Entergy Draft Construction Plan Update 1

Size: px
Start display at page:

Download "Entergy Draft Construction Plan Update 1"

Transcription

1 Entergy Draft Construction Plan Update 1 Construction Plan Projects Relating To: Regulatory Transmission Service Economic Enhanced Transmission Reliability Customer Driven Generation Interconnection Page 1 of 17 May, 2013

2 Entergy Draft Construction Plan Update Draft Construction Plan Modified Construction Plan ID Removed Project Driver Project Name LE Proposed ISD (Planning) 2012 Funding Comments Project Status Actual ISD Other Comments 10-EAI-018-CP 11-EAI-006-CP 11-EAI-010-CP 10-EAI-020-CP Ebony 161 kv Switching Station: Install 5 Breaker Ring Bus Lines Terminating Into New Ebony Substation (ratings unchanged): Ebony - Kuhn Road 161 kv Line Ebony - WM Lehi - WM Polk - WM EHV 161 kv Line Ebony - WM Dover - WM Gateway 161 kv Line Ebony - Marked Tree 161 kv Line Ebony - WM Lehi - WM EHV 161 kv Line EAI 2012 Winter Approved Complete 11/16/12 Delayed to winter due to construction feasibility Ebony 161 kv Switching Station: Add 36 MVAR Capacitor Bank EAI 2012 Winter Approved Complete 11/30/12 Delayed to winter due to construction feasibility Wilmar Substation: Add 21.6 MVAR Capacitor Bank (Formerly Hilo Substation) EAI 2012 Winter Approved Complete 1/21/13 Delayed to winter due to construction feasibility Benton North to Benton South: Construct New 115 kv Line Rated at least 170 MVA EAI 2012 Winter Approved Complete 4/22/13 May be delayed to summer due to Install Switching Stations at Benton North and Benton South routing difficulties 11-EAI-012-CP 11-EAI-026-CP Stuttgart Ricuskey 115 kv Substation: Expand Capacitor Bank to 39 MVAR EAI 2013 Summer Approved NLR Westgate - NLR Levy: Reconductor 115 kv Line EAI 2013 Summer Approved May be delayed to winter 2013 due to outage scheduling 13-EAI-004-CP Monticello East - Add 21.6 MVAR capacitor bank EAI 2013 Summer Approved Replaces Monticello East SVC project 12-EAI-007-CP 13-EAI-008-CP Hot Springs EHV Substation: Replace two 115 kv autotransformer breakers EAI 2013 Summer Approved Construction to address fault interrupting requirements 13-EAI-009-CP Transmission Service Hot Spring Transmission Service: EAI 2013 Winter Approved White Bluff to Pine Bluff Arsenal C - Upgrade terminal equipment at White Bluff 11-EAI-003-CP Fordyce: Relocate capacitor bank to 115 kv bus. Install switch on line side of capacitor EAI 2014 Summer Proposed & In Updated project description bank. 11-EAI CP Economic Sheridan South 500 kv FG Upgrade: Mabelvale 500 kv Substation replace 3 breakers, EAI 2014 Summer Approved Construction 13 switches, and 2 line traps 11-EAI CP Economic Sheridan South 500 kv FG Upgrade: Sheridan 500 kv Substation replace 11 switches, EAI 2014 Summer Approved Construction and 6 line traps 11-EAI CP Economic Sheridan South 500 kv FG Upgrade: White Bluff 500 kv Substation replace 5 switches, EAI 2014 Summer Approved Construction and 2 line traps 11-EAI CP Economic Sheridan South 500 kv FG Upgrade: Eldorado 500 kv Substation replace 1 switch and EAI 2014 Summer Approved Construction 2 line traps 12-EAI-002-CP Woodward - Pine Bluff West - Pine Bluff McCamant: Reconductor 115 kv EAI 2014 Summer Approved 12-EAI-005-CP Camden McGuire - Camden North 115kV Line: Construct New Line EAI 2014 Summer Approved Construction 12-EAI CP LV Bagby to Macon Lake: Construct new 230 kv line and operate at 115 kv EAI 2014 Summer Approved Project split into two phases. Formerly 12-EAI-008-CP 12-EAI-023-CP Woodward to Pine Bluff Watson Chapel: Rebuild line to 230 kv construction and EAI 2014 Summer Approved operate at 115 kv. 14-EAI-001-CP Osceola: Add 24MVAR capacitor Bank EAI 2014 Summer Proposed & In 14-EAI-003-CP Ulm: Add 21.4MVAR capacitor Bank EAI 2014 Summer Proposed & In Moved to Horizon Plan 12-EAI-001-CP Calico Rock-Melbourne - Upgrade 161kV Line EAI 2014 Winter Approved 14-EAI-002-CP Transmission Service Hot Springs Transmission Service: McCrory-Bailey: Upgrade line to 100C EAI 2014 Winter Approved 11-EAI-007-CP Hot Springs Hamilton (Albright) - Carpenter Dam: Construct new 115 kv Line and convert Mountain Pine South to ring bus stations. EAI 2015 Summer Approved CP (Others) Page 2 of 17 May, 2013

3 Draft Construction Plan Modified Construction Plan ID Removed Project Driver Project Name LE Proposed ISD (Planning) 2012 Funding Comments Project Status Actual ISD Other Comments 13-EAI-003-CP 11-EAI-008-CP 11-EAI-017-CP 12-EAI-016-CP 12-EAI-017-CP 12-EAI-018-CP 12-EAI-035-CP 11-EAI-025-CP 11-EAI-027-CP 12-EAI-003-CP 12-EAI-019-CP 11-EAI-015-CP Monticello East to Reed: Construct new 115 kv transmission line. Construct to 230 kv but operate at 115 kv. EAI 2015 Summer Proposed & In Pine Bluff Voltage Support Project: Phase 2 EAI 2015 Summer Proposed & In Woodward: Construct 230 kv ring bus and construct new White Bluff to Woodward 230 kv line White Bluff: Reconfigure 500 kv Station and construct 230 kv ring bus EAI 2015 Summer Proposed & In HS EHV-HS Industrial: Upgrade Terminal Equipment EAI 2015 Summer Proposed & In HS Industrial-HS Union Carbide: Upgrade Terminal Equipment EAI 2015 Summer Proposed & In HS Union Carbide-HS East: Upgrade Terminal Equipment EAI 2015 Summer Proposed & In Beebe: Install 21.6 MVAR capacitor bank EAI 2015 Summer Proposed & In Norfork-Calico Rock : Upgrade 161 kv Line EAI 2016 Summer Proposed & In AECC L&D 2 to Gillett: Construct new 115 kv Line EAI 2016 Summer Proposed & In Woodward-115 kv Bus Reconfiguration EAI 2016 Summer Proposed & In Mabelvale: Replace Autos EAI 2016 Summer Proposed & In Jim Hill Area Upgrades EAI 2017 Summer Proposed & In Doniphan (AECI New Sub) - Datto 161 construct new line Replaces Monticello East SVC project 12-EAI-007-CP Changed location from Ward substation to Bebee 12-EAI-027-CP 12-EAI CP 12-EAI-021-CP Enhanced Transmission Reliability 11-EAI-016-CP 12-EAI CP 12-EAI CP 14-EAI-004-CP 14-EAI-005-CP 12-EGL-014-CP 11-EGL CP 10-EGL-011-CP 11-EGL-004-CP 11-EGL-008-CP Malvern South: Add 10.2 MVAR Capacitor Bank EAI 2017 Summer Proposed & In Macon Lake to Reed: Construct new 230 kv line and operate at 115 kv EAI 2017 Summer Approved Project split into two phases. Formerly 12-EAI-008-CP Mayflower - Reconfigure 500 kv bus (eliminate breaker failure impact on autos) EAI 2017 Winter Proposed & In ISES- Reconfiguration of the 161kV Bus EAI 2018 Summer Proposed & In Construct Gum Springs Switching Station EAI 2018 Summer Proposed & In Gum Springs to Amity construct new line. Add breakers at Amity EAI 2018 Summer Proposed & In Gurdon: Add 21.6MVAR capacitor bank EAI 2018 Summer Proposed & In Project moved to Area Holland Bottoms - Beebe: Build new 161kV line, Install 161/115kV auto EAI 2019 Summer Proposed & In Lake Charles Bulk Substation: Replace four 69 kv, 600 A switches on transformers and EGSL 2012 Fall Approved Complete 1/28/13 bus section breaker with 1200 A switches Fireco to Copol 69 kv line: Upgrade line conductor EGSL 2012 Winter Approved Complete 12/17/12 Mossville - Cut-in line 616 (Nelson to Carlyss 138 kv) into Mossville 138 kv Substation EGSL 2013 Summer Approved Bloomfield to Bosco 138 kv line (formerly Vatican project) Construct new Bloomfield 138 kv SS north of Vatican Construct new Bosco 138 kv SS on Scott to Scanlan 138 kv line Construct new Bloomfield to Bosco 138 kv line Install 5 ohm reactor at Bosco substation Francis 69 kv substation - Add 14.4 MVAR, 69 kv capacitor bank (Previously considered Marydale as alternative location) EGSL 2013 Summer Approved Complete 12/20/12 EGSL 2013 Summer Approved Complete 3/25/13 CP (Others) Page 3 of 17 May, 2013

