ICT Strategic Transmission Plan (ISTEP) Review and Status Update

Size: px
Start display at page:

Download "ICT Strategic Transmission Plan (ISTEP) Review and Status Update"

Transcription

1 ICT Strategic Transmission Plan (ISTEP) Review and Status Update Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans, Louisiana Douglas Bowman, PE Lead Engineer, ICT Planning

2 ISTEP ICT Strategic Transmission Expansion Plan Attachment K Paragraph The ICT will identify potential economic upgrades on the Transmission System, including upgrades to existing facilities as well as construction of new facilities. Paragraph 14.3 The ICT will identify such upgrades based on screening criteria, which may include considerations such as frequent transmission loading relief events, frequently constrained flowgates in the Available Flowgate Capability process or Weekly Procurement Process (WPP), flowgates with high congestion costs as identified in the WPP process, and commonly invoked must-run operating guides.

3 ISTEP Scope and Purpose Promote transmission expansion on the Entergy transmission system by identifying and developing economic projects that address transmission constraints through powerflow studies and stakeholder input Focus on creating new, higher-voltage transmission in order to address potential issues on the Entergy transmission system, as opposed to upgrading the underlying lower-voltage system. Not used for cost allocation Entergy is not obligated to construct ISTEP projects Not related to reliability requirements

4 ISTEP Objective Improve Load-Serving Capability Improve Inter-regional Transfer Capability Improve Load Pockets/Load Centers Relieve Constraining Flowgates

5 Completed 12/2007 ISTEP Phase I Identified Operational Limitations 213 TLRs resulting in curtailment of 340GWh of firm and non-firm transmission service from January to October, Identified Transfer Capability Limitations Most limiting flowgates identified

6 ISTEP Phase I (continued) Modeling 2015 Summer Peak Case Includes 2008 Construction Plan upgrades Does not include Base Plan upgrades Does not include Operating guides, redispatch, breaker operation, or other mitigation plans

7 ISTEP Phase I (continued) 20 proposed projects consisting of one or more transmission upgrades Proposed Projects Louisiana 7 Projects Arkansas 5 Projects Mississippi 5 Projects Texas 1 Project Other 2 Short Term Projects

8 ISTEP Phase II Stakeholders ranked Phase I projects Approximately 20 stakeholder responses Top 5 were selected from each stakeholder ranking Final ranking was developed using a combination of stakeholder rankings and the ICT s knowledge of the Entergy system.

9 ISTEP Phase II Projects South LA Bulk Central Arkansas 230 kv Acadiana Area Central MS Bulk McAdams Series Reactor Seams Projects

10 South LA & Acadiana South LA Bulk Webre Richard 500kV Projects address: WOTAB Import Constraining flowgates Acadiana Flowgates: Webre Wells Mt. Olive Hartburg Wilbert Livonia Terrebonne Greenwood Cecelia Moril Meaux - Judice Fancy Point Hartburg 500 kv

11 Central AR 230kV Central AR 230kV Gleason - Conway W. 230 kv Gold Creek- Conway Industrial 230kV Projects address: Constraining flowgates Flowgates: Morrilton East- Gleason Conway- Donaghey Conway W. Conway Ind. 230kV Cabot-Gold Creek 230kV

12 Central AR 230kV Central AR 230kV Kanis 230/115kV transformer Little Rock South 230/115kV transformer Projects address: Constraining flowgates Flowgates: Morrilton East- Gleason Conway- Donaghey Wrightsville 500/ 230kV transformer Kanis-Mabelvale 230 kv Mabelvale 500/230kV transformer Wrightsville-Little Rock South 230kV

13 Central AR 230kV Cheetah-Mt. Pine South 230kV Mabelvale- Cheetah 230kV Projects address: Constraining flowgates Flowgates: Morrilton East- Gleason Conway- Donaghey Hot Springs- Cheetah 230kV Mt. Pine South- Carpenter 230 kv Carpenter-Hot Springs EHV 230kV Hot Springs EHV 500/230kV transformer

14 South LA & Acadiana Richard Sellers 230 kv Sellers Meaux 230 kv Acadiana Area Wells Labbe 230kV Labbe Bonin 230 kv Sellers Labbe 230kV Sellers Segura 230 kv Projects address: WOTAB Import Constraining flowgates Acadiana Flowgates: Webre Wells Mt. Olive Hartburg Wilbert Livonia Terrebonne Greenwood Cecelia Moril Meaux - Judice

15 Central MS Bulk Central MS Bulk Projects address: Constraining flowgates Flowgates: Ray Braswell Baxter Wilson Grand Gulf Ray Braswell 500 kv

16 McAdams Series Reactor Install a 36Ω reactor in series with McAdams 500/230 kv transformer McAdams Series Reactor 500/230kV

17 Seams Projects Ft. Smith-ANO-ISES 500kV El Dorado Longwood Series Compensation Messick 500/230 Ft. Smith-NW Texarkana-McNeil 500kV- Turk S. Fayetteville Van Buren ANO 500kV

18 Ft. Smith ANO ISES 765 kv Ft. Smith ANO ISES 500 kv Projects address: Improve SPP/Entergy Interface

19 El Dorado Longwood Series Compensation Increase Transfer Capability of the Line El Dorado Longwood Series Compensation

20 Messick 500/230 kv Mt Olive Hartburg Tap Stability Issue Improve SPP/Entergy Interface Existing Mt. Olive - Hartburg 500kV Messick 500/230kV

