1 XXXXXXXXXXXXXXXXXXXX GENERATION INTERCONNECTION FACILITIES STUDY SHORT CIRCUIT ANALYSIS FOR PROPOSED GENERATION AT NEWMAN 115 kv BUS El Paso Electric Company System Operations Department System Planning Section May 2003

2 I. INTRODUCTION XXXXXXXXXXXXXXXXXXXXXXXXXXX (XXX) has proposed the addition of a generating plant near EPE s Newman Substation. This proposed generation unit was analyzed in two phases. Phase I analyzed a 140 MW combustion turbine (CT) in Phase II analyzed a steam turbine integrated with the CT to form a Combined Cycle (CC) unit in In both phases, the unit was modeled as being interconnected at EPE s Newman 115 kv bus. When generating units are added to a transmission system, the available fault current on a system increases. Therefore, as part of the Generation Interconnection Facilities Study (GIFS), a short circuit study was performed to determine if the additional fault current on the EPE system due to the proposed generation does not exceed the interruption ratings of EPE s existing substation circuit breakers. In the powerflow analysis of the GIFS, the 2006 CT was modeled at a 140 MW generation output level. The 2009 CC unit was modeled at a 290 MW maximum generation output level. This Short Circuit Study was performed by El Paso Electric Company s Transmission & Distribution Division (EPE T&D). The Powerflow, Q-V, and Stability analyses for this study are also being performed by El Paso Electric Company s Transmission & Distribution Division (EPE T&D) and will be issued under a separate cover. Short Circuit Analysis for a 1 El Paso Electric Company

3 II. SHORT CIRCUIT STUDY MODELING The new generation proposed by XXX is sited at EPE s Newman 115 kv substation. The combustion and steam-turbine generator portion of the proposed combined-cycle plant will be connected to the 115 kv transmission through a 200 MVA, 18/115 kv step-up transformer per generator. Each of the two step-up transformers has an impedance of 7.5 % on a 120 MVA base. The step-up transformer impedance modeled in the short circuit analysis for both step-up transformers was: Z (step-up) = J per unit (100 MVA base) The new generators have the following reactance values on the generator MVA base: Combustion-Turbine: X d = Direct Axis Synchronous Reactance = per unit X d = Direct Axis Transient Reactance = per unit X d = Direct Axis Subtransient Reactance = per unit Steam-Turbine: X d = Direct Axis Synchronous Reactance = per unit X d = Direct Axis Transient Reactance = per unit X d = Direct Axis Subtransient Reactance = per unit These reactance values were converted to a 100 MVA base and used to model the new generators in the short circuit study. In addition to the new generation connected to the Newman 115 kv bus, one existing and four potential generation projects were also modeled in the analysis. These generation projects included the following: 135 MW of generation at Afton Substation interconnected to the Luna-Afton- Newman 345 kv line (existing). 614 MW of generation interconnected at the Luna 345 kv Substation. 160 MW of generation interconnected near Lordsburg, New Mexico. 150 MW of generation interconnected at Lordsburg, New Mexico. 130 MW of new generation interconnected at Afton 345 kv Substation and 14 MW of additional generation on the existing Afton generator. These additional generators were modeled in the study to provide a worst case scenario in the event that all are interconnected into EPE s system before the proposed Newman generation is interconnected. Short Circuit Analysis for a 2 El Paso Electric Company

4 Maximum fault currents were then determined at the Newman 115 kv bus and other EPE substations of interest or importance. These included the following: Diablo 345 kv Diablo 115 kv Newman 345 kv Rio Grande 115 kv Rio Grande 69 kv The resulting fault current was then compared to the circuit breaker interruption ratings of the breakers at each of the above mentioned substations. Among the proposed projects listed above is the addition of 14 MW of generation to the existing 135 MW generator at Afton. This existing generator will be combined with a proposed 130 MW generator and interconnected to the Luna-Afton-Newman 345 kv line. Together, these projects (135 MW +14 MW MW) represent a combinedcycle configuration with a modeled output of 279 MW. Because there are two transmission line interconnection configurations for this proposed project that are currently being studied as part of a different analysis, the results for this Short-Circuit Study will be presented in two different result groups. The Transmission Configuration 1 used to interconnect the 279 MW generation plant mentioned above involves the use of the existing Luna-Afton-Newman 345 kv transmission configuration. The existing Afton generator interconnects the Luna- Newman 345 kv line to now form two line segments, the Luna-Afton 345 kv line and the Afton to Newman 345 kv. In Transmission Configuration 2, EPE s Luna-Diablo 345 kv line is routed such that this existing line will be tied to Afton 345 kv substation to also form two line segments, the Luna-Afton 345 kv line and the Afton-Diablo 345 kv line Ultimately, a Study of the proposed Afton Project, currently in progress, will be used to determine which Transmission Configuration will be used to interconnect the 279 MW project described above. Because the study referenced above has not yet been completed, results of this Short- Circuit Study will be divided into two groups corresponding to each of the two Transmission Configurations described above. Short Circuit Analysis for a 3 El Paso Electric Company

5 III. RESULTS OF THE SHORT CIRCUIT ANALYSIS The circuit breakers used in the Southern New Mexico System at 345 kv, 115 kv, and 69 kv buses vary between the substations. The following is a list of the existing circuit breakers, along with the interruption rating, at each of the relevant substations: Breaker Breaker Interruption Substation Voltage Number Rating (Amps) Diablo B 40, B 40, B 40,000 Diablo B 40, B 40, B 40, B 40, B 40, B 31,500 Newman B 40, B 40, B 40, B 40,000 Newman , , , N , , , N , , N , , , N , , , N , , N , N ,000 Short Circuit Analysis for a 4 El Paso Electric Company

6 Breaker Breaker Interruption Substation Voltage Number Rating (Amps) Newman ,000 (continued) 115 N , N , , N , N ,000 Rio Grande B 40,000* B 23, B 23, B 40, B 40, B 23, B 23, B 40, B 40,000* B 23, B 23, B 40,000 Rio Grande ,000* , , , , , , , B 31, , , B 31, , ,000 * Currently these breakers have ratings ranging between 19,000-20,000 amperes. They are expected to be replaced with breakers having 40,000 ampere ratings as part of EPE s normal breaker replacement program. Short Circuit Analysis for a 5 El Paso Electric Company

7 The short circuit analysis was first performed with no new generation at Newman 115 kv (all other potential generation projects in). This gave the base case fault duties of the circuit breakers. The new generation at Newman 115 kv was then modeled in two phases. Phase I analyzed a 140 MW combustion turbine (CT) in Phase II analyzed a steam-turbine added to the combustion turbine configuration to form a Combined Cycle (CC) unit in In both phases the short circuit study was then reanalyzed (with all other potential generation projects in). The incremental between the three studies gave the impact of the new generators on the existing circuit breakers in the Southern New Mexico system. A. Short Circuit Results for Proposed New Generation at Newman 115 kv Using Transmission Configuration 1 Transmission Configuration 1 assumes that the transmission configuration of interconnecting the Afton generating station to the Luna-Afton-Newman 345 kv line will remain as it exists now, with the line divided into two segments: 1) Luna to Afton 345 kv substation 2) Afton to Newman 345 kv substation. The other proposed projects previously listed are also included in this configuration. The short circuit (fault) currents of Configuration 1 at all the substations which may be impacted due to the addition of the proposed Newman 5 project are listed below: No New Generation at Newman 115 kv Bus Versus Phase 1 CT Addition at Newman 115 kv Bus in 2006 Three Phase Line to Ground: No New Generation With New Generation Diablo 345 kv Bus 5, ,498.0 Diablo 115 kv Bus 19, ,070.0 Newman 345 kv Bus 8, ,348.0 Newman 115 kv Bus 25, ,755.0 Rio Grande 115 kv Bus 21, ,845.0 Rio Grande 69 kv Bus 19, ,051.0 Short Circuit Analysis for a 6 El Paso Electric Company

