1 TEXAS ECONOMIC STUDY REPORT ICTES INFORMATIONAL ONLY Prepared for: Entergy Service, Inc. (SPO) American Electric Power Service Corporation (AEPSC) GDS Associates, Inc. (GDS), as agent of East Texas Electric Cooperative, Inc. ( ETEC ), Tex-La Electric Cooperative of Texas, Inc. (TEXL), and Northeast Texas Electric Cooperative, Inc. (NTEC) Prepared by: Southwest Power Pool Independent Coordinator of Transmission 201 Worthen Drive Little Rock, Arkansas Rev Issue Date Description of Revision 0 8/01/2012 Final Step 1Study Report
2 TABLE OF CONTENTS 1. EXECUTIVE SUMMARY DESCRIPTION OF PROBLEM ASSUMPTIONS Power-flow Models Model Change Model(s) STUDY PROCESS Power-flow model analysis Economic Study Analysis SOLUTION SETS Quarry Rivtrin 345 kv Solution Set kv Alternative Solution Set Grimes Mt. Zion 138 kv Solution Set Grimes Huntsville 138 kv Solution Set Grimes Ponderosa 230 kv Solution Set POWERFLOW STUDY DATA ECONOMIC STUDY DATA Quarry Rivtrin Economic Study Information Economic Analysis Projects Included in the Economic Study Models Projects include in the B/C calculations APC Breakdown Additional gates Added kv Solution Economic Study Information Economic Study Projects Included in the Economic Study Models Projects Included in the B/C Calculations Grimes Mt. Zion Economic Study Information Economic Study Projects Included in the Economic Study Models
3 7.3.3 Projects Include in the B/C calculations Grimes Huntsville Economic Study Information Economic Study Projects Included in the Economic Study Models Projects Include in the B/C calculations Grimes - Ponderosa Economic Study Information Economic Study Projects Included in the Economic Study Models Projects Include in the B/C calculations Additional gates Added SUMMARY APPENDIX A LIST OF PRIORS APPENDIX B ECONOMIC STUDY ASSUMPTIONS Fuel Price Forecast Summary Wheeling Charges Emission Rates APPENDIX C METRIC CALCULATION How is the APC calculated? Import/Export Cost Calculation APC-d Benefit-to-Cost-Ratio APPENDIX D ENTERGY APPROVED CONSTRUCTION PLAN PROJECTS
4 1. EXECUTIVE SUMMARY This study reviews constraints identified through System Impact Studies (SIS) and Affected Systems Studies (AFS) in the Entergy Texas region. In accordance with Section 14 of Attachment K of the Entergy OATT, this study was commissioned in order to determine upgrades in the area that will increase transfer capability. Those upgrades have also been assessed to determine what, if any, economic benefits in terms of production cost reduction that they may provide. This report identifies constraints, reviews potential solution sets, and provides planning level cost estimates as well as an evaluation of the economic benefits of each solution set. Through this study process, a number of transmission solution sets have been developed. Those solutions sets have been evaluated in order to determine if a) those upgrades will relieve the N-1 overloads that are seen with the inclusion of the selected transmission service requests, and b) what reduction in congestion and production cost these upgrades may have. The results are summarized in the table below. The projects and results are described in more detail in the body of the report. Table 1: Summary of Results Solution Set Cost Estimate Relieves N-1 Overloads? APC B/C Ratio (2015) APC B/C Ratio (2020) Quarry Rivtrin 345 kv $84,590,215 Yes kv Alternative $141,780,842 Yes Grimes Mt. Zion 138 kv $14,966,895 No Grimes Huntsville 138 kv $24,442,906 No Grimes Ponderosa 230 kv $82,279,000 Yes d upon the results of this study, the study participants will have the option of entering into a more detailed study of selected solution set(s) in order to arrive at a more detailed breakdown of the benefits associated with the projects and to arrive at a cost allocation for the selected upgrades. Note that this study is for informational purposes only and does not guarantee the availability of Available Transfer Capability (ATC) or Rollover Rights (ROR). 2. DESCRIPTION OF PROBLEM Several constraints in the Texas Region have been identified from the following Transmission Service Requests: OASIS , OASIS , OASIS , OASIS , SPP OASIS , SPP OASIS , SPP OASIS , SPP OASIS _1004_1007_1231_1265, and SPP OASIS
5 3. ASSUMPTIONS 3.1 Power-flow Models Model A. Entergy s 2010 Series Update 3 Models. a Summer / Winter Peak case b Summer / Winter Peak case c Summer / Winter Peak case B. Includes 2011 Approved Construction Plan (CP) projects and commitments to fund Supplemental Upgrades available at the time of the study. The Case Models were modified with SPP Priority Projects, and SPP Balanced Portfolio Projects. Also, the ETEC Load Forecast was updated in the Case Models Change Model(s) A. Entergy Proposed / Horizon projects were considered to relieve constraints. B. Considered any other additional transmission upgrades to relieve constraints. 4. STUDY PROCESS This study is a High-Level Analysis (Step1), as described below. d upon the outcome of the Step1 analysis, Customers may choose to have their TSRs studied further in the Step 2 analysis. 4.1 Power-flow model analysis A high-level full AC contingency analysis (N-1) will be performed on the base and change models. There will be no TRM included in the analysis. The contingency scan will include NERC Category A and B events. Details on monitored elements and Category A and B events can be found in the Contingency Scan. The thermal and voltage violations thresholds are the same as those specified for the NERC Reliability Standard TPL-001 and -002 contingency evaluations in which facility loadings must be within their normal rating (RATE A) or emergency rating (RATE B), consistent with the applicable rating as determined and consistently applied by SPP, ICT and/or Entergy. The monitored and contingent element list will include all transmission facilities at 115kV or higher. 4.2 Economic Study Analysis Economic modeling, simulations, and results will be developed using GridView (GV), developed by ABB Inc. In general, GV is a database-driven software package that uses a linear programming approach for economic simulation of electric power systems. Its application is for generation and transmission expansion planning, market simulation, and production cost modeling. GV uses a Security Constrained Unit Commitment and 5
6 Economic Dispatch (SCUC&ED) to simulate the most economic generation dispatch while observing system security constraints. The economic analysis will also be conducted in Step 2. Adjusted Production Cost1 (APC)-based Benefit-to-Cost (B/C) ratio metric has been calculated below. The APCbased B/C refers to the reduction in APC due to a project divided by carrying charge rate of the planning cost estimate of the project. Ideal APC-based B/C ratio would be greater than 1. A ratio of 1 or greater would imply that they reduction in APC would be equal to or greater than the annual transmission revenue requirement for the upgrade. 5. SOLUTION SETS This section will detail those solution sets that have been evaluated as part of this study. Planning level cost estimates have been provided for these upgrades, as well as a description of the projects that are included in each solution set. 5.1 Quarry Rivtrin 345 kv Solution Set The main project in this solution set is the Quarry Rivtrin 345 kv project, along with several supporting projects. The Quarry - Rivtrin project consists of tapping the existing Crockett Grimes 345 kv line, installing a new 345 kv switching station at Quarry, and building nine (9) miles of new 345 kv line from Quarry to the existing Rivtrin station. A 345/138 kv transformer would be added at Rivtrin to step down to the 138 kv system. A diagram of that option is displayed below. In addition to the Quarry project, several smaller system reinforcements are needed to address other overloads in the area. All of the required upgrades for this solution set, along with their costs are listed below. 1 Adjusted Production Cost (APC) is a measure of the impact on production cost savings by using LMPs, accounting for purchases and sales of energy between each area. This metric compares adjusted production cost with and without transmission solutions. A negative value means that a reduction in transmission congestion decreased generation production cost. In theory, production cost will decrease when constraints are removed from the system. 6
7 Figure 1 - Quarry - Rivtrin Project Table 2: Quarry Rivtrin Solution Set and Cost Estimates MAJOR ELEMENTS COSTS SCHEDULE % Quarry Rivtrin 345kV Project $79,697,735 3 years Egypt Panorama Line $1,429,120 2 years Panorama Longmire Line $3,363,360 2 years Rivtrin Walker Line $100,000 1 year 4L558TP91 Wyntex 4L558TP85 Line O&M 1 month Upgrade Toledo Bend Leach Line (ISD Summer 2017) Ponderosa Switching Station Mossville Cut in Nelson to Carlyss Line New Moss Bluff Nelson Line Cedar Hill Plantation Line Plantation Conroe Line DTEC Project NONE TOTAL: $84,590,215* (ISD Summer 2013) (ISD Summer 2013) (ISD Summer 2012) (ISD Summer 2013) (ISD Summer 2013) DTEC Project (ISD 2015) * Note: The costs identified above are estimates, but do not include an additional +/- 30% for tax gross up, which may be applicable should the customer elect to proceed with the upgrades. Detailed cost estimates and solutions for the major elements would be provided in the Step 2 study. % The schedule estimates are planning estimates only. 7