4 Draft Construction Plan Modified Construction Plan ID Removed Project Driver Project Name LE Proposed ISD (Planning) 2012 Funding Comments Project Status Actual ISD Other Comments 11-EGL CP Transmission Service Acadia Generation - Upgrade Moril to Hopkins 138 kv line EGSL 2013 Summer Approved Complete 10/30/12 11-EGL CP Transmission Service Acadia Generation - Upgrade 69 kv breaker at Scott EGSL 2013 Summer Approved Complete 10/11/12 12-EGL-003-CP Champagne to Plaisance 138 kv line - Modify/Replace CTs at Champagne EGSL 2013 Summer Approved Complete 12/26/12 11-EGL CP Mossville to Canal - Phase 1: Upgrade 69 kv Line EGSL 2013 Winter Proposed & In Project split into two phases. Formerly 11-EGL-016-CP 12-EGL-015-CP Economic Willow Glen to Conway - Construct new 230 kv line EGSL 2014 Spring Approved Design Project ISD moved from 2013 Winter to 2014 Spring 11-EGL CP Mossville to Canal - Phase 2: Upgrade 69 kv Line EGSL 2014 Winter Proposed & In Project split into two phases. Formerly 11-EGL-016-CP 12-EGL-008-CP Copol to Bourbeaux: Upgrade 69 kv line EGSL 2014 Winter Approved Complete 4/18/13 14-EGL-001-CP Longfellow to Cade Switch - Move Normally Open Point EGSL 2015 Summer Proposed & In 13-EGL-002-CP Lake Arthur 69 kv: Move normally open point EGSL 2015 Summer Proposed & In (Accelerated from Horizon Plan) 12-EGL-010-CP New Iberia: Add kv transformer EGSL 2015 Summer Proposed & In (Accelerated from Horizon Plan) 14-EGL-003-CP Willow Glenn: Upgrade kv single phase transformer bank with 1200 MVA EGSL 2016 Summer Proposed & In units 11-EGL-007-CP Moril to Delcambre 138 kv line: Upgrade station equipment EGSL 2016 Summer Proposed & In (Accelerated from Horizon Plan) 12-EGL-004-CP McManus to Brady Heights - Upgrade 69 kv line EGSL 2016 Winter Proposed & In Accelerated one year from 2017 Winter 14-EGL-016-CP Port Hudson to Zachary REA 69 kv Line Reconductor EGSL 2017 Summer Proposed & In 14-EGL-017-CP Crown Zellerbach Area: Construct new kv substation on the Fancy Point to EGSL 2017 Summer Proposed & In. Replaces 12-EGL-006-CP Waterloo 230 kv line 14-EGL-004-CP Fancy Point: Add 2nd kv, 1200 MVA transformer EGSL 2017 Summer Proposed & In 14-EGL-005-CP Enhanced Transmission Nelson: Add 2nd kv transformer (relocate Willow Glen units) EGSL 2017 Summer Proposed & In Reliability 14-EGL-006-CP LeBlanc - New Cap Bank #1 EGSL 2017 Summer Proposed & In 12-EGL-006-CP Bronco - New 230 kv distribution substation (Formerly called Zachery) EGSL 2017 Summer Proposed & In Replaced by Crown Zellerbach project 11-EGL-002-CP Harelson to Gloria - upgrade 69 kv line EGSL 2018 Summer Proposed & In Replaced by Flannery Project 11-EGL-017-CP Five Points to Line Tap 281 to Line 247 Tap- Upgrade 69 kv line EGSL 2019 Summer Proposed & In Moved from 2018 Winter to 2019 Summer 14-EGL-018-CP Port Hudson Substation: Replace (2) kv autos with 200 MVA units EGSL 2019 Summer Proposed & In 14-EGL-007-CP Chlomal to Lacassine - Upgrade Line EGSL 2019 Winter Proposed & In 14-EGL-002-CP 11-EGL-010-CP 13-ELL-002-CP 10-ELL-008-CP Flannery Area Construct new kv Substation Also reconfigure 69 kv lines 340 and 749 EGSL 2020 Summer Proposed & In Sorrento Upgrade 138/115 kv Auto and upgrade Gonzales - Sorrento 138 kv Line EGSL/ELL 2014 Summer Approved McCall 115 kv Substation: Add 20.4 MVAR Capacitor Bank (Formerly Napoleonville add capacitor bank) Southeast LA Coastal Improvement Plan: Phase 3 Construct Oakville to Alliance 230kV Line Add kv Autotransformer at Alliance Substation ELL 2013 Fall Approved. Replaces 11-EGL-002- CP, 12-EGL-001-HZ, and 12-EGL-009- HZ ELL 2013 Summer Approved Design/Construction Routing issues may result in potential delay to spring 2015 CP (Others) Page 4 of 17 May, 2013

5 Draft Construction Plan Modified Construction Plan ID Removed Project Driver Project Name LE Proposed ISD (Planning) 2012 Funding Comments Project Status Actual ISD Other Comments 11-ELL CP 13-ELL-001-CP 11-ELL-002-CP 11-ELL-001-CP Enhanced Transmission Reliability 11-ELL CP NE Louisiana Improvement Project - Phase 1 Swartz to Oakridge - Construct new 115 kv Line (1272 ACSS) Operate Sterlington to Oakridge normally open ELL 2013 Summer Approved Complete 3/22/13 Golden Meadow to Barataria: Upgrade switch ELL 2013 Summer Approved Complete 4/25/13 Mt. Olive: Add Shunt Reactor ELL 2013 Winter Approved Golden Meadow to Leeville 115 kv - Rebuild/relocate 115 kv transmission line ELL 2014 Spring Approved NE Louisiana Improvement Project - Phase 2 Oakridge to new Dunn Substation - Construct new 115 kv Line (1272 ACSS) Add 115 kv breakers at Dunn ELL 2014 Summer Approved 11-ELL CP Generation Interconnection NM6: Modify Ninemile switchyard for interconnection ELL 2014 Winter Approved Construction 11-ELL CP Transmission Service NM6: Upgrade Ninemile to Southport 230 kv transmission line No.1 ELL 2014 Winter Approved 11-ELL CP Transmission Service NM6: Upgrade Ninemile to Southport 230 kv transmission line No.2 ELL 2014 Winter Approved 10-ELL-009-CP Iron Man to Tezcuco 230 kv line - Construct new line ELL 2015 Summer Approved Design/Construction 11-ELL-012-CP Valentine to Clovelly 115 kv upgrade ELL 2015 Summer Proposed & In 13-ELL-004-CP Minden Improvement Project Ph 1-Place cap bank at Minden REA ELL 2015 Summer Proposed & In 11-ELL-004-CP Northeast LA Improvement Project Phase 3 Upgrade Sterlington to Oakridge 115 kv Line ELL 2015 Summer Proposed & In Updated Project Description 14-ELL-001-CP 11-EMI-004-CP 14-EMI-001-CP 10-EMI-017-CP 10-EMI CP Norco 115 kv Substaton: Add 30.5 MVAR Capacitor Bank ELL 2017 Summer Proposed & In Ray Braswell to West Jackson 115 kv line: Reconductor line EMI 2012 Winter Approved Complete 11/21/12 Final relay settings completed and installed March Line now up to full conductor rating. Horn Lake to Greenbrook 115kV line: Upgrade 4 switches EMI 2013 Summer Approved Construction Ray Braswell - Wyndale 115kV Line: Construct New 260 MVA Construct new 115 kv Switching Station between Byram and Terry Wyndale SS to be designed for future kv auto and distribution facilities EMI 2013 Summer Approved Construction Ray Braswell to Spring Ridge Road 115kV line upgrade EMI 2013 Summer Approved Complete 5/16/13 Identified as part of 10-EMI-017-CP project requirement due to swapping of line bays Getwell to Church Road 230 kv construct new 230 kv Transmission Line EMI 2013 Summer Approved Complete 5/10/13 10-EMI-018-CP 13-EMI-001-CP Upgrade CTs at Vicksburg for Vicksburg-B.Wilson ckt 1 (ckt without Spencer Potash on EMI 2013 Summer Approved Design it) 13-EMI-006-CP Enhanced Transmission Bolton 115 kv Substation: Add 115 kv breakers EMI 2013 Summer Approved Complete 3/28/13 Reliability 13-EMI-004-CP Transmission Service SMEPA Plum Point Transmission Service: EMI 2013 Summer Approved Complete 4/19/13 Horn Lake to Greenbrook 115 kv line: Upgrade station equipment at Horn Lake 11-EMI-002-CP Baxter Wilson to S.E. Vicksburg - Upgrade 115 kv line EMI 2015 Summer Proposed & In 14-EMI-002-CP Bozeman Rd to Tinnin Rd 230kV: Build new 230kV line from Bozeman Road to GASES- EMI 2017 Summer Proposed & In Ray Braswell 230kV and add new breaker station 14-EMI-003-CP Natchez Improvement Project Phase 1: Baxter Wilson to Natchez SES 115kV EMI 2018 Summer Proposed & In Build new 115kV line rated 260MVA (230kV constructed) 14-EMI-005-CP Enhanced Transmission EMI 2018 Summer Proposed & In Reliability Vicksburg Area Improvement Project: Build new 115kV switching station and rebuild E.Vicksburg-R.Braswell 115kV and SE Vicksburg-new switching station. Upgrade station equipment at SE Vicksburg and Bovina CP (Others) Page 5 of 17 May, 2013

6 Draft Construction Plan Modified Construction Plan ID Removed Project Driver Project Name LE Proposed ISD (Planning) 2012 Funding Comments Project Status Actual ISD Other Comments 11-EMI-007-CP 12-EMI-001-CP Breakers at Hollandale and Belzoni (close normally-open point) EMI 2019 Summer Proposed & In Franklin - McComb build new 115 kv line (constructed to 230 kv) EMI 2020 Summer Proposed & In Also upgrade all substation elements along Tylertown to McComb 115 kv line to provide a minimum 1000A rating. McAdams: Add 3rd kV autotransformer EMI 2020 Summer Proposed & In 14-EMI-004-CP 11-ENO-001-CP Generation Interconnection NM6: Upgrade Michoud breaker N9803 ENOI 2014 Winter Approved 12-ETI-015-CP Enhanced Transmission Reliability Moved out from 2015 Summer Moved out from 2017 Summer College Station SS: Create emergency tie point with ERCOT (asynchronous) ETI 2013 Spring Approved Construction Projected ISD moved to Spring Entergy has completed all possible work and is waiting on the City of College Station to complete their work. 10-ETI-017-CP 11-ETI CP 11-ETI-008-CP 11-ETI-036-CP Jasper to Rayburn 138 kv line: Upgrade line to 100 deg C design ETI 2013 Summer Approved Complete 5/14/13 Clarified project description Plantation to Conroe 138 kv line: Upgrade station equipment at Plantation ETI 2013 Summer Approved Complete 4/4/13 Cedar Hill to Plantation 138 kv line: Upgrade line conductor and station equipment at ETI 2013 Summer Approved Complete 2/21/13 Plantation Plantation to Conroe 138 kv line: Reconductor Line ETI 2013 Summer Approved Complete 4/4/13 CP (Others) Page 6 of 17 May, 2013

