1 1. PROJECT LOCATION MAP: Monthly Progress Report September
2 2. EXECUTIVE SUMMARY : Independent Engineering Service The Government of India (GOI) through Ministry of Shipping Road Transport & Highways (MORT & H) is contemplating to enhance the traffic capacity and safety for efficient transportation of goods as well as passenger traffic on the very heavy traffic intensity National Highways. The Government of India had entrusted to National Highways Authority of India (NHAI) for the development, maintenance and management of NH-7 from km to km (59.87km) in the state of Tamil Nadu. In order to provide a better level of service to the vehicular traffic and to augment the capacity of NH 07 (NH-44 New) by widening the existing four lane to six lanes divided carriageway facility including rehabilitation/strengthening of the existing four lane, it has been decided to carry out the works under NHDP Phase V as BOT (Toll) on Design, Build, Finance, Operate & Transfer (DBFOT) basis. 3. SCOPE OF THE PROJECT: The scope of the project include the following during the concession period: Construction of the project highway as set forth in Schedule A and as specified in Schedule B together with provision of Project Facilities as specified in Schedule C and standards as set forth in Schedule D of the concession agreement with other applicable standard specification. Operation and Maintenance of the project highway in accordance with the provisions of the concession agreement of Schedule K Performance and fulfillment of all other obligations of the Concessionaire in accordance with the provisions of Agreement and matters incidental thereto or necessary for the performance of any or all of the obligations of the concession agreement by the Concessionaire. Six laning shall be undertaken and completed by the Concessionaire in conformity with specifications and standards set forth in Annex- I of Schedule D of CA. Monthly Progress Report September
3 SR. NO. 4. PROJECT MILE STONES : MILESTONES Independent Engineering Service PERIOD FROM APPOINTMENT DATE 1 Milestone - I 255 days 2 Milestone - II 512 days 3 Milestone - III 717days 4 Scheduled Six Laning with Service Lane Date 912days DESCRIPTION 255 days from the appointed date i.e Commenced construction of project highway and expended not less than ten percentages (10%) of the total capital cost of the project set forth in the financial package. 512 days from the appointed date i.e Commenced construction of all bridges and expended not less than thirty five percentage (35%) of the total capital cost of the project set forth in the financial package. 717 days from the appointed date i.e Commenced construction of all facilities of the project and expended not less than seventy percentage (70%) of the total capital cost of the project set forth in the financial package. The Scheduled Six Laning date shall occur on the 912th (Nine Hundred and Twelve) day from the appointed date i.e On or before the scheduled six laning date, the Concessionaire shall have completed six laning projects. Mile stones I, II and III have already been achieved by the Concessionaire. Note: For Schedule six laning EOT I approved up to 30 th May EOT II submitted 15 th Nov 2015 by the Concessionaire and recommended by IE up to 18 th July 2015 (CDM/CEI/ /1221 dated on 28 th July 2015) S l Mile Stone : Total Mile Stone days Mile Stone Mile Stone Mile Stone Date as per Actual date CA Percen tage 10% EPC Cost (Cro res) Monthly Progress Report September To be Expended (Crores) Expended (Crores) % % Scheduled six laning 4 date % Progress Note: 1. Concessionaire submitted PCC and it is under progress( Review). 2. Schedule I Tests are under progress. Time extension recommended by IE up to 18 th July-2015
4 5. SALIENT FEATURES: The Authority National Highways Authority of India Six laning of Hosur-Krishnagiri Section of NH-07 from Name of the Project km to km: (Length Km 59.87) in the State of Tamil Nadu Under NHDP Phase V as BOT (TOLL) on DBFOT basis. Independent Engineer / Consultants CDM Smith Inc. In Joint Venture with Wilbur Smith Associates Pvt Ltd Agreement date of IE: 14 th Aug 2012 The Concessionaire M/s Hosur-Krishangiri Toll Road Limited The EPC Contractor M/s Reliance Utility Engineers Pvt.Ltd. Construction Contractor M/s L & T Limited. Date of agreement 2 nd July 2010 Period of Construction 30 Months Date of Commencement of Construction 7 th June 2011 Date of Completion of Construction 4 th December 2013 The Concession Period 24 years Project Capital Cost Crores. EPC Cost Crores Project Length kms Lenders Engineer M/s. Frischman Prabhu Lenders Name Canara Bank-Mumbai Lenders Contribution Crores. Premium to NHAI Crores with an escalation of 5% per year Contribution by Concessionaire Crores Flyover 6 Nos (Repair -3, New 3) Vehicular Under Passes 5 Nos ( New Construction) Pedestrian Under Passes 8 Nos (New Construction) Toll Plaza 1 No Major Bridges 1 No. Minor Bridges 13 Nos (Widening- 3, New- 4, Repair-6) Box/Slab Culverts 109 Nos (Widening and Repair, Rehabilitation) Pipe Culverts 34 Nos (Widening and Repair, Rehabilitation) Track Lay bay with Rest Area 1 No. Major & Minor Junctions 9 & 66 Nos Respectively Length of Service Road kms Bus Byes with Bus Shelters 66 Nos (LHS-30nos,RHS 36nos) Change of scope Upgraded PUP at Km , Box culvert at Ch Monthly Progress Report September
5 6. PROJECT HIGHWAY PAVEMENT CONFIGURATIONS: Scope of Work and Cross Sections: Description Scope Design Chainage (km) From To Length Main Carriage Way Six lane Service Road Two lane both sides The Existing LHS (ie Hosur to Krishnagiri) carriageway between Km to Km is proposed to be used as carriageway of Service road on LHS. Pavement Configurations: Carriageway Type of carriageway (Flexible/Rigid) Chainage (from - to) Name of Layer Design Thickness in mm Total Thickness BC 40 mm MCW Flexible to except toll plaza location DBM WMM GSB 120 mm 250 mm 200 mm 610mm Sub grade 500 mm 500mm BC 40 mm Service road Flexible to DBM WMM 50 mm 250 mm 540mm GSB 200 mm Sub grade 500 mm 500mm Rigid Pavement for Toll Plaza : The Location at Ch. Km Toll Plaza Expansion and Regid pavement (PQC) drawing submitted from Concessionaire for review and work is in progress. Rest Area: The available land between the carriageways from Ch. Km to LHS is to be developed as truck lay bye and Rest area Facilities, and the existing road to be used as carriage way of service road on LHS Monthly Progress Report September