8 Table 3: Upgrade Description No. Upgrade Description 1 Tap Grimes Crocket 345kV Line with the Quarry substation, build 345kV line from Quarry to Rivtrin, and install 345/ Autotransformer at Rivtrin. Capacity created by this upgrade is 525MW on the Rivtrin 345/ autotransformer and 1326MW from Quarry to Rivtrin 345kV Line. 2 Upgrade 1.16 miles of transmission line from Egypt to Panorama. 3 Upgrade 2.73 miles of transmission line from Panorama to Longmire. 4 5 Replace line bay buses at Walker. Closed transmission line from 4L558TP91 to Wyntex and open transmission line from 4L558TP85 to Wyntex. 6 Upgrade 2.26 miles of transmission line from Toledo Bend to Leach. 7 Tie together Longmire Fish Creek and Conroe Woodhaven stations at West Conroe Switching Station. Upgrade miles of transmission line from Longmire to Conroe. 8 Cut Nelson to Carlyss line into Mossville substation. 9 Build new Nelson to Moss Bluff 230kV. 10 Upgrade 3.13 miles of transmission line from Cedar Hill to Plantation. 11 Upgrade 2.93 miles of transmission line from Plantation to Conroe. The existing conductor needs to be upgraded to at least 1272 MCM ACSR, which gives a line rating of 316MVA and 1322A. The existing conductor needs to be upgraded to at least 1272 MCM ACSR, which gives a line rating of 316MVA and 1322A. Upgrade the line bay buses at Walker, which gives a line rating on Rivtrin Walker of 140MVA and 585A. The switching scheme reduces the flow on the 4L558TP91 Huntsville line. The existing conductor needs to be upgraded to at least 954 MCM ACSR, which gives a line rating of 265MVA and 1109A. The existing conductor needs to be upgraded to at least ACSR, which gives a line rating of 205MVA and 858A. Capacity created by this upgrade is 0MW. Capacity created by this upgrade is 704MW. The existing conductor needs to be upgraded to at least MCM ACSR, which gives a line rating of 478MVA and 2000A. The existing conductor needs to be upgraded to at least MCM ACSR, which gives a line rating of 478MVA and 2000A. 12 Build new line from Etoile to Chireno, set Leach to Six Mile in-service, convert Tenaha to Martinsville to, and build new line from Chireno to Martinsville. Capacity created by this project is 902MW. 8
9 kv Alternative Solution Set Instead of constructing one bulk project, this alternative examined upgrading the existing system to accommodate the transfers. As such, there are a number of 138 kv line upgrades included in this option. The projects are diagramed below, and a table is included that provides the list of projects and the cost estimates. Figure kv Alternative Solution Table 4: 138 kv Alternative Solution Set and Cost Estimates MAJOR ELEMENTS COSTS SCHEDULE % New 3 rd 345/ Grimes $24,668,806 3 years Upgrade Grimes Bentwater Line $21,629,995 2 years Upgrade Grimes Mt. Zion Wyntex Tap Line $20,132,921 2 years Upgrade Grimes Magnolia Anderson Sota Navasota Line $32,697,280 2 years Upgrade Tubular Dobbin Line $19,724,320 2 years Upgrade Porter Apollo Line $22,927,520 2 years Upgrade Mossville - Nelson Line (ISD Summer 2013) 9
10 MAJOR ELEMENTS COSTS SCHEDULE % New Moss Bluff Nelson 230kV Line Upgrade Toledo Bend Leach Line Ponderosa Switching Station Orange County Upgrade Cedar Hill Plantation Line Upgrade Plantation Conroe Line Jacinto Splendora Project Upgrade Jacinto Splendora Line Upgrade Splendora Apollo Line DTEC Project NONE TOTAL COST: $141,780,842* (ISD Summer 2012) (ISD Summer 2017) (ISD Summer 2013) (ISD Summer 2017) (ISD Summer 2013) (ISD Summer 2013) (ISD Summer 2017) (ISD Summer 2016) (ISD Summer 2016) DTEC Project (ISD 2105) * Note: The costs identified above are estimates, but do not include an additional +/- 30% for tax gross up, which may be applicable should the customer elect to proceed with the upgrades. Detailed cost estimates and solutions for the major elements would be provided in the Step 2 study. % The schedule estimates are planning estimates only. Table 5: Upgrade Description No. Upgrade Description Install 345/ autotransformer at Grimes. Upgrade miles of transmission line from Grimes - Bentwater. Upgrade miles of transmission line from Grimes - Mt. Zion. Upgrade 5.35 miles of transmission line from Mt. Zion - Wyntex Tap. Upgrade miles of transmission line from Grimes to Magnolia Anderson. Upgrade 7.46 miles of transmission line from Magnolia Anderson to Sota. Replace line relays at Navasota. Capacity created by this upgrade is 525MW on the 3 rd Grimes 345/ autotransformer. The existing conductor needs to be upgraded to at least 1272 MCM ACSR, which gives a line rating of 312MVA and 1304A. The existing conductors from Grimes to Mt. Zion and Mt. Zion to Wyntex Tap need to be upgraded to at least MCM ACSR, which gives a line rating of 339 MVA and 1418A. The existing conductors from Grimes to Magnolia Anderson and Magnolia Anderson to Sota need to be upgraded to at least 954 MCM ACSR, which gives a line rating of 265 MVA and 1108A. The existing conductor from Sota to Navasota needs line relays replaced at Navasota, which gives a line rating of 243 MVA and 1017A. 10
11 No. Upgrade Description Upgrade miles of transmission line from Tubular to Dobbin. Upgrade miles of transmission line from Porter to Apollo. Cut Nelson to Carlyss line into Mossville substation. The existing conductor from Tubular to Dobbin needs to be upgraded to at least MCM ACSR, which gives a line rating of 206 MVA and 860A. The existing conductor needs to be upgraded to at least 1272 MCM ACSR, which gives a line rating of 312MVA and 1304A. Capacity created by this upgrade is 0 MW. 8 Build new Nelson to Moss Bluff 230kV. Capacity created by this upgrade is 704 MW Upgrade 2.26 miles of transmission line from Toledo Bend to Leach. Tie together Longmire Fish Creek and Conroe Woodhaven stations at West Conroe Switching Station. Upgrade miles of transmission line from Longmire to Conroe. Cut Sabine Georgetown 230kV line into new substation called Chisholm Road. Add new Hartburg Chisholm Road 230kV line and 2 nd 500/230kV autotransformer at Hartburg. Upgrade 3.13 miles of transmission line from Cedar Hill to Plantation. Upgrade 2.93 miles of transmission line from Plantation to Conroe. The existing conductor needs to be upgraded to at least 954 MCM ACSR, which gives a line rating of 265MVA and 1109A. The existing conductor needs to be upgraded to at least ACSR, which gives a line rating of 205MVA and 858A. Capacity created by the Hartburg Chisholm Road 230kV line is 1042 MW. Capacity created by the 2 nd 500/230kV autotransformer at Hartburg is 800 MW. The existing conductor needs to be upgraded to at least MCM ACSR, which gives a line rating of 478MVA and 2000A. The existing conductor needs to be upgraded to at least MCM ACSR, which gives a line rating of 478MVA and 2000A. 14 Tie Jacinto Splendora line into Cleveland station. Capacity created by this project is 0 MW. 15 Upgrade miles of transmission line from Jacinto to Splendora. The existing conductor needs to be upgraded to at least MCM ACSR, which gives a line rating of 478 MVA. 11
12 No. Upgrade Description Upgrade 2.67 miles of transmission line from Splendora to Apollo. Build new line from Etoile to Chireno, set Leach to Six Mile in-service, convert Tenaha to Martinsville to, and build new line from Chireno to Martinsville. The existing conductor needs to be upgraded to at least MCM ACSR, which gives a line rating of 478 MVA. Capacity created by this project is 902 MW. 5.3 Grimes Mt. Zion 138 kv Solution Set This alternative project was examined to observe what overloads were alleviated in the Western Region. This alternative project was not sufficient in accommodating the transfers for this study. The projects are diagramed below, and a table is included that provides the list of projects and the cost estimates. Figure 3 - Grimes - Mt. Zion 138 kv Upgrade 12
13 Table 6: Grimes Mt. Zion Solution Set and Cost Estimates MAJOR ELEMENTS COSTS SCHEDULE % Upgrade Grimes Mt. Zion Line $14,966,895 2 years TOTAL COST: $14,966,895 * Note: The costs identified above are estimates, but do not include an additional +/- 30% for tax gross up, which may be applicable should the customer elect to proceed with the upgrades. Detailed cost estimates and solutions for the major elements would be provided in the Step 2 study. % The schedule estimates are planning estimates only. Table 7: Upgrade Description No. Upgrade Description 1 Upgrade miles of transmission line from Grimes to Mt. Zion The existing conductor needs to be upgraded to at least MCM ACSR, which gives a line rating of 339 MVA and 1418A. 5.4 Grimes Huntsville 138 kv Solution Set This alternative project was examined to observe what overloads were alleviated in the Western Region. This alternative project was not sufficient in accommodating the transfers for this study. The projects are diagramed below, and a table is included that provides the list of projects and the cost estimates. Figure 4 - Grimes - Huntsville 138 kv upgrade 13
14 Table 8: Grimes Huntsville Solution Set and Cost Estimates MAJOR ELEMENTS COSTS SCHEDULE % Upgrade Grimes Mt. Zion Huntsville Line $24,442,906 2 years TOTAL COST: $24,442,906 * Note: The costs identified above are estimates, but do not include an additional +/- 30% for tax gross up, which may be applicable should the customer elect to proceed with the upgrades. Detailed cost estimates and solutions for the major elements would be provided in the Step 2 study. % The schedule estimates are planning estimates only. Table 9: Upgrade Description No. Upgrade Description 1 Upgrade miles of transmission line from Grimes to Mt. Zion. Upgrade 5.35 miles of transmission line from Mt. Zion to Wyntex Tap. Upgrade 2.25 miles of transmission line from Wyntex Tap to Huntsville. The existing conductors from Grimes to Mt. Zion and Mt. Zion to Wyntex Tap, and Wyntex Tap to Huntsville need to be upgraded to at least MCM ACSR, which gives a line rating of 339 MVA and 1418A. The existing conductor from Wyntex Tap to Huntsville need to be upgraded to at least 1033 MCM ACSR, which gives a line rating of 299MVA and 1252A. 5.5 Grimes Ponderosa 230 kv Solution Set The main project in this solution set is the Grimes - Ponderosa project, along with a few supporting projects. The Grimes - Ponderosa project consists of the following upgrades: tie together Longmire Fish Creek and the Conroe Woodhaven stations at Ponderosa Switching Station, upgrade Longmire Conroe line, build new 230kV substation at Grimes, add 345/230kV autotransformer at Grimes, build new Grimes Ponderosa 230kV line, add new 230/ autotransformer at Ponderosa, and upgrade Ponderosa Conroe line. In addition to the Grimes Ponderosa project, a few smaller system reinforcements are needed to address other overloads in the area. The projects are diagramed below, and a table is included that provides the list of projects and the cost estimates. 14