7 Draft Construction Plan Modified Construction Plan ID Removed Project Driver Project Name LE Proposed ISD (Planning) 2012 Funding Comments Project Status Actual ISD Other Comments 11-ETI-041-CP 11-ETI-043-CP 12-ETI-003-CP 11-ETI-020-CP 11-ETI-003-CP 12-ETI-004-CP 11-ETI-010-CP 13-ETI CP 13-ETI CP 11-ETI-033-CP 13-ETI-011-CP 11-ETI-042-CP 14-ETI-004-CP Eastgate to Dayton Bulk: Upgrade terminal equipment at Eastgate (formerly ETI 2013 Summer Approved Complete 4/19/13 reconductor) Expand Cap Bank at Calvert 69kV ETI 2013 Summer Approved Complete 5/8/13 Bentwater Substation: Add 138 kv Capacitor Bank ETI 2013 Summer Approved Complete 5/1/13 Hickory Ridge-Eastgate 138kV: Upgrade terminal equipment at Eastgate ETI 2013 Summer Approved Complete 4/5/13 Needed in 2016 Summer but being worked in conjunction with 11-ETI-041- CP Deweyville (JNEC) - Add 69 kv capacitor bank ETI 2013 Winter Proposed & In Delayed to Winter due to finalization of agreements Ponderosa Switching Station: tie lines Longmire to Fish Creek and Conroe to ETI 2013 Winter Approved Projected delayed to Winter due to site Woodhaven into new switching station acquistion Leach to Newton Bulk 138 kv line: Upgrade terminal equipment at Newton Bulk ETI 2013 Winter Proposed & In Complete 3/18/13 Pansy to Lovells Lake 69 kv line: Upgrade line to 100 deg design ETI 2013 Winter Proposed & In Lovells Lake to Texaco Hillebrandt 69 kv line: Upgrade line to 100 deg design ETI 2013 Winter Proposed & In Toledo Bend to Leach 138 kv - Upgrade line ETI 2014 Fall Proposed & In 2014 Fall DETEC project results in project acceleration by 3 years Lewis Creek to Egypt 138 kv line: Reconductor ETI 2014 Summer Proposed & In New 50.2 MVAR Cap Bank at Parkway 138kV ETI 2014 Summer Proposed & In Leach 138 kv Substation: DTEC add 138 kv breakers (To accommodate DTEC/TEXLA Tie Project to close normally open point) ETI 2014 Fall Proposed & In New DTEC Project resulting in associated ETI facility modifications 11-ETI-039-CP 12-ETI-007-CP 13-ETI-006-CP 11-ETI-018-CP 13-ETI CP 13-ETI CP 13-ETI-012-CP 11-ETI-023-CP Upgrade Jacinto - Splendora 138 kv Line ETI 2015 Summer Proposed & In Alden 138 kv Substation: Add Capacitor Bank ETI 2015 Summer Proposed & In Magnolia Groveton: Add 25.1 MVAR Cap Bank ETI 2015 Summer Proposed & In Accelerated from Horizon Plan (2021 Summer to 2015 Summer) Construct new China to Amelia 230kV line ETI 2016 Summer Approved Ponderosa to Grimes: Construct new 230 kv Line Add kv Auto at Grimes Add kv Auto at Ponderosa ETI 2016 Summer Approved Conroe to Ponderosa 138 kv line: Upgrade Line ETI 2016 Summer Approved Construct new Porter to Forest 138 kv transmission line - Construct new line from Porter to Oakridge area and tie into de-energized line Terminate line 403 into Forest 138 kv substation Orange County 230kV Project: Construct new Chisholm Road 230 kv substation, Construct new line from Hartburg to Chisholm Road, add 2nd Hartburg kv auto ETI 2016 Summer Proposed & In ETI 2017 Summer Proposed & In Project eliminates need for WRRIP-Add Alden SVC 11-ETI-022-CP 11-ETI-002-CP 12-ETI-009-CP Reconductor Sabine to Port Neches Bulk (Line 515) ETI 2017 Summer Proposed & In Sabine: Upgrade terminal equipment (Sabine to Big 3 line) ETI 2017 Summer Proposed & In CP (Others) Page 7 of 17 May, 2013

8 Draft Construction Plan Modified Construction Plan ID Removed Project Driver Project Name LE Proposed ISD (Planning) 2012 Funding Comments Project Status Actual ISD Other Comments 13-ETI-013-CP Egypt to Panorama 138 kv Line: Reconductor line ETI 2017 Summer Proposed & In Accelerated one year 11-ETI-037-CP 11-ETI-038-CP 14-ETI CP 12-ETI-006-CP 12-ETI-017-CP 11-ETI-026-CP 13-ETI-014-CP 14-ETI CP Construct new China to Stowell 138 kv line ETI 2018 Summer Proposed & In Reconductor Sabine to Port Neches Bulk (via Linde Line 516) ETI 2018 Summer Proposed & In Raywood Area Improvements ETI 2018 Summer Proposed & In Add 2nd kv Auto at Raywood Kolbs 230 kv - Add capacitor bank ETI 2018 Summer Proposed & In Gulfway 230 kv substation: Upgrade equipment on VFW Park 230 kv line bay ETI 2018 Summer Proposed & In Upgrade Splendora to Apollo 138 kv Line ETI 2019 Summer Proposed & In Panorama to Longmire 138 kv Line: Reconductor ETI 2019 Summer Proposed & In Raywood Area Improvements ETI 2019 Summer Proposed & In Construct 2nd Raywood to Daisetta 69 kv line (extend line 440 approximately 2.2 miles to Daisetta substation) Project need dependent on 13-ETI CP and 13-ETI CP Rolled in from Horizon Plan Rolled in from Horizon Plan Rolled in from Horizon Plan Accelerated one year from 2020 to Moved to CP CP (Others) Page 8 of 17 May, 2013

9 Addendum Horizon Projects [Beyond Construction Plan] Horizon Projects are projects identified in the annual 10 year reliability assesment but are not included in the current five year construction plan window. Final project scopes and timing may vary in future assessments. Page 9 of 17 May, 2013

10 Horizon Projects are projects identified in the annual 10 year reliability assessment but are not included in the current five year construction plan window. Final project scopes and timing may vary in future assessments. Horizon Project ID Project Driver Project Name LE Proposed Planning ISD Project Status Other Comments 12-EAI-014-HZ Mabelvale-Bryant: Reconductor 115kV line EAI 2020 Summer Conceptual (former Area) 12-EAI-033-HZ Hergett: Add 36 MVAR Capacitor Bank EAI 2020 Summer Conceptual 12-EAI-034-HZ Jonesboro to Jonesboro SPA reconductor line EAI 2020 Summer Conceptual 14-EAI-003-HP Ulm: Add 21.4MVAR capacitor Bank EAI 2021 Summer Conceptual Moved from Construction Plan 11-EAI-021-HZ Trumann-Trumann West- Upgrade 161 kv Line EAI 2021 Summer Conceptual (former Area) 13-EAI-001-HZ Pine Bluff McCamant- Pine Bluff East: Reconductor line EAI 2021 Summer Conceptual Moved from Construction Plan 13-EAI-002-HZ Pine Bluff Watson Chapel - Pine Bluff South: Rebuild line to 230 kv construction and operate at 115 kv EAI 2021 Summer Conceptual Moved from Construction Plan 13-EAI-005-HZ Bryant: Install 21.6 MVAR capacitor bank EAI 2021 Summer Conceptual 14-EAI-006-HZ Beebe - Garner: Build new 161kV line, Build new 161kV Garner sub - tap Copper Springs-Searcy S. line EAI 2021 Summer Conceptual section 14-EAI-007-HZ Wynne S: Install 24 MVAR capacitor bank EAI 2022 Summer Conceptual 14-EGL-008-HZ Krotz Springs - New Cap Bank EGSL 2019 Summer Conceptual 14-EGL-009-HZ Port Hudson to Fancy Point Lines 1 and 2 - Upgrade Port Hudson line bay bus and jumpers to breaker limit of 637 MVA for both lines EGSL 2019 Summer Conceptual Replaced by Crown Zellerbach Project in CP 12-EGL-001-HZ Juban: Construct a new 230 kv Distribution substation. (Formerly called Lockhart) EGSL 2020 Summer Conceptual Replaced by Flannery Project in CP 12-EGL-009-HZ Harleson to 372A Tap: Upgrade line EGSL 2020 Summer Conceptual Replaced by Flannery Project in CP 14-EGL-010-HZ Meaux to Abbeville - Upgrade Meaux Line bay bus EGSL 2020 Summer Conceptual 14-EGL-011-HZ Longfellow to Cade Switch - Construct new 69kV parallel line from New Iberia to Line 625A Tap Point. EGSL 2022 Summer Conceptual 14-EGL-012-HZ LeBlanc - New Cap Bank #2 EGSL 2022 Summer Conceptual 14-EGL-015-HZ Transmisison Reliability - Meaux to Abbeville - Reconductor Line EGSL 2022 Summer Conceptual 11-EGL-018-HZ Francis to Marydale: Upgrade 69 kv line EGSL 2023 Winter Conceptual Moved from Summer to Winter of EGL-013-HZ Serpent 69 kv Substation: Upgrade Lacassine to Carter 69kV conductor. EGSL 2023 Winter Conceptual 14-EGL-014-HZ Kaplan to Hunter - Upgrade Line EGSL 2024 Summer Conceptual 11-ELL-011-HZ 13-ELL-005-HZ Mt. Olive to Arcadia Project Construct new 230 kv line (operate at 115 kv) from Mt. Olive to Arcadia Add 115 kv breakers at Arcadia (formerly separate CP project 11-ELL-005-CP) ELL 2020 Summer Conceptual Included former project 11-ELL-005-CP into overall project. Modified project description Vienna to Ruston Frazier Road 115 kv Line 173: Upgrade metering CTs at Ruston ELL 2020 Summer Conceptual Accelerated 3 years Horizon Projects Page 10 of 17 May, 2013

