Size: px
Start display at page:

Download "Janice Fortunato Senior Director Business Partnerships"

Transcription

1 Janice Fortunato Senior Director Business Partnerships

2 What are Megaprojects? They are large-scale projects distinguished by cost, complexity and the potential impact on the community. Collectively, these projects represent several billion dollars in significant transportation improvements all long overdue. When completed, they will offer travelers more choices to reach their destinations, including improvements to multiple modes of transportation.

3 MEGAPROJECTS Telegraph Road Interchange I-95 4 th Lane Widening Fairfax County Parkway Extension / BRAC I-495 Capital Beltway HOT Lanes Dulles Metrorail I-95/395 HOV/Bus/HOT Lanes (Proposed)

4 Telegraph Road Project Overview Rebuild the I-95 interchange at Telegraph Road. Final major contract of the Woodrow Wilson Bridge Project (largest contract in VDOT History) New interchange will improve traffic flow and provide safer pedestrian access

5 I-95 Widening Adding a fourth lane in each direction on I-95 between Fairfax County Parkway and Route 123 Status/ Upcoming Milestones December 2009 opened I-95 Northbound lane ahead of schedule Widening of Occoquan Bridge by Summer 2011

6 Fairfax County Parkway Extension / BRAC Final two miles of Fairfax County Parkway Interchange at the Engineer Proving Ground access road Extension of Boudinot Drive with ramp to southbound Parkway Status/Milestones Phase 1 and 2 of the project are on schedule with a projected end date of November 2010

7 I-495 High Occupancy Toll Lanes Overview Two new lanes in each direction Carpool/HOV-3 lanes on the Beltway and Tysons Corner for the first time Seamless connection with existing HOV Service I-395/I-95, I-66, and Dulles Toll Rd Congestion-free network for transit buses Toll option for motorists needing reliable travel time

8 I-495 Project Overview Improved & expanded sound wall protection for local neighborhoods Replace over $260 million of aging infrastructure 58 bridges & overpasses to be rebuilt Pedestrian & bicycle access for each interchange crossing over the Beltway Improved connection for I-66 regular lanes

9 I-495 Project Overview Free to HOV-3, buses, motorcycles and emergency vehicles Variable pricing: tolls rise or fall based on real-time traffic conditions Not an everyday toll road: choose to pay a toll when they need a faster, more reliable travel time Fully electronic tolling with E-Z Pass: Electronic signs display rates; no toll booths Ride for Free: Carpools (HOV-3), Motorcycles and Emergency Vehicles

10 January - Spring 2010 Dulles Metro Station Construction 123 S right lane closed I-495S Bridge Construction Continues Left lane closures on Route 123 return in Spring (Duration months) Westpark Bridge construction continues (Completion Fall 2010) Late Spring/Summer 2010 I-495 South shifted to new bridge over Route 123 (May/June) Existing I-495 South Bridge demolished UPCOMING - Route 123 Work

11 Fall Ramp (Rt. 123N I-495N) closed; Temporary traffic signal installed to detour Rt. 123 North travel to I-495 North I-495N shifted to new bridge over Route 123 Existing Beltway bridges demolished Dulles Metrorail Pier/Guideway construction Bridge construction begins on new I-495 North bridge, HOT Lanes and connection to Westpark Bridge UPCOMING - Route 123 Work

12 General Construction Plan Build outer 2 lanes: Rebuild/lengthen all bridges & overpasses along alignment: Shift traffic into two new outer lanes: Build inner two (HOT) lanes: Projected HOT Lanes Opening: Early 2013 I-495 Project Overview

13 I-495 Project Overview Currently 12 interchanges/ overpasses under construction Structural steel and concrete beam installation Installing noise barriers Drainage and utility work underway

14 23-mile new Metrorail line branching off the Orange Line after East Falls Church 11 new stations 5 in Phase 1 with a completion date of mid in Phase 2 with a completion date of 2015 Seamless integration with current 106-mile system Approx. 50% of Tysons commuters originate from eastern points accessible to existing metro rail Dulles Metrorail Extension At-a-Glance

15 Dulles Metrorail Route Map

16 Dulles Metrorail Route Map

17 Tysons Central Station 123

18 Northern Section Federal environmental approval received Regional transit study complete; bus rapid transit station study starting soon Public hearings held in Feb Scope review underway schedule to be established upon completion of scope review Southern Section I-95/395 Project status Environmental review underway targeting spring 2010

19 Employer Solutions Team Services Work with companies to increase employees commuting options Construction briefings and updates Tenant/Commuter services seminars or fairs Employee Commute Survey Density plot map of employees home addresses Carpool and vanpool matching Transit support information Employee transit incentive information Keep Tysons Moving

20 Keep Tysons Moving Commuter Solutions NEW! Tysons Express bus from Woodbridge to Tysons Express from Loudoun (June 2010) Free carpool and vanpool matching Vanpool incentives Transit trip planning Guaranteed Ride Home Program Park-and-Ride lot information Bike to work information Brochures for all programs

