denver West Parkway, Suite 185 Golden, Colorado i2i.org/cad.aspx BRT = BTR

Independence Institute Denver West Parkway, Suite 185 Golden, Colorado i2i.org/cad.aspx BRT = BTR Independence Institute 14142 Denver West Parkway, Suite 185 Golden, Colorado 80401 303-279-6536 i2i.org/cad.aspx BRT = BTR Bus-Rapid Transit Is Better Than Rail: The Smart Alternative to Light Rail Joseph

More information

APPENDIX E. Traffic Analysis Report

APPENDIX E. Traffic Analysis Report APPENDIX E Traffic Analysis Report THIS PAGE INTENTIONALLY BLANK EAGLE RIVER TRAFFIC MITIGATION PHASE I OLD GLENN HIGHWAY/EAGLE RIVER ROAD INTERSECTION IMPROVEMENTS TRAFFIC ANALYSIS Eagle River, Alaska

More information

Oakbrook Village Plaza City of Laguna Hills

Oakbrook Village Plaza City of Laguna Hills Oakbrook Village Plaza City of Laguna Hills Traffic Impact Analysis Prepared by: HDR Engineering 3230 El Camino Real, Suite 200 Irvine, CA 92602 October 2012 Revision 3 D-1 Oakbrook Village Plaza Laguna

More information

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Submitted by April 9, 2009 Introduction Kenig, Lindgren, O Hara, Aboona,

More information

Technical Feasibility Report

Technical Feasibility Report Prepared For: Bow Concord I-93 Improvements Project Bow and Concord, NH Prepared By: 53 Regional Drive Concord, NH 03301 NHDOT Project # 13742 Federal Project #T-A000(018) September 2018 TABLE OF CONTENTS

More information

Traffic Management Plan and Queuing Analysis Lakehill Preparatory School Z Hillside Drive, Dallas, TX October 27, 2015

Traffic Management Plan and Queuing Analysis Lakehill Preparatory School Z Hillside Drive, Dallas, TX October 27, 2015 Traffic Management Plan and Queuing Analysis Lakehill Preparatory School Z145-235 2720 Hillside Drive, Dallas, TX October 27, 2015 Introduction: The Lakehill Preparatory School is located on the northeast

More information

Open Access Delay Measurement of Manually Controlled Intersection Using GPS

Open Access Delay Measurement of Manually Controlled Intersection Using GPS Send Orders for Reprints to reprints@benthamscience.net 13 The Open Civil Engineering Journal, 214, 8, 13-135 Open Access Delay Measurement of Manually Controlled Intersection Using GPS S. Nithya *,1,

More information

D-25 Speed Advisory System

D-25 Speed Advisory System Report Title Report Date: 2002 D-25 Speed Advisory System Principle Investigator Name Pesti, Geza Affiliation Texas Transportation Institute Address CE/TTI, Room 405-H 3135 TAMU College Station, TX 77843-3135

More information

DRIVER SPEED COMPLIANCE WITHIN SCHOOL ZONES AND EFFECTS OF 40 PAINTED SPEED LIMIT ON DRIVER SPEED BEHAVIOURS Tony Radalj Main Roads Western Australia

DRIVER SPEED COMPLIANCE WITHIN SCHOOL ZONES AND EFFECTS OF 40 PAINTED SPEED LIMIT ON DRIVER SPEED BEHAVIOURS Tony Radalj Main Roads Western Australia DRIVER SPEED COMPLIANCE WITHIN SCHOOL ZONES AND EFFECTS OF 4 PAINTED SPEED LIMIT ON DRIVER SPEED BEHAVIOURS Tony Radalj Main Roads Western Australia ABSTRACT Two speed surveys were conducted on nineteen

More information

Level of Service Classification for Urban Heterogeneous Traffic: A Case Study of Kanapur Metropolis

