1 NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Shipping, Road Transport & Highways) Government of India Improvement, Operation and Maintenance, Rehabilitation and Strengthening of Existing 2- Lane Road and Widening to 4-6 Lane Divided Highway from Km to Km of NH-3 (Dhule - Pimpalgaon section) in the State of Maharashtra on Build, Operate and Transfer (BOT) Basis MONTHLY (O&M) PROGRESS REPORT FOR THE MONTH OF BY INDEPENDENT CONSULTANT
2 DHULE - PTMPALGAON (NH-3) BOT PROJECT K&J/DPNH ltll J Z Date: 20th January 2015 To The Project Director, National Highways Authority of India, PlU. Nashik "subodh House",S. N o.91.1 t2,plot No.4,' Off Mumbai Agra Highway, Nashik Sub: lmprovement, Operation & Maintenance, Rehabilitation and Strengthening of Existing 2 lane road and widening to 4-lane divided Highway from Km: to Km: of NH-3 (Pimpalgaon - Dhule) in the state of Maharashtra on Build Operate and transfer (BOT) Basis- Submission of Monthly O & M Report for the month of December Reg. Ref: Clause No.19.2, Volume- of Concession Agreement. Dear Sir, The Provisional COD for the partly completed stretch of the project from Km to Km was commenced on 25'n October 2009 and for the balance stretch of Km to km , the Provisional COD came into effect on 19'n April Accordingly, as per Clause No.19.2, Volume - of Concession Agreement, we submit herewith the Monthly O & M Report of lc for the month of December Further, as per CGM (LA & Coord.),NHA, HQ, New Delhi Circular No /2007-Admin, Dtd , Chapters for bringing out the deficiencies observed in the Concessionaire's O&M obligations, remedial action taken, damages recovered included in the Monthly progress Report. This is for your kind information please. Team Leader Dhule Pimpalgaon Section of NH-3 Encl: As above. Copy to: 1) DGM (Tech), NHAI Head Quarler, New Delhi. 2) COO, ISTPL, Laling Toll Plaza, Dhule for inf & n/a. 3) Mr. J. N. Dabe, Executive Director, Mis. K&J Projects Pvt. Ltd. Nagpurfor perusal. 4) File. K &J Projects Pvt. Ltd. Plot No. 11, Shrirang Colony, NearA-one Petrol Pump, Old Agra Road, Deopur, Dhule , Maharashtra, India. Tel: ,Fax: , tl_pd@knjprojects.com, www,knjprojects.com
3 1. TABLE OF CONTENTS SL. NO. ITEMS PAGE 1 TABLE OF CONTENTS 1 PROJECT DESCRIPTION Project Background Project Description IC s Operation And Maintenance Phase Responsibilities 2 3 PURPOSE O FTHIS DOUMENT 3 4 PROJECT LOCATION MAP 4 5 SALIENT FEATURES 5 6 PROJECT DETAILS 6 to 13 TOLL OPERATIONS 14 A - Monthly Tolled Traffic 15 7 B - Monthly Local Tolled Traffic 16 C - Monthly Total Tolled Traffic 17 D Daily Traffic & Collection 18 to 41 E Road User s Complaint Compliance Report 42 to 43 8 DETAILS OF ESCROW ACCOUNT 44 to 51 9 FINANCIAL PROGRESS OF WORK IMPEDIENTS 52 ROUTE OPERATIONS 53 A Accident / Incident Report 54 to 60 B Damage Report C Encroachment Removal Report 62 D Incidents of Lane Closure Report 63 to 65 E Customer Feedback Report 66 to 69 F Emergency Services 70 to 71 G List of Equipments 72 MAINTENANCE REPORT 73 A IC Inspection Report October to A.1 Shoulder A.2 Road Maintenance 75 to A.3 Structure 86 to A.4 Road Furniture 90 to A.5 Drainage 107 to A.6 Miscellaneous Work 109 to A.7 Horticulture 111 to A.8 RHS Encroachment A.9 - LHS Encroachment A.10 - Median Encroachment A.11 Highway Lighting 116 to A.12 Status of Avenue Plant A.13 Action Taken Report - Recovery of Damages 120 to 121 B IC Inspection Report November 2014 V/s Compliance by Concessionaire 122 to 165 C Maintenance of Electrical 166 to 201 D Maintenance of Systems 202 to 212 E Preventive / Periodic Maintenance Details 213 to 268 F Material Modification Report 269 G Test Conducted During The Month 270 to 272 K & J PROJECTS PVT. LTD. Page 1
4 2. PROJECT DESCRIPTION 2.1 PROJECT BACKGROUND National Highway No. 3 popularly known as Agra-Bombay road connects Agra one of the most important tourist center of the country to Mumbai the Capital of Maharashtra and passes through states of Uttar Pradesh, Rajasthan, Madhya Pradesh & Maharashtra. Other important towns connected by this National Highway are Dholpur in Rajsthan, Gwalior, Shivpuri, Guna, Dewas and Indore in Madhya Pradesh and Dhule and Nashik in Maharashtra. Dholpur is known for its bird sanctuary, Gwalior is one of the most important education centre of Madhya Pradesh, Dewas is close to Ujjain a pilgrimage center. Indore is most important business and commercial centre of Madhya Pradesh and Nashik in Maharashtra is an important ancient pilgrimage center of India. The road therefore besides carrying normal goods and passenger traffic is of great tourist interest. 2.2 PROJECT DESCRIPTION Starting from 265 Km stone on Dhule town and this road passes through Dhule, Aarvee, Malegaon, Chandwad and ends at 380 Km stone (Pimpalgaon). The road traverse through mainly plain/rolling terrain except for short stretches in 3 locations, where it is aligned through hilly terrain. A number of National Highways & State Highways intersect/meet the project road. Besides these major roads a number of major District Roads and ODR s meet the project road all along the route. Total length of the road is Km, which has been divided in two packages. Package A is between Km 265/000 to 316/000 measures Kms. Package B is between Km 316/000 to 380/000 measures Kms. The COD for the partly completed stretches of the project from Km to was commenced on and the balance portion from Km to was commenced on IC S OPERATION AND MAINTENANCE PHASE RESPONSIBILITIES During operation and maintenance phase the Independent Consultant shall inspect, review and report to ensure that O&M is carried out in accordance with the provision of the Concession Agreement. His duties shall include, but not limited to: Review work, plan and schedules of various operation and maintenance activities. K & J PROJECTS PVT. LTD. Page 2
5 Review Operation and Maintenance manual prepared by the Concessionaire. Review the performance of Operation and Maintenance (O&M) activities including equipment, service, traffic operation and safety, toll plazas and fees collection system, landscaping. Environmental issues and way side amenities. To mediate and assist in resolving disputes between NHAI and Concessionaire during O&M stage. Initiate necessary action to undertake maintenance obligation of the Concessionaire at the risk and cost of the Concessionaire in the event of his failure to carry out O&M. Undertake audit of the traffic using the Project Highway at least once a month. Review and inspect the Project Highway at least once a month during the O&M period and issue an Inspection Report of such inspections. Review the accident record on the Project Highway and suggest remedial measures. 3. PURPOSE OF THIS DOCUMENT This Document is submission of Monthly O & M report to NHAI for the month of December 2014, as per requirement of Clause No. 19.2, Volume- I of Concession Agreement. K & J PROJECTS PVT. LTD. Page 3
6 4. PROJECT LOCATION MAP Dhule Dist Nashik Dist. Maharashtra Project Starting Chainage (Dhule) Project Ending Chainage (Pimpalgaon) K & J PROJECTS PVT. LTD. Page 4
