1 EAGLE GOLD PROJECT TRAFFIC MANAGEMENT PLAN Versin JULY 2017

2 THIS PAGE INTENTIONALLY LEFT BLANK

3 Dcument Cntrl DOCUMENT CONTROL Submissin Histry Versin Number Versin Date Sep Mar Jul 2017 Dcument Descriptin and Revisins Made Original submissin t the Department f Energy, Mines and Resurces in supprt f an applicatin fr a Quartz Mining Licence allwing fr preliminary cnstructin activities Revisins made in supprt f an applicatin t the Department f Energy, Mines and Resurces in supprt f an applicatin fr a Quartz Mining Licence allwing the full Cnstructin, Operatin and Clsure f the Prject. Revisins made t reflect the current site general arrangement and submitted t the Department f Energy, Mines and Resurces in advance f Prject Cnstructin. Versin f the (the Plan) fr the Prject has been revised in July 2017 t update Versin submitted in March The table belw is intended t identify mdificatins t the Plan and prvide the ratinale fr such mdificatins Versin Revisins Sectin Sectin 1.3 Legislative and Other Requirements Figure Prject Access Sectin 4.4 Signage Sectin 3 Traffic Vlume Revisin/Ratinale Revised sectin t include regular mnitring t meet requirements f QML-0011 and, if warranted, amend the Plan t reflect changing cnditins r uses f the rads. Updated with ptimized site ftprint Revised sectin as required by QML-001 t include signage and radi ntificatin f blasting activities t Haggart Creek Rad Users. Verified/updated traffic vlume estimates fr cnsistency with the ptimized Prject cnstructin and peratin plans and schedule. i

4 Table f Cntents TABLE OF CONTENTS Intrductin Prject Summary Scpe and Objectives Legislative and Other Requirements... 1 Site Access Access Rad Design Access Rad Maintenance... 3 Traffic Vlume Traditinal Use Traffic... 6 Traffic Cntrl Right f Way Standards Speed Limits Cmmunicatin Public Ntice Radi Cntrl Radi Prcedures Radi Calling Prtcl Public Nn-radi Users Signage Vehicle Inspectins Parking Accident Preventin Emplyee Training Cntractrs and Visitrs Fllwing Equipment and Other Vehicles Escrt Vehicles Wildlife Prtectin Driver Fatigue Incident Respnse Cmplaint Management Rles and Respnsibilities List f Figures Figure Prject Access... 5 ii

5 Sectin 1 Intrductin 1 INTRODUCTION 1.1 PROJECT SUMMARY StrataGld Crpratin (SGC), a directly held whlly wned subsidiary f Victria Gld Crp. has prpsed t cnstruct, perate, clse and reclaim a gld mine in central Yukn. The Eagle Gld Prject ( the Prject) is lcated 85 km frm May, Yukn using existing highway and access rads. The Prject will invlve pen pit mining and gld extractin using a three stage crushing prcess, heap leaching, and a carbn adsrptin, desrptin, and recvery system ver the mine life. 1.2 SCOPE AND OBJECTIVES The bjective f this is t describe the prcedures and prtcls fr the use f the Haggart Creek and Suth McQuesten Rads and site traffic during the life f the Eagle Gld Prject. The plan prvides estimated traffic vlumes by vehicle type, cmmunicatin prtcls fr Prject traffic and public users f the access rad, and plans fr management f dust, wildlife interactins, incident respnse and cmplaints. Public, emplyee and cntractr safety is the primary bjective f this plan. SGC recgnizes that the Silver Trail is used by ther industrial and public users, and that the Suth McQuesten and Haggart Creek Rads are used by the public. Public use f the access rad varies cnsiderably seasnally with a relatively shrt placer mining and summer seasn. SGC is als aware f the seasnal usage f the Suth McQuesten and Haggart Creek Rads fr hunting, fishing and traditinal uses. The safety f these users is a special cnsideratin when public traffic increases during summer and fall. Access rad upgrades and cnstructin details are presented in the Rad Cnstructin Plan submitted t Yukn Gvernment Energy Mines and Resurces as required by the Quartz Mining License. 1.3 LEGISLATIVE AND OTHER REQUIREMENTS This has been prepared in accrdance with the Yukn Gvernment Decisin Dcument terms and cnditins. The Yukn Gvernment Decisin Dcument was issued in April 2013 pursuant t the Yukn Envirnmental and Sci-Ecnmic Assessment Act and includes terms and cnditins that encmpass cmmitments made by SGC as part f the envirnmental assessment cmpleted by the Yukn Envirnmental and Sci-Ecnmic Assessment Bard (YESAB) in April Cmmitment #110 frm Appendix A f the YESAB screening reprt states that SGC will develp and implement a Traffic Management Plan. The use and management f the SMR and the HCR will be regularly mnitred as required by the Quartz Mining Licence in rder t meet SGC s annual reprting requirements, and if warranted, the Plan will be revised t reflect changing cnditins r uses f the rads. N ther legislatin r regulatins require a traffic management plan fr the Prject. 1

6 Sectin 2 Site Access 2 SITE ACCESS The prpsed Prject is lcated in central Yukn apprximately 350 km nrth f Whitehrse, and 85 km by rad nrth f the Village f May. Access t the Prject site frm Highway 11, the Silver Trail Highway will be via the existing Suth McQuesten Rad (SMR) and the Haggart Creek Rad (HCR). Tgether, the SMR and HCR cmprise a 45 km rad, which is divided by the Suth McQuesten River. The sectin f the rad between the Silver Trail and the Suth McQuesten River is referred t as the SMR (km 0 t 22.9), whereas the sectin f the rad between the river and the mine site is referred t as the HCR (km 23 t 45). Bth rads are public rads, regulated under the Yukn Highways Act; hwever, the SMR is maintained during summer nly by the Yukn Gvernment Department f Highways and Public Wrks (HPW), whereas the HCR is cnsidered a public unmaintained rad. Figure depicts the existing alignment f the SMR and HCR. The site secndary rads will tie int the HCR. There will be a gate and guardhuse lcated at the site entrance t restrict unauthrized access. 2.1 ACCESS ROAD DESIGN Currently the average width f the HCR is greater than a single lane but less than a standard tw-lane rad in mst lcatins. SGC will cmplete a number f upgrades s that the HCR will be a tw-way ne-lane radi cntrlled access rad. In 2009, Yukn Gvernment Highways and Public Wrks (HPW) upgraded the SMR by cmpleting brushing, grading, culvert installatin, and miscellaneus drainage imprvements. Additinal upgrades f the Suth McQuesten Bridge abutments were cmpleted in August In August 2013, HPW upgraded the Haldane Creek Bridge and it is currently rated fr 63.5 tnnes. The Suth McQuesten Bridge is currently rated fr in maximum allwable grss vehicle weight f 40 tnnes fr 4 r mre axles and 35 tnnes fr 3 axles at -35 C. Further upgrades t the Suth McQuesten Bridge are required prir t cnstructin t meet the prjected lad and vlume estimates fr the cnstructin and peratins phases. The fllwing upgrades are prpsed fr the HCR in supprt f the Prject and will be cnducted in accrdance with permit terms prvided by HPW and best management practices: Upgrade frm the existing ne t tw lane unimprved resurce rad t a tw-way single-lane radi cntrlled resurce access rad Cnstructin f pulluts as required alng the grade t allw vehicles mving in ppsite directins t pass each ther and fr vehicles t stp if necessary Right f way clearing 15 m n each side f rad centerline t increase sight lines fr the safety f the vehicles as well as t allw mre light and air mvement t reach the rad surface t aid in the melting r drying f the rad bed Drainage imprvements Installatin f new and maintenance f the existing ditching alng the radway t ensure adequate drainage 2

7 Sectin 2 Site Access Repair and replacement f damaged r undersized culverts as well as the installatin f additinal culverts in selected areas t imprve the drainage f the rad bed. Where required, imprting fill and raising the rad grade thrugh select areas Minr realignments fr safety imprvements Cnstructin f a gravel parking area at the Suth McQuesten River fr recreatinal users as requested by the FNNND After the upgrade, the width f the HCR will be apprximately 5 m thrughut. The 5 m width will include a single 3 m wide travelled rad lane with tw 1 m wide shulders. The design cnsidered specific gemetric parameters and Transprtatin Assciatin f Canada (TAC) design standards fr Lw Vlume Rads (LVR 50), as well as acceptable engineering practices fr tw-way ne-lane access rads. Prpsed upgrades will be subject t final review and acceptance by the Yukn Gvernment Department f Highways and Public Wrks (HPW) and in accrdance with wrk within the right f way permit terms and cnditins. 2.2 ACCESS ROAD MAINTENANCE Rad maintenance is essential t ensure user safety, preserve the existing cnditin f the rad, and ensure cnvenient and efficient travel t the site. Rads that are nt prperly maintained are susceptible t failure frm vehicular and envirnmental impacts. The SMR is maintained during summer nly by HPW, whereas the HCR is cnsidered a public unmaintained rad. SGC understands that HPW will maintain the SMR thrughut the life f the Prject. Maintenance f the HCR is currently being cmpleted by SGC independently f the Prject t supprt year rund explratin activities and is undertaken in accrdance with existing permits. SGC will cntinue t maintain the HCR thrughut the life f the Prject fr safe travel including drainage imprvements, resurfacing, brush clearing within the right f way, etc. Snw clearing f bth rads will be cmpleted by SGC. Maintenance f the HCR will ccur n a rutine basis as rad cnditins dictate. The HCR is used fr access t lcal placer mining peratins and maintenance f this rad will be made in an effrt t accmmdate access by lcal users hwever, the primary bjective is fr the safety f emplyees, cntractrs and Prject related traffic. The rad maintenance schedule will include (but nt be limited t): Summer/Fall Mnths: ensuring culverts are delineated prir t snwfall t prevent snw plw damage and lcatin fr steaming in winter; remval f deadfall and brushing alng the cleared right-f-way; repairing pthles and ruts and re-blade washbard areas; ensuring that there is prper drainage ff the rad structure; ditches pulled where needed and are clear and clean f bstructins; culverts are perating and draining prperly. 3

