1 LETTING SCHEDULE REPORT Transportation Improvement Projects Date: Const Scope ROW /UTL County Projects E4080 COBB PARKWAY AT CEDARCREST ROAD/AWTREY CHURCH ROAD Category: THOROUGHFARE IMPROVE #: 0057 Cedarcrest Rd - D Cedarcrest/Awtrey Church SR 3/US 41/ RD/AWTREY CHURCH RD SR 3/US 41/ RD/AWTREY CHURCH RD Scope: Engineering to widen to 4 lanes from /Paulding Cty line to US TIP. ARC# CO-344. Improve traffic flow by creating dual left turn lanes from Pkwy onto Cedarcrest Road. MIS#0048-original contract w/long Eng. TranSystems acquired Long En JIM MARTINEZ 26/11/11 26/12/08 Preparing advertisement., 26/10/31, JM. Received notice to advertise, 26/10/, JM. GDOT reevaluating NEPA documentation per FHWA, 26/08/18, JM. FHWA reviewing resubmittal, 26/07/, JM. Addressed FHWA comments and resubmitted, 26/05/31, JM. 25/07/09 UTL:6 of 6 X2904 RESURFACING 27-2 LOCAL ROADS SOUTH Category: RESURFACING #: 05 Resurfacing 27-2 Local Roads (South) X2904 RESURFACING 27-2 LOCAL ROADS SOUTH Scope: Resurfacing project, 04 KRISTEN ORTON 26/11/11 26/12/08 X2217 WILLOW GLENN DR DRAINAGE Category: DRAINAGE/HEADWALL #: 0064 Willow Glenn Drive Drainage - X2217 Willow Glenn Drainage Improvements Scope: Willow Glenn Dr Drainage - Replace road crossing under Willow Glenn Drive and Clear Springs Ct. 26/11/29 26/12/13 On-site mtg held , 26/11/28, JM. On-site Mod UPC meeting scheduled for Thursday, Nov. 3., 26/10/31, JM. Parcel Ct: 1 Parcel Possessed: 1 UTL:0 of 6 11:27:AM Page 1 of 19

2 Const Scope ROW /UTL X29 RESURFACING 27-1 LMIG THOROUGHFARES Category: RESURFACING #: 04 Resurfacing 27-1 LMIG Thoroughfares X29 RESURFACING 27-1 LMIG THOROUGHFARES Scope: Resurfacing project KRISTEN ORTON 26/11/25 26/12/22 working on preliminary road list, 26/07/11, DM. X2316 CIRCLE 75 PKY AT HERODIAN WAY #: 09 Circle 75 Parkway at Herodian Way X2316 CIRCLE 75 PKY AT HERODIAN WAY Scope: Intersection at Circle 75 and Herodian Way JANE STRICKLIN 26/12/16 27//12 PFPR/FFPR was held on December 2, 26. The plans have been sent to CW Matthews and ES for construction cost due on December 13, 26. It was stated that project needs to be operational by April 8, 27 even if the signal is temporary until the decorative poles can be fabricated., 26/12/05, JS. Coordination meeting with Braves parking lot on November 2., 26/11/, JS. UTL:0 of 11 X2210 OWL CREEK DR DRAINAGE Category: DRAINAGE/HEADWALL #: 0057 Owl Creek Drive Drainage - X2210 OWL CREEK DR DRAINAGE Scope: 27//10 27//24 E7350 MCCOLLUM PKWY FILL-IN-THE-GAPS Category: S #: 0071 McCollum Parkway Sidewalks - E7350 MCCOLLUM PKWY FILL-IN-THE-GAPS BEN KING RD OLYMPIC LN Scope: Install sidewalks on the west side of McCollum Pkwy between Ben King Road and Olympic Lane JIM MARTINEZ 26/12/30 27//26 Awaiting scope & fee from consultant, this project associated with McCollum Pkwy at Ben King (X2309)., 26/12/06, JM. X2321 JOHNSON FERRY ROAD AT GOLDBERGS/CVS #: 0045 Johnson Ferry Road at Goldbergs/CVS - X2321 JOHNSON FERRY ROAD AT GOLDBERGS/CVS Scope: Add "dog-bone" at median break on Johnson Ferry Rd at CVS/Goldberg's driveways. Restricts left out. Also adds pedestrian crosswalk, median cut, on Woodlawn Pkwy at intersection with Johnson Ferry. 26/12/30 27//26 Parcel Ct: 2 11:27:AM Page 2 of 19

3 Const Scope ROW /UTL X2704 BIG SHANTY ROAD Category: S #: 0079 Big Shanty Road Sidewalks X2704 BIG SHANTY ROAD McCollum Rd Chastain Rd Scope: Install sidewalk on the north side of Big Shanty Road between McCollum Road and Chastain Road JIM MARTINEZ 26/12/30 27//26 Awaiting scope & fee from consultant, this project associated with McCollum Pkwy at Ben King (X2309)., 26/12/06, JM. X2222 RIVER MILL CIR DRAINAGE Category: DRAINAGE/HEADWALL #: 0070 River Mill Circle Drainage - X2222 RIVER MILL CIR DRAINAGE Scope: River Mill Circle drainage. 26/12/16 27//27 Waiting on survey completion., 26/11/28, JM. X2220 VALLEY STREAM DR DRAINAGE Category: DRAINAGE/HEADWALL #: 0067 Valley Stream Drive Drainage - X2220 VALLEY STREAM DR DRAINAGE Scope: Valley Stream Drive drainage. 27//19 27// Field survey work completed., 26/11/28, JM. Survey requested., 26/10/31, JM. E6040 RIVER VIEW RD #: RIVER VIEW RD S&O IMPROVEMENTS-E6040 RIVER VIEW RD VETERANS MEMORIAL HWY NICHOLS DR Scope: Safety and Operational improvements between Veterans Memorial Hwy and Nichols Dr. Improvements includes turn lanes at key intersections, improved alignment at the intersection with Veterans Memorial Highway, and potential changes to the vertical alignment 04 RUSTAVIUS FORD 27//20 27//09 FFPR is scheduled for 12/21/16. The 404 permit was submitted on 12/2/16. Property owners has chosen not to communicate with Georgia Power regarding utility easements until they are comfortable with right of way agreement with the County., 26/12/06, RF. Seeking FFPR late November 26., 26/07/05, RF. Meeting scheduled with Consultant to on Thursday for project discussion and path moving forward to completion. Seeking 2nd utility submittal mid June and FFPR and mid August., 26/05/31, RF. ROW staking was requested on March 21, 26., 26/04/05, JS. Revised ROW plans were submitted on February 24, 26. There is a survey bust between our project and the development survey. Russell Rayoni has verified that our survey is accurate and there is not a problem with our survey data. MRPA permit is not needed for this project according to Jim Santo with ARC., 26//, JS. Parcel Ct: 16 26/08/12 UTL:0 of 9 11:27:AM Page 3 of 19

4 Const Scope ROW /UTL TR482 SHALLOWFORD ROAD CHILDERS ROAD #: Master Task Order - KIMLEY-HORN CAT B SHALLOWFORD ROAD CHILDERS ROAD Scope: KIMLEY-HORN - Master TOC for on-demand services CAT B - Hwy Design: Roadway, Bridge & Surveying MICHAEL FRANCIS 27//13 27//09 Parcel Ct: 1 Parcel Possessed: 1 Option Signed: 1 26/04/21 UTL:5 of 7 X2221 WATERFORD GREEN DRAINAGE Category: DRAINAGE/HEADWALL #: 0068 Waterford Green Drainage - X2221 WATERFORD GREEN DRAINAGE Scope: Waterford Green drainage. 27//13 27//10 Waiting for survey completion., 26/11/28, JM. X2212 CUMBERLAND PKWY DRAINAGE Category: DRAINAGE/HEADWALL #: 0059 Cumberland Parkway Drainage - X2212 Cumberland Parkway at Weather Channel Drainage Improvements Scope: Prepare contract bids docs for installation of tunnel liner, inlet trash restriction structure for storm drainage system under Cumberland Parkway at the Weather Channel. Work to be accomplished under task order with Atkins. 27//27 27//23 Moving forward with bid documents., 26/10/31, JM. X2218 MAY BREEZE RD AT SHALLOWFORD RD DRAINAGE Category: DRAINAGE/HEADWALL #: 0065 May Breeze Road at Shallowford Road Drainage - X2218 Maybreeze at Shallowford Drainage Improvements Scope: May Breeze Rd at Shallowford Rd Drainage. Extend existing box culvert, reconstruct OCS from detention pond, misc. 27// 27// EMC must move UG power line., 26/11/07, JM. Parcel Ct: 1 Parcel Possessed: 1 UTL:0 of 7 E7370 ATLANTA ROAD FILL-IN-THE-GAPS Category: S #: 0075 Atlanta Road Sidewalks - E7370 ATLANTA ROAD FILL-IN-THE-GAPS NORTH CHURCH LANE PLANT ATKINSON RD Scope: Install sidewalks on the north side of Atlanta Road between North Church Lane and Plant Atkinson Road 27//10 27//09 11:27:AM Page 4 of 19

