1 XXXXXXXXXXXXXXXXXXXXXXXXX TRANSMISSION/GENERATION FEASIBILITY STUDY FATAL FLAW AND FEASIBILITY ANALYSIS System Operations Department System Planning Section June 2001

2 TABLE OF CONTENTS 1.0 Executive Summary...Page Cost Estimates...Page Interconnection Costs of XXXX Generation to Hidalgo Substation...Page Task II, Scenario 1 System Modification Costs...Page Task II, Scenario 2 System Modification Costs...Page Task II, Sensitivity #1 System Modification Costs...Page Task II, Sensitivity #2 System Modification Costs...Page Introduction...Page Assumptions...Page Criteria...Page Procedure...Page Base Case Development...Page List Of Contingencies...Page Transient Stability Analysis...Page Q-V Analysis...Page Short-Circuit Analysis...Page Powerflow Analysis Results...Page Task I (Benchmark) Case...Page Task II Scenario 1 Case...Page Task II Scenario 2 Case...Page Task II Sensitivity #1 Case...Page Task II Sensitivity #2 Case...Page Comparison of Task II Sensitivity #2 Case and Sensitivity #1 Case...Page Transient Stability Analysis Results...Page Task I Benchmark Case...Page Task II Scenario 1 Case...Page Task II Scenario 2 Case...Page Q-V Analysis Results...Page Short-Circuit Analysis Results...Page Disclaimer...Page Certification...Page 30 Transmission/Generation Feasibility Study i El Paso Electric Company For XXXXXXXXXXXXXXXXXXX June 2001

3 APPENDICIES Feasibility Transmission/Generation Interconnection Study: Study Scope...Appendix 1 EPE FERC Form Appendix 2 Load and Resources Tables...Appendix 3 Powerflow Maps One-Line Diagrams...Appendix 4 List of Contingencies...Appendix 5 XXXX Stability Models & Parameters...Appendix 6 Base Case & Contingency Criteria Violation Tables...Appendix 7 Stability Plots...Appendix 8 Q-V Plots...Appendix 9 SHORT-CIRCUIT ANALYSIS...ATTACHMENT Transmission/Generation Feasibility Study ii El Paso Electric Company For XXXXXXXXXXXXXXXXXXX June 2001

4 1.0 EXECUTIVE SUMMARY On January 26, 2001, XXXXXXXXXXXXXXX (XXXX) submitted to El Paso Electric Company (EPE) a request for a Transmission and Facilities Study with the intention of requesting a Fatal Flaw and Feasibility Analysis. This request was made concerning XXXX s plans to construct and interconnect generating facilities at the Hidalgo 345 kv bus in the 2003 time frame. Subsequently, on March 19, 2001, EPE and XXXX signed an Agreement for a Feasibility Transmission Interconnection Study. Pursuant to the above Agreement, on April 9, 2001 EPE and XXXX signed a Feasibility Transmission/Generation Interconnection Study: Study Scope (Appendix 1). This Study Scope discussed the system studies to be conducted by EPE concerning the proposed XXXX generation and the XXXX interconnection. The generating units studied included two 234 MVA gas turbines and a 323 MVA steam turbine, with a net summer continuous capability output of 505 MW. The study period analyzed is the 2003 Heavy Summer time period. EPE did not analyze in this fatal flaw and feasibility analysis any other seasons with different import levels, load levels, and/or generation patterns. Therefore, this analysis only identified problems found in a 2003 Heavy Summer scenario. The purpose of this study is to identify all Fatal Flaws on the southern New Mexico system if XXXX is to interconnect its generation at the Hidalgo 345 kv bus. Any additional facilities needed to correct these fatal flaws are noted and a rough estimates of the costs of these facilities are provided in the study. It should be noted that the requested interconnection location (Hidalgo Substation) is a jointly owned substation between EPE, Public Service of New Mexico (PNM), and Texas-New Mexico Power Company (TNMP). Due to time constraints in completing the study, the above mentioned utilities were not consulted regarding the methodology used in the study. Therefore, the nature of and estimated costs of any facilities and upgrades required on the PNM and/or TNMP systems are solely EPE s opinion and may be change in a future Transmission and Facilities Study by PNM and/or TNMP. The Study Scope Agreement was used as a guide by EPE to conduct its system studies, which included power flow, transient stability, Q-V reactive margin, and short-circuit analyses. Results of the system study with the interconnection of the XXXX generation show that numerous overloads and reactive margin criteria violations occur in the existing southern New Mexico system when the XXXX generation is added to the system. Utilizing engineering judgement, proposed system modifications are included in the Study, which, in EPE s opinion, will correct the criteria violations and rough estimates for these proposed modifications to EPE s system. The study also shows that modifications will be needed to other southern New Mexico area utility s systems. These included PNM, TNMP, and Tri-State Generation & Transmission, Coop. Inc. (Tri-State), formerly Plains Electric Generation & Transmission Coop., Inc (PGT). As per the Study Scope, further evaluation of the system with the recommended modifications installed has not been performed. Therefore, these modifications may not represent optimal corrections to the Transmission/Generation Feasibility Study -1- El Paso Electric Company

5 system. System modifications are also proposed to correct the nearby utility system impacts and rough cost estimates (using EPE s prices) are provided. The requestor (XXXX) will need to follow up with these other utilities in question to mitigate those impacts and to get more detailed cost estimates of their recommended system modifications. The lists of recommended system modifications for EPE, as well as for the other southern New Mexico utilities, along with the estimated "rough" costs, are shown in the following section of this report (Section 2.0) for each of the scenarios analyzed. Additionally, although double contingency scenarios were not analyzed in this study, it should be noted that a problem can occur with the proposed generation interconnected at the Hidalgo 345 kv bus when either the Greenlee-Hidalgo (GH) 345 kv line or the Hidalgo-Luna (HL) 345 kv line is initially out of service (IOS). Under this scenario, with either line in an IOS condition, a forced outage of the other line will result with the only path for the 505 MW of XXXX generation being through the underlying 115 kv system connected at Hidalgo through two 200 MVA transformers. This would immediately load both the 345/115 kv transformers beyond their emergency ratings with 505 MW of XXXX generation. In addition, some of the 115 kv lines in the vicinity of Hidalgo Substation would also overload beyond their emergency ratings. Using engineering judgement, a preliminary recommendation that requires no system modifications would be to curtail or turn off the XXXX generation to prevent overloading of the transformers and/or the underlying 115 kv system. In a full Facilities Study, a detailed analysis to determine a safe level of generation for XXXX to operate during an IOS condition of either the GH or HL line will need to be performed. Transmission/Generation Feasibility Study -2- El Paso Electric Company

6 2.0 COST ESTIMATES The following estimated "rough" costs are for system modifications to the EPE and other neighboring utilities systems required to correct the criteria violations that arose with the interconnection and operation of XXXX s 505 MW of generation. The generation is interconnected at the Hidalgo 345 kv bus and a 2003 heavy summer system is analyzed. These costs are rough estimates only using the information as supplied by XXXX. Project dollar amounts shown are in year 2001 U.S. dollars. Costs for system modifications to other neighboring utilities systems are also only rough estimates using EPE s prices. 2.1 Interconnection Costs of XXXX Generation to Hidalgo Substation: The following table shows the estimated costs necessary for XXXX to interconnect its generation to the Hidalgo 345 kv Substation. This estimated cost applies to all scenarios and is in addition to the System Modification Costs estimated for each scenario. INTERCONNECTION COSTS OF XXXX GENERATION TO HIDALGO 345 KV SUBSTATION FACILITY MODIFICATION OWNER ESTIMATED COST (1) 345 kv Gas Circuit Breaker EPE $275,000 (2) 345 kv Motor operated disconnect switches EPE $50,000 (1) Dead End Tower EPE $20,000 (1) Protection Scheme EPE $50,000 (1) Controls Equipment EPE $20,000 (1) Communication Scheme EPE $25,000 Total Interconnection Costs (Applies to all Scenarios): $440,000 Please note that the above cost is a "rough" estimate only and may change when detailed engineering and design studies are performed for the interconnection. 2.2 Task II, Scenario 1 System Modification Costs: XXXX generation totaling 505 MW is interconnected to the Hidalgo 345 kv bus and sold to California, i.e. simulating a sale to an entity outside the southern New Mexico area. California area generation is reduced by 505 MW in order to purchase the XXXX generation. Local EPE generation remains unchanged from the benchmark case. This scenario simulates a case where XXXX sells its entire generation output to California. Transmission/Generation Feasibility Study -3- El Paso Electric Company

7 TASK II, SCENARIO 1 SYSTEM MODIFICATION COSTS FACILITY MODIFICATION AREA/OWNER ESTIMATED COST Additional 24 MVA Hidalgo 115/69 kv XFMR TNMP $300,000 Total Cost of Modifications for Task II, Scenario 1: $300, Task II, Scenario 2 System Modification Costs: XXXX generation totaling 505 MW is interconnected to the Hidalgo 345 kv bus and sold to EPE. Local EPE generation is reduced to one unit (Newman 3) with an output of 55 MW. This scenario simulates a case where EPE purchases XXXX s entire generation output with a corresponding reduction of its local generation. TASK II, SCENARIO 2 SYSTEM MODIFICATION COSTS FACILITY MODIFICATION AREA/OWNER ESTIMATED COST 200 MVAC of Capacitors on EPE 115 kv System EPE $2,100, MVAC of SVC s on EPE s 115 kv System EPE $25,500,000 Additional 200 MVA Newman 345/115 kv XFMR EPE $4,500,000 Additional 200 MVA Diablo 345/115 kv XFMR EPE $4,500,000 Additional 200 MVA Caliente 345/115 kv XFMR EPE $4,500,000 Caliente-Vista 115 kv line upgrade (5.9 miles) EPE $1,200,000 Mesa-Rio Grande 115 kv line upgrade (2.17 miles) EPE $500,000 Central-Turquois 115 kv line upgrade (12 miles) TNMP $2,640,000 Silver City-Tyrone 69 kv line upgrade (11 miles) TNMP $2,420,000 Additional 24 MVA Hidalgo 115/69 kv XFMR TNMP $300,000 Belen-Bernardo 115 kv line upgrade (19 miles) Tri-State $4,180,000 Elephant Butte-Picacho 115 kv line upgrade (50 miles) Tri-State $11,000,000 Grants Tap-Laguna 115 kv line upgrade (20 miles) Tri-State $4,400,000 Bernardo-Socorro 115 kv line upgrade (28 miles) Tri-State $6,160,000 Luna-Mimbres 115 kv line upgrade (5 miles) PNM $1,100,000 Total Cost of Modifications for Task II, Scenario 2: $75,000, Task II, Sensitivity #1 System Modification Costs: XXXX generation totaling 505 MW is interconnected to the Hidalgo 345 kv bus and sold to California. In addition to the XXXX generation, 1,235 MW of generation from other companies who may potentially desire to interconnect into the EPE/southern New Mexico system were also modeled as a sale to California. This generation included the following: 500 MW interconnected to the EPE system at the Newman 345 kv bus; 135 MW interconnected to the EPE system between the Luna-Newman and Luna-Diablo 345 kv lines; 600 MW interconnected to the EPE system at the Luna 345 kv bus. Transmission/Generation Feasibility Study -4- El Paso Electric Company