8 Sectin 2 Site Access Winter/Spring Mnths: remval f snw frm the driving surface and pulluts; where required sanding and scarifying the rad surface; ensuring that there is prper drainage ff the rad structure; steaming f culverts as required t maintain adequate flw. In additin t the seasnal maintenance requirements, the fllwing will be maintained n an as needed basis: replacing unreadable kilmeter signs; rad signage; identificatin and recnstructin f rad structure failure (e.g. washuts); remval f large rcks that may have fallen nt the rad surface r been bladed up during the reshaping; replacement f any material that has washed ut as a result f spring runff. Rad maintenance, including installatin f signs, will be cnducted in accrdance with HPW permit cnditins and signage requirements. 4

9 # ³ Haggart Creek Rad # #! Elsa Suth McQuesten River Suth McQuesten Rad Silver Trail Legend: Suth McQuesten Rad Haggart Creek Rad Rad Eagle Gld Prject! Twn / Village Watercurse Kilmetres Prjectin: Drawn By: NAD 83 Zne 8N HC Date: Figure: 2017/07/ EAGLE GOLD PROJECT YUKON TERRITORY Prject Access Rad

10 Sectin 3 Traffic Vlume 3 TRAFFIC VOLUME The HCR is a public unmaintained rad under the Highways Act. Althugh traffic vlume data alng the HCR is unavailable, the current traffic vlume is relatively lw. There is less traffic vlume n the SMR and HCR than the Silver Trail (Highway 11). Use f the Silver Trail and SMR is currently well belw their respective capacities and the HPW has indicated that the predicted level f Prject traffic is insignificant in terms f affecting the publicly maintained radways alng the access rute (Silver Trail and SMR), and can be accmmdated. Therefre, the Prject is nt expected t result in significant adverse impacts t the rad infrastructure alng the Silver Trail and the SMR. Emplyees frm surrunding cmmunities will be driven t May by a transfer van service. Emplyees frm utside the lcal area will be flwn in frm Whitehrse t May. Mine site wrkfrce will temprarily stage in May and be transprted by bus t the Prject site. During cnstructin, increased vehicle and truck traffic will utilize the SMR and HCR. The largest vehicles anticipated will be A-Trains, trucks with lng lads (steel members, crane cmpnents), and trucks with wide lads (truck bxes, tanks, pre-fabricated camp mdules). Lads will be adjusted fr seasnal lad restrictins. Estimated traffic vlume during cnstructin is: 2,500 ttal semi-trailer rund-trips 7,500 t 10,000 ttal pickup truck (<5 tnne truck) rund-trips (10 t 20 pickup truck rund-trips per day n average during peak cnstructin) 10 passenger car r pickup trucks per day during peak cnstructin Estimated traffic vlume during peratins: Crew shift changes are expected t ccur every tw weeks. Persnnel will travel frm May t the mine site by bus. This will invlve apprximately bus rundtrips per year Ttal trucklads are estimated at 3,000 trucks per year (rund-trips). As with the estimate fr the cnstructin phase, these numbers d nt accunt fr seasnal lad restrictins, which will determine seasnal differences in truck traffic vlumes (e.g. likely increased traffic prir t and after spring lad restrictins. 3.1 TRADITIONAL USE TRAFFIC The Suth McQuesten Bridge is a knwn destinatin fr grayling fishing in the spring and is als used t access the river fr hunting. Cmments received during the Public Cmment Perid f the Envirnmental Assessment indicate that the Suth McQuesten River is a prime grayling fishing area and that the area is an imprtant First Natin fishery. Cmments als indicate that the area alng the access rad and the Prject site is accessed fr mse hunting by the First Natin and ther hunters. The First Natin f Na-ch Nyäk Dun (FNNND) has expressed a desire t engage in fishing at the Suth McQuesten Bridge. SGC has cmmitted t cnstructing a cleared parking area nrth f the bridge t prvide additinal recreatinal parking. 6

11 Sectin 4 Traffic Cntrl 4 TRAFFIC CONTROL The SMR will cntinue t be a tw lane, tw-way rad that will nt be radi cntrlled. Whereas the HCR will be a tw-way ne-lane radi cntrlled access rad. SGC will implement the fllwing general best management practices and prcedures t maximize rad and transprt safety: Implement radi cntrl n the HCR after the Suth McQuesten Bridge Restrict the use f persnal vehicles by Prject emplyees and require Prject related traffic t use apprpriate vehicles (e.g. transprt buses, rental vehicles, etc.) Transprt drivers will be briefed n significant rute characteristics regularly and when changes t access rute cnditins dictate Restrictin f nn-essential travel during inclement weather Maintain the entire length f the access rad thrugh cllabratin with HPW Pst speed limits fr Prject vehicles in accrdance with HPW permit cnditins and signage requirements Ensure Prject related drivers have apprpriate driver training, radi cntact capabilities, vehicle maintenance requirements, and spill respnse capabilities as apprpriate Ensure hazardus materials are transprted and handled in accrdance with the Transprtatin f Dangerus Gds Act and Regulatins Require bulk carriers t carry tw-way radis t cmmunicate with ther rad users Identify wildlife migratin crridrs and crssings alng the rad and prvide signage in high risk areas Plw wildlife crssing and escape pints in the access rad snw banks (i.e. at least every 0.5 km f less than 0.5 m bank height) In accrdance with the Occupatinal Health and Safety Regulatins fr public rads, require the use f flashing devices n vehicles/machinery and equipment that will crss, travel n r may therwise pse a risk t users f public rads. 4.1 RIGHT OF WAY STANDARDS The fllwing standards, in rder f highest t lwest pririty, apply t rights-f-way at any area nt cntrlled by traffic signs: Emergency vehicles when lights flashing Trucks transprting dangerus gds (TDG): Explsives transprt vehicles Reagent transprt trucks Fuel trucks 7

12 Sectin 4 Traffic Cntrl Other TDG trucks Haul trucks Bulk carriers (nn-tdg) Heavy equipment frm large t small All ther vehicles When tw cmparable trucks/vehicles (e.g., tw laded/unladed fuel trucks) meet, the blind side vehicle has the right-f-way. Generally, Prject vehicles must yield t public vehicles unless rad cnditins/lcatin wuld make this unsafe. Passing is permitted nly when safe t d s. Radi r visual cntact must be made befre passing any heavy equipment. 4.2 SPEED LIMITS Speed limits will be enfrced fr mine traffic and psted alng the access and site rads and in accrdance with HPW permit cnditins and signage requirements. The fllwing are maximum speed limits in ptimal cnditins. Emplyees will be reminded t drive t rad cnditins and nt take chances in adverse situatins r inclement weather. Access Rad t Site (HCR and SMR): Maximum = 50 km/hr as established by the Yukn Highways Act Blind crners and bridge crssings = Prject vehicle speed reduced t 20 km/hr Site Rads Ore and Waste Rck Haul Rads = 50 km/hr Secndary site access rads = 50 km/hr unless psted therwise Parking lts = 15 km/hr Trailing vehicles and heavy equipment = Light vehicles will fllw the established highway standard f the three-secnd rule when fllwing any equipment r vehicle (e.g. allw fr a safe distance equivalent t three secnds f vehicle prgress at the current rate f speed). 4.3 COMMUNICATION Public Ntice SGC anticipates that any rad maintenance/upgrades will require nly single-lane temprary / shrt term clsures. Signage warning f cnstructin activities n the radway will be placed at apprpriate distances frm the cnstructin/maintenance sites, in cnsultatin with HPW. Fr significant upgrade/maintenance events requiring mre than ne day t cmplete, HPW will be ntified and public ntice will be issued t the Village f May and the FNNND fr psting if deemed necessary by cmmunity leadership. 8

13 Sectin 4 Traffic Cntrl Public ntices will be psted at multiple lcatins in May t cmmunicate any planned rad clsures r large lads that will travel t site. SGC will als cntact lcal users, the Village f May, and the FNNND t ntify f the start f Prject cnstructin and peratins s that public users are aware f changes in traffic vlume and type Radi Cntrl SGC will establish radi cverage alng the entire site and length f the HCR and SMR access rads. The frequency will be used n Prject fleet radis and prvided t cntractrs, suppliers and bulk carriers fr radi prgramming. SGC will als establish a FM r AM frequency fr public users that d nt pssess radis r that have nt prgrammed the SGC frequencies prir t first use f the rad. This will enable nn-radi users t listen t traffic using the HCR t understand the lcatin f vehicles t knw when t use pulluts r t adjust speed. SGC will pst the FM frequency established fr the Prject at the SMR and Silver Trail Intersectin fr the infrmatin f public users Radi Prcedures Single lane radi cntrlled rads with industrial traffic present ptential hazards unique frm tw lane rads and highways. Ptential hazards n radi cntrlled include: Nt pre-prgramming radi frequency n radi prir t trip (cannt be dne be user at radside) Lsing track f lcatin Lsing track f ncming vehicle lcatin Vehicles nt using radi calling Nt fllwing calling prcedure Unnecessary radi chatter and talking ver ther calls Inadequate signage (missing km markers) Radi dead znes At the start f cnstructin, SGC will require that Prject rad users utilize a radi calling prtcl that enables safe usage f vehicle traffic while n the HCR and SMR. Drivers will be required t annunce: their vehicle type, lcatin, and directin at the time they enter r exit the radway; and stpping r parking, and when they resume. Drivers will als annunce every nn-radi user they bserve s that ther traffic is aware f and can take apprpriate precautins f nn-radi users n the HCR and SMR. 9

