June 30, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Delivery Point Entitlement Filing Docket No.

Size: px
Start display at page:

Download "June 30, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Delivery Point Entitlement Filing Docket No."

Transcription

1 Transcontinental Gas Pipe Line Company, LLC 2800 Post Oak Boulevard (77056) P.O. Box 1396 Houston, Texas / June 30, 2009 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Attention: Reference: Kimberly D. Bose Transcontinental Gas Pipe Line Company, LLC Delivery Point Entitlement Filing Docket No. RP09- Ladies and Gentlemen: Pursuant to Section 4 of the Natural Gas Act and Part 154 of the Federal Energy Regulatory Commission s ( Commission ) Regulations, Transcontinental Gas Pipe Line Company, LLC ( Transco ) hereby submits for filing certain revised tariff sheets to its FERC Gas Tariff, Fourth Revised Volume No. 1 ( Tariff ), which tariff sheets are enumerated in Appendix A attached hereto. The proposed effective date of the tariff sheets is July 30, Statement of Nature, Reasons and Basis The purpose of the instant filing is to update certain Delivery Point Entitlement (DPE) tariff sheets in accordance with the provisions of Section 19 of the General Terms and Conditions of Transco s Tariff. Specifically, the tariff sheets submitted herewith reflect revisions to include changes associated with completed incremental capacity expansions, company name changes, and other miscellaneous adjustments. Appendix B attached herein contains the explanations of the changes on each revised tariff sheet. Proposed Effective Date The revised tariff sheets submitted herein are proposed to be effective on July 30, In the event the tariff sheets are suspended, modified, or accepted subject to conditions, in accordance with Section 154.7(a)(9) of the Commission s regulations, Transco reserves the right to file a later motion to place such tariff sheets into effect at the end of the applicable suspension period.

2 Federal Energy Regulatory Commission June 30, 2009 Page 2 Materials Submitted Herewith In accordance with, Section 154.7(a)(1) of the Commission s Regulations, the following material is submitted herewith: (1) The revised tariff sheets, and as required by Section of the Regulations, a diskette copy of such sheet labeled TF ASC; (2) A redlined version of the tariff sheets submitted in the instant filing in accordance with the provisions of Section (a) of the Regulations; (3) Appendix A which contains the list of tariff sheets being revised with the instant filing; and Appendix B which contains the explanation of the changes to each revised tariff sheet. Posting and Certification of Service In accordance with the provisions of Section 154.2(d) of the Commission s Regulations, copies of this filing are available for public inspection, during regular business hours, in a convenient form and place at Transco s main office at 2800 Post Oak Boulevard in Houston, Texas. In addition, Transco is serving copies of the instant filing to its affected customers and interested State Commissions. Any communication regarding this filing should be sent to: Scott C. Turkington Director, Rates & Regulatory P.O. Box 1396 Houston, Texas and copies should be mailed to: Julie Pradel Marshia Younglund Senior Counsel Manager, Regulatory Affairs P.O. Box 1396 The Williams Companies, Inc. Houston, Texas Eye Street, N.W., Suite 900 Washington, D.C

3 Federal Energy Regulatory Commission June 30, 2009 Page 3 Respectfully submitted, Transcontinental Gas Pipe Line Company, LLC /s/ Marg Camardello By Marg Camardello Manager, Certificates & Tariffs (713) Filed: June 30, 2009

4 APPENDIX A LIST OF REVISED TARIFF SHEETS First Revised Sheet No. 370 First Revised Sheet No. 371 First Revised Sheet No. 378 First Revised Sheet No. 380 First Revised Sheet No. 383 First Revised Sheet No. 388 First Revised Sheet No. 393 First Revised Sheet No. 394 First Revised Sheet No. 395 First Revised Sheet No. 396 First Revised Sheet No. 398 First Revised Sheet No. 399 First Revised Sheet No. 400 First Revised Sheet No. 405 First Revised Sheet No. 406 First Revised Sheet No. 407

5 APPENDIX B DESCRIPTION OF DELIVERY POINT ENTITLEMENT REVISIONS Sheet No. First Revised Sheet No. 370 First Revised Sheet No. 371 Revision Corporate name change - from Commonwealth Gas Services to Columbia Gas of Virginia. Corporate name change - from Sun Oil Company to Sunoco, Inc. (R&M). Corporate name changed from PPL Gas Utilities to UGI Central Penn Gas, Inc and PG Energy Inc. to UGI Penn Natural Gas, Inc. as a result of the acquisition of the two companies by UGI Utilities, Inc. Correct UGI to full name, UGI Utilities, Inc. First Revised Sheet No. 378 Footnote 4 was added as a result of the turn-back of 28,985 Mcf/d of FT capacity by Alabama Gas Corp. Southern Company acquired 22 Mmcf/d of the available capacity through an open season, and the remaining 6 Mmcf/d is currently posted as available capacity on Transco s EBB. Other revisions reflect the corporate reorganization and consolidation of Alabama Gas Corp - Linden, Alabama Gas Corp Thomaston, and Alabama Gas Corp - Clanton, which reorganization resulted in an additional DPE of 5,730 Mcf/d for Alabama Gas Corp. Footnote 3 was revised to reflect the termination of the agency relationship between Alabama Gas Corp and TEMCO (now Williams Gas Marketing, Inc.). First Revised Sheet No. 380 Added facility group geographical area information that has been inadvertently omitted. Increased DPE at Wansley to reflect subscription by Municipal Electric Authority of Georgia to 46,377 Mcf/day of FT capacity in Phase II of Transco s Momentum Expansion Project. Corrected name of delivery point to Center-Dahlberg. Transcontinental Gas Pipe Line Company, LLC June 30, 2009 Page 1 of 4

6 APPENDIX B DESCRIPTION OF DELIVERY POINT ENTITLEMENT REVISIONS Sheet No. First Revised Sheet No. 383 First Revised Sheet No. 388 First Revised Sheet No. 393 First Revised Sheet No. 394 First Revised Sheet No. 395 Revision Corporate name change - from Commonwealth Gas Services to Columbia Gas of Virginia. Added Prince William delivery point to reflect Columbia Gas of Virginia s subscription to 38,647 Mcf/d of Rate Schedule FT capacity in Transco s Potomac expansion project in Docket No. CP Revised Footnote 4 to reflect TEMCO s permanent release to various customers of 77,295 Mcf/d of Rate Schedule FT capacity. Corporate name changes from Amerada Hess to Hess Corporation and from TEMCO to Williams Gas Marketing, Inc. Added Westmore Road and Rock Creek delivery points to reflect Washington Gas Light Company s subscription to 96,618 Mcf/d of Rate Schedule FT capacity in Transco s Potomac expansion project in Docket No. CP Deleted the Frederick delivery point to reflect the transfer of DPE from Frederick to Rock Creek and Westmore Road. Increased DPE at Hockessin and Wilmington to reflect Delmarva Power & Light Company s subscription to 9,662 and 14,493 Mcf/d, respectively, of Rate Schedule FT capacity in Transco s Sentinel expansion project in Docket No. CP Increased DPE at Parkesburg and revised footnote 7 to reflect Chesapeake Utilities Corporation d/b/a Delaware Division s subscription to 9,662 Mcf/d of Rate Schedule FT capacity in Transco s Sentinel expansion project in Docket No. CP Footnotes 7, 8, and 10 revised to correct corporate names. Footnote 13 deleted to reflect the permanent release by Dow Reichhold Specialty Latex LLC (formerly Reichhold Chemicals, Inc.) to Chesapeake Utilities Corporation d/b/a/ Delaware Division of Mmcf/day of Rate Schedule FT capacity. Transcontinental Gas Pipe Line Company, LLC June 30, 2009 Page 2 of 4

7 APPENDIX B DESCRIPTION OF DELIVERY POINT ENTITLEMENT REVISIONS Sheet No. First Revised Sheet No. 396 First Revised Sheet No. 398 First Revised Sheet No. 399 First Revised Sheet No. 400 Revision Corrected spelling of Downingtown. Increased DPE at New Village #2 to reflect Pivotal Utility Holdings subscription to 4,831 Mcf/d of Rate Schedule FT capacity in Transco s Sentinel expansion project in Docket No. CP Footnote 5 updated to reflect the turn-back of service under Rate Schedule SS-2 by KCS Energy and the acquisition of the resulting FT capacity by Conectiv Energy Supply, Inc. through an open season. Footnote 6 updated to reflect KCS Energy s permanent release of 5,778 Mcf/d of Rate Schedule FT capacity to Sprague Energy Corp. (also includes a correction to reflect the conversion to open access of Rate Schedule X-314, which occurred prior to KCS s turn-back). Increased DPE at Long Beach, amended footnote 8 and added footnote 16 to reflect Keyspan Gas East Corporation d/b/a National Grid s subscription to 96,618 Mcf/d of Rate Schedule FT capacity in Transco s Leidy to Long Island expansion project in Docket No. CP Revised footnotes 11 and 15 to reflect BP Energy Company s permanent release of 24,155 Mcf/d of Rate Schedule FT capacity to Keyspan Gas East Corporation d/b/a National Grid. Other footnotes updated to reflect corrections to or changes in company names (footnotes 5, 9, 10, 12, 13, and 14) and rate schedule conversion (footnote 7). Corporate name change from PG Energy Inc. to UGI Penn Natural Gas, Inc. as a result of the acquisition by UGI Utilities, Inc. Footnote 6 corrected to reflect full name of Enmark Gas Corporation. Revised footnote 5 to reflect corporate name change from Amerada Hess to Hess Corporation. Transcontinental Gas Pipe Line Company, LLC June 30, 2009 Page 3 of 4

8 APPENDIX B DESCRIPTION OF DELIVERY POINT ENTITLEMENT REVISIONS Sheet No. First Revised Sheet No. 405 First Revised Sheet No. 406 First Revised Sheet No. 407 Revision Corporate name change from Sun Oil Company to Sunoco, Inc. (R&M). Corporate name change from PPL Gas Utilities to UGI Central Penn Gas, Inc. as a result of the acquisition by UGI Utilities, Inc. Revised footnote 5 to reflect corporate name change from Horsehead Resource Development Co. to Horsehead Corporation. Corrected UGI to full name, UGI Utilities, Inc. Transcontinental Gas Pipe Line Company, LLC June 30, 2009 Page 4 of 4

