CIL/CEL Values and Study Timeline
|
|
- Reginald Evans
- 5 years ago
- Views:
Transcription
1 CIL/CEL Values and Study Timeline LOLEWG 9/11/2018 Updated 10/3/2018 1
2 Purpose and Key Takeaways Purpose Inform stakeholders of Draft Capacity Import and Export Limits. Key Takeaways (Limit changes) Limits have been impacted by the FERC Locational filing changes (MISO process change). Limits have been impacted by MISO system changes including transmission topology and generation dispatch. 2
3 Introduction Capacity Import and Export Limits (CIL and CEL) in this presentation are calculated based on the FERC Locational filing. The CIL and CEL results have been adjusted for exports to non- MISO load. Coordinating Owner Resources and Border External Resources are no longer treated as imports and instead treated as internal to the zone which impacts base area interchange. CIL/ZIA for LRZs 1, 2, 3 and 4 along with CEL/ZEA for LRZs 4 and 5 have all been updated as of 10/03/18. 3
4 Capacity Import Limits Zone ZIA 1 (MW) CIL 1 (MW) CIL 2 (MW) Import in Auction 1 3,747 4,078 4,546 Export 2 1,713 1,713 2, ,813 3,037 2,812 Export 4 3 5,210 6,845 6,278 1, ,013 5,013 3, ,924 7,066 7,375 Export 7 3 3,211 3,211 3, ,185 4,424 4,778 Export 9 3,631 3,950 3,679 1, ,792 3,906 2, Limits based on revisions made to the new Locational Tariff filing 2 Limits after applying changes due to December 31, 2015 FERC Order on exports 3 Denotes voltage limited transfers 4
5 Planning Year ( ) CIL Results
6 Capacity Import Limits Zone 1: MN and ND Limit: 4,078 MW Colby to North Iowa Wind 161 kv Line Adams to Barton 161 kv Line Re-dispatch of 1,992 MW applied 10/3 update: Added two expedited ComEd projects that we not included in the regional model Final Limiting Element: Sherman Street to Sunnyvale 115 kv Final Contingency: Arpin to Rocky Run 345 kv 6
7 Capacity Import Limits Zone 2: WI and MI Limit: 1,713 MW University Park to East Frankfort 345 kv Line Dumont to Wilton 765 kv Line Re-dispatch of 2,000 MW applied 10/3 update: Added two expedited ComEd projects that we not included in the regional model No change in limiting element or contingency 735 kv 345 kv Limiting Element 7
8 Capacity Import Limits Zone 3: IA Limit: 3,037 MW Sub 3458 to Sub kv Line Sub 3455 to Sub kv Line Mitigation of the initial limiting element as an RCF flowgate 10/3 update: Added two expedited ComEd projects that we not included in the regional model Re-dispatch of 2,000 MW applied No change in limiting element or contingency 8
9 Capacity Import Limits Zone 4 IL: Voltage Constraint Limit: 5,489 MW Limiting Voltage Element: Hallock138 kv Bus Limiting Contingency: Clinton unit Voltage constraint is more limiting than thermal constraint 10/3 update: A TO submitted a model correction that was applied after the 9/11/18 meeting that impacted this limit 345 kv Limiting Element 9
10 Capacity Import Limits Zone 5: MO Limit: 5,013 MW Heritage to Fredtown 161 kv Line Lutesville to St. Francois 345 kv line Redispatch of 1,820 MW applied Final Limiting Element: Joppa TS 345/161 kv Autotransformer Final Contingency: Shawnee 500/345 kv Auto- Transformer Line 500 kv 345 kv 230 kv Limiting Element 10
11 Capacity Import Limits Zone 6: IN and KY Limit: 7,066 MW Benton 345/138 kv Auto Transformer ckt. 1 Benton to Cook 345 kv Auto- Transformer Re-dispatch of 2,000 MW applied Final Limiting Element: Paradise to BRTAP 161 kv Final Contingency: Volunteer to Phillips B 500 kv Line 500 kv 345 kv Limiting Element 11
12 Capacity Import Limits Zone 7 MI: Voltage Constraint Limit: 3,211 MW Limiting Voltage Element: Pioneer 120 kv Bus Limiting Contingency: Wayne to Monroe 345 kv Line Voltage constraint is more limiting than thermal constraint 345 kv Limiting Element 12
13 Capacity Import Limits Zone 8: AR Limit: 4,424 MW Colonial Orange to Cow 138 kv Line Sabine to Cow 138 kv Line Re-dispatch of 2,000 MW applied Final Limiting Element: Moonlake to Ritchie 230 kv Line Final Contingency: Cordova TN to Benton MS 500 kv Line 500 kv Limiting Element 13
14 Capacity Import Limits Zone 9: TX and LA Limit: 3,950 MW Ray Braswell to Franklin 500 kv Line Franklin to Grand Gulf 500 kv Line Re-dispatch of 2,000 MW applied Final Limiting Element: Sterlington to Downsville 115 kv Line Final Contingency: Mt. Olive to El Dorado 500 kv Line 500 kv Limiting Element 14
15 Capacity Import Limits Zone 10: MS Limit: 3,906 MW Cow to Colonial Orange 138 kv Line Sabine to Cow 138 kv Line Re-dispatch of 2,000 MW applied Final Limiting Element: Freeport to Twinkletown 230 kv Line Final Contingency: Freeport to Hornlake 230 kv Line 500 kv 230 kv Limiting Element 15