8 Single Phase Line to Ground: No New Generation With New Generation Diablo 345 kv Bus 4, ,958.0 Diablo 115 kv Bus 19, ,820.0 Newman 345 kv Bus 8, ,396.0 Newman 115 kv Bus 30, ,063.0 Rio Grande 115 kv Bus 22, ,373.0 Rio Grande 69 kv Bus 23, ,518.0 No New Generation at Newman 115 kv Bus Versus Phase 2 CC Plant at Newman 115 kv Bus in 2009 Three Phase Line to Ground: No New Generation With New Generation Diablo 345 kv Bus 5, ,562.0 Diablo 115 kv Bus 19, ,323.0 Newman 345 kv Bus 8, ,746.0 Newman 115 kv Bus 25, ,695.0 Rio Grande 115 kv Bus 21, ,430.0 Rio Grande 69 kv Bus 19, ,308.0 Single Phase Line to Ground: No New Generation With New Generation Diablo 345 kv Bus 4, ,992.0 Diablo 115 kv Bus 19, ,231.0 Newman 345 kv Bus 8, ,738.0 Newman 115 kv Bus 30, ,787.0 Rio Grande 115 kv Bus 22, ,819.0 Rio Grande 69 kv Bus 23, ,753.0 Short Circuit Analysis for a 7 El Paso Electric Company

9 As can be seen in the table below, the fault currents of six (6) existing circuit breakers at Rio Grande 115 kv exceed their interruption ratings during a single phase line to ground fault in SUBSTATION BREAKER NUMBER INTERRUPTION RATING SC FAULT CURRENT W/O NEWMAN 5 SC FAULT CURRENT WITH NEWMAN 5 Rio Grande B 23,000 22,818 23, B 23,000 22,818 23, B 23,000 22,818 23, B 23,000 22,818 23, B 23,000 22,818 23, B 23,000 22,818 23,373 Therefore, under Transmission Configuration 1, XXX will be responsible for the cost of replacing six new circuit breakers at the Rio Grande 115 kv bus. B. Short Circuit Results for Proposed New Generation at Newman 115 kv Using Transmission Configuration 2 Transmission Configuration 2 assumes that the transmission configuration of interconnecting the Afton generating station to the Luna-Afton-Newman 345 kv line will remain as it exists now, with the line divided into two segments: 1) Luna to Afton 345 kv substation 2) Afton to Newman 345 kv substation. However, this Configuration also interconnects the Afton plant to EPE s Luna-Diablo 345 kv line, also dividing the line into two segments, 1) Luna to Afton 345 kv substation 2) Afton to Diablo 345 kv substation. The other proposed projects previously listed are also included in this configuration. The short circuit (fault) currents under Configuration 2 at all the substations which may be impacted due to the addition of the proposed Newman 5 project are listed on the following page. Short Circuit Analysis for a 8 El Paso Electric Company

10 No New Generation at Newman 115 kv Bus Versus Phase 1 CT Addition at Newman 115 kv Bus in 2006 Three Phase Line to Ground: No New Generation With New Generation Diablo 345 kv Bus 7, ,876.0 Diablo 115 kv Bus 21, ,759.0 Newman 345 kv Bus 9, ,791.0 Newman 115 kv Bus 25, ,783.0 Rio Grande 115 kv Bus 22, ,019.0 Rio Grande 69 kv Bus 20, ,441.0 Single Phase Line to Ground: No New Generation With New Generation Diablo 345 kv Bus 6, ,025.0 Diablo 115 kv Bus 21, ,823.0 Newman 345 kv Bus 9, ,727.0 Newman 115 kv Bus 30, ,097.0 Rio Grande 115 kv Bus 23, ,549.0 Rio Grande 69 kv Bus 23, ,935.0 No New Generation at Newman 115 kv Bus Versus Phase 2 CC Plant at Newman 115 kv Bus in 2009 Three Phase Line to Ground: No New Generation With New Generation Diablo 345 kv Bus 7, ,022.0 Diablo 115 kv Bus 21, ,323.0 Newman 345 kv Bus 9, ,217.0 Newman 115 kv Bus 25, ,723.0 Rio Grande 115 kv Bus 22, ,692.0 Rio Grande 69 kv Bus 20, ,717.0 Single Phase Line to Ground: Short Circuit Analysis for a 9 El Paso Electric Company

11 No New Generation With New Generation Diablo 345 kv Bus 6, ,103.0 Diablo 115 kv Bus 21, ,231.0 Newman 345 kv Bus 9, ,086.0 Newman 115 kv Bus 30, ,821.0 Rio Grande 115 kv Bus 23, ,059.0 Rio Grande 69 kv Bus 23, ,186.0 As can be seen in the table below, the fault currents of six (6) existing circuit breakers at Rio Grande 115 kv exceed their interruption ratings during a single phase line to ground fault in These circuit breakers will have to be replaced due to the increased shortcircuit current resulting from the addition of another proposed project in Therefore, XXX is not responsible for the replacement of these breakers. BREAKER NUMBER INTERRUPTION RATING SC FAULT CURRENT W/O NEWMAN 5 SC FAULT CURRENT WITH NEWMAN 5 Rio Grande B 23,000 23,916 24, B 23,000 23,916 24, B 23,000 23,916 24, B 23,000 23,916 24, B 23,000 23,916 24, B 23,000 23,916 24,549 However, in the 2009 case, the fault current to at the Rio Grande 115 kv bus exceeds the interruption rating of one (1) existing circuit breaker. The table below shows that the overloading of this breaker is due to the addition of the proposed Newman 5 project. INTERRUPTION RATING SC FAULT CURRENT W/O NEWMAN 5 SC FAULT CURRENT WITH NEWMAN 5 SUBSTATION BREAKER NUMBER Rio Grande ,000 23,616 24,186 Therefore, under Transmission Configuration 2, XXX will be responsible for the cost of replacing one new circuit breaker at the Rio Grande 69 kv bus. Short Circuit Analysis for a 10 El Paso Electric Company

12 IV. Results and Conclusions A short circuit study was performed on the EPE system comparing the maximum fault current on the system at various substations: Newman 115 kv Substation and selected substations in the EPE system, both with and without the new generation proposed at Newman 115 kv. In addition, two transmission configurations were analyzed to model potential interconnections involving the interconnection of an additional 144 MW of proposed generation at the existing Afton Substation. Transmission Configuration 1 assumes that the transmission configuration of the Luna- Afton-Newman 345 kv line remains as it exists now, with the line divided into two segments 1) Luna to Afton 345 kv substation 2) Afton to Newman 345 kv substation. Transmission Configuration 2 assumes that the Afton substation is interconnected to the Luna-Afton-Newman 345 kv line as it is in Configuration 1 and it is also tied in to the Luna-Diablo 345 kv line as follows 1) Luna to Afton 345 kv substation 2) Afton to Diablo 345 kv substation Ultimately, a Study for the proposed Afton project that is currently in progress will determine which transmission configuration will be used to interconnect the additional 144 MW of the potential generation to the EPE system. The tables below show the results of the short circuit analyses for Transmission Configuration 1 and Transmission Configuration 2. A. Short Circuit Results for Proposed New Generation at Newman 115 kv Using Transmission Configuration 1 Maximum Fault Current With Proposed Minimum Circuit Breaker Generation Addition Substation Interruption Rating (Amps) (Amps) Diablo 345 kv Bus 40, ,562.0 Diablo 115 kv Bus 31, ,323.0 Newman 345 kv Bus 40, ,746.0 Newman 115 kv Bus 40, ,787.0 Rio Grande 115 kv Bus* 23, ,819.0 Rio Grande 69 kv Bus* 24, ,753.0 Short Circuit Analysis for a 11 El Paso Electric Company