5 Const Scope ROW /UTL E7380 PIEDMONT RD (EAST) - FILL-IN-THE-GAPS Category: S #: 0072 Piedmont Road (East) Sidewalks - E7380 PIEDMONT RD (EAST) - FILL-IN-THE-GAPS EAST OF RAILROAD TRACKS SHAW RD Scope: Install sidewalks on the south side of Piedmont Road between the RR and Shaw Road 27//10 27//09 Unit Price, 26/12/06, DM. E7410 PIEDMONT RD (WEST) - FILL-IN-THE-GAPS Category: S #: 0073 Piedmont Road (West) Sidewalks - E7410 PIEDMONT RD (WEST) - FILL-IN-THE-GAPS COTTONWOOD DR CANTON ROAD Scope: Install sidewalks on the south side of Piedmont Road between Canton Road and Cottonwood Drive 27//10 27//09 Unit Price, 26/12/06, DM. E7440 BURNT HICKORY ROAD SCHOOL RELATED /SAFE ROUTES TO SCHOOL Category: S #: 0074 Burnt Hickory Road Sidewalks - E7440 BURNT HICKORY ROAD SCHOOL RELATED /SAFE ROUTES TO SCHOOL CROSSWALK NEAR SCHOOL ACWORTH DUE WEST RD Scope: Install sidewalks on the north side of Burnt Hickory Road between school and Acworth Due West Road 27//10 27//09 Unit Price, 26/12/06, DM. X2315 BROOKVIEW RD AT TERRELL MILL RD #: 0076 Brookview Road at Terrell Mill Road BROOKVIEW RD AT TERRELL MILL RD Scope: Intersection Improvement at Terrell Mill and Brookview Drive. Widens Brookview to the South to accommodate 2 lanes outbound. 27//10 27//09 E4050 I-75 WADE GREEN ROAD INTERCHANGE Category: THOROUGHFARE IMPROVE #: I-75 AT WADE GREEN ROAD DDI - E FOR TRACKING DESIGN BUILD TEAM SCHEDULE BUSBEE DR SHILOH ROAD Scope: The project will convert the interchange to a Diverging Diamond with minor widening, median construction, and minor bridge re-construction. The project will begin just east of Shiloh Road and end just east of the northbound ramps. 27//13 27//13 PFPR scheduled with GDOT SME's at CCDOT on 9/9. FFPR will be lead by GDOT. expect Construction NTP in Dec or Jan, depending on Utilities. Completion date = 11/9/27, 26/09/06, KM. Currently in design, Field Plan Review in August, 26/08/, DM. Schedule entered in ProjectView., 26/07/12, AD. 26/12/16 11:27:AM Page 5 of 19

6 Const Scope ROW /UTL D6040 BELLS FERRY ROAD #: MASTER TASK ORDER CONTRACT- POND -CAT B GP#L3880 BELLS FERRY ROAD Piedmont Road Barrett Parkway Scope: POND & CO. - Master TOC for on-demand services Cat B - Hwy Design; Roadway, bridge & surveying KRISTEN ORTON 27//24 27//23 Construction Plans completed /30/25; Right of Way Plans completed /30/25; NTP for Utilities issued 06/14/26, 26/07/05, DM. Final ROW plans have been submitted. Acquisition is in process. Some minor revisions need to be made to the plans after contacting the property owners. Consultant is aware and working towards these revisions., 25/06/30, KO. Consultant has addressed comments from FFPR and are awaiting pre-bid review meeting., 25/06/, KO. Existing facilities incomplete for CCWS and AGL. Need updated utility plans., 25//30, KO. Consultant is working on Final Construction Plans., 25//30, KO. Parcel Ct: 12 Parcel Possessed: 7 Option Signed: 5 25//16 25//28 UTL:7 of 9 X2123 CONCORD ROAD COVERED BRIDGE Category: BRIDGES & CULVERTS #: Covered Bridge Rehabilitation CONCORD ROAD COVERED BRIDGE Scope: Covered bridge rehabilitation 04 JANE STRICKLIN 27//24 27//23 Met with USACE and SHPO on site on November 16, 26. USACE wants us to do a PAR. Need to discuss if the plans proceed forward or wait for project direction from USACE., 26/12/05, JS. Meeting scheduled with COE and SHPO on site on November 16 to discuss the proposed improvements to the bridge., 26/11/, JS. PFPR on October 5, 26. Want SHPO involvement before FFPR., 26/10/11, JS. Phone call with COE on 7/26/16 to discuss the project. COE would like to set up a conference call with SHPO., 26/08/, JS. Kickoff meeting on June 20,26. Bridge survey on June 28, 26., 26/07/, JS. X2723 PROVIDENCE RD Category: S #: 0081 Providence Road Sidewalks X2723 PROVIDENCE RD Providence Corner Dr Pine Rd Scope: Install sidewalk on the east side of Providence Road between Providence Corner Drive and Pine Road 27//24 27//23 11:27:AM Page 6 of 19

7 Const Scope ROW /UTL X2763 DISCOVERY BLVD Category: S #: 0086 Discovery Boulevard Sidewalks X2763 DISCOVERY BLVD Mableton Pkwy Castle Lake Dr Scope: Install sidewalk on the northwest side of Discovery Boulevard between Mableton Parkway and Castle Lake Drive 04 27//24 27//23 X2207 PEMBRIDGE WAY DRAINAGE Category: DRAINAGE/HEADWALL #: 0055 Pembridge Way Drainage - X2207 PEMBRIDGE WAY DRAINAGE Scope: Pembridge Way drainage. 27//24 27//24 Water System replacing sanitary sewer line and replacing headwall., 26/11/28, JM. X2612 DICKERSON RD #: 09 Dickerson Road Improvements - X2612 DICKERSON RD Scope: Roadway improvements to Dickerson Road to improve emergency vehicle access. 27//17 27/04/13 Parcel Ct: 8 26/05/27 UTL:0 of 6 E7260 WESLEY CHAPEL RD Category: S #: Wesley Chapel Road Sidewalk - E7260 WESLEY CHAPEL RD SPRING MILL DRIVE SANDY PLAINS ROAD Scope: Add sidewalk on the east side of Wesley Chapel Road, from Spring Mill Drive to Sandy Plains Road (Approximately 0.4 miles), to provide sidewalk access between Garrison Mill Elementary School, Area Subdivisions, and Mabry Park 27//31 27/04/27 E7570 IRWIN RD Category: S #: Irwin Road Sidewalk - E7570 IRWIN RD Scope: Irwin Road sidewalk - In-House Design AMAN MATHUR 27/05/12 27/06/08 Survey completed 8/2/16, 26/08/, DM. UTL:0 of 6 11:27:AM Page 7 of 19

8 Const Scope ROW /UTL X26 BEECH RD WESTSIDE DR #: Powder Spring Connector WEST SIDE DRIVE PEDESTRIAN - D4150 SOUTH COBB DR SANDTOWN RD Scope: Powder Springs Connector via West Side Drive 27/05/12 27/06/08 Received Utility submittal comments. Held FFPR. included an additional 2 trailers for removal due to Haven Drive intersection proximity/grades. Leave 3-way stop in place. Checking on signal Permit status. Need detour plan., 26/11/28, JM. Awaiting utility comments from 2nd submittal., 26/10/31, JM. Utility plans 2nd submittal FFPR to be scheduled for early November., 26/09/08, JM. RW plans approved , 26/07/18, JM. RW plans reviewed. Scheduling on-site review to confirm accuracy prior to approval., 26/06/30, JM. Parcel Ct: 15 26/08/25 UTL:2 of 8 E7420 SHALLOWFORD ROAD SCHOOL RELATED /SAFE ROUTES TO SCHOOL Category: S #: Shallowford Road Sidewalk - E7420 SHALLOWFORD ROAD SCHOOL RELATED /SAFE ROUTES TO SCHOOL MEADOW WAY CANTON ROAD Scope: Add sidewalk on the south side of shallowford Rd, from existing sidewalk near Meadow Way to Canton Rd (approximately 0.5 miles), to provide sidewaks in the vicinity of Nicholson Elementary School & McCleskey Middle School. 27/05/26 27/06/22 This will be moved to a Task Order, 26/10/31, DM. X27 NICHOLS RD Category: S #: 0078 Nichols Road Sidewalks X27 NICHOLS RD Antioch Rd Holland Rd Scope: Install sidewalk on the north side of Nichols Road between Antioch Road and Holland Road AMAN MATHUR 27/06/16 27/07/13 X28 TERRELL MILL RD AT GREENWOOD TRL BRUMBY ELEM EAST COBB MIDDLE Category: SCHOOL ZONE IMPRVMNT #: Terrell Mill Road at Greenwood Trail (Brumby Elementary School/East Middle School) - X28 TERRELL MILL RD AT GREENWOOD TRL BRUMBY ELEM EAST COBB MIDDLE Scope: New traffic signal at Terrell Mill Rd and Greenwood Trail/Main Driveway for Brumby ES/East MS. Includes new right-turn lane on Greenwood Trail and new school flashing beacons on Terrell Mill Rd. DAVE GARRETT 27/08/04 27/09/ Project being coordinated with CCSD site work for July 28 school opening., 26/08/22, DG. Phase One, turn lanes on Terrell Mill Rd, completed by MOU in conjunction with WA water line project. Remainder of project consists of adding a right-turn lane on Greenwood and installing a traffic signal., 26/08/22, DG. Survey boundaries determined for upcoming survey., 26/06/14, DG. 11:27:AM Page 8 of 19