16 Capacity Export Limits Zone ZEA 1 (MW) CEL 1 (MW) CEL (MW) Export in Auction 1 3,379 3, ,017 Import 3 4,664 4,440 5, ,332 3,693 4,280 Import 5 2 2,122 2,122 2,122 Import 6 1,577 1,435 3, ,358 1,358 2,578 Import 8 5,328 5,089 2,424 2, ,224 1,905 2,149 Import 10 1,721 1,607 1,824 Import 1 Limits based on revisions made to the new Locational Tariff filing 2 Limits determined as the excess capacity in the zone. It is the difference between maximum available generation in that zones and the total generation dispatched. 16
17 Planning Year ( ) CEL Results
18 Capacity Export Limits Zone 1: MN and ND Limit: 3,048 MW New Ulm South to New Ulm 69 kv Line System Intact Re-dispatch of 400 MW GLT applied Final Limiting Element: Seneca to Gran Grae 161 kv Line Final Contingency: Arpin to Eau Claire 345 kv Line 345 kv Limiting Element 18
19 Capacity Export Limits Zone 2: WI and MI Limit: 979 MW Wempletown 345/138 kv autotransformer Cherry Valley 345/138 kv autotransformer Cherry Valley 138/34.5 kv autotransformer Cherry Valley 2M to Cherry Valley B 138 kv Line Re-dispatch of 1,208.5 MW GLT applied No change in limiting element or contingency post re-dispatch 345 kv 230 kv Limiting Element 19
20 Capacity Export Limits Zone 3: IA Limit: 4,440 MW Sub P Iowa City 161/69 kv auto-transformer Final Contingency: System Intact GLT applied Final Limiting Element: Fargo 345/138 kv Auto- Transformer Final Contingency: Mapleridge to Tazewell 345 kv Line 345 kv Limiting Element 20
21 Capacity Export Limits Zone 4: IL Limit: 3,693 MW Pontiac to Brokaw 345 kv Line Pontiac to Bluemond 345 kv Line Re-dispatch of 350 MW applied GLT applied Implemented two expedited ComEd projects that we not initially submitted No change in limiting element or contingency post re-dispatch 345 kv 230 kv Limiting Element 21
22 Capacity Export Limits Zone 5: MO Limit: 2,122 MW A valid constraint was not found. Initially, Capacity Export Limit was determined as the sum of the Base Area Interchange and the excess capacity in LRZ 5. This was discussed at the 9/11/18 LOLEWG and the 9/12/18 RASC meetings and it was agreed that without any major changes from last year within LRZ 5, the previous limits would be utilized. 22
23 Capacity Export Limits Zone 6: IN and KY Limit: 1,435 MW GLT Applied Final Limiting Element: University Park to East Frankfort 345 kv Line Final Contingency: Dumont to Wilton 765 kv Line 500 kv 345 kv Limiting Element 23
24 Capacity Export Limits Zone 7: MI Limit: 1,358 MW University Park to East Frankfort 345 kv Line Dumont to Wilton 765 kv Line Re-dispatch of 1,400 MW applied No change in limiting element or contingency post re-dispatch 345 kv 230 kv Limiting Element 24
25 Capacity Export Limits Zone 8: AR Limit: 5,089 MW Catherine U4 to Arklahoma 115 kv Line System Intact GLT Applied Final Limiting Element: Russelville South to Dardanelle 161 kv Line Final Contingency: Arkansas Nuclear to Fort Smith 500 kv Line 500 kv Limiting Element 25
26 Capacity Export Limits Zone 9: TX and LA Limit: 1,905 MW Addis to Tiger 230 kv Line Formosa to Enco kv Line Re-dispatch of 800 MW applied Final Limiting Element: Addis to Tiger 230 kv Final Contingency: Dowmeter to Chenango 230 kv 500 kv 230 kv Limiting Element 26
27 Capacity Export Limits Zone 10: MS Limit: 1,607 MW Batesville to Tallahachie 161 kv Line Choctaw to Clay 500 kv Line Re-dispatch of 100 MW applied GLT Applied No change in limiting element or contingency post re-dispatch 230 kv Limiting Element 27
28 Next Steps Next steps These results are final. However, if any updates are deemed necessary, a conference call will be scheduled to discuss the revision. Results will be incorporated into the LOLE report 28
Market Congestion Planning Study (South)- Robustness Analysis. Economic Planning Users Group Meeting August 11 th, 2017
Market Congestion Planning Study (South)- Robustness Analysis Economic Planning Users Group Meeting August 11 th, 2017 Key Takeaways The benefit calculations were updated due to a flowgate rating correction
More informationICT Strategic Transmission Plan (ISTEP) Review and Status Update
ICT Strategic Transmission Plan (ISTEP) Review and Status Update Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans, Louisiana Douglas Bowman, PE Lead Engineer, ICT Planning 501-688-1640
More informationJOB LOSSES BY STATE, State Industry US total AK AL AR AZ CA CO CT Agriculture, forestry, fisheries -15, ,
