1 National Highways Authority of India (Ministry of Road Transport & Highways) Monthly Inspection Report October 2014 Independent Engineering Service for four Laning of Maharashtra/Karnataka Sangareddy Section of NH-9 from Km to Km in the States Of Karnataka and Andhra Pradesh to be executed as BOT (Toll) on DBFOT Basis under NHDP Phase-III (Package No. Kar /Phase-III/IC-3/ ) MH/KAR BORDER to SANGAREDDYSECTION OF NH-9 (New No. NH-65) CDM Smith Inc. in Joint Venture with Wilbur Smith Associates Pvt. Ltd. Site Office : Plot No. 126, 3 rd Venture, Defense (ODF) Colony, Rajam Pet,, Sangareddyi Medak Dt. Andhra Pradesh. India Phone: , cdmsmthsangazbd@gmail.com Bangalore Office : #75, 2 nd Floor, 80 Feet Road, R.T. Nagar Bangalore Karnataka. India Phone:

2 INDEX Sl. No. CONTENT Page Nos. 1 PROJECT DETAILS 1.1 Executive Summary Project Location Map Scope of the Project Project Details Project Mile Stones PROJECT KEY ORGANIZATIONS. 2.1 The Authority Independent Engineer Concessionaire PRECONSTRUCTION ACTIVITIES 3.1 Condition Precedent Land Acquisition Forest Clearance Environmental Clearance Giving Site Possession Applicable permits PRELIMINERY WORKS DURING DEVELOPMENT PERIOD 4.1 Shop Drawing Preparations Shifting of Utilities Tree cutting Removal of Structures affecting Preliminary Surveying works Video Recording of Existing Road corridors Submission of project related documents. 17

3 Sl. No. CONTENT Page Nos. 5. OVERVIEW OF WORK PROGRESS. 5.1 Mobilization of Contractor Progress of Road Works Progress of Structural Works Achievement of Milestones Plant and Machinery at Site Progress photographs QUALITY ASSURANCE AND QUALITY CONTROL RECORDS. 6.1 Status of RFI attended by Independent Engineer Laboratory Test Reports Defects and deficiencies Status of NCR MATRIAL USED AND SOURCE OF MATERIAL 7.1 Status of source approvals METHODOLOGIES OF WORK SAFETY. 9.1 General observations Specific observations Safety observation Photographs MAINTENANCE OF ROAD ISSUESAND ENCOMBRANCES PROGRESS PHOTOGRAPHS COMMENTS OF TEAM LEADER 28-29

4 ANNEXURES: Annexure 1 Annexure 2 Annexure 3 Annexure 4 Annexure 5 Annexure 6 Annexure 7 Annexure 8 Annexure 9 Annexure 10 Annexure 11 Annexure 12 Annexure 13 Status of Structural Drawing Approvals Status of Road Drawing Approvals Status of Water line Shifting Andhra Section Status of Water line Shifting Karnataka Section Status of Electrical line Shifting Andhra Section Status of Electrical line Shifting Karnataka Section Progress of Road works Progress of Structural works Plant and Machineries at Site. Laboratory Report summary. Source Approvals. Safety Photographs. Progress Photographs

5 IE / Sangareddy NH-9 1. PROJECT DETAILS. 1.1 EXECUTIVE SUMMARY The Government of India (GOI) through Ministry of Shipping Road Transport & Highways (MOSRT & H) is contemplating to enhance the traffic capacity and safety for efficient transportation of goods as well as passenger traffic on the heavily trafficked National Highways. The Government of India had entrusted National Highways Authority of India (NHAI) for the development, maintenance and management of National Highway No. 9 (NH- 65) section from km to km ( km) in the states of Karnataka and Andhra Pradesh and from km to km (75 km) in the state of Karnataka and from Km to in Andhra Pradesh (Now Telangana) In order to provide a better level of service to the vehicular traffic and to augment the capacity of NH9 by widening the existing 2 lane to 4 lanes divided carriageway facility including strengthening of the existing 2 lane, it has been decided to carry out the works on Design, Build, Finance, Operate and Transfer (DBFOT) Toll Basis Under NHDP, Phase-III. 1.2 PROJECT LOCATION MAP 1 P a g e

6 IE / Sangareddy NH SCOPE OF THE PROJECT: The scope of the project shall include the following during the Concession period: Construction of the project highway on site as set forth in Schedule A and as specified in Schedule B together with provision of Project Facilities as specified in Schedule C and standards as set forth in Schedule D of the Concession agreement. See the Section (4) brief details of the project summarized. Operation and Maintenance of the project highway in accordance with the provisions of the Concession Agreement. Performance and fulfillment of all other obligations in accordance with the provisions and matters incidental thereto or necessary for the performance of any or all of the obligations of the concession agreement by the Concessionaire. 1.4 PROJECT DETAILS: Project Brief: Scope of Project : Location : Four Laning of Maharashtra/Karnataka Boarder to Sangareddy Section of NH-9 from Km to Km in the States of Karnataka and Andhra Pradesh to be executed as BOT (Toll) on DBFOT Basis under NHDP Phase-III Karnataka & Andhra Pradesh (Now in Telangana) Project Cost : Ind. Rs Cores (216 Mill US$) Length : Construction Period : km from Ch to Ch of NH months Maintenance Period : 25 Year including Construction Period Concession period : 25 Years from Appointed date 2 P a g e

7 IE / Sangareddy NH-9 Major Parties Involved: PARTY ORGANIZATION SHORT NAME Employer National Highways Authority of India NHAI Concessionaire L&T Deccan Toll ways Limited L&T DTL Funding Agent Punjab National Bank PNB Independent Engineer M/s CDS Smith JV with Wilbur Smith CDM Smith EPC Contractor L&T ECC-Infra IC Ltd. ECC Safety Consultant M/s HAKS Engineers, Architects and Land Surveyors, HAKS-ITE P.C. in Association with Info Trans Engineers Pvt. Ltd. (HAKS-ITE) Owner s Engineer Halcrow International Halcrow Design Consultants L & T Ramboll L & T Ramboll Project Management Consultant M/s LEE Associates South Asia LASA Project Salient Features The Authority Independent Engineer (IE) Agreement No. of IE National Highways Authority of India (NHAI) CDM Smith Inc. In Joint Venture with Wilbur Smith Associates Pvt. Ltd. Package No. Kar /Phase-III/IC-3/ Date of start as per contract of IE The Concessionaire The EPC Contractor M/s L&T Deccan Toll ways Limited Subsidiary of L&T IDPL Chennai (TN) M/s L&T ECC IC Date of agreement 11th February 2012 Period of Construction Date of Commencement of Construction (appointed date) Date of Completion of Construction The Concession Period Project Cost Project Length 30 Months (910 days from the appointed date) 1st April Sep Years (Including Construction period) Crores Kms Financial close date Execution of Escrow agreement Date of submission of Performance Security Lenders Name (Amount: Crores.) Yet to be 3 P a g e

8 IE / Sangareddy NH-9 Lenders Contribution Grant from NHAI (Equity support) 60% of the PC Nil Contribution by Concessionaire 40% Date of Appointment of Safety Consultant Safety Consultant 24/04/2014 (LOA Date) M/s HAKS - ITE Major Structures in the Project (Salient Features of the Project) Description Length (KM)/Nos TS Section Kar Section Main Road (KM) By Passes (KM) Service Roads (KM) Drains (Concrete/Pipe/Masonry/Open) (KM) Major Intersections Minor Intersections New Major Bridges Existing Major Bridges (Rehab.) Minor Bridges Railway Bridges 1 1 Under Passes/Flyover Box /Slab Culverts Pipe Culverts Tunnel Bus Bays Bus Shelters Truck lay byes Toll Plaza Rest Area/Wayside amenities NIL 4 P a g e

9 IE / Sangareddy NH PROJECT MILE STONES: As per the SCHEDULE-(G) Of Concession Agreement: 1st Mile Stone I: Project Mile Stone I shall occur on the date falling on the 180th day from the Appointed Date i.e Prior to the Project Mile Stone I, the Concessionaire shall have commenced construction of the Project Highway and expended not less than 10% of the total capital cost set forth in the Financial Package. Comment of IE: 1 st Mile Stone reached. 2nd Mile Stone: 400 days from appointed date i.e % of Project Cost and Concessionaire shall have started all bridges. Comment of IE: Nil 3rd Mile Stone: 650 days from appointed date i.e To be expended 70% of the Project Cost and shall have commenced all Project facilities. Comment of IE: Nil Scheduled Completion Date: The Scheduled Four laning date i.e., shall occur on the [910th (Nine Hundred and Ten) day from the appointed date. On or before the Scheduled Four laning date, the Concessionaire shall have completed Four laning and also the sections where two lane with Paved Shoulders are allowed in accordance with this agreement and Schedules Comment of IE: Nil Extension of Time (EOT): Comment of IE: Nil 5 P a g e

10 IE / Sangareddy NH-9 2. KEY ORGANIZATIONS OF THE PROJECT: 2.1 The Authority. The Authority of the Project is National Highway Authority of India (NHAI).The project is controlled and monitored by the Projects Division of NHAI headed by Member Projects Brief details of Authority structure: Authority Project Director Project Office Contract Details National Highway Authority of India (NHAI) Mr. P.S. Dodamani PD-PIU (Project Implementation Unit) Plot No.65, Kothari Layout, Venkatesh Nagar GULBARGA , Karnataka INDIA piugulbarga@gmail.com, piugulbarga@nhai.org Landline: Fax: Obligations of the Authority: (i) (ii) (iii) (iv) (v) (vi) Enable access to the Site to the concessionaire, free from Encumbrance. Permit peaceful use of the site by the concessionaire as licensee without any let or hindrance from NHAI or persons claiming through or under it. Upon written request from the concessionaire, assist the Concessionaire in obtaining access to all necessary infrastructure facilities and utilities, including Water, Electricity and Telecommunication facilities at rates and on terms no less favorable to the Concessionaire than those generally available to commercial customers receiving substantially equivalent services. Enter into the State Support Agreement with the Concessionaire and the Government of Karnataka and Andhra Pradesh. Operate and Maintain the Project Highway during the Development Period, as its own cost and expense. Take all necessary steps towards accomplishment of acquisition of additional land. NHAI shall bear the cost of additional land. (vii) Provide necessary support to the Concessionaire in obtaining necessary clearances / permissions / permits in respect of Environmental Clearances, Tree cutting, Compensatory afforestation, shifting of all types of utility services, and rehabilitation and resettlement. 6 P a g e

11 IE / Sangareddy NH Independent Engineer. Details of Independent Engineer Name of Independent Engineer Head Office Project Office Date mobilized at project. Contract period. CDM Smith Inc. JV with Wilbur Smith India Pvt Ltd., No 75, II Floor, 1 st Block, RT Nagar, Bangalore Karnataka Plot no. 126, 3rd Venture-ODF Colony, Rajampet, Sangareddy Medak (DT) Telangana State 18 March Months Contact Details. cdmsmithsangazbd@gmail.com Landline: Cell no Head Office : Obligations of Independent Engineer. (viii) (ix) (x) (xi) (xii) (xiii) (xiv) (xv) Review of the Drawings and Documents as set forth in the agreement. Review, inspection and monitoring of Construction Works as set forth in the Agreement. Conducting Tests on completion of construction and issuing Completion/ Provisional Certificate as set forth in the Agreement. Review, inspection and monitoring of O&M as set forth in the Agreement. Review, inspection and monitoring of Divestment Requirements as set forth in the Agreement. Determining, as required under the Agreement, the costs of any works or services and/or their reasonableness. Determining, as required under the Agreement, the period or any extension thereof, for performing any duty or obligation; Assisting the Parties in resolution of disputes as set forth in Paragraph ix; and (x) undertaking all other duties and functions in accordance with the Agreement. 3.2 The Independent Engineer shall discharge its duties in a fair, impartial and efficient manner, consistent with the highest standards of professional integrity and Good Industry Practice. 7 P a g e

12 IE / Sangareddy NH-9 Composition of Independent Engineer SI Date Name Designation No Mobilized Key Personnel (Professional Staffs) 1 Mr. W H Susil Priyantha Team Leader Mrs. Padmaja /Prema Kumari Sr. Bridge Design Engineer Mr. Amarender Mallepaka Resident cum Highway Engineer Mr. Atul G Sakharkar Resident cum Highway Engineer Mr. Gagan Trivedi Highway Design Engineer Mr. Jimmy Thamos Highway Design Engineer Mr. T. Linga Murthy Bridge / Structural Engineer To be named (TBN) Sr. Pavement Specialist - 9 Mr. SK M.M. Ahammad Sr. Quality cum Material Expert Mr. Vittal Puvvada Traffic & Transportation Expert - 11 To be named (TBN) Road Safety Expert 12 Mr. M. Shankar Narayanan Financial Expert 13 Mr. J. Dhanvandh Legal Expert Sub-Professionals 1 To be named (TBN) Survey Engineer-1 2 To be named (TBN) Survey Engineer-2 3 To be named (TBN) Survey Engineer-3 4 To be named (TBN) Survey Engineer-4 5 Mr. B. Shiva Prasad Asst. Highway Engineer-1 01/10/ Mr. Vamsi Mungara Asst. Highway Engineer-2 07/10/ Mr. S. Ravinder Asst. Highway Engineer-3 8 Mr. V. Raju Asst. Highway Engineer-4 To be named (TBN) CAD Expert To be named (TBN) CAD Expert-2 11 To be named (TBN) Environmental Engineer 12 Mr. Ramesh Babu Asst. Bridge Engineer-1 25/09/ Ms. Indira Priyadarshini Asst. Bridge Engineer-2 25/09/ Mr. Umakanth Asst. Bridge Engineer-3 08/10/ Mr. Aneel Kumar Asst. Bridge Engineer-4 08/10/ Mr. Rajesh Kumar Asst. Quality cum Material Engineer-1 19/09/ Mr. Mulla Sahanavaz Asst. Quality cum Material Engineer-2 25/09/ Mr. M.P. Ashok Kumar Asst. Quality cum Material Engineer-3 01/10/ Mr. Rakhesh Kumar Asst. Quality cum Material Engineer-4 01/10/ To be named (TBN) Electrical Engineer-1 21 To be named (TBN) Electrical Engineer-2 22 To be named (TBN) HTMS/ Toll Expert 23 To be named (TBN) HTMS/ Toll Expert 24 To be named (TBN) Quantity Surveyor To be named (TBN) Quantity Surveyor To be named (TBN) Horticulture cum Landscaping Expert 8 P a g e

