Texas Eastern Transmission, LP

Size: px
Start display at page:

Download "Texas Eastern Transmission, LP"

Transcription

1 Texas Eastern Transmission, LP Planned Service Outage Postings from 08/01/2015 to 08/31/2015 Page 1 of 84

2 TSP: TSP Name: Texas Eastern Transmission, LP Critical Desc: Not a critical notice Notice Eff Date/Time: 08/03/ :59:00 AM Notice End Date/Time: 11/01/ :59:00 AM Notice ID: Notice Stat Desc: Supersede Notice Type: Maintenance Post Date/Time: 08/03/ :59:00 AM Prior Notice: Reqrd Rsp Desc: No response required Rsp Date/Time: Subject: TE 2015 Maintenance Schedule -- Revised Notice Text: The text below is included in the attached Word document located at the bottom of this posting. Listed below is a partial schedule for major outages that will affect capacity or that impact major receipt/delivery areas on the Texas Eastern Transmission (TE) system for the 2015 outage season. This schedule is not a complete list of all outages that will occur during the 2015 outage season. Due to unforeseen delays or scheduling conflicts, the dates below are subject to change. As TE continues to plan for the 2015 outage season, updates to the list below will be posted at the earliest known date. Access Area Longview to Kosciusko: Blessing to PEMEX Mexico EOL Line 16 (STX): Cleaning Tool Dates: See specific schedules below In-Line Tool Dates: See specific schedules below Potential Repair Dates: See specific schedules below Potential Run Comparison Repair Dates: See specific schedules below Project, TE will be conducting in-line inspection tool runs on Line 16 between Blessing and PEMEX Mexico EOL. TE will coordinate system receipts and deliveries with point operators to minimize operational impacts, however, during the cleaning and in-line tools, meters listed below will be required to flow/shut in as follows: Blessing to Tivoli: Cleaning Tool Dates: Fall 2015 In-Line Tool Dates: December 10 Potential Repair Dates: March 2016 Potential Run Comparison Repair Dates: March 2016 The following meters may be unavailable for flow: ENTERPRISE TEXAS PIPELINE LLC - HIDALGO COUNTY, TX T2 GAS UTILITY LLC/REFUGIO INTERCONNECT Tivoli to Petronilla: Cleaning Tool Dates: Fall 2015 In-Line Tool Dates: Complete Potential Repair Dates: Approximately March 24 - mid September Page 2 of 84

3 Potential Run Comparison Repair Dates: May 15 - mid September The following meters will be unavailable for flow during the cleaning and in-line tool runs: ONYX PIPELINE/NUECES BAY ONYX PIPELINE/BARNEY DAVIS The following meters will be unavailable for flow until the cleaning and in-line tools passes the meter: SOUTH SHORE P/L (NE&T), NUECES CO., TX CROSSTEX ENERGY (FROM TE) UPRIVER RD., NUECES CO T2 GAS UTILITY LLC/REFUGIO INTERCONNECT The following meters will be required to flow for the duration of the cleaning and in-line tool runs: MAGIC VALLEY P/L-CALPINE PWR. PROJECT (DEL)/HIDALGO DEFS, LP - EDINBURG POWER PLANT - HIDALGO CO., TX PEMEX - REYNOSA, MX (D 70333/R 76333) Petronilla to Santa Fe: Cleaning Tool Dates: Fall 2015 In-Line Tool Dates: December 9 Potential Repair Dates: March 2016 Potential Run Comparison: March 2016 The following meters will be unavailable for flow during the cleaning and in-line tool runs: ONYX PIPELINE/NUECES BAY ONYX PIPELINE/BARNEY DAVIS The following meters will be required to flow for the duration of the cleaning and in-line tool runs: MAGIC VALLEY P/L-CALPINE PWR. PROJECT (DEL)/HIDALGO DEFS, LP - EDINBURG POWER PLANT - HIDALGO CO., TX PEMEX - REYNOSA, MX (D 70333/R 76333) Santa Fe to PEMEX Mexico (EOL): Cleaning Tool Dates: Complete In-Line Tool Dates: Complete Potential Repair Dates: Complete Potential Run Comparison Repair Dates: Complete The following meters will be unavailable for flow during the cleaning and in-line tool runs: ONYX PIPELINE/NUECES BAY ONYX PIPELINE/BARNEY DAVIS MAGIC VALLEY P/L-CALPINE PWR. PROJECT (DEL)/HIDALGO DEFSDEFS, LP - EDINBURG POWER PLANT - HIDALGO CO., TX The following meter will be required to flow for the duration of the cleaning and in-line tool runs: PEMEX - REYNOSA, MX (D 70333/R 76333) As a result of these in-line inspections, certain locations could require further detailed investigations, which may require TE to isolate Line 16 between Blessing and PEMEX Mexico EOL. If an isolation of Line 16 is required, shippers sourcing gas for delivery points located between Blessing and PEMEX EOL will be required to source their supply from receipt points between Blessing and PEMEX EOL. Additionally, any gas sourced between Blessing and PEMEX EOL for delivery outside of this area may be restricted. Depending on the level of nominated quantities, if further investigations are required, restrictions are possible for interruptible, secondary firm services and primary firm services. Page 3 of 84

4 Should any of these investigations lead to a reduction of capacity, TE will post on the bulletin board as soon as it is known. TE estimates that the investigations will begin on April 9 continuing through May 29. West Monroe to Providence Line 26 (ELA): July 15 - August 21 Program, TE will be conducting further investigations on Line 26 (a single line system) between West Monroe and Providence Stations. During these investigations the following meters may experience lower than normal pressures or be unavailable for flow: GULF SOUTH PIPELINE COMPANY, LP - WEST MONROE, LA (RECEIPT GULF SOUTH PIPELINE COMPANY, LP - DARNELL, LA (DELIVERY) RELIANT ENERGY GAS TRANSMISSION - WEST MONROE, LA TRANSOK - OUACHITA PSH., LA Hempstead to Huntsville Line 11 (ETX) - Pipeline Maintenance: Cleaning Tool Date: Complete In-Line Tool Dates: Complete Potential Repair Dates: Complete Potential Run Comparison Repair Dates: VS3: August 10-16, VS6: October 3-10 Project, TE will be conducting in-line inspection tool runs on Line 11 between Provident City and Hempstead stations. During the cleaning and in-line inspection tool runs, the following meters may experience lower than normal pressures or be unavailable for flow: ENTERGY - LEWIS CREEK / MONTGOMERY COUNTY, TX Additionally, if further detailed investigations are required, the meters listed below could experience lower than normal pressure or be unavailable for flow during the potential repair dates: 72964ELLIOT OIL & GAS, BROWDER #C-1, SAN JACINTO CO., TX (REC) 73175MME DESOTO PIPELINE, L.P. - PRAIRIE VIEW, TX - REC 73249ENTERGY - LEWIS CREEK / MONTGOMERY COUNTY, TX 73364BRAMMER-BROWDER GATHERING-SAN JACINTO CO., TX (REC) 73388MONTGOMERY GAS TRANSMISSION, INC. - MONTGOMERY CO., TX (DEL 73391FAMCOR OIL - GOLDEN MINER #1 / SAN JACINTO CO., TX (REC) 73461UNIVERSAL NATURAL GAS/INTERCONNECT - MONTGOMERY CO., TX (DE 73477PRIME OPERATING COMPANY - MONEY WORT #1 - WALKER CO., TX (R 73669SK&CO./MASSEY FERGUSON GATHERING, SAN JACINTO CO., TX 75475MME DESOTO PIPELINE, LP - (D70475/R76475) 75778LONE STAR GAS - WALLER, TX-(D72778/R76778) 75858KCS TX INTRASTATE GAS PIPELINE (D72858/R76858) Page 4 of 84

5 Hempstead to Huntsville Line 11 (ETX) - Pipeline Maintenance: August To comply with the applicable regulatory requirements associated with TE ongoing DOT Pipeline Integrity Program, TE will be conducting further detailed investigations on Line 11 VS3 (a single line system) between Hempstead and Huntsville stations. As a result of these investigations, the following meter will be unavailable for flow: MONTGOMERY GAS TRANSMISSION, INC. - MONTGOMERY CO., TX (DEL TE / SESH Interconnect (Dentville): August TE has been informed by Southeast Supply Header, LLC ("SESH") of the following outage below which will impact receipts and deliveries to/from SESH at the TE / SESH pipeline interconnect MR Southeast Supply Header, LLC (SESH) will be performing construction at the SESH interconnection with Texas Eastern Transmission, LP (Texas Eastern) associated with the expansion approved in FERC Docket No. CP In accordance with the provisions of its FERC Gas Tariff, SESH notifies its shippers that these construction activities will result in a service outage on the SESH system as described below. During a 4 day period beginning on Gas Day August 18, 2015 at 9:00 am and continuing until August 22, 2015 at 9:00 am, service at the Texas Eastern interconnection (MR 83005) will be unavailable for either receipt or delivery point activity. This outage will not result in any service impacts to the pipeline capacity on the SESH system and all other receipt and delivery points will be available for service. Providence to Yazoo Line 26 (ELA) - Pipeline Maintenance: In-Line Tool Dates: Complete Potential Repair Dates: August Potential Run Comparison Repair Dates: September Project, TE will be conducting in-line inspection tool runs on Line 26 between Providence and Yazoo stations. During the in-line inspection tool run, the following meters may experience lower than normal pressures or be unavailable for flow: GULF SOUTH PIPELINE COMPANY, LP - WEST MONROE, LA (RECEIPT GULF SOUTH PIPELINE COMPANY, LP - DARNELL, LA (DELIVERY) RELIANT ENERGY GAS TRANSMISSION - WEST MONROE, LA TRANSOK - OUACHITA PSH., LA FEDERAL BUREAU OF PRISON - YAZOO CO. MS Additionally, if further detailed investigations are required, the meters listed above could experience lower than normal pressure or be unavailable for flow during the potential repair dates. Yazoo to Kosciusko Line 26 (ELA) - Pipeline Maintenance: September TE will be conducting pipeline maintenance on Line 26 between Yazoo and Kosciusko stations. During this maintenance the following meters will be unavailable for flow: Page 5 of 84

6 GULF SOUTH PIPELINE COMPANY, LP - WEST MONROE, LA (RECEIPT GULF SOUTH PIPELINE COMPANY, LP - DARNELL, LA (DELIVERY) RELIANT ENERGY GAS TRANSMISSION - WEST MONROE, LA TRANSOK - OUACHITA PSH., LA MISSISSIPPI CHEMICAL - YAZOO CITY, MS Blessing to Angleton Line 16 - Pipeline Maintenance: Cleaning Tool Dates: Complete ILI In-Line Tool Dates: Complete Potential Repair Dates: September 20 - October 7 Potential Run Comparison Dates: October Project, TE will be conducting cleaning and in-line inspection tool runs on Line 16 between Blessing and Angleton stations. During the cleaning tool runs, the following meters will be unavailable until the pig passes the meters: SWEENY PLANT-CONOCO PIPELINE TRES PALACIOS GAS STORAGE - INJ/DEL During the ILI in-line tool runs, the following meters will be unavailable for the duration of the tool run: SWEENY PLANT-CONOCO PIPELINE TRES PALACIOS GAS STORAGE - INJ/DEL Additionally, the following meters could experience lower than normal pressure during all cleaning and ILI tool runs: WILMAR PIPELINE, INC. - #1 DUNCAN SLOUGH, MATAGORDA CO., T ENTERPRISE TEXAS PIPELINE LLC - MATAGORDA COUNTY, TX (REC) DEEP ROCK RESOURCES - FLOWERS / MATAGORDA CO., TX - RUN UNION PETROLEUM, LTD (LINE 16LL) - BRAZORIA CO., TX SANTOSUSA CORP CHESAPEAKE OPERATING INC-ANKENMEN GATHERING, BRAZORIA CO., BUCKEYE RANCH GATHERING - MATAGORDA CO., TX ASPECT ENERGY - BINTLIFF GATHERING - BRAZORIA CO., TX WALTER OIL & GAS-KASMAN GATHERING - MATAGORDA CO., TX DAVIS SOUTHERN/BINTLIFF #1 Additionally, if further detailed investigations are required, all meters listed above could experience lower than normal pressure or be unavailable for flow during the potential repair dates. Hempstead to Huntsville Line 11 (ETX) - Pipeline Maintenance: October 3-10 Page 6 of 84

