This section is illustrated in Figure The length of this section is approximately 24.5 km.

Size: px
Start display at page:

Download "This section is illustrated in Figure The length of this section is approximately 24.5 km."

Transcription

1 4.2.5 Section 5: Ntafufu River to Lusikisiki (Magwa Intersection) This section is illustrated in Figure The length of this section is approximately 24.5 km. It is proposed to upgrade and rehabilitate the existing R61 between Ntafufu and Lusikisiki (approximately 18 km) to national road standards by improving the design speed and safety of this section. Where necessary and feasible, climbing lanes would be added and the road cross-section widened. The proposed toll highway would follow the existing concrete road (DR 08024) through the outskirts of Lusikisiki up to the Magwa Intersection (a distance of approximately 5 km). The existing concrete road would be widened to a dual carriageway (see Plate 4.10) while accesses such as the Magwa Intersection would be upgraded to acceptable standards. A grade-separated interchange would be constructed in the vicinity of the current R61/DR Intersection to provide access to the Lusikisiki CBD (see Figure 4.20). Plate 4.10: The existing concrete road to Magwa would be upgraded to a dual carriageway Rehabilitation activities would also include resealing and resurfacing of the road, replacement of guard rails, signage and road markings, provision and maintenance of fencing along the length of the road, provision of pedestrian walkways, where required, construction of over- and/or underpasses for local accessibility and provision of safety features (e.g. lighting), where required. A detailed description of the proposed construction activities for the road section between the Ntafufu River and Lusikisiki (Magwa Intersection) is provided in Table 4.5. CCA Environmental (Pty) Ltd 4-14 December 2009

2 Table 4.5: Proposed construction activities for the road section between the Ntafufu River and Lusikisiki (Magwa Intersection) ROAD SECTION Ntafufu River to Lusikisiki (Magwa Intersection) (24.5 km) DESIGN SPEED (km/h) WORK LAST UNDERTAKEN Original construction in 1993/1995. Concrete road Lusikisiki to Magwa turnoff (5 km) in PROPOSED CONSTRUCTION ACTIVITIES Upgrade pass to a minimum design speed of 60 km/h, widen and realign as required. Construction of climbing lanes, where required. Widening of road cross-section, where required (see Figure 4.21). Widening of the Mzintlava River bridge. Construction of four-lane undivided road through Lusikisiki. Construction of Lusikisiki Interchange. Upgrading of Magwa Intersection. Safety features such as over and underpasses, improved intersections, fencing, road signs and guard rails Section 6: Lusikisiki (Magwa Intersection) to Mthamvuna River This section is illustrated in Figure 4.22 and would involve the construction of a new road to national road standards. The length of this section is approximately 73.5 km. The first 12.5 km of the proposed N2 toll highway would essentially follow the horizontal alignment of DR Thereafter the proposed new road would be diverted from the DR alignment and would follow a proposed greenfields alignment up to the Mthamvuna River bridge (see Plates 4.11 to 4.16). The alternative alignments between Lusikisiki and the Mthamvuna River being considered during this phase of the EIA process are presented in Chapter 5 and assessed in Part C, Chapter 12. A number of deeply incised gorges and minor streams would be crossed. The gorges, some in the order of 200 to 300 m deep, include, amongst others, the Msikaba, Mthentu and Mzamba River gorges. The Msikaba (see Plate 4.11) and Mthentu (see Plate 4.13) gorge crossings would most probably involve high-level suspension, cable-stayed or arch bridges while the other gorges would be crossed with more conventional concrete structures. A new grade-separated interchange is proposed in the vicinity of the Wild Coast Sun Casino where the proposed new toll highway would intersect the existing R61 (see Figure 4.23). The proposed route would then join the existing R61 before crossing the Mthamvuna River on the existing CH Mitchell bridge, the only major existing crossing of the Mthamvuna River (Plate 4.16). Intersections (future interchanges) are proposed at all locations where the proposed new N2 toll highway between Lusikisiki and the Mthamvuna River would cross existing district roads. These include DR 08141, Mkamela access road, Holy Cross/Mkambati road, DR (several times) and the Amadiba access road. Other construction activities would include the erection of guard rails and signage, provision and maintenance of fencing along the length of the road, provision of pedestrian walkways, where required, construction of over- and/or underpasses for local accessibility and provision of safety features (e.g. lighting), where required. CCA Environmental (Pty) Ltd 4-15 December 2009

3 Plate 4.11: The location of the proposed high-level suspension, cable-stayed or arch bridge across the Msikaba gorge Plate 4.12: Affected area along the proposed alignment close to the KwaDlambu River CCA Environmental (Pty) Ltd 4-16 December 2009

4 Plate 4.13: The location of the proposed high-level suspension, cable-stayed or arch bridge across the Mthentu gorge Plate 4.14: Affected area along the proposed alignment between the Mthentu and Mnyameni rivers CCA Environmental (Pty) Ltd 4-17 December 2009

5 Plate 4.15: Affected area along the proposed route close to the Mpahlane River crossing Plate 4.16: The existing CH Mitchell bridge across the Mthamvuna River CCA Environmental (Pty) Ltd 4-18 December 2009