21 Benefits of Vanpooling & Carpooling Carpool and Vanpool Benefits Less stress commuting to and from work Financial savings due to shared commuting costs. Reduces need for parking Increases free time for riders If an HOV lane is available, trips may take less time Reduces pollution due to auto emissions Qualify for Guaranteed Ride Home Program if used 2 days per week Vanpool Incentives VanStart/VanSave Program - supplement to help get started or maintain with loss of riders May use pre-tax transit benefits up to $230 per month

22 FCDOT Tysons Connector Runs every 10 minutes from 10:00 am until 2:30 pm

23 PRTC Tysons Express For schedules visit: org

24 CommuterConnections.org

25 Trip Planner at wmata.com

26 Stay Informed Janice Fortunato:

W&OD TRAIL BRIDGE OVER LEE HIGHWAY I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237)

W&OD TRAIL BRIDGE OVER LEE HIGHWAY I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237) W&OD TRAIL BRIDGE OVER LEE HIGHWAY A COMPONENT OF THE I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237) October 11, 2018 Bill Cuttler, PE

More information

Maryland Gets to Work

Maryland Gets to Work I-695/Leeds Avenue Interchange Reconstruction Baltimore County Reconstruction of the I-695/Leeds Avenue interchange including replacing the I-695 Inner Loop bridges over Benson Avenue, Amtrak s Northeast

More information

CLRP. Performance Analysis of The Draft 2014 CLRP. Long-Range Transportation Plan For the National Capital Region

CLRP. Performance Analysis of The Draft 2014 CLRP. Long-Range Transportation Plan For the National Capital Region NATIONAL CAPITAL REGION TRANSPORTATION PLANNING BOARD Item 12 CLRP Financially Constrained Long-Range Transportation Plan For the National Capital Region 2014 Performance Analysis of The Draft 2014 CLRP

More information

Appendix B. Tier 2 Final Environmental Assessment I-66 Transit/TDM Technical Report

Appendix B. Tier 2 Final Environmental Assessment I-66 Transit/TDM Technical Report Tier 2 Final Environmental Assessment I-66 Transit/TDM Technical Report Appendix B Bus Bay, Maintenance, and Storage Capacity Analysis Technical Memorandum FINAL MAY 2016 INTRODUCTION This technical memorandum

More information

Update on Transportation Activities in Fairfax County

Update on Transportation Activities in Fairfax County Update on Transportation Activities in Fairfax County Transportation Roundtable Dulles Area Transportation Association June 13, 2018 Tom Biesiadny, Director Fairfax County Continuing Project Implementation

More information

Basic Project Information

Basic Project Information FY 2015-16 PROJECT DESCRIPTION FORM (7B) Submitting Agency: Fairfax County Basic Project Information Project Title: South Van Dorn Street and Franconia Road Interchange 7B Project Type (check one): Roadway

More information

Develop ground transportation improvements to make the Airport a multi-modal regional

Develop ground transportation improvements to make the Airport a multi-modal regional Project Overview TRANSPORTATION IMPROVEMENTS WHAT ARE THE PROJECT GOALS? Transportation transportation hub. Develop ground transportation improvements to make the Airport a multi-modal regional Land Use

More information

Reston Transportation Strategy July 9, 2018

Reston Transportation Strategy July 9, 2018 Reston Transportation Strategy July 9, 2018 Background: On February 11, 2014, the Board of Supervisors adopted the Reston Phase I Comprehensive Plan Amendment for the core areas of Reston between Sunset

More information

Policy Note. Vanpools in the Puget Sound Region The case for expanding vanpool programs to move the most people for the least cost.

Policy Note. Vanpools in the Puget Sound Region The case for expanding vanpool programs to move the most people for the least cost. Policy Note Vanpools in the Puget Sound Region The case for expanding vanpool programs to move the most people for the least cost Recommendations 1. Saturate vanpool market before expanding other intercity

More information

Organization. SDOT Date and Commute Seattle. Dave Sowers, Deputy Program Administrator

Organization. SDOT Date and Commute Seattle. Dave Sowers, Deputy Program Administrator Organization SDOT Date and Commute Seattle Dave Sowers, Deputy Program Administrator October 22, 2018 TODAY S FOCUS The big picture #Realign99 closure/opening the tunnel Removal, decommissioning, surface

More information

Background Information about the Metrobus 29 Lines Study

Background Information about the Metrobus 29 Lines Study Background Information about the Metrobus 29 Lines Study Questions Overview of Existing Service Q. Why is the study being conducted? A. The 29 Lines provide an important connection between Annandale and

More information

US 59 (SOUTHWEST FWY) IH 610 (West Loop) to SH 288 (South Fwy)

US 59 (SOUTHWEST FWY) IH 610 (West Loop) to SH 288 (South Fwy) Mobility Investment Priorities Project Houston US 59 US 59 (SOUTHWEST FWY) IH 610 (West Loop) to SH 288 (South Fwy) Current Conditions From IH 610 West to SH 288, US 59 operates with four or five lanes

More information

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP): SEGMENT 3. April 19, 2018 NHHIP April 19, 2018

