1 TEXAS FREIGHT MOBILITY PLAN 2017 PROGRAM AND PROJECT APPENDICES DRAF T SEPTEMBER 26, 2017 TEXAS DEPARTMENT OF TRANSPORTATION

2 Appendix A Relationship between Goals and Objectives

3 Goals Freight Plan Update Objectives Management Safety Reliability Multimodal Economic Competiveness Stewardship Sustainable Funding Customer Service Reduce rates of truck-involved crashes, injuries and fatalities on the Texas way Freight Network Reduce the number of rail-related incidents, including crashes at at-grade rail crossings Increase the resiliency and security of the state s freight transportation system in response to multi-hazard threats, including natural disasters and man-made threats Support deployment of innovative technologies to enhance the safety and efficiency of the Texas Multimodal Freight Network Achieve and maintain a good state of repair on the Texas way Freight Network Improve the overall rating of bridges on the Texas way Freight Network Increase the percent of pavement lane-miles in good condition on the Texas way Freight Network ize technology to provide for the resiliency and security of the state s freight transportation network in response to multi-hazard threats, including natural disasters and man-made threats Legend: The objective strongly supports the goal. The objective is related to the goal and serves to fulfill that goal on a secondary level. 2-2

4 Goals Freight Plan Update Objectives Management Safety Reliability Multimodal Economic Competiveness Stewardship Sustainable Funding Customer Service Reduce the number of Texas way Freight Network miles at unacceptable congestion levels (level-of-service D or worse) Improve travel time reliability on the Texas way Freight Network Apply the most cost-effective methods to improve system capacity (including technology and operations) Partner with U.S. and Mexican federal, state, regional, local and private stakeholders to address Texas-Mexico border crossing challenges Support development and deployment of integrated Texas-Mexico border crossing management through ITS Leverage technology to improve management and operations of the existing transportation system Increase Texas supply chain efficiencies by improving connectivity between modes Improve first/last mile connectivity between freight modes and major generators and gateways Improve connectivity between rural and urban freight centers Improve access into and out of Texas seaports to facilitate projected future growth Legend: The objective strongly supports the goal. The objective is related to the goal and serves to fulfill that goal on a secondary level. 2-3

5 Goals Freight Plan Update Objectives Management Safety Reliability Multimodal Economic Competiveness Stewardship Sustainable Funding Customer Service Improve ground access to commercial airports to enhance truck access and connectivity Improve highway and rail connectivity to major freight gateways and generators through increased capacity improvements Improve connectivity to Texas-Mexico border crossings Leverage multi-state organizations to increase multimodal freight connectivity across state lines Reduce adverse environmental and community impacts of the Texas Multimodal Freight Network Lead efforts to foster greater coordination among the agencies responsible for freight network investment Reduce freight project planning, programming and implementation delays Coordinate freight project planning and implementation with all planning partners and stakeholders Implement a performance-based prioritization process for freight system investment Develop and sustain partnerships with private sector industries, communities, agencies, MPOs and other transportation stakeholders Legend: The objective strongly supports the goal. The objective is related to the goal and serves to fulfill that goal on a secondary level. 2-4

6 Goals Freight Plan Update Objectives Management Safety Reliability Multimodal Economic Competiveness Stewardship Sustainable Funding Customer Service Increase freight expertise in TxDOT districts, across departments and among elected officials Partner with public and private sector stakeholders to enhance workforce recruitment and retention in the transportation and logistics industry Facilitate statewide dissemination of real-time freight traveler information by integrating existing traffic management centers Identify potential alternative funding sources for high priority freight projects Identify and document the needed transportation investment costs to meet the state s future freight transportation needs Educate the public and stakeholders on the costs of constructing and preserving the freight transportation system Improve predictive capabilities for revenue forecasting and long-term needs assessments Strengthen Texas position as a trade and logistics hub by improving and maintaining Texas Multimodal Freight Network infrastructure and connectivity Expand public-private and public-public partnerships to facilitate investments in freight improvements that enhance economic development and global competitiveness Identify critical freight infrastructure improvements necessary to support future supply chains, logistics and consumer demands Legend: The objective strongly supports the goal. The objective is related to the goal and serves to fulfill that goal on a secondary level. 2-5

7 Goals Freight Plan Update Objectives Management Safety Reliability Multimodal Economic Competiveness Stewardship Sustainable Funding Customer Service Conduct outreach activities and develop educational programs to increase awareness of the importance of freight to the Texas economy Support strategic transportation investments to address the rapid increase in key industries, such as energy, agriculture and automotive production Legend: The objective strongly supports the goal. The objective is related to the goal and serves to fulfill that goal on a secondary level. 2-6

8 Appendix B 5- Freight Investment Plan: -2022

9 Appendix B-1: 5- FIP: National way Freight Program Eligible District CSJ Facility Location Description Project Abilene I-20 Martin Co Line to Install Median Barrier Safety $409 Project FM 818 Abilene I-20 At 1.8 Miles West Construct New Safety Rest Safety 2020 $500 Project of Areas Howard/Mitchell to North and South of I-20 Abilene I-20 At FM 700 to Install Intersection Flashing Safety $137 Project Frontage Roads Beacon, Advance Warning Only Signals and Signs, Install Pavement Markings Abilene I-20 At I-20 Exit 226A Remove Existing Ramp Safety $500 Project (WB Off Ramp) Abilene I-20 US 84 at Roscoe Construct New Interchange 2021 $40,000 Draft Abilene I-20 At N of I-20,2.7 Construct New Safety Rest Safety 2020 $1,975 Project mi W of Nolan Areas C/L to at S of I- 20, 7.0 mi W of Nolan C/L 2 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

10 Abilene I-20 At Bitter Creek (I- Replace Bridge and Approach Safety $48 Project & Nfr & Sfr) to Railing Or Add Safety End 2.50 mi E of FM Treatment Or Replace 1085 Guardfence Abilene I-20 At Little Bitter Ck Replace Bridge and Approach Safety $21 Project (I-20 & N FTg) to Railing Or Add Safety End 3.10 mi W of FM Treatment Or Replace 126 Guardfence Abilene I-20 At Mulberry Replace Bridge and Approach Safety $36 Project Creek Branch (Ml Railing Or Add Safety End & FTg) to 4.55 mi Treatment Or Replace E of FM 126 Guardfence Abilene I-20 At Draw (I-20 Ml Replace Bridge and Approach Safety $54 Project & N Frtg) to 1.05 Railing Or Add Safety End mi W of FM 126 Treatment Or Replace Guardfence Abilene I-20 At E Fork Bitter Replace Bridge and Approach Safety $57 Project Creek (I-20 & Fr) Railing Or Add Safety End to 0.35 mi E of Treatment Or Replace FM 126 Guardfence 3 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

11 Abilene I-20 At Draw (I-20 Ml Replace Bridge and Approach Safety $33 Project & Frtg Rd) to Railing Or Add Safety End 1.95 mi E of FM Treatment Or Replace 126 Guardfence Abilene I mi E of FM Milled Edgeline Rumble Strips Safety $18 Project to Near Old Anson Rd Abilene I-20 Old Anson Rd to Milled Edgeline Rumble Strips Safety $56 Project mi W of Callahan Co Line Abilene I-20 At FM 1707 to Install Intersection Flashing Safety $72 Project Frontage Roads Beacon, Advance Warnining Only Signals and Signs, Install Pavement Markings Abilene US mi S of SH Profile Edgeline Markings Safety $210 Project to US 277 Abilene US 83 At FM 707 Install Intersection Flashing Safety $59 Project Beacon,Advance Warning Signals Intersection-Existing Signal,Flashing Beacon Or Stop Signs 4 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

12 Abilene US 84 At FM 1673 (Int Install Intersection Flashing Safety $101 Project With N.Front Rd) Beacon, Advance Warnining Signals and Signs, Safety Lighting Abilene US mi NW of I- Texturize Shoulders-Profile Safety $123 Project to mi Pavement Markers NW of I-20 Abilene US 87 Mopac RR at Bridge Rehab Safety 2019 $6,277 Project Beals Creek. Abilene FM 700 At Birdwell Lane Improve Traffic Sgnls, Instl Safety $180 Project Adv Int Warning Sig & Signs, Safety Lt Intersection, Instl Transvers Rumble Strips Abilene SH 208 Kent County Line Profile Edgeline Markings Safety 2019 $218 Project to 1.5 Miles North of US 84 Amarillo I West of Intersection Improvements at Manag $1,500 Draft FM 2381 to RM 2381 (Bushland) and Frt and 2000 East of FM Road Improvements 2381 Amarillo I-27 45th Street to Operational and Mobility 2022 $8,700 Draft Potter County Improvements Line 5 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

13 Amarillo I-27 Randall County Operational and Mobility 2022 $1,000 Draft Line to I-40 Improvements Amarillo US 60 At Lincoln Street Improve Traffic Signals, Safety 2019 $221 Project Interconnect Signals Amarillo I-40 Bih 40-D to SL B-2 Frt Rds Phase Ii: Manag 2020 $24,600 Draft (Soncy Reconstruct Bridge at SL 335 and Road) (2nd Level) For Future Freeway Amarillo SL 335 FM 2590 to West B-1 Phase Ii:Construct 2021 $19,700 Draft of Coulter Mainlanes and Frontage Roads Amarillo SL st Street to Operational and Mobility 2019 $5,300 Draft Potter County Improvements Line Atlanta I-20 At Lansing Switch Replace Bridge & Approaches Manag 2021 $6,600 Draft Road to Improve Vertical Clearance and Atlanta I mi W of US Safety Lighting Safety 2019 $234 Project to 0.5 mi E of US TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

14 Atlanta I-20 At US 59 Replace Bridge & Approaches Manag 2021 $8,100 Draft to Improve Vertical Clearance and Atlanta I-30 At Hayes Creek Bridge Preventative Safety $13 Project Maintenance Atlanta I-30 FM 3419 to FM Construct One-Way Frontage 2020 $18,900 Draft Roads, Entrance & Exit Ramps & Turnarounds Atlanta I-30 At Rain Creek Bridge Preventative Safety $52 Project Maintenance Atlanta I mi W of FM Widen Existing Interstate 2020 $61,000 Draft to Arkansas From 4 Lanes to 6 Lanes State Line Austin I FT South of Upgrade Bridge and Approach Safety 2019 $55 Project SS 158 to 1911 Railing FT South of Ss_158 Austin I-35 At CR 305 Bridge Replacement $6,600 Draft TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