15 Figure 5 Grimes Ponderosa 230 kv Table 10: Grimes - Ponderosa Solution Set and Cost Estimates MAJOR ELEMENTS COSTS SCHEDULE % Grimes Ponderosa Project $82,179,000 3 years Rivtrin Walker Line $100,000 1 year Mossville Cut in Nelson to Carlyss Line (ISD Summer 2013) Upgrade Toledo Bend Leach Line (ISD Summer 2017) DTEC Project NONE DTEC Project (ISD 2015) TOTAL COST: $82,279,000* * Note: The costs identified above are estimates, but do not include an additional +/- 30% for tax gross up, which may be applicable should the customer elect to proceed with the upgrades. Detailed cost estimates and solutions for the major elements would be provided in the Step 2 study. % The schedule estimates are planning estimates only. 15
16 Table 11: Upgrade Description No. Upgrade Description 1 Tie together Longmire Fish Creek and Conroe Woodhaven stations at Ponderosa Switching Station. Upgrade miles of transmission line from Longmire to Conroe. Build new 230kV substation and 345/230kV autotransformer at Grimes. Build new transmission line from Grimes to Ponderosa 230kV. Add new 230/ autotransformer at Ponderosa. Upgrade 2.6 miles of transmission line from Ponderosa to Conroe. Capacity created by the 345/230kV autotransformer at Grimes, Grimes Ponderosa 230kV line, 230/ autotransformer at Ponderosa, and Ponderosa Conroe line are 700MW, 519MW,750MW, and 193MW, respectively. 2 Upgrade line bay buses at Walker. Upgrade the line bay buses at Walker, which gives a line rating on Rivtrin Walker of 140MVA and 585A Cut Nelson to Carlyss line into Mossville substation. Upgrade 2.26 miles of transmission line from Toledo Bend to Leach. Build new line from Etoile to Chireno, set Leach to Six Mile in-service, convert Tenaha to Martinsville to, and build new line from Chireno to Martinsville. Capacity created by this upgrade is 0 MW. The existing conductor needs to be upgraded to at least 954 MCM ACSR, which gives a line rating of 265MVA and 1109A. Capacity created by this project is 902 MW. 16
17 6. POWERFLOW STUDY DATA Study results are summarized below. The top constraints were listed. Tables 1 6 contain priors and the transactions of this Economic Study with the parameters outlined in Section 4.1 of this report. No transmission solutions were included in these runs. Tables 7-12 contain priors and the transactions of this Economic Study with the parameters outlined in Section 4.1 of this report, along with the Quarry Rivtrin Solution Set. The 138 kv Solution and the Grimes Ponderosa 230 kv Solution yield the same results. As such, specific tables are not provided for those solutions. Tables contain priors and the transactions of this Economic Study with the parameters outlined in Section 4.1 of this report, along with the Grimes Mt. Zion Solution Set. Tables contain priors and the transactions of this Economic Study with the parameters outlined in Section 4.1 of this report, along with the Grimes Huntsville Solution Set. Table Summer () Limiting Element Contingency Element ContMW Mossville Nelson Carlyss Citcon West Table Winter () Limiting Element Contingency Element ContMW NONE NONE Table Summer () Limiting Element Contingency Element ContMW Grimes 345/ ckt 1 Grimes 345/ ckt Grimes 345/ ckt 2 Grimes 345/ ckt Jasper Rayburn Cypress Hartburg 500kV Tubular Dobbin Mossville Nelson Longmire Lewis Creek Carlyss Citcon West
18 Table 4 Winter 2015 () Limiting Element Contingency Element ContMW NONE NONE Table Summer () Limiting Element Contingency Element ContMW Magnolia Anderson Sota Grimes Magnolia Anderson Grimes College Station Grimes College Station Grimes 345/ ckt 1 Grimes 345/ ckt Grimes 345/ ckt 2 Grimes 345/ ckt Grimes Bentwater Grimes Huntsville Grimes Mt. Zion Cypress Hartburg 500kV Dobbin Springbranch Tubular Dobbin Mt. Zion Wyntex Tap Plantation Conroe Conroe2 Conroe1 Plantation Cedar Hill Longmire Lewis Creek Longmire Lewis Creek Cypress Hartburg 500kV Oak Ridge Porter Oak Ridge Porter Oak Ridge Porter Rayburn Jasper Cypress Hartburg 500kV Newton Bulk Leach Leach Toledo Bend Cypress Hartburg 500kV Cypress Hartburg 500kV Helbig McLewis 230kV Cypress Hartburg 500kV Mossville Nelson Cypress 500/ transformer Carlyss Citcon West Cypress 500/230kV transformer
19 Limiting Element Contingency Element ContMW Splendora Jacinto Eastgate Klemp Exposaic China Porter 230kV China Porter 230kV Table Winter () Limiting Element Contingency Element ContMW Grimes 345/ ckt 1 Grimes 345/ ckt Grimes 345/ ckt 2 Grimes 345/ ckt Grimes Bentwater Grimes Frontier 345/ Grimes Mt. Zion Grimes - Conroe Tubular Dobbin Longmire Lewis Creek Rayburn Jasper Cypress Hartburg 500kV Buna Evadale Junction Evadale Junction Evadale Newton Bulk Leach Leach Toledo Bend Rayburn Mill Creek Rayburn Mill Creek Cypress Hartburg 500kV Cypress Hartburg 500kV Mossville Nelson Carlyss Citcon West
20 Table Summer (w/quarry-rivtrin) Limiting Element Contingency Element ContMW NONE NONE Table Winter (w/quarry-rivtrin) Limiting Element Contingency Element ContMW NONE NONE Table Summer (w/quarry-rivtrin) Limiting Element Contingency Element ContMW NONE NONE Table Winter (w/quarry-rivtrin) Limiting Element Contingency Element ContMW NONE NONE Table Summer (w/quarry-rivtrin) Limiting Element Contingency Element ContMW NONE NONE Table Winter (w/quarry-rivtrin) Limiting Element Contingency Element ContMW NONE NONE
21 Table Summer (w/grimes Mt. Zion) Limiting Element Contingency Element ContMW Mossville Nelson Carlyss Citcon West Table Winter (w/grimes Mt. Zion) Limiting Element Contingency Element ContMW NONE NONE Table Summer (w/grimes Mt. Zion) Limiting Element Contingency Element ContMW Grimes 345/ ckt 1 Grimes 345/ ckt Grimes 345/ ckt 2 Grimes 345/ ckt Mt. Zion Wyntex Tap Cypress Hartburg 500kV Jasper Rayburn Cypress Hartburg 500kV Tubular Dobbin Longmire Lewis Creek Mossville Nelson Carlyss Citcon West Table Winter (w/grimes Mt. Zion) Limiting Element Contingency Element ContMW NONE NONE Table Summer (w/grimes Mt. Zion) Limiting Element Contingency Element ContMW 21 Grimes 345/ ckt 1 Grimes 345/ ckt Grimes 345/ ckt 2 Grimes 345/ ckt Grimes Bentwater Grimes - Huntsville Dobbin Springbranch Lewis Creek - Longmire
22 Tubular Dobbin Lewis Creek - Longmire Huntsville Wyntex Tap Cypress Hartburg 500kV Mt. Zion Wyntex Tap Cypress Hartburg 500kV Plantation Conroe Oak Ridge Porter Conroe2 Conroe1 Oak Ridge Porter Plantation Cedar Hill Oak Ridge Porter Rayburn Jasper Cypress Hartburg 500kV Newton Bulk Leach Cypress Hartburg 500kV Leach Toledo Bend Cypress Hartburg 500kV Helbig McLewis 230kV Cypress Hartburg 500kV Mossville Nelson Carlyss Citcon West Cypress 500/ Cypress 500/230kV transformer transformer Splendora Jacinto China Porter 230kV Eastgate Klemp Exposaic China Porter 230kV Table Winter (w/grimes Mt. Zion) Limiting Element Contingency Element ContMW Grimes 345/ ckt 1 Grimes 345/ ckt Grimes 345/ ckt 2 Grimes 345/ ckt Grimes Bentwater Tubular Dobbin Grimes - Huntsville Lewis Creek - Longmire Huntsville Wyntex Tap Grimes Conroe Mt. Zion Wyntex Tap Grimes Conroe Rayburn Jasper Cypress Hartburg 500kV Buna Evadale Junction Rayburn Mill Creek Evadale Evadale Junction Rayburn Mill Creek Newton Bulk Leach Cypress Hartburg 500kV
23 Leach Toledo Bend Mossville Nelson Cypress Hartburg 500kV Carlyss Citcon West Table Summer (w/grimes Huntsville) Limiting Element Contingency Element ContMW Mossville Nelson Carlyss Citcon West Table Winter (w/grimes Huntsville) Limiting Element Contingency Element ContMW NONE NONE Table Summer (w/grimes Huntsville) Limiting Element Contingency Element ContMW Grimes 345/ ckt 1 Grimes 345/ ckt Grimes 345/ ckt 2 Grimes 345/ ckt Jasper Rayburn Cypress Hartburg 500kV Tubular Dobbin Longmire Lewis Creek Mossville Nelson Carlyss Citcon West Table Winter (w/grimes Huntsville) Limiting Element Contingency Element ContMW NONE NONE
24 Table Summer (w/grimes Huntsville) Limiting Element Contingency Element ContMW Grimes 345/ ckt 1 Grimes 345/ ckt Grimes 345/ ckt 2 Grimes 345/ ckt Grimes Bentwater Grimes Huntsville Dobbin Springbranch Lewis Creek - Longmire Tubular Dobbin Lewis Creek - Longmire Plantation Conroe Oak Ridge Porter Conroe2 Conroe1 Oak Ridge Porter Plantation Cedar Hill Oak Ridge Porter Rayburn Jasper Cypress Hartburg 500kV Newton Bulk Leach Cypress Hartburg 500kV Leach Toledo Bend Cypress Hartburg 500kV Helbig McLewis 230kV Cypress Hartburg 500kV Mossville Nelson Carlyss Citcon West Cypress 500/ Cypress 500/230kV transformer transformer Splendora Jacinto China Porter 230kV Eastgate Klemp Exposaic China Porter 230kV Table Winter (w/grimes Huntsville) Limiting Element Contingency Element ContMW 24 Grimes 345/ ckt 1 Grimes 345/ ckt Grimes 345/ ckt 2 Grimes 345/ ckt Grimes Bentwater Grimes - Huntsville Tubular Dobbin Lewis Creek - Longmire Rayburn Jasper Cypress Hartburg 500kV Buna Evadale Junction Rayburn Mill Creek
25 Evadale Evadale Junction Newton Bulk Leach Leach Toledo Bend Mossville Nelson Rayburn Mill Creek Cypress Hartburg 500kV Cypress Hartburg 500kV Carlyss Citcon West
26 7. ECONOMIC STUDY DATA 7.1 Quarry Rivtrin Economic Study Information Economic Analysis Year Upgrade Cost Annualized Cost Change in APC-d Benefit-to-Costof Upgrades APC Ratio 2015 $79,797,735* $13,964,604 $24M $84,590,215* $14,803,288 $22M Projects Included in the Economic Study Models 2015 Reference o Mossville Nelson Line Plan (Summer 2013) o Plantation Conroe Line Upgrade Plan (Summer 2013) o Cedar Hill Plantation Line Upgrade Plan (Summer 2013) o Conroe Switching Station Plan (Summer 2013) o DTEC Project GDS Supplied Project (2015) 2020 Reference o Mossville Nelson Line Plan (Summer 2013) o Plantation Conroe Line Upgrade Plan (Summer 2013) o Cedar Hill Plantation Line Upgrade Plan (Summer 2013) o Conroe Switching Station Plan (Summer 2013) o DTEC Project GDS Supplied Project (2015) o Toledo Bend Leach Line Upgrade Plan (Summer 2017) Projects include in the B/C calculations The tables below breakdown what projects were included in the cost portion of the B/C metric MAJOR ELEMENTS COSTS Quarry Rivtrin 345kV Project $79,697,735 Rivtrin Walker Line $100,000 TOTAL: $79,797,735 26