9 Const Scope ROW /UTL E7580 GORDON COMBS RD Category: S #: Gordon Combs Road Sidewalk - E7580 GORDON COMBS RD Scope: Install sidewalks on the east side from Burnt Hickory Road to Madison Grove Lane. 27/08/18 27/09/14 This will be moved to a Task Order, 26/10/31, DM. UTL:0 of 6 x2724 WINDY RIDGE PKY Category: S #: 00 Windy Ridge Parkway Sidewalk - X2724 WINDY RIDGE PKY Scope: Windy Ridge Parkway Sidewalk from US 41/ Pkwy to Heritage Ct. 12' multi-use trail on south side of roadway, ties to trail on Braves frontage. 27/08/18 27/09/14 X2743 EBENEZER RD Category: S #: 0083 Ebenezer Road Sidewalks X2743 EBENEZER RD Blackwell Rd Hampton Oaks Bend Scope: Install sidewalk on the north side of Ebenezer Road between Blackwell Road and Hampton Oaks Bend ASHLEY WHITE 27/08/18 27/09/14 E6060 SANDY PLAINS ROAD #: SANDY PLAINS ROAD - E6060 SANDY PLAINS ROAD EAST PIEDMONT ROAD EBENEZER RD Scope: From Canton Rd in Marietta to SR 92 in Roswell, more than 8 miles of Sandy Plains Rd has a raised median except the segment between Kinjac Dr & Ebenezer Rd. This project will close the gap with a raised median and the addition of turn lanes. 27/09/ 27/09/28 Mtg w/ Comm. Birrell & Church on 9/14., 26/09/06, KM. Issued Georgia Transmission Corporation Utility Notice to Proceed on; June 3, 26., 26/07/, AR. ROW is underway, will meet w/chruch in April after ROW offer & grave moving letter are sent, Utilities still working toward let date, 26//17, DM. Major utility impact to aerial electrical facilities. 2nd submission needed. Earliest start date Spring 27, completion of aerial relocation, 15 months later., 25/10/05, AR. Received Final Plans 08/28/25., 25/09/, KO. Parcel Ct: 33 Parcel Possessed: 13 Option Signed: 12 25/07/28 25/10/07 UTL:5 of 11 11:27:AM Page 9 of 19

10 Const Scope ROW /UTL X2305 DALLAS HWY AT LOST MOUNTAIN RD MARS HILL RD #: DALLAS HWY AT LOST MOUNTAIN RD/MARS HILL RD - ENGINEERING DALLAS HWY AT LOST MOUNTAIN RD MARS HILL RD Scope: The project consists of intersection improvements at SR 120 / Dallas Highway and Lost Mountain Road and Mars Hill Road. Improvements would include turn lane modifications (additions, reassigned lanes, and a potential drop lane) and commercial access modif JIM MARTINEZ 27/10/20 27/11/16 Concept team meeting 11/9., 26/10/31, JM. Reviewing revised traffic study, 26/10/18, JM. Consultant addressing concept report comments, 26/10/, JM. Kickoff meeting 8/11, 26/08/18, JM. s executed; kickoff meeting TBD, 26/08/, JM. X2310 OLD CANTON RD AT HOLLY SPRINGS RD #: MASTER TASK ORDER CONTRACT- POND -CAT B OLD CANTON RD AT HOLLY SPRINGS RD Old Canton Rd and Holly Springs Rd Old Canton Rd and Holly Springs Rd Scope: POND & CO. - Master TOC for on-demand services Cat B - Hwy Design; Roadway, bridge & surveying RUSTAVIUS FORD 27/11/10 27/12/07 The PM for this project is Steve Bitney ( )., 26/12/06, RF. The traffic counts completed early May 26. Working on completing insurance documents for contract execution., 26/08/, RF. X2311 POST OAK TRITT RD AT HEMBREE RD #: POST OAK TRITT RD AT HEMBREE RD - ENGINEERING POST OAK TRITT RD AT HEMBREE RD Post Oak Tritt Rd at Hembree Rd Post Oak Tritt Rd at Hembree Rd Scope: The project consists of safety and operational improvements at the intersection of Post Oak Tritt Road at Hembree Road. The improvements will potentially include reconfiguration of turn/travel lanes, traffic signal, or a roundabout. RUSTAVIUS FORD 27/11/10 27/12/07 Surveying has began and consultant is moving forward, 26/11/, RF. Surveying to begin soon., 26/10/04, RF. The traffic counts completed early May 26. Working on completing insurance documents for contract execution., 26/08/, RF. X2312 POWDER SPRINGS RD AT FLINT HILL RD PINE GROVE DR DEERCREEK DR #: Master Task Order -GRESHAM SMITH-CAT B POWDER SPRINGS RD AT FLINT HILL RD PINE GROVE DR DEERCREEK DR Powder Springs Rd at Flint Hill Rd/Pine Grove Dr/Deercreek Dr Powder Springs Rd at Flint Hill Rd/Pine Grove Dr/Deercreek Dr Scope: GRESHAM SMITH & PARTNERS - Master TOC for on-demand services CAT B - Hwy Design: Roadway, Bridge & Survey 04 RUSTAVIUS FORD 27/11/10 27/12/07 The PM for this project is Scott Shelton ( )., 26/12/06, RF. Consultant is only contracted to perform services through concept., 26/10/04, RF. The traffic counts completed early May 26. Working on completing insurance documents for contract execution., 26/08/, RF. Insurance document issues, 26/07/11, DM. 11:27:AM Page 10 of 19

11 Const Scope ROW /UTL X27 JOHN WARD RD Category: S #: 0077 John Ward Road Sidewalks X27 JOHN WARD RD Macland Rd Irwin Rd Scope: Install sidewalks on the west side of John Ward Road between Macland Road and Irwin Road. Project will also include a pedestrian bridge. 27/11/17 27/12/14 RFP (27), 26/12/06, DM. X2722 BEECH HAVEN TRAIL Category: S #: 0080 Beech Haven Trail Sidewalks X2722 BEECH HAVEN TRAIL Log Cabin Rd Cumberland Pkwy Scope: Install sidewalk on the east side of Beech Haven Trail between Log Cabin Road and Cumberland Parkway 27/11/17 27/12/14 X2742 MCPHERSON RD Category: S #: 0082 McPherson Road Sidewalks X2742 MCPHERSON RD Post Oak Tritt Rd Shallowford Rd Scope: Install sidewalk on the west side of McPherson Road between Post Oak Tritt Road and Shallowford Road, 27/11/17 27/12/14 X2744 BELLS FERRY ROAD Category: S #: 0084 Bells Ferry Road Sidewalks X2744 BELLS FERRY ROAD Chastain Rd Estates Landing Dr Scope: Install sidewalk on the east side of Bells Ferry Road between Chastain Road and Estates Landing Drive 27/11/17 27/12/14 X2745 BELLS FERRY ROAD Category: S #: 0085 Bells Ferry Road Sidewalks X2745 BELLS FERRY ROAD Noonday Creek Trail Lloyd Dr Scope: Install sidewalk on the west side of Bells Ferry Road between Noonday Creek Trail and Lloyd Drive 27/11/17 27/12/14 11:27:AM Page 11 of 19

12 Const Scope ROW /UTL X2115 MARS HILL RD OVER ALLATOONA CREEK Category: BRIDGES & CULVERTS #: Mars Hill Road over Allatoona Creek - X2115 Mars Hill Road over Allatoona Creek - X2115 Scope: The project consists of a total bridge replacement of the Allatoona Creek Bridge located on Mars Hill Road. The bridge is located on Mars Hill Road between Chipping Drive and Waldenbrooke Court which are the anticipated limits of the project. 28//26 28//22 X2607 MAIN ST #: Master Task Order - KIMLEY-HORN CAT B Old Highway 41/Main Street NANCE RD NOWLIN RD Scope: KIMLEY-HORN - Master TOC for on-demand services CAT B - Hwy Design: Roadway, Bridge & Surveying JIM MARTINEZ 28//23 28//22 Concept team meeting 11/9., 26/11/, JM. Concept report being circulated for signatures., 26/10/31, JM. Reviewing additional scope of work. Meeting with N. H.S.(10/19) to coordinate improvements., 26/10/18, JM. s executed; kickoff meeting TBD, 26/08/, JM. X2112 LITTLE WILLEO RD OVER TIMBER RIDGE BRANCH Category: BRIDGES & CULVERTS #: LIttle Willeo Road over Willeo Creek Little Willeo Road over Willeo Creek - X2112 Scope: The project consists of total bridge replacement on Willeo Creek Bridge located on Little willeo Road. The Willeo Creek bridge is locatedon Little Willeo Road between Lake Fjord Pass and Odins Way. 28// 28//29 PFPR submittal scheduled , 26/12/, JM. Database underway., 26/10/31, JM. Kimley Horn selected as consultant. BOC contract approval , 26/09/08, JM. 26/12/05 X21 BROOKWOOD DR OVER CLAY BRANCH Category: BRIDGES & CULVERTS #: Brookwood Drive over Clay Branch - X21 Brookwood Drive over Clay Branch - X21 Billy Max Drive Center St. Scope: the project consists of total bridge replacement to Clay Branch Creek Bridge located on Brookwood Drive - Bridge is located between Billy Max Drive and Cetner Street // 28//30 PFPR submittal scheduled for , 26/12/, JM. Database underway., 26/10/31, JM. Kimley Horn selected as consultant. BOC contract approval , 26/09/08, JM. 11:27:AM Page 12 of 19