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP): SEGMENT 3. April 19, 2018 NHHIP April 19, 2018 NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP): SEGMENT 3 April 19, 2018 NHHIP OVERVIEW NHHIP divided into 3 Segments: Segment 1: I-45: Beltway 8 to I-610 (9 mi) 45 Segment 2: I-45: I-610 to I-10 (3

More information

ITEM 9 Information October 19, Briefing on the Performance Analysis of the Draft 2016 CLRP Amendment

ITEM 9 Information October 19, Briefing on the Performance Analysis of the Draft 2016 CLRP Amendment ITEM 9 Information October 19, 2016 Briefing on the Performance Analysis of the Draft 2016 CLRP Amendment Staff Recommendation: Issues: Background: Receive briefing None The board will be briefed on a

More information

May 23, 2011 APTA Bus & Paratransit Conference. Metro ExpressLanes

May 23, 2011 APTA Bus & Paratransit Conference. Metro ExpressLanes May 23, 2011 APTA Bus & Paratransit Conference Metro ExpressLanes Program Overview > Conversion of HOV lanes to HOT lanes on I-10 and I-110 > Multi-modal Integrated Corridor Emphasis > 1 of 6 Nationwide

More information

Utah Transit Authority Rideshare. CTAA Conference June 12, 2014

Utah Transit Authority Rideshare. CTAA Conference June 12, 2014 Utah Transit Authority Rideshare CTAA Conference June 12, 2014 UTA Statistics and Info A Public Transit Agency Six counties, about 1600 square miles Within this area is 80% of the state s population, an

More information

SOUTH ACCESS TO THE GOLDEN GATE BRIDGE DOYLE DRIVE DOYLE DRIVE. Doyle Drive Presentation Golden Gate Bridge Board Meeting July 24, 2009

SOUTH ACCESS TO THE GOLDEN GATE BRIDGE DOYLE DRIVE DOYLE DRIVE. Doyle Drive Presentation Golden Gate Bridge Board Meeting July 24, 2009 DOYLE DRIVE Doyle Drive Presentation Golden Gate Bridge Board Meeting July 24, 2009 Presentation Overview Introduction Project Acceleration Construction Contracts Construction Activities Lane and Road

More information

FY 2018 I-66 Commuter Choice Program Presentation to the Northern Virginia Transportation Commission May 3,

FY 2018 I-66 Commuter Choice Program Presentation to the Northern Virginia Transportation Commission May 3, FY 2018 I-66 Commuter Choice Program Presentation to the Northern Virginia Transportation Commission May 3, 2018 www.novatransit.o rg 703-524-3322 Presentation Overview I-66 Commuter Choice Program Overview

More information

Energy Technical Memorandum

Energy Technical Memorandum Southeast Extension Project Lincoln Station to RidgeGate Parkway Prepared for: Federal Transit Administration Prepared by: Denver Regional Transportation District May 2014 Table of Contents Page No. Chapter

More information

IH 45 (GULF FWY) IH 10 (Katy Fwy) to IH 610 S (South Loop) 2010 Rank: Rank: 12

IH 45 (GULF FWY) IH 10 (Katy Fwy) to IH 610 S (South Loop) 2010 Rank: Rank: 12 Mobility Investment Priorities Project Houston IH 45 IH 45 (GULF FWY) IH 10 (Katy Fwy) to IH 610 S (South Loop) Current Conditions From IH 10 to IH 610 south, IH 45 is a 6- to 9-lane facility with three

More information

Strategies to keep people and goods moving in and through Seattle

Strategies to keep people and goods moving in and through Seattle Strategies to keep people and goods moving in and through Seattle SR 99 Closure and the Seattle Squeeze 2018-2024 DON Information Session Department of Transportation Delridge Community Center November

More information

I-405 Sepulveda Pass Improvements Project Wilshire Ramps Reconstruction

I-405 Sepulveda Pass Improvements Project Wilshire Ramps Reconstruction metro.net/works I-405 Sepulveda Pass Improvements Project Wilshire Ramps Reconstruction We re working to create safer, smoother interchanges. Project Overview The primary goal of the I-405 Sepulveda Pass

More information

Capital Metro Plans & Projects Update NASWC July 27, capmetro.org

Capital Metro Plans & Projects Update NASWC July 27, capmetro.org Capital Metro Plans & Projects Update NASWC July 27, 2017 1 Capital Metro at a Glance Established in 1985 535 square mile service area 1,079,995 population 7 Member Cities Austin Leander Manor Lago Vista

More information

Point A Point B Point C Point D. Fulton County Board of Commissioners and Mayors Meeting December 14, 2017

Point A Point B Point C Point D. Fulton County Board of Commissioners and Mayors Meeting December 14, 2017 Fulton County Board of Commissioners and Mayors Meeting December 14, 2017 Master Plan Overview Phase 1 Community Vision and Existing Transit Conditions Phase 2 Scenario Development Phase 3 Transit Master

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS FREQUENTLY ASKED QUESTIONS 2018 What is the More MARTA Atlanta program? The More MARTA Atlanta program is a collaborative partnership between MARTA and the City of Atlanta to develop and implement a program

More information

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015 SOUTHERN GATEWAY Transportation and Trinity River Project Committee 11 May 2015 Southern Gateway Project History Began in 2001 as a Major Investment Study [ MIS ], Schematic, and Environmental Assessment