6 A detailed description of the proposed construction activities per road section between Lusikisiki (Magwa Intersection) and the Mthamvuna River is provided in Table 4.6. Table 4.6: Proposed construction activities per road section between Lusikisiki (Magwa Intersection) and the Mthamvuna River ROAD SECTION Lusikisiki (Magwa Intersection) to Msikaba River (19.5 km); new road section Msikaba River to Mthentu River (22 km); new road section Mthentu River to Mthamvuna River (33 km); new road section DESIGN SPEED (km/h) WORK LAST UNDERTAKEN DR re-gravelled to Msikaba River mouth in PROPOSED CONSTRUCTION ACTIVITIES New road construction on alignment of existing district road up to Msikaba Village, new frontage and feeder roads. New greenfields construction from Msikaba Village to Msikaba Gorge on a preferred alignment. High-level bridge crossing over Msikaba River. Safety features such as over- and underpasses, improved and new intersections, fencing, road signs and guard rails. 120 New road construction on a preferred alignment. Bridge crossing over the Kwadlambu River. High-level bridge crossing over the Mthentu River. Safety features such as over- and underpasses, new intersections, fencing, road signs and guard rails Last 2 km on R61 constructed New road construction on a preferred alignment. New R61 Interchange (Mthamvuna Interchange). Construction of high-level bridge structures across the Mnyameni, Kulumbe, Mpahlane and Mzamba Rivers. Maintenance and rehabilitation of the existing Mthamvuna River bridge. Safety features such as over- and underpasses, new intersections, fencing, road signs and guard rails. SANRAL s preferred Toll Plaza locality It is proposed to construct a mainline toll plaza in the greenfields section north of the Mthentu River crossing the Mthentu Toll Plaza (see Figure 4.24). An alternative locality for a toll plaza in this section has been identified, namely in the vicinity of the proposed intersection with the Holy Cross/Mkambati road (refer to Figure 4.22 and Section 5.5) Section 7: Mthamvuna River to Isipingo Interchange This section is illustrated in Figure 4.25, while Figure 4.26 provides a detailed illustration of the section between Pennington and Durban. The length of this section is approximately 148 km and would involve the rehabilitation and upgrading of the existing R61/N2. This section includes the existing N2 South Coast Toll Road. The existing R61/N2 between the Mthamvuna River and Southbroom Interchange (approximately 22 km) is currently considered to be in a good condition as it was rehabilitated in 2003/4. However, this section of road is characterised by frequent access points which currently serve a number of holiday resorts and the more rural areas of KwaZulu-Natal. In order to improve road-user safety, it is proposed that some of the current at-grade intersections are upgraded to grade-separated interchanges. Amongst others, these would include the Port Edward and Southbroom intersections. The section of the existing N2 South Coast Toll Road between Southbroom and Hibberdene (approximately 50 km) is considered to be in a good condition and proposed construction activities relate CCA Environmental (Pty) Ltd 4-19 December 2009

7 mostly to safety aspects, such as fencing. The section between Hibberdene and Winklespruit (approximately 61 km) is considered to be in fair to good condition and proposed construction activities would include minor rehabilitation and resurfacing of selected portions, as most of this section has been resurfaced in the recent past. The existing N2 between Winklespruit, Amanzimtoti and the Isipingo Interchange (approximately 15 km) is currently in a fair condition. This section would be widened (capacity has been exceeded) and rehabilitated. An additional lane and paved shoulder would be added in each direction between Amanzimtoti River bridge and the Isipingo Interchange while a further lane would be added in each direction between Dickens Road and Joyner Road interchanges. The sub-standard Adams Road Interchange would be completely reconstructed while a number of overpass bridges would be demolished and reconstructed due to insufficient vertical and/or horizontal clearances. The additional lanes would alleviate current and anticipated future traffic congestion by way of restoring the required LOS. Other construction activities would include resurfacing of the road, replacement of guard rails, signage and road markings, provision and maintenance of fencing along the length of the road and provision of safety features (e.g. lighting, where required). All construction activities would occur within the existing road reserve, with the exception of the Adams Road Interchange and the proposed mainline toll plazas at Park Rynie and Isipingo. A detailed description of the proposed construction activities per road section between the Mthamvuna River and the Isipingo Interchange is provided in Table 4.7. Table 4.7: Proposed construction activities per road section between the Mthamvuna River and the Isipingo Interchange ROAD SECTION Mthamvuna River to Southbroom (23 km) Southbroom to Marburg Interchange (22 km) Marburg Interchange to St Faiths Interchange (6 km) St Faiths Interchange to Umhlungwa Interchange (Hibberdene) (23 km) Umhlumgwa Interchange (Hibberdene) to Park Rynie Interchange (31.7 km) Park Rynie Interchange to Winklespruit Interchange (29 km) DESIGN SPEED (km/h) WORK LAST UNDERTAKEN Original construction in the early 1980s. 120 Original construction in early 1990s. 120 Original construction in early 1990s. 120 Original construction in early 1990s. 120 Original construction in mid-1970s to 1980s. 120 Original construction completed in PROPOSED CONSTRUCTION ACTIVITIES Upgrading of at-grade intersections. Construction of Port Edward and Southbroom interchanges (see Figures 4.27 and 4.28). Improvement of intersection layouts, where required. Consolidation of access points illegal and dangerous accesses would be closed and feeder roads constructed to provide access at new, safe and appropriate access points. Safety improvements. Minor rehabilitation and resurfacing, as required. Safety improvements. Minor rehabilitation and resurfacing, as required. Construction of ramp plazas on the southern ramps of the Pennington Interchange (see Plate 4.17). Construction of ramp plazas on the southern ramps of the Park Rynie Interchange (see Figure 4.29). Safety improvements. Minor rehabilitation and resurfacing, as required. Construction of proposed Park Rynie mainline toll plaza (see Figure 4.29). CCA Environmental (Pty) Ltd 4-20 December 2009

8 ROAD SECTION Winklespruit Interchange to Adams Road Interchange (Amanzimtoti) (5.5 km) Adams Road Interchange (Amanzimtoti) to Dickens Road Interchange (Athlone Park) (5.1 km) Dickens Road Interchange (Athlone Park) to Isipingo Interchange (4 km) DESIGN SPEED (km/h) WORK LAST UNDERTAKEN 100 Original construction in late 1970s. 100 Original construction in late 1970s. 100 Original construction in late 1970s. PROPOSED CONSTRUCTION ACTIVITIES Construction of ramp plazas on the northern ramps of the Scottburgh Interchange (see Plate 4.18). Construction of ramp plazas on the northern ramps of the Umkomaas Interchange (see Plate 4.19). Resurfacing and rehabilitation, as required. Widening of Amanzimtoti River Bridge. Addition of third lane and paved shoulder from Amanzimtoti River northwards. Reconstruction of Adams Road Interchange to improve the operational safety of the interchange (see Figure 4.30). Construction of ramp plazas on the southern ramps of the Adams Road Interchange (see Figure 4.30). Resurfacing and rehabilitation of existing road pavement. Addition of a third lane in each direction. Construction of ramp plazas on the southern ramps of the Moss Kolnick Drive Interchange (see Plate 4.20). Resurfacing and rehabilitation of existing road pavement. Addition of a third lane and paved shoulders in each direction. Addition of a fourth lane between Dickens Road and Joyner Road in each direction (see Figure 4.31). Construction of ramp plazas on the southern ramps of the Joyner Road Interchange (see Plate 4.21). Construction of proposed Isipingo mainline toll plaza south of the Prospecton Road (Isipingo) Interchange (see Figure 4.32). SANRAL s preferred Toll Plaza locality A mainline toll plaza is proposed in the Park Rynie area, in close proximity to the Park Rynie on- and offramps the Park Rynie Toll Plaza (see Figure 4.29) while a second mainline toll plaza is proposed between the Joyner Road Interchange and the Prospecton Road (Isipingo) Interchange, at the limit of the concession the Isipingo Toll Plaza (see Figure 4.32). The existing Oribi mainline Toll Plaza between Izotsha and Umtentweni would be incorporated into the proposed project. The following existing ramp plazas would also be included: Shelly Beach Interchange (existing Izotsha ramp plazas); Marburg Interchange (existing Oribi northern and southern ramp plazas); and Umtentweni Interchange (existing Umtentweni ramp plazas). New ramp toll plazas are proposed as follows: Pennington Interchange (southern ramps); Park Rynie Interchange (southern ramps); Scottburgh Interchange (northern ramps); Umkomaas Interchange (northern ramps); Adams Road Interchange (southern ramps); Moss Kolnick Interchange (southern ramps); and Joyner Road Interchange (southern ramps). CCA Environmental (Pty) Ltd 4-21 December 2009