21 Ft. Smith NW Texarkana Turk McNeil 500 kv FT. Smith NW Texarkana 500kV Turk Turk McNeil 500kV NW Texarkana Turk 500kV Projects address: Improve SPP/Entergy Interface

22 S. Fayetteville Van Buren ANO 500kV S. Fayetteville Van Buren 500 kv Projects address: Improve SPP/Entergy Interface Van Buren ANO 500kV

23 South LA Bulk Status Engineering analysis complete Economic analysis proceeding Central Arkansas 230 kv Engineering analysis underway Acadiana Area Engineering analysis complete Currently in stakeholder negotiations

24 Central MS Bulk Status (continued) Engineering analysis underway McAdams Series Reactor Engineering analysis complete Currently in stakeholder negotiations Seams Projects Engineering analysis underway

25 ISTEP Timeline ISTEP Phase I Report Published Dec. 4, 2007 Stakeholder comment period Stakeholder comment period ends Feb. 1, 2008 LTTIWG Meeting: Discuss comments and establish scope for additional analysis Feb. 12, 2008 LTTIWG Meeting: Present status update and list of seams projects for analysis May, 2008 Transmission Summit: Present update of study status July, 2008 LTTIWG Meeting: Present update of study status and Webre Wells Economic Study Results September, 2008 LTTIWG Meeting: Present update of study status October, 2008 Complete ISTEP Phase II December, 2008 LTTIWG Meeting: Present Final Strategic Plan Phase II Report January, 2009

26 Next Steps ICT to study ISTEP projects in further detail Continue engineering analysis of ISTEP and seams projects Complete Webre-Wells economic analysis Complete economic analysis of remaining ISTEP and seams projects

SPP Reliability Coordinator TLR 5 Analysis Report for the ICT Reliability Area

SPP Reliability Coordinator TLR 5 Analysis Report for the ICT Reliability Area SPP Reliability Coordinator TLR 5 Analysis Report for the ICT Reliability Area MAINTAINED BY SPP Reliability Coordinator PUBLISHED: 10/11/2010 LATEST REVISION: 10/12/2010 Copyright 2010 by Southwest Power

More information

ICT Strategic Transmission Expansion Plan (ISTEP) Report. ICT Planning

ICT Strategic Transmission Expansion Plan (ISTEP) Report. ICT Planning ICT Strategic Transmission Expansion Plan (ISTEP) Report ICT Planning PUBLISHED: 12/04/2007 Table of Contents Table of Contents...1 I. Executive Summary...2 II. Objectives...4 III. A. Improving Load-Serving

More information

Market Congestion Planning Study (South)- Robustness Analysis. Economic Planning Users Group Meeting August 11 th, 2017

Market Congestion Planning Study (South)- Robustness Analysis. Economic Planning Users Group Meeting August 11 th, 2017 Market Congestion Planning Study (South)- Robustness Analysis Economic Planning Users Group Meeting August 11 th, 2017 Key Takeaways The benefit calculations were updated due to a flowgate rating correction

More information

Cleco Power - Lafayette Utilities System- SPP/SPPICT-Entergy Joint Transmission Planning Study

Cleco Power - Lafayette Utilities System- SPP/SPPICT-Entergy Joint Transmission Planning Study October 20, 2008 DRAFT Cleco Power - Lafayette Utilities System- SPP/SPPICT-Entergy Joint Transmission Planning Study RELIABILITY AND ECONOMIC STUDY FOR THE 2008 TRANSMISSION EXPANSION PLAN OF THE ACADIANA

More information

Stability Study for the Mt. Olive Hartburg 500 kv Line

Stability Study for the Mt. Olive Hartburg 500 kv Line Stability Study for the Mt. Olive Hartburg 500 kv Line Peng Yu Sharma Kolluri Transmission & Distribution Planning Group Energy Delivery Organization Entergy Sevices Inc April, 2011 New Orleans, LA 1.

More information

1. Administrative Items... SPP. 2. Stakeholder Web-Presentation... ABB

1. Administrative Items... SPP. 2. Stakeholder Web-Presentation... ABB Southwest Power Pool, Inc. ENTERGY REGIONAL STATE COMMITTEE MINIMIZING BULK POWER COSTS STUDY STAKEHOLDER MEETING Face-to-face & Web-conference Hyatt Regency DFW DFW Airport, TX Room: Maverick AGENDA July

More information

CIL/CEL Values and Study Timeline

CIL/CEL Values and Study Timeline 2019-2020 CIL/CEL Values and Study Timeline LOLEWG 9/11/2018 Updated 10/3/2018 1 Purpose and Key Takeaways Purpose Inform stakeholders of Draft 2019-20 Capacity Import and Export Limits. Key Takeaways

More information

Southwest Power Pool, Inc. Entergy ENTERGY SPP RTO REGIONAL PLANNING PROCESS MEETING May 24, 2012 NET CONFERENCE AGENDA 10:00 AM 12:00 PM

Southwest Power Pool, Inc. Entergy ENTERGY SPP RTO REGIONAL PLANNING PROCESS MEETING May 24, 2012 NET CONFERENCE AGENDA 10:00 AM 12:00 PM Southwest Power Pool, Inc. Entergy ENTERGY SPP RTO REGIONAL PLANNING PROCESS MEETING May 24, 2012 NET CONFERENCE AGENDA 10:00 AM 12:00 PM 1. Administrative A. Introductions... All B. SPP Antitrust Guidelines...