9 Transcontinental Gas Pipe Line Company, LLC FERC Gas Tariff First Revised Sheet No. 370 Fourth Revised Volume No. 1 Superseding Original Sheet No. 370 INDEX OF DAILY FACILITY GROUP AND DELIVERY POINT ENTITLEMENTS - AND RELATED MAPS ---- Maps: ---- Sheet No. --- Legend 372 Zone Zone Zone Philadelphia - New York Portion of Zone Leidy Line Portion of Zone Customer ---- Zone 4: Alabama Gas Corporation 378 Atlanta Gas Light Company 379 Georgia Power 380 Municipal Gas Authority of Georgia 381 Zone 5: Columbia Gas of Virginia 383 Danville, Virginia 384 Fort Hill Natural Gas Authority 385 Lexington, North Carolina 386 Piedmont Natural Gas Company, Inc. 387 Public Service Company of North Carolina, Inc. 389 Richmond, City of 390 South Carolina Pipeline Corporation 391 Virginia Natural Gas 392 Washington Gas Light Company 393 Issued by: Frank J. Ferazzi, Vice President Issued on: June 30, 2009 Effective on: July 30, 2009

10 Transcontinental Gas Pipe Line Company, LLC FERC Gas Tariff First Revised Sheet No. 371 Fourth Revised Volume No. 1 Superseding Original Sheet No. 371 INDEX OF DAILY FACILITY GROUP AND DELIVERY POINT ENTITLEMENTS - AND RELATED MAPS ---- Customer Sheet No Zone 6: Delmarva Power & Light Company 394 Eastern Shore Natural Gas Company 395 Pivotal Utility Holdings, Inc. (Elizabethtown Gas Company) 396 National Fuel Gas Supply Corporation 397 New York Facilities Group 398 UGI Penn Natural Gas, Inc. 399 PECO Energy Company 400 Philadelphia Gas Works 401 PSEG Energy Resources and Trade, LLC 402 South Jersey Gas Company 404 Sunoco, Inc. (R&M) 405 UGI Central Penn Gas, Inc. 406 UGI Utilities, Inc. 407 Issued by: Frank J. Ferazzi, Vice President Issued on: June 30, 2009 Effective on: July 30, 2009

11 Transcontinental Gas Pipe Line Company, LLC FERC Gas Tariff First Revised Sheet No. 378 Fourth Revised Volume No. 1 Superseding Original Sheet No. 378 ZONE 4 ALABAMA GAS CORPORATION -- - Facility Linden Thomaston Selma 40 (4) - 40 (4) - Total Montgomery 100 (4) (4) - Birmingham 100 (4) (4) - Clanton Total Total Firm Contract 98.0 (3,4) 98.0 (3,4) (3) Includes presently authorized firm service under Rate Schedule FT. Available firm quantities limited to individual rate schedule provisions. (4) Includes MMCF/D delivered for Southern Company Services, Inc under Rate Schedule FT. Issued by: Frank J. Ferazzi, Vice President Issued on: June 30, 2009 Effective on: July 30, 2009

12 Transcontinental Gas Pipe Line Company, LLC FERC Gas Tariff First Revised Sheet No. 380 Fourth Revised Volume No. 1 Superseding Original Sheet No. 380 ZONE 4 GEORGIA POWER - - Facility Wansley 261 (4) (4) - 7 Center-Dahlberg Total Total Firm Contract (3&4) (3&4) (3) Includes presently authorized firm service under Rate Schedule FT. Available firm quantities limited to individual rate schedule provisions. (4) Includes MMCF/D delivered for Oglethorpe Power Corp. and MMCF/D delivered for Municipal Electric Authority of Georgia under Rate Schedule FT. Issued by: Frank J. Ferazzi, Vice President Issued on: June 30, 2009 Effective on: July 30, 2009

13 Transcontinental Gas Pipe Line Company, LLC FERC Gas Tariff First Revised Sheet No. 383 Fourth Revised Volume No. 1 Superseding Original Sheet No. 383 ZONE 5 COLUMBIA GAS OF VIRGINIA Facility Brockway Glass Chatham Altavista Brookneal Lynchburg Total L South Boston Chase City South Hill Lawrenceville Emporia Hopewell Total - 97 (4) - 97 (4) 12 Virginia Fiber Scottsville Waldrop Gordonsville Total Fredericksburg Prince William Total Total Firm Contract (3,4&5) (3,4&5) (3) Includes presently authorized firm service under Rate Schedules FT and GSS. (4) Includes 78 MMCF/D for various shippers under Rate Schedule FT. (5) Includes.336 MMCF/D delivered for City of Greenwood under Rate Schedule FT. Issued by: Frank J. Ferazzi, Vice President Issued on: June 30, 2009 Effective on: July 30, 2009

14 Transcontinental Gas Pipe Line Company, LLC FERC Gas Tariff First Revised Sheet No. 388 Fourth Revised Volume No. 1 Superseding Original Sheet No. 388 ZONE 5 PIEDMONT NATURAL GAS COMPANY, INC Facility L Pleasant Hill 77 (9) - 71 (9) - Ahoskie 77 (9) - 71 (9) - Total Total Firm Contract (3,8) (4,8) (3) Includes presently authorized firm service under Rate Schedules FT, GSS and LG-A. Available firm quantities limited to individual rate schedule provisions. (4) Includes presently authorized firm service under Rate Schedules FT and GSS. (5) The Facility Group maximum is 508 MMCF/D for Facility Group 10 plus the volume of gas in MMCF/D previously flowing under Rate Schedules FT-NT and NIPPS. (6) The Facility Group maximum is 333 MMCF/D for Facility Group 10 plus the volume of gas in MMCF/D previously flowing under Rate Schedules FT-NT and NIPPS. (7) Hicks Crossroads is in Facility Group 9, but the delivery is included in Facility Group 10 group total. (8) Includes MMCF/D delivered for Hess Corporation, MMCF/D delivered for Williams Gas Marketing, Inc. and MMCF/D delivered for Tyson Foods under Rate Schedule FT. (9) The sum of Pleasant Hill, Ahoskie and Cardinal may not exceed 104 MMCF/D during the Winter Period or 98 MMCF/D during the Summer Period. Issued by: Frank J. Ferazzi, Vice President Issued on: June 30, 2009 Effective on: July 30, 2009

15 Transcontinental Gas Pipe Line Company, LLC FERC Gas Tariff First Revised Sheet No. 393 Fourth Revised Volume No. 1 Superseding Original Sheet No. 393 ZONE 5 WASHINGTON GAS LIGHT COMPANY Facility Bull Run Herndon Dranesville Total Westmore Rd (4) Rock Creek (4) Total Total Firm Contract (3) (3) (3) Includes presently authorized firm service under Rate Schedules FT and GSS. (4) Facility Group 14 is in Zone 6. Issued by: Frank J. Ferazzi, Vice President Issued on: June 30, 2009 Effective on: July 30, 2009

16 Transcontinental Gas Pipe Line Company, LLC FERC Gas Tariff First Revised Sheet No. 394 Fourth Revised Volume No. 1 Superseding Original Sheet No. 394 ZONE 6 DELMARVA POWER & LIGHT COMPANY Facility Parkesburg Total L Hockessin Total Wilmington Total Total Firm Contract (3) (4) (3) Includes presently authorized firm service under Rate Schedules FT, GSS, LG-A and LNG. (4) Includes presently authorized firm service under Rate Schedules FT and GSS. Available firm quantities limited to individual rate schedule provisions. Issued by: Frank J. Ferazzi, Vice President Issued on: June 30, 2009 Effective on: July 30, 2009

17 Transcontinental Gas Pipe Line Company, LLC FERC Gas Tariff First Revised Sheet No. 395 Fourth Revised Volume No. 1 Superseding Original Sheet No. 395 ZONE 6 EASTERN SHORE NATURAL GAS COMPANY Facility Parkesburg 57 (6) - 36(6) - Total L Eastern Hockessin Total Total Firm Contract 57.1 (3,5-12) 54.5 (4-12) (3) Includes presently authorized firm service under Rate Schedules GSS, LG-A and LSS. (4) Includes presently authorized firm service under Rate Schedule GSS. (5) Includes 9.3 MMCF/D for The Premcor Refining Group Inc. of authorized firm transportation under Rate Schedule FT. (6) Includes MMCF/D delivered for Peco Energy Company under Rate Schedule FT. (7) Includes MMCF/D for Chesapeake Utilities Corporation d/b/a Delaware Division under Rate Schedule FT. (8) Includes MMCF/D for Chesapeake Utilities Corporation d/b/a Maryland Division under Rate Schedule FT. (9) Includes MMCF/D for Pivotal Utility Holdings, Inc. under Rate Schedule FT. (10) Includes MMCF/D for Easton Utilities Commission under Rate Schedule FT. (11) Includes MMCF/D for Formosa Plastics Corporation Delaware under Rate Schedule FT. (12) Includes MMCF/D for City of Dover, Delaware under Rate Schedule FT. Issued by: Frank J. Ferazzi, Vice President Issued on: June 30, 2009 Effective on: July 30, 2009

18 Transcontinental Gas Pipe Line Company, LLC FERC Gas Tariff First Revised Sheet No. 396 Fourth Revised Volume No. 1 Superseding Original Sheet No. 396 ZONE 6 PIVOTAL UTILITY HOLDINGS, INC. (ELIZABETHTOWN GAS COMPANY) Facility Downingtown Total Pennington Total Ford Motors Grandview Cloverleaf Total Erie Street North Avenue Total Clinton Spruce Run New Village # Total Total Firm Contract (3,5,6&7) (4,6&7) (3) Includes presently authorized firm service under Rate Schedules FT, X-269, X-270, X-276, GSS, LG-A, LNG, S-2, LSS and SS-1. Available firm quantities limited to individual rate schedule provisions. (4) Includes presently authorized firm service under Rate Schedules FT, X-269, X-270, X-276 and GSS. (5) Includes MMCF/D delivered for Conectiv Energy Supply, Inc. under Rate Schedule FT. (6) Includes MMCF/D delivered for Sprague Energy Corp. previously flowing under Rate Schedule FT. (7) Facility Groups 14, 16, 17, 19 & 20 cannot exceed 239 during the winter period and 173 during the summer period. Issued by: Frank J. Ferazzi, Vice President Issued on: June 30, 2009 Effective on: July 30, 2009