6 7. Typical Cross-Section: Sl. no Typical cross sections are detailed as below: Type of Cross Section 6 lane cross section with raised median + embankment slope(2h:1v)on both sides + unlined longitudinal drain on both sides + both sides 7.0 m paved service road with 0.75 m earthen shoulder on both sides + utility corridor on both sides in non-built up areas 6 lane cross section with raised median + embankment slope(2h:1v), unlined longitudinal drain & utility corridor on both sides in non-built up areas 6 lane cross section with raised median m wide separator cum lined covered drain (RCC) with M.S railing between paved shoulder & 7.00 m paved service road on both sides m wide footpath cum utility duct (RCC) on both sides in urban areas 6 lane cross section with raised median m wide separator cum lined covered drain (RCC) with M.S railing between paved shoulder & 7.00 m paved service road on both sides m wide footpath cum utility duct (RCC) on both sides in urban areas ( Shifting of Existing Center line to L.H.S) 6 lane cross section with raised median m wide separator cum lined covered drain (RCC) with M.S railing between paved shoulder & 7.00 m paved service road on both sides m wide footpath cum utility duct (RCC) on both sides in urban areas ( Shifting of Existing Center line to R.H.S) 6 lane Approach cross section for Flyover/ Underpass with R.E Wall/R.C.C Retaining Wall upto FRL with friction slab & RCC Crash barrier ( excluding Via Duct portion) + raised median m wide separator cum lined covered drain (RCC)between approach & 7.00 m paved service road on both sides m wide footpath cum utility duct ( RCC) on both sides 6 lane Approach cross section for Flyover/ Underpass with R.E Wall/R.C.C Retaining Wall upto FRL with friction slab & RCC Crash barrier ( excluding Via Duct portion) + raised median m wide separator cum lined covered drain (RCC)between approach & 7.00 m paved service road on both sides m wide footpath cum utility duct ( RCC) on both sides (Shifting of Existing Center line) Code Length ( m) Type Type Type Type Type Type Type lane cross section with raised median + embankment slope (2H:1V)&unlined longitudinal drain on both sides in hilly/forest areas Type Toll Plaza Toll Plaza Major bridge Major bridge Existing Flyover with 6 lane configuration with exiting service road. Existing Flyover Uni directional flyover with 3 lane Flyover Approach cross section with m deck width R.E Wall/R.C.C Retaining Wall up to FRL with friction slab RCC Crash barrier (excluding Via-Duct portion)+1.50m wide separatorcum-lined covered drain (RCC)between approach & 7.00m paved service road on RHS +1.50m wide footpath-cum utility duct(rcc) ON RHS. Uni directional Flyover 1050 Monthly Progress Report September
7 8. STATUS OF MOBILIZATION OF INDEPENDENT ENGINEER SI Date Name Designation No Mobilized Key Personnel (Professional Staffs) 1 TBN Team Leader Not Mobilized * 2 Mr. C.V.Krishna Reddy Acting Team Leader cum Resident Engineer 3 Mrs. Padmaja Jayakumar Sr. Bridge Design Engineer Mr. Gagan Trivedi Highway Design Engineer Mr. K.C.Sathiya Murthi Bridge / Structural Engineer Dr.Jimmy Thomas Sr. Pavement Specialist Mr. N.Madhsudana Chowdary Sr. Quality cum Material Expert Mr. P. Hariharan Traffic & Transportation Expert 9 Mr. R. Krishna Murthy Road Safety Expert Mr. Shankar Narayana Financial Expert Mr. J.Dhanvanth Legal Expert Sub-Professionals Staffs: 1 Mr. S.Ramesh Babu Survey Engineer TBN Survey Engineer-2 Not Mobilized 3 TBN Asst. Highway Engineer-1 Not Mobilized 4 TBN Asst. Highway Engineer-2 Not Mobilized 5 TBN Asst. Bridge Engineer-1 Not Mobilized** 6 TBN Asst. Bridge Engineer-2 Not Mobilized*** 7 Mr. J.Selva Kumar Asst. Quality cum Material Engineer Prashant K Deshpande Asst. Quality cum Material Engineer ****** 9 TBN Quantity Surveyor -1 Not Mobilized **** 10 Mr. Ayyappan Nair CAD Expert Mr. Shashikanth.Joshi Electrical Engineer Mr. V.Rangarajan HTMS/Toll Expert Mr. Rajesh varghese Environmental Engineer Dr. K. Malla Reddy Horticulture cum Landscaping Expert TBN: To be Named *: Shri P J Xavier worked as Team Leader from to and resigned on personal reason. **: Mr. A. Vijay Jayaraj worked as Assistant Bridge Engineer from to and resigned on personal reason. ***: Mr. Kola Nagaraju worked as Assistant Bridge Engineer from to and resigned on personal reason **** : Mr. G Senthil Kumar worked as Quantity Surveyor from to *****: Mr.R. Ashok Kumar, worked as Assistant Highway Engineer from to 31 July 2015 and resigned on personal reason. ******: Mr. Prashant K Deshpande as Assistant Quality cum Material Engineer from to 24 Sep 2015 and resigned on personal reason. Monthly Progress Report September
8 8.1 ORGANIZATIONAL CHART : Monthly Progress Report September 2015 Page 8
9 9. INSPECTION AND MONITORING OF THE CONSTRUCTION WORKS. 1a. HIGHWAYS - MCW & Service Road PROGRESS UP TO 30 September 2015 Sl Description Unit Total Scope (Km) Completed Percentage achieved % 1 Clearing & Grubbing Km % 2 Excavation Km % 3 Embankment Top Km % 4 Sub Grade Top Km % 5 GSB Km % 6 WMM-1 Km % 7 WMM - 2 Km % 8 DBM - Widening Km % 9 DBM - Overlay Km % 10 BC Km % 1b. HIGHWAYS - MCW Sl Description Unit Total Scope (Km) Completed Percentage achieved Clearing & 1 Km % Grubbing 2 Excavation Km % 3 Embankment Top Km % 4 Sub Grade Top Km % 5 GSB Km % 6 WMM-1 Km % 7 WMM - 2 Km % 8 DBM - Widening Km % 9 DBM - Overlay Km % 10 BC Km % 11 PQC Km 1.2 Existing (Toll Plaza at Ch to Both Sides) Monthly Progress Report September 2015 Page 9
