1 LETTING SCHEDULE REPORT Transportation Improvement Projects Date: July 09, 28 Cobb COBB COUNTY PROJECTS E7570 IRWIN RD SIDEWALK #: Irwin Road Sidewalk - E T Constructability IRWIN RD SIDEWALK Wilkes Way Villa Rica Road Scope: Irwin Road sidewalk - In-House Design Aman Mathur 28/06/15 28/07/12, Adv. moved to 06/15 after revisions required to rectify existing ROW lines and also in response to Parcel 3 building permit., 28/06/, AM,, Advertisement postponed due to drainage re-design and associated impacts on Utilities and ROW plans. Revised plans have been submitted for review for Utilities and ROW considerations., 28//, AM,, 2nd Utility submittal due March 3, 28., 28//05, AR,, Utility plans due 3/2/18., 28//15, AR,, Utilities need plans., 27/06/, AR, Parcel Ct: 3 28//26 28//15 UTL:6 of 6 X2233 SAINT GEORGE TER DRAINAGE Category: DRAINAGE/HEADWALL #: 35 Saint George Terrace Drainage SAINT GEORGE TER DRAINAGE Scope: Sink hole developed behind curb. John Morey 28/07/05 28/07/19, Project is in design., 28/06/, JMM, 28/05/ X2771 MEADOWS RD SIDEWALKS #: 0340 Meadows Road Sidewalk MEADOWS RD SIDEWALKS Hendricks Elementary School Windbrooke Drive Scope: Construction of sidewalk on the east side of Meadows Road between Winbrook Drive and Hendricks Elementary School. Coordination with City of Austell. Ligia Florim 28/06/21 28/07/20 28/05/14 Page 1 of 24

2 E7420 SHALLOWFORD ROAD SCHOOL RELATED SIDEWALK/SAFE ROUTES TO SCHOOL #: Shallowford Road Sidewalk - E T Constructability SHALLOWFORD ROAD SCHOOL RELATED SIDEWALK/SAFE ROUTES TO SCHOOL MEADOW WAY PATRIOT RAIL Scope: Add sidewalk on the south side of Shallowford Rd, from existing sidewalk near Meadow Way to Patriot Rail (approximately 0.25 miles), to provide sidewalks in the vicinity of Nicholson Elementary School & McCleskey Middle School. Ashley White 28/06/29 28/07/26, Construction plans approved on 6/28. Project set to advertise on 6/29. Pre-Bid Meeting scheduled for 7/16. Signed executed agreement and cost estimate ($35,800) received from Patriot Rail on 6/25., 28/06/26, AW,, Consultant addressing comments from Constructability Review (held 5/16)., 28/06/, AW,, Constructability Review scheduled for 5/16., 28/05/09, AW,, Construction plans received on 4/20. Constructability Review underway. Cost Estimate received from Patriot Rail for (3) 9 ft concrete panels on 4/19., 28//23, AW,, Constructability Review on schedule for 4/30/18., 28//27, AW,, Final Plans received on 1/5/28. PFPR/FFPR meeting scheduled for 2/1/28., 28//24, AW, Parcel Ct: 4 Parcel Possessed: 3 Option Signed: 2 27/11/07 27/09/25 UTL:8 of 8 X2246 LOST MOUNTAIN LN DRAINAGE Category: DRAINAGE/HEADWALL #: 0337 Lost Mountain Lane LOST MOUNTAIN LN DRAINAGE Scope: Drainage Improvement John Morey 28/07/23 28/08/09 X2238 KINSMON CV DRAINAGE Category: DRAINAGE/HEADWALL #: 80 Kinsmon Cove Drainage KINSMON CV DRAINAGE Scope: Drainage Improvements near 1750 Kinsmon Cove in Easthampton subdivision - failures in pavement along storm drain John Morey 28/08/ 28/08/17, Survey completed. In design., 28/06/, JMM, Page 2 of 24

3 X2114 MACEDONIA RD OVER NOSES CREEK #: Master Task Order Cateogry B - Heath & Lineback Engineers 16-T Prelim MACEDONIA RD OVER NOSES CREEK Bridge Replacement on Macedona Rd Bridge Replacement on Macedona Rd Jim Martinez 28/07/27 28/08/23, Awaiting a cost from GPC Transmission; Cobb EMC relocating their lines, will need to issue NTP ahead of advertising, 28/06/, JM,, Received and submitted revisions GPC Transmission. Awaiting their maintenance department's approval. Once approved, GPC will begin the agreement process, this may take up to three(3) months., 28//27, JM,, Met with various utility representatives (2/22/18) to discuss conflicts; Overhead transmission (Georgia Power Transmission) may require relocation, GPT will review plans to determine alternatives and get it on their schedule. Water Authority line conflicts with double 42" storm pipes Cobb EMC was not present but they may be able to gap the line or relocate. Consultant will adjust design accordingly., 28//26, JM,, 4 permit submitted 2/8/18, 28//26, JM,, 1st & 2nd utility submittal due March 23, 28., 28//05, AR, Parcel Ct: 5 Parcel Possessed: 1 Option Signed: 2 28//26 28//24 UTL:3 of 5 X27 NICHOLS RD SIDEWALK #: 0078 Nichols Road Sidewalks X27 Final NICHOLS RD SIDEWALK Antioch Rd Holland Rd Scope: Install sidewalk on the north side of Nichols Road between Antioch Road and Holland Road Aman Mathur 28/08/17 28/09/13, A second field visit conducted on April 26 to reconsider pavement drainage options. Plans have been revised based on recommendations from the construction team. Consequently, one Permanent Drainage Easement can be deleted. Approved ROW Plans to be revised and a final submittal of revised design changes be made to utility companies. Adv. & LET dates are to be postponed by 4 weeks., 28//30, AM,, Field Visit conducted on Feb 27. Minor drainage improvements, proprietary retaining wall, and two additional parcels requiring permanent easement drainage added., 28//06, AM,, 2nd utility submittal needed for proposed relocation information., 28//05, AR,, Field meeting scheduled in Feb 28 to evaluate drainage design and additional project requirements., 28//31, AM,, Parcel Count revised to '6'., 28//19, AM, Parcel Ct: 9 28//18 28//08 UTL:5 of 7 Page 3 of 24

4 X2244 THICKET PATHDRAINAGE Category: DRAINAGE/HEADWALL #: 0338 Thicket Path Drainage (Remington Oaks S/D) THICKET PATHDRAINAGE Scope: Drainage improvement John Morey 28/08/27 28/09/18 X21 CANDY LN OVER OLLEY CREEK #: 0158 Candy Lane over Olley Creek CANDY LN OVER OLLEY CREEK bridge and documentation of any deficiencies that are in need of repair. 28/08/31 28/09/27, Remove debris piled against bridge, clear vegetation within R/W of bridge., 28/06/11, JH,, Batch nine (9) bridges into 1 construction contract - X21, X2106, X2107, X2108, X2109, X2111, X2121, X2125, and X2126, 28//06, WK, 28//26 X2106 ELLIOTT RD OVER POWDER SPRINGS CREEK #: 0158 Candy Lane over Olley Creek ELLIOTT RD OVER POWDER SPRINGS CREEK bridge and documentation of any deficiencies that are in need of repair. 28/08/31 28/09/27, Seal cracks, remove debris, clear vegatation, 28/06/11, JH,, Powder Springs water line on bridge ($25k), 28/06/11, JH, 28//26 X2107 FLINT HILL RD OVER NOSES CREEK TRIBUTARY #: 0158 Candy Lane over Olley Creek FLINT HILL RD OVER NOSES CREEK TRIBUTARY bridge and documentation of any deficiencies that are in need of repair. 28/08/31 28/09/27, Seal cracks, clear vegetation, 28/06/11, JH,, CCWS project to replace water line next year ($25k), 28/06/11, JH, X2108 GREENFIELD DR OVER SOPE CREEK #: 0158 Candy Lane over Olley Creek GREENFIELD DR OVER SOPE CREEK bridge and documentation of any deficiencies that are in need of repair. 28/08/31 28/09/27, Paint, seal joints, remove debris, clear vegetation, 28/06/11, JH, 27/12/15 Page 4 of 24

5 X2109 HURT RD OVER NICKAJACK CREEK #: 0158 Candy Lane over Olley Creek HURT RD OVER NICKAJACK CREEK bridge and documentation of any deficiencies that are in need of repair. 28/08/31 28/09/27, Seal cracks, clear vegetation, 28/06/11, JH, X2111 LITTLE JOHN TRL OVER POWERS CREEK #: 0158 Candy Lane over Olley Creek LITTLE JOHN TRL OVER POWERS CREEK bridge and documentation of any deficiencies that are in need of repair. 28/08/31 28/09/27, Seal cracks, clear vegetation, 28/06/11, JH, 27/12/15 X2121 WRIGHT RD OVER MILL CREEK #: 0158 Candy Lane over Olley Creek WRIGHT RD OVER MILL CREEK bridge and documentation of any deficiencies that are in need of repair. 28/08/31 28/09/27, Seal cracks, clear vegetation, 28/06/11, JH, X2125 CALLAWAY ROAD OVER OLLEY CREEK #: 0158 Candy Lane over Olley Creek CALLAWAY ROAD OVER OLLEY CREEK bridge and documentation of any deficiencies that are in need of repair. 28/08/31 28/09/27, CCWS to replace water line hangers on bridge / Seal cracks, clear vegetation, 28/06/11, JH,, 28/06/11, JH, 27/12/15 X2126 MABRY RD OVER HIGHLAND LAKE OUTFALL #: 0158 Candy Lane over Olley Creek Concept MABRY RD OVER HIGHLAND LAKE OUTFALL bridge and documentation of any deficiencies that are in need of repair. 28/08/31 28/09/27, Seal cracks, Concrete Repair: 1.Space in beam at Bent 1. 2.Vertical cracks in both sides of Bent 2., 28/06/11, JH, 27/12/15 Page 5 of 24