7 To comply with the applicable regulatory requirements associated with TE ongoing DOT Pipeline Integrity Program, TE will be conducting further detailed investigations on Line 11 VS6 (a single line system) between Hempstead and Huntsville stations. As a result of these investigations, the following meters will be unavailable for flow: ELLIOT OIL & GAS, BROWDER #C-1, SAN JACINTO CO., TX (REC) ENTERGY - LEWIS CREEK / MONTGOMERY COUNTY, TX BRAMMER-BROWDER GATHERING-SAN JACINTO CO., TX (REC) FAMCOR OIL - GOLDEN MINER #1 / SAN JACINTO CO., TX (REC) PRIME OPERATING COMPANY - MONEY WORT #1-WALKER CO., TX R SK&CO./MASSEY FERGUSON GATHERING, SAN JACINTO CO., TX KCS TX INTRASTATE GAS PIPELINE (D72858/R76858) Castor to EOL Line 11 - Pipeline Maintenance: October TE will be conducting pipeline maintenance on Line 11 between Castor and the end of the line. During this maintenance the following meters will be unavailable for flow: TEXAS GAS TRANSMISSION - LISBON, LA (DELIVERY) PANENERGY FIELD SERVICES - LINCOLN PARISH, LA KOCH GATEWAY - CASTOR, LA-(D70078/R76078) Additionally, the follow following meters may experience lower than normal pressures: SMITH (HARVEY BROYLE)#2 MURPHY-BRYCELAND, BIENVILLE PSH., L NGC ENERGY RESOURCES - SLIGO GAS PLANT, LA (RECEIPT) JEEMS BAYOU - #1 CALHOUN / DESOTO PSH., LA SMITH OPER. (HARVEY BROYLE M.P. 0.00) - BIENVILLE PSH. LA COMSTOCK RESOURCES - #1 DESOTO - DESOTO PSH., LA WILLAMETTE INDUSTRIES - BIENVILLE PARISH, LA PETROCHEM OPERATING / LOTT #1 - BOSSIER PARISH, LA (REC) ENTERPRISE GATHERING LLC/BETHANY-DESOTO PARISH, LA-RUN ENERGY TRANSFER/TIGER PIPELINE BIENVILLE, LA GULF STATES PIPELINE - BIENVILLE PA. LA-(D72688/R7 Based on current nomination levels TE doesn't anticipate any restrictions at this time. Angleton to Mont. Belvieu Line 16 - Pipeline Maintenance: Cleaning Tool Date: Complete Gauge Tool Date: Complete In-Line Tool Date: Complete Potential Repair Dates: October 29 - November 4 Project, TE will be conducting in-line inspection tool runs on Line 16 between Angleton and Mont. Belvieu stations. During the cleaning and in-line inspection tool runs, the following meters may experience lower Page 7 of 84

8 than normal pressures or be unavailable for flow: LOUIS DREYFUS HOUSTON PIPE LINE CO.-ENERFIN LYONDELL SYS./ HARRIS CO., TX MONUMENT PIPELINE, LP - HARRIS COUNTY, TX DENBURY ONSHORE, LLC NET LP - MONUMENT PIPELINE - HARRIS COUNTY, TX NRG - CEDAR BAYOU ENTERPRISE PRODUCTS/WALLACE JUNCTION TEJAS GAS/CLEAR LK. STOR CALPINE BAYER PWR. PLANT ACCT. PT. Additionally, if further detailed investigations are required, the meters listed above could experience lower than normal pressure or be unavailable for flow during the potential repair dates. 24" System Longview to Berne: ***Gas City to Lebanon Line 69 - Pipeline Maintenance: July 21 - August 8 TE will be conducting pipeline maintenance on Line 69 between Gas City and Lebanon compressor stations. During this work, the following meters will be unavailable for flow: DAYTON PWR & LT - RED LION, OH COL. GAS (I-O) & LEBANON, OH Norris City to French Lick Line 1: July 27 - August 5 A DOT hydro test will block Line 1 VS3, a single line system, between Norris City and French Lick stations. During this outage the following meter will be unavailable for flow: HUNTINGBURG, IN Additionally, based on current nominations, TE doesn't anticipate any additional restrictions associated with this outage. Norris City to Oakland City Line 72 (Vermilion Lateral) - Pipeline Maintenance Cleaning Tool Dates: Deferred to 2016 In-Line Tool Date: Deferred to 2016 Potential Repair Dates: Deferred to 2016 Project, TE will be conducting in-line inspection tool runs on Norris City to Oakland City Line 72. During the tool run and depending on the results of the ILI Tool runs and if further detailed investigations are required, the following meter may experience lower than normal pressures or be unavailable for flow: DUKE ENERGY VERMILLION II, LLC Page 8 of 84

9 30 Inch System and Market Area: Holbrook to Uniontown Line 2 - Pipeline Maintenance: July 13 - August 4 TE will be conducting pipeline maintenance on Line 2 between Holbrook and Uniontown compressor stations. During this work, the following meter will be unavailable for flow: COLUMBIA GAS - WAYNESBURG, PA Wheelersburg Compressor Station: July 20 - Aug 22 TE will be conducting compressor station maintenance at its Wheelersburg Compressor Station. During this outage TE anticipates that point operators on the 30 inch line south of Wheelersburg may see lower than normal operating pressures. Additionally, during the timeframes detailed below, north to south capacity through stations on the 30 inch line will be reduced as follows: July 27 - August 19 Posted:Reduced to approximately: Berne 30" South1,218,000 Dth /d1,118,000 Dth /d Wheelersburg South 957,000 Dth /d 857,000 Dth /d Tompkinsville South 734,000 Dth /d 634,000 Dth /d Barton South 606,000 Dth /d 506,000 Dth /d Based on historical north to south nominations TE anticipates restrictions for interruptible and secondary firm nominations flowing north to south through Berne, Wheelersburg, Tompkinsville and Barton. TE will coordinate system receipts and deliveries with point operators to minimize Delmont to Lilly Line 12 - Pipeline Maintenance ILI Tool Runs: Complete Potential Repair Dates: August 6-31 Project, TE will be conducting in-line inspection tool runs on Delmont to Lilly Line 12. Depending on the results of the ILI Tool runs and if further detailed investigations are required, the following meter may experience lower than normal pressures or be unavailable for flow: XTO ENERGY INC. - EAST WHEATFIELD INTERCONNECT - CAMBRIA CO Heidlersburg to Marietta 36" Line 1-AF - Pipeline Maintenance Caliper & ILI Tool Runs: Complete Page 9 of 84

10 Potential Repair Dates: August Project, TE will be conducting in-line inspection tool runs on the Heidlersburg to Marietta 36" Line 1-AF. During the tool run and depending on the results of the ILI Tool runs and if further detailed investigations are required, the following meter may experience lower than normal pressures or be unavailable for flow: WILLIAMS-TRANSCO, LOWER CHANCEFORD-YORK CO., PA COLUMBIA-MARIETTA, LANCASTER CO., PA Kosciusko Compressor Station: August TE will be conducting compressor station maintenance at its Kosciusko Compressor Station. Based on current north to south nomination levels through Kosciusko, no restrictions are anticipated; however if restrictions are necessary, restrictions to interruptible and secondary firm nominations flowing north to south through Berne, Wheelersburg, Tompkinsville and Barton are possible. TE will coordinate system receipts and deliveries with point operators to minimize Lilly to Entriken Line 12 - Pipeline Maintenance ILI Tool Runs: Complete Potential Repair Dates: September 2-30 Project, TE will be conducting in-line inspection tool runs on Lilly to Entriken Line 12. Depending on the results of the ILI Tool runs and if further detailed investigations are required, the following meters may experience lower than normal pressures or be unavailable for flow: PEOPLES NAT - CLAYSBURG, PA UGI CENTRAL - VALLEY GAS - MARTINSBURG, PA UGI CENTRAL - HUNTINGDON GAS - MAPLETON, PA UGI CENTRAL - HUNTINGDON GAS - HUNTINGDON, PA UGI CENTRAL - LEWISTOWN - JUNIATA CO., PA Marietta Compressor Station Maintenance: September 9-30 TE will be conducting compressor station maintenance at its Marietta Compressor Station. During this maintenance, capacity through Marietta will be reduced from a seasonal capacity of 1,848,000 Dth /d to approximately 1,335,000 Dth /d for nominations delivering to locations between Marietta and up to Lambertville on TE's 36 inch line. Based on historical nominations through Marietta, TE anticipates restrictions for interruptible, secondary firm and potentially primary firm services. Page 10 of 84

11 Holbrook to Uniontown Lines 10 and 30 - Pipeline Maintenance: September TE will be conducting pipeline maintenance on Lines 10 and 30 between Holbrook and Uniontown compressor stations. During this work, the following meter will be unavailable for flow: ACCESS MIDSTREAM / WIND RIDGE-MCNAY RIDGE ROAD - GREENE CO. Holbrook to Uniontown Line 25 - Pipeline Maintenance: September 23 - October 18 TE will be conducting pipeline maintenance on Line 25 between Holbrook and Uniontown compressor stations. During this work, the following meter will be unavailable for flow: DTI - CRAYNE LL, RT 188, GREENE CO., PA. Athens to Berne - Pipeline Maintenance: TBD TE will be conducting pipeline maintenance between Athens and Berne stations. During this work, the following meter will be unavailable for flow: DUKE ENERGY WASHINGTON II, LLC Mt. Pleasant to Gladeville Line 25 VS5- DOT Pipe Replacement: 2016 TE will be conducting a DOT pipe replacement between Mt. Pleasant and Gladeville stations on Line 25 VS5. During this work, the following meter will be unavailable for flow: PIEDMONT NATURAL GAS - RUTHERFORD Texas Eastern DOT Pipeline Integrity Project TE will be conducting, as part of its ongoing DOT Pipeline Integrity Project, in-line inspection tool runs at various locations throughout the Texas Eastern pipeline system. As a result of these in-line inspections, certain locations could be identified for an investigation which could lead to possible reduction of capacity. Should any of these investigations lead to a reduction of capacity, TE will post on the bulletin board as soon as it is known. Listed below are the pipeline segments scheduled for inspection this year. Each segment will have a caliper tool run, and an ILI tool run. Also listed below are the dates of a possible investigation as a result of the in-line inspection. CaliperILIPossible Run Comp Segment Access AreaDateDateRepl DtPoss Repl Dt Blessing to Tivoli (Line 16)* ---12/10/1503/01/1603/01/16 Tivoli to Petronilla (Line 16)* ---Complete04/15/1505/15/15 Petronilla to Santa Fe (Line 16)* ---12/09/1503/01/1603/01/16 Santa Fe to PEMEX EOL (Line 16)* ---CompleteCompleteComplete Hempstead to Huntsville (Line 11)* ---CompleteAug & OctAug & Oct Opelousas to St. Francisville (Line 14) ---CompleteCompleteAugust St. Francisville to Union Church (Line 18) Union Church to Clinton (Line 14) ---CompleteNovemberNovember Page 11 of 84