13 Results of the analysis for Transmission Configuration 1 indicate that the fault current at the Rio Grande 115 kv bus for a single line-to-ground fault exceeded the breaker interruption rating of six existing breakers. From the list of circuit breakers at the Rio Grande 115 kv bus on page 5, the maximum fault current at this bus for a single line-toground fault exceeded the 23,000 ampere interruption rating of six breakers. This was due to the addition of the proposed CT at Newman 115 kv bus in Therefore, the addition of new generation at the Newman 115 kv bus in 2006 will require that six existing circuit breakers at the Rio Grande 115 kv Substation with 23,000 amp ratings be replaced with six new breakers with higher breaker interruption ratings in B. Short Circuit Results for Proposed New Generation at Newman 115 kv Using Transmission Configuration 2 Maximum Fault Current With proposed Minimum Circuit Breaker Generation Addition Substation Interruption Rating (Amps) (Amps) Diablo 345 kv Bus 40, ,022.0 Diablo 115 kv Bus 31, ,323.0 Newman 345 kv Bus 40, ,217.0 Newman 115 kv Bus 40, ,821.0 Rio Grande 115 kv Bus* 23, ,059.0 Rio Grande 69 kv Bus* 24, ,186.0 Results of the analysis for Transmission Configuration 2 indicate that fault currents for a single line-to-ground fault exceeded breaker interruption rating of six existing breakers at the Rio Grande 115 kv bus and one breaker at the Rio Grande 69 kv bus. From the list of circuit breakers at the Rio Grande 115 kv bus on page 5, the maximum fault current for a single line-to-ground fault exceeded the 23,000 ampere interruption rating of six breakers. In Transmission Configuration 2, the fault current exceeded 23,000 amps for a single line-to-ground fault due to the addition of proposed generation interconnected at the existing Afton Substation as modeled in this short circuit analysis in This potential project occurs in the study queue prior to the addition of new generation at the Newman 115 kv bus. Therefore, under this transmission configuration, the owner of this proposed project is responsible for the cost of replacing the six existing 23,000 amp circuit breakers at Rio Grande 115 kv Substation. However, the list of circuit breaker ratings at the Rio Grande 69 kv bus on page 6 indicates that the maximum fault current at this bus for a single line-to-ground fault exceeded the 24,000 amp circuit breaker interruption rating of one existing circuit breaker due to the addition of the proposed new generation at the Newman 115 kv bus in Therefore, under this configuration, XXX is responsible for the cost of replacing one 69 kv breaker at the Rio Grande 69 kv bus with a circuit breaker with an interruption rating above 24,000 amps in Short Circuit Analysis for a 12 El Paso Electric Company

14 The estimated costs to replace the breakers XXX will be responsible under each of the configurations analyzed are shown below: XXX ESTIMATED COSTS FOR BREAKER REPLACEMENT UNDER TRANSMISSION CONFIGURATION 1 SUBSTATION BREAKER NUMBER YEAR ESTIMATED COST (2003$) Rio Grande B 2006 $60, B 2006 $60, B 2006 $60, B 2006 $60, B 2006 $60, B 2006 $60,000 TOTAL XXX BREAKER REPLACEMENT COSTS $360,000 XXX ESTIMATED COSTS FOR BREAKER REPLACEMENT UNDER TRANSMISSION CONFIGURATION 2 SUBSTATION BREAKER NUMBER YEAR ESTIMATED COST (2003$) Rio Grande $40,000 TOTAL XXX BREAKER REPLACEMENT COSTS $40,000 Short Circuit Analysis for a 13 El Paso Electric Company

15 V. Certification This Short Circuit Analysis was performed pursuant with a Generation Interconnection Facilities Study requested by XXXXXXXXXXXXXXXXXXXXXXXXXXXX (XXX). The generator, step-up transformer and new transmission line parameters were supplied by XXX. The Short Circuit Analysis was performed by El Paso Electric Company s Transmission & Distribution Division (EPE T&D). Name: Title: Dennis H. Malone Manager, System Planning Signature: Dennis H. Malone Company: El Paso Electric Company Date: Short Circuit Analysis for a 14 El Paso Electric Company

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX TRANSMISSION/GENERATION FEASIBILITY STUDY SHORT CIRCUIT ANALYSIS

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX TRANSMISSION/GENERATION FEASIBILITY STUDY SHORT CIRCUIT ANALYSIS XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX TRANSMISSION/GENERATION FEASIBILITY STUDY SHORT CIRCUIT ANALYSIS El Paso Electric Company System Operations Department System Planning Section September 2001 Short Circuit

More information

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX TRANSMISSION AND FACILITIES STUDY. Short Circuit Analysis

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX TRANSMISSION AND FACILITIES STUDY. Short Circuit Analysis XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX TRANSMISSION AND FACILITIES STUDY Short Circuit Analysis System Operations Department System Planning Section March 2001 I. Introduction XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

More information

Short Circuit Analysis with New Generation Proposed by XXXXXXXXXXXXXXXXXXXXXX Pursuant to a Transmission and Facilities Study

Short Circuit Analysis with New Generation Proposed by XXXXXXXXXXXXXXXXXXXXXX Pursuant to a Transmission and Facilities Study Short Circuit Analysis with New Generation Proposed by XXXXXXXXXXXXXXXXXXXXXX Pursuant to a Transmission and Facilities Study Study Performed by El Paso Electric Company System Planning Section - 1 I.

More information

EL PASO ELECTRIC COMPANY SHORT CIRCUIT ANALYSIS FOR XXX S PROPOSED GENERATION INTERCONNECTION

EL PASO ELECTRIC COMPANY SHORT CIRCUIT ANALYSIS FOR XXX S PROPOSED GENERATION INTERCONNECTION EL PASO ELECTRIC COMPANY SHORT CIRCUIT ANALYSIS FOR XXX S PROPOSED GENERATION INTERCONNECTION El Paso Electric Company System Operations Department System Planning Section August 2006 I. INTRODUCTION The

More information

Generation Interconnection Feasibility Study For XXXXXXXXXXXXXXXXXXXXXX MW generator at new Western Refinary Substation

Generation Interconnection Feasibility Study For XXXXXXXXXXXXXXXXXXXXXX MW generator at new Western Refinary Substation Generation Interconnection Feasibility Study For XXXXXXXXXXXXXXXXXXXXXX 131-250 MW generator at new Western Refinary Substation System Planning Section April, 2005 TABLE OF CONTENT 1 EXECUTIVE SUMMARY

More information

EL PASO ELECTRIC COMPANY (EPE) FACILITIES STUDY FOR PROPOSED HVDC TERMINAL INTERCONNECTION AT NEW ARTESIA 345 KV BUS

EL PASO ELECTRIC COMPANY (EPE) FACILITIES STUDY FOR PROPOSED HVDC TERMINAL INTERCONNECTION AT NEW ARTESIA 345 KV BUS EL PASO ELECTRIC COMPANY (EPE) FACILITIES STUDY FOR PROPOSED HVDC TERMINAL INTERCONNECTION AT NEW ARTESIA 345 KV BUS El Paso Electric Company System Operations Department System Planning Section May 2004