More information

Entergy Gulf States, Inc. (Texas) Proposed Transmission Reliability Projects

Entergy Gulf States, Inc. (Texas) Proposed Transmission Reliability Projects Entergy Gulf States, Inc. (Texas) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 14, 2005 1 2004-06 EGSI-TX Transmission Western Region Reliability

More information

Service Requested 150 MW, Firm. Table ES.1: Summary Details for TSR #

Service Requested 150 MW, Firm. Table ES.1: Summary Details for TSR # Executive Summary Firm point to point transmission service has been requested by Transmission Service Request (TSR) #75669514, under the SaskPower Open Access Transmission Tariff (OATT). The TSR consists

More information

Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting

Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting BHE Wyoming Q4 Stakeholder Meeting November 17, 2016 @ 1:00PM MT Black Hills Energy Service Center 409 Deadwood Avenue, Rapid

More information

SPP-RTO: Operational Characteristics

SPP-RTO: Operational Characteristics SPP-RTO: Operational Characteristics Derek Hawkins, Supervisor Real Time Support May 23, 2018 SouthwestPowerPool SPPorg southwest-power-pool 2 The SPP Footprint: Members in 14 States Arkansas Kansas Iowa

More information

Highly Constrained Elements Within ATC Footprint

Highly Constrained Elements Within ATC Footprint Highly Constrained Elements Within ATC Footprint Feb. 21, 2008 Presented by Dale Burmester Compiled by ATC Economic Planning Team: Tom Dagenais, Todd Tadych, Arash Ghodsian, Chris Hagman Solutions to Market

More information

SERTP rd Quarter Meeting

SERTP rd Quarter Meeting 2014 SERTP SERTP 2014 3 rd Quarter Meeting 2 nd RPSG Meeting September 30 th, 2014 APC Headquarters Birmingham, AL 2014 SERTP Process Information The SERTP process is a transmission planning process. Please

More information

2015 Grid of the Future Symposium

2015 Grid of the Future Symposium 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http ://www.cigre.org 2015 Grid of the Future Symposium Flexibility in Wind Power Interconnection Utilizing Scalable Power Flow Control P. JENNINGS,

More information

Sub Regional RTEP Committee Western Region ATSI

Sub Regional RTEP Committee Western Region ATSI Sub Regional RTEP Committee Western Region ATSI February 20, 2019 1 ATSI Needs Stakeholders must submit any comments within 10 days of this meeting in order to provide time necessary to consider these

More information

SERTP rd Quarter Meeting

SERTP rd Quarter Meeting 2015 SERTP SERTP 2015 3 rd Quarter Meeting 2nd RPSG Meeting September 24 th, 2015 APC Headquarters Birmingham, AL 2015 SERTP Process Information The SERTP process is a transmission planning process. Please

More information

Market Efficiency Planning Study

Market Efficiency Planning Study Market Efficiency Planning Study West SPM June 12, 2013 SPM : Market Efficiency Planning Study Update March 25, 2012 Market Efficiency Planning Study Recap Objective is to execute an annual structured

More information

System Impact Study PID MW Plant

System Impact Study PID MW Plant System Impact Study PID 257 252 MW Plant Prepared by: Southwest Power Pool Independent Coordinator of Transmission 415 N. McKinley, Suite140 Little Rock, AR 72205 Rev Issue Date Description of Revision

More information

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY California Independent System Operator Memorandum To: ISO Operations (MRTU) Committee From: Armando J. Perez, Director of Grid Planning cc: ISO Board of Governors ISO Officers Date: April 29, 2005 Re:

More information

Entergy Louisiana, LLC (South) & Entergy New Orleans, Inc. Proposed Transmission Reliability Projects

Entergy Louisiana, LLC (South) & Entergy New Orleans, Inc. Proposed Transmission Reliability Projects Entergy Louisiana, LLC (South) & Entergy New Orleans, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 13, 2006 1 Approved 2006 2010 ELL-South Transmission

More information

IMM Quarterly Report: Summer 2017

IMM Quarterly Report: Summer 2017 IMM Quarterly Report: Summer 2017 MISO Independent Market Monitor David Patton, Ph.D. Potomac Economics September 19, 2017 Highlights and Findings: Summer 2017 The MISO markets performed competitively

More information

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation Prepared by: Entergy Services, Inc. T & D Planning L-ENT-17A 639 Loyola Avenue New Orleans, LA 70113 Rev Issue Date

More information

Manitoba Hydro Generation Interconnection Exploratory Study Notice September 28, 2006

Manitoba Hydro Generation Interconnection Exploratory Study Notice September 28, 2006 Manitoba Hydro Generation Interconnection Exploratory Study Notice September 28, 2006 As per the Manitoba Hydro Open Access Interconnection Tariff, the Transmission Owner has contracted TransGrid Solutions

More information

SH 249 IN GRIMES COUNTY. Open House April 3, 2014

SH 249 IN GRIMES COUNTY. Open House April 3, 2014 SH 249 IN GRIMES COUNTY Open House April 3, 2014 Meeting Agenda Purpose of Meeting Today: Review the purpose and need for the SH 249 Grimes County project Review the proposed project and alternatives Discuss