12 Atlanta to Hope (Line 1) ---08/27/1510/04/1510/27/15 Providence to Yazoo City (Line 26)* ---Complete08/18/1509/09/15 Blessing to Angleton (Line 16)* ---Complete09/20/1510/15/15 Angleton to Mont Belvieu (Line 16)* CompleteComplete10/29/ CaliperILIPossible Run Comp Segment M1/M2 AreaDateDateRepl DtPoss Repl Dt Norris City to Oakland City (Line 72)* Owingsville to Wheelersburg (Line 15) ---Complete08/03/ Wheelersburg to Athens (Line 15) ---Complete09/01/ Holbrook to Uniontown (Line 10) CaliperILIPossible Run Comp Segment M3 AreaDateDateRepl DtPoss Repl Dt Lambertville to Linden (Line 1)CompleteComplete08/10/ Heidlersburg to Marietta (Line 1-AF)* ---Complete08/17/ Perulack to Shermansdale (Line 27) ---TBDTBD --- Entriken to Perulack (Line 19) ---Complete07/15/ Perulack (Line 24-AUX1) ---08/27/1510/15/ Delmont to Lilly (Line 12)*CompleteComplete08/05/ Lilly to Entriken (Line 12)*CompleteComplete08/31/ Perulack to Leidy (Line 37) ---Complete08/10/ As a result of prior DOT mandated investigations, the following locations have been identified as requiring additional evaluation which may require a reduction of capacity. Should any of these investigations lead to a reduction of capacity, TE will post on the bulletin board as soon as it is known: Angleton to Mont. Belvieu (Line 16) Angleton to Mont. Belvieu (Line 16-PP) Armagh to Lilly (Line 12) Armagh to Lilly (Line 19) Atlanta to Hope (Line 1) Bernville to Bechtelsville (Line 12) Blessing to Angleton (Line 16) Blessing to Tivoli (Line 16) Carthage to Longview (Line 13) Chambersburg to Marietta (Line 2) Chambersburg to Heidlersburg (Line 2-U) Clinton to Kosciusko (Line 14) Danville to Owingsville (Line 10) Danville to Owingsville (Line 15) Danville to Owingsville (Line 25) Delmont to Lilly (Line 12) Delmont to Lilly (Line 19) Delmont to Lilly (Line 27) Delmont to Armagh (Line 19) Delmont to Armagh (Line 27-1) Delmont to Armagh (Line 27-2) Donaldson to N. Little Rock (Line 1) Donaldson to N. Little Rock (Line 1-AUX-1) Eagle to Lambertville (Line 1) Eagle to Lambertville (Line 2) Entriken to Perulack (Line 19) Page 12 of 84

13 French Lick to Seymour (Line 1) Gillis to Opelousas (Line 14) Gladeville to Tompkinsville (Line 10) Gladeville to Tompkinsville (Line 15) Grantville to Bernville (Line 12) Grantville to Bernville (Line 19) Grantville to Bernville (Line 28) Holbrook to Uniontown (Line 9) Holbrook to Uniontown (Line 10) Hope to Donaldson (Line 1) Kosciusko to Egypt (Line 10) Kosciusko to Egypt (Line 15) Lambertville to Linden (Line 1) Lambertville to Linden (Line 2) Lambertville to Linden (Line 20-B) Lambertville to Linden (Line 20-D) Longview to Atlanta (Line 1) Longview to Atlanta (Line 1N) Lilly to Entriken (Line 12) Lilly to Entriken (Line 12-Aux-1) Lilly to Entriken (Line 27-Aux-1) Mt. Pleasant to Gladeville (Line 25) Norris City to Oakland City (Line 1) Oakland City to French Lick (Line 1) Perulack to Grantville (Line 19) Perulack to Leidy (Line 24) Perulack to Shermansdale (Line 24 Aux-1) Perulack to Shermansdale (Line 27) Perulack to Leidy (Line 37) Pollard to Oran (Line 1) Provident to Yazoo (Line 26) Providence City to Hempstead (Line 11-H) Provident City to Hempstead (Line 11) Provident City to Thomaston (Line 21) Red River to Castor (Line 11) Shermansdale to Grantville (Line 19) St. Francisville to Union Church (Line 14) St. Francisville to Union Church (Line 18) Thomaston to Provident City (Line 21) Tivoli to Petronilla (Line 16) Union Church to Clinton (Line 14) Union Church to Clinton (Line 18) Uniontown to Delmont (Line 9) Uniontown to Delmont (Line 39) Vidor to Gillis (Line 14) West Monroe to Providence (Line 26) Wheelersburg to Athens (Line 10) Wheelersburg to Athens (Line 15) Download File: TE 2015 Maintenance Schedule Rev18.docx Page 13 of 84

14 TSP: TSP Name: Texas Eastern Transmission, LP Critical Desc: Not a critical notice Notice Eff Date/Time: 08/06/ :50:00 PM Notice End Date/Time: 11/01/ :00:00 AM Notice ID: Notice Stat Desc: Supersede Notice Type: Maintenance Post Date/Time: 08/06/ :50:00 PM Prior Notice: Reqrd Rsp Desc: No response required Rsp Date/Time: Subject: TE 2015 Maintenance Schedule -- Revised Notice Text: The text below is included in the attached Word document located at the bottom of this posting. Listed below is a partial schedule for major outages that will affect capacity or that impact major receipt/delivery areas on the Texas Eastern Transmission (TE) system for the 2015 outage season. This schedule is not a complete list of all outages that will occur during the 2015 outage season. Due to unforeseen delays or scheduling conflicts, the dates below are subject to change. As TE continues to plan for the 2015 outage season, updates to the list below will be posted at the earliest known date. Access Area Longview to Kosciusko: Blessing to PEMEX Mexico EOL Line 16 (STX): Cleaning Tool Dates: See specific schedules below In-Line Tool Dates: See specific schedules below Potential Repair Dates: See specific schedules below Potential Run Comparison Repair Dates: See specific schedules below Project, TE will be conducting in-line inspection tool runs on Line 16 between Blessing and PEMEX Mexico EOL. TE will coordinate system receipts and deliveries with point operators to minimize operational impacts, however, during the cleaning and in-line tools, meters listed below will be required to flow/shut in as follows: Blessing to Tivoli: Cleaning Tool Dates: Fall 2015 In-Line Tool Dates: December 10 Potential Repair Dates: March 2016 Potential Run Comparison Repair Dates: March 2016 The following meters may be unavailable for flow: ENTERPRISE TEXAS PIPELINE LLC - HIDALGO COUNTY, TX T2 GAS UTILITY LLC/REFUGIO INTERCONNECT Tivoli to Petronilla: Cleaning Tool Dates: Fall 2015 In-Line Tool Dates: Complete Potential Repair Dates: Approximately March 24 - mid September Page 14 of 84

15 Potential Run Comparison Repair Dates: May 15 - mid September The following meters will be unavailable for flow during the cleaning and in-line tool runs: ONYX PIPELINE/NUECES BAY ONYX PIPELINE/BARNEY DAVIS The following meters will be unavailable for flow until the cleaning and in-line tools passes the meter: SOUTH SHORE P/L (NE&T), NUECES CO., TX CROSSTEX ENERGY (FROM TE) UPRIVER RD., NUECES CO T2 GAS UTILITY LLC/REFUGIO INTERCONNECT The following meters will be required to flow for the duration of the cleaning and in-line tool runs: MAGIC VALLEY P/L-CALPINE PWR. PROJECT (DEL)/HIDALGO DEFS, LP - EDINBURG POWER PLANT - HIDALGO CO., TX PEMEX - REYNOSA, MX (D 70333/R 76333) Petronilla to Santa Fe: Cleaning Tool Dates: Fall 2015 In-Line Tool Dates: December 9 Potential Repair Dates: March 2016 Potential Run Comparison: March 2016 The following meters will be unavailable for flow during the cleaning and in-line tool runs: ONYX PIPELINE/NUECES BAY ONYX PIPELINE/BARNEY DAVIS The following meters will be required to flow for the duration of the cleaning and in-line tool runs: MAGIC VALLEY P/L-CALPINE PWR. PROJECT (DEL)/HIDALGO DEFS, LP - EDINBURG POWER PLANT - HIDALGO CO., TX PEMEX - REYNOSA, MX (D 70333/R 76333) Santa Fe to PEMEX Mexico (EOL): Cleaning Tool Dates: Complete In-Line Tool Dates: Complete Potential Repair Dates: Complete Potential Run Comparison Repair Dates: Complete The following meters will be unavailable for flow during the cleaning and in-line tool runs: ONYX PIPELINE/NUECES BAY ONYX PIPELINE/BARNEY DAVIS MAGIC VALLEY P/L-CALPINE PWR. PROJECT (DEL)/HIDALGO DEFSDEFS, LP - EDINBURG POWER PLANT - HIDALGO CO., TX The following meter will be required to flow for the duration of the cleaning and in-line tool runs: PEMEX - REYNOSA, MX (D 70333/R 76333) As a result of these in-line inspections, certain locations could require further detailed investigations, which may require TE to isolate Line 16 between Blessing and PEMEX Mexico EOL. If an isolation of Line 16 is required, shippers sourcing gas for delivery points located between Blessing and PEMEX EOL will be required to source their supply from receipt points between Blessing and PEMEX EOL. Additionally, any gas sourced between Blessing and PEMEX EOL for delivery outside of this area may be restricted. Depending on the level of nominated quantities, if further investigations are required, restrictions are possible for interruptible, secondary firm services and primary firm services. Page 15 of 84

16 Should any of these investigations lead to a reduction of capacity, TE will post on the bulletin board as soon as it is known. TE estimates that the investigations will begin on April 9 continuing through May 29. West Monroe to Providence Line 26 (ELA): July 15 - August 21 Program, TE will be conducting further investigations on Line 26 (a single line system) between West Monroe and Providence Stations. During these investigations the following meters may experience lower than normal pressures or be unavailable for flow: GULF SOUTH PIPELINE COMPANY, LP - WEST MONROE, LA (RECEIPT GULF SOUTH PIPELINE COMPANY, LP - DARNELL, LA (DELIVERY) RELIANT ENERGY GAS TRANSMISSION - WEST MONROE, LA TRANSOK - OUACHITA PSH., LA Hempstead to Huntsville Line 11 (ETX) - Pipeline Maintenance: Cleaning Tool Date: Complete In-Line Tool Dates: Complete Potential Repair Dates: Complete Potential Run Comparison Repair Dates: VS3: August 10-16, VS6: October 3-10 Project, TE will be conducting in-line inspection tool runs on Line 11 between Provident City and Hempstead stations. During the cleaning and in-line inspection tool runs, the following meters may experience lower than normal pressures or be unavailable for flow: ENTERGY - LEWIS CREEK / MONTGOMERY COUNTY, TX Additionally, if further detailed investigations are required, the meters listed below could experience lower than normal pressure or be unavailable for flow during the potential repair dates: 72964ELLIOT OIL & GAS, BROWDER #C-1, SAN JACINTO CO., TX (REC) 73175MME DESOTO PIPELINE, L.P. - PRAIRIE VIEW, TX - REC 73249ENTERGY - LEWIS CREEK / MONTGOMERY COUNTY, TX 73364BRAMMER-BROWDER GATHERING-SAN JACINTO CO., TX (REC) 73388MONTGOMERY GAS TRANSMISSION, INC. - MONTGOMERY CO., TX (DEL 73391FAMCOR OIL - GOLDEN MINER #1 / SAN JACINTO CO., TX (REC) 73461UNIVERSAL NATURAL GAS/INTERCONNECT - MONTGOMERY CO., TX (DE 73477PRIME OPERATING COMPANY - MONEY WORT #1 - WALKER CO., TX (R 73669SK&CO./MASSEY FERGUSON GATHERING, SAN JACINTO CO., TX 75475MME DESOTO PIPELINE, LP - (D70475/R76475) 75778LONE STAR GAS - WALLER, TX-(D72778/R76778) 75858KCS TX INTRASTATE GAS PIPELINE (D72858/R76858) Page 16 of 84