More information

XXXXXXXXXXXXXXXX Transmission Interconnection Feasibility Study

XXXXXXXXXXXXXXXX Transmission Interconnection Feasibility Study XXXXXXXXXXXXXXXX Transmission Interconnection Feasibility Study System Operations Department System Planning Section March 2002 Table of Contents: 1.0 EXECUTIVE SUMMARY 4 2.0 COST ESTIMATES 8 2.1 Cost

More information

XXXXXXXXXXXXXXXXXXXXXXXXX TRANSMISSION/GENERATION FEASIBILITY STUDY FATAL FLAW AND FEASIBILITY ANALYSIS

XXXXXXXXXXXXXXXXXXXXXXXXX TRANSMISSION/GENERATION FEASIBILITY STUDY FATAL FLAW AND FEASIBILITY ANALYSIS XXXXXXXXXXXXXXXXXXXXXXXXX TRANSMISSION/GENERATION FEASIBILITY STUDY FATAL FLAW AND FEASIBILITY ANALYSIS System Operations Department System Planning Section June 2001 TABLE OF CONTENTS 1.0 Executive Summary...Page

More information

EL PASO ELECTRIC COMPANY (EPE) GENERATOR INTERCONNECTION SYSTEM IMPACT STUDY FOR PROPOSED XXXXXXXXXXXXXXXXXX GENERATION ON THE AMRAD-ARTESIA 345 KV

EL PASO ELECTRIC COMPANY (EPE) GENERATOR INTERCONNECTION SYSTEM IMPACT STUDY FOR PROPOSED XXXXXXXXXXXXXXXXXX GENERATION ON THE AMRAD-ARTESIA 345 KV EL PASO ELECTRIC COMPANY (EPE) GENERATOR INTERCONNECTION SYSTEM IMPACT STUDY FOR PROPOSED XXXXXXXXXXXXXXXXXX GENERATION ON THE AMRAD-ARTESIA 345 KV LINE El Paso Electric Company System Planning Department

More information

120 MW SOLAR-THERMAL PLANT GENERATOR INTERCONNECTION FEASIBILITY STUDY. May 2008 Prepared by: EL PASO ELECTRIC COMPANY

120 MW SOLAR-THERMAL PLANT GENERATOR INTERCONNECTION FEASIBILITY STUDY. May 2008 Prepared by: EL PASO ELECTRIC COMPANY . 120 MW SOLAR-THERMAL PLANT GENERATOR INTERCONNECTION May 2008 Prepared by: EL PASO ELECTRIC COMPANY Foreword This report was prepared for XXXXXXXXXXXXXXXXXXX by System Planning at El Paso Electric Company.

More information

XXXXXXXXXXXXXXXXXXXXXXXXXXXX TRANSMISSION/GENERATION FEASIBILITY STUDY FATAL FLAW AND FEASIBILITY ANALYSIS

XXXXXXXXXXXXXXXXXXXXXXXXXXXX TRANSMISSION/GENERATION FEASIBILITY STUDY FATAL FLAW AND FEASIBILITY ANALYSIS XXXXXXXXXXXXXXXXXXXXXXXXXXXX TRANSMISSION/GENERATION FEASIBILITY STUDY FATAL FLAW AND FEASIBILITY ANALYSIS El Paso Electric Company System Operations Department System Planning Section September 2001 TABLE

More information

El PASO ELECTRIC COMPANY 2014 BULK ELECTRIC SYSTEM TRANSMISSION ASSESSMENT FOR YEARS

El PASO ELECTRIC COMPANY 2014 BULK ELECTRIC SYSTEM TRANSMISSION ASSESSMENT FOR YEARS El Paso Electric Company El PASO ELECTRIC COMPANY 2014 BULK ELECTRIC SYSTEM TRANSMISSION ASSESSMENT FOR YEARS 2015 2024 A Review on System Performance Following Extreme Bulk Electric System Events of the

More information

XXXXXXXXXXXXXX 99 MW WIND PARK GENERATOR INTERCONNECTION FEASIBILITY STUDY. September 2008 Prepared by: EL PASO ELECTRIC COMPANY

XXXXXXXXXXXXXX 99 MW WIND PARK GENERATOR INTERCONNECTION FEASIBILITY STUDY. September 2008 Prepared by: EL PASO ELECTRIC COMPANY XXXXXXXXXXXXXX 99 MW WIND PARK GENERATOR INTERCONNECTION FEASIBILITY STUDY September 2008 Prepared by: EL PASO ELECTRIC COMPANY Foreword This report was prepared for XXXXXXXXXXXXX (XXX) of XXXXXXXX by

More information

El Paso Electric Company

El Paso Electric Company Feasibility Study XXXXXX Solar Generation Prepared for El Paso Electric Company Prepared by TRC Engineers, LLC 249 Eastern Avenues Augusta, ME 04330 (207) 621-7000 Project Number: 202327 May 2013 FOREWORD

More information

300 MW SOLAR PHOTOVOLTAIC PLANT, GENERATOR INTERCONNECTION FEASIBILITY STUDY

300 MW SOLAR PHOTOVOLTAIC PLANT, GENERATOR INTERCONNECTION FEASIBILITY STUDY 300 MW SOLAR PHOTOVOLTAIC PLANT, GENERATOR INTERCONNECTION FEASIBILITY STUDY El Paso Electric Company System Planning August 2006 TABLE OF CONTENTS 1.0 EXECUTIVE SUMMARY...Page 1 2.0 PURPOSE...Page 7 3.0

More information

ENERGY RESOURCE INTERCONNECTION SERVICE STUDY DRAFT REPORT

ENERGY RESOURCE INTERCONNECTION SERVICE STUDY DRAFT REPORT ENERGY RESOURCE INTERCONNECTION SERVICE STUDY DRAFT REPORT ART320W 320 MW Wind Powered Project Prepared for: El Paso Electric Company Prepared by: TRC Engineers, LLC 249 Western Avenue Augusta, ME 04330

More information

SYSTEM IMPACT STUDY REPORT LA450S GENERATION STUDY. El Paso Electric Company

SYSTEM IMPACT STUDY REPORT LA450S GENERATION STUDY. El Paso Electric Company SYSTEM IMPACT STUDY REPORT LA450S GENERATION STUDY Prepared for: El Paso Electric Company Prepared by: Engineers, LLC 1526 Cole Boulevard Building 3, Suite 150 Lakewood, CO 80401 (303) 395-4018 FOREWORD

More information

SYSTEM IMPACT RESTUDY H252W ERIS REPORT. El Paso Electric Company

SYSTEM IMPACT RESTUDY H252W ERIS REPORT. El Paso Electric Company SYSTEM IMPACT RESTUDY H252W ERIS REPORT Prepared for: El Paso Electric Company Prepared by: Engineers, LLC 1526 Cole Boulevard Building 3, Suite 150 Lakewood, CO 80401 (303) 395-4018 FOREWORD This report

More information

SYSTEM IMPACT STUDY EC300W ERIS FINAL REPORT. El Paso Electric Company

SYSTEM IMPACT STUDY EC300W ERIS FINAL REPORT. El Paso Electric Company SYSTEM IMPACT STUDY EC300W ERIS FINAL REPORT Prepared for: El Paso Electric Company Prepared by: Engineers, LLC 1526 Cole Boulevard Building 3, Suite 150 Lakewood, CO 80401 (303) 395-4018 FOREWORD This