8 In this sensitivity, California generation is reduced by 1,740 MW in order to purchase the XXXX and other potential generation. Local EPE generation is unchanged from the benchmark case. This scenario simulated a case where all generation that may potentially be interconnected to the EPE system (including XXXX) is sold to California. TASK II, SENSITIVITY # 1 SYSTEM MODIFICATION COSTS FACILITY MODIFICATION AREA/OWNER ESTIMATED COST Change Taps on Arroyo 345 kv PST EPE $4,000,000 Additional 200 MVA Arroyo 345/115 kv XFMR EPE $4,500,000 Additional 200 MVA Caliente 345/115 kv XFMR EPE $4,500,000 Greenlee-Hidalgo 345 kv line upgrade (59.95 miles) EPE $13,800,000 Elephant Butte-Socorro 115 kv line upgrade (85 miles) Tri-State $18,700,000 Hurley-Luna 115 kv line upgrade (12 miles) TNMP $2,640,000 Alamogordo-Alamo Tap 115 kv line upgrade (4 miles) TNMP $880,000 Additional 500/345 kv XFMR at Coronado Substation Arizona * * An estimate for this project was not provided because EPE does not own any similar facilities and cannot make a reasonable cost estimate. XXXX is still responsible for this project and will need to mitigate costs with the Arizona utility owning the facility. Total Cost of Modifications for Task II, Sensitivity #1: $49,020, Task II, Sensitivity #2 System Modification Costs: This scenario is the same as Sensitivity #1 (Section 2.4) except that the XXXX generation has been excluded. Generation from other companies who may potentially desire to interconnect into the EPE system, however, is modeled as a sale to California. California generation is reduced by 1,235 MW in order to purchase the other potential generation. Local EPE generation is unchanged from the benchmark case. This scenario was requested by XXXX in order to determine which impacts from Sensitivity #1 are due to the XXXX generation and which impacts are a result of the XXXX generation being installed after the other generation is already interconnected. TASK II, SENSITIVITY # 2 SYSTEM MODIFICATION COSTS FACILITY MODIFICATION AREA/OWNER ESTIMATED COST Additional 200 MVA Arroyo 345/115 kv XFMR EPE $4,500,000 Additional 200 MVA Caliente 345/115 kv XFMR EPE $4,500,000 Hurley-Luna 115 kv line upgrade (12 miles) TNMP $2,640,000 Alamogordo-Alamo Tap 115 kv line upgrade (4 miles) TNMP $880,000 Total Cost of Modifications for Task II, Sensitivity #2: $12,520,000 Transmission/Generation Feasibility Study -5- El Paso Electric Company

9 Note: System modification costs shown in Sensitivity #2 are the responsibility of the other potential generators, since they also appear in the Sensitivity #1 costs. XXXX would be responsible for the difference between Sensitivity #1 and Sensitivity #2, or $36,500,000 ($49,020,000 - $12,520,000) in system modifications if the other generators were already on-line before the XXXX generation is interconnected into the EPE system. In addition, XXXX is responsible for the cost of an additional 500/345 kv transformer at the Coronado Substation in Arizona. Estimated cost for this project is not included. Transmission/Generation Feasibility Study -6- El Paso Electric Company

10 3.0 INTRODUCTION This system study is in response to a request for a Feasibility Transmission/Generation Interconnection Study by XXXXXXXXXXXXXXXXXXX (XXXX) to determine any Fatal Flaws in XXXX s plan to construct and operate generation interconnected to the Hidalgo 345 kv Substation beginning in The proposed generating units studied include two 234 MVA gas turbines and a 323 MVA steam turbine, with a net summer continuous capability output of 505 MW. Each gas turbine analyzed is connected through an 18/345 kv, 270 MVA step-up transformer and the steam turbine is connected through an 18/345 kv 333 MVA step-up transformer at XXXX s 345 kv bus. The XXXX interconnection is through a short 345 kv transmission connection to the Hidalgo 345 kv Substation. As part of the evaluation process in studying the impact of the XXXX generation on the southern New Mexico system, EPE conducted powerflow, transient stability, Q-V reactive margin, and short-circuit analyses. Results of the analysis indicate that numerous overloads and reactive margin criteria violations occur in the existing EPE system when the XXXX generation is added to the system. Utilizing engineering judgement, proposed system modifications and rough estimates for these proposed modifications have been made, which, in EPE s opinion, will correct the criteria violations. In addition, the analysis showed that system modifications will be needed to correct criteria violations in other southern New Mexico area utility systems. Criteria violations are found in the systems of Public Service Company of New Mexico (PNM), Texas-New Mexico Power Company (TNMP) and Tri-State Generation & Transmission, Coop. Inc. (Tri-State), formerly Plains Electric Generation & Transmission Coop., Inc. (PGT). System modifications are also proposed to correct the criteria violations in the southern New Mexico utilities areas and rough cost estimates (using EPE s prices) are provided. However, because EPE did not evaluate the system with these modifications installed, these modifications may not represent an optimal solution. It should be noted that due to time constraints in completing the study, the above mentioned utilities were not consulted regarding the methodology or power flow base case representation used in the study. Therefore, study results are based on the latest information available to EPE at the time of the analysis and some of the criteria violations revealed in the benchmark case may not really exist. The benchmark criteria violations were noted in the study and were not considered as impacts due to the addition of the XXXX generation. Transmission/Generation Feasibility Study -7- El Paso Electric Company

11 3.1 Assumptions The following assumptions are consistent for all study scenarios unless otherwise noted. Project dollar amounts shown are in year 2001 U.S. dollars. The cost of any XXXX generator and associated equipment is separate and is not included in this study. This study assumes that EPE substation space is available for the system modifications called for. The cost estimates are only rough estimates using EPE prices. Costs for modifications on the other utilities systems are also rough estimates using EPE prices. The recommended modifications were not re-analyzed to determine if they corrected the criteria violation. Therefore, the recommended system modifications may or may not represent an optimal solution. This study does not assume that XXXX has acquired the transmission rights needed to sell its generation. Cost estimates for the 115 kv and 69 kv line upgrades recommended in this study were determined using a cost of $220,000 per mile. 3.2 Criteria The reliability criteria standards used by EPE in performing this study are readily acceptable standards are listed on pages 3 through 5 of the Feasibility Transmission/Generation Interconnection Study: Study Scope (Appendix 1) and in Section 4 of EPE s FERC Form 715 (Appendix 2). 3.3 Procedure As previously mentioned, the system study analyses conducted by EPE included powerflow, transient stability, Q-V reactive margin, and short-circuit analyses. Detailed discussions for each topic have been included in this report (for quick location of any topic, refer to the Table of Contents). The following procedures were used in conducting this analysis: Base Case Development A 2003 Heavy Summer base case without XXXX generation was developed in order to compare a benchmark case without XXXX generation against other scenarios which included the XXXX generation interconnected into the EPE transmission system. The Benchmark 2003 case (Task 1) was established by integrating the latest available EPE and New Mexico system representations with the existing WSCC 03HS2SA case. In the Benchmark case, New Mexico and Arizona utilities were flagged for criteria violations. Consequently, these initial system criteria violations also existed in the With XXXX Generation powerflow cases and therefore, are not a direct impact Transmission/Generation Feasibility Study -8- El Paso Electric Company

12 due to the new XXXX generation. It is suspected that most of these criteria violations probably do not exist and may be a result of EPE not having the latest system representations of the utilities in question. In an effort to cover the agreed upon range of operating scenarios, Scenario 1, Scenario 2, Sensitivity 1 and Sensitivity 2 powerflow representations were developed and analyzed under Task II. This was done by taking the beginning benchmark base cases from Task I and making appropriate changes to XXXX sales, Southern New Mexico Import (SNMI) levels, EPE generation patterns, and area transfer levels. Scenario 1 modeled the new XXXX generation interconnected at the Hidalgo 345 kv Substation and all generation output (505 MW) from the XXXX generators being sold to California. This simulates a scenario where the new XXXX generation is interconnected into the EPE system and all of its generation was sold to a WSCC utility west of EPE s system. All local EPE generation remains the same as in the benchmark case. Scenario 2 modeled the new XXXX generation interconnected at the Hidalgo 345 kv Substation and all generation output (505 MW) from the XXXX generators being sold to EPE. This simulates a scenario where the new XXXX generation is interconnected into the EPE system and EPE s local generation is reduced in order to purchase 505 MW from XXXX. Sensitivity #1 under Task II is a variation of Scenario 1. This Sensitivity models the new XXXX generation interconnected at the Hidalgo 345 kv bus as well as other potential generation interconnected into the southern New Mexico system. The other potential generation includes 500 MW interconnected at EPE s Newman 345 kv bus, 135 MW interconnected to EPE s Luna-Diablo and Luna-Newman 345 kv lines, and 600 MW interconnected at the Luna 345 kv bus. This scenario was requested by XXXX to determine the impact of the XXXX generation if this additional potential generation is already interconnected into the EPE system when the XXXX generation is installed. Sensitivity #2 under Task II is the same scenario as Sensitivity #1 except that XXXX generation is excluded. This scenario was requested by XXXX to determine if any system impacts to EPE s system revealed in Sensitivity #1 are due to XXXX s generation or to the other potential generation. The purpose of this study was to determine the major problems, i.e., fatal flaws that could occur on the southern New Mexico system if the XXXX generation is interconnected to the system. The study proposes recommended solutions that, using engineering judgement, should correct the criteria violations that are determined to be impacts due to the XXXX generation. Transmission/Generation Feasibility Study -9- El Paso Electric Company