9 Plate 4.17: The location for the proposed ramp toll plazas at the Pennington Interchange Plate 4.18: The location for the proposed ramp toll plaza at the Scottburgh Interchange CCA Environmental (Pty) Ltd 4-22 December 2009

10 Plate 4.19: The location for the proposed ramp toll plaza at the Umkomaas Interchange Plate 4.20: The location for the proposed ramp toll plaza at the Moss Kolnick Interchange CCA Environmental (Pty) Ltd 4-23 December 2009

11 Plate 4.21: The location for the proposed ramp toll plaza at the Joyner Road Interchange 4.3 WORK TO BE UNDERTAKEN DURING BALANCE OF THE CONCESSION PERIOD It should be noted that the construction work to be undertaken during the balance of the concession period is not assessed as part of this EIA. Separate EIAs would be undertaken on this work before planned commencement thereof. The following work would be undertaken during the balance of the concession period: Widening to four lanes of the entire section of the road between East London and Ndwalane, and between the Mthamvuna River and Southbroom; In addition, the existing N2 South Coast Toll Road would be widened to four lanes. Further widening would also be undertaken between Scottburgh and Isipingo; The entire road would require major rehabilitation in a 15 to 20-year cycle, with minor rehabilitation on a 7 to 10-year cycle within the larger period; Future ring roads (bypasses) are envisaged at Butterworth, Dutywa and Mthatha. It should, however, be noted that in light of comments received from I&APs and the independent technical reviewer during the Scoping Study, SANRAL is currently considering the construction of these ring roads (bypasses) as part of the Initial Construction Works. The proposed ring roads (bypasses) would be subject to a separate environmental authorisation process; and It is envisaged that additional grade-separated interchanges would be required as well as upgrades to remaining at-grade intersections. CCA Environmental (Pty) Ltd 4-24 December 2009

12 4.4 GENERAL IMPROVEMENTS A number of general improvements would be introduced along the full length of the proposed toll highway. These include: Video surveillance cameras at toll plazas, emergency roadside phones and regular highway patrols; Safety features, where none now exist, such as over- and underpasses, fencing, lighting, pedestrian walkways remote from the traffic flow; and Operation and maintenance of the proposed toll road to specified requirements for toll roads. This would be the Concessionaire s main obligation. CCA Environmental (Pty) Ltd 4-25 December 2009

4.1 BROAD DESCRIPTION OF PROPOSED PROJECT

4.1 BROAD DESCRIPTION OF PROPOSED PROJECT CHAPTER 4 PROJECT DESCRIPTION This chapter firstly provides a broad description of the proposed N2 Wild Coast Toll Highway, followed by a detailed description of the proposed construction activities that

More information

N2 Wild Coast Toll Road between East London and Durban: Environmental Impact Assessment Report

N2 Wild Coast Toll Road between East London and Durban: Environmental Impact Assessment Report 2. DESCRIPTION OF THE PROPOSED PROJECT The proposal for the N2 Wild Coast Toll Road project is to design, construct, finance, operate and maintain this new limited-access toll road facility for a 30 year

More information

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange I-820 (East) Project Description Fort Worth District Reconstruct Southern I-820/SH 121 Interchange I-820 from approximately 2,000 feet north of Pipeline Road/Glenview Drive to approximately 3,200 feet

More information

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999 &+$37(5Ã)Ã Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999 &+$37(5) 52$'6,'()$&,/,7,(6 7$%/(2)&217(176 Section Subject Page Number Page Date F.1 VEHICLE INSPECTION STATIONS... F-3 April

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 9/8/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

SH 249 IN GRIMES COUNTY. Open House April 3, 2014

SH 249 IN GRIMES COUNTY. Open House April 3, 2014 SH 249 IN GRIMES COUNTY Open House April 3, 2014 Meeting Agenda Purpose of Meeting Today: Review the purpose and need for the SH 249 Grimes County project Review the proposed project and alternatives Discuss

More information

New Jersey Turnpike Authority Interchange 6 to 9 Widening Program

New Jersey Turnpike Authority Interchange 6 to 9 Widening Program New Jersey Turnpike Authority Interchange 6 to 9 Widening Program Tuesday, September 18, 2007 Public Hearings: Time: 5:00 PM - 8:00 PM Wednesday, September 19, 2007 Senior Center 3 Municipal Drive Bordentown,

More information

W&OD TRAIL BRIDGE OVER LEE HIGHWAY I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237)

W&OD TRAIL BRIDGE OVER LEE HIGHWAY I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237) W&OD TRAIL BRIDGE OVER LEE HIGHWAY A COMPONENT OF THE I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237) October 11, 2018 Bill Cuttler, PE

More information

IH 35 FEASIBILITY STUDY

IH 35 FEASIBILITY STUDY IH 35 FEASIBILITY STUDY COOKE COUNTY, TEXAS February 1, 2007 Prepared by: Carter & Burgess, Inc. For: The Wichita Falls District of the Texas Department of Transportation INDEX I. INTRODUCTION. 3 II. PURPOSE

More information

IMPROVEMENT CONCEPTS

IMPROVEMENT CONCEPTS IMPROVEMENT CONCEPTS for the South Novato Transit Hub Study Prepared by: January 11, 2010 DKS Associates With Wilbur Smith Associates IMPROVEMENT CONCEPTS Chapter 1: Introduction 1. INTRODUCTION The strategic

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 2/19/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015 SOUTHERN GATEWAY Transportation and Trinity River Project Committee 11 May 2015 Southern Gateway Project History Began in 2001 as a Major Investment Study [ MIS ], Schematic, and Environmental Assessment