19 Transcontinental Gas Pipe Line Company, LLC FERC Gas Tariff First Revised Sheet No. 398 Fourth Revised Volume No. 1 Superseding Original Sheet No. 398 ZONE 6 NEW YORK FACILITIES GROUP (5) Facility Long Beach 529 (9,16) (9,16) - Narrows 336 (6) (6) - Total Central Manhattan 721 (10,11&12) (10,11,14&15) - Manhattan 484 (13&15) Total (6) (6) Total Firm Contract (3,7 to 13,15&16) (4,7 to 11,14,15&16) (3) Includes presently authorized firm service under Rate Schedules FT, GSS, S-2, LSS, SS-1 and SS-2, plus the volume of gas in MMCF/D previously flowing under Rate Schedule X-315. (4) Includes presently authorized firm service under Rate Schedules FT and GSS, plus the volume of gas in MMCF/D previously flowing under Rate Schedule X-315. Available firm quantities limited to individual rate schedule provisions. (5) Group consists of The Brooklyn Union Gas Company d/b/a National Grid NY, Consolidated Edison Company of New York, Inc. and KeySpan Gas East Corporation d/b/a National Grid. (6) The sum of Facility Group 19 and Narrows may not exceed 1,265 MMCF/D during the winter period and 1,149 MMCF/D during the summer period. (7) Includes MMCF/D delivered for New York Power Authority under Rate Schedule FT (formerly FT-NT). (8) Sum of Facility Groups 17 and 19 cannot exceed 1,576 MMCF/D in the winter period and 1,319 MMCF/D in the summer period. (9) Includes MMCF/D for Hess Corporation and MMCF/D for NJR Energy Services Company under Rate Schedule FT. (10) Includes MMCF/D for Consolidated Edison Energy, Inc. under Rate Schedule FT. (11) Includes MMCF/D for KeySpan Gas East Corporation d/b/a National Grid under Rate Schedule FT. (12) Includes MMCF/D for Washington Gas Light Company under Rate Schedule FT during the winter period. (13) Includes MMCF/D for Washington Gas Light Company under Rate Schedule FT during the winter period. (14) Includes MMCF/D for Washington Gas Light Company under Rate Schedule FT during the summer period. (15) Includes MMCF/D for KeySpan Gas East Corporation d/b/a/ National Grid under Rate Schedule FT. (16) Includes 96.6 MMCF/D for KeySpan Gas East Corporation d/b/a National Grid under Rate Schedule FT that is nominatable on a primary basis to a separate virtual Long Beach location (Riverside). Issued by: Frank J. Ferazzi, Vice President Issued on: June 30, 2009 Effective on: July 30, 2009

20 Transcontinental Gas Pipe Line Company, LLC FERC Gas Tariff First Revised Sheet No. 399 Fourth Revised Volume No. 1 Superseding Original Sheet No. 399 ZONE 6 UGI PENN NATURAL GAS, INC Facility Saylor Avenue Wyoming Monument Dallas Shickshinny Muncy Old Lycoming Total Total Firm Contract (3,5&6) (4,5&6) (3) Includes presently authorized firm service under Rate Schedules FT, GSS, LSS and SS-2. (4) Includes presently authorized firm service under Rate Schedules FT and GSS. Available firm quantities limited to individual rate schedule provisions. (5) Includes 21.8 MMCF/D delivered under Rate Schedule X-234. (6) Includes MMCF/D delivered for Enmark Gas Corporation under Rate Schedule FT. Issued by: Frank J. Ferazzi, Vice President Issued on: June 30, 2009 Effective on: July 30, 2009

21 Transcontinental Gas Pipe Line Company, LLC FERC Gas Tariff First Revised Sheet No. 400 Fourth Revised Volume No. 1 Superseding Original Sheet No. 400 ZONE 6 PECO ENERGY COMPANY - Facility West Parkesburg Coatsville Total L Kennett Square Pottstown Total Chester Concord Total West Conshohocken Ivyland U.S. Steel Total L Oreland Total Total Firm Contract (3&5) (4&5) (3) Includes presently authorized firm service under Rate Schedules FT, GSS and S-2. Available firm quantities limited to individual rate schedule provisions. (4) Includes presently authorized firm service under Rate Schedules FT and GSS. Available firm quantities limited to individual rate schedule provisions. (5) Includes MMCF/D delivered for Hess Corporation under Rate Schedule FT. Issued by: Frank J. Ferazzi, Vice President Issued on: June 30, 2009 Effective on: July 30, 2009

22 Transcontinental Gas Pipe Line Company, LLC FERC Gas Tariff First Revised Sheet No. 405 Fourth Revised Volume No. 1 Superseding Original Sheet No. 405 ZONE 6 SUNOCO, INC. (R&M) Facility Marcus Hook Sunolin Total Total Firm Contract 40.0 (3) 40.0 (4) (3) Includes presently authorized firm service under Rate Schedule FT. Available firm quantities limited to individual rate schedule provisions. (4) Includes presently authorized firm service under Rate Schedule FT. Available firm quantities limited to individual rate schedule provisions. Issued by: Frank J. Ferazzi, Vice President Issued on: June 30, 2009 Effective on: July 30, 2009

23 Transcontinental Gas Pipe Line Company, LLC FERC Gas Tariff First Revised Sheet No. 406 Fourth Revised Volume No. 1 Superseding Original Sheet No. 406 ZONE 6 UGI CENTRAL PENN GAS, INC Facility Windgap Palmerton Total Wyoming Hughesville Total Avis Total Total Firm Contract 26.5 (3&5) 20.0 (4&5) (3) Includes presently authorized firm service under Rate Schedules FT, GSS and LG-A. (4) Includes presently authorized firm service under Rate Schedules FT and GSS. Available firm quantities limited to individual rate schedule provisions. (5) Includes 3.9 MMCF/D for Enmark, Inc. and 2.2 MMCF/D for Horsehead Corporation and 1.0 MMCF/D of Columbia assignment under Rate Schedule FT. Issued by: Frank J. Ferazzi, Vice President Issued on: June 30, 2009 Effective on: July 30, 2009

24 Transcontinental Gas Pipe Line Company, LLC FERC Gas Tariff First Revised Sheet No. 407 Fourth Revised Volume No. 1 Superseding Original Sheet No. 407 ZONE 6 UGI UTILITIES, INC. - Facility Quarryville Total L Coventry Total Allentown Hazelton Total Humboldt Total Total Firm Contract 38.9 (3) 30.6 (4) (3) Includes presently authorized firm service under Rate Schedules FT, GSS and SS-2, plus the volume of gas in MMCF/D previously flowing under Rate Schedule FT-NT. (4) Includes presently authorized firm service under Rate Schedules FT and GSS, plus the volume of gas in MMCF/D previously flowing under Rate Schedule FT-NT. Issued by: Frank J. Ferazzi, Vice President Issued on: June 30, 2009 Effective on: July 30, 2009

25 Transcontinental Gas Pipe Line Company, LLC First Revised Sheet No. 370 Fourth Revised Volume No. 1 Original Sheet No. 370 Effective: December 31, 2008 Issued: December 15, 2008 Page 1 INDEX OF DAILY FACILITY GROUP AND DELIVERY POINT ENTITLEMENTS - AND RELATED MAPS ---- Maps: ---- Sheet No. --- Legend 372 Zone Zone Zone Philadelphia - New York Portion of Zone Leidy Line Portion of Zone Customer ---- Zone 4: Alabama Gas Corporation 378 Atlanta Gas Light Company 379 Georgia Power 380 Municipal Gas Authority of Georgia 381 Zone 5: Commonwealth Gas Services 383 Columbia Gas of Virginia 383 Danville, Virginia 384 Fort Hill Natural Gas Authority 385 Lexington, North Carolina 386 Piedmont Natural Gas Company, Inc. 387 Public Service Company of North Carolina, Inc. 389 Richmond, City of 390 South Carolina Pipeline Corporation 391 Virginia Natural Gas 392 Washington Gas Light Company 393

26 Transcontinental Gas Pipe Line Company, LLC First Revised Sheet No. 371 Fourth Revised Volume No. 1 Original Sheet No. 371 Effective: December 31, 2008 Issued: December 15, 2008 Page 1 INDEX OF DAILY FACILITY GROUP AND DELIVERY POINT ENTITLEMENTS - AND RELATED MAPS ---- Customer Sheet No Zone 6: Delmarva Power & Light Company 394 Eastern Shore Natural Gas Company 395 Pivotal Utility Holdings, Inc. (Elizabethtown Gas Company) 396 National Fuel Gas Supply Corporation 397 New York Facilities Group 398 PG EnergyUGI Penn Natural Gas, Inc. 399 PECO Energy Company 400 Philadelphia Gas Works 401 PSEG Energy Resources and Trade, LLC 402 South Jersey Gas Company 404 Sun Oil Company Sunoco, Inc. (R&M) 405 PPL Gas Utilities Corp. UGI Central Penn Gas, Inc. 406 UGI UGI Utilities, Inc. 407

27 Transcontinental Gas Pipe Line Company, LLC First Revised Sheet No. 378 Fourth Revised Volume No. 1 Original Sheet No. 378 Effective: December 31, 2008 Issued: December 15, 2008 Page 1 ZONE 4 ALABAMA GAS CORPORATION -- - Facility Linden Thomaston Selma 40 (4) - 40 (4) - Total Montgomery 100 (4) (4) - Birmingham 100 (4) (4) - Clanton Total Total Firm Contract (3) (3) 98.0 (3,4) 98.0 (3,4) (3) Includes presently authorized firm service for TEMCO under Rate Schedule FT. Available firm quantities limited to individual rate schedule provisions. (4) Includes MMCF/D delivered for Southern Company Services, Inc under Rate Schedule FT.