27 o Annualized Cost To calculate the Annualized Cost, the project cost is multiplied by a Carrying Charge. Annualized Cost = Upgrade Cost * Carrying Charge: ,797,735 * 17.5% = $13,964,604 MAJOR ELEMENTS COSTS Quarry Rivtrin 345kV Project $79,697,735 Rivtrin Walker Line $100,000 Egypt Panorama Line $1,429,120 Panorama Longmire Line $3,363,360 4L558TP91 Wyntex 4L558TP85 O&M Line TOTAL: $84,590,215 o Annualized Cost To calculate the Annualized Cost, the project cost is multiplied by a Carrying Charge. Annualized Cost = Upgrade Cost * Carrying Charge: 84,590,215 * 17.5% = $14,803, APC Breakdown 2015 Production Cost Import Cost Adjusted Production Year Savings (M$) Savings (M$) Cost Savings (M$) Production Cost Import Cost Adjusted Production Year Savings (M$) Savings (M$) Cost Savings (M$)
28 7.1.5 Additional gates Added Mt Zion Wyntex Tap FTLO Grime Quarry 345kV Wyntex Tap Huntsville FTLO Grimes Bentwater Wyntex Tap Huntsville FTLO Grimes Quarry 345kV Mt. Zion Wyntex Tap FTLO Grimes Bentwater Rivtrin Line 558/91 Tap FTLO Rivtrin Goree Rivtrin Goree FTLO Rivtrin Line 558/91 Tap Line 558/91 Tap Huntsville FTLO Rivtrin Goree Grimes Mt Zion FTLO Quarry Rivtrin 345kV Rivtrin Line 558/91 Tap FTLO Grimes Quarry 345kV Rivtrin Goree FTLO Grimes Quarry 345kV kv Solution Economic Study Information Economic Study Year Upgrade Cost Annualized Cost Change in APC-d Benefit-to-Costof Upgrades APC Ratio 2015 $24,668,806 $4,317,041 -$3M $141,780,842 $24,811,647 $22M Projects Included in the Economic Study Models 2015 Reference o Mossville Nelson Line Plan (Summer 2013) o Moss Bluff Nelson 230kV Line Plan (Summer 2012) o Toledo Bend Leach Line Upgrade Plan (Summer 2017) o Conroe Switching Station Plan (Summer 2013) o DTEC Project GDS Supplied Project (2015) 2015 Change Case All 2015 Reference Case Projects plus the following: o 3rd 345/ Grimes Supplemental 2020 Reference o Mossville Nelson Line Plan (Summer 2013) o Moss Bluff Nelson 230kV Line Plan (Summer 2012) o Toledo Bend Leach Line Upgrade Plan (Summer 2017) o Conroe Switching Station Plan (Summer 2013) o DTEC Project No $ (2015) 28
29 o Plantation Conroe Line Upgrade Plan (Summer 2013) o Cedar Hill Plantation Line Upgrade Plan (Summer 2013) o Jacinto Splendora Project Plan (Summer 2017) o Jacinto Splendora Line Plan (Summer 2016) o Splendora Apollo Line Plan (Summer 2016) o Orange County Plan (Summer 2017) 2020 Change Case All 2020 Reference Case Projects plus the following: o 3rd 345/ Grimes Supplemental o Grimes Bentwater Line Supplemental o Grimes Mt Zion Wyntex Tap Line Supplemental o Grimes Magnolia Anderson Sota Navasota Line Supplemental o Tubular Dobbin Line Supplemental o Porter Apollo Line Supplemental Projects Included in the B/C Calculations The tables below breakdown what projects were included in the cost portion of the B/C metric MAJOR ELEMENTS New 3 rd 345/ Grimes COSTS $24,668,806 TOTAL: $24,668,806 o Annualized Cost To calculate the Annualized Cost, the project cost is multiplied by a Carrying Charge. Annualized Cost = Upgrade Cost * Carrying Charge: 24,668,806 * 17.5% = $4,317,041 29
30 2020 MAJOR ELEMENTS COSTS New 3rd 345/ Grimes $24,668,806 Upgrade Grimes Bentwater Line $21,629,995 Upgrade Grimes Mt. Zion Wyntex Tap Line $20,132,921 Upgrade Grimes Magnolia Anderson Sota Navasota Line $32,697,280 Upgrade Tubular Dobbin Line $19,724,320 Upgrade Porter Apollo Line $22,927,520 TOTAL: $141,780,842 o Annualized Cost To calculate the Annualized Cost, the project cost is multiplied by a Carrying Charge. Annualized Cost = Upgrade Cost * Carrying Charge: 141,780,842 * 17.5% = $24,811, Grimes Mt. Zion Economic Study Information Economic Study Year Upgrade Cost Annualized Cost Change APC-d Benefit-to-Costof Upgrades in APC Ratio 2015 $14,966,895 $2,619,206 $0M N/A 2020 $14,966,895 $2,619,206 $1M Projects Included in the Economic Study Models 2015 Reference o Only projects that were included in the base model (i.e. Entergy Approved Construction Plan Projects) 2015 Change Case All 2015 Reference Case Projects plus the following: o Grimes Mt Zion Line Supplemental 2020 Reference o Only projects that were included in the base model (i.e., Entergy Approved Construction Plan Projects) 30
31 2020 Change Case All 2020 Reference Case Projects plus the following: o Grimes Mt Zion Line Supplemental Projects Include in the B/C calculations The tables below breakdown what projects were included in the cost portion of the B/C metric MAJOR ELEMENTS Upgrade Grimes Mt. Zion Line COSTS $14,966,895 TOTAL: $14,966,895 o Annualized Cost To calculate the Annualized Cost, the project cost is multiplied by a Carrying Charge. Annualized Cost = Upgrade Cost * Carrying Charge: 14,966,895 * 17.5% = $4,317, MAJOR ELEMENTS Upgrade Grimes Mt. Zion Line COSTS $14,966,895 TOTAL: $14,966,895 o Annualized Cost To calculate the Annualized Cost, the project cost is multiplied by a Carrying Charge. Annualized Cost = Upgrade Cost * Carrying Charge: 14,966,895 * 17.5% = $4,317,041 31
32 7.4 Grimes Huntsville Economic Study Information Economic Study Year Upgrade Cost Annualized Cost Change APC-d Benefit-to-Costof Upgrades in APC Ratio 2015 $24,442,906 $4,277,509 $6M $24,442,906 $4,277,509 $5M Projects Included in the Economic Study Models 2015 Reference o Only projects that were included in the base model (i.e. Entergy Approved Construction Plan Projects) 2015 Change Case All 2015 Reference Case Projects plus the following: o Grimes Mt Zion Huntsville Line Supplemental 2020 Reference o Only projects that were included in the base model (i.e. Entergy Approved Construction Plan Projects) 2020 Change Case All 2020 Reference Case Projects plus the following: o Grimes Mt Zion - Huntsville Line Supplemental Projects Include in the B/C calculations The tables below breakdown what projects were included in the cost portion of the B/C metric MAJOR ELEMENTS Upgrade Grimes Mt. Zion Huntsville Line COSTS $24,442,906 TOTAL: $24,442,906 32
33 o Annualized Cost To calculate the Annualized Cost, the project cost is multiplied by a Carrying Charge. Annualized Cost = Upgrade Cost * Carrying Charge: 24,442,906 * 17.5% = $4,277, MAJOR ELEMENTS Upgrade Grimes Mt. Zion - Huntsville Line COSTS $24,442,906 TOTAL: $24,442,906 o Annualized Cost To calculate the Annualized Cost, the project cost is multiplied by a Carrying Charge. Annualized Cost = Upgrade Cost * Carrying Charge: 24,442,906 * 17.5% = $4,277, Grimes - Ponderosa Economic Study Information Economic Study Year Upgrade Cost Annualized Cost of Upgrades 2015 $82,279,000 $ 14,398, $82,279,000 $ 14,398,825 Change in APC APC-d Benefit-to-Cost- Ratio $19,000, $18,700, Projects Included in the Economic Study Models 2015 Reference o Only projects that were included in the base model (i.e. Entergy Approved Construction Plan Projects) 33
34 2015 Change Case All 2015 Reference Case Projects plus the following: o Grimes Ponderosa Project Supplemental 2020 Reference o Only projects that were included in the base model (i.e. Entergy Approved Construction Plan Projects) 2020 Change Case All 2020 Reference Case Projects plus the following: o Grimes Ponderosa Project Supplemental Projects Include in the B/C calculations The tables below breakdown what projects were included in the cost portion of the B/C metric MAJOR ELEMENTS COSTS Upgrade Grimes Ponderosa Project $82,279,000 TOTAL: $82,279,000 o Annualized Cost To calculate the Annualized Cost, the project cost is multiplied by a Carrying Charge. Annualized Cost = Upgrade Cost * Carrying Charge: $82,279,000 * 17.5% = $ 14,398, MAJOR ELEMENTS COSTS Upgrade Grimes Ponderosa Project $82,279,000 TOTAL: $82,279,000 o Annualized Cost To calculate the Annualized Cost, the project cost is multiplied by a Carrying Charge. Annualized Cost = Upgrade Cost * Carrying Charge: $82,279,000 * 17.5% = $14,398,825 34
35 7.5.4 Additional gates Added Grimes- Mt Zion FTLO Grimes Ponderosa Grimes - Bentwater FTLO Grimes - Ponderosa Ponderosa - Conroe FTLO China - Porter Ponderosa - Conroe FTLO Longmire - Ponderosa Conroe - Goslin FTLO Conroe - Plantation 8. SUMMARY This report analyzed the effects of several sets of upgrades in the Entergy Texas region in terms of powerflow and economics. d upon the analysis presented here, it can be determined that there is the potential for alleviating overloads, removing constraints to transmission service, and reduction in congestion from several of the packages of upgrades. The Quarry - Rivtrin, 138 kv Solution, and the Grimes Ponderosa solutions all took care of the transmission overloads that are described in Section 6. The other solutions, Grimes Mt. Zion and Grimes Huntsville, provided some relief, but did not address all of the overloads in Section 6. In addition to the powerflow analysis, these upgrades were reviewed to determine if there are any economic benefits to those projects. The Quarry Rivtrin, Grimes Ponderosa, and Grimes Huntsville projects all displayed benefits in excess of their costs. However, with the Grimes Huntsville upgrade, there is still congestion that remains in Western Region that can be alleviated with the Quarry Rivtrin or Grimes Ponderosa projects. d on the analysis, it appears that the Quarry Rivtrin and Grimes Ponderosa projects are similar in terms of cost and performance. This report is intended to be a high-level analysis of these upgrades in order to provide the study participants with information such that they can make a decision on whether to pursue these upgrades further. If the study participants are so inclined, the next step would be to perform a more detailed analysis of a subset of the upgrades presented here in order to arrive at a more detailed breakdown of the benefits associated with the upgrades. Ultimately, any information produced from a more detailed analysis could be used to derive an allocation of costs amongst the participating study members. 35