Level of Service Classification for Urban Heterogeneous Traffic: A Case Study of Kanapur Metropolis Level of Service Classification for Urban Heterogeneous Traffic: A Case Study of Kanapur Metropolis B.R. MARWAH Professor, Department of Civil Engineering, I.I.T. Kanpur BHUVANESH SINGH Professional Research

More information

Traffic Impact Statement (TIS)

Traffic Impact Statement (TIS) Traffic Impact Statement (TIS) Vincentian PUDA Collier County, FL 10/18/2013 Prepared for: Global Properties of Naples Prepared by: Trebilcock Consulting Solutions, PA 2614 Tamiami Trail N, Suite 615 1205

More information

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT

Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT Traffic Impact Analysis 5742 BEACH BOULEVARD MIXED USE PROJECT CITY OF BUENA PARK Prepared by Project No. 14139 000 April 17 th, 2015 DKS Associates Jeffrey Heald, P.E. Rohit Itadkar, T.E. 2677 North Main

More information

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis

Date: February 7, 2017 John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Memorandum Date: February 7, 07 To: From: Subject: John Doyle, Z-Best Products Robert Del Rio. T.E. Z-Best Traffic Operations and Site Access Analysis Introduction Hexagon Transportation Consultants, Inc.

More information

APPENDIX I: [FIXED-GUIDEWAY TRANSIT FEASIBILITY]

APPENDIX I: [FIXED-GUIDEWAY TRANSIT FEASIBILITY] APPENDIX I: [FIXED-GUIDEWAY TRANSIT FEASIBILITY] Jackson/Teton Integrated Transportation Plan 2015 Appendix I. Fixed-Guideway Transit Feasibility Jackson/Teton County Integrated Transportation Plan v2

More information

APPENDIX C-2. Traffic Study Supplemental Analysis Memo

APPENDIX C-2. Traffic Study Supplemental Analysis Memo APPENDIX C-2 Traffic Study Supplemental Analysis Memo The Mobility Group Transportation Strategies & Solutions Memorandum To: From: Subject: Tomas Carranza, LADOT Matthew Simons Traffic Review - Revised

More information

Development of Crash Modification Factors for Rumble Strips Treatment for Freeway Applications: Phase I Development of Safety Performance Functions

Development of Crash Modification Factors for Rumble Strips Treatment for Freeway Applications: Phase I Development of Safety Performance Functions LATIN AMERICAN AND CARIBBEAN CONFERENCE FOR ENGINEERING AND TECHNOLOGY (LACCEI 2014) Development of Crash Modification Factors for Rumble Strips Treatment for Freeway Applications: Phase I Development

More information

Clean Harbors Canada, Inc.

Clean Harbors Canada, Inc. Clean Harbors Canada, Inc. Proposed Lambton Landfill Expansion Environmental Assessment Terms of Reference Transportation Assessment St. Clair Township, Ontario September 2009 itrans Consulting Inc. 260

More information

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site TRAFFIC IMPACT STUDY for USD #497 Warehouse and Bus Site Prepared by: Jason Hoskinson, PE, PTOE BG Project No. 16-12L July 8, 216 145 Wakarusa Drive Lawrence, Kansas 6649 T: 785.749.4474 F: 785.749.734

More information

Appendix B CTA Transit Data Supporting Documentation

Appendix B CTA Transit Data Supporting Documentation RED ED-PURPLE BYPASS PROJECT ENVIRONMENTAL ASSESSMENT AND SECTION 4(F) EVALUATION Appendix B CTA Transit Data Supporting Documentation 4( Memorandum Date: May 14, 2015 Subject: Chicago Transit Authority

More information

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below:

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below: 3.5 TRAFFIC AND CIRCULATION 3.5.1 Existing Conditions 3.5.1.1 Street Network DRAFT ENVIRONMENTAL IMPACT REPORT The major roadways in the study area are State Route 166 and State Route 33, which are shown