More information

Project #148. Generation Interconnection System Impact Study Report

Project #148. Generation Interconnection System Impact Study Report Project #148 Generation Interconnection System Impact Study Report June 05, 2012 Electric Transmission Planning Table of Contents Table of Contents... 2 Executive Summary... 3 Energy Resource Interconnection

More information

Feasibility Study. Shaw Environmental, Inc. 12MW Landfill Gas Generation Interconnection. J.E.D. Solid Waste Management Facility. Holopaw Substation

Feasibility Study. Shaw Environmental, Inc. 12MW Landfill Gas Generation Interconnection. J.E.D. Solid Waste Management Facility. Holopaw Substation Feasibility Study Shaw Environmental, Inc. 12MW Landfill Gas Generation Interconnection J.E.D. Solid Waste Management Facility Holopaw Substation September 2013 1 of 12 Table of Contents GENERAL... 3 SHORT

More information

Legal Name of the Customer (or, if an individual, individual's name): Name: Contact Person: Mailing Address: Physical Address: City: State: Zip Code:

Legal Name of the Customer (or, if an individual, individual's name): Name: Contact Person: Mailing Address: Physical Address: City: State: Zip Code: Generating Facility Level 2 or 3 Interconnection Review (For Generating Facilities with Electric Nameplate Capacities no Larger than 20 MW) Instructions An Interconnection Customer who requests a Utah

More information

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI Executive Summary Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI-2003-2 Xcel Energy Transmission Planning January 2004 This Interconnection Feasibility

More information

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation Prepared by: Entergy Services, Inc. T & D Planning L-ENT-17A 639 Loyola Avenue New Orleans, LA 70113 Rev Issue Date

More information

Project #94. Generation Interconnection System Impact Study Report Revision

Project #94. Generation Interconnection System Impact Study Report Revision Project #94 Generation Interconnection System Impact Study Report Revision October 2, 2009 Electric Transmission Planning Table of Contents Table of Contents...2 Executive Summary...3 Energy Resource Interconnection

More information

PJM Generator Interconnection R81 Emilie (Fords Mill) MW Impact Study Re-Study

PJM Generator Interconnection R81 Emilie (Fords Mill) MW Impact Study Re-Study PJM Generator Interconnection R81 Emilie (Fords Mill) 100.9 MW Impact Study Re-Study August 2008 DMS # 498781 General Queue R81 Emilie (Fords Mills) is a Fairless Energy, LLC request to obtain an additional

More information

Wheeler Ridge Junction Substation Project Description and Functional Specifications for Competitive Solicitation

Wheeler Ridge Junction Substation Project Description and Functional Specifications for Competitive Solicitation Wheeler Ridge Junction Substation Project Description and Functional Specifications for Competitive Solicitation 1. Description In the 2013-2014 Transmission Planning Cycle, the ISO approved the construction

More information

Interconnection Feasibility Study Report GIP-226-FEAS-R3

Interconnection Feasibility Study Report GIP-226-FEAS-R3 Interconnection Feasibility Study Report GIP-226-FEAS-R3 System Interconnection Request #226 70 MW Wind Generating Facility Kings County (L-6013) 2010 07 21 Control Centre Operations Nova Scotia Power

More information

RULE 21 GENERATING FACILITY INTERCONNECTION APPLICATION SMUD s Distribution System - (SMUD FORM 2655)

RULE 21 GENERATING FACILITY INTERCONNECTION APPLICATION SMUD s Distribution System - (SMUD FORM 2655) - (SMUD FORM 2655) A. Applicability: This Generating Facility Interconnection Application (Application) shall be used to request the interconnection of a Generating Facility to Sacramento Municipal Utility

More information

PJM Generator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study September 2008

PJM Generator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study September 2008 PJM enerator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study 504744 September 2008 PJM Interconnection 2008. All rights reserved R60 Robison Park-Convoy 345kV Impact Study eneral

More information

GENERATING FACILITY INTERCONNECTION APPLICATION. Part 1 Introduction and Overview

GENERATING FACILITY INTERCONNECTION APPLICATION. Part 1 Introduction and Overview Part 1 Introduction and Overview A. Applicability: This Generating Facility Interconnection Application (Application) is used to request the interconnection of a Generating Facility to Southern California

More information

New Mexico Transmission Expansion Concepts For Wind Resources

New Mexico Transmission Expansion Concepts For Wind Resources New Mexico Transmission Expansion Concepts For Wind Resources May 2008 Update Electric Services Transmission Operations FOREWORD This document contains PNM s latest concepts for expanding the transmission

More information

ABB POWER SYSTEMS CONSULTING

ABB POWER SYSTEMS CONSULTING ABB POWER SYSTEMS CONSULTING DOMINION VIRGINIA POWER Offshore Wind Interconnection Study 2011-E7406-1 R1 Summary Report Prepared for: DOMINION VIRGINIA POWER Report No.: 2011-E7406-1 R1 Date: 29 February

More information

NORTH CAROLINA INTERCONNECTION REQUEST APPLICATION FORM. Utility: Duke Energy Progress

NORTH CAROLINA INTERCONNECTION REQUEST APPLICATION FORM. Utility: Duke Energy Progress NORTH CAROLINA INTERCONNECTION REQUEST APPLICATION FORM ATTACHMENT 2 Utility: Duke Energy Progress Designated Utility Contact: Attention: Customer Owned Generation Mail Code ST13A E-Mail Address: Customerownedgeneration@duke-energy.com

More information

CUSTOMER/ TWIN ARROWS PROJECT

CUSTOMER/ TWIN ARROWS PROJECT A subsidiary of Pinnacle West Capital Corporation CUSTOMER/ TWIN ARROWS PROJECT V1 Facility Study Report APS Contract 52149 Prepared by: Arizona Public Service Company Transmission & Distribution Asset

More information

Verde Transmission, LLC. Verde Project. System Impact Study Report

Verde Transmission, LLC. Verde Project. System Impact Study Report Verde Transmission, LLC Verde Project System Impact Study Report March 2017 Prepared by: Public Service Company of New Mexico Foreword This report was prepared for Verde Transmission, LLC by the PNM Transmission/

More information

Feasibility Study Report

Feasibility Study Report Generator Interconnection Request Feasibility Study Report For: Customer --- Service Location: Rutherford County Total Output: 79.2 MW Commercial Operation Date: 9/1/2014 In-Service Date (if given): 9/1/2014

More information

Request for Payment Instructions Wholesale Distribution Access Tariff (WDAT) Attachment I - GIP

Request for Payment Instructions Wholesale Distribution Access Tariff (WDAT) Attachment I - GIP Grid Interconnection & Contract Development Request for Payment Instructions Wholesale Distribution Access Tariff (WDAT) Attachment I - GIP Submittal Instructions Prior to submitting your application and

More information

EE 456 Design Project

EE 456 Design Project F-2014 EE 456 Design Project PROJECT REPORT MALUWELMENG, CONNIE SHARP, MEGAN Table of Contents Introduction... 2 Assignment I... 2 Setup... 2 Simulation... 2 Assignment II... 3 Problems... 3 Solution...