15 Austin I-35 At Williams Dr Reconstruct Interchange 2020 $52,000 Draft Austin I-35 At West Fork Upgrade Bridge and Approach Safety 2019 $50 Project Smith Branch Railing Austin I-35 Grand Ave Prkwy Reverse NB Ramps & Add 2020 $5,320 Draft to SH 45N Auxilary Lanes Austin I-35 At Wells Branch Operational Improvements $29,247 Draft Pkwy Interchange Austin I-35 At Parmer Ln Reconstruct Intersection 2019 $24,159 Draft Austin I-35 SH 45Se to Southbound Ramp Reversal 2019 $9,700 Draft Onion Creek Parkway Austin I mi N. of Replace Bridge & Approaches $28,633 Draft Posey Road to Comal County Line 8 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

16 Austin I-35 Loop 82 to South Reconstruct Ramps 2020 $1,020 Draft of Loop 82 Austin I-35 South of SH 80 Add Shlds, Aux Lns, Ramp 2021 $107,00 Draft to North of RM Imprvmts, Pvmt Rehab, Frtg 0 12 Rd Inter Sect Improvmt, Bike & Ped Imprvmts Austin SL 360 At Westlake Drive Grade Separate Intersections 2022 $48,000 Draft Austin SL 360 At Spicewood Grade Separate Intersection 2022 $45,000 Draft Springs Road Austin US mi E of FM Widen to 4 Lane Divided 2019 $34,791 Draft to mi E of FM 696 Austin US 290 FM 2104 to Lee Widen to 4 Lane Divided 2019 $16,845 Draft C/L Beaumont I Miles East Widen Existing Mainlanes 2019 $40,000 Draft of FM 3247 to From 4 to 6 Lanes Sabine River Bridge 9 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

17 Beaumont US 69 Tram Road, Widen Freeway From 4 to 6 $14,250 Draft South to Lnva Lanes Canal Beaumont US 69 Lnva Canal, Widen Freeway From 4 to 6 $19,300 Draft South to I-10 Lanes Beaumont I-10 At FM 3180 Construct Overpass $27,584 Draft Beaumont I-10 FM 365, East to Widen Freeway From 4 to 6 $133,40 Draft CR 131 (Walden Lanes 0 Road) Brownwood SH 6 I-20 to SL 389 Construct Super $9,064 Draft Brownwood SH 6 SL 389 to Construct Super $12,546 Draft Comanche County Line Brownwood SH 6 Eastland County Construct Super $11,947 Draft Line to SH TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

18 Brownwood SH 6 Deleon West City Construct Super $8,141 Draft Limits to Erath County Line Childress I Miles West Upgrade Bridge & Approach 2019 $196 Project of FM 3075, East Rail to Miles West of US 83 Childress I Miles West Upgrade Bridge & Approach 2019 $200 Project of US 83, East to Rail 3.10 Miles East of FM 1802 Corpus I-37 Control Break (.2 Improve Guardrail to Desgin Safety 2019 $673 Project Christi mi N of Cr499) to Standards Atascosa County Line Corpus I-37 Control Break (.1 Improve Guardrail to Design Safety 2019 $943 Project Christi mi N of Cr302) to Standards Control Break (.2 mi N of Cr499) Corpus I-37 Patricio Improve Guardrail to Design Safety 2019 $1,078 Project Christi County Line to Standards Control Break (.1 mi N of Cr302) 11 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

19 Corpus I-37 Nueces River Widen Freeway 2020 $10,000 Draft Christi (Cb) to Ih37/Us 77 Interchange Corpus I-37 US 181 to Improve Guardrail to Design Safety $406 Project Christi mi S of US 77 Standards Corpus I-37 On Ih37 at Buddy Rep. Brg. & Appr. Railing Or Safety $138 Project Christi Lawrence Dr. Add Sft End Trt. Or Rep. Gudf. On South Bond Lanes Corpus I-37 On Ih37 at Buddy Rep. Brg. and Appr. Railing Or Safety $138 Project Christi Lawrence Add Sft. End Trt Or Rep. Gudf On North Bond Lanes Corpus I-37 On I-37 at Rep. Brg. & Appr. Railing Or Safety $142 Project Christi Navigation Blvd Add Sft. End Trt. Or Rep. Guadf On The South Bound Lanes Corpus I-37 On I-37 at Rep. Brg. & Appr. Railing Or Safety $142 Project Christi Navigation Blvd Add Sft. End Trt. Or Rep. Guadf On North Bound Lanes Corpus I-37 On I-37 at Up Rep. Brg. & Appr. Railing Or Safety $171 Project Christi River Rd. Add Sft. End Trt. Or Rep. Guadf On The South Bound Lanes 12 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

20 Corpus I-37 On I-37 at Up Rep. Brg. & Appr. Railing Or Safety $171 Project Christi Rivier Rd. Add Sft. End Trt. Or Rep. Guadf On The North Bound Lanes Corpus I-37 On I-37 at Ccta Rep. Brg. & Appr. Railing Or Safety $116 Project Christi RR Add Sft. End Trt. Or Rep. Guadf On South Bound Main Lanes Corpus I-37 On I-37 at Ccta Rep. Brg. & Appr. Railing Or Safety $116 Project Christi RR Add Sft. End Trt. Or Rep. Guadf On The North Bound Main Lanes Corpus I-37 Redbird Ln. Widen Freeway By 2020 $35,000 Draft Christi (Overpass) to Constructing Additional 2 Nueces Travel Lanes NB & 1 River_(Cb) Additional Travel Lane SB Corpus SH 44 West of FM 3386 Upgrade From 4-Ln Divided $18,500 Draft Christi to East of FM Hwy to 4-Ln Freeway W/Ftrg 1694 By Constructing 4 Mainlanes, Interchanges, and Ftrg Roads Corpus SH 44 Manning Rd. to Install Median Barrier, Milled Safety 2019 $130 Project Christi mi W of Edegline Rumble Strips Ss544 (Inter. Dr.) 13 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

21 Corpus US 77 North of FM Construct Main $13,000 Draft Christi to South of Lanes,Frontage Roads and CR 28 (Control Structures Break) Corpus US 77 CR 16 to FM Construct Main Lanes and $22,000 Draft Christi Overpasses Corpus US 77 S of Cr28 to CR Construct Relief Route $75,000 Draft Christi Around Driscoll Corpus US 77 FM 1356 to CR Construct Mainlnaes, 2020 $35,000 Draft Christi Frontage Roads and Structures Corpus US 77.5 mi N of SH Safety Lighting Safety $139 Project Christi to 1.1 mi N of SH 285 Corpus SH 44 FM 2292 to Install Median Barrier, Milled Safety 2019 $147 Project Christi Manning Rd. Edgeline Rumble Strips Corpus SH mi E of FM Improve Traffic Signals, Safety 2019 $634 Project Christi to Interconnect Signals mi W Fo Ss TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

22 Corpus SH 358 Nile Drive to Ramp Reversal Phase Ii-B 2021 $35,000 Draft Christi Staples Street Corpus SH mi W of Ss35 Safety Lighting Safety $179 Project Christi mi W of Ss3 Corpus SH mi E. of SS Safety Lighting Safety 2019 $99 Project Christi to mi W of Pr 22 Corpus SH mi E of Safety Lighting Safety 2020 $246 Project Christi Ss3 to mi E of Ss3 Corpus SH mi W of Pr Safety Lighting Safety 2020 $246 Project Christi to mi W of Pr 22 Dallas SH 78 At Gaston Ave Reconfigure Intersection 2021 $4,350 Draft Dallas I-30 Bass Pro Drive to Construct 0 to 6 Lane 2021 $124,37 Draft Dalrock Rd Frontage Roads, Bayside 2 Interchange, & Ramp Modifications; Reconstruct Dalrock Interchange 15 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

23 Dallas US 75 North of FM 455 Construct Interchange $21,502 Draft to CR 370 Dallas US 80 Lawson Rd Reconstruct and Widen 4 to $113,19 Draft (Dallas / Mainlanes and Reconstruct 4 7 Kaufman C/L) to Lane Discontinuous Frontage FM 460 Roads. Dallas I-35E At FM 664 Reconstruct Interchange 2022 $25,000 Draft Dallas I-30 Dallas County Widen From 6-8 Gen Purpose 2021 $19,500 Draft Line to SH 161 Lns With 2 Rev Exp Lns With 4 Cont Frontage Rd Lns. Modifcations to SH 161 Connections Dallas I-635 At Skillman / Interchange Improvements 2019 $65,000 Draft Audelia Interchange Dallas SH 161 South of SH 183 Widen and Reconstruct 4 to 8 $57,000 Draft to North of Belt General Purpose Lanes Line Rd 16 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

24 El Paso US 54 Loop 375 Installation of Bluetooth Technology 2020 $730 Project (Transmountain) Detectors and Radar Vehicle and Ops. to FM 2529 Sensin G Devices (Rvsd) Improv (Mccombs) El Paso FM 659 Sun Fire Blvd to Widen From 4 Lane to 6 Lane 2020 $17,253 Draft US 62/180 (Montana Ave) El Paso FM mi N of Operational Improvements at $7,983 Draft Saul Kleinfeld to Zaragoza Rd/Montwood E of Loop Dr/LP 375 Intersection 375 El Paso I-10 Raynor St to US Add 1 Lane In Each Direction 2020 $5,200 Draft (Paisano Dr) By Restriping El Paso I mi E of Remove and Replace Bonded Manag $16,810 Project Portirio Diaz St to Overlay and mi W of Cotton St El Paso I mi S of SH Replace Bridge and Approach Safety $684 Project to 0.8 mi W of Railing US TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

25 El Paso I-10 FM 2316 (Mcrae) Mill and Inlay Manag 2021 $8,500 Project to mi E of and FM 2316 El Paso I-10 Airway Blvd to Ramp and Intersection Manag 2019 $10,500 Project Viscount Blvd Improvements at Airways, and Hawkins and V Iscount (Phase 2) El Paso I-10 Horizon (FM Frontage Road Overlay (Seal Manag 2020 $3,100 Project ) to Clint Coat) and (FM 1110) El Paso I mi S of FM Replace Bridge and Approach Safety $107 Project to mi Railing S of SL 375 El Paso South Presidio Bridge Reconstruction of Manag 2019 $10,000 TxDOT N/A Orient international rail bridge and Rail Railroad 5 Division El Paso South Presidio County Rehabilitation of the South Manag 2019 $7,000 TxDOT N/A Orient Orient (FASTLANE Grant) and Rail Railroad 5 Division Fort Worth I-35W Ricky Ln to US 67 Reconstruct Interchange at 2020 $15,000 Draft FM 917 and Convert Frontage Roads to One Way 18 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