13 I.E Sangareddy (NH-9) Project CDM Smith Inc In Joint Venture with Wilbur Smith Associates Pvt.Ltd. 2.3 Concessionaire: Details of Concessionaire Name of Concessionaire Head Office Project Office Date mobilized at project. Contract period Contact Details. L&T Deccan Tollways Limited PO Box No 979, Mount Poonamallee Road, Manapakkam, Chennai Tamil Nadu L&T Deccan Tollways Ltd., (A Subsidiary of L&T IDPL), Plot no. 11&12, up stair of Siddi Vinayaka Traders, Opp. Allipur Dargah, Zaheerabad Medak (Dt), Telangana State. Mobilization in progress After taking Appointed Date. 25 yrs. from appointed date including maintenance period Landline: Cell no Obligations of Concessionaire: (i) Obtaining all Applicable Permits from the relevant Agencies. (ii) Procure, as required, the appropriate proprietary rights, licenses, agreements and permissions for materials, methods, processes and systems used or incorporated into the Project Highway. (iii) Provide necessary reports on regular basis during Construction Period and Operations Periods. (iv) Appoint, Supervise, monitor and control the activities of Contractors under their respective Project Agreements as may be necessary. (v) Make all necessary arrangements for accomplishing the tasks of physical removal of the encroachments at its own cost. (vi) Obtain all the necessary environmental clearance, cut the trees and compensatory afforestation. carry out (vii) Carrying out shifting of utility services. 9 P a g e

14 I.E Sangareddy (NH-9) Project CDM Smith Inc In Joint Venture with Wilbur Smith Associates Pvt.Ltd. (viii) The concessionaire shall submit Project Completion Schedule and Schedule Project Completion Date, its design, engineering and construction time schedule and shall formulate and provide CPM / PERT charts for the completion of the said activities. (ix) Finalize the Design and Detailed Engineering. (x) Appoint a Project Manager and such other Managers, officers and representatives as it may deem appropriate to supervise the Project and Deal with NHAI representative and be responsible for all necessary exchange of information required pursuant. (xi) The concessionaire shall submit to NHAI the draft of the Project Agreements including in particular the EPC Contract, the Financing Documents, the O&M Contract and the Tolling Contract for its review. Composition of Concessionaire Key Personnel (Professional Staffs) NAME POSITION DATE MOBILIZED 1 Mr. Indraneel Dev Roy Project Manager Arangarajan. S AGM Planning Sanjay Kumar Gour AGM Contracts K.V.S.R. Murthy AGM QA/QC Coordinator Jaykumar. M Senior Manager Construction Raja Ratnakar. P Senior Manager Construction Manohar. P Manager Quality C.K. Sunil Section Manager S.V.H. Kamesh Senior Engineer - Planning Prashanth Kulkarni Manager Highways Sanjay Yeole Manager Utilities B.V. Srinivas Dy.Manager- Accounts & Admin Ganga Prasad GCT (Graduate Commercial Trainee) P a g e

15 I.E Sangareddy (NH-9) Project CDM Smith Inc In Joint Venture with Wilbur Smith Associates Pvt.Ltd. 3. PRE CONSTRUCTION ACTIVITIES. 3.1 Condition Precedent. Condition Precedent of Authority ( Cl of CA) Name Status Completion Date Land Acquisition Yes ROB/RUB Clearance and approval for GADs for them Yes Environment Clearance Yes Forest Clearance Yes Wildlife Clearance Not Applicable Issued the Fee Notification Yes Provided Right of Way to the Site Yes Provided Right of Way to Critical Stretch Not Applicable Condition Precedent of Concessionaire (Cl of CA) Name Status Completion Date Executed the Financing Agreements and delivered to the Authority Financial Package and the Financial Model delivered to the Authority Procured all the Applicable Permits specified in Schedule-E Yes Yes Yes Applicable Permits Yes Provided Performance Security to the Authority Executed and procured execution of the Escrow Agreement Representations and Warranties delivered to the Authority Legal opinion delivered to the Authority Executed and procured execution of the Substitution Agreement Yes Yes Yes Yes Yes P a g e

16 I.E Sangareddy (NH-9) Project CDM Smith Inc In Joint Venture with Wilbur Smith Associates Pvt.Ltd. 3.2 Land Acquisition. LAND ACQUISITION II Total land required (Ha) No. of villages (in the entire stretch of land to be acquired) 920 Length available for road development ( up to end of previous month, Year) 59 Length available for road development up to Wednesday, June 11, Land already in Possession (Ha) 380 Status of Valuation of Structures completed Total additional land to be acquired (Ha) 540 Possession up to Wednesday, June 11, 2014 Cumulative Possession (Ha) 520 Pending Possession (Ha) 20 % of Possession Completed % of additional land in possession 96.3 % of total land vested with NHAI 100 3A Progress up to Wednesday, June 11, 2014 Cumulative Progress 540 Pending 3A works (Ha) 0 % of 3A Completed 100 3D Progress up to Wednesday, June 11, 2014 Cumulative Progress 540 Pending 3D works (Ha) 0 % of 3D Completed 100 3G Progress up to Wednesday, June 11, 2014 Cumulative progress up to 520 Pending LA works (Ha) 20 Total length of critical stretches (if any, as per clause of of MCA(km)) Length of ROW available for construction (where minimum required width(30m/45m/60m as applicable for 2- laning/4-laning/6-laning) Remarks 0 Length of critical stretch available (for construction(km) as against column no 22A) 135 Length of RoW (where entire width of ROW is available for Construction(km)) P a g e

17 I.E Sangareddy (NH-9) Project CDM Smith Inc In Joint Venture with Wilbur Smith Associates Pvt.Ltd. 3.3 Forest Clearance. Project Area Survey: Total length in Km 145 Total forest area to be diverted (Ha.) 8.44 Total length affected 5.44 Forest division/forest circle involved Bidar and Medak Forest area to be diverted in the Division (Ha) 8.44 Length affected in the division 5.44 Date of finalization of proposal by DPR Consultant Date of registration with the Nodal Officer 1/2/2013 Stage 1 of Clearance: Status of in principle approval Stage-I approval for Kar and AP obtained Compliance of conditions laid down Condition have been Complied Amount to be deposited as per clearance conditions (NPV) Rs. Amount to be deposited as per clearance Conditions (CA and Other amount) 6,448, ,083, Date of depositing the amount in CAMPA fund 11/9/2013 Date of forwarding of compliance by the State Govt. to MoEF Stage 2 of Clearance: Date of depositing the amount in CAMPA fund Date of forwarding of compliance by the State Govt. to MoEF Grant status of clearance by MoEF Order of State Government Date of handing over of diverted forest land 11/9/ /02/2013 Stage-II approval is awaited by MoEF subject to submission of FRA certificate from DC Bidar and DC Medak. PD has approached DC Bidar on 7/05/2014. Awaited 13 P a g e

18 I.E Sangareddy (NH-9) Project CDM Smith Inc In Joint Venture with Wilbur Smith Associates Pvt.Ltd. 3.4 Environmental Clearance. Stage I (Scoping) Date of submission of draft TOR by Consultant Submission Date of TOR to MoEF 3/5/2012 Date of approval of TOR by MoEF 11/5/2012 Stage II (Public Consultation) Date of submission of draft TOR by Consultant Submission Date of TOR to MoEF 3/5/2012 Date of approval of TOR by MoEF 11/5/2012 Stage III (Environmental Appraisal) Submission date of all documents required for clearance by the consultant Submission date of EIA to MoEF 3/5/2012 Date of consideration of Project by MoEF 12/5/2012 Number of MoEF approval letter 82/2012 Date of MoEF approval letter Date of submission of application for NOC of PCB by consultant Number of NOC by PCB Date of NOC by PCB Remarks 3.5 Access to Site. Joint Memorandum Signed 14 P a g e

19 I.E Sangareddy (NH-9) Project CDM Smith Inc In Joint Venture with Wilbur Smith Associates Pvt.Ltd. 3.6 Applicable Permits. CA Ref. Approval Required for Status Date Remarks A Schedule -E 1.1(a) Schedule -E 1.1(b) Schedule -E 1.1(c) Schedule -E 1.1(J) B Schedule -E 1.1(J) Schedule -E 1.1(J) C Schedule -E 1.1(d) D Schedule -E 1.1(e) Schedule -E 1.1(f) E Schedule -E 1.1(g) F Schedule -E 1.1(h) Schedule -E 1.1(J) Schedule -E 1.1(J) G Schedule -E 1.1(i) H Schedule -E 1.1(J) State Government Permits/ Quarrying Permits: Permits for extraction of boulder from quarry from Additional District Magistrate (ADM) Mines Permit for installation of crusher from village Panchayat and State/Central Pollution Control Board License for explosives from the office of Explosive controller Explosive license for storing diesel Electricity: Permission required from State Electricity Board (SEB) for installation of Diesel Generator (DG) Permission for electrical connection, if power source is available Water: If water has to be taken from river/ reservoir, permission to be obtained from State Irrigation Department Batching Plant: License from inspection of factories NOC consent/clearance required from village panchayat & State/Central Pollution Control Board/Dept. Asphalt Plant: Clearance required from village panchayat & State/Central Pollution Control Board Borrow Earth: Permission from irrigation department if land taken from irrigation land Permission required from village panchayat and ADM mines for Government & private land Permission from Local Municipalities and Development Authorities Cutting of trees and other environment clearances: Permission from Forest Department and other applicable agencies Sewage Lines and Water Mains: Permission from Local Municipalities and Development Authorities Not yet submitted Not yet submitted Not yet submitted Not Applicable Not Applicable Not Applicable V.P: PCB: NA for A. P. portion only. No permission for Kar Sanctioned Sanctioned Sanctioned Approved V.P: Approved NA Approved Kar: A. P: Approved 15 P a g e

20 I.E Sangareddy (NH-9) Project CDM Smith Inc In Joint Venture with Wilbur Smith Associates Pvt.Ltd. 4. PRELIMINERY ACTIVITIES DURING DEVELOPMENT PERIOD: 4.1 Shop Drawing preparations. Status of Structural Drawing Approvals No Category Total Scope (No s) Submitted (Nos) Under Review (Nos) Reviewed and commented (Nos) 1 Major Bridges Minor Bridges ROB/RUB Flyover/VUP PUP Approved (Nos) 6 Hume pipe culverts GFC Issued 7 Box/Slab culverts *For more Details see Annexure - 1 Status of Road Drawing Approvals 1 No Category Total Scope (Km) Submitted (Km) Under Review (Km) Horizontal Alignment Reviewed and commented (Km) 2 Plan And Profile for main Highway Plan & Profile for Service Roads Typical X- Section (no s) *For more Details see Annexure 2 Approved (Km) Verbal Approval Concessionaire resubmitted P&P after IE Comments Comments submitted by Concessionaire 4.2 Utility shifting. See Annexure 03 Status of Water line Shifting Telangana Section See Annexure 04 Status of Water line Shifting Karnataka Section See Annexure 05 Status of Electrical line Shifting Telangana Section See Annexure 06 Status of Electrical line Shifting Karnataka Section 16 P a g e

21 I.E Sangareddy (NH-9) Project CDM Smith Inc In Joint Venture with Wilbur Smith Associates Pvt.Ltd. 4.3 Tree Cutting. Status of Tree Cutting. Section No. of trees affecting No. of Trees cut Karnataka Telangana (AP) Balance to be cut Remarks Uprooting to be carried out Uprooting to be carried out 4.4 Removal of Structures affected. Removal of encroached buildings structures started and work in progress about 10% work completed. 4.5 Preliminary Survey works. Setting of GPS Points at 5Km intervals done. Setting of Basic Level Bench Marks Done. Setting of Temporary Bench Marks (BMs) in Progress. Setting of intermediate Coordinate Control Points (CPs) in progress. Marking of Road Center line in progress. Planting of ROW Pillars 100% Completed. Work in Progress. 4.6 Video Recording of Existing Road corridors Video recording of Existing Road both sides done and Digital copies submitted to Authority 4.7 Submission of project related documents. Document Status Remarks Project Quality Plan Submitted Accepted Environment safety plan Submitted Under review Traffic Controlling Plan Submitted Under review Project Program Submitted Accepted 17 P a g e

22 I.E Sangareddy (NH-9) Project CDM Smith Inc In Joint Venture with Wilbur Smith Associates Pvt.Ltd. 5. PROJECT WORK PROGRESS: 5.1 Mobilization of Contractor EPC Contractor for the Project works has been appointed. The name of Contractor L&T ECC-Infra IC Ltd. (ECC) Mobilization of EPC Contractor is in progress. Updated status of progress is follows. Administration Offices 2 Offices at Karnataka and Telangana Section mobilized at Km and Km (Base Camp) Yards 1 Machinery yard for Telangana Section mobilized at Km Machinery yard for Karnataka section at Ch mobilized. Laboratories 2 Laboratories for Each Section (1 at Karnataka section and 1 at Telangana section) mobilized with required equipment. Plants 3 Crusher Plants erected.(2 in Telangana and 1 in Karnataka State) 2 Concrete Batching Plants mobilized at and Km Progress of Road Works. Summary of Road works status Karnataka section From: Km to Km Activity LHS (Km) RHS (Km) Total (Km) C&G Embankment Sub grade Telangana section From: Km to Activity LHS (Km) RHS (Km) BHS (Km) C&G Embankment Sub grade 0.25 * See Annexure 7 for progress of Road works 18 P a g e