36 9. APPENDIX A List of Priors OASIS PSE MW Begin End NRG Power Marketing 300 1/1/2013 1/1/ NRG Power Marketing 300 1/1/2013 1/1/ Cargill Power Markets 101 7/1/2012 7/1/ Cargill Power Markets 101 7/1/2012 7/1/ Cargill Power Markets 101 7/1/2012 7/1/ Cargill Power Markets 101 7/1/2013 7/1/ Cargill Power Markets 101 7/1/2013 7/1/ Cargill Power Markets 101 7/1/2013 7/1/ Entergy Services (SPO) 450 6/1/2012 6/1/ Entergy Services (SPO) 620 6/1/2012 6/1/ Entergy Services (SPO) 35 6/1/2012 6/1/ Entergy Services (SPO) 20 6/1/2012 6/1/ (undesignation) Entergy Services (SPO) 1 1/1/2012 1/1/ (undesignation) Entergy Services (SPO) 1 1/1/2012 1/1/ SMEPA 2 1/1/2012 1/1/ AECI 103 1/1/2012 1/1/ TEA 200 7/1/2012 7/1/ Cargill Power Markets /1/ /1/ Cargill Power Markets /1/ /1/ MOWR 20 4/1/2012 4/1/ Cargill Power Markets 98 12/1/ /1/ NRG Power Marketing 600 1/1/2014 1/1/ NextEra Energy 100 1/1/2012 1/1/ Cargill Power Markets /1/ /1/ Horizon Wind 100 7/1/2012 7/1/2017 SPP Tenaska Power Service 6 8/1/2011 6/1/2014 SPP Tenaska Power Service 44 8/1/2011 6/1/
37 10. APPENDIX B Economic Study Assumptions 10.1 Fuel Price Forecast Summary
38
39 2015 &
40 10.2 Wheeling Charges Wheeling charges are per MWh charges for moving energy from one area to another. GridView models this charge as a tariff for a particular interface. Commitment and dispatch are the two types of charges that can be assessed in GridView. A commitment charge is only applied to the initial startup of a unit and a dispatch charges is applied per MWh of an operating unit Emission Rates 40
41 11. APPENDIX C Metric Calculation 11.1 How is the APC calculated? Adjusted Production Cost (APC) is a measure of the impact on production cost savings by using LMPs, accounting for purchases and sales of energy between each area. The APC is calculated by: Entergy Production Cost Imports Exports APC 11.2 Import/Export Cost Calculation Interface for 1 hr (MW) The Average of (Simple LMP of Sending Area + Simple Average LMP of Receiving Area) Hourly Import/Export Cost Sum all 8760 hours of the year to get total Import/Export Cost for each interface Sum all Interface Import/Export Cost to get total Import/Export Cost 11.3 APC-d Benefit-to-Cost-Ratio Change in APC Annualized Transmission Cost* APC B/C Ratio *Annualized Transmission Cost is calculated using a 17.5% Carrying Charge. 41
42 12. APPENDIX D Entergy Approved Construction Plan Projects Construction Plan ID Project Name LE Proposed ISD (Planning) 10CP-EAI-006 Donaghey - Conway South 161 kv Line: Reconductor with 666 ACSS EAI Spring CP-EAI SMEPA (Plum Point): * Dell - Manilla 161kV Line: Upgrade to at least 247MVA EAI Spring CP-EAI SMEPA (Plum Point): * Manilla - Monette 161kV Line: Upgrade to at least 247MVA EAI Spring CP-EAI SMEPA (Plum Point): * Jonesboro North - Paragould South 161kV Line: Upgrade to at least 247MVA EAI Spring CP-EAI SMEPA (Plum Point): * Jonesboro North - Jonesboro 161kV Line: Upgrade to at least 247MVA EAI Spring CP-EAI-008 Beebe 115 kv Substation: Install 21.6 MVAR Capacitor Bank EAI Summer CP-EAI-009 Melbourne - Sage 161 kv Line: Upgrade line to at least 1200 A EAI Summer CP-EAI-010 Warren East 115 kv Substation: Install 10.8 MVAR Capacitor Bank EAI Summer CP-EAI-011 Parkin to Twist 161 kv - Replace line trap at Parkin (increase rating of line segment) EAI Winter CP-EAI Transmission Service (OG&E) Upgrade ANO - Russellville North 161 kv Line to 546 MVA EAI Summer CP-EAI Transmission Service (OG&E) Upgrade Russellville East - Russellville South 161 kv Line to 448 MVA EAI Summer CP-EAI-013 Osage Creek-Grandview New Line Build new 161 kv (At Least 1200 A) line from Grandview EAI Summer 2011 (Planned SPA 161 kv Substation tapped on the Eureka - Table Rock 161 kv Line) to Osage Creek 10CP-EAI Holland Bottoms (Cabot EHV): Construct new 500/161/115 kv substation Phase 1 Projects (2011) Tap the Keo - ISES 500 kv Line EAI Summer 2011 Tap the Cabot - Jacksonville North 115 kv Line Install 500 kv and 115 kv Busses and a 600 MVA 500 kv / 115 kv Autotransformer 10CP-EAI Holland Bottoms (Cabot EHV): Construct new 500/161/115 kv substation Phase 2 Projects(2012) EAI Summer 2012 Install 161 kv Bus and a 600 MVA 500 kv / 161 kv Autotransformer 10CP-EAI Transmission Service (Aquilla) Upgrade Hot Springs - Bismark 115 kv Line to 176 MVA EAI Winter CP-EAI Transmission Service (Aquilla) Upgrade Bismark - Alpine 115 kv Line to 176 MVA EAI Winter CP-EAI Transmission Service (Aquilla) Upgrade Alpine - Amity 115 kv Line to 176 MVA EAI Winter
43 Construction Plan ID Project Name 43 LE Proposed ISD (Planning) 10CP-EAI-017 Holland Bottoms - Hamlet 161 kv Line: Construct new 161 kv Line Convert Hamlet SS to a breaker station (Single Bus Single Breaker Scheme) Move the Quitman line from Gold Creek to Hamlet SS EAI Summer 2012 Move the Gravel Ridge line from Gold Creek to Hamlet SS Construct a line rated at least 1200 A from Hamlet SS to Holland Bottoms 10CP-EAI-019 Jonesboro to Hergett 161 kv Line: Upgrade 161 kv Line to at least 240 MVA EAI Summer CP-EAI-020 Benton North to Benton South: Construct New 115 kv Line Rated at least 170 MVA Install Switching Stations at Benton North and Benton South EAI Winter CP-EAI Westar Transmission Service Monette - Paragould 161kV Line: Upgrade to at least 246 MVA EAI Summer CP-EAI Westar Transmission Service Paragould Substation: Upgrade the switch B6673 from 600A to 2000A EAI Summer CP-EAI Westar Transmission Service Russellville South - Dardanelle Dam (SPA) 161kV Line: Upgrade to 416 MVA EAI Summer CP-EAI-023 Couch to McNeil 115kV Line: Upgrade jumpers at Couch EAI Summer CP-EAI-024 Lake Catherine 4 to Arklahoma 115 kv line: Upgrade risers at Arklahoma EAI Summer CP-EAI-025 Mabelvale to LR Mann Road 115 kv line: Replace switches and risers at Mabelvale and upgrade bus at LR Mann Road EAI Winter CP-EAI-026 Mabelvale to LR Alexander 115 kv line: Replace switches and risers at Mabelvale and upgrade bus at LR Mann Road EAI Winter CP-EAI-027 Russellville North to Russellville East 161 kv line: Replace jumpers at EAI Spring 2011 Russellville East 10CP-EAI-028 Morgan to Mayflower 115 kv line: Replace jumpers and bus at Mayflower EAI Summer CP-EAI-029 Maumelle East SS to Morgan 115 kv line: Replace switch and bus at Maumelle East SS EAI Summer CP-EAI-030 Heber Springs South to Heber Springs Industrial 161 kv line: Replace bus at Heber Springs South EAI Summer CP-EAI-031 West Memphis to Birmingham Steel 500 kv line flowgate: Replace 500 kv breaker, six line traps, and 2 switches at West Memphis 500 kv substation EAI Fall CP-EAI Sheridan South 500 kv FG Upgrade: Mabelvale 500 kv Substation replace 3 breakers, 13 switches, and 2 line traps EAI Spring CP-EAI Sheridan South 500 kv FG Upgrade: Sheridan 500 kv Substation replace 11 switches, and 6 line traps EAI Spring CP-EAI Sheridan South 500 kv FG Upgrade: White Bluff 500 kv Substation replace 5 switches, and 2 line traps EAI Spring CP-EAI Sheridan South 500 kv FG Upgrade: Eldorado 500 kv Substation replace 1 switch and 2 line traps EAI Spring CP-EAI-005 Russellville East to Russellville South 161 kv line: Replace jumpers and risers at Russellville East EAI Spring CP-EAI-009 Basin Springs Substation - Construct new substation EAI Summer CP-EAI-011 Pangburn 161 kv Substation: Relocate Rutherford 116 kv Cap Bank to Pangburn EAI Summer CP-EAI-013 Woodward to Pine Bluff Watson Chapel: Upgrade station equipment at Watson Chapel EAI Summer CP-EGL-002 Addis to Cajun 230 kv line - Upgrade Limiting Section With Double-Bundled ACAR (654 MVA) EGSL Winter CP-EGL-003 Carter and Elton: Upgrade 69 kv capacitor bank at Elton to 14 MVAR, Add 69 kv, 14 MVAR capacitor bank at Carter EGSL Fall CP-EGL-004 Construct New Youngsville 138 kv Distribution Substation EGSL Winter CP-EGL-005 Alchem - Monochem 138 kv Line: Upgrade 138 kv line to 275 MVA EGSL Summer
Entergy Texas, Inc. Transmission Draft Construction Plan Update 1 Projects
Entergy Texas, Inc. Transmission 2014 2018 Draft Construction Plan Update 1 Projects 1 2014-2018 ETI Draft Construction Plan Update 1 Projects Completed in the Fall of 2012 & 2013 to date 1) Cedar Hill
More information1. Administrative Items... SPP. 2. Stakeholder Web-Presentation... ABB
Southwest Power Pool, Inc. ENTERGY REGIONAL STATE COMMITTEE MINIMIZING BULK POWER COSTS STUDY STAKEHOLDER MEETING Face-to-face & Web-conference Hyatt Regency DFW DFW Airport, TX Room: Maverick AGENDA July
More informationEntergy Gulf States, Inc. (Texas) Proposed Transmission Reliability Projects
Entergy Gulf States, Inc. (Texas) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 14, 2005 1 2004-06 EGSI-TX Transmission Western Region Reliability
More informationMarket Congestion Planning Study (South)- Robustness Analysis. Economic Planning Users Group Meeting August 11 th, 2017
Market Congestion Planning Study (South)- Robustness Analysis Economic Planning Users Group Meeting August 11 th, 2017 Key Takeaways The benefit calculations were updated due to a flowgate rating correction
More informationMTEP14 South SPM #2. MISO Texas Project Information. April 7, 2014
MTEP14 South SPM #2 MISO Texas Project Information April 7, 2014 MISO Southern Region EAST TEXAS ELECTRIC COOPERATIVE 2 East Texas Electric Cooperative (ETEC) No projects submitted for moving to Appendix
More informationMonthly Construction Plan Project Status Report Report Date: 1/16/2014
Monthly Construction Plan Report Report Date: 1/16/2014 EAI EMI ELL ENOI EGSL ETI EGSL/ELL ELL/ENOI ALL General Major Updates Added fifteen transmission reliability projects (SPOF and Under rated breakers).