17 Hempstead to Huntsville Line 11 (ETX) - Pipeline Maintenance: August To comply with the applicable regulatory requirements associated with TE ongoing DOT Pipeline Integrity Program, TE will be conducting further detailed investigations on Line 11 VS3 (a single line system) between Hempstead and Huntsville stations. As a result of these investigations, the following meter will be unavailable for flow: MONTGOMERY GAS TRANSMISSION, INC. - MONTGOMERY CO., TX (DEL ***Blessing Compressor Station Maintenance: August TE will be conducting compressor station maintenance at its Blessing Compressor Station. During this maintenance, capacity through Blessing will be reduced to approximately 285,000 Dth /d. Based on current nomination levels through Blessing, TE doesn't anticipate restrictions resulting from this outage, however if restrictions are required, restrictions to interruptible nominations may be necessary. TE / SESH Interconnect (Dentville): August TE has been informed by Southeast Supply Header, LLC ("SESH") of the following outage below which will impact receipts and deliveries to/from SESH at the TE / SESH pipeline interconnect MR Southeast Supply Header, LLC (SESH) will be performing construction at the SESH interconnection with Texas Eastern Transmission, LP (Texas Eastern) associated with the expansion approved in FERC Docket No. CP In accordance with the provisions of its FERC Gas Tariff, SESH notifies its shippers that these construction activities will result in a service outage on the SESH system as described below. During a 4 day period beginning on Gas Day August 18, 2015 at 9:00 am and continuing until August 22, 2015 at 9:00 am, service at the Texas Eastern interconnection (MR 83005) will be unavailable for either receipt or delivery point activity. This outage will not result in any service impacts to the pipeline capacity on the SESH system and all other receipt and delivery points will be available for service. Providence to Yazoo Line 26 (ELA) - Pipeline Maintenance: In-Line Tool Dates: Complete Potential Repair Dates: August Potential Run Comparison Repair Dates: September Project, TE will be conducting in-line inspection tool runs on Line 26 between Providence and Yazoo stations. During the in-line inspection tool run, the following meters may experience lower than normal pressures or be unavailable for flow: GULF SOUTH PIPELINE COMPANY, LP - WEST MONROE, LA (RECEIPT GULF SOUTH PIPELINE COMPANY, LP - DARNELL, LA (DELIVERY) RELIANT ENERGY GAS TRANSMISSION - WEST MONROE, LA TRANSOK - OUACHITA PSH., LA FEDERAL BUREAU OF PRISON - YAZOO CO. MS Page 17 of 84

18 Additionally, if further detailed investigations are required, the meters listed above could experience lower than normal pressure or be unavailable for flow during the potential repair dates. Yazoo to Kosciusko Line 26 (ELA) - Pipeline Maintenance: September TE will be conducting pipeline maintenance on Line 26 between Yazoo and Kosciusko stations. During this maintenance the following meters will be unavailable for flow: GULF SOUTH PIPELINE COMPANY, LP - WEST MONROE, LA (RECEIPT GULF SOUTH PIPELINE COMPANY, LP - DARNELL, LA (DELIVERY) RELIANT ENERGY GAS TRANSMISSION - WEST MONROE, LA TRANSOK - OUACHITA PSH., LA MISSISSIPPI CHEMICAL - YAZOO CITY, MS Blessing to Angleton Line 16 - Pipeline Maintenance: Cleaning Tool Dates: Complete ILI In-Line Tool Dates: Complete Potential Repair Dates: September 20 - October 7 Potential Run Comparison Dates: October Project, TE will be conducting cleaning and in-line inspection tool runs on Line 16 between Blessing and Angleton stations. During the cleaning tool runs, the following meters will be unavailable until the pig passes the meters: SWEENY PLANT-CONOCO PIPELINE TRES PALACIOS GAS STORAGE - INJ/DEL During the ILI in-line tool runs, the following meters will be unavailable for the duration of the tool run: SWEENY PLANT-CONOCO PIPELINE TRES PALACIOS GAS STORAGE - INJ/DEL Additionally, the following meters could experience lower than normal pressure during all cleaning and ILI tool runs: WILMAR PIPELINE, INC. - #1 DUNCAN SLOUGH, MATAGORDA CO., T ENTERPRISE TEXAS PIPELINE LLC - MATAGORDA COUNTY, TX (REC) DEEP ROCK RESOURCES - FLOWERS / MATAGORDA CO., TX - RUN UNION PETROLEUM, LTD (LINE 16LL) - BRAZORIA CO., TX SANTOSUSA CORP CHESAPEAKE OPERATING INC-ANKENMEN GATHERING, BRAZORIA CO., BUCKEYE RANCH GATHERING - MATAGORDA CO., TX ASPECT ENERGY - BINTLIFF GATHERING - BRAZORIA CO., TX Page 18 of 84

19 WALTER OIL & GAS-KASMAN GATHERING - MATAGORDA CO., TX DAVIS SOUTHERN/BINTLIFF #1 Additionally, if further detailed investigations are required, all meters listed above could experience lower than normal pressure or be unavailable for flow during the potential repair dates. Hempstead to Huntsville Line 11 (ETX) - Pipeline Maintenance: October 3-10 To comply with the applicable regulatory requirements associated with TE ongoing DOT Pipeline Integrity Program, TE will be conducting further detailed investigations on Line 11 VS6 (a single line system) between Hempstead and Huntsville stations. As a result of these investigations, the following meters will be unavailable for flow: ELLIOT OIL & GAS, BROWDER #C-1, SAN JACINTO CO., TX (REC) ENTERGY - LEWIS CREEK / MONTGOMERY COUNTY, TX BRAMMER-BROWDER GATHERING-SAN JACINTO CO., TX (REC) FAMCOR OIL - GOLDEN MINER #1 / SAN JACINTO CO., TX (REC) PRIME OPERATING COMPANY - MONEY WORT #1-WALKER CO., TX R SK&CO./MASSEY FERGUSON GATHERING, SAN JACINTO CO., TX KCS TX INTRASTATE GAS PIPELINE (D72858/R76858) Castor to EOL Line 11 - Pipeline Maintenance: October TE will be conducting pipeline maintenance on Line 11 between Castor and the end of the line. During this maintenance the following meters will be unavailable for flow: TEXAS GAS TRANSMISSION - LISBON, LA (DELIVERY) PANENERGY FIELD SERVICES - LINCOLN PARISH, LA KOCH GATEWAY - CASTOR, LA-(D70078/R76078) Additionally, the follow following meters may experience lower than normal pressures: SMITH (HARVEY BROYLE)#2 MURPHY-BRYCELAND, BIENVILLE PSH., L NGC ENERGY RESOURCES - SLIGO GAS PLANT, LA (RECEIPT) JEEMS BAYOU - #1 CALHOUN / DESOTO PSH., LA SMITH OPER. (HARVEY BROYLE M.P. 0.00) - BIENVILLE PSH. LA COMSTOCK RESOURCES - #1 DESOTO - DESOTO PSH., LA WILLAMETTE INDUSTRIES - BIENVILLE PARISH, LA PETROCHEM OPERATING / LOTT #1 - BOSSIER PARISH, LA (REC) ENTERPRISE GATHERING LLC/BETHANY-DESOTO PARISH, LA-RUN ENERGY TRANSFER/TIGER PIPELINE BIENVILLE, LA GULF STATES PIPELINE - BIENVILLE PA. LA-(D72688/R7 Based on current nomination levels TE doesn't anticipate any restrictions at this time. Page 19 of 84

20 Angleton to Mont. Belvieu Line 16 - Pipeline Maintenance: Cleaning Tool Date: Complete Gauge Tool Date: Complete In-Line Tool Date: Complete Potential Repair Dates: October 29 - November 4 Project, TE will be conducting in-line inspection tool runs on Line 16 between Angleton and Mont. Belvieu stations. During the cleaning and in-line inspection tool runs, the following meters may experience lower than normal pressures or be unavailable for flow: LOUIS DREYFUS HOUSTON PIPE LINE CO.-ENERFIN LYONDELL SYS./ HARRIS CO., TX MONUMENT PIPELINE, LP - HARRIS COUNTY, TX DENBURY ONSHORE, LLC NET LP - MONUMENT PIPELINE - HARRIS COUNTY, TX NRG - CEDAR BAYOU ENTERPRISE PRODUCTS/WALLACE JUNCTION TEJAS GAS/CLEAR LK. STOR CALPINE BAYER PWR. PLANT ACCT. PT. Additionally, if further detailed investigations are required, the meters listed above could experience lower than normal pressure or be unavailable for flow during the potential repair dates. 24" System Longview to Berne: ***Gas City to Lebanon Line 69 - Pipeline Maintenance: July 21 - August 15 TE will be conducting pipeline maintenance on Line 69 between Gas City and Lebanon compressor stations. During this work, the following meters will be unavailable for flow: DAYTON PWR & LT - RED LION, OH COL. GAS (I-O) & LEBANON, OH ***Norris city to French Lick Line 1 VS4 - Pipeline Maintenance: August To comply with the applicable regulatory requirements associated with TE ongoing DOT Pipeline Integrity Program, TE will be conducting further detailed investigations on Line 1 VS4 (a single line system) between Norris city and French Lick stations. Based on current nominations levels, TE doesn't anticipate any additional restrictions associated with this outage. Norris City to Oakland City Line 72 (Vermilion Lateral) - Pipeline Maintenance Cleaning Tool Dates: Deferred to 2016 Page 20 of 84

21 In-Line Tool Date: Deferred to 2016 Potential Repair Dates: Deferred to 2016 Project, TE will be conducting in-line inspection tool runs on Norris City to Oakland City Line 72. During the tool run and depending on the results of the ILI Tool runs and if further detailed investigations are required, the following meter may experience lower than normal pressures or be unavailable for flow: DUKE ENERGY VERMILLION II, LLC 30 Inch System and Market Area: Wheelersburg Compressor Station: July 20 - Aug 22 TE will be conducting compressor station maintenance at its Wheelersburg Compressor Station. During this outage TE anticipates that point operators on the 30 inch line south of Wheelersburg may see lower than normal operating pressures. Additionally, during the timeframes detailed below, north to south capacity through stations on the 30 inch line will be reduced as follows: July 27 - August 19 Posted:Reduced to approximately: Berne 30" South1,218,000 Dth /d1,118,000 Dth /d Wheelersburg South 957,000 Dth /d 857,000 Dth /d Tompkinsville South 734,000 Dth /d 634,000 Dth /d Barton South 606,000 Dth /d 506,000 Dth /d Based on historical north to south nominations TE anticipates restrictions for interruptible and secondary firm nominations flowing north to south through Berne, Wheelersburg, Tompkinsville and Barton. TE will coordinate system receipts and deliveries with point operators to minimize Delmont to Lilly Line 12 - Pipeline Maintenance ILI Tool Runs: Complete Potential Repair Dates: August 6-31 Project, TE will be conducting in-line inspection tool runs on Delmont to Lilly Line 12. Depending on the results of the ILI Tool runs and if further detailed investigations are required, the following meter may experience lower than normal pressures or be unavailable for flow: XTO ENERGY INC. - EAST WHEATFIELD INTERCONNECT - CAMBRIA CO Page 21 of 84