23 I.E Sangareddy (NH-9) Project CDM Smith Inc In Joint Venture with Wilbur Smith Associates Pvt.Ltd. 5.3 Progress of Structural Works: Description Scope KNT TS In Progress Completed In Progress Completed Cumulative completed Major Bridges 3 No s Minor Bridges 47 No s Box Culverts 58 No s Pipe Culverts 157 No s Pedestrians Under Passes 14 No s Vehicle Under Passes 6 Nos Fly over Bridges Railway Over Bridges Toll Gate 1 No s 1 No s 2 No s See Annexure -8 for progress of Structural works 5.4 Achievement of Milestones Milestone 1 ( 180 Days from Appointed Date): Mile stone reached. Details of financial progress achieved towards the Milestone no1, i.e. 10% of total project cost yet to be submitted. Notice has been issued by Engineer. Milestone 2 (400 Days from Appointed Date) Date Not yet Reached. Milestone 3 ( 650 Days from Appointed Date) Date Not yet Reached. 5.5 Plants and Machineries at Site. See Annexure 09 Plant and Machineries at Site. 5.6 Progress Photographs: See Annexure 12 Weather Report at Site 19 P a g e

24 I.E Sangareddy (NH-9) Project CDM Smith Inc In Joint Venture with Wilbur Smith Associates Pvt.Ltd. 6 QUALITY CONTROL AND QUALITY ASSURANCE RECORDS 6.1 Status of RFI attended by Independent Engineer: Summary of Requests for Inspections (RFIs) Section Last Month (August 14) No. RFI raised for the Month No. RFI IE Attended % of IE Reviewed This Month (Oct 14) No. RFI No. RFI raised IE for the Attend Month ed % of IE Reviewed Cum. Total Attuned by IE Road Works % Structural works % Laboratory tests % 23% Survey works % - 29 Miscellaneous % Laboratory Test Reports * See Annexure 10 Laboratory Test Reports 6.3 Defects and deficiencies : Nil 6.4 Summary of NCR s NCR Nu Detail Date Issued Date Action proposed Date Closed Status NIL 20 P a g e

25 I.E Sangareddy (NH-9) Project CDM Smith Inc In Joint Venture with Wilbur Smith Associates Pvt.Ltd. 7 MATERIAL USED AND SOURCES OF MATERIAL. 7.1 Status of source approvals. No Material No. of Sources Proposed by Contractor No. of Sources approved by IE 1 Cement 6 6 Remarks 2 Steel Hume Pipes Admixtures Emulsion Mix Design Aggregate for Road work Nil Nil 8 Aggregate for Structural work Nil Nil See Annexure 11 for details of Sources approval 21 P a g e

26 I.E Sangareddy (NH-9) Project CDM Smith Inc In Joint Venture with Wilbur Smith Associates Pvt.Ltd. 8 METHODOLOGIES OF WORK: Clearing and Grubbing: Initial step of road work at widening areas, clearing and grubbing started after submitting Methodology reviewed by Independent Engineer. Large bushes small trees are removed by using excavators and Back hoe loaders and then top layer of soil removed by motor Graders. Roots left after cutting trees removed by excavators. The pits formed by removing tree roots were filled by crusher fines. Construction of Pipe Culverts: Methodology for construction of pipe culverts submitted and reviewed by Independent Engineer. All the material, Concrete, Hume pipes, Aggregates, bedding materials were accepted by Independent Engineer prior to use. Concretes were produced at central batching plant and transported to working place. Did not use concrete pumps but unload to containers and place concrete manually. Hume pipes were placed by mean of cranes,. Head walls were constructed subsequently after laying pipes. Proper continuous cuing of concrete was done by wet gunny bags for 14 Days.. 22 P a g e

27 I.E Sangareddy (NH-9) Project CDM Smith Inc In Joint Venture with Wilbur Smith Associates Pvt.Ltd. 9 SAFETY 9.1 General Observations: It was decided to provide adequate safety to road users by erecting road sign boards and warning boards as a part of road maintenance. Many places vehicles jumped out the road in night time Contractor was advised to erect reflective illuminated barriers at dangerous places. It was observed the reason for this type of accident is high speed in night time. 9.2 Specific Observations: See Table 1 Specified Safety observations at Site 9.3 Safety observations Photographs : See Annexure 12 Safety observations Photographs 23 P a g e

28 I.E Sangareddy (NH-9) Project CDM Smith Inc In Joint Venture with Wilbur Smith Associates Pvt.Ltd. Table 1. Safety observations at site: S. No Safety Issue Locations as on Action taken for closing/removal/att ended/ replaced Locations action pending with reason Issue raised with enforcing agency Penal action by IE due to delay/no action 1 Unauthorized median openings Nil Nil Nil NA NA (Project is under implementation and the project is now at Earth work Stage) 2 Liquor shops adjacent to highway 3 Black spots (No.of 10 accidents & more in ayear at any spot causing fatal) Identified by IE & safety Consltant based on last 3 years statistics 4 Major/ minor junctions transverse bar marking, rumble strips, speed breakers on X- road, signages etc.,speed restriction signages as per enforcing agency requirement Nil NA NA NA NA (Project is under implementation and the project is now at Earth work Stage) Km , 479 and 441 and 489 Km to Km Encroachment within ROW Km to Km Dumped/ surplue waste material Km to ,Km to Km , Km to , 7 Damaged/deficient signages as per codal/ca provisions 8 Public demand/vip ref. for VUP/ PUP/ FOB/subway/service roads etc. 9 Any other unauthorized / illegal/ unsafe activities on /along project highway Since, project is under implementation infomatory and caution boards are placed for safety and easy access. Nil NA NA (Project is under implementation and the project is now at Earth work Stage) Attended Nil NA NA Removal works are in progress Removal works are in progress Nil NA NA Nil NA NA (Project is under implementation and the project is now at Earth work Stage) Nil Nil Nil NA NA (Project is under implementation and the project is now at Earth work Stage) Nil Nil Nil NA NA (Project is under implementation and the project is now at Earth work Stage) Nil Nil Nil NA NA (Project is under implementation and the project is now at Earth work Stage) 24 P a g e

29 I.E Sangareddy (NH-9) Project CDM Smith Inc In Joint Venture with Wilbur Smith Associates Pvt.Ltd. 10 MAINTENANCE OF ROAD 10.1 Maintenance of road in construction stage. Due to delaying of appointed date the routine maintenance to the road not done caused for severe damages to road. NHAI sanctioned some amount and hand over the maintenance work to PWD. PWD completed partial maintenance works on priority basis.. The road sections still under DLP after recent up gradation, damaged badly. After taking appointed date by the Concessionaire NHAI handed over to the maintenance works to the Concessionaire to complete the initial repairing of rod damage sections except DLP sections Concessionaire has undertaken the existing road repairing, as instructed by NHAI. Estimate for initial repairing submitted by Concessionaire reviewed by Independent Engineer and commented estimate with recommendations submitted to NHAI. On pending approval of estimate road repairing was done by Concessionaire. The present condition of road is far better than the initial stage. The time period to move from Sangaredy to Humnabad reduced from 4Hrs to 2Hrs after repairing of road. Concessionaire was invited to submit Estimate for repairing the road sections still under Defects liability period (DLP), the. Concessionaire submitted additional Estimate for repairing those sections too. Independent Engineer received the estimate and under review. 25 P a g e

30 I.E Sangareddy (NH-9) Project CDM Smith Inc In Joint Venture with Wilbur Smith Associates Pvt.Ltd. 11 ISSUES AND ENCOMBRANCES. No Major Issues 26 P a g e

31 I.E Sangareddy (NH-9) Project CDM Smith Inc In Joint Venture with Wilbur Smith Associates Pvt.Ltd. 12 PROGRESS PHOTOGRAPHS See - Annexure P a g e

32 I.E Sangareddy (NH-9) Project CDM Smith Inc In Joint Venture with Wilbur Smith Associates Pvt.Ltd. 13 COMMENTS OF TEAM LEADER As a part of safety during construction on existing road Concessionaire was advised to add the items of Road marking and safety sign boards to the estimate itself submitted for the repairing of the existing road. It was done and the estimate was reviewed by Independent Engineer and forwarded to NHAI. The scheduled appointed date did not taken by the concessionaire but after one year the new appointed date taken on 1st April Although appointed date declared due to monsoon season rain Concessionaire couldn t achieved considerable progress at site. Concessionaire agreed with Authority to start physical work at the beginning of June 2014 after taking appointed date. C&G and layout marking and Excavation of Pipe Culverts Started. Concessionaire has undertaken the existing road repairing, as instructed by NHAI. Estimate for initial repairing submitted by the Concessionaire for Independent Engineer s review. Independent Engineer has reviewed and commented estimate with recommendations submitted to NHAI. Concessionaire was invited to submit Estimate for repairing the road sections still under Defects liability period (DLP). The estimate received by IE. Concessionaire already started maintenance of existing road. More than 90% overlaying at road damaged sections completed to bring the existing road to motarable condition. 90% of affected trees have been cut some roots to be removed, still observed many roots with stem around 2m above ground level remained in place after cutting trees not removed. Shifting of utilities is in progress at the both Sections (Karnataka and Andhra Pradesh (New Telangana) States. Concessionaire submitted work program accepted by IE as the Master program. But they have not detailed the monthly targets and Financial S curve based on the accepted program till to date as requested by Independent Engineer. Demolishing of structures within new ROW started by concessionaire, work in progress. Concessionaire has raised claim invoice the bill for demolishing buildings within ROW but entitlement of such claims not yet finalized. The Concession Agreement not mentioned about payments for the demolishing of buildings within ROW.. 28 P a g e

33 I.E Sangareddy (NH-9) Project CDM Smith Inc In Joint Venture with Wilbur Smith Associates Pvt.Ltd. The first millstone has been reached on 27 th September 2014 after 180 day from appointed date 1 st April Notice Issued by Independent Engineer to submit the proof of their financial progress towards the milestone No.1, 10% amount of total project cost should have been spent in the project up to Milestone No.1. The 90 day cure period allowed in the Agreement in the case of less financial progress, will be over at the end of December Reply from Concessionaire in this regards is awaited. Review of drawings 70% of submitted completed, balance will be completed within two weeks. First Drawing, only for centre span of the ROB (Railway Over Bridge) at Ch was issued by concessionaire along with IIT (Indian Institute of Technology) certificate, submitted to Railway department for approval. 29 P a g e

34 I.E Sangareddy (NH-9) Project CDM Smith Inc In Joint Venture with Wilbur Smith Associates Pvt.Ltd. ANNEXURES 30 P a g e

35 Annexure 1 Sl. Design Category Section Unit Status of Structures Design Reports as at End of Oct Total No. of Structures No of structures drawing prepared No. of drawings Reviewed and Commented No of Drawings Reviewed and Approved No of Drawings under Review % Submitted 1 Major Bridges Karnataka Nos % 0 % Reviewed Telangana Nos % 0 Total Nos Minor Bridges Karnataka Nos % 48 Telangana Nos % 65 Total Nos % 55 3 ROB/RUB Karnataka Nos Telangana Nos Total Nos Fly Over Bridges/VUP Karnataka Nos % 0 Telangana Nos % 0 Total Nos % 0 5 Pedestrian Under Passes Karnataka Nos % 0 Telangana Nos % 0 Total Nos % 0 6 Hume Pipe Culverts Karnataka Nos % 100% Telangana Nos % 100% Total Nos % 100% 7 Box/Slab Culverts Karnataka Nos % 0 Telangana Nos % 58% Total Nos % 63%

36 Annexure 2 Status of Road Design Drawings as at the end of Oct 2014 Sl. Design Category Section Unit Total Qty. No of Drawing Submitted No. of Drawings Reviewed and Commented No of Drawings Reviewed and Approved No of Drawings under Review % Submitted. % Reviewed 1 Horizontal Alignments Karnataka KM % 100% TS KM % 100% Total % 100% 2 Plan & Profile main Carriageway Karnataka KM % 2.4% TS KM % 11% Total % 7% 3 Plan & profile Service Roads (B/S) Karnataka KM % UR TS KM % UR Total % UR 4 Typical Cross Sections Total No % 100%

37 Annexure 3 Status of Water Line Shifting Telangana Section as at end of Oct 2014 S.NO DEPT From Chainage To Length (Km) 1 RWS RWS RWS RWS RWS Amount Of Estimate (Rs) 7,458, ,151, ,266, ,565, ,372, RWS ,00, Supervision Charges (Rs) Estimate cost submitted to NHAI (Rs) 1,690, ,609, ,690, ,204, Estimate Approval Approved by NHAI,RO, Bangalore Approved by NHAI, HQ, Delhi Submitted to NHAI, RO, Bangalore Progress in % (Amount received as on 25 th October 14 (Rs) 50% (Rs 37,33,800.00) 60% (Rs 49,34,174.00) 67% (Rs 33,55,956.00) 85% (Rs 9,79,259.00) 78% (Rs 61,05,251.00) 7 RWS ,42, Submitted to NHAI, RO, Bangalore 8 RWS ,30, Submitted to NHAI, RO, Bangalore 9 Muni Submitted to NHAI,PIU, 26,00,00, ,00,00, Gulbarga Nil 10 Muni ,37,00, ,37,00, UR Nil 11 HMWS Approved by NHAI, HQ, 56% (Rs 1,42,22,346.00) 2,73,90, ,70, ,520, Delhi 12 HMWS Approved in NHAI, RO, 4,309, , ,309, Bangalore No Progress