7 5. SALIENT FEATURES 1 Name of Project Improvement, Operation and Maintenance, Rehabilitation and Strengthening of Existing 2-lane road and widening to 4-lane divided Highway from Km to Km of NH-3 (Pimpalgaon Dhule) in the state of Maharashtra on BOT Basis. 2 Name of Client NATIONAL HIGHWAYS AUTHORITY OF INDIA 3 Name of Consultant M/S. K & J PROJECTS PVT.LTD. 4 Name of Concessionaire IRCON SOMA TOLLWAY PRIVATE LIMITED 5 Project Kilometer Km to Km (Existing) Km to Km (Revised) 6 Date of Concession Agreement Date of Commencement Concession Period 20 years (3 Years for construction and 17 years for O&M) 9 Date of Scheduled Completion Date of Extended Completion Date of Actual Completion Date of Substantial Completion 13 Date of Commercial Operation Km to Km Km to Km Km to Km Km to Km Km to Km Estimated Project Cost 606 Crores 15 Actual project cost Crores 16 Location of Chandwad Plaza Km Location of Dhule Plaza Km K & J PROJECTS PVT. LTD. Page 5
8 6. PROJECT DETAILS 6.1 GEOMETRIC PARAMETERS AND STANDARDS Sl. Particulars Unit Value ruling Value Remarks No. exceptional A. ROAD WORKS 50 km per 1. Design Speed Km/hr to 50 hour at Rahud Ghat only 2. Width of Carriageway meter 7.0 m Shoulder Paved meter 1.5 Earthen meter 2.0 Edge Strip meter 0.5 meter 4.5 Rural area Sections Median meter through built 2.0 up areas, deep box cut sections etc. Service Road meter 5.5 (fully paved) Footpath meter 1.50 To be provided in built up area To be provided over drain in built up/urban area 3. Embankment Slope Ratio 2H:1V 4. Cross fall Carriageway % 2.5 Paved Shoulder % 2.5 Earthen Shoulder % 3.0 d) Service Road % Super Elevation % 7.0 (max) rotation about median edge 6. Horizontal Curves Minimum Radius (expect in Rahud ghat) meter In Rahud ghat 90 to 120 m 7. Gradient % Flatter than Up to designed for 8. Vertical curves safe stopping sight distance B. INTERCHANGES 9. Interchanges Ramp a) Design Speed Km/hr 65 b) Carriageway width i) Single Lane Metre 5.5 ii) Double Lane Metre 7 c) Shoulder Paved i) Inner (Single Lane) Metre 1.5 K & J PROJECTS PVT. LTD. Page 6
9 Sl. No. Particulars Unit Value ruling ii) Outer Metre 2.5 d) Minimum Radius Metre 120 e) Maximum Super % 5 elevation f) Longitudinal Gradient Metre 1 in 30 (max) 10. Interchange Loop Ramp a) Design Speed Km/hr 40 b) Carriageway width Metre 2 i) Double Lane c) Shoulder Paved i) Inner ii) Outer Metre Metre d) Minimum Radius Metre 100 e) Longitudinal Gradient Metre 1 in 30 (max) Value exceptional Remarks Bridge Works Sl. No. Particulars Unit Value Remarks 1.a Outer to Outer width of Culverts M 26.5 (without service road) 1.b Outer to Outer width of Culverts M 40.5 (with service road on both sides) 1.c Outer to Outer width of Culverts M 33.5 (with service road on one side 2. Outer to Outer width of Bridges for M Without footpath each 3-lane 3. Width of Railings M Median a) Covered totally Same as Approach Section b) Gap between two adjacent Same as Approach Section bridges 5. Approach Road a) Embankment Slope Ratio 2H:1V b) Transition between Bridge and Approach Road Minimum 4.0 m length RCC approach slab 300 mm thick for full width of Carriageway c) Longitudinal Slope Percentage 3% (max) 6. Construction Material a) Reinforced concrete works Min. M 25 b) Pre-stressed concrete works Min. M 35 c) Wearing Coarse Concrete or bituminous type d) Reinforcing steel TMT bars S 415 (Fe 415) e) Pre-stressing steel K & J PROJECTS PVT. LTD. Page 7
10 6.2 VILLAGE INVENTORY Sr. No. Location Village Name Avdhan Divanmala Arvi Village Purmepada Ramnagar Phata Zodge Village Dewarpada Jalaku Chikhalhol Saine Dasane Sanwatgaon Tehre / Soyagaon Patne Mungse Village Saundane Umrane Village Chinchve Rahud Chandwad Sogras Malsane Wadalibhui Khadakjam Shirvade Vani 6.3 MAJOR JUNCTIONS Sr. No. Junctions Description 1 Km NH-211 from Aurangabad leading to Dhule town 2 Km Road taking off from NH-3 and linking with NH-6 3 Km SH-15 from Parola joins NH-3 near Arvi village 4 Km SH-19 from chalisgaon meets NH-3 near Malegaon 5 Km SH-10 known as Manmad Road joins NH-3 at Malegaon 6 Km SH-24 from manmad-shirdi joins NH-3 at Malegaon 7 Km SH-7 from Satana meets NH-3 near Mangrul Village 6.4 TOILET BLOCKS Sr. No. Village LHS location RHS location Remarks 1 Sangvi (Fabricated) Km Km At Truck Lay Bye 2 Arvee (Fabricated) Km Km At Truck Lay Bye 3 Laling (RCC) Km Km At Laling Toll Plaza 4 Chandwad (RCC) Km At Chandwad Toll Plaza 5 Renuka Devi Temple Km K & J PROJECTS PVT. LTD. Page 8
11 6.5 DETAILS OF PAVEMENT COMPOSITION FOR MAIN CARRIAGEWAY For New Carriageway Overlay on Existing Carriageway As per DPR As per Concessionaire As per DPR Km Km Km Design BC 50 mm 50 mm 50 mm 50 mm BC 50 mm DBM 150 mm 150 mm 150 mm 150 mm DBM Km 265 Km mm Km 297 Km mm Km 316 Km mm WMM 250 mm 250 mm 250 mm 250 mm GSB 260 mm 200 mm 300 mm 200 mm - TOTAL 710 mm 650 mm 750 mm 650 mm 6.6 DETAILS OF PAVEMENT COMPOSITION FOR SERVICE ROAD DPR Concessionaire BC 40 mm 40 mm DBM 60 mm 95 mm WMM 250 mm 250 mm GSB 200 mm 200 mm Total 550 mm 585 mm 6.7 DETAILS OF PROJECT ROAD Sr.no. Description Package-A Package-B Total 1 Total Length of Road km km km 2 Length of Service Roads km km km 3 Length of Approaches for ROB km km 4 Length of Approaches for Overpass km km km 5 Length of Realignment km km km 6 Length of Toll plaza km km km 7 Length of Retaining wall km km km 8 Length of CC Breast wall km km km 6.8 DETAILS OF SERVICE ROADS As per CA Provisions As per Execution at site Sl. Remarks No. Length Length From To Side From To Side (M) (M) RHS RHS 4075 As Per CA LHS LHS 5075 As Per CA RHS RHS 675 As Per CA LHS 190 Additional Works LHS LHS 380 As Per CA RHS RHS 430 As Per CA LHS LHS 275 As Per CA LHS LHS 645 As Per CA RHS RHS 645 As Per CA RHS RHS 1005 As Per CA LHS LHS 1055 As Per CA RHS 98 Additional Works LHS 152 Additional Works RHS RHS 1000 As Per CA Status Completed K & J PROJECTS PVT. LTD. Page 9
12 S. As per CA Provisions As per Execution at site no Remarks Length Length. From To Side From To Side (M) (M) LHS LHS 1000 As Per CA RHS 640 Additional Works LHS 140 Additional Works RHS RHS 500 As Per CA LHS LHS 500 As Per CA RHS 150 Additional Works LHS 215 Additional Works RHS RHS 2135 As Per CA LHS LHS 2135 As Per CA LHS LHS 128 As Per CA RHS RHS 472 As Per CA LHS LHS 590 As Per CA RHS RHS 1725 As Per CA LHS LHS 1725 As Per CA RHS RHS 300 As Per CA LHS LHS 300 As Per CA RHS RHS 1450 As Per CA LHS LHS 1450 As Per CA RHS RHS 838 As Per CA LHS LHS 758 As Per CA Total length in meter Completed Total length of service road as per CA = km. Total length of Service Road Completed\ to be completed as per CA = 31,266 km Total length of Service Road Completed other than CA =1,585 km (Sr. No. 4, 12, 13,16,17,20 and 21) 6.9 DETAILS OF STRUCTURES S.no. Description Package-A Package-B Total A Bridges: 1 No. of Rail Over Bridge No. of Overpasses No. of Fly Over No. of Vehicular Underpass No. of Pedestal Underpass No. of Major Bridges No. of Minor Bridges B Culverts: 1 No. of Pipe Culverts No. of Box Culverts No. of Slab Culverts K & J PROJECTS PVT. LTD. Page 10