13 Const Scope ROW /UTL X2762 MABLETON PKWY PEDESTRIAN IMPROVEMENTS Category: S #: Mableton Parkway Pedestrian Improvements E7560/X2762 MABLETON PKWY PEDESTRIAN IMPROVEMENTS FACTORY SHOALS RD DISCOVERY BLVD Scope: Engineering design for 10-ft wide trail on westside of Mableton Pkwy and 5-ft S/W on eastside from Discovery Blvd to Factory Shoals Rd 04 28/04/06 28/05/ PIOH is not required., 26/08/08, DM. Parcel Ct: 18 X2116 OLD 41 HWY BRIDGE Category: BRIDGES & CULVERTS #: Old 41 Highway over CSX Railroad - X2116 OLD 41 HWY BRIDGE Scope: Replace bridge over CSX RR - Joint Project with City of Marietta 28/10/12 28/11/08 X2122 WILLEO RD OVER WILLEO CREEK Category: BRIDGES & CULVERTS #: 0046 Willeo Road over Willeo Creek Bridge Replacement - X2122 WILLEO RD OVER WILLEO CREEK L. Roswell/Timber Ridge Bywater Trail Scope: Project includes a bridge replacement for Willeo Road over Willeo Creek. Project goals include minimizing impacts to utilities and USACOE and National Park Service property, low long term maintenance, utilize cost constrained structures, and start/complet, 28/10/12 28/11/08 X2409 I-20 EB RAMPS AT RIVERSIDE PKWY Category: THOROUGHFARE IMPROVE #: 0047 I-20 Eastbound Ramps at Riverside Parkway Roadway Improvements - X2409 I-20 EB RAMPS AT RIVERSIDE PKWY South Service Rd Riverside Pkwy Scope: This proposed project includes safety and operational improvements consisting of turn-lanes, signal installation, sidewalk, way-finding signage and realignment of South Service Road. The project will extend from South Service Road to Riverside Pkwy. 04 RUSTAVIUS FORD 28/10/12 28/11/08 Coordination with Work of Faith Church is required during the life of the project. This project has 1.6 million dollars of funding support from the State Road & Tollway Authority (SRTA)., 26/12/05, RF. 11:27:AM Page 13 of 19

14 Const Scope ROW /UTL X26 CANTON RD CORRIDOR #: 01 Canton Road Corridor - X26 CANTON RD CORRIDOR CANTON ROAD CONN CHEROKEE COUNTY LINE Scope: The project includes roadway and operational improvements on Canton Road from the Canton Road Connector to Jamerson Road. Improvements will include turn-lanes, raised medians, access revisions, sidewalks, signal upgrades, and drainage improvements. 28/10/12 28/11/08 X2608 NEW MACLAND RD #: 0087 New Macland Road Design X2608 NEW MACLAND RD MACLAND RD ARAPAHO DR Scope: The project includes roadway safety and traffic operational improvements on New Macland Road beginning at Arapaho Drive and ending at Macland Road. Improvements will include turn-lanes, sidewalks, drainage improvements and potential signal upgrades. 04 RUSTAVIUS FORD 28/10/12 28/11/08 Meeting was held with CCSD and McEachern HS on 10/24/16., 26/12/, RF. X2309 MCCOLLUM PKWY AT BEN KING RD #: McCollum Parkway at Ben King Road MCCOLLUM PKWY AT BEN KING RD Ben King Road/Big Shanty Road McCollum Parkway Scope: This project will consist of intersection improvements on McCollum Parkway at Ben King Road and Big Shanty Road. Improvements will include traffic operational and safety improvements which may consist of turn-lanes, realignment, and/or a roundabout. Proj JIM MARTINEZ 28/11/30 28/12/27 Awaiting scope & fee from consultant., 26/12/06, JM. Kick off meeting scheduled for 10/4, 26/10/, JM. Selection committee met 7/28; top three firms to be presented at 8/23 BOC, 26/08/, JM. X26 CHEROKEE ST #: Cherokee Street (Kennesaw) - X26 Cherokee Street (Kennesaw) JILES RD I-75 Scope: This project will consist of roadway improvements along Cherokee Street from Jiles Road to Shiloh Road. The improvements will include the addition of a third travel lane in the eastbound direction only, the addition of a right turn lane at the intersection of shiloh Road and potential access improvements between the two intersections 28/11/30 28/12/27 11:27:AM Page 14 of 19

15 Const Scope ROW /UTL X24 WINDY HILL RD TERRELL MILL RD CONNECTOR Category: THOROUGHFARE IMPROVE #: Windy Hill / Terrell Mill Road Connector - X24 CO WINDY HILL RD TERRELL MILL RD CONNECTOR WINDY HILL RD TERRELL MILL RD Scope: Construct a new 4-lane roadway, parallel to I-75, connecting Windy Hill road with Terrell Mill Road to alleviate congestion on Windy Hill Road and Powers Ferry Road, with raised median, 10' trail on 1 side and lighting. 29// 29//28 HNTB kicked off. Fall PIOH, PFPR by early 27, begin early acquisitions as soon as possible., 26/08/19, KM. Awaiting HNTB NTP; Kickoff w/gdot on 3/17/16; GDOT schedule is aggressive in 26, 26//17, DM. GDOT Funing $12M. If CST stays under $12M, will have some reimbursable ROW. Preference is to keep all in CST, 26//17, DM. RFP December 25; Concept spring/summer 26; GEPA Dec 26; ROW 27& 28; let March 29, 26//17, DM. X2407 SOUTH BARRETT RELVR PHASE 3 Category: THOROUGHFARE IMPROVE #: South Barrett Reliever Phase SOUTH BARRETT RELVR PHASE 3 Barrett Lakes Blvd SR 5 Connector Scope: This project consists of adding a 4-lane divided road from S. Barrett Rel 2 over I-75 to Roberts Court and widening Roberts Court to a 4-lane divided road. This project will add a bridge over I-75 that will not have access ramps to I /10/18 29/11/14 PIOH is being scheduled, 26/08/08, DM. X24 WINDY HILL RD Category: THOROUGHFARE IMPROVE #: 0105 Windy HIll Road X24 WINDY HILL RD SOUTH COBB DR ATLANTA RD Scope: City of Smyrna contract for design. Coordination required with County. 29/10/30 29/11/21 E60 LOWER ROSWELL ROAD #: LOWER ROSWELL ROAD - E60 GP#L5279 On Hold LOWER ROSWELL ROAD WOODLAWN DRIVE DAVIDSON RD Scope: adding a median, access management, turn lanes at Woodlawn Drive, improved turn lanes at Johnson Ferry Road and Davidson Road, and improved alignment of Lower Roswell Road across Johnson Ferry Rd. Project also includes sidewalks on both sides and landscap JAMES HUDGINS 29/11/29 29/12/26 PROJECT ON HOLD PENDING BOC DIRECTION ON CONCEPT., 24/07/30, DM. Utilities need plans, 23/07/30, DM. Meeting with Commissioner, County Manager, and Chairman on the Concept the week of July 8th to complete getting their direction and move forward., 23/07/, BR. Parcel Ct: 1 Parcel Possessed: 1 Option Signed: 1 UTL:0 of 10 11:27:AM Page 15 of 19

16 Const Scope ROW /UTL GDOT Projects D4190 SR 92 SR 92 fm US 41 to Glade Rd Category: THOROUGHFARE IMPROVE #: SR92 from US41 to Cherokee/Glade at I75 CO SR 92 SR 92 fm US 41 to Glade Rd SR 3/US 41 GLADE ROAD Scope: Design by GDOT 27/11/15 Construction funds = HB170$ Corps permit putting schedule at risk, 26/09/06, KM. Nov 27 let - $ in FY20, 25/12/16, DM. Design underway, new schedule shows 11/27 let date., 24/12/, KM. Interim intersection improvements requested by Acworth. 4-lane divided and triple lefts on US41 or direct connection (via 3rd Army Rd.) to I-75. URS selected.pioh scheduled for 7/8/08. Revised length showed 4 lane divided with bike lanes that fails 22. Reduced environ impacts, no 4F. FHWA challenged reasonable termini 12/08 - delay. Team concept mtg 2/ /09. Concept being approved (4/09). Prelim Design underway. Environ. Doc underway. New design contract., 23/07/09, MS. 25/06/10 D4200 SR 92 SR 92 fm Paulding Co Line to US 41 Category: THOROUGHFARE IMPROVE #: SR 92 from US 41 to just south of Cedarcrest Rd CO SR 92 SR 92 fm Paulding Co Line to US 41 PAULDING COUNTY LINE SR 3/US 41 Scope: Design by GDOT 29/08/15 R/W funds shifted to HB170, 26/09/06, KM. New design contract executed by GDOT 9/26/13; schedule change in development for 6/25 ROW Auth & 9/27 CST Auth, per clb 05/21/14, 24/06/, KM. County did not sign LGPA. Was in Long Range. Request GDOT to move up and done. URS selected. Team concept mtg Design continues - preliminary only- 6., 23/07/09, MS. 11:27:AM Page 16 of 19