10 1c. HIGHWAYS -Service Road Sl Description Unit Total Scope (Km) Completed Percentage achieved 1 Clearing & Grubbing Km % 2 Excavation Km Embankment Top Km % 98.53% 4 Sub Grade Top Km % 5 GSB Km % 6 WMM-1 Km % 7 WMM - 2 Km % 8 DBM Km % 9 BC Km % 10 PQC `Km 0.9 Existing (At Ch to LHS Service Road) ** The Existing carriageway LHS (i.e. Hosur to Krishnagiri ) carriageway between Km to Km is proposed to be used as carriageway of service road on LHS. 9.1.d. Structure: Sl. No Structure Unit As Per CA Additional Total Work to be done at site In Progress Completed 1 Box Culverts Nos Pipe Culverts Nos Minor Bridge Nos Major Bridge Nos Flyovers Nos Vehicular Under pass Nos Pedestrian Under pass Nos Girders casting - Nos Nos RE wall Panel Sqm 68,500-68,500 68,500 Casting 10 RE wall Erection Sqm 67,252-67,265 67,265 Remarks 3 nos not in site,1 no cross road Monthly Progress Report September 2015 Page 10
11 9.1.e.Major structures status: Sl.no Description Location Status Remarks 1 Major Bridge Completed miscellaneous works are in progress 2 Minor Bridge Completed miscellaneous works are in progress. 3 Minor Bridge Completed miscellaneous works are in progress Completed miscellaneous works are in progress. 4 Minor Bridge Completed miscellaneous works are in progress. 5 Minor Bridge Completed miscellaneous works are in progress. 6 Flyover Completed miscellaneous works are in progress. 7 Flyover Completed miscellaneous works are in progress. Completed miscellaneous works are in progress. 8 Flyover Completed miscellaneous works are in progress. 9 VUP Completed miscellaneous works are in progress. 10 VUP Completed miscellaneous works are in progress 11 VUP Completed miscellaneous works are in progress 12 VUP Completed miscellaneous works are in progress 13 VUP Completed miscellaneous works are in progress 14 PUP Completed miscellaneous works are in progress. 15 PUP Completed miscellaneous works are in progress 16 PUP (VUP) Completed miscellaneous works are in progress 17 PUP Completed miscellaneous works are in progress 18 PUP Completed miscellaneous works are in progress 19 PUP Completed miscellaneous works are in progress 20 PUP Completed miscellaneous works are in progress 21 PUP Completed miscellaneous works are in progress Monthly Progress Report September 2015 Page 11
12 Structure Location Wall RE WALL STATUS - As on Structure RE WALL AREA (Sqm) Completed Balance Remarks RE WALL PUP RE WALL PUP RE WALL Flyover RE WALL Flyover RE WALL PUP RE WALL VUP RE WALL VUP RE WALL VUP RE WALL VUP RE WALL PUP RE WALL VUP RE WALL PUP RE WALL PUP RE WALL Flyover 2, , , , , , , , , , , , , , , , , , , , , , , , , , , , Retaining wall (RCC) Retaining wall (RCC) PUP PUP 67,265 67,265-2, , , , , , Monthly Progress Report September 2015 Page 12
13 9.1.f. STATUS OF PROJECT FACILITIES : SL CA Ref Annexure Description Unit Scope as pe CA Schedule - C Executed at site Balance to be completed Description of Project Facilities Toll plaza - One toll plaza (six lanes in each direction) exists at km 87. It shall Nos be designed as per the guidelines of 1 1 manual Roadside furniture; 4 Traffic Signs: Traffic signs include roadside signs, overhead signs and (i) kerb mounted signs along the entire Nos Project Highway Chevorn Sign boards Nos Overhead signs: 16 Nos (Excluding overhead signs at Toll Plaza location which are given in schedule D) a) 14 Nos Cantilever Type with size (ii) 4.0m x 1.2m, b). 2 Nos overhead sign. with size 3- lane width x 1.2m Nos (iii) Pavement Markings: Pavement markings shall cover road marking for the entire Project Highway MCW Km Service Road Km (iv) LED Traffic Beacons: These shall be provided on the entire Project Highway near pedestrian crossings, public gathering places (Educational Institutions, Hospitals, Worshipping Nos Monthly Progress Report September 2015 Page 13
14 Places, etc.), cross roads, median openings & entry / exit of service roads / ramps (v) (vi) (vii) Delineators and studs: The studs (100mmx100m x10mm) with reflective panels of dual prismatic cube capable of providing total reflection of light entering the lens face for lane marking and delineation for night time visibility for the entire Project Highway. Studs Nos Delineators Nos Boundary stones: shall be provided for the entire Project Highway Nos Hectometre / Kilometre stones: shall be provided for the entire ProjectHighway Hectometer Nos Kilometer Nos Highway lighting: - Lighting shall be provided for main carriageway and service road at the locations in built up areas, flyovers, underpasses (PUP Nos and VUP), Toll Plaza and its approaches, Rest areas, Truck Lay Byes and Bus Stops as per Schedule D Street Lighting in Urban area Km Undrpass and Flyovers Nos VUP,PUP in Rural Areas Km Bus bays Nos Toll plaza Nos 1-1 Rest area Nos Pedestrian facilities (i) Pedestrian guardrail: Provide 150m of pedestrian guardrail at each bus bay location. Nos Monthly Progress Report September 2015 Page 14
15 Ramps/Steps: Provide Ramps/Steps at (iii) Flyovers on cross road Nil Nil - 15 Pedestrian Crossings: Provide pedestrian crossing facilities on (iv) service roads Nos Landscaping and tree plantation Median Plantation: at locations where (i) Km the median width is 4.5m and more (ii) Landscaping: at Service area, Interchanges, Entry/Exit ramps (ii) Avenue plantation Nos Rest Area (Service Area) - The available land between the carriageways from km 68/3 to km 68/8 to develop as truck laybye with rest area facilities Nos Bus-bays and bus shelters Nos Highway Patrol: Provide the facility of highway patrolling covering the entire ProjectHighway. These shall confirm to the specifications mentioned in Schedule D. Ambulance(s) : Provide the ambulance(s) services covering the entire Project Highway. These shall confirm to the specifications mentioned in Schedule D. Cranes: Provided the crane services covering the entire Project Highway. These shall confirm to the specifications mentioned in Schedule D Advance Traffic Management Systems (ATMS)- Provide the Advance Traffic Management Systems covering the entire Project Highway. These shall confirm to the specifications mentioned in Schedule D. Nos Nos Nos LSM 1-1 Monthly Progress Report September 2015 Page 15