14 Sectin 4 Traffic Cntrl Radi Calling Prtcl 1) Up and Dwn used t identify the directin f travel. Up = assigned t directin t site and increasing kilmetre numbers Dwn = assigned t directin frm site and decreasing kilmetre numbers 2) Prject vehicles travelling n the HCR must identify themselves; pick-up, lw-bed, fuel truck, grader, etc., (i.e. pick-up 15 Dwn, grader 20 Up ). 3) Calling prtcl fr vehicles: Up vehicles call every EVEN km, unless psted therwise Dwn vehicles call every ODD km, unless psted therwise 4) Must call situatins When leaving and entering the rad At psted must call signs When stpping and parking n the rad, and again when travel resumes When encuntering large wildlife n r adjacent t the rad (bear, mse, wlf) When encuntering a vehicle traveling withut a radi 5) Only pass a vehicle nce the slwer vehicle has safely exited nt a pull-ut. If required t pass a vehicle at a lcatin ther than a pull-ut (e.g. heavy equipment perfrming rad maintenance) the driver must first make radi r visual cntact with the vehicle being passed and receive OK t d s. 6) Fuel trucks, wide lads and laded bulk carriers have the right f way; light duty vehicles r empty trucks must yield using pulluts unless therwise agreed t via radi with ppsing traffic. 7) Cnvy calling (tw r mre vehicles) is allwed: The lead vehicle is respnsible fr calling fr all vehicles in the cnvy It is the respnsibility f the vehicle jining r leaving the cnvy t infrm and t receive cnfirmatin frm the lead vehicle. A vehicle mre than 2 km behind the lead vehicle is n lnger part f that cnvy and must call their wn psitin. A lead vehicle shall nt call fr vehicles mre than 1 km behind them r each ther. 8) Avid distractins while mnitring the rad channel. N unnecessary radi chatter that ccludes ther users calling Avid nise distractins that prevent hearing radi calling (lud music, headphnes, passengers etc.). 9) Stay n designated rad channel at all times while traveling. 10

15 Sectin 4 Traffic Cntrl 10) The HCR radi channels are fr traffic management purpses nly. Cnduct all ther cmmunicatin n a nn-hcr radi channel when nt travelling n the HCR Public Nn-radi Users Public traffic that d nt have radis will be instructed n safety rules fr the HCR and SMR via signage at the start f the SMR indicating the fllwing: FM/AM radi frequency fr statin that prvides traffic cmmunicatin fr the access rad Mandatry use f headlights during night and daylight hurs Observance f the 50 km/hr speed limit and slwer speeds arund crners r during times f reduced visibility t allw fr sufficient time t stp in case f an n-cming vehicle Use f the pulluts t allw passing f ppsing traffic Maintaining distance between any ther vehicle mving in the same directin t avid airbrne debris. Nn-radi users may be temprarily restricted frm using the rad in special circumstances, such as if an extralarge vehicle which cannt use the pulluts is n the rad. When a Prject vehicle is anticipated t require the temprary restrictin f use by nn-prject related traffic, it will be accmpanied by bth a frnt and rear pilt vehicle. The frnt pilt vehicle will prceed in advance f the Prject vehicle requiring guidance t the clsest sectin f the rad that has sufficient clearance fr passing and temprarily halt ncming traffic. Once restricted access has been secured by the frnt pilt vehicle, the Prject vehicle requiring guidance will prceed t the restricted access lcatin with the rear pilt vehicle securing assistance frm the ther directin at the prir restricted access lcatins. This prcess will cntinue until safe ingress r egress t the Prject site has been cnfirmed. Nn-radi users will als be infrmed that they must yield t Prject vehicles that wuld have difficulty reversing directin n the access rad. 4.4 SIGNAGE Kilmeter markers are installed alng the entire length f the HCR beginning at the Suth McQuesten Bridge and ending at site. Stp signs will be used at pints f ingress and egress t public rads. Speed limit signs will be psted at regular intervals and at required lcatins t indicate changes fr slwer speeds arund turns, at bridge crssings r at knwn wildlife crridrs as determined thrugh mnitring. An entrance sign will be installed where the tw-lane public rad changes t the radi cntrlled single lane HCR at the Suth McQuesten Bridge. A pullut in frnt f the sign will allw fr the user t stp and safely read it. The sign will include the rad name, speed limits, VHF radi channel frequency, FM radi frequency, calling prtcl, lad restrictins, primary user name (SGC), and SGC cntact phne numbers. This sign will als prvide guidelines fr nn-radi users listed abve. Speed indicatr signs may be used if required t enfrce and encurage the bservance f speed limits. Signage installed n public rads will be in accrdance with HPW permit terms and signage regulatins. Signs will be installed n the HCR at pints utside f the 1.5 km bundary identified in the Nise Assessment Reprt, that include warnings and infrmatin relating t blasting activities including time f day and frequency f blasting. Radi frequencies will be used t ntify HCR users f blasting activities. 11

16 Sectin 4 Traffic Cntrl 4.5 VEHICLE INSPECTIONS T ensure vehicles that are part f the SGC fleet which are used by multiple drivers remain in safe perating cnditin, a pre-trip inspectin will be perfrmed daily. Each vehicle will be equipped with a lgbk t recrd inspectins and regular maintenance. The inspectin checklist will include the fllwing and list whether the cnditin is k r requires actin and the date the actin was cmpleted if required: Maintenance and service Radi Husekeeping Glass and mirrrs Lights, signals, hrn and buggy whip Fluid levels Tires (incl. spare) Bdy damage Safety and First Aid Kit Spill Kit Fire extinguisher Wheel chcks 4.6 PARKING All vehicle, truck, and heavy equipment peratrs are respnsible fr parking their vehicle in a safe manner. When leaving the vehicle unattended, the peratr must ensure that the transmissin is in park r in the case f a manual transmissin, in reverse. The use f wheel chcks are mandatry fr vehicles n site. Mbile equipment greater than 7,000 kg will be equipped with tw wheel chcks which will be used each time the vehicle is parked. When parking n a grade, if safe and practical t d s, the vehicle shuld be parked perpendicular t the grade. If this is nt pssible, the peratr must ensure that the vehicle is prperly parked and secured. When parking n a grade, the vehicle shuld be parked as clse t the side f the rad as is safely practical. The steering wheel shuld be turned as much as pssible t the right (tward the side f the rad). When vehicles are being parked, adequate clearance frm ther equipment and vehicles must be maintained. Vehicles left idling and unattended must have the parking brake applied. Back-in parking will be practiced whenever pssible. 12

17 Sectin 5 Accident Preventin 5 ACCIDENT PREVENTION 5.1 EMPLOYEE TRAINING New emplyees are required t review the and Emergency Respnse Plan as part f the emplyee inductin training at the beginning f their emplyment. Subsequently, each emplyee is required t review the every 36 mnths and the Emergency Respnse Plan every 12 mnths r mre frequently if plans are updated. 5.2 CONTRACTORS AND VISITORS Cntractrs will be required t review the and Emergency Respnse Plan as part f the cntractr inductin training. Visitrs will receive an rientatin during check-in that will prvide an verview f the Rad Rules and Emergency Respnse Prcedures amngst ther infrmatin. 5.3 FOLLOWING EQUIPMENT AND OTHER VEHICLES T determine the right fllwing distance, drivers shuld select a fixed bject n the rad ahead such as a sign, tree r verpass. When the vehicle ahead passes the bject, slwly cunt "ne ne thusand, tw ne thusand, three ne thusand." If yu reach the bject befre cmpleting the cunt, there is nt adequate distance between vehicles. In inclement weather, high dust cnditins r at night the three-secnd rule shuld be dubled t six secnds, fr added safety. If the weather cnditins are very pr, e.g. heavy rain, heavy fg, r heavy snw, start by tripling the three secnd rule t nine secnds t determine a safe fllwing distance. 5.4 ESCORT VEHICLES Escrt vehicles and/r cnvys may be used fr trucks transprting dangerus gds (e.g. sdium cyanide, reagents, fuel, etc.) when deemed necessary by SGC site peratins particularly in inclement weather. Drivers will cntribute t maintaining up-t-date infrmatin n any changes in rute cnditins, circumstances, r risk by reprting bserved changes after each trip alng the entire transprtatin rute including the Silver Trail Yukn Highway 11, the SMR and the HCR. 5.5 WILDLIFE PROTECTION SGC is cmmitted t the prtectin f wildlife and has implemented a Wildlife Prtectin Plan pursuant t the Quartz Mining Act. Wildlife prtectin measures included in the Wildlife Prtectin Plan that pertain t use f the access rad and vehicle traffic are summarized belw. Wildlife may interact with vehicles as they take pprtunistic advantage f the relatively easy access rute prvided by the plwed access rad during winter. Cnsequently, winter is cnsidered the highest risk seasn due t the ptential fr the snw banks n the plwed rad making it difficult fr mse and ther wildlife t leave the rad t avid traffic. In additin, mse may run significant distances n the rad t avid vehicles, expending valuable winter energy reserves, in attempts t find escape ptins frm the access rad. Bth cllisins and the expenditure f energy may increase their risk f mrtality during winter mnths. 13