More informationFACILITIES STUDY TRANSMISSION SERVICE REQUEST OASIS
TRANSMISSION / DISTRIBUTION PROJECTS COMPANY:EAI CUSTOMER: CARTHAGE WATER & ELECTRIC FACILITIES STUDY EJO # F4PPAR0436 ICTT-2007-179 TRANSMISSION SERVICE REQUEST OASIS 1498226 Revision: 1 Rev Issue Date
More informationFACILITIES STUDY CONSTELLATION ENERGY TRANSMISSION SERVICE REQUEST OASIS
TRANSMISSION / DISTRIBUTION PROJECTS COMPANY:EAI CUSTOMER: CONSTELLATION ENERGY FACILITIES STUDY EJO # F4PPAR0434 ICTT-2007-177 CONSTELLATION ENERGY TRANSMISSION SERVICE REQUEST OASIS 1498122 Revision:
More informationFACILITIES STUDY ICTT TRANSMISSION SERVICE FACILITIES STUDY OASIS
TRANSMISSION LINE & SUBSTATION PROJECTS COMPANY: ENTERGY SERVICES, INC. CUSTOMER: EAST TEXAS ELECTRIC COOPERATIVE (ETEC) FACILITIES STUDY EJO NO. F4PPTX0068 ICTT-2011-003 TRANSMISSION SERVICE FACILITIES
More informationEntergy Draft Construction Plan Update 1
Entergy 2014-2018 Draft Construction Plan Update 1 Construction Plan Projects Relating To: Regulatory Transmission Service Economic Enhanced Transmission Reliability Customer Driven Generation Interconnection
More informationEntergy Final Construction Plan
Introduction Entergy 2012-2016 Final Construction Plan Project Driver Project Description Cost Allocation Guideline Project Category Block load addition Projects needed to accommodate the addition of block
More informationSouthwest Power Pool, Inc. Entergy ENTERGY SPP RTO REGIONAL PLANNING PROCESS MEETING May 24, 2012 NET CONFERENCE AGENDA 10:00 AM 12:00 PM
Southwest Power Pool, Inc. Entergy ENTERGY SPP RTO REGIONAL PLANNING PROCESS MEETING May 24, 2012 NET CONFERENCE AGENDA 10:00 AM 12:00 PM 1. Administrative A. Introductions... All B. SPP Antitrust Guidelines...
More informationSERTP rd Quarter Meeting
2014 SERTP SERTP 2014 3 rd Quarter Meeting 2 nd RPSG Meeting September 30 th, 2014 APC Headquarters Birmingham, AL 2014 SERTP Process Information The SERTP process is a transmission planning process. Please
More informationStability Study for the Mt. Olive Hartburg 500 kv Line
Stability Study for the Mt. Olive Hartburg 500 kv Line Peng Yu Sharma Kolluri Transmission & Distribution Planning Group Energy Delivery Organization Entergy Sevices Inc April, 2011 New Orleans, LA 1.
More informationSPP Reliability Coordinator TLR 5 Analysis Report for the ICT Reliability Area
SPP Reliability Coordinator TLR 5 Analysis Report for the ICT Reliability Area MAINTAINED BY SPP Reliability Coordinator PUBLISHED: 10/11/2010 LATEST REVISION: 10/12/2010 Copyright 2010 by Southwest Power
More informationSERTP rd Quarter Meeting
2015 SERTP SERTP 2015 3 rd Quarter Meeting 2nd RPSG Meeting September 24 th, 2015 APC Headquarters Birmingham, AL 2015 SERTP Process Information The SERTP process is a transmission planning process. Please
More informationSystem Impact Study Report
Report For: NTE Carolinas II, LLC ( Customer ) Queue #: 42432-01 Service Location: Rockingham County, NC Total Output: 477 MW (summer) / 540 MW (winter) Commercial Operation Date: 12/1/2020 42432-01 SIS
More informationTransmission Planning using Production Cost Simulation & Power Flow Analysis
ABB Transmission Planning using Production Cost Simulation & Power Flow Analysis Jinxiang Zhu, Ph.D. Senior Principal, ABB Power Consulting ABB Group January 16, 2018 Slide 1 Power System Studies TECHNICAL
More information2013 SERTP. Welcome. SERTP rd Quarter Meeting. 2 nd RPSG Meeting
2013 SERTP Welcome SERTP 2013 3 rd Quarter Meeting 2 nd RPSG Meeting 1 2013 SERTP The SERTP process is a transmission planning process. Please contact the respective transmission provider for questions
More informationICT Strategic Transmission Plan (ISTEP) Review and Status Update
ICT Strategic Transmission Plan (ISTEP) Review and Status Update Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans, Louisiana Douglas Bowman, PE Lead Engineer, ICT Planning 501-688-1640
More informationBlack Hills Project Summary
2016 Rule 3627 Report Black Hills Project Summary Page 1 of 38 Black Hills Project Summary Colorado PUC E-Filings System D 1 2016 Rule 3627 Report Black Hills Project Summary Page 2 of 38 Category Transmission
More informationEntergy Final Construction Plan
Introduction Entergy 2013-2017 Final Construction Plan Project Driver Project Description Cost Allocation Guideline Project Category Block load addition Projects needed to accommodate the addition of block
More informationTHE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS
THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS 2/27/2018 ELECTRIC TRANSMISSION PLANNING Table of Contents Table of Contents... 2 Executive
More informationService Requested 150 MW, Firm. Table ES.1: Summary Details for TSR #
Executive Summary Firm point to point transmission service has been requested by Transmission Service Request (TSR) #75669514, under the SaskPower Open Access Transmission Tariff (OATT). The TSR consists
More informationPID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation
PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation Prepared by: Entergy Services, Inc. T & D Planning L-ENT-17A 639 Loyola Avenue New Orleans, LA 70113 Rev Issue Date
More informationDUKE ENERGY PROGRESS TRANSMISSION SYSTEM PLANNING SUMMARY
DUKE ENERGY PROGRESS TRANSMISSION SYSTEM PLANNING SUMMARY Transmission Department Transmission Planning Duke Energy Progress TABLE OF CONTENTS I. SCOPE 3 II. TRANSMISSION PLANNING OBJECTIVES 3 III. TRANSMISSION
More informationATTACHMENT Y STUDY REPORT
Attachment Y Study Edwards Unit 1: 90 MW Coal Retirement December 31, 2012 ATTACHMENT Y STUDY REPORT 7/5/2013 PUBLIC / EXECUTIVE SUMMARY MISO received an Attachment Y Notification of Potential Generation
More informationSPS Planning Criteria and Study Methodology
SPS Planning Criteria and Study Methodology SPS subscribes to the Southwest Power Pool ("SPP") Reliability Criteria, which incorporates compliance with the appropriate North American Electric Reliability
More informationTransmission Improvements Plan for 575 MW Network Service Request Wansley CC 7 Generation Facility (OASIS # ) Georgia Transmission Corporation
Transmission Improvements Plan for 575 MW Network Service Request CC 7 Generation Facility (OASIS # 143556) Georgia Transmission Corporation November 11, 2010 CC7 TIP 11-11-2010 (2).docx PROBLEM STATEMENT
More informationFeasibility Study Report
Generator Interconnection Request Feasibility Study Report For: Customer --- Service Location: Rutherford County Total Output: 79.2 MW Commercial Operation Date: 9/1/2014 In-Service Date (if given): 9/1/2014
More informationOuter Metro 115 kv Transmission Development Study. (Scott Co, Carver Co and Hennepin Co)
Outer Metro 115 kv Transmission Development Study. (Scott Co, Carver Co and Hennepin Co) Participants: Great River Energy Xcel Energy Inc. Executive Summary This study is done to address various load serving
More informationFACILITIES STUDY ICTT /-143/-144/-145 TRANSMISSION SERVICE REQUEST OASIS _74_76_80
TRANSMISSION LINE & SUBSTATION PROJECTS COMPANY: ENTERGY SERVICES, INC. CUSTOMER ENTERGY SERVICES, INC. FACILITIES STUDY EJO NO. F4PPLA0351 ICTT-2010-142/-143/-144/-145 TRANSMISSION SERVICE REQUEST OASIS
More informationProject #148. Generation Interconnection System Impact Study Report
Project #148 Generation Interconnection System Impact Study Report June 05, 2012 Electric Transmission Planning Table of Contents Table of Contents... 2 Executive Summary... 3 Energy Resource Interconnection