More information

Purple Line Light Rail P3 Project

Purple Line Light Rail P3 Project Purple Line Light Rail P3 Project TPB Meeting May 18, 2016 1 Topics General Project Overview The P3 Contract Details on The Successful Proposal 2 Recap of Purple Line P3 Events In November 2013 MTA initiated

More information

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange I-820 (East) Project Description Fort Worth District Reconstruct Southern I-820/SH 121 Interchange I-820 from approximately 2,000 feet north of Pipeline Road/Glenview Drive to approximately 3,200 feet

More information

TRANSPORTATION EFFECTS

TRANSPORTATION EFFECTS 6 TRANSPORTATION EFFECTS This chapter describes the long-term and construction effects of the No Build Alternative, the Wiehle Avenue, and the full LPA on the local and regional transportation network.

More information

Is The Dulles Corridor Metrorail Project the answer?

Is The Dulles Corridor Metrorail Project the answer? Is The Dulles Corridor Metrorail Project the answer? Shigenori Hiraoka Contributed to by Bill Gouse & Claire Felbinger 10/27/2006 Japan International Transport Institute JITI Seminars are fully supported

More information

Mobility Corridor Updates. Transit & Active Transportation Projects

Mobility Corridor Updates. Transit & Active Transportation Projects Mobility Corridor Updates Transit & Active Transportation Projects Manjeet Ranu, SEO East San Fernando Valley Transit Corridor Metro Board LPA selection: June 2018 Recently awarded $200 million in Senate

More information

Your comments count!

Your comments count! WELCOME Identifying Solutions Between I-495 and the Roosevelt Bridge Schedule 6:30-8:30 p.m. Open House Review the presentation boards and talk to the project s technical staff about the study in an open

More information

Husky Stadium: TMP Modernization Project

Husky Stadium: TMP Modernization Project Husky Stadium: TMP Modernization Project 1 Husky Stadium: TMP History 2 Husky Stadium TMP History 1986-1987 Husky Stadium adds the north upper deck. City of Seattle and UW agree on a plan (TMP) to mitigate

More information

South Gloucestershire Challenge Fund and Cycle Ambition Fund

South Gloucestershire Challenge Fund and Cycle Ambition Fund South Gloucestershire Challenge Fund and Cycle Ambition Fund The Challenge Fund A4174 scheme is coordinated and delivered by South Gloucestershire Council who were awarded 14 million pounds from the Department

More information

I-405 and SR 522/NE 145th Bus Rapid Transit. Elected Leadership Groups Meeting November 30, 2018

I-405 and SR 522/NE 145th Bus Rapid Transit. Elected Leadership Groups Meeting November 30, 2018 I-405 and SR 522/NE 145th Bus Rapid Transit Elected Leadership Groups Meeting November 30, 2018 Agenda Welcome and Introductions Public Comment BRT Connection in Bothell Common Elements: Bus base, Station

More information

Help shape your community investment in Wake Transit. Fiscal Year 2019 Draft Work Plan Summary

Help shape your community investment in Wake Transit. Fiscal Year 2019 Draft Work Plan Summary Help shape your community investment in Wake Transit Fiscal Year 2019 Draft Work Plan Summary Wake County, growth and transit The Triangle is one of the fastest-growing regions in the nation. Wake County

More information

MARTA s blueprint for the future. COFFEE AND CONVERSATION Kyle Keahey, More MARTA Atlanta Dec. 5, 2018

MARTA s blueprint for the future. COFFEE AND CONVERSATION Kyle Keahey, More MARTA Atlanta Dec. 5, 2018 MARTA s blueprint for the future COFFEE AND CONVERSATION Kyle Keahey, More MARTA Atlanta Dec. 5, 2018 TODAY S AGENDA About MARTA Economic development/local impact More MARTA Atlanta program Program summary/timeline

More information

WELCOME MAY FORT BELVOIR COMMUTER WORKSHOP 9:30 am 1:30 pm

WELCOME MAY FORT BELVOIR COMMUTER WORKSHOP 9:30 am 1:30 pm WELCOME MAY 24 2011 FORT BELVOIR COMMUTER WORKSHOP 9:30 am 1:30 pm Part One RIDESHARING Presenter Walter Daniel FCDOT CARPOOLS AND VANPOOLS SAVE TIME AND MONEY! Commuter Connections Finding Carpoolers

More information

Green Line opens June 14

Green Line opens June 14 Winter 2014 Green Line opens June 14 To-do list for METRO Green Line s grand opening Yours: Study safety tips at www.centralcorridor.org/safety Learn about planned Metro Transit bus service changes on

More information

Welcome. Please Sign In

Welcome. Please Sign In Welcome South Bay Bus Rapid Transit (BRT) Draft Environmental Impact Report (DEIR) Public Meeting Please Sign In Please comment in any of the following manners: 1. Submit a comment form 2. Provide verbal