18 Sectin 5 Accident Preventin Animal behavir is related t the fight-r-flight respnse. There is a certain amunt f space in which an animal feels safe; but nce that bundary is vilated, the animal s reactin is unpredictable. Even if an animal sees the vehicle, it may still jump in frnt f the vehicle. If an animal has crssed the rad, it may turn and crss again. Animals standing calmly at the side f the rad may blt unexpectedly. Therefre drivers must slw dwn r stp if an animal is bserved n the access rad and wait t prceed until the animal has cleared the rad and right f way and is safe t pass. SGC cmmits t the fllwing measures t mitigate the ptential effects f Prject-related traffic n wildlife resurces and prevent wildlife cllisins: Reduce persnnel traffic n the access rad by implementing an emplyee travel plicy that prhibits the use f persnal vehicles withut prir apprval and requires emplyees and cntractrs t utilize SGC prvided charter transprtatin t and frm the Prject site. Facilitate wildlife mvement by: a) prviding wildlife crssing and escape pints in the plwed snw banks alng the access rad (escape pints will be cut int snw banks at regular intervals between every kilmeter maker); b) prviding wildlife crssing pints alng extensive pen ditches; and, c) prviding directin t Prject staff and cntractrs n methds t avid interference with the mvement f wildlife acrss rads. Prmte practive radi cmmunicatin amng users f the access rad t cnvey safety infrmatin, including sightings f large wildlife species alng the rad. Prvide and maintain signage where wildlife encunters are mst likely t ccur (e.g. blind turns, bstructed views, water crssings, etc.), reminding drivers t be vigilant fr wildlife and t give wildlife the right f way. Reprt cllisins and carcasses f ungulates and ther large animals bserved n the Prject site and alng the access rad t the Envirnmental Manager, Mine Manager r designate(s) as sn as pssible t ensure prmpt remval. Near misses and cllisins that result in the death r injury f an ungulate r ther large animal must be reprted as sn as pssible. Measures will be develped in crdinatin with verall rad planning with HPW if required. Implement a maximum speed limit fr Prject related vehicles f 50 km/h n the access rad t minimize dust and reduce wildlife cllisins. 5.6 DRIVER FATIGUE Travel t and frm the Prject site by emplyees and cntractrs will be regulated s that the number f driving and rest hurs are managed prperly t prevent fatigue, drwsiness and falling asleep at the wheel. Lng-term measures, such as schedule planning, cupled with shrt-term strategies such as naps and shrt breaks, are the mst effective means f reducing accident risks. Lng-term planning is the respnsibility f lgistics managers and dispatchers. Shrt-term strategies are the respnsibility f drivers. They must, hwever, be given the pprtunity t incrprate them int their schedule. 14

19 Sectin 5 Accident Preventin Drivers are respnsible fr taking shrt-term actin. At the first signs f fatigue, they shuld stp and rest. Driving in extreme weather requires taking shrt breaks in a lcatin with the best cnditins. During such breaks, drivers shuld take advantage f the pprtunity t take a nap, stretch their legs and perfrm a few simple physical exercises. Fatigue management requires that drivers are well rested and fit t perate a vehicle. Driving fitness requires a driver and carrier t behave in a manner that minimizes the risk f fatigue-related accidents. SGC will ensure that cntractrs whm they d business with intrduce plicies, prcedures and practices t ensure that drivers are prperly rested and ready t drive safely. 15

20 Sectin 6 Incident Respnse 6 INCIDENT RESPONSE SGC has a detailed Emergency Respnse Plan and Spill Respnse Plan and has develped several prtcls fr specific emergencies n the rad including minr/majr accident, spills, fire/flding, rad clsure etc. A current cpy f the Emergency Respnse Plan and Spill Respnse Plan will be available in cmpany vehicles and ffices. An active, well-trained Emergency Respnse Team and emergency respnse vehicles will be based at the Prject site ensuring apprpriate emergency respnse and spill cntingency training and knwledge. Equipment, materials, and prcedures will be maintained t limit the cnsequence f releases t the Envirnment thrugh prmpt cntainment and clean-up. Prject-related vehicles will be equipped with as a minimum - VHF radi, safety cnes, danger tapes, spill kits, fire extinguishers, and first aid kits. Statinary spill kits will be placed at key pints alng the rad and maintained and inspected n a regular basis. Details are prvided in the Spill Respnse Plan. Respnse prtcls will be established with lcal Emergency Respnders frm May, Dawsn and Whitehrse. SGC will ensure that Emergency Respnders are adequately trained fr a respnse t specialized prducts unique t the Prject. 16

21 Sectin 7 Cmplaint Management 7 COMPLAINT MANAGEMENT SGC has a site peratins telephne number (778) advertised t the public via the Victria Gld website, this plan and public ntices such as the Ptat Hills Press. This telephne number is equipped with vic and prvides a mechanism by which cmplaints and general enquiries regarding envirnmental r cmmunity issues assciated with peratinal activities can be directed. All cmplaints whether received via the htline r directly t SGC persnnel will be dcumented and entered int cmplaint tracking database fr fllw up. Cmplaints regarding traffic r access rad cnditin will be immediately frwarded t the relevant Cmpany representative fr fllw up as required. Cmplaints will be handled by keeping recrd f all cmplaints shwing: The date and time f the cmplaint The methd by which the cmplaint was received The persnal detail f the cmplainant which were prvided by the cmplainant and if n details were prvided a nte t that effect The nature f the cmplaint The actin taken including any fllw up cntact If n actin is taken the reasn why n actin was taken The number and categry (traffic, rad cnditin, dust, etc.) f cmplaints will be reprted mnthly t Senir Management and a summary f cmplaints fr the year will be reprted in the Annual Reprt as required by Energy Mines and Resurces. 17

22 Sectin 8 Rles and Respnsibilities 8 ROLES AND RESPONSIBILITIES It is the respnsibility f emplyees and cntractrs t undertake practices t manage and minimize traffic incidents accrding t this. The Prject/Mine Manager is respnsible fr crdinating the implementatin f this Management Plan and fr the peridic review f the Plan. The Mine Manager will be respnsible fr ensuring the cmmitments f the Plan are met including: 1) Enfrcement f the prcedures and speed limits described in this plan 2) Ntificatin f key stakehlders when large lads are required t be transprted, r rad clsures are t ccur; and 3) Prductin and disseminatin f reprts. The Health and Safety Manager is respnsible fr crdinating the training f emplyees and cntractrs with regards t their respnsibilities under this plan. 18

NON-ROAD DIESEL EMISSIONS FUEL EFFICIENCY PLAN GUIDELINE VANCOUVER FRASER PORT AUTHORITY

NON-ROAD DIESEL EMISSIONS FUEL EFFICIENCY PLAN GUIDELINE VANCOUVER FRASER PORT AUTHORITY NON-ROAD DIESEL EMISSIONS FUEL EFFICIENCY PLAN GUIDELINE VANCOUVER FRASER PORT AUTHORITY January 31, 2017 VANCOUVER FRASER PORT AUTHORITY Nn-Rad Diesel Emissins Fuel Efficiency Plan Guideline Table f Cntents

More information

CONTRACTOR MANAGEMENT SYSTEM LIGHT VEHICLE SITE ACCESS POLICY

CONTRACTOR MANAGEMENT SYSTEM LIGHT VEHICLE SITE ACCESS POLICY Page: 1 f 8 TABLE OF CONTENTS 1. Purpse... 2 2. Scpe... 2 3. Definitins... 2 4. General Rules... 3 5. Vehicles... 3 6. Site Access Areas... 4 7. Cnditin f Vehicles... 5 8. Drivers Licence Cnfirmatin...

More information

Safety Management System. Initial Revision Date: Version Revision No. 02 DRIVING SAFETY

Safety Management System. Initial Revision Date: Version Revision No. 02 DRIVING SAFETY Dc N: DRIVING Issue Date JAN 1995 Revisin Versin Revisin N. 02 Next Revisin Preparatin: Safety Mgr Authrity: President Issuing Dept: Safety Page: Page 1 f 5 Purpse This prgram is written t be in cmpliance

More information

RICHARD L. OREAIR & CO. Safety Management System

RICHARD L. OREAIR & CO. Safety Management System SAFETY Dc N: Revisin Date: Revisin N. 2 Initial Versin Preparatin: Safety Mgr Authrity: President Issuing Dept: Safety Page: Page 1 f 5 Purpse This prgram is written t be in cmpliance with lcal regulatry

More information

Draft ADEM Guidance Proposed Additions to the Alabama UST Regulations

Draft ADEM Guidance Proposed Additions to the Alabama UST Regulations Draft ADEM Guidance Prpsed Additins t the Alabama UST Regulatins Yu may have heard abut upcming changes t the undergrund strage tank regulatins (UST regulatins). On Octber 13, 2015 EPA finalized the first

More information

Safe Work Procedure Self-Loading Logging Truck

Safe Work Procedure Self-Loading Logging Truck Safe Wrk Prcedure Self-Lading Lgging Truck PERSONAL PROTECTIVE EQUIPMENT: Adequate ftwear with gd tractin sles Hi-vis hardhat when ut f cab Hi-vis vest when ut f cab Hearing prtectin when driving PROCEDURES:

More information

Highfields Independent School and Day Nursery Mini Bus Policy

Highfields Independent School and Day Nursery Mini Bus Policy Highfields Independent Schl and Day Nursery Mini Bus Plicy Last Reviewed: Nv 2015 Apprved n: Cmmittee Respnsible: Pupil and Persnnel Next Review: Nv 2017 Apprved by: Full Gvs Highfields Schl is cmmitted

More information

Texas Christian University Policy

Texas Christian University Policy Texas Christian University Plicy Plicy Number: 6.060 Subject: Off Rad Vehicle Plicy Effective Date: January 16, 2009 Apprved: By Chancellr s Cabinet, January 15, 2009 I. Purpse This plicy prvides guidelines

More information

Burlington Northern Santa Fe (BNSF) Railway Blocked Access to Crescent Beach

Burlington Northern Santa Fe (BNSF) Railway Blocked Access to Crescent Beach CORPORATE REPORT NO: R161 COUNCIL DATE: July 27, 2015 REGULAR COUNCIL TO: Mayr & Cuncil DATE: July 23, 2015 FROM: Fire Chief FILE: 8710-00 SUBJECT: Burlingtn Nrthern Santa Fe (BNSF) Railway Blcked Access

More information

Design Standard - Fume Hoods & Fume Hood Exhausts

Design Standard - Fume Hoods & Fume Hood Exhausts 1.0 Intrductin Design Standard - Fume Hds & Fume Hd Exhausts The fume hd is the primary cntrl device in mst labratries fr prtecting emplyees and students frm expsure t hazardus chemicals. It is als an

More information

Track Lateral Stability

Track Lateral Stability Discipline: Engineering (Track & Civil) Categry: Cde f Practice Track Lateral Stability Sectin 6 Applicability ARTC Netwrk Wide Primary Surce Dcument Status Versin Date Reviewed Prepared by Reviewed by

More information

CS ENERGY PROCEDURE FOR LADDERS CS-OHS-52. Key Changes Prepared By Checked By Approved By Date

CS ENERGY PROCEDURE FOR LADDERS CS-OHS-52. Key Changes Prepared By Checked By Approved By Date CS ENERGY PROCEDURE FOR LADDERS CS-OHS-52 Respnsible Officer: Respnsible Executive: Grup Manager Health and Safety Executive General Manager Crprate DOCUMENT HISTORY Key Changes Prepared By Checked By

More information

SCHOOL VEHICLE SAFETY POLICY WHEN TRANSPORTING STUDENTS

SCHOOL VEHICLE SAFETY POLICY WHEN TRANSPORTING STUDENTS SCHOOL VEHICLE SAFETY POLICY WHEN TRANSPORTING STUDENTS Purpse The purpse f this Plicy is t ensure the safety f emplyees wh transprt students t schl authrized events and thse students being transprted.

More information

Route Sheet Guidelines

Route Sheet Guidelines Fairfax VA H.O.G. Chapter Rute Sheet Guidelines THIS DOCUMENT IS A WORK IN PROGRESS AND IS NOT FOR GENERAL DISTRIBUTION. ANY INTERIM USE BY AN OFFICER OR VOLUNTEER OF FAIRFAX VA CHAPTER H.O.G. IS FOR THE

More information

PLANNING MEETINGS CHEFS, AWGIC AND HOST SOCIETY

PLANNING MEETINGS CHEFS, AWGIC AND HOST SOCIETY Planning Meetings PLANNING MEETINGS CHEFS, AWGIC AND HOST SOCIETY The Arctic Winter Games Internatinal Cmmittee (AWGIC) establishes a series f planning meetings with each Hst Sciety and Chefs de Missin

More information

Underground Storage Tank Management Practices

Underground Storage Tank Management Practices Prgram #: Envirnmental Management Prgram Revisin # 1.0 Implementatin Date 1/30/08 Page #: 1 f 13 Authr: Envirnmental Prgrams Apprval: W. Brewer Undergrund Strage Tank Management Practices 1.0 Purpse /

More information

DANGEROUS GOODS TEAM. TransCAER Training Classroom (without CN 911 Training Tank Car or Trailer)

DANGEROUS GOODS TEAM. TransCAER Training Classroom (without CN 911 Training Tank Car or Trailer) TransCAER Training Classrm (withut CN 911 Training Tank Car r Trailer) Awareness Level Classrm sessin / Estimated 1-2 hurs. The CN TransCAER prgram is designed t prvide first respnders with basic railrad

More information

Mobile Delineator Safe Work Practice Template with Application for Approval

Mobile Delineator Safe Work Practice Template with Application for Approval Mbile Delineatr Safe Wrk Practice Template with Applicatin fr Apprval [Insert yur cmpany name and graphic, if desired. Expand space as required] [Insert yur cmpany dcument reference number, if desired.

More information

CITY OF ELK GROVE SPEED CONTROL PROGRAM GUIDELINES

CITY OF ELK GROVE SPEED CONTROL PROGRAM GUIDELINES CITY OF ELK GROVE SPEED CONTROL PROGRAM GUIDELINES Revised July 11, 2018 Prepared by: City f Elk Grve Public Wrks Department 1. INTRODUCTION BACKGROUND In 2002, the Public Wrks Department develped the

More information

Transport Research Laboratory Creating the future of transport

Transport Research Laboratory Creating the future of transport Transprt Research Labratry Creating the future f transprt CLIENT PROJECT REPORT CPR2188 Survey f vehicle radwrthiness f HCVs and driver cmpliance with EU rules n driving times, breaks and rest perids -

More information

ADVISORY: General Motors Upfitter Integration Bulletin #108d P a g e 1 May 18, 2016

ADVISORY: General Motors Upfitter Integration  Bulletin #108d P a g e 1 May 18, 2016 Subject: Aftermarket ALDL r DLC Interface Devices Causing Multiple Issues Mdels All Passenger Cars and Trucks Affected: Mdel Years: 2006 and beynd Date: February 4, 2013 Revisin Date: May 18, 2016 ADVISORY:

More information

Golf/Utility Cart Operation Program Originally Endorsed on May 26, 2009 by the University Safety Committee Brooks Baker, Chair

Golf/Utility Cart Operation Program Originally Endorsed on May 26, 2009 by the University Safety Committee Brooks Baker, Chair Glf/Utility Cart Operatin Prgram Originally Endrsed n May 26, 2009 by the University Safety Cmmittee Brks Baker, Chair 1) Intrductin Purpse & Scpe The effective date f this prgram is August 1, 2009. This

More information

Temporary Use and Vendor Stand Online Permit Submittal

Temporary Use and Vendor Stand Online Permit Submittal Temprary Use and Vendr Stand Online Permit Submittal A Temprary Use Permit is an pen-air small business that is there fr a limited time fr the uses listed belw. Temprary Use Duratin Extensin Agricultural

More information

Florida CDL Handbook School Bus

Florida CDL Handbook School Bus Flrida CDL Handbk 2007 10. Schl Bus 10.1. Danger Znes and Use f Mirrrs 10.2. Lading and Unlading 10.3. Emergency Exit and Evacuatin 10.4. Railrad-highway Crssings 10.5. Student Management 10.6. Antilck

More information

For personal use only

For personal use only ASX ANNOUNCEMENT / MEDIA RELEASE ASX: ABU 14 April 2015 Further Update n the Develpment f the Old Pirate High Grade Gld Depsit ABM Resurces NL ( ABM r the Cmpany ) is pleased t annunce an update n the

More information

PARKING POLICY JULY 2012

PARKING POLICY JULY 2012 1. DEFINITIONS DRAFT POLICY RELATING TO PARKING Designated parking area: means basement parking bays, pen parking bays and ther parking bays at the Mangaung Metrplitan Municipality s premises. Lading Zne:

More information

PARKING ENFORCEMENT ON PRIVATE PROPERTY BY AUTHORIZED CITY BY-LAW ENFORCEMENT OFFICERS

PARKING ENFORCEMENT ON PRIVATE PROPERTY BY AUTHORIZED CITY BY-LAW ENFORCEMENT OFFICERS ENFCEMENT ON PRIVATE PROPERTY BY AUTHIZED CITY BY-LAW ENFCEMENT OFFICERS T: Supervisr f Parking Services, City f Brantfrd: I, Of Name (print) Municipal Address (print) Brantfrd, ON Psitin (print) Type

More information

Texas: Texas Transportation Code link: TRANSPORTATION CODE TITLE 7. VEHICLES AND TRAFFIC

Texas: Texas Transportation Code link:  TRANSPORTATION CODE TITLE 7. VEHICLES AND TRAFFIC Texas: Texas Transprtatin Cde link: http://www.statutes.legis.state.tx.us/?link=tn TRANSPORTATION CODE TITLE 7. VEHICLES AND TRAFFIC (17) "Semitrailer" means a vehicle with r withut mtive pwer, ther than

More information

E+ Battery Care Guide

E+ Battery Care Guide Electric Mtin Systems, LLC 45150 Business Curt, Suite 300 Dulles, VA 20166 USA E+ Battery Care Guide Welcme! Yur E+ Hub Battery Pack is a pwerful, sphisticated, and imprtant part f yur E+ Electric Bicycle.