13 However, these recommended solutions were not re-evaluated and therefore may not represent the optimal solution to correcting these criteria violations. Load and resource information for the base cases, including transfer schedules, are included in Appendix 3. EPE powerflow maps (one-line diagrams) are located in Appendix List of Contingencies The same contingencies are evaluated for all scenarios and sensitivities and are identified in Appendix 5. The contingencies were selected base on engineering judgement that these would be the most likely to stress the EPE and southern New Mexico systems. Any contingencies that resulted in a nonconvergent system in the benchmark case were not analyzed in the scenarios/sensitivities. It is assumed that since these non-convergent problems exist in the Benchmark cases, the addition of XXXX generation will not significantly impact EPE s system for these non-convergent contingencies Transient Stability Analysis The stability data representation for the XXXX generators is based on data provided by XXXX and included generator modeling parameters, MVAR reactive curves, short circuit test curves, and a model for a typical Power System Stabilizer (PSS). XXXX supplied EPE with equivalent models for the various components of the generator voltage regulator system including modeling of the excitation system, generator, and PSS systems. The models were then represented in the WSCC master stability file for analysis using the GE Transient Stability Program. Transient stability analyses were conducted on the Task I Benchmark case, the Task II, Scenario 1 case, and the Task II, Scenario 2 case. The models and parameters for this analysis are shown in Appendix Q-V Analysis Reactive margin Q-V analyses were performed on the Task I Benchmark case, the Task II, Scenario 1 case, and the Task II, Scenario 2 case to verify that the WSCC criteria for reactive power margin will be met under the worst contingencies on the EPE system. A procedure developed by WSCC was used to determine the reactive power margin. As outlined in this procedure, load was increased by 5% and the worst contingency was analyzed to determine the reactive margin on the system. The margin is determined by identifying the critical (weakest) bus on the system during the worst contingency. The critical bus is the most reactive deficient bus. Q-V curves are developed and the minimum point on the curve is the critical point. If the minimum point of the Q-V curve is positive, the system is reactive power Transmission/Generation Feasibility Study -10- El Paso Electric Company

14 deficient. If it is negative, then the system has sufficient reactive power margin and meets the WSCC criteria. Prior experience has shown that the worst contingencies impacting reactive power margin are the Springerville-Luna, Luna-Diablo, and Greenlee-Hidalgo 345 kv lines and the buses most impacted are the 345 kv buses at Luna, Hidalgo, Arroyo, Caliente, Newman, and Diablo. A Q-V analysis of these three 345 kv line contingencies on the Benchmark Case determined that the Luna-Diablo contingency was the worst contingency impacting the system reactive power margin. Therefore this contingency was used to evaluate reactive power margins for all cases. Q-V plots were created showing the margins available at the 345 kv buses listed above Short-Circuit Analysis Short-circuit studies were performed on four scenarios/sensitivities in this study. These scenarios/sensitivities include the following: Existing EPE system(no new generation) Existing EPE system with new XXXX generation included Existing EPE system with all potential new generation on (500 MW at the Newman 345 kv bus, 135 MW between the Luna-Diablo and Luna- Newman 345 kv lines, 600 MW at the Luna 345 kv bus) and including the new XXXX generation Existing EPE system with all potential generation on (500 MW at the Newman 345 kv bus, 135 Mw between the Luna-Diablo and Luna- Newman 345 kv lines, 600 MW at the Luna 345 kv bus) but excluding the new XXXX generation The short circuit analyses consisted of substation three phase and single phase-to-ground bus fault simulations at Hidalgo Substation as well as those substations with direct 345 kv or 115 kv transmission line connections into it. Fault simulations were also taken at the Newman 115 kv bus, Rio Grande 115 kv bus, and selected 345 kv buses on the EPE system. This was done in order to analyze the impact of the new XXXX generation when faults occur on buses considered to be critical to the EPE system. The objective was to make certain that the existing substation breakers would safely accommodate fault currents for each scenario. The analysis identified any breaker whose rating was exceeded. The complete Short-Circuit Analysis report can be found under the ATTACHMENT tab at the end of this report. Transmission/Generation Feasibility Study -11- El Paso Electric Company

15 4.0 POWERFLOW ANALYSIS RESULTS Powerflow analyses were performed for the Benchmark; Task II, Scenario 1; Task II, Scenario 2; and Task II Sensitivity #1 and Sensitivity #2 cases. A 2003 HS base case was developed to compare against each scenario, simulating the system with all lines in service. Voltage and/or loading criteria violations in the base case were noted for EPE as well as other New Mexico and Arizona utilities. These violations are shown in the Base Case and Contingencies Tables listed in Appendix 7. Contingency (N-1) powerflow analyses were then performed for all cases. A list of the contingencies analyzed is shown in Appendix 5. For the contingency analyses, criteria violations were noted and modifications were recommended using engineering judgement. However, the recommended modifications were not analyzed and therefore may not represent the optimal solutions in correcting these criteria violations. Contingencies that resulted in voltage and loading problems for non-epe utilities were also noted in the tables (Appendix 7) and potential solutions were recommended using engineering judgement. Again, these solutions were not re-analyzed and may not represent the optimal solution to correcting the criteria violations for the non-epe utilities. Additionally, although double contingency scenarios were not analyzed in this study, it should be noted that a problem can occur with the proposed generation interconnected at the Hidalgo 345 kv bus when either the Greenlee-Hidalgo (GH) 345 kv line or the Hidalgo-Luna (HL) 345 kv line is initially out of service (IOS). Under this scenario, with either line in an IOS condition, a forced outage of the other line will result with the only path for the 505 MW of XXXX generation being through the underlying 115 kv system connected at Hidalgo through two 200 MVA transformers. This would immediately load both the 345/115 kv transformers beyond their emergency ratings with 505 MW of XXXX generation. In addition, some of the 115 kv lines in the vicinity of Hidalgo Substation would also overload beyond their emergency ratings. Using engineering judgement, a preliminary recommendation that requires no system modifications would be to curtail or turn off the XXXX generation to prevent overloading of the transformers and/or the underlying 115 kv system. In a full Facilities Study, a detailed analysis to determine a safe level of generation for XXXX to operate during an IOS condition of either the GH or HL line will need to be performed. Results of the powerflow analyses are listed below. 4.1 Task I (Benchmark) Case A 2003 Heavy Summer (HS) benchmark case was developed and analyzed in this study and a contingency powerflow analysis was performed on the case. The EPE system was represented with 2003 HS loads and without XXXX generation. This case simulated the EPE system, as it will exist in the summer of 2003 without XXXX generation. There were no criteria violations involving EPE facilities in the base case or during contingencies for the benchmark case. However, there were Transmission/Generation Feasibility Study -12- El Paso Electric Company

16 some overload and overvoltage criteria violations during the base case condition (all lines in service) in the Arizona, PNM, and Tri-State areas. The table below shows the overload criteria violations with all lines in service: Overload Criteria Violations for Task I (Benchmark) Case With All Lines In Service LINE AREA / OWNER RATING (MVA) FLOW (MVA) % LOADING LINCSTRT-WPHX 230 kv line Arizona CTRYCLUB-LINCSTRT 230 kv line Arizona CTRYCLUB-MEADOWBK 230 kv line Arizona HERNANDZ-NORTON_2 115 kv line PNM BLUEWATR-GRANTS_T 115 kv line Tri-State These violations are noted in Appendix 7. It is suspected, however, that these violations may not exist and are due to not having the latest system representations from the above utilities. In any event, these violations are not due to the addition of the new XXXX generation. There were also some criteria violations during contingency conditions in the Tri- State, PNM and TNMP areas. The table below shows the overload criteria violations for the benchmark case during contingency conditions: Overload Criteria Violations for Task I (Benchmark) Case During Contingency Conditions CONTINGENCY OVERLOADED LINE / TRANSFORMER AREA / OWNER % LOADING McKinley-Springerville 345 kv line GRANTS_T-LAGUNA 115 kv line Tri-State Newman-Luna 345 kv line PICACHO-MIMBRES 115 kv line PNM Arroyo 345/115 kv transformer PICACHO-MIMBRES 115 kv line PNM Luna 345/115 kv transformer HIDALGO-TURQUOIS 115 line TNMP For a detailed listing of all the criteria violations in the Task I benchmark case, please refer to the 2003 HS Task I Case Table in Appendix Task II, Scenario 1 Case The 2003 HS case for Task II, Scenario 1 was developed and analyzed in this study and compared to the Benchmark case. A contingency powerflow analysis was then performed on this case. The EPE system is represented as in the Benchmark cases except that XXXX generation is now included. Two gas turbines generators and one steam turbine generator are modeled with generation output set to 505 MW and all generation output sold to California. Generation in California was reduced by the amount of the XXXX generation output. Local EPE generation remained the same as in the Task I benchmark case. This scenario simulated a case where XXXX will sell all of its 505 MW generation output to a utility in California. Transmission/Generation Feasibility Study -13- El Paso Electric Company

17 The addition of 505 MW of XXXX generation did not cause any major impacts to EPE s system under base case (all lines in service) conditions. There were some overload criteria violations in the Arizona, PNM, and Tri-State areas, but these were the same violations reported in the Task I benchmark case. Therefore, these violations are not a direct impact of the new XXXX generation. There was also one criteria violation during contingency conditions in the TNMP area. The table below shows the overload criteria violation for the Task II, Scenario 1 Case during contingency conditions: Overload Criteria Violations for Task II, Scenario 1 Case During Contingency Conditions CONTINGENCY OVERLOADED LINE / TRANSFORMER AREA / OWNER % LOADING Luna-Hidalgo 345 kv line HIDALGO 69/115 kv XFMR TNMP Luna 345/115 kv transformer HIDALGO 69/115 kv XFMR TNMP As can be seen in the above table, the only impact due to the addition of the new XXXX generation in Scenario 1 is an overload of TNMP s Hidalgo 69/115 kv transformer during a Luna-Hidalgo 345 kv line or a Luna 345/115 kv transformer contingency. Since the above criteria violation is on the TNMP system, a rough cost estimate for the system modification recommended to correct the violation was provided using EPE prices. The proposed solution to correct the criteria violation listed above, with a rough cost estimate, is listed below: TASK II, SCENARIO 1 SYSTEM MODIFICATION COSTS FACILITY MODIFICATION AREA/OWNER ESTIMATED COST Additional 24 MVA Hidalgo 115/69 kv XFMR TNMP $300,000 Total Cost of Modifications for Task II, Scenario 1: $300,000 Again it must be noted that although this scenario required only one system modification, it is also recommended that XXXX be required to curtail or turn off its entire generation to prevent overloading of the underlying 115 kv system during an IOS condition of either the GH or HL lines. In addition, the interconnection costs described in Section 2.1 of this report apply to this, as well as all scenarios. For a detailed listing of all the criteria violations in the Task II Scenario 1 Case, please refer to the 2003 HS Task II Scenario 1 Case Table in Appendix 7. Transmission/Generation Feasibility Study -14- El Paso Electric Company