More information

CITY OF BEVERLY HILLS STAFF REPORT

CITY OF BEVERLY HILLS STAFF REPORT Meeting Date: July 7, 2011 To: From: Subject: CITY OF BEVERLY HILLS STAFF REPORT Honorable Mayor & City Council Pamela Mottice Muller, Director of Emergency Management 405 Closure Attachments: 1. 1-405

More information

US 67 WIDENING PROJECT

US 67 WIDENING PROJECT US 67 WIDENING PROJECT From Belt Line Rd. to I-20 History & Background The US 67 improvements from Belt Line Rd to I-20 were originally part of TxDOT s Southern Gateway project, studied as part of the

More information

I-405 Sepulveda Pass Improvements Project

I-405 Sepulveda Pass Improvements Project I-405 Sepulveda Pass Improvements Project 26, 2012 Click to edit Master title January style Community Advisory Committee 1 Community Meeting Schedule for 2012 26-Jan CAC, Final Meeting Feb 22-Mar Community

More information

RTSP Phase II Update

RTSP Phase II Update Washington Metropolitan Area Transit Authority RTSP Phase II Update Presentation to the Technical Advisory Group July 18, 2013 Meeting 1 Presentation Outline RTSP Integration with Momentum RTSP Process

More information

Project Status Update January 2017

Project Status Update January 2017 Project Status Update January 2017 1 What is the Purple Line? A new 16 mile east-west light rail line Operates mostly on the surface with 21 stations Connects New Carrollton in Prince George s County and

More information

Leadership NC. November 8, 2018

Leadership NC. November 8, 2018 v Leadership NC November 8, 2018 Planning for our region s growth The Triangle is one of the fastestgrowing regions in the nation. More than 2 million people are already part of the equation, and the

More information

Redefining Mobility Ready or not: Autonomous and connected vehicle planning and policy, now and in the future

Redefining Mobility Ready or not: Autonomous and connected vehicle planning and policy, now and in the future Redefining Mobility Ready or not: Autonomous and connected vehicle planning and policy, now and in the future Randy Iwasaki November 30, 2017 WHO WE ARE The Contra Costa Transportation Authority (CCTA)

More information

New Jersey Turnpike Authority Interchange 6 to 9 Widening Program

New Jersey Turnpike Authority Interchange 6 to 9 Widening Program New Jersey Turnpike Authority Interchange 6 to 9 Widening Program Tuesday, September 18, 2007 Public Hearings: Time: 5:00 PM - 8:00 PM Wednesday, September 19, 2007 Senior Center 3 Municipal Drive Bordentown,

More information

Rolling Road (Route 638) Widening Project

Rolling Road (Route 638) Widening Project Rolling Road (Route 638) Widening Project From: 0.369 Mile North of Fairfax County Parkway (Route 286) To: Old Keene Mill Road (Route 644) State Project No. 0638-029-156, P104, R204, C504; UPC 5559 Public

More information

East San Fernando Valley Transit Corridor. TAC Briefing December 4, 2013

East San Fernando Valley Transit Corridor. TAC Briefing December 4, 2013 East San Fernando Valley Transit Corridor TAC Briefing December 4, 2013 Overview Measure R Project Long Range Transportation Plan Reserves $170.1 Million 2018 Revenue Operations Date Coordination with

More information

Converting BRT to LRT in the Nation s Capital Ottawa, Canada. John Manconi City of Ottawa Ottawa, Canada

Converting BRT to LRT in the Nation s Capital Ottawa, Canada. John Manconi City of Ottawa Ottawa, Canada Converting BRT to LRT in the Nation s Capital Ottawa, Canada John Manconi City of Ottawa Ottawa, Canada 1 The Challenge *Mackenzie King Bridge Ottawa, AM peak period 2 The Challenge Ottawa s population

More information

Corridor Management Committee. March 7, 2012

Corridor Management Committee. March 7, 2012 Corridor Management Committee March 7, 2012 2 Today s Topics SWLRT Project Office Update Engineering Services Procurement Update Legislative Leadership Tour Annual New Starts Report Update on Proposed

More information

6/6/2018. June 7, Item #1 CITIZENS PARTICIPATION

6/6/2018. June 7, Item #1 CITIZENS PARTICIPATION June 7, 2018 Item #1 CITIZENS PARTICIPATION 1 Item #2 APPROVAL OF MINUTES Item #3 TRAC GOALS, FRAMEWORK & AGENDA REVIEW 2 COMMITTEE GOALS Learn about Southern Nevada s mobility challenges, new developments

More information

Mobility 2045 Plan Workshop

Mobility 2045 Plan Workshop Mobility 2045 Plan Workshop Regional Transportation Council October 12, 2017 Agenda Mobility Planning Mobility 2045 Innovative Funding and Strategic Partnerships Public Outreach Efforts Next Steps 2 Mobility

More information

Perry City 1200 West Walking/ Biking Path Project Type Pedestrian/ Bike

Perry City 1200 West Walking/ Biking Path Project Type Pedestrian/ Bike Perry City 1200 West Walking/ Biking Path Project Type Pedestrian/ Bike 3275 South to 2625 South $ 839,800 $ 666,408 The 1200 West roadway is a very narrow road just enough for two lanes of traffic and