More information

2010 SERTP. Welcome. SERTP rd Quarter Meeting. 2 nd RPSG Meeting 9:00 AM 3:00 PM

2010 SERTP. Welcome. SERTP rd Quarter Meeting. 2 nd RPSG Meeting 9:00 AM 3:00 PM 2010 SERTP Welcome SERTP 2010 3 rd Quarter Meeting 2 nd RPSG Meeting 9:00 AM 3:00 PM 1 2010 SERTP Purposes & Goals of the Meeting Preliminary Economic Planning Results SERC Regional Model Development Update

More information

Transmission Planning using Production Cost Simulation & Power Flow Analysis

Transmission Planning using Production Cost Simulation & Power Flow Analysis ABB Transmission Planning using Production Cost Simulation & Power Flow Analysis Jinxiang Zhu, Ph.D. Senior Principal, ABB Power Consulting ABB Group January 16, 2018 Slide 1 Power System Studies TECHNICAL

More information

Interconnection Feasibility Study Report GIP-023-FEAS-R1. Generator Interconnection Request # MW Wind Generating Facility Inverness (L6549), NS

Interconnection Feasibility Study Report GIP-023-FEAS-R1. Generator Interconnection Request # MW Wind Generating Facility Inverness (L6549), NS Interconnection Feasibility Study Report GIP-023-FEAS-R1 Generator Interconnection Request # 23 100 MW Wind Generating Facility Inverness (L6549), NS February 16, 2006 Control Centre Operations Nova Scotia

More information

FACILITIES STUDY TRANSMISSION SERVICE REQUESTS OASIS

FACILITIES STUDY TRANSMISSION SERVICE REQUESTS OASIS TRANSMISSION / DISTRIBUTION PROJECTS COMPANY:EGSI -LA CUSTOMER: NRG FACILITIES STUDY EJO # F4PPGS0411 TRANSMISSION SERVICE REQUESTS OASIS 1521373 Revision: 0 Issue Revised Project Rev Description of Revision

More information

Flowgate 10515, an OTDF flowgate, consists of the following elements:

Flowgate 10515, an OTDF flowgate, consists of the following elements: MAIN Report for NERC Initial Investigation NERC TLR Level 5A Flowgate 10515 Kewaunee 345/138 kv Transformer for the loss of Point Beach-North Appleton 345kV Line October 15 17, 2001 Submitted January 14,

More information

Market Efficiency Update

Market Efficiency Update Market Efficiency Update Transmission Expansion Advisory Committee July 13, 2017 Agenda Where we are in the process Interregional Projects Status RPM Projects Status Reevaluation Analysis Status Next Steps

More information

Western NY Public Policy Transmission Planning Report

Western NY Public Policy Transmission Planning Report Western NY Public Policy Transmission Planning Report Dawei Fan Supervisor, Public Policy and Interregional Planning Business Issues Committee September 12, 2017 Operating Committee September 15, 2017

More information

Interconnection Feasibility Study Report GIP-084-FEAS-R2

Interconnection Feasibility Study Report GIP-084-FEAS-R2 Interconnection Feasibility Study Report GIP-084-FEAS-R2 System Interconnection Request #84 50 MW Wind Generating Facility Pictou County (L-7004) August 17, 2007 Control Centre Operations Nova Scotia Power

More information

Kansas Legislature. Briefing for the. March 6, Paul Suskie & Mike Ross

Kansas Legislature. Briefing for the. March 6, Paul Suskie & Mike Ross Briefing for the Kansas Legislature March 6, 2013 Paul Suskie & Mike Ross psuskie@spp.org mross@spp.org 501.614.3200 Presentation overview Who we are What we do How we benefit the consumer Industry dynamics

More information

Transmission Expansion Advisory Committee

Transmission Expansion Advisory Committee Transmission Expansion Advisory Committee February 7, 2013 1 Issues Tracking 2 Issues Tracking Open Issues None New Issues 3 2013 RTEP Scenario Analysis 4 RTEP Scenario Analysis 2012 North Carolina Transmission

More information

Transmission Coordination and Planning Committee 2014 Q4 Stakeholder Meeting. December 18, 2014

Transmission Coordination and Planning Committee 2014 Q4 Stakeholder Meeting. December 18, 2014 Transmission Coordination and Planning Committee 2014 Q4 Stakeholder Meeting December 18, 2014 Agenda 1. Introductions 2. TCPC Policies 3. BHCE Planning Department Update 4. 2014 LTP Study Results 5. Stakeholder

More information

Status of PNM s Completed Transmission Construction Projects 11/30/2017

Status of PNM s Completed Transmission Construction Projects 11/30/2017 Status of s Completed Transmission Construction Projects Second Tah Ta Hey 115/345 kv Transformer Yah Ta Hey Switching Station On January 9, 2015, filed with the NMPRC under NMPRC Rule 440 information

More information

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L79. October 18, 2016

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L79. October 18, 2016 Decision 21481-D01-2016 October 18, 2016 Alberta Utilities Commission Decision 21481-D01-2016 Proceeding 21481 Application 21481-A001 October 18, 2016 Published by the: Alberta Utilities Commission Fifth

More information

FUEL ADJUSTMENT CLAUSE

FUEL ADJUSTMENT CLAUSE Page 26.1 ENTERGY NEW ORLEANS, INC. ELECTRIC SERVICE Supersedes: FAC effective 6/1/09 RIDER SCHEDULE FAC-5 Schedule Consists of: One Sheet Plus Schedule A and Attachments A and B FUEL ADJUSTMENT CLAUSE

More information

Alberta Electric System Operator Needs Identification Document Application. Mowat 2033S Substation