6 X23 BLACKWELL RD AT AUTUMN RIDGE PKWY #: Master Task Order Category B - CALYX Engineers 17-T BLACKWELL RD AT AUTUMN RIDGE PKWY Blackwell Rd Autumn Ridge Brian Loudermilk 28/08/31 28/09/27, Proposed utility information due June 8, 28., 28//24, AR,, Utility submittal for existing information only., 28//05, AR,, Gave NTP for design of the hill cut on 11/1/17., 27/12/05, BL,, Traffic counts will be completed the week of 8/7/17., 27/08/, BL, Parcel Ct: 8 Parcel Possessed: 2 Option Signed: 6 28//26 28//06 UTL:2 of 6 X2722 BEECH HAVEN TRAIL SIDEWALK #: Master Task Order Category B - Pond 17-T Prelim BEECH HAVEN TRAIL SIDEWALK Log Cabin Rd Cumberland Pkwy 28/08/31 28/09/27, Coordination with developer complete. Constructability review plans due 7/10. Need Cobb water plans., 28/07/06, KM,, working with consultant to schedule constructability review before 6/14, 28/06/, KM,, FFPR scheduled for 5/9. Under 1 acre disturbance, 28//30, KM,, ROW ongoing. Final plans underway. Utilities due 4/13, may shift FFPR to get as many incorporated as possible. Schedule has float to cover this shift., 28//, KM,, Plans in final design., 28//, KM, Parcel Ct: 8 28//16 28//12 UTL:8 of 11 D7280 SIDEWALKS BIG SHANTY ROAD #: TASK ORDER CONTRACT - LPA - CAT A Final SIDEWALKS BIG SHANTY ROAD CHASTAIN MEADOWS PARKWAY BELLS FERRY ROAD Scope: The project consists of 5 sidewalk being constructed on both sides of Big Shanty Road from Chastain Meadows Pkwy to Bells Ferry Road. Brian Loudermilk 28/09/14 28/10/11, Need to set up environmental reval by end of September., 28/07/06, BL,, ROW revisions approved and sent to MA., 28//30, BL,, WFI will be needed for proposed MSE wall. Contour will provide., 28//, BL,, Conference call with Felecia Basolo on 2/13/18 to discuss schedule going forward., 28//05, BL,, Revised Right of way plans to be submitted on April 13, 28, 28//29, RF, Parcel Ct: 3 24/10/ UTL:0 of 7 X26 CHEROKEE ST Category: ROADWAYS #: Cherokee Street (Kennesaw) - X26 17-T Cherokee Street (Kennesaw) JILES RD I-75 Scope: This project will consist of roadway improvements along Cherokee Street from Jiles Road to Shiloh Road. The improvements will include the addition of a third travel lane in the eastbound direction only, the addition of a right turn lane at the intersectio, Brian Loudermilk 28/09/14 28/10/11, Agreement with Georgia Transmission Corporation executed and returned to GTC 4/16/28., 28//24, AR,, Revised set of erosion plans received to go to EPD for review on 3/1/18., 28//05, BL,, 1 set of erosion plans received for review before going to EPD on 2/5/18., 28//07, BL,, Georgia Transmission Corporation agreement forwarded for legal review., 28//05, AR,, This is a joint project with the City of Kennesaw., 28//29, BL, Parcel Ct: 13 27/11/07 27/08/18 UTL:7 of 8 Page 6 of 24

7 X2726 PACES FERRY RD SIDEWALK AT CSX RAILROAD CROSSING #: 0177 Paces Ferry Road Sidewalk at CSX RR 17-T Final PACES FERRY RD SIDEWALK AT CSX RAILROAD CROSSING Overlook Pkwy New Paces Ferry Rd Scope: Design services for sidewalk on Paces Ferry Road at CSX RR crossing in Vinings. Kim Chapman through ARCADIS task order. Design with X2318 Paces Ferry Rd at New Paces Ferry Rd/Paces Mill Rd/Twin Lakes Dr 28/09/14 28/10/11, Let with X2627, Paces Ferry Road improvements; need to align dates. RR will have full closure of the x-ing to repave - need to coordinate contractor schedule with this closure., 28/07/06, KM,, RR agreement: $129,585., 28/07/06, KM,, Plans approved by STV on behalf of CSX. Awaiting construction cost estimate, then need Commissioner approval., 28/06/, KM,, Full design plans for CSX received 4/27., 28//30, KM,, CSX has requested full plan set before next review. Kim has put this in her queue., 28//23, KM, Parcel Ct: 3 28//06 27/11/ UTL:8 of 9 X2245 KARLS GATE DR AT MIDDLEBURY CT DRAINAGE Category: DRAINAGE/HEADWALL #: 0339 Karls Gate Drive at Middlebury Ct Drainage KARLS GATE DR AT MIDDLEBURY CT DRAINAGE Scope: Drainage improvement John Morey 28/10/08 28/10/23 TR472 TOWN CENTER MALL NOONDAY CREEK TRAIL/KSU BIKE/PEDESTRIAN CONNECTOR Category: TOWN CENTER AREA CID #: TASK ORDER CONTRACT- Heath & Lineback-CAT B CO-449 Prelim Town Center/Noonday Creek Trail/KSU Ped/Bike Connector Cobb Linc Transit Station Skip Spann Bridge Scope: Master Task order contract for Cat B - Hwy design, Roadway, Bridge & Surveying Brian Loudermilk 28/09/28 28/10/25, Utility submittal for existing information only., 28//05, AR,, Construction Phase is unfunded for this project. Preliminary ROW Plans were submitted on 1/19/28 and comments have been provided by Russ Ford and TCID., 28//29, RF,, PFPR scheduled for 1/11/28., 28//, RF,, PFPR plans are anticipated week of 12/11/17., 27/12/, RF,, 1st submission of utilities was done on 10/24/17., 27/10/31, RF, Parcel Ct: 3 28//07 UTL:2 of 8 X2317 LOST MOUNTAIN RD AT AMBERTON DR/HOPETON DR AND KINGSBURY DR/OAKLEIGH VALLEY WAY #: 0336 Lost Mountatin Road at Amberton Dr/Hopeton Dr/Oakleigh Valley Way LOST MOUNTAIN RD AT AMBERTON DR/HOPETON DR AND KINGSBURY DR/OAKLEIGH VALLEY WAY Scope: Engineering/design - in-house Michael Francis 28/09/28 28/10/25 Page 7 of 24

8 X2318 PACES FERRY ROAD AT NEW PACES FERRY RD/PACES MILL RD/TWIN LAKES DR #: 0176 Paces Ferry Road at New Paces Ferry Rd/Paces Mill Rd/Twin Lakes Dr Final PACES FERRY ROAD AT NEW PACES FERRY RD/PACES MILL RD/TWIN LAKES DR Paces Ferry Rd Twin Lakes Dr Scope: Design services for intersection improvements. Kim Chapman through ARCADIS Task Order. 28/09/28 28/10/25, Met with Vinings group 7/6. Fountain likely to stay in ROW, behind sidewalk. Need landscape license with Civic Club. Negotiations on-going., 28/07/06, KM,, ROW revision complete. Fountain relocation discussions ongoing with Vinings Civic Club, 28/06/, KM,, Survey for additional sw complete. Awaiting design changes and ROW plan updates. Expected in late April. Will need utility update at that time., 28//30, KM,, Add'l SW added to project. Survey underway. Changes due to fountain placement also underway. Qnty's for intersection/signals/sw to be kept separate for payment. Schedule adjusted for this change., 28//, KM,, Additional S/W cost estimated at about $50k if incl. w project., 28//30, KM, Parcel Ct: 4 28//06 27/11/ UTL:8 of 9 X2745 BELLS FERRY ROAD SIDEWALK #: Master Task Order Category B - Moreland Altobelli 17-T BELLS FERRY ROAD SIDEWALK Noonday Creek Trail Estates Landing Dr Brian Loudermilk 28/09/28 28/10/25, Sent ROW comments back on 6/18/18., 28/07/06, BL,, First ROW submission on 4/24/18. Sent comments back on 4/27/18., 28//30, BL,, Project to be combined with X2744 Bells Ferry Road Sidewalk from Chastain Road to Estates Landing Drive., 27/10/, DM, Parcel Ct: 10 27/11/06 UTL:4 of 5 X2747 CANTON RD SIDEWALK - SOUTH #: 0334 Canton Road Sidewalk South CANTON RD SIDEWALK - SOUTH Liberty Hill Road Rosedale Drive Scope: Sidewalk construction from Liberty Hill Road to Rosedale Drive Brian Loudermilk 28/09/28 28/10/25 X2748 CANTON RD SIDEWALK - NORTH #: 0335 Canton Road Sidewalk North CANTON RD SIDEWALK - NORTH Judy Ann Lane Old Noonday School Road Scope: Design of sidewalk between Judy Ann Lane and Old Noonday School Road Brian Loudermilk 28/09/28 28/10/25 Page 8 of 24

9 X2116 OLD 41 HWY BRIDGE OVER CSX RAILROAD #: Old 41 Highway over CSX Railroad - X T Final OLD 41 HWY BRIDGE OVER CSX RAILROAD Bells Ferry Rd Kenview Dr Scope: Replace bridge over CSX RR - Joint Project with City of Marietta 28/10/12 28/11/08, Several utilities still outstanding. CSX will require all utility permit #'s shown on plans prior to plan approval. This could delay the project., 28/07/06, KM,, Several critical utilities still outstanding to complete bridge design, 28/06/, KM,, Once most utilities are received, final bridge plans will be sent to RR and FFPR can be scheduled., 28//30, KM,, Minor comments from RR received on 3/29. Next submittal to include final bridge plans. Final design underway., 28//30, KM,, Following PFPR, designers investigating wall options. RR ROW update from surveyor also affected bridge and wall alignments. ROW plan submittal expected 3/8, 28//, KM, Parcel Ct: 7 28// 28//12 UTL:8 of 11 X2113 LOWER ROSWELL RD OVER SOPE CREEK #: 0165 Lower Roswell Road over Sope Creek LOWER ROSWELL RD OVER SOPE CREEK bridge and documentation of any deficiencies that are in need of repair. 28/11/ 28/11/29, Repair space in deck apply 2 part polymer overlay, 28/06/11, JH,, Proposal approved 6/5/18, Task order issued 6/13/18, 28/06/05, JH,, Proposal being evaluated - No Change, 28/05/, JH, 27/12/15 X2118 POWERS FERRY DR OVER ROTTENWOOD CREEK TRIBUTARY #: Master Task Order Category B - Moreland Altobelli 17-T POWERS FERRY DR OVER ROTTENWOOD CREEK TRIBUTARY Tuxedo Dr 1000'' west of Tuxedo Dr 28/11/ 28/11/29, Second PFPR has been scheduled. Depending on plan quality, if we combine FFPR and constructability, we might be able to hold the let date. Summer closure, hitting a sewer line., 28/07/06, KM,, Questions sent to MA on 4/16 regarding design decisions, still waiting on MA responses. Schedule will need to be shifted out once design is set., 28/06/12, DM,, BFI & plans reviewed by Patrick Pecot. Questions sent to MA on 4/16 regarding design decisions, waiting on MA responses. Schedule will need to be shifted out once design is set., 28/06/12, DM,, ConSpan option explored, not viable. PFPR plans to be resubmitted in early April to get project back on track., 28/06/12, DM,, PFPR cancelled due to plan presentation quality. MAAI conducting geotech investigation for arch culvert option. Schedule moved out accordingly., 28/06/12, DM, Parcel Ct: 8 UTL:0 of 5 Page 9 of 24