More information

Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 25 kw to 10 MVA or less)

Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 25 kw to 10 MVA or less) Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 25 kw to 10 MVA or less) Interconnection Customer Contact Information Name Alternative Contact Information (if different

More information

THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS

THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS 2/27/2018 ELECTRIC TRANSMISSION PLANNING Table of Contents Table of Contents... 2 Executive

More information

Feasibility Study for the Q MW Solar Project

Feasibility Study for the Q MW Solar Project Feasibility Study for the Q171 74.5 MW Solar Project August 2018 Bulk Transmission Planning, Florida i This document and any attachments hereto ( document ) is made available by Duke Energy Florida, LLC

More information

Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood

Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood Prepared for: SCE&G Fossil/Hydro June 30, 2008 Prepared by: SCE&G Transmission Planning Table of Contents

More information

CIS-IEEE 2017 Conference Renewable Energy Session Renewable Energy s Impact of Power Systems

CIS-IEEE 2017 Conference Renewable Energy Session Renewable Energy s Impact of Power Systems CIS-IEEE 2017 Conference Renewable Energy Session Renewable Energy s Impact of Power Systems Ben Huckaba, P.E. President & Principal Engineer 317-273-9841 benh@alphaeng.us Indiana University Bloomington,

More information

Feasibility Study Report

Feasibility Study Report Report For: Fresh Air Energy II, LLC ( Customer ) Queue #: Service Location: Chester County, SC Total Output Requested By Customer: 74.5 MW Commercial Operation Date Requested By Customer: 1/7/2019 Feasibility

More information

MILLIGAN SOLAR PROJECT

MILLIGAN SOLAR PROJECT February 16, 2009 Page 1 of 18 A subsidiary of Pinnacle West Capital Corporation MILLIGAN SOLAR PROJECT FINAL Feasibility Study Report APS Contract 52115 Prepared by: Arizona Public Service Company Transmission

More information

PSNH INTERCONNECTION REQUEST

PSNH INTERCONNECTION REQUEST PSNH INTERCONNECTION REQUEST Send the completed Interconnection Request and required attachments to: Public Service of New Hampshire Attn: Michael Motta, Senior Engineer Supplemental Energy Sources P.

More information

Final Draft Report. Assessment Summary. Hydro One Networks Inc. Longlac TS: Refurbish 115/44 kv, 25/33/ General Description

Final Draft Report. Assessment Summary. Hydro One Networks Inc. Longlac TS: Refurbish 115/44 kv, 25/33/ General Description Final Draft Report Assessment Summary Hydro One Networks Inc. : Refurbish 115/44 kv, 25/33/42 MVA DESN Station CAA ID Number: 2007-EX360 1.0 General Description Hydro One is proposing to replace the existing

More information

Interconnection Feasibility Study Report GIP-222-FEAS-R3

Interconnection Feasibility Study Report GIP-222-FEAS-R3 Interconnection Feasibility Study Report GIP-222-FEAS-R3 System Interconnection Request #222 48 MW Steam Generating Facility Pictou County (53N) 2010 07 30 Control Centre Operations Nova Scotia Power Inc.

More information

Generator Interconnection System Impact Study For

Generator Interconnection System Impact Study For Generator Interconnection System Impact Study For Prepared for: January 15, 2015 Prepared by: SCE&G Transmission Planning Table of Contents General Discussion... Page 3 I. Generator Interconnection Specifications...

More information

Interconnection System Impact Study Report Request # GI

Interconnection System Impact Study Report Request # GI Executive Summary Interconnection System Impact Study Report Request # GI-2008-23 34 MW Solar Generation Ranch at Hartsel, Colorado Public Service Company of Colorado Transmission Planning August 19, 2010

More information

Generation Interconnection Facilities Study For

Generation Interconnection Facilities Study For Generation Interconnection Facilities Study For Prepared for: Prepared by: SCE&G Transmission Planning May 27, 2015 TABLE OF CONTENTS General Discussion... Page 3 Generator Interconnection Specifications...

More information

SPS Planning Criteria and Study Methodology

SPS Planning Criteria and Study Methodology SPS Planning Criteria and Study Methodology SPS subscribes to the Southwest Power Pool ("SPP") Reliability Criteria, which incorporates compliance with the appropriate North American Electric Reliability

More information

Transmission Improvements Plan for 575 MW Network Service Request Wansley CC 7 Generation Facility (OASIS # ) Georgia Transmission Corporation

Transmission Improvements Plan for 575 MW Network Service Request Wansley CC 7 Generation Facility (OASIS # ) Georgia Transmission Corporation Transmission Improvements Plan for 575 MW Network Service Request CC 7 Generation Facility (OASIS # 143556) Georgia Transmission Corporation November 11, 2010 CC7 TIP 11-11-2010 (2).docx PROBLEM STATEMENT

More information

An Alternative to Reduce Medium-Voltage Transient Recovery Voltage Peaks

An Alternative to Reduce Medium-Voltage Transient Recovery Voltage Peaks An Alternative to Reduce Medium-Voltage Transient Recovery Voltage Peaks D. M. Nobre W. L. A. Neves B. A. de Souza Departamento de Engenharia Elétrica - UFPB Av. Aprígio Veloso, 882 Bodocongó 58.109-970,

More information

TRANSMISSION PLANNING CRITERIA

TRANSMISSION PLANNING CRITERIA CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003-3502 Effective Date: TRANSMISSION PLANNING CRITERIA PURPOSE This specification describes Con Edison s Criteria for assessing

More information

Maryland Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 10 kw to 10 MW or less)

Maryland Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 10 kw to 10 MW or less) Maryland Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 10 kw to 10 MW or less) Interconnection Customer Contact Information Name: Address: Alternative Contact Information

More information

CHAPER 5 POWER FLOW STUDY IN THE INTEGRATED GRID NETWORK

CHAPER 5 POWER FLOW STUDY IN THE INTEGRATED GRID NETWORK 91 CHAPER 5 POWER FLOW STUDY IN THE INTEGRATED GRID NETWORK CHAPTER CONTENTS: 5.1 INTRODUCTION 5.2 CONDUCTION OF VARIOUS POWER FLOW STUDIES ON THE MODEL 5.3 EXPERIMENTS CONDUCTED FOR VARIOUS POWER FLOW

More information

Transmission Planning & Engineering P.O. Box MS 3259 Phoenix, Arizona

Transmission Planning & Engineering P.O. Box MS 3259 Phoenix, Arizona Transmission Planning & Engineering P.O. Box 53933 MS 3259 Phoenix, Arizona 85072-3933 March 9, 2016 Mr. Philip Augustin Chair, WECC Technical Studies Subcommittee Mr. Enoch Davies WECC Technical Staff

More information

PUD ELECTRIC SYSTEM INTERCONNECTION

PUD ELECTRIC SYSTEM INTERCONNECTION APPENDIX A PROCEDURES & REQUIREMENTS for OKANOGAN PUD ELECTRIC SYSTEM INTERCONNECTION Version 4.0 December 2011 Version 4.0 12/28/2011 Page 1 of 15 TABLE OF CONTENTS DEFINITIONS 1.0 Introduction 2.0 Procedures

More information

Shippensburg University

Shippensburg University Shippensburg University 1871 Old Main Drive Shippensburg, PA 17257 SUPPLEMENT 1 Electrical Coordination Study Professional: Entech Engineering, Inc. 4 South Fourth Street P.O. Box 32 Reading, PA 19603

More information

Consulting Agreement Study. Completed for Transmission Customer

Consulting Agreement Study. Completed for Transmission Customer Completed for Transmission Customer Proposed Resource & Transmission Carbon County, MT & 230 kv Transmission in North Wyoming August 2016 Table of Contents 1.0 Description... 1 2.0 Overall Assumptions...