Alberta Electric System Operator Needs Identification Document Application. Mowat 2033S Substation Decision 21781-D01-2016 Alberta Electric System Operator Needs Identification Document Application Facility Applications September 7, 2016 Alberta Utilities Commission Decision 21781-D01-2016: Alberta

More information

Final Series of Public Meetings

Final Series of Public Meetings Final Series of Public Meetings Public Meeting Locations City Date Jasper Monday, September 26 Livingston Tuesday, September 27 Huntsville Wednesday, September 28 Bryan Thursday, September 29 Eldorado

More information

MTEP13 SPM #2- Central Region. March 25, 2013

MTEP13 SPM #2- Central Region. March 25, 2013 MTEP13 SPM #2- Central Region Ameren Missouri March 25, 2013 Ameren Missouri Project Review Central Region: Ameren Missouri Ameren Missouri has a total of 10 project proposals that are recommended for

More information

Western Area Power Administration

Western Area Power Administration 2014/15 Integrated System (IS) 890 Local Planning Stakeholder Meeting #2 Western Area Power Administration Upper Great Plains Region Transmission Planning Stakeholder Meeting Wednesday, December 10 th,

More information

TEN YEAR PLANNING GUIDE SHASTA LAKE ELECTRIC UTILITY

TEN YEAR PLANNING GUIDE SHASTA LAKE ELECTRIC UTILITY TEN YEAR PLANNING GUIDE SHASTA LAKE ELECTRIC UTILITY 2011-2020 P+ PowerPlus Engineering A Department of STAR Energy Services, LLC TEN YEAR PLANNING GUIDE 2011-2020 SHASTA LAKE ELECTRIC UTILITY CITY OF

More information

Southeastern Regional Transmission Planning (SERTP)

Southeastern Regional Transmission Planning (SERTP) Southeastern Regional Transmission Planning (SERTP) December 2014 Regional Transmission Planning Analyses I. Overview of Regional Analyses SERTP sponsors plan and expand the transmission system to reliably

More information

New Jersey State Report

New Jersey State Report New Jersey State Report July 2017 Table of Contents 1. Planning Generation Portfolio Analysis Transmission Analysis Load Forecast 2. Markets Capacity Market Results Market Analysis 3. Operations Emissions

More information

Illinois State Report

Illinois State Report July 2016 Illinois State Report Table of Contents 1. Planning Generation Portfolio Analysis Transmission Analysis Load Forecast Gas Pipeline Information 2 Executive Summary (July 2016) Existing Capacity:

More information

Terry Blackwell Page 1 of 5. Education North Carolina State University BS, Electrical Engineering Power Systems emphasis

Terry Blackwell Page 1 of 5. Education North Carolina State University BS, Electrical Engineering Power Systems emphasis Terry Blackwell Page 1 of 5 Education 1977 North Carolina State University BS, Electrical Engineering Power Systems emphasis Professional Qualifications 1977 PE-Professional Engineer Business Experience

More information

TEXAS ECONOMIC STUDY REPORT ICTES INFORMATIONAL ONLY

TEXAS ECONOMIC STUDY REPORT ICTES INFORMATIONAL ONLY TEXAS ECONOMIC STUDY REPORT ICTES-2011-001 INFORMATIONAL ONLY Prepared for: Entergy Service, Inc. (SPO) American Electric Power Service Corporation (AEPSC) GDS Associates, Inc. (GDS), as agent of East

More information

Customer Service, Operations and Safety Committee. Rail Car Deployment Strategies

Customer Service, Operations and Safety Committee. Rail Car Deployment Strategies Customer Service, Operations and Safety Committee Rail Car Deployment Strategies July 21, 2005 Department of Operations Table of Contents Purpose Metro Matters Power Upgrade Schedule Current Service Possible

More information

2013 SERTP. Welcome. SERTP rd Quarter Meeting. 2 nd RPSG Meeting

2013 SERTP. Welcome. SERTP rd Quarter Meeting. 2 nd RPSG Meeting 2013 SERTP Welcome SERTP 2013 3 rd Quarter Meeting 2 nd RPSG Meeting 1 2013 SERTP The SERTP process is a transmission planning process. Please contact the respective transmission provider for questions

More information

System Impact Study Report

System Impact Study Report Report For: NTE Carolinas II, LLC ( Customer ) Queue #: 42432-01 Service Location: Rockingham County, NC Total Output: 477 MW (summer) / 540 MW (winter) Commercial Operation Date: 12/1/2020 42432-01 SIS

More information

Updates. Pat Reiten President and CEO, PacifiCorp Transmission

Updates. Pat Reiten President and CEO, PacifiCorp Transmission PacifiCorp Transmission and Regional Updates Pat Reiten President and CEO, PacifiCorp Transmission PacifiCorp Transmission Overview 16,400 circuit-miles of transmission lines 12,685 MW record peak demand

More information

Supplemental Report on the NCTPC Collaborative Transmission Plan

Supplemental Report on the NCTPC Collaborative Transmission Plan Supplemental Report on the NCTPC 2007-2017 Collaborative Transmission Plan May 16, 2008 1 Table of Contents I. Executive Summary...1 II. Richmond-Fort Bragg Woodruff Street 230 kv Line...2 II.A. Need for

More information

New Mexico Transmission Expansion Concepts For Wind Resources

New Mexico Transmission Expansion Concepts For Wind Resources New Mexico Transmission Expansion Concepts For Wind Resources May 2008 Update Electric Services Transmission Operations FOREWORD This document contains PNM s latest concepts for expanding the transmission