State US total AK AL AR AZ CA CO CT -15,597-35 -272-248 -232-3,163-132 -46-3,858-68 4-19 -291-303 -116-11 -3,318-9 -55-32 -73-314 -66-35 -554,750-194 -14,113-7,789-4,781-55,255-4,453-6,836-9,326-13 -190-282
More informationTransmission Expansion Advisory Committee Meeting 2014 Market Efficiency Analysis
Transmission Expansion Advisory Committee Meeting 2014 Market Efficiency Analysis September 02, 2014 Objectives To review simulated congestion results for all Market Efficiency study years To provide an
More informationATTACHMENT Y STUDY REPORT
Attachment Y Study Edwards Unit 1: 90 MW Coal Retirement December 31, 2012 ATTACHMENT Y STUDY REPORT 7/5/2013 PUBLIC / EXECUTIVE SUMMARY MISO received an Attachment Y Notification of Potential Generation
More informationHighly Constrained Elements Within ATC Footprint
Highly Constrained Elements Within ATC Footprint Feb. 21, 2008 Presented by Dale Burmester Compiled by ATC Economic Planning Team: Tom Dagenais, Todd Tadych, Arash Ghodsian, Chris Hagman Solutions to Market
More informationThe Transmission Lay of the Land
The Transmission Lay of the Land Overview Energy Markets Transmission Planning Beth Soholt John Moore April 21, 2010 Overview Regional Transmission Organizations Organizations of transmission owners, users,
More informationImpacts of MISO DPP-2016-February (West, ATC, MI, South) Projects on PJM Facilities
Impacts of MISO DPP-2016-February (West, ATC, MI, South) 1. MISO generators studied: Projects on PJM Facilities Net MW size (Summer) Net MW size (Winter) Service DPP Project Type Region Fuel Type POI J432
More informationTransmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting
Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting BHE Wyoming Q4 Stakeholder Meeting November 17, 2016 @ 1:00PM MT Black Hills Energy Service Center 409 Deadwood Avenue, Rapid
More informationSPP Reliability Coordinator TLR 5 Analysis Report for the ICT Reliability Area
SPP Reliability Coordinator TLR 5 Analysis Report for the ICT Reliability Area MAINTAINED BY SPP Reliability Coordinator PUBLISHED: 10/11/2010 LATEST REVISION: 10/12/2010 Copyright 2010 by Southwest Power
More informationManual 3: Transmission Operations Updates Version 52
Manual 3: Transmission Operations Updates Version 52 Liem Hoang Sr. Lead Engineer, Transmission Operations Review Timeline Manual First Reads: November 2 nd SOS Joint November 2 nd SOS-T (Section 5 only)
More informationIllinois State Report
July 2016 Illinois State Report Table of Contents 1. Planning Generation Portfolio Analysis Transmission Analysis Load Forecast Gas Pipeline Information 2 Executive Summary (July 2016) Existing Capacity:
More informationTransmission Expansion Advisory Committee
Transmission Expansion Advisory Committee February 7, 2013 1 Issues Tracking 2 Issues Tracking Open Issues None New Issues 3 2013 RTEP Scenario Analysis 4 RTEP Scenario Analysis 2012 North Carolina Transmission
More informationMarket Efficiency Update
Market Efficiency Update Transmission Expansion Advisory Committee December 13, 2018 2018/19 Long Term Window 2 2018/19 Long Term Window Problem Statement and Eligible Congestion Drivers posted on the
More informationPSE Attachment K Puget Sound Area Transmission Meeting
PSE Attachment K Puget Sound Area Transmission Meeting Stephanie Lu Senior Engineer December 15, 2011 Agenda Attachment K Review Economic Studies Process PSE Planning Process and Assumptions PSE Projects
More informationNational Routing Number Administration p-ani Activity and Projected Exhaust Report
National Routing Number Administration 2016 p-ani Activity and Projected Exhaust Report The ATIS Industry Numbering Committee developed the P-ANI Administration Guidelines, which contain the following
More informationHigh Plains Regional Transmission Summit. Timelines for Planning Processes / Policy
High Plains Regional Transmission Summit John Lawhorn Director Regulatory & Economic Studies Midwest ISO November 2, 2009 Timelines for Planning Processes / Policy 1 year 20 year Planning Horizons Queue
More informationCOAL BY WIRE & MISO. Indiana Center for Coal Technology Research CCTR Basic Facts File # 11
COAL BY WIRE & MISO CCTR Basic Facts File # 11 Brian H. Bowen, Marty W. Irwin, Devendra Canchi The Energy Center at Discovery Park Purdue University CCTR, Potter Center, 500 Central Drive West Lafayette,
More information1. Administrative Items... SPP. 2. Stakeholder Web-Presentation... ABB