16 Progress up to Description Target Achieved Ahead / -Behind Physical Progress ( % ) Cumulative Physical Progress: Physical Progress Up to Aug This month Up to Sep-2015 Cumulative Schedule Progress (%) Cumulative achieved progress (%) Cumulative Financial Progress - work done Crs Details Cumulative Schedule Expenditure (Rs. in Crores) Cumulative Achieved Expenditure (Rs.in Crores) Up to Aug This month Up to Sep (%) Cumulative Achieved Progress 97.20% 0.54% 97.74% Financial Progress (Expended Project Cost) Sl Description Amount Remarks 1 Total work done up to September Rs Crores Expended EPC cost up to September Rs Crores For 840 Crores Overheads and other expenses Rs.85.00Crores Expended Total Project cost up to September Rs Crores For Crores Monthly Progress Report September 2015 Page 16
17 9.2 Design / Drawing Submission Status : 9.2.a. Highways : Sl.no Description Remarks 1 Base plan Submitted 2 Project Quality Plan Submitted 3 Construction Programme Submitted 4 Survey & Engineering Report Submitted 5 Environmental Management Plan Submitted 6 Health & safety Management Plan Submitted 7 Typical C/S Submitted 8 Submission of Traffic Assessment and pavement Design Report Submitted 9 Submission of plan and profile drawing for Main Carriageway and Service Road 10 Submission of Project Facilities as per modified Schedule C Submitted Under Progress 9.2.b. Structures: Sl. No Description Unit Total Scope Submitted Balance to be submitted Remarks 1 Major Bridges No Minor Bridges No Fly Over No Vehicular Under Pass No Pedestrian Under Pass No Pipe Culverts No Box/Slab culverts No RE wall No RCC Wall No Monthly Progress Report September 2015 Page 17
Hosur Krishnagiri Project Of NH-7
9. INSPECTION AND MONITORING OF THE CONSTRUCTION WORKS. PROGRESS UP TO 31 May 2015 1a. HIGHWAYS - MCW & Service Road Sl Description Unit Total Scope (Km) Completed Percentage achieved % 1 Clearing & Grubbing
More informationHosur Krishnagiri Project Of NH-7
. INSPECTION AND MONITORING OF THE CONSTRUCTION WORKS. PROGRESS UP TO 31st October 2014.1. a. HIGHWAYS - MCW & Service Road Sl Description Unit Total Scope (Km) Completed Percentage achieved % 1 Clearing
More informationProject Details. Description. 2 Commencement date of Concession 9 May Schedule Commencement date of O&M
Project Details NH-45 (popularly known as GST Road) is one of the important National Highways, which connects Chennai, the Capital City of Tamilnadu with the southern districts of the State, including
More informationNational Highways Authority of India (Ministry of Road Transport & Highways)
National Highways Authority of India (Ministry of Road Transport & Highways) Monthly Progress Report (MPR) March 2016 Independent Engineering Services for the work of four Laning of Tirupati- Tiruthani-Chennai
More informationMONTHLY (O&M) PROGRESS REPORT
NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Shipping, Road Transport & Highways) Government of India Improvement, Operation and Maintenance, Rehabilitation and Strengthening of Existing 2- Lane Road
More informationMONTHLY (O&M) PROGRESS REPORT
NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Shipping, Road Transport & Highways) Government of India Improvement, Operation and Maintenance, Rehabilitation and Strengthening of Existing 2- Lane Road
More informationSECTION DESCRPTIONS PAGE NOS.
Four Laning of Farakka Raiganj Section of NH -34 from Km 295.00 to Km 398.00 in the State of West Bengal under NHDP phase III on Design, Build, Finance, Operate SECTION DESCRPTIONS PAGE NOS. 1 Summary
More informationSECTION DESCRPTIONS PAGE NOS.
Four Laning of Farakka Raiganj Section of NH -34 from Km 295.00 to Km 398.00 in the State of West Bengal under NHDP phase III on Design, Build, Finance, Operate SECTION DESCRPTIONS PAGE NOS. 1 Summary
More informationMONTHLY PROGRESS REPORT MAY-2014
ESSEL AHMEDABAD GODHRA TOLL ROADS LIMITED (A Special Purpose Vehicle of Essel Infra Projects Limited) FOUR LANING OF AHMEDABAD TO GODHRA SECTION OF NH- 59 FROM KM 4.200 TO KM 122.420 IN THE STATE OF GUJARAT
More informationPCDO. Jan Launched portion of Viaduct Deck Structure from S-180 (KATRA- BANIHAL SECTION) Udhampur-Srinagar-Baramulla Rail Link Project
PCDO Jan-2018 Launched portion of Viaduct Deck Structure from S-180 (KATRA- BANIHAL SECTION) Udhampur-Srinagar-Baramulla Rail Link Project Northern Railway vuqjkx dqekj lpku vkbzvkj,lb Anurag Kumar Sachan
More informationNational Highways Authority of India (Ministry of Road Transport & Highways)
National Highways Authority of India (Ministry of Road Transport & Highways) ANNUITY PROJECT - NH 45 TAMBARAM TO TINDIVANAM (KM 28.000 TO KM 121.000) MONTHLY O&M REPORT MAY - 2018 INDEPENDENT ENGINEER
More informationROAD DEVELOPMENT PROJECTS IN KARANTAKA
ROAD DEVELOPMENT PROJECTS IN KARANTAKA August 2010 1 Road Development Projects in Karnataka Provide an integrated road network in the State with the following broad objectives: To make road connectivity
More informationRef: As per Schedule-P, Volume-ll of Concession Agreement.
Plot No. 11, Shrirang Colony, NearA-one Petrol Pump, Old Agra Road, Deopur, Dhule 424005, Maharashtra, India. +91 +91 DHULE- PIMPALGAON (NH-3) BOT PROJECT K&J/DPN H/TL 201 5l o 2-5-
More informationNational Highways Authority of India (Ministry of Road Transport & Highways)
National Highways Authority of India (Ministry of Road Transport & Highways) Monthly Inspection Report October 2014 Independent Engineering Service for four Laning of Maharashtra/Karnataka Sangareddy Section
More informationIndian Highways. Emerging Opportunities for Profitable Partnership. Government of India. Ministry of Shipping, Road Transport & Highways
Conceived & Designed by New Ink Publications Pvt. Ltd. Indian Highways Emerging Opportunities for Profitable Partnership Government of India This brochure has been prepared by the Information Technology
More informationMadhya Pradesh Road Development Corporation: A Case Study of ADB Assistance for Institutional Development in the Transport Sector in India
Madhya Pradesh Road Development Corporation: A Case Study of ADB Assistance for Institutional Development in the Transport Sector in India South Asia Transport Team Presented by Prodyut Dutt Asian Development
More informationThis section is illustrated in Figure The length of this section is approximately 24.5 km.