17 Const Scope ROW /UTL Recently Let Projects TRANSIT PROJECTS RENOVATION OF FUELING STATION/BUS WASH FACILITIES Category: TRANSIT PROJECTS #: Master Task Order Kimley Horn Cat E TRANSIT PROJECTS RENOVATION OF FUELING STATION/BUS WASH FACILITIES CCT Site CCT Site Scope: Kimley Horn - Master TOC for on-demand services Category E-Transit RUSTAVIUS FORD 26/09/16 26/10/13 Selection committee met on 11/2/16. Selection committee conducted interviews on 11/30/16. BOC agenda item for 12/13/16 meeting for ranking of contractors., 26/12/06, RF. RFP was advertised on 9/16/16. Pre-proposal meeting was held on 9/29/16. Bids opened 10/13/16. Selection committee meeting is scheduled for 11/2/16., 26/10/04, RF. Meeting with County Manager on 8/4/26., 26/08/, RF. Purchasing to Let project., 26/07/11, DM. Received 60% plans on 7/1/16. Plan review is scheduled for July 13. Will pursue AR method to procure a contractor., 26/07/05, RF. D11J0 FLOYD ROAD TRAIL PHASE 2 Category: MULTI-USE TRAILS #: TASK ORDER CONTRACT-HNTB-CAT B FLOYD ROAD TRAIL PHASE 2 HICKS RD SILVER COMET TRAIL Scope: HNTB - Master Task Order Agmt for on-call services. Category B - Hwy Design: Roadway, Bridge & Surveying 04 26/09/16 26/10/13 Approval received 8/3/16 - NTP should be released 8/19/16., 26/08/, DM. Documents are at Moreland for FHWA review / Re-Eval final approval still at FHWA, 26/07/11, DM. Still waiting on utility cert. GA Power., 25/07/16, BL. FFPR plans sent to MA on 7/7/14. They will not review until ROW & utility cert., 24/06/30, BL. Received FFPR plans to send to MA on 6/27/14., 24/06/30, BL. Parcel Ct: 11 Parcel Possessed: 11 Option Signed: 9 24//28 24/06/23 UTL:7 of 7 X2604 CUMBERLAND BLVD #: 0008 CCID-CUMBERLAND BOULEVARD 042 CCID Cumberland BLVD Improvements - CCID19/X2604 AKERS MILL RD SPRING RD Scope: Provide design and survey services for the widening of 0.5 miles of Cumberland Blvd from 2 lanes to 3 lanes westbound between Cumberland Pkwy and Akers Mill Rd. Additional left turn lane improvements will be made where Cumberland Blvd intersects with Cum 26/09/16 26/10/13 Env cert: 8/16, ROW cert 8/23, 26/09/06, KM. GDOT needs to be invited to constructability meeting, 26/07/11, DM. The storm drain pipes were investigated by Water and found to be in good shape. Need to discuss the results with CCID since the plans will need to be revised., 26/04/07, DM. FFPR was held on 2/26/16. The P storm drain pipes are being filmed by CCWS. Need mtg to discuss the drainage design for the project once we have the results of the P investigation, 26/04/07, DM. Informed that ROW will have to follow the Uniform Act so will push back the letting until the first of 27, 26//, DM. Parcel Ct: 9 Parcel Possessed: 9 Option Signed: 1 25/10/06 26//16 UTL:11 of 12 11:27:AM Page 17 of 19

18 Const Scope ROW /UTL E4190 INTERSTATE NORTH PKWY AT INTERSTATE NORTH CIRCLE Category: THOROUGHFARE IMPROVE #: Interstate North Pkwy at Interstate North Cir E Interstate North Pkwy At Interstate North Circle Scope: Eng Design for realignment of I/S from Interstate N. Pkwy to Interstate N. Cir. Includes bike/ped improvements on Interstate N. Pkwy to Windy Ridge Pkwy 26/09/30 26/10/27 Final plans, estimate and FFPR responses to GDOT on 8/25. Env cert: 8/16, Bid docs to GDOT by 9/16, ROW cert by 9/30, 26/09/06, KM. Possible combined FFPR/Constructabiity Review, 26/07/11, DM. ROW Staking was requested on March 10, 26. The ROW staking was completed on March 29, 26. Need to schedule a meeting with the Consultant to discuss the trail location along Interstate North Pkwy., 26/04/05, JS. PFPR was held on February 11, 26. Preliminary ROW plans were submitted on February 25, 26. Schedule sent to GDOT. GDOT approved LAP on February 19, 26., 26//, JS. PFPR is set for February 11, 26 at 9:00 AM. Working on local let agreement and schedule update., 26//, JS. Parcel Ct: 15 Parcel Possessed: 15 Option Signed: 3 26/08/17 UTL:9 of 11 X2324 BARRETT PARKWAY AT CHASTAIN MEADOWS PKWY #: 0091 Barrett Parkway at Chastain Meadows Parkway TR486/X2324 BARRETT PARKWAY AT CHASTAIN MEADOWS PKWY Scope: Adding dual left turns on southbound Chastain Meadows Parkway to eastbound Barrett Parkway. 26/10/14 26/11/10 Original TR486, 26/10/31, DM. Parcel Ct: 1 Option Signed: 1 26/06/21 UTL:7 of 7 X2804 SANDY PLAINS RD AT DAVIS RD (MOUNTAIN VIEW ELEM) Category: SCHOOL ZONE IMPRVMNT #: Sandy Plains Road at Davis Road - X2804 SANDY PLAINS RD AT DAVIS RD (MOUNTAIN VIEW ELEM) Vicinity of Karen Ln and Sandy Plains Rd Vicinity of Berkshire Flats Ct and Sandy Plains Rd Scope: Improve the intersection of Sandy Plains Road at Davis Road (due to relocation of Mountain View Elementary School). Includes a traffic signal rebuild, new school zone flashing beacons, and median improvements at the new bus driveway on Sandy Plains Rd. DAVE GARRETT 26/10/21 26/11/17 NOI is needed. Plans being developed for submittal to EPD., 26/08/22, DG. Discussed with Andy and David. Combined utility submittal., 26/06/14, DG. Survey complete, including property owner boundaries April 28, 26. Concept development underway for May 19 concept meeting., 26/05/, DG. Parcel Ct: 5 Option Signed: 1 26/08/17 UTL:6 of 6 11:27:AM Page 18 of 19

19 Const Scope ROW /UTL X2905 RESURFACING 27-3 LOCAL ROADS NORTH Category: RESURFACING #: 06 Resurfacing 27-3 Local Roads (North) X2905 RESURFACING 27-3 LOCAL ROADS NORTH Scope: Resurfacing, KRISTEN ORTON 26/10/21 26/11/17 11:27:AM Page 19 of 19

LETTING SCHEDULE REPORT

LETTING SCHEDULE REPORT LETTING SCHEDULE REPORT Transportation Improvement Projects Date: July 09, 28 Cobb COBB COUNTY PROJECTS E7570 IRWIN RD SIDEWALK #: 000941 Irwin Road Sidewalk - E7570 18-T8000-0009 Constructability IRWIN

More information

Cobb County SPLOST. Presented to the Cobb County Board of Commissioners May 22, 2017

Cobb County SPLOST. Presented to the Cobb County Board of Commissioners May 22, 2017 Presented to the Cobb County Board of Commissioners May 22, 2017 Facilities, Eddie Canon, Support Services Director Information Services, Sharon Stanley, Director Public Safety, Sam Heaton, Director Parks,

More information

I-4 Beyond the Ultimate. Florida Transportation Builders Association January 18, 2019

I-4 Beyond the Ultimate. Florida Transportation Builders Association January 18, 2019 I-4 Beyond the Ultimate Florida Transportation Builders Association January 18, 2019 FDOT District 5 Improving Mobility & Safety in Central Florida FDOT District 5 is: Designing and building a better Interstate

More information

V-vDD ^l^lll Marietta, OA 30060

V-vDD ^l^lll Marietta, OA 30060 D 514 Glover Street V-vDD ^l^lll 1 1 1 Marietta, OA 30060 SCHOOL DISTRICT Telephone: {770) 426-3300 ; www.cobbkl2.org One Team, One Goal: Student Success September 5,2018 Ms. Sue Wadsworth Hamb/s Commercial

More information

Workshop Agenda. Bransford Roundabout. Bedford Intersection/Roundabout. Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion

Workshop Agenda. Bransford Roundabout. Bedford Intersection/Roundabout. Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion Workshop Agenda Bransford Roundabout Bedford Intersection/Roundabout Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion Project Phasing Summary of Recommendation Purpose: Provide

More information

School Facilities Information

School Facilities Information Introductory Notes Related to Information in This Report After many years of using the calculated capacity data for schools, staff have recently reviewed these figures and established new capacity numbers

More information

I-405 Sepulveda Pass Improvements Project

I-405 Sepulveda Pass Improvements Project I-405 Sepulveda Pass Improvements Project Community Meeting November 15, 2012 1 Wilshire Segment Overview of Wilshire Segment There are a total of 23 bridges being constructed on this project; almost half

More information

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange I-820 (East) Project Description Fort Worth District Reconstruct Southern I-820/SH 121 Interchange I-820 from approximately 2,000 feet north of Pipeline Road/Glenview Drive to approximately 3,200 feet

More information

Middle Georgia Transportation Executive Committee. September 27, 2017

Middle Georgia Transportation Executive Committee. September 27, 2017 Middle Georgia Transportation Executive Committee September 27, 2017 Project Discussions MACON BIBB, CRAWFORD, MONROE Project List Development Process to Date Cities, Counties and MPOs submitted projects

More information

REGIONAL REVIEW FINDING

REGIONAL REVIEW FINDING REGIONAL REVIEW FINDING DATE: June 18, 2014 ARC REVIEW CODE: R14052101 TO: ATTN TO: FROM: RE: Chairman Tim Lee John Pederson, Zoning Division Manager Douglas R. Hooker, Executive Director Development of