26 Fort Worth I-20 FM 2552 to Construct New Westbound 2021 $21,000 Draft Bankhead and Eastbound Frontage way Roads (0 to 4/6 Lanes) Fort Worth SH 121 Stars and Stripes Construct I-635 and FM $351,30 Draft Blvd to South of I- Deferred Connections 0 635Ine Fort Worth FM 156 US 81/287 to Widen 2 to 4 Lane Divided $40,009 Draft Watauga Road (Mcelroy) Fort Worth I-30 Six Flags Drive to Reconstruct/Widen $60,500 Draft Dallas County General Purpose Lns, 2 Line Concurrent Exp Lns, 4 Frontage Road Lanes Continous Fort Worth I-30 I-20 to East of Construct WB Ramps to FM 2021 $27,800 Draft Walsh Ranch 1187, Construct EB Ramps to Pkwy(Tarrant Cl I-30 & I-20 Fort Worth SH 360 North of E. Reconstruct 6 to 8 Main 2020 $43,572 Draft Randol Mill Rd. to Lanes Replace Railroad I-30 Bridge, and Reconstruct 4/8 to 4/8 Lane Continuous Frontage Roads 19 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

27 Fort Worth SH 360 SH 183 to I-30 Operational Improvements 2020 $20,000 Draft Houston US 90A Fort Bend County Install Its Equipment and Technology 2022 $10,000 Draft Line to I-610S Infrastructure and Ops. Improv Houston I-69 I-45 to SH 288 Reconstruct and Widen to $173,50 Draft Main Lanes and Reconstruct 0 Ih69/ SH 288 Interchange Houston I-69 SH 288 to SP Reconstruct to 10 Main 2020 $192,00 Draft Lanes 0 Houston I-69 I-69 Southwest Reconstruction of Direct $10,395 Project Fwy South Bound Connector to I-610 South Bound Connector Houston I-69 At Mcgowen, Construct 3 Bridges 2020 $55,800 Draft Tuam and Elgin Houston I Miles Friction Surface Safety $81 Project North East of I-10 Treatment On Curve to I TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

28 Houston SH 36 Fort Bend County Widen to 4-Lane Divided 2019 $45,000 Draft Line to Rural Miles North of SH 35 Houston SH 36 FM 522 to Widen to 4 Lane Divided 2022 $37,400 Draft Miles North of SH Rural (Ptf Candidate) 332 Houston SH 36 SH 35 to FM 522 Reconstruct to 4 Lane 2022 $28,000 Draft Divided With Continuous Left Turn Lane Intersection Improvements and Bicycle Accomodations Houston SH 36 SH 35 to South Gs Over New SH 35, Overlay 2022 $9,590 Draft of SH 35 and Restripe Pavement From 2 to 4 Lanes Houston SH 6 Fort Bend Pkwy Install Its Equipment & Technology 2019 $2,397 Draft Tollway to Infrastructure Strand and Ops. Brazoria C/L Fiber Trunk Line, Closed- Improv Circuit Cameras, Dms & Traveltime Readers Houston I-10 At Oliver Street Construct Oliver Street Bridge $1,770 Project & Widen Easbound Frontage Rd 21 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

29 Houston I-610 West of Reconstruct Mainlanes, $75,000 Draft Cambridge to Frontage Road and Construct West of Scott Overpass at Cambridge Street Street/Almeda Road/Uprr Houston SH th Street to SL Widen to 4 Lane Divided 2021 $21,400 Draft Rural Houston SH 105 SL 336 to FM Reconstruct Pavement to $50,600 Draft Lane Divided Rural Houston SH 105 FM 1484 to Reconstruct Pavement to $52,200 Draft Jacinto C/L Lane Divided Rural Houston SH 146 Red Bluff to Nasa Widen to 8-Lanes, Gs at $29,000 Draft Major Intersections and 2 2- Lane Frontage Roads Houston SH 146 NASA 1 to Widen to 6-Lanes With 4- $73,000 Draft Harris/Galveston Lane Express Lanes County Line Houston SH 146 Port Rd to Remove Median Rail Safety 2019 $3,300 Project Fairmont Pkwy W/Fencing and Replace With Concrete Traffic Barrier (Cast- In-Place) 22 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

30 Houston SH 146 West Fairmont Install Its Equipment & Technology 2022 $3,000 Draft Parkway to Nasa Infrastructure Strand and Ops. 1 Fiber Trunk Line, Closed- Improv Circuit Cameras, Dms & Traveltime Readers Houston I mi N of Reconstruct to 8 Main Lanes; 2021 $95,000 Draft Causeway to S of 2 2-Lane Frontage Roads Texas City Wye Houston I-45 61st Street to Reconstruct to 8 Main Lanes, 2022 $104,00 Draft mi S of 2 2-Lane Frontage Roads 0 Causeway With SH 275 and 61st Street Connections Houston I-45 I-45 NB From Reconstruct Frontage Roads Manag $7,800 Project Detroit to Berkley (I-45 NB to EB I-610; Detroit and to and I-610 WB to Berkley) and (WB I-610 to From Berkley to NB I-45; Berkley to Broad) Broad Houston I-45 At I-69 South Reconstruct Interchange 2021 $856,50 Draft Including I-45 & I-69 0 Mainlanes Houston I-45 S of Texas City Reconstruct I-45/Sh 146/Sh 2021 $68,000 Draft Wye to N of 6 Interchange Texas City Wye 23 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

31 Houston I-45 N of Texas City Reconstruct to 8 Main Lanes 2021 $96,100 Draft Wye to N of FM and 2 2-Lane Frontage Roads 519 Houston I-45 N of FM 519 to N Reconstruct to 8 Main Lanes 2019 $121,60 Draft of FM 1764 and 2 2-Lane Frontage Roads 0 Houston I-45 N of FM 517 to S Reconstruct Pavement to 8 $148,48 Draft of FM 1764 Main Lanes and 2 2-Lane 8 Frontage Roads Houston I-45 At Texas City Wye Construct Two Direct 2021 $69,284 Draft Connectors to LP 197 (SB to EB & WB to NB) to Port of Texas City at Shoal Point at Texas City Wye Houston SH 288 SH 6 to Frm Install Its Equipment and Technology 2022 $8,032 Draft Infrastructure and Ops. Improv Houston I-45 League Line Install Its Equipment and Technology 2020 $7,333 Draft Road to Walker Infrastructure and Ops. Cou9Nty Line Improv 24 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

32 Houston FM 2100 South Widen to 4-Lane Divided 2019 $19,500 Draft Diamondhead Blvd to 0.28 mi N of Hare Cook Rd Houston FM mi N of Widen to 4-Lane Divided 2019 $19,500 Draft Hare Cook Rd to 0.23 mi S of Antelope Dr Houston FM mi S of Widen to 4-Lane Divided 2019 $22,000 Draft Antelope Dr to FM 1960 Houston FM 1960 SH 249 to Cutten Intersection Improvements Manag $16,376 Project Rd and Houston FM 1960 At Eldridge Reconstruct 8 Main Lanes On 2019 $14,991 Draft Parkway FM 1960 and 6 Main Lanes On Eldridge With Left and Right Turn Lanes Houston FM 1960 I-45 to SH 249 Install Its Equipment & Technology 2022 $10,904 Draft Infrastructure Strand and Ops. Fiber Trunk Line, Closed- Improv Circuit Cameras, Dms & Traveltime Readers 25 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

33 Laredo I-35 Webb/Lasalle Construction of A New Two $2,562 Draft County Line to Lane Roadway 0.95 mi North of Webb/Lasalle Cl Laredo I mi S of Replacement of Existing Manag 2022 $65,000 Draft Uniroyal Bridge and Interchange to mi N of Uniroyal Interchange Laredo I-35 Shiloh Drive to Widen of Mainlanes and Rr 2021 $54,000 Draft Miles N. of Grade Separation US 59/ I-69W Laredo I mi South of Construction of Direct 2019 $30,000 Draft Us59-Sl20 to Connector Interchange 0.50 mi East of (Dc#5) Ih35 / Us59-Sl20 Laredo US 59 At Del Mar Construction of Interchange 2022 $24,100 Draft Laredo US 59 At Shiloh Construction of Interchange 2022 $21,500 Draft TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

34 Laredo US mi S of Construction of Interchange 2021 $19,691 Draft Jacaman Rd to 0.50 mi N of Jacaman Rd Laredo US 59 At University Blvd Construction of Interchange 2022 $16,850 Draft Lubbock US FT West of New Interchange 2022 $19,340 Draft LP 289 to Zenith Ave Lufkin US 69 Cherokee County Improve Guardrail to Design Safety $196 Project Line to SH 103 Standards Lufkin US 59 Old Moffett Road Convert to 4 Lane Fwy W/ 2020 $13,557 Draft to SH 103 Frontage Rds Odessa I-20 Pecos River to Faility Upgrades to Meet 2019 $26,000 Project Miles West of Freeway Standards FM 1927 Odessa I-20 FM 1053 to 2.4 Install Median Barrier Safety $1,289 Project mi W of FM 1601 Odessa I mi W of FM Install Median Barrier Safety $3,236 Project to BI 20-E 27 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

35 Odessa I-20 West BI 20-F to Install Median Barrier Safety $1,706 Project Howard Co Line Odessa I-20 At CR 1250 Construct New Interchange 2019 $19,840 Draft Odessa I-20 Lamesa Road to Reversal of EB On/Off Ramps $4,500 Draft FM 715 Odessa US mi North of Safety Treat Fixed Objects Safety 2019 $489 Project FM 11 to 4.3 mi South of FM 11 Odessa US 67 Crockett County Roadway Widening to A Manag $27,138 Draft Line to I-10 Modified Super 2 and Odessa I Miles East of Facility Upgrades to Meet 2020 $7,140 Project Reeves C/L to Freeway Standards 8.7 Miles East Odessa South Upton County Rehabilitation Of South Orient Manag $ Draft N/A Orient Line Rrmp RR To 25 Mph Track Speeds and Railroad 5 to Crockett County Line RRMP TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

36 Odessa South Reagan County Infrastructure Rehab to Manag $3,415.6 Draft N/A Orient Line to Crane Replace Jointed Rail, Replace and 0 Railroad 5 County Line Ties, Ballast, Reconstruct Grade Paris SS 503 SH 91 to US 69 Milled Edgeline Rumble Safety 2019 $13 Project Strips, Milled Centerline Rumble Strips Paris US mi S of Milled Edgeline Rumble Safety 2019 $1 Project Murray St to SS Strips, Milled Centerline 503 and US 69 Rumble Strips Intersection Paris SH 91 At Woodlake Improve Traffic Signals Safety 2019 $136 Project Road Paris US 75 At FM 131 Improve Traffic Signals, Safety 2019 $281 Project Safety Lighting at Intersection Paris US 75 At SH 56 Improve Traffic Signals Safety 2019 $254 Project Paris I-30 At Caney Creek Replace Bridge and Approach Safety 2020 $141 Project Branch, Draw Railing Or Add Safety End Creek to and Treatment Or Replace Elaine's Creek Guardfence 29 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