18 4.3 Task II, Scenario 2 Case The 2003 HS case for Scenario 2 was developed and analyzed in this study and compared to the Benchmark case. A contingency powerflow analysis was then performed on this case. The EPE system is represented as in the Benchmark cases except that XXXX generation is now included and sold to EPE. Two gas turbines generators and one steam turbine generator are modeled with generation output set to 505 MW. Local EPE generation is reduced to one unit (Newman 3) with a generation output of 55 MW. This scenario simulated a sale of XXXX generation to EPE and a corresponding reduction of EPE local generation to accommodate the sale. The reduction in EPE local generation to accommodate the purchase of 505 MW of XXXX generation resulted in some impacts to the EPE and PNM systems under base case (all lines in service) conditions. The initial case was non-convergent due to a lack of reactive (MVAR) support on the EPE system. Therefore, 200 MVAR s of shunt capacitors were needed on EPE s 115 kv system in order to increase voltages to acceptable levels. The addition of these capacitors allowed the case to converge under base case conditions. However, there were some overload criteria violations in the EPE, Arizona, PNM, and Tri-State areas. Some of the violations were the same violations reported in the Task I benchmark case, but others were a result of EPE reducing its local generation to accommodate the new XXXX generation. The table below shows the overload criteria violations that are a result of EPE reducing its local generation in order to purchase the total XXXX generation output, with all lines in service: Overload Criteria Violations for Task II, Scenario 2 Case With All Lines In Service LINE AREA / OWNER RATING (MVA) FLOW (MVA) % LOADING PICACHO-MIMBRES 115 kv line PNM NEWMAN 115/345 kv transformer EPE DIABLO 115/345 kv transformer #1 EPE DIABLO 115/345 kv transformer #2 EPE There were also numerous problems in the Scenario 2 case during contingency conditions in the EPE, Tri-State, PNM and TNMP areas. There were five (5) contingencies that were non-convergent in the Task II, Scenario 2 case. Again, the lack of MVAR support on the EPE 115 kv system as a result of EPE reducing its local generation to accommodate the purchase of XXXX generation caused the criteria violations. Voltage collapse during contingencies of the Amrad-Artesia 345 kv line, Arroyo-WestMesa 345 kv line, Caliente-Newman 345 kv line, Luna- Hidalgo 345 kv line, and the Amrad 115/345 kv autotransformer caused these contingencies to be non-convergent. The proposed solution to correcting these voltage collapses is to install Static Var Compensator (SVC) device(s) on EPE s 115 kv system. Previous studies have determined that the Diablo 115 kv bus is the best location for installing a SVC. A quick analysis determined that 310 MVAC of Transmission/Generation Feasibility Study -15- El Paso Electric Company

19 SVC support on the EPE 115 kv system will be required in order to eliminate the voltage collapse under the worst contingency in the powerflow analysis for this scenario. However, in the Q-V analysis (Section 6.0), it was determined that 510 MVAC support is needed on EPE s 115 kv system in order to meet the Western Systems Coordinating Council s (WSCC) voltage stability criteria. Another analysis will have to be performed to determine the optimal size and location(s) of the SVC(s) on EPE s 115 kv system. There were also various overload criteria violations during contingency conditions for Scenario 2. A few of the criteria violations flagged in this scenario also appear in the benchmark case. Those violations that appear in both this scenario and the benchmark are not due to the addition of the new XXXX generation, and therefore it is not XXXX s responsibility to correct these violations. However, there were many other criteria violations in this scenario that do not appear in the benchmark scenario. These violations are also a result of the addition of the new XXXX generation at the Hidalgo 345 kv bus. Therefore, it is XXXX s responsibility for any modification that is a required to correct these criteria violations. The table below shows the overload criteria violations for the Task II, Scenario 2 Case during contingency conditions that are due to the addition of the new XXXX generation: Overload Criteria Violations Task II, Scenario 2 Case During Contingency Conditions CONTINGENCY OVERLOADED LINE / TRANSFORMER AREA / OWNER % LOADING Hidalgo-Greenlee 345 kv line EL_BUTTE-PICACHO 115 kv line Tri-State Luna-Hidalgo 345 kv line HIDALGO 69/115 kv XFMR TNMP (With SVG in) EL_BUTTE-PICACHO 115 kv line Tri-State CENTRAL-TURQUOIS 115 kv line TNMP SILVER_C-TYRONE 69 kv line TNMP BELEN_PG-BERNARDO 115 kv line Tri-State BERNARDO-SOCORROP 115 kv line Tri-State NEWMAN 115/345 kv XFMR EPE Luna-Diablo 345 kv line NEWMAN 115/345 kv XFMR EPE EL_BUTTE-PICACHO 115 kv line Tri-State LUNA-MIMBRES 115 kv line PNM CALIENTE 115/345 kv XFMR #1 EPE CALIENTE 115/345 kv XFMR #2 EPE CALIENTE-VISTA_# 115 kv line EPE Newman-Luna 345 kv line EL_BUTTE-PICACHO 115 kv line Tri-State DIABLO 115/ kv XFMR #1 EPE DIABLO 115/ kv XFMR #2 EPE LUNA-MIMBRES 115 kv line PNM MESA_#-RIO_GRAN 115 kv line EPE Arroyo 115/345 kv transformer NEWMAN 115/345 kv XFMR EPE Caliente 115/345 kv transformer #1 CALIENTE 115/345 kv XFMR #2 EPE Diablo 115/345 kv transformer #1 DIABLO 115/ kv XFMR #2 EPE EL_BUTTE-PICACHO 115 kv line Tri-State Luna 345/115 kv transformer HIDALGO 69/115 kv XFMR TNMP Newman 115/345 kv transformer DIABLO 115/ kv XFMR #1 EPE DIABLO 115/ kv XFMR #2 EPE Transmission/Generation Feasibility Study -16- El Paso Electric Company

20 As can be seen in the table above, there are numerous impacts due to the addition of the new XXXX generation in this scenario during contingency conditions. Some of the criteria violations flagged in this scenario also appear in the benchmark case and are not shown here. Those violations that appeared in both the benchmark and this scenario are not due to the new XXXX generation, and therefore are not XXXX s responsibility to correct. However, the criteria violations listed above are a direct result of the new XXXX generation at the Hidalgo 345 kv bus. Therefore, it is XXXX s responsibility for any modifications necessary to correct these criteria violations. For a detailed listing of all the criteria violations in the Task II Scenario 2 Case, please refer to the 2003 HS Task II Scenario 1 Case Table in Appendix 7. The proposed solutions for correcting the criteria violations in Task II, Scenario 2, with rough cost estimates, are listed below: TASK II, SCENARIO 2 SYSTEM MODIFICATION COSTS FACILITY MODIFICATION AREA/OWNER ESTIMATED COST 200 MVAC of Capacitors on EPE 115 kv System EPE $2,100, MVAC of SVC s on EPE s 115 kv System EPE $25,500,000 Additional 200 MVA Newman 345/115 kv XFMR EPE $4,500,000 Additional 200 MVA Diablo 345/115 kv XFMR EPE $4,500,000 Additional 200 MVA Caliente 345/115 kv XFMR EPE $4,500,000 Caliente-Vista 115 kv line upgrade (5.9 miles) EPE $1,200,000 Mesa-Rio Grande 115 kv line upgrade (2.17 miles) EPE $500,000 Central-Turquois 115 kv line upgrade (12 miles) TNMP $2,640,000 Silver City-Tyrone 69 kv line upgrade (11 miles) TNMP $2,420,000 Additional 24 MVA Hidalgo 115/69 kv XFMR TNMP $300,000 Belen-Bernardo 115 kv line upgrade (19 miles) Tri-State $4,180,000 Elephant Butte-Picacho 115 kv line upgrade (50 miles) Tri-State $11,000,000 Grants Tap-Laguna 115 kv line upgrade (20 miles) Tri-State $4,400,000 Bernardo-Socorro 115 kv line upgrade (28 miles) Tri-State $6,160,000 Luna-Mimbres 115 kv line upgrade (5 miles) PNM $1,100,000 Total Cost of Modifications for Task II, Scenario 2: $75,000,000 For a detailed listing of all the criteria violations in the Task II, Scenario 2 Case, please refer to the 2003 HS Task II Scenario 2 Case Table in Appendix 7. Transmission/Generation Feasibility Study -17- El Paso Electric Company

21 4.4 Task II Sensitivity #1 Case The 2003 HS Sensitivity #1 case was developed and analyzed in this study as requested by XXXX. This sensitivity modeled 505 MW of XXXX generation interconnected at the Hidalgo 345 kv Substation along with the following additional generation resources: 500 MW of generation interconnected at EPE s Newman 345 kv Substation; 135 MW of generation interconnected to EPE s Luna-Diablo 345 KV and Luna- Newman 345 kv lines; and, 600 MW of generation interconnected at the Luna 345 kv Substation. This additional generation represents the proposed generation to be interconnected to the EPE system by other entities and which are ahead of XXXX in EPE interconnection request queue. All of the generation output was modeled as a sale to California. This simulated a scenario where the new XXXX generation as well as other potential generation was all interconnected into the EPE system and all generation was sold to California. This sensitivity was performed in order to see the impacts that will occur on EPE s and other neighboring utilities systems if other potential generation is already interconnected into the EPE grid when the XXXX generation is installed. The addition of 505 MW of XXXX generation along with all the other potential interconnected generation resulted in some impacts to the southern New Mexico system under base case (all lines in service) conditions. First, the addition of all of the proposed generation, XXXX as well as others, and being sold to the west (California) causes a problem on the flow of the Arroyo Phase Shifting Transformer (PST). By contract, the PST is set to hold the flow on the WestMesa Arroyo (EP) 345 kv line to 186 MW from northern New Mexico to southern New Mexico in order to reduce impacts in the PNM area. The taps on the PST have an angle range of ± 34. With the additional proposed generation in southern New Mexico and being sold to California, the -34 limit is reached on the PST with the flow on the EP line at only 121 MW. This 65 MW reduction in flow on the EP line violates the contractual agreements between EPE and other southern New Mexico parties. In order to eliminate this impact and restore the ability of the PST to regulate up to at least 186 MW north to south, the PST taps would need to be changed to allow for an angle range of ± 45. Additionally, there were a few overload criteria violations in the EPE area with all lines in service that were a direct impact of the new generation. The table below shows the overload criteria violations for the Task II, Sensitivity #1 case with all lines in service: Transmission/Generation Feasibility Study -18- El Paso Electric Company