38 Annexure 4 Status of Water Line Shifting Karnataka Section as at end of Oct 2014 Sr no From To Length Cost Estimate Approval Progress of Shifting As on 31 st October ,242, Pending in HQ,NHA for Approval Approval awaiting ,882, Pending in HQ,NHA for Approval Approval awaiting ,150, Pending in HQ,NHA for Approval Approval awaiting , Pending in HQ, NHAI for Approval Approval awaiting ,708, Pending in HQ, NHAI for Approval Approval awaiting ,720, Pending in HQ, NHAI for Approval Approval awaiting , Pending in HQ,NHAI for Approval Approval awaiting ,661, Pending in HQ-NHAI for Approval Approval awaiting ,110, Pending in HQ,NHAI for Approval Approval awaiting ,410, Approved by RO, NHAI Not Started yet ,050, Approved by RO, NHAI 100% Completed , Approved by RO, NHAI 100% Completed , Approved by RO, NHAI Not Started yet , Approved by RO, NHAI 85% completed , Approved by RO, NHAI Not Started yet , Approved by RO, NHAI Not Started yet ,000,000.00(Approx) Pending with RO,NHAI Approval awaiting , Approved by RO, NHAI 100% Completed , Approved by RO, NHAI Not Started yet , Approved by RO, NHAI 100% Completed , Approved by RO, NHAI Not Started yet , Approved by RO, NHAI 100% completed ,300, Approved by RO, NHAI Not Started yet , Pending in HQ, NHAI for Approval Approval awaiting , Pending in HQ, NHAI for Approval Approval awaiting , Approved by RO, NHAI Not Started yet , Pending in HQ, NHAI for Approval Approval awaiting ,850, Approved by RO, NHAI 95% completed ,985, Approved by RO, NHAI 100% completed ,561, Approved by RO, NHAI 80% completed , Pending in HQ, NHAI for Approval Approval awaiting ,812, Pending in HQ, NHAI for Approval Approval awaiting , Pending in HQ, NHAIfor Approval Approval awaiting ,630, Approved by RO, NHAI 100% completed ,760, Approved by RO, NHAI 85% completed

39 Annexure 5 Status of Electrical Line Shifting Telangana Section as at end of Oct 2014 S.NO From Chainage To Length (Km) Amount Of Estimate (Rs) Supervision Charges (Rs) Estimate cost submitted to NHAI (Rs) Estimate Approval Progress in % (Work done Amount as on 25th October 14) (Rs) 52% (Rs 45,40,266.00) ,677, ,076, ,67,61, ,49, ,871, Approved in NHAI, RO, Bangalore 56% (Rs 28,34,,414.00) 80% (Rs 1,34,18,885.00) ,63,90, % (Rs 96,85,846.00) ,24,34, Approved by NHAI, HQ, 17,10, ,96,94, Delhi 46% (Rs 1,06,16,151.00) ,96,25, % (Rs 1,19,49,699.00) ,92, Approved in NHAI, RO, 57% (Rs 27,57,508.00) ,71, ,90, ,99,38, Bangalore 63% (Rs 8,22,257.00) ,47,59, % (Rs 1,65,74,248.00) ,52,59, ,47,15, Approved in NHAI, RO, Bangalore Nil ,28,69, ,17,95, ,55,43, ,49,58, Total 17,50,10, ,50,445 11,55,03, Approved in NHAI, RO, Bangalore Approved in NHAI, RO, Bangalore Nil Nil

40 Annexure 6 Status of Electrical Line Shifting Karnataka Section as at end of Oct 2014 Sr No From To Length (m) Estimated Cost Estimate Approval Progress of Shifting as on 31/10/ ,186,022 1,500,000 Sent to NHAI, HQ on 09/03/13 Approved ,295, ,768 Sent to NHAI, HQ on 09/03/13 Approved ,399, ,340 Sent to NHAI, HQ on 09/03/13 Approved ,053,526 99,733 Sent to NHAI, HQ on 09/03/13 Approved ,053,526 99,733 Sent to NHAI, HQ on 09/03/ ,053,770 99,720 Sent to NHAI, HQ on 09/03/ ,053,526 99,733 Sent to NHAI, HQ on 09/03/ ,053,451 99,727 Sent to NHAI, HQ on 09/03/ ,063, ,540 Sent to NHAI, HQ on 09/03/ ,320, ,519 Sent to NHAI, HQ on 09/03/ ,053,520 99,732 Sent to NHAI, HQ on 09/03/ ,053,451 99,727 Sent to NHAI, HQ on 09/03/ ,053,296 99,714 Sent to NHAI, HQ on 09/03/ ,296, ,778 Sent to NHAI, HQ on 09/03/ ,105, ,780 Sent to NHAI, HQ on 09/03/ ,250, ,751 Sent to NHAI, HQ on 09/03/ ,054,998 99,855 Sent to NHAI, HQ on 09/03/ ,145,904 1,087,659 Sent to NHAI, HQ on 09/03/ ,053,445 99,726 Sent to NHAI, HQ on 09/03/ ,055,238 99,876 Sent to NHAI, HQ on 09/03/ ,053,296 99,714 Sent to NHAI, HQ on 09/03/ ,296, ,778 Sent to NHAI, HQ on 09/03/13 Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved Approved

41 Sr No From To Length (m) Estimated Cost Estimate Approval Progress of Shifting ,296, ,781 Sent to NHAI, HQ on 09/03/13 Approved ,995,622 1,500,000 Sent to NHAI, HQ on 09/03/13 Approved ,114,763 1,114,776 Approved by RO, NHAI 95% Work Completed ,339, ,994 Approved by RO, NHAI 95% Work Completed ,193, ,366 Approved by RO, NHAI 95% Work Completed ,224, ,489 Approved by RO, NHAI 95% Work Completed ,182, ,289 Approved by RO, NHAI 95% Work Completed ,114, ,469 Approved by RO, NHAI 95% Work Completed ,114, ,476 Approved by RO, NHAI 95% Work Completed ,381, ,111 Approved by RO, NHAI 95% Work Completed ,051,685 99,579 Sent to NHAI, HQ on 09/03/13 Approved ,296, ,778 Sent to NHAI, HQ on 09/03/13 Approved ,296, ,778 Sent to NHAI, HQ on 09/03/ ,296, ,778 Sent to NHAI, HQ on 09/03/ KM ,876,821 1,500,000 Sent to NHAI, HQ on 09/03/ ,295, ,751 Sent to NHAI, HQ on 09/03/ ,036,505 1,500,000 Sent to NHAI, HQ on 09/03/ ,296, ,778 Sent to NHAI, HQ on 09/03/13 Approved Approved Approved Approved Approved Approved ,264, ,961 Approved by RO, NHAI 95% Work Completed ,243, ,115 Approved by RO, NHAI 95% Work Completed ,235, ,190 Approved by RO, NHAI 95% Work Completed ,259, ,672 Approved by RO, NHAI 95% Work Completed ,357, ,111 Approved by RO, NHAI 95% Work Completed ,148, ,817 Approved by RO, NHAI 95% Work Completed ,283, ,859 Approved by RO, NHAI 95% Work Completed ,206, ,530 Approved by RO, NHAI 95% Work Completed ,447, ,823 Approved by RO, NHAI 95% Work Completed ,624, ,951 Approved by RO, NHAI 95% Work Completed ,053,296 99,714 Approved by RO, NHAI 85% Work Completed ,310, ,678 Approved by RO, NHAI 80%Work Completed ,143, ,425 Approved by RO, NHAI 95% Work Completed

42 Sr No From To Length (m) Estimated Cost Estimate Approval Progress of Shifting ,253, ,092 Approved by RO, NHAI 95% Work Completed ,049,831 99,924 Approved by RO, NHAI 95% Work Completed ,051,624 99,574 Approved by RO, NHAI 80% Work Completed ,049,831 99,424 Approved by RO, NHAI 95% Work Completed ,296, ,836 Approved by RO, NHAI 95% Work Completed ,082, ,515 Approved by RO, NHAI 95% Work Completed ,313, ,806 Approved by RO, NHAI 95% Work Completed ,149, ,952 Approved by RO, NHAI 95% Work Completed ,190, ,047 Approved by RO, NHAI 95% Work Completed ,059, ,246 Approved by RO, NHAI 95% Work Completed ,051,685 99,579 Approved by RO, NHAI 98% Work Completed ,053,296 99,714 Approved by RO, NHAI 98% Work Completed ,058, ,111 Approved by RO, NHAI 98% Work Completed ,216, ,576 Approved by RO, NHAI 98% Work Completed ,053,296 99,714 Approved by RO, NHAI 98%Work Completed ,123, ,335 Approved by RO, NHAI 95% Work Completed ,431, ,127 Approved by RO, NHAI 95% Work Completed ,346, ,678 Approved by RO, NHAI 95% Work Completed ,630, ,019 Approved by RO, NHAI 95% Work Completed ,296, ,676 Approved by RO, NHAI 85% Work Completed ,064, ,441 Approved by RO, NHAI 95% Work Completed ,337, ,770 Approved by RO, NHAI 95% Work Completed ,177, ,772 Approved by RO, NHAI 95% Work Completed ,490, ,072 Approved by RO, NHAI 95% Work Completed ,370, ,030 Approved by RO, NHAI 95% Work Completed ,319, ,901 Approved by RO, NHAI 95% Work Completed ,177, ,723 Approved by RO, NHAI 95% Work Completed

43 7,1 Clearing and Grubbing completed at Karnataka section: Chainage From To Length (m) Side %ge complete LHS % RHS % LHS % RHS % BHS % BHS % RHS % RHS % RHS % RHS % LHS % RHS % RHS % RHS % LHS % RHS % RHS % LHS % LHS % RHS % RHS % LHS % LHS % LHS % LHS % LHS % RHS % BHS % RHS % BHS % LHS % RHS % RHS % RHS % BHS % LHS % RHS % LHS % LHS % BHS % RHS % LHS % LHS % RHS % RHS % BHS % RHS %

44 7,1 Clearing and Grubbing completed at Karnataka section: RHS % RHS % RHS % LHS % RHS % BHS % LHS % LHS % RHS % BHS % LHS % RHS % RHS % LHS % RHS % BHS % BHS % RHS % LHS % LHS % RHS % RHS % RHS % RHS % BHS % RHS % Total 16540

45 7.2 Clearing and Grubbing Completed at Telagana section: Chainage From To Length (m) Side %ge Done BHS % BHS % LHS % LHS % LHS % LHS % LHS % LHS % LHS % RHS % BHS % LHS % RHS % LHS % LHS % BHS % LHS % LHS % LHS % LHS % LHS % LHS % LHS % LHS % RHS % LHS % LHS % LHS % LHS % LHS % LHS % BHS % LHS % LHS % LHS % LHS % LHS % BHS % LHS % LHS % LHS % LHS % LHS % LHS % LHS % LHS % BHS % LHS % LHS % LHS % LHS % LHS %

46 7.2 Clearing and Grubbing Completed at Telagana section: LHS % LHS % LHS % LHS % LHS % LHS % LHS % LHS % RHS % LHS % RHS % RHS % RHS % LHS % BHS % LHS % BHS % LHS % BHS % RHS % RHS % LHS % LHS % BHS % LHS % LHS % LHS % BHS % LHS % BHS % BHS % LHS % RHS % LHS % RHS % RHS % LHS % RHS % Total

47 7.3 Embankment works completed at Karnataka section: Chainage From To Length (m) Side %ge Done RHS % LHS % RHS % RHS % RHS % LHS % LHS % LHS % LHS % RHS % RHS % LHS % LHS % LHS % LHS % LHS % RHS % RHS % LHS % LHS % Total 1620

48 7.4 Embankment works completed at Telagana section: Chainage From To Length (m) Side %ge Done LHS % LHS % LHS % LHS % LHS % LHS % LHS % LHS % LHS % LHS % LHS % LHS % LHS % LHS % LHS % LHS % LHS % LHS % LHS % LHS % LHS % RHS % RHS % RHS % LHS % LHS % RHS % RHS % LHS % RHS % LHS % BHS % LHS % LHS % RHS % BHS % BHS % BHS % LHS % BHS % RHS % RHS % RHS % RHS % RHS % Total 6810

49 7.5 Subgrade completed at Karnataka section: Chainage From To Length (m) Side %ge Done LHS % LHS % Total %

50 8.1 PROGRESS STRIP CHART FOR PIPE CULVERT FOR KARNATAKA SECTION LHS RHS Other Misc Works Back Filling Head wall Final Lift Laying of Hume Pipe & Jointing Pipe Bed Headwall I lift upto Pipe Invert level PCC for Headwall Chainage Excavation Excavation PCC for Headwall Headwall I lift upto Pipe Invert level Pipe Bed Laying of Hume Pipe & Jointing Head wall Final Lift Back Filling Other Misc Works % Completed nill

51 8.1 PROGRESS STRIP CHART FOR PIPE CULVERT FOR KARNATAKA SECTION

52 8.1 PROGRESS STRIP CHART FOR PIPE CULVERT FOR KARNATAKA SECTION Total Number of Pipe Culverts in the scope : 158

53 8.1 PROGRESS STRIP CHART FOR PIPE CULVERT FOR KARNATAKA SECTION Number of Culverts work in Progresss : Number of Culverts work in Completed : 92 0 % of completed work over Total scope :

54 8.2 PROGRESS STRIP CHART FOR PIPE CULVERT TELANGANA SECTION Completed 2 In Progress LHS RHS Other Misc Works Back Filling Head wall Final Lift Laying of Hume Pipe & Jointing Pipe Bed Headwall I lift upto Pipe Invert level PCC for Headwall Excavation chainage Excavation PCC for Headwall Headwall I lift upto Pipe Invert level Pipe Bed Laying of Hume Pipe & Jointing Head wall Final Lift Back Filling Other Misc Works % Completed

55 8.2 PROGRESS STRIP CHART FOR PIPE CULVERT TELANGANA SECTION Completed 2 In Progress Total Number of Pipe Culverts in the scope : Number of Culverts work in Progresss : Number of Culverts Completed :

56 8.2 PROGRESS STRIP CHART FOR PIPE CULVERT TELANGANA SECTION Completed 2 In Progress % of completed work over Total scope : 23.00%