Southwest Power Pool, Inc. ENTERGY REGIONAL STATE COMMITTEE MINIMIZING BULK POWER COSTS STUDY STAKEHOLDER MEETING Face-to-face & Web-conference Hyatt Regency DFW DFW Airport, TX Room: Maverick AGENDA July
More informationManual 3: Transmission Operations Updates Version 52
Manual 3: Transmission Operations Updates Version 52 Yuri Smolanitsky Sr. Engineer, Transmission Operations Review Timeline Manual First Reads: October 4 th SOS Joint November 2 nd SOS-T (Section 5 only)
More informationCOORDINATED SYSTEM CONGESTED FLOWGATE STUDY SCOPE MISO, PJM, SPP AND TVA January 2010
COORDINATED SYSTEM CONGESTED FLOWGATE STUDY SCOPE MISO, PJM, SPP AND TVA January 2010 Objectives: Identify and implement, consistent with tariff provisions and existing regional and interregional processes
More informationFY 2002 AWA INSPECTIONS
FY 22 AWA INSPECTIONS number of Number of inspections Number of inspections facilities and (sites) category category Inspections for Compliance Other Types of Inspections Dealers 3,893 4,846 Prelicensing
More informationSPP-RTO: Operational Characteristics
SPP-RTO: Operational Characteristics Derek Hawkins, Supervisor Real Time Support May 23, 2018 SouthwestPowerPool SPPorg southwest-power-pool 2 The SPP Footprint: Members in 14 States Arkansas Kansas Iowa
More informationSERTP rd Quarter Meeting
2014 SERTP SERTP 2014 3 rd Quarter Meeting 2 nd RPSG Meeting September 30 th, 2014 APC Headquarters Birmingham, AL 2014 SERTP Process Information The SERTP process is a transmission planning process. Please
More informationEP 724 US RAIL SERVICE ISSUES DATA COLLECTION
EP 724 US RAIL SERVICE ISSUES DATA COLLECTION Railroad: BNSF Year: 2016 1. System Average Train Speed by Train Type for the Reporting Week (MPH) Intermodal 39.3 Grain unit 26.6 Coal unit 25.9 Automotive
More informationIMM Quarterly Report: Summer 2017
IMM Quarterly Report: Summer 2017 MISO Independent Market Monitor David Patton, Ph.D. Potomac Economics September 19, 2017 Highlights and Findings: Summer 2017 The MISO markets performed competitively
More information2013 Migration Patterns traffic flow by state/province
Interstate and Cross-Border 2013 Migration Patterns traffic flow by state/province Based on 77,308 Interstate Household Goods Moves from January 1, 2013 through December 31, 2013 YUKON TERRITORY 0 0 BC
More informationTransmission Planning using Production Cost Simulation & Power Flow Analysis
ABB Transmission Planning using Production Cost Simulation & Power Flow Analysis Jinxiang Zhu, Ph.D. Senior Principal, ABB Power Consulting ABB Group January 16, 2018 Slide 1 Power System Studies TECHNICAL
More information2016 Migration Patterns traffic flow by state/province
Interstate and Cross-Border 2016 Migration Patterns traffic flow by state/province Based on 75,427 Interstate Household Goods Moves from January 1, 2016 through December 15, 2016 NL 8 13 YUKON TERRITORY
More informationSERTP rd Quarter Meeting
2015 SERTP SERTP 2015 3 rd Quarter Meeting 2nd RPSG Meeting September 24 th, 2015 APC Headquarters Birmingham, AL 2015 SERTP Process Information The SERTP process is a transmission planning process. Please
More informationNew Tie Line Loop Flow Impact
Minnesota Power New Tie Line Loop Flow Impact Study Report Christian Winter and Andy Kienitz August 28, 2014 Table of Contents Table of Contents... 1 Report Structure... 2 Study Summary... 3 Executive
More informationUPDATE OF THE SURVEY OF SULFUR LEVELS IN COMMERCIAL JET FUEL. Final Report. November 2012
CRC Project AV-1-10 UPDATE OF THE SURVEY OF SULFUR LEVELS IN COMMERCIAL JET FUEL Final Report November 2012 COORDINATING RESEARCH COUNCIL, INC. 3650 MANSELL ROAD SUITE 140 ALPHARETTA, GA 30022 The Coordinating
More informationTransmission Coordination and Planning Committee 2014 Q4 Stakeholder Meeting. December 18, 2014
Transmission Coordination and Planning Committee 2014 Q4 Stakeholder Meeting December 18, 2014 Agenda 1. Introductions 2. TCPC Policies 3. BHCE Planning Department Update 4. 2014 LTP Study Results 5. Stakeholder
More informationMarket Efficiency Update
Market Efficiency Update Transmission Expansion Advisory Committee July 13, 2017 Agenda Where we are in the process Interregional Projects Status RPM Projects Status Reevaluation Analysis Status Next Steps
More informationCharles Hernick Director of Policy and Advocacy
Charles Hernick Director of Policy and Advocacy Presentation to National Association of State Energy Officials on Energy Storage, Renewable Power, and Demand Response: Have we Arrived at a 100% Solution?