10 E60 RIVER VIEW RD Category: ROADWAYS #: RIVER VIEW RD S&O IMPROVEMENTS-E60 16-T ; 17-T Constructability RIVER VIEW RD VETERANS MEMORIAL HWY NICHOLS DR Scope: Safety and Operational improvements between Veterans Memorial Hwy and Nichols Dr. Improvements includes turn lanes at key intersections, improved alignment at the intersection with Veterans Memorial Highway, and potential changes to the vertical alignment Rustavius Ford 28/11/16 28/12/13, Addressing comments on right of way revisions. Consultant has supplied files for 2nd resubmission., 28/07/05, RF,, Revised ROW plans anticipated by 6/24/18. Anticipate submitting for encroachment permit by 10/12/28., 28/06/, RF,, Project is moving forward with intersection only and resurfacing the remainder to the city limit. A new schedule has been requested., 28//30, RF,, New 2nd submittal for all utility owners required., 28//24, AR,, New agreements with Cobb County Marietta Water Authority and Georgia Power Company required., 28//24, AR, Parcel Ct: 16 Parcel Possessed: 12 Option Signed: 1 26//18 26/08/12 UTL:0 of 9 X2115 MARS HILL RD OVER ALLATOONA CREEK #: Mars Hill Road over Allatoona Creek - X T ; 17-T Prelim Mars Hill Road over Allatoona Creek - X2115 Waldenbrooke Ct Chipping Dr Scope: The project consists of a total bridge replacement of the Allatoona Creek Bridge located on Mars Hill Road. The bridge is located on Mars Hill Road between Chipping Drive and Waldenbrooke Court which are the anticipated limits of the project. 28/12/07 28/12/21, Geotechnical drilling to start 7/9., 28/07/06, KM,, ROW plans, 1st and 2nd submission utility plans, and plans for Corps review due 7/10., 28/07/06, KM,, No major comments from PFPR. on schedule, 28/06/, KM,, Finalizing PFPR plans., 28//30, KM,, Updated plan/profile to include trail under Bent 1 delivered on 3/27., 28//30, KM, 28/06/22 CCID13 CCID BOB CALLAN TRUNK TRAIL, PHASE II Category: CUMBERLAND AREA CID #: 00 CCID-Bob Callan Trunk Trail Phase II CO A PI B On Hold Segment B INTERSTATE NORTH PKWY Terrell Mill Road Scope: Design and construction of approx 2.1 miles of 10' trail. Segement A (PI 00009) limits are from Interstate North Pkwy to Interstate North Pkwy. Segement B (PI 808) limits are from Interstate North Pkwy to Terrell Mill Rd. Rustavius Ford 28/11/30 28/12/27, ARC approved the phasing schedule for ROW/29 and CST/20. They are still working on the funding request, PE/28-440k, ROW-636k, and CST-1,686,357., 27/10/27, RF,, Project is currently on hold. Trail re-aligned to travel from termini of Segment A to Windy Hill Rd along Interstate North Pkwy. CCID submitted an administrative modification request to ARC for on 8/18/17., 27/08/31, RF,, CCID is working with the consultant to move forward with this segment. Path forward may including phasing., 26/10/, RF,, Consultant to provided concept of potential alignment change by mid-april 26., 26//05, RF,, Cobb County FFPR was held on /16/25. This project is currently placed on hold., 25//, RF, Parcel Ct: 8 24/11/18 25//09 UTL:0 of 11 Page 10 of 24

11 E7350 MCCOLLUM PKWY FILL-IN-THE-GAPS SIDEWALK #: McCollum Parkway at Ben King Road E7350 McCollum Pkwy Fill-In-The-Gaps Sidewalk BEN KING RD OLYMPIC LN Scope: This project will consist of intersection improvements on McCollum Parkway at Ben King Road and Big Shanty Road. Improvements will include traffic operational and safety improvements which may consist of turn-lanes, realignment, and/or a roundabout. Proj Jim Martinez 28/11/30 28/12/27, Combined with X2309 and X27, 27/08/24, DM, UTL:0 of 7 X27 BIG SHANTY ROAD SIDEWALK #: McCollum Parkway at Ben King Road X27 Big Shanty Road Sidewalk McCollum Rd Chastain Rd Scope: This project will consist of intersection improvements on McCollum Parkway at Ben King Road and Big Shanty Road. Improvements will include traffic operational and safety improvements which may consist of turn-lanes, realignment, and/or a roundabout. Proj Jim Martinez 28/11/30 28/12/27, Combined with X2309 and E7350, 27/08/24, DM, Parcel Ct: 10 UTL:0 of 7 X28 JIM OWENS RD LEWIS ELEMENTARY Category: SCHOOL ZONE IMPRVMNT #: 0183 Jim Owens Road at Lewis Elementary School JIM OWENS RD LEWIS ELEMENTARY Main School Driveway on Jim Owens Rd Approx. 250 feet to the west Scope: Design services (combined with X23 Acworth Due West at Jim Owens Road project Dave Garrett 28/11/30 28/12/27, Have received Lewis ES IGA Exhibit from Pond. IGA submitted for County Attorney review, prior to submitting to CCSD Legal for their review., 28/05/31, DG,, Draft IGA with CCSD prepared. Requested IGA Exhibit A (concept type) from POND before submitting for legal reviews., 28//26, DG,, At the current time Andy doesn't foresee any reimbursable utility costs., 28//28, DG,, Met with CCSD on 3/22/18. Provided a cost estimate for their portion of school driveway improvements. Waiting to hear back from them regarding an IGA., 28//28, DG,, Need to meet with CCSD SPLOST, bus and Lewis ES staff to discuss/review., 28//07, DG, X2308 LOST MOUNTAIN RD AT MIDWAY RD MIRROR LAKE DR #: Master Task Order Category B - HNTB LOST MOUNTAIN RD AT MIDWAY RD MIRROR LAKE DR Midway Road Mirror Lake Drive Jim Martinez 28/12/28 29//24, Consultant to revise schedule and resubmit., 28//27, JM,, Consultant continuing with preliminary plans, 28//05, JM,, Preliminary plans underway, 28//05, JM,, Consultant moving forward with preliminary plans, 28//, DM,, Consultant finalizing concept, CTM tentatively scheduled for 11/16, 28//, DM, Parcel Ct: 5 UTL:0 of 6 Page 11 of 24

12 X2911 RESURFACING 29-3 LOCAL ROADS NORTH Category: RESURFACING #: 0333 Resurfacing 29-3 Local Roads North RESURFACING 29-3 LOCAL ROADS NORTH Scope: Resurfacing Local Roads North Kristen Orton 28/12/28 29//24 X2608 NEW MACLAND RD Category: ROADWAYS #: 0087 New Macland Road Design X T Prelim NEW MACLAND RD MACLAND RD ARAPAHO DR Scope: The project includes roadway safety and traffic operational improvements on New Macland Road beginning at Arapaho Drive and ending at Macland Road. Improvements will include turn-lanes, sidewalks, drainage improvements and potential signal upgrades. Ligia Florim 29//11 29//07, PFPR meeting held , 28/05/21, LF,, PFPR plans received., 28/05/21, LF,, PFPR plans due today but delayed due to SEI's technical difficulties. Should be submitted by Friday, May 18th., 28/05/15, LF,, 1st Utility Submittal. Coordinating with School on additional sidewalk within school property. PFPR might have to be delayed if this additional work is added to the project., 28//25, LF,, PIOH held 3/21/18. Coordination meetings with McEachern and CCSD 3/1, 3/8, and 3/22., 28//22, LF, UTL:0 of 7 E7580 GORDON COMBS RD SIDEWALK #: Master Task Order Category B - RS&H 17-T GORDON COMBS RD SIDEWALK Burnt Hickory Rd Madison Grove Ln Brian Loudermilk 29//18 29//14, Consultant addressing PFPR comments. Waiting on revised schedule., 28/07/06, BL,, ROW comments sent back to Consultant on 4/16/18., 28//30, BL,, First ROW submittal on 2/28/18., 28//05, BL,, Revised schedule received on 2/12/18., 28//13, BL,, Conflict with CWA has been corrected., 28//06, BL, Parcel Ct: 15 27/10/20 UTL:5 of 6 X2307 HICKS RD AT CONCORD RD #: Master Task Order Category B - AECOM 18-T Prelim Hicks Rd at Concord Rd Intersection Improvement Hicks Concord Rd Hicks Concord Rd John Morey 29//18 29//14, Coordination with Paragua development in process. Plans to be modified to ensure seamless coexistence. Developer to dedicate RW and Easement. Developer to contribute monies towards required frontage improvements., 28/06/27, JMM,, Waiting on utility relocations and water plans before we do the FFPR submittal. Working on residential project coordination (Paragua)., 28/06/, JMM,, Development roadway frontage paving improvements added to scope. Developer to reimburse for costs. Milling, overlay, inlay, and striping to be accomplished under intersection project scope., 28//17, JMM,, RW plans approved , 28//26, JMM,, Prelim RW plans submitted , 28//05, JMM, Parcel Ct: 17 Option Signed: 1 28//26 28//20 UTL:4 of 5 Page 12 of 24

13 X2727 CHIMNEY SPGS DR SIDEWALK #: Master Task Order Category B - Long Engineering 18-T CHIMNEY SPGS DR SIDEWALK REVERE CIRCLE BISHOP LAKE Ligia Florim 29//18 29//14, 1.Utility Submittal - Should be this week. 2.ROW Submittal Should be soon after utility submittal. Long is working to revise/tighten up construction limits. 3.FFPR Will follow ROW submittal/approval., 28/07/, LF,, 28/06/25, LF,, Held PFPR , 28/06/25, LF,, Received PFPR package PFPR scheduled for , 28/05/21, LF,, Received revised schedule and analysis regarding keeping existing curb vs replacing w L-back curb. Concluded to keep existing curb, 28/05/07, LF, X2910 RESURFACING 29-2 LOCAL ROADS SOUTH Category: RESURFACING #: 0332 Resurfacing Local Roads South RESURFACING 29-2 LOCAL ROADS SOUTH Scope: Resurfacing 29-2 Kristen Orton 29//18 29//14 X2909 RESURFACING 29-1 LMIG Category: RESURFACING #: 0331 Resurfacing LMIG Thoroughfares RESURFACING 29-1 LMIG Scope: Resurfacing 29-1 LMIG Kristen Orton 29// 29//28 X2409 I-20 EB RAMPS AT RIVERSIDE PKWY Category: THOROUGHFARE IMPROVE #: 07 I-20 Eastbound Ramps at Riverside Parkway Roadway Improvements - X T Prelim I-20 EB RAMPS AT RIVERSIDE PKWY I-20 Eastbound Ramps North of Harbor Way Scope: This proposed project includes safety and operational improvements consisting of turn-lanes, signal installation, sidewalk, way-finding signage and realignment of South Service Road. The project will extend from South Service Road to Riverside Pkwy. Ligia Florim 29//08 29//07, Per Janis K review of ROW plans, a public hearing (at BOC) might be required prior to obliterating/abandoning the existing South Service Road., 28/06/26, LF,, Received preliminary ROW plans for review. Coordinating SCATS/ATMS add. services proposal from LOWE Engineers., 28/06/25, LF,, Made presentation to Sterling Riverside Townhomes HOA on , 28/05/31, LF,, Held coordination meeting regarding SCATS on Lowe to provide add services proposal to include SCATS design., 28/05/31, LF,, Met with Cobb Link to coordinate the relocation of the existing bus stops along South Service Road., 28/05/09, LF, Parcel Ct: 5 28/06/08 UTL:0 of 8 Page 13 of 24