More information

FACILITIES STUDY CONSTELLATION ENERGY TRANSMISSION SERVICE REQUEST OASIS

FACILITIES STUDY CONSTELLATION ENERGY TRANSMISSION SERVICE REQUEST OASIS TRANSMISSION / DISTRIBUTION PROJECTS COMPANY:EAI CUSTOMER: CONSTELLATION ENERGY FACILITIES STUDY EJO # F4PPAR0434 ICTT-2007-177 CONSTELLATION ENERGY TRANSMISSION SERVICE REQUEST OASIS 1498122 Revision:

More information

2013 CARIS Phase 1 Report

2013 CARIS Phase 1 Report 2013 CARIS Phase 1 Report Timothy Duffy Manager, Economic Planning New York Independent System Operator Business Issues Committee September 18, 2013 KCC 2013 New York Independent System Operator, Inc.

More information

FACILITIES STUDY TRANSMISSION SERVICE REQUESTS OASIS

FACILITIES STUDY TRANSMISSION SERVICE REQUESTS OASIS TRANSMISSION / DISTRIBUTION PROJECTS COMPANY:EGSI -LA CUSTOMER: CLECO POWER LLC FACILITIES STUDY EJO # F4PPGS0419 ICTT-2008-012 TRANSMISSION SERVICE REQUESTS OASIS 1543621 Revision: 1 Rev Issue Date Description

More information

APPENDIX E: Project Need and Description

APPENDIX E: Project Need and Description APPENDIX E: Project Need and California ISO/MID E-1 Intentionally left blank California ISO/MID E-2 Tyler 60 kv Shunt Capacitor Installation of a 2x10 MVAR capacitor bank at Tyler 60 kv bus Objectives

More information

Panel Discussion: Planning for Today and Tomorrow

Panel Discussion: Planning for Today and Tomorrow Panel Discussion: Planning for Today and Tomorrow Moderator: Chuck Farmer, Director, Stakeholder and Panelists: Public Affairs, IESO David Short, Power System Assessments, IESO Ahmed Maria, Senior Manager,

More information

FORTISBC INC. PRUDENCY REVIEW KETTLE VALLEY SUBSTATION EXHIBIT A2 5

FORTISBC INC. PRUDENCY REVIEW KETTLE VALLEY SUBSTATION EXHIBIT A2 5 ALANNA GILLIS ACTING COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, BC CANADA V6Z 2N3 TELEPHONE: (604) 660 4700 BC TOLL

More information

Local Transmission Plan. Rev. 1: April 2018

Local Transmission Plan. Rev. 1: April 2018 Local Transmission Plan Rev. 1: April 2018 1 Central Hudson s Service Territory Own & Operate approximately 610 miles of 69 kv, 115 kv & 345 kv transmission lines and three 345 kv substations 2 Central

More information

Transmission Expansion Advisory Committee Meeting 2014 Market Efficiency Analysis

Transmission Expansion Advisory Committee Meeting 2014 Market Efficiency Analysis Transmission Expansion Advisory Committee Meeting 2014 Market Efficiency Analysis September 02, 2014 Objectives To review simulated congestion results for all Market Efficiency study years To provide an

More information

Alberta Electric System Operator Saleski Transmission Project Needs Identification Document

Alberta Electric System Operator Saleski Transmission Project Needs Identification Document Decision 2013-127 Alberta Electric System Operator Saleski Transmission Project Needs Identification Document ATCO Electric Ltd. Saleski 901S Substation and 144-kV Transmission Line 7L142 Facility Application

More information

The 6 th Basic Plan for Long-term Electricity Supply and Demand (2013~2027)

The 6 th Basic Plan for Long-term Electricity Supply and Demand (2013~2027) The 6 th Basic Plan for Long-term Electricity Supply and Demand (2013~2027) February 2013 Contents I. Introduction 1 II. Status of Electricity Supply and Demand 2 1. Electricity Demand 2 2. Electricity

More information

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L82

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L82 Decision 21447-D01-2016 August 23, 2016 Decision 21447-D01-2016 Proceeding 21447 Application 21447-A001 August 23, 2016 Published by the: Fifth Avenue Place, Fourth Floor, 425 First Street S.W. Calgary,

More information

Mobility Corridor Updates. Transit & Active Transportation Projects

Mobility Corridor Updates. Transit & Active Transportation Projects Mobility Corridor Updates Transit & Active Transportation Projects Laura Cornejo, DEO Regional Planner Regional Operator Metro is LA County s Regional Builder/Funder Rail Bus Service (Metro/Muni/Local)

More information

Facilities Study for Alberta to US Available Transfer Capability

Facilities Study for Alberta to US Available Transfer Capability Facilities Study for Alberta to US Available Transfer Capability Report No: NPP2002-05 June 3, 2002 System Planning & Grid Operations, Transmission Line of Business Engineering Services Executive Summary

More information

FACILITIES STUDY TRANSMISSION SERVICE REQUEST OASIS

FACILITIES STUDY TRANSMISSION SERVICE REQUEST OASIS TRANSMISSION / DISTRIBUTION PROJECTS COMPANY:EAI CUSTOMER: CARTHAGE WATER & ELECTRIC FACILITIES STUDY EJO # F4PPAR0436 ICTT-2007-179 TRANSMISSION SERVICE REQUEST OASIS 1498226 Revision: 1 Rev Issue Date