More information

Janice Fortunato Senior Director Business Partnerships

Janice Fortunato Senior Director Business Partnerships Janice Fortunato Senior Director Business Partnerships What are Megaprojects? They are large-scale projects distinguished by cost, complexity and the potential impact on the community. Collectively, these

More information

The Eastern Connector Study November, 2007 planning for the future

The Eastern Connector Study November, 2007 planning for the future The Eastern Connector Study November, 2007 planning for the future In late 2006, Albemarle County and the City of Charlottesville jointly initiated the Eastern Connector Corridor Study. The Project Team

More information

STH 60 Northern Reliever Route Feasibility Study Report

STH 60 Northern Reliever Route Feasibility Study Report #233087 v3 STH 60 Northern Reliever Route Feasibility Study Report Washington County Public Works Committee Meeting September 28, 2016 1 STH 60 Northern Reliever Route Feasibility Study Hartford Area Development

More information

US 81 Bypass of Chickasha Environmental Assessment Public Meeting

US 81 Bypass of Chickasha Environmental Assessment Public Meeting US 81 Bypass of Chickasha Environmental Assessment Public Meeting March 14, 2013 Introductions ODOT FHWA SAIC Meeting Purpose Present need for bypass Provide responses to 10/04/11 public meeting comments

More information

800 Access Control, R/W Use Permits and Drive Design

800 Access Control, R/W Use Permits and Drive Design Table of Contents 801 Access Control... 8-1 801.1 Access Control Directives... 8-1 801.2 Access Control Policies... 8-1 801.2.1 Interstate Limited Access... 8-1 801.2.2 Limited Access... 8-1 801.2.3 Controlled

More information

Wentzville Parkway South Phase 2 & 2A

Wentzville Parkway South Phase 2 & 2A Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total

More information

Harlem Avenue between 63 rd and 65 th

Harlem Avenue between 63 rd and 65 th Harlem Avenue between 63 rd and 65 th Community Advisory Group Meeting #3 December 1, 2017 Bedford Park Public Library 1 Meeting Agenda 1. Welcome/Introductions (3 mins) 2. Project Overview and Re-Cap

More information

APPENDIX 7.1 Annex E. South Kyle Wind Farm Abnormal Load Traffic Management Plan VATTENFALL

APPENDIX 7.1 Annex E. South Kyle Wind Farm Abnormal Load Traffic Management Plan VATTENFALL APPENDIX 7.1 Annex E South Kyle Wind Farm Abnormal Load Traffic Management Plan VATTENFALL Ref: 402-03640-00006 March 2013 VATTENFALL i Ref: 402.03640.00006 CONTENTS 1.0 INTRODUCTION... 2 1.1 Proposed

More information

Tomingley Gold Operations. Traffic Management Plan

Tomingley Gold Operations. Traffic Management Plan Tomingley Gold Operations Traffic Management Plan Tomingley Gold Operations Traffic Management Plan TABLE OF REVISIONS Revision Number Revision Date Prepared By Approved by Comments Revision 1 August 2012

More information

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015 Memo To: From: Adrian Soo, P. Eng. Markham, ON : 165620021 Date: Reference: E.C. Row Expressway, Dominion Boulevard Interchange, Dougall Avenue Interchange, and Howard 1. Review of Interchange Geometry

More information

what you need to know FREEWAY IMPROVEMENT PROJECT (GFIP)

what you need to know FREEWAY IMPROVEMENT PROJECT (GFIP) what you need to know Road users are already experiencing the benefits of the upgraded Gauteng freeway network through reduced travel time, which means more time to engage in business and doing things

More information

US 67 WIDENING PROJECT

US 67 WIDENING PROJECT US 67 WIDENING PROJECT From Belt Line Rd. to I-20 History & Background The US 67 improvements from Belt Line Rd to I-20 were originally part of TxDOT s Southern Gateway project, studied as part of the

More information

South Gloucestershire Challenge Fund and Cycle Ambition Fund

South Gloucestershire Challenge Fund and Cycle Ambition Fund South Gloucestershire Challenge Fund and Cycle Ambition Fund The Challenge Fund A4174 scheme is coordinated and delivered by South Gloucestershire Council who were awarded 14 million pounds from the Department

More information

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP)

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP) Public Information Packet FY - Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP) Comment Form Annual Element TIP Projects - TIP Projects Year - Metropolitan Transportation Improvement

More information

Transportation Improvement Program (TIP) Candidate Project List for Public Review

Transportation Improvement Program (TIP) Candidate Project List for Public Review 2011-2014 Transportation Improvement Program (TIP) Candidate List for Public Review Table 1 Annual Listing Of Federal Aid Obligation For Federal Fiscal Year 2010 North Dakota s Number Transit 410083 Transit

More information

Chicago to St. Louis High-Speed Rail. IDOT District 8 Crossings. July 29, 2015

Chicago to St. Louis High-Speed Rail. IDOT District 8 Crossings. July 29, 2015 Chicago to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015 1 History: Chicago-St. Louis Corridor» IDOT has actively developed the Chicago to St. Louis corridor since the mid 1980 s» In

More information

Summary of the Alcoa Highway Redevelopment Project

Summary of the Alcoa Highway Redevelopment Project Appendix B Summary of the Alcoa Highway Redevelopment Project By Marcia Finfer, October 2009 The Timberlake community, along with numerous other concerned citizen groups (including the Lakemoor Hills community)

More information

PUBLIC INFRASTRUCTURE PROJECTS

PUBLIC INFRASTRUCTURE PROJECTS PUBLIC INFRASTRUCTURE PROJECTS FM 664 / OVILLA ROAD WIDENING & IMPROVEMENTS FM 664 / OVILLA ROAD CONNECTS US 287 WITH I-45 (SOURCE: TEXAS DEPARTMENT OF TRANSPORTATION. 2016 FM 664 / OVILLA ROAD WIDENING

More information

June WASHINGTON STATE DEPARTMENT OF TRANSPORTATION Alaskan Way Viaduct and Seawall Replacement Program Seattle, Washington

June WASHINGTON STATE DEPARTMENT OF TRANSPORTATION Alaskan Way Viaduct and Seawall Replacement Program Seattle, Washington DESIGN DEVIATION NOs. 1 & 2 Horizontal Stopping Sight Distance and Shoulder Width Reduction SR 99 S. Holgate St to S. King St. Viaduct Replacement Stage 2 MP 29.89 TO MP 30.78 XL-3237 PIN-809936D June

