August 18, 2016 NWN OPUC Advice No A / UG 309 SUPPLEMENT A (UM 1766)

Size: px
Start display at page:

Download "August 18, 2016 NWN OPUC Advice No A / UG 309 SUPPLEMENT A (UM 1766)"

Transcription

1 ONITA R. KING Rates & Regulatory Affairs Tel: Fax: August 18, 2016 NWN OPUC Advice No A / UG 309 SUPPLEMENT A (UM 1766) VIA ELECTRONIC FILING Public Utility Commission of Oregon Attention: Filing Center 201 High Street SE, Suite 100 Post Office Box 1088 Salem, Oregon Re: SUPPLEMENTAL FILING: REQUEST FOR AMORTIZATION OF CERTAIN NON-GAS COST DEFERRED ACCOUNTS RELATING TO: UM 1766: Oregon Regulatory Fee Increase Northwest Natural Gas Company, dba NW Natural ( NW Natural or the Company ), files herewith revisions to its Tariff, P.U.C. Or ( the Tariff ), stated to become effective with service on and after November 1, 2016, as follows: Original Sheet 181-1, Schedule 181, Special Adjustment to Rates Regulatory Fee Increase ; and Original Sheet 181-2, Schedule 181, Special Adjustment to Rates - Regulatory Fee Increase (continued). The purpose of this supplemental filing is to update amounts proposed in the Company s initial request for amortization of amounts deferred under Docket UM 1766 dated July 29, 2016, to correct for a change in the load forecast used in the derivation of the adjustment amounts. These amounts are proposed for inclusion in rates effective November 1, This is the first time that the Company has proposed adjusted rates for this purpose. The Company s initial July 29, 2016, filing is hereby withdrawn in its entirety. The effect of the application of the new temporary adjustments is to increase the Company s annual revenues by $178,043, or about 0.03%. In accordance with discussions with Commission Staff, the amounts are proposed to be recovered on an equal-percentage-of-revenue basis. The monthly bill of the average residential customer served under Rate Schedule 2 using 50 therms will increase by one cent. The monthly increase for the average commercial Rate Schedule 3 customer using 233 therms per month is about six cents, and the monthly increase for the average industrial Schedule 32 firm sales customer using 21,274 therms is about $ Tariff P.U.C. Or. 25 originated November 1, 2012 with Docket UG 221; OPUC Order No as supplemented by Order No , and was filed pursuant to ORS and OAR

2 Public Utility Commission of Oregon UG 309; NWN OPUC Advice No A August 18, 2016, Page 2 Because the rate adjustments are calculated on an equal-percentage-of-revenue basis, the proposed adjustments vary by rate schedule and as such are too numerous to list here. A worksheet showing all of the rate adjustments can be found in Exhibit A to this filing. The number of customers affected by the proposed change is 579,129 residential customers, 60,111 commercial customers, and 935 industrial customers. This filing is in compliance with ORS (2003), which authorizes deferred utility expenses or revenues to be allowed (amortized) in rates to the extent authorized by the Commission in a proceeding to change rates. All of the deferrals included in this filing occurred with appropriate application by Commission authorization, as rate orders or under approved tariffs. For the purpose of recovering deferred balances as outlined in ORS , the required earnings review covering the period(s) during which the deferrals in this filing occurred was performed with Staff s review of the 2016 Annual Results of Operations review. In addition to the supporting materials submitted as part of this filing, the Company will separately submit work papers in electronic format, all of which are incorporated herein by reference. The Company requests that the tariff sheets filed herewith be permitted to become effective with service on and after November 1, In accordance with ORS , copies of this letter and the filing made herewith are available in the Company's main office in Oregon and on its website at Notice to customers was made following the Company s initial filing dated July 29, 2016, by newspaper notice published in the Eugene Register-Guard on August 9 th, and the Oregonian, the Salem Statesman-Journal, and the Coos Bay World on August 10 th, in accordance with OAR Because the change associated with this supplemental filing is not material, the Company does not plan to re-notice customers with this filing. Please address correspondence on this matter to Andrew Speer at Andrew.Speer@nwnatural.com, with copies to the following: Sincerely, NW NATURAL /s/ Onita R. King Onita R. King efiling Rates & Regulatory Affairs NW Natural 220 NW Second Avenue Portland, Oregon Telecopier: (503) Telephone: (503) , x3589 efiling@nwnatural.com Attachments: Exhibit A Supporting Materials

3 NORTHWEST NATURAL GAS COMPANY P.U.C. Or. 25 Original Sheet SCHEDULE 181 SPECIAL RATE ADJUSTMENT - REGULATORY FEE INCREASE PURPOSE: The purpose of this Schedule is to reflect the rate effects of the regulatory fee increase established by Commission Order , the cost recovery of which was approved by the Commission by Order issued in Docket UM 1766, OPUC Order No dated April 21, APPLICABLE: To the following Rate Schedules of this Tariff: Rate Schedule 2 Rate Schedule 27 Rate Schedule 32 Rate Schedule 3 Rate Schedule 31 Rate Schedule 33 GENERAL TERMS: This Schedule is governed by the terms of this Schedule, the General Rules and Regulations contained in this Tariff, any other schedules that by their terms or by the terms of this Schedule apply to service under this Schedule and by all rules and regulations prescribed by regulatory authorities, as amended from time to time. APPLICATION TO RATE SCHEDULES: Effective: November 1, 2016 The Total Adjustment amount shown below is included in the Temporary Adjustments reflected in the above-listed Rate Schedules. NO ADDITIONAL ADJUSTMENT TO RATES IS REQUIRED. Schedule Block Total Adjustment 2 $ CSF $ ISF $ $ CSF Block 1 $ Block 2 $ CTF Block 1 $ Block 2 $ PROPOSED (continue to Sheet 181-2) (N) (N) Issued August 18, 2016 Effective with service on NWN OPUC Advice No A and after November 1, 2016 Issued by: NORTHWEST NATURAL GAS COMPANY d.b.a. NW Natural 220 N.W. Second Avenue Portland, Oregon

4 NORTHWEST NATURAL GAS COMPANY P.U.C. Or. 25 Original Sheet SCHEDULE 181 SPECIAL RATE ADJUSTMENT - REGULATORY FEE INCREASE (continued) APPLICATION TO RATE SCHEDULES: Effective: November 1, 2016 The Total Adjustment amount shown below is included in the Temporary Adjustments reflected in the above-listed Rate Schedules. NO ADDITIONAL ADJUSTMENT TO RATES IS REQUIRED. Schedule Block Total Adjustment 31 ISF Block 1 $ Block 2 $ ITF Block 1 $ Block 2 $ CSF Block 1 $ Block 2 $ Block 3 $ Block 4 $ Block 5 $ Block 6 $ ISF Block 1 $ Block 2 $ Block 3 $ Block 4 $ Block 5 $ Block 6 $ CTF/ITF Block 1 $ Block 2 $ Block 3 $ Block 4 $ Block 5 $ Block 6 $ CSI Block 1 $ Block 2 $ Block 3 $ Block 4 $ Block 5 $ Block 6 $ ISI Block 1 $ Block 2 $ Block 3 $ Block 4 $ Block 5 $ Block 6 $ CTI/ITI Block 1 $ Block 2 $ Block 3 $ Block 4 $ Block 5 $ Block 6 $ (all) $ PROPOSED (N) (N) Issued August 18, 2016 Effective with service on NWN OPUC Advice No A and after November 1, 2016 Issued by: NORTHWEST NATURAL GAS COMPANY d.b.a. NW Natural 220 N.W. Second Avenue Portland, Oregon