More informationEPA REGULATORY UPDATE PEI Convention at the NACS Show October 8, 2018 Las Vegas, NV
EPA REGULATORY UPDATE 2018 PEI Convention at the NACS Show October 8, 2018 Las Vegas, NV 1 Periodic Operations and Maintenance Walkthrough Inspections - beginning no later than October 13, 2018 (40 CFR
More informationDirections to Mt Pleasant, TX 252 mi about 5 hours 1 min
Directions to Mt Pleasant, TX 252 mi about 5 hours 1 min Loading... 2013 Google - Map data 2013 Google - https://maps.google.com/maps?f=d&source=s_d&saddr=mt+pleasant,+tx&daddr=diana,+tx+to:marshall,+tx+to:carthage,+tx+to:bossier+city,+la+to:m
More informationInterconnection Feasibility Study Report Request # GI Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado
Executive Summary Interconnection Feasibility Study Report Request # GI-2016-6 Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado Public Service Company of Colorado Transmission
More information2013 SERTP. Welcome. SERTP rd Quarter Meeting. 2 nd RPSG Meeting
2013 SERTP Welcome SERTP 2013 3 rd Quarter Meeting 2 nd RPSG Meeting 1 2013 SERTP The SERTP process is a transmission planning process. Please contact the respective transmission provider for questions
More informationMarket Efficiency Update
Market Efficiency Update Transmission Expansion Advisory Committee August 10, 2017 Where we are - Market Efficiency Timeline 2 2016-2017 Window Market Efficiency Base Case Mid-Cycle Update Base case to
More informationStability Study for the Mt. Olive Hartburg 500 kv Line
Stability Study for the Mt. Olive Hartburg 500 kv Line Peng Yu Sharma Kolluri Transmission & Distribution Planning Group Energy Delivery Organization Entergy Sevices Inc April, 2011 New Orleans, LA 1.
More informationUL 1008 ATS Withstand and Close On Ratings
UL 1008 ATS Withstand and Close On Ratings Revised: September 25, 2017 2016 Cummins Power Generation All Rights Reserved Welcome! PowerHour is designed to help our engineer partners to Keep up to date
More informationMarket Efficiency RTEP Proposal Window
Market Efficiency RTEP Proposal Window Market Efficiency RTEP Proposal Window Status Window opened on 8/12/2013 Closed on 9/26/2013 17 individual proposals addressing congestion from Market Efficiency
More informationSoutheastern Regional Transmission Planning (SERTP)
Southeastern Regional Transmission Planning (SERTP) December 2014 Regional Transmission Planning Analyses I. Overview of Regional Analyses SERTP sponsors plan and expand the transmission system to reliably
More informationAlaska (AK) Passenger vehicles, motorcycles 1959 and newer require a title ATV s, boats and snowmobiles do not require a title
Alabama (AL) Passenger vehicles 1975 and newer require a Motorcycles, mopeds and trailers 1975 and newer require a ATVs, snowmobiles and boats do not require a Alaska (AK) Passenger vehicles, motorcycles
More informationWeather Shield Thermal Performance Criteria
Weather Shield Thermal Perfmance Criteria As a proud ENERGY STAR partner, we ensure our products are rated, certifi ed and labeled f and by the National Fenestration Council (NFRC). The 2010 ENERGY STAR
More informationFalcon-Midway 115 kv Line Uprate Project Report
Falcon-Midway 115 kv Line Uprate Project Report 12/1/2008 1 Background The function of this project is to uprate the 26.7 miles of Tri-State s 115 kv line between Midway and Falcon substations from 50
More informationSTATE OF MINNESOTA OFFICE OF ADMINISTRATIVE HEARINGS FOR THE PUBLIC UTILITIES COMMISSION PUC DOCKET NO. E002/TL OAH DOCKET NO.
STATE OF MINNESOTA Direct Testimony and Schedule OFFICE OF ADMINISTRATIVE HEARINGS FOR THE PUBLIC UTILITIES COMMISSION Amanda King IN THE MATTER OF THE ROUTE PERMIT APPLICATION FOR THE CAPX00 HAMPTON ROCHESTER
More informationCalifornia and the Western Grid: Transmission Challenges
California and the Western Grid: Transmission Challenges IEEE PES May 11, 2006 Stewart Ramsay, Vice President, Asset Management & Electric Transmission, Pacific Gas and Electric Company California s RPS
More informationDepartment of Market Quality and Renewable Integration November 2016
Energy Imbalance Market March 23 June 3, 216 Available Balancing Capacity Report November 1, 216 California ISO Department of Market Quality and Renewable Integration California ISO i TABLE OF CONTENTS
More informationHighway Safety Countermeasures
Highway Safety Countermeasures National Conference of State Legislatures May 14, 2009 Stephen Oesch Intersections Intersection crashes More than 2.4 million in 2007 5 crashes per minute 1 serious injury
More informationService Requested 150 MW, Firm. Table ES.1: Summary Details for TSR #