More information

Business Advisory Committee. July 7, 2015

Business Advisory Committee. July 7, 2015 Business Advisory Committee July 7, 2015 1 Today s Topics Outreach Update TI #1 and 2: Target Field Station Connection to I-94: Recommendation 85 th Station Configuration 93 rd Station Configuration DEIS

More information

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP)

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP) Public Information Packet FY - Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP) Comment Form Annual Element TIP Projects - TIP Projects Year - Metropolitan Transportation Improvement

More information

Transit Project Delivery Status Report. Significant Issues

Transit Project Delivery Status Report. Significant Issues Item 1 Transit Project Delivery Status Report Significant Issues Presented By K.N. Murthy Executive Director Construction Committee 1 I-405 Sepulveda Pass Closure Construction Committee I-405 Sepulveda

More information

PUBLIC INFRASTRUCTURE PROJECTS

PUBLIC INFRASTRUCTURE PROJECTS PUBLIC INFRASTRUCTURE PROJECTS FM 664 / OVILLA ROAD WIDENING & IMPROVEMENTS FM 664 / OVILLA ROAD CONNECTS US 287 WITH I-45 (SOURCE: TEXAS DEPARTMENT OF TRANSPORTATION. 2016 FM 664 / OVILLA ROAD WIDENING

More information

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year Capital Improvement Plan FY2015/2016 through FY2020

More information

system performance I-820 East Loop FM 156 TxDOT is working to expand its busiest metropolitan corridors.

system performance I-820 East Loop FM 156 TxDOT is working to expand its busiest metropolitan corridors. system performance TxDOT is working to expand its busiest metropolitan corridors. Nine of the state s 100 most congested highways are located in Tarrant County. Six of these highways will be expanded and

More information

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015 SOUTHERN GATEWAY Transportation and Trinity River Project Committee 11 May 2015 Southern Gateway Project History Began in 2001 as a Major Investment Study [ MIS ], Schematic, and Environmental Assessment

More information

Transportation Improvement Program (TIP) Candidate Project List for Public Review

Transportation Improvement Program (TIP) Candidate Project List for Public Review 2011-2014 Transportation Improvement Program (TIP) Candidate List for Public Review Table 1 Annual Listing Of Federal Aid Obligation For Federal Fiscal Year 2010 North Dakota s Number Transit 410083 Transit

More information

Committee Report. Transportation Committee. Business Item No

Committee Report. Transportation Committee. Business Item No Committee Report Business Item No. 2015-280 Transportation Committee For the Metropolitan Council meeting of December 9, 2015 Subject: METRO Blue Line Extension (Bottineau Light Rail Transit) Revised Scope

More information

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS... Crosshaven Drive Corridor Study City of Vestavia Hills, Alabama Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA... 3 Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

More information

Public Works Department, Capital Improvement Program Project Tracking

Public Works Department, Capital Improvement Program Project Tracking Community Facilities Name CF-01 Eastshore State Park/Powell Street Bioswale Seeking grant funding. TT CF-02 South Bayfront Bridge and Horton Landing Park CF-03 / - 04 Transit Center Updated plans are being

More information

Mobility Corridor Updates. Transit & Active Transportation Projects

Mobility Corridor Updates. Transit & Active Transportation Projects Mobility Corridor Updates Transit & Active Transportation Projects Manjeet Ranu, SEO East San Fernando Valley Transit Corridor Metro Board LPA selection: June 2018 Recently awarded $200 million in Senate

More information

Metro Highway Program

Metro Highway Program Metro Highway Program ACEC November 2018 I-5 North HOV and Truck Lanes 14 miles of HOV lanes in both directions 2 miles of truck climbing lanes at the south end 7 bridge modifications at: Gavin Canyon

More information

Transportation Committee Revised Project Scope and Cost Estimate. November 23, 2015

Transportation Committee Revised Project Scope and Cost Estimate. November 23, 2015 Transportation Committee Revised Project Scope and Cost Estimate November 23, 2015 1 Today s Topics Revised Project Scope Revised Cost Estimate Municipal Approval Action 2 3 Revised Project Scope Project

More information

Business Advisory Committee. November 3, 2015

Business Advisory Committee. November 3, 2015 Business Advisory Committee November 3, 2015 1 Today s Topics DEIS Cost Estimate 2 Assumptions Revised Cost Estimate Revised Project Scope Cost Estimate Overview Position Statement Discussion Municipal

More information

ALTERNATIVE PROJECT DELIVERY

ALTERNATIVE PROJECT DELIVERY ALTERNATIVE PROJECT DELIVERY Varuna Singh SH 288 IN HARRIS COUNTY SH 288 in Harris County SEGMENT 1: 8 New Tolled Direct Connectors at SH 288 and Beltway 8 Existing traffic uses frontage roads today to

More information

Harlem Avenue between 63 rd and 65 th

Harlem Avenue between 63 rd and 65 th Harlem Avenue between 63 rd and 65 th Community Advisory Group Meeting #3 December 1, 2017 Bedford Park Public Library 1 Meeting Agenda 1. Welcome/Introductions (3 mins) 2. Project Overview and Re-Cap

More information

Rolling Road (Route 638) Widening Project

Rolling Road (Route 638) Widening Project Rolling Road (Route 638) Widening Project From: 0.369 Mile North of Fairfax County Parkway (Route 286) To: Old Keene Mill Road (Route 644) State Project No. 0638-029-156, P104, R204, C504; UPC 5559 Public

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 9/8/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

STH 60 Northern Reliever Route Feasibility Study Report

STH 60 Northern Reliever Route Feasibility Study Report #233087 v3 STH 60 Northern Reliever Route Feasibility Study Report Washington County Public Works Committee Meeting September 28, 2016 1 STH 60 Northern Reliever Route Feasibility Study Hartford Area Development

More information

NASHVILLE AREA MPO FY TIP - ADOPTED DECEMBER

NASHVILLE AREA MPO FY TIP - ADOPTED DECEMBER WILLIAMSON/ MAURY NASHVILLE AREA MPO FY -2017 TIP - ADOPTED DECEMBER 11, 2013 SR-247 (Duplex Road) Widening TIP # 2004-051 Road Widening Spring Hill Williamson Length 3.10 Regional Plan ID 1062-170 Air

More information

SAINT CHARLES COUNTY ROAD BOARD Minutes of March 21, 2018

SAINT CHARLES COUNTY ROAD BOARD Minutes of March 21, 2018 SAINT CHARLES COUNTY ROAD BOARD Minutes of March 21, 2018 The Wednesday, March 21, 2018, meeting of the St. Charles County Road Board was called to order at 4:30 p.m. in Room 542 of the Administration

More information

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION DECEMBER 24 UPDATED

More information

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction 550 North to 650 North $ 1,750,000 $ 1,582,113 To widen an existing bridge on 1200 West over Box Elder Creek that will

More information

Wentzville Parkway South Phase 2 & 2A

Wentzville Parkway South Phase 2 & 2A Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total

More information

CITY of NOVI CITY COUNCIL

CITY of NOVI CITY COUNCIL CITY of NOVI CITY COUNCIL Agenda Item 3 July 9, 2018 ci tyofnovi.org SUBJECT: Approval to award design engineering services to AECOM Great Lakes, Inc., for the Flint Street Realignment and Reconstruction

More information

SH 249 IN GRIMES COUNTY. Open House April 3, 2014

SH 249 IN GRIMES COUNTY. Open House April 3, 2014 SH 249 IN GRIMES COUNTY Open House April 3, 2014 Meeting Agenda Purpose of Meeting Today: Review the purpose and need for the SH 249 Grimes County project Review the proposed project and alternatives Discuss

More information

Mobility Corridor Updates. Transit & Active Transportation Projects

Mobility Corridor Updates. Transit & Active Transportation Projects Mobility Corridor Updates Transit & Active Transportation Projects Laura Cornejo, DEO Regional Planner Regional Operator Metro is LA County s Regional Builder/Funder Rail Bus Service (Metro/Muni/Local)

More information

CAPITAL FUND 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS

CAPITAL FUND 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 2019-2023 9510 STREET & SIDEWALK IMPROVEMENTS - 01 STREET AND SIDEWALK MAINTENANCE PROGRAM $1,250,000 $0 $1,250,000

More information

Guam Transportation Program Project Updates. Joanne M.S. Brown Director Carl Dominguez Deputy Director February 6, 2012

Guam Transportation Program Project Updates. Joanne M.S. Brown Director Carl Dominguez Deputy Director February 6, 2012 Guam Transportation Program Project Updates Joanne M.S. Brown Director Carl Dominguez Deputy Director February 6, 2012 Agenda Road Construction Highlights Ongoing Construction Route 17 Rehabilitation and

More information

Cobb ITBS Scores Remain Above National Averages

Cobb ITBS Scores Remain Above National Averages P.O. Box 1088 Marietta, GA 30061 Telephone: (770) 426-3300 www.cobbk12.org For Immediate Release December 20, For more information contact: Jay Dillon (770) 426-3345 Cobb ITBS Scores Remain Above National

More information

Rocky Mount. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

Rocky Mount. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation 2020 Transportation Plan Developed by the Transportation Planning Division of the Virginia Department of Transportation in cooperation with the U.S. Department of Transportation, Federal Highway Administration

More information

ODOT District Two Monthly Construction Update

ODOT District Two Monthly Construction Update Ohio Department of Transportation Construction Update DISTRICT 2 KIRK SLUSHER, P.E., ACTING DEPUTY DIRECTOR 317 East Poe Rd. Bowling Green, Ohio 43402-1330 www.transportation.ohio.gov/dist2 ODOT District