More information

SOMSAS Student User Manual Overseas Short Term Programs

SOMSAS Student User Manual Overseas Short Term Programs SOMSAS Student User Manual Overseas Shrt Term Prgrams Table f cntents WHAT IS SOMSAS? 2 CREATE A NEW APPLICATION 2 Shrt Term Prgram 3 ADD SUBJECTS TO YOUR APPLICATION 3 Hst Institutin Details 4 Partner

More information

TEAM INTRODUCTIONS. GARVER Matthew Youngblood - Project Manager / Bridge Lead Jenny Sallee - Roadway Lead Kirsten McCullough - Environmental Lead

TEAM INTRODUCTIONS. GARVER Matthew Youngblood - Project Manager / Bridge Lead Jenny Sallee - Roadway Lead Kirsten McCullough - Environmental Lead TEAM INTRODUCTIONS ODOT Paul Rachel - Divisin 3 Engineer Siv Sundaram - Envirnmental Prgrams Sctt Sundermeyer - Cultural Resurces Nick Grank & Diana Barlw - Right-f-Way & Utilities Frank Resler III - Public

More information

PSS INSTALLATION INSTRUCTIONS

PSS INSTALLATION INSTRUCTIONS PSS INSTALLATION INSTRUCTIONS Imprtant - Read Befre Starting! Befre starting yur installatin carefully read the fllwing warnings and instructins. Failure t prperly fllw the warnings and instructins culd

More information

DISD NATHAN ADAMS ELEMENTARY SCHOOL

DISD NATHAN ADAMS ELEMENTARY SCHOOL TRAFFIC MANAGEMENT PLAN FOR DISD NATHAN ADAMS ELEMENTARY SCHOOL IN DALLAS, TEXAS DESHAZO PROJECT NO. 15235 Prepared fr: Masterplan 900 Jacksn Street, Suite 640 Dallas, Texas 75202 Prepared by: Texas Registered

More information

BHC-P-11.1 Temporary Works

BHC-P-11.1 Temporary Works Berkeley Hme Cunties Safety Prcedures Cntents 1.0 Purpse 2.0 Scpe 3.0 Definitins 4.0 Main requirements 5.0 Guidance dcuments and references 6.0 Appendices Revisin register BHC-P-11.1 Temprary Wrks Date

More information

Diagram1- typical B-Triple. Diagram 2 typical AB-Triple. Diagram 3 typical Road Train

Diagram1- typical B-Triple. Diagram 2 typical AB-Triple. Diagram 3 typical Road Train NSW ROAD TRAIN MODERNISATION PROGRAM B-TRIPLE & AB-TRIPLE OPERATING CONDITIONS Applicatin These perating cnditins apply t: B-Triples, which are a vehicle cmbinatin cnsisting f a prime mver twing three

More information

REQUEST FOR QUALIFICATIONS FOR ENGINEERING SERVICES RELATED TO SALEM BIKE-PED CORRIDOR PHASE 2 DESIGN AND CONSTRUCTION SUPERVISION

REQUEST FOR QUALIFICATIONS FOR ENGINEERING SERVICES RELATED TO SALEM BIKE-PED CORRIDOR PHASE 2 DESIGN AND CONSTRUCTION SUPERVISION REQUEST FOR QUALIFICATIONS FOR ENGINEERING SERVICES RELATED TO SALEM BIKE-PED CORRIDOR PHASE 2 DESIGN AND CONSTRUCTION SUPERVISION The Twn f Salem, New Hampshire is requesting qualificatins frm qualified

More information

Perkins Car Clearance Individual Clearance Level

Perkins Car Clearance Individual Clearance Level Perkins Car Clearance Individual Clearance Level Name: Prgram: Psitin: Supervisr: The abve staff is cleared t perate Perkins Vehicles at the fllwing levels. This clearance is fr use f vehicles t transprt

More information

Hub/Remote Operations in version 3.0

Hub/Remote Operations in version 3.0 Hub/Remte Operatins in versin 3.0 In StckTrac Enterprise 3.0, the Hub and Remte perate quite a bit differently than they did in 2.0. In 2.0, the shps stred their business fr the day int daily files which

More information

ITU-T. FG Distraction. Report on Vehicle-to-Applications Communications Interface. ITU-T Focus Group on Driver Distraction

ITU-T. FG Distraction. Report on Vehicle-to-Applications Communications Interface. ITU-T Focus Group on Driver Distraction I n t e r n a t i n a l T e l e c m m u n i c a t i n U n i n ITU-T TELECOMMUNICATION STANDARDIZATION SECTOR OF ITU FG Distractin Versin 1.0 (03/2013) ITU-T Fcus Grup n Driver Distractin Reprt n Vehicle-t-Applicatins

More information

CASTLE ROCK BUSINESS AND DEVELOPMENT INCENTIVE PROGRAM

CASTLE ROCK BUSINESS AND DEVELOPMENT INCENTIVE PROGRAM CASTLE ROCK BUSINESS AND DEVELOPMENT INCENTIVE PROGRAM PROGRAM OVERVIEW Ecnmic Vitality is a critical factr in ensuring Castle Rck s lng-term success and in achieving its Visin f being a Self-Sufficient

More information

Effective Date: 10-January Table of Contents

Effective Date: 10-January Table of Contents Versin: 3 Page: 1 f 7 Table f Cntents 1.0 Intrductin... 2 1.1 Purpse... 2 1.2 Scpe... 2 1.3 Definitins... 2 1.4 Training Requirements... 3 2.0 General Requirements... 3 3.0 Inspectin... 3 4.0 Testing...

More information

DriveCam Unit Installation Instructions

DriveCam Unit Installation Instructions DriveCam Unit Installatin Instructins Installatin f the DriveCam Unit is nt cmplicated, thugh care must be taken t avid specific prblems. Sme vehicles require additinal cnsideratin t determine the ptimum

More information

Safety Policies & Guidelines

Safety Policies & Guidelines Safety Plicies & Guidelines The fllwing infrmatin is being prvided t insure yu are familiar with the fllwing Nrth American Van Lines, Inc., Safety Plicies and Guidelines. Accident Reprting Plicy Safety

More information

PARKING AND VEHICULAR RULES

PARKING AND VEHICULAR RULES PARKING AND VEHICULAR RULES General Rules 1. All residents and guests must abide by all psted traffic signs, CC&Rs, Rules & Regulatins, Califrnia Vehicle Cdes, and San Clemente Municipal Cdes. All vilatins

More information

PRAIRIE 360 4X4 (KVF360-A/C), PRAIRIE 360 2X4 (KVF360-B), PRAIRIE 650 4X4 (KVF650-A/B), PRAIRIE 700 4X4 (KVF700-A/B/D),

PRAIRIE 360 4X4 (KVF360-A/C), PRAIRIE 360 2X4 (KVF360-B), PRAIRIE 650 4X4 (KVF650-A/B), PRAIRIE 700 4X4 (KVF700-A/B/D), SERVICE REPLACES: Please discard ATV 07-02 dated 4/5/07 MODEL: PRAIRIE 360 4X4 (KVF360-A/C), PRAIRIE 360 2X4 (KVF360-B), PRAIRIE 650 4X4 (KVF650-A/B), PRAIRIE 700 4X4 (KVF700-A/B/D), KFX700 (KSV700-A/B/C),

More information

Onboarding Class Details and Travel Guide. Onboarding Better. Together.

Onboarding Class Details and Travel Guide. Onboarding Better. Together. Onbarding Class Details and Travel Guide Onbarding Better. Tgether. Onbarding Class Details and Travel Guide Table f Cntents Reference this guide fr the fllwing infrmatin: Class details by lcatin McLean

More information

Volume 1.1 OPERATIONAL MANUAL MODEL: CG-211Y PIPE TORCH/BURNER MACHINE. by BLUEROCK Tools

Volume 1.1 OPERATIONAL MANUAL MODEL: CG-211Y PIPE TORCH/BURNER MACHINE. by BLUEROCK Tools Vlume 1.1 OPERATIONAL MANUAL MODEL: CG-211Y PIPE TORCH/BURNER MACHINE by BLUEROCK Tls UNPACKING THE ITEM Cautin: This machine is packed tgether with items that may be sharp, ily and verly heavy bjects.

More information

SAFETY AND HEALTH STANDARD VEHICLES AND DRIVING Effective Date:12/17/16 Standard 15.3 Document Number:KUCSH0032 Rev:09

SAFETY AND HEALTH STANDARD VEHICLES AND DRIVING Effective Date:12/17/16 Standard 15.3 Document Number:KUCSH0032 Rev:09 Effective Date:12/17/16 Standard 15.3 Dcument Number:KUCSH0032 Rev:09 15.3.1 INTRODUCTION: 15.3.1.1 This standard establishes the minimum requirements fr safely perating vehicles and mbile equipment n

More information

- No object may be left inside the vehicle;

- No object may be left inside the vehicle; GENERAL CONDITIONS AND RULES OF USE OF THE CAR PARK ARTICLE 1 General prvisins and respnsibilities 1.1 - In the absence f a prir written agreement with PARKING, upn entering these premises the USER uncnditinally

More information

Transparency in the Mining Sector Taxes and Value Distribution

Transparency in the Mining Sector Taxes and Value Distribution Transparency in the Mining Sectr Taxes and Value Distributin A presentatin by Edward Bickham 17 April 2014 Senir Adviser, Gld fr Develpment, Wrld Gld Cuncil UKSIF and Sustainalytics Seminar Edinburgh Transparency

More information

OWNER S MANUAL. DCR-205-XX-DC Powered Drum Rotators

OWNER S MANUAL. DCR-205-XX-DC Powered Drum Rotators VESTIL MANUFACTURING CORP. 2999 N. Wayne St., Angla, IN 46703 Ph: 260-665-7586 Fax: 260-665-1339 E-mail: sales@vestil.cm Website: www.vestil.cm 0317 DCR-205-DC, MANUAL DCR-205-XX-DC Pwered Drum Rtatrs