14 X2806 FAVOR RD AT WINDY HILL RD (OSBORNE HIGH SCHOOL) Category: SCHOOL ZONE IMPRVMNT #: 63 Favor Road at Windy Hill Road (Osborne High School) - X2806 Concept FAVOR RD AT WINDY HILL RD (OSBORNE HIGH SCHOOL) Favor Rd (approx. 500 feet north of Windy Hill Rd) Favor Rd (approx feet south of Windy Hill Rd) Scope: School Zone Improvements Dave Garrett 29//08 29//07, In-house survey to be completed and sent to consultant, Calyx, on 7/13/18. Design to start on 7/16/18., 28/07/05, DG,, Design will be done through a consultant. Engineering cost added to the estimate to reflect this. CCSD contribution (to be done though an IGA) has also been added., 28/05/31, DG,, CCSD constructing The Career Academy at Osborne HS to open in conjunction with substantial Osborne Rebuild opening - by May of 20. Project scoped has been expanded to include Academy impacts to Windy Hill Rd., 28//25, DG,, CCSD to reimburse $198,000 through an IGA. Signals to contribute $30,000 for signal rebuild., 28//28, DG,, CCSD and the Department in agreement for Option 2, with CCSD reimbursing a portion of the roadway project costs through an IGA., 28//22, DG, X2120 WOODLAND BROOK DR OVER GILMORE CREEK #: Master Task Order Category B - Long Engineering 18-T Concept WOODLAND BROOK DR OVER GILMORE CREEK Bridge/culvert replacement Bridge/culvert replacement Ligia Florim 29//15 29//14, 1. Long has draft Geotech report from NOVA (approx. 2 weeks ago) Report has been reviewed by Long but not submitted to County. 2. Hydraulic Analysis complete. Long will present soon. 3. PFPR Long should make submittal within 2 weeks., 28/07/, LF,, Survey Control Package Preliminary Draft submitted for Review, 28/05/11, LF,, FEMA Study was ordered about a month ago but not received. Long met with Dave Braden. Dave was good with a FEMA No-Rise that does not involve a CLOMR. Moving forward with plan development. Long currently finalizing survey submittal to CCDOT., 28/05/, LF,, Project update meeting with Long Engineering (plan development in progress, hydro study on-going, Environmental Screening complete, Engaged a couple of vendors on bottomless culvert design), 28//18, LF,, Update : 1)Survey/Database Preparation Complete.2)General Sheets are being set up are progressing, Cover, Typical, plan/profile, cross section.3)hydraulic Study underway April.5)Schedule Geotech once we have bridge/culvert elevation April., 28//05, LF, Page 14 of 24

15 X23 ACWORTH DUE WEST RD AT JIM OWENS MARS HILL CHURCH RDS #: Master Task Order Category B - Pond 17-T Acworth Due West Rd at Jim Owens Mars Hill Church Rd Jim Martinez 29// 29//28, Staff reviewed RAB options to meet sight distance. Consultant moving forward with preliminary design, raising RAB grade approximately 3 feet; mitering wall and removing tree at NE corner., 28//27, JM,, Roundabout preliminary design indicate issues with sight distance along southbound and westbound approaches due to wall and trees., 28//, JM,, Consultant proceeding with preliminary plans., 28//, JM,, Consultant addressing concept report comments, 28//05, JM,, Consultant revising concept report to allow additional capacity within the decal lane into the elementary school., 28//31, JM, UTL:0 of 7 X2309 MCCOLLUM PKWY AT BEN KING RD #: McCollum Parkway at Ben King Road X2309 McCollum Pkwy at Ben King Rd Ben King Road/Big Shanty Road McCollum Parkway Scope: This project will consist of intersection improvements on McCollum Parkway at Ben King Road and Big Shanty Road. Improvements will include traffic operational and safety improvements which may consist of turn-lanes, realignment, and/or a roundabout. Proj Jim Martinez 29// 29//28, Consultant to submit ROW plan week of 4/30., 28//27, JM,, Consultant addressing PFPR comments., 28//, JM,, Utility submittal for existing information only., 28//29, AR,, Received preliminary plans, PFPR tentatively 3/20, 28//05, JM,, Preliminary plans underway., 28//31, JM, Parcel Ct: 21 28/06/07 UTL:0 of 7 X2743 EBENEZER RD SIDEWALK #: Master Task Order Category B - HNTB Final EBENEZER RD SIDEWALK Maybreeze Road Hampton Oaks Bend Ashley White 29// 29//28, PFPR meeting held on 6/20. Consultant addressing comments and working on 2nd utility submittal and prelim right-of-way plans (both scheduled to be completed by the end of July)., 28/06/26, AW,, Preliminary Plans requested to print on 6/4. PFPR underway., 28/06/, AW,, New PM assigned for HNTB. New schedule received. No change to advertisement and let date. Preliminary Plans scheduled for 5/11., 28//30, AW,, Consultant continues with preliminary plans, 28//, JM,, Consultant working on preliminary plans. Initial plan review was scheduled for 3/13/18 but was canceled so that consultant could refine plans. Sample plan set was ed to consultant as an example of the quality that is expected. Preliminary plans scheduled to be completed on 4/20., 28//27, AW, Parcel Ct: 27 UTL:0 of 5 Page 15 of 24

16 X2610 SANDTOWN RD Category: ROADWAYS #: 29 Sandtown Road (Joint with City of Marietta) - X2610 Negotiation/Award SANDTOWN RD WESTSIDE DRIVE AUSTELL RD Scope: Safety and operational improvements, turn lanes, sidewalks. Joint project with City of Marietta., Ligia Florim 29//15 29//11, CSA to BOC on Negotiated reduced scope for concept, traffic analysis and environmental screening., 28/05/31, LF,, Reviewing fee proposal received , 28//25, LF,, Scope meeting with LOWE Eng. scheduled for 4/6/18. BOC approved highest ranked firms on 3/27/18., 28//, LF,, Need to have Traffic Counts completed before school year ends on May 24th, 28., 28//14, LF,, Evaluation Committee met on 3/5/18. Top three firms going to BOC on 3/27/18 for approval., 28//07, LF, X27 JOHN WARD RD SIDEWALK #: 0077 John Ward Road Sidewalks X27 17-T JOHN WARD RD SIDEWALK Macland Rd Irwin Rd Scope: Install sidewalks on the west side of John Ward Road between Macland Road and Irwin Road. Project will also include a pedestrian bridge. Brian Loudermilk 29//15 29//11, Bridge Analysis received on 2/27/18. Bridge OK for extra load., 28//05, BL,, Per Muller, all utilities will be marked for survey by 1/15/18., 28//31, BL,, Scope & fee on 12/12/17 agenda., 27/12/05, BL,, Negotiating scope & fee, 27/10/31, BL,, RFP (27), 26/12/06, DM, Parcel Ct: 20 UTL:0 of 7 X2119 SILVER COMET TRAIL BRIDGES #: 0168 Silver Comet Trail Bridges SILVER COMET TRAIL BRIDGES bridges (7 each) and documentation of any deficiencies that are in need of repair. For the SCT bridge over Noses Creek a routine bridge inspection as defined by Code of Federal Regulations - National Bridge Inspection Standa 29//29 29//25, SCT over Noses Creek - $250k retreatment of hood, pile, Bents and cross bracing replacements, 28/06/11, JH,, SCT Over Nickajack Creek - repair Bent 3 foot long undermining cowed by scour, 28/06/11, JH,, Proposal approved 6/5/18. Task Order issued 6/13/18, 28/06/05, JH,, Proposal being evaluated no change, 28/05/, JH, X2762 MABLETON PKWY PEDESTRIAN IMPROVEMENTS #: Mableton Parkway Pedestrian Improvements E7560/X2762 MABLETON PKWY PEDESTRIAN IMPROVEMENTS FACTORY SHOALS RD DISCOVERY BLVD Scope: Engineering design for 10-ft wide trail on westside of Mableton Pkwy and 5-ft S/W on eastside from Discovery Blvd to Factory Shoals Rd Brian Loudermilk 29//29 29//25, ARC money is currently in 21.We sill try to move the money up next update in August., 28//30, BL,, Received $3,280,000 for construction from ARC that we will try to flex over to FTA., 28//19, BL,, FFPR plans submitted 1/26/18., 28//29, BL,, All utility owners will be required to permit facilities through GDOT., 27/12/, AR,, PIOH is not required., 26/08/08, DM, Parcel Ct: 75 Parcel Possessed: 31 Option Signed: 39 27//18 27/10/13 UTL:2 of 14 Page 16 of 24

17 X2305 DALLAS HWY AT LOST MOUNTAIN RD MARS HILL RD #: DALLAS HWY AT LOST MOUNTAIN RD/MARS HILL RD - ENGINEERING 17-T DALLAS HWY AT LOST MOUNTAIN RD MARS HILL RD Corner Road Pindos Pass Scope: The project consists of intersection improvements at SR 120 / Dallas Highway and Lost Mountain Road and Mars Hill Road. Improvements would include turn lane modifications (additions, reassigned lanes, and a potential drop lane) and commercial access modif Jim Martinez 29/05/17 29/06/13, Consultant continues with preliminary design., 28//27, JM,, Utility submittal for existing information due June 22, 28., 28//24, AR,, Concept report being circulated for signatures. Consultant proceeding with preliminary plans., 28//, JM,, Consultant addressing concept report comments, 28//05, JM,, Consultant finalizing concept report; need to confirm length of trail and additional ROW for future widening project., 28//31, JM, Parcel Ct: 15 UTL:0 of 11 X2807 FACTORY SHOALS RD (HARMONY LELAND/CLAY ELEMENTARY SCHOOLS) Category: SCHOOL ZONE IMPRVMNT #: 93 Factory Shoals Road (Harmony Leland/Clay Elementary Schools) Concept FACTORY SHOALS RD (HARMONY LELAND/CLAY ELEMENTARY SCHOOLS) Mableton Parkway Factory Shoals Drive Scope: TBD Dave Garrett 29/05/24 29/06/20, Met with CCSD on 6/26/18. Finalized concept. Separate, but related, projects being designed by both agencies. CCSD to supply their site survey data for our use in survey and design. No IGA required., 28/07/05, DG,, Met with CCSD and their site design consultant on 4/10/18. Waiting to hear back regarding their acceptance of ownership for improvements needed along school frontage on Factory Shoals Road., 28//26, DG, X2306 FACTORY SHOALS RD AT SIX FLAGS DR #: Master Task Order Category B - AECOM 18-T Factory Shoals Road at Riverside Factory Shoals Road Riverside Parkway (intersection) Amy Diaz 29/05/31 29/06/27 X24 WINDY HILL RD TERRELL MILL RD CONNECTOR Category: THOROUGHFARE IMPROVE #: Windy Hill / Terrell Mill Road Connector - X24 CO T Final WINDY HILL RD TERRELL MILL RD CONNECTOR WINDY HILL RD TERRELL MILL RD Scope: Construct a new 4-lane roadway, parallel to I-75, connecting Windy Hill road with Terrell Mill Road to alleviate congestion on Windy Hill Road and Powers Ferry Road, with raised median, 10' trail on 1 side and lighting. 29/07/ 29/08/, Geotech SA on 8/14 agenda, $98k. Waiting on Cobb EMC for street lighting costs to present to CCID., 28/07/06, KM,, Final plans and ROW ongoing. Geotech SA request still outstanding., 28//30, KM,, Cost Estimate update to be complete 4/6. Final plans ongoing. Geotech sub asking for SA - working with HNTB to refine the documentation., 28//30, KM,, SUE for private utilities complete. Meeting with Water Dept on 3/5 to discuss design., 28//, KM,, Turnberry buy-out has been approved - adds 10 condos. ROW revision for this and culvert adjustments in design., 28//, KM, Parcel Ct: 160 Parcel Possessed: 47 Option Signed: 40 27/09/25 28//26 UTL:0 of 14 Page 17 of 24