22 Overload Criteria Violations for Task II Sensitivity #1 Case With All Lines In Service LINE AREA / OWNER RATING (MVA) FLOW (MVA) % LOADING GREENLEE-HIDALGO 345 kv line EPE ARROYO 345/115 kv transformer EPE As can be seen in the table above, there were two impacts due to the addition of the new XXXX and other entity generation in this scenario with all lines in service. The Greenlee-Hidalgo 345 kv line and the Arroyo 345/115 kv transformer are both overloaded to 100.5% of their normal ratings with all lines in service. There were also criteria violations during contingency conditions in the EPE, Arizona, Tri-State, PNM and TNMP areas. The table below shows the overload criteria violations for the Task II, Sensitivity #1 case during contingency conditions: Overload Criteria Violations for Task II, Sensitivity #1 Case During Contingency Conditions CONTINGENCY OVERLOADED LINE / TRANSFORMER AREA / OWNER % LOADING Caliente-Newman 345 kv line ARROYO 115/345 KV XFMR EPE Hidalgo-Greenlee 345 kv line EL_BUTTE-SOCORROP 115 kv line Tri-State Luna-Hidalgo 345 kv line EL_BUTTE-SOCORROP 115 kv line Tri-State HURLEY_#-LUNA 115 kv line TNMP Springerville-Luna 345 kv line GREENLEE-HIDALGO 345 kv line EPE EL_BUTTE-SOCORROP 115 kv line Tri-State Springerville-Greenlee 345 kv line GREENLEE-HIDALGO 345 kv line EPE Greenlee-Vail 345 kv line EL_BUTTE-SOCORROP 115 kv line Tri-State CORONADO 500/345 kv XFMR Arizona Amrad 115/345 kv transformer ARROYO 115/345 KV XFMR EPE Arroyo 345/115 kv transformer ALAMOGCP-ALAMOTAP 115 kv line TNMP Caliente 115/345 kv transformer #1 CALIENTE 115/345 kv XFMR #2 EPE Luna 345/115 kv transformer ARROYO 115/345 KV XFMR EPE As can be seen in the table above, there were some impacts due to the addition of the new proposed generation in this scenario during contingency conditions. The proposed solutions to correcting the criteria violations on EPE s system listed above are the following: Transmission/Generation Feasibility Study -19- El Paso Electric Company

23 TASK II, SENSITIVITY # 1 SYSTEM MODIFICATION COSTS FACILITY MODIFICATION AREA/OWNER ESTIMATED COST Change Taps on Arroyo 345 kv PST EPE $4,000,000 Additional 200 MVA Arroyo 345/115 kv XFMR EPE $4,500,000 Additional 200 MVA Caliente 345/115 kv XFMR EPE $4,500,000 Greenlee-Hidalgo 345 kv line upgrade (59.95 miles) EPE $13,800,000 Elephant Butte-Socorro 115 kv line upgrade (85 miles) Tri-State $18,700,000 Hurley-Luna 115 kv line upgrade (12 miles) TNMP $2,640,000 Alamogordo-Alamo Tap 115 kv line upgrade (4 miles) TNMP $880,000 Additional 500/345 kv XFMR at Coronado Substation Arizona * * An estimate for this project is not provided because EPE does not own any similar facilities and cannot make a reasonable cost estimate. XXXX is still responsible for this project and will need to mitigate costs with the Arizona utility owning the facility. Total Cost of Modifications for Task II, Sensitivity #1: $49,020,000 For a detailed listing of all the criteria violations in the Task II, Sensitivity #1 Case, please refer to the 2003 HS Task II, Sensitivity #1 Case Table in Appendix Task II Sensitivity #2 Case The 2003 HS Sensitivity #2 case was developed and analyzed in this study as requested by XXXX. In this sensitivity, XXXX requested that if there were any criteria violations in the Sensitivity #1 case, a Sensitivity #2 case be developed. This sensitivity case is the same as the Sensitivity #1 case, except that the XXXX generation is excluded, i.e., not modeled. All generation output from the other potential generators is modeled as a sale to California. The purpose of this scenario is to determine if the impacts seen in Sensitivity #1 are due to the other potential generation being interconnected into the EPE system or to the new XXXX generation being interconnected after the other generation is already interconnected. In other words, the sensitivity is performed to determine the impact to the system of the XXXX generation with the other generation already in-service. Without the XXXX generation in, there were no major impacts to EPE s system under base case (all lines in service) conditions. There were some overload criteria violations in the Arizona, PNM, and Tri-State areas, but these were the same violations reported in the Task I benchmark case. Therefore, these violations are not a direct result of the new potential generation and are not listed here. There were various criteria violations during contingency conditions in the EPE, Tri-State, PNM and TNMP areas. The table below shows the overload criteria violations for the Task II, Sensitivity #2 Case during contingency conditions: Transmission/Generation Feasibility Study -20- El Paso Electric Company

XXXXXXXXXXXXXXXXXXXXXXXXXXXX TRANSMISSION/GENERATION FEASIBILITY STUDY FATAL FLAW AND FEASIBILITY ANALYSIS

XXXXXXXXXXXXXXXXXXXXXXXXXXXX TRANSMISSION/GENERATION FEASIBILITY STUDY FATAL FLAW AND FEASIBILITY ANALYSIS XXXXXXXXXXXXXXXXXXXXXXXXXXXX TRANSMISSION/GENERATION FEASIBILITY STUDY FATAL FLAW AND FEASIBILITY ANALYSIS El Paso Electric Company System Operations Department System Planning Section September 2001 TABLE

More information

EL PASO ELECTRIC COMPANY (EPE) FACILITIES STUDY FOR PROPOSED HVDC TERMINAL INTERCONNECTION AT NEW ARTESIA 345 KV BUS

EL PASO ELECTRIC COMPANY (EPE) FACILITIES STUDY FOR PROPOSED HVDC TERMINAL INTERCONNECTION AT NEW ARTESIA 345 KV BUS EL PASO ELECTRIC COMPANY (EPE) FACILITIES STUDY FOR PROPOSED HVDC TERMINAL INTERCONNECTION AT NEW ARTESIA 345 KV BUS El Paso Electric Company System Operations Department System Planning Section May 2004

More information

EL PASO ELECTRIC COMPANY (EPE) GENERATOR INTERCONNECTION SYSTEM IMPACT STUDY FOR PROPOSED XXXXXXXXXXXXXXXXXX GENERATION ON THE AMRAD-ARTESIA 345 KV

EL PASO ELECTRIC COMPANY (EPE) GENERATOR INTERCONNECTION SYSTEM IMPACT STUDY FOR PROPOSED XXXXXXXXXXXXXXXXXX GENERATION ON THE AMRAD-ARTESIA 345 KV EL PASO ELECTRIC COMPANY (EPE) GENERATOR INTERCONNECTION SYSTEM IMPACT STUDY FOR PROPOSED XXXXXXXXXXXXXXXXXX GENERATION ON THE AMRAD-ARTESIA 345 KV LINE El Paso Electric Company System Planning Department

More information

XXXXXXXXXXXXXXXX Transmission Interconnection Feasibility Study

XXXXXXXXXXXXXXXX Transmission Interconnection Feasibility Study XXXXXXXXXXXXXXXX Transmission Interconnection Feasibility Study System Operations Department System Planning Section March 2002 Table of Contents: 1.0 EXECUTIVE SUMMARY 4 2.0 COST ESTIMATES 8 2.1 Cost

More information

120 MW SOLAR-THERMAL PLANT GENERATOR INTERCONNECTION FEASIBILITY STUDY. May 2008 Prepared by: EL PASO ELECTRIC COMPANY

120 MW SOLAR-THERMAL PLANT GENERATOR INTERCONNECTION FEASIBILITY STUDY. May 2008 Prepared by: EL PASO ELECTRIC COMPANY . 120 MW SOLAR-THERMAL PLANT GENERATOR INTERCONNECTION May 2008 Prepared by: EL PASO ELECTRIC COMPANY Foreword This report was prepared for XXXXXXXXXXXXXXXXXXX by System Planning at El Paso Electric Company.

More information

300 MW SOLAR PHOTOVOLTAIC PLANT, GENERATOR INTERCONNECTION FEASIBILITY STUDY

300 MW SOLAR PHOTOVOLTAIC PLANT, GENERATOR INTERCONNECTION FEASIBILITY STUDY 300 MW SOLAR PHOTOVOLTAIC PLANT, GENERATOR INTERCONNECTION FEASIBILITY STUDY El Paso Electric Company System Planning August 2006 TABLE OF CONTENTS 1.0 EXECUTIVE SUMMARY...Page 1 2.0 PURPOSE...Page 7 3.0

More information

XXXXXXXXXXXXXX 99 MW WIND PARK GENERATOR INTERCONNECTION FEASIBILITY STUDY. September 2008 Prepared by: EL PASO ELECTRIC COMPANY

XXXXXXXXXXXXXX 99 MW WIND PARK GENERATOR INTERCONNECTION FEASIBILITY STUDY. September 2008 Prepared by: EL PASO ELECTRIC COMPANY XXXXXXXXXXXXXX 99 MW WIND PARK GENERATOR INTERCONNECTION FEASIBILITY STUDY September 2008 Prepared by: EL PASO ELECTRIC COMPANY Foreword This report was prepared for XXXXXXXXXXXXX (XXX) of XXXXXXXX by

More information

Generation Interconnection Feasibility Study For XXXXXXXXXXXXXXXXXXXXXX MW generator at new Western Refinary Substation

Generation Interconnection Feasibility Study For XXXXXXXXXXXXXXXXXXXXXX MW generator at new Western Refinary Substation Generation Interconnection Feasibility Study For XXXXXXXXXXXXXXXXXXXXXX 131-250 MW generator at new Western Refinary Substation System Planning Section April, 2005 TABLE OF CONTENT 1 EXECUTIVE SUMMARY

More information

El PASO ELECTRIC COMPANY 2014 BULK ELECTRIC SYSTEM TRANSMISSION ASSESSMENT FOR YEARS

El PASO ELECTRIC COMPANY 2014 BULK ELECTRIC SYSTEM TRANSMISSION ASSESSMENT FOR YEARS El Paso Electric Company El PASO ELECTRIC COMPANY 2014 BULK ELECTRIC SYSTEM TRANSMISSION ASSESSMENT FOR YEARS 2015 2024 A Review on System Performance Following Extreme Bulk Electric System Events of the

More information

EL PASO ELECTRIC COMPANY SHORT CIRCUIT ANALYSIS FOR XXX S PROPOSED GENERATION INTERCONNECTION

EL PASO ELECTRIC COMPANY SHORT CIRCUIT ANALYSIS FOR XXX S PROPOSED GENERATION INTERCONNECTION EL PASO ELECTRIC COMPANY SHORT CIRCUIT ANALYSIS FOR XXX S PROPOSED GENERATION INTERCONNECTION El Paso Electric Company System Operations Department System Planning Section August 2006 I. INTRODUCTION The

More information

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX TRANSMISSION/GENERATION FEASIBILITY STUDY SHORT CIRCUIT ANALYSIS

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX TRANSMISSION/GENERATION FEASIBILITY STUDY SHORT CIRCUIT ANALYSIS XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX TRANSMISSION/GENERATION FEASIBILITY STUDY SHORT CIRCUIT ANALYSIS El Paso Electric Company System Operations Department System Planning Section September 2001 Short Circuit

More information

ENERGY RESOURCE INTERCONNECTION SERVICE STUDY DRAFT REPORT

ENERGY RESOURCE INTERCONNECTION SERVICE STUDY DRAFT REPORT ENERGY RESOURCE INTERCONNECTION SERVICE STUDY DRAFT REPORT ART320W 320 MW Wind Powered Project Prepared for: El Paso Electric Company Prepared by: TRC Engineers, LLC 249 Western Avenue Augusta, ME 04330

More information

Short Circuit Analysis with New Generation Proposed by XXXXXXXXXXXXXXXXXXXXXX Pursuant to a Transmission and Facilities Study

Short Circuit Analysis with New Generation Proposed by XXXXXXXXXXXXXXXXXXXXXX Pursuant to a Transmission and Facilities Study Short Circuit Analysis with New Generation Proposed by XXXXXXXXXXXXXXXXXXXXXX Pursuant to a Transmission and Facilities Study Study Performed by El Paso Electric Company System Planning Section - 1 I.