13 Bridge No. Location 6.10 DETAILS OF MAJOR STRUCTURES As per Execution Existing Span Span Length Type of Arrangement Arrangement (m) Foundation 1. ROB 264/ X24 72 Open Foundation As per Execution Bridge Existing Span Location Span Length Type of No. Arrangement Arrangement (m) Foundation 2. MAJOR BRIDGE 283/ [9.1+10x ] Open 6 x Foundation 313/ [17x25] Open Foundation 330/ [ Open 3x ] 58.4 Foundation 1x / x8.80 2x FLY OVER 314/ x x Open 1x31.50 Foundation 4.OVERPASS x 25 m 50 m Open foundation x 25 m 50 m Open foundation 6.11 DETAILS OF MINOR BRIDGES Type of Superstructure PSC Girder Type of Superstructure RCC T- Beam RCC T-Beam RCC T-Beam RCC T-Beam PSC Girder Bridge RCC T- Beam RCC T- Beam Proposed Bridge Bridge Existing Span Location No. Arrangement Span Length Type of Type of Arrangement (m) Foundation Superstructure 275/ (6.5+2x ) 2x Open RCC T-Beam 275/ ( ) 1x Open RCC T-Beam 279/ (2x6.8+2x6.95) 2x Open RCC T-Beam 281/ (2x ) 1x Open RCC T- Beam 281/ (2x6.5+2x6.75) 2x Open RCC T- Beam 283/ (2x6.25+2x6.25) 2x Open RCC T- Beam 286/ (2x ) 1x Open RCC T- Beam 289/ (4x6.75) 2x Open RCC T- Beam 290/ (2x5.5) 1x Open RCC T- Beam 293/ (7x3.20) 3x Open Deck Slab 294/ (3x5.50) 1x Open RCC T- Beam 295/ (2x6.5) 1x Open RCC T- Beam 298/ (3x5.6) 1x Open RCC T-Beam 298/ (2x ) 2x14.80(Skew 24 ) 31.1 Open RCC T-Beam 309/ (2x7.65) 1x15.80(Skew 30 ) Open RCC T-Beam 309/ (2x8.75) 1x Open RCC T-Beam 310/ [2x27]55.3 2x Open RCC T-Beam K & J PROJECTS PVT. LTD. Page 11
14 Proposed Bridge Bridge Existing Span Location No. Arrangement Span Length Type of Type of Arrangement (m) Foundation Superstructure 311/ (1x7.9) 1x8.0 (Skew 38 ) 8.78 Open Deck Slab 322/ (2x7.5) 1x Open RCC T-Beam 322/ (2x ) 16.30(Skew 56.2 ) Open RCC T-Beam 324/ ( ) 2x Open RCC T-Beam 324/ ( ) 1x21 (Skew32 ) Open RCC T-Beam 354/ (1x7.0) 1x Open Deck Slab 356/ (2x8.50 2x Open Deck Slab 361/ (2x8.5+2x8.75) 2x Open RCC T-Beam 1x / ( ) Open RCC T-Beam (Skew20 ) 378/ (1x8.7) 1x Open Deck Slab 379/ ( ) 1x21.70 (Skew37 ) Open RCC T-Beam 6.12 DETAILS OF UNDERPASSES Sl. Name of the Structure Dimension in Remarks No. Structure Location M 1 NVUP x 3.5 Laling Village 2 NVUP x3.50 Arvi village 3 VUP x 3.71 Arvi Village 4 NVUP x 3.5 Zodge Village 5 NVUP x 3.5 Chikalhole village 6 VUP x 4.5 Daregaon Village 7 NVUP x 3.5 Malegaon (Before Girna Bridge) 8 VUP x 4.5 Malegaon Town (Before Girna Bridge) 9 NVUP x 3 Chandanpuri Town 10 VUP x 3 Umrane Junction 11 NVUP x 3 Chinchuve village 12 NVUP x 3.5 Chinchuve village 13 NVUP x 3.5 Infront of Chandwad College 14 NVUP x 3.5 In Chandwad Town 15 NVUP x 3 Mangrul Village 16 VUP x 5 Vadali Bhui Village 17 NVUP x 3 Vadali Bhui Town 6.13 OTHER DETAILS S.no. Description Package-A Package-B Total Armed Junctions Armed Junctions No. of Bus Bays No. of Truck Lay Bays DETAILS OF METALIC BEAM CRASH BARRIER Chainage Length (Meter) Remarks Sr. No. From To LHS LHS Shoulder side LHS Shoulder side LHS Shoulder side K & J PROJECTS PVT. LTD. Page 12
15 Sr. No. From Chainage To LHS Length (Meter) Remarks LHS Soulder side LHS Shoulder side LHS Shoulder side LHS Shoulder side LHS Shoulder side LHS Shoulder side LHS Shoulder side LHS Median side LHS Median side LHS Shoulder side LHS Shoulder side LHS Shoulder side LHS Median side LHS Median Side LHS Shoulder side LHS Shoulder side LHS Shoulder side LHS Shoulder side LHS Shoulder side LHS Shoulder side RHS RHS Shoulder side RHS Shoulder side RHS Shoulder side RHS Shoulder side RHS Shoulder side RHS Shoulder side RHS Shoulder side RHS Shoulder side RHS Shoulder side RHS Shoulder side RHS Shoulder side RHS Shoulder side RHS Shoulder side RHS Shoulder side RHS Shoulder side RHS Shoulder side RHS Shoulder side RHS Shoulder side RHS Shoulder side RHS Shoulder side K & J PROJECTS PVT. LTD. Page 13
16 7. TOLL OPERATIONS A MONTHLY TOLLED TRAFFIC 15 B MONTHLY LOCAL TOLLED TRAFFIC 16 C MONTHLY TOTAL TOLLED TRAFFIC 17 D DAILY TRAFFIC & COLLECTION 18 to 41 E ROAD USER S COMPLAINT COMPLIANCE REPORT 42 to 43 K & J PROJECTS PVT. LTD. Page 14
17 7.A - MONTHLY FEE COLLECTION STATEMENT Tolled Traffic 1. Name of Work: IRCON-SOMA TOLLWAY PVT. LTD. 2. Date of commencement of fee collection : Plaza (1) on 25/10/2009 at 11:55 AM 3. Report for month ending: December Fee rates (Rs.) Vehicle Type Fee rates on commencement Plaza (2) on 19/04/2010 at 00:00 Hours Rates during year before last year w.e.f... (Date) Rates during previous year applied w.e.f... (Date) Present rates applied w.e.f. 01/07/ (Date) Car, Passenger Van or Jeep Light Commercial Vehicle Truck/Bus Multi Axle Vehicle (>2 axle) Collection during month under report (Amount in Rs. Lacs). Vehicle Type Previous Month Corresponding Month during Previous Year Nos. Amount Nos. Amount Current Month Chandwad Plaza (1) Dhule Plaza (2) Nos. Amount Nos. Amount Nos. Grand Total Car, Passenger Van or Jeep Light Commercial Vehicle Truck/Bus Multi Axle Vehicle (>2 axle) Gross Total Amount K & J PROJECTS PVT. LTD. Page 15
18 7.B - MONTHLY FEE COLLECTION STATEMENT Local Tolled Traffic 1. Name of Work: IRCON-SOMA TOLLWAY PVT. LTD. 2. Date of commencement of fee collection : Plaza (1) on 25/10/2009 at 11:55 AM Plaza (2) on 19/04/2010 at 00:00 Hours 3. Report for month ending : December Fee rates (Rs.) Vehicle Type Fee rates on commencement Rates during year before last year w.e.f... (Date) Rates during previous year applied w.e.f... (Date) Present rates applied w.e.f. 01/07/ (Date) Car, Passenger Van or Jeep 10 & & 30 Light Commercial Vehicle Truck/Bus Multi Axle Vehicle (>2 axle) Collection during month under report (Amount in Rs. Lacs). Vehicle Type Previous Month Corresponding Month during Previous Year Nos. Amount Nos. Amount Current Month Chandwad Plaza (1) Dhule Plaza (2) Nos. Amount Nos. Amount Nos. Grand Total Car, Passenger Van or Jeep Light Commercial Vehicle Truck/Bus Multi Axle Vehicle (>2 axle) Gross Total Amount K & J PROJECTS PVT. LTD. Page 16
19 7.C - MONTHLY FEE COLLECTION STATEMENT Total Tolled Traffic 1. Name of Work: IRCON-SOMA TOLLWAY PVT.LTD. 2. Date of commencement of fee collection : Plaza (1) on 25/10/2009 at 11:55 AM 3. Report for month ending : December Fee rates (Rs.) Vehicle Type Fee rates on commencement Plaza (2) on 19/04/2010 at 00:00 Hours Rates during year before last year w.e.f... (Date) Rates during previous year applied w.e.f... (Date) Present rates applied w.e.f. 01/07/ (Date) Car, Passenger Van or Jeep Light Commercial Vehicle Truck/Bus Multi Axle Vehicle (>2 axle) Collection during month under report (Amount in Rs. Lacs). Vehicle Type Previous Month Corresponding Month during Previous Year Nos. Amount Nos. Amount Current Month Chandwad Plaza (1) Dhule Plaza (2) Nos. Amount Nos. Amount Grand Total Nos. Amount Car, Passenger Van or Jeep Light Commercial Vehicle Truck/Bus Multi Axle Vehicle (>2 axle) Gross Total K & J PROJECTS PVT. LTD. Page 17
20 7.D - STATEMENT OF DAILY TRAFFIC & COLLECTION (Toll Plaza 1, Chandwad) 1. Name of Work : IRCON-SOMA TOLLWAY PVT. LTD. 2. Date of commencement of fee collection : 25/10/2009 at 11:55 AM 3. Report for month ending : December '2014 (A) Tolled Traffic & Collection (Cash) Date Car, Passenger Van or Jeep Light Commercial Vehicle Truck/Bus Multi Axle Vehicle (>2 axle) Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount (Rs.) Total Dec 1, Dec 2, Dec 3, Dec 4, Dec 5, Dec 6, Dec 7, Dec 8, Dec 9, Dec 10, Dec 11, Dec 12, Dec 13, Dec 14, K & J PROJECTS PVT. LTD. Page 18
21 Date Car, Passenger Van or Jeep Light Commercial Vehicle Truck/Bus Multi Axle Vehicle (>2 axle) Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount (Rs.) Dec 15, Dec 16, Dec 17, Dec 18, Dec 19, Dec 20, Dec 21, Dec 22, Dec 23, Dec 24, Dec 25, Dec 26, Dec 27, Dec 28, Dec 29, Dec 30, Dec 31, Total Total K & J PROJECTS PVT. LTD. Page 19
22 \(B) Local Tolled Traffic & Collection (Through Smart cards) Date Car, Passenger Van or Jeep Light Commercial Vehicle Truck/Bus Multi Axle Vehicle (>2 axle) Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount (Rs.) Total Dec 1, Dec 2, Dec 3, Dec 4, Dec 5, Dec 6, Dec 7, Dec 8, Dec 9, Dec 10, Dec 11, Dec 12, Dec 13, Dec 14, Dec 15, Dec 16, K & J PROJECTS PVT. LTD. Page 20