Executive Summary Firm point to point transmission service has been requested by Transmission Service Request (TSR) #75669514, under the SaskPower Open Access Transmission Tariff (OATT). The TSR consists
More informationTOT1A: Metering Point Relocation Comprehensive Progress Report (WECC Path 30)
TOT1A: Metering Point Relocation Comprehensive Progress Report (WECC Path 30) Submitted to TOT1A Stakeholders and TOT1A Interconnected Utilities And Western Electricity Coordinating Council June 6, 2013
More informationSouthwest Power Pool Network Integration Transmission Service Application
Revised 09/17/2014 REVISION-2, 12/11/2014 Southwest Power Pool Network Integration Transmission Service Application Date: 14-Oct-14 Purpose of Application: (Check boxes as applicable) Initial NITS Application
More informationWe offer the best quality buildings in the carport industry. $ 'x21'x5' 2-1/2, 14 Gauge Galvanized Frame
We offer the best quality buildings in the carport industry. Engineer Certified Carports *OUR CARPORTS ARE ENGINEER CERTIFIED TO MEET YOUR STATE & LOCAL CODES CALL YOUR LOCAL DEALER. TEL: $895. 00 (14
More informationPRISM. Performance and Registration Information Systems Management. IRP Annual Meeting 2016 Oklahoma City, OK May 2 4
PRISM Performance and Registration Information Systems Management IRP Annual Meeting 2016 Oklahoma City, OK May 2 4 Dennis Piccolo, PRISM Project Manager (VOLPE) 1 What is PRISM? Cooperative Federal/State
More informationThe Economic Downturn Lessons on the Correlation between Economic Growth and Energy
The Economic Downturn Lessons on the Correlation between Economic Growth and Energy Demand presented to Indiana State Bar Association Utility Law Spring Seminar April 9, 2010 presented by Doug Gotham State
More informationSupplemental Report on the NCTPC Collaborative Transmission Plan
Supplemental Report on the NCTPC 2007-2017 Collaborative Transmission Plan May 16, 2008 1 Table of Contents I. Executive Summary...1 II. Richmond-Fort Bragg Woodruff Street 230 kv Line...2 II.A. Need for
More informationDiesel Generators in the Data Center: When to Go Big
PowerHour webinar series for consulting engineers Experts you trust. Excellence you count on. Diesel Generators in the Data Center: When to Go Big April 11th, 2017 11:00 PDT / 13:00 CDT (1PDH issued by
More informationAmeren Missouri. AMENDED Renewable Energy Standard Compliance Report Prepared in Compliance with 4 CSR
Ameren Missouri AMENDED Renewable Energy Standard Compliance Report 2015 Prepared in Compliance with 4 CSR 240-20.100 June 23, 2016 NP Table of Contents Page INTRODUCTION...4 SECTION (8) (A) 1 A: TOTAL
More informationRoute truck by fuel stops? Spread gap by historical proration of fleet/of truck? Spread gap based on current travel history of truck? Other?
Truck 302 GPS Vendor 3 and Traditional Fuel receipts GPS Vendor 3 reports chronologically as truck travels the distance by state with odometer readings at the entry and exit of every state and the lat/lon
More informationU.S. PRODUCTION GROWTH
U.S. PRODUCTION GROWTH U.S. Production has increased by more than 78 percent since 2011, as Nissan Group continues to localize core-model production. Nissan built a record number of vehicles in the U.S.
More information, NAS!?r-s~~if.{" WOQi2AN PIGS: FINAt:. EST'IHATES (STATISTICAL,,,", BULLETIN.) NATIONAL ' AGRICULTURAL STATISTICS SERVICE,, ':-'-"'-'-,,
, NAS!?r-s~~if.{" WOQi2AN PIGS: FINAt:. EST'IHATES 1988-92. (STATISTICAL,,,", BULLETIN.) NATIONAL ' AGRICULTURAL STATISTICS SERVICE,, ':-'-"'-'-,, WASHINGTOH, DC. DEC 9 57P' ~ alii Association for Informat
More informationSTATE OF MINNESOTA BEFORE THE MINNESOTA PUBLIC UTILITIES COMMISSION DOCKET NO. ET6675/CN OAH DOCKET NO REBUTTAL TESTIMONY
STATE OF MINNESOTA BEFORE THE MINNESOTA PUBLIC UTILITIES COMMISSION DOCKET NO. ET6675/CN-12-1053 OAH DOCKET NO. 60-2500-30782 REBUTTAL TESTIMONY OF RANDALL PORTER, PE SUBMITTED ON BEHALF OF: WIND ON THE
More informationImpacts of MISO DPP-2016-August Projects on PJM Facilities
1. MISO generators studied: Impacts of MISO DPP-2016-August Projects on PJM Facilities Project Service Type DPP Region Fuel Type Net MW Size (Summer) Net MW Size (Winter) J619 NRIS SOUTH Solar 50 50 J620
More informationFlowgate 10515, an OTDF flowgate, consists of the following elements:
MAIN Report for NERC Initial Investigation NERC TLR Level 5A Flowgate 10515 Kewaunee 345/138 kv Transformer for the loss of Point Beach-North Appleton 345kV Line October 15 17, 2001 Submitted January 14,
More informationParticipating Dealers Ram Trucks
Participating Dealers Ram Trucks For 64 years, Ram Trucks has had a strong partnership with the National FFA Organization based on the historic connection between traditional American farming and Ram Trucks.