More information

The GTB Glare and Visibility Study

The GTB Glare and Visibility Study Authr: G R Draper Infrmal dcument N. GRE-66-21 (66th GRE, 4-6 Octber 2011 agenda item 17(b)) GTB Dcument N. CE-4684 Date: 2011-09-16 The GTB Glare and Visibility Study GTB TASK FORCE COORDINATION f AUTOMOTIVE

More information

ENVIRONMENTAL HEALTH Prepackaged Food Booths with Open Sampling or Beverage Dispensing at Community Events

ENVIRONMENTAL HEALTH Prepackaged Food Booths with Open Sampling or Beverage Dispensing at Community Events STE 120 HE ALTH CARE AGENCY/PUBLIC HE ALTH ENVIRONMENTAL HEALTH Prepackaged Fd Bths with Open Sampling r Beverage Dispensing at Cmmunity Events WHY THIS INFORMATION IS IMPORTANT A temprary fd bth, r hw

More information

TECHNICAL SPECIFICATION. SPC-4T Stirling Process Cryogenerator

TECHNICAL SPECIFICATION. SPC-4T Stirling Process Cryogenerator TECHNICAL SPECIFICATION SPC-4T Stirling Prcess Crygeneratr Reference 80 8044_00 Issue Date April 20, 2016 Stirling Crygenics is a registered trade name f DH Industries BV Fr mre infrmatin n the Stirling

More information

Proposed Changes to Ontario s Building Code Summer and Fall 2017 Consultation: Electric Vehicle Charging in Multi-Unit Residential Buildings

Proposed Changes to Ontario s Building Code Summer and Fall 2017 Consultation: Electric Vehicle Charging in Multi-Unit Residential Buildings Prpsed Changes t Ontari s Building Cde Summer and Fall 2017 Cnsultatin: Electric Vehicle Charging in Multi-Unit Residential Buildings Purpse T prvide infrmatin n prpsed changes t the Building Cde regarding

More information

APPLICATION FOR SPECIAL EVENT PERMIT EVENT BASICS

APPLICATION FOR SPECIAL EVENT PERMIT EVENT BASICS Date Applicatin Received: Permit Number: APPLICATION FOR SPECIAL EVENT PERMIT Please return cmpleted applicatin frm with permit fee and paperwrk t: Events Crdinatr, Twn f Beaufrt 701 Frnt Street P.O. Bx

More information

Minnesota Licensing and Registration System (MNLARS) Frequently Asked Questions

Minnesota Licensing and Registration System (MNLARS) Frequently Asked Questions Minnesta Licensing and Registratin System (MNLARS) Frequently Asked Questins The fllwing cntent was received frm the Minnesta Department f Public Safety in respnse t a request n Octber 12, 2017. Can I

More information

Traffic Impact Statement and Vehicle Access Guideline

Traffic Impact Statement and Vehicle Access Guideline TABLE OF CONTENTS 1 TRAFFIC IMPACT STATEMENT AND VEHICLE ACCESS GUIDELINE... 2 1.1 TRAFFIC IMPACT STATEMENT... 2 1.2 VEHICLE ACCESS... 3 1.3 OCCASIONAL ACCESS... 3 1.4 REGULAR ACCESS MAJOR ROAD NETWORK...

More information

Franchised Hauler Exemption for Recycling Application

Franchised Hauler Exemption for Recycling Application Franchised Hauler Exemptin fr Recycling Applicatin City f Ann Arbr Franchised Hauler Exemptin fr Recycling Applicatin Exemptins frm cmmercial trash services prvided by the city-selected franchised hauler

More information

Safe Handling of High Voltage Electrical components in Electrical End of Life Vehicles

Safe Handling of High Voltage Electrical components in Electrical End of Life Vehicles Safe Handling f High Vltage Electrical cmpnents in Electrical End f Life Vehicles The fllwing infrmatin is extracted frm the dcument Safe Handling f High Vltage Electrical cmpnents in Electrical End f

More information

Mud Hole Management Guideline

Mud Hole Management Guideline Engineering Guideline Mud Hle Management Guideline ETH-10-01 Applicability ARTC Netwrk Wide Dcument Status Versin Date Reviewed Prepared by Reviewed by Endrsed Apprved 1.2 12 Nv 13 Standards Stakehlders

More information

FIRST: Top battery (closest to the arm) SECOND: Middle battery. LAST: Top battery (furthest from arm)

FIRST: Top battery (closest to the arm) SECOND: Middle battery. LAST: Top battery (furthest from arm) Hw t Install the Batteries Hw t Hld the Lamp: The InteliEnergy Lamp selectin switches utilize the same technlgy as cell phnes: Capacitive Tuch. This assures the ultimate in lngevity because there are n

More information

Frequently Asked Questions autonomous shuttle Scheemda

Frequently Asked Questions autonomous shuttle Scheemda Frequently Asked Questins autnmus shuttle Scheemda Hw d I reach the main entrance f the hspital by public transprtatin? After arriving by train at the Scheemda railway statin, take the bus (lines N. 119

More information

Lithium Battery Shipping Overview

Lithium Battery Shipping Overview Lithium batteries are used in many electrnic devices such as cameras, cell phnes, laptp cmputers, medical equipment and pwer tls. When shipping r imprting lithium batteries, including thse cntained in

More information

Kentucky: Kentucky revised vehicle code Link: Kentucky Revised Statutes.

Kentucky: Kentucky revised vehicle code Link:   Kentucky Revised Statutes. Kentucky: Kentucky revised vehicle cde Link: http://www.lrc.ky.gv/statutes/chapter.aspx?id=38038 Kentucky Revised Statutes 189.010 Definitins fr chapter. As used in this chapter: KRS Chapter 189 (17) "Trailer"

More information

3000-series Remote Start System with Keyless Entry. Owner's Guide

3000-series Remote Start System with Keyless Entry. Owner's Guide 3000-series Remte Start System with Keyless Entry Owner's Guide Cngratulatins Cngratulatins n the purchase f yur state-f-the-art remte start system with keyless entry. Reading this Owner s Guide prir

More information

Virginia s UST Compliance Program VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY

Virginia s UST Compliance Program VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY Virginia s UST Cmpliance Prgram BET TY LAMP OFFICE OF SPILL RESPONSE AND REMEDIATION VIRGINIA DEQ Revised Federal UST Regulatin Published in the July 15, 2015 Federal Register Effective Octber 13, 2015

More information

Bus Transportation Program Handbook. Northside/Riverside School Year

Bus Transportation Program Handbook. Northside/Riverside School Year Bus Transprtatin Prgram Handbk Nrthside/Riverside 2018-2019 Schl Year Bishp Jhn J. Snyder High Schl Bus Transprtatin Prgram Handbk Plicies and Prcedures fr the 2018-2019 Schl Year Admissins fr the Bus

More information

APPLICATION FORM FOR DIGITAL TACHOGRAPH DRIVER CARD

APPLICATION FORM FOR DIGITAL TACHOGRAPH DRIVER CARD APPLICATION FORM FOR DIGITAL TACHOGRAPH DRIVER CARD Use the checklists belw t make sure that yur applicatin is cmplete befre yu return it. Have yu cnsidered applying fr yur driver card nline? It s quicker

More information

TRUCK AND TRANSPORT MECHANIC STATUTORY DECLARATION OF WORK EXPERIENCE

TRUCK AND TRANSPORT MECHANIC STATUTORY DECLARATION OF WORK EXPERIENCE T qualify t challenge certificatin in this trade r be granted authrity t supervise and sign-ff n apprentices in this trade, individuals must have: wrked a minimum f 9,540 hurs perfrming the tasks listed

More information

GLOBAL LIFT CORP Owner s Manual

GLOBAL LIFT CORP Owner s Manual GLOBAL LIFT CORP Owner s Manual 39 N. Caseville Rad PO Bx 559 Pigen, MI 48755 Tll Free: 866-712-0606 Fax: 989-453-3050 www.glballiftcrp.cm Page 1 COMMERCIAL SERIES POOL LIFTS C-350 ~ C-450 ~ C-550 TABLE

More information

Update on Emerging Technologies of the RfG

Update on Emerging Technologies of the RfG An Cimisiún um Rialáil Fóntas Cmmissin fr Regulatin f Utilities Update n Emerging Technlgies f the RfG Reprting Perid March May 2018 Infrmatin Paper Reference: CRU/18/121 Date Published: 26/07/2018 Clsing

More information

ACCESSORY DWELLING UNITS (ADU)

ACCESSORY DWELLING UNITS (ADU) ACCESSORY DWELLING UNITS (ADU) San Francisc Public Wrks: Bureau f Street Use & Mapping Bureau f Urban Frestry Overview San Francisc Public Wrks Cde (SFPW) gverns permit requirements fr wrk in the public

More information

PRE-PLANNING & DELIVERY GUIDE

PRE-PLANNING & DELIVERY GUIDE TM PRE-PLANNING & DELIVERY GUIDE Need Assistance? Call 1-888-329-4847 PRE-DELIVERY Spa Delivery Preparatin Yur spa delivery will arrive CURBSIDE at the specified delivery address yu prvided at the time

More information

REQUEST FOR PROPOSAL MUNICIPAL ENGINEERING SERVICES

REQUEST FOR PROPOSAL MUNICIPAL ENGINEERING SERVICES REQUEST FOR PROPOSAL MUNICIPAL ENGINEERING SERVICES The Twn f Sundre is requesting prpsals frm qualified engineering firms fr civil engineering services. This will invlve prviding advice and recmmendatins

More information

Update on Emerging Technologies of the RfG

Update on Emerging Technologies of the RfG An Cimisiún um Rialáil Fóntas Cmmissin fr Regulatin f Utilities Update n Emerging Technlgies f the RfG Reprting Perid May July 2018 Infrmatin Paper Reference: CRU18223 Date Published: 1/10/2018 Clsing

More information

LED Driver Feedback Signs

LED Driver Feedback Signs LED Driver Feedback Signs Installatin Instructins (029-04151-0000) Nvember 2012 Slar Kit 35AH / 55W 70AH / 55W 70AH / 85W M75-SOLAR-000S M75-SLR70-000S M75-SOLAR-000C E. 5676 Seltice Way Pst Falls, Idah

More information

Machine Safeguarding

Machine Safeguarding Machine Safeguarding General This dcument will prvide yu a high-level verview n sme best practices pertaining t machine guarding and sample types f guards fund in manufacturing settings. The Main Causes

More information

Introduction Specifications Structure & Performance Assembly Folding Operation Care & Maintenance...