23 Date Car, Passenger Van or Jeep Light Commercial Vehicle Truck/Bus Multi Axle Vehicle (>2 axle) Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount (Rs.) Dec 17, Dec 18, Dec 19, Dec 20, Dec 21, Dec 22, Dec 23, Dec 24, Dec 25, Dec 26, Dec 27, Dec 28, Dec 29, Dec 30, Dec 31, Total Total K & J PROJECTS PVT. LTD. Page 21
24 Total Tolled Traffic & Collection (A+B) Date Car, Passenger Van or Jeep Light Commercial Vehicle Truck/Bus Multi Axle Vehicle (>2 axle) Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount (Rs.) Total Dec 1, Dec 2, Dec 3, Dec 4, Dec 5, Dec 6, Dec 7, Dec 8, Dec 9, Dec 10, Dec 11, Dec 12, Dec 13, Dec 14, Dec 15, K & J PROJECTS PVT. LTD. Page 22
25 Date Car, Passenger Van or Jeep Light Commercial Vehicle Truck/Bus Multi Axle Vehicle (>2 axle) Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount (Rs.) Dec 16, Dec 17, Dec 18, Dec 19, Dec 20, Dec 21, Dec 22, Dec 23, Dec 24, Dec 25, Dec 26, Dec 27, Dec 28, Dec 29, Dec 30, Dec 31, Total Total K & J PROJECTS PVT. LTD. Page 23
26 (C) Exempted Traffic Date Car, Passenger Van or Jeep Light Commercial Vehicle Truck/Bus Multi Axle Vehicle (>2 axle) Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount (Rs.) Dec 1, Dec 2, Dec 3, Dec 4, Dec 5, Dec 6, Dec 7, Dec 8, Dec 9, Dec 10, Dec 11, Dec 12, Dec 13, Dec 14, Dec 15, Dec 16, Total K & J PROJECTS PVT. LTD. Page 24
27 Date Car, Passenger Van or Jeep Light Commercial Vehicle Truck/Bus Multi Axle Vehicle (>2 axle) Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount (Rs.) Dec 17, Dec 18, Dec 19, Dec 20, Dec 21, Dec 22, Dec 23, Dec 24, Dec 25, Dec 26, Dec 27, Dec 28, Dec 29, Dec 30, Dec 31, Total Total K & J PROJECTS PVT. LTD. Page 25
28 (D) Bar Code Traffic (From Dhule Plaza) Date Car, Passenger Van or Jeep Light Commercial Vehicle Truck/Bus Multi Axle Vehicle (>2 axle) Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount (Rs.) Total Dec 1, Dec 2, Dec 3, Dec 4, Dec 5, Dec 6, Dec 7, Dec 8, Dec 9, Dec 10, Dec 11, Dec 12, Dec 13, Dec 14, Dec 15, K & J PROJECTS PVT. LTD. Page 26
29 Date Car, Passenger Van or Jeep Light Commercial Vehicle Truck/Bus Multi Axle Vehicle (>2 axle) Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount (Rs.) Dec 16, Dec 17, Dec 18, Dec 19, Dec 20, Dec 21, Dec 22, Dec 23, Dec 24, Dec 25, Dec 26, Dec 27, Dec 28, Dec 29, Dec 30, Dec 31, Total Total K & J PROJECTS PVT. LTD. Page 27
30 Grand Total of Traffic & Collection (A+B+C+D) Date Car, Passenger Van or Jeep Light Commercial Vehicle Truck/Bus Multi Axle Vehicle (>2 axle) Grand Total Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount (Rs.) Dec 1, Dec 2, Dec 3, Dec 4, Dec 5, Dec 6, Dec 7, Dec 8, Dec 9, Dec 10, Dec 11, Dec 12, Dec 13, Dec 14, Dec 15, Dec 16, K & J PROJECTS PVT. LTD. Page 28
31 Date Car, Passenger Van or Jeep Light Commercial Vehicle Truck/Bus Multi Axle Vehicle (>2 axle) Grand Total Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount (Rs.) Dec 17, Dec 18, Dec 19, Dec 20, Dec 21, Dec 22, Dec 23, Dec 24, Dec 25, Dec 26, Dec 27, Dec 28, Dec 29, Dec 30, Dec 31, Total K & J PROJECTS PVT. LTD. Page 29
32 7.D - STATEMENT OF DAILY TRAFFIC & COLLECTION (Toll Plaza 2, Dhule) 1. Name of Work: IRCON-SOMA TOLLWAY PVT. LTD. 2. Date of commencement of fee collection : 19/04/2010 at 00:00 Hours 3. Report for month ending : December '2014 (A) Tolled Traffic & Collection (Cash) Date Car, Passenger Van or Jeep Light Commercial Vehicle Truck/Bus Multi Axle Vehicle (> 2 axle) Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount (Rs.) Total Dec 1, Dec 2, Dec 3, Dec 4, Dec 5, Dec 6, Dec 7, Dec 8, Dec 9, Dec 10, Dec 11, Dec 12, Dec 13, K & J PROJECTS PVT. LTD. Page 30
33 Date Car, Passenger Van or Jeep Light Commercial Vehicle Truck/Bus Multi Axle Vehicle (> 2 axle) Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount (Rs.) Dec 14, Dec 15, Dec 16, Dec 17, Dec 18, Dec 19, Dec 20, Dec 21, Dec 22, Dec 23, Dec 24, Dec 25, Dec 26, Dec 27, Dec 28, Dec 29, Dec 30, Dec 31, Total Total K & J PROJECTS PVT. LTD. Page 31
34 (B) Local Tolled Traffic & Collection (Through Smart cards) Date Car, Passenger Van or Jeep Light Commercial Vehicle Truck/Bus Multi Axle Vehicle (> 2 axle) Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount (Rs.) Total Dec 1, Dec 2, Dec 3, Dec 4, Dec 5, Dec 6, Dec 7, Dec 8, Dec 9, Dec 10, Dec 11, Dec 12, Dec 13, Dec 14, Dec 15, Dec 16, K & J PROJECTS PVT. LTD. Page 32
35 Date Car, Passenger Van or Jeep Light Commercial Vehicle Truck/Bus Multi Axle Vehicle (> 2 axle) Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount (Rs.) Dec 17, Dec 18, Dec 19, Dec 20, Dec 21, Dec 22, Dec 23, Dec 24, Dec 25, Dec 26, Dec 27, Dec 28, Dec 29, Dec 30, Dec 31, Total Total K & J PROJECTS PVT. LTD. Page 33
36 Total Tolled Traffic & Collection (A+B) Date Car, Passenger Van or Jeep Light Commercial Vehicle Truck/Bus Multi Axle Vehicle (> 2 axle) Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount (Rs.) Total Dec 1, Dec 2, Dec 3, Dec 4, Dec 5, Dec 6, Dec 7, Dec 8, Dec 9, Dec 10, Dec 11, Dec 12, Dec 13, Dec 14, Dec 15, Dec 16, K & J PROJECTS PVT. LTD. Page 34
37 Date Car, Passenger Van or Jeep Light Commercial Vehicle Truck/Bus Multi Axle Vehicle (> 2 axle) Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount (Rs.) Dec 17, Dec 18, Dec 19, Dec 20, Dec 21, Dec 22, Dec 23, Dec 24, Dec 25, Dec 26, Dec 27, Dec 28, Dec 29, Dec 30, Dec 31, Total Total K & J PROJECTS PVT. LTD. Page 35
38 (C) Exempted Traffic Date Car, Passenger Van or Jeep Light Commercial Vehicle Truck/Bus Multi Axle Vehicle (> 2 axle) Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount (Rs.) Dec 1, Dec 2, Dec 3, Dec 4, Dec 5, Dec 6, Dec 7, Dec 8, Dec 9, Dec 10, Dec 11, Dec 12, Dec 13, Dec 14, Dec 15, Dec 16, Total K & J PROJECTS PVT. LTD. Page 36
39 Date Car, Passenger Van or Jeep Light Commercial Vehicle Truck/Bus Multi Axle Vehicle (> 2 axle) Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount (Rs.) Dec 17, Dec 18, Dec 19, Dec 20, Dec 21, Dec 22, Dec 23, Dec 24, Dec 25, Dec 26, Dec 27, Dec 28, Dec 29, Dec 30, Dec 31, Total Total K & J PROJECTS PVT. LTD. Page 37
40 Barcode Traffic (From Chandwad Toll Plaza)(D) Date Car, Passenger Van or Jeep Light Commercial Vehicle Truck/Bus Multi Axle Vehicle (> 2 axle) Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount (Rs.) Total Dec 1, Dec 2, Dec 3, Dec 4, Dec 5, Dec 6, Dec 7, Dec 8, Dec 9, Dec 10, Dec 11, Dec 12, Dec 13, Dec 14, Dec 15, K & J PROJECTS PVT. LTD. Page 38
41 Date Car, Passenger Van or Jeep Light Commercial Vehicle Truck/Bus Multi Axle Vehicle (> 2 axle) Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount (Rs.) Dec 16, Dec 17, Dec 18, Dec 19, Dec 20, Dec 21, Dec 22, Dec 23, Dec 24, Dec 25, Dec 26, Dec 27, Dec 28, Dec 29, Dec 30, Dec 31, Total Total K & J PROJECTS PVT. LTD. Page 39
42 Grand Total of Traffic & Collection (A+B+C+D) Date Car, Passenger Van or Jeep Light Commercial Vehicle Truck/Bus Multi Axle Vehicle (> 2 axle) Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount (Rs.) Total Dec 1, Dec 2, Dec 3, Dec 4, Dec 5, Dec 6, Dec 7, Dec 8, Dec 9, Dec 10, Dec 11, Dec 12, Dec 13, Dec 14, Dec 15, Dec 16, K & J PROJECTS PVT. LTD. Page 40
43 Date Car, Passenger Van or Jeep Light Commercial Vehicle Truck/Bus Multi Axle Vehicle (> 2 axle) Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount (Rs.) Dec 17, Dec 18, Dec 19, Dec 20, Dec 21, Dec 22, Dec 23, Dec 24, Dec 25, Dec 26, Dec 27, Dec 28, Dec 29, Dec 30, Dec 31, Total Total K & J PROJECTS PVT. LTD. Page 41