More information2018 & 22 Final LCR Study Results Greater Bay Area
2018 & 22 Final LCR Study Results Greater Bay Area Bryan Fong Senior Regional Transmission Engineer Stakeholder Call April 13, 2017 Greater Bay Area Map Slide 2 Greater Bay Area Transmission System Slide
More informationEnergy from Waste Grid Connections
Energy from Waste Grid Connections Catherine Cleary Grid Connection Lead TNEI Services catherine.cleary@tnei.co.uk 0161 233 4839 Overview Introduction to the UK Electricity Network Key Grid Connection
More informationMTEP14 South SPM #2. MISO Texas Project Information. April 7, 2014
MTEP14 South SPM #2 MISO Texas Project Information April 7, 2014 MISO Southern Region EAST TEXAS ELECTRIC COOPERATIVE 2 East Texas Electric Cooperative (ETEC) No projects submitted for moving to Appendix
More informationEvaluating the impact of feedstock quality on delivered cost: Two case studies from the US Southeast region
Evaluating the impact of feedstock quality on delivered cost: Two case studies from the US Southeast region Laurence Eaton*, Matthew Langholtz, Craig Brandt, Erin Webb, Mark Downing Oak Ridge National
More information2019 & 2023 Final LCR Study Results Greater Bay Area
2019 & 2023 Final LCR Study Results Greater Bay Area Binaya Shrestha Regional Transmission Engineer Lead Stakeholder Call May 1, 2019 Greater Bay Area Transmission System Contra Costa Subarea Oakland Subarea
More informationU.S. Heat Pump Water Heater Market Transformation: Where We ve Been and Where to Go Next
U.S. Heat Pump Water Heater Market Transformation: Where We ve Been and Where to Go Next JOSH BUTZBAUGH LINDA SANDAHL MICHAEL BAECHLER SEPTEMBER 14, 2017 1 Agenda Agenda Background Technology Considerations
More informationDUKE ENERGY PROGRESS TRANSMISSION SYSTEM PLANNING SUMMARY
DUKE ENERGY PROGRESS TRANSMISSION SYSTEM PLANNING SUMMARY Transmission Department Transmission Planning Duke Energy Progress TABLE OF CONTENTS I. SCOPE 3 II. TRANSMISSION PLANNING OBJECTIVES 3 III. TRANSMISSION
More informationSPP Notification to Construct
SPP Notification to Construct SPP-NTC-20123 February 14, 2011 Mr. Sam McGarrah Empire District Electric Company PO Box 127 Joplin, MO 64802 RE: Notification to Construct Approved Reliability Network Upgrades
More informationNISSAN GROUP. More than 34 Years of Manufacturing in America IS INVESTING IN AMERICA FUTURE IN AMERICA JOBS IN AMERICA SOURCED IN AMERICA
NISSAN GROUP IS INVESTING U.S. SALES GROWTH In 2017, Nissan Group set an all-time U.S. record in 2017 with total sales of 1,593,464 units, up 2 percent over the prior year. Nissan continues to grow sales
More informationEPA Emissions Standards for Switch and Line-Haul Locomotives
EPA Emissions s for Switch and Line-Haul Locomotives Spring 2018 EPA Line-Haul Locomotive Emission s Tier Level Year of Manufacture NOx PM HC CO Effective Date 0 1973-1992 8.0 38 0.22 31 1.00 0 5.0 0 1998
More informationWyoming electricity use is growing
Wyoming electricity use is growing 12,000 $40 gigawatt-hours 11,000 10,000 9,000 8,000 7,000 6,000 5,000 $38 $36 $34 $32 $30 $28 $26 $24 $22 gross state product (economic growth) ($ billions) 4,000 2004
More informationNew 115 kv Disconnect Switches at Bloomsburg MTS
115 kv Line tap from C9 to Bloomsburg MTS & New Bus Tie Switch CAA ID Number: 2007-EX353 Final Draft ASSESSMENT SUMMARY 1. GENERAL DESCRIPTION Norfolk TS and Bloomsburg MTS are supplied by a single 115
More informationOwner letters will be mailed based upon part number and production date, starting with earlier production vehicles.
TO: ALL TOYOTA DEALER PRINCIPALS, SERVICE MANAGERS, PARTS MANAGERS SUBJECT: SPECIAL SERVICE CAMPAIGN (SSC) 50J PHASE 1 (FRONT SUSPENSION LOWER BALL JOINT) As announced in May, 2005, Toyota will initiate
More informationGeneration Interconnection Feasibility Study For XXXXXXXXXXXXXXXXXXXXXX MW generator at new Western Refinary Substation
Generation Interconnection Feasibility Study For XXXXXXXXXXXXXXXXXXXXXX 131-250 MW generator at new Western Refinary Substation System Planning Section April, 2005 TABLE OF CONTENT 1 EXECUTIVE SUMMARY
More informationSub Regional RTEP Committee Mid-Atlantic
Sub Regional RTEP Committee Mid-Atlantic August 24, 2018 Proposal Window Exclusion Definitions The following definitions explain the basis for excluding flowgates and/or projects from the competitive planning
More informationWestern NY Public Policy Transmission Planning Report
Western NY Public Policy Transmission Planning Report Dawei Fan Supervisor, Public Policy and Interregional Planning Business Issues Committee September 12, 2017 Operating Committee September 15, 2017
More informationCapX 2020 Technical Update: Identifying Minnesota s Electric Transmission Infrastructure Needs May 2005
CapX 2020 Technical Update: Identifying Minnesota s Electric Transmission Infrastructure Needs May 2005 EXECUTIVE SUMMARY Background Minnesota s electric transmission infrastructure, a network of transmission
More informationIntroducing ITC Midwest
Introducing ITC Midwest Great River Energy s Southern Minnesota Member Cooperatives March 17, 2009 Keith Eyler, Account Rep. Who is ITC? ITC Midwest LLC, a subsidiary of ITC Holdings Corp. (NYSE: ITC),
More informationSPP Notification to Construct
February 19, 2014 SPP Notification to Construct Mr. Mo Awad Westar Energy, Inc. P.O. Box 889 Topeka, KS 66601 RE: Notification to Construct Approved Reliability Network Upgrades Dear Mr. Awad, Pursuant
More informationReactive Power Requirements and Financial Compensation. Addendum to Draft Final Proposal
Reactive Power Requirements and Financial Compensation July 21, 2016 Table of Contents 1. Introduction... 3 2. Changes to Proposal... 4 3. Plan for Stakeholder Engagement... 4 4.... 4 6. Next Steps...