22 Heidlersburg to Marietta 36" Line 1-AF - Pipeline Maintenance Caliper & ILI Tool Runs: Complete Potential Repair Dates: August Project, TE will be conducting in-line inspection tool runs on the Heidlersburg to Marietta 36" Line 1-AF. During the tool run and depending on the results of the ILI Tool runs and if further detailed investigations are required, the following meter may experience lower than normal pressures or be unavailable for flow: WILLIAMS-TRANSCO, LOWER CHANCEFORD-YORK CO., PA COLUMBIA-MARIETTA, LANCASTER CO., PA Kosciusko Compressor Station: August TE will be conducting compressor station maintenance at its Kosciusko Compressor Station. Based on current north to south nomination levels through Kosciusko, no restrictions are anticipated; however if restrictions are necessary, restrictions to interruptible and secondary firm nominations flowing north to south through Berne, Wheelersburg, Tompkinsville and Barton are possible. TE will coordinate system receipts and deliveries with point operators to minimize Lilly to Entriken Line 12 - Pipeline Maintenance ILI Tool Runs: Complete Potential Repair Dates: September 2-30 Project, TE will be conducting in-line inspection tool runs on Lilly to Entriken Line 12. Depending on the results of the ILI Tool runs and if further detailed investigations are required, the following meters may experience lower than normal pressures or be unavailable for flow: PEOPLES NAT - CLAYSBURG, PA UGI CENTRAL - VALLEY GAS - MARTINSBURG, PA UGI CENTRAL - HUNTINGDON GAS - MAPLETON, PA UGI CENTRAL - HUNTINGDON GAS - HUNTINGDON, PA UGI CENTRAL - LEWISTOWN - JUNIATA CO., PA ***Marietta Compressor Station Maintenance: September 9 - October 9 TE will be conducting compressor station maintenance at its Marietta Compressor Station. During this maintenance, capacity through Marietta will be reduced from a seasonal capacity of 1,848,000 Dth /d to approximately 1,335,000 Dth /d for nominations delivering to locations between Marietta and up to Lambertville on TE's 36 inch line. Page 22 of 84

23 Based on historical nominations through Marietta, TE anticipates restrictions for interruptible, secondary firm and potentially primary firm services. Holbrook to Uniontown Lines 10 and 30 - Pipeline Maintenance: September TE will be conducting pipeline maintenance on Lines 10 and 30 between Holbrook and Uniontown compressor stations. During this work, the following meter will be unavailable for flow: ACCESS MIDSTREAM / WIND RIDGE-MCNAY RIDGE ROAD - GREENE CO. Holbrook to Uniontown Line 25 - Pipeline Maintenance: September 23 - October 18 TE will be conducting pipeline maintenance on Line 25 between Holbrook and Uniontown compressor stations. During this work, the following meter will be unavailable for flow: DTI - CRAYNE LL, RT 188, GREENE CO., PA. Athens to Berne - Pipeline Maintenance: TBD TE will be conducting pipeline maintenance between Athens and Berne stations. During this work, the following meter will be unavailable for flow: DUKE ENERGY WASHINGTON II, LLC Mt. Pleasant to Gladeville Line 25 VS5- DOT Pipe Replacement: 2016 TE will be conducting a DOT pipe replacement between Mt. Pleasant and Gladeville stations on Line 25 VS5. During this work, the following meter will be unavailable for flow: PIEDMONT NATURAL GAS - RUTHERFORD Texas Eastern DOT Pipeline Integrity Project TE will be conducting, as part of its ongoing DOT Pipeline Integrity Project, in-line inspection tool runs at various locations throughout the Texas Eastern pipeline system. As a result of these in-line inspections, certain locations could be identified for an investigation which could lead to possible reduction of capacity. Should any of these investigations lead to a reduction of capacity, TE will post on the bulletin board as soon as it is known. Listed below are the pipeline segments scheduled for inspection this year. Each segment will have a caliper tool run, and an ILI tool run. Also listed below are the dates of a possible investigation as a result of the in-line inspection. CaliperILIPossible Run Comp Segment Access AreaDateDateRepl DtPoss Repl Dt Blessing to Tivoli (Line 16)* ---12/10/1503/01/1603/01/16 Tivoli to Petronilla (Line 16)* ---Complete04/15/1505/15/15 Petronilla to Santa Fe (Line 16)* ---12/09/1503/01/1603/01/16 Santa Fe to PEMEX EOL (Line 16)* ---CompleteCompleteComplete Hempstead to Huntsville (Line 11)* ---CompleteAug & OctAug & Oct Page 23 of 84

24 Opelousas to St. Francisville (Line 14) ---CompleteCompleteAugust St. Francisville to Union Church (Line 18) Union Church to Clinton (Line 14) ---CompleteNovemberNovember Atlanta to Hope (Line 1) ---08/27/1510/04/1510/27/15 Providence to Yazoo City (Line 26)* ---Complete08/18/1509/09/15 Blessing to Angleton (Line 16)* ---Complete09/20/1510/15/15 Angleton to Mont Belvieu (Line 16)* CompleteComplete10/29/ CaliperILIPossible Run Comp Segment M1/M2 AreaDateDateRepl DtPoss Repl Dt Norris City to Oakland City (Line 72)* Owingsville to Wheelersburg (Line 15) ---Complete08/03/ Wheelersburg to Athens (Line 15) ---Complete09/01/ Holbrook to Uniontown (Line 10) CaliperILIPossible Run Comp Segment M3 AreaDateDateRepl DtPoss Repl Dt Lambertville to Linden (Line 1)CompleteComplete08/10/ Heidlersburg to Marietta (Line 1-AF)* ---Complete08/17/ Perulack to Shermansdale (Line 27) ---TBDTBD --- Entriken to Perulack (Line 19) ---Complete07/15/ Perulack (Line 24-AUX1) ---08/27/1510/15/ Delmont to Lilly (Line 12)*CompleteComplete08/05/ Lilly to Entriken (Line 12)*CompleteComplete08/31/ Perulack to Leidy (Line 37) ---Complete08/10/ As a result of prior DOT mandated investigations, the following locations have been identified as requiring additional evaluation which may require a reduction of capacity. Should any of these investigations lead to a reduction of capacity, TE will post on the bulletin board as soon as it is known: Angleton to Mont. Belvieu (Line 16) Angleton to Mont. Belvieu (Line 16-PP) Armagh to Lilly (Line 12) Armagh to Lilly (Line 19) Atlanta to Hope (Line 1) Bernville to Bechtelsville (Line 12) Blessing to Angleton (Line 16) Blessing to Tivoli (Line 16) Carthage to Longview (Line 13) Chambersburg to Marietta (Line 2) Chambersburg to Heidlersburg (Line 2-U) Clinton to Kosciusko (Line 14) Danville to Owingsville (Line 10) Danville to Owingsville (Line 15) Danville to Owingsville (Line 25) Delmont to Lilly (Line 12) Delmont to Lilly (Line 19) Delmont to Lilly (Line 27) Delmont to Armagh (Line 19) Delmont to Armagh (Line 27-1) Delmont to Armagh (Line 27-2) Donaldson to N. Little Rock (Line 1) Donaldson to N. Little Rock (Line 1-AUX-1) Page 24 of 84

Texas Eastern Transmission, LP

Texas Eastern Transmission, LP Texas Eastern Transmission, LP Planned Service Outage Postings from 08/01/2016 to 08/31/2016 Page 1 of 36 TSP: 007932908 TSP Name: Texas Eastern Transmission, LP Critical Desc: Not a critical notice Notice

More information

Texas Eastern Transmission, LP

Texas Eastern Transmission, LP Texas Eastern Transmission, LP Planned Service Outage Postings from 06/01/2018 to 06/30/2018 Page 1 of 34 TSP: 007932908 TSP Name: Texas Eastern Transmission, LP Critical Desc: Not a critical notice Notice

More information

Texas Eastern Transmission, LP

Texas Eastern Transmission, LP Texas Eastern Transmission, LP Planned Service Outage Postings from 03/01/2017 to 03/31/2017 Page 1 of 33 TSP: 007932908 TSP Name: Texas Eastern Transmission, LP Critical Desc: Not a critical notice Notice

More information

Association of Energy Engineers January 9, Michael Dirrane Director, Northeast Marketing

Association of Energy Engineers January 9, Michael Dirrane Director, Northeast Marketing Association of Energy Engineers January 9, 2013 Michael Dirrane Director, Northeast Marketing Spectra Energy U.S. Transmission Map Miles of Pipe 13,297 Number of Compressor Stations 129 Total Horsepower

More information

Southern Natural Gas Company 2016 Outage Review Meeting. Customer con call and Webex May 18, 2016

Southern Natural Gas Company 2016 Outage Review Meeting. Customer con call and Webex May 18, 2016 Southern Natural Gas Company 2016 Outage Review Meeting Customer con call and Webex May 18, 2016 1 Welcome 2 Agenda Review of current and upcoming notable Outages- May/June/July Unscheduled outages North

More information

Southern Natural Gas Company 2016 Outage Review Meeting. Customer con call and Webex June 15, 2016

Southern Natural Gas Company 2016 Outage Review Meeting. Customer con call and Webex June 15, 2016 Southern Natural Gas Company 2016 Outage Review Meeting Customer con call and Webex June 15, 2016 1 Welcome 2 Agenda Review of current and upcoming notable Outages- June/July/August Unscheduled outages

More information

Mid-Year Population Estimates for H-GAC Region Cities 1 Source: U.S. Census Bureau Released: May 2018

Mid-Year Population Estimates for H-GAC Region Cities 1 Source: U.S. Census Bureau Released: May 2018 Mid-Year Population Estimates for H-GAC Region Cities 1 Region 7,064,712 6,969,489 6,833,956 6,665,117 6,497,288 6,350,627 6,225,081 6,114,513 5,991,217 5,840,526 5,704,344 5,587,630 5,398,017 5,295,983

More information

NEW HAMPSHIRE GAS CORPORATION WINTER PERIOD ORIGINAL FILING CONTENTS 3. CONVERSION OF GAS COSTS - GALLONS TO THERMS SCHEDULE A

NEW HAMPSHIRE GAS CORPORATION WINTER PERIOD ORIGINAL FILING CONTENTS 3. CONVERSION OF GAS COSTS - GALLONS TO THERMS SCHEDULE A NEW HAMPSHIRE GAS CORPORATION COST OF GAS RATE FILING - DG 13- WINTER PERIOD 2013-2014 ORIGINAL FILING CONTENTS 1. TARIFF PAGE - COST OF GAS RATE 2. MARKED TARIFF PAGE - COST OF GAS RATE 3. CONVERSION

More information

East Tennessee Natural Gas Shipper Meeting. Knoxville, Tennessee April 23, 2015

East Tennessee Natural Gas Shipper Meeting. Knoxville, Tennessee April 23, 2015 EAST TENNESSEE NATURAL GAS SHIPPER MEETING APRIL 23, 2015 East Tennessee Natural Gas Shipper Meeting Knoxville, Tennessee April 23, 2015 Agenda Introduction Winter Operations Maintenance Update LINK -

More information

September 2, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

September 2, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. TEXAS EASTERN TRANSMISSION, LP Mailing Address: 5400 Westheimer Court P. O. Box 1642 Houston, TX 77056-5310 Houston, TX 77251-1642 713.627.5400 main Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory

More information

Penn-Jersey System Operations Update

Penn-Jersey System Operations Update 2016 FALL CUSTOMER MEETING THE HOTEL HERSHEY SEPTEMBER 14 16, 2016 Penn-Jersey System Operations Update Tom Wooden Vice President, Field Operations Andy Drake Vice President, Operations & EHS Agenda Welcome

More information

Infrastructure Disruptions: What if?