More informationAppendix D Black Hills Project Summary
Page 1 of 28 Appendix D Black Hills Project Summary Table of Contents Black Hills Project Summary... D-1 Boone-Nyberg 115 kv Project... D-3 Rattlesnake Butte 115 kv Substation Terminal... D-6 Fountain
More information100 MW Wind Generation Project
A subsidiary of Pinnacle West Capital Corporation 100 MW Wind Generation Project CUSTOMER FINAL Feasibility Study Results By Transmission Planning, APS December 21, 2007 Executive Summary This Feasibility
More informationInterconnection Feasibility Study Report GIP-084-FEAS-R2
Interconnection Feasibility Study Report GIP-084-FEAS-R2 System Interconnection Request #84 50 MW Wind Generating Facility Pictou County (L-7004) August 17, 2007 Control Centre Operations Nova Scotia Power
More informationMTEP13 SPM #2- Central Region. March 25, 2013
MTEP13 SPM #2- Central Region Ameren Missouri March 25, 2013 Ameren Missouri Project Review Central Region: Ameren Missouri Ameren Missouri has a total of 10 project proposals that are recommended for
More informationInterconnection Feasibility Study Report GIP-023-FEAS-R1. Generator Interconnection Request # MW Wind Generating Facility Inverness (L6549), NS
Interconnection Feasibility Study Report GIP-023-FEAS-R1 Generator Interconnection Request # 23 100 MW Wind Generating Facility Inverness (L6549), NS February 16, 2006 Control Centre Operations Nova Scotia
More informationNew Jersey State Report
New Jersey State Report July 2017 Table of Contents 1. Planning Generation Portfolio Analysis Transmission Analysis Load Forecast 2. Markets Capacity Market Results Market Analysis 3. Operations Emissions
More information2010 SERTP. Welcome. SERTP rd Quarter Meeting. 2 nd RPSG Meeting 9:00 AM 3:00 PM
2010 SERTP Welcome SERTP 2010 3 rd Quarter Meeting 2 nd RPSG Meeting 9:00 AM 3:00 PM 1 2010 SERTP Purposes & Goals of the Meeting Preliminary Economic Planning Results SERC Regional Model Development Update
More informationTRANSMISSION LINE & SUBSTATION PROJECTS COMPANY: ENTERGY SERVICES, INC. CUSTOMER: NORTHEAST TEXAS ELECTRIC COOPERATIVE FACILITIES STUDY
TRANSMISSION LINE & SUBSTATION PROJECTS COMPANY: ENTERGY SERVICES, INC. CUSTOMER: NORTHEAST TEXAS ELECTRIC COOPERATIVE FACILITIES STUDY EJO # F4PPTX0039 ICTT-ASA-2010-005 TRANSMISSION SERVICE REQUEST OASIS
More informationImpacts of MISO DPP-2016-February (West, ATC, MI, South) Projects on PJM Facilities
Impacts of MISO DPP-2016-February (West, ATC, MI, South) 1. MISO generators studied: Projects on PJM Facilities Net MW size (Summer) Net MW size (Winter) Service DPP Project Type Region Fuel Type POI J432
More informationEast. Dalton Utilities. GTC (Georgia Transmission Corporation) MEAG (Municipal Electric Authority of GA) Southern Company Transmission
Southeastern Region Transmission Planning East Dalton Utilities GTC (Georgia Transmission Corporation) MEAG (Municipal Electric Authority of GA) Southern Company Transmission Southeastern Region Transmission
More informationSPP Notification to Construct
February 19, 2014 SPP Notification to Construct Mr. Mo Awad Westar Energy, Inc. P.O. Box 889 Topeka, KS 66601 RE: Notification to Construct Approved Reliability Network Upgrades Dear Mr. Awad, Pursuant
More informationInterconnection Feasibility Study Report GIP-157-FEAS-R2
Interconnection Feasibility Study Report GIP-157-FEAS-R2 System Interconnection Request #157 100.5 MW Wind Generating Facility Guysborough County (L-6515) 2009 09 14 Control Centre Operations Nova Scotia
More informationTransmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting
Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting BHE Wyoming Q4 Stakeholder Meeting November 17, 2016 @ 1:00PM MT Black Hills Energy Service Center 409 Deadwood Avenue, Rapid
More informationDETOUR GOLD CORPORATION SYSTEM IMPACT ASSESSMENT FOR DETOUR LAKE PROJECT
DETOUR GOLD CORPORATION SYSTEM IMPACT ASSESSMENT FOR DETOUR LAKE PROJECT Report No.: RP-160388-02-141-0001 CAA ID No. 2010-380 Rev. 01 Prepared by: AMEC Americas Limited Energy and Mining Division Power
More informationICT Strategic Transmission Expansion Plan (ISTEP) Report. ICT Planning
ICT Strategic Transmission Expansion Plan (ISTEP) Report ICT Planning PUBLISHED: 12/04/2007 Table of Contents Table of Contents...1 I. Executive Summary...2 II. Objectives...4 III. A. Improving Load-Serving
More informationAPPENDIX E: Project Need and Description
APPENDIX E: Project Need and California ISO/MID E-1 Intentionally left blank California ISO/MID E-2 Lakeville 115 kv Bus Upgrade Installation of a sectionalizing breaker to be installed on 115 kv bus section
More informationSupplemental Report on the NCTPC Collaborative Transmission Plan
Supplemental Report on the NCTPC 2007-2017 Collaborative Transmission Plan May 16, 2008 1 Table of Contents I. Executive Summary...1 II. Richmond-Fort Bragg Woodruff Street 230 kv Line...2 II.A. Need for
More informationSystem Impact Study PID MW Plant
System Impact Study PID 257 252 MW Plant Prepared by: Southwest Power Pool Independent Coordinator of Transmission 415 N. McKinley, Suite140 Little Rock, AR 72205 Rev Issue Date Description of Revision
More informationChapter 7 - Appendix A
Chapter 7 - Appendix A Transmission and Distribution Supplemental Information Table 7A.1 MTEP Transmission Projects in Missouri 1 Project Approved Project Title Project Description Category Estimated Cost
More informationSub Regional RTEP Committee Mid-Atlantic
Sub Regional RTEP Committee Mid-Atlantic November 04, 2013 2013 RTEP Baseline Analysis Update 11/04/2013 AE Transmission Zone Cost Change for B2354 Install second 230/69kV transformer and 230kV circuit
More informationAPPENDIX F: Project Need and Description
APPENDIX F: Project Need and Description California ISO/MID F-1 Intentionally left blank California ISO/MID F-2 Name Brief Description Type Lugo Victorville 500 kv Upgrade (SCE portion) The project was
More informationInterconnection Feasibility Study Report Request # GI Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado
Executive Summary Interconnection Feasibility Study Report Request # GI-2016-6 Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado Public Service Company of Colorado Transmission
More informationSub Regional RTEP Committee Western Region ATSI
Sub Regional RTEP Committee Western Region ATSI February 20, 2019 1 ATSI Needs Stakeholders must submit any comments within 10 days of this meeting in order to provide time necessary to consider these
More informationAPPENDIX E: Project Need and Description
APPENDIX E: Project Need and California ISO/MID E-1 Intentionally left blank California ISO/MID E-2 Tyler 60 kv Shunt Capacitor Installation of a 2x10 MVAR capacitor bank at Tyler 60 kv bus Objectives
More informationInterconnection Feasibility Study Report GIP-226-FEAS-R3
Interconnection Feasibility Study Report GIP-226-FEAS-R3 System Interconnection Request #226 70 MW Wind Generating Facility Kings County (L-6013) 2010 07 21 Control Centre Operations Nova Scotia Power
More informationInterconnection Feasibility Study Report GIP-222-FEAS-R3
Interconnection Feasibility Study Report GIP-222-FEAS-R3 System Interconnection Request #222 48 MW Steam Generating Facility Pictou County (53N) 2010 07 30 Control Centre Operations Nova Scotia Power Inc.