More informationSelection of States for MANE-VU Regional Haze Consultation (2018)
Selection of States for MANE-VU Regional Haze Consultation (2018) MANE-VU Technical Support Committee 5/4/2017 Introduction Under the Regional Haze Rule 1, States with Class I areas are to consult with
More informationUpdates. Pat Reiten President and CEO, PacifiCorp Transmission
PacifiCorp Transmission and Regional Updates Pat Reiten President and CEO, PacifiCorp Transmission PacifiCorp Transmission Overview 16,400 circuit-miles of transmission lines 12,685 MW record peak demand
More information2018 CG Transient Stability and MOD 33 Updates
2018 CG Transient Stability and MOD 33 Updates CG Planning Meeting Oct. 4, 2018 1 Transient Stability Study Updates 2 Studied Case Study performed for 2024HS case Two Colstrip units retired, with ATR model
More informationMay 11, Ms. Kavita Kale Executive Secretary Michigan Public Service Commission 7109 West Saginaw Highway Post Office Box Lansing, MI 48909
Amy C. Monopoli Counsel Regulatory & Legislative Phone: 774-452-4227 amonopoli@itctransco.com May 11, 2017 Ms. Kavita Kale Executive Secretary Michigan Public Service Commission 7109 West Saginaw Highway
More informationWE CARRY THE FUTURE SM
WE CARRY THE FUTURE SM www.hmm21.com m.hmm21.com 877-7HYUNDAI August 30, 2012 To: HMM Valued Customers Re: Change in Dynamics in the US trades As an update to the Hyundai Merchant Marine Program, effective
More informationSub Regional RTEP Committee Mid-Atlantic
Sub Regional RTEP Committee Mid-Atlantic December 19, 2017 First Preliminary Review Baseline Reliability and Supplemental Projects 2 The slide was previously presented at 8/31/2017 and is replaced by the
More informationProject #148. Generation Interconnection System Impact Study Report
Project #148 Generation Interconnection System Impact Study Report June 05, 2012 Electric Transmission Planning Table of Contents Table of Contents... 2 Executive Summary... 3 Energy Resource Interconnection
More informationEffects of all-offender alcohol ignition interlock laws on recidivism and alcohol-related crashes
Effects of all-offender alcohol ignition interlock laws on recidivism and alcohol-related crashes Lifesavers National Conference on Highway Safety Priorities Chicago, IL March 16, 2015 Anne T. McCartt
More informationWILLIAM LYNN STRICKLAND
WILLIAM LYNN STRICKLAND Employment (TDS) Arlington, Tx (1-98-2012) - Held positions as project supervisor and Lead Electrical Start-up Engineer in addition to hands on experience. -Tested Protective Relays
More informationReview of Reliability Must-Run and Capacity Procurement Mechanism BBB Issue Paper and Straw Proposal for Phase 1 Items
Review of Reliability Must-Run and Capacity Procurement Mechanism BBB Issue Paper and Straw Proposal for Phase 1 Items Stakeholder Meeting January 30, 2018 Keith Johnson Infrastructure and Regulatory Policy
More informationTransmission Planning Attachment K Public Input Meeting
Transmission Planning Attachment K Public Input Meeting FERC 890 6 th Quarter Meeting May 25, 2011 Agenda Mountain Time Topic Presenter 1:00 1:15 Greetings and Introduction Dennis Desmarais 1:15 1:30 Attachment
More informationInterconnection System Impact Study Report Request # GI
Executive Summary Interconnection System Impact Study Report Request # GI-2008-23 34 MW Solar Generation Ranch at Hartsel, Colorado Public Service Company of Colorado Transmission Planning August 19, 2010
More informationIn 2007, with oil at $70 per barrel, the U.S. trade deficit in petroleum products was 36% of the total of $819 billion deficit.
3 In 2007, with oil at $70 per barrel, the U.S. trade deficit in petroleum products was 36% of the total of $819 billion deficit. CREATION OF ARPA-E American Recovery and Reinvestment Act of 2009 (Recovery
More information