More information

Rocky Mount. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

Rocky Mount. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation 2020 Transportation Plan Developed by the Transportation Planning Division of the Virginia Department of Transportation in cooperation with the U.S. Department of Transportation, Federal Highway Administration

More information

Methods to Identify and Manage Runaway Heavy Vehicle Issues on Steep Descents

Methods to Identify and Manage Runaway Heavy Vehicle Issues on Steep Descents Mak, J. 1, Vecovski, P. 1, Brisbane, G. 1 1 NSW, Roads & Traffic Authority Abstract Mount Ousley Road and the Bulli Pass are two key freight routes entering the Southern Region of NSW from Sydney. Both

More information

RECOMMENDATIONS. 7-1 Anchorage Metropolitan Area Transportation Solutions

RECOMMENDATIONS. 7-1 Anchorage Metropolitan Area Transportation Solutions RECOMMENDATIONS 7-1 Anchorage Metropolitan Area Transportation Solutions 2035 Metropolitan Transportation Plan 7-2 A Call to Action 7-3 Anchorage Metropolitan Area Transportation Solutions 2035 Metropolitan

More information

City Hall 539 Phoenix Street South Haven, Michigan Telephone (269) Fax (269)

City Hall 539 Phoenix Street South Haven, Michigan Telephone (269) Fax (269) City of South Haven City Hall 539 Phoenix Street South Haven, Michigan 49090-1499 Telephone (269) 637-0700 Fax (269) 637-5319 Dunkley and Black River Infrastructure Improvements Dunkley - Dyckman Avenue

More information

PAPER FOR AREMA 2006 ANNUAL CONFERENCE LOS ANGELES UNION STATION RUN-THROUGH TRACKS UNION STATION TERMINAL IMPROVEMENTS. Paul Mak, PE, SE HDR Inc

PAPER FOR AREMA 2006 ANNUAL CONFERENCE LOS ANGELES UNION STATION RUN-THROUGH TRACKS UNION STATION TERMINAL IMPROVEMENTS. Paul Mak, PE, SE HDR Inc PAPER FOR AREMA 2006 ANNUAL CONFERENCE LOS ANGELES UNION STATION RUN-THROUGH TRACKS UNION STATION TERMINAL IMPROVEMENTS Paul Mak, PE, SE HDR Inc 801 S. Grand Ave. Suite 500, Los Angeles, CA 90017. Tel

More information

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction 550 North to 650 North $ 1,750,000 $ 1,582,113 To widen an existing bridge on 1200 West over Box Elder Creek that will

More information

JCE 4600 Basic Freeway Segments

JCE 4600 Basic Freeway Segments JCE 4600 Basic Freeway Segments HCM Applications What is a Freeway? divided highway with full control of access two or more lanes for the exclusive use of traffic in each direction no signalized or stop-controlled

More information

The Highways Agency is working to improve the M3 between junctions 2 to 4a.

The Highways Agency is working to improve the M3 between junctions 2 to 4a. Welcome The Highways Agency is working to improve the M3 between junctions 2 to 4a. The M3 Junctions 2 to 4a is part of a major strategic road network connecting people, communities and businesses, carrying

More information

Hosur Krishnagiri Project Of NH-7

Hosur Krishnagiri Project Of NH-7 9. INSPECTION AND MONITORING OF THE CONSTRUCTION WORKS. PROGRESS UP TO 31 May 2015 1a. HIGHWAYS - MCW & Service Road Sl Description Unit Total Scope (Km) Completed Percentage achieved % 1 Clearing & Grubbing

More information

Alconbury Weald: the story so far

Alconbury Weald: the story so far Alconbury Weald: the story so far The development of Alconbury Weald is a 20 year project, which will be rolled out with a series of phased investments in new infrastructure on site and across the local

More information

Corridor Sketch Summary

Corridor Sketch Summary Corridor Sketch Summary SR 241: I-82 Jct (Sunnyside) to SR 24 Jct Corridor Highway No. 241 Mileposts: 7.53 to 25.21 Length: 17.65 miles Corridor Description The seventeen and one-half mile corridor begins

More information

Countdown to the Closure Extended 53-Hour Closure of I-405 Freeway Between U.S. 101 and I-10 Planned in Mid-July for Mulholland Bridge Demolition

Countdown to the Closure Extended 53-Hour Closure of I-405 Freeway Between U.S. 101 and I-10 Planned in Mid-July for Mulholland Bridge Demolition Countdown to the Closure Extended 3-Hour Closure of I-40 Freeway Between U.S. 0 and I-0 Planned in Mid-July for Mulholland Bridge Demolition Work Los Angeles, Calif. Plan Ahead, Avoid The Area, Or Stay

More information

LOCAL. Legend. Le Roux Road which provides a link across the N1 will be extended westwards to link with the planned K73.

LOCAL. Legend. Le Roux Road which provides a link across the N1 will be extended westwards to link with the planned K73. N LOCAL K71 Kyalami Main Road (R55) K58 Olifantsfontein Road (R562) K73 New Road M71) Le Roux Lever Road R101 N1 Highway Old Pretoria Main Road K56 Dale Road Olifantsfontein Road (R562) PWV 5 Allan Road

More information

Appendix F-1 Description of the Long-Term Alternatives

Appendix F-1 Description of the Long-Term Alternatives Appendix F-1 Description of the Long-Term Alternatives Memorandum Page 1 of 21 Project No. 9309 Phase 280 Date June 2, 2015 From Chris Sidlar (LEA) To Edward Presta / City of Toronto C.C. Terry Wallace

More information

Appendix G Aquilla Lake Pool Rise Recreational Resources

Appendix G Aquilla Lake Pool Rise Recreational Resources Appendix G Aquilla Lake Pool Rise Recreational Resources 1. INTRODUCTION The purpose of this appendix is to document the impacts of a 2.5 ft (Alternative A), 4.5 ft (Alternative B), and 6.5 ft. (Alternative

More information

ROAD DEVELOPMENT PROJECTS IN KARANTAKA

ROAD DEVELOPMENT PROJECTS IN KARANTAKA ROAD DEVELOPMENT PROJECTS IN KARANTAKA August 2010 1 Road Development Projects in Karnataka Provide an integrated road network in the State with the following broad objectives: To make road connectivity

More information

State of the City s Infrastructure. Topic of the Presentation. Johannesburg DirectorateRoads Agency

State of the City s Infrastructure. Topic of the Presentation. Johannesburg DirectorateRoads Agency State of the City s Infrastructure Topic of the Presentation Johannesburg DirectorateRoads Agency State of Joburg s Road Network 13599 km Hilson Street - Waverley Current Condition of Johannesburg 2017