37 Pharr US 83 FM 649 to FM Profile Edgeline Markings, Safety $139 Project Profile Centerline Markings Pharr I-69E.35 mi N of Old Construct NB Frontage Rd $12,000 Draft Alice/Stillman Overpasses For Vehicles & Rd. to 0.40 mi Hike and Bike South of Merryman Rd. Pharr I-69E At Union Pacific Construct SB Frontage Rd. $6,000 Draft Railroad (UPRR) Overpass Pharr SH 48 I-69E to SH 4 Proposed Raised Median 2019 $3,000 Draft Pharr SH mi E of SH Profile Edgeline Markings, Safety $89 Project to mi Profile Centerline Markings E of SH 550 Pharr US mi S. of La Construct Mainlanes & 2020 $18,404 Draft Parra Ave. to 8 Overpasses mi S. of La Parra Ave TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

38 Pharr US 77 8 mi S. of La Construct Mainlanes & 2020 $19,953 Draft Parra Ave.. to 9.6 Overpasses mi N. of Norias Rd. Pharr US mi N of Construct Mainlanes & 2019 $11,764 Draft Willacy/Kenedy Overpasses C.L. to Willacy/Kenedy County Line Pharr I-69E Industrial Blvd. to North Bound Ramp Reversal 2019 $1,500 Draft Primera Rd. Pharr I-69E 0.17 mi N of Proposed Southbound 2021 $2,500 Draft Ballenger RdAt Frontage Road Sebastian Pharr US 77 Willacy/Kenedy Construct Mainlanes & 2019 $14,005 Draft C.L. to 0.93 mi S Overpasses of Willacy/Kenedy C.L. Pharr I-69E Cameron/Willacy Upgrade to Interstate 2020 $3,932 Draft Cl to Spur 413 Standards 31 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

39 Pharr FM 1926 At FM 1926 Addition of North and South $86 Project (23rd St.) to Bound Center Turn Lanes Hackberry Ave. Pharr FM 1926 At FM 1926 Addition of North & $95 Project (23rd St.) and Southbound Center Turn Kendlewood Ave. Lanes Pharr FM 1926 At FM 1926 Addition of East, North & $141 Project (23rd St.) and Southbound Center Turn Ebony Ave. Lanes Pharr SS 115 At FM 1926 Addition of North and South $117 Project (23rd St.) to at Bound Center Turn Lanes SS 115 (23rd St.) Angelo South Crane County Rehabilitation Of South Orient Manag $ Draft N/A Orient Line to Pecos RR To 25 Mph Track Speeds and Railroad 5 County Line RRMP I-35 Hays County Line Revise Ramps and Convert $885 Draft Antonio to 0.5 mi S of Frontage Roads From Two Hays County Line Way to One Way Operation I-10 I-410 to Loop Expand From 4 to 6 Lane $120,00 Draft Antonio Expressway TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

40 0072- I-10 US 87 South "Y" Reconstruct Grade $27,000 Draft Antonio to Cascade Separation at US 87 South Caverns/Scenic "Y", Reconfigure Ramps & Loop Widen Frontage Roads to Convert to One Way Operation I-10 SH 46 to US 87 Reconstruct Grade $30,000 Draft Antonio South "Y" Separation at SH 46, Reconfigure Ramps and Widen EB Frontage Road to Convert to One Way Operation I-10 Bexar/Kendall Construct Grade Separation $29,000 Draft Antonio County Line to at Balcones Creek Road Fair Oaks Reconfigure Ramps & Widen Fr Rd to Convert to One Way I-10 At Wurzbach Intersection and Operational $3,000 Draft Antonio Road Improvements I-410 Ingram Rd. to SH Expand From 8 to 10 Lane 2021 $50,000 Draft Antonio Expressway 33 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

41 0521- I-410 At SH 151 to Reconstruct Interchange $40,000 Draft Antonio Interchange Phase I-410 SH 151 to US 90 Expand From 6 Lane to $10,000 Draft Antonio Lane Expressway I-410 At US 281/ Interchange Improvements 2022 $20,000 Draft Antonio Pedro I-410 At I-10 E Construct Direct Connectors 2021 $100,00 Draft Antonio ;Phase 1- Connectors I mi East of FM Construct Weigh Station Manag $3,100 Project Antonio to 0.3 mi Weigh In Motion Ramps and West of CR SL 1604 SH 16 to US 281 Expand to 8 Lane Expressway 2020 $507,70 Draft Antonio Construct 4 New Managed 6 Lanes; Including Managed Lane Direct Connectors at I SL 1604 At FM Intersection Operational 2022 $30,000 Draft Antonio Blanco Rd Improvements 34 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

42 2452- SL 1604 At FM 1535 Intersection Operational $1,000 Draft Antonio Improvements- EB to WB Turnaround SL 1604 Bitters Rd to Intersection Operational $8,000 Draft Antonio Huebner Rd Improvements- Construct 4 Turnarounds SL 1604 I-35 to FM 78 Expand From 4 Lane Divided $40,000 Draft Antonio to 4 Lane Expressway SL 1604 Redland Rd to Reconfigure Ramps, $12,000 Draft Antonio Bulverde Rd. Construct Turnarounds at Bulverde and Operational Improvements SL 1604 At FM 2252 Intersection Operational $3,000 Draft Antonio Improvements- EB to WB Turnaround Tyler I-20 US 69 in Lindale, Realign & Lengthen WB Exit $9,400 Draft E to 0.8 mi E of & EB Entrance Ramps For US US 69 (End C-S) 69 Tyler I mi E of US 69 Realign & Lengthen WB Exit $4,000 Draft (Bgn C-S), E to & EB Entrance Ramps For US 1.75 mi E of US (Jim Hogg Rd) 35 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

43 Waco I-35 N LP 340 to Construct Flush Median 2019 $4,000 Project Craven Ave Including Drainage and Concrete Traffic Barrier Waco I-35 12th Street to N Reconst, Widen Mainlanes 2019 $278,00 Draft LP 340 From 6 to 8, Reconst 0 Frontage Rd & Realign Ramps Waco I-35E I-35W to Ellis Co Reconstruct and Widen From 2019 $100,00 Draft Line 4 Lanes to 6 Lanes, 0 Reconstruct and Realign Ramps Wichita I Miles North Widen to 6 Lane Freeway 2021 $319,50 Draft Falls of FM 3002 to Facility Miles South of US 82 Yoakum US 290 Lee C/L to Safety Treat Fixed Objects Safety $86 Project Washington C/L Yoakum US 87 Victoria C/L to SH Improve Guardrail to Design Safety 2019 $176 Project Standards Yoakum US 87 At FM 1090 Improve Traffic Signal Safety 2019 $175 Project 36 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

44 Yoakum I Miles East Improve Guardrail to Design Safety 2019 $368 Project of SH 71 to Standards Austin C/L Yoakum I-10 Colorado C/L to Add Lanes For 6-Lane Facility 2020 $113,78 Draft FM Yoakum I-10 West of FM 3538 Construct 1 Additional Main $57,900 Draft to SH 36 Lane In Each Direction Yoakum I-10 West of Manak Construct 1 Additional Main $83,600 Draft Road to East of Lane In Each Direction Brazos River Yoakum I-10 Kersten Road to Construct 1 Additional Main $75,700 Draft West of Manak Lane In Each Direction Road Yoakum I-10 SH 36 to Kersten Construct 1 Additional Main $16,300 Draft Road Lane In Each Direction Yoakum I-10 Fayette C/L to Modernize Bridge and Safety 2019 $619 Project mi E of SH Approach Guardrail, Improve 71 W Guardrail to Design Standards 37 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

45 Appendix B-2: 5- FIP: Not Eligible for National way Freight Program District CSJ Facility Location Description Project Abilene US mi E of US Profile Centerline-Edgeline Safety $168 Project to mi Markings W of Stephens C/L Abilene US 83 FM 1263 to US Texturize Shoulders and Safety $174 Project Center Line Rolled-In Or Milled-In Abilene US mi S of FM Texturize Shoulders and Safety $176 Project to Fisher Center Line Rolled-In Or County Line Milled-In Abilene US 83 At Double Mtn Replace Bridge and 2020 $5,368 Project 040 Fork of Brazos Approaches River Abilene US 83 Stonewall County Texturize Shoulders and Safety $23 Project 018 Line to Jones Center Line Rolled-In Or County Line Milled-In Abilene US 83 Fisher County Texturize Shoulders and Safety $10 Project 028 Line to FM 540 Center Line Rolled-In Or Milled-In Abilene US 83 North 10 Th to Illumination Upgrade Safety $500 Project 114 South 1st 38 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

46 Abilene US 83 S of FM 204 Construct Overpass and $10,000 Draft 126 (Clark/Remingto Relocate Ramps n Rd) to FM 707 Abilene US 83 Just South of FM Regrade Vertical Curve to Safety $8,000 Draft to US 83 -Us Eliminate Sight Distance 84 Split Issues, Eliminate Cross-Overs and Add Accel and Decel Lanes Abilene US 83 Runnels County Construct Super Two 2020 $10,000 Draft 044 Line to US 84 Abilene US 83 US 380 to 2 mi S Texturize Shoulders and Safety $28 Project 032 of US 380 Center Line Rolled-In Or Milled-In Abilene US 180 SH 6 to mi Profile Centerline-Edgeline Safety $157 Project 039 W of SH 351 Markings Abilene SH mi S of FM Texturize Shoulders and Safety $86 Project to Callahan Center Line Rolled-In Or County Line Milled-In Abilene SH 70 North 5th Street Milled Centerline and Safety 2019 $224 Project 022 in Roby to Nolan Edgeline Rumble Strips County Line 39 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

47 Abilene SH Miles South Install Milled In Centerline Safety 2019 $148 Project 038 of I-20 to and Edgeline Rumble Strips Miles South of FM 1809 Abilene SH Miles Install Milled In Centerline Safety 2019 $277 Project 028 South of FM and Edgeline Rumble Strips 1809 to 0.21 Miles South of CR 236 Abilene US 180 At FM 1054 to at Install Intersection Flashing Safety $56 Project 027 FM 1054 Beacon, Install Advance Intersection Warning Signals and Signs, Safety Lighting Abilene US 180 FM 669 to Scurry Texturize Shoulders-Rolled-In Safety $221 Project 031 County Line Or Milled-In Abilene US 180 FM 669 to Scurry Milled Centerline Rumble Safety $149 Project 033 Co Line Strips Abilene US 180 Borden County Texturize Shoulders-Rolled-In Safety $140 Project 045 Line to FM 1609 Or Milled-In Abilene US 180 Alkali Creek Bridge Replacement $3,700 Project TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