More information

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX TRANSMISSION AND FACILITIES STUDY. Short Circuit Analysis

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX TRANSMISSION AND FACILITIES STUDY. Short Circuit Analysis XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX TRANSMISSION AND FACILITIES STUDY Short Circuit Analysis System Operations Department System Planning Section March 2001 I. Introduction XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

More information

XXXXXXXXXXXXXXXXXXXX GENERATION INTERCONNECTION FACILITIES STUDY SHORT CIRCUIT ANALYSIS FOR PROPOSED GENERATION AT NEWMAN 115 kv BUS

XXXXXXXXXXXXXXXXXXXX GENERATION INTERCONNECTION FACILITIES STUDY SHORT CIRCUIT ANALYSIS FOR PROPOSED GENERATION AT NEWMAN 115 kv BUS XXXXXXXXXXXXXXXXXXXX GENERATION INTERCONNECTION FACILITIES STUDY SHORT CIRCUIT ANALYSIS FOR PROPOSED GENERATION AT NEWMAN 115 kv BUS El Paso Electric Company System Operations Department System Planning

More information

El Paso Electric Company

El Paso Electric Company Feasibility Study XXXXXX Solar Generation Prepared for El Paso Electric Company Prepared by TRC Engineers, LLC 249 Eastern Avenues Augusta, ME 04330 (207) 621-7000 Project Number: 202327 May 2013 FOREWORD

More information

SYSTEM IMPACT STUDY EC300W ERIS FINAL REPORT. El Paso Electric Company

SYSTEM IMPACT STUDY EC300W ERIS FINAL REPORT. El Paso Electric Company SYSTEM IMPACT STUDY EC300W ERIS FINAL REPORT Prepared for: El Paso Electric Company Prepared by: Engineers, LLC 1526 Cole Boulevard Building 3, Suite 150 Lakewood, CO 80401 (303) 395-4018 FOREWORD This

More information

New Mexico Transmission Expansion Concepts For Wind Resources

New Mexico Transmission Expansion Concepts For Wind Resources New Mexico Transmission Expansion Concepts For Wind Resources May 2008 Update Electric Services Transmission Operations FOREWORD This document contains PNM s latest concepts for expanding the transmission

More information

SYSTEM IMPACT STUDY REPORT LA450S GENERATION STUDY. El Paso Electric Company

SYSTEM IMPACT STUDY REPORT LA450S GENERATION STUDY. El Paso Electric Company SYSTEM IMPACT STUDY REPORT LA450S GENERATION STUDY Prepared for: El Paso Electric Company Prepared by: Engineers, LLC 1526 Cole Boulevard Building 3, Suite 150 Lakewood, CO 80401 (303) 395-4018 FOREWORD

More information

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI Executive Summary Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI-2003-2 Xcel Energy Transmission Planning January 2004 This Interconnection Feasibility

More information

100 MW Wind Generation Project

100 MW Wind Generation Project A subsidiary of Pinnacle West Capital Corporation 100 MW Wind Generation Project CUSTOMER FINAL Feasibility Study Results By Transmission Planning, APS December 21, 2007 Executive Summary This Feasibility

More information

Project #148. Generation Interconnection System Impact Study Report

Project #148. Generation Interconnection System Impact Study Report Project #148 Generation Interconnection System Impact Study Report June 05, 2012 Electric Transmission Planning Table of Contents Table of Contents... 2 Executive Summary... 3 Energy Resource Interconnection

More information

SYSTEM IMPACT RESTUDY H252W ERIS REPORT. El Paso Electric Company

SYSTEM IMPACT RESTUDY H252W ERIS REPORT. El Paso Electric Company SYSTEM IMPACT RESTUDY H252W ERIS REPORT Prepared for: El Paso Electric Company Prepared by: Engineers, LLC 1526 Cole Boulevard Building 3, Suite 150 Lakewood, CO 80401 (303) 395-4018 FOREWORD This report

More information

Verde Transmission, LLC. Verde Project. System Impact Study Report

Verde Transmission, LLC. Verde Project. System Impact Study Report Verde Transmission, LLC Verde Project System Impact Study Report March 2017 Prepared by: Public Service Company of New Mexico Foreword This report was prepared for Verde Transmission, LLC by the PNM Transmission/

More information

Service Requested 150 MW, Firm. Table ES.1: Summary Details for TSR #

Service Requested 150 MW, Firm. Table ES.1: Summary Details for TSR # Executive Summary Firm point to point transmission service has been requested by Transmission Service Request (TSR) #75669514, under the SaskPower Open Access Transmission Tariff (OATT). The TSR consists

More information

THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS

THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS 2/27/2018 ELECTRIC TRANSMISSION PLANNING Table of Contents Table of Contents... 2 Executive

More information

MILLIGAN SOLAR PROJECT

MILLIGAN SOLAR PROJECT February 16, 2009 Page 1 of 18 A subsidiary of Pinnacle West Capital Corporation MILLIGAN SOLAR PROJECT FINAL Feasibility Study Report APS Contract 52115 Prepared by: Arizona Public Service Company Transmission

More information

Gateway South Transmission Project

Gateway South Transmission Project Phase 1 Comprehensive Progress Report Volume 1 - Technical Report Report Prepared by PacifiCorp Transmission Planning Department November 21, 2008 WECC1-V4 Phase 1 Comprehensive Progress Report Executive

More information

Status of PNM s Completed Transmission Construction Projects 11/30/2017

Status of PNM s Completed Transmission Construction Projects 11/30/2017 Status of s Completed Transmission Construction Projects Second Tah Ta Hey 115/345 kv Transformer Yah Ta Hey Switching Station On January 9, 2015, filed with the NMPRC under NMPRC Rule 440 information

More information

TOLTEC POWER PARTNERSHIP TOLTEC POWER PROJECT INTERCONNECTION STUDY SYSTEM IMPACT STUDY

TOLTEC POWER PARTNERSHIP TOLTEC POWER PROJECT INTERCONNECTION STUDY SYSTEM IMPACT STUDY TOLTEC POWER PARTNERSHIP TOLTEC POWER PROJECT INTERCONNECTION STUDY SYSTEM IMPACT STUDY January 7, 2002 Prepared by Jorge Chacon (Consultant) Tucson Electric Power Company Ed Beck ii EXECUTIVE SUMMARY

More information

Interconnection System Impact Study Report Request # GI

Interconnection System Impact Study Report Request # GI Executive Summary Interconnection System Impact Study Report Request # GI-2008-23 34 MW Solar Generation Ranch at Hartsel, Colorado Public Service Company of Colorado Transmission Planning August 19, 2010

More information

CUSTOMER/ TWIN ARROWS PROJECT

CUSTOMER/ TWIN ARROWS PROJECT A subsidiary of Pinnacle West Capital Corporation CUSTOMER/ TWIN ARROWS PROJECT V1 Facility Study Report APS Contract 52149 Prepared by: Arizona Public Service Company Transmission & Distribution Asset

More information

Clean Line Energy Partners, LLC. Western Spirit Clean Line 345 kv. System Impact Study

Clean Line Energy Partners, LLC. Western Spirit Clean Line 345 kv. System Impact Study Clean Line Energy Partners, LLC Western Spirit Clean Line 345 kv System Impact Study February, 2017 Prepared by: Public Service Company of New Mexico Foreword This report was prepared for the Clean Line

More information

TransWest Express Project

TransWest Express Project TransWest Express Project Phase One--Feasibility Study Final Study Report November 2006 A subsidiary of Pinnacle West Capital Corporation Executive Summary On October 21, 2005 Arizona Public Service Company

More information

Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting

Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting BHE Wyoming Q4 Stakeholder Meeting November 17, 2016 @ 1:00PM MT Black Hills Energy Service Center 409 Deadwood Avenue, Rapid

More information

Feasibility Study Report

Feasibility Study Report Generator Interconnection Request Feasibility Study Report For: Customer --- Service Location: Rutherford County Total Output: 79.2 MW Commercial Operation Date: 9/1/2014 In-Service Date (if given): 9/1/2014

More information

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation Prepared by: Entergy Services, Inc. T & D Planning L-ENT-17A 639 Loyola Avenue New Orleans, LA 70113 Rev Issue Date

More information

SPS Planning Criteria and Study Methodology

SPS Planning Criteria and Study Methodology SPS Planning Criteria and Study Methodology SPS subscribes to the Southwest Power Pool ("SPP") Reliability Criteria, which incorporates compliance with the appropriate North American Electric Reliability

More information

Interconnection Feasibility Study Report GIP-226-FEAS-R3

Interconnection Feasibility Study Report GIP-226-FEAS-R3 Interconnection Feasibility Study Report GIP-226-FEAS-R3 System Interconnection Request #226 70 MW Wind Generating Facility Kings County (L-6013) 2010 07 21 Control Centre Operations Nova Scotia Power

More information

Feasibility Study for the Q MW Solar Project

Feasibility Study for the Q MW Solar Project Feasibility Study for the Q171 74.5 MW Solar Project August 2018 Bulk Transmission Planning, Florida i This document and any attachments hereto ( document ) is made available by Duke Energy Florida, LLC

More information

March 2017 to June 2017 Preliminary Interconnection Cluster Window System Impact Study 49.9 MW IA-PNM May 2018

March 2017 to June 2017 Preliminary Interconnection Cluster Window System Impact Study 49.9 MW IA-PNM May 2018 March 2017 to June 2017 Preliminary Interconnection Cluster Window System Impact Study 49.9 MW IA-PNM-2017-11 May 2018 Prepared by: Public Service Company of New Mexico Foreword This report is prepared

More information

Interconnection Feasibility Study Report Request # GI Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado

Interconnection Feasibility Study Report Request # GI Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado Executive Summary Interconnection Feasibility Study Report Request # GI-2016-6 Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado Public Service Company of Colorado Transmission