11 Horizon Projects are projects identified in the annual 10 year reliability assessment but are not included in the current five year construction plan window. Final project scopes and timing may vary in future assessments. Horizon Project ID Project Driver Project Name LE Proposed Planning ISD Project Status 13-ELL-006-HZ Ninemile to Westwego 115 kv: Reconductor Line ELL 2020 Summer Conceptual Other Comments 14-ELL-002-HZ Sterlington 115 kv Substaton: Upgrde jumpers on the Sterlington to Walnut Grove 115 kv line (line 107) ELL 2020 Summer Conceptual 14-ELL-003-HZ 14-ELL-004-HZ 14-ELL-005-HZ 14-ELL-006-HZ 14-ELL-007-HZ Bayou Verret 230 kv Substation : Add 40.7 MVAR Capacitor Bank ELL 2020 Summer Conceptual Amite kv Auto: Change tap to ELL 2020 Winter Conceptual North Louisiana Improvement Project Phase 4 ELL 2021 Summer Conceptual Sacksonia to Winnsboro: Construct New 115 kv Line Ninemile to Harvey2 115 kv: Reconductor line and change station limiting elements ELL 2022 Summer Conceptual Ramsay 230 kv Substation: Add 40.7 MVAR Capacitor Bank ELL 2023 Winter Conceptual 14-ETI-002-HZ 14-ETI-003-HZ 12-ETI-008-HZ 13-ETI-015-HZ 13-ETI-020-HZ Transmission Reliability- 13-ETI-016-HZ 12-ETI-014-HZ 11-ETI-019-HZ 12-ETI-001-HZ 13-ETI-018-HZ 11-ETI-016-HZ 11-ETI-040-HZ Carroll St - Neches Line 1 ETI 2020 Summer Conceptual Carroll St - Neches line 2 ETI 2020 Summer Conceptual Upgrade Apollo to Porter 138 kv ETI 2021 Summer Conceptual Accelerated 2 years Eastgate 138 kv Substation: Add 37.7 MVAR Capacitor Bank ETI 2021 Summer Conceptual Jacinto to Cleveland 138 kv Line: Upgrade line bay risers at both Jacinto and Cleveland ETI 2021 Summer Conceptual (Needed in lieu of the former Cleveland Cut-in Project) Ponderosa to Fish Creek 138 kv: Reconductor ETI 2022 Summer Conceptual Amelia to Helbig: Reconductor Line ETI 2022 Summer Conceptual Moved from Construction Plan Cut Line 871 Jacinto to Splendora 138 kv line into the Cleveland 138 kv substation. ETI 2023 Summer Former Area Project Winshire 69 kv: Add capacitor bank ETI 2023 Summer Conceptual Dobbins 138 kv Substation: Add 25.1 MVAR capacitor bank ETI 2023 Summer Conceptual Add 2nd Cypress Auto 500/138kV ETI 2024 Summer Conceptual Moved from 2021 to 2024 Helbig to Chisolm Road - Reconductor with ACCC ETI 2024 Summer Conceptual Moved from 2022 to 2024 Horizon Projects Page 11 of 17 May, 2013

12 Horizon Projects are projects identified in the annual 10 year reliability assessment but are not included in the current five year construction plan window. Final project scopes and timing may vary in future assessments. Horizon Project ID Project Driver Project Name LE Proposed Planning ISD Project Status Other Comments 13-ETI-007-HZ Western Region Reliability Improvement Plan Phase 3 Final ETI 2024 Summer Conceptual Moved from 2021 to 2024 Construct new Cypress to Jacinto 230 kv Line with series compensation Horizon Projects Page 12 of 17 May, 2013

13 Addendum Areas areas are areas of interest that may require reliability improvements beyond the 10 year planning horizon. Page 13 of 17 May, 2013

14 areas are areas of interest that may require reliability improvements beyond the 10 year planning horizon. Project Driver Project Name LE Proposed Planning ISD Project Status Other Comments Bull Shoals - Midway 161 kv Line: Upgrade EAI TBD Conceptual Change Danville Auto tap to kv EAI TBD Conceptual Formerly 12-EAI-026-CP Cabot: Install 21.6 MVAR capacitor bank EAI TBD Conceptual Formerly 13-EAI-006-HZ Reconductor Arklahoma No. 2 to HS EHV East EAI TBD Conceptual Formerly 12-EAI-024-HZ Reconductor Arklahoma No. 1 to HS EHV West EAI TBD Conceptual Formerly 12-EAI-025-HZ El Dorado Upland - Texas Eastern F: New Line/ Texas Eastern F - TEF SS: Reconductor Line EAI TBD Conceptual Gobel Substation build at crossing point, Wabbaskeka Cap Bank, ULM Cap Bank - scope 2008 (Marvel EAI TBD Conceptual South) Gurdon: Add 21.6MVAR capacitor bank EAI TBD Conceptual Formerly 14-EAI-004-CP Highland 161 kv: Add 24 MVAR Cap Bank EAI TBD Conceptual Formerly 11-EAI-023-HZ. Holland Bottoms - Searcy Price Construct new line EAI TBD Conceptual Formerly 12-EAI-030 Holland Bottoms - Ward 115kV Line EAI TBD Conceptual Install Breakers at AECC Ward or Construct New N.O. Line Holland Bottoms to Jacksonville North: Reconductor 115 kv Line EAI TBD Conceptual Formerly 11-EAI-024-CP Jonesboro Area: Construct New 500/161 kv Substation EAI TBD Conceptual Lake Village Bagby - Macon 115 kv Line: Upgrade EAI TBD Conceptual LR Boyle Park-LR West: Upgrade Terminal Equipment EAI TBD Conceptual Formerly 12-EAI-012-HZ LR Kanis to LR Markham: Reconductor line EAI TBD Conceptual Formerly 12-EAI-031-CP LR Mann Road-LR Chicot: Upgrade Terminal Equipment EAI TBD Conceptual Formerly 12-EAI-013-HZ LR South-LR Rock Creek: Upgrade Terminal Equipment EAI TBD Conceptual Formerly 12-EAI-002-HZ LR West-LR Palm: Reconductor 115kV line EAI TBD Conceptual Formerly 12-EAI-009-CP Mabelvale-Bryant: Reconductor 115kV line EAI TBD Conceptual Formerly 12-EAI-014-CP Mabelvale-LR Kanis 115kV Reconductor EAI TBD Conceptual Formerly 11-EAI-019-CP Mayflower - Morgan 115 kv Line: Upgrade EAI TBD Conceptual Formerly 11-EAI-020-HZ NLR Westgate-LR Gaines: Reconductor 115kV line EAI TBD Conceptual Formerly 12-EAI-010-CP Paragould-Paragould South: Reconductor 161kV line EAI TBD Conceptual Formerly 12-EAI-011-HZ Areas Page 14 of 17 May, 2013

15 areas are areas of interest that may require reliability improvements beyond the 10 year planning horizon. Project Driver Project Name LE Proposed Planning ISD Project Status Other Comments Russellville East - Russellville North 161kV Line: Upgrade EAI TBD Conceptual Russellville East-Russellville North: Reconductor 161kV line EAI TBD Conceptual Formerly 12-EAI-006-CP Trumann-Trumann West- Upgrade 161 kv Line EAI TBD Conceptual Formerly 11-EAI-021-CP Upgrade Cheetah to Hot Springs Village 115 kv line EAI TBD Conceptual Formerly 12-EAI-029-CP Addis 69 kv loop improvement: Upgrade both kv autotransformers and upgrade 69 kv line EGSL TBD Conceptual Formerly 11-EGL-019-CP (Bourbeaux to Turnerville) Bronco - New 230 kv distribution substation (Formerly called Zachery) EGSL TBD Conceptual Formerly 12-EGL-006-CP Carlyss: Upgrade existing kv autos or add a third auto EGSL TBD Conceptual Formerly 12-EGL-002-CP Catalyst 69 kv Substation: Add capacitor bank EGSL TBD Conceptual Formerly 12-EGL-007-CP Champagne - Add 138 kv Capacitor Bank EGSL TBD Conceptual Colonial Springs: Add capacitor bank EGSL TBD Conceptual Formerly 12-EGL-013-HZ Construct new 69 kv line from Mossville to Alfol EGSL TBD Conceptual Convert Sunset Substation to 138 kv: Cut in Scott to East Opelousa 138 kv line. EGSL TBD Conceptual Formerly 12-EGL-005-HZ Greenwell Springs area reconfiguration (Coly-Polyform-Denham Springs) EGSL TBD Conceptual Harelson to Gloria - upgrade 69 kv line EGSL TBD Conceptual Formerly 11-EGL-002-CP Harleson to 372A Tap: Upgrade line EGSL TBD Conceptual Formerly 12-EGL-009-HZ Juban: Construct a new 230 kv Distribution substation. (Formerly called Lockhart) EGSL TBD Conceptual Formerly 12-EGL-001-HZ Lawtag-Jennings: Upgrade 69kV line EGSL TBD Conceptual LC Bulk - Chlomal 69 kv Line: Reconductor line EGSL TBD Conceptual Formerly 11-EGL-003-CP LC Bulk: Construct 230 kv facilities and add kv autotransformer (LC Loop Improvement Ph 2) EGSL TBD Conceptual Formerly 12-EGL-012-HZ Louisiana Station to Thomas 138 kv Upgrade Line EGSL TBD Conceptual Port Hudson to Fancy Point Lines 1 and 2 - Upgrade Port Hudson line bay bus and jumpers to breaker EGSL TBD Conceptual Formerly 14-EGL-009-HZ limit of 637 MVA for both lines Serpent 69 kv Substation: Upgrade capacitor bank to 11.2 MVAR EGSL TBD Conceptual Formerly 13-EGL-001-HZ Solac - Upgrade kv Autos or add 3rd transformer EGSL TBD Conceptual Arcadia to Sailes - Construct new 230 kv line (operate at 115 kv) ELL TBD Conceptual Formerly 11-ELL-013-HZ Areas Page 15 of 17 May, 2013