48 Abilene US 180 SH 70 to Jones Profile Edgeline Markings Safety $189 Project 036 County Line Abilene US 180 Fisher County Milled Edgedline Rumble Safety 2019 $183 Project 022 Line to 0.6 Mile Strips West of US 83 Abilene US mi N of FM Milled Edgeline and Safety $59 Project to 5 mi N Centerline Rumble Strips of FM 89 Abilene FM 89 Rebecca Lane to Access Management 2020 $11,650 Draft 052 US 83 (Winters Fwy) in Abilene Abilene FM 89 At FM 707 Improve Traffic Signals, Safety $162 Project 053 Install Flashing Yellow Arrow, Safety Lighting at Intersection Abilene SL 322 I-20 Fr to Texturize Shoulders-Rofile Safety $189 Project 049 mi E of BU 83-D Pavement Markers Abilene SL 322 SH 36 to Lytle Exit Ramp Relocation $750 Draft 051 Creek Amarillo US 54 New Mexico Convert to Super 2 way 2020 $19,000 Draft 032 State Line to Middlewater 41 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

49 Amarillo US 54 Middlewater to Convert to Super 2 way 2020 $20,000 Draft 038 Rita Blanca Bridge Amarillo SL 335 At SL 434 Improve Traffic Signals,Safety Safety 2019 $232 Project 036 Lighting at Intersection Amarillo SL 335 Randall County Operational and Mobility 2019 $200 Draft 036 Line to I-40 Improvements Atlanta US 59 At N. Marshall Construct 2019 $444 Project 090 Industrial Avenue Acceleration/Deceleration Lanes Atlanta US mi N. of FM Safety Lighting Safety 2019 $100 Project to 0.3 mi S. of FM 2625 Atlanta US 59 FM 2792 to 0.3 Safety Lighting Safety 2019 $50 Project 063 mi S. of FM 2792 Atlanta US 59 At Intersection of Safety Lighting at Intersection Safety $60 Project 013 FM 2792 Atlanta US mi N. of FM Safety Lighting Safety 2019 $50 Project to FM TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

50 Atlanta US 80 At Tom Brown Improve Traffic Signal and Safety $258 Project 045 Intersection Add Left Turn Lane Atlanta US 271 At Dickson Creek, Replace Bridges and 2019 $7,500 Project 065 Big Slough, Approaches Atlanta US 271 At White Oak Replace Bridge and 2019 $4,000 Project 086 Creek Approaches Atlanta US 271 At White Oak Replace Bridge and 2019 $5,096 Project 087 Creek_ Relief Approaches Atlanta US mi W. of FM Install Continuous Turn Lane, Safety $2,403 Project to Louisiana Milled Edgeline Rumble State Line Strips Atlanta US 79 Texas State Line Install Continuous Turn Lane Safety $500 Project 033 (In Louisiana) to 0.2 mi E. of Texas State Line Austin US 290 US 281 to 2.5 mi Profile Edgeline & Centerline Safety 2019 $42 Project 048 East of US 281 Marks 43 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

51 Austin US mi East of US Profile Edgeline & Centerline Safety 2019 $112 Project to Hays Markings County Line Austin US 290 Blanco County Profile Edgeline & Centerline Safety 2019 $145 Project 066 Line to mi Markings NW of RM 12 Austin US 183 Rm 620/Sh 45 Widen From 3 to 4 General 2019 $60,000 Draft 113 to Travis County Purpose Lanes Line Austin US 183 Cedar Park Dr to Realignment of Existing US 2019 $10,710 Project 115 South of 183 to Old Hwy 183. Old 183 Buttercup Creek to Be Widened and Realigned Blvd Include Relocation. Austin US 183 Williamson Widen From 3 to 4 General 2019 $60,000 Draft County Line to SL Purpose Lanes 1 Austin US 79 I-35 to East of Add One Lane In Each 2022 $28,000 Draft 063 FM 1460 Direction Austin US 281 Rm 2147 East to Add Center Left Turn Lane $7,740 Draft mi North and Shoulders of SH TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

52 Austin SH 71 At Ross Road & Construct Overpass 2020 $48,000 Draft 036 at Kellam Road Austin SH 71 At FM 1209 Construct Overpass 2021 $35,000 Draft 041 Austin SH 71 At Pope Bend Rd. Construct Overpass 2021 $25,000 Draft 042 Austin SH 71 At Tucker Hill Construct Overpass 2021 $30,000 Draft 043 Lane <CR 214> Austin SH mi West of Construct Bridges, Main 2019 $18,665 Draft 076 SH 95 to Lanes, and Frontage Roads mi West of SH 95 Austin SL 230 Smithville Widening 2019 $2,744 Project 023 School to Loop 230 at Fawcett Street Austin US mi N of Install Continuous Turn Lane, Safety 2020 $1,313 Project 040 Live Oak Dr to Construct Paved Shoulders mi S of CR TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

53 Austin SH 95 At Gabriel Replace Deck and Structural Safety $1,300 Project 099 River Repairs Austin SH 29 +/ FT W of Reconstruct Rdwy From Exist 2020 $6,500 Draft 043 Db Wood to +/- 4-Lane Rdwy With Cltl to FT E of Db Lane Rdwy With Raised Wood Median & Turn Lanes Austin RM 620 Deepwood Drive Construct Railroad Grade 2019 $21,538 Draft to I-35 (Dot No. Separation Structure H) Austin RM 620 Steiner Ranch Restripe Road to Add 2021 $400 Project 065 Road to RM Auxiliary Lane 2222 Austin RM 2222 Bonaventure Dr. Reconstrt to 6-Lane Divided Technology 2019 $11,000 Draft 054 to Ribelin Ranch Roadway and Ops. Rd. Improv Austin RM 2222 Rm 620 to Operational Improvements & Technology 2019 $7,000 Draft 060 Bonaventure Dr. New Connector Road and Ops. Improv Beaumont US 59 South End of Widen to 6 Main Lanes With 2019 $112,00 Draft 096 Cleveland Bypass Frontage Roads 0 to Montgomery County Line 46 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

54 Beaumont US mi South of Construct New Location $70,000 Draft 049 Black Creek to Lane Divided Facility Hardin County Line Beaumont US 69 Tyler County Line Construct New Location $70,000 Draft 069 to 0.75 mi South Lane Divided Facility of FM 1003 Beaumont US 69 FM 421, South to Widen Existing way to 4 $2,500 Draft 067 US 96 Lanes With A Continuous Left Turn Lane Beaumont SH Miles East of Widen to Four Lanes With Ctl 2021 $38,200 Draft 036 SH 326 to Pine Island Bayou Brownwoo US 87 Concho County Construct Passing Lanes 2020 $250 Draft d 049 Line to CR 140 Bryan SH 6 SH 21 to Bs-6R Widen Non-Freeway Facility 2022 $60,920 Draft 110 South Bryan US mi East of Widen to 4 Lane Divided 2022 $20,000 Draft 024 The Navasota way River to 0.1 mi East of FM TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

55 Bryan US Miles East of Widen to 4 Lane Divided 2022 $50,000 Draft 031 FM 39 to N. way Wilson Street in Madisonville Bryan US Miles East of Widen to 4 Lane Divided 2022 $36,000 Draft 034 FM 39 to 3.1 way Miles East of FM 39 Bryan FM 158 BS 6-R to SH 6 Raised Median, Decel Lane, 2021 $11,000 Draft 050 Sidewalks Bryan FM Miles North Widen Non-Freeway Facility 2020 $33,210 Draft 074 of FM 60 to FM Consisting of Grading, Base, 2154 Structures, Surface, and Conc Median Barrier Childress US Miles Upgrade Bridge & Approach 2019 $150 Project 069 South of FM Rail 2162, S to Miles North of Clarendon Ecl Childress US 287 Memphis Scl, Realignment 2020 $8,142 Draft 124 South to Miles 48 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

56 Childress US Miles West Upgrade Bridge & Approach 2019 $98 Project 075 of Quanah Wcl, Rail East to Quanah Wcl Childress US 287 At Wanderer's Upgrade Bridge & Approach 2019 $54 Project 079 Creek Bridge Rail (Relief) Childress US 82 FM 267, E to Super $9,000 Draft 038 Baylor C/L Corpus US mi N of FM Improve Traffic Signals, Safety 2019 $345 Project Christi to 0.25 mi Interconnect Signals S of FM 893 Corpus US 181 FM 3239 (Buddy Reverse Entrance and Exit 2020 $4,000 Draft Christi Ganem Dr.) to Ramps In Northbound FM 2986 Direction (Wildcat Dr.) Corpus US mi N of FM Texturize Shoulders (Roll Or Safety $110 Project Christi mi N of Mill In) Centerline Texturing FM 119 Intersection 49 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

57 Corpus US 183 Dewitt Couny Rehabiliate Roadway and Add $8,000 Project Christi 029 Line to Control Passing Lanes Break Corpus US mi S of FM Modernize Bridge Rail and Safety 2019 $95 Project Christi to SH 119 Approach Guardrail,Improve (Intersection Cb) Guardra Il to Design Standards, Safety Treat Fixed Objects Corpus US mi N of FM Texturize Shoulders (Roll Or Safety $96 Project Christi Intersection Mill In) Centerline Texturing to 2 mi S of FM 622 Corpus US 183 Control Break to Rehabilitate Roadway and $10,000 Project Christi 040 US 59 Add Passing Lanes Corpus US 183 SH 119 Modernize Bridge Rail and Safety 2019 $121 Project Christi 041 (Intersection Cb) Approach Guardrail,Improve to US 59 Guardra Il to Design Standards, Safety Treat Fixed Objects Corpus US mi No of FM Texturize Shoulders (Roll Or Safety $238 Project Christi to Refugiio Mill In) Centerline Texturing County Line 50 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