5 EXHIBIT A BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON NW NATURAL SUPPORTING MATERIALS Non-Gas Cost Deferral Amortizations Regulatory Fee Increase Balances UM 1766 NWN OPUC Advice No A / UG 309 August 18, 2016

6 NW NATURAL EXHIBIT A Supporting Material Non-Gas Cost Deferral Amortizations Regulatory Fee Increase Balances NWN OPUC ADVICE NO A / UG 309 Description Page Calculation of Increments Allocated on Equal Percentage of Revenue 1 Effects of Average Bill by Rate Schedule 2 Basis for Revenue Related Costs 3 PGA Effects on Revenue 4 Summary of Deferred Accounts Included in the PGA Regulatory Fee Amortization 6

7 NW Natural Rates & Regulatory Affairs PGA - Oregon: August Filing Calculation of Increments Allocated on the EQUAL PERCENTAGE OF REVENUE ALL VOLUMES IN THERMS 1 UG NWN's OPUC Advice No A Exhibit A-Supporting Materials Page 1 of 6 Oregon PUC Fee 2 Oregon PGA Proposed Amount: 172,937 Temporary Increment 3 Volumes page, Total Revenue Sensitive Multiplier: 2.868% add revenue sensitive factor 4 Column F Revenue Amount to Amortize: 178,043 to all classes and schedules 5 Multiplier Allocation to RS Increment 6 Schedule Block A B C D E 7 2R 350,075,126 $369,316, $104,314 $ C Firm Sales 159,370,240 $144,762, $40,889 $ I Firm Sales 4,175,625 $3,547, $1,002 $ Dry Out 776,455 $722, $204 $ C Firm Sales Block 1 17,477,992 $26,307, $7,431 $ Block 2 12,723, $ C Firm Trans Block 1 1,364,169 $913, $258 $ Block 2 1,632, $ I Firm Sales Block 1 4,251,890 $10,253, $2,896 $ Block 2 9,164, $ I Firm Trans Block 1 175,539 $169, $48 $ Block 2 517, $ C Firm Sales Block 1 27,042,245 $24,118, $6,812 $ Block 2 8,064, $ Block 3 797, $ Block 4 11, $ Block $ Block $ I Firm Sales Block 1 4,884,363 $8,303, $2,345 $ Block 2 5,102, $ Block 3 1,942, $ Block 4 579, $ Block $ Block $ Firm Trans Block 1 14,611,752 $6,349, $1,793 $ Block 2 17,230, $ Block 3 9,911, $ Block 4 17,461, $ Block 5 21,764, $ Block 6 2,455, $ C Interr Sales Block 1 6,252,115 $13,666, $3,860 $ Block 2 8,553, $ Block 3 4,339, $ Block 4 5,183, $ Block 5 89, $ Block $ I Interr Sales Block 1 7,427,326 $15,411, $4,353 $ Block 2 8,841, $ Block 3 4,869, $ Block 4 9,961, $ Block 5 2,051, $ Block $ Interr Trans Block 1 8,822,944 $6,502, $1,837 $ Block 2 16,011, $ Block 3 11,561, $ Block 4 29,665, $ Block 5 56,877, $ Block 6 83,025, $ $0 1.0 $0 $ TOTALS 957,099,637 $ 630,345,850 $ 630,345,850 $ 178, Sources for line 2 above: 59 Inputs page Line Tariff Schedules 61 Rate Adjustment Schedule Sched Note: Rate increment calcuation is made by dividing the allocation to the rate schedule by the PGA volumes.

8 NW Natural Rates & Regulatory Affairs PGA - Oregon: August Supplemental Filing Effects on Average Bill by Rate Schedule [1] ALL VOLUMES IN THERMS 1 Oregon PGA Normal 2 Normalized Therms Minimum 11/1/ /1/ Volumes page, Therms in Monthly Monthly Billing Current 4 Column D Block Average use Charge Rates Average Bill 5 F=D+(C * E) 6 Schedule Block A B C D E F 7 2R 350,075,126 N/A 50 $8.00 $ $ C Firm Sales 159,370,240 N/A 233 $15.00 $ $ I Firm Sales 4,175,625 N/A 1,006 $15.00 $ $ Dry Out 776,455 N/A 36 $6.00 $ $ C Firm Sales Block 1 17,477,992 2,000 3,092 $ $ $2, Block 2 12,723,016 all additional $ C Firm Trans Block 1 1,364,169 2,000 1,601 $ $ $ Block 2 1,632,747 all additional $ I Firm Sales Block 1 4,251,890 2,000 5,375 $ $ $3, Block 2 9,164,274 all additional $ I Firm Trans Block 1 175,539 2,000 5,773 $ $ $1, Block 2 517,230 all additional $ C Firm Sales Block 1 27,042,245 10,000 7,918 $ $ $4, Block 2 8,064,435 20,000 $ Block 3 797,112 20,000 $ Block 4 11, ,000 $ Block ,000 $ Block 6 0 all additional $ I Firm Sales Block 1 4,884,363 10,000 21,274 $ $ $10, Block 2 5,102,563 20,000 $ Block 3 1,942,948 20,000 $ Block 4 579, ,000 $ Block ,000 $ Block 6 0 all additional $ Firm Trans Block 1 14,611,752 10,000 41,387 $ $ $4, Block 2 17,230,536 20,000 $ Block 3 9,911,484 20,000 $ Block 4 17,461, ,000 $ Block 5 21,764, ,000 $ Block 6 2,455,153 all additional $ C Interr Sales Block 1 6,252,115 10,000 35,083 $ $ $15, Block 2 8,553,424 20,000 $ Block 3 4,339,671 20,000 $ Block 4 5,183, ,000 $ Block 5 89, ,000 $ Block 6 0 all additional $ I Interr Sales Block 1 7,427,326 10,000 41,859 $ $ $18, Block 2 8,841,797 20,000 $ Block 3 4,869,921 20,000 $ Block 4 9,961, ,000 $ Block 5 2,051, ,000 $ Block 6 0 all additional $ Interr Trans Block 1 8,822,944 10, ,043 $ $ $9, Block 2 16,011,309 20,000 $ Block 3 11,561,774 20,000 $ Block 4 29,665, ,000 $ Block 5 56,877, ,000 $ Block 6 83,025,918 all additional $ N/A 0 $38, $ $38, Totals 957,099, [1] For convenience of presentation, the cent per therm demand charge is used, rather than the available MDD 60 [2] Tariff Advice Notice 16-10: Non-Gas Cost Deferral Amortizations - Intervenor Funding 61 [3] Tariff Advice Notice 16-15: Non-Gas Cost Deferral Amortizations - Industrial DSM 62 [4] Tariff Advice Notice 16-14: Non-Gas Cost Deferral Amortizations - SRRM 63 [5] Tariff Advice Notice 16-16: Non-Gas Cost Deferral Amortizations - Decoupling 64 [6] Tariff Advice Notice : Non-Gas Cost Deferral Amortizations - Oregon PUC Fee 65 [7] Tariff Advice Notice 16-17: PGA UG NWN's OPUC Advice No A Exhibit A-Supporting Materials Page 2 of 6 Advice See note [6] Proposed Proposed Proposed 11/1/ /1/ /1/2016 Oregon PUC Fee Oregon PUC Fee Oregon PUC Fee Rates Average Bill % Bill Change T = D+(C * S) U = (T - F)/F S T U $ $ % $ $ % $ $ % $ $ % $ $2, % $ $ $ % $ $ $3, % $ $ $1, % $ $ $4, % $ $ $ $ $ $ $10, % $ $ $ $ $ $ $4, % $ $ $ $ $ $ $15, % $ $ $ $ $ $ $18, % $ $ $ $ $ $ $9, % $ $ $ $ $ $ $38, %