28 Transcontinental Gas Pipe Line Company, LLC First Revised Sheet No. 380 Fourth Revised Volume No. 1 Original Sheet No. 380 Effective: December 31, 2008 Issued: December 15, 2008 Page 1 ZONE 4 GEORGIA POWER - - Facility Wansley (4) (4) - 7 Center-Dahlberg Total Total Firm Contract (3&4) (3&4) (3) Includes presently authorized firm service under Rate Schedule FT. Available firm quantities limited to individual rate schedule provisions. (4) Includes MMCF/D delivered for Oglethorpe Power Corp. and MMCF/D delivered for Municipal Electric Authority of Georgia under Rate Schedule FT.

29 Transcontinental Gas Pipe Line Company, LLC First Revised Sheet No. 383 Fourth Revised Volume No. 1 Original Sheet No. 383 Effective: December 31, 2008 Issued: December 15, 2008 Page 1 ZONE 5 COMMONWEALTH GAS SERVICES -COLUMBIA GAS OF VIRGINIA Facility Brockway Glass Chatham Altavista Brookneal Lynchburg Total L South Boston Chase City South Hill Lawrenceville Emporia Hopewell Total - 97 (4) - 97 (4) 12 Virginia Fiber Scottsville Waldrop Gordonsville Total Fredericksburg Prince William Total Total Firm Contract (3,4&5) (3,4&5) (3) Includes presently authorized firm service under Rate Schedules FT and GSS. (4) Includes 78 MMCF/D for TEMCOvarious shippers under Rate Schedule FT. (5) Includes.336 MMCF/D delivered for City of Greenwood under Rate Schedule FT.

30 Transcontinental Gas Pipe Line Company, LLC First Revised Sheet No. 388 Fourth Revised Volume No. 1 Original Sheet No. 388 Effective: December 31, 2008 Issued: December 15, 2008 Page 1 ZONE 5 PIEDMONT NATURAL GAS COMPANY, INC Facility L Pleasant Hill 77 (9) - 71 (9) - Ahoskie 77 (9) - 71 (9) - Total Total Firm Contract (3,8) (4,8) (3) Includes presently authorized firm service under Rate Schedules FT, GSS and LG-A. Available firm quantities limited to individual rate schedule provisions. (4) Includes presently authorized firm service under Rate Schedules FT and GSS. (5) The Facility Group maximum is 508 MMCF/D for Facility Group 10 plus the volume of gas in MMCF/D previously flowing under Rate Schedules FT-NT and NIPPS. (6) The Facility Group maximum is 333 MMCF/D for Facility Group 10 plus the volume of gas in MMCF/D previously flowing under Rate Schedules FT-NT and NIPPS. (7) Hicks Crossroads is in Facility Group 9, but the delivery is included in Facility Group 10 group total. (8) Includes MMCF/D delivered for Amerada Hess Corporation, MMCF/D delivered for TEMCOWilliams Gas Marketing, Inc. and MMCF/D delivered for Tyson Foods under Rate Schedule FT. (9) The sum of Pleasant Hill, Ahoskie and Cardinal may not exceed 104 MMCF/D during the Winter Period or 98 MMCF/D during the Summer Period.

31 Transcontinental Gas Pipe Line Company, LLC First Revised Sheet No. 393 Fourth Revised Volume No. 1 Original Sheet No. 393 Effective: December 31, 2008 Issued: December 15, 2008 Page 1 ZONE 5 WASHINGTON GAS LIGHT COMPANY Facility Bull Run Herndon Dranesville Total Frederick (4) Westmore Rd (4) Rock Creek (4) Total Total Firm Contract (3) (3) (3) Includes presently authorized firm service under Rate Schedules FT and GSS. (4) Facility Group 14 is in Zone 6.

32 Transcontinental Gas Pipe Line Company, LLC First Revised Sheet No. 394 Fourth Revised Volume No. 1 Original Sheet No. 394 Effective: December 31, 2008 Issued: December 15, 2008 Page 1 ZONE 6 DELMARVA POWER & LIGHT COMPANY Facility Parkesburg Total L Hockessin Total Wilmington Total Total Firm Contract (3) (4) (3) Includes presently authorized firm service under Rate Schedules FT, GSS, LG-A and LNG. (4) Includes presently authorized firm service under Rate Schedules FT and GSS. Available firm quantities limited to individual rate schedule provisions.

33 Transcontinental Gas Pipe Line Company, LLC First Revised Sheet No. 395 Fourth Revised Volume No. 1 Original Sheet No. 395 Effective: December 31, 2008 Issued: December 15, 2008 Page 1 ZONE 6 EASTERN SHORE NATURAL GAS COMPANY Facility Parkesburg 4757 (6) (6) - Total L Eastern Hockessin Total Total Firm Contract 47.5 (3,5-13) 44.9 (4-13) Total Firm Contract 57.1 (3,5-12) 54.5 (4-12) (3) Includes presently authorized firm service under Rate Schedules GSS, LG-A and LSS. (4) Includes presently authorized firm service under Rate Schedule GSS. (5) Includes 9.3 MMCF/D for The Premcor Refining Group Inc. of authorized firm transportation under Rate Schedule FT. (6) Includes MMCF/D delivered for Peco Energy Company under Rate Schedule FT. (7) Includes MMCF/D for Chesapeake Utilities Corporation -d/b/a Delaware Division under Rate Schedule FT. (8) Includes MMCF/D for Chesapeake Utilities Corporation -d/b/a Maryland Division under Rate Schedule FT. (9) Includes MMCF/D for Pivotal Utility Holdings, Inc. under Rate Schedule FT. (10) Includes MMCF/D for Easton Utilities Commission under Rate Schedule FT. (11) Includes MMCF/D for Formosa Plastics Corporation Delaware under Rate Schedule FT. (12) Includes MMCF/D for City of Dover, Delaware under Rate Schedule FT. (13) Includes MMCF/D for Reichhold Chemicals, Inc. under Rate Schedule FT.

34 Transcontinental Gas Pipe Line Company, LLC First Revised Sheet No. 396 Fourth Revised Volume No. 1 Original Sheet No. 396 Effective: December 31, 2008 Issued: December 15, 2008 Page 1 ZONE 6 PIVOTAL UTILITY HOLDINGS, INC. (ELIZABETHTOWN GAS COMPANY) Facility Dowingtown Downingtown Total Pennington Total Ford Motors Grandview Cloverleaf Total Erie Street North Avenue Total Clinton Spruce Run New Village # Total Total Firm Contract (3,5,6&7) (4,6&7) (3) Includes presently authorized firm service under Rate Schedules FT, X-269, X-270, X-276, GSS, LG-A, LNG, S-2, LSS and SS-1. Available firm quantities limited to individual rate schedule provisions. (4) Includes presently authorized firm service under Rate Schedules FT, X-269, X-270, X-276 and GSS. (5) Includes MMCF/D delivered for KCSConectiv Energy Supply, Inc. under Rate Schedule SS- 2FT. (6) Includes MMCF/D delivered for KCSSprague Energy Corp. previously flowing under Rate Schedule X-314FT. (7) Facility Groups 14, 16, 17, 19 & 20 cannot exceed 239 during the winter period and 173 during the summer period.

35 Transcontinental Gas Pipe Line Company, LLC First Revised Sheet No. 398 Fourth Revised Volume No. 1 Original Sheet No. 398 Effective: December 31, 2008 Issued: December 15, 2008 Page 1 ZONE 6 NEW YORK FACILITIES GROUP (5) Facility Long Beach (9,16) (9,16) - Narrows 336 (6) (6) - Total Central Manhattan 721 (10,11&12) (10,11,14&15) - Manhattan 484 (13&15) Total (6) (6) Total Firm Contract (3,7 to 13,15&16) (4,7 to 11,14,15&16) (3) Includes presently authorized firm service under Rate Schedules FT, GSS, S-2, LSS, SS-1 and SS-2, plus the volume of gas in MMCF/D previously flowing under Rate Schedule X-315. (4) Includes presently authorized firm service under Rate Schedules FT and GSS, plus the volume of gas in MMCF/D previously flowing under Rate Schedule X-315. Available firm quantities limited to individual rate schedule provisions. (5) Group consists of The Brooklyn Union Gas Company d/b/a National Grid NY, Consolidated Edison Company of New York, Inc. and Long Island Lighting Company and KeySpan Gas East Corporation d/b/a National Grid. (6) The sum of Facility Group 19 and Narrows may not exceed 1,265 MMCF/D during the winter period and 1,149 MMCF/D during the summer period. (7) Includes MMCF/D delivered for New York Power Authority under Rate Schedule FT (formerly FT-NT). (8) Sum of Facility Groups 17 and 19 cannot exceed 1, MMCF/D in the winter period and 1,319 MMCF/D in the summer period. (9) Includes MMCF/D for Amerada Hess Corporation and MMCF/D for NJR Energy Services Company Con Ed Electric under Rate Schedule FT. (10) Includes MMCF/D for Con Ed Consolidated Edison Energy, Inc. under Rate Schedule FT. (11) Includes MMCF/D for BP Energy CompanyKeySpan Gas East Corporation d/b/a National Grid under Rate Schedule FT. (12) Includes MMCF/D for Washington Gas Light Company under Rate Schedule FT during the winter period. (13) Includes MMCF/D for Washington Gas Light Company under Rate Schedule FT during the winter period.

36 Transcontinental Gas Pipe Line Company, LLC First Revised Sheet No. 398 Fourth Revised Volume No. 1 Original Sheet No. 398 Effective: December 31, 2008 Issued: December 15, 2008 Page 2 (14) Includes MMCF/D for Washington Gas Light Company under Rate Schedule FT during the summer period. (15) Includes MMCF/D for BP Energy CompanyKeySpan Gas East Corporation d/b/a/ National Grid under Rate Schedule FT. (16) Includes 96.6 MMCF/D for KeySpan Gas East Corporation d/b/a National Grid under Rate Schedule FT that is nominatable on a primary basis to a separate virtual Long Beach location (Riverside).