57 Annexure 9 Machineries at Site in the Month of October 2014 Sl.No Asset Description Telangana Karnataka Section Section 1 Graders Tandom Rollers Cranes Welding machines Gantry Weigh Bridges Batching Plants WMM Plant Hot Mix Plant Crusher DGs Mini Truck Mini Roller Light Mast Bar Bending Machine Bar Cutting Machine Auto Level Instrument CTM Total Station Cement Feeding Pump Mono Block Pump Vibratory Soil Compactor Paver Finisher Cold Milling Machine Asphalt Cutting Machine CBR Machine Immersion Vibrator Wood Surface Planner Plate Compactor Motor Cube Vibrator Emulsion Tank JCB Trailor Broomer Water Tanker Dumpers Tractor with compressor Tractor with Trolley 2 3

58 Annexure Karnataka Section MONTHLY QUALITY CONTROL & QUALITY ASSURANCE TESTS STATISTICS Section : MH-KNT Border to KNT-AP BORDER ( Km TO ) S. No. Description 1.0 Tests on OGL Soil MOST 305 Tested Passed Failed Tested Passed Failed Tested Passed Failed 1.1 Procter IS:2720 (Part8) 1 test/250 RM Attenberg Limits IS:2720 (Part5) 1 test/250 RM Gradation IS:2720 (Part4) 1 test/250 RM CBR Test IS:2720 (Part16) 1 test/250 RM Free Swell index IS:2720 (Part48) 1 test/250 RM Tests on Shoulder Soil MOST Procter IS:2720 (Part8) 1 test/500 RM Attenberg Limits IS:2720 (Part5) 1 test/500 RM Gradation IS:2720 (Part4) 1 test/500 RM CBR Test IS:2720 (Part16) 1 test/500 RM Free Swell index IS:2720 (Part48) 1 test/500 RM Tests on Borrow Areas MOST Procter IS:2720 (Part8) 1 test /1500 m Attenberg Limits IS:2720 (Part5) 1 test /1500 m Gradation IS:2720 (Part4) 1 test /1500 m CBR Test IS:2720 (Part16) 1 test /3000 m Free Swell index IS:2720 (Part48) 1 test /1500 m GSB MOST Procter IS:2720 (Part8) As required Attenberg Limits IS:2720 (Part5) 1 test /200 m Gradation Table 400-2,Gr test /200 m Water absorbtion IS:2386 (Part3) As required % Fines value BS : 812(Part111) As required CBR IS:2720 (Part16) As required WMM MOST Procter IS:2720 (Part8) As required Gradation IS:2720 (Part4) 1 test /100 m Attenberg Limits IS:2720 (Part5) 1 test /100 m Flakiness&Elongation Index IS:2386 (Part1) 1 test /200 m Impact value IS:2386 (Part4) 1 test /200 m Water absorbtion IS:2386 (Part3) As required Sound ness IS:2386 (Part5) As required Field Dry Density Test 6.1 OGL IS:2720 (Part28) 1 set Test per 1000Sqm Embankment IS:2720 (Part28) 1 set Test per 1000Sqm Subgrade IS:2720 (Part28) 1set Test per 500 Sqm GSB IS:2720 (Part28) 1 test /500 m WMM IS:2720 (Part28) 1 test /500 m Fine Aggregate MOST Grad /Sieve analysys IS:2386 (Part1) 1 test / 15 days Specific gravity IS:2386 (Part2) As required Water absorbtion IS:2386 (Part2) As required Coarse Aggregate MOST Specific gravity IS:2386 (Part3) As required Aggregate Impact Value IS:2386 (Part4) 1 test / 15 days Flakiness index IS:2386 (Part1) 1 test / 15 days Water absorbtion IS:2386 (Part3) As required Cement MOST Fineness IS:4031 (Part1) Every batch Consistancy IS:4031 (Part4) Every batch I S T & F S T IS:4031 (Part5) Every batch Compressive Strength IS:4031 (Part6) Every batch Concrete MOST 1700 IS Designation/Project Spec Clause Frequency of Tests Total Tests upto previous month Tests conducted during current month Month : Oct Total Tests up to Oct Mix design (Lab) IS:10262 MOST Sec Cube test (Trail Mix) MOST Sec MOST Sec Cube test (Site Cubes) MOST Sec MOST Sec Gradation MOST Sec MOST Sec

59 11.0 Prime coat : MOST Sec Rate of Spray MOST Sec Tests per Day Viscosity test IS: As per manf. Report Tack coat : MOST Sec Rate of Spray MOST Sec Tests per Day Viscousity test IS: As per manf. Report Bituminous Tests MOST Sec Penetration Test IS: sample / Tanker Ductility test IS: sample / Tanker Softening Point test IS: sample / Tanker Specific gravity IS:1203 As required DBM : MOST Sec Dry mix gradation Table Set of Test/400T or 2Tests /Day Extraction & Gradation MOST Sec Set of Test/400T or 2Tests /Day Density/Stability/Flow Test Table do Core Density MOST Sec test /250 m Air,Vma,Vfb Table Set of Test/400T or 2Tests /Day Flakiness & Elangation IS:2386 (Part1) 1 test /50 m Agg. Impact value IS:2386 (Part4) 1 test /50 m Water absorbtion IS:2386 (Part3) As required Sound ness IS:2386 (Part5) As required Sand equivalent test IS:2720 (Part 37) As required Plasticity index IS:2720 (Part5) As required Percentage of fractured faces As per MOST As required Water sensity of mix AASHTO T 283 As required Temparature of mix ---- Every truck Agg. Coating/Stripping Test IS : 6241 As required BC : MOST Sec Dry mix gradation Table Set of Test/400T or 2Tests /Day Extraction & Gradation MOST Sec Set of Test/400T or 2Tests /Day Density/Stability/Flow Test Table do Core Density MOST Sec test /250 m Air,Vma,Vfb Table Set of Test/400T or 2Tests /Day Flakiness & Elangation IS:2386 (Part1) 1 test /50 m Agg. Impact value IS:2386 (Part4) 1 test /50 m Water absorbtion IS:2386 (Part3) As required Sound ness IS:2386 (Part5) As required Sand equivalent test IS:2720 (Part 37) As required Plasticity index IS:2720 (Part5) As required Percentage of fractured faces As per MOST As required Polished stone value BS : 812(Part114) As required Swell test on the mix As required Water sensity of mix AASHTO T 283 As required Temparature of mix ---- Every truck Loss of stability ASTM D Set of Test/400T or 2Tests /Day Agg. Coating/Stripping Test IS : 6241 As required

60 Annexure-10.2 Telangana Section Four Laning of MH-KNT Border-Sangareddy From Km to Km in the States of KNT and AP of NH-9 under NHDP-III MONTHLY QUALITY CONTROL & QUALITY ASSURANCE TESTS STATISTICS Section : KNT-AP Border to Sangareedy ( Km ) Month : Oct S. No. Description Total Tests upto previous Tests conducted during Total Tests up to Oct- IS Designation/Project Frequency of Tests month current month 2014 Spec Clause Tested Passed Failed Tested Passed Failed Tested Passed Failed 1.0 Tests on OGL Soil MOST Proctor IS:2720 (Part8) 1 test/250 RM Attenberg Limits IS:2720 (Part5) 1 test/250 RM Gradation IS:2720 (Part4) 1 test/250 RM CBR Test IS:2720 (Part16) 1 test/250 RM Free Swell index IS:2720 (Part48) 1 test/250 RM Tests on Shoulder Soil MOST Proctor IS:2720 (Part8) 1 test/500 RM Attenberg Limits IS:2720 (Part5) 1 test/500 RM Gradation IS:2720 (Part4) 1 test/500 RM CBR Test IS:2720 (Part16) 1 test/500 RM Free Swell index IS:2720 (Part48) 1 test/500 RM Tests on Borrow Areas MOST Proctor IS:2720 (Part8) 1 test /1500 m Attenberg Limits IS:2720 (Part5) 1 test /1500 m Gradation IS:2720 (Part4) 1 test /1500 m CBR Test IS:2720 (Part16) 1 test /3000 m Free Swell index IS:2720 (Part48) 1 test /1500 m GSB MOST Proctor IS:2720 (Part8) As required Attenberg Limits IS:2720 (Part5) 1 test /200 m Gradation Table 400-2,Gr test /200 m Water absorbtion IS:2386 (Part3) As required % Fines value BS : 812(Part111) As required CBR IS:2720 (Part16) As required WMM MOST Proctor IS:2720 (Part8) As required Gradation IS:2720 (Part4) 1 test /100 m Attenberg Limits IS:2720 (Part5) 1 test /100 m Flakiness&Elongation Index IS:2386 (Part1) 1 test /200 m Impact value IS:2386 (Part4) 1 test /200 m Water absorbtion IS:2386 (Part3) As required Sound ness IS:2386 (Part5) As required Field Dry Density Test 6.1 OGL IS:2720 (Part28) 1 set Test per 1000Sqm Embankment IS:2720 (Part28) 1 set Test per 1000Sqm Subgrade IS:2720 (Part28) 1set Test per 500 Sqm GSB IS:2720 (Part28) 1 test /500 m WMM IS:2720 (Part28) 1 test /500 m Fine Aggregate MOST Grad /Sieve analysys IS:2386 (Part1) 1 test / 15 days Specific gravity IS:2386 (Part2) As required Water absorbtion IS:2386 (Part2) As required Coarse Aggregate MOST Specific gravity IS:2386 (Part3) As required Aggregate Impact Value IS:2386 (Part4) 1 test / 15 days Flakiness index IS:2386 (Part1) 1 test / 15 days Water absorbtion IS:2386 (Part3) As required Cement MOST Fineness IS:4031 (Part1) Every batch Consistancy IS:4031 (Part4) Every batch I S T & F S T IS:4031 (Part5) Every batch Compressive Strength IS:4031 (Part6) Every batch Concrete MOST Mix design (Lab) IS:10262 MOST Sec Cube test MOST Sec MOST Sec Gradation MOST Sec MOST Sec Slump test MOST Sec MOST Sec

61 11.0 Prime coat MOST Sec Rate of Spray MOST Sec Tests per Day Viscosity test IS: As per manf. Report Tack coat MOST Sec Rate of Spray MOST Sec Tests per Day Viscousity test IS: As per manf. Report Bituminous Tests MOST Sec Penetration Test IS: sample / Tanker Ductility test IS: sample / Tanker Softening Point test IS: sample / Tanker Specific gravity IS:1203 As required DBM : MOST Sec Dry mix gradation Table Set of Test/400T or 2Tests /Day Extraction & Gradation MOST Sec Set of Test/400T or 2Tests /Day Density/Stability/Flow Test Table do Core Density MOST Sec test /250 m Air,Vma,Vfb Table Set of Test/400T or 2Tests /Day Flakiness & Elangation IS:2386 (Part1) 1 test /50 m Agg. Impact value IS:2386 (Part4) 1 test /50 m Water absorbtion IS:2386 (Part3) As required Sound ness IS:2386 (Part5) As required Sand equivalent test IS:2720 (Part 37) As required Plasticity index IS:2720 (Part5) As required Percentage of fractured faces As per MOST As required Water sensity of mix AASHTO T 283 As required Temparature of mix ---- Every truck Agg. Coating/Stripping Test IS : 6241 As required BC : MOST Sec Dry mix gradation Table Set of Test/400T or 2Tests /Day Extraction & Gradation MOST Sec Set of Test/400T or 2Tests /Day Density/Stability/Flow Test Table do Core Density MOST Sec test /250 m Air,Vma,Vfb Table Set of Test/400T or 2Tests /Day Flakiness & Elangation IS:2386 (Part1) 1 test /50 m Agg. Impact value IS:2386 (Part4) 1 test /50 m Water absorbtion IS:2386 (Part3) As required Sound ness IS:2386 (Part5) As required Sand equivalent test IS:2720 (Part 37) As required Plasticity index IS:2720 (Part5) As required Percentage of fractured faces As per MOST As required Polished stone value BS : 812(Part114) As required Swell test on the mix As required Water sensity of mix AASHTO T 283 As required Temparature of mix ---- Every truck Loss of stability ASTM D Set of Test/400T or 2Tests /Day Agg. Coating/Stripping Test IS : 6241 As required

62 Annexure 11 Status of Material Approvals as at End of October 2014 Sl Material Source/Brand Status of Approval Remarks Ultra Tech Approved Approval dt Coromandel Approved Approval dt Cement OPC 53 Group Zuari Cement Approved Approval dt Maha Cement Approved Approval dt Jaypee Cement Approved Approval dt Bharthi Cement Approved Approval dt RINL (Vizag Steel) Approved Approval dt Steel Fe 500 SAIL Approved Approval dt JSW Steel and TATA Steel Approved Approval dt Hume Pipes M/s SVS Products Pvt. Ltd. Approved Approval dt M/s Balaji Pipe Industries Approved Approval dt FOSROC Approved Approval dt SIKA and Approved Approval dt Admixtures BASF etc., Approved Approval dt MYK Schomburg India Pvt. Ltd. Approved Approval dt M/s Shalimar Seal & Tar Products Hot Crete Infrastructure Pvt. Ltd Approved Approval dt Approved Approval dt Emulsion M/s Shalimar Seal & Tar Products Approved Approval dt IWL India Pvt. ltd. Approved Approval dt M/s Shalimar Seal & Tar Products Approved Approval dt Mix Design M-15 PCC KNT Section Approved Approval dt M-15 PCC Telangana Section Approved Approval dt

63 Annexure 12 -MH/KNT Safety Photos Observations Photos Km to Km RHS:- Insufficient safety measures like lack of safety tape, barricading in the construction site. Km to Km RHS:- Deep excavation done without proper barricading the road side.

64 Annexure 12 -MH/KNT Safety Photos Observations Photos Km to Km RHS-Road Way Excavation:- : Deep excavation done without proper barricading the road side. Km RHS- Road Way Excavation:- : Insufficient safety measures like lack of safety tape, barricading in the construction site.

65 Annexure 12 -MH/KNT Safety Photos Observations Photos Km RHS-Road Way Excavation:- Insufficient safety measures like lack of safety tape, barricading in the construction site. Km LHS-Road Way Excavation on Hillock besides existing road:- No flagman and other safety measures while heavy equipment is working just by the road Side.