16 areas are areas of interest that may require reliability improvements beyond the 10 year planning horizon. Project Driver Project Name LE Proposed Planning ISD Project Status Other Comments DSG Reliability Improvements: Phase 3 ELL/ENOI TBD Conceptual Charity Church 230 kv: Add Capacitor Bank EMI TBD Conceptual Formerly 13-EMI-005-HZ Durant: Add Capacitor Bank EMI TBD Conceptual Formerly 13-EMI-002-CP Edwards to Bolton: Reconductor line EMI TBD Conceptual Formerly 13-EMI-003-HZ Gerald Andrus - Add 2nd kv autotransformer EMI TBD Conceptual Getwell Area Improvements Construct new 230 kv line from Getwell to new Senatobia Industrial kv substation. EMI TBD Conceptual Formerly 12-EMI CP Getwell Area Improvements Construct new Senatobia Industrial substation. Cut in Senatobia to Sardis 115 kv line into new substation and add new kv autotransformer EMI TBD Conceptual Formerly 12-EMI CP Reconductor E.Vicksburg-Edwards 115kV EMI TBD Conceptual Formerly 11-EMI-006-CP Upgrade South Jackson - East Jackson 115kV line EMI TBD Conceptual Paterson: Install 230/115 kv Auto ENOI TBD Conceptual Add Cap Bank at Huntsville 138kV ETI TBD Conceptual Formerly 11-ETI-017-HZ Amelia - Helbig 230 kv line: Upgrade station equipment at Amelia and Helbig to a minimum of 996 MVA ETI TBD Conceptual Formerly 13-ETI-017-HZ Bragg 138 kv Substation: Cut in Cypress to Rye 138 kv line ETI TBD Conceptual Formerly 13-ETI-019-HZ Buna to Evadale: Upgrade Line ETI TBD Conceptual Formerly 12-ETI-011-HZ Buna: Add capacitor bank ETI TBD Conceptual Formerly 12-ETI-010-HZ Construct new Jacinto to Porter 230 kv line and add 2nd auto at Porter ETI TBD Conceptual Cut Line 871 Jacinto to Splendora 138 kv line into the Cleveland 138 kv substation. ETI TBD Conceptual Formerly 11-ETI-019-CP Fork Creek to Turkey Creek: Upgrade to 100 deg C ETI TBD Conceptual Formerly 13-ETI-008-HZ Leach to Newton Bulk 138 kv - Reconductor line ETI TBD Conceptual Formerly 11-ETI-034-CP Liberty Sub: Add 25.1 MVAR Capacitor Bank ETI TBD Conceptual Formerly 13-ETI-002-CP Port Acres Bulke 230 kv: Add Capacitor Banks ETI TBD Conceptual Formerly 13-ETI-003-HZ Porter Substation: Upgrade line bay bus ETI TBD Conceptual Formerly 13-ETI-004-HZ Porter Var Support: Add 36 MVAR capacitor bank at Porter ETI TBD Conceptual Formerly 13-ETI-001-CP Areas Page 16 of 17 May, 2013

17 areas are areas of interest that may require reliability improvements beyond the 10 year planning horizon. Project Driver Project Name LE Proposed Planning ISD Project Status Other Comments Rayburn to Fork Creek: Upgrade to 100 deg C ETI TBD Conceptual Formerly 13-ETI-005-HZ Rayburn to Mill Creek: Upgrade Line ETI TBD Conceptual Formerly 12-ETI-012-HZ Stonegate: Add capacitor bank ETI TBD Conceptual Formerly 12-ETI-013-HZ Upgrade New Caney to Hickory Ridge 138 kv ETI TBD Conceptual Fromerly 12-ETI-005-HZ Western Region Reliability Improvement Plan : Add Alden SVC ETI TBD Conceptual Formerly 11-ETI-022-CP Orange to Hollywood 138 kv line - Upgrade Line ETI/EGL TBD Conceptual Areas Page 17 of 17 May, 2013

Entergy Texas, Inc. Transmission Draft Construction Plan Update 1 Projects

Entergy Texas, Inc. Transmission Draft Construction Plan Update 1 Projects Entergy Texas, Inc. Transmission 2014 2018 Draft Construction Plan Update 1 Projects 1 2014-2018 ETI Draft Construction Plan Update 1 Projects Completed in the Fall of 2012 & 2013 to date 1) Cedar Hill

More information

Entergy Final Construction Plan

Entergy Final Construction Plan Introduction Entergy 2013-2017 Final Construction Plan Project Driver Project Description Cost Allocation Guideline Project Category Block load addition Projects needed to accommodate the addition of block

More information

Entergy Final Construction Plan

Entergy Final Construction Plan Introduction Entergy 2012-2016 Final Construction Plan Project Driver Project Description Cost Allocation Guideline Project Category Block load addition Projects needed to accommodate the addition of block

More information

Monthly Construction Plan Project Status Report Report Date: 1/16/2014

Monthly Construction Plan Project Status Report Report Date: 1/16/2014 Monthly Construction Plan Report Report Date: 1/16/2014 EAI EMI ELL ENOI EGSL ETI EGSL/ELL ELL/ENOI ALL General Major Updates Added fifteen transmission reliability projects (SPOF and Under rated breakers).

More information

TEXAS ECONOMIC STUDY REPORT ICTES INFORMATIONAL ONLY

TEXAS ECONOMIC STUDY REPORT ICTES INFORMATIONAL ONLY TEXAS ECONOMIC STUDY REPORT ICTES-2011-001 INFORMATIONAL ONLY Prepared for: Entergy Service, Inc. (SPO) American Electric Power Service Corporation (AEPSC) GDS Associates, Inc. (GDS), as agent of East

More information

Entergy Gulf States, Inc. (Texas) Proposed Transmission Reliability Projects

Entergy Gulf States, Inc. (Texas) Proposed Transmission Reliability Projects Entergy Gulf States, Inc. (Texas) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 14, 2005 1 2004-06 EGSI-TX Transmission Western Region Reliability

More information

1. Administrative Items... SPP. 2. Stakeholder Web-Presentation... ABB

1. Administrative Items... SPP. 2. Stakeholder Web-Presentation... ABB Southwest Power Pool, Inc. ENTERGY REGIONAL STATE COMMITTEE MINIMIZING BULK POWER COSTS STUDY STAKEHOLDER MEETING Face-to-face & Web-conference Hyatt Regency DFW DFW Airport, TX Room: Maverick AGENDA July

More information

MTEP14 South SPM #2. MISO Texas Project Information. April 7, 2014

MTEP14 South SPM #2. MISO Texas Project Information. April 7, 2014 MTEP14 South SPM #2 MISO Texas Project Information April 7, 2014 MISO Southern Region EAST TEXAS ELECTRIC COOPERATIVE 2 East Texas Electric Cooperative (ETEC) No projects submitted for moving to Appendix

More information

Entergy Louisiana, LLC (South) & Entergy New Orleans, Inc. Proposed Transmission Reliability Projects

Entergy Louisiana, LLC (South) & Entergy New Orleans, Inc. Proposed Transmission Reliability Projects Entergy Louisiana, LLC (South) & Entergy New Orleans, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 13, 2006 1 Approved 2006 2010 ELL-South Transmission

More information

ICT Strategic Transmission Expansion Plan (ISTEP) Report. ICT Planning

ICT Strategic Transmission Expansion Plan (ISTEP) Report. ICT Planning ICT Strategic Transmission Expansion Plan (ISTEP) Report ICT Planning PUBLISHED: 12/04/2007 Table of Contents Table of Contents...1 I. Executive Summary...2 II. Objectives...4 III. A. Improving Load-Serving

More information

ICT Strategic Transmission Plan (ISTEP) Review and Status Update

ICT Strategic Transmission Plan (ISTEP) Review and Status Update ICT Strategic Transmission Plan (ISTEP) Review and Status Update Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans, Louisiana Douglas Bowman, PE Lead Engineer, ICT Planning 501-688-1640

More information

Market Congestion Planning Study (South)- Robustness Analysis. Economic Planning Users Group Meeting August 11 th, 2017

Market Congestion Planning Study (South)- Robustness Analysis. Economic Planning Users Group Meeting August 11 th, 2017 Market Congestion Planning Study (South)- Robustness Analysis Economic Planning Users Group Meeting August 11 th, 2017 Key Takeaways The benefit calculations were updated due to a flowgate rating correction

More information

SPP Reliability Coordinator TLR 5 Analysis Report for the ICT Reliability Area

SPP Reliability Coordinator TLR 5 Analysis Report for the ICT Reliability Area SPP Reliability Coordinator TLR 5 Analysis Report for the ICT Reliability Area MAINTAINED BY SPP Reliability Coordinator PUBLISHED: 10/11/2010 LATEST REVISION: 10/12/2010 Copyright 2010 by Southwest Power

More information

Southwest Power Pool, Inc. Entergy ENTERGY SPP RTO REGIONAL PLANNING PROCESS MEETING May 24, 2012 NET CONFERENCE AGENDA 10:00 AM 12:00 PM

Southwest Power Pool, Inc. Entergy ENTERGY SPP RTO REGIONAL PLANNING PROCESS MEETING May 24, 2012 NET CONFERENCE AGENDA 10:00 AM 12:00 PM Southwest Power Pool, Inc. Entergy ENTERGY SPP RTO REGIONAL PLANNING PROCESS MEETING May 24, 2012 NET CONFERENCE AGENDA 10:00 AM 12:00 PM 1. Administrative A. Introductions... All B. SPP Antitrust Guidelines...