37 Transcontinental Gas Pipe Line Company, LLC First Revised Sheet No. 399 Fourth Revised Volume No. 1 Original Sheet No. 399 Effective: December 31, 2008 Issued: December 15, 2008 Page 1 ZONE 6 PG ENERGYUGI PENN NATURAL GAS, INC Facility Saylor Avenue Wyoming Monument Dallas Shickshinny Muncy Old Lycoming Total Total Firm Contract (3,5&6) (4,5&6) (3) Includes presently authorized firm service under Rate Schedules FT, GSS, LSS and SS-2. (4) Includes presently authorized firm service under Rate Schedules FT and GSS. Available firm quantities limited to individual rate schedule provisions. (5) Includes 21.8 MMCF/D delivered under Rate Schedule X-234. (6) Includes MMCF/D delivered for Enmark Gas Corporation under Rate Schedule FT.

38 Transcontinental Gas Pipe Line Company, LLC First Revised Sheet No. 400 Fourth Revised Volume No. 1 Original Sheet No. 400 Effective: December 31, 2008 Issued: December 15, 2008 Page 1 ZONE 6 PECO ENERGY COMPANY - Facility West Parkesburg Coatsville Total L Kennett Square Pottstown Total Chester Concord Total West Conshohocken Ivyland U.S. Steel Total L Oreland Total Total Firm Contract (3&5) (4&5) (3) Includes presently authorized firm service under Rate Schedules FT, GSS and S-2. Available firm quantities limited to individual rate schedule provisions. (4) Includes presently authorized firm service under Rate Schedules FT and GSS. Available firm quantities limited to individual rate schedule provisions. (5) Includes MMCF/D delivered for Amerada Hess Corporation under Rate Schedule FT.

39 Transcontinental Gas Pipe Line Company, LLC First Revised Sheet No. 405 Fourth Revised Volume No. 1 Original Sheet No. 405 Effective: December 31, 2008 Issued: December 15, 2008 Page 1 ZONE 6 SUN OIL COMPANY SUNOCO, INC. (R&M) Facility Marcus Hook Sunolin Total Total Firm Contract 40.0 (3) 40.0 (4) (3) Includes presently authorized firm service under Rate Schedule FT. Available firm quantities limited to individual rate schedule provisions. (4) Includes presently authorized firm service under Rate Schedule FT. Available firm quantities limited to individual rate schedule provisions.

40 Transcontinental Gas Pipe Line Company, LLC First Revised Sheet No. 406 Fourth Revised Volume No. 1 Original Sheet No. 406 Effective: December 31, 2008 Issued: December 15, 2008 Page 1 ZONE 6 PPL GAS UTILITIES CORP. UGI CENTRAL PENN GAS, INC Facility Windgap Palmerton Total Wyoming Hughesville Total Avis Total Total Firm Contract 26.5 (3&5) 20.0 (4&5) (3) Includes presently authorized firm service under Rate Schedules FT, GSS and LG-A. (4) Includes presently authorized firm service under Rate Schedules FT and GSS. Available firm quantities limited to individual rate schedule provisions. (5) Includes 3.9 MMCF/D for Enmark, Inc. and 2.2 MMCF/D for Horsehead Resource Development Co., Inc.Corporation and 1.0 MMCF/D of Columbia assignment under Rate Schedule FT.

41 Transcontinental Gas Pipe Line Company, LLC First Revised Sheet No. 407 Fourth Revised Volume No. 1 Original Sheet No. 407 Effective: December 31, 2008 Issued: December 15, 2008 Page 1 ZONE 6 UGI UTILITIES, INC. - Facility Quarryville Total L Coventry Total Allentown Hazelton Total Humboldt Total Total Firm Contract 38.9 (3) 30.6 (4) (3) Includes presently authorized firm service under Rate Schedules FT, GSS and SS-2, plus the volume of gas in MMCF/D previously flowing under Rate Schedule FT-NT. (4) Includes presently authorized firm service under Rate Schedules FT and GSS, plus the volume of gas in MMCF/D previously flowing under Rate Schedule FT-NT.

Willia m ORIGINAL. Er:UtpfO~V 6,,-~.' ' :: L. ~1 All6-2 P 3:I~0. F-ILED rfic OF ; ~E CfiE TAR y. August I, 2007

Willia m ORIGINAL. Er:UtpfO~V 6,,-~.' ' :: L. ~1 All6-2 P 3:I~0. F-ILED rfic OF ; ~E CfiE TAR y. August I, 2007 lnofflclal FERC-Generated PDF of 20070806-0152 Received by FERC OSEC 08/02/2007 in Docket#: RP07-554-000 F-ILED rfic OF ; ~E CfiE TAR y ~1 All6-2 P 3:I~0 Willia m Gu Plpclht - T~mgo 2800 Post OIk Boulevmd

More information

November 16, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

November 16, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. November 16, 2012 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 ANR Pipeline Company 717 Texas Street, Suite 2400 Houston, Texas 77002-2761

More information

September 9, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E., Room 1A Washington, DC 20426

September 9, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E., Room 1A Washington, DC 20426 Mark D. Patrizio Attorney at Law 77 Beale Street, B30A San Francisco, CA 94105 Mailing Address P.O. Box 7442 San Francisco, CA 94120 (415) 973.6344 Fax: (415) 973.5520 E-Mail: MDP5@pge.com September 9,

More information

September 2, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

September 2, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. TEXAS EASTERN TRANSMISSION, LP Mailing Address: 5400 Westheimer Court P. O. Box 1642 Houston, TX 77056-5310 Houston, TX 77251-1642 713.627.5400 main Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory

More information

FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D.C

FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D.C FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D.C. 20426 OFFICE OF ENERGY MARKET REGULATION Northern Natural Gas Company 1111 South 103 rd Street Omaha, NE 68124-1000 In Reply Refer To: Letter Order

More information

February 13, Docket No. ER ; ER Response to Request for Additional Information

February 13, Docket No. ER ; ER Response to Request for Additional Information California Independent System Operator Corporation The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California Independent System

More information

January 18, 2002 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

January 18, 2002 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION Akbar Jazayeri Director of Revenue and Tariffs January 18, 2002 ADVICE 115-G (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Decrease in Santa Catalina Island

More information

August 1, Amended Attachment S under Southern Companies Open Access Transmission Tariff, effective January 1, 2014

August 1, Amended Attachment S under Southern Companies Open Access Transmission Tariff, effective January 1, 2014 August 1, 2014 Ms. Kimberly D. Bose, Secretary Mr. Nathaniel J. Davis, Jr., Deputy Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426 Re: Amended Attachment S under

More information

January 20, 2004 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

January 20, 2004 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION Akbar Jazayeri Director of Revenue and Tariffs January 20, 2004 ADVICE 123-G (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Increase in Santa Catalina Island

More information

Re: California Independent System Operator Corporation

Re: California Independent System Operator Corporation California Independent System Operator October 21, 2014 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California Independent

More information

Association of Energy Engineers January 9, Michael Dirrane Director, Northeast Marketing

Association of Energy Engineers January 9, Michael Dirrane Director, Northeast Marketing Association of Energy Engineers January 9, 2013 Michael Dirrane Director, Northeast Marketing Spectra Energy U.S. Transmission Map Miles of Pipe 13,297 Number of Compressor Stations 129 Total Horsepower

More information

ATLANTA CLEVELAND DAYTON WASHINGTON, D.C. CINCINNATI

ATLANTA CLEVELAND DAYTON WASHINGTON, D.C. CINCINNATI HOMPSON LINE ATLANTA CLEVELAND DAYTON WASHINGTON, D.C. CINCINNATI COLUMBUS NEW YORK Via Electronic Filing Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington,

More information

PUBLIC SERVICE ELECTRIC AND GAS COMPANY Sixth Revised Sheet No. 73 Superseding B.P.U.N.J. No. 15 ELECTRIC Fifth Revised Sheet No.

PUBLIC SERVICE ELECTRIC AND GAS COMPANY Sixth Revised Sheet No. 73 Superseding B.P.U.N.J. No. 15 ELECTRIC Fifth Revised Sheet No. PUBLIC SERVICE ELECTRIC AND GAS COMPANY Sixth Revised Sheet No. 73 B.P.U.N.J. No. 15 ELECTRIC Fifth Revised Sheet No. 73 COMMERCIAL AND INDUSTRIAL ENERGY PRICING (CIEP) STANDBY FEE APPLICABLE TO: All kilowatthour

More information

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS PUBLIC UTILITIES COMMISSION IN RE: NEW ENGLAND GAS COMPANY DOCKET NO ANNUAL GAS CHARGE FILING

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS PUBLIC UTILITIES COMMISSION IN RE: NEW ENGLAND GAS COMPANY DOCKET NO ANNUAL GAS CHARGE FILING STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS PUBLIC UTILITIES COMMISSION IN RE: NEW ENGLAND GAS COMPANY DOCKET NO. 1673 ANNUAL GAS CHARGE FILING REPORT AND ORDER On August 31, 2001, the New England

More information

Transco s Atlantic Access Project

Transco s Atlantic Access Project FOR DISCUSSION PURPOSES ONLY NOT AN OFFER OR ACCEPTANCE OF AN OFFER Transco s Atlantic Access Project April 2012 Atlantic Access Overview Path Capacity (Mdt/d) Receipt Point Delivery Point Original Paths

More information

Donna S. Painter Record of Litigation Experience

Donna S. Painter Record of Litigation Experience Page 1 ER13-1605-000 NV Energy Operating Companies Las Vegas Power Transmission cost of service and 2013-14 Company LLC revenue requirements, postage stamp and zonal rates United States District Court,

More information

: : : : : : : Commonwealth Edison Company ( ComEd ), pursuant to Section of the Public

: : : : : : : Commonwealth Edison Company ( ComEd ), pursuant to Section of the Public STATE OF ILLINOIS ILLINOIS COMMERCE COMMISSION Commonwealth Edison Company Verified Petition for approval of Rider POGCS Parallel Operation of Retail Customer Generating Facilities Community Supply and

More information

Case 13-M Edic to New Scotland 345 kv Transmission Line and Hurley Avenue PARs Project (ED-NS/HA) Article VII Filing ED-NS/HA

Case 13-M Edic to New Scotland 345 kv Transmission Line and Hurley Avenue PARs Project (ED-NS/HA) Article VII Filing ED-NS/HA Submission of Indicated New York Transmission Owners For Authority to Construct and Operate Electric Transmission Facilities in Multiple Counties in New York Case 13-M-0457 Edic to New Scotland 345 kv