9 NW Natural Rates and Regulatory Affairs PGA Filing - OREGON Basis for Revenue Related Costs UG NWN's OPUC Advice No A Exhibit A-Supporting Materials Page 3 of 6 Twelve Months 1 Ended 06/30/ Total Billed Gas Sales Revenues 606,080,614 4 Total Oregon Revenues 611,607, Regulatory Commission Fees [1] 1,633, % Statutory rate 7 City License and Franchise Fees 14,818, % Line 7 Line 4 8 Net Uncollectible Expense [2] 1,036, % Line 8 Line Total 17,488, % Sum lines Note: 14 [1] Dollar figure is set at statutory level of 0.275% times Total Oregon Revenues (line 4). 15 Because the fee changed occurred mid gas year, the difference between the previous fee of 0.25% 16 and the new fee of 0.275% is being captured as a temporary deferral. 17 [2] Represents the normalized net write-offs based on a three-year average.

10 NW Natural Rates & Regulatory Affairs PGA Filing - Oregon: August Filing PGA Effects on Revenue Tariff Advice 16-13: Oregon Regulatory Fee UG NWN's OPUC Advice No A Exhibit A-Supporting Materials Page 4 of 6 Including Revenue Sensitve 1 Amount 2 3 Regulatory Fee: 4 5 OR Reg. Fee $178, Total 178, Oregon Earnings Test Normalized Total Revenues $653,343, Effect of this filing, as a percentage change (line 7 line 11) 0.03%

11 UG NWN's OPUC Advice No A Exhibit A-Supporting Materials Page 5 of 6 NW Natural Total Rates & Regulatory Affairs PGA Filing - August Filing Summary of Deferred Accounts Included in the PGA Estimated Estimated Jul-Oct Estimated Interest Rate Interest Amount for Amounts Amounts Balance Estimated Jul-Oct Balance During During (Refund) or Excluded from Included in Account 6/30/2016 Activity Interest 10/31/2016 Amortization Amortization Collection PGA Filing PGA Filing A B C D E F1 F2 G H I E = sum B thru D 2.20% G = E + F2 Excl. Rev Sens Miscellaneous Amortizations DEFER PUC FEE 166, , , % 2, , ,937

12 UG NWN's OPUC Advice No A Exhibit A-Supporting Materials Page 6 of 6 Company: Northwest Natural Gas Company State: Oregon Description: Defer PUC Fee Account Number: UM 1766 Amortization of PUC fee approved in Order Debit (Credit) 2 3 Month/Year Note Interest Rate Interest Balance 4 (a) (b) (c) (d) (e) 5 6 Beginning Balance 163, Apr % 1, , May % 1, , Jun % 1, , Jul % 1, , Aug % 1, , Sep % 1, , Oct % 1, ,894.28

Temporary Adjustments to Rates for Low-Income Programs.

Temporary Adjustments to Rates for Low-Income Programs. Onita R. King Rates & Regulatory Affairs Tel: 503.721.2452 Fax: 503.721.2516 email: ork@nwnatural.com September 12, 2016 NWN WUTC Advice No.16-04 / UG- Steven V. King, Executive Director & Secretary Washington

More information

September 15, 2016 NWN OPUC Advice No / UG 324

September 15, 2016 NWN OPUC Advice No / UG 324 ONITA R. KING Rates & Regulatory Affairs Tel: 503.721.2452 Fax: 503.721.2516 email: ork@nwnatural.com September 15, 2016 NWN OPUC Advice No. 16-18 / UG 324 VIA ELECTRONIC FILING Public Utility Commission

More information

RE: Advice Schedule 45 Public DC Fast Charger Delivery Service Optional Transitional Rate REPLACEMENT PAGES

RE: Advice Schedule 45 Public DC Fast Charger Delivery Service Optional Transitional Rate REPLACEMENT PAGES January 31, 2017 VIA ELECTRONIC FILING Public Utility Commission of Oregon 201 High Street SE, Suite 100 Salem, OR 97301-3398 Attn: Filing Center RE: Advice 16-020 Schedule 45 Public DC Fast Charger Delivery

More information

NORTHWEST NATURAL GAS COMPANY P.U.C. Or. 25 Second Revision of Sheet 3-1 Cancels First Revision of Sheet 3-1

NORTHWEST NATURAL GAS COMPANY P.U.C. Or. 25 Second Revision of Sheet 3-1 Cancels First Revision of Sheet 3-1 P.U.C. Or. 25 Second Revision of Sheet 3-1 Cancels First Revision of Sheet 3-1 SERVICE AVAILABLITY: Service under this Rate Schedule is available on the Company s Distribution System to Non-Residential

More information

September 21, Advice No , NEW Schedule 50 Retail Electric Vehicle Charging Rates

September 21, Advice No , NEW Schedule 50 Retail Electric Vehicle Charging Rates 121 SW Sa/111011 Street Portland, Oregon 97204 PortlandGeneral.com September 21, 2018 Public Utility Commission of Oregon Attn: Filing Center 201 High Street, S.E. P.O. Box 1088 Salem, OR 97308-1088 RE

More information

April 6, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

April 6, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 414 Nicollet Mall Minneapolis, MN 55401 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 RE: Public Service Company of Colorado Docket

More information

II pepco. February 6, 2018

II pepco. February 6, 2018 Wendy E. Stark Office 202.872.2347 Deputy General Counsel Fax 202.331.6767 pepco.com EP1006 westark@pepcoholdings.com 70 1 Ninth Street NW Washington, DC 20068-0001 II pepco. An Exelon Company February

More information

NEW HAMPSHIRE GAS CORPORATION WINTER PERIOD ORIGINAL FILING CONTENTS 3. CONVERSION OF GAS COSTS - GALLONS TO THERMS SCHEDULE A

NEW HAMPSHIRE GAS CORPORATION WINTER PERIOD ORIGINAL FILING CONTENTS 3. CONVERSION OF GAS COSTS - GALLONS TO THERMS SCHEDULE A NEW HAMPSHIRE GAS CORPORATION COST OF GAS RATE FILING - DG 13- WINTER PERIOD 2013-2014 ORIGINAL FILING CONTENTS 1. TARIFF PAGE - COST OF GAS RATE 2. MARKED TARIFF PAGE - COST OF GAS RATE 3. CONVERSION

More information

February 4, 2019 VIA ELECTRONIC FILING. Public Utility Commission of Oregon 201 High Street SE, Suite 100 Salem, OR Attn: Filing Center

February 4, 2019 VIA ELECTRONIC FILING. Public Utility Commission of Oregon 201 High Street SE, Suite 100 Salem, OR Attn: Filing Center February 4, 2019 VIA ELECTRONIC FILING Public Utility Commission of Oregon 201 High Street SE, Suite 100 Salem, OR 97301-3398 Attn: Filing Center RE: Advice No. 19-003 Schedule 12 Quarterly Meter Reading

More information

PUBLIC UTILITIES COMMISSION

PUBLIC UTILITIES COMMISSION The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. PUBLIC UTILITIES COMMISSION FINAL DECISION THRESHOLD