More information

New Buck O Neil (U. S. 169) Crossing Benefit-Cost Analysis. Kansas City, Missouri

New Buck O Neil (U. S. 169) Crossing Benefit-Cost Analysis. Kansas City, Missouri New Buck O Neil (U. S. 169) Crossing Benefit-Cost Analysis Kansas City, Missouri New Buck O Neil (U. S. 169) Crossing Benefit-Cost Analysis prepared for Kansas City, Missouri prepared by Burns & McDonnell

More information

Public Transportation Problems and Solutions in the Historical Center of Quito

Public Transportation Problems and Solutions in the Historical Center of Quito TRANSPORTATION RESEARCH RECORD 1266 205 Public Transportation Problems and Solutions in the Historical Center of Quito JACOB GREENSTEIN, Lours BERGER, AND AMIRAM STRULOV Quito, the capital of Ecuador,

More information

Use of Flow Network Modeling for the Design of an Intricate Cooling Manifold

Use of Flow Network Modeling for the Design of an Intricate Cooling Manifold Use of Flow Network Modeling for the Design of an Intricate Cooling Manifold Neeta Verma Teradyne, Inc. 880 Fox Lane San Jose, CA 94086 neeta.verma@teradyne.com ABSTRACT The automatic test equipment designed

More information

Trucks at Roundabouts: A Synthesis Study

Trucks at Roundabouts: A Synthesis Study Journal of Transportation Technologies, 2018, 8, 65-74 http://www.scirp.org/journal/jtts ISSN Online: 2160-0481 ISSN Print: 2160-0473 Trucks at Roundabouts: A Synthesis Study Pavan Kumar Chevuri Department

More information

Dey 2. the urban. To meet. stream in. median opening. The. traffic. every

Dey 2. the urban. To meet. stream in.   median opening. The. traffic. every Modelling the area occupancy of major stream traffic Malaya Mohanty 1, Partha Pratim Dey 2 1 Research Scholar, School of Infrastructure, Indian Institute of Technology, Bhubaneswar, India. Email: mm14@iitbbs.ac.in

More information

Exhibit F - UTCRS. 262D Whittier Research Center P.O. Box Lincoln, NE Office (402)

Exhibit F - UTCRS. 262D Whittier Research Center P.O. Box Lincoln, NE Office (402) UTC Project Information Project Title University Principal Investigator PI Contact Information Funding Source(s) and Amounts Provided (by each agency or organization) Exhibit F - UTCRS Improving Safety

More information

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas.

Volume 1 Traffic Impact Analysis Turtle Creek Boulevard Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. Volume 1 Traffic Impact Analysis 2727 Dallas, Texas June 18, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064523000 Registered Firm F-928 Traffic Impact Analysis 2727 Dallas, Texas Prepared

More information

Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary

Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County Executive Summary October 2014 Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County Executive Summary October 2014 Prepared

More information

P07033 US 50 EB Weaving Analysis between El Dorado Hills and Silva Valley Ramp Metering Analysis for US 50 EB On-Ramp at Latrobe Road

P07033 US 50 EB Weaving Analysis between El Dorado Hills and Silva Valley Ramp Metering Analysis for US 50 EB On-Ramp at Latrobe Road 180 Grand Avenue, Suite 250 428 J Street, Suite 500 Oakland, CA 94612 Sacramento, CA 95814 510.839.1742 916.266.2190 510.839.0871 fax 916.266.2195 Dowling Associates, Inc. www.dowlinginc.com traffic@dowlinginc.com

More information

Electric Vehicle Infrastructure Location Tool and Visualization Map. July 17, 2018

Electric Vehicle Infrastructure Location Tool and Visualization Map. July 17, 2018 Electric Vehicle Infrastructure Location Tool and Visualization Map Version 2.0 Analysis Summary July 17, 2018 Contents Electric Vehicle Fast Charging Infrastructure Planning Tools Overview & Analysis

More information