18 E60 LOWER ROSWELL ROAD Category: ROADWAYS #: LOWER ROSWELL ROAD - E60 GP#L T LOWER ROSWELL ROAD WOODLAWN DRIVE DAVIDSON RD Scope: adding a median, access management, turn lanes at Woodlawn Drive, improved turn lanes at Johnson Ferry Road and Davidson Road, and improved alignment of Lower Roswell Road across Johnson Ferry Rd. Project also includes sidewalks on both sides and landscap 29/07/12 29/08/08, NTP & Kickoff meeting June 6, 28, 28/05/, JH,, Requested and received on 2/6/18 cost proposal, SA needed for $167,000.00, from consultant to prepare plan on Alt 2. Awaiting Approval to proceed., 28/05/, JH,, Met with Commissioner and McDonald's on 12/22/07 with 3 alternates - Alt 2 chosen by Commissioner, 28/05/, JH,, Meeting with Commissioner, County Manager, Chairman and others on different option, 28/05/, JH,, 28/05/, DM, Parcel Ct: 2 Parcel Possessed: 1 Option Signed: 1 UTL:0 of 10 X2122 WILLEO RD OVER WILLEO CREEK #: 06 Willeo Road over Willeo Creek Bridge Replacement - X T On Hold WILLEO RD OVER WILLEO CREEK L. Roswell/Timber Ridge Bywater Trail Scope: Project includes a bridge replacement for Willeo Road over Willeo Creek. Project goals include minimizing impacts to utilities and USACOE and National Park Service property, low long term maintenance, utilize cost constrained structures, and start/complet 29/10/12 29/11/08, New law passed - working on PFA with Roswell directly now., 28//30, KM,, on hold., 27/08/30, KM,, Scoping meeting with Gresham Smith to include City of Roswell., 27//10, DM, X2314 SHILOH RD AT ROYAL DR APARTMENT DR #: Master Task Order Category B - American Engineers On Hold SHILOH RD AT ROYAL DR APARTMENT DR Shiloh Rd at Royal Drive Shiloh Rd at Royal Drive Roadway, Bridge, and Surveying Amy Diaz 29/10/18 29/11/14, New schedule will be provided when project reactivates., 28//22, ADI,, Traffic Counts taken. Intersection does not meet signal warrants. Project will be placed on hold until Manage-Lane Project opens to see impact on intersection., 28//, RF, X24 WINDY HILL RD Category: THOROUGHFARE IMPROVE #: 0105 Windy HIll Road X24 17-T WINDY HILL RD SOUTH COBB DR ATLANTA RD Scope: City of Smyrna contract for design. Coordination required with County. 29/10/30 29/11/21, Plans received for review: Less than FFPR, 28/06/05, JH,, Meeting with Smyrna held on 2:30 at Smyrna, 28/05/, JH,, Received Traffic Report on 1/15/18 no other information as of 3/5/18, 28/05/, JH,, 12 buildings have been demolished and removed as of 4/30/18, 28/05/, JH,, No Estimates, schedules for other design data has been shared, 28/05/, JH, Parcel Ct: 14 27/07/10 Page 18 of 24

19 X23 CAMPUS LOOP RD BIG SHANTY RD CHASTAIN RD #: Campus Loop Road - X23 CAMPUS LOOP RD BIG SHANTY RD CHASTAIN RD Campus Loop Chastain Road Scope: Improve connection Campus Loop Rd to Big Shanty Rd, possible connection under Chastain Rd. Jim Martinez 29/11/15 29/12/12, Traffic data under review., 28/06/, JM,, Received contracts signed by consultant, 4/27., 28//27, JM,, Scope and fee to go before BOC 3/13, 28//05, JM,, Reviewing latest scope and fee., 28//31, JM,, Negotiating fee; potentially reducing scope to Concept, 27/12/, JM, D4260 THIRD ARMY ROAD INTERCHANGE Category: THOROUGHFARE IMPROVE #: 0043 I-75 at Third Army Road Interchange - Scoping Phase (D4260) Concept THIRD ARMY ROAD INTERCHANGE Third Army Road Rutledge Drive/Black Acre Trail Scope: Project consists of fully directional interchange on I-75 at Third Army Rd approx 2.67 miles north of the I-75/Glade Rd I/C with a multi-lane connector to US 41 (N Cobb Pkwy) and Dabbs Bridge Rd Jim Martinez 29/12/27 20//23, Consultant continues to address GDOT comments, 28//, JM,, Consultant received and addressing comments regarding future volumes, 28//05, JM,, GDOT approved Methodology Report and Existing Year Traffic Diagrams. Consultant proceeding with final forecast traffic diagrams., 28//29, JM,, Consultant analyzing traffic for IJR re-evaluation. Met with GDOT & FHWA 10/25 re: IJR., 27/10/31, JM,, Received scope and fee for concept validation and IJR re-evaluation. Evaluating Bartow County alternate alignment., 27/06/05, JM, 26/05/15 X23 CANTON RD AT SHALLOWFORD RD HIGHLAND TER SOUTHERN INTERSECTION #: 01 Canton Road Corridor - X26 Prelim Intersection Project X23 Hunter Green Dr Dover St Scope: The project includes roadway and operational improvements on Canton Road from the Canton Road Connector to Jamerson Road. Improvements will include turn-lanes, raised medians, access revisions, sidewalks, signal upgrades, and drainage improvements.. 20//10 20//14, Plans combined with Canton Rd Corridor X26, 27/06/28, KM, Page 19 of 24

20 X26 CANTON RD CORRIDOR Category: ROADWAYS #: 01 Canton Road Corridor - X26 17-T Corridor Project X26A CANTON ROAD CONN CHEROKEE COUNTY LINE Scope: The project includes roadway and operational improvements on Canton Road from the Canton Road Connector to Jamerson Road. Improvements will include turn-lanes, raised medians, access revisions, sidewalks, signal upgrades, and drainage improvements.. 20//10 20//14, Survey underway & new schedule set. Will update ENG budget (shift excess to misc. services). Will use some to further develop Canton Corr concept., 28/07/06, KM,, Draft schedule from consultant entered into ProjectView. Will review with team and update further, if needed., 28/06/, KM,, Final concepts ready. PIOH scheduled for 5/1. If supported by community/commissioner, will move forward quickly., 28//30, KM,, Traffic Ops looking to advance SB Piedmont portion of project. Working with resurfacing/cst to find contracting method., 28//, KM,, Project scope to (S intersection). Will present at PIOH first week of May, per Comm. Then will ask BOC to approve concept. Schedule adjusted accordingly., 28//, KM, Parcel Ct: 30 X2312 POWDER SPRINGS RD AT FLINT HILL RD PINE GROVE DR DEERCREEK DR #: Master Task Order -GRESHAM SMITH-CAT B 17-T On Hold POWDER SPRINGS RD AT FLINT HILL RD PINE GROVE DR DEERCREEK DR Powder Springs Rd at Flint Hill Rd/Pine Grove Dr/Deercreek Dr Powder Springs Rd at Flint Hill Rd/Pine Grove Dr/Deercreek Dr Scope: GRESHAM SMITH & PARTNERS - Master TOC for on-demand services CAT B - Hwy Design: Roadway, Bridge & Survey Ligia Florim 20//31 20//27, A meeting was held with City on 2/X/28 to discuss CFA Amendment and path forward for intersections of Powder Springs 1) Flint Hill Rd and 2)Pine Grove Drive. A SA#1 will be required for any additional design services as the consultant was only in contract up to Concept., 28//29, RF,, Working on CFA Amendment (in discussions with City)., 28//, RF,, NTP for construction of RT turn Deercreek Drive on 12/4/17. City is hosting a Town Hall meeting for all three intersections on 12/11/17., 27/12/, RF,, Working on amendment to CFA with the City., 27/10/31, RF,, For Deercreek Drive: Right of Plans Approved on 9/13/27, Met with Unit Price ors on October 11, 27. D&H Construction Company, Inc. was low bid. Plan to award contract on 11/14/17 BOC agenda., 27/10/, RF, Parcel Ct: 3 Parcel Possessed: 3 Option Signed: 3 27/09/22 Page 20 of 24

21 X2310 OLD CANTON RD AT HOLLY SPRINGS RD #: MASTER TASK ORDER CONTRACT- POND -CAT B Concept OLD CANTON RD AT HOLLY SPRINGS RD Old Canton Rd and Holly Springs Rd Old Canton Rd and Holly Springs Rd Scope: POND & CO. - Master TOC for on-demand services Cat B - Hwy Design; Roadway, bridge & surveying, 20//13 20//10, 116 comments from PIOH. 70 against, 24 conditional, 18 for. Against were mostly from Kings Farm and worry they won't be able to get out of their neighborhood. Working on response letter., 28/07/06, KM,, PIOH scheduled for 6/14, 28/06/, KM,, Planning for second PIOH around 6/7. Concept approval 8/5., 28//30, KM,, Scope/fee for updating concepts for 2 locations approved on 3/28. Allows 10 weeks for completion of concept layouts. Concept Report 1 month from close of public comments. Planning for PIOH in late June., 28//30, KM,, Internal meeting held on 1/16/18 with decisions to have Pond & Company to provide concept layouts for two alternatives at Post Oak Tritt and Holly Springs Rd along with cost estimates. A meeting was held with Pond & Company to discuss the scope of the layouts on 1/25/18., 28//09, RF, Parcel Ct: 12 UTL:0 of 8 X2606 MACK DOBBS RD Category: ROADWAYS #: 15 Mack Dobbs Road (joint project with Kennesaw) - X T Concept MACK DOBBS RD COBB PKWY KENNESAW CITY LIMITS Scope: Safety and operational improvements, turn lanes, and sidewalks Ligia Florim 20/05/ 20/05/28, AEI provided updated cost estimates., 28/06/25, LF,, Held concept meeting , 28/06/25, LF,, Scheduled concept meeting for Received conceptual plans, cost estimate, traffic engineering report, and environmental screening., 28/05/31, LF,, Provided additional comments on traffic report AEI resubmitted traffic study Provided comments on traffic report., 28/05/11, LF,, Received traffic study for review Updated schedule As of : Survey database field work 65% complete, Environmental screening started, Traffic memo in progress, Started layout., 28//25, LF, X2407 SOUTH BARRETT RELVR PHASE 3 Category: THOROUGHFARE IMPROVE #: South Barrett Reliever Phase T SOUTH BARRETT RELVR PHASE 3 Barrett Lakes Blvd SR 5 Connector Scope: This project consists of adding a 4-lane divided road from S. Barrett Rel 2 over I-75 to Roberts Court and widening Roberts Court to a 4-lane divided road. This project will add a bridge over I-75 that will not have access ramps to I-75. Brian Loudermilk 20/08/28 20/09/24, Addressing minor comments and developing TMP for GDOT review., 28/07/06, BL,, PFPR package delivered to GDOT on 4/20/18., 28//30, BL,, Possible funding from ARC of $3,244,000 ROW and $7,200,000 Const., 28//19, BL,, Waiting on soils report so we can submit PFPR to GDOT., 27/12/07, BL,, In-house PFPR was held on 10/19/17., 27/10/30, BL, Parcel Ct: 12 UTL:0 of 7 Page 21 of 24