More information

US 70 Corridor Planning for the Future

US 70 Corridor Planning for the Future New Bern/James City Area - Work Session US 70 Corridor Planning for the Future Brinson Elementary School Thursday, January 31, 2008 Agenda Sign-in, in, View Maps, Talk to Project Team Public Q & A Session

More information

2.1.5 Traffic and Circulation. Table Level of Service Criteria for Highway Segment Regulatory Setting Affected Environment

2.1.5 Traffic and Circulation. Table Level of Service Criteria for Highway Segment Regulatory Setting Affected Environment 2.1.5 Traffic and Circulation This section addresses the potential impacts to traffic and circulation associated with construction and long-term operation of the proposed project. The traffic and circulation

More information

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily 5.8 TRAFFIC, ACCESS, AND CIRCULATION This section describes existing traffic conditions in the project area; summarizes applicable regulations; and analyzes the potential traffic, access, and circulation

More information

Mountainland Association of Governments SPRINGVILLE-SPANISH FORK AREA TRANSPORTATION STUDY APRIL 2012

Mountainland Association of Governments SPRINGVILLE-SPANISH FORK AREA TRANSPORTATION STUDY APRIL 2012 Mountainland Association of Governments SPRINGVILLE-SPANISH FORK AREA TRANSPORTATION STUDY APRIL 2012 PLANNING FOR OUR FUTURE Planners with the Mountainland Association of Governments (MAG) have evaluated

More information

5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES

5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES 5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES 5.1 INTRODUCTION This chapter of the TMP presents an opinion of probable cost estimates for the proposed Horizon Year roadway network improvements

More information

CAPITAL FUND 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS

CAPITAL FUND 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 2019-2023 9510 STREET & SIDEWALK IMPROVEMENTS - 01 STREET AND SIDEWALK MAINTENANCE PROGRAM $1,250,000 $0 $1,250,000

More information

Guidelines for Retro-fitting Existing Roads to Optimise Safety Benefits. A Practitioners Experience and Assessment of Options for Improvement.

Guidelines for Retro-fitting Existing Roads to Optimise Safety Benefits. A Practitioners Experience and Assessment of Options for Improvement. Guidelines for Retro-fitting Existing Roads to Optimise Safety Benefits. A Practitioners Experience and Assessment of Options for Improvement. Author: Stephen Levett, Manager, Safer Roads Policy, Standards

More information

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Barrhaven Fellowship CRC 3058 Jockvale Road Ottawa, ON K2J 2W7 December 7, 2016 116-649 Report_1.doc D. J.

More information

Project Application. General Information ODOT PID. Primary County (3 char abrv) ODOT District

Project Application. General Information ODOT PID. Primary County (3 char abrv) ODOT District Current Status (Tier 1, Tier 2 or New) Proposed Status (Tier 1 or Tier 2) Project Application General Information ODOT PID ODOT District Primary County (3 char abrv) Facility Name (i.e. route, rail, terminal,

More information

system performance I-820 East Loop FM 156 TxDOT is working to expand its busiest metropolitan corridors.

system performance I-820 East Loop FM 156 TxDOT is working to expand its busiest metropolitan corridors. system performance TxDOT is working to expand its busiest metropolitan corridors. Nine of the state s 100 most congested highways are located in Tarrant County. Six of these highways will be expanded and

More information

Transportation Highway Engineering Conference February 24, 2015

Transportation Highway Engineering Conference February 24, 2015 Transportation Highway Engineering Conference February 24, 2015 Today s Agenda Move Illinois status Jane Addams Memorial (I-90) Rebuilding and Widening Project Building a 21 st century corridor Incorporating

More information

City of Houston Fondren Road Paving and Drainage

City of Houston Fondren Road Paving and Drainage City of Houston Fondren Road Paving and Drainage From Braeswood Boulevard to Creekbend Drive TRC Meeting March 2016 Location and Vicinity Maps City Council District K Key Map 530 Z, 530 Y Land Use Commercial

More information

Chapter 9 Recommended Locally Preferred Alternative and Alternatives for Evaluation in Draft SEIS/SEIR

Chapter 9 Recommended Locally Preferred Alternative and Alternatives for Evaluation in Draft SEIS/SEIR Chapter 9 Recommended Locally Preferred Alternative and Alternatives for Evaluation in Draft SEIS/SEIR 9.0 RECOMMENDED LOCALLY PREFERRED ALTERNATIVE AND ALTERNATIVES FOR EVALUATION IN DRAFT SEIS/SEIR

More information

Public Works. Capital Projects FY

Public Works. Capital Projects FY Public Works Capital Projects FY 2015-17 Projects Completed FY 2014 All Done Projects! Residential and Collector Street Paving Lower Westside Arterial Street Rehab: Front, River St South, Soquel Hwy 1

More information

TRAFFIC IMPACT ASSESSMENT PART OF AN ENVIRONMENTAL IMPACT ASSESSMENT FOR THE KEBRAFIELD ROODEPOORT COLLIERY IN THE PULLEN S HOPE AREA

TRAFFIC IMPACT ASSESSMENT PART OF AN ENVIRONMENTAL IMPACT ASSESSMENT FOR THE KEBRAFIELD ROODEPOORT COLLIERY IN THE PULLEN S HOPE AREA TRAFFIC IMPACT ASSESSMENT PART OF AN ENVIRONMENTAL IMPACT ASSESSMENT FOR THE KEBRAFIELD ROODEPOORT COLLIERY IN THE PULLEN S HOPE AREA 20 March 2014 Report prepared by: Corli Havenga Transportation Engineers

More information

Note: The October 2007 version of this report has been updated in this December 2008 report to present costs in year 2007 dollars.