Infrastructure Disruptions: What if? Infrastructure Disruptions: What if? NGA Executive Conference R.L.Levitan, rll@levitan.com September 12, 2016 Agenda Recap of TETCO Incident on 4/29/16 What if? Potential Impacts on Winter and Summer Peak

More information

Donna S. Painter Record of Litigation Experience

Donna S. Painter Record of Litigation Experience Page 1 ER13-1605-000 NV Energy Operating Companies Las Vegas Power Transmission cost of service and 2013-14 Company LLC revenue requirements, postage stamp and zonal rates United States District Court,

More information

Algonquin Gas Transmission Pre-Winter Operations Discussion

Algonquin Gas Transmission Pre-Winter Operations Discussion AGT PRE-WINTER OPERATIONS MEETING OCTOBER 22, 2013 Algonquin Gas Transmission Pre-Winter Operations Discussion October 22, 2013 Agenda Welcome & Opening Comments Operational Update Northeast Projects Update

More information

June 30, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Delivery Point Entitlement Filing Docket No.

June 30, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Delivery Point Entitlement Filing Docket No. Transcontinental Gas Pipe Line Company, LLC 2800 Post Oak Boulevard (77056) P.O. Box 1396 Houston, Texas 77251-1396 713/215-3380 June 30, 2009 Federal Energy Regulatory Commission 888 First Street, N.E.

More information

NGA Pre Winter Meeting

NGA Pre Winter Meeting NGA Pre Winter Meeting Mike Dirrane Director of Marketing November 6, 2014 Westboro, MA Spectra Energy U.S. Transmission Map Miles of Pipe 13,297 Number of Compressor Stations 129 Total Horsepower 2,147,488

More information

Spectra Energy s Perspective on Natural Gas Service to Electric Generation during the Winter. Rich Paglia Vice President Northeast Marketing

Spectra Energy s Perspective on Natural Gas Service to Electric Generation during the Winter. Rich Paglia Vice President Northeast Marketing Spectra Energy s Perspective on Natural Gas Service to Electric Generation during the Winter Rich Paglia Vice President Northeast Marketing Presentation Overview Spectra Energy Transmission and Power Plant

More information

THE TRES AMIGAS PROJECT

THE TRES AMIGAS PROJECT UNITING THE NATION S ELECTRIC POWER GRID THE TRES AMIGAS PROJECT Project Development, Business Case, and Benefits -ERCOT Presentation Jan 22, 2010 Agenda Project Overview Project Objective Project Description,

More information

CHEVRON PIPE LINE COMPANY

CHEVRON PIPE LINE COMPANY F.E.R.C. I.C.A. OIL TARIFF (Cancels F.E.R.C. No. 1157.19.0) CHEVRON PIPE LINE COMPANY LOCAL TARIFF Applying on the Transportation of CRUDE PETROLEUM (As Defined Herein) BRETON SOUND SYSTEM Rates are filed

More information

T-4 Start County Location Fluid /1/2015 ECTOR, MARTIN, MIDLAND & WINKLER BASIN PIPELINE SYSTEM/WINK TO MIDLAND 24"

T-4 Start County Location Fluid /1/2015 ECTOR, MARTIN, MIDLAND & WINKLER BASIN PIPELINE SYSTEM/WINK TO MIDLAND 24 This file is continuously updated as soon as new construction reports are received. Complete thru July 22, 2015 If a T-4 permit number is listed as 00000, it is not yet permitted or added to an existing

More information

PLANNED ENHANCEMENTS, NORTHEAST NATURAL GAS PIPELINE SYSTEMS (as of )

PLANNED ENHANCEMENTS, NORTHEAST NATURAL GAS PIPELINE SYSTEMS (as of ) PIPELINE SYSTEMS (as of 8-27-14) The Northeast Gas Association (NGA) has prepared this summary based on publicly-available information. NGA will strive to keep the information as updated as possible and

More information

FUEL ADJUSTMENT CLAUSE

FUEL ADJUSTMENT CLAUSE Page 26.1 ENTERGY NEW ORLEANS, INC. ELECTRIC SERVICE Supersedes: FAC effective 6/1/09 RIDER SCHEDULE FAC-5 Schedule Consists of: One Sheet Plus Schedule A and Attachments A and B FUEL ADJUSTMENT CLAUSE

More information

Capacity Market Rules for Energy Storage Resources

Capacity Market Rules for Energy Storage Resources Capacity Market Rules for Energy Storage Resources Zachary T Smith Manager, Capacity Market Design ICAPWG August 23 rd, 2018 Agenda Background Energy Storage Resource (ESR) overview Capacity Market Rules

More information

Appendix E Water Supply Modeling

Appendix E Water Supply Modeling Supply Modeling Modesto Irrigation District Treatment Plant Expansion Project Modeling I. Introduction The Modesto Irrigation District (MID) is situated adjacent to and north of the Tuolumne River. Over

More information

November 29, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Attention: Ms. Kimberly D.

November 29, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Attention: Ms. Kimberly D. November 29, 2018 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly D. Bose, Secretary Commissioners: Re: Annual Recomputation of Fuel and Lost

More information

New Electric Generating Plants in Texas Amarillo. Abilene. El Paso. Austin31. San Antonio. Corpus Christi.

New Electric Generating Plants in Texas Amarillo. Abilene. El Paso. Austin31. San Antonio. Corpus Christi. 6 60 New Electric Generating Plants in Texas Amarillo El Paso 63 28 9 73 11 83 37 8 35 48 46 33 21 71 7 10 78 44 39 Generation projects completed since 1995 totaling 13,141 MW 20 Generation projects under

More information

November 16, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

November 16, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. November 16, 2012 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 ANR Pipeline Company 717 Texas Street, Suite 2400 Houston, Texas 77002-2761

More information

Ameren Missouri. AMENDED Renewable Energy Standard Compliance Report Prepared in Compliance with 4 CSR

Ameren Missouri. AMENDED Renewable Energy Standard Compliance Report Prepared in Compliance with 4 CSR Ameren Missouri AMENDED Renewable Energy Standard Compliance Report 2015 Prepared in Compliance with 4 CSR 240-20.100 June 23, 2016 NP Table of Contents Page INTRODUCTION...4 SECTION (8) (A) 1 A: TOTAL

More information

Texas Eastern Transmission, LP

Texas Eastern Transmission, LP Texas Eastern Transmission, LP 5400 Westheimer Court Houston, TX 77056-5310 (713) 627-5400 September 28, 2017 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E.

More information

WRAP Oil & Gas: Part 1: 2002/2005 and 2018 Area Source Emissions Inventory Improvements

WRAP Oil & Gas: Part 1: 2002/2005 and 2018 Area Source Emissions Inventory Improvements WRAP Oil & Gas: Part : 22/25 and 28 Area Source Emissions nventory mprovements WRAP SSJF Working Group Members and Other nterested Parties May 8, 27 WRAP Phase Project Overview Project is focused on developing

More information

Orange & Rockland Utilities, Inc. Marketer Meeting October 24, 2012

Orange & Rockland Utilities, Inc. Marketer Meeting October 24, 2012 Orange & Rockland Utilities, Inc. Marketer Meeting October 24, 2012 1 Robert J. Melvin Manager, Retail Access Customer Energy Services melvinr@oru.com (845) 577-3373 2 O&R Service Territory 3 O&R (NY)

More information

CITY OF PASADENA APPLICATION FOR PARTICIPATING TRANSMISSION OWNER STATUS

CITY OF PASADENA APPLICATION FOR PARTICIPATING TRANSMISSION OWNER STATUS CITY OF PASADENA APPLICATION FOR PARTICIPATING TRANSMISSION OWNER STATUS July 15, 2004 TABLE OF CONTENTS Page No. 1. Description of Pasadena s Transmission Lines and Facilities...1 A. Overview:... 1 B.

More information

Spring 2016 Gas/Electric Forum. March 1, 2016 Waltham, MA

Spring 2016 Gas/Electric Forum. March 1, 2016 Waltham, MA Spring 2016 Gas/Electric Forum March 1, 2016 Waltham, MA Agenda Welcome Gas/Electric Harmonization Update Operations Update Rich Paglia President, Maritimes & Northeast Pipeline Vice President, Marketing

More information

ROVER PIPELINE PROJECT Resource Report 10 Alternatives APPENDIX 10A. Maps

ROVER PIPELINE PROJECT Resource Report 10 Alternatives APPENDIX 10A. Maps ROVER PIPELINE PROJECT Resource Report 1 Alternatives APPENDIX 1A Maps FERC Proposed Compressor Certificated HP HP Current Proposed Abandoned Pollock 31,1 28,1 3, Epps 34,15 33,1 1,5 Shaw 32,3 28,1 4,2

More information

Tennessee Gas Pipeline Fall Operations Update Webex October 25, 2016

Tennessee Gas Pipeline Fall Operations Update Webex October 25, 2016 1 Tennessee Gas Pipeline 2016 Fall Operations Update Webex October 25, 2016 Agenda Sherri Glazebrook Director, Trans and Storage Svc, TGP & SNG, KMI East Region Brian Merchant Director, Engineering Gas

More information

Market Shifts: Infrastructure in the Northeast

Market Shifts: Infrastructure in the Northeast Market Shifts: Infrastructure in the Northeast Colette Breshears, Natural Gas & Infrastructure Intelligence October 19, 2017 info@genscape.com US: +1 502 583 3435 EU: +31 20 524 4089 Agenda Genscape who

More information

Greater Albuquerque Area Monthly Housing Trends vs. 2014

Greater Albuquerque Area Monthly Housing Trends vs. 2014 Month Greater Albuquerque Association of REALTORS Greater Albuquerque Area Monthly Housing Trends - 2013 vs. 2014 Class R1 (Existing Single-Family Detached) and Class R2 (Existing Condo/Townhome Attached)

More information

Entergy Gulf States, Inc. (Texas) Proposed Transmission Reliability Projects

Entergy Gulf States, Inc. (Texas) Proposed Transmission Reliability Projects Entergy Gulf States, Inc. (Texas) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 14, 2005 1 2004-06 EGSI-TX Transmission Western Region Reliability

More information

Reactive Power Requirements and Financial Compensation. Addendum to Draft Final Proposal

Reactive Power Requirements and Financial Compensation. Addendum to Draft Final Proposal Reactive Power Requirements and Financial Compensation July 21, 2016 Table of Contents 1. Introduction... 3 2. Changes to Proposal... 4 3. Plan for Stakeholder Engagement... 4 4.... 4 6. Next Steps...