More information

Observations from Avista Short Circuit Analysis WECC Short Circuit Workgroup January 2018 Tracy Rolstad

Observations from Avista Short Circuit Analysis WECC Short Circuit Workgroup January 2018 Tracy Rolstad Observations from Avista Short Circuit Analysis WECC Short Circuit Workgroup January 2018 Tracy Rolstad The Driver (TPL-001, R2.3) With apologies to Protection folks this is all about a Planner s perspective.

More information

Interconnection Feasibility Study Report GIP-157-FEAS-R2

Interconnection Feasibility Study Report GIP-157-FEAS-R2 Interconnection Feasibility Study Report GIP-157-FEAS-R2 System Interconnection Request #157 100.5 MW Wind Generating Facility Guysborough County (L-6515) 2009 09 14 Control Centre Operations Nova Scotia

More information

Q0044 interconnection at

Q0044 interconnection at Generation Interconnection Feasibility Study Report for Q0044 interconnection at Utah County Utah on PacifiCorp s Transmission System (138 kv Transmission System) September 15, 2004 Page 1 1.0 Description

More information

Interconnection Feasibility Study Report GIP-023-FEAS-R1. Generator Interconnection Request # MW Wind Generating Facility Inverness (L6549), NS

Interconnection Feasibility Study Report GIP-023-FEAS-R1. Generator Interconnection Request # MW Wind Generating Facility Inverness (L6549), NS Interconnection Feasibility Study Report GIP-023-FEAS-R1 Generator Interconnection Request # 23 100 MW Wind Generating Facility Inverness (L6549), NS February 16, 2006 Control Centre Operations Nova Scotia

More information

CHAPTER 4 PROTECTION REQUIREMENTS

CHAPTER 4 PROTECTION REQUIREMENTS CHAPTER 4 PROTECTION REQUIREMENTS CHAPTER 4 PROTECTION REQUIREMENTS 4.1 General Means of protection for automatic disconnection against phase and earth faults shall be provided on the customer main switch.

More information

System Impact Study Report

System Impact Study Report Report For: NTE Carolinas II, LLC ( Customer ) Queue #: 42432-01 Service Location: Rockingham County, NC Total Output: 477 MW (summer) / 540 MW (winter) Commercial Operation Date: 12/1/2020 42432-01 SIS

More information

March 2017 to June 2017 Preliminary Interconnection Cluster Window System Impact Study 49.9 MW IA-PNM May 2018

March 2017 to June 2017 Preliminary Interconnection Cluster Window System Impact Study 49.9 MW IA-PNM May 2018 March 2017 to June 2017 Preliminary Interconnection Cluster Window System Impact Study 49.9 MW IA-PNM-2017-11 May 2018 Prepared by: Public Service Company of New Mexico Foreword This report is prepared

More information

Large Load Serving Study Report for La Plata Electric Association, Inc. Alternatives. Addendum. San Juan Major Project

Large Load Serving Study Report for La Plata Electric Association, Inc. Alternatives. Addendum. San Juan Major Project Large Load Serving Study Report for La Plata Electric Association, Inc. Alternatives Addendum San Juan Major Project Tri-State Generation and Transmission Association Power System Planning December, 2008

More information

POWER SYSTEM INCIDENT REPORT: TRIP OF NO 1 AND 2 NEW OSBORNE 66 KV BUSBARS ON 26 SEPTEMBER 2010

POWER SYSTEM INCIDENT REPORT: TRIP OF NO 1 AND 2 NEW OSBORNE 66 KV BUSBARS ON 26 SEPTEMBER 2010 POWER SYSTEM INCIDENT REPORT: TRIP OF NO 1 AND 2 NEW OSBORNE 66 KV BUSBARS ON 26 SEPTEMBER 2010 PREPARED BY: Electricity System Operations Planning and Performance FINAL Disclaimer (a) Purpose - This report

More information

Feasibility Study. Customer Kingman Area Photovoltaic Generation Project Interconnection

Feasibility Study. Customer Kingman Area Photovoltaic Generation Project Interconnection Feasibility Study Customer Kingman Area Photovoltaic Generation Project Interconnection October, 2009 October 2009 i EXECUTIVE SUMMARY CONCLUSION Customer has requested network resource interconnection

More information

Interconnection System Impact Study Final Report February 19, 2018

Interconnection System Impact Study Final Report February 19, 2018 Interconnection System Impact Study Final Report February 19, 2018 Generator Interconnection Request No. TI-17-0225 248.4 MW (Alternate Project Output of 217.35 MW) Wind Energy Generating Facility In Goshen

More information

Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 10 kva to 10 MVA or less)

Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 10 kva to 10 MVA or less) Section 466.APPENIX C Levels 2 to 4 Application Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 10 kva to 10 MVA or less) Interconnection Customer Contact Information

More information

TOLTEC POWER PARTNERSHIP TOLTEC POWER PROJECT INTERCONNECTION STUDY SYSTEM IMPACT STUDY

TOLTEC POWER PARTNERSHIP TOLTEC POWER PROJECT INTERCONNECTION STUDY SYSTEM IMPACT STUDY TOLTEC POWER PARTNERSHIP TOLTEC POWER PROJECT INTERCONNECTION STUDY SYSTEM IMPACT STUDY January 7, 2002 Prepared by Jorge Chacon (Consultant) Tucson Electric Power Company Ed Beck ii EXECUTIVE SUMMARY

More information

Solar Photovoltaic Inverter Current Distribution during Fault on Distribution and Transmission System

Solar Photovoltaic Inverter Current Distribution during Fault on Distribution and Transmission System Solar Photovoltaic Inverter Current Distribution during Fault on Distribution and Transmission System Rishabh Pandey, Uttam Singh, Varun Sachdeva, Jaikaran Singh Department of Electronic and Communication

More information

Interconnection Feasibility Study Report GIP-084-FEAS-R2

Interconnection Feasibility Study Report GIP-084-FEAS-R2 Interconnection Feasibility Study Report GIP-084-FEAS-R2 System Interconnection Request #84 50 MW Wind Generating Facility Pictou County (L-7004) August 17, 2007 Control Centre Operations Nova Scotia Power

More information

AMERICAN ELECTRIC POWER 2017 FILING FERC FORM 715 ANNUAL TRANSMISSION PLANNING AND EVALUATION REPORT PART 4 TRANSMISSION PLANNING RELIABILITY CRITERIA

AMERICAN ELECTRIC POWER 2017 FILING FERC FORM 715 ANNUAL TRANSMISSION PLANNING AND EVALUATION REPORT PART 4 TRANSMISSION PLANNING RELIABILITY CRITERIA AMERICAN ELECTRIC POWER 2017 FILING FERC FORM 715 ANNUAL TRANSMISSION PLANNING AND EVALUATION REPORT PART 4 TRANSMISSION PLANNING RELIABILITY CRITERIA AEP Texas (comprised of its Central and North Divisions

More information

APPENDIX E: Project Need and Description

APPENDIX E: Project Need and Description APPENDIX E: Project Need and California ISO/MID E-1 Intentionally left blank California ISO/MID E-2 Lakeville 115 kv Bus Upgrade Installation of a sectionalizing breaker to be installed on 115 kv bus section

More information

APPENDIX E: Project Need and Description

APPENDIX E: Project Need and Description APPENDIX E: Project Need and California ISO/MID E-1 Intentionally left blank California ISO/MID E-2 Tyler 60 kv Shunt Capacitor Installation of a 2x10 MVAR capacitor bank at Tyler 60 kv bus Objectives

More information

Electrical Handbook Fault Calculations Using The Mva Method

Electrical Handbook Fault Calculations Using The Mva Method Electrical Handbook Fault Calculations Using The Mva Method In the power systems analysis field of electrical engineering, a per-unit system is the Calculations are simplified because quantities expressed