Note: The October 2007 version of this report has been updated in this December 2008 report to present costs in year 2007 dollars. Sound Transit Phase 2 South Corridor LRT Design Report: SR 99 and I-5 Alignment Scenarios (S 200 th Street to Tacoma Dome Station) Tacoma Link Extension to West Tacoma Prepared for: Sound Transit Prepared

More information

Appendix J Traffic Impact Study

Appendix J Traffic Impact Study MRI May 2012 Appendix J Traffic Impact Study Level 2 Traffic Assessment Limited Impact Review Appendix J [This page was left blank intentionally.] www.sgm-inc.com Figure 1. Site Driveway and Trail Crossing

More information

2. Katikati. 2.1 Infrastructure Schedule. Katikati Utilities. Project Number. Project Construction Year. Funding Source (percentage) Costs 2015 ($)

2. Katikati. 2.1 Infrastructure Schedule. Katikati Utilities. Project Number. Project Construction Year. Funding Source (percentage) Costs 2015 ($) 2. Katikati 2.1 Infrastructure Schedule Katikati Utilities Number Proposed Construction Year Costs 2015 ($) Funding Source (percentage) WS2 WS3 WS4 WS5 WS 9 WS 10 New Water supply (200mm dia) Tetley Rd

More information

4. Transportation Plan

4. Transportation Plan The sizes of the most suitable sites are indicated in Table 4.3.6.2. Table 4.3.6.2: Site Sizes and Potential Development Area Potential Development Site Site Size (m 2 ) Area m 2 (3 Floors) D1 29,000 87,000

More information

CORE AREA SPECIFIC PLAN

CORE AREA SPECIFIC PLAN only four (A, B, D, and F) extend past Eighth Street to the north, and only Richards Boulevard leaves the Core Area to the south. This street pattern, compounded by the fact that Richards Boulevard is

More information

Tongaat Hullette Developments - Cornubia Phase 2. Technical Note 02 - N2/M41 AIMSUN Micro-simulation Analysis

Tongaat Hullette Developments - Cornubia Phase 2. Technical Note 02 - N2/M41 AIMSUN Micro-simulation Analysis Technical Note 02 - N2/M41 AIMSUN Micro-simulation Tongaat Hullette Developments Cornubia Phase 2 Technical Note 02 - N2/M41 AIMSUN Micro-simulation Analysis Prepared by: 18/11/14 Justin Janki Date Approvals

More information

SH 249 PUBLIC MEETING DESIGN CHANGES FROM FM 2920 TO HARDIN STORE ROAD

SH 249 PUBLIC MEETING DESIGN CHANGES FROM FM 2920 TO HARDIN STORE ROAD SH 249 PUBLIC MEETING DESIGN CHANGES FROM FM 2920 TO HARDIN STORE ROAD Lone Star College, Tomball Campus December 8, 2015 Open House 5:30-7:30 pm National Environmental Policy Act The environmental review,

More information

I-90 ALLSTON INTERCHANGE A MULTIMODAL TRANSPORTATION PROJECT PUBLIC INFORMATION MEETING

I-90 ALLSTON INTERCHANGE A MULTIMODAL TRANSPORTATION PROJECT PUBLIC INFORMATION MEETING I-90 ALLSTON INTERCHANGE A MULTIMODAL TRANSPORTATION PROJECT PUBLIC INFORMATION MEETING DECEMBER 8, 2015 JACKSON MANN COMMUNITY CENTER Meeting Agenda Welcome & Introductions Introduce Concept 3K West Station

More information

Clean Harbors Canada, Inc.

Clean Harbors Canada, Inc. Clean Harbors Canada, Inc. Proposed Lambton Landfill Expansion Environmental Assessment Terms of Reference Transportation Assessment St. Clair Township, Ontario September 2009 itrans Consulting Inc. 260

More information

Southeastern Wisconsin Regional Freeway System Reconstruction Study

Southeastern Wisconsin Regional Freeway System Reconstruction Study Southeastern Wisconsin Regional Freeway System Reconstruction Study July 26, 2001 1 Agenda Item 3 Presentation of Projected Traffic Impacts of the Possible New Freeway Segment Connecting IH 43 and USH

More information

Road Condition Assessment and Road Contributions Study. 270 Grants Road, Somersby. June 2015 Our Ref: SY140135

Road Condition Assessment and Road Contributions Study. 270 Grants Road, Somersby. June 2015 Our Ref: SY140135 Condition Assessment and Contributions Study 270 June 2015 Our Ref: SY140135 Copyright Barker Ryan Stewart Pty Ltd 2015 All Rights Reserved Project No. SY140135 Author DH Checked PM Approved GB Rev No.

More information

Alignment Comparison Report (May 9, 2002) PARK BRIDGE TO BRAKE CHECK (10 Mile Bridge) TRANS CANADA HIGHWAY (CCR)

Alignment Comparison Report (May 9, 2002) PARK BRIDGE TO BRAKE CHECK (10 Mile Bridge) TRANS CANADA HIGHWAY (CCR) Alignment Comparison Report (May 9, 2002) PARK BRIDGE TO BRAKE CHECK (10 Mile Bridge) TRANS CANADA HIGHWAY (CCR) INTRODUCTION The Ministry of Transportation (MoT), Region 2, Highway Engineering staff were

More information

DISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (15-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual

DISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (15-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual DISTRIBUTION: Electronic Recipients List MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards Unit ISSUED BY: Office of Project Management and Technical Support TRANSMITTAL LETTER NO.

More information

EXCEPTION TO STANDARDS REPORT

EXCEPTION TO STANDARDS REPORT EXCEPTION TO STANDARDS REPORT PROJECT DESCRIPTION AND NEED The project is located in Section 6, Township 23 North, Range 9 East and Section 31 Township 24 North, Range 9 East, in the Town of Stockton,

More information

I-405 Sepulveda Pass Improvements Project Wilshire Ramps Reconstruction

I-405 Sepulveda Pass Improvements Project Wilshire Ramps Reconstruction metro.net/works I-405 Sepulveda Pass Improvements Project Wilshire Ramps Reconstruction We re working to create safer, smoother interchanges. Project Overview The primary goal of the I-405 Sepulveda Pass

More information

Metro Highway Program

Metro Highway Program Metro Highway Program ACEC November 2018 I-5 North HOV and Truck Lanes 14 miles of HOV lanes in both directions 2 miles of truck climbing lanes at the south end 7 bridge modifications at: Gavin Canyon

More information

Engineering Report: Shasta-Trinity National Forest. Shasta McCloud Management Unit. Analysis of. National Forest System Road 37N79

Engineering Report: Shasta-Trinity National Forest. Shasta McCloud Management Unit. Analysis of. National Forest System Road 37N79 Engineering Report: Shasta-Trinity National Forest Shasta McCloud Management Unit Analysis of National Forest System Road 37N79 (milepost 0.56 to 2.28) for Motorized Mixed Use Designation Forest: Shasta-Trinity

More information

Revised Evaluation Scores. System Preservation

Revised Evaluation Scores. System Preservation Revised Evaluation s System Preservation This page provides a summary of any revisions made to the draft scores presented at the October th Attributable Funds mmittee meeting. The information below highlights