More information

The USDOT Congestion Pricing Program: A New Era for Congestion Management

The USDOT Congestion Pricing Program: A New Era for Congestion Management The USDOT Congestion Pricing Program: A New Era for Congestion Management Patrick DeCorla-Souza, AICP Federal Highway Administration Presentation at Congestion Pricing Discovery Workshop Los Angeles, CA

More information

Proposed FY2015 Budget and Fare Increase

Proposed FY2015 Budget and Fare Increase Washington Metropolitan Area Transit Authority Proposed FY2015 Budget and Fare Increase Riders Advisory Council January 8, 2014 1 Washington Metropolitan Area Transit Authority What will riders see from

More information

Sepulveda Pass Corridor Systems Planning Study Update

Sepulveda Pass Corridor Systems Planning Study Update Los Angeles County Metropolitan Transportation Authority Sepulveda Pass Corridor Systems Planning Study Update June 20, 2012 Measure R Transit Corridors One of 12 Measure R Transit Corridors approved by

More information

IMPROVEMENT CONCEPTS

IMPROVEMENT CONCEPTS IMPROVEMENT CONCEPTS for the South Novato Transit Hub Study Prepared by: January 11, 2010 DKS Associates With Wilbur Smith Associates IMPROVEMENT CONCEPTS Chapter 1: Introduction 1. INTRODUCTION The strategic

More information

2018 Long Range Development Plan Update Community Advisory Group- February 21, 2018

2018 Long Range Development Plan Update Community Advisory Group- February 21, 2018 Transportation @ UC San Diego 2018 Long Range Development Plan Update Community Advisory Group- February 21, 2018 Agenda UC San Diego Transportation Services Organizational Overview Current State Parking,

More information

Puget Sound Transportation Panel Factors in Daily Travel Choices September 1991

Puget Sound Transportation Panel Factors in Daily Travel Choices September 1991 Puget Sound Transportation Panel Factors in Daily Travel Choices September 1991 My current work/school status is: 1 Work, 35 hours/week or more 2 Work, fewer than 35 hours/week 3 Student, full-time Continue

More information

Valley Metro: Past, Present and Future. September 11, 2014

Valley Metro: Past, Present and Future. September 11, 2014 Valley Metro: Past, Present and Future September 11, 2014 Valley Metro Who are We? Two Boards of Directors Regional Public Transportation Authority Fund and operate regional transit services Valley Metro

More information

A Transit Plan for the Future. Draft Network Plan

A Transit Plan for the Future. Draft Network Plan A Transit Plan for the Future Draft Network Plan Project Overview and Status Completed Market Analysis and Service Evaluation. Developed Plan Framework and Guiding Principles. Developed a draft Five Year

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 9/8/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

I-4 Beyond the Ultimate. Florida Transportation Builders Association January 18, 2019

I-4 Beyond the Ultimate. Florida Transportation Builders Association January 18, 2019 I-4 Beyond the Ultimate Florida Transportation Builders Association January 18, 2019 FDOT District 5 Improving Mobility & Safety in Central Florida FDOT District 5 is: Designing and building a better Interstate

More information

Balancing the Transportation Needs of a Growing City

Balancing the Transportation Needs of a Growing City Balancing the Transportation Needs of a Growing City FY 2019 and FY 2020 Capital Budget SFMTA Board Meeting Ed Reiskin, Director of Transportation April 3, 2018 1 FY 2019-23 Capital Improvement Program

More information

Executive Summary. I-95 Transit/TDM Study

Executive Summary. I-95 Transit/TDM Study Executive Summary I-95 Transit/TDM Study (Page Left Intentionally Blank) Contents 1 Existing Conditions 1-1 1.1 Previous Studies 1-1 1.2 Transit Service 1-1 1.2.1 Park and Ride Lots 1-3 1.2.2 Ridership

More information

I-405 Sepulveda Pass Improvements Project

I-405 Sepulveda Pass Improvements Project I-405 Sepulveda Pass Improvements Project Community Meeting November 15, 2012 1 Wilshire Segment Overview of Wilshire Segment There are a total of 23 bridges being constructed on this project; almost half

More information

WARES. October, 2018

WARES. October, 2018 WARES October, 2018 1 Project Overview A new 16 mile east-west light rail line between Bethesda in Montgomery County and New Carrollton in Prince George s County Operates mostly on the surface with 21

More information

Mass Transit in Charlotte and San Antonio. Keith T. Parker, AICP

Mass Transit in Charlotte and San Antonio. Keith T. Parker, AICP Mass Transit in Charlotte and San Antonio Keith T. Parker, AICP President/CEO Presentation Overview Charlotte Agency and Customer Profile San Antonio Agency and Customer Profile Attracting New Customers

More information

The TDM Plan for Fort Washington Office Park NOVEMBER 1 6, 2017 FORT WASHINGTON OFFICE PARK STAKEHOLDERS

The TDM Plan for Fort Washington Office Park NOVEMBER 1 6, 2017 FORT WASHINGTON OFFICE PARK STAKEHOLDERS The TDM Plan for Fort Washington Office Park NOVEMBER 1 6, 2017 FORT WASHINGTON OFFICE PARK STAKEHOLDERS What is Transportation Demand Management (TDM)? Sources: Philly.com, Montgomery County, GVF Location