More information

Williamson County Projects

Williamson County Projects Williamson Projects SR-6/ US-31/ Franklin Road TIP # 2006-408 Road Widening TDOT Williamson Length 2.30 Regional Plan ID 1062-160 Air Quality Status Non-Exempt TDOT PIN 105717.00 $38,000,000.00 SR-31/Franklin

More information

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP): SEGMENT 3. April 19, 2018 NHHIP April 19, 2018

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP): SEGMENT 3. April 19, 2018 NHHIP April 19, 2018 NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP): SEGMENT 3 April 19, 2018 NHHIP OVERVIEW NHHIP divided into 3 Segments: Segment 1: I-45: Beltway 8 to I-610 (9 mi) 45 Segment 2: I-45: I-610 to I-10 (3

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 2/19/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

COBB COUNTY, GEORGIA AND INCORPORATED AREAS. Cobb County REVISED: MARCH 4, 2013 VOLUME 2 OF 4 FLOOD INSURANCE STUDY NUMBER 13067CV002D

COBB COUNTY, GEORGIA AND INCORPORATED AREAS. Cobb County REVISED: MARCH 4, 2013 VOLUME 2 OF 4 FLOOD INSURANCE STUDY NUMBER 13067CV002D VOLUME 2 OF 4 Cobb County COBB COUNTY, GEORGIA COMMUNITY NAME COMMUNITY NUMBER ACWORTH, CITY OF 130053 AUSTELL, CITY OF 130054 COBB COUNTY 130052 (UNINCORPORATED AREAS) KENNESAW, CITY OF 130055 MARIETTA,

More information

IMPROVEMENT CONCEPTS

IMPROVEMENT CONCEPTS IMPROVEMENT CONCEPTS for the South Novato Transit Hub Study Prepared by: January 11, 2010 DKS Associates With Wilbur Smith Associates IMPROVEMENT CONCEPTS Chapter 1: Introduction 1. INTRODUCTION The strategic

More information

CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE

CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE TUESDAY, DECEMBER 5, 2017 1 DISCUSSION TOPICS Update of Infrastructure Action Plan (IAP) o Sidewalk and Roadway projects

More information

Project Description: Georgia Department of Transportation Public Information Open House Handout PI#(s): , County: Muscogee

Project Description: Georgia Department of Transportation Public Information Open House Handout PI#(s): , County: Muscogee Why We Are Here: GDOT s Transportation Improvement Act (TIA) Office, the City of Columbus, and the project delivery team are here this evening to display and answer questions concerning the proposed roadway

More information

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan Valley Line West LRT Concept Plan Recommended Amendments Lewis Farms LRT Terminus Site Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan Lewis Farms LRT terminus site, 87 Avenue/West

More information

Welcome. Highway 23 Gap New London to Paynesville. Open House. - Please Sign In -

Welcome. Highway 23 Gap New London to Paynesville. Open House. - Please Sign In - Highway Gap New London to Paynesville Welcome Highway Gap New London to Paynesville Open House - Please Sign In - There is no formal presentation, but representatives are available to answer your questions.

More information

Richmond Area MPO Regional Priority Transportation Projects

Richmond Area MPO Regional Priority Transportation Projects Regional Priority Transportation Projects September 27, 2007 HANOVER GOOCHLAND ASHLAND POWHATAN RICHMOND HENRICO NEW KENT CHESTERFIELD CHARLES CITY 9211 Forest Hill Avenue, Suite 200 Richmond, Virginia

More information

Mobility Program. City of St. Augustine. Mobility Program Update. City Commission Meeting Monday, October 22, Moving People Through History

Mobility Program. City of St. Augustine. Mobility Program Update. City Commission Meeting Monday, October 22, Moving People Through History Mobility Program City of St. Augustine Mobility Program Update City Commission Meeting Monday, October 22, 2018 Moving People Through History Program Update: Activity Management Progress to Date Level/Initiative

More information

Proposed Project I 35 Improvements from SH 195 to I 10

Proposed Project I 35 Improvements from SH 195 to I 10 I 35 ROADWAY Proposed Project I 35 Improvements from SH 195 to I 10 The existing I 35 facility from State Highway 195 (SH 195) north of Georgetown to Interstate 10 (I 10) in San Antonio varies from four

More information

Crestmont Development Update 2017 AGM

Crestmont Development Update 2017 AGM Crestmont Development Update 2017 AGM West Crestmont West Crestmont Will be built in phases finally reaching about 524 residential units. Rough grading for phases 9 & 10 already underway. First show home

More information

Transportation Analysis. Pedestrian Pathways. Sterling District. County Project Manager: Suheili Pérez-Jiménez. Prepared by: J2 Engineers, Inc.

Transportation Analysis. Pedestrian Pathways. Sterling District. County Project Manager: Suheili Pérez-Jiménez. Prepared by: J2 Engineers, Inc. Transportation Analysis Pedestrian Pathways Prepared for: Loudoun County Department of Transportation and Capital Infrastructure County Project Manager: Suheili Pérez-Jiménez Prepared by: J2 Engineers,

More information

5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES

5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES 5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES 5.1 INTRODUCTION This chapter of the TMP presents an opinion of probable cost estimates for the proposed Horizon Year roadway network improvements

More information

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,

More information

Delaware County Engineer s Office

Delaware County Engineer s Office Delaware County Engineer s Office JANUARY 2017 County Engineer Responsibility Serve as engineer to the Board of County Commissioners and 18 Boards of Township Trustees for roads, bridges and land surveying

More information

Point A Point B Point C Point D. Fulton County Board of Commissioners and Mayors Meeting December 14, 2017

Point A Point B Point C Point D. Fulton County Board of Commissioners and Mayors Meeting December 14, 2017 Fulton County Board of Commissioners and Mayors Meeting December 14, 2017 Master Plan Overview Phase 1 Community Vision and Existing Transit Conditions Phase 2 Scenario Development Phase 3 Transit Master

More information

ITBS Scores Top National Averages, Show Slight Drop From Last Year

ITBS Scores Top National Averages, Show Slight Drop From Last Year For Immediate Release December 4, 2008 For more information contact: Jay Dillon (770) 426-3345 ITBS Scores Top National Averages, Show Slight Drop From Last Year BOARD OF EDUCATION Betty Gray, Chairman

More information

Mobility Management: Caltrain

Mobility Management: Caltrain Mobility Management: Caltrain Community Relations Committee October 4, 2017 Agenda Item 7 Presentation Outline Operating Statistics Ridership On-time Performance Fleet Reliability Capital Program Review

More information

ANDERSON PROPERTY SITE ANALYSIS

ANDERSON PROPERTY SITE ANALYSIS ANDERSON PROPERTY SITE ANALYSIS Introduction The Montgomery County Department of Transportation (MCDOT) initiated a feasibility study in the fall of 2012 to evaluate the need for transit service expansion

More information

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN Page 1 of 3 CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN The six-year Capital Improvement Plan (CIP) includes capital projects for 2017 2022. This plan includes capital projects that add

More information

Received June 2, 2017 PLN-PUDC

Received June 2, 2017 PLN-PUDC MASTER LAND USE PLAN for: a prestigious community presented by: Breeden Investment Properties and Davenport Management Company Virginia Beach, Virginia 23452(757) 468-6800 Received PLN-PUDC-2016-008 page

More information

SOUTH TEXAS COMMISSION MEETING

SOUTH TEXAS COMMISSION MEETING SOUTH TEXAS COMMISSION MEETING September 26, 2013 Pharr District Commission Meeting Pharr District: Overview The Pharr District plans, designs, builds, operates and maintains the state transportation system

More information

Station Evaluation Summary

Station Evaluation Summary Station Evaluation Summary Preferred Site Location 10/1/00 Loop 1 Station Points 70 Key Issues: Potential Master Plan Development suggests a strong economic development potential for the larger property

More information

SC Highway 41 Existing Conditions

SC Highway 41 Existing Conditions SC Highway 41 Existing Conditions Existing Typical Cross Section purposes only and does not replace the required NEPA process necessary for alignment The NEPA process is anticipated to begin in the next

More information

MAP OR PHOTO. Public Meeting & Open House July 23, Project Roadway Limits From: FM 1957 To: FM 471. Counties Bexar & Medina

MAP OR PHOTO. Public Meeting & Open House July 23, Project Roadway Limits From: FM 1957 To: FM 471. Counties Bexar & Medina Public Meeting & Open House July 23, 2013 Project Roadway Limits From: FM 1957 To: FM 471 MAP OR PHOTO Counties Bexar & Medina 1 I. Project History II. III. IV. Project Overview Project Alternatives Response

More information

City of Houston Fondren Road Paving and Drainage

City of Houston Fondren Road Paving and Drainage City of Houston Fondren Road Paving and Drainage From Braeswood Boulevard to Creekbend Drive TRC Meeting March 2016 Location and Vicinity Maps City Council District K Key Map 530 Z, 530 Y Land Use Commercial

More information

SAN RAFAEL CITY COUNCIL AGENDA REPORT

SAN RAFAEL CITY COUNCIL AGENDA REPORT Agenda Item No: 8.b Meeting Date: December 19, 2016 Department: PUBLIC WORKS SAN RAFAEL CITY COUNCIL AGENDA REPORT Prepared by: Bill Guerin, Public Works Director City Manager Approval: File No.: 18.01.79

More information

Tulsa Transportation Management Area. Urbanized Area Surface Transportation Program

Tulsa Transportation Management Area. Urbanized Area Surface Transportation Program Tulsa Transportation Management Area Urbanized Area Surface Transportation Program FFY 2022 Application Information Sponsor Location Description STP Request Other Funds Broken Arrow Elm Place: Kenosha

More information

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM. Design Endorsement for Sterling Boulevard Extension

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM. Design Endorsement for Sterling Boulevard Extension Date of Meeting: July 20, 2017 # 6 BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM SUBJECT: ELECTION DISTRICT: CRITICAL ACTION DATE: STAFF CONTACTS: Design Endorsement for Sterling Boulevard Extension

More information

Prince William County Department of Transportation 1st Quarter Joint Mobility Report March 13, 2018

Prince William County Department of Transportation 1st Quarter Joint Mobility Report March 13, 2018 Prince William County Department of Transportation 1st Quarter Joint Mobility Report March 13, 2018 Burwell Road (Rural Rustic) Plans were submitted to VDOT and PWC for review and comment on December 11,

More information

Draft US Corridor Study Traffic Analysis Report

Draft US Corridor Study Traffic Analysis Report Draft US 15-501 Corridor Study Traffic Analysis Report US 15-501 from NC 54 to US 64 Year 2013-2040 Prepared for: North Carolina Department of Transportation Prepared by: Stantec Consulting Services, Inc.