More information

SPP.org 1. Expansion Planning and Cost Allocations. Sweetwater, TX

SPP.org 1. Expansion Planning and Cost Allocations. Sweetwater, TX 1 Expansion Planning and Cost Allocations Transmission Summit 2010 Sweetwater, TX January 15, 2010 1 3 Interconnections / 8 NERC Regions 3 Independent System Operator (ISO) / Regional Transmission Organization

More information

Electric Power Research Institute, USA 2 ABB, USA

Electric Power Research Institute, USA 2 ABB, USA 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2016 Grid of the Future Symposium Congestion Reduction Benefits of New Power Flow Control Technologies used for Electricity

More information

2017 MAX Program. Red & Blue Line Platform Extension. John Rhone Vice President, Capital Design & Construction June 22, 2017

2017 MAX Program. Red & Blue Line Platform Extension. John Rhone Vice President, Capital Design & Construction June 22, 2017 2017 MAX Program Red & Blue Line Platform Extension John Rhone Vice President, Capital Design & Construction June 22, 2017 Project Goals and Objectives Increase capacity: Move more passengers by 2021 with

More information

LAX Specific Plan Amendment Study. CONCEPT DEVELOPMENT Public Meeting Series #5 August 23 & 26, 2006

LAX Specific Plan Amendment Study. CONCEPT DEVELOPMENT Public Meeting Series #5 August 23 & 26, 2006 LAX Specific Plan Amendment Study CONCEPT DEVELOPMENT Public Meeting Series #5 August 23 & 26, 2006 Agenda Background on public planning process Regional planning update LAWA progress on settlement commitments

More information

DUKE ENERGY PROGRESS TRANSMISSION SYSTEM PLANNING SUMMARY

DUKE ENERGY PROGRESS TRANSMISSION SYSTEM PLANNING SUMMARY DUKE ENERGY PROGRESS TRANSMISSION SYSTEM PLANNING SUMMARY Transmission Department Transmission Planning Duke Energy Progress TABLE OF CONTENTS I. SCOPE 3 II. TRANSMISSION PLANNING OBJECTIVES 3 III. TRANSMISSION

More information

SunZia Southwest Transmission Project

SunZia Southwest Transmission Project SunZia Southwest Transmission Project SunZia Project Update for the 9 th Annual Transmission Summit West October 13, 2017 SUNZIA SOUTHWEST TRANSMISSION PROJECT OCTOBER 13, 2017 0 SouthWestern Power Group

More information

Kake - Petersburg Intertie Update

Kake - Petersburg Intertie Update Kake - Petersburg Intertie Update September 18, 2013 Sitka Southeast Conference Annual Meeting Trey Acteson CEO, SEAPA Mark Schinman, P.E. Commonwealth Associates There is a Need for the Intertie Kake

More information

The UK s Industrial Strategy; the Automotive Sector Deal

The UK s Industrial Strategy; the Automotive Sector Deal The UK s Industrial Strategy; the Automotive Sector Deal Mike Hawes, SMMT LowCVP - 12 April 2018 What is SMMT? Targeted networking in UK and internationally National and international events Reliable automotive

More information

PSE Attachment K Puget Sound Area Transmission Meeting

PSE Attachment K Puget Sound Area Transmission Meeting PSE Attachment K Puget Sound Area Transmission Meeting Stephanie Lu Senior Engineer December 15, 2011 Agenda Attachment K Review Economic Studies Process PSE Planning Process and Assumptions PSE Projects

More information

Local Transmission Plan. October 11, 2013 Revised August 25, 2014

Local Transmission Plan. October 11, 2013 Revised August 25, 2014 Local Transmission Plan October 11, 2013 Revised August 25, 2014 2 Central Hudson s System Zone G: Majority of Central Hudson s load Zone E: One small distribution substation Interconnections with Consolidated

More information

Market Efficiency RTEP Proposal Window

Market Efficiency RTEP Proposal Window Market Efficiency RTEP Proposal Window Market Efficiency RTEP Proposal Window Status Window opened on 8/12/2013 Closed on 9/26/2013 17 individual proposals addressing congestion from Market Efficiency

More information

The Long-Range Transmission Plan

The Long-Range Transmission Plan The Long-Range Transmission Plan 2015 2025 Matt Koenig Presentation to ESPWG / TPAS October 29 th, 2015 Long-Range Transmission Plan Driver of the Plan is to maintain local reliability 10-year planning

More information

ATTACHMENT Y STUDY REPORT

ATTACHMENT Y STUDY REPORT Attachment Y Study Edwards Unit 1: 90 MW Coal Retirement December 31, 2012 ATTACHMENT Y STUDY REPORT 7/5/2013 PUBLIC / EXECUTIVE SUMMARY MISO received an Attachment Y Notification of Potential Generation

More information

Request for Qualification for Comprehensive Plan Services RFQ#

Request for Qualification for Comprehensive Plan Services RFQ# Request for Qualification for Comprehensive Plan Services RFQ#16-2001-05 City of Texarkana, Texas Planning and Community Development 220 Texas Boulevard Texarkana, TX 75501 Page 2 of 10 RFQ COMPREHENSIVE

More information

From: Tito R. Nagrampa Jr, P.E. Approved by: /s/ General Manager Juan M. Ulloa, P.E. Engineering Supervisor