58 Corpus US 183 Goliad County Texturize Shoulders (Roll Or Safety $112 Project Christi 040 Line to 1 mi S. of Mill In) Centerline Texturing SH 202 Corpus SH 35 SH 239 N to Safety Trt Fixed Objects, Safety $1,159 Project Christi 040 Aransas County Install Passing Lanes On 2 Line Lane Rd Corpus SH 35 Refugio County Safety Trt Fixed Objects, Safety $1,206 Project Christi 038 Line to Pr 13A Install Passing Lanes On 2 Lane Rd Corpus SH mi N of FM Improve Traffic Signals, Safety 2019 $42 Project Christi to FM Interconnect Signals 3036 Corpus BS 35-L FM 3036 to Improve Traffic Signals, Safety 2019 $796 Project Christi mi S of FM Interconnect Signals 3036 Corpus BS 35-L mi E of SL Improve Traffic Signals, Safety 2019 $95 Project Christi to mi E. Interconnect Signals of SL 90 Corpus BS 35-L.88 mi N. of SH Install Continous Left Turn $1,500 Project Christi to SH 188 Lane Corpus SH 361 Reynolds Plant to Improve Traffic Signals and Safety $889 Project Christi 075 Sunray Road Interconnect Signals 51 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

59 Corpus SH mi S. of SL Improve Traffic Signals, Safety 2019 $293 Project Christi to SL 90 Interconnect Signals Corpus US mi North of Construct A Four Lane Relief 2020 $70,000 Draft Christi 050 FM 1538 to 1 mi Route Along US 281At North of CR 431 Premont On New Location Corpus SH 72 1 Mile East of SH Rehabilitate Roadway and $12,800 Project Christi to West Add Passing Lanes Main Street (Runge) Corpus SH 72 Wilbern St. to Rehabilitate Roadway and $5,000 Project Christi 076 Dewitt County Add Passing Lanes Line Corpus SH 286 FM 43 to South Construct Phase I Freeway 2021 $16,000 Draft Christi 056 of FM 2444 Extension By Upgrading Existing 2- Ln Rdwy to 4-Ln Divided way Corpus SH mi N of FM Milled Edgeline and Safety 2019 $366 Project Christi to BS Centerline Rumble Strips 123D Corpus US mi S of SH Safety Lighting Safety $219 Project Christi mi N of Mf TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

60 Corpus US 77 At FM 1944 Safety Lighting at Intersection Safety 2019 $44 Project Christi 103 Corpus US 77 At Peters Swale Replace Railings Along Bridge $157 Project Christi 104 (NBl)5 mi NE of SH 234 Corpus US 77 At Peter Swale Replace Railings Along Bridge $157 Project Christi 105 (SBl) to 0.5 mi NE of SH 234 Corpus SH 44 At CR 336 Safety Lighting at Intersection Safety 2019 $81 Project Christi 036 Corpus SH 202 US 181 to Texturize Shoulders (Roll Or Safety $330 Project Christi 038 Refugio County Mill In) Centerline Texturing Line Corpus SH 202 Bee County Line Texturize Shoulders (Roll Or Safety $110 Project Christi 020 to US 183 Mill In) Centerline Texturing Corpus SH 239 SH 72 to Goiad Texturize Shoulders (Roll Or Safety $153 Project Christi 018 County Line Mill In) Centerline Texturing Corpus SH 239 Karnes County Texturize Shoulders (Roll Or Safety $261 Project Christi 028 Line to US 59 Mill In) Centerline Texturing Corpus PR mi N of SH Improve Traffic Signals, Safety 2019 $213 Project Christi to mi Interconnect Signals S of SH TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

61 Corpus PR mi E of SH Safety Lighting Safety 2019 $98 Project Christi to mi E of SH 358 Corpus PR mi W of Safety Lighting Safety 2019 $197 Project Christi 070 SH 361 to mi W of SH 361 Corpus FM 624 CR 77 to Wildcat Improve Traffic Signals Safety $885 Project Christi 048 Rd. Interconnect Signals Corpus SH mi W of Green Improve Traffic Signals and Safety $2,927 Project Christi 035 Wood2 mi E of Interconnect Signals Rodd Field Road Corpus SH mi S of SH Improve Traffic Signals, Safety $652 Project Christi mi S of SH Interconnect Signals 358 Corpus FM 1069 Aransas County Milled Edgeline and Safety 2019 $73 Project Christi 025 Line to SH 35 S Centerline Rumble Strips Intersection Corpus FM mi N of SH Safety Lighting Safety 2019 $95 Project Christi to SH 361 Corpus FM 1545 SH 72 to SH 72 Rehab and Widen 2019 $3,000 Project Christi TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

62 Corpus FM 43.8 mi S of SH Improve Traffic Signals, Safety $813 Project Christi mi S of Hs Interconnect Signals 358 Corpus FM mi SW of Safety Treat Fixed Objects, Safety 2020 $243 Project Christi 026 Ih37 to 2.16 mi Add Left Turn Lane SW of Ih37 Corpus SS mi N of SH Improve Traffic Signals, Safety 2019 $311 Project Christi to mi Interconnect Signals N of SH 358 Dallas US 377 Henrietta Creek Reconstruct and Widen 2/4 $12,222 Draft 048 Rd to SH 114 to 4 Lane Divided Urban (Section 5) Dallas US 377 I-35E to South of Widen 2 Lane to 6 Lane $18,731 Draft 025 FM 1830 Divided Urban Section Dallas US 377 At Union Pacific Replace Railroad Overpass $10,251 Draft RR Overpass to (0.4 mi S of I- 35E) Dallas US 175 South of Budd St Reconstruct Freeway to $40,532 Draft 052 to I-45 Lane Divided Arterial 55 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

63 Dallas US 175 Dallas County Ramp Modifications 2019 $2,000 Draft 074 Line to West of FM 1389 Dallas BS 114K At UP Railroad Replace Railroad $9,000 Draft Underpass in Underpass_And Improve BS Roanoke to Dot 114-K Drainage No V Dallas SH 352 North of Kearney Reconstruct 4 Lane 2019 $9,918 Draft 057 Street to US 80 Undivided Rural to 4 Lane EB Frontage Rd Divided Urban Roadway Dallas FM 720 South of Martop Widen Two Lane Rural to Six $18,180 Draft 037 to US 380 Lanes Urban Divided El Paso US mi W of US Install Led Flashing Chevrons Safety 2019 $150 Project to mi W of US 62 El Paso US 62 At Montana Ave Intersection Operational 2020 $595 Project Improvements at Montana Ave/Paisano Dr El Paso US 62 Geronimo Dr to Intersection Operational 2019 $503 Project Sioux Dr Improvements Montana Ave at Airport Rd/Mescalero Dr 56 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

64 El Paso US mi E of FM Texturized Shoulders (Profile Safety $95 Project (Zaragoza) Pavement Markings) to mi E of FM 659 (Zaragoza) El Paso US mi E of El Construct Super $9,076 Draft 026 Paso/Hudspeth Cl to 2.04 mi E of FM 2317 El Paso US mi W of Box Culvert Structural Repair Safety $80 Project 027 RM 2317 to mi W of RM 2317 El Paso US mi E of FM Construct Super $12,102 Draft to 6.17 mi E of RM 1111 El Paso US mi W of Construct Super $10,120 Draft 027 FM 1437 to Hudspeth/Culber son Co Line 57 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

65 El Paso SS 601 Spur 601 at LP Construct Northbound $33,931 Draft 005 3, Westbound and Eastbound- Southbound Direct Connectors On Spur 601 at Loop 375 El Paso SL 375 Bob Hope Dr to Construct Managed Lanes $34,500 Draft FM 659 (Zaragoza) El Paso SL 375 FM 76 North LP 375 (Americas) Ramps $27,500 Draft 058 1, 4 Loop to Zaragoza Reconfiguration and Frontage Poe Road Extension W/Grade Separation at Railroad Crossing El Paso SL 375 Pellicano to Safety Lighting Safety 2020 $1,273 Project Rojas Fort Worth US 287 FM 3479 Reconstruct Northbound 2020 $1,542 Draft 033 (Harmon Road) Frontage Road and Exit Ramp to South of South of FM 3479 (Harmon Proposed Ntp Road); Phase 1B Crossover 58 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

66 Fort Worth US 287 Entrance/Exit Reconstruct NB Frontage 2020 $1,538 Draft 035 Ramp, North to Road From FM 3479 to Ramp FM 3479 and SB Frontage Road From (Harmon Road) Ramp to FM 3479 Fort Worth US 287 North of FM Construct Auxiliary Lane From 2020 $1,556 Draft to North of NB Entrance From FM 3479 I-35W & Ih35W to Ntp; Auxiliary For Interchange SB Exit to FM 3479 & Entr Fr Ntp Fort Worth US 67 Comanche Construct Super 2, Grading, 2020 $4,350 Draft 051 County Line to Base, Ext Culverts, Overlay, Douglas Street Pavement Markings Fort Worth SH 199 S End of Lake Construct 0 to 6 Mainlanes & 2020 $29,700 Draft 097 Worth Br to Azle Realign Frontage Roads Ave Fort Worth US 281 At SH 199 Construct Super 2, Grading, Safety 2020 $6,659 Draft 071 Base, Ext Culverts, Overlay, Pavement Markings Fort Worth US 281 At US 380 Construct Bridge and Safety 2020 $6,663 Draft 072 Retaining Walls at US 380 Intersection 59 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

67 Fort Worth US 281 Jack County Line Construct Super 2, Grading, 2020 $8,406 Draft 042 to US 180; in Base, Ext Culverts, Overlay, Mineral Wells Pavement Markings Fort Worth US 281 US 180, in Construct Super 2, Grading, 2020 $5,550 Draft 036 Mineral Wells to Base, Ext Culverts, Overlay, Approx. 5.5 Miles Pavement Markings North of I-20 Fort Worth US 67 SH 220 to US Construct Super 2, Grading, 2020 $13,627 Draft Base, Ext Culverts, Overlay, Pavement Markings Fort Worth US 67 Johnson County Construct Super 2, Grading, 2020 $7,500 Draft 055 Line to SH 144 Base, Ext Culverts, Overlay, Pavement Markings Fort Worth SH 114 FM 1938 to Dove Construct SB Frontage Road 2022 $20,000 Draft 100 Rd From FM 1938 to Solana/Kirkwood and NB and SB Frontage Roads From Solana/Kirkwood to Dove Fort Worth SH 121 I-820 to Handley- Const 3 Lns In Ea Dir, Rdwy $43,365 Draft 054 Ederville Road Tie Ins For I-820/Sh 121 Dir Connectors, Reconst Exist EB Exit Ramp to Handley- Ederville 60 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