More information

Monthly Long Term Transmission Plan Project Status Report

Monthly Long Term Transmission Plan Project Status Report Operating Company EAI EMI ELL ENOI ETI ALL Major Updates 1 project in service 1 project in service 5 projects in service No major changes 2 project in service 9 projects in service Entergy 11-EAI-015 4669

More information

Transmission Improvements Plan for 575 MW Network Service Request Wansley CC 7 Generation Facility (OASIS # ) Georgia Transmission Corporation

Transmission Improvements Plan for 575 MW Network Service Request Wansley CC 7 Generation Facility (OASIS # ) Georgia Transmission Corporation Transmission Improvements Plan for 575 MW Network Service Request CC 7 Generation Facility (OASIS # 143556) Georgia Transmission Corporation November 11, 2010 CC7 TIP 11-11-2010 (2).docx PROBLEM STATEMENT

More information

Western Area Power Administration Rocky Mountain Region Annual Progress Report. Projects. Weld Substation Stage 04

Western Area Power Administration Rocky Mountain Region Annual Progress Report. Projects. Weld Substation Stage 04 Western Area Power Administration Rocky Mountain Region 2014 Annual Progress Report Projects Weld Substation Stage 04 Lovell Yellowtail 115-kV rebuild Curecanti 230/115-kV 150 MVA transformer Terry Ranch

More information

Stability Study for the Mt. Olive Hartburg 500 kv Line

Stability Study for the Mt. Olive Hartburg 500 kv Line Stability Study for the Mt. Olive Hartburg 500 kv Line Peng Yu Sharma Kolluri Transmission & Distribution Planning Group Energy Delivery Organization Entergy Sevices Inc April, 2011 New Orleans, LA 1.

More information

Pacific Gas and Electric Company s Revised 2016 Annual Progress

Pacific Gas and Electric Company s Revised 2016 Annual Progress March 06, 2016 Mr. Philip Augustin Chair, WECC Technical Studies Subcommittee Mr. Enoch Davies WECC Technical Staff 155 North 400 West Salt Lake City, UT 84103-1114 Subject: Report Pacific Gas and Electric

More information

2018 Annual Progress Report to WECC Pacific Gas and Electric Company

2018 Annual Progress Report to WECC Pacific Gas and Electric Company 2018 Annual Progress Report to WECC Pacific Gas and Electric Company Waiver of Significant Transmission Project Status Table 1 and 2 update the planned transmission and generation projects, respectively,

More information

Pacific Gas and Electric Company s Revised 2015 Annual Progress

Pacific Gas and Electric Company s Revised 2015 Annual Progress March 02, 2015 Mr. Tracy Rolstad Chair, WECC Technical Studies Subcommittee Avista PO Box 3727 MSC-16 1411 East Mission Ave Spokane, WA 99220-3727 Mr. Enoch Davies WECC Technical Staff 155 North 400 West

More information

System Impact Study PID MW Plant

System Impact Study PID MW Plant System Impact Study PID 257 252 MW Plant Prepared by: Southwest Power Pool Independent Coordinator of Transmission 415 N. McKinley, Suite140 Little Rock, AR 72205 Rev Issue Date Description of Revision

More information

Status of PNM s Completed Transmission Construction Projects 11/30/2017

Status of PNM s Completed Transmission Construction Projects 11/30/2017 Status of s Completed Transmission Construction Projects Second Tah Ta Hey 115/345 kv Transformer Yah Ta Hey Switching Station On January 9, 2015, filed with the NMPRC under NMPRC Rule 440 information

More information

Twin Cities Minnesota Zone Meeting Xcel Energy. May 11, 2005 Bloomington, MN

Twin Cities Minnesota Zone Meeting Xcel Energy. May 11, 2005 Bloomington, MN Twin Cities Minnesota Zone Meeting Xcel Energy May 11, 2005 Bloomington, MN Overview of Presentation Xcel Energy Projects: Aldrich to St Louis Park 115 kv line Eden Prairie to Edina 115 kv line Eden Prairie

More information

Generation Deactivation Notification Update

Generation Deactivation Notification Update Generation Deactivation Notification Update Transmission Expansion Advisory Committee November 8, 2018 Generation Deactivations for 2018 2 Generation Deactivation ATSI Transmission Zones Bruce Mansfield

More information

Appendix B. Summary of Changes to the Year Assessment

Appendix B. Summary of Changes to the Year Assessment Appendix B Summary of Changes to the 2003 10- Assessment For the below tables, the following color-coding scheme was utilized for indicating what type of change has been made to the 10- Assessment from

More information

Chapter 7 - Appendix A

Chapter 7 - Appendix A Chapter 7 - Appendix A Transmission and Distribution Supplemental Information Table 7A.1 MTEP Transmission Projects in Missouri 1 Project Approved Project Title Project Description Category Estimated Cost

More information

March 18, Subject: Imperial Irrigation District 2014 Annual Progress Report - Rev 1

March 18, Subject: Imperial Irrigation District 2014 Annual Progress Report - Rev 1 Energy Division P.O. Box 937 333 E. Barioni Blvd. Imperial, CA 92251 www.iid.com March 18, 2014 Mr. Tracy Rolstad Chair, WECC Technical Studies Subcommittee Senior Power System Consultant Avista System

More information

East. Dalton Utilities. GTC (Georgia Transmission Corporation) MEAG (Municipal Electric Authority of GA) Southern Company Transmission

East. Dalton Utilities. GTC (Georgia Transmission Corporation) MEAG (Municipal Electric Authority of GA) Southern Company Transmission Southeastern Region Transmission Planning East Dalton Utilities GTC (Georgia Transmission Corporation) MEAG (Municipal Electric Authority of GA) Southern Company Transmission Southeastern Region Transmission

More information

Q0044 interconnection at

Q0044 interconnection at Generation Interconnection Feasibility Study Report for Q0044 interconnection at Utah County Utah on PacifiCorp s Transmission System (138 kv Transmission System) September 15, 2004 Page 1 1.0 Description

More information

MTEP13 SPM #2- Central Region. March 25, 2013

MTEP13 SPM #2- Central Region. March 25, 2013 MTEP13 SPM #2- Central Region Ameren Missouri March 25, 2013 Ameren Missouri Project Review Central Region: Ameren Missouri Ameren Missouri has a total of 10 project proposals that are recommended for

More information

ATC Year Asessment Network Project List. Zone 2 switching initiative ASAP*** Operating flexibility Proposed -- --

ATC Year Asessment Network Project List. Zone 2 switching initiative ASAP*** Operating flexibility Proposed -- -- ATC 20 10-Year Asessment Project List Project ACEC Dellwood Substation: Install line breakers to sectionalize Y- 146 20*** 20 1 T-D interconnection Planned A 7741 Zone 2 switching initiative ASAP*** 20

More information

Interconnection Feasibility Study Report Request # GI Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado

Interconnection Feasibility Study Report Request # GI Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado Executive Summary Interconnection Feasibility Study Report Request # GI-2016-6 Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado Public Service Company of Colorado Transmission

More information

South Dakota 890 Study

South Dakota 890 Study South Dakota 890 Study September 16, 2011 South Dakota 890 Study Presentation of 890 Study results from 2011 Includes WAPA suggested system improvements and timelines Stakeholder Feedback Questions? 2

More information

ATC Year Assessment Network Project List. MTEP Cost Reason for Change since Previous System Addition

ATC Year Assessment Network Project List. MTEP Cost Reason for Change since Previous System Addition TC 208 0- ssessment Network Project List 2 3 4 5 6 7 8 9 0 2 3 4 5 6 7 8 9 20 2 22 23 24 Sherman Street SS, DIC - Replace High Side Circuit Switcher 208*** 208 T-D Interconnection Proposed targeted 8 372

More information

South Carolina Electric and Gas Company Planned Transmission Projects $2M and above Total 5 Year Budget

South Carolina Electric and Gas Company Planned Transmission Projects $2M and above Total 5 Year Budget Project 1 of 28 Blythewood 115 kv Switching Station: Construct 03087A Construct Blythewood Switching Station with four 115 kv line terminals, with plans to expand to 230 kv at a future date. Fold in the

More information

Sub Regional RTEP Committee Mid-Atlantic

Sub Regional RTEP Committee Mid-Atlantic Sub Regional RTEP Committee Mid-Atlantic November 04, 2013 2013 RTEP Baseline Analysis Update 11/04/2013 AE Transmission Zone Cost Change for B2354 Install second 230/69kV transformer and 230kV circuit

More information

Black Hills Project Summary

Black Hills Project Summary 2016 Rule 3627 Report Black Hills Project Summary Page 1 of 38 Black Hills Project Summary Colorado PUC E-Filings System D 1 2016 Rule 3627 Report Black Hills Project Summary Page 2 of 38 Category Transmission

More information

SPP Notification to Construct

SPP Notification to Construct February 19, 2014 SPP Notification to Construct Mr. Mo Awad Westar Energy, Inc. P.O. Box 889 Topeka, KS 66601 RE: Notification to Construct Approved Reliability Network Upgrades Dear Mr. Awad, Pursuant

More information

East. Dalton Utilities. GTC (Georgia Transmission Corporation) MEAG (Municipal Electric Authority of GA) Southern Company Transmission

East. Dalton Utilities. GTC (Georgia Transmission Corporation) MEAG (Municipal Electric Authority of GA) Southern Company Transmission Southeastern Region Transmission Planning East Dalton Utilities GTC (Georgia Transmission Corporation) MEAG (Municipal Electric Authority of GA) Southern Company Transmission Southeastern Region Transmission

More information

Pacific Gas and Electric Company s 2013 Annual Progress Report

Pacific Gas and Electric Company s 2013 Annual Progress Report March 14, 2013 Mr. David Franklin Chair, WECC Technical Studies Subcommittee Southern California Edison 1 Innovation Way Pomona, CA 91768 Mr. Enoch Davies WECC Technical Staff 155 North 400 West Salt Lake

More information

Attached is Idaho Power s 2013 WECC Annual Progress Report. Please contact me if you have any questions.