66 Annexure 12 -MH/KNT Safety Photos Observations Photos Km to Km LHS-Road Way Excavation:- Insufficient safety measures like lack of safety tape, barricading in the construction site RHS-Electrical Crossing:- No safety sling and helmet for the workers doing the electrical stringing on high tower.

67 Annexure 12 -MH/KNT Safety Photos Observations Photos Km Traffic stopped for Electrical crossing wire stringing :- No flagman deployed while controlling the traffic during electrical cable crossing work. Km RHS-Road Way Excavation:- Insufficient safety measures like lack of safety tape, barricading in the construction site.

68 Annexure 12 -MH/KNT Safety Photos Observations Photos Km RHS-Road Way Excavation:- No flagman and other safety measures while heavy equipment is working just by the road side. Km RHS-Road Way Excavation:- Insufficient safety measures like lack of safety tape, barricading in the construction site.

69 Annexure 12 -MH/KNT Safety Photos Observations Photos Km :-Caution Board Should be fixed. Hazard Markers Should be fixed at the start and end of the divider and caution Board should be fixed at Sadshivpet Village

70 Annexure 12 -MH/KNT Safety Photos Observations Photos Km :-Barricades are far Apart and there are no Caution Boards. Km :-No Caution Boards

71 Annexure 12 -MH/KNT Safety Photos Observations Photos Km :-Barricades are far Apart from each other. Km :-There are no caution boards

72 Annexure 12 -MH/KNT Safety Photos Observations Photos

73 Annexure- 13 Progress Photos FDD Checking at Km 467 Box Culvert at Km

74 Annexure- 13 Progress Photos GSB Trail Stretch at Km 454 (L&T EPC Base Camp) Embankment work in progress at Km

National Highways Authority of India (Ministry of Road Transport & Highways)

National Highways Authority of India (Ministry of Road Transport & Highways) National Highways Authority of India (Ministry of Road Transport & Highways) Monthly Inspection Report September 2014 Independent Engineering Service for four Laning of Maharashtra/Karnataka Sangareddy

More information

Hosur Krishnagiri Project Of NH-7

Hosur Krishnagiri Project Of NH-7 1. PROJECT LOCATION MAP: Monthly Progress Report September 2015 1 2. EXECUTIVE SUMMARY : Independent Engineering Service The Government of India (GOI) through Ministry of Shipping Road Transport & Highways

More information

Hosur Krishnagiri Project Of NH-7

Hosur Krishnagiri Project Of NH-7 . INSPECTION AND MONITORING OF THE CONSTRUCTION WORKS. PROGRESS UP TO 31st October 2014.1. a. HIGHWAYS - MCW & Service Road Sl Description Unit Total Scope (Km) Completed Percentage achieved % 1 Clearing

More information

Hosur Krishnagiri Project Of NH-7

Hosur Krishnagiri Project Of NH-7 9. INSPECTION AND MONITORING OF THE CONSTRUCTION WORKS. PROGRESS UP TO 31 May 2015 1a. HIGHWAYS - MCW & Service Road Sl Description Unit Total Scope (Km) Completed Percentage achieved % 1 Clearing & Grubbing

More information

ROAD DEVELOPMENT PROJECTS IN KARANTAKA

ROAD DEVELOPMENT PROJECTS IN KARANTAKA ROAD DEVELOPMENT PROJECTS IN KARANTAKA August 2010 1 Road Development Projects in Karnataka Provide an integrated road network in the State with the following broad objectives: To make road connectivity

More information

Project Details. Description. 2 Commencement date of Concession 9 May Schedule Commencement date of O&M

Project Details. Description. 2 Commencement date of Concession 9 May Schedule Commencement date of O&M Project Details NH-45 (popularly known as GST Road) is one of the important National Highways, which connects Chennai, the Capital City of Tamilnadu with the southern districts of the State, including

More information

Madhya Pradesh Road Development Corporation: A Case Study of ADB Assistance for Institutional Development in the Transport Sector in India

Madhya Pradesh Road Development Corporation: A Case Study of ADB Assistance for Institutional Development in the Transport Sector in India Madhya Pradesh Road Development Corporation: A Case Study of ADB Assistance for Institutional Development in the Transport Sector in India South Asia Transport Team Presented by Prodyut Dutt Asian Development

More information

National Highways Authority of India (Ministry of Road Transport & Highways)

National Highways Authority of India (Ministry of Road Transport & Highways) National Highways Authority of India (Ministry of Road Transport & Highways) Monthly Progress Report (MPR) March 2016 Independent Engineering Services for the work of four Laning of Tirupati- Tiruthani-Chennai

More information

PCDO. Jan Launched portion of Viaduct Deck Structure from S-180 (KATRA- BANIHAL SECTION) Udhampur-Srinagar-Baramulla Rail Link Project

PCDO. Jan Launched portion of Viaduct Deck Structure from S-180 (KATRA- BANIHAL SECTION) Udhampur-Srinagar-Baramulla Rail Link Project PCDO Jan-2018 Launched portion of Viaduct Deck Structure from S-180 (KATRA- BANIHAL SECTION) Udhampur-Srinagar-Baramulla Rail Link Project Northern Railway vuqjkx dqekj lpku vkbzvkj,lb Anurag Kumar Sachan

More information

SECTION DESCRPTIONS PAGE NOS.

SECTION DESCRPTIONS PAGE NOS. Four Laning of Farakka Raiganj Section of NH -34 from Km 295.00 to Km 398.00 in the State of West Bengal under NHDP phase III on Design, Build, Finance, Operate SECTION DESCRPTIONS PAGE NOS. 1 Summary

More information

TITLE 16. TRANSPORTATION CHAPTER 27. TRAFFIC REGULATIONS AND TRAFFIC CONTROL DEVICES

TITLE 16. TRANSPORTATION CHAPTER 27. TRAFFIC REGULATIONS AND TRAFFIC CONTROL DEVICES NOTE: This is a courtesy copy of this rule. The official version can be found in the New Jersey Administrative Code. Should there be any discrepancies between this text and the official version, the official

More information

SECTION DESCRPTIONS PAGE NOS.

SECTION DESCRPTIONS PAGE NOS. Four Laning of Farakka Raiganj Section of NH -34 from Km 295.00 to Km 398.00 in the State of West Bengal under NHDP phase III on Design, Build, Finance, Operate SECTION DESCRPTIONS PAGE NOS. 1 Summary

More information

INDUSTRIAL HAUL AGREEMENT

INDUSTRIAL HAUL AGREEMENT INDUSTRIAL HAUL AGREEMENT PUBLIC WORKS MEMORANDUM OF AGREEMENT entered into this day of, A.D., 20(yr). BETWEEN: PARKLAND COUNTY a County incorporated under the laws of the Province of Alberta, (hereinafter

More information

Sano Milti Khola Hydropower Project, Fulasi VDC, Ramechhap (3 MW)

Sano Milti Khola Hydropower Project, Fulasi VDC, Ramechhap (3 MW) Sano Milti Khola Hydropower Project, Fulasi VDC, Ramechhap (3 MW) Monthly Progress Report Prepared by : Sano Milti Khola Hydropower Limited www.smi.com.np smi.investment.limited@gmail.com Date : June,

More information

Indian Highways. Emerging Opportunities for Profitable Partnership. Government of India. Ministry of Shipping, Road Transport & Highways

Indian Highways. Emerging Opportunities for Profitable Partnership. Government of India. Ministry of Shipping, Road Transport & Highways Conceived & Designed by New Ink Publications Pvt. Ltd. Indian Highways Emerging Opportunities for Profitable Partnership Government of India This brochure has been prepared by the Information Technology

More information

ARAI/TA(4G_RV)/SMS/D680/ Dated 21 st Mar 2015 CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES

ARAI/TA(4G_RV)/SMS/D680/ Dated 21 st Mar 2015 CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES M/s SMS Autoline Equipments Pvt. Ltd. Plot No.AP215, 6 th Street, I Block, Vallalar Colony, Anna Nagar (West) Chennai 600 040 Cert Annex Drg

More information

PS 127 Abnormal / Indivisible Loads Policy

PS 127 Abnormal / Indivisible Loads Policy PS 127 Abnormal / Indivisible Loads Policy June 2017 Version 1.5 Statement of legislative compliance This document has been drafted to comply with the general and specific duties in the Equality Act 2010;

More information

ARAI/TA(4G)/SMS/D680/ Dated 28 Jan 2010

ARAI/TA(4G)/SMS/D680/ Dated 28 Jan 2010 CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES M/s SMS Autoline Equipments Pvt. Ltd. Plot No.AP215, 6 th Street I Block, Vallalar Colony, Anna Nagar (West) Chennai 600 040 Cert Annex Drg

More information

City of Grand Forks Staff Report

City of Grand Forks Staff Report City of Grand Forks Staff Report Service/Safety Committee December 15, 2015 City Council December 21, 2015 Agenda Item: Amendment No. 1 to Engineering Services Agreement with CPS for City Project No. 7143,

More information

Guidelines for Solar Grid Power Projects

Guidelines for Solar Grid Power Projects Guidelines for Solar Grid Power Projects NTPC Ltd. NTPC Vidyut Vyapar Nigam Ltd. AGENDA 1 2 3 NTPC / NVVN at a glance Broad Guidelines for Selection of Solar Power Developers Elements of PPA NTPC Limited

More information

ARAI/TA (4G)/AIRVISOR/AVG500/ Dated 17 th Apr 2017

ARAI/TA (4G)/AIRVISOR/AVG500/ Dated 17 th Apr 2017 Airvisor Technologies Pvt. Ltd. H-155, Adhyapak Nagar, Nangloi, New Delhi 110041. CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES Cert Annex Drg Total 1 7 0 8 pgs Exhaust Gas Analyzer Model

More information

Date of Issue: For: County Engineer. County Road No.: Maintenance Area: Section Forman Payment Required: (Options: Cash Cheque Credit Card)

Date of Issue: For: County Engineer. County Road No.: Maintenance Area: Section Forman Payment Required: (Options: Cash Cheque Credit Card) County of Wellington Engineering Services Department Roads Division 74 Woolwich Street Guelph, Ontario N1H 3T9 Phone: (519) 837-2601 Fax: (519) 837-8138 Email: roadsinfo@wellington.ca ENTRANCE PERMIT OWNER/APPLICANT

More information

Access Management Standards

Access Management Standards Access Management Standards This section replaces Access Control Standards on Page number 300-4 of the Engineering Standards passed February 11, 2002 and is an abridged version of the Access Management

More information

INDUSTRIAL ROADS ACT

INDUSTRIAL ROADS ACT PDF Version [Printer-friendly - ideal for printing entire document] Published by Quickscribe Services Ltd. Updated To: [includes 2017 Bill 9, c. 10 amendments (effective November 2, 2017)] Important: Printing

More information

Wheeling charges, Banking charges & Cross Subsidy Surcharge for Solar Power Generators

Wheeling charges, Banking charges & Cross Subsidy Surcharge for Solar Power Generators KARNATAKA ELECTRICITY REGULATORY COMMISSION No.9/2, 6 th & 7 th Floor, Mahalaxmi Chambers, M.G.Road, Bangalore-560 001 Present: Shri M.R. Sreenivasa Murthy Chairman Shri H. D. Arun Kumar Shri D.B. Manival

More information

ELMORE COUNTY HIGHWAY DEPARTMENT

ELMORE COUNTY HIGHWAY DEPARTMENT Adopted 11/27/06 Effective 2/1/07 Amended 4/10/08 ELMORE COUNTY HIGHWAY DEPARTMENT 155 County Shop Road Wetumpka, Alabama 36092 Phone (334) 567-1162 Fax (334) 567-1100 Access Management Policy The Elmore

More information

Report Date: May 18, 2012 Contact: Al Zacharias Contact No.: RTS No.: 9587 VanRIMS No.: Meeting Date: June 12, 2012

Report Date: May 18, 2012 Contact: Al Zacharias Contact No.: RTS No.: 9587 VanRIMS No.: Meeting Date: June 12, 2012 A5 ADMINISTRATIVE REPORT Report Date: May 18, 2012 Contact: Al Zacharias Contact No.: 604.873.7214 RTS No.: 9587 VanRIMS No.: 08-2000-21 Meeting Date: June 12, 2012 TO: FROM: SUBJECT: Vancouver City Council

More information

No. TE/F-814/16/WO- 145/ Dt

No. TE/F-814/16/WO- 145/ Dt No. TE/F-814/16/WO- 145/ Dt. 30.11.2016 To M/s Jaikar Techno Private Limited Plot No. 43, Near Imam Kothi, Old Hazaribagh Road, Kokar, Ranchi - 834009 Dear Sir, Sub : Work order for the work of Renewal

More information

ARAI/TA(4G_RV)/HORIBA/MEXA 584L/ Dated 25 Mar 2014

ARAI/TA(4G_RV)/HORIBA/MEXA 584L/ Dated 25 Mar 2014 CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES M/s Horiba India Pvt. Ltd. Room 1521, 15 th Floor, Eros Corporate Tower, Nehru Place New Delhi 110 019 Cert Annex Drg Total 1 7 0 8 pgs Exhaust

More information

P. SUMMARY: The Southeastern Power Administration (SEPA) establishes Rate Schedules JW-

P. SUMMARY: The Southeastern Power Administration (SEPA) establishes Rate Schedules JW- This document is scheduled to be published in the Federal Register on 08/29/2016 and available online at http://federalregister.gov/a/2016-20620, and on FDsys.gov 6450-01-P DEPARTMENT OF ENERGY Southeastern

More information

City Transfer Stations: Loading Services and Fees

City Transfer Stations: Loading Services and Fees STAFF REPORT ACTION REQUIRED City Transfer Stations: Loading Services and Fees Date: March 24, 2009 To: From: Wards: Reference Number: Public Works and Infrastructure Committee General Manager, Solid Waste

More information

Abu Dhabi Department of Transport Application Form Non Objection Certificate (NOC)

Abu Dhabi Department of Transport Application Form Non Objection Certificate (NOC) Abu Dhabi Department of Transport Application Form Non Objection Certificate (NOC) for a Commercial Licence to Operate Goods Vehicles with an Unladen Weight of over 2.5 tonnes Does this Application Apply

More information

WELLINGTON, NEW ZEALAND. PURSUANT to sections 152, 155(a) and (e) and 158(a)(i) of the Land Transport Act 1998

WELLINGTON, NEW ZEALAND. PURSUANT to sections 152, 155(a) and (e) and 158(a)(i) of the Land Transport Act 1998 WELLINGTON, NEW ZEALAND PURSUANT to sections 152, 155(a) and (e) and 158(a)(i) of the Land Transport Act 1998 I, Gerry Brownlee, Minister of Transport, HEREBY make the following ordinary Rule: Land Transport

More information

Ref: As per Schedule-P, Volume-ll of Concession Agreement.