From: Tito R. Nagrampa Jr, P.E. Approved by: /s/ General Manager Juan M. Ulloa, P.E. Engineering Supervisor AGENDA ITEM NO: 4.I.1 MEETING DATE: 12/10/2012 ADMINISTRATIVE REPORT NO.: 2013-28 To: Honorable Public Utilities Board Submitted by: /s/ Douglas Draeger AGM Engineering and Operations From: Tito R. Nagrampa

More information

SSF Section Location of Change SSF Issue Change(s) Comments Chapter Part B All Multiple Formatting, spelling and minor Changes applied -

SSF Section Location of Change SSF Issue Change(s) Comments Chapter Part B All Multiple Formatting, spelling and minor Changes applied - SSF Update December 2017 Summary of Changes This table only mentions SSF chapters that were updated. All other SSF chapters were checked and confirmed as still being uptodate. SSF Section Location of Change

More information

Electricity Transmission Infrastructure Development in New England

Electricity Transmission Infrastructure Development in New England Electricity Transmission Infrastructure Development in New England NPCC Governmental/Regulatory Affairs Advisory Group Paul G. Afonso March 4, 2008 Transmission Infrastructure is Playing An Increasingly

More information

August 15, Please contact the undersigned directly with any questions or concerns regarding the foregoing.

August 15, Please contact the undersigned directly with any questions or concerns regarding the foregoing. California Independent System Operator Corporation The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 August 15, 2017 Re: California

More information

APPENDIX E: Project Need and Description

APPENDIX E: Project Need and Description APPENDIX E: Project Need and California ISO/MID E-1 Intentionally left blank California ISO/MID E-2 Lakeville 115 kv Bus Upgrade Installation of a sectionalizing breaker to be installed on 115 kv bus section

More information

Click to edit Master title style

Click to edit Master title style Nelson/Nygaard Consulting Associates SERVICE IMPROVEMENT STRATEGIES September 22, 2015 1 PROJECT OVERVIEW & WORK TO DATE 1. Extensive stakeholder involvement Throughout 2. System and market assessment

More information

Monthly Long Term Transmission Plan Project Status Report

Monthly Long Term Transmission Plan Project Status Report Operating Company EAI EMI ELL ENOI ETI ALL Major Updates 1 project in service 1 project in service 5 projects in service No major changes 2 project in service 9 projects in service Entergy 11-EAI-015 4669

More information

2016 Load & Capacity Data Report

2016 Load & Capacity Data Report Caution and Disclaimer The contents of these materials are for information purposes and are provided as is without representation or warranty of any kind, including without limitation, accuracy, completeness

More information

February 10, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

February 10, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 California Independent System Operator Corporation February 10, 2016 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California

More information

Entergy Texas, Inc. Transmission Draft Construction Plan Update 1 Projects

Entergy Texas, Inc. Transmission Draft Construction Plan Update 1 Projects Entergy Texas, Inc. Transmission 2014 2018 Draft Construction Plan Update 1 Projects 1 2014-2018 ETI Draft Construction Plan Update 1 Projects Completed in the Fall of 2012 & 2013 to date 1) Cedar Hill

More information

Public Service Company of Colorado Transmission Projects Status. CCPG May 5, 2016

Public Service Company of Colorado Transmission Projects Status. CCPG May 5, 2016 Public Service Company of Colorado Transmission Projects Status CCPG May 5, 2016 1 Transmission Ownership Colorado 2016 Transmission Planning Drivers Load Service / Near-Term (1-5 years) TPL Studies (5

More information

Memorandum. This is a status report only. No Board action is required.

Memorandum. This is a status report only. No Board action is required. California Independent System Operator Memorandum To: Market Issues/ADR Committee From: Anjali Sheffrin, Director of Market Analysis CC: ISO Governing Board; ISO Officers Date: March 10, 2000 Re: Market

More information

Entergy Final Construction Plan

Entergy Final Construction Plan Introduction Entergy 2012-2016 Final Construction Plan Project Driver Project Description Cost Allocation Guideline Project Category Block load addition Projects needed to accommodate the addition of block

More information

Restoration of Historic Streetcar Services in Downtown Los Angeles

Restoration of Historic Streetcar Services in Downtown Los Angeles Restoration of Historic Streetcar Services in Downtown Los Angeles Alternatives Analysis Community Update Meeting August 2, 2011 Introduction Key players Local lead agency: Metro Federal lead agency: Federal

More information

Review of Reliability Must-Run and Capacity Procurement Mechanism BBB Issue Paper and Straw Proposal for Phase 1 Items

Review of Reliability Must-Run and Capacity Procurement Mechanism BBB Issue Paper and Straw Proposal for Phase 1 Items Review of Reliability Must-Run and Capacity Procurement Mechanism BBB Issue Paper and Straw Proposal for Phase 1 Items Stakeholder Meeting January 30, 2018 Keith Johnson Infrastructure and Regulatory Policy

More information

Jay Caspary Director Research, Development & Tariff Services

Jay Caspary Director Research, Development & Tariff Services Interconnection Seams Study Update CIGRE GOTF October 23, 2017 Jay Caspary Director Research, Development & Tariff Services jcaspary@spp.org 2 Disclaimer This deck includes materials which were presented

More information

Decision on Merced Irrigation District Transition Agreement

Decision on Merced Irrigation District Transition Agreement California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Karen Edson, Vice President Policy & Client Services Date: March 13, 2013 Re: Decision on Merced Irrigation

More information