Attached is Idaho Power s 2013 WECC Annual Progress Report. Please contact me if you have any questions. March 8, 2013 David Franklin Chair, Technical Studies Subcommittee Southern California Edison 1 Innovation Way Pomona, CA 91768 MHanson@idahopower.com (208) 388-2253 Enoch Davies Western Electricity Coordinating

More information

Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting

Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting BHE Wyoming Q4 Stakeholder Meeting November 17, 2016 @ 1:00PM MT Black Hills Energy Service Center 409 Deadwood Avenue, Rapid

More information

Supplemental Report on the NCTPC Collaborative Transmission Plan

Supplemental Report on the NCTPC Collaborative Transmission Plan Supplemental Report on the NCTPC 2007-2017 Collaborative Transmission Plan May 16, 2008 1 Table of Contents I. Executive Summary...1 II. Richmond-Fort Bragg Woodruff Street 230 kv Line...2 II.A. Need for

More information

Key to Status Fields in the Project List

Key to Status Fields in the Project List Key to Fields in the Project List Load Growth Interconnection Economic Reliability Concept Proposed Planned Under Construction In Cancelled N/A Backstop Too early TO Update Base case Increasing load served

More information

Falcon-Midway 115 kv Line Uprate Project Report

Falcon-Midway 115 kv Line Uprate Project Report Falcon-Midway 115 kv Line Uprate Project Report 12/1/2008 1 Background The function of this project is to uprate the 26.7 miles of Tri-State s 115 kv line between Midway and Falcon substations from 50

More information

Sub Regional RTEP Committee Mid-Atlantic

Sub Regional RTEP Committee Mid-Atlantic Sub Regional RTEP Committee Mid-Atlantic December 19, 2017 First Preliminary Review Baseline Reliability and Supplemental Projects 2 The slide was previously presented at 8/31/2017 and is replaced by the

More information

March 7, Subject: Southern California Edison 2011 Annual Progress Report

March 7, Subject: Southern California Edison 2011 Annual Progress Report March 7, 2011 Mr. Kyle Kohne Mr. Kent Bolton Chair, WECC Technical Studies Subcommittee WECC Technical Staff Bonneville Power Administration University of Utah Research Park P.O. Box 61409 615 Arapeen

More information

Sub Regional RTEP Committee Mid-Atlantic

Sub Regional RTEP Committee Mid-Atlantic Sub Regional RTEP Committee Mid-Atlantic July 26, 2016 Reliability Analysis Update MetEd Transmission Zone N-1 First Energy Planning Criteria (FERC Form 715): The North Boyertown West Boyertown 69 kv is

More information

Sub Regional RTEP Committee Mid-Atlantic

Sub Regional RTEP Committee Mid-Atlantic Sub Regional RTEP Committee Mid-Atlantic August 24, 2018 Proposal Window Exclusion Definitions The following definitions explain the basis for excluding flowgates and/or projects from the competitive planning

More information

Appendix D Black Hills Project Summary

Appendix D Black Hills Project Summary Page 1 of 28 Appendix D Black Hills Project Summary Table of Contents Black Hills Project Summary... D-1 Boone-Nyberg 115 kv Project... D-3 Rattlesnake Butte 115 kv Substation Terminal... D-6 Fountain

More information

Impacts of MISO DPP-2016-February (West, ATC, MI, South) Projects on PJM Facilities

Impacts of MISO DPP-2016-February (West, ATC, MI, South) Projects on PJM Facilities Impacts of MISO DPP-2016-February (West, ATC, MI, South) 1. MISO generators studied: Projects on PJM Facilities Net MW size (Summer) Net MW size (Winter) Service DPP Project Type Region Fuel Type POI J432

More information

South Carolina Electric and Gas Company Planned Transmission Projects $2M and above Total 5 Year Budget

South Carolina Electric and Gas Company Planned Transmission Projects $2M and above Total 5 Year Budget Project 1 of 34 Aiken Trans - Aiken Hampton 115 kv Line: Upgrade 1272A Upgrade the 115 kv line between Aiken and Aiken Hampton substations from 336 ACSR to 1272 ACSR. Total line length approximately 3.7

More information

Sub Regional RTEP Committee Mid-Atlantic

Sub Regional RTEP Committee Mid-Atlantic Sub Regional RTEP Committee Mid-Atlantic March 23, 2018 First Review Baseline Reliability and Supplemental Projects 2 AEC Transmission Zone: Supplemental Project 69/12kV Wenonah Substation Retire/Bypass

More information

Outer Metro 115 kv Transmission Development Study. (Scott Co, Carver Co and Hennepin Co)

Outer Metro 115 kv Transmission Development Study. (Scott Co, Carver Co and Hennepin Co) Outer Metro 115 kv Transmission Development Study. (Scott Co, Carver Co and Hennepin Co) Participants: Great River Energy Xcel Energy Inc. Executive Summary This study is done to address various load serving

More information

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015 No. Comment Submitted ISO Response Date Q&A Posted 1 Will the ISO consider proposals that are not within the impedance range specified? Yes. However, the benefits estimated and studies performed by the

More information

100 MW Wind Generation Project

100 MW Wind Generation Project A subsidiary of Pinnacle West Capital Corporation 100 MW Wind Generation Project CUSTOMER FINAL Feasibility Study Results By Transmission Planning, APS December 21, 2007 Executive Summary This Feasibility

More information

2013 ANNUAL PROGRESS REPORT

2013 ANNUAL PROGRESS REPORT March 1, 2013 Mr. David Franklin, Chairman WECC Technical Studies Subcommittee Southern California Edison 1 Innovation Way Pomona, CA 91768-2560 Mr. Enoch Davies WECC Technical Staff 155 North 400 West,

More information

Mid-Year Population Estimates for H-GAC Region Cities 1 Source: U.S. Census Bureau Released: May 2018

Mid-Year Population Estimates for H-GAC Region Cities 1 Source: U.S. Census Bureau Released: May 2018 Mid-Year Population Estimates for H-GAC Region Cities 1 Region 7,064,712 6,969,489 6,833,956 6,665,117 6,497,288 6,350,627 6,225,081 6,114,513 5,991,217 5,840,526 5,704,344 5,587,630 5,398,017 5,295,983

More information

North Oregon Coast Area Study. Adam Lint

North Oregon Coast Area Study. Adam Lint North Oregon Coast Area Study Adam Lint PAGE 2 North Oregon Coast System Overview - Clatsop Study Covers: Transmission Switching Stations (Clatsop District): Astoria Lewis and Clark 115 kv Distribution

More information

National Grid s 2017 Local Transmission Plan

National Grid s 2017 Local Transmission Plan National Grid s 2017 Local Transmission Plan Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line.

More information

Western Area Power Administration

Western Area Power Administration 2014/15 Integrated System (IS) 890 Local Planning Stakeholder Meeting #2 Western Area Power Administration Upper Great Plains Region Transmission Planning Stakeholder Meeting Wednesday, December 10 th,

More information

APPENDIX E: Project Need and Description

APPENDIX E: Project Need and Description APPENDIX E: Project Need and California ISO/MID E-1 Intentionally left blank California ISO/MID E-2 Lakeville 115 kv Bus Upgrade Installation of a sectionalizing breaker to be installed on 115 kv bus section

More information

Market Efficiency Update

Market Efficiency Update Market Efficiency Update Transmission Expansion Advisory Committee July 13, 2017 Agenda Where we are in the process Interregional Projects Status RPM Projects Status Reevaluation Analysis Status Next Steps

More information

First Energy Generator Deactivation Request - January Deactivation Study Results and Required Upgrades April 25, 2012

First Energy Generator Deactivation Request - January Deactivation Study Results and Required Upgrades April 25, 2012 First Energy Generator Deactivation Request - January 2012 Deactivation Study Results and Required Upgrades April 25, 2012 General PJM received a notice on January 26, 2012 from FirstEnergy of its intent

More information

Sub Regional RTEP Committee Western Region ATSI

Sub Regional RTEP Committee Western Region ATSI Sub Regional RTEP Committee Western Region ATSI February 20, 2019 1 ATSI Needs Stakeholders must submit any comments within 10 days of this meeting in order to provide time necessary to consider these

More information

2016 SPP Transmission Expansion Plan Project List Kansas Projects

2016 SPP Transmission Expansion Plan Project List Kansas Projects WR Zonal Reliability $9,308,090 Build 6.7 mile Clay Center Switching Station to TC Riley 115 kv line 6/1/2018 10/1/2012 115 6.7 Install a 2000 Amp bus system, GOAB switches, metering and WR Zonal Reliability

More information

SERTP rd Quarter Meeting

SERTP rd Quarter Meeting 2015 SERTP SERTP 2015 3 rd Quarter Meeting 2nd RPSG Meeting September 24 th, 2015 APC Headquarters Birmingham, AL 2015 SERTP Process Information The SERTP process is a transmission planning process. Please

More information

Reliability Analysis Update

Reliability Analysis Update Reliability Analysis Update Transmission Expansion Advisory Committee October 11, 2018 Proposal Window Exclusion Definitions The following definitions explain the basis for excluding flowgates and/or projects

More information

BC Hydro System 2011 Annual Progress Report

BC Hydro System 2011 Annual Progress Report March 1, 2011 Mr. Kyle R. Kohne, Chairman WECC Technical Studies Subcommittee Bonneville Power Administration P.O. Box 491 MS, TPP-OPP-3 Vancouver, WA 98666 Mr. Kent Bolton WECC Technical Staff 155 North

More information

National Grid s 2018 Local Transmission Plan

National Grid s 2018 Local Transmission Plan National Grid s 2018 Local Transmission Plan Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line.