68 Houston BU 90-U I-610, NE to E of Widen to 6 Lane Divided 2020 $17,000 Draft 067 Mesa Rd (Old FM Urban_(Phase 2) 527) Houston US 90 I-610 E to BW 8 Install Its Equipment & Technology $4,573 Draft 092 Infrstructure (Fiber Trunk and Ops. Line, Clo Sed-Circuit Improv Cameras, Dynamic Sign, Radar Sensors, Time Reade Houston SH 3 Richey St S to Mill and Asphalt Overlay of $7,583 Project 101 Galveston C/L Shoulders, Shoulder Widening, Pavement Markings, Striping and Signage For Bike Facility Houston SH mi S of The Widen to 4-Lane Divided 2019 $8,500 Draft 100 Brazos River to Rural FM 1495 (Seg. 15). Houston SH mi N of FM Widen to 4-Lane Divided 2019 $59,400 Draft to Rural mi S of Needville- Fairchilds 61 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

69 Houston SH mi S of Widen to 4-Lane Divided 2019 $38,300 Draft 036 Needville- Rural Fairchild to Brazoria C/L Houston SH 146 FM 518 to FM Widen to 6 Lanes 2022 $85,000 Draft Houston SH 146 Harris/Galveston Widen to 6 Lanes With 4- $70,000 Draft 095 County Line to Lane Express Lanes FM 518 Houston SH 249 BW 8 to I-45 Install Its Equipment and Technology 2019 $4,300 Draft 134 Infrastructure and Ops. Improv Houston FM 865 At Alvin Street Add Left Turn Lane Safety 2019 $303 Project FM 2100 Houston Huffman- Widen to 4-Ln Divided 2022 $86,000 Draft 009 Cleveland Rd (North) to FM 1960 Houston FM 1774 Grimes County Widen to 4-Lane Divided $11,000 Draft 006 Line to Rural Montgomery County Line 62 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

70 Houston FM 1960 BF 1960A to E of Widen to 6-Ln Divided W/ 2020 $51,000 Draft Twigsworth Ln Raised Medians, Channelized Turn Lanes Houston FM 1960 E of Twigsworth Widen to 6-Ln Divided W/ 2020 $44,000 Draft 098 Ln to W of Raised Medians, Channelized Jacinto River Turn Lanes and 4-Ln Bridge Overpass at West Lake Houston Pkwy Houston FM 2234 At UPRR Construct Grade Separation $15,500 Draft (Dot# S) Houston FM 646 Edmunds Way to Widen From 2 to 4 Lanes 2022 $31,127 Draft 022 FM 1266 Divided With Overpass Bridge Houston FM 3083 UPRR to LP 336 Widen to 4-Lane Divided 2019 $7,800 Draft 032 North Urban Houston SH 99 Fort Bend County Install Its Equipment and Technology 2022 $4,487 Draft 040 Line to I-10 Infrastructure and Ops. Improv Lubbock SL FT East of New Interchange 2022 $19,340 Draft 102 US 84 to 5000 FT West of US TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

71 Lufkin FM 1 Augustine Safety Treat Fixed Objects; Safety 2019 $236 Project 061 County Line to Provide Additional Paved SH 103 Surface Width Lufkin SH 21 East End of Reconstruct Pavement and $12,882 Draft 045 Trinity River Add Passing Lanes Bridge to FM 1280 Lufkin SH 21 Madison County Improve Guardrail to Design Safety $720 Project 046 Line to FM 1280 Standards, Safety Treat Fixed Objects Lufkin SH 21 SH 21 at Trinity Replace Bridge and 2019 $14,649 Project 047 River Approaches Lufkin SH 21 FM 225 (W) to Profile Edgeline Markings Safety 2019 $169 Project 070 US 59 Lufkin SH 21 At King Creek Replace Bridge and 2022 $1,400 Project 071 Approaches Lufkin SH mi East of Profile Edgeline Markings Safety 2019 $85 Project 028 FM 330 to mi East of SH TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

72 Lufkin US mi W of Milled Centerline Rumble Safety 2019 $93 Project 091 FM 2669 to Strips mi W of FM 2428 Lufkin US 59 SH 7 to mi Construct Two-Way Direct 2019 $69,585 Draft 081 South of Spradley Connection St. Lufkin US 59 South of FM Convert to 4 Lane Fwy W/ 2022 $20,650 Draft to North of Frontage Rds & Grade US 59/Sl 287 Separations Lufkin US 59 FM 2108 to 1.15 Construct 4 Lane Freeway at 2020 $142,05 Draft 097 mi South of Diboll 6 White Oak Creek Lufkin US 59 SL 287 to Polk Improve Guardrail to Design Safety $519 Project 131 County Line Standards Lufkin US 59 At US 287 in Install Advance Intersection Safety 2019 $38 Project 083 Corrigan Warning Signals-Existing Warning Signs Lufkin US 69 At FM 326 South Install Intersection Flashing Safety 2019 $40 Project 089 Beacon 65 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

73 Lufkin US Miles Milled Edgeline Rumble Safety 2019 $119 Project 041 South of FM Strips 1669 to SH 63 Lufkin US 69 FM 1270 to Widen to 4 Lanes, Divided, 2019 $31,815 Draft 021 Jasper County Trunk System Line Lufkin US 69 SH 63 to FM Widen to 4 Lanes, Divided, $13,464 Draft Trunk System Lufkin US 69 SH 63 to Jasper Milled Edgeline Rumble Safety 2019 $92 Project 032 County Line Strips Lufkin SH Miles East Milled Centerline Rumble Safety 2019 $118 Project 062 of FM 842 to Strips Miles West of Nacogdoches Lufkin SH 103 Nacogdoches Milled Centerline Rumble Safety 2019 $160 Project 068 County Line to Strips FM 3229 Lufkin SH 105 Montgomery C/L Reconstruct Pavement to $10,000 Draft 011 to Montgomery Lane Divided Rural C/L 66 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

74 Lufkin US 287 At Beaver Creek Replace Bridge and 2022 $1,800 Project 043 Approaches Lufkin US mi S of FM Profile Edgeline Markings Safety 2019 $124 Project to mi N of SH 94 Lufkin US Miles East Profile Edgeline Markings Safety 2020 $131 Project 038 of US 59 to Tyler County Line Lufkin US 96 FM 417 to Add Passing Lanes and 2022 $11,900 Project 069 Augustine County Reconstruct Pavement Line Lufkin US Miles S of Add Passing Lanes and 2021 $8,165 Project 070 SL 500 to FM Reconstruct Pavement 417 Lufkin US 96 SL 500 to Milled Edgeline Rumble Safety 2019 $107 Project 071 Augustine County Strips Line Lufkin US 96 FM 3451 to SH Reconstruct Pavement and 2020 $6,000 Project Add Passing Lanes Lufkin US 96 SH 21 to FM Reconstruct Pavement and 2022 $14,058 Project Add Passing Lanes 67 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

75 Lufkin SH 7 SH 103 to Profile Edgeline and Safety 2019 $142 Project 020 Miles West of US Centerline Markings 69 Odessa BI 20-E At SH 302 Install Intersection Flashing Safety 2019 $115 Project 109 Beacons, Warning Signals and Signs Odessa US mi South of Roadway Widening to A 2021 $13,996 Draft 026 I-10 to Brewster Modified Super 2 County Line Odessa US mi South Safety Treat Fixed Objects Safety 2019 $151 Project 021 of I-10 to mi South of I-10 Odessa US 67 I-10 to 16.8 mi Roadway Widening to A 2021 $18,997 Draft 022 South of I-10 Modified Super 2 Odessa US 67 Crane County Roadway Widening to A $1,019 Draft 021 Line to Pecos Modified Super 2 County Line Odessa US 67 Upton County Roadway Widening to A $4,007 Draft 026 Line to Crockett Modified Super 2 County Line 68 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

76 Odessa US 67 US 385 to Crane Roadway Widening to A $5,831 Draft 030 County Line Modified Super 2 Odessa US 67 SH 329 to US Roadway Widening to A 2019 $29,946 Draft Modified Super 2 Odessa US Miles East Safety Treat Fixed Objects Safety 2019 $181 Project 038 of FM 1776 to Miles East of FM 1776 Odessa US 385 At N SL 338 Construct New Interchange $17,700 Draft 081 Odessa US 385 Castle Gap Road Widening to An Ultimate 4- $30,000 Draft 035 to Upton County Lane Divided way Line Odessa US 385 Lilley Lane in Widening to An Ultimate $30,000 Draft 037 Crane to Castle Lane Divided way Gap Road Odessa SH 158 At FM 1213 Install Intersection Flashing Safety 2019 $127 Project 048 Beacon, Install Advance Intersection Warning Signals - Existing Warning Signs 69 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

77 Odessa SH 302 At FM 1936 Install Intersection Flashing Safety 2019 $119 Project 064 Beacon, Install Advance Intersection Warning Signals and Signs, Rumble Strips Odessa SL 250 At CR 1150/Cr Construct New Interchange 2019 $21,500 Draft Odessa SH 158 BS 158-B to Reconfigure Interchanges 2021 $11,630 Draft 099 Thomason Drive Odessa SL 250 BS 158-B to Reconfigure Interchanges 2021 $11,630 Draft 100 Wadley Avenue Odessa SL 250 SH 158 to Install Median Barrier Safety $2,233 Project 101 Fairgrounds Rd Odessa SH 349 SH 191 to BI 20- Upgrade to Standards Non $6,000 Draft 043 E Freeway Odessa SL 338 At East Yukon Rd Construct New Interchange 2020 $19,200 Draft TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

78 Paris SH 56 FM 1417 to Texturize Shoulders, Rolled Safety $53 Project mi W of US Or Milled In, Centerline and 69 Texturing Paris US 82 At FM 38 Install Intersection Flashing Safety $35 Project 038 Beacon Paris US mi N of BU Improve Guardrail to Design Safety 2019 $172 Project H to 0.86 mi Standards W of FM 196 Paris US 82 At N Collegiate Dr Improve Traffic Signals Safety 2019 $69 Project Paris US mi W of FM Improve Guardrail to Design Safety 2019 $23 Project to Red River Standards County Line Paris US 82 Lamar County Improve Guardrail to Design Safety 2019 $302 Project 083 Line to SH 37 Standards Paris US 82 At FM 410 Improve Traffic Signals Safety 2019 $103 Project Paris US 82 FM 131 to FM Safety Treat Fixed Objects Safety $1,165 Project TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

79 Paris US Miles West of Add Two Lanes With $7,304 Draft 018 SH 121 to SH 78 Shoulders (0.478 mi East of SH 78) Paris US 82 At SH 78 Improve Traffic Signals Safety 2019 $140 Project Paris US mi E of SH Add Two Lanes With $51,965 Draft to FM 100 Shoulders Paris US 82 FM 100 to 0.5 Widen From 2-Lane to 4-Lane $9,453 Draft 012 Miles East of SH 56 Paris US 82 BU 82 J to Bowie Construct Super $10,940 Draft 064 County Line Paris US 82 FM 1159 to BU Construct Super $560 Draft J Paris US 82 At FM 1159 Install Intersection Flashing Safety 2019 $33 Project 002 Beacon Paris US 69 US 75 to Safety Treat Fixed Objects Safety $353 Project 062 mi N of FM TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