22 X24 KENNESAW MOUNTAIN PEDESTRIAN IMPROVEMENTS Category: THOROUGHFARE IMPROVE #: 0138 Cheatham Hill Multi-Use Trail (KMNBP) - X24 CO T KENNESAW MOUNTAIN PEDESTRIAN IMPROVEMENTS John Ward Rd; Whitlock Ave; John Ward Rd Cheatham Hill Dr; Old Mtn Rd; Powder Springs St. Scope: Joint project with the city of Marietta - Improve trail network in the KMNBP area. Project to include an 8-10 ft multi-use trail along the east side of Cheatham Hill beginning at Powder Springs Rd. Trail will extend north to tie into the existing trail o 20/11/13 20/12/10, PFPR package submitted to GDOT - PFPR scheduled by GDOT 6/25 & 6/26, 28/05/, JH,, Utility submittal for existing information only., 28//29, AR,, 1st utility submittal due March 30, 28., 28//05, AR,, Preliminary plans under way 1/3/18 Coordinating with GDOT signal SR120 and John Ward Rd, 28//, DM,, 5 more agreements to process, FHWA: FLAP Agreement signed by Cobb, Marietta & NPS, NPS: MOI, MOA, Construction Agreement and Maintenance Agreement, 27/12/, DM, Parcel Ct: 24 UTL:0 of 9 X2110 JAMES RD OVER PINE CREEK #: 0163 James Road over Pine Creek JAMES RD OVER PINE CREEK bridge and documentation of any deficiencies that are in need of repair. 20/11/27 20/12/24 X2117 PIEDMONT RD OVER LITTLE NOONDAY CREEK #: 0166 Piedmont Road over Little Noonday Creek PIEDMONT RD OVER LITTLE NOONDAY CREEK bridge and documentation of any deficiencies that are in need of repair. 20/11/27 20/12/24, Remove debris, repair/protect from inlet scour / Repair vertical crack in webs and top slabs of both barrels / Repair 1" wide crack at current deviation in both barrels, 28/06/11, JH,, 28/06/05, JH,, Proposal being evaluated - No change, 28/05/, JH, 27/12/15 X2609 OLD 41 HWY Category: ROADWAYS #: 14 Old 41 Highway 18-T OLD 41 HWY KENNESAW AVE STILESBORO RD Scope: Roadway safety and operational improvements between Stilesboro Road and Kennesaw Avenue 20/12/ 20/12/31, Initial Concept Team meeting held 5/9/18. Refining Concept for comments received., 28/05/, JH,, Traffic analysis in progress. FLAP Grant application for $2,500,000 submitted 3/30/18 - Received approval for $2.5 million FLAP Grant Funding., 28/05/, JH,, BOC Approved 12/12/07; Award for Concept Dev & Environmental only ($182,644); 5 agreements are required with NPS as project progresses, 28/05/, JH,, 28/05/, DM,, 28//, DM, Page 22 of 24

LETTING SCHEDULE REPORT

LETTING SCHEDULE REPORT LETTING SCHEDULE REPORT Transportation Improvement Projects Date: Const Scope ROW /UTL County Projects E4080 COBB PARKWAY AT CEDARCREST ROAD/AWTREY CHURCH ROAD Category: THOROUGHFARE IMPROVE #: 0057 Cedarcrest

More information

Cobb County SPLOST. Presented to the Cobb County Board of Commissioners May 22, 2017

Cobb County SPLOST. Presented to the Cobb County Board of Commissioners May 22, 2017 Presented to the Cobb County Board of Commissioners May 22, 2017 Facilities, Eddie Canon, Support Services Director Information Services, Sharon Stanley, Director Public Safety, Sam Heaton, Director Parks,

More information

Business Advisory Committee. July 7, 2015

Business Advisory Committee. July 7, 2015 Business Advisory Committee July 7, 2015 1 Today s Topics Outreach Update TI #1 and 2: Target Field Station Connection to I-94: Recommendation 85 th Station Configuration 93 rd Station Configuration DEIS

More information

COBB COUNTY, GEORGIA AND INCORPORATED AREAS. Cobb County REVISED: MARCH 4, 2013 VOLUME 2 OF 4 FLOOD INSURANCE STUDY NUMBER 13067CV002D

COBB COUNTY, GEORGIA AND INCORPORATED AREAS. Cobb County REVISED: MARCH 4, 2013 VOLUME 2 OF 4 FLOOD INSURANCE STUDY NUMBER 13067CV002D VOLUME 2 OF 4 Cobb County COBB COUNTY, GEORGIA COMMUNITY NAME COMMUNITY NUMBER ACWORTH, CITY OF 130053 AUSTELL, CITY OF 130054 COBB COUNTY 130052 (UNINCORPORATED AREAS) KENNESAW, CITY OF 130055 MARIETTA,

More information

Workshop Agenda. Bransford Roundabout. Bedford Intersection/Roundabout. Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion

Workshop Agenda. Bransford Roundabout. Bedford Intersection/Roundabout. Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion Workshop Agenda Bransford Roundabout Bedford Intersection/Roundabout Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion Project Phasing Summary of Recommendation Purpose: Provide

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 9/8/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 2/19/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

Transit Project Delivery Status Report. Significant Issues

Transit Project Delivery Status Report. Significant Issues Item 1 Transit Project Delivery Status Report Significant Issues Presented By K.N. Murthy Executive Director Construction Committee 1 I-405 Sepulveda Pass Closure Construction Committee I-405 Sepulveda

More information

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015 SOUTHERN GATEWAY Transportation and Trinity River Project Committee 11 May 2015 Southern Gateway Project History Began in 2001 as a Major Investment Study [ MIS ], Schematic, and Environmental Assessment

More information

Wentzville Parkway South Phase 2 & 2A

Wentzville Parkway South Phase 2 & 2A Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total

More information

Middle Georgia Transportation Executive Committee. September 27, 2017

Middle Georgia Transportation Executive Committee. September 27, 2017 Middle Georgia Transportation Executive Committee September 27, 2017 Project Discussions MACON BIBB, CRAWFORD, MONROE Project List Development Process to Date Cities, Counties and MPOs submitted projects

More information

Rolling Road (Route 638) Widening Project

Rolling Road (Route 638) Widening Project Rolling Road (Route 638) Widening Project From: 0.369 Mile North of Fairfax County Parkway (Route 286) To: Old Keene Mill Road (Route 644) State Project No. 0638-029-156, P104, R204, C504; UPC 5559 Public

More information

STH 60 Northern Reliever Route Feasibility Study Report

STH 60 Northern Reliever Route Feasibility Study Report #233087 v3 STH 60 Northern Reliever Route Feasibility Study Report Washington County Public Works Committee Meeting September 28, 2016 1 STH 60 Northern Reliever Route Feasibility Study Hartford Area Development

More information

V-vDD ^l^lll Marietta, OA 30060

V-vDD ^l^lll Marietta, OA 30060 D 514 Glover Street V-vDD ^l^lll 1 1 1 Marietta, OA 30060 SCHOOL DISTRICT Telephone: {770) 426-3300 ; www.cobbkl2.org One Team, One Goal: Student Success September 5,2018 Ms. Sue Wadsworth Hamb/s Commercial

More information

I-4 Beyond the Ultimate. Florida Transportation Builders Association January 18, 2019

I-4 Beyond the Ultimate. Florida Transportation Builders Association January 18, 2019 I-4 Beyond the Ultimate Florida Transportation Builders Association January 18, 2019 FDOT District 5 Improving Mobility & Safety in Central Florida FDOT District 5 is: Designing and building a better Interstate

More information

I-405 Sepulveda Pass Improvements Project

I-405 Sepulveda Pass Improvements Project I-405 Sepulveda Pass Improvements Project Community Meeting November 15, 2012 1 Wilshire Segment Overview of Wilshire Segment There are a total of 23 bridges being constructed on this project; almost half

More information

School Facilities Information

School Facilities Information Introductory Notes Related to Information in This Report After many years of using the calculated capacity data for schools, staff have recently reviewed these figures and established new capacity numbers

More information

Agenda. Utility Undergrounding Strategies & Laguna Canyon Road Master Plan

Agenda. Utility Undergrounding Strategies & Laguna Canyon Road Master Plan Utility Undergrounding Strategies & Laguna Canyon Road Master Plan January 17, 2017 City Council Meeting 2 Agenda Progress since March 2016 Status of undergrounding and road widening between El Toro Rd.

More information

CAPITAL FUND 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS

CAPITAL FUND 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 2019-2023 9510 STREET & SIDEWALK IMPROVEMENTS - 01 STREET AND SIDEWALK MAINTENANCE PROGRAM $1,250,000 $0 $1,250,000

More information

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP)

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP) Public Information Packet FY - Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP) Comment Form Annual Element TIP Projects - TIP Projects Year - Metropolitan Transportation Improvement

More information

Mobility Corridor Updates. Transit & Active Transportation Projects

Mobility Corridor Updates. Transit & Active Transportation Projects Mobility Corridor Updates Transit & Active Transportation Projects Manjeet Ranu, SEO East San Fernando Valley Transit Corridor Metro Board LPA selection: June 2018 Recently awarded $200 million in Senate

More information

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM. Design Endorsement for Sterling Boulevard Extension

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM. Design Endorsement for Sterling Boulevard Extension Date of Meeting: July 20, 2017 # 6 BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM SUBJECT: ELECTION DISTRICT: CRITICAL ACTION DATE: STAFF CONTACTS: Design Endorsement for Sterling Boulevard Extension

More information

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange I-820 (East) Project Description Fort Worth District Reconstruct Southern I-820/SH 121 Interchange I-820 from approximately 2,000 feet north of Pipeline Road/Glenview Drive to approximately 3,200 feet

More information

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,

More information

City of Grand Forks Staff Report

City of Grand Forks Staff Report City of Grand Forks Staff Report Service/Safety Committee December 15, 2015 City Council December 21, 2015 Agenda Item: Amendment No. 1 to Engineering Services Agreement with CPS for City Project No. 7143,

More information

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study FROM MICHIGAN AVENUE TO INDUSTRY ROAD BREVARD COUNTY, FLORIDA Financial Project ID No: 433605-1-22-01 Federal Aid Project

More information

TRAFFIC CALMING PROGRAM

TRAFFIC CALMING PROGRAM TRAFFIC CALMING PROGRAM PROGRAM BASICS Mount Pleasant Transportation Department 100 Ann Edwards Lane Mt. Pleasant, SC 29465 Tel: 843-856-3080 www.tompsc.com The Town of Mount Pleasant has adopted a traffic

More information

IMPROVEMENT CONCEPTS

IMPROVEMENT CONCEPTS IMPROVEMENT CONCEPTS for the South Novato Transit Hub Study Prepared by: January 11, 2010 DKS Associates With Wilbur Smith Associates IMPROVEMENT CONCEPTS Chapter 1: Introduction 1. INTRODUCTION The strategic

More information

Transportation Improvement Program (TIP) Candidate Project List for Public Review

Transportation Improvement Program (TIP) Candidate Project List for Public Review 2011-2014 Transportation Improvement Program (TIP) Candidate List for Public Review Table 1 Annual Listing Of Federal Aid Obligation For Federal Fiscal Year 2010 North Dakota s Number Transit 410083 Transit