More information

PLANNED ENHANCEMENTS, NORTHEAST NATURAL GAS PIPELINE SYSTEMS (as of )

PLANNED ENHANCEMENTS, NORTHEAST NATURAL GAS PIPELINE SYSTEMS (as of ) PIPELINE SYSTEMS (as of 8-27-14) The Northeast Gas Association (NGA) has prepared this summary based on publicly-available information. NGA will strive to keep the information as updated as possible and

More information

Transco s Atlantic Access Project

Transco s Atlantic Access Project FOR DISCUSSION PURPOSES ONLY NOT AN OFFER OR ACCEPTANCE OF AN OFFER Transco s Atlantic Access Project June 2012 Atlantic Access Overview Path Capacity (Mdt/d) Receipt Point Delivery Point Original Paths

More information

Improved Community and Product Awareness Increases Satisfaction with Gas Utilities, J.D. Power Finds

Improved Community and Product Awareness Increases Satisfaction with Gas Utilities, J.D. Power Finds Improved Community and Product Awareness Increases Satisfaction with Gas Utilities, J.D. Power Finds COSTA MESA, Calif.: 12 Sept. 2018 Gas utility companies should be doing more to increase their communications

More information

Michigan Public Service Commission Case No.: U The Detroit Edison Company Exhibit: A-17 Current and Historical Credit Ratings Schedule: I1

Michigan Public Service Commission Case No.: U The Detroit Edison Company Exhibit: A-17 Current and Historical Credit Ratings Schedule: I1 Current and Historical Credit Ratings Schedule: I1 Page: 1 of 1 Line 1 Standard & Poor's 2 Current Ratings at Year End 3 Ratings 2009 2008 2007 2006 2005 4 Detroit Edison 5 Senior Unsecured Debt BBB BBB

More information

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) APPLICATION

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) APPLICATION BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Application of Great Oaks Water Company (U-162-W for an Order establishing its authorized cost of capital for the period from July 1, 2019

More information

JOB CUT ANNOUNCEMENTS SURGE 45 PERCENT TO 76,835, HIGHEST MONTHLY TOTAL IN OVER THREE YEARS

JOB CUT ANNOUNCEMENTS SURGE 45 PERCENT TO 76,835, HIGHEST MONTHLY TOTAL IN OVER THREE YEARS CONTACT Colleen Madden, Director of Public Relations Office: 312-422-5074 Mobile: 314-807-1568 colleenmadden@challengergray.com **EMBARGOED COPY** FOR RELEASE AT 7:30 A.M. ET, MARCH 7, 2019 JOB CUT ANNOUNCEMENTS

More information

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA PACIFICORP. Exhibit Accompanying Direct Testimony of. Kurt G.

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA PACIFICORP. Exhibit Accompanying Direct Testimony of. Kurt G. Application No. 18-04- BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA PACIFICORP Exhibit Accompanying Direct Testimony of Kurt G. Strunk Allowed Return on Equity for Other Utilities

More information

Docket No. ER June 2018 Informational Report Energy Imbalance Market Transition Period Report Idaho Power Company

Docket No. ER June 2018 Informational Report Energy Imbalance Market Transition Period Report Idaho Power Company California Independent System Operator Corporation August 21, 2018 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California

More information

Overview of ISO New England and the New England Wholesale Power Markets

Overview of ISO New England and the New England Wholesale Power Markets Overview of ISO New England and the New England Wholesale Power Markets Boston Chapter of IEEE PES Technical Meeting June 15, 2010 Stephen J. Rourke Vice President, System Planning About ISO New England

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) Salt River Project Agricultural ) Improvement and Sacramento ) Municipal Utility District ) ) Docket No. EL01-37-000 v. ) ) California

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) )

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Requirements for Frequency and Voltage Ride Through Capability of Small Generating Facilities Docket No. RM16-8-000 COMMENTS OF

More information

October 30, 2002 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

October 30, 2002 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION Akbar Jazayeri Director of Revenue and Tariffs October 30, 2002 ADVICE 1657-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Revision to Schedule AL-2, Outdoor

More information

The North American Electric Reliability Corporation ( NERC ) hereby submits

The North American Electric Reliability Corporation ( NERC ) hereby submits April 13, 2011 VIA ELECTRONIC FILING Veronique Dubois Régie de l'énergie Tour de la Bourse 800, Place Victoria Bureau 255 Montréal, Québec H4Z 1A2 Re: North American Electric Reliability Corporation Dear

More information

Customer Engagement Drives Electric Utility Business Customer Satisfaction to Record High

Customer Engagement Drives Electric Utility Business Customer Satisfaction to Record High Customer Engagement Drives Electric Utility Business Customer Satisfaction to Record High Satisfaction Improves across All Factors, with Largest Gains in Price and Communication COSTA MESA, Calif.: 11

More information

We are filing these changes now to allow affected third parties sufficient lead time to prepare their systems for this change.

We are filing these changes now to allow affected third parties sufficient lead time to prepare their systems for this change. PSC REF#:279693 December 22, 2015 Jeffrey Ripp, Administrator Division of Energy Regulation Public Service Commission of Wisconsin (PSCW) 610 North Whitney Way P.O. Box 7854 Madison, Wisconsin 53707-7854

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Regional Reliability Standards ) VAR-002-WECC-2 and VAR-501-WECC-2 ) Docket No. RD15-1-000 COMMENTS OF DOMINION RESOURCES SERVICES,

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) )

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) ) UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION The Nevada Hydro Company, Inc. Docket No. EL18-131-000 SOUTHERN CALIFORNIA EDISON COMPANY'S COMMENTS AND PROTEST TO THE NEVADA HYDRO

More information

Medium- and Heavy-Duty Vehicle Policies

Medium- and Heavy-Duty Vehicle Policies Medium- and Heavy-Duty Vehicle Policies This map contains state laws and regulations that affect medium- and heavy-duty vehicles. The policies include the following: Tax incentives: tax credits for vehicle

More information

53, ,750 SF INDUSTRIAL STEELE CREEK ROAD CHARLOTTE, NORTH CAROLINA

53, ,750 SF INDUSTRIAL STEELE CREEK ROAD CHARLOTTE, NORTH CAROLINA 53,000-250,750 SF INDUSTRIAL 11130 STEELE CREEK ROAD CHARLOTTE, NORTH CAROLINA sits on 25 acres in Charlotte s premier Southwest submarket near the intersection of Westinghouse Boulevard and Steele Creek

More information

THE PUBLIC SERVICE COMMISSION OF MARYLAND

THE PUBLIC SERVICE COMMISSION OF MARYLAND THE PUBLIC SERVICE COMMISSION OF MARYLAND Report on the Status of Net Energy Metering In the State of Maryland Prepared for the General Assembly of Maryland Pursuant to 7-306(i) of the Public Utilities

More information

December 4, Docket: ER Energy Imbalance Market Special Report Transition Period July 2018 for Idaho Power Company

December 4, Docket: ER Energy Imbalance Market Special Report Transition Period July 2018 for Idaho Power Company California Independent System Operator Corporation December 4, 2018 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California

More information

ILLINOIS COMMERCE COMMISSION

ILLINOIS COMMERCE COMMISSION ILLINOIS COMMERCE COMMISSION Public Notice of Successful Bidders and Average Prices Ameren Illinois Company and Commonwealth Edison Company Spring 2015 Procurement of Standard Energy Products April 1,

More information

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM Sheet 1 FITCHBURG GAS AND ELECTRIC LIGHT COMPANY SCHEDULE NM Applicability The following tariff provisions shall be applicable to a Host Customer, as defined herein, that requests net metering services

More information

March 30, 2005 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION. 1% Franchise Surcharge for City of Santa Barbara Residents

March 30, 2005 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION. 1% Franchise Surcharge for City of Santa Barbara Residents Akbar Jazayeri Director of Revenue and Tariffs March 30, 2005 ADVICE 1881-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: 1% Franchise Surcharge for City of

More information

QUEENS LIBRARY BUILDINGS AND GROUNDS COMMITTEE THURSDAY, DECEMBER 21, Central Library Merrick Blvd., Jamaica, NY AGENDA

QUEENS LIBRARY BUILDINGS AND GROUNDS COMMITTEE THURSDAY, DECEMBER 21, Central Library Merrick Blvd., Jamaica, NY AGENDA QUEENS LIBRARY BUILDINGS AND GROUNDS COMMITTEE THURSDAY, DECEMBER 21, 2017 Central Library 89-11 Merrick Blvd., Jamaica, NY 11432 AGENDA 6:00 PM BUILDINGS AND GROUNDS COMMITTEE REGULAR MEETING I. Call

More information

ROCKY MOUNTAIN POWER A DIVISION OF PACIFICORP

ROCKY MOUNTAIN POWER A DIVISION OF PACIFICORP ROCKY MOUNTAIN POWER A DIVISION OF PACIFICORP 1407 W. North Temple, Suite 330 Salt Lake City, Utah 84116 January 28, 2016 VIA ELECTRONIC FILING AND OVERNIGHT DELIVERY Wyoming Public Service Commission

More information

P. SUMMARY: The Southeastern Power Administration (SEPA) establishes Rate Schedules JW-

P. SUMMARY: The Southeastern Power Administration (SEPA) establishes Rate Schedules JW- This document is scheduled to be published in the Federal Register on 08/29/2016 and available online at http://federalregister.gov/a/2016-20620, and on FDsys.gov 6450-01-P DEPARTMENT OF ENERGY Southeastern

More information

Infrastructure Disruptions: What if?