More information

BC Hydro System 2011 Annual Progress Report

BC Hydro System 2011 Annual Progress Report March 1, 2011 Mr. Kyle R. Kohne, Chairman WECC Technical Studies Subcommittee Bonneville Power Administration P.O. Box 491 MS, TPP-OPP-3 Vancouver, WA 98666 Mr. Kent Bolton WECC Technical Staff 155 North

More information

Dawn Storage Pricing Summary last updated April 1, 2018

Dawn Storage Pricing Summary last updated April 1, 2018 Dawn Storage Pricing Summary last updated April 1, 2018 The table below illustrates how Union Gas enters into market priced storage services (park, loans, off peak, short & long term peak) and provides

More information

SHELL PIPELINE COMPANY LP ZYDECO PIPELINE COMPANY LLC

SHELL PIPELINE COMPANY LP ZYDECO PIPELINE COMPANY LLC F.E.R.C. No. S-162.3.0 Cancels F.E.R.C. No. S-162.2.0 SHELL PIPELINE COMPANY LP IN CONNECTION WITH ZYDECO PIPELINE COMPANY LLC JOINT TARIFF APPLYING ON THE TRANSPORTATION OF PETROLEUM ROUTE NO. 01 02 03

More information

SunZia Southwest Transmission Project

SunZia Southwest Transmission Project SunZia Southwest Transmission Project SunZia Project Update for the 9 th Annual Transmission Summit West October 13, 2017 SUNZIA SOUTHWEST TRANSMISSION PROJECT OCTOBER 13, 2017 0 SouthWestern Power Group

More information

Mobility Corridor Updates. Transit & Active Transportation Projects

Mobility Corridor Updates. Transit & Active Transportation Projects Mobility Corridor Updates Transit & Active Transportation Projects Manjeet Ranu, SEO East San Fernando Valley Transit Corridor Metro Board LPA selection: June 2018 Recently awarded $200 million in Senate

More information

Managing California s Electrical Supply System after the shut down of San Onofre Nuclear Generating Station

Managing California s Electrical Supply System after the shut down of San Onofre Nuclear Generating Station Managing California s Electrical Supply System after the shut down of San Onofre Nuclear Generating Station East Asian Alternative Energy Futures Workshop By the Nonproliferation Policy Education Center

More information

State Regulatory Affairs and Local Relations Update. ATC Customer Meeting November 19, 2009

State Regulatory Affairs and Local Relations Update. ATC Customer Meeting November 19, 2009 State Regulatory Affairs and Local Relations Update ATC Customer Meeting November 19, 2009 Project Certification Steve Parker Manager State Regulatory Affairs CA/CPCN Applications (Filed/Ordered/Under

More information

MMP Investigation of Arthur Kill 2 and 3

MMP Investigation of Arthur Kill 2 and 3 MMP Investigation of Arthur Kill 2 and 3 Requestor Consolidated Edison Company of New York, Inc. Facility Name Arthur Kill 2 and 3 Date of Request January 27, 2003 Type of Facility NG Generator Topic of

More information

We are filing these changes now to allow affected third parties sufficient lead time to prepare their systems for this change.

We are filing these changes now to allow affected third parties sufficient lead time to prepare their systems for this change. PSC REF#:279693 December 22, 2015 Jeffrey Ripp, Administrator Division of Energy Regulation Public Service Commission of Wisconsin (PSCW) 610 North Whitney Way P.O. Box 7854 Madison, Wisconsin 53707-7854

More information

Status of PNM s Completed Transmission Construction Projects 11/30/2017

Status of PNM s Completed Transmission Construction Projects 11/30/2017 Status of s Completed Transmission Construction Projects Second Tah Ta Hey 115/345 kv Transformer Yah Ta Hey Switching Station On January 9, 2015, filed with the NMPRC under NMPRC Rule 440 information

More information

Docket No. ER June 2018 Informational Report Energy Imbalance Market Transition Period Report Idaho Power Company

Docket No. ER June 2018 Informational Report Energy Imbalance Market Transition Period Report Idaho Power Company California Independent System Operator Corporation August 21, 2018 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California

More information

El Paso Pipeline Maintenance Summary

El Paso Pipeline Maintenance Summary El Paso Pipeline Maintenance Summary This document lists major maintenance and construction shutdowns that are being planned on the EPNG pipeline system for the next 12 to 15 months. The purpose of this

More information

U.S. GASOLINE AND DISTILLATE FUELS UPDATE - DECEMBER 20, 2017

U.S. GASOLINE AND DISTILLATE FUELS UPDATE - DECEMBER 20, 2017 U.S. GASOLINE AND DISTILLATE FUELS UPDATE - DECEMBER 20, 2017 PRICE TRENDS Monday, December 18 According to the Energy Information Administration (EIA), the average U.S. retail price for regular grade

More information

Insulator Replacements

Insulator Replacements A REPORT TO THE BOARD OF COMMISSIONERS OF PUBLIC UTILITIES Insulator Replacements Electrical Mechanical. Civil Protection & Control Transmission & Distribution Telecontrol System Planning HYDRO THE POWER

More information

Addendum StartPage: 0

Addendum StartPage: 0 Control Number : 42698 Item Number : 2 Addendum StartPage: 0 ^20x de.i^ WA OCI solar power November 4, 2015 -;, - L Li { Sent via Overnight UPS Delivery Public Utility Commission of Texas 1701 N. Congress

More information

Greater Albuquerque Area Monthly Housing Trends vs. 2011

Greater Albuquerque Area Monthly Housing Trends vs. 2011 Greater Albuquerque Area Monthly Housing Trends - 2010 vs. 2011 Class R1 (Existing Single-Family Detached) and Class R2 (Existing Condo/Townhome Attached) homes Data on this page was obtained from the

More information

Inventory Levels - All Prices. Inventory Levels - By Price Range

Inventory Levels - All Prices. Inventory Levels - By Price Range Inventory Levels - All Prices Idaho Falls Bonneville Total 3-Nov-17 198 128 326 2-Nov-18 155 134 289-11% Inventory Levels - By Price Range 3-Nov-17 2-Nov-18 0-100,000 17 11 100,001-125,000 15 9 125,001-150,000

More information

Transco s Atlantic Access Project

Transco s Atlantic Access Project FOR DISCUSSION PURPOSES ONLY NOT AN OFFER OR ACCEPTANCE OF AN OFFER Transco s Atlantic Access Project April 2012 Atlantic Access Overview Path Capacity (Mdt/d) Receipt Point Delivery Point Original Paths

More information

CHEVRON PHILLIPS CHEMICAL PIPELINE COMPANY LLC PETROCHEMICAL PRODUCTS (AS DEFINED HEREIN)

CHEVRON PHILLIPS CHEMICAL PIPELINE COMPANY LLC PETROCHEMICAL PRODUCTS (AS DEFINED HEREIN) (Cancels T.R.S. No. 48.0.0) CHEVRON PHILLIPS CHEMICAL PIPELINE COMPANY LLC LOCAL TARIFF Applying on Intrastate Transportation of PETROCHEMICAL PRODUCTS (AS DEFINED HEREIN) [C] Ethane-Propane Mixture System

More information

Important network developments in 2013

Important network developments in 2013 1 Overview 2013 Important network developments in 2013 Hauts de France II pipe New pipe to prepare the future connection of Dunkirk LNG terminal Cuvilly station Station upgrading to prepare the future

More information

Wednesday, April 20, 2016

Wednesday, April 20, 2016 Wednesday, April 20, 2016 MARCH 2015-MARCH 2016 REVENUE VARIANCE % CHANGE $8.6 4.3% $1.7 2.7% -$0.8-6.1% $0.3 6.3% $-21.3-53.4% $1.7 73.9% $-0.6 5.0% $-10.4-3.3% $365.0 $315.0 $311.2 $300.8 $265.0 $215.0

More information

Rate Schedules. Effective 1/1/2019

Rate Schedules. Effective 1/1/2019 Rate Schedules 2019 Effective 1/1/2019 SUMMARY OF RATE SCHEDULES REVISIONS FOR RATES EFFECTIVE JANUARY 1, 2019 (1) Rate component changes for Residential and Heating Service rate schedules. (2) General

More information

Like a Box of Chocolates The Condensate Dilemma. 3rd Annual NGLs Forum

Like a Box of Chocolates The Condensate Dilemma. 3rd Annual NGLs Forum Like a Box of Chocolates The Condensate Dilemma 3rd Annual NGLs Forum E. Russell Braziel RBN Energy, LLC September 23, 2013 Tsunami of Condensates Mb/d 1,600 1,400 1,200 1,000 800 600 400 200 0» Historically

More information

2012 Water Consumption Statistics Report. Water Services Department

2012 Water Consumption Statistics Report. Water Services Department 212 Water Consumption Statistics Report Water Services Department Issued: December 213 TABLE OF CONTENTS 212 Water Consumption Statistics Report December 213 212 GVWD Statistics Book - Notes...3 Annual

More information

Peninsula Corridor Electrification Project Cost / Schedule Update

Peninsula Corridor Electrification Project Cost / Schedule Update Peninsula Corridor Electrification Project Cost / Schedule Update LPMG Meeting November 20, 2014 Context Caltrain/high-speed rail blended system - Primarily 2 track system - Minimize impacts - Shared system

More information

ENERGY SLIDESHOW. Federal Reserve Bank of Dallas

ENERGY SLIDESHOW. Federal Reserve Bank of Dallas ENERGY SLIDESHOW Updated: January 16, 2019 ENERGY PRICES www.dallasfed.org/research/energy Brent & WTI & Crude Brent Oil Crude Oil Dollars per barrel 140 120 100 Brent (Jan 11 = $58.64) WTI (Jan 11 = $50.78)

More information

Tennessee Gas Pipeline. Enfield Customer Meeting October 19, 2016

Tennessee Gas Pipeline. Enfield Customer Meeting October 19, 2016 1 Tennessee Gas Pipeline Enfield Customer Meeting October 19, 2016 Agenda Brian Merchant Director, Engineering Gas Control, KMI East Region Ron Besette Director, OPS, Division 10 Office, KMI East Region

More information

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L79. October 18, 2016

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L79. October 18, 2016 Decision 21481-D01-2016 October 18, 2016 Alberta Utilities Commission Decision 21481-D01-2016 Proceeding 21481 Application 21481-A001 October 18, 2016 Published by the: Alberta Utilities Commission Fifth

More information

Market Congestion Planning Study (South)- Robustness Analysis. Economic Planning Users Group Meeting August 11 th, 2017

Market Congestion Planning Study (South)- Robustness Analysis. Economic Planning Users Group Meeting August 11 th, 2017 Market Congestion Planning Study (South)- Robustness Analysis Economic Planning Users Group Meeting August 11 th, 2017 Key Takeaways The benefit calculations were updated due to a flowgate rating correction

More information

March 14, Please contact the undersigned directly with any questions or concerns regarding the foregoing.