More information

UNITIL ENERGY SYSTEMS. INC. CALCULATION OF THE EXTERNAL DELIVERY CHARGE

UNITIL ENERGY SYSTEMS. INC. CALCULATION OF THE EXTERNAL DELIVERY CHARGE Schedule LSM-DJD-1 Page 1 of 2 UNITIL ENERGY SYSTEMS. INC. CALCULATION OF THE EXTERNAL DELIVERY CHARGE Calculation Calculation of the Calculation of the of the EDC EDC/ Only EDC/Non- 1. (Over)/under Recovery

More information

January 18, 2002 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

January 18, 2002 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION Akbar Jazayeri Director of Revenue and Tariffs January 18, 2002 ADVICE 115-G (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Decrease in Santa Catalina Island

More information

January 20, 2004 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

January 20, 2004 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION Akbar Jazayeri Director of Revenue and Tariffs January 20, 2004 ADVICE 123-G (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Increase in Santa Catalina Island

More information

Portland General Electric Company Second Revision of Sheet No. 122-1 P.U.C. Oregon No. E-18 Canceling First Revision of Sheet No. 122-1 PURPOSE SCHEDULE 122 RENEWABLE RESOURCES AUTOMATIC ADJUSTMENT CLAUSE

More information

Consolidated Edison Company of New York, Inc.

Consolidated Edison Company of New York, Inc. PSC NO: 11 Electricity Leaf: 1 Initial Superseding Economic Development Delivery Service No. 2 Consolidated Edison Company of New York, Inc. Schedule For Economic Development Delivery Service Subsequent

More information

The Peoples Gas Light and Coke Company

The Peoples Gas Light and Coke Company History of Gas Charges Due to the Operation of Rider 2 (Cents per Therm) Factors for Transportation Customers (Riders FST, SST, P, CFY and AGG) Non- Total Standby Standby Aggregation Commodity Commodity

More information

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM Sheet 1 FITCHBURG GAS AND ELECTRIC LIGHT COMPANY SCHEDULE NM Applicability The following tariff provisions shall be applicable to a Host Customer, as defined herein, that requests net metering services

More information

National Grid's Electric Revenue Decoupling Mechanism ("RDM") Reconciliation Filing for the Year Ending March 31, 2013 Docket No.

National Grid's Electric Revenue Decoupling Mechanism (RDM) Reconciliation Filing for the Year Ending March 31, 2013 Docket No. Thomas R. Teehan Senior Counsel May 15, 2013 VIA HAND DELIVERY & ELECTRONIC MAIL Luly E. Massaro, Commission Clerk Rhode Island Public Utilities Commission 89 Jefferson Boulevard Warwick, RI 02889 RE:

More information

Direct Energy Regulated Services

Direct Energy Regulated Services Decision 23986-D01-2018 Application for True-Up of the 2017 and 2018 Interim Rates for the Default Rate Tariff and the Regulated Rate Tariff December 4, 2018 Alberta Utilities Commission Decision 23986-D01-2018

More information

BEFORE THE FLORIDA PUBLIC SERVICE COMMISSION. The following Commissioners participated in the disposition of this matter:

BEFORE THE FLORIDA PUBLIC SERVICE COMMISSION. The following Commissioners participated in the disposition of this matter: BEFORE THE FLORIDA PUBLIC SERVICE COMMISSION In re: Fuel and purchased power cost recovery clause with generating performance incentive factor. ORDER NO. PSC-17-0219-PCO-EI ISSUED: June 13, 2017 The following

More information

Thank you for your time and attention to this matter. Please feel free to contact me if you have any questions regarding the filing.

Thank you for your time and attention to this matter. Please feel free to contact me if you have any questions regarding the filing. Mary L. Cottrell, Secretary March 27, 2009 Page 1 Stacey M. Donnelly Counsel September 23, 2009 Mark D. Marini, Secretary Department of Public Utilities One South Station Boston, MA 02110 Re: D.P.U. 09-03

More information

Portland General Electric Company Eleventh Revision of Sheet No. 7-1 P.U.C. Oregon No. E-18 Canceling Tenth Revision of Sheet No.

Portland General Electric Company Eleventh Revision of Sheet No. 7-1 P.U.C. Oregon No. E-18 Canceling Tenth Revision of Sheet No. Portland General Electric Company Eleventh Revision of Sheet No. 7-1 P.U.C. Oregon No. E-18 Canceling Tenth Revision of Sheet No. 7-1 AVAILABLE In all territory served by the Company. APPLICABLE To Residential

More information

Docket No. DE Dated: 05/04/2015 Attachment CJG-1 Page 1

Docket No. DE Dated: 05/04/2015 Attachment CJG-1 Page 1 Docket No. DE - Dated: 0/0/0 Attachment CJG- Page 8 9 Summary of Forecasted Energy Service 0 Cost For January 0 Through December 0 TOTAL COST Cents per KWH Reference Fossil energy costs $ 9,9 $. Attachment

More information

STATE OF NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION DE LIBERTY UTILITIES (GRANITE STATE ELECTRIC) CORP. d/b/a LIBERTY UTILITIES

STATE OF NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION DE LIBERTY UTILITIES (GRANITE STATE ELECTRIC) CORP. d/b/a LIBERTY UTILITIES STATE OF NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION DE 17-058 LIBERTY UTILITIES (GRANITE STATE ELECTRIC) CORP. d/b/a LIBERTY UTILITIES Request for Approval of Energy Supply Solicitation and Resulting Rates

More information

Massachusetts Electric Company and Nantucket Electric Company, Docket No. D.T.E

Massachusetts Electric Company and Nantucket Electric Company, Docket No. D.T.E Amy G. Rabinowitz Counsel April 3, 2003 By Hand Mary L. Cottrell, Secretary Department of Telecommunications and Energy One South Station, 2 nd Floor Boston, MA 02110 Re: Massachusetts Electric Company

More information

M A N I T O B A ) Order No. 42/14 ) THE PUBLIC UTILITIES BOARD ACT ) April 23, 2014

M A N I T O B A ) Order No. 42/14 ) THE PUBLIC UTILITIES BOARD ACT ) April 23, 2014 M A N I T O B A ) ) THE PUBLIC UTILITIES BOARD ACT ) BEFORE: Régis Gosselin, B ès Arts, M.B.A., C.G.A., Chair Larry Soldier, Member Marilyn Kapitany, B.Sc. (Hons.), M.Sc., Member Neil Duboff, B.A. (Hons.),

More information

ATLANTA CLEVELAND DAYTON WASHINGTON, D.C. CINCINNATI

ATLANTA CLEVELAND DAYTON WASHINGTON, D.C. CINCINNATI HOMPSON LINE ATLANTA CLEVELAND DAYTON WASHINGTON, D.C. CINCINNATI COLUMBUS NEW YORK Via Electronic Filing Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington,

More information

The cost estimation methodology used to update the charges and credits is the same methodology the Company utilized in the prior year s filing.