Infrastructure Disruptions: What if? Infrastructure Disruptions: What if? NGA Executive Conference R.L.Levitan, rll@levitan.com September 12, 2016 Agenda Recap of TETCO Incident on 4/29/16 What if? Potential Impacts on Winter and Summer Peak

More information

TRAFFIC VOLUME TRENDS

TRAFFIC VOLUME TRENDS Page 1 U. S. Department Transportation Federal Highway Administration Office Highway Policy Information TRAFFIC VOLUME TRENDS September Travel on all roads and streets changed by +2.5 (5.8 billion vehicle

More information

PUBLIC SERVICE ELECTRIC AND GAS COMPANY PROPOSAL FOR BASIC GENERATION SERVICE REQUIREMENTS TO BE PROCURED EFFECTIVE JUNE 1, 2016

PUBLIC SERVICE ELECTRIC AND GAS COMPANY PROPOSAL FOR BASIC GENERATION SERVICE REQUIREMENTS TO BE PROCURED EFFECTIVE JUNE 1, 2016 IN THE MATTER OF THE PROVISION OF : BASIC GENERATION SERVICE FOR BASIC : GENERATION SERVICE REQUIREMENTS : Docket No. ER15040482 EFFECTIVE JUNE 1, 2016 : PUBLIC SERVICE ELECTRIC AND GAS COMPANY PROPOSAL

More information

High Satisfaction Achieved When Electric Utilities Deliver Convenience, Focus on Citizenship, J.D. Power Finds

High Satisfaction Achieved When Electric Utilities Deliver Convenience, Focus on Citizenship, J.D. Power Finds High Satisfaction Achieved When Electric Utilities Deliver Convenience, Focus on Citizenship, Finds Top-Performing Utilities Offer Convenience for Business Customer Interaction, Place Greater Focus on

More information

February 10, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

February 10, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 California Independent System Operator Corporation February 10, 2016 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California

More information

The Commonwealth of Massachusetts

The Commonwealth of Massachusetts The Commonwealth of Massachusetts DEPARTMENT OF PUBLIC UTILITIES NOTICE OF FILING, PROCEDURAL CONFERENCE AND PUBLIC HEARINGS D.P.U. 17-05 January 30, 2017 Petition of NSTAR Electric Company and Western

More information

The Northeast Corridor Master Plan Amtrak s Next Generation High-Speed Rail and Northeastern Maryland

The Northeast Corridor Master Plan Amtrak s Next Generation High-Speed Rail and Northeastern Maryland The Northeast Corridor Master Plan Amtrak s Next Generation High-Speed Rail and Northeastern Maryland Chesapeake Science & Security Corridor Regional Rail Committee Meeting October 20, 2010 Drew Galloway

More information

Duke Energy Carolinas North Carolina Interconnection Request Checklist

Duke Energy Carolinas North Carolina Interconnection Request Checklist Duke Energy Carolinas North Carolina Interconnection Request Checklist The North Carolina Utilities Commission issued North Carolina Interconnection Procedures, Forms, And Agreements For State-Jurisdictional

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. ) Southwest Power Pool, Inc. ) Docket No. ER ) )

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. ) Southwest Power Pool, Inc. ) Docket No. ER ) ) UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) Southwest Power Pool, Inc. ) Docket No. ER13-1748 ) ) MOTION TO INTERVENE AND COMMENTS OF THE ELECTRICITY STORAGE ASSOCIATION

More information

January 18, Docket: ER Energy Imbalance Market Special Report Transition Period August 2018 for Idaho Power Company

January 18, Docket: ER Energy Imbalance Market Special Report Transition Period August 2018 for Idaho Power Company California Independent System Operator Corporation January 18, 2019 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California

More information

Transportation Charging Statement

Transportation Charging Statement Transportation Charging Statement Revision One Effective: 29 th June 2012 Transportation Charges for Natural Gas Distribution Networks BK-REL-IG-0020 GPL Transportation Charges Statement Rev 01 Page 1

More information

SEP 2016 JUL 2016 JUN 2016 AUG 2016 HOEP*

SEP 2016 JUL 2016 JUN 2016 AUG 2016 HOEP* Ontario Energy Report Q1 Electricity January March Electricity Prices Commodity Commodity cost comprises of two components, the wholesale price (the Hourly Ontario Energy Price) and the Global Adjustment.

More information

5LINX Energy Program The Power of Choice Features and Benefits: How it works: Install Process: Enrollment: 1

5LINX Energy Program The Power of Choice Features and Benefits: How it works: Install Process: Enrollment: 1 5LINX Energy Program The Power of Choice The 5LINX Energy Program empowers consumers to make an informed decision when selecting a competitive supply offer. The program brings competitive natural gas and

More information

DELAWARE RIVER MAIN CHANNEL DEEPENING PROJECT

DELAWARE RIVER MAIN CHANNEL DEEPENING PROJECT Philadelphia Regional Port Authority U.S. Army Corps of Engineers Philadelphia District DELAWARE RIVER MAIN CHANNEL DEEPENING PROJECT Investigation of Submarine Utility Crossings Stations 249+000 to 515+000

More information

Addendum StartPage: 0

Addendum StartPage: 0 Control Number : 42698 Item Number : 2 Addendum StartPage: 0 ^20x de.i^ WA OCI solar power November 4, 2015 -;, - L Li { Sent via Overnight UPS Delivery Public Utility Commission of Texas 1701 N. Congress

More information

PURCHASING MEMORANDUM

PURCHASING MEMORANDUM ew York State Office of General Services AWARD NUMBER: 21744 DATE: February 7, 2011 GROUP: 05500 FUEL OIL, HEATING (518) 474-1108 colleen.messier@ogs.state ny.us CONTRACTOR Hess Corporation customer.services@ogs.state.ny.us

More information

RE: Advice Schedule 45 Public DC Fast Charger Delivery Service Optional Transitional Rate REPLACEMENT PAGES

RE: Advice Schedule 45 Public DC Fast Charger Delivery Service Optional Transitional Rate REPLACEMENT PAGES January 31, 2017 VIA ELECTRONIC FILING Public Utility Commission of Oregon 201 High Street SE, Suite 100 Salem, OR 97301-3398 Attn: Filing Center RE: Advice 16-020 Schedule 45 Public DC Fast Charger Delivery

More information

Developing Infrastructure: Getting the Gas to Market. Doreen Wrick Director, Northeast Marketing, Spectra Energy

Developing Infrastructure: Getting the Gas to Market. Doreen Wrick Director, Northeast Marketing, Spectra Energy Northeast Gas Association Annual Sales & Marketing Seminar August 20, 2013 Developing Infrastructure: Getting the Gas to Market Doreen Wrick Director, Northeast Marketing, Spectra Energy Safe Harbor Statement

More information

PURCHASING MEMORANDUM

PURCHASING MEMORANDUM http://www.ogs.state.ny.us AWARD NUMBER: 22285 DATE: April 11, 2013 Contract Management Specialist customer.services@ogs.state.ny.us CONTRACTOR: United Metro Energy Corp. CONTRACT NOS. PC66028 CONTRACT

More information

ADOPTED REGULATION OF THE STATE BOARD OF AGRICULTURE. LCB File No. R Effective February 20, 2013

ADOPTED REGULATION OF THE STATE BOARD OF AGRICULTURE. LCB File No. R Effective February 20, 2013 ADOPTED REGULATION OF THE STATE BOARD OF AGRICULTURE LCB File No. R106-10 Effective February 20, 2013 EXPLANATION Matter in italics is new; matter in brackets [omitted material] is material to be omitted.

More information

Local Transmission Plan. Rev. 1: April 2018

Local Transmission Plan. Rev. 1: April 2018 Local Transmission Plan Rev. 1: April 2018 1 Central Hudson s Service Territory Own & Operate approximately 610 miles of 69 kv, 115 kv & 345 kv transmission lines and three 345 kv substations 2 Central

More information

Spectra Energy s Perspective on Natural Gas Service to Electric Generation during the Winter. Rich Paglia Vice President Northeast Marketing

Spectra Energy s Perspective on Natural Gas Service to Electric Generation during the Winter. Rich Paglia Vice President Northeast Marketing Spectra Energy s Perspective on Natural Gas Service to Electric Generation during the Winter Rich Paglia Vice President Northeast Marketing Presentation Overview Spectra Energy Transmission and Power Plant

More information

ELECTRIC AND GAS RESIDENTIAL RATE COMPARISON OCTOBER 1, 1998

ELECTRIC AND GAS RESIDENTIAL RATE COMPARISON OCTOBER 1, 1998 Public Service Commission Of West Virginia ELECTRIC ND GS RESIDENTIL RTE COMPRISON OCTOBER 1, 1998 Prepared by: Francis J. DiVita Utilities nalyst I Special Studies Section Utilities Division TBLE OF CONTENTS

More information

(Page 2 of 2) NOTE: Eight charts follow.

(Page 2 of 2) NOTE: Eight charts follow. Reports: Overall Satisfaction among Business Customers of Electric Utilities Increases Notably, But Satisfaction Lags among Businesses That Spend the Least on Electricity Ranking Highest in Their Respective

More information

Reactive Power Requirements and Financial Compensation. Addendum to Draft Final Proposal

Reactive Power Requirements and Financial Compensation. Addendum to Draft Final Proposal Reactive Power Requirements and Financial Compensation July 21, 2016 Table of Contents 1. Introduction... 3 2. Changes to Proposal... 4 3. Plan for Stakeholder Engagement... 4 4.... 4 6. Next Steps...

More information

mew Doc 2995 Filed 03/30/18 Entered 03/30/18 14:32:55 Main Document Pg 1 of 17. Chapter 11 : : : :

mew Doc 2995 Filed 03/30/18 Entered 03/30/18 14:32:55 Main Document Pg 1 of 17. Chapter 11 : : : : Pg 1 of 17 UNITED STATES BANKRUPTCY COURT SOUTHERN DISTRICT OF NEW YORK ---------------------------------------------------------- x In re: : : WESTINGHOUSE ELECTRIC COMPANY : LLC, et al., : : Debtors.

More information

October 1, Docket: ER Energy Imbalance Market Special Report Transition Period June 2018 for Powerex Corp.