More information

Transportation Committee Revised Project Scope and Cost Estimate. November 23, 2015

Transportation Committee Revised Project Scope and Cost Estimate. November 23, 2015 Transportation Committee Revised Project Scope and Cost Estimate November 23, 2015 1 Today s Topics Revised Project Scope Revised Cost Estimate Municipal Approval Action 2 3 Revised Project Scope Project

More information

SAINT CHARLES COUNTY ROAD BOARD Minutes of March 21, 2018

SAINT CHARLES COUNTY ROAD BOARD Minutes of March 21, 2018 SAINT CHARLES COUNTY ROAD BOARD Minutes of March 21, 2018 The Wednesday, March 21, 2018, meeting of the St. Charles County Road Board was called to order at 4:30 p.m. in Room 542 of the Administration

More information

Committee Report. Transportation Committee. Business Item No

Committee Report. Transportation Committee. Business Item No Committee Report Business Item No. 2015-280 Transportation Committee For the Metropolitan Council meeting of December 9, 2015 Subject: METRO Blue Line Extension (Bottineau Light Rail Transit) Revised Scope

More information

PUBLIC INFRASTRUCTURE PROJECTS

PUBLIC INFRASTRUCTURE PROJECTS PUBLIC INFRASTRUCTURE PROJECTS FM 664 / OVILLA ROAD WIDENING & IMPROVEMENTS FM 664 / OVILLA ROAD CONNECTS US 287 WITH I-45 (SOURCE: TEXAS DEPARTMENT OF TRANSPORTATION. 2016 FM 664 / OVILLA ROAD WIDENING

More information

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION DECEMBER 24 UPDATED

More information

Business Advisory Committee. November 3, 2015

Business Advisory Committee. November 3, 2015 Business Advisory Committee November 3, 2015 1 Today s Topics DEIS Cost Estimate 2 Assumptions Revised Cost Estimate Revised Project Scope Cost Estimate Overview Position Statement Discussion Municipal

More information

Letter of Transmittal

Letter of Transmittal Letter of Transmittal To: Chris Lovell City of Richmond Hill Date: 5/2/6 Job 2582 Re: Richmond Hill-South Bryan County Transportation STudy WE ARE SENDING YOU THE FOLLOWING ITEMS ( attached) ( under separate

More information

ANDERSON PROPERTY SITE ANALYSIS

ANDERSON PROPERTY SITE ANALYSIS ANDERSON PROPERTY SITE ANALYSIS Introduction The Montgomery County Department of Transportation (MCDOT) initiated a feasibility study in the fall of 2012 to evaluate the need for transit service expansion

More information

CITY OF STEVENS POINT AGENDA

CITY OF STEVENS POINT AGENDA CITY OF STEVENS POINT BOARD OF PUBLIC WORKS MEETING Monday, September 11, 2017 6:00 p.m. (or immediately following previously scheduled meeting) Lincoln Center 1519 Water Street Stevens Point, WI 54481

More information

Delaware County Engineer s Office

Delaware County Engineer s Office Delaware County Engineer s Office JANUARY 2017 County Engineer Responsibility Serve as engineer to the Board of County Commissioners and 18 Boards of Township Trustees for roads, bridges and land surveying

More information

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS... Crosshaven Drive Corridor Study City of Vestavia Hills, Alabama Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA... 3 Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

More information

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan Valley Line West LRT Concept Plan Recommended Amendments Lewis Farms LRT Terminus Site Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan Lewis Farms LRT terminus site, 87 Avenue/West

More information

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN Page 1 of 3 CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN The six-year Capital Improvement Plan (CIP) includes capital projects for 2017 2022. This plan includes capital projects that add

More information

ALTERNATIVE PROJECT DELIVERY

ALTERNATIVE PROJECT DELIVERY ALTERNATIVE PROJECT DELIVERY Varuna Singh SH 288 IN HARRIS COUNTY SH 288 in Harris County SEGMENT 1: 8 New Tolled Direct Connectors at SH 288 and Beltway 8 Existing traffic uses frontage roads today to

More information

City of Houston Fondren Road Paving and Drainage

City of Houston Fondren Road Paving and Drainage City of Houston Fondren Road Paving and Drainage From Braeswood Boulevard to Creekbend Drive TRC Meeting March 2016 Location and Vicinity Maps City Council District K Key Map 530 Z, 530 Y Land Use Commercial

More information

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP): SEGMENT 3. April 19, 2018 NHHIP April 19, 2018

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP): SEGMENT 3. April 19, 2018 NHHIP April 19, 2018 NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP): SEGMENT 3 April 19, 2018 NHHIP OVERVIEW NHHIP divided into 3 Segments: Segment 1: I-45: Beltway 8 to I-610 (9 mi) 45 Segment 2: I-45: I-610 to I-10 (3

More information

Public Works Department, Capital Improvement Program Project Tracking

Public Works Department, Capital Improvement Program Project Tracking Community Facilities Name CF-01 Eastshore State Park/Powell Street Bioswale Seeking grant funding. TT CF-02 South Bayfront Bridge and Horton Landing Park CF-03 / - 04 Transit Center Updated plans are being

More information

2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS. Eastside Transportation Partnership September 9, 2016

2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS. Eastside Transportation Partnership September 9, 2016 2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS Eastside Transportation Partnership September 9, 2016 1 2 PSRC 2016 Project Selection Process 2018-2020 Estimated FHWA Funds Available: (Summary)

More information

Traffic Engineering Study

Traffic Engineering Study Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested

More information

SH 249 IN GRIMES COUNTY. Open House April 3, 2014

SH 249 IN GRIMES COUNTY. Open House April 3, 2014 SH 249 IN GRIMES COUNTY Open House April 3, 2014 Meeting Agenda Purpose of Meeting Today: Review the purpose and need for the SH 249 Grimes County project Review the proposed project and alternatives Discuss

More information

Public Information Workshop

Public Information Workshop Public Information Workshop Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 29, 2018 Welcome to the Public Information Workshop for Harborview Road Project Development and Environment (PD&E)

More information

BINGHAMTON METROPOLITAN TRANSPORTATION STUDY

BINGHAMTON METROPOLITAN TRANSPORTATION STUDY BINGHAMTON METROPOLITAN TRANSPORTATION STUDY ANNUAL LISTING OF FEDERAL AID PROJECT OBLIGATIONS FEDERAL FISCAL YEAR Federal regulations require an annual listing of transportation projects, including investments

More information

system performance I-820 East Loop FM 156 TxDOT is working to expand its busiest metropolitan corridors.

system performance I-820 East Loop FM 156 TxDOT is working to expand its busiest metropolitan corridors. system performance TxDOT is working to expand its busiest metropolitan corridors. Nine of the state s 100 most congested highways are located in Tarrant County. Six of these highways will be expanded and

More information

Project Working Group Meeting #5

Project Working Group Meeting #5 September 17, 2013 Project Working Group Meeting #5 1 September 17, 2013 www.i-80will.com Meeting Purpose Project update Discuss Range of Alternatives Discuss next steps 2 September 17, 2013 www.i-80will.com

More information

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year Capital Improvement Plan FY2015/2016 through FY2020

More information

5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES

5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES 5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES 5.1 INTRODUCTION This chapter of the TMP presents an opinion of probable cost estimates for the proposed Horizon Year roadway network improvements

More information

Project Description: Georgia Department of Transportation Public Information Open House Handout PI#(s): , County: Muscogee

Project Description: Georgia Department of Transportation Public Information Open House Handout PI#(s): , County: Muscogee Why We Are Here: GDOT s Transportation Improvement Act (TIA) Office, the City of Columbus, and the project delivery team are here this evening to display and answer questions concerning the proposed roadway

More information

Transportation Analysis. Pedestrian Pathways. Sterling District. County Project Manager: Suheili Pérez-Jiménez. Prepared by: J2 Engineers, Inc.

Transportation Analysis. Pedestrian Pathways. Sterling District. County Project Manager: Suheili Pérez-Jiménez. Prepared by: J2 Engineers, Inc. Transportation Analysis Pedestrian Pathways Prepared for: Loudoun County Department of Transportation and Capital Infrastructure County Project Manager: Suheili Pérez-Jiménez Prepared by: J2 Engineers,

More information

West Broadway Reconstruction/LRT Design. March 19, 2015

West Broadway Reconstruction/LRT Design. March 19, 2015 West Broadway Reconstruction/LRT Design March 19, 2015 1 Meeting Agenda 6:05 6:30 PM Brief presentation What we heard Project overview 6:30 8:00 PM Visit Six Topic Areas Road and LRT design elements Pedestrian

More information

Mobility Corridor Updates. Transit & Active Transportation Projects

Mobility Corridor Updates. Transit & Active Transportation Projects Mobility Corridor Updates Transit & Active Transportation Projects Laura Cornejo, DEO Regional Planner Regional Operator Metro is LA County s Regional Builder/Funder Rail Bus Service (Metro/Muni/Local)

More information

Harlem Avenue between 63 rd and 65 th

Harlem Avenue between 63 rd and 65 th Harlem Avenue between 63 rd and 65 th Community Advisory Group Meeting #3 December 1, 2017 Bedford Park Public Library 1 Meeting Agenda 1. Welcome/Introductions (3 mins) 2. Project Overview and Re-Cap

More information

S.M. Wright Project (I-45, US 175, SH 310) and Road to Work Opportunity Program. Transportation and Trinity River Project Committee May 23, 2016

S.M. Wright Project (I-45, US 175, SH 310) and Road to Work Opportunity Program. Transportation and Trinity River Project Committee May 23, 2016 635 S.M. Wright Project (I-45, US 175, SH 310) and Road to Work Opportunity Program Transportation and Trinity River Project Committee May 23, 2016 Project Scope Increase safety by removing the existing

More information

Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY Boston Post Road Realignment and Roundabout Design Report

Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY Boston Post Road Realignment and Roundabout Design Report March 6, 2015 Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY 10580 RE: JMC Project 14108 Boston Post Road Roundabout Boston Post Road and Parsons Street City of Rye, NY Dear Ryan:

More information

South Gloucestershire Challenge Fund and Cycle Ambition Fund

South Gloucestershire Challenge Fund and Cycle Ambition Fund South Gloucestershire Challenge Fund and Cycle Ambition Fund The Challenge Fund A4174 scheme is coordinated and delivered by South Gloucestershire Council who were awarded 14 million pounds from the Department

More information

Major Widening/New Roadway

Major Widening/New Roadway Revised Evaluation s Major Widening/New Roadway This page provides a summary of any revisions made to the draft scores presented at the October th Attributable Funds Committee meeting. The information

More information

Welcome The City has undertaken a naming exercise for the existing and future LRT lines. The SE to West LRT, as the project has been called to date,

Welcome The City has undertaken a naming exercise for the existing and future LRT lines. The SE to West LRT, as the project has been called to date, Welcome The City has undertaken a naming exercise for the existing and future LRT lines. The SE to West LRT, as the project has been called to date, is now called the Valley Line. We are here to present

More information

30-Day Look Ahead Summary August 2011

30-Day Look Ahead Summary August 2011 Wilshire Segment 30-Day Look Ahead Summary August 2011 DWP and SCE Utility Relocation Sepulveda reduced to one lane in each direction, Constitution to Ohio, 9pm to 6am Westbound Wilshire reduced to one

More information

Peninsula Corridor Electrification Project (PCEP)

Peninsula Corridor Electrification Project (PCEP) Peninsula Corridor Electrification Project (PCEP) Q4 Quarterly Update #11 April 1 June 30, 2017 JPB Board Meeting August 3, 2017 Agenda Item # 8a Electrification - Infrastructure Design Build Contract

More information

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES...