The cost estimation methodology used to update the charges and credits is the same methodology the Company utilized in the prior year s filing. LISA D. NORDSTROM Lead Counsel lnordstrom@idahopower.com December 28, 2018 Public Utility Commission of Oregon Filing Center 201 High Street SE, Suite 100 P.O. Box 1088 Salem, Oregon 97301 Re: Tariff Advice

More information

42 PGC Rate E-Factor Total Rate Currently effective Rate Increase (Decrease) in Rate 0.

42 PGC Rate E-Factor Total Rate Currently effective Rate Increase (Decrease) in Rate 0. Line No. Exhibit 1-A Schedule 1 Sheet 1 of 2 COMPUTATION OF CHANGE IN RATE PURSUANT TO SECTION 1307(f) APPLICATION PERIOD: OCTOBER, 2016 THROUGH SEPTEMBER, 2017 Description Amount (1) 1 Purchased Gas Commodity

More information

PURCHASED GAS ADJUSTMENT RIDER SCHEDULE

PURCHASED GAS ADJUSTMENT RIDER SCHEDULE Page 22 GAS SERVICE Effective: October 27, 2005 Filed: August 25, 2005 Supersedes: PGA-2 filed 8/25/05 RIDER SCHEDULE PGA-3 Schedule Consists of: Three Sheets Plus PURCHASED GAS ADJUSTMENT RIDER SCHEDULE

More information

National Grid 2017 ELECTRIC RETAIL RATE FILING. Consisting of the Direct Testimony and Schedules of Adam S. Crary and Tiffany M.

National Grid 2017 ELECTRIC RETAIL RATE FILING. Consisting of the Direct Testimony and Schedules of Adam S. Crary and Tiffany M. National Grid 2017 ELECTRIC RETAIL RATE FILING Consisting of the Direct Testimony and Schedules of Adam S. Crary and Tiffany M. Forsyth February 16, 2017 Submitted to: Rhode Island Public Utilities Commission

More information

Superseding Revised Sheet No. 63 REVISED SHEET NO. 63 Effective March 1, 2011 Effective September 1, 2012 ENERGY COST ADJUSTMENT CLAUSE

Superseding Revised Sheet No. 63 REVISED SHEET NO. 63 Effective March 1, 2011 Effective September 1, 2012 ENERGY COST ADJUSTMENT CLAUSE Superseding Revised Sheet No. 63 REVISED SHEET NO. 63 Effective March 1, 2011 Effective September 1, 2012 ENERGY COST ADJUSTMENT CLAUSE Applicable To Schedule R - Residential Service Schedule G - General

More information

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM Sheet 1 FITCHBURG GAS AND ELECTRIC LIGHT COMPANY SCHEDULE NM Applicability The following tariff provisions shall be applicable to a Host Customer, as defined herein, that requests net metering services

More information

s m BC hydro REGENERATION December 22, 2011

s m BC hydro REGENERATION December 22, 2011 BC hydro REGENERATION s m Janet Fraser Chief Regulatory Officer Phone: 6046234046 Fax: 6046234407 bchydroregu latoryg rou p@bchydro.com December 22, 2011 Ms. Alanna Gillis Acting Commission Secretary British

More information

Re: YEC & YECL Rider F Fuel Adjustment Rider & Deferred Fuel Price Variance Policy

Re: YEC & YECL Rider F Fuel Adjustment Rider & Deferred Fuel Price Variance Policy January 20, 2012 Mr. Bruce McLennan, Chair Yukon Utilities Board Box 31728 Whitehorse, YT Y1A 6L3 Dear Mr. McLennan: Re: YEC & YECL Rider F Fuel Adjustment Rider & Deferred Fuel Price Variance Policy On

More information

Oregon Withholding Tax Tables

Oregon Withholding Tax Tables Oregon Withholding Tax Tables Effective January 1, 2007 To: Oregon Employers The Oregon Withholding Tax Tables include: Things you need to know. The standard tax tables for all payroll periods. The computer

More information

GENERAL INFORMATION 15. MARKET SUPPLY CHARGE ("MSC")

GENERAL INFORMATION 15. MARKET SUPPLY CHARGE (MSC) P.S.C. NO. 3 ELECTRICITY LEAF: 214 ORANGE AND ROCKLAND UTILITIES, INC. REVISION: 3 INITIAL EFFECTIVE DATE: November 1, 2015 SUPERSEDING REVISION: 1 Issued in compliance with Order in Case 14-E-0493 dated

More information

SOUTHWEST GAS CORPORATION P.O. Box 98510 Las Vegas, Nevada 89193-8510 118th Revised Cal. P.U.C. Sheet No. 65 California Gas Tariff Canceling 114th Revised Cal. P.U.C. Sheet No. 65 STATEMENT OF RATES RATES

More information

Revised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E. San Francisco, California

Revised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E. San Francisco, California Revised Cal. P.U.C. Sheet No. 42736-E Cancelling Revised Cal. P.U.C. Sheet No. 41884-E ELECTRIC SCHEDULE EL-1 Sheet 1 APPLICABILITY: This schedule is applicable to single-phase and polyphase residential

More information

Attention: Mr. Patrick Wruck, Commission Secretary and Manager, Regulatory Support

Attention: Mr. Patrick Wruck, Commission Secretary and Manager, Regulatory Support Diane Roy Vice President, Regulatory Affairs Gas Regulatory Affairs Correspondence Email: gas.regulatory.affairs@fortisbc.com Electric Regulatory Affairs Correspondence Email: electricity.regulatory.affairs@fortisbc.com

More information

February 8, Southwest Power Pool, Inc. Revisions to SPP Open Access Transmission Tariff to add Schedule 12 Docket No.

February 8, Southwest Power Pool, Inc. Revisions to SPP Open Access Transmission Tariff to add Schedule 12 Docket No. February 8, 2005 VIA HAND DELIVERY The Honorable Magalie R. Salas Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: Southwest Power Pool, Inc. Revisions to

More information

Southern California Gas Company Summary of Proposed Regulatory Account Balances for Amortization in Rates (Over) / Undercollection M$

Southern California Gas Company Summary of Proposed Regulatory Account Balances for Amortization in Rates (Over) / Undercollection M$ Southern California Gas Company Summary of Proposed Regulatory Account Balances for Amortization in Rates (Over) / Undercollection M$ Regulatory Account 1/ Proposed January 1, 2013 Amortization ($000)

More information

P. SUMMARY: The Southeastern Power Administration (SEPA) establishes Rate Schedules JW-

P. SUMMARY: The Southeastern Power Administration (SEPA) establishes Rate Schedules JW- This document is scheduled to be published in the Federal Register on 08/29/2016 and available online at http://federalregister.gov/a/2016-20620, and on FDsys.gov 6450-01-P DEPARTMENT OF ENERGY Southeastern

More information

EXHIBIT A Tenth Revised Sheet No. 6 B.P.U.N.J. No. 11 - GAS Superseding Ninth Revised Sheet No. 6 APPLICABLE TO USE OF SERVICE FOR: RESIDENTIAL SERVICE (RSG) All residential purposes. Customer may elect

More information

STATE OF NORTH CAROLINA UTILITIES COMMISSION RALEIGH NOTICE TO CUSTOMERS DOCKET NO. E-34, SUB 46 BEFORE THE NORTH CAROLINA UTILITIES COMMISSION

STATE OF NORTH CAROLINA UTILITIES COMMISSION RALEIGH NOTICE TO CUSTOMERS DOCKET NO. E-34, SUB 46 BEFORE THE NORTH CAROLINA UTILITIES COMMISSION Page 1 of 5 STATE OF NORTH CAROLINA UTILITIES COMMISSION RALEIGH NOTICE TO CUSTOMERS DOCKET NO. E-34, SUB 46 BEFORE THE NORTH CAROLINA UTILITIES COMMISSION Notice is given that Appalachian State University,

More information

Large General Service Time-of-Use Storage Program

Large General Service Time-of-Use Storage Program Large General Service Time-of-Use Storage Program AVAILABILITY Available throughout the Company s entire electric service area where the facilities of the Company are of adequate capacity and are adjacent

More information

UM1716 Resource Value of Solar Docket Due: December 22, 2015

UM1716 Resource Value of Solar Docket Due: December 22, 2015 UM1716 Resource Value of Solar Docket Due: December 22, 2015 Status Report to ALJ Investigation #2 into the Extent of Cost Shifting, if any, from net metering At a pre-hearing conference on October 27,

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 52116-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 45654-E Schedule GS-2 Sheet 1 APPLICABILITY Applicable to single- and

More information

BEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION ) ) ) ) SETTLEMENT TESTIMONY MYRA L. TALKINGTON MANAGER, REGULATORY FILINGS ENTERGY SERVICES, INC.

BEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION ) ) ) ) SETTLEMENT TESTIMONY MYRA L. TALKINGTON MANAGER, REGULATORY FILINGS ENTERGY SERVICES, INC. BEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION IN THE MATTER OF THE APPLICATION OF FOR APPROVAL OF CHANGES IN FOR RETAIL ELECTRIC SERVICE SETTLEMENT TESTIMONY OF MYRA L. TALKINGTON MANAGER, REGULATORY FILINGS

More information

KAUAI ISLAND UTILITY COOPERATIVE KIUC Tariff No. 1 Lihue, Kauai, Hawaii First Revised Sheet 80 Cancels Original Sheet 80

KAUAI ISLAND UTILITY COOPERATIVE KIUC Tariff No. 1 Lihue, Kauai, Hawaii First Revised Sheet 80 Cancels Original Sheet 80 Lihue, Kauai, Hawaii First Revised Sheet 80 Cancels Original Sheet 80 Availability: SCHEDULE "L" Applicable for primary large light and/or power service supplied and metered at primary voltage and a single

More information

Public Utilities Commission of the State of California

Public Utilities Commission of the State of California March 1, 2000 ADVICE 1972-E Utilities Commission of the State of California Pacific Gas and Electric Company (PG&E) hereby submits for filing revisions to its electric tariff sheets. The affected tariff

More information

BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON PACIFICORP. Exhibit Accompanying Direct Testimony of Judith M. Ridenour

BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON PACIFICORP. Exhibit Accompanying Direct Testimony of Judith M. Ridenour Docket No. UE 339 Exhibit PAC/303 Witness: Judith M. Ridenour BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON PACIFICORP Exhibit Accompanying Direct Testimony of Judith M. Ridenour Estimated Effect of Proposed

More information

STATE OF NEW YORK PUBLIC SERVICE COMMISSION

STATE OF NEW YORK PUBLIC SERVICE COMMISSION COMMISSIONERS PRESENT: Audrey Zibelman, Chair Patricia L. Acampora Gregg C. Sayre Diane X. Burman, abstaining STATE OF NEW YORK PUBLIC SERVICE COMMISSION At a session of the Public Service Commission held

More information

Reactive Power Requirements and Financial Compensation. Addendum to Draft Final Proposal

Reactive Power Requirements and Financial Compensation. Addendum to Draft Final Proposal Reactive Power Requirements and Financial Compensation July 21, 2016 Table of Contents 1. Introduction... 3 2. Changes to Proposal... 4 3. Plan for Stakeholder Engagement... 4 4.... 4 6. Next Steps...

More information

of New York, Inc. Original Leaf No. 216 SERVICE CLASSIFICATION NO. 3 BACK-UP SERVICE

of New York, Inc. Original Leaf No. 216 SERVICE CLASSIFICATION NO. 3 BACK-UP SERVICE Consolidated Edison Company P.S.C. No. 9 - Electricity of New York, Inc. Original Leaf No. 216 Applicable to Use of Service for SERVICE CLASSIFICATION NO. 3 Power and energy supplied by the Company to

More information

BEFORE THE PUBLIC UTILITY COMMISSION OF THE STATE OF OREGON UE 294. Pricing PORTLAND GENERAL ELECTRIC COMPANY. Direct Testimony and Exhibits of

BEFORE THE PUBLIC UTILITY COMMISSION OF THE STATE OF OREGON UE 294. Pricing PORTLAND GENERAL ELECTRIC COMPANY. Direct Testimony and Exhibits of UE 294 / PGE / 1400 BEFORE THE PUBLIC UTILITY COMMISSION OF THE STATE OF OREGON UE 294 Pricing PORTLAND GENERAL ELECTRIC COMPANY Direct Testimony and Exhibits of Marc February 12, 2015 UE 294 I PGE I 1400

More information

STATE OF NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION DE PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE

STATE OF NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION DE PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE STATE OF NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION DE 07-097 PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE Petition for Adjustment of Stranded Cost Recovery Charge Order Following Hearing O R D E R N O. 24,872

More information

Schedule TOU-EV-8 Sheet 1 GENERAL SERVICE TIME-OF-USE, ELECTRIC VEHICLE CHARGING, DEMAND METERED

Schedule TOU-EV-8 Sheet 1 GENERAL SERVICE TIME-OF-USE, ELECTRIC VEHICLE CHARGING, DEMAND METERED Southern California Edison Revised Cal. PUC Sheet No. 66647-E Rosemead, California (U 338-E) Cancelling Original Cal. PUC Sheet No. 64807-E Schedule TOU-EV-8 Sheet 1 APPLICABILITY Applicable solely for

More information

March 30, 2005 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION. 1% Franchise Surcharge for City of Santa Barbara Residents

March 30, 2005 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION. 1% Franchise Surcharge for City of Santa Barbara Residents Akbar Jazayeri Director of Revenue and Tariffs March 30, 2005 ADVICE 1881-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: 1% Franchise Surcharge for City of

More information

BEFORE THE NEW MEXICO PUBLIC REGULATION

BEFORE THE NEW MEXICO PUBLIC REGULATION BEFORE THE NEW MEXICO PUBLIC REGULATION IN THE MATTER OF THE APPLICATION ) OF PUBLIC SERVICE COMPANY OF NEW ) MEXICO FOR REVISION OF ITS RETAIL ) ELECTRIC RATES PURSUANT TO ADVICE ) NOTICE NO. 513 ) )

More information

Maritime Electric C A N A D A PROVINCE OF PRINCE EDWARD ISLAND BEFORE THE ISLAND REGULATORY AND APPEALS COMMISSION

Maritime Electric C A N A D A PROVINCE OF PRINCE EDWARD ISLAND BEFORE THE ISLAND REGULATORY AND APPEALS COMMISSION Maritime Electric C A N A D A PROVINCE OF PRINCE EDWARD ISLAND BEFORE THE ISLAND REGULATORY AND APPEALS COMMISSION IN THE MATTER of Section 20 of the Electric Power Act (R.S.P.E.I. 1988, Cap. E- 4) and

More information

Proposal Concerning Modifications to LIPA s Tariff for Electric Service

Proposal Concerning Modifications to LIPA s Tariff for Electric Service Proposal Concerning Modifications to LIPA s Tariff for Electric Service Requested Action: The Trustees are being requested to approve a resolution adopting modifications to the Long Island Power Authority

More information

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS PUBLIC UTILITIES COMMISSION

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS PUBLIC UTILITIES COMMISSION STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS PUBLIC UTILITIES COMMISSION IN RE: THE NARRAGANSETT ELECTRIC : COMPANY d/b/a NATIONAL GRID S 2018 : DOCKET NO. 4805 ELECTRIC RETAIL RATE FILING : : IN RE:

More information

D.P.U A Appendix B 220 CMR: DEPARTMENT OF PUBLIC UTILITIES

D.P.U A Appendix B 220 CMR: DEPARTMENT OF PUBLIC UTILITIES 220 CMR 18.00: NET METERING Section 18.01: Purpose and Scope 18.02: Definitions 18.03: Net Metering Services 18.04: Calculation of Net Metering Credits 18.05: Allocation of Net Metering Credits 18.06:

More information

Electric Vehicle Program

Electric Vehicle Program Cause No. 43960 INDIANAPOLIS POWER & LIGHT COMPANY Electric Vehicle Program Year 3 2013 Report May 2, 2014 Contents Background... 2 Project Objectives... 3 Current Status... 3 Significant Milestones...