More information

Updates and Modifications to Report

Updates and Modifications to Report QUARTERLY COMPLIANCE REPORT (JULY 2015) OF SOUTHERN CALIFORNIA EDISON COMPANY (U 338-E) REGARDING STATUS OF TRANSMISSION PROJECTS AND GENERATION INTERCONNECTION PROJECTS Pursuant to Commission Decision

More information

Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers

Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers Puget Sound Area Study Team Bonneville Power Administration, Puget Sound Energy, Seattle City Light,

More information

Kiwanis International

Kiwanis International Page 1 of 11 Missouri-Arkansas 01 Division 1 K01274 Canton MO 21 21 21 21 21 21 21 21 21 21 21 0.00 K02289 Hannibal MO 60 60 59 59 59 59 58 59 62 62 62 3.33 +2 K08858 Hannibal, Early Birds MO 40 42 41

More information

South Carolina Regional Transmission Planning. Stakeholder Meeting. Web Conference

South Carolina Regional Transmission Planning. Stakeholder Meeting. Web Conference South Carolina Regional Transmission Planning Stakeholder Meeting Web Conference June 1, 2017 2:00 4:00 PM 1 Purpose and Goals for Today s Meeting Review of Current Transmission Expansion Plans Update

More information

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation Prepared by: Entergy Services, Inc. T & D Planning L-ENT-17A 639 Loyola Avenue New Orleans, LA 70113 Rev Issue Date

More information

State Regulatory Affairs and Local Relations Update. ATC Customer Meeting November 19, 2009

State Regulatory Affairs and Local Relations Update. ATC Customer Meeting November 19, 2009 State Regulatory Affairs and Local Relations Update ATC Customer Meeting November 19, 2009 Project Certification Steve Parker Manager State Regulatory Affairs CA/CPCN Applications (Filed/Ordered/Under

More information

THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS

THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS 2/27/2018 ELECTRIC TRANSMISSION PLANNING Table of Contents Table of Contents... 2 Executive

More information

Sub Regional RTEP Committee Mid-Atlantic

Sub Regional RTEP Committee Mid-Atlantic Sub Regional RTEP Committee Mid-Atlantic September 24, 2014 1 Reliability Analysis Update 2 AE Transmission Zone Generation Deliverability Violation: The Middle 230/69 kv is overloaded for line fault stuck

More information

Rocky Mountain Power Five Year Study Findings & Kick Off Meeting

Rocky Mountain Power Five Year Study Findings & Kick Off Meeting 2000 PACIFICORP PAGE 1 Attachment K Rocky Mountain Power Five Year Study Findings & Kick Off Meeting Thursday, June 9 th 2016 2000 PACIFICORP PAGE 2 Rocky Mountain Power Area Transmission Planning Manager:

More information

Interconnection Feasibility Study Report GIP-157-FEAS-R2

Interconnection Feasibility Study Report GIP-157-FEAS-R2 Interconnection Feasibility Study Report GIP-157-FEAS-R2 System Interconnection Request #157 100.5 MW Wind Generating Facility Guysborough County (L-6515) 2009 09 14 Control Centre Operations Nova Scotia

More information

Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood

Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood Prepared for: SCE&G Fossil/Hydro June 30, 2008 Prepared by: SCE&G Transmission Planning Table of Contents

More information

Transmission Planning & Engineering P.O. Box MS 3259 Phoenix, Arizona

Transmission Planning & Engineering P.O. Box MS 3259 Phoenix, Arizona Transmission Planning & Engineering P.O. Box 53933 MS 3259 Phoenix, Arizona 85072-3933 March 9, 2016 Mr. Philip Augustin Chair, WECC Technical Studies Subcommittee Mr. Enoch Davies WECC Technical Staff

More information

APPENDIX E: Project Need and Description

APPENDIX E: Project Need and Description APPENDIX E: Project Need and California ISO/MID E-1 Intentionally left blank California ISO/MID E-2 Tyler 60 kv Shunt Capacitor Installation of a 2x10 MVAR capacitor bank at Tyler 60 kv bus Objectives

More information

APPENDIX I: Description and Functional Specifications for Transmission Facilities Eligible for Competitive Solicitation

APPENDIX I: Description and Functional Specifications for Transmission Facilities Eligible for Competitive Solicitation APPENDIX I: Description and Functional Specifications for Transmission Facilities Eligible for Competitive Solicitation Intentionally left blank F1 Description and Functional Specifications of Proposed

More information

Market Efficiency RTEP Proposal Window

Market Efficiency RTEP Proposal Window Market Efficiency RTEP Proposal Window Market Efficiency RTEP Proposal Window Status Window opened on 8/12/2013 Closed on 9/26/2013 17 individual proposals addressing congestion from Market Efficiency

More information

FACILITIES STUDY ICTT TRANSMISSION SERVICE FACILITIES STUDY OASIS

FACILITIES STUDY ICTT TRANSMISSION SERVICE FACILITIES STUDY OASIS TRANSMISSION LINE & SUBSTATION PROJECTS COMPANY: ENTERGY SERVICES, INC. CUSTOMER: EAST TEXAS ELECTRIC COOPERATIVE (ETEC) FACILITIES STUDY EJO NO. F4PPTX0068 ICTT-2011-003 TRANSMISSION SERVICE FACILITIES

More information

Updates and Modifications to Report

Updates and Modifications to Report QUARTERLY COMPLIANCE REPORT (OCTOBER 2016) OF SOUTHERN CALIFORNIA EDISON COMPANY (U 338-E) REGARDING STATUS OF TRANSMISSION PROJECTS AND GENERATION INTERCONNECTION PROJECTS Pursuant to Commission Decision

More information

FACILITIES STUDY TRANSMISSION SERVICE REQUEST OASIS

FACILITIES STUDY TRANSMISSION SERVICE REQUEST OASIS TRANSMISSION / DISTRIBUTION PROJECTS COMPANY:EAI CUSTOMER: CARTHAGE WATER & ELECTRIC FACILITIES STUDY EJO # F4PPAR0436 ICTT-2007-179 TRANSMISSION SERVICE REQUEST OASIS 1498226 Revision: 1 Rev Issue Date

More information

APPENDIX F: 2012 Request Window Submittals

APPENDIX F: 2012 Request Window Submittals APPENDIX F: 2012 Request Window Submittals Table F-1: 2012 Request Window Submittals Project Name Service Submitted by 1 Lockeford-Lodi 230 kv Development City of Lodi, Electric Utility Department 5/31/2017

More information

FACILITIES STUDY CONSTELLATION ENERGY TRANSMISSION SERVICE REQUEST OASIS

FACILITIES STUDY CONSTELLATION ENERGY TRANSMISSION SERVICE REQUEST OASIS TRANSMISSION / DISTRIBUTION PROJECTS COMPANY:EAI CUSTOMER: CONSTELLATION ENERGY FACILITIES STUDY EJO # F4PPAR0434 ICTT-2007-177 CONSTELLATION ENERGY TRANSMISSION SERVICE REQUEST OASIS 1498122 Revision:

More information

Process Timeline. Area Bubbles. Legend. Problem Area that have been resolved. Recurring Areas from previous System Assessment.

Process Timeline. Area Bubbles. Legend. Problem Area that have been resolved. Recurring Areas from previous System Assessment. Process Timeline Legend Problem Area that have been resolved Recurring Areas from previous System Assessment New Areas Area Bubbles Flows Modeled for One-Year Heavy Winter Peak Conditions Base Case Conditions

More information

ATTACHMENT B - Table 1: LIST OF MANAGEMENT-APPROVED PROJECTS UNDER $50M

ATTACHMENT B - Table 1: LIST OF MANAGEMENT-APPROVED PROJECTS UNDER $50M of Need In-service Cost Alternatives Service Projects in PG&E Service Territory Mare Island - Ignacio 115 kv NERC Category 2010 Reconductor the limiting 19 $19M Connect Highway May 2012 Line re-rates and

More information

Southeast Louisiana 115kV Transmission Upgrades. Westwego, LA

Southeast Louisiana 115kV Transmission Upgrades. Westwego, LA Southeast Louisiana 115kV Transmission Upgrades Westwego, LA Safety & Diversity 1 Safety is the cornerstone of Entergy s culture. We start every work day with a safety focus to create and sustain a safe,

More information

FACILITIES STUDY TRANSMISSION SERVICE REQUESTS OASIS

FACILITIES STUDY TRANSMISSION SERVICE REQUESTS OASIS TRANSMISSION / DISTRIBUTION PROJECTS COMPANY:EGSI -LA CUSTOMER: NRG FACILITIES STUDY EJO # F4PPGS0411 TRANSMISSION SERVICE REQUESTS OASIS 1521373 Revision: 0 Issue Revised Project Rev Description of Revision

More information

Sub Regional RTEP Committee - Southern. August 19, 2011

Sub Regional RTEP Committee - Southern. August 19, 2011 Sub Regional RTEP Committee - Southern August 19, 2011 2011 RTEP Analysis Summary 2010 2015 Project Updates 2016 Analysis NERC Category A, B NERC Category C (N-1-1 in progress) Load Deliverability Generator

More information

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC OCTOBER 22, 2014 Emera Maine s Local System Plan Bangor Hydro District Needs Assessment/Potential Solutions Local Planning Advisory Committee Meeting E M i R t ti Emera Maine Representative: Jeffrey Fenn,

More information

Feasibility Study. Shaw Environmental, Inc. 12MW Landfill Gas Generation Interconnection. J.E.D. Solid Waste Management Facility. Holopaw Substation

Feasibility Study. Shaw Environmental, Inc. 12MW Landfill Gas Generation Interconnection. J.E.D. Solid Waste Management Facility. Holopaw Substation Feasibility Study Shaw Environmental, Inc. 12MW Landfill Gas Generation Interconnection J.E.D. Solid Waste Management Facility Holopaw Substation September 2013 1 of 12 Table of Contents GENERAL... 3 SHORT

More information

Transmission Expansion Advisory Committee (TEAC) Recommendations to the PJM Board

Transmission Expansion Advisory Committee (TEAC) Recommendations to the PJM Board Transmission Expansion Advisory Committee (TEAC) Recommendations to the PJM Board PJM Staff Whitepaper October 2013 EXECUTIVE SUMMARY On December 5, 2012 the PJM Board of Managers approved changes to the

More information

Market Efficiency RTEP Proposal Window

Market Efficiency RTEP Proposal Window Market Efficiency RTEP Proposal Window Market Efficiency RTEP Proposal Window Status Window opened on 8/12/2013 Closed on 9/26/2013 17 individual proposals addressing congestion from Market Efficiency

More information