Ref: As per Schedule-P, Volume-ll of Concession Agreement. Plot No. 11, Shrirang Colony, NearA-one Petrol Pump, Old Agra Road, Deopur, Dhule 424005, Maharashtra, India. +91 +91 DHULE- PIMPALGAON (NH-3) BOT PROJECT K&J/DPN H/TL 201 5l o 2-5-

More information

Need Assessment Document (NAD) DDUGJY

Need Assessment Document (NAD) DDUGJY Need Assessment Document (NAD) DDUGJY Index SNo. Details Page No. 1.0 General Instruction 3 2.0 Objectives of DDUGJY 5 3.0 Scope of works 7 4.0 General information of project area 10 5.0 Details of existing

More information

Public Works Operations Manual Standard Operating Procedures for Water and Sewer WS - B311 Sanitary Sewer Connection Repair

Public Works Operations Manual Standard Operating Procedures for Water and Sewer WS - B311 Sanitary Sewer Connection Repair Public Works Operations Manual Standard Operating Procedures for Water and Sewer WS - B311 Sanitary Sewer Connection Repair 1. Objective: 1.1. To repair the sanitary sewer connection in a timely and efficient

More information

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015 SOUTHERN GATEWAY Transportation and Trinity River Project Committee 11 May 2015 Southern Gateway Project History Began in 2001 as a Major Investment Study [ MIS ], Schematic, and Environmental Assessment

More information

MONTHLY (O&M) PROGRESS REPORT

MONTHLY (O&M) PROGRESS REPORT NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Shipping, Road Transport & Highways) Government of India Improvement, Operation and Maintenance, Rehabilitation and Strengthening of Existing 2- Lane Road

More information

BRIEF ACHIEVEMENTS AND INITIATIVES OF SIKKIM NATIONALISED TRANSPORT (SNT) (TILL DECEMEBR 2015)

BRIEF ACHIEVEMENTS AND INITIATIVES OF SIKKIM NATIONALISED TRANSPORT (SNT) (TILL DECEMEBR 2015) TRANSPORT DEPARTMENT GOVERNMENT OF SIKKIM YATAYAT BHAWAN, DEVELOPMENT AREA GANGTOK 737101 Ph. No.: 03592-202483(O), 03592-203483(R), Fax No. 03592-203418 Email: secytransport@gmail.com BRIEF ACHIEVEMENTS

More information

DRIVEWAY STANDARDS EXHIBIT A. The following definition shall replace the definition of driveway in Section 62:

DRIVEWAY STANDARDS EXHIBIT A. The following definition shall replace the definition of driveway in Section 62: 1365 S. Camino del Rio Durango, CO 81303 970-382-6363 DRIVEWAY STANDARDS Resolution 2014-40 EXHIBIT A The following definition shall replace the definition of driveway in Section 62: Driveway means a roadway,

More information

Head of Division for Road Traffic Technology; Road Infrastructure Safety; Routine Road Maintenance Management

Head of Division for Road Traffic Technology; Road Infrastructure Safety; Routine Road Maintenance Management BDir Dipl Ing Manfred Silvanus Head of Division for Road Traffic Technology; Road Infrastructure Safety; Routine Road Maintenance Management www.bmvi.de AGENDA - Federal Ministry of Transport and Digital

More information

Presentation on URBAN TRANSPORTATION PLAN FOR MEERUT CITY. Presentation by: Meerut Development Authority

Presentation on URBAN TRANSPORTATION PLAN FOR MEERUT CITY. Presentation by: Meerut Development Authority Presentation on URBAN TRANSPORTATION PLAN FOR MEERUT CITY Presentation by: Meerut Development Authority Meerut City An Overview Historical city - dating back to Ramayana and Mahabharata. In 1806 the cantonment

More information

EDS REPLY. Point No.2 Past-production details duly authenticated by DMG since Reply

EDS REPLY. Point No.2 Past-production details duly authenticated by DMG since Reply INDEX S. No. PARTICULARS PAGE NO. A EDS REPLY 1-3 ANNEXURE I ESSENTIAL DETAILS SOUGHT (EDS) 4-5 ANNEXURE II LEASE DOCUMENTS 6-58 ANNEXURE III AUTHENTICATED PAST PRODUCTION DATA 59 ANNEXURE IV CTE (AIR)

More information

GOVERNMENT OF INDIA MINISTRY OF ROAD TRANSPORT & HIGHWA YS

GOVERNMENT OF INDIA MINISTRY OF ROAD TRANSPORT & HIGHWA YS GOVERNMENT OF INDIA MINISTRY OF ROAD TRANSPORT & HIGHWA YS Parivahan Bhavan, 1, Parliament Street, New Delhi-11 0001 RW-NH-350721112010-S&R(B) Dated: 2dh May, 2014 1. The Chief Secretaries of all State

More information

By: Muhammad Usman Arshad Khan Head of Projects and Policy

By: Muhammad Usman Arshad Khan Head of Projects and Policy By: Muhammad Usman Arshad Khan Head of Projects and Policy Introduction to SME Business Support Fund Sharing of results Pre Audit conducted at Quaid-e-Azam (Kot Lakhpat) Industrial Estate Lahore Overview

More information

Implementation Status & Results Bosnia and Herzegovina ROAD INFRASTRUCTURE AND SAFETY PROJECT (P100792)

Implementation Status & Results Bosnia and Herzegovina ROAD INFRASTRUCTURE AND SAFETY PROJECT (P100792) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Bosnia and Herzegovina ROAD INFRASTRUCTURE AND SAFETY PROJECT (P100792) Operation Name: ROAD INFRASTRUCTURE

More information

TRANSMISSION LICENCE NO. 1 OF 2011 LICENCE FOR TRANSMISSION OF ELECTRICITY IN THE STATE OF MAHARASHTRA

TRANSMISSION LICENCE NO. 1 OF 2011 LICENCE FOR TRANSMISSION OF ELECTRICITY IN THE STATE OF MAHARASHTRA MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th floor, Cuffe Parade, Mumbai - 400 005. Tel. No. 022 22163964/65/69 Fax 022 22163976 E-mail mercindia@mercindia.org.in

More information

Rancho Villas Community Association Vehicle & Parking Rules and Regulations

Rancho Villas Community Association Vehicle & Parking Rules and Regulations Running head: RVCA VEHICLE & PARKING RULES AND REGULATIONS Rancho Villas Community Association Vehicle & Parking Rules and Regulations Board Approved: January 9, 2014 ** NOTE ANY PREVIOUS PARKING ARRANGEMENTS

More information

Mechanical Trainstop Systems

Mechanical Trainstop Systems Mechanical Trainstop Systems Synopsis This document defines the functional requirements for mechanical trainstop systems and the requirements relating to their use on both track and trains. Signatures

More information

MONTHLY PROGRESS REPORT MAY-2014

MONTHLY PROGRESS REPORT MAY-2014 ESSEL AHMEDABAD GODHRA TOLL ROADS LIMITED (A Special Purpose Vehicle of Essel Infra Projects Limited) FOUR LANING OF AHMEDABAD TO GODHRA SECTION OF NH- 59 FROM KM 4.200 TO KM 122.420 IN THE STATE OF GUJARAT

More information

ST. VINCENT AND THE GRENADINES

ST. VINCENT AND THE GRENADINES ST. VINCENT AND THE GRENADINES MARITIME ADMINISTRATION CIRCULAR N POL 022 FUEL OIL CONSUMPTION DATA COLLECTION SYSTEM Amendments to MARPOL Annex VI, MEPC.278(70) TO: APPLICABLE TO: EFFECTIVE AS FROM: SHIPOWNERS,

More information

Solar Energy Corporation of India Limited New Delhi Expression of Interest for Setting up of Solar PV Manufacturing Capacities in India

Solar Energy Corporation of India Limited New Delhi Expression of Interest for Setting up of Solar PV Manufacturing Capacities in India SECI/SD/EoI/20000 MW Mfg./I/2017 18.12.2017 Expression of Interest for Setting up of Solar PV Manufacturing Capacities in India 1. Objective of EOI: SECI intends to invite Expression of Interest from the

More information

Page 1 of 10. Motor Pool Policies & Procedures

Page 1 of 10. Motor Pool Policies & Procedures Page 1 of 10 Motor Pool Policies & Procedures Page 2 of 10 I. Request Vehicle from Motor Pool A. Call Motor Pool to check availability of desired vehicle and make reservation. B. Complete and submit Motor

More information

GC108: EU Code: Emergency & Restoration: Black start testing requirement

GC108: EU Code: Emergency & Restoration: Black start testing requirement Stage 01: Modification Proposal Grid Code GC108: EU Code: Emergency & Restoration: Black start testing requirement Purpose of Modification: This modification seeks to align the GB Grid Code with the European

More information

MONTHLY (O&M) PROGRESS REPORT

MONTHLY (O&M) PROGRESS REPORT NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Shipping, Road Transport & Highways) Government of India Improvement, Operation and Maintenance, Rehabilitation and Strengthening of Existing 2- Lane Road

More information

Comparison of Indian Electricity Rules, 1956 Vs CEA (Measures relating to Safety and Electric Supply) Regulations, 2010

Comparison of Indian Electricity Rules, 1956 Vs CEA (Measures relating to Safety and Electric Supply) Regulations, 2010 1 of 5. Comparison of Indian Electricity Rules, 1956 Vs CEA (Measures relating to Safety and Electric Supply) Regulations, 2010 2 Definitions 2 Not seen the definition for Inspector. But with, - Qualifications,

More information

THE CORPORATION OF THE TOWNSHIP OF MIDDLESEX CENTRE BY-LAW NUMBER

THE CORPORATION OF THE TOWNSHIP OF MIDDLESEX CENTRE BY-LAW NUMBER THE CORPORATION OF THE TOWNSHIP OF MIDDLESEX CENTRE BY-LAW NUMBER 2006-052 BEING A BY-LAW TO REGULATE AND CONTROL PARKING WITHIN THE TOWNSHIP OF MIDDLESEX CENTRE WHEREAS the Municipal Act authorizes local

More information

A P P L I C A T I O N F O R

A P P L I C A T I O N F O R 1. Valet Parking Operator: Name Mailing Address A P P L I C A T I O N F O R V A L E T P A R K I N G P E R M I T 5 5 0 L A N D A S T R E E T N E W B R A U N F E L S T X 7 8 1 30 E-MAIL: planning@nbtexas.org

More information

Parking Control Bylaw 2014

Parking Control Bylaw 2014 Parking Control Bylaw 2014 1 Thames-Coromandel District Council - Parking Control Bylaw 2014 1. TITLE 1.1. This Bylaw is the Thames-Coromandel District Council Parking Control Bylaw 2014. 2. EXPLANATORY

More information

ARAI/TA(4G)/GEN-MAINT/EXOSCAN-V/ Dated 26 th Mar 2009 CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES

ARAI/TA(4G)/GEN-MAINT/EXOSCAN-V/ Dated 26 th Mar 2009 CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES M/s Gen-Maint 106-107, New Diamond Premises Coop. Soc. Ltd. Off. Western Express Highway Goregaon (E) Mumbai 400 063 Cert Annex Drg Tot al

More information

Chapter 17 TRAFFIC AND VEHICLES. Adoption of Uniform Rules of the Road. Temporary Traffic Regulations.

Chapter 17 TRAFFIC AND VEHICLES. Adoption of Uniform Rules of the Road. Temporary Traffic Regulations. Chapter 17 TRAFFIC AND VEHICLES Article I. Article II. Article III. In General. Section 17.1 Adoption of Uniform Rules of the Road. Section 17.2 Temporary Traffic Regulations. Section 17.3 Traffic Speed,

More information

Gisborne District Traffic and Parking Bylaw DOCS_n144966

Gisborne District Traffic and Parking Bylaw DOCS_n144966 Gisborne District Traffic and Parking Bylaw 2011 DOCS_n144966 Contents 1. TITLE 1 2. COMMENCEMENT AND REPEALS 1 3. APPLICATION 1 4. INTERPRETATION 1 5. GENERAL 3 6. PARKING 7. PARKING OF HEAVY MOTOR VEHICLES

More information

Interconnection Process for Generation Systems

Interconnection Process for Generation Systems Interconnection Process for Generation Systems I. INTRODUCTION...1 II. GENERAL INFORMATION...2 A. Definitions...2 B. Nodak Electric Cooperative, Inc. Generation Interconnection Contacts...3 C. Engineering

More information

Right-of-Way Obstruction Permit Fee Structure Minneapolis Department of Public Works May 10, 2001

Right-of-Way Obstruction Permit Fee Structure Minneapolis Department of Public Works May 10, 2001 Right-of-Way Obstruction Permit Fee Structure Minneapolis Department of Public Works May 10, 2001 Revised April 5, 2005 Revised January 27, 2006 Prepared by: Steve Collin, Engineer 2.5 Revised by Douglas

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: India Project: Delhi Mass Rapid Transport System Project Phase 2 (V) Loan Agreement: March 31, 2010 Loan Amount:

More information

The principal activities of UMWD are mainly investment holding and property development.