More information

If AL filed in compliance with a Commission order, indicate relevant Decision/Resolution:

If AL filed in compliance with a Commission order, indicate relevant Decision/Resolution: CALIFORNIA PUBLIC UTILITIES COMMISSION ADVICE LETTER FILING SUMMARY ENERGY UTILITY MUST BE COMPLETED BY LSE (Attach additional pages as needed) Company name/cpuc Utility No. (U 933-E) Utility type: Contact

More information

BIENNIAL REPORT REGARDING FUEL AND FUEL-RELATED CHARGE ADJUSTMENT PROCEEDINGS FOR ELECTRIC UTILITIES. REQUIRED PURSUANT TO G.S

BIENNIAL REPORT REGARDING FUEL AND FUEL-RELATED CHARGE ADJUSTMENT PROCEEDINGS FOR ELECTRIC UTILITIES. REQUIRED PURSUANT TO G.S BIENNIAL REPORT REGARDING FUEL AND FUEL-RELATED CHARGE ADJUSTMENT PROCEEDINGS FOR ELECTRIC UTILITIES REQUIRED PURSUANT TO G.S. 62-133.2(g) DATE DUE: JULY 1, 2013 SUBMITTED: JUNE 28, 2013 RECEIVED BY THE

More information

PUBLIC REDACTED VERSION

PUBLIC REDACTED VERSION PUBLIC REDACTED VERSION BEFORE THE MARYLAND PUBLIC SERVICE COMMISSION CASE NO. 9208 IN THE MATTER OF BALTIMORE GAS AND ELECTRIC COMPANY FOR AUTHORIZATION TO DEPLOY A SMART GRID INITIATIVE AND TO ESTABLISH

More information

Rhode Island Net Metering First Bill Walkthrough. Updated September 2017

Rhode Island Net Metering First Bill Walkthrough. Updated September 2017 Rhode Island Net Metering First Bill Walkthrough Updated September 2017 1 Net Metering Credit Amount 2 Bill Display 3 Bill Display Continued 4 Bill Display Continued 5 Schedule B Any Credits generated

More information

WASHINGTON ELECTRIC COOPERATIVE, INC. NET METERING TARIFF POLICY BULLETIN NO. 38 NM

WASHINGTON ELECTRIC COOPERATIVE, INC. NET METERING TARIFF POLICY BULLETIN NO. 38 NM WASHINGTON ELECTRIC COOPERATIVE, INC. NET METERING TARIFF POLICY BULLETIN NO. 38 NM A. Application. The following tariff shall apply to members who: (1) take service under a rate within this electric service

More information

Docket No EI Date: May 22, 2014

Docket No EI Date: May 22, 2014 Docket No. 140032-EI Big Bend Units 1 through 4 are pulverized coal steam units that currently use distillate oil 2 for start-ups and for flame stabilization. The Company seeks to use natural gas in place

More information

National Grid s Renewable Energy Growth Program RE Growth Factor Filing For the Period April 1, 2015 Through March 31, 2016 Docket No.

National Grid s Renewable Energy Growth Program RE Growth Factor Filing For the Period April 1, 2015 Through March 31, 2016 Docket No. Celia B. O Brien Assistant General Counsel and Director December 30, 2014 VIA OVERNIGHT COURIER & ELECTRONIC MAIL Luly E. Massaro, Commission Clerk Rhode Island Public Utilities Commission 89 Jefferson

More information

KANSAS CITY POWER AND LIGHT COMPANY P.S.C. MO. No. 7 Fourth Revised Sheet No. 39 Canceling P.S.C. MO. No. 7 Third Revised Sheet No.

KANSAS CITY POWER AND LIGHT COMPANY P.S.C. MO. No. 7 Fourth Revised Sheet No. 39 Canceling P.S.C. MO. No. 7 Third Revised Sheet No. P.S.C. MO. No. 7 Fourth Revised Sheet No. 39 Canceling P.S.C. MO. No. 7 Third Revised Sheet No. 39 PURPOSE: The purpose of the Solar Subscription Pilot Rider (Program) is to provide a limited number of

More information

THE CONNECTICUT LIGHT AND POWER COMPANY dba EVERSOURCE ENERGY AND THE UNITED ILLUMINATING COMPANY

THE CONNECTICUT LIGHT AND POWER COMPANY dba EVERSOURCE ENERGY AND THE UNITED ILLUMINATING COMPANY THE CONNECTICUT LIGHT AND POWER COMPANY dba EVERSOURCE ENERGY AND THE UNITED ILLUMINATING COMPANY Virtual Net Metering Application Effective November 18, 2016 This application form addresses virtual net

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 62149-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 54195-E Schedule TOU-EV-4 Sheet 1 APPLICABILITY Applicable solely for

More information

November 16, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

November 16, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. November 16, 2012 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 ANR Pipeline Company 717 Texas Street, Suite 2400 Houston, Texas 77002-2761

More information

PUBLIC SERVICE COMMISSION OF WEST VIRGINIA %% CHARLESTON

PUBLIC SERVICE COMMISSION OF WEST VIRGINIA %% CHARLESTON PI PUBLIC SERVICE COMMISSION OF WEST VIRGINIA %% CHARLESTON At a session of the PUBLIC SERVICE COMMISSION OF WEST VIRGINIA, at the Capitol in the City of Charleston on the 3Oth,aay,6f June, 1980. CASE

More information

ELECTRIC RATE SCHEDULES ROCKY MOUNTAIN POWER. Salt Lake City, Utah. for ELECTRIC SERVICE. in the STATE OF UTAH. Under

ELECTRIC RATE SCHEDULES ROCKY MOUNTAIN POWER. Salt Lake City, Utah. for ELECTRIC SERVICE. in the STATE OF UTAH. Under Original Sheet No. A ELECTRIC RATE SCHEDULES of ROCKY MOUNTAIN POWER Salt Lake City, Utah for ELECTRIC SERVICE in the Under PUBLIC SERVICE COMMISSION OF UTAH TARIFF NO. 50 CANCELS ALL PREVIOUS SCHEDULES

More information

The Company has also included a copy of the workpapers used to determine the Default Service Charges effective September 2016 through November 2016.

The Company has also included a copy of the workpapers used to determine the Default Service Charges effective September 2016 through November 2016. Pike County Light & Power Co. Pike County Light & Power Co. 4 Irving Place New York NY 10003-0987 www.oru.com August 29, 2016 Honorable Rosemary Chiavetta Secretary Commonwealth of Pennsylvania Pennsylvania

More information

(2) Scope. 220 CMR applies to all Distribution Companies subject to the jurisdiction of the Department.