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES... Transportation Impact Fee Study September 2014 TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS......4 POTENTIAL FUNDING SOURCES...7 PROPOSED

More information

Harlem Avenue between 63 rd and 65 th

Harlem Avenue between 63 rd and 65 th Harlem Avenue between 63 rd and 65 th Public Meeting #2 March 13, 2018 Summit Park District Welcome to the second Public Meeting for the preliminary engineering and environmental studies of Illinois 43

More information

Arterial Bus Rapid Transit. System Policy Oversight Committee April 7, 2014

Arterial Bus Rapid Transit. System Policy Oversight Committee April 7, 2014 Arterial Bus Rapid Transit System Policy Oversight Committee April 7, 2014 1 Meeting Agenda Welcome and Introductions A Line - Project Status Shelter and Pylon Development Arterial BRT Branding Update

More information

CITY of NOVI CITY COUNCIL

CITY of NOVI CITY COUNCIL CITY of NOVI CITY COUNCIL Agenda Item 3 July 9, 2018 ci tyofnovi.org SUBJECT: Approval to award design engineering services to AECOM Great Lakes, Inc., for the Flint Street Realignment and Reconstruction

More information

Proposed Project I 35 Improvements from SH 195 to I 10

Proposed Project I 35 Improvements from SH 195 to I 10 I 35 ROADWAY Proposed Project I 35 Improvements from SH 195 to I 10 The existing I 35 facility from State Highway 195 (SH 195) north of Georgetown to Interstate 10 (I 10) in San Antonio varies from four

More information

TRAFFIC MANAGEMENT STANDARDS CITY OF GARLAND TRANSPORTATION DEPARTMENT

TRAFFIC MANAGEMENT STANDARDS CITY OF GARLAND TRANSPORTATION DEPARTMENT TRAFFIC MANAGEMENT STANDARDS CITY OF GARLAND TRANSPORTATION DEPARTMENT JUNE 1996 TABLE OF CONTENTS 1.0 Street Design Standards 1.1 Right-of-Way Requirements 1.2 Median Openings 1.3 Sidewalks 1.4 Traffic

More information

Crestmont Development Update 2017 AGM

Crestmont Development Update 2017 AGM Crestmont Development Update 2017 AGM West Crestmont West Crestmont Will be built in phases finally reaching about 524 residential units. Rough grading for phases 9 & 10 already underway. First show home

More information

~ p bl' S E. S 4,781 (ADA ComQiiance Program) $ 32,006 TOTAL $119,100 (Meadowbrook Rd Pathway) $108,600 (Taft Rd Pathway)

~ p bl' S E. S 4,781 (ADA ComQiiance Program) $ 32,006 TOTAL $119,100 (Meadowbrook Rd Pathway) $108,600 (Taft Rd Pathway) CITY of NOVI CITY COUNCIL Agenda Item K August 27, 2012 SUBJECT: Approval to award an amendment to the engineering services agreement with Spalding DeDecker Associates, Inc. related to the 2012 Pathway

More information

Construction Staging Area 4 Avenue Road

Construction Staging Area 4 Avenue Road REPORT FOR ACTION Construction Staging Area 4 Avenue Road Date: September 27, 2017 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District

More information

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction 550 North to 650 North $ 1,750,000 $ 1,582,113 To widen an existing bridge on 1200 West over Box Elder Creek that will

More information

Maryland Gets to Work

Maryland Gets to Work I-695/Leeds Avenue Interchange Reconstruction Baltimore County Reconstruction of the I-695/Leeds Avenue interchange including replacing the I-695 Inner Loop bridges over Benson Avenue, Amtrak s Northeast

More information

Rocky Mount. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

Rocky Mount. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation 2020 Transportation Plan Developed by the Transportation Planning Division of the Virginia Department of Transportation in cooperation with the U.S. Department of Transportation, Federal Highway Administration

More information

Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007

Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007 EAST-WEST CORRIDOR Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007 Presentation Agenda Project Overview / Purpose and Need Highway Component Transit Component

More information

NASHVILLE AREA MPO FY TIP - ADOPTED DECEMBER

NASHVILLE AREA MPO FY TIP - ADOPTED DECEMBER WILLIAMSON/ MAURY NASHVILLE AREA MPO FY -2017 TIP - ADOPTED DECEMBER 11, 2013 SR-247 (Duplex Road) Widening TIP # 2004-051 Road Widening Spring Hill Williamson Length 3.10 Regional Plan ID 1062-170 Air

More information

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition Welcome Meetings 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition 6:30 to 8:00 p.m. - Open House Why is Highway 212 Project Important? Important Arterial Route Local Support Highway 212

More information

Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary

Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County Executive Summary October 2014 Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County Executive Summary October 2014 Prepared

More information

Williamson County Projects

Williamson County Projects Williamson Projects SR-6/ US-31/ Franklin Road TIP # 2006-408 Road Widening TDOT Williamson Length 2.30 Regional Plan ID 1062-160 Air Quality Status Non-Exempt TDOT PIN 105717.00 $38,000,000.00 SR-31/Franklin

More information

No Thoroughfare. Gated Private Road Ahead

No Thoroughfare. Gated Private Road Ahead No Thoroughfare Gated Private Road Ahead 1 Think: Safety and Security In our Community 2 Mainlands Secondary Entrance Barrier Gate Proposal Technology and Cost Study (as Prepared by Gate Committee on April

More information

US 81 Bypass of Chickasha Environmental Assessment Public Meeting

US 81 Bypass of Chickasha Environmental Assessment Public Meeting US 81 Bypass of Chickasha Environmental Assessment Public Meeting March 14, 2013 Introductions ODOT FHWA SAIC Meeting Purpose Present need for bypass Provide responses to 10/04/11 public meeting comments

More information

Transportation & Traffic Engineering

Transportation & Traffic Engineering Transportation & Traffic Engineering 1) Project Description This report presents a summary of findings for a Traffic Impact Analysis (TIA) performed by A+ Engineering, Inc. for the Hill Country Family

More information

ACTION TRANSMITTAL No

ACTION TRANSMITTAL No Transportation Advisory Board of the Metropolitan Council of the Twin Cities DATE: January 4, 2016 TO: ACTION TRANSMITTAL No. 2016-19 TAC Funding and Programming Committee PREPARED BY: Joe Barbeau, Senior

More information

W&OD TRAIL BRIDGE OVER LEE HIGHWAY I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237)

W&OD TRAIL BRIDGE OVER LEE HIGHWAY I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237) W&OD TRAIL BRIDGE OVER LEE HIGHWAY A COMPONENT OF THE I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237) October 11, 2018 Bill Cuttler, PE

More information

Scope of Services January 26, Project Development and Conceptual Engineering for City of Lake Forest Amtrak Station

Scope of Services January 26, Project Development and Conceptual Engineering for City of Lake Forest Amtrak Station 203 North LaSalle Street, Suite 2100 Chicago, IL 60601 (312) 558-1345 Fax: (312) 346-9603 E-Mail: cquandel@quandelconsultants.com www.quandel.com Scope of Services January 26, 2010 Project Development

More information

MAP OR PHOTO. Public Meeting & Open House July 23, Project Roadway Limits From: FM 1957 To: FM 471. Counties Bexar & Medina

MAP OR PHOTO. Public Meeting & Open House July 23, Project Roadway Limits From: FM 1957 To: FM 471. Counties Bexar & Medina Public Meeting & Open House July 23, 2013 Project Roadway Limits From: FM 1957 To: FM 471 MAP OR PHOTO Counties Bexar & Medina 1 I. Project History II. III. IV. Project Overview Project Alternatives Response

More information

SOUTH ACCESS TO THE GOLDEN GATE BRIDGE DOYLE DRIVE DOYLE DRIVE. Doyle Drive Presentation Golden Gate Bridge Board Meeting July 24, 2009

SOUTH ACCESS TO THE GOLDEN GATE BRIDGE DOYLE DRIVE DOYLE DRIVE. Doyle Drive Presentation Golden Gate Bridge Board Meeting July 24, 2009 DOYLE DRIVE Doyle Drive Presentation Golden Gate Bridge Board Meeting July 24, 2009 Presentation Overview Introduction Project Acceleration Construction Contracts Construction Activities Lane and Road

More information

Transportation. Background. Transportation Planning Goals. Level of Service Analysis 5-1

Transportation. Background. Transportation Planning Goals. Level of Service Analysis 5-1 Transportation portion of the city s stormwater utility, and state road and fuel taxes. Background The transportation needs of the City of Lacey and its planning areas are met by a growing multimodal network

More information

CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE

CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE TUESDAY, DECEMBER 5, 2017 1 DISCUSSION TOPICS Update of Infrastructure Action Plan (IAP) o Sidewalk and Roadway projects

More information

Waco Rapid Transit Corridor (RTC) Feasibility Study

Waco Rapid Transit Corridor (RTC) Feasibility Study Waco Rapid Transit Corridor (RTC) Feasibility Study Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System Jimi Mitchell, Project Manager AECOM

More information

Received June 2, 2017 PLN-PUDC

Received June 2, 2017 PLN-PUDC MASTER LAND USE PLAN for: a prestigious community presented by: Breeden Investment Properties and Davenport Management Company Virginia Beach, Virginia 23452(757) 468-6800 Received PLN-PUDC-2016-008 page

More information

Mobility Program. City of St. Augustine. Mobility Program Update. City Commission Meeting Monday, August 27, Moving People Through History

Mobility Program. City of St. Augustine. Mobility Program Update. City Commission Meeting Monday, August 27, Moving People Through History Mobility Program City of St. Augustine Mobility Program Update City Commission Meeting Monday, August 27, 2018 Moving People Through History Program Update: North Florida Safe Streets Summit 2018 Program

More information

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject TECHNICAL MEMORANDUM To Kumar Neppalli Traffic Engineering Manager Town of Chapel Hill From Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. Cc HNTB Project File: 38435 Subject Obey Creek TIS 2022

More information

PALM BEACH COUNTY FIVE YEAR ROAD PROGRAM - EXHIBIT A

PALM BEACH COUNTY FIVE YEAR ROAD PROGRAM - EXHIBIT A Page 1 of 5 PALM BEACH COUNTY FIVE YEAR ROAD PROGRAM - EXHIBIT A FY 2017 TOTAL BUDGETED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED PROJECTED Local Option Gas Taxes Total 49,679,000 49,679,000 49,679,000

More information

Letter EL652 City of Mercer Island. Page 1. No comments n/a

Letter EL652 City of Mercer Island. Page 1. No comments n/a Letter EL652 City of Mercer Island Page 1 No comments n/a Page 2 Response to comment EL652 1 Section 4.5.3 of the Final EIS presents the range of potential impacts of the project. This project also lists

More information