Introduction Specifications Structure & Performance Assembly Folding Operation Care & Maintenance... n Intrductin... 3 Specificatins... 4 Structure & Perfrmance... 5 Assembly... 6 Flding... 7 Operatin... 8-12 Care & Maintenance... 13-15 2 P a g e Read and fllw all instructins, warnings, and ntes in this

More information

GLOBAL LIFT CORP. Owner s Manual. Superior Series Proformance Series S-350 / P-375

GLOBAL LIFT CORP. Owner s Manual. Superior Series Proformance Series S-350 / P-375 GLOBAL LIFT CORP Owner s Manual Superir Series Prfrmance Series S-350 / P-375 684 N Prt Crescent Rd Suite C Bad Axe, MI 48413 Tll Free: 866-712-0606 Fax: 989-269-5902 www.glballiftcrp.cm Page 1 SUPERIOR

More information

Frequently Asked Fleet Card Questions HuskyPRO Universal Fuel Card

Frequently Asked Fleet Card Questions HuskyPRO Universal Fuel Card Frequently Asked Fleet Card Questins HuskyPRO Universal Fuel Card General Fleet Card Accunt Questins Hw can the HuskyPRO Universal Fuel Card Prgram help me manage my business fleet fuel expenses? HuskyPRO

More information

Idaho: Idaho revised vehicle code:

Idaho: Idaho revised vehicle code: Idah: Idah revised vehicle cde: http://www.legislature.idah.gv/idstat/title49/t49.htm (6) "Trailer" means: (a) General. Every vehicle withut mtive pwer designed fr carrying persns r prperty and fr being

More information

You have a Chiller, Now What?

You have a Chiller, Now What? Yu have a Chiller, Nw What? Raschell Hickmtt Reginal Sales Manger Dimplex Thermal Slutins Klant Klers Brand Chillers Agenda This presentatin is develped t be a very brief and generic intrductin t anyne

More information

Application of size, weight, and load limitations for vehicles -- Exceptions.

Application of size, weight, and load limitations for vehicles -- Exceptions. Utah Vehicle Cde 41-1a-102. Definitins. As used in this chapter: (10) "Cmmercial vehicle" means a mtr vehicle, trailer, r semitrailer used r maintained fr the transprtatin f persns r prperty that perates:

More information

EnergyBar 6. Setup Guide

EnergyBar 6. Setup Guide EnergyBar 6 Setup Guide WELCOME Cngratulatins n yur purchase f the Apex EnergyBar 6! The EnergyBar 6 allws the Apex system t cntrl up t six 230 vlt items such as lights, pumps, fans, heaters, chillers

More information

City of San Luis Obispo Zoning Regulations December 2013

City of San Luis Obispo Zoning Regulations December 2013 City f San Luis Obisp Zning Regulatins December 2013 parking areas, parking f vehicles fr purpses f vernight camping r sleeping is prhibited by and shall be subject t enfrcement in accrdance with Chapter

More information

Hydro One Electricity Bills. Summer 2010

Hydro One Electricity Bills. Summer 2010 Hydr One Electricity Bills Summer 2010 Agenda Explanatin f Bills Reasns fr High Bills Tax Exemptin Cntact Infrmatin 1. Explanatin f Bills Page 1 f the Bill Balance Infrmatin: Balance Frward Budget Billing

More information

IB Regional Workshops: Guidelines for Host Schools in Latin America

IB Regional Workshops: Guidelines for Host Schools in Latin America IB Reginal Wrkshps: Guidelines fr Hst Schls in Latin America Page 1/11 Dear Head f Schl and IB crdinatr, Thank yu fr cnsidering hsting an IB Prfessinal Develpment event at yur schl. As a leader in prfessinal

More information

GLOBAL LIFT CORP. Owner s Manual. Rotational Series R-375

GLOBAL LIFT CORP. Owner s Manual. Rotational Series R-375 GLOBAL LIFT CORP Owner s Manual Rtatinal Series R-375 684 N Prt Crescent Rd Suite C Bad Axe, MI 48413 Tll Free: 866-712-0606 Fax: 989-269-5902 www.glballiftcrp.cm Page 1 ROTATIONAL SERIES POOL LIFTS R-375

More information

2016 OPP Year End Report. Georgian Bay Township. Presented by Inspector Andrew Ferguson

2016 OPP Year End Report. Georgian Bay Township. Presented by Inspector Andrew Ferguson 2016 OPP Year End Reprt Gergian Bay Twnship Presented by Inspectr Andrew Fergusn SOUTHERN GEORGIAN BAY DETACHMENT CORPORATE & EMERGENCY SERVICES REPORT Suthern Gergian Bay OPP 2016 Annual Reprt Gergian

More information

Western Canada- Fleet Integration Program

Western Canada- Fleet Integration Program Western Canada- Fleet Integratin Prgram Western Canada Cvered Hpper Fleet Integratin Prgram CN is ffering a Fleet Integratin Prgram fr grain, ilseed and special crp shippers wh wish t enter agreements

More information

SMARTQUOTE 2.0 RELEASE NOTES

SMARTQUOTE 2.0 RELEASE NOTES SMARTQUOTE 2.0 RELEASE NOTES CHANGES AT A GLANCE SmartQute 2.0 enhancements are detailed in this dcument and include the fllwing: Vastly imprved vehicle cverage Nrmal and Adverse Service schedule selectin

More information

Mandatory Maintenance Vehicle Owner

Mandatory Maintenance Vehicle Owner Mandatry Maintenance Vehicle Owner In accrdance with Québec s Highway Safety Cde, wners f vehicles with grss vehicle weight rating (GVWR)* f 4,500 kg r mre (except tl vehicles) and f tw trucks and minibuses

More information

ABTQ-103 rev 01 Last review:

ABTQ-103 rev 01 Last review: INSTALLATION, OPERATION & MAINTENANCE INSTRUCTIONS FOR ABTECH PCS Cntrl Statin Purpse f Instructins Wrking in hazardus areas, the safety f persnnel and plant depends n cmplying with all relevant safety

More information

FUELS SAFETY BRANCH INFORMATION BULLETIN July 1994

FUELS SAFETY BRANCH INFORMATION BULLETIN July 1994 FUELS SAFETY BRANCH INFORMATION BULLETIN July 1994 Guidelines fr Maintenance and Inspectin Prgrams fr Natural Gas and Prpane Appliances and their Fuel Features In Schls The Ontari Gas Utilizatin Cde states

More information

Pre-Planning Delivery Guide

Pre-Planning Delivery Guide Pre-Planning Delivery Guide Need Assistance? Call 1-888-768-6772 Pre-Delivery Spa Delivery Preparatin Yur spa delivery will arrive CURBSIDE at the specified delivery address yu prvided at the time f yur

More information

SESSION V PHASE ONE: VEHICLE IN MOTION HS 178 R2/06

SESSION V PHASE ONE: VEHICLE IN MOTION HS 178 R2/06 SESSION V PHASE ONE: VEHICLE IN MOTION HS 178 R2/06 SESSION V PHASE ONE: VEHICLE IN MOTION Upn successfully cmpleting this sessin, the participant will be able t: Identify typical cues f Detectin Phase

More information

L2L DRIVING SCHOOL. Portfolio. Company Driver Assessments & Risk Management WE FOLLOW THE ETHICS OF HONESTY & INTEGRITY

L2L DRIVING SCHOOL. Portfolio. Company Driver Assessments & Risk Management WE FOLLOW THE ETHICS OF HONESTY & INTEGRITY Cmpany Driver Assessments & Risk Management Prtfli WE FOLLOW THE ETHICS OF HONESTY & INTEGRITY L2L DRIVING SCHOOL Learners T License Driving Schl Intrductin At Learners t License we pride urselves in assisting

More information

NIEVS PROJECT. First Registration Support Document Version 1.0

NIEVS PROJECT. First Registration Support Document Version 1.0 NIEVS PROJECT First Registratin Supprt Dcument Versin 1.0 CONTENTS CONTENTS... 2 INTRODUCTION... 3 SCOPE OF DOCUMENT... 3 FIRST REGISTRATION MIGRATION ACTIVITIES... 4 AFRL... 4 V55 MIGRATION... 4 SOM...

More information

Summary of Regulations for Commercial Driver s Licenses from the Federal Motor Carrier Safety Administration (Excerpts 2010)

Summary of Regulations for Commercial Driver s Licenses from the Federal Motor Carrier Safety Administration (Excerpts 2010) Summary f Regulatins fr Cmmercial Driver s Licenses frm the Federal Mtr Carrier Safety Administratin (Excerpts 2010) Classes f License: The Federal standard requires States t issue a CDL t drivers accrding

More information