4.2.5 Section 5: Ntafufu River to Lusikisiki (Magwa Intersection) This section is illustrated in Figure 4.19. The length of this section is approximately 24.5 km. It is proposed to upgrade and rehabilitate
More informationCase Study: Bangalore Elevated Tollway Limited, Bangalore
Case Study: Bangalore Elevated Tollway Limited, Bangalore Project Brief: Bangalore Elevated Tollway Limited (BETL) is the Special Purpose Vehicle (SPV) created to undertake the Construction, operation,
More informationULUNDURPET EXPRESSWAYS PRIVATE LIMITED MONTHLY O&M REPORT JANUARY Submitted to:
UEPL ULUNDURPET EXPRESSWAYS PRIVATE LIMITED MONTHLY O&M REPORT JANUARY 2016 Submitted to: NATIONAL HIGHWAYS AUTHORITY OF INDIA & CDM SMITH INDIA PRIVATE LIMITED Ulundurpet Expressways Pvt. Ltd. Monthly
More informationSano Milti Khola Hydropower Project, Fulasi VDC, Ramechhap (3 MW)
Sano Milti Khola Hydropower Project, Fulasi VDC, Ramechhap (3 MW) Monthly Progress Report Prepared by : Sano Milti Khola Hydropower Limited www.smi.com.np smi.investment.limited@gmail.com Date : June,
More informationDate of Issue: For: County Engineer. County Road No.: Maintenance Area: Section Forman Payment Required: (Options: Cash Cheque Credit Card)
County of Wellington Engineering Services Department Roads Division 74 Woolwich Street Guelph, Ontario N1H 3T9 Phone: (519) 837-2601 Fax: (519) 837-8138 Email: roadsinfo@wellington.ca ENTRANCE PERMIT OWNER/APPLICANT
More informationConsultancy Services for 6 Laning of Belgaum-Dharwad section of NH-4 (NHDP V/MC-II/BOT/DPR/19) Feasibility Report. Consulting Engineers Group Ltd 2-1
CHAPTER 1: INTRODUCTION Consulting Engineers Group Ltd 2-1 CHAPTER 1: INTRODUCTION TABLE OF CONTENTS 1.1 Project Background.. 1-1 1.2 Objectives of Consultancy Services. 1-2 1.3 Scope of Consultancy Services
More informationTransportation Improvement Program (TIP) Candidate Project List for Public Review
2011-2014 Transportation Improvement Program (TIP) Candidate List for Public Review Table 1 Annual Listing Of Federal Aid Obligation For Federal Fiscal Year 2010 North Dakota s Number Transit 410083 Transit
More informationHighway Drawings. Government of Maharashtra. Public Works Department
Government of Maharashtra Government of Maharashtra Construction of Two-laning Road with paved shoulders, under Package HAM-AU 108 in the State of Maharashtra, under MRIP on Hybrid Annuity Mode Package
More informationPN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS
PN 420-10/21/2016 - SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS DESCRIPTION: The surface tolerance specification requirements are modified as follows for all pavements of constant width with at least
More informationULUNDURPET EXPRESSWAYS PRIVATE LIMITED
UEPL ULUNDURPET EXPRESSWAYS PRIVATE LIMITED MONTHLY O&M REPORT JANUARY 2017 Submitted to: NATIONAL HIGHWAYS AUTHORITY OF INDIA Ulundurpet Expressways Pvt. Ltd. Monthly O&M Report Contents Page No 1. Executive
More informationCity of Grand Forks Staff Report
City of Grand Forks Staff Report Service/Safety Committee December 15, 2015 City Council December 21, 2015 Agenda Item: Amendment No. 1 to Engineering Services Agreement with CPS for City Project No. 7143,
More informationCOST ESTIMATES: Curb-Running
COST ESTIMATES: Curb-Running PROJECT FEASIBILITY COST ESTIMATE SUMMARY Geary Bus Rapid Transit Study Alternative: Side Lane (Curb Running) Date: 4/12/07 Percent Cost Total Project Capital Outlay I- Roadway
More informationRURAL ROAD MAINTENANCE PROGRAM GUIDELINES
RURAL ROAD MAINTENANCE PROGRAM GUIDELINES April 2015 Contents: Overview:.. 1 Policy Goals and Objectives:... 1 Definitions:.. 1 Program Requirements:. 2 Road Standards and Specifications: 3 Right-of-Way:....
More informationECONOMIC AND FINANCIAL ANALYSIS
South Asia Subregional Economic Cooperation Dhaka Northwest Corridor Road Project, Phase 2 (RRP BAN 40540) A. Introduction ECONOMIC AND FINANCIAL ANALYSIS 1. The proposed project primarily aims at capacity
More informationNational Highways Authority of India (Ministry of Road Transport & Highways)
National Highways Authority of India (Ministry of Road Transport & Highways) Monthly Inspection Report September 2014 Independent Engineering Service for four Laning of Maharashtra/Karnataka Sangareddy
More information4.1 BROAD DESCRIPTION OF PROPOSED PROJECT
CHAPTER 4 PROJECT DESCRIPTION This chapter firstly provides a broad description of the proposed N2 Wild Coast Toll Highway, followed by a detailed description of the proposed construction activities that
More informationA428 Western Corridor Guided Bus Route Options
Guided Bus Route Options for Cambridgeshire County Council Guided Bus Route Options Document Status Document status Revision Date Status or comment Prepared by Checked by Authorised by 10/08/2017 First
More informationTHE CENTRAL ROAD FUND (AMENDMENT) BILL, 2017
1 AS INTRODUCED IN LOK SABHA Bill No. 114 of 2017 5 54 of 2000. 10 82 of 1985. THE CENTRAL ROAD FUND (AMENDMENT) BILL, 2017 A BILL further to amend the Central Road Fund Act, 2000. BE it enacted by Parliament
More informationPublic Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP)
Public Information Packet FY - Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP) Comment Form Annual Element TIP Projects - TIP Projects Year - Metropolitan Transportation Improvement
More informationAppendix F-1 Description of the Long-Term Alternatives
Appendix F-1 Description of the Long-Term Alternatives Memorandum Page 1 of 21 Project No. 9309 Phase 280 Date June 2, 2015 From Chris Sidlar (LEA) To Edward Presta / City of Toronto C.C. Terry Wallace
More informationBALESHWAR KHARAGPUR EXPRESSWAY LIMITED (BKEL)
BALESHWAR KHARAGPUR EXPRESSWAY LIMITED (BKEL) MONTHLY PROGRESS REPORT MAY, 2015 INDEX 1.0 Project Brief... 2 2.0 Project Details... 4 2.03 Scope of Work.5 Development of the Project Highway includes Construction
More informationARTICLE 24. OFF-STREET PARKING AND LOADING REQUIREMENTS