More information

ENVIRONMENTAL IMPACT STATEMENT

ENVIRONMENTAL IMPACT STATEMENT RED HILL MINING LEASE ENVIRONMENTAL IMPACT STATEMENT Section 14 Transport Section 14 Transport 14.1 Description of Environmental Values This section of the Red Hill Mining Lease Environmental Impact Statement

More information

In response to the TIA the Director General of the Department of Planning and Infrastructure issued the following comment:

In response to the TIA the Director General of the Department of Planning and Infrastructure issued the following comment: 06 July 2012 P0961 Natural Gas Storage Facility Letter Ver2.doc CB&I Level 13, 197 St Georges Terrace Perth, Western Australia, 6000 Attention: Jim Rutherford Dear Jim, Re: Natural Gas Storage Facility

More information

30-Day Look Ahead Summary August 2011

30-Day Look Ahead Summary August 2011 Wilshire Segment 30-Day Look Ahead Summary August 2011 DWP and SCE Utility Relocation Sepulveda reduced to one lane in each direction, Constitution to Ohio, 9pm to 6am Westbound Wilshire reduced to one

More information

Tulsa Transportation Management Area. Urbanized Area Surface Transportation Program

Tulsa Transportation Management Area. Urbanized Area Surface Transportation Program Tulsa Transportation Management Area Urbanized Area Surface Transportation Program FFY 2022 Application Information Sponsor Location Description STP Request Other Funds Broken Arrow Elm Place: Kenosha

More information

FLAMBOROUGH QUARRY HAUL ROUTE STUDY HAUL ROUTE VIBRATION REPORT. itrans Consulting Inc 100 York Boulevard Richmond Hill, Ontario L4B 1J8

FLAMBOROUGH QUARRY HAUL ROUTE STUDY HAUL ROUTE VIBRATION REPORT. itrans Consulting Inc 100 York Boulevard Richmond Hill, Ontario L4B 1J8 FINAL REPORT FLAMBOROUGH QUARRY HAUL ROUTE STUDY HAUL ROUTE VIBRATION REPORT Project Number: #W08-5107A August 28, 2008 SUBMITTED TO: Tara Erwin itrans Consulting Inc 100 York Boulevard Richmond Hill,

More information

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below:

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below: 3.5 TRAFFIC AND CIRCULATION 3.5.1 Existing Conditions 3.5.1.1 Street Network DRAFT ENVIRONMENTAL IMPACT REPORT The major roadways in the study area are State Route 166 and State Route 33, which are shown

More information

Technical Feasibility Report

Technical Feasibility Report Prepared For: Bow Concord I-93 Improvements Project Bow and Concord, NH Prepared By: 53 Regional Drive Concord, NH 03301 NHDOT Project # 13742 Federal Project #T-A000(018) September 2018 TABLE OF CONTENTS

More information

Facility Conditions.

Facility Conditions. Facility Conditions Circle Interchange Under Construction Looking orth, Circa Late 1950s There have been no major improvements made to the Circle Interchange since its construction in the 1950s. Maintenance

More information

Tunney s Pasture to Dominion Station Traffic and Transit Detours. April 4, 2017 C. Wheeler/ C. Swail

Tunney s Pasture to Dominion Station Traffic and Transit Detours. April 4, 2017 C. Wheeler/ C. Swail Tunney s Pasture to Dominion Station Traffic and Transit Detours April 4, 2017 C. Wheeler/ C. Swail Purpose of Presentation Outline key principles for traffic and transit management Implementation strategies

More information

The Design-Builder shall meet local road criteria provided by the local governing agencies.

The Design-Builder shall meet local road criteria provided by the local governing agencies. 11 ROADWAYS 11.1 General The -Builder shall conduct all Work necessary to meet the requirements of roadways. Roadway classifications include mainline, acceleration lanes, deceleration lanes, auxiliary

More information

Night Work Specification

Night Work Specification Night Work Specification 1.0 Hours of Work The contractor is advised that most work for this contract will be carried out during night time hours. For the purposes of this contract night is defined as

More information

Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007

Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007 EAST-WEST CORRIDOR Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007 Presentation Agenda Project Overview / Purpose and Need Highway Component Transit Component

More information

Winter Maintenance on Provincial Highways. District Municipality of Muskoka Winter Maintenance Update December 14, 2015

Winter Maintenance on Provincial Highways. District Municipality of Muskoka Winter Maintenance Update December 14, 2015 Winter Maintenance on Provincial Highways District Municipality of Muskoka Winter Maintenance Update December 14, 2015 Outline 1. Auditor General s Report 2. MTO Action Plan 3. Recent Winter Maintenance

More information

Project Description: Georgia Department of Transportation Public Information Open House Handout PI#(s): , County: Muscogee

Project Description: Georgia Department of Transportation Public Information Open House Handout PI#(s): , County: Muscogee Why We Are Here: GDOT s Transportation Improvement Act (TIA) Office, the City of Columbus, and the project delivery team are here this evening to display and answer questions concerning the proposed roadway

More information

I-15/ CAJALCO ROAD INTERCHANGE IMPROVEMENTS Final Report

I-15/ CAJALCO ROAD INTERCHANGE IMPROVEMENTS Final Report 2013 Jesse Morton (Project Manager) Said Yahya (Project Manager) Ziad Abourazra Danee Berumen Marion Cartas Brandon Chan Joie Edles Luis Fernandez Ruben Hovanesian Gerard Nepomuceno Andrew Osaki Advisor:

More information

I-4 Beyond the Ultimate. Florida Transportation Builders Association January 18, 2019

I-4 Beyond the Ultimate. Florida Transportation Builders Association January 18, 2019 I-4 Beyond the Ultimate Florida Transportation Builders Association January 18, 2019 FDOT District 5 Improving Mobility & Safety in Central Florida FDOT District 5 is: Designing and building a better Interstate

More information

Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary

Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County Executive Summary October 2014 Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County Executive Summary October 2014 Prepared

More information

Construction Staging Area 4 Avenue Road

Construction Staging Area 4 Avenue Road REPORT FOR ACTION Construction Staging Area 4 Avenue Road Date: September 27, 2017 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District

More information

MEMORANDUM FPN: State Road: 91 County: Osceola (92)

MEMORANDUM FPN: State Road: 91 County: Osceola (92) Traffic and Revenue Consultant Florida s Turnpike Enterprise Florida Department of Transportation MEMORANDUM Date: October 14, 2013 To: From: Copies: Subject: Tom Neyer, Production Project Manager Emam

More information