44 Km to (Dhule Toll Plaza) 7.E - ROAD USER S COMPLAINT COMPLIANCE REPORT Sr. No. Complaint No. Complaint Date User Name Address Complaint Summary Complaint Reply Date Remark /12/2014 Smt.Shama Abdul Pinjari Sainath Shikshan Sanstha, Hill No.3, Jai Santoshi Mata Nagar, Ghatkopar (W), Mumbai-84 Regarding Toll Fee Exemption 04/12/2014 Letter posted on 4/12/ /12/2014 Shri.Brijeshsingh Rajput Address Not Mention Regarding Change N/A N/A /12/2014 Shri.Bacchasingh Rajput Address Not Mention Regarding Change N/A N/A /12/2014 Shri.Ashutosh Chudaman Patil /12/2014 Shri. Bhushan Nana Patil /12/2014 Mr.Tushar B Kasarle 254/1/5-3, Laxmi Nagar, Mehrun, Jalgaon Chopda ST Bus Depot, Chopda, Dist-Jalgaon Pincode Dhule Toll Plaza, Laing, Tal & Dist-Dhule Pincode Regarding Road Condition & Speed Breakers Regarding Rs 5 Change 27/12/2014 Regarding Misbehavior of Road User 17/12/ /12/ /12/2014 Letter posted on 31/12/2014 Letter posted on 31/12/ /12/2014 Shri.Rajesh Agrawal 402, Vikram Palace, Manish Puri, Saket, Indore (MP) Regarding Unavailability Diversion Board 27/12/2014 Letter posted on 31/12/ /12/2014 Shri.Avinash Pandit Shukla A/P, Varchegaon, Shirpur, Dist-Dhule Regarding Misbehavior of Booth Operator 31/12/2014 Letter posted on 31/12/2017 K & J PROJECTS PVT. LTD. Page 42
45 Km to (Chandwad Toll Plaza) Complaint Date 02/12/ /12/ /12/ /12/ /12/ /12/ /12/ /12/2014 User Name & Address Complaint Summary Complaint Reply Date Remark Shri.Mahendra N Suryavanshi, 13, Konarknagar Nashik-02 Shri.Waman Naguji Pawar, At Post & Tal : Talasari Dist: Palghar Shri. Abhishek Kumar, 602, Galaxy Apartment, Sector-20,Airoli Shri. Chugh Goridheri, Maharashtra Auto House, Sec-17, Sashri Chowk, Ulhasnagar-3 Shri.Girish P Vadnerkar, Dam Safety Organisation, Dindori Road, Meri campus, Nashik Shri.Yadav R.P, Sr.No.1, Siddhanathwadi, Wai Taluka -Satara Shri.Md.M.Zaid, Bombay Rajbhava, Raj Bhavan, Mumbai Shri.H.B.Lahat, Sub Divisional Officer, Public Works Division, Ahmadnagar Toll Fee 09/12/2014 Reg.Post Toll Fee 09/12/2014 Reg.Post Exemption 10/12/2014 Reg.Post Toll Fee 11/12/2014 Reg.Post Misbehavior & Toll Fee 12/12/2014 Reg.Post Exemption 14/12/2014 Reg.Post Exemption 20/12/2014 Reg.Post Toll Fee 20/12/2014 Reg.Post 16/12/ /12/ /12/ /12/2014 Shri. Uttamchandji, Gangarainji Jain(Sawala) Nagpur-Reshambag Chowk, Umrade Road,Nagpur Shri.Hari Khandu Pawar, At Post: Vadaliboi Tal: Chandwad, Dist: Nashik Shri. Nilesh M Nahar, Lodha Bhavan Satana Road, Malegaon, Dist: Nashik Shri. Prakash P Gosavi, Near Poornima Bus Stop Kalyan Toll Fee 20/12/2014 Reg.Post Maintenance of Road 30/12/2014 Reg.Post Toll Fee 31/12/2014 Reg.Post Maintenance of Road 31/12/2014 Reg.Post K & J PROJECTS PVT. LTD. Page 43
46 8. DETAILS OF ESCROW ACCOUNT K & J PROJECTS PVT. LTD. Page 44
47 K & J PROJECTS PVT. LTD. Page 45
48 K & J PROJECTS PVT. LTD. Page 46
49 K & J PROJECTS PVT. LTD. Page 47
MONTHLY (O&M) PROGRESS REPORT
NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Shipping, Road Transport & Highways) Government of India Improvement, Operation and Maintenance, Rehabilitation and Strengthening of Existing 2- Lane Road
More informationRef: As per Schedule-P, Volume-ll of Concession Agreement.
Plot No. 11, Shrirang Colony, NearA-one Petrol Pump, Old Agra Road, Deopur, Dhule 424005, Maharashtra, India. +91 +91 DHULE- PIMPALGAON (NH-3) BOT PROJECT K&J/DPN H/TL 201 5l o 2-5-
More informationHosur Krishnagiri Project Of NH-7
9. INSPECTION AND MONITORING OF THE CONSTRUCTION WORKS. PROGRESS UP TO 31 May 2015 1a. HIGHWAYS - MCW & Service Road Sl Description Unit Total Scope (Km) Completed Percentage achieved % 1 Clearing & Grubbing
More informationHosur Krishnagiri Project Of NH-7
. INSPECTION AND MONITORING OF THE CONSTRUCTION WORKS. PROGRESS UP TO 31st October 2014.1. a. HIGHWAYS - MCW & Service Road Sl Description Unit Total Scope (Km) Completed Percentage achieved % 1 Clearing
More informationHosur Krishnagiri Project Of NH-7
1. PROJECT LOCATION MAP: Monthly Progress Report September 2015 1 2. EXECUTIVE SUMMARY : Independent Engineering Service The Government of India (GOI) through Ministry of Shipping Road Transport & Highways
More informationROAD DEVELOPMENT PROJECTS IN KARANTAKA
ROAD DEVELOPMENT PROJECTS IN KARANTAKA August 2010 1 Road Development Projects in Karnataka Provide an integrated road network in the State with the following broad objectives: To make road connectivity
More informationProject Details. Description. 2 Commencement date of Concession 9 May Schedule Commencement date of O&M
Project Details NH-45 (popularly known as GST Road) is one of the important National Highways, which connects Chennai, the Capital City of Tamilnadu with the southern districts of the State, including
More informationHighway Drawings. Government of Maharashtra. Public Works Department
Government of Maharashtra Government of Maharashtra Construction of Two-laning Road with paved shoulders, under Package HAM-AU 108 in the State of Maharashtra, under MRIP on Hybrid Annuity Mode Package
More informationPCDO. Jan Launched portion of Viaduct Deck Structure from S-180 (KATRA- BANIHAL SECTION) Udhampur-Srinagar-Baramulla Rail Link Project
PCDO Jan-2018 Launched portion of Viaduct Deck Structure from S-180 (KATRA- BANIHAL SECTION) Udhampur-Srinagar-Baramulla Rail Link Project Northern Railway vuqjkx dqekj lpku vkbzvkj,lb Anurag Kumar Sachan
More informationNational Highways Authority of India (Ministry of Road Transport & Highways)
National Highways Authority of India (Ministry of Road Transport & Highways) ANNUITY PROJECT - NH 45 TAMBARAM TO TINDIVANAM (KM 28.000 TO KM 121.000) MONTHLY O&M REPORT MAY - 2018 INDEPENDENT ENGINEER
More informationIndian Highways. Emerging Opportunities for Profitable Partnership. Government of India. Ministry of Shipping, Road Transport & Highways
Conceived & Designed by New Ink Publications Pvt. Ltd. Indian Highways Emerging Opportunities for Profitable Partnership Government of India This brochure has been prepared by the Information Technology
More informationCase Study: Bangalore Elevated Tollway Limited, Bangalore
Case Study: Bangalore Elevated Tollway Limited, Bangalore Project Brief: Bangalore Elevated Tollway Limited (BETL) is the Special Purpose Vehicle (SPV) created to undertake the Construction, operation,
More informationSECTION DESCRPTIONS PAGE NOS.
Four Laning of Farakka Raiganj Section of NH -34 from Km 295.00 to Km 398.00 in the State of West Bengal under NHDP phase III on Design, Build, Finance, Operate SECTION DESCRPTIONS PAGE NOS. 1 Summary
More informationConsultancy Services for 6 Laning of Belgaum-Dharwad section of NH-4 (NHDP V/MC-II/BOT/DPR/19) Feasibility Report. Consulting Engineers Group Ltd 2-1
CHAPTER 1: INTRODUCTION Consulting Engineers Group Ltd 2-1 CHAPTER 1: INTRODUCTION TABLE OF CONTENTS 1.1 Project Background.. 1-1 1.2 Objectives of Consultancy Services. 1-2 1.3 Scope of Consultancy Services
More informationPresentation on URBAN TRANSPORTATION PLAN FOR MEERUT CITY. Presentation by: Meerut Development Authority
Presentation on URBAN TRANSPORTATION PLAN FOR MEERUT CITY Presentation by: Meerut Development Authority Meerut City An Overview Historical city - dating back to Ramayana and Mahabharata. In 1806 the cantonment
More informationSECTION DESCRPTIONS PAGE NOS.