ARTICLE 24. OFF-STREET PARKING AND LOADING REQUIREMENTS 1. APPLICABILITY : A. C-1 Exempt: Off-street parking and loading space, as required in this article, shall be provided for all new buildings or additions
More informationCITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6
2016 2019 CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6 STRATEGIC AREA OF FOCUS: SUB-PRIORITY: STRATEGY: INITIATIVE: INITIATIVE LEAD(S): BUILDING A SUSTAINABLE CITY
More informationBINGHAMTON METROPOLITAN TRANSPORTATION STUDY
BINGHAMTON METROPOLITAN TRANSPORTATION STUDY ANNUAL LISTING OF FEDERAL AID PROJECT OBLIGATIONS FEDERAL FISCAL YEAR Federal regulations require an annual listing of transportation projects, including investments
More informationABSTRACT OF COST FOR PAVEMENT
CHAPTER - 5 ABSTRACT OF COST FOR PAVEMENT Name of Work :- CONSTRUCTION OF TRANS - ARUNACHAL HIGHWAY (SH:- Road from Khodaso (Ch. 110.450 Km) to Dakte Hoj (Ch. 212.450 Km) via Sagalee, Toru, Kheel - 102.000
More informationEQUIPMENT AVAILABLE FOR KWRP SITE AS ON Sl.No
EQUIPMENT AVAILABLE FOR KWRP SITE AS ON 30.06.2013 Sl.No Name of Equipment / apparatus/ Tool & Plant with Capacity SOIL 1 CBR Testing Machine set - 2 2 Proving ring of 50 KN 2 3 Proving ring of 25 KN 4
More informationCUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS TRAFFIC CONTROL STANDARDS
CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS TRAFFIC CONTROL STANDARDS Supplement to O.D.O.T. TRAFFIC ENGINEERING MANUAL November 26, 2013 Revisions to the June 22, 2011 edition are noted by a vertical line
More informationPARAPETS / RAILS / MEDIANS / SIDEWALKS TABLE OF CONTENTS CHAPTER 25
TABLE OF CONTENTS CHAPTER 25 FILE NO. TITLE DATE TABLE OF CONTENTS AND INTRODUCTION 25.TOC-1 Table of Contents Chapter 25... 08Aug2018 25.00 Introduction Chapter 25... 03May2018 VDOT STANDARD PARAPETS
More informationTITLE 16. TRANSPORTATION CHAPTER 27. TRAFFIC REGULATIONS AND TRAFFIC CONTROL DEVICES
NOTE: This is a courtesy copy of this rule. The official version can be found in the New Jersey Administrative Code. Should there be any discrepancies between this text and the official version, the official
More informationNight Work Specification
Night Work Specification 1.0 Hours of Work The contractor is advised that most work for this contract will be carried out during night time hours. For the purposes of this contract night is defined as
More informationTER WP2 Transport Challenges and Global Crisis. Dr. Klaus Schierhackl, CFO Bad Gastein,
TER WP2 Transport Challenges and Global Crisis Dr. Klaus Schierhackl, CFO Bad Gastein, 23.4.2009 1 ASFINAG Group is the 3rd largest concessionaire in Europe responsible for a network of more than 2.100
More informationECONOMIC AND FINANCIAL ANALYSIS
Second Jharkhand State Road Project (RRP IND 49125) ECONOMIC AND FINANCIAL ANALYSIS A. Introduction 1. The project involves capacity augmentation and rehabilitation of four state highway sections in the
More informationCATEGORY 500 PAVING SECTION 535 PAVEMENT SURFACE PROFILE
CATEGORY 500 PAVING 1 of 9 SECTION 535.01 DESCRIPTION. This work shall consist of measuring the roughness of the final surface of hot mix asphalt (HMA) or portland cement concrete (PCC) pavements. The
More information:Tamil Nadu Generation and Distribution Corporation Limited: Delegation of powers of sanction to officers (TNEB Volume-II) - revised Communicated Reg
:Tamil Nadu Generation and Distribution Corporation Limited: Delegation of powers of sanction to officers (TNEB Volume-II) - revised Communicated Reg Technical Branch (Per) TANGEDCO Proceedings. (FB) No.
More informationPT4 Pump Station, Turkey
HEALTH AND SAFETY 9 PT4 Pump Station, Turkey PSG2 employees, Georgia KP 377, Azerbaijan 9 9 HEALTH AND SAFETY All efforts continued this quarter to observe the stringent health and safety targets set by
More informationDairy Cum Powder Plant
Profile of Dairy Cum Powder Plant ( a unit of TCMPF Ltd ) Ammapalayam (An ISO 22000 : 2005 FSMS Certified Dairy) The Tamil Nadu Co-Operative Milk Producers Federation Ltd., Chennai - 98 (Regn. No.: MD
More informationTEMPLATE OF THE NATIONAL REPORT
TEMPLATE OF THE NATIONAL REPORT TO BE PRESENTED BY EACH DELEGATION DURING THE ASECAP STUDY AND INFORMATION DAYS LJUBLJANA, 6-8 JUNE 2018 Network length The total length of the Polish Motorways network
More informationSOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015
SOUTHERN GATEWAY Transportation and Trinity River Project Committee 11 May 2015 Southern Gateway Project History Began in 2001 as a Major Investment Study [ MIS ], Schematic, and Environmental Assessment
More informationWentzville Parkway South Phase 2 & 2A
Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total
More informationEffective [one year after date of adoption] the provisions of this rule shall apply to:
VENTURA COUNTY AIR POLLUTION CONTROL DISTRICT RULE 55.1 PAVED ROADS AND PUBLIC UNPAVED ROADS (Adopted / / ) A. Applicability Effective [one year after date of adoption] the provisions of this rule shall
More informationAnalysis of Road Crash Statistics Western Australia 1990 to Report. December Project: Transport/21
Analysis of Road Crash Statistics Western Australia 1990 to 1999 Report December 2000 Project: Transport/21 Analysis of Road Crash Statistics Western Australia 1990 to 1999 December 2000 Client: Transport
More information800 Access Control, R/W Use Permits and Drive Design
Table of Contents 801 Access Control... 8-1 801.1 Access Control Directives... 8-1 801.2 Access Control Policies... 8-1 801.2.1 Interstate Limited Access... 8-1 801.2.2 Limited Access... 8-1 801.2.3 Controlled
More information2 Min. Min. Edge of. Edgeline See Note 3 PLAN VIEW. See Note 3. This distance may vary
8" Physical gore ( ) ( ) 250 Varies 250 TYPICAL RUMBLE STRIP PLACEMENT AT EXIT AND ENTRANCE RAMPS This distance may vary This distance may vary ( ) 2 16" edge of R=12" Max ( ) Physical gore Texturing 1.