More information

Request for Payment Instructions Rule 21 Export Submittal Instructions

Request for Payment Instructions Rule 21 Export Submittal Instructions Grid Interconnection & Contract Development Request for Payment Instructions Rule 21 Export Submittal Instructions Prior to submitting your application and fee or deposit, please complete and submit this

More information

Feasibility Study for the Q MW Solar Project

Feasibility Study for the Q MW Solar Project Feasibility Study for the Q174 74.5 MW Solar Project August 2018 Bulk Transmission Planning, Florida i This document and any attachments hereto ( document ) is made available by Duke Energy Florida, LLC

More information

Feasibility Study Report

Feasibility Study Report Report For: Orion Renewable Resources LLC ( Customer ) Queue #: Service Location: Rockingham County, NC Total Output Requested By Customer: 100 MW Commercial Operation Date Requested By Customer: 11/1/2019

More information

100 MW Wind Generation Project

100 MW Wind Generation Project A subsidiary of Pinnacle West Capital Corporation 100 MW Wind Generation Project CUSTOMER FINAL Feasibility Study Results By Transmission Planning, APS December 21, 2007 Executive Summary This Feasibility

More information

Generating unit functional document submission form

Generating unit functional document submission form Generating unit functional document submission form The below form must be completed and returned to generator.reports@aeso.ca. Supporting information to assist generating unit owners to complete this

More information

Georgia Transmission Corporation Georgia Systems Operations Corporation

Georgia Transmission Corporation Georgia Systems Operations Corporation Georgia Transmission Corporation Georgia Systems Operations Corporation Reactive Power Requirements for Generating Facilities Interconnecting to the Georgia Integrated Transmission System with Georgia

More information

Maryland Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 10 kw to 10 MW or less)

Maryland Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 10 kw to 10 MW or less) Maryland Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 10 kw to 10 MW or less) Interconnection Customer Contact Information Name: Address: City: Telephone (aytime):

More information

Analysis of Power System Impacts and Frequency Response Performance: February 1-4, 2011 Texas and Southwestern U.S. Cold Snap

Analysis of Power System Impacts and Frequency Response Performance: February 1-4, 2011 Texas and Southwestern U.S. Cold Snap Analysis of Power System Impacts and Frequency Response Performance: February 1-4, 2011 Texas and Southwestern U.S. Cold Snap September, 2011 1 NERC s Mission NERC s Mission The North American Electric

More information

STATE OF MINNESOTA OFFICE OF ADMINISTRATIVE HEARINGS FOR THE PUBLIC UTILITIES COMMISSION PUC DOCKET NO. E002/TL OAH DOCKET NO.

STATE OF MINNESOTA OFFICE OF ADMINISTRATIVE HEARINGS FOR THE PUBLIC UTILITIES COMMISSION PUC DOCKET NO. E002/TL OAH DOCKET NO. STATE OF MINNESOTA Direct Testimony and Schedule OFFICE OF ADMINISTRATIVE HEARINGS FOR THE PUBLIC UTILITIES COMMISSION Amanda King IN THE MATTER OF THE ROUTE PERMIT APPLICATION FOR THE CAPX00 HAMPTON ROCHESTER

More information

EL PASO ELECTRIC COMPANY SYSTEM EXPANSION PLAN

EL PASO ELECTRIC COMPANY SYSTEM EXPANSION PLAN EL PASO ELECTRIC COMPANY SYSTEM EXPANSION PLAN 2019-2028 Produced by System Planning 2018 GENERAL EL PASO ELECTRIC COMPANY 2019-2028 SYSTEM EXPANSION PLAN Executive Summary El Paso Electric Company s

More information

Texas A&M Microgrid and Electrical System Study. Cushing Memorial Library & Archives

Texas A&M Microgrid and Electrical System Study. Cushing Memorial Library & Archives Texas A&M Microgrid and Electrical System Study Cushing Memorial Library & Archives Introduction of Texas A&M Microgrid Study Purpose Why are we studying the TAMU electrical system? Process How do we want

More information

Manitoba Hydro Generation Interconnection Exploratory Study Notice September 28, 2006

Manitoba Hydro Generation Interconnection Exploratory Study Notice September 28, 2006 Manitoba Hydro Generation Interconnection Exploratory Study Notice September 28, 2006 As per the Manitoba Hydro Open Access Interconnection Tariff, the Transmission Owner has contracted TransGrid Solutions

More information

The Effect Of Distributed Generation On Voltage Profile and Electrical Power Losses Muhammad Waqas 1, Zmarrak Wali Khan 2

The Effect Of Distributed Generation On Voltage Profile and Electrical Power Losses Muhammad Waqas 1, Zmarrak Wali Khan 2 International Journal of Engineering Works Kambohwell Publisher Enterprises Vol., Issue 1, PP. 99-103, Dec. 015 www.kwpublisher.com The Effect Of Distributed Generation On Voltage Profile and Electrical

More information

Performance Analysis of Transient Stability on a Power System Network

Performance Analysis of Transient Stability on a Power System Network Performance Analysis of Transient Stability on a Power System Network Ramesh B Epili 1, Dr.K.Vadirajacharya 2 Department of Electrical Engineering Dr. Babasaheb Ambedkar Technological University, Lonere

More information

FIRSTENERGY S PROPOSED SOLUTION AND REQUEST FOR CONSTRUCTION DESIGNATION

FIRSTENERGY S PROPOSED SOLUTION AND REQUEST FOR CONSTRUCTION DESIGNATION PJM RTEP - Artificial Island Area FIRSTENERGY S PROPOSED SOLUTION AND REQUEST FOR CONSTRUCTION DESIGNATION Part 1 Report REDACTED VERSION FirstEnergy Corp. Energy Delivery, Transmission Planning and Protection

More information

Cost Benefit Analysis of Faster Transmission System Protection Systems

Cost Benefit Analysis of Faster Transmission System Protection Systems Cost Benefit Analysis of Faster Transmission System Protection Systems Presented at the 71st Annual Conference for Protective Engineers Brian Ehsani, Black & Veatch Jason Hulme, Black & Veatch Abstract

More information

Interconnection Feasibility Study Report GIP-369-FEAS-R1

Interconnection Feasibility Study Report GIP-369-FEAS-R1 Interconnection Feasibility Study Report GIP-369-FEAS-R1 System Interconnection Request #369 50 MW Wind Generating Facility Cumberland County (L-6513) 2012-02-09 Control Centre Operations Nova Scotia Power

More information

Market Congestion Planning Study (South)- Robustness Analysis. Economic Planning Users Group Meeting August 11 th, 2017

Market Congestion Planning Study (South)- Robustness Analysis. Economic Planning Users Group Meeting August 11 th, 2017 Market Congestion Planning Study (South)- Robustness Analysis Economic Planning Users Group Meeting August 11 th, 2017 Key Takeaways The benefit calculations were updated due to a flowgate rating correction

More information

COMPARISON OF DIFFERENT SOFTWARE PACKAGES IN POWER FLOW AND SHORT-CIRCUIT SIMULATION STUDIES. A Project

COMPARISON OF DIFFERENT SOFTWARE PACKAGES IN POWER FLOW AND SHORT-CIRCUIT SIMULATION STUDIES. A Project COMPARISON OF DIFFERENT SOFTWARE PACKAGES IN POWER FLOW AND SHORT-CIRCUIT SIMULATION STUDIES A Project Presented to the faculty of the Department of Electrical and Electronic Engineering California State

More information