(2) Scope. 220 CMR applies to all Distribution Companies subject to the jurisdiction of the Department. D.P.U. 11-10-A 220 CMR 18.00: NET METERING Section 18.01: Purpose and Scope 18.02: Definitions 18.03: Net Metering Services 18.04: Calculation of Net Metering Credits 18.05: Allocation of Net Metering

More information

AOBA Utility Committee

AOBA Utility Committee AOBA Utility Committee Budgeting for Utilities In the Face of Constantly Changing Rates Surcharges, Taxes and Automatic Adjustment Clauses Grow as a Proportion of Total Billed Charges for Utility Services

More information

Revised Cal. P.U.C. Sheet No E** Pacific Gas and Electric Company Cancelling Revised Cal. P.U.C. Sheet No E San Francisco, California

Revised Cal. P.U.C. Sheet No E** Pacific Gas and Electric Company Cancelling Revised Cal. P.U.C. Sheet No E San Francisco, California Revised Cal. P.U.C. Sheet No. 25718-E** Pacific Gas and Electric Company Cancelling Revised Cal. P.U.C. Sheet No. 24808-E APPLICABILITY: TERRITORY: This voluntary schedule is available to customers for

More information

Topic Small Projects (< 100 kw) Large Projects (>100 kw)

Topic Small Projects (< 100 kw) Large Projects (>100 kw) New Hampshire Public Utilities Commission Docket No. DE 16-576 Development of New Alternative Net Metering Tariffs and/or Other Regulatory Mechanisms and Tariffs for Customer-Generators Joint Settlement

More information

THE NARRAGANSETT ELECTRIC COMPANY LARGE DEMAND RATE (G-32) RETAIL DELIVERY SERVICE

THE NARRAGANSETT ELECTRIC COMPANY LARGE DEMAND RATE (G-32) RETAIL DELIVERY SERVICE Sheet 1 AVAILABILITY Electric delivery service shall be taken under this rate for all purposes by any customer who is placed on the rate by the Company in accordance with this paragraph. The Company shall

More information

Schedule TOU-EV-7 Sheet 1 GENERAL SERVICE TIME-OF-USE, ELECTRIC VEHICLE CHARGING

Schedule TOU-EV-7 Sheet 1 GENERAL SERVICE TIME-OF-USE, ELECTRIC VEHICLE CHARGING Southern California Edison Revised Cal. PUC Sheet No. 66642-E Rosemead, California (U 338-E) Cancelling Original Cal. PUC Sheet No. 64800-E Schedule TOU-EV-7 Sheet 1 APPLICABILITY Applicable solely for

More information

Thank you for requesting information on our utility auditing services!

Thank you for requesting information on our utility auditing services! - EXHIBIT A - ELECTRIC - CLIENT INVOICE: EXAMPLE #1 If we moved a client from an electrical rate 6 to a rate 6L, and, as a result, changed their KWH rate from $.06 per Kilowatt Hour to $.05 per Kilowatt

More information

INDEX 2.11 EXHIBIT 8: RATE DESIGN E8 E8\T1 E8\T2

INDEX 2.11 EXHIBIT 8: RATE DESIGN E8 E8\T1 E8\T2 2. EXHIBIT 8: RATE DESIGN INDEX 2. EXHIBIT 8: RATE DESIGN 2.. FIXED/VARIABLE PROPORTION 2..2 RATE DESIGN POLICY CONSULTATION 2..3 RETAIL TRANSMISSION SERVICE RATES ( RTSRs ) 2..4 RETAIL SERVICE CHARGES

More information

September 2, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

September 2, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. TEXAS EASTERN TRANSMISSION, LP Mailing Address: 5400 Westheimer Court P. O. Box 1642 Houston, TX 77056-5310 Houston, TX 77251-1642 713.627.5400 main Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory

More information

Energy Performance Information Request Timeline

Energy Performance Information Request Timeline Energy Performance Information Request Timeline Project Title: UT Project # Project Manager: Submitted by: Day Submitted: The timeline below outlines a comprehensive list of required documents and when

More information

ELECTRIC SCHEDULE E-1 Sheet 1 RESIDENTIAL SERVICES

ELECTRIC SCHEDULE E-1 Sheet 1 RESIDENTIAL SERVICES Revised Cal. P.U.C. Sheet No. 33759-E Cancelling Revised Cal. P.U.C. Sheet No. 33566-E ELECTRIC SCHEDULE E-1 Sheet 1 APPLICABILITY: TERRITORY: RATES: This schedule is applicable to single-phase and polyphase

More information

SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-21 PRICE PLAN FOR RESIDENTIAL SUPER PEAK TIME-OF-USE SERVICE

SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-21 PRICE PLAN FOR RESIDENTIAL SUPER PEAK TIME-OF-USE SERVICE SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-21 PRICE PLAN FOR RESIDENTIAL SUPER PEAK TIME-OF-USE SERVICE Effective: April 2015 Billing Cycle Supersedes: November 2012 Billing Cycle

More information

ENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE

ENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE ENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE Rates in effect as of September 1, 2015 EPC DISTRIBUTION TARIFF RATE SCHEDULE Rate Code Rate Description Page D100 Distribution Tariff

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 41. Procurement Of RMR Generation... 2 41.1 Procurement Of Reliability Must-Run Generation By The CAISO... 2 41.2 Designation Of Generating Unit As Reliability Must-Run Unit... 2 41.3

More information

Application of claw-back

Application of claw-back Application of claw-back A report for Vector Dr. Tom Hird Daniel Young June 2012 Table of Contents 1. Introduction 1 2. How to determine the claw-back amount 2 2.1. Allowance for lower amount of claw-back

More information

RIDER RTP REAL-TIME PRICING

RIDER RTP REAL-TIME PRICING d/b/a Ameren Illinois 2 nd Revised Sheet No. 27 Electric Service Schedule Ill. C. C. No. 1 (Canceling 1 st Revised Sheet No. 27) PURPOSE Rider RTP Real-Time Pricing (Rider RTP), along with Delivery Service

More information

January 18, Docket: ER Energy Imbalance Market Special Report Transition Period August 2018 for Idaho Power Company

January 18, Docket: ER Energy Imbalance Market Special Report Transition Period August 2018 for Idaho Power Company California Independent System Operator Corporation January 18, 2019 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 62984-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 62336-E APPLICABILITY Schedule LS-2 Sheet 1 Applicable to unmetered service

More information

We are filing these changes now to allow affected third parties sufficient lead time to prepare their systems for this change.

We are filing these changes now to allow affected third parties sufficient lead time to prepare their systems for this change. PSC REF#:279693 December 22, 2015 Jeffrey Ripp, Administrator Division of Energy Regulation Public Service Commission of Wisconsin (PSCW) 610 North Whitney Way P.O. Box 7854 Madison, Wisconsin 53707-7854

More information

Revised Cal. P.U.C. Sheet No E Pacific Gas and Electric Company Cancelling Revised Cal. P.U.C. Sheet No E San Francisco, California

Revised Cal. P.U.C. Sheet No E Pacific Gas and Electric Company Cancelling Revised Cal. P.U.C. Sheet No E San Francisco, California Revised Cal. P.U.C. Sheet No. 26003-E Pacific Gas and Electric Company Cancelling Revised Cal. P.U.C. Sheet No. 25736-E APPLICABILITY: This schedule is applicable to single-phase and polyphase residential

More information

Large Power Service Time-of-Use (LPS-TOU)

Large Power Service Time-of-Use (LPS-TOU) Original Sheet No.: 302 Large Power Service Time-of-Use (LPS-TOU) AVAILABILITY Available throughout the Company s entire electric service area where the facilities of the Company are of adequate capacity

More information