More information

Valley Metro Overview. ITE/IMSA Spring Conference March 6, 2014

Valley Metro Overview. ITE/IMSA Spring Conference March 6, 2014 Valley Metro Overview ITE/IMSA Spring Conference March 6, 2014 Valley Metro Who Are We? Operate Regional Transit Services Valley Metro and Phoenix are region s primary service providers Light Rail and

More information

Transportation Improvement Program (TIP) Candidate Project List for Public Review

Transportation Improvement Program (TIP) Candidate Project List for Public Review 2011-2014 Transportation Improvement Program (TIP) Candidate List for Public Review Table 1 Annual Listing Of Federal Aid Obligation For Federal Fiscal Year 2010 North Dakota s Number Transit 410083 Transit

More information

Countdown to the Closure Extended 53-Hour Closure of I-405 Freeway Between U.S. 101 and I-10 Planned in Mid-July for Mulholland Bridge Demolition

Countdown to the Closure Extended 53-Hour Closure of I-405 Freeway Between U.S. 101 and I-10 Planned in Mid-July for Mulholland Bridge Demolition Countdown to the Closure Extended 3-Hour Closure of I-40 Freeway Between U.S. 0 and I-0 Planned in Mid-July for Mulholland Bridge Demolition Work Los Angeles, Calif. Plan Ahead, Avoid The Area, Or Stay

More information

Sales and Use Transportation Tax Implementation Plan

Sales and Use Transportation Tax Implementation Plan Sales and Use Transportation Tax Implementation Plan Transportation is more than just a way of getting from here to there. Reliable, safe transportation is necessary for commerce, economic development,

More information

I-225 Rail Line Iliff and Florida Stations Information Meeting

I-225 Rail Line Iliff and Florida Stations Information Meeting I-225 Rail Line Iliff and Florida Stations Information Meeting May 15, 2013 FasTracks and I-225 Rail Line Update Chuck Culig I-225 Rail Line Project Manager Chris Hinton I-225 Rail Line Deputy Project

More information

Vanpooling and Transit Agencies. Module 3: Benefits to Incorporating Vanpools. into a Transit Agency s Services

Vanpooling and Transit Agencies. Module 3: Benefits to Incorporating Vanpools. into a Transit Agency s Services Vanpooling and Transit Agencies Module 3: Benefits to Incorporating Vanpools into a Transit Agency s Services A common theme we heard among the reasons why the transit agencies described in Module 2 began

More information

The Seattle Squeeze and the #Realign99 Closure: Coordinated Agency Response Plan

The Seattle Squeeze and the #Realign99 Closure: Coordinated Agency Response Plan The Seattle Squeeze and the #Realign99 Closure: Coordinated Agency Response Plan Media Briefing Seattle City Hall January 3, 2019 As we build a better Seattle, how we get around is about to change. Over

More information

HOT Lanes: Congestion Relief and Better Transit

HOT Lanes: Congestion Relief and Better Transit HOT Lanes: Congestion Relief and Better Transit Robert W. Poole, Jr. Director of Transportation Studies Reason Foundation www.reason.org/transportation Basic Thesis: Current Transportation Plans Need Rethinking

More information

When Do We Talk About the Future?

When Do We Talk About the Future? When Do We Talk About the Future? How to Lead an Agency Through the Transportation Revolution Month Day, 2014 UC Davis March, 4, 2016 WHO WE ARE The Contra Costa Transportation Authority (CCTA) is a public

More information

FasTracks News. RTD s Eagle P3 Transit Project Nears Halfway Mark to Opening Day EP3 will add three commuter rail lines to metro area in 2016

FasTracks News. RTD s Eagle P3 Transit Project Nears Halfway Mark to Opening Day EP3 will add three commuter rail lines to metro area in 2016 July 29, 2013 Welcome to Inside RTD FasTracks a monthly e- update to keep you informed about the progress of the Regional Transportation District's FasTracks program. FasTracks News RTD s Eagle P3 Transit

More information

Wentzville Parkway South Phase 2 & 2A

Wentzville Parkway South Phase 2 & 2A Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total

More information

MetroExpress Improvements

MetroExpress Improvements Improvements Enhancements Short-term improvements to keep Austin moving. Investments Long-term projects to support our future. Mobility Hubs MetroRapid MetroRail Commuters Connectors Circulators Project

More information

Transportation Demand Management Element

Transportation Demand Management Element Transportation Demand Management Element Over the years, our reliance on the private automobile as our primary mode of transportation has grown substantially. Our dependence on the automobile is evidenced

More information

WAKE TRANSIT PLAN Summer 2018

WAKE TRANSIT PLAN Summer 2018 WAKE TRANSIT PLAN Summer 2018 Planning for growth WAKE COUNTY s population already exceeds ONE MILLION and grows by more than 60 people a day. That s 23,000 people a year or basically another Morrisville.