Four Laning of Farakka Raiganj Section of NH -34 from Km 295.00 to Km 398.00 in the State of West Bengal under NHDP phase III on Design, Build, Finance, Operate SECTION DESCRPTIONS PAGE NOS. 1 Summary
More informationDate of Issue: For: County Engineer. County Road No.: Maintenance Area: Section Forman Payment Required: (Options: Cash Cheque Credit Card)
County of Wellington Engineering Services Department Roads Division 74 Woolwich Street Guelph, Ontario N1H 3T9 Phone: (519) 837-2601 Fax: (519) 837-8138 Email: roadsinfo@wellington.ca ENTRANCE PERMIT OWNER/APPLICANT
More informationNational Highways Authority of India (Ministry of Road Transport & Highways)
National Highways Authority of India (Ministry of Road Transport & Highways) Monthly Progress Report (MPR) March 2016 Independent Engineering Services for the work of four Laning of Tirupati- Tiruthani-Chennai
More information4.1 BROAD DESCRIPTION OF PROPOSED PROJECT
CHAPTER 4 PROJECT DESCRIPTION This chapter firstly provides a broad description of the proposed N2 Wild Coast Toll Highway, followed by a detailed description of the proposed construction activities that
More informationMONTHLY PROGRESS REPORT MAY-2014
ESSEL AHMEDABAD GODHRA TOLL ROADS LIMITED (A Special Purpose Vehicle of Essel Infra Projects Limited) FOUR LANING OF AHMEDABAD TO GODHRA SECTION OF NH- 59 FROM KM 4.200 TO KM 122.420 IN THE STATE OF GUJARAT
More informationMadhya Pradesh Road Development Corporation: A Case Study of ADB Assistance for Institutional Development in the Transport Sector in India
Madhya Pradesh Road Development Corporation: A Case Study of ADB Assistance for Institutional Development in the Transport Sector in India South Asia Transport Team Presented by Prodyut Dutt Asian Development
More informationAPPENDIX A Basis of Design and Design Criteria Memorandum
APPENDIX A Basis of Design and Design Criteria Memorandum Job No: Y01-500 Files are stored in: Engineering / Client / Yolo/Y01500 Buckeye and Rumsey/Rumsey CR 41 over Cache Creek, CAD files stored in:
More informationMotorways Route in Thailand. Sustainable Highway Design
Motorways Route in Thailand 2 2 Development of Highway Community Speed decreased Open Highway At Grade Median Opening Settlements along the highway (Ribbon Development) Non Control Access or Partial Control
More informationThis section is illustrated in Figure The length of this section is approximately 24.5 km.
4.2.5 Section 5: Ntafufu River to Lusikisiki (Magwa Intersection) This section is illustrated in Figure 4.19. The length of this section is approximately 24.5 km. It is proposed to upgrade and rehabilitate
More information800 Access Control, R/W Use Permits and Drive Design
Table of Contents 801 Access Control... 8-1 801.1 Access Control Directives... 8-1 801.2 Access Control Policies... 8-1 801.2.1 Interstate Limited Access... 8-1 801.2.2 Limited Access... 8-1 801.2.3 Controlled
More informationULUNDURPET EXPRESSWAYS PRIVATE LIMITED
UEPL ULUNDURPET EXPRESSWAYS PRIVATE LIMITED MONTHLY O&M REPORT JANUARY 2017 Submitted to: NATIONAL HIGHWAYS AUTHORITY OF INDIA Ulundurpet Expressways Pvt. Ltd. Monthly O&M Report Contents Page No 1. Executive
More informationSchedule 18 (Technical Requirements) DBFO Agreement EXECUTION VERSION APPENDIX B - SELECT DEPARTMENT STANDARD DRAWINGS AND REFERENCE TABLES
Schedule (Technical Requirements) DBFO Agreement EXECUTION VERSION APPENDIX B - SELECT DEPARTMENT STANDARD DRAWINGS AND REFERENCE TABLES Schedule (Technical Requirements) DBFO Agreement EXECUTION VERSION
More informationChapter III Geometric design of Highways. Tewodros N.
Chapter III Geometric design of Highways Tewodros N. www.tnigatu.wordpress.com tedynihe@gmail.com Introduction Appropriate Geometric Standards Design Controls and Criteria Design Class Sight Distance Design
More informationDRIVEWAY DESIGN AND CONSTRUCTION GUIDELINES
DRIVEWAY DESIGN AND CONSTRUCTION GUIDELINES These guidelines are provided to assist you in the construction of your driveway to help you determine: The best location on your property. What you need to
More informationULUNDURPET EXPRESSWAYS PRIVATE LIMITED MONTHLY O&M REPORT JANUARY Submitted to:
UEPL ULUNDURPET EXPRESSWAYS PRIVATE LIMITED MONTHLY O&M REPORT JANUARY 2016 Submitted to: NATIONAL HIGHWAYS AUTHORITY OF INDIA & CDM SMITH INDIA PRIVATE LIMITED Ulundurpet Expressways Pvt. Ltd. Monthly
More informationCORRIGENDUM # 1. Rate Cotnract for Hiring ofvehicle for CNG, PNG and Other Activities TENDER NO: IGL/ND/C&P/CM15118
CORRIGENDUM # Rate Cotnract for Hiring ofvehicle for CNG, PNG and Other Activities TENDER NO: IGL/ND/C&P/CM8 Sr. No. Description Clause/ Para/ Section Amendment/Addition/Modification/Deletion Comemrcial
More informationDISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (15-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual
DISTRIBUTION: Electronic Recipients List MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards Unit ISSUED BY: Office of Project Management and Technical Support TRANSMITTAL LETTER NO.
More informationIntroduction to geometric design
Chapter 11 Introduction to geometric design 11.1 Overview The geometric design of highways deals with the dimensions and layout of visible features of the highway. The emphasis of the geometric design
More informationPARAPETS / RAILS / MEDIANS / SIDEWALKS TABLE OF CONTENTS CHAPTER 25
TABLE OF CONTENTS CHAPTER 25 FILE NO. TITLE DATE TABLE OF CONTENTS AND INTRODUCTION 25.TOC-1 Table of Contents Chapter 25... 08Aug2018 25.00 Introduction Chapter 25... 03May2018 VDOT STANDARD PARAPETS
More informationThe Design-Builder shall meet local road criteria provided by the local governing agencies.
11 ROADWAYS 11.1 General The -Builder shall conduct all Work necessary to meet the requirements of roadways. Roadway classifications include mainline, acceleration lanes, deceleration lanes, auxiliary
More informationVALLIAMMAI ENGINEERING COLLEGE SRM Nagar, Kattankulathur DEPARTMENT OF CIVIL ENGINEERING SUBJECT NAME: HIGHWAY ENGINEERING
VALLIAMMAI ENGINEERING COLLEGE SRM Nagar, Kattankulathur 603 203 DEPARTMENT OF CIVIL ENGINEERING SUBJECT CODE: CE6504 SUBJECT NAME: HIGHWAY ENGINEERING YEAR: III SEM : V QUESTION BANK (As per Anna University
More informationMDOT Load Rating Program
Presentation Outline FHWA Audit & Action Plan Prioritization list Announcements and updates Bridge load rating assistance program Virtis load rating software MDOT Load Rating Program 2009 FHWA Audit, Final
More informationChapter III Geometric design of Highways. Tewodros N.
Chapter III Geometric design of Highways Tewodros N. www.tnigatu.wordpress.com tedynihe@gmail.com Introduction Appropriate Geometric Standards Design Controls and Criteria Design Class Sight Distance Design
More informationDRIVEWAY STANDARDS EXHIBIT A. The following definition shall replace the definition of driveway in Section 62:
1365 S. Camino del Rio Durango, CO 81303 970-382-6363 DRIVEWAY STANDARDS Resolution 2014-40 EXHIBIT A The following definition shall replace the definition of driveway in Section 62: Driveway means a roadway,
More informationThe project faces a number of challenges:
On-Track Light Rail Project The Ministry of Transport of the city of Gotham is proposing to construct an elevated 20- kilometer light rail transit (LRT) with 5 passenger stations, connecting several nearby
More informationPlease Read Carefully
Please Read Carefully Name Address Address Address ANNE BRERETON DIRECTOR FOR PLACES Central Depot, Moat Lane Solihull West Midlands B91 2LW Tel: 0121 704 6103 Fax:0121 704 8162 Email: jwilkins@solihull.gov.uk
More informationARTICLE 8 OFF-STREET PARKING AND PRIVATE DRIVEWAY STANDARDS
ARTICLE 8 OFF-STREET PARKING AND PRIVATE DRIVEWAY STANDARDS TABLE OF CONTENTS SECTION PAGE 8.1 GENERAL STANDARDS...8-2 8.2 PRIVATE DRIVEWAY PROVISIONS...8-4 8.3 OFF-STREET PARKING STANDARDS...8-5 8.4 OFF-STREET
More informationJanuary 13, 2012 AACE Annual Meeting, Wickenburg, AZ. I-15 in Arizona. Its Past, Present, and Future
January 13, 2012 AACE Annual Meeting, Wickenburg, AZ I-15 in Arizona. Its Past, Present, and Future Jean A. Nehme, Ph.D., P.E. State Bridge Engineer, ADOT Presentation Overview Location, History, and Photographs
More informationAlberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999
&+$37(5Ã)Ã Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999 &+$37(5) 52$'6,'()$&,/,7,(6 7$%/(2)&217(176 Section Subject Page Number Page Date F.1 VEHICLE INSPECTION STATIONS... F-3 April
More informationComparison of T-Beam Girder Bridge with Box Girder Bridge for Different Span Conditions.