More information

Janice Fortunato Senior Director Business Partnerships

Janice Fortunato Senior Director Business Partnerships Janice Fortunato Senior Director Business Partnerships What are Megaprojects? They are large-scale projects distinguished by cost, complexity and the potential impact on the community. Collectively, these

More information

SIXTH STREET VIADUCT REPLACEMENT PROJECT MONTHLY EXECUTIVE MEETING REPORT FEBRUARY 2015

SIXTH STREET VIADUCT REPLACEMENT PROJECT MONTHLY EXECUTIVE MEETING REPORT FEBRUARY 2015 SIXTH STREET VIADUCT REPLACEMENT PROJECT MONTHLY EXECUTIVE MEETING REPORT FEBRUARY 2015 Sixth Street Viaduct Replacement Project Monthly Executive Meeting Report February 2015 TABLE OF CONTENTS Project

More information

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition Welcome Meetings 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition 6:30 to 8:00 p.m. - Open House Why is Highway 212 Project Important? Important Arterial Route Local Support Highway 212

More information

Major Widening/New Roadway

Major Widening/New Roadway Revised Evaluation s Major Widening/New Roadway This page provides a summary of any revisions made to the draft scores presented at the October th Attributable Funds Committee meeting. The information

More information

Letter of Transmittal

Letter of Transmittal Letter of Transmittal To: Chris Lovell City of Richmond Hill Date: 5/2/6 Job 2582 Re: Richmond Hill-South Bryan County Transportation STudy WE ARE SENDING YOU THE FOLLOWING ITEMS ( attached) ( under separate

More information

DIXIE TIP CONCEPT REPORT APPLICATION FY 2015 (Due November 6, 2013) PROJECT INFORMATION

DIXIE TIP CONCEPT REPORT APPLICATION FY 2015 (Due November 6, 2013) PROJECT INFORMATION DIXIE TIP CONCEPT REPORT APPLICATION FY 2015 (Due November 6, 2013) PROJECT INFORMATION 1) TITLE: Old Hwy 91 (Swiss Village, Santa Clara to 200 East, Ivins) 2) DESCRIPTION: This joint Ivins/Santa Clara

More information

TSPLOST 2018 Project Request $ 1,531,000 Estimated Annual Operating Impact $ 0

TSPLOST 2018 Project Request $ 1,531,000 Estimated Annual Operating Impact $ 0 TSPLOST 2018 Project Statements from Submitted Projects Project # 01, 01 Airport Capital Improvements Program (CIP) Matching Funds, will include the construction of numerous FAA and GDOT funded projects

More information

Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007

Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007 EAST-WEST CORRIDOR Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007 Presentation Agenda Project Overview / Purpose and Need Highway Component Transit Component

More information

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study FROM MICHIGAN AVENUE TO INDUSTRY ROAD BREVARD COUNTY, FLORIDA Financial Project ID No: 433605-1-22-01 Federal Aid Project

More information

NCTCOG CATEGORY 5 RECAP FY 2016

NCTCOG CATEGORY 5 RECAP FY 2016 NCTCOG CATEGORY 5 RECAP FY 2016 A + B = C Total Uncommitted Funds FY 2016 C + D = E E - F = G A B C D E F G FY 15 Carryover 1 FY (includes all adjustments) 2 Total Available Total Obligations and Transfers

More information

City of Grand Forks Staff Report

City of Grand Forks Staff Report City of Grand Forks Staff Report Service/Safety Committee December 15, 2015 City Council December 21, 2015 Agenda Item: Amendment No. 1 to Engineering Services Agreement with CPS for City Project No. 7143,

More information

Project Working Group Meeting #5

Project Working Group Meeting #5 September 17, 2013 Project Working Group Meeting #5 1 September 17, 2013 www.i-80will.com Meeting Purpose Project update Discuss Range of Alternatives Discuss next steps 2 September 17, 2013 www.i-80will.com

More information

ODOT District Two Monthly Construction Update

ODOT District Two Monthly Construction Update Ohio Department of Transportation Construction Update DISTRICT 2 KIRK SLUSHER, P.E., ACTING DEPUTY DIRECTOR 317 East Poe Rd. Bowling Green, Ohio 43402-1330 www.transportation.ohio.gov/dist2 ODOT District

More information

HDR Engineering. HART North / South. Tampa Bay Applications Group Meeting May 14, 2009

HDR Engineering. HART North / South. Tampa Bay Applications Group Meeting May 14, 2009 HDR Engineering HART North / South BRT Corridor PD&E Tampa Bay Applications Group Meeting May 14, 2009 1 Agenda Update on Project Development and Environment (PD&E) Study Project Overview System Branding

More information

Agenda. Utility Undergrounding Strategies & Laguna Canyon Road Master Plan

Agenda. Utility Undergrounding Strategies & Laguna Canyon Road Master Plan Utility Undergrounding Strategies & Laguna Canyon Road Master Plan January 17, 2017 City Council Meeting 2 Agenda Progress since March 2016 Status of undergrounding and road widening between El Toro Rd.

More information

The Eastern Connector Study November, 2007 planning for the future

The Eastern Connector Study November, 2007 planning for the future The Eastern Connector Study November, 2007 planning for the future In late 2006, Albemarle County and the City of Charlottesville jointly initiated the Eastern Connector Corridor Study. The Project Team

More information

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Submitted by April 9, 2009 Introduction Kenig, Lindgren, O Hara, Aboona,

More information

Richmond Area MPO Regional Priority Transportation Projects

Richmond Area MPO Regional Priority Transportation Projects Regional Priority Transportation Projects October 12, 2006 Town of Ashland Counties of Charles City Chesterfield Goochland Hanover Henrico New Kent Powhatan City of Richmond Richmond Regional Planning

More information

LAX Specific Plan Amendment Study. CONCEPT DEVELOPMENT Public Meeting Series #5 August 23 & 26, 2006

LAX Specific Plan Amendment Study. CONCEPT DEVELOPMENT Public Meeting Series #5 August 23 & 26, 2006 LAX Specific Plan Amendment Study CONCEPT DEVELOPMENT Public Meeting Series #5 August 23 & 26, 2006 Agenda Background on public planning process Regional planning update LAWA progress on settlement commitments

More information

Arterial Bus Rapid Transit. System Policy Oversight Committee April 7, 2014

Arterial Bus Rapid Transit. System Policy Oversight Committee April 7, 2014 Arterial Bus Rapid Transit System Policy Oversight Committee April 7, 2014 1 Meeting Agenda Welcome and Introductions A Line - Project Status Shelter and Pylon Development Arterial BRT Branding Update

More information

TAP PHASE 3.2 EXECUTIVE SUMMARY

TAP PHASE 3.2 EXECUTIVE SUMMARY TAP PHASE 3.2 EXECUTIVE SUMMARY Introduction In 2002 the North Central Texas Council of Governments (NCTCOG) launched the Thoroughfare Assessment Program (TAP), the goal of which has been to reduce vehicular

More information

Western ND Meeting. February 19, 2014 Grant Levi, NDDOT Director

Western ND Meeting. February 19, 2014 Grant Levi, NDDOT Director Western ND Meeting February 19, 2014 Grant Levi, NDDOT Director 1 Traffic Trends in North Dakota 2 Truck Traffic 2008 3 Truck Traffic 2012 4 Average Daily Traffic 5 ND Vehicle Miles Traveled Statewide

More information

YELM HWY AND MERIDIAN RD INTERSECTION IMPROVEMENTS PROJECT CONTEXT

YELM HWY AND MERIDIAN RD INTERSECTION IMPROVEMENTS PROJECT CONTEXT PROJECT CONTEXT 510 Hicks L A C E Y Mullen Rd SE Thurston County Fairgrounds Rd SE Carpenter Long Woodland Elementary Rd SE Marvin Old Paci c H w y 510 Reservation Rd SE Nisqually Indian Community Nis

More information

Task Force Meeting January 15, 2009

Task Force Meeting January 15, 2009 Task Force Meeting January 15, 2009 Study Update August 14 th Task Force Meeting Update on Traffic Projections and Financial Feasibility Study presented by Kane County and WSA staff The presentation summarized