More information

EL PASO ELECTRIC COMPANY SYSTEM EXPANSION PLAN

EL PASO ELECTRIC COMPANY SYSTEM EXPANSION PLAN EL PASO ELECTRIC COMPANY SYSTEM EXPANSION PLAN 2019-2028 Produced by System Planning 2018 GENERAL EL PASO ELECTRIC COMPANY 2019-2028 SYSTEM EXPANSION PLAN Executive Summary El Paso Electric Company s

More information

New Mexico Transmission System Overview TRANSMISSION SYSTEM OVERVIEW NETWORK OPERATING COMMITTEE

New Mexico Transmission System Overview TRANSMISSION SYSTEM OVERVIEW NETWORK OPERATING COMMITTEE New Mexico Transmission System Overview TRANSMISSION SYSTEM OVERVIEW NETWORK OPERATING COMMITTEE November 8, 2006 1 PNM Transmission System Uses Retail-PNM native load customers represent about 60% to

More information

PUBLIC SERVICE COMPANY OF NEW MEXICO (PNM)

PUBLIC SERVICE COMPANY OF NEW MEXICO (PNM) PUBLIC SERVICE COMPANY OF NEW MEXICO (PNM) Determination and Posting Of Total Transmission Capability (TTC) & Available Transmission Capability (ATC) On The Open Access Same-Time Information System (OASIS)

More information

ABB Inc. Public Service Company of New Mexico Broadview Full Buildout Affected PSLF Study

ABB Inc. Public Service Company of New Mexico Broadview Full Buildout Affected PSLF Study ABB Inc. Public Service Company of New Mexico Broadview Full Buildout Affected PSLF Study Final Report ABB Power Systems Consulting June 27, 2016 LEGAL NOTICE This document, prepared by ABB Inc, is an

More information

Interconnection Feasibility Study Report GIP-222-FEAS-R3

Interconnection Feasibility Study Report GIP-222-FEAS-R3 Interconnection Feasibility Study Report GIP-222-FEAS-R3 System Interconnection Request #222 48 MW Steam Generating Facility Pictou County (53N) 2010 07 30 Control Centre Operations Nova Scotia Power Inc.

More information

Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood

Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood Prepared for: SCE&G Fossil/Hydro June 30, 2008 Prepared by: SCE&G Transmission Planning Table of Contents

More information

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015 No. Comment Submitted ISO Response Date Q&A Posted 1 Will the ISO consider proposals that are not within the impedance range specified? Yes. However, the benefits estimated and studies performed by the

More information

TOT1A: Metering Point Relocation Comprehensive Progress Report (WECC Path 30)

TOT1A: Metering Point Relocation Comprehensive Progress Report (WECC Path 30) TOT1A: Metering Point Relocation Comprehensive Progress Report (WECC Path 30) Submitted to TOT1A Stakeholders and TOT1A Interconnected Utilities And Western Electricity Coordinating Council June 6, 2013

More information

Feasibility Study for the Q MW Solar Project

Feasibility Study for the Q MW Solar Project Feasibility Study for the Q174 74.5 MW Solar Project August 2018 Bulk Transmission Planning, Florida i This document and any attachments hereto ( document ) is made available by Duke Energy Florida, LLC

More information

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY California Independent System Operator Memorandum To: ISO Operations (MRTU) Committee From: Armando J. Perez, Director of Grid Planning cc: ISO Board of Governors ISO Officers Date: April 29, 2005 Re:

More information

Cargill Power Markets LLC Transmission Service Study (OASIS # TSR and )

Cargill Power Markets LLC Transmission Service Study (OASIS # TSR and ) Cargill Power Markets LLC Transmission Service Study (OASIS # TSR 72608299 and 72827161) Prepared by: Electric Power Research Institute (EPRI) Under contract with: Public Service Company of New Mexico

More information

PUD ELECTRIC SYSTEM INTERCONNECTION

PUD ELECTRIC SYSTEM INTERCONNECTION APPENDIX A PROCEDURES & REQUIREMENTS for OKANOGAN PUD ELECTRIC SYSTEM INTERCONNECTION Version 4.0 December 2011 Version 4.0 12/28/2011 Page 1 of 15 TABLE OF CONTENTS DEFINITIONS 1.0 Introduction 2.0 Procedures

More information

Transmission Coordination and Planning Committee 2014 Q4 Stakeholder Meeting. December 18, 2014

Transmission Coordination and Planning Committee 2014 Q4 Stakeholder Meeting. December 18, 2014 Transmission Coordination and Planning Committee 2014 Q4 Stakeholder Meeting December 18, 2014 Agenda 1. Introductions 2. TCPC Policies 3. BHCE Planning Department Update 4. 2014 LTP Study Results 5. Stakeholder

More information

Stability Study for the Mt. Olive Hartburg 500 kv Line

Stability Study for the Mt. Olive Hartburg 500 kv Line Stability Study for the Mt. Olive Hartburg 500 kv Line Peng Yu Sharma Kolluri Transmission & Distribution Planning Group Energy Delivery Organization Entergy Sevices Inc April, 2011 New Orleans, LA 1.

More information

Midway/Monument Area TTC Study

Midway/Monument Area TTC Study Midway/Monument Area TTC Study (includes the following lines: Midway Geesen 115 kv, Geesen Falcon 115 kv, Falcon Fuller 115 kv, Fuller Black Squirrel 115 kv, and Black Squirrel Monument 115 kv) Johnny

More information

Interconnection Feasibility Study Report GIP-IR373-FEAS-R1

Interconnection Feasibility Study Report GIP-IR373-FEAS-R1 Interconnection Feasibility Study Report GIP-IR373-FEAS-R1 Generator Interconnection Request 373 109.5 MW Wind Generating Facility South Canoe Lake, NS Mar. 2, 2012 Control Centre Operations Nova Scotia

More information

Feasibility Study Report

Feasibility Study Report Report For: Fresh Air Energy II, LLC ( Customer ) Queue #: Service Location: Chester County, SC Total Output Requested By Customer: 74.5 MW Commercial Operation Date Requested By Customer: 1/7/2019 Feasibility

More information

Georgia Transmission Corporation Georgia Systems Operations Corporation

Georgia Transmission Corporation Georgia Systems Operations Corporation Georgia Transmission Corporation Georgia Systems Operations Corporation Reactive Power Requirements for Generating Facilities Interconnecting to the Georgia Integrated Transmission System with Georgia

More information

Q92 Asarco Interconnection

Q92 Asarco Interconnection A subsidiary of Pinnacle West Capital Corporation Q92 Asarco Interconnection Feasibility Study APS Contract No. 52239 By Arizona Public Service Company Transmission Planning July 29, 2010 Prepared by Utility

More information

Supplemental Report on the NCTPC Collaborative Transmission Plan

Supplemental Report on the NCTPC Collaborative Transmission Plan Supplemental Report on the NCTPC 2007-2017 Collaborative Transmission Plan May 16, 2008 1 Table of Contents I. Executive Summary...1 II. Richmond-Fort Bragg Woodruff Street 230 kv Line...2 II.A. Need for

More information

Interconnection Feasibility Study Report GIP-023-FEAS-R1. Generator Interconnection Request # MW Wind Generating Facility Inverness (L6549), NS

Interconnection Feasibility Study Report GIP-023-FEAS-R1. Generator Interconnection Request # MW Wind Generating Facility Inverness (L6549), NS Interconnection Feasibility Study Report GIP-023-FEAS-R1 Generator Interconnection Request # 23 100 MW Wind Generating Facility Inverness (L6549), NS February 16, 2006 Control Centre Operations Nova Scotia

More information

Guide. Services Document No: GD-1401 v1.0. Issue Date: Title: WIND ISLANDING. Previous Date: N/A. Author: Heather Andrew.

Guide. Services Document No: GD-1401 v1.0. Issue Date: Title: WIND ISLANDING. Previous Date: N/A. Author: Heather Andrew. Guide Department: Interconnection Services Document No: GD-1401 v1.0 Title: WIND ISLANDING Issue Date: 11-24-2014 Previous Date: N/A Contents 1 PURPOSE... 2 2 SCOPE AND APPLICABILITY... 2 3 ROLES AND RESPONSIBILITIES...

More information

Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers

Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers Puget Sound Area Study Team Bonneville Power Administration, Puget Sound Energy, Seattle City Light,

More information

PJM Generator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study September 2008

PJM Generator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study September 2008 PJM enerator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study 504744 September 2008 PJM Interconnection 2008. All rights reserved R60 Robison Park-Convoy 345kV Impact Study eneral

More information

Large Load Serving Study Report for La Plata Electric Association, Inc. Alternatives. Addendum. San Juan Major Project

Large Load Serving Study Report for La Plata Electric Association, Inc. Alternatives. Addendum. San Juan Major Project Large Load Serving Study Report for La Plata Electric Association, Inc. Alternatives Addendum San Juan Major Project Tri-State Generation and Transmission Association Power System Planning December, 2008

More information

Appendix D Black Hills Project Summary

Appendix D Black Hills Project Summary Page 1 of 28 Appendix D Black Hills Project Summary Table of Contents Black Hills Project Summary... D-1 Boone-Nyberg 115 kv Project... D-3 Rattlesnake Butte 115 kv Substation Terminal... D-6 Fountain

More information

Project #94. Generation Interconnection System Impact Study Report Revision

Project #94. Generation Interconnection System Impact Study Report Revision Project #94 Generation Interconnection System Impact Study Report Revision October 2, 2009 Electric Transmission Planning Table of Contents Table of Contents...2 Executive Summary...3 Energy Resource Interconnection

More information

Interconnection System Impact Study Final Report February 19, 2018

Interconnection System Impact Study Final Report February 19, 2018 Interconnection System Impact Study Final Report February 19, 2018 Generator Interconnection Request No. TI-17-0225 248.4 MW (Alternate Project Output of 217.35 MW) Wind Energy Generating Facility In Goshen

More information

System Impact Study Report

System Impact Study Report Report For: NTE Carolinas II, LLC ( Customer ) Queue #: 42432-01 Service Location: Rockingham County, NC Total Output: 477 MW (summer) / 540 MW (winter) Commercial Operation Date: 12/1/2020 42432-01 SIS

More information

Interconnection Feasibility Study Report GIP-157-FEAS-R2

Interconnection Feasibility Study Report GIP-157-FEAS-R2 Interconnection Feasibility Study Report GIP-157-FEAS-R2 System Interconnection Request #157 100.5 MW Wind Generating Facility Guysborough County (L-6515) 2009 09 14 Control Centre Operations Nova Scotia

More information

Manitoba Hydro Generation Interconnection Exploratory Study Notice September 28, 2006