The International Journal of Engineering and Science (IJES) ISSN (e): 2319 1813 ISSN (p): 23-19 1805 Pages PP 67-71 2018 Comparison of T-Beam Girder Bridge with Box Girder Bridge for Different Span Conditions.
More informationAppendix F-1 Description of the Long-Term Alternatives
Appendix F-1 Description of the Long-Term Alternatives Memorandum Page 1 of 21 Project No. 9309 Phase 280 Date June 2, 2015 From Chris Sidlar (LEA) To Edward Presta / City of Toronto C.C. Terry Wallace
More informationCATEGORY 500 PAVING SECTION 535 PAVEMENT SURFACE PROFILE
CATEGORY 500 PAVING 1 of 9 SECTION 535.01 DESCRIPTION. This work shall consist of measuring the roughness of the final surface of hot mix asphalt (HMA) or portland cement concrete (PCC) pavements. The
More informationSano Milti Khola Hydropower Project, Fulasi VDC, Ramechhap (3 MW)
Sano Milti Khola Hydropower Project, Fulasi VDC, Ramechhap (3 MW) Monthly Progress Report Prepared by : Sano Milti Khola Hydropower Limited www.smi.com.np smi.investment.limited@gmail.com Date : June,
More informationTransportation Improvement Program (TIP) Candidate Project List for Public Review
2011-2014 Transportation Improvement Program (TIP) Candidate List for Public Review Table 1 Annual Listing Of Federal Aid Obligation For Federal Fiscal Year 2010 North Dakota s Number Transit 410083 Transit
More informationTEMPLATE OF THE NATIONAL REPORT
TEMPLATE OF THE NATIONAL REPORT TO BE PRESENTED BY EACH DELEGATION DURING THE ASECAP STUDY AND INFORMATION DAYS PARIS, 29-31 MAY 2017 Network length The total length of the Polish Motorways network as
More informationEXCEPTION TO STANDARDS REPORT
EXCEPTION TO STANDARDS REPORT PROJECT DESCRIPTION AND NEED The project is located in Section 6, Township 23 North, Range 9 East and Section 31 Township 24 North, Range 9 East, in the Town of Stockton,
More informationTRAFFIC ENGINEERING ASSESSMENT MOUNT EDEN ROAD, MOUNT EDEN
12 September 2017 Iain McManus Civitas Planning Consultants PO Box 47020 Ponsonby AUCKLAND 1144 Dear Iain, TRAFFIC ENGINEERING ASSESSMENT 43-45 45 MOUNT EDEN ROAD, MOUNT EDEN As requested, we have prepared
More information2 Min. Min. Edge of. Edgeline See Note 3 PLAN VIEW. See Note 3. This distance may vary
8" Physical gore ( ) ( ) 250 Varies 250 TYPICAL RUMBLE STRIP PLACEMENT AT EXIT AND ENTRANCE RAMPS This distance may vary This distance may vary ( ) 2 16" edge of R=12" Max ( ) Physical gore Texturing 1.
More informationGEOMETRIC ALIGNMENT AND DESIGN
GEOMETRIC ALIGNMENT AND DESIGN Geometric parameters dependent on design speed For given design speeds, designers aim to achieve at least the desirable minimum values for stopping sight distance, horizontal
More informationTRANSMISSION LICENCE NO. 1 OF 2011 LICENCE FOR TRANSMISSION OF ELECTRICITY IN THE STATE OF MAHARASHTRA
MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th floor, Cuffe Parade, Mumbai - 400 005. Tel. No. 022 22163964/65/69 Fax 022 22163976 E-mail mercindia@mercindia.org.in
More informationAnalysis of Design of a Flexible Pavement with Cemented Base and Granular Subbase
Volume-5, Issue-4, August-2015 International Journal of Engineering and Management Research Page Number: 187-192 Analysis of Design of a Flexible Pavement with Cemented Base and Granular Subbase Vikash
More informationECONOMIC AND FINANCIAL ANALYSIS
Second Jharkhand State Road Project (RRP IND 49125) ECONOMIC AND FINANCIAL ANALYSIS A. Introduction 1. The project involves capacity augmentation and rehabilitation of four state highway sections in the
More informationODOT District Two Monthly Construction Update
Ohio Department of Transportation Construction Update DISTRICT 2 KIRK SLUSHER, P.E., ACTING DEPUTY DIRECTOR 317 East Poe Rd. Bowling Green, Ohio 43402-1330 www.transportation.ohio.gov/dist2 ODOT District
More informationRURAL ROAD MAINTENANCE PROGRAM GUIDELINES
RURAL ROAD MAINTENANCE PROGRAM GUIDELINES April 2015 Contents: Overview:.. 1 Policy Goals and Objectives:... 1 Definitions:.. 1 Program Requirements:. 2 Road Standards and Specifications: 3 Right-of-Way:....
More informationCity of Grand Forks Staff Report
City of Grand Forks Staff Report Service/Safety Committee December 15, 2015 City Council December 21, 2015 Agenda Item: Amendment No. 1 to Engineering Services Agreement with CPS for City Project No. 7143,
More informationAmerican Association of State Highway and Transportation Officials. June Dear Customer:
American Association of State Highway and Transportation Officials John R. Njord, President Executive Director Utah Department of Transportation John Horsley Executive Director June 2004 Dear Customer:
More informationCHAPTER 2 ZONING AND DEVELOPMENT
2.200 GENERAL DEVELOPMENT STANDARDS CHAPTER 2 ZONING AND DEVELOPMENT Section 2.201 GENERAL PROVISIONS... 2.2-1 Section 2.202 FENCES AND VISIONS CLEARANCE... 2.2-2 2.202.01 Fences... 2.2-2 2.202.02 Vision
More informationFREQUENTLY ASKED QUESTIONS
THE PROJECT Last updated on 2/19/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on
More informationFREQUENTLY ASKED QUESTIONS
THE PROJECT Last updated on 9/8/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on
More informationARAI/TA(4G)/SMS/D680/ Dated 28 Jan 2010
CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES M/s SMS Autoline Equipments Pvt. Ltd. Plot No.AP215, 6 th Street I Block, Vallalar Colony, Anna Nagar (West) Chennai 600 040 Cert Annex Drg
More informationPARAPETS / RAILS / MEDIANS / SIDEWALKS TABLE OF CONTENTS CHAPTER 25
TABLE OF CONTENTS CHAPTER 25 FILE NO. TITLE DATE TABLE OF CONTENTS AND INTRODUCTION 25.TOC-1 Table of Contents Chapter 25... 28Dec2016 25.00 Introduction Chapter 25... 28Dec2016 VDOT STANDARD PARAPETS
More informationReport Date: May 18, 2012 Contact: Al Zacharias Contact No.: RTS No.: 9587 VanRIMS No.: Meeting Date: June 12, 2012
A5 ADMINISTRATIVE REPORT Report Date: May 18, 2012 Contact: Al Zacharias Contact No.: 604.873.7214 RTS No.: 9587 VanRIMS No.: 08-2000-21 Meeting Date: June 12, 2012 TO: FROM: SUBJECT: Vancouver City Council
More information5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES
5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES 5.1 INTRODUCTION This chapter of the TMP presents an opinion of probable cost estimates for the proposed Horizon Year roadway network improvements
More informationTo: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015
Memo To: From: Adrian Soo, P. Eng. Markham, ON : 165620021 Date: Reference: E.C. Row Expressway, Dominion Boulevard Interchange, Dougall Avenue Interchange, and Howard 1. Review of Interchange Geometry
More informationW&OD TRAIL BRIDGE OVER LEE HIGHWAY I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237)
W&OD TRAIL BRIDGE OVER LEE HIGHWAY A COMPONENT OF THE I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237) October 11, 2018 Bill Cuttler, PE
More informationODOT District Two Monthly Construction Update
Ohio Department of Transportation Construction Update DISTRICT 2 KIRK SLUSHER, P.E., ACTING DEPUTY DIRECTOR 317 East Poe Rd. Bowling Green, Ohio 43402-1330 www.transportation.ohio.gov/dist2 ODOT District
More informationDriveway Entrance Policy for Residential Properties - District 3 - All Wards
Driveway Entrance Policy for Residential Properties - District 3 - All Wards (City Council on August 1, 2, 3 and 4, 2000, adopted this Clause, without amendment.) The North York Community Council recommends
More informationPLEASE SUBMIT THE CORRECT PERMIT FEE WITH PAGES 1 & 3 OF APPLICATION TO: OCONTO COUNTY HIGHWAY DEPT, P.O. BOX 138, OCONTO, WI 54153
PLEASE SUBMIT THE CORRECT PERMIT FEE WITH PAGES 1 & 3 OF APPLICATION TO: OCONTO COUNTY HIGHWAY DEPT, P.O. BOX 138, OCONTO, WI 54153 APPLICATION/PERMIT TO INSTALL ACCESS DRIVEWAY TO A COUNTY TRUNK HIGHWAY
More informationGuidelines for Retro-fitting Existing Roads to Optimise Safety Benefits. A Practitioners Experience and Assessment of Options for Improvement.