The principal activities of UMWD are mainly investment holding and property development. 1. INTRODUCTION UMW Holdings Berhad ( UMW Holdings or the Company ) wishes to announce that its wholly-owned subsidiary, UMW Corporation Sdn Bhd ( UMWC ), has today entered into a Settlement Agreement

More information

Marina Bay Sands Guidelines for Electrical and Wiring Service

Marina Bay Sands Guidelines for Electrical and Wiring Service Marina Bay Sands Guidelines for Electrical and Wiring Service 1) The supply of electrical mains in the licensed area of the event is an exclusive service offered by Marina Bay Sands (MBS). In the event

More information

Policies and Procedures

Policies and Procedures PAGE 1 OF 5 PURPOSE This policy has been developed to define standards of conduct and establish mandatory training for faculty, staff, students, volunteers or contractors/vendors who operate golf carts

More information

52.1 SNOW REMOVAL AND ICE CONTROL (TRUCK)

52.1 SNOW REMOVAL AND ICE CONTROL (TRUCK) 52.1 SNOW REMOVAL AND ICE CONTROL (TRUCK) 52.1.1 GENERAL The Work consists of loading trucks, snowplowing and the application of sand, salt or a sand and salt mixture to roadway surfaces. 52.1.2 MATERIALS

More information

VDOT Unused Facilities

VDOT Unused Facilities VDOT Unused Facilities Appropriation Act Item 457 K.1 (2010) Report to the Chairmen of House Appropriations and Senate Finance Committees Virginia Department of Transportation 1401 East Broad Street Richmond,

More information

Applicable California Vehicle Code Sections, 2015 Edition

Applicable California Vehicle Code Sections, 2015 Edition Applicable California Vehicle Code Sections, 2015 Edition Speed limits in California are governed by the California Vehicle Code (CVC), Sections 22348 through 22413; also, pertinent sections are found

More information

Application for release of capital subsidy on installation of Grid Connected Solar Power Plant

Application for release of capital subsidy on installation of Grid Connected Solar Power Plant Chandigarh Renewal Energy, Science & Technology Promotion Society (CREST) Under the Aegis of Department of Science & Technology, Chandigarh Administration), Paryavaran Bhawan, First Floor, Sec-19B, Madhya

More information

800 Access Control, R/W Use Permits and Drive Design

800 Access Control, R/W Use Permits and Drive Design Table of Contents 801 Access Control... 8-1 801.1 Access Control Directives... 8-1 801.2 Access Control Policies... 8-1 801.2.1 Interstate Limited Access... 8-1 801.2.2 Limited Access... 8-1 801.2.3 Controlled

More information

Mysuru PBS Presentation on Prepared by: Directorate of Urban Land Transport

Mysuru PBS Presentation on Prepared by: Directorate of Urban Land Transport Mysuru PBS Presentation on 04.11.2017 Prepared by: Directorate of Urban Land Transport Introduction to Mysuru Public Bicycle Sharing System Mysuru Public Bicycle Sharing System Bicycle based transportation

More information

MIDWAY CITY Municipal Code

MIDWAY CITY Municipal Code TITLE 8 STREETS AND SIDEWALKS MIDWAY CITY Municipal Code CHAPTER 8.01 UTAH CRIMINAL AND TRAFFIC CODE ADOPTED CHAPTER 8.02 UNLAWFUL PARKING CHAPTER 8.03 TRAFFIC REGULATIONS CHAPTER 8.04 RIGHT-OF-WAY REGULATIONS

More information

National Highways Authority of India (Ministry of Road Transport & Highways)

National Highways Authority of India (Ministry of Road Transport & Highways) National Highways Authority of India (Ministry of Road Transport & Highways) ANNUITY PROJECT - NH 45 TAMBARAM TO TINDIVANAM (KM 28.000 TO KM 121.000) MONTHLY O&M REPORT MAY - 2018 INDEPENDENT ENGINEER

More information

Request for Quotation (RFQ) for the provision of electrical construction services to the CSIR CSIR RFQ:

Request for Quotation (RFQ) for the provision of electrical construction services to the CSIR CSIR RFQ: Request for Quotation (RFQ) for the provision of electrical construction services to the CSIR Date of issue Wednesday, 07 February 2018 Compulsory Briefing session and site inspection Venue Tuesday, 13

More information

Control, Safe Use and Operation of Excavators, Loaders and Earth Moving Equipment

Control, Safe Use and Operation of Excavators, Loaders and Earth Moving Equipment Control, Safe Use and Operation of Excavators, Loaders and Earth Moving Equipment Page 1 of 14 Part A Synopsis A standard detailing the requirements for the control, safe use and operation of excavators,

More information

Implementation procedure for certification and continued airworthiness of Beriev Be-200E and Be-200ES-E

Implementation procedure for certification and continued airworthiness of Beriev Be-200E and Be-200ES-E 1. Scope 1.1 The general process is described in the implementation procedure for design approvals of aircraft, engine and propeller from CIS and in the implementation procedure for design approvals of

More information

CATEGORY 500 PAVING SECTION 535 PAVEMENT SURFACE PROFILE

CATEGORY 500 PAVING SECTION 535 PAVEMENT SURFACE PROFILE CATEGORY 500 PAVING 1 of 9 SECTION 535.01 DESCRIPTION. This work shall consist of measuring the roughness of the final surface of hot mix asphalt (HMA) or portland cement concrete (PCC) pavements. The

More information

Documents: CITY COUNCIL COMMUNICATION GOLF CARTS - COPY.DOCX, GOLF CART PERMIT PROPOSAL.DOCX, IOWA GOLF CART CODE.DOCX

Documents: CITY COUNCIL COMMUNICATION GOLF CARTS - COPY.DOCX, GOLF CART PERMIT PROPOSAL.DOCX, IOWA GOLF CART CODE.DOCX 1. City of Oskaloosa City Council Study Session Council Chambers City Hall, 220 S. Market Street Oskaloosa, IA 52577 Agenda April 4, 2016 5:15 p.m. Discussion Of An Ordinance Amending The Oskaloosa Municipal

More information

THE CENTRAL ROAD FUND (AMENDMENT) BILL, 2017

THE CENTRAL ROAD FUND (AMENDMENT) BILL, 2017 1 AS INTRODUCED IN LOK SABHA Bill No. 114 of 2017 5 54 of 2000. 10 82 of 1985. THE CENTRAL ROAD FUND (AMENDMENT) BILL, 2017 A BILL further to amend the Central Road Fund Act, 2000. BE it enacted by Parliament

More information

SAKHALIN ENERGY INVESTMENT COMPANY LTD. INVITATION TO TENDER

SAKHALIN ENERGY INVESTMENT COMPANY LTD. INVITATION TO TENDER SAKHALIN ENERGY INVESTMENT COMPANY LTD. INVITATION TO TENDER For the purchase of inch instrument. All goods being offered for tender are located at PMD Yasnoye, Sakhalin Region, Russian Federation. General

More information

TRANSPORTATION DEPARTMENT YEARS OF TRANSPORTATION REGULATION

TRANSPORTATION DEPARTMENT YEARS OF TRANSPORTATION REGULATION TRANSPORTATION DEPARTMENT 1867-2012 145 YEARS OF TRANSPORTATION REGULATION OHIO THE TRANSPORTATION HEART OF IT ALL NATIONAL COMPARISON Highway System(116,000 miles) CMV Miles Traveled (111 million) Rail

More information

Electric Vehicle Charging Station Incentives PROGRAM HANDBOOK

Electric Vehicle Charging Station Incentives PROGRAM HANDBOOK Electric Vehicle Charging Station Incentives PROGRAM HANDBOOK 1 1 TABLE OF CONTENTS Please ensure you are reading the most recent version of this handbook by visiting the NV Energy website https://www.nvenergy.com/cleanenergy/electric-vehicles

More information

Too Good to Throw Away Implementation Strategy

Too Good to Throw Away Implementation Strategy Too Good to Throw Away Implementation Strategy Council Briefing by Sanitation Services October 4, 2006 Purpose of Briefing Summarize preparations for Too Good To Throw Away recycling services FY07 Recommend

More information

Bihar Electricity Regulatory Commission Vidyut Bhawan, J.L.Nehru Marg, Patna

Bihar Electricity Regulatory Commission Vidyut Bhawan, J.L.Nehru Marg, Patna Bihar Electricity Regulatory Commission Vidyut Bhawan, J.L.Nehru Marg, Patna 800 021 ------------------------------------------------------------------------------------------------------------- ROOFTOP

More information

CITY OF LYNN In City Council

CITY OF LYNN In City Council January 10, 1995 IN THE YEAR ONE THOUSAND NINE HUNDRED NINETY-FIVE, AN ORDINANCE AMENDING THE ORDINANCE RELATIVE TO TOWING AND PARKING IN THE CITY OF LYNN Be it Ordained by the City Council of the City

More information

(Liability of producers and importer for spent batteries and accumulators etc.)

(Liability of producers and importer for spent batteries and accumulators etc.) Law amending the Law on Environmental Protection and repealing the Law on reimbursement in connection with the collection of hermetically-sealed nickel-cadmium accumulators (closed nickelcadmium batteries)

More information

3. Application Fees, Certificate Of Insurance & Performance Bond

3. Application Fees, Certificate Of Insurance & Performance Bond SUBSECTION 13.10 CONSTRUCTION OF DRIVEWAYS 13.10A PERMIT REQUIREMENTS 1. General A driveway or access road serving private property and intersecting with a town road shall be constructed in such a manner

More information

1 [94. NOISE LIMIT FOR GENERATOR SETS RUN WITH DIESEL

1 [94. NOISE LIMIT FOR GENERATOR SETS RUN WITH DIESEL [94. NOISE LIMIT FOR GENERATOR SETS RUN WITH DIESEL. Noise limit for diesel generator sets (upto 000 KVA) manufactured on or after the [ st January, 005]. The maximum permissible sound pressure level for

More information

TARIFF SCHEDULES FOR HIGH TENSION CONSUMERS. Table of Contents

TARIFF SCHEDULES FOR HIGH TENSION CONSUMERS. Table of Contents Annexure-1-B ANNEXURE TO TARIFF ORDER PASSED BY MPERC For Financial Year 2005-06 MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION TARIFF SCHEDULES FOR HIGH TENSION CONSUMERS Table of Contents Sr No Particulars

More information

THE ANDHRA PRADESH GAZETTE PART IV-B EXTRAORDINARY PUBLISHED BY AUTHORITY [No.1] HYDERABAD, THURSDAY, JANUARY 24, 2013

THE ANDHRA PRADESH GAZETTE PART IV-B EXTRAORDINARY PUBLISHED BY AUTHORITY [No.1] HYDERABAD, THURSDAY, JANUARY 24, 2013 THE ANDHRA PRADESH GAZETTE PART IV-B EXTRAORDINARY PUBLISHED BY AUTHORITY [No.1] HYDERABAD, THURSDAY, JANUARY 24, 2013 ANDHRA PRADESH ACTS, ORDINANCES AND REGULATIONS Etc. The following Act of the Andhra

More information

RESOLUTION MEPC.278(70) (Adopted on 28 October 2016) AMENDMENTS TO THE ANNEX OF THE PROTOCOL OF 1997 TO AMEND THE INTERNATIONAL CONVENTION FOR THE

RESOLUTION MEPC.278(70) (Adopted on 28 October 2016) AMENDMENTS TO THE ANNEX OF THE PROTOCOL OF 1997 TO AMEND THE INTERNATIONAL CONVENTION FOR THE RESOLUTION MEPC.278(70) (Adopted on 28 October 2016) AMENDMENTS TO THE ANNEX OF THE PROTOCOL OF 1997 TO AMEND THE INTERNATIONAL CONVENTION FOR THE PREVENTION OF POLLUTION FROM SHIPS, 1973, AS MODIFIED

More information

EXHIBIT A EAST VALLEY WATER DISTRICT SCHEDULE OF WATER AND WASTEWATER RATES AND CHARGES

EXHIBIT A EAST VALLEY WATER DISTRICT SCHEDULE OF WATER AND WASTEWATER RATES AND CHARGES EXHIBIT A EAST VALLEY WATER DISTRICT SCHEDULE OF WATER AND WASTEWATER RATES AND CHARGES UPDATED MAY 24, 2017 Table of Contents Section 1: Water Service Charges... 2 Monthly Water System Charge... 2 Commodity

More information

PLEASE SUBMIT THE CORRECT PERMIT FEE WITH PAGES 1 & 3 OF APPLICATION TO: OCONTO COUNTY HIGHWAY DEPT, P.O. BOX 138, OCONTO, WI 54153

PLEASE SUBMIT THE CORRECT PERMIT FEE WITH PAGES 1 & 3 OF APPLICATION TO: OCONTO COUNTY HIGHWAY DEPT, P.O. BOX 138, OCONTO, WI 54153 PLEASE SUBMIT THE CORRECT PERMIT FEE WITH PAGES 1 & 3 OF APPLICATION TO: OCONTO COUNTY HIGHWAY DEPT, P.O. BOX 138, OCONTO, WI 54153 APPLICATION/PERMIT TO INSTALL ACCESS DRIVEWAY TO A COUNTY TRUNK HIGHWAY

More information

Umatilla Electric Cooperative Net Metering Rules

Umatilla Electric Cooperative Net Metering Rules Umatilla Electric Cooperative Net Metering Rules Version: July 2017 Umatilla Electric Cooperative NET METERING RULES Rule 0005 Scope and Applicability of Net Metering Facility Rules (1) Rule 0010 through

More information

Resident Permit and Visitor Permit Guidelines

Resident Permit and Visitor Permit Guidelines OPERATING GUIDELINES Resident Permit and Visitor Permit Guidelines Approved by: GM, City Services May 2003 Subsequent Amendments: 9 September 2016 Associate Director (Vanessa Godden) Amended to reflect

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (MEAN ROUGHNESS INDEX ACCEPTANCE CRITERIA)

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (MEAN ROUGHNESS INDEX ACCEPTANCE CRITERIA) MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (MEAN ROUGHNESS INDEX ACCEPTANCE CRITERIA) CFS:TEH 1 of 10 APPR:KPK:JFS:07-07-16 FHWA:APPR:07-15-16 a. Description. This

More information