More information

Transit Access to the National Harbor

Transit Access to the National Harbor Transit Access to the National Harbor December 2014 Table of Contents Executive Summary... 3 Introduction and Project Purpose... 6 Methodology.. 9 Definition of Alternatives..... 9 Similar Project Implementation

More information

Long Bridge Park. Parking Analysis and Transportation Management Plan. Long Range Planning Committee of the Planning Commission Meeting

Long Bridge Park. Parking Analysis and Transportation Management Plan. Long Range Planning Committee of the Planning Commission Meeting Long Bridge Park Parking Analysis and Transportation Management Plan Long Range Planning Committee of the Planning Commission Meeting Thursday, February 7, 2013 Purpose Achieve consensus on parking and

More information

CTR Employer Survey Report

CTR Employer Survey Report CTR Employer Report Employer Id : E12146 Employer : WA State Dept. of Enterprise Services Worksite : Street : 7511 New Market St 7511 New Market St Sw Thank you for completing your Commute Trip Reduction

More information

I-35W Past, Present, and Future: METRO Orange Line

I-35W Past, Present, and Future: METRO Orange Line I-35W Past, Present, and Future: METRO Orange Line 2018 State Public Transportation Partnerships Conference Charles Carlson Director, BRT Projects Metro Transit Charles.Carlson@metrotransit.org Metro Transit:

More information

ALTERNATIVE PROJECT DELIVERY

ALTERNATIVE PROJECT DELIVERY ALTERNATIVE PROJECT DELIVERY Varuna Singh SH 288 IN HARRIS COUNTY SH 288 in Harris County SEGMENT 1: 8 New Tolled Direct Connectors at SH 288 and Beltway 8 Existing traffic uses frontage roads today to

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 2/19/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

CTR Employer Survey Report

CTR Employer Survey Report CTR Employer Report Employer Id : E12138 Employer : WA State Dept. of Enterprise Services Worksite : Street : 616 Cherry St 616 Cherry St Se Thank you for completing your Commute Trip Reduction survey.

More information

Click to edit Master title style

Click to edit Master title style Nelson/Nygaard Consulting Associates SERVICE IMPROVEMENT STRATEGIES September 22, 2015 1 PROJECT OVERVIEW & WORK TO DATE 1. Extensive stakeholder involvement Throughout 2. System and market assessment

More information

Delaware County Engineer s Office

Delaware County Engineer s Office Delaware County Engineer s Office JANUARY 2017 County Engineer Responsibility Serve as engineer to the Board of County Commissioners and 18 Boards of Township Trustees for roads, bridges and land surveying

More information

Swift Green Line April 11, 2019

Swift Green Line April 11, 2019 Swift Green Line April 11, 2019 Overview Swift BRT Overview Swift Green Line Project Snohomish County Partnership Early Results Swift Washington s first BRT Overlay BRT Stations approx. 3/4-1 mile apart

More information

Treasure Island Mobility Management Program

Treasure Island Mobility Management Program Treasure Island Mobility Management Program Preliminary Toll Policy Recommendations For Buildout Year (2030) Draft TIDA CAB June 2, 2015 About the Treasure Island Mobility Management Program 2003 2008

More information

METRO Orange Line BRT American Boulevard Station Options

METRO Orange Line BRT American Boulevard Station Options METRO Orange Line BRT American Boulevard Station Options Bloomington City Council Work Session November 18, 2013 Christina Morrison BRT/Small Starts Project Office Coordinating Planning and Design AMERICAN

More information

MWAA FY /16/2008 NORTHERN VIRGINIA TRANSPORTATION IMPROVEMENT PROGRAM CAPITAL COSTS (in $1,000) Source Source Total Fed/St/Loc.

MWAA FY /16/2008 NORTHERN VIRGINIA TRANSPORTATION IMPROVEMENT PROGRAM CAPITAL COSTS (in $1,000) Source Source Total Fed/St/Loc. Capital VIRGINIA MWAA Title: Dulles Corridor Metrorail Project - Phase 1 53,584 c East Falls Church Metrorail Station Wiehle Avenue Fairfax County, 75,174 c 636,182 c 849,625 c 695,240 c 415,559 c 214,064

More information

Capital Needs Assessment Riders Advisory Council July2, 2008

Capital Needs Assessment Riders Advisory Council July2, 2008 Capital Needs Assessment 2011-2020 Riders Advisory Council July2, 2008 1 Outline I. Capital Improvement Plan History II. Capital Improvement Plan Update III. Capital Needs Assessment State of Good Repair

More information

Attachment A. BATA Resolution No. 128 BAY AREA TOLL AUTHORITY TOLL SCHEDULE FOR TOLL BRIDGES (EFFECTIVE JANUARY 1, 2019)

Attachment A. BATA Resolution No. 128 BAY AREA TOLL AUTHORITY TOLL SCHEDULE FOR TOLL BRIDGES (EFFECTIVE JANUARY 1, 2019) Page 1 of 6 BAY AREA TOLL AUTHORITY TOLL SCHEDULE FOR TOLL BRIDGES (EFFECTIVE JANUARY 1, 2019) BRIDGES AND TOLLS 2 AXLE VEHICLES Antioch Bridge, Benicia-Martinez Bridge, Carquinez Bridge, Dumbarton Bridge,

More information