Manitoba Hydro Generation Interconnection Exploratory Study Notice September 28, 2006 Manitoba Hydro Generation Interconnection Exploratory Study Notice September 28, 2006 As per the Manitoba Hydro Open Access Interconnection Tariff, the Transmission Owner has contracted TransGrid Solutions

More information

Western Area Power Administration Sierra Nevada Region

Western Area Power Administration Sierra Nevada Region Western Area Power Administration Sierra Nevada Region 2014 Annual Ten-Year Transmission Plan Assessment Report November 20, 2014 For information or questions regarding this Transmission Assessment Report,

More information

DUKE ENERGY PROGRESS TRANSMISSION SYSTEM PLANNING SUMMARY

DUKE ENERGY PROGRESS TRANSMISSION SYSTEM PLANNING SUMMARY DUKE ENERGY PROGRESS TRANSMISSION SYSTEM PLANNING SUMMARY Transmission Department Transmission Planning Duke Energy Progress TABLE OF CONTENTS I. SCOPE 3 II. TRANSMISSION PLANNING OBJECTIVES 3 III. TRANSMISSION

More information

Falcon-Midway 115 kv Line Uprate Project Report

Falcon-Midway 115 kv Line Uprate Project Report Falcon-Midway 115 kv Line Uprate Project Report 12/1/2008 1 Background The function of this project is to uprate the 26.7 miles of Tri-State s 115 kv line between Midway and Falcon substations from 50

More information

Connection Engineering Study Report for AUC Application: AESO Project # 1674

Connection Engineering Study Report for AUC Application: AESO Project # 1674 APPENDIX A CONNECTION ASSESSMENT Connection Engineering Study Report for AUC Application: AESO Project # 1674 Executive Summary Project Overview FortisAlberta Inc. (FortisAlberta) submitted a System

More information

Feasibility Study Report

Feasibility Study Report Report For: Orion Renewable Resources LLC ( Customer ) Queue #: Service Location: Rockingham County, NC Total Output Requested By Customer: 100 MW Commercial Operation Date Requested By Customer: 11/1/2019

More information

Consulting Agreement Study. Completed for Transmission Customer

Consulting Agreement Study. Completed for Transmission Customer Completed for Transmission Customer Proposed Resource & Transmission Carbon County, MT & 230 kv Transmission in North Wyoming August 2016 Table of Contents 1.0 Description... 1 2.0 Overall Assumptions...

More information

High Lonesome Mesa 100 MW Wind Generation Project (OASIS #IA-PNM ) Interconnection Facility Study. Final Report November 2, 2007

High Lonesome Mesa 100 MW Wind Generation Project (OASIS #IA-PNM ) Interconnection Facility Study. Final Report November 2, 2007 High Lonesome Mesa 100 MW Wind Generation Project (OASIS #IA-PNM-2006-02) Interconnection Facility Study Final Report November 2, 2007 Prepared by: Public Service Company of New Mexico Electric Services

More information

Interconnection Feasibility Study Report GIP-084-FEAS-R2

Interconnection Feasibility Study Report GIP-084-FEAS-R2 Interconnection Feasibility Study Report GIP-084-FEAS-R2 System Interconnection Request #84 50 MW Wind Generating Facility Pictou County (L-7004) August 17, 2007 Control Centre Operations Nova Scotia Power

More information

Four Corners Queue Transmission Interconnection Study

Four Corners Queue Transmission Interconnection Study Four Corners Queue Transmission Interconnection Study Facility Study Results By Arizona Public Service Company Transmission Planning & Interconnection Development March 22, 2016 Version 1 FACILITIES STUDY

More information

Feasibility Study. Customer Kingman Area Photovoltaic Generation Project Interconnection

Feasibility Study. Customer Kingman Area Photovoltaic Generation Project Interconnection Feasibility Study Customer Kingman Area Photovoltaic Generation Project Interconnection October, 2009 October 2009 i EXECUTIVE SUMMARY CONCLUSION Customer has requested network resource interconnection

More information

AMERICAN ELECTRIC POWER 2017 FILING FERC FORM 715 ANNUAL TRANSMISSION PLANNING AND EVALUATION REPORT PART 4 TRANSMISSION PLANNING RELIABILITY CRITERIA

AMERICAN ELECTRIC POWER 2017 FILING FERC FORM 715 ANNUAL TRANSMISSION PLANNING AND EVALUATION REPORT PART 4 TRANSMISSION PLANNING RELIABILITY CRITERIA AMERICAN ELECTRIC POWER 2017 FILING FERC FORM 715 ANNUAL TRANSMISSION PLANNING AND EVALUATION REPORT PART 4 TRANSMISSION PLANNING RELIABILITY CRITERIA AEP Texas (comprised of its Central and North Divisions

More information

2012 LOCAL TRANSMISSION PLAN:

2012 LOCAL TRANSMISSION PLAN: Colorado PUC E-Filings System 2012 LOCAL TRANSMISSION PLAN: TRANSMISSION COORDINATION AND PLANNING COMMITTEE ANNUAL TRANSMISSION ASSESSMENT FOR BLACK HILLS/COLORADO ELECTRIC UTILITY COMPANY, L.P., D/B/A

More information

APPENDIX I: Description and Functional Specifications for Transmission Facilities Eligible for Competitive Solicitation

APPENDIX I: Description and Functional Specifications for Transmission Facilities Eligible for Competitive Solicitation APPENDIX I: Description and Functional Specifications for Transmission Facilities Eligible for Competitive Solicitation Intentionally left blank F1 Description and Functional Specifications of Proposed

More information

Transmission Planning & Engineering P.O. Box MS 3259 Phoenix, Arizona

Transmission Planning & Engineering P.O. Box MS 3259 Phoenix, Arizona Transmission Planning & Engineering P.O. Box 53933 MS 3259 Phoenix, Arizona 85072-3933 March 9, 2016 Mr. Philip Augustin Chair, WECC Technical Studies Subcommittee Mr. Enoch Davies WECC Technical Staff

More information

PJM Generator Interconnection R81 Emilie (Fords Mill) MW Impact Study Re-Study

PJM Generator Interconnection R81 Emilie (Fords Mill) MW Impact Study Re-Study PJM Generator Interconnection R81 Emilie (Fords Mill) 100.9 MW Impact Study Re-Study August 2008 DMS # 498781 General Queue R81 Emilie (Fords Mills) is a Fairless Energy, LLC request to obtain an additional

More information

Final System Impact Study for. Sierra Pacific Industries 31 MW Generation Project. Mount Vernon, WA. November 16, 2006

Final System Impact Study for. Sierra Pacific Industries 31 MW Generation Project. Mount Vernon, WA. November 16, 2006 Final System Impact Study for Sierra Pacific Industries 31 MW Generation Project Mount Vernon, WA November 16, 2006 Puget Sound Energy, Inc. Electric Transmission Department 1 1. Introduction On October

More information

ABB POWER SYSTEMS CONSULTING

ABB POWER SYSTEMS CONSULTING ABB POWER SYSTEMS CONSULTING DOMINION VIRGINIA POWER Offshore Wind Interconnection Study 2011-E7406-1 R1 Summary Report Prepared for: DOMINION VIRGINIA POWER Report No.: 2011-E7406-1 R1 Date: 29 February

More information

Burlington Lamar 345/230 kv Impact and 2013 Post TPL Assessment Study

Burlington Lamar 345/230 kv Impact and 2013 Post TPL Assessment Study Burlington Lamar 345/230 kv Impact and 2013 Post TPL Assessment Study Vince Leung May 1, 2014 Reviewed by: Chris Pink (edited July 8, 2014) Table of Contents Page Background... 4 Objectives... 5 Study

More information

City of Palo Alto (ID # 6416) City Council Staff Report

City of Palo Alto (ID # 6416) City Council Staff Report City of Palo Alto (ID # 6416) City Council Staff Report Report Type: Informational Report Meeting Date: 1/25/2016 Summary Title: Update on Second Transmission Line Title: Update on Progress Towards Building

More information

Small Generator Interconnection Program Interconnection Technical Requirements

Small Generator Interconnection Program Interconnection Technical Requirements General Program Information What is the purpose of the PGE Small Generator Interconnection Program? How do I initiate a distribution interconnection request for my project? The purpose of our Small Generator

More information

Final Draft Report. Assessment Summary. Hydro One Networks Inc. Longlac TS: Refurbish 115/44 kv, 25/33/ General Description

Final Draft Report. Assessment Summary. Hydro One Networks Inc. Longlac TS: Refurbish 115/44 kv, 25/33/ General Description Final Draft Report Assessment Summary Hydro One Networks Inc. : Refurbish 115/44 kv, 25/33/42 MVA DESN Station CAA ID Number: 2007-EX360 1.0 General Description Hydro One is proposing to replace the existing

More information

Operational Planning Study Report. RTA to BCH transfer limit updates For Kitimat 4 Capacitor Banks

Operational Planning Study Report. RTA to BCH transfer limit updates For Kitimat 4 Capacitor Banks Operational Planning Study Report RTA to BCH transfer limit updates For Kitimat 4 Capacitor Banks Report No. T&S Planning 2013-062 British Columbia Hydro and Power Authority British Columbia Hydro and

More information

APPENDIX E: Project Need and Description

APPENDIX E: Project Need and Description APPENDIX E: Project Need and California ISO/MID E-1 Intentionally left blank California ISO/MID E-2 Lakeville 115 kv Bus Upgrade Installation of a sectionalizing breaker to be installed on 115 kv bus section

More information

Q95 Vicksburg 69kV. System Impact Study. APS Contract No Arizona Public Service Company Transmission Planning.

Q95 Vicksburg 69kV. System Impact Study. APS Contract No Arizona Public Service Company Transmission Planning. A subsidiary of Pinnacle West Capital Corporation Q95 Vicksburg 69kV System Impact Study APS Contract No. 52246 By Arizona Public Service Company Transmission Planning December 1, 2010 Version 2.6 Final

More information

Generator Interconnection System Impact Study For

Generator Interconnection System Impact Study For Generator Interconnection System Impact Study For Prepared for: January 15, 2015 Prepared by: SCE&G Transmission Planning Table of Contents General Discussion... Page 3 I. Generator Interconnection Specifications...

More information

FEASIBILITY STUDY REPORT

FEASIBILITY STUDY REPORT FEASIBILITY STUDY REPORT HL20S PV Prepared for: El Paso Electric Company Prepared by: Engineers, LLC 249 Eastern Avenue Augusta, ME 04330 (207) 621-7000 July 2012 FOREWORD This report was prepared for

More information

Introduction to PowerWorld Simulator: Interface and Common Tools

Introduction to PowerWorld Simulator: Interface and Common Tools Introduction to PowerWorld Simulator: Interface and Common Tools I10: Introduction to Contingency Analysis 2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330 support@powerworld.com http://www.powerworld.com

More information