Guidelines for Retro-fitting Existing Roads to Optimise Safety Benefits. A Practitioners Experience and Assessment of Options for Improvement. Author: Stephen Levett, Manager, Safer Roads Policy, Standards
More informationARAI/TA(4G_RV)/HORIBA/MEXA 584L/ Dated 25 Mar 2014
CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES M/s Horiba India Pvt. Ltd. Room 1521, 15 th Floor, Eros Corporate Tower, Nehru Place New Delhi 110 019 Cert Annex Drg Total 1 7 0 8 pgs Exhaust
More informationRoad Accident Prediction for Nashik City
Road Accident Prediction for Nashik City V.S. Aher 1, K.H. Ahirrao 2, M.R. Gaikar 3, S.S. Surve 4, R.R. Kshatriya 5 1 to 4 UG Student, Department of Civil Engineering, Matoshri College of Engineering and
More informationBRIEF ACHIEVEMENTS AND INITIATIVES OF SIKKIM NATIONALISED TRANSPORT (SNT) (TILL DECEMEBR 2015)
TRANSPORT DEPARTMENT GOVERNMENT OF SIKKIM YATAYAT BHAWAN, DEVELOPMENT AREA GANGTOK 737101 Ph. No.: 03592-202483(O), 03592-203483(R), Fax No. 03592-203418 Email: secytransport@gmail.com BRIEF ACHIEVEMENTS
More informationINFRASTRUCTURE AND TRANSPORTATION ADVERTISING SCHEDULE 2015/2016 CONSTRUCTION AND MATERIAL SUPPLY TENDERS
INFRASTRUCTURE AND TRANSPORTATION ADVERTISING SCHEDULE 2015/2016 CONSTRUCTION AND MATERIAL SUPPLY TENDERS Manitoba Infrastructure and Transportation Contract Services Branch 1630-215 Garry Street Winnipeg,
More informationARAI/TA(4G_RV)/SMS/D680/ Dated 21 st Mar 2015 CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES
CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES M/s SMS Autoline Equipments Pvt. Ltd. Plot No.AP215, 6 th Street, I Block, Vallalar Colony, Anna Nagar (West) Chennai 600 040 Cert Annex Drg
More information2 MAJOR MACKENZIE DRIVE WEST JOG ELIMINATION AT HUNTINGTON ROAD CITY OF VAUGHAN
2 MAJOR MACKENZIE DRIVE WEST JOG ELIMINATION AT HUNTINGTON ROAD CITY OF VAUGHAN The Transportation Services Committee recommends the adoption of the recommendations contained in the following report dated
More informationEMERGING REQUIREMENTS
Page of 0 EMERGING REQUIREMENTS EXTERNALLY INITIATED PLANT RELOCATIONS THESL distributes electricity to residential, commercial, and industrial customers via overhead and underground infrastructure. This
More informationTulsa Transportation Management Area. Urbanized Area Surface Transportation Program
Tulsa Transportation Management Area Urbanized Area Surface Transportation Program FFY 2022 Application Information Sponsor Location Description STP Request Other Funds Broken Arrow Elm Place: Kenosha
More informationPERMIT FOR INSTALLATION ON COUNTY RIGHTS-OF-WAY: ACCESS DRIVEWAYS RESIDENTIAL
PERMIT FOR INSTALLATION ON COUNTY RIGHTS-OF-WAY: ACCESS DRIVEWAYS RESIDENTIAL Submit To Martin County Judge s Office P.O. Box 1330 Stanton Texas 79782-1330 mhernandez@co.martin.tx.us APPLICATION: Permittee
More informationAmended DRIVEWAY ORDINANCE TOWN OF CLIFTON
Amended 2007-02 DRIVEWAY ORDINANCE TOWN OF CLIFTON SECTION 1. Purpose The purpose of this ordinance is to regulate the location, design and construction of driveways within the Town of Clifton, Pierce
More informationAASHTO Policy on Geometric Design of Highways and Streets
AASHTO Policy on Geometric Design of Highways and Streets 2001 Highlights and Major Changes Since the 1994 Edition Jim Mills, P.E. Roadway Design Office 605 Suwannee Street MS-32 Tallahassee, FL 32399-0450
More informationDRIVEWAY/APPROACH PERMIT APPLICATION Applicant Type: Architect/Engineer Contractor Owner
DRIVEWAY/APPROACH PERMIT APPLICATION Applicant Type: Architect/Engineer Contractor Owner Lake Elmo City Hall 651-747-3900 3880 Laverne Avenue North Lake Elmo, MN 55042 Project Address: Property Owner:
More informationSteps Followed :- Support Required From LFS :- 1. To study electrical bill and electrical items in use at entire school
Project :- Saving of Electrical Energy at Little Flower School ( LFS ), Jamshedpur, India to reduce generation of Green House gases and electric power. Part B Steps Followed :- 1. To study electrical bill
More informationEMERGENCY ACCESS POLICY
Cowlitz 2 Fire & Rescue Policies and Operating Guidelines Policy: EMERGENCY ACCESS POLICY Number Effective Date Approved and Issued: 4001 8/28/02 8/28/02 1.0 REFERENCE 23 CFR Part 650 Subpart C Code of
More informationJanice Fortunato Senior Director Business Partnerships
Janice Fortunato Senior Director Business Partnerships What are Megaprojects? They are large-scale projects distinguished by cost, complexity and the potential impact on the community. Collectively, these
More informationACTION TRANSMITTAL No
Transportation Advisory Board of the Metropolitan Council of the Twin Cities DATE: January 4, 2016 TO: ACTION TRANSMITTAL No. 2016-19 TAC Funding and Programming Committee PREPARED BY: Joe Barbeau, Senior
More informationTransportation Highway Engineering Conference February 24, 2015
Transportation Highway Engineering Conference February 24, 2015 Today s Agenda Move Illinois status Jane Addams Memorial (I-90) Rebuilding and Widening Project Building a 21 st century corridor Incorporating
More informationGeometric Design Elements to Reduce Wrong-Way (WW) Entry at Freeway Interchanges Hugo Zhou, Ph.D., P.E.
Geometric Design Elements to Reduce Wrong-Way (WW) Entry at Freeway Interchanges Hugo Zhou, Ph.D., P.E. Department of Civil Engineering Auburn University March, 2017 Why People Drive Wrong-way? WW Entry:
More informationLAHORE RING ROAD SOUTHERN LOOP LAHORE RING ROAD PROJECT COMMUNICATION & WORKS DEPARTMENT GOVERNMENT OF THE PUNJAB PROJECT MANAGEMENT UNIT
COMMUNICATION & WORKS DEPARTMENT GOVERNMENT OF THE PUNJAB LAHORE RING ROAD PROJECT PROJECT MANAGEMENT UNIT LAHORE RING ROAD SOUTHERN LOOP February 22, 2011 NATIONAL ENGINEERING SERVICES PAKISTAN (PVT)
More information[Insert name] newsletter CALCULATING SAFETY OUTCOMES FOR ROAD PROJECTS. User Manual MONTH YEAR
[Insert name] newsletter MONTH YEAR CALCULATING SAFETY OUTCOMES FOR ROAD PROJECTS User Manual MAY 2012 Page 2 of 20 Contents 1 Introduction... 4 1.1 Background... 4 1.2 Overview... 4 1.3 When is the Worksheet
More informationDESIGN AND COMPARISION OF FLEXIBLE AND RIGID PAVEMENTS
DESIGN AND COMPARISION OF FLEXIBLE AND RIGID PAVEMENTS V Swathi Padmaja 1, A. Tejaswi 2 1,2Assistant Professor, Andhra Loyola Institute of engineering and Technology, A.P, India ---------------------------------------------------------------------***----------------------------------------------------------------------
More informationEngineering Dept. Highways & Transportation Engineering
The University College of Applied Sciences UCAS Engineering Dept. Highways & Transportation Engineering (BENG 4326) Instructors: Dr. Y. R. Sarraj Chapter 4 Traffic Engineering Studies Reference: Traffic
More informationECONOMIC AND FINANCIAL ANALYSIS
Second Rural Connectivity Investment Program (RRP IND 48226-002) ECONOMIC AND FINANCIAL ANALYSIS 1. The Second Rural Connectivity Investment Program (the investment program) will build or upgrade about
More informationMoraga-Orinda Fire District
Moraga-Orinda Fire District Fire Prevention Division Subject: Fire Apparatus Access Roads Approved by: Fire Marshal Kathy Leonard Reference: CFC 2016, MOFD Ordinance 16-02 Standard Number: 2016.503 Effective
More informationWELLINGTON, NEW ZEALAND. PURSUANT to Section 152 of the Land Transport Act I, Harry James Duynhoven, Minister for Transport Safety,
WELLINGTON, NEW ZEALAND PURSUANT to Section 152 of the Land Transport Act 1998 I, Harry James Duynhoven, Minister for Transport Safety, HEREBY make the following ordinary Rule: Land Transport Rule: Setting
More informationSTUDY OF GEOMETRIC FEATURES OF ROAD AND ACCIDENT RATE. A Thesis Submitted in Partial Fulfilment of the Requirements for the Award of the Degree of
STUDY OF GEOMETRIC FEATURES OF ROAD AND ACCIDENT RATE A Thesis Submitted in Partial Fulfilment of the Requirements for the Award of the Degree of Bachelor of Technology In CIVIL ENGINEERING Submitted by
More information