October 1, Docket: ER Energy Imbalance Market Special Report Transition Period June 2018 for Powerex Corp. California Independent System Operator Corporation The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 October 1, 2018 Re: California

More information

The Premcor Refining Group, Inc. Delaware City Refinery 4550 Wrangle Hill Rd. EXHIBIT A Delaware City, DE 19706

The Premcor Refining Group, Inc. Delaware City Refinery 4550 Wrangle Hill Rd. EXHIBIT A Delaware City, DE 19706 DRAFT Permit: APC-2004/0721-CONSTRUCTION (NSPS) Two Package Boilers The Premcor Refining Group, Inc. Delaware City Refinery 4550 Wrangle Hill Rd. EXHIBIT A Delaware City, DE 19706 ATTENTION: Andrew Kenner

More information

January 18, Docket: ER Energy Imbalance Market Special Report Transition Period September 2018 for Idaho Power Company

January 18, Docket: ER Energy Imbalance Market Special Report Transition Period September 2018 for Idaho Power Company California Independent System Operator Corporation January 18, 2019 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California

More information

November 8, 2004 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

November 8, 2004 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION Akbar Jazayeri Director of Revenue and Tariffs November 8, 2004 ADVICE 1656-E-A (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Supplemental to Advice 1656-E,

More information

Updates and Modifications to Report

Updates and Modifications to Report QUARTERLY COMPLIANCE REPORT (JULY 2015) OF SOUTHERN CALIFORNIA EDISON COMPANY (U 338-E) REGARDING STATUS OF TRANSMISSION PROJECTS AND GENERATION INTERCONNECTION PROJECTS Pursuant to Commission Decision

More information

NGA Pre Winter Meeting

NGA Pre Winter Meeting NGA Pre Winter Meeting Mike Dirrane Director of Marketing November 6, 2014 Westboro, MA Spectra Energy U.S. Transmission Map Miles of Pipe 13,297 Number of Compressor Stations 129 Total Horsepower 2,147,488

More information

Airworthiness Directive

Airworthiness Directive Airworthiness Directive Federal Register Information Header Information DEPARTMENT OF TRANSPORTATION Federal Aviation Administration 14 CFR Part 39 [61 FR 63704 NO. 232 12/02/96] Docket No. 96-ANE-31;

More information

Monthly Biodiesel Production Report

Monthly Biodiesel Production Report Monthly Biodiesel Production Report With data for June 2017 August 2017 Independent Statistics & Analysis www.eia.gov U.S. Department of Energy Washington, DC 20585 This report was prepared by the U.S.

More information

Retail Electric Rates in Deregulated and Regulated States: 2010 Update

Retail Electric Rates in Deregulated and Regulated States: 2010 Update Retail Electric Rates in Deregulated and Regulated States: 2010 Update Published March 2011 1875 Connecticut Avenue, NW Washington, D.C. 20009-5715 202/467-2900 www.appanet.org Retail Electric Rates in

More information

NOTICE OF REGULARLY SCHEDULED BOARD MEETINGS

NOTICE OF REGULARLY SCHEDULED BOARD MEETINGS NOTICE OF REGULARLY SCHEDULED BOARD MEETINGS NEW JERSEY TRANSIT CORPORATION NJ TRANSIT RAIL OPERATIONS, INC. NJ TRANSIT BUS OPERATIONS, INC. NJ TRANSIT MERCER, INC. NJ TRANSIT MORRIS, INC. TO WHOM IT MAY

More information

Southern Company Transmission Active OATT Interconnection Agreements

Southern Company Transmission Active OATT Interconnection Agreements Southern Transmission Active OATT Agreements Albany Green Energy IC-312 Albany Green Energy, LLC Dougherty County, GA Albany - Radium Springs 115 kv 50 Co-Generation 2/6/2015 2/1/2017 Butler Solar IC-343

More information

Rate Schedules. Effective 1/1/2019

Rate Schedules. Effective 1/1/2019 Rate Schedules 2019 Effective 1/1/2019 SUMMARY OF RATE SCHEDULES REVISIONS FOR RATES EFFECTIVE JANUARY 1, 2019 (1) Rate component changes for Residential and Heating Service rate schedules. (2) General

More information

LYCOMING ENGINES AND TELEDYNE CONTINENTAL MOTORS

LYCOMING ENGINES AND TELEDYNE CONTINENTAL MOTORS Page 1 011-13-03 LYCOMING ENGINES AND TELEDYNE CONTINENTAL MOTORS (TYPE CERTIFICATE PREVIOUSLY HELD BY TEXTRON LYCOMING) AND TELEDYNE CONTINENTAL MOTORS (TCM) TURBOCHARGED RECIPROCATING ENGINES Amendment

More information

August 18, 2016 NWN OPUC Advice No A / UG 309 SUPPLEMENT A (UM 1766)

August 18, 2016 NWN OPUC Advice No A / UG 309 SUPPLEMENT A (UM 1766) ONITA R. KING Rates & Regulatory Affairs Tel: 503.721.2452 Fax: 503.721.2516 Email: ork@nwnatural.com August 18, 2016 NWN OPUC Advice No. 16-13A / UG 309 SUPPLEMENT A (UM 1766) VIA ELECTRONIC FILING Public

More information

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA SOUTHERN CALIFORNIA EDISON COMPANY S (U338-E) NOTICE OF EX PARTE COMMUNICATION

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA SOUTHERN CALIFORNIA EDISON COMPANY S (U338-E) NOTICE OF EX PARTE COMMUNICATION BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Application of Southern California Edison Company (U 338-E) for Approval of Electric Vehicle Charging at Schools, State Parks and Beaches

More information

Manufactured Home Shipments by Product Mix ( )

Manufactured Home Shipments by Product Mix ( ) Manufactured Home Shipments by Product Mix (1990-2014) Data Source: Institute for Building Technology and Safety (IBTS) * "Destination Pending" represents month-end finished home inventory at a plant.

More information

Subject - Revisions to PG&E Forms Entitled General Terms and Conditions (Form ) and Declarations (Form ).

Subject - Revisions to PG&E Forms Entitled General Terms and Conditions (Form ) and Declarations (Form ). May 11, 2001 ADVICE 2316-G/2116-E (Pacific Gas and Electric Company ID U 39 M) Subject - Revisions to PG&E Forms Entitled General Terms and Conditions (Form 79-716) and Declarations (Form 62-0980). Public

More information

Altec AC26-103B LOAD CHARTS. Written Examinations. for Use With

Altec AC26-103B LOAD CHARTS. Written Examinations. for Use With LOAD CHARTS for Use With Written Examinations Altec AC26-103B Altec Industries, Inc., by providing pages of one of its manuals, is not providing a substitute for training on an Altec crane. These pages

More information

Supply Margin Assessment (SMA) test announced in the SMA Order 2 with

Supply Margin Assessment (SMA) test announced in the SMA Order 2 with . UNITED STATE OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Duke Energy Marketing America, LLC ) Motion to Intervene and Comments of the California Independent System Operator Corporation

More information

April 6, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

April 6, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 414 Nicollet Mall Minneapolis, MN 55401 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 RE: Public Service Company of Colorado Docket

More information

BEFORE THE PUBLIC SERVICE COMMISSION OF MARYLAND

BEFORE THE PUBLIC SERVICE COMMISSION OF MARYLAND BEFORE THE PUBLIC SERVICE COMMISSION OF MARYLAND IN THE MATTER OF THE APPLICATION OF OF * LEGORE BRIDGE SOLAR CENTER, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE * AND NECESSITY TO CONSTRUCT A 20.0 MW

More information

SOUTHWEST GAS CORPORATION P.O. Box 98510 Las Vegas, Nevada 89193-8510 118th Revised Cal. P.U.C. Sheet No. 65 California Gas Tariff Canceling 114th Revised Cal. P.U.C. Sheet No. 65 STATEMENT OF RATES RATES

More information

Utilities in the South Maintain Power Reliability Ratings, Despite Four Hurricanes in 2004

Utilities in the South Maintain Power Reliability Ratings, Despite Four Hurricanes in 2004 Reports: Electric Utilities Improve Customer Satisfaction Utilities in the South Maintain Power Reliability Ratings, Despite Four Hurricanes in 2004 WESTLAKE VILLAGE, Calif.: 21 July 2005 Overall customer

More information

P.S.C. No. 9 - Electricity Consolidated Edison Company First Revised Leaf No. 244 of New York, Inc. Superseding Original Leaf No.

P.S.C. No. 9 - Electricity Consolidated Edison Company First Revised Leaf No. 244 of New York, Inc. Superseding Original Leaf No. Consolidated Edison Company First Revised Leaf No. 244 of New York, Inc. Superseding Original Leaf No. 244 Applicable to Use of Service for SERVICE CLASSIFICATION NO. 6 Lighting of public and private streets,

More information

TRAFFIC VOLUME TRENDS July 2002

TRAFFIC VOLUME TRENDS July 2002 TRAFFIC VOLUME TRENDS July 2002 Travel on all roads and streets changed by +2.3 percent for July 2002 as compared to July 2001. Estimated Vehicle-Miles of Travel by Region - July 2002 - (in Billions) West

More information

MAGAZINE Publisher s Statement 6 months ended December 31, 2014 Subject to Audit

MAGAZINE Publisher s Statement 6 months ended December 31, 2014 Subject to Audit MAGAZINE Publisher s Statement 6 months ended December 31, 2014 Subject to Audit Field Served: The 164-year old monthly journal of politics, economics, society, travel, culture and nature, as well as essays

More information

Gas Utility Satisfaction Reaches All-Time High, J.D. Power Finds. Safety First: Safety Prep Translates into Satisfaction among Business Customers

Gas Utility Satisfaction Reaches All-Time High, J.D. Power Finds. Safety First: Safety Prep Translates into Satisfaction among Business Customers Gas Utility Satisfaction Reaches All-Time High, J.D. Power Finds Safety First: Safety Prep Translates into Satisfaction among Business Customers COSTA MESA, Calif.: 17 Jan. 2018 Gas utility business customer

More information

Thank you for your time and attention to this matter. Please feel free to contact me if you have any questions regarding the filing.

Thank you for your time and attention to this matter. Please feel free to contact me if you have any questions regarding the filing. Mary L. Cottrell, Secretary March 27, 2009 Page 1 Stacey M. Donnelly Counsel September 23, 2009 Mark D. Marini, Secretary Department of Public Utilities One South Station Boston, MA 02110 Re: D.P.U. 09-03

More information

DEPARTMENT OF TRANSPORTATION

DEPARTMENT OF TRANSPORTATION DEPARTMENT OF TRANSPORTATION Federal Aviation Administration 14 CFR Part 39 [62 FR 40262 No. 144; 07/28/97][SN] [Docket No. 97-ANE-26-AD; Amendment 39-10085; AD 97-15-11] RIN 2120-AA64 Avco Lycoming /

More information