More informationSuggested improvements to existing decanting station at Anna stadium Trichy
Suggested improvements to existing decanting station at Anna stadium Trichy April 2018 TECHNICAL SUPPORT UNIT: IN ASSOCIATION WITH: Document History and Status Sheet S. No. Issue Issued by Issued Date
More informationContract No: OASRTRS-14-H-MST (Missouri University of Science and Technology)
Smart Rock Technology for Real-time Monitoring of Bridge Scour and Riprap Effectiveness Design Guidelines and Visualization Tools (Progress Report No. 7) Contract No: OASRTRS-14-H-MST (Missouri University
More informationARAI/TA(4G_RV)/HORIBA/MEXA 584L/ Dated 25 Mar 2014
CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES M/s Horiba India Pvt. Ltd. Room 1521, 15 th Floor, Eros Corporate Tower, Nehru Place New Delhi 110 019 Cert Annex Drg Total 1 7 0 8 pgs Exhaust
More informationPlease Read Carefully
Please Read Carefully Name Address Address Address ANNE BRERETON DIRECTOR FOR PLACES Central Depot, Moat Lane Solihull West Midlands B91 2LW Tel: 0121 704 6103 Fax:0121 704 8162 Email: jwilkins@solihull.gov.uk
More informationDealership Application form
MKT/01/05 MAN Trucks India Pvt. Ltd. 1. Proposed Dealership at: Proposed Dealership (2S or 3S)*: Dealership Application form Affix photograph of main Applicant * 2S - Service and Spares; 3S - Sales, Service
More informationTulsa Transportation Management Area. Urbanized Area Surface Transportation Program
Tulsa Transportation Management Area Urbanized Area Surface Transportation Program FFY 2022 Application Information Sponsor Location Description STP Request Other Funds Broken Arrow Elm Place: Kenosha
More informationSection 6H.01 Typical Applications
December 27, 2010 Draft Page 6H-1 Section 6H.01 Typical Applications Support: 01 Whenever the acronym TTC is used in this Chapter, it refers to temporary traffic control. 02 The needs and control of all
More informationDISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (15-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual
DISTRIBUTION: Electronic Recipients List MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards Unit ISSUED BY: Office of Project Management and Technical Support TRANSMITTAL LETTER NO.
More informationELMORE COUNTY HIGHWAY DEPARTMENT
Adopted 11/27/06 Effective 2/1/07 Amended 4/10/08 ELMORE COUNTY HIGHWAY DEPARTMENT 155 County Shop Road Wetumpka, Alabama 36092 Phone (334) 567-1162 Fax (334) 567-1100 Access Management Policy The Elmore
More informationTRAVEL DEMAND FORECASTS
Jiangxi Ji an Sustainable Urban Transport Project (RRP PRC 45022) TRAVEL DEMAND FORECASTS A. Introduction 1. The purpose of the travel demand forecasts is to assess the impact of the project components
More informationPN 420-7/18/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS
PN 420-7/18/2014 - SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS DESCRIPTION: The surface tolerance specification requirements are modified as follows for all mainline lanes and collector-distributor road
More informationAct 229 Evaluation Report
R22-1 W21-19 W21-20 Act 229 Evaluation Report Prepared for Prepared by Table of Contents 1. Documentation Page 3 2. Executive Summary 4 2.1. Purpose 4 2.2. Evaluation Results 4 3. Background 4 4. Approach
More informationDATABASE HEALTH INDEX - DASHBOARD
Page 1 of 7 DATABASE HEALTH INDEX - DASHBOARD Carriageway Asset Inventory Collected Data Non-Carriageway Asset Inventory Area: PSMC 006 Date: 5/09/2013 Category Measures Result Measure Capital Projects
More informationPriority Transport Projects in Republic of Armenia. 10th Eastern Partnership transport panel Brussels, 11 May 2016
Priority Transport Projects in Republic of Armenia 10th Eastern Partnership transport panel Brussels, 11 May 2016 Brief Presentation of North-South Road Corridor Investment Project Estimated length of
More informationGuidelines for Retro-fitting Existing Roads to Optimise Safety Benefits. A Practitioners Experience and Assessment of Options for Improvement.
Guidelines for Retro-fitting Existing Roads to Optimise Safety Benefits. A Practitioners Experience and Assessment of Options for Improvement. Author: Stephen Levett, Manager, Safer Roads Policy, Standards
More informationSafety Audits in Iowa
Safety Audits in Iowa National RSA Peer Exchange April 29-10, 2008 Little Rock, AR Tom Welch, P.E. State Safety Engineer Office of Traffic and Safety Iowa Department of Transportation From 3R to 1R We
More information[Insert name] newsletter CALCULATING SAFETY OUTCOMES FOR ROAD PROJECTS. User Manual MONTH YEAR
[Insert name] newsletter MONTH YEAR CALCULATING SAFETY OUTCOMES FOR ROAD PROJECTS User Manual MAY 2012 Page 2 of 20 Contents 1 Introduction... 4 1.1 Background... 4 1.2 Overview... 4 1.3 When is the Worksheet
More informationJanuary 13, 2012 AACE Annual Meeting, Wickenburg, AZ. I-15 in Arizona. Its Past, Present, and Future
January 13, 2012 AACE Annual Meeting, Wickenburg, AZ I-15 in Arizona. Its Past, Present, and Future Jean A. Nehme, Ph.D., P.E. State Bridge Engineer, ADOT Presentation Overview Location, History, and Photographs
More informationPARAPETS / RAILS / MEDIANS / SIDEWALKS TABLE OF CONTENTS CHAPTER 25
TABLE OF CONTENTS CHAPTER 25 FILE NO. TITLE DATE TABLE OF CONTENTS AND INTRODUCTION 25.TOC-1 Table of Contents Chapter 25... 28Dec2016 25.00 Introduction Chapter 25... 28Dec2016 VDOT STANDARD PARAPETS
More informationCITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE
CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE TUESDAY, DECEMBER 5, 2017 1 DISCUSSION TOPICS Update of Infrastructure Action Plan (IAP) o Sidewalk and Roadway projects