More informationCUSTOMER/ TWIN ARROWS PROJECT
A subsidiary of Pinnacle West Capital Corporation CUSTOMER/ TWIN ARROWS PROJECT V1 Facility Study Report APS Contract 52149 Prepared by: Arizona Public Service Company Transmission & Distribution Asset
More informationTEN YEAR PLANNING GUIDE SHASTA LAKE ELECTRIC UTILITY
TEN YEAR PLANNING GUIDE SHASTA LAKE ELECTRIC UTILITY 2011-2020 P+ PowerPlus Engineering A Department of STAR Energy Services, LLC TEN YEAR PLANNING GUIDE 2011-2020 SHASTA LAKE ELECTRIC UTILITY CITY OF
More informationFACILITIES STUDY TRANSMISSION SERVICE REQUESTS OASIS
TRANSMISSION / DISTRIBUTION PROJECTS COMPANY:EGSI -LA CUSTOMER: NRG FACILITIES STUDY EJO # F4PPGS0411 TRANSMISSION SERVICE REQUESTS OASIS 1521373 Revision: 0 Issue Revised Project Rev Description of Revision
More informationSouthwest Power Pool Network Integration Transmission Service Application
Revised 09/17/2014 REVISION-2, 12/11/2014 Southwest Power Pool Network Integration Transmission Service Application Date: 14-Oct-14 Purpose of Application: (Check boxes as applicable) Initial NITS Application
More informationSouthwest Power Pool, Inc TPL Stability Study. MAINTAINED BY SOUTHWEST POWER POOL ENIGINEERING GROUP Modeling Group
Southwest Power Pool, Inc. 2011 TPL Stability Study MAINTAINED BY SOUTHWEST POWER POOL ENIGINEERING GROUP Modeling Group PUBLISHED: 12/19/2011 Approved by TWG: 12/19/2011 2 2011 Stability Study Revisions
More informationTransmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015
No. Comment Submitted ISO Response Date Q&A Posted 1 Will the ISO consider proposals that are not within the impedance range specified? Yes. However, the benefits estimated and studies performed by the
More informationSPP-RTO: Operational Characteristics
SPP-RTO: Operational Characteristics Derek Hawkins, Supervisor Real Time Support May 23, 2018 SouthwestPowerPool SPPorg southwest-power-pool 2 The SPP Footprint: Members in 14 States Arkansas Kansas Iowa
More informationFeasibility Study Report
Report For: Fresh Air Energy II, LLC ( Customer ) Queue #: Service Location: Chester County, SC Total Output Requested By Customer: 74.5 MW Commercial Operation Date Requested By Customer: 1/7/2019 Feasibility
More informationTransmission Expansion Advisory Committee
Transmission Expansion Advisory Committee February 7, 2013 1 Issues Tracking 2 Issues Tracking Open Issues None New Issues 3 2013 RTEP Scenario Analysis 4 RTEP Scenario Analysis 2012 North Carolina Transmission
More informationMerger of the generator interconnection processes of Valley Electric and the ISO;
California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Karen Edson Vice President, Policy & Client Services Date: August 18, 2011 Re: Decision on Valley Electric
More informationUpdated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers
Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers Puget Sound Area Study Team Bonneville Power Administration, Puget Sound Energy, Seattle City Light,
More informationDFO STATEMENT OF NEED REPORT
APPENDIX E DFO STATEMENT OF NEED REPORT Table of Contents 1.0 Executive Summary... 1 2.0 Description of the Area... 2 2.1 Geographic Study Area... 2 2.2 2016 System Configuration... 2 3.0 Area Loading
More informationIllinois State Report
July 2016 Illinois State Report Table of Contents 1. Planning Generation Portfolio Analysis Transmission Analysis Load Forecast Gas Pipeline Information 2 Executive Summary (July 2016) Existing Capacity:
More informationGenerator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood
Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood Prepared for: SCE&G Fossil/Hydro June 30, 2008 Prepared by: SCE&G Transmission Planning Table of Contents
More informationLocal Transmission Plan. October 11, 2013 Revised August 25, 2014
Local Transmission Plan October 11, 2013 Revised August 25, 2014 2 Central Hudson s System Zone G: Majority of Central Hudson s load Zone E: One small distribution substation Interconnections with Consolidated
More informationFeasibility Study Report
Report For: Orion Renewable Resources LLC ( Customer ) Queue #: Service Location: Rockingham County, NC Total Output Requested By Customer: 100 MW Commercial Operation Date Requested By Customer: 11/1/2019
More informationFIRSTENERGY S PROPOSED SOLUTION AND REQUEST FOR CONSTRUCTION DESIGNATION
PJM RTEP - Artificial Island Area FIRSTENERGY S PROPOSED SOLUTION AND REQUEST FOR CONSTRUCTION DESIGNATION Part 1 Report REDACTED VERSION FirstEnergy Corp. Energy Delivery, Transmission Planning and Protection
More informationTOLTEC POWER PARTNERSHIP TOLTEC POWER PROJECT INTERCONNECTION STUDY SYSTEM IMPACT STUDY
TOLTEC POWER PARTNERSHIP TOLTEC POWER PROJECT INTERCONNECTION STUDY SYSTEM IMPACT STUDY January 7, 2002 Prepared by Jorge Chacon (Consultant) Tucson Electric Power Company Ed Beck ii EXECUTIVE SUMMARY
More informationNational Grid s 2017 Local Transmission Plan
National Grid s 2017 Local Transmission Plan Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line.
More informationPJM Generator Interconnection R81 Emilie (Fords Mill) MW Impact Study Re-Study
PJM Generator Interconnection R81 Emilie (Fords Mill) 100.9 MW Impact Study Re-Study August 2008 DMS # 498781 General Queue R81 Emilie (Fords Mills) is a Fairless Energy, LLC request to obtain an additional
More informationSPP Notification to Construct
SPP Notification to Construct SPP-NTC-20123 February 14, 2011 Mr. Sam McGarrah Empire District Electric Company PO Box 127 Joplin, MO 64802 RE: Notification to Construct Approved Reliability Network Upgrades
More informationVerde Transmission, LLC. Verde Project. System Impact Study Report
Verde Transmission, LLC Verde Project System Impact Study Report March 2017 Prepared by: Public Service Company of New Mexico Foreword This report was prepared for Verde Transmission, LLC by the PNM Transmission/
More informationLarge Load Serving Study Report for La Plata Electric Association, Inc. Alternatives. Addendum. San Juan Major Project
Large Load Serving Study Report for La Plata Electric Association, Inc. Alternatives Addendum San Juan Major Project Tri-State Generation and Transmission Association Power System Planning December, 2008
More informationTransmission and Distribution Substation Projects. Operating Company: Entergy Gulf States - Texas. Customer: PID # 202
Transmission and Distribution Substation Projects Operating Company: Entergy Gulf States - Texas Customer: PID # 202 Funding Project Number: F4PPGS0386 Facility Study for PID # 202: Study for 146 MW Revision
More informationPREPARED DIRECT TESTIMONY
Application No.: A.0-04- Exhibit No.: SDG&E-4 Witness: William V. Torre In the Matter of San Diego Gas & Electric Company s Application for Authorization to (1) to Participate in the Steam Generator Replacement
More informationInterconnection System Impact Study Report Request # GI
Executive Summary Interconnection System Impact Study Report Request # GI-2008-23 34 MW Solar Generation Ranch at Hartsel, Colorado Public Service Company of Colorado Transmission Planning August 19, 2010
More informationFalcon-Midway 115 kv Line Uprate Project Report
Falcon-Midway 115 kv Line Uprate Project Report 12/1/2008 1 Background The function of this project is to uprate the 26.7 miles of Tri-State s 115 kv line between Midway and Falcon substations from 50
More informationAMERICAN ELECTRIC POWER 2017 FILING FERC FORM 715 ANNUAL TRANSMISSION PLANNING AND EVALUATION REPORT PART 4 TRANSMISSION PLANNING RELIABILITY CRITERIA
AMERICAN ELECTRIC POWER 2017 FILING FERC FORM 715 ANNUAL TRANSMISSION PLANNING AND EVALUATION REPORT PART 4 TRANSMISSION PLANNING RELIABILITY CRITERIA AEP Texas (comprised of its Central and North Divisions
More information2012 LOCAL TRANSMISSION PLAN:
Colorado PUC E-Filings System 2012 LOCAL TRANSMISSION PLAN: TRANSMISSION COORDINATION AND PLANNING COMMITTEE ANNUAL TRANSMISSION ASSESSMENT FOR BLACK HILLS/COLORADO ELECTRIC UTILITY COMPANY, L.P., D/B/A
More informationMILLIGAN SOLAR PROJECT
February 16, 2009 Page 1 of 18 A subsidiary of Pinnacle West Capital Corporation MILLIGAN SOLAR PROJECT FINAL Feasibility Study Report APS Contract 52115 Prepared by: Arizona Public Service Company Transmission
More informationWheeler Ridge Junction Substation Project Description and Functional Specifications for Competitive Solicitation
Wheeler Ridge Junction Substation Project Description and Functional Specifications for Competitive Solicitation 1. Description In the 2013-2014 Transmission Planning Cycle, the ISO approved the construction
More informationElectric Power Research Institute, USA 2 ABB, USA
21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2016 Grid of the Future Symposium Congestion Reduction Benefits of New Power Flow Control Technologies used for Electricity
More informationGateway South Transmission Project
Phase 1 Comprehensive Progress Report Volume 1 - Technical Report Report Prepared by PacifiCorp Transmission Planning Department November 21, 2008 WECC1-V4 Phase 1 Comprehensive Progress Report Executive
More informationMarket Efficiency Planning Study
Market Efficiency Planning Study West SPM June 12, 2013 SPM : Market Efficiency Planning Study Update March 25, 2012 Market Efficiency Planning Study Recap Objective is to execute an annual structured
More informationMidway/Monument Area TTC Study
Midway/Monument Area TTC Study (includes the following lines: Midway Geesen 115 kv, Geesen Falcon 115 kv, Falcon Fuller 115 kv, Fuller Black Squirrel 115 kv, and Black Squirrel Monument 115 kv) Johnny
More informationElbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI
Executive Summary Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI-2003-2 Xcel Energy Transmission Planning January 2004 This Interconnection Feasibility
More informationProject #94. Generation Interconnection System Impact Study Report Revision
Project #94 Generation Interconnection System Impact Study Report Revision October 2, 2009 Electric Transmission Planning Table of Contents Table of Contents...2 Executive Summary...3 Energy Resource Interconnection
More informationEngineering Study Report: FortisAlberta Inc. Plamondon 353S Capacity Increase. Contents
APPENDIX A CONNECTION ASSESSMENT : FortisAlberta Inc. Plamondon 5S Capacity Increase Contents Executive Summary.... Introduction... 6. Project... 6.. Project Overview... 6.. Load Component... 6.. Generation
More informationKey to Status Fields in the Project List
Key to Fields in the Project List Load Growth Interconnection Economic Reliability Concept Proposed Planned Under Construction In Cancelled N/A Backstop Too early TO Update Base case Increasing load served
More informationFeasibility Study. Shaw Environmental, Inc. 12MW Landfill Gas Generation Interconnection. J.E.D. Solid Waste Management Facility. Holopaw Substation
Feasibility Study Shaw Environmental, Inc. 12MW Landfill Gas Generation Interconnection J.E.D. Solid Waste Management Facility Holopaw Substation September 2013 1 of 12 Table of Contents GENERAL... 3 SHORT
More information15 Nelson-Marlborough Regional Plan
15 Nelson-Marlborough Regional Plan 15.1 Regional overview 15.2 Nelson-Marlborough transmission system 15.3 Nelson-Marlborough demand 15.4 Nelson-Marlborough generation 15.5 Nelson-Marlborough significant
More information