March 14, Please contact the undersigned directly with any questions or concerns regarding the foregoing. California Independent System Operator Corporation The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 March 14, 2017 Re: California

More information

Peninsula Corridor Electrification Project (PCEP)

Peninsula Corridor Electrification Project (PCEP) Peninsula Corridor Electrification Project (PCEP) Q4 Quarterly Update #11 April 1 June 30, 2017 JPB Board Meeting August 3, 2017 Agenda Item # 8a Electrification - Infrastructure Design Build Contract

More information

Public Service Company of Colorado Transmission Projects Status. CCPG May 5, 2016

Public Service Company of Colorado Transmission Projects Status. CCPG May 5, 2016 Public Service Company of Colorado Transmission Projects Status CCPG May 5, 2016 1 Transmission Ownership Colorado 2016 Transmission Planning Drivers Load Service / Near-Term (1-5 years) TPL Studies (5

More information

Oregon Smoke Management Annual Report

Oregon Smoke Management Annual Report Oregon Smoke Management Annual Report OREGON DEPARTMENT OF FORESTRY FIRE PROTECTION DIVISION SMOKE MANAGEMENT AND FUELS General File 1-2-5-910 OREGON SMOKE MANAGEMENT ANNUAL REPORT Prepared By: FIRE PROTECTION

More information

Greater Albuquerque Area Monthly Housing Trends vs. 2016

Greater Albuquerque Area Monthly Housing Trends vs. 2016 Month Greater Albuquerque Area Monthly Housing Trends - 2015 vs. 2016 Class R1 (Existing Single-Family Detached) and Class R2 (Existing Condo/Townhome Attached) homes Data on this page was obtained from

More information

The Dash 9 Locomotive Pack

The Dash 9 Locomotive Pack The Dash 9 Locomotive Pack 1 BACKGROUND...2 1.1 Dash 9-44CW (GE C44-9W)...2 1.2 BNSF...2 1.3 Norfolk Southern...2 1.4 Canadian National Railway...2 2 ROLLING STOCK...3 2.1 Dash 9 BNSF...3 2.2 Dash 9 BNSF

More information

Directions to Mt Pleasant, TX 252 mi about 5 hours 1 min

Directions to Mt Pleasant, TX 252 mi about 5 hours 1 min Directions to Mt Pleasant, TX 252 mi about 5 hours 1 min Loading... 2013 Google - Map data 2013 Google - https://maps.google.com/maps?f=d&source=s_d&saddr=mt+pleasant,+tx&daddr=diana,+tx+to:marshall,+tx+to:carthage,+tx+to:bossier+city,+la+to:m

More information

Section 5. Crude Oil and Natural Gas Resource Development

Section 5. Crude Oil and Natural Gas Resource Development Section 5. Crude Oil and Natural Gas Resource Development The September 4 rotary rig count was 1,4, slightly higher than the count in August 4 and 13 percent higher than the count in September 3. Of the

More information

TRAFFIC VOLUME TRENDS

TRAFFIC VOLUME TRENDS Page 1 U. S. Department Transportation Federal Highway Administration Office Highway Policy Information TRAFFIC VOLUME TRENDS September Travel on all roads and streets changed by +2.5 (5.8 billion vehicle

More information

DISNEYLAND PARIS SUMMER PACKAGE PRICES

DISNEYLAND PARIS SUMMER PACKAGE PRICES Disneyland Paris Hotel & Specially Handpicked Hotel (except Adagio Marne La Vallee Val d'europe, Vienna House Magic Circus Hotel & Vienna House Dream Castle Hotel ) March 2018 April 2018 May 2018 June

More information

Houston Regional Monitoring. Air Quality Update to RAQPAC

Houston Regional Monitoring. Air Quality Update to RAQPAC Air Quality Update to RAQPAC September 27, 2017 Presented by: Steve Hansen Technical Advisory Committee s Purpose is a voluntary industry-funded technical resource dedicated to performing ambient air monitoring

More information

Greater Albuquerque Area Monthly Housing Trends vs. 2017

Greater Albuquerque Area Monthly Housing Trends vs. 2017 Month Greater Albuquerque Association of REALTORS Greater Albuquerque Area Monthly Housing Trends - 2016 vs. 2017 Class R1 (Existing Single-Family Detached) and Class R2 (Existing Condo/Townhome Attached)

More information

Memorandum October 5, 2017

Memorandum October 5, 2017 614 Magnolia Avenue Ocean Springs, Mississippi 39564 228.818.9626 Memorandum October 5, 2017 To: Gary Miller, U.S. Environmental Protection Agency From: David Keith, John Laplante, Matt Henderson, and

More information

APPENDIX B. Origin Destination Study Data

APPENDIX B. Origin Destination Study Data APPENDIX B Origin Destination Study Data - TABLE OF CONTENTS - Page No. EXECUTIVE SUMMARY... 1 Map of the Study area with Site Locations... 2 Summary Table of Results for the TH 14 Corridor Study... 3

More information

A REPORT TO THE BOARD OF COMMISSIONERS OF PUBLIC UTILITIES. Electrical. Mechanical. Civil. Protection & Control. Transmission & Distribution

A REPORT TO THE BOARD OF COMMISSIONERS OF PUBLIC UTILITIES. Electrical. Mechanical. Civil. Protection & Control. Transmission & Distribution A REPORT TO THE BOARD OF COMMISSIONERS OF PUBLIC UTILITIES Electrical.1_ UFSS#p A:_. DAVID/ IC, L re Mechanical Civil Protection & Control an LAND& 4^ Transmission & Distribution Telecontrol System Planning

More information

Mobility Corridor Updates. Transit & Active Transportation Projects

Mobility Corridor Updates. Transit & Active Transportation Projects Mobility Corridor Updates Transit & Active Transportation Projects Laura Cornejo, DEO Regional Planner Regional Operator Metro is LA County s Regional Builder/Funder Rail Bus Service (Metro/Muni/Local)

More information

MINUTES OF THE MEETING OF THE BOARD OF DIRECTORS OF THE BRAZORIA COUNTY GROUNDWATER CONSERVATION DISTRICT

MINUTES OF THE MEETING OF THE BOARD OF DIRECTORS OF THE BRAZORIA COUNTY GROUNDWATER CONSERVATION DISTRICT MINUTES OF THE MEETING OF THE BOARD OF DIRECTORS OF THE BRAZORIA COUNTY GROUNDWATER CONSERVATION DISTRICT August 15, 2012 The Board of Directors of the Brazoria County Groundwater Conservation District

More information

ALTERNATIVE PROJECT DELIVERY

ALTERNATIVE PROJECT DELIVERY ALTERNATIVE PROJECT DELIVERY Varuna Singh SH 288 IN HARRIS COUNTY SH 288 in Harris County SEGMENT 1: 8 New Tolled Direct Connectors at SH 288 and Beltway 8 Existing traffic uses frontage roads today to

More information

1975 Wilbur Smith Traffic Study, Parking Feasibility. tudy for the City of. aguna Beach dated March 28, 1975

1975 Wilbur Smith Traffic Study, Parking Feasibility. tudy for the City of. aguna Beach dated March 28, 1975 1975 Wilbur Smith Traffic Study, Parking Feasibility tudy for the City of. aguna Beach dated March 28, 1975 6 CAII'-E: WILSMITH CONSULTING ENGINEERS AND PLANNERS CALIFORNIA TELEX 57.3469!I~OO WILSHIRE

More information

August 15, Please contact the undersigned directly with any questions or concerns regarding the foregoing.

August 15, Please contact the undersigned directly with any questions or concerns regarding the foregoing. California Independent System Operator Corporation The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 August 15, 2017 Re: California

More information

December 4, Docket: ER Energy Imbalance Market Special Report Transition Period July 2018 for Idaho Power Company

December 4, Docket: ER Energy Imbalance Market Special Report Transition Period July 2018 for Idaho Power Company California Independent System Operator Corporation December 4, 2018 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California

More information

Individual Certification Programs Status Update

Individual Certification Programs Status Update Individual Certification Programs Status Update Breakdown as of 10/01/2018 Andri Orphanides 18000 16000 14000 12000 10000 8000 6000 4000 2000 0 Overall Program Growth API 510 API 570 API 653 Other Program

More information

42 PGC Rate E-Factor Total Rate Currently effective Rate Increase (Decrease) in Rate 0.

42 PGC Rate E-Factor Total Rate Currently effective Rate Increase (Decrease) in Rate 0. Line No. Exhibit 1-A Schedule 1 Sheet 1 of 2 COMPUTATION OF CHANGE IN RATE PURSUANT TO SECTION 1307(f) APPLICATION PERIOD: OCTOBER, 2016 THROUGH SEPTEMBER, 2017 Description Amount (1) 1 Purchased Gas Commodity

More information

Impacts of Recent Hurricanes and the Outlook for Energy Markets

Impacts of Recent Hurricanes and the Outlook for Energy Markets Impacts of Recent Hurricanes and the Outlook for Energy Markets Presentation to Baton Rouge Rotary Club November 8, 2005 David E. Dismukes Center for Louisiana State University Summary on Impacts of Hurricanes

More information

CHECKING SLIP-IMPORTANT TEXAS AUTOMOBILE INSURANCE PLAN ASSOCIATION RULES AND RATING MANUAL

CHECKING SLIP-IMPORTANT TEXAS AUTOMOBILE INSURANCE PLAN ASSOCIATION RULES AND RATING MANUAL CHECKING SLIP-IMPORTANT TEXAS AUTOMOBILE INSURANCE PLAN ASSOCIATION RULES AND RATING MANUAL Revision Number 14 You may view and search the current and archived electronic interactive versions of the Rules

More information

Across the Nation...it must be Dun! (903)

Across the Nation...it must be Dun! (903) Across the Nation...it must be Dun! (9)891-9660 Home History Projects Equipment Safety Gallery Contact Dun Transportation & Stringing, Inc. Projects Within The Last 20 Years CUSTOMER LOCATION DATE SCOPE

More information

Inventory Levels - All Prices. Inventory Levels - By Price Range

Inventory Levels - All Prices. Inventory Levels - By Price Range Inventory Levels - All Prices Idaho Falls Bonneville Total 7-Apr-17 154 111 265 6-Apr-18 113 91 204-23% Inventory Levels - By Price Range 7-Apr-17 6-Apr-18 0-100,000 36 10 100,001-125,000 13 9 125,001-150,000

More information

CHEVRON PHILLIPS CHEMICAL PIPELINE COMPANY LLC PETROCHEMICAL PRODUCTS (AS DEFINED HEREIN)

CHEVRON PHILLIPS CHEMICAL PIPELINE COMPANY LLC PETROCHEMICAL PRODUCTS (AS DEFINED HEREIN) (Cancels T.R.S. No. 48.1.0) CHEVRON PHILLIPS CHEMICAL PIPELINE COMPANY LLC LOCAL TARIFF Applying on Intrastate Transportation of PETROCHEMICAL PRODUCTS (AS DEFINED HEREIN) Rates in Cents per Barrel of

More information

Inventory Levels - All Prices. Inventory Levels - By Price Range

Inventory Levels - All Prices. Inventory Levels - By Price Range Inventory Levels - All Prices Idaho Falls Bonneville Total 3-Mar-17 152 108 260 2-Mar-18 109 78 187-28% Inventory Levels - By Price Range 3-Mar-17 2-Mar-18 0-100,000 41 6 100,001-125,000 19 8 125,001-150,000

More information

Ambient PM 10 Monitoring Sechelt, B.C Update

Ambient PM 10 Monitoring Sechelt, B.C Update Ministry of Environment LOWER MAINLAND REGION Ambient PM 10 Monitoring Sechelt, B.C. 2004-2005 Update E N V I R O N M E N T A L Q U A L I T Y Library and Archives Canada Cataloguing in Publication Data

More information

ENERGY SLIDESHOW. Federal Reserve Bank of Dallas

ENERGY SLIDESHOW. Federal Reserve Bank of Dallas ENERGY SLIDESHOW Updated: March 13, 2018 ENERGY PRICES www.dallasfed.org/research/energy Brent & WTI & Crude Brent Oil Crude Oil Dollars per barrel 140 Brent (Mar 9 = $65.12) WTI (Mar 9 = $61.65) 120 100

More information

UPDATE OF THE SURVEY OF SULFUR LEVELS IN COMMERCIAL JET FUEL. Final Report. November 2012

UPDATE OF THE SURVEY OF SULFUR LEVELS IN COMMERCIAL JET FUEL. Final Report. November 2012 CRC Project AV-1-10 UPDATE OF THE SURVEY OF SULFUR LEVELS IN COMMERCIAL JET FUEL Final Report November 2012 COORDINATING RESEARCH COUNCIL, INC. 3650 MANSELL ROAD SUITE 140 ALPHARETTA, GA 30022 The Coordinating

More information