More informationARAI/TA(4G_RV)/SMS/D680/ Dated 21 st Mar 2015 CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES
CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES M/s SMS Autoline Equipments Pvt. Ltd. Plot No.AP215, 6 th Street, I Block, Vallalar Colony, Anna Nagar (West) Chennai 600 040 Cert Annex Drg
More informationRECEIVED. 1CIy. lir,;,ih!'ysapl " JV - VJA-GGt h.i
VIIAYAWADA GUNDUGOLUNU ROAD PROIECT PRIVATE LIMITED Flot # F-3, 1'r Floor, 5oi Residency. Acijocent lone to 5BI, Honumon Junction, Krishno District, Andhrq Prodesh - 521105. Ph. 08656-244222 Ref : VG RPP
More informationBALESHWAR KHARAGPUR EXPRESSWAY LIMITED (BKEL)
BALESHWAR KHARAGPUR EXPRESSWAY LIMITED (BKEL) MONTHLY PROGRESS REPORT JULY, 2015 INDEX 1.0 Project Brief... 2 2.0 Project Details... 4 2.03 Scope of Work.5 Development of the Project Highway includes Construction
More informationUPGRADING STANDARDS OF RIDING QUALITY IN BITUMINOUS CONCRETE A CASE STUDY
International Journal of Industrial Engineering& Technology (IJIET) ISSN 2277-4769 Vol. 3, Issue 3, Aug 2013, 21-34 TJPRC Pvt. Ltd. UPGRADING STANDARDS OF RIDING QUALITY IN BITUMINOUS CONCRETE A CASE STUDY
More informationChairperson and Committee Members REGULATORY MANAGEMENT COMMITTEE 3 SEPTEMBER 2015
Chairperson and Committee Members REGULATORY MANAGEMENT COMMITTEE 3 SEPTEMBER 2015 SPEED LIMIT CHANGE ON KĀPITI ROAD PURPOSE OF REPORT Meeting Status: Public Purpose of Report: For Decision 1 The purpose
More informationStatus Report on Bridges and Roads Repair/Renovations
Basis FOR Analysis Compliance with the Clean Water Act as set forth in a Consent Decree approved by the U.S. District Court of Guam in February 2004 Layon site selected by Government of Guam and approved
More informationCorridor Sketch Summary
Corridor Sketch Summary SR 241: I-82 Jct (Sunnyside) to SR 24 Jct Corridor Highway No. 241 Mileposts: 7.53 to 25.21 Length: 17.65 miles Corridor Description The seventeen and one-half mile corridor begins
More informationPERMIT FOR INSTALLATION ON COUNTY RIGHTS-OF-WAY: ACCESS DRIVEWAYS RESIDENTIAL
PERMIT FOR INSTALLATION ON COUNTY RIGHTS-OF-WAY: ACCESS DRIVEWAYS RESIDENTIAL Submit To Martin County Judge s Office P.O. Box 1330 Stanton Texas 79782-1330 mhernandez@co.martin.tx.us APPLICATION: Permittee
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: October 29, 2009 SUBJECT: BETWEEN $1,000,000 TO $5,000,000 FOR THE PERIOD AUGUST 1, 2009 TO SEPTEMBER 30, 2009 INFORMATION
More informationAPPENDIX 7.1 Annex E. South Kyle Wind Farm Abnormal Load Traffic Management Plan VATTENFALL
APPENDIX 7.1 Annex E South Kyle Wind Farm Abnormal Load Traffic Management Plan VATTENFALL Ref: 402-03640-00006 March 2013 VATTENFALL i Ref: 402.03640.00006 CONTENTS 1.0 INTRODUCTION... 2 1.1 Proposed
More informationMobility Vehicle Policy
Mobility Vehicle Policy Version 1 Approved by: Executive Team Approved date: 8 June 2017 1.0 Introduction 1.1 For many people, mobility vehicles are integral to addressing mobility needs. For local journeys,
More informationLAHORE RING ROAD SOUTHERN LOOP LAHORE RING ROAD PROJECT COMMUNICATION & WORKS DEPARTMENT GOVERNMENT OF THE PUNJAB PROJECT MANAGEMENT UNIT
COMMUNICATION & WORKS DEPARTMENT GOVERNMENT OF THE PUNJAB LAHORE RING ROAD PROJECT PROJECT MANAGEMENT UNIT LAHORE RING ROAD SOUTHERN LOOP February 22, 2011 NATIONAL ENGINEERING SERVICES PAKISTAN (PVT)
More informationThree Year Engineering Factors, SFY 2017 Report: Overhead Costs per Total Construction Costs
Three Year Factors, SFY 2017 Report: Overhead Costs per Costs 1/9/2018 Report Key: Projects are group by Work Type 1, and then work types are used to group projects into categories: qry01makekey 12/11/2017
More informationPresentation on URBAN TRANSPORTATION PLAN FOR MEERUT CITY. Presentation by: Meerut Development Authority
Presentation on URBAN TRANSPORTATION PLAN FOR MEERUT CITY Presentation by: Meerut Development Authority Meerut City An Overview Historical city - dating back to Ramayana and Mahabharata. In 1806 the cantonment
More informationARAI/TA (4G)/AIRVISOR/AVG500/ Dated 17 th Apr 2017
Airvisor Technologies Pvt. Ltd. H-155, Adhyapak Nagar, Nangloi, New Delhi 110041. CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES Cert Annex Drg Total 1 7 0 8 pgs Exhaust Gas Analyzer Model
More informationVolume Contents for NRA Manual of Contract Documents for Road Works
Volume Contents for Manual of Contract s for Road Works GE-GEN-01002 January 2016 General Standards TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure Ireland (TII)
More informationTEMPLATE OF THE NATIONAL REPORT
TEMPLATE OF THE NATIONAL REPORT TO BE PRESENTED BY EACH DELEGATION DURING THE ASECAP STUDY AND INFORMATION DAYS PARIS, 29-31 MAY 2017 Network length The total length of the Polish Motorways network as
More informationTransportation Highway Engineering Conference February 24, 2015
Transportation Highway Engineering Conference February 24, 2015 Today s Agenda Move Illinois status Jane Addams Memorial (I-90) Rebuilding and Widening Project Building a 21 st century corridor Incorporating
More informationWELLINGTON, NEW ZEALAND. PURSUANT to Section 152 of the Land Transport Act I, Harry James Duynhoven, Minister for Transport Safety,
WELLINGTON, NEW ZEALAND PURSUANT to Section 152 of the Land Transport Act 1998 I, Harry James Duynhoven, Minister for Transport Safety, HEREBY make the following ordinary Rule: Land Transport Rule: Setting
More informationBusiness Advisory Committee. November 3, 2015
Business Advisory Committee November 3, 2015 1 Today s Topics DEIS Cost Estimate 2 Assumptions Revised Cost Estimate Revised Project Scope Cost Estimate Overview Position Statement Discussion Municipal
More information