80 Paris US 69 At Red River (SB Upgrade Bridge / Approach Safety 2020 $1,234 Project 063 & NB) Railing Or Add Safety End Treatment Or Replace Guardfence Paris SS 503 US 75 to SH 91 Milled Edgeline Rumble Safety 2019 $10 Project 013 Strips, Milled Centerline Rumble Strips Paris SH 19 At FM 2285 Install Advanced Intersection Safety $21 Project 049 Warning Signals and Signs Paris SH 19 SH 154 to Safety Treat Fixed Objects Safety 2020 $43 Project 050 mi SW of SH 154 Paris SH 24 BS 24 D to Hunt Improve Guardrail to Design Safety 2020 $163 Project 065 County Line Standards Paris SH 24 SH 19 to BS 24 D Improve Guardrail to Design Safety 2020 $88 Project 044 Standards Paris US 271 FM 1499 to US Improve Guardrail to Design Safety 2020 $118 Project Standards Paris US Feet N of Improve Guardrail to Design Safety 2020 $293 Project 042 FM 197 to FM Standards TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

81 Paris US 271 Oklahoma State Improve Guardrail to Design Safety 2020 $12 Project 022 Line to Standards Feet N of FM 197 Paris SH mi S of SH Milled Edgeline Rumble Safety 2019 $88 Project to mi N Strips, Milled Centerline of SH 224 Rumble Strips Paris FM 697 SH 11 to US 69 Texturize Shoulders, Profile Safety $179 Project 029 Pavement Markers Paris US mi S of SH Milled Edgeline Rumble Safety 2019 $5 Project to Fannin Strips, Milled Centerline County Line Rumble Strips Paris US mi SE of Milled Edgeline Rumble Safety 2019 $14 Project 059 BU 69D to 3.27 Strips, Milled Centerline mi E of BU 69D Rumble Strips Paris US mi E of BU Milled Edgeline Rumble Safety 2019 $45 Project D to CR 3401 Strips, Milled Centerline Rumble Strips Paris US 69 CR 3401 to CR Raised Edgeline Rumble Safety 2019 $23 Project Strips, Raised Centerline Rumble Strips 74 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

82 Paris US mi S of FM Raised Edgeline Rumble Safety 2019 $98 Project to Wood Strips, Raised Centerline County Line Rumble Strips Paris Paris BU 271B At Collegiate Dr Improve Traffic Signals Safety $21 Project US 271 FM 410 to SH 37 Safety Treat Fixed Objects Safety $204 Project Paris US 271 SH 37 to Franklin Safety Treat Fixed Objects Safety $719 Project 065 County Line Paris US mi S of BU Milled Edgeline Rumble Safety 2019 $43 Project D to Franklin Strips, Milled Centerline County Line Rumble Strips Paris US 271 Red River County Safety Treat Fixed Objects Safety $40 Project 024 Line to Titus County Line Paris SH 19 Delta County Line Safety Treat Fixed Objects Safety 2020 $1,572 Project 051 to SH 154 Paris US 69 SS 503 to US 82 Safety Treat Fixed Objects Safety $979 Project 75 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

83 Paris US 69 SS 503 and US Milled Edgeline Rumble Safety 2019 $61 Project Intersection Strips, Milled Centerline to mi N of Rumble Strips SH 56 Paris Paris US 69 At SS 503 Improve Traffic Signals Safety 2019 $109 Project US 69 US 82 to SH 56 Safety Treat Fixed Objects Safety $164 Project Paris US mi S of SH Milled Edgeline Rumble Safety 2019 $32 Project to mi N Strips, Milled Centerline of SH 11 Rumble Strips Paris US mi S of BU Close Crossover, Add Left Safety 2019 $218 Project H to mi Turn Lane S of BU 82H Pharr US mi N of Lasso Widen From 2 Lane Rural to 2019 $24,275 Draft 040 Ln to 0.28 mi N 4 Lane Divided of FM 2687 Pharr US mi North of Widen From 2 Lane Rural to 2022 $27,043 Draft Starr/Zapata 4 Lane Divided Cl31 mi North of FM 2098 (South Leg) 76 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

84 Pharr US mi South of Widen From 2 Lane Rural to 2022 $24,257 Draft Placido Rd. to 4 Lane Divided 0.09 mi North of Loma Blanca Rd. Pharr SS 54 Chester Park Widen Roadway, C&G, Traffic 2019 $7,100 Draft 008 Road to I-69E SB Medians, Sidewalks, Lighting Frontage Road & Traffic Signals Pharr US 281 FM Miles Widen to 4 Lane Rural 2021 $11,000 Draft West of FM Pharr SH 107 Louisiana St. to Reconstruct to 4 Lanes C&G 2020 $8,000 Draft 037 Hooks E. Hodges Rd. Pharr SH 107 FM 676 to SH Construct 6 Lane Divided 2021 $15,000 Draft Urban Pharr SH 336 Intersection of Addition of North Bound Right $78 Project Bus 83 to 135 FT Turn Lane S of Intersection of Bus 83 Pharr FM 494 FM 676 (Mile 5) Widen to 4 Lane 2019 $9,570 Draft 068 to SH TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

85 Pharr SH 495 Veterans Blvd., Construct 4 Lane 2020 $11,360 Draft 108 From I-2 (Us 83) Divided_Urban Section to La Homa Rd. Pharr FM 676 SH 364, East to Widen to 4 Lane Divided 2019 $14,956 Draft 032 SH 107 Pharr SL 499 At I-69E West Proposed SB Dual Right Turn 2022 $1,500 Draft 028 Bound Frontage Lanes Rd. Pharr FM 1925 Wallace Rd. to Proposed 6 Lane W/Raised 2020 $23,000 Draft th St. Median Pharr FM 1925 FM 907 (Alamo Widen to 4 Lane 2022 $11,011 Draft 035 Rd) to Sharp Rd. Pharr FM 1925 FM 88 to FM 491 Proposed Super $15,700 Draft 038 Pharr FM 2220 SH 107 to Mile 5 Proposed 6 Lane Median 2021 $17,470 Draft TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

86 Pharr FM 2220 SH 107 to FM Proposed 4 Lane W/Median 2020 $15,000 Draft US 83 Taylor County Add Passing Lanes 2020 $5,520 Draft Angelo 019 Line to 6.9 Miles S of Taylor County Line US Miles S of Add Passing Lanes 2020 $6,800 Draft Angelo 039 Taylor County Line to 15.4 Miles S of Taylor County Line US mi S of Add Passing Lanes 2020 $7,070 Draft Angelo 041 Taylor Co Line to US US 83 SH 29 to Kimble Add Passing Lanes $8,660 Draft Angelo 032 County Line US 83 Menard County Add Passing Lanes $8,812 Project Angelo 043 Line to I TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

87 US Miles East of Construct Passing Lanes 2020 $11,000 Draft Angelo 037 US 83 to Mcculloch County Line US 67 SH 137 to Upton Add Passing Lanes 2020 $25,500 Draft Angelo 027 County Line US mi NW of Safety Treated Fixed Objects Safety $136 Project Angelo 030 Irion Co Line to SH US 67 At Tractor Trail Construct Interchange $20,680 Draft Angelo US 67 At Paulann Blvd. Construct Interchange $11,872 Draft Angelo US 277 SL 110 to Profile Edgeline and Safety 2019 $182 Project Angelo 076 Schleicher Centerline Markings County Line US 277 Tom Green Profile Edgeline and Safety 2019 $314 Project Angelo 027 County Line to Centerline Markings 12.0 mi S of Tom Green Co Line 80 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

88 US mi S of Tom Profile Edgeline and Safety 2019 $238 Project Angelo 035 Green Co Line to Centerline Markings 21.1 mi S of Tom Green Co Line US 277 SL 467 to 12.3 Profile Edgeline and Safety 2019 $236 Project Angelo 037 mi N of Edwards Centerline Markings Co Line US mi North Add Passing Lanes 2020 $9,800 Draft Angelo 025 of Edwards Co Line to Edwards County Line US 277 Sutton County Add Passing Lanes 2019 $10,856 Draft Angelo 024 Line to Val Verde County Line US 277 SH 158 to Tom Profile Edgeline and Safety 2019 $361 Project Angelo 028 Green County Centerline Markings Line US 277 Coke County Line Profile Edgeline and Safety 2019 $359 Project Angelo 041 to US 67 Centerline Marking SH 137 Glasscock Co Profile Edgeline and Safety 2019 $301 Project Angelo 016 Line to 11.5 mi S Centerline Markings of Glasscock Co Line 81 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

89 SL 368 At N. New Intersection Operational $649 Project Antonio 036 Braunfels Improvements Intersection SH 27 FM 1350 to Spur Rehab and Widen Roadway $11,000 Project Antonio to Provide Passing Lanes and Operational Improvements SH 46 US 281 to Expand From 2 Lanes to $14,000 Draft Antonio 044 Bentwood Dr. Lanes With Raised Median Or Cltl SH 46 Farhills Dr. to US Expand From 2 Lanes to $26,000 Draft Antonio Lanes With Raised Median Or Cltl US minorth of Expand to 6 Lane Expressway 2019 $182,00 Draft Antonio 138 Stone Oak to With Frontage Rds -4 General 0 Bexar / Comal Purpose & 2 Hov Lanes County Line SS mi W of I-10 Install Raised Median and Safety 2019 $411 Project Antonio 021 to I-10 Rectangular Rapid Flashing Beacons FM 1518 FM 78 to I-10 E Intersection and Operational 2021 $19,500 Draft Antonio 027 Improvements 82 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

90 SH 16 At Atascosa River Widen Existing Bridge $1,006 Project Antonio FM 471 Old FM 471 to Expand 2 to 4 Lane Divided 2022 $21,000 Draft Antonio 055 Medina County With Bike Lanes and Line Sidewalks FM 2252 Evans Road to Expand From 2 Lanes to $6,000 Draft Antonio 028 Comal/Bexar Lanes With Raised Median Or County Line Continuous Left Turn Lane, Bike Lanes and Sidewalks SL 1604 FM 1937 to US Expand From 2 Lanes to 4 $10,000 Draft Antonio Lane Divided FM 1976 Woodlake Rehab & Widen Narrow $11,000 Project Antonio 046 Parkway to LP Roadway to Add Shoulders SL 1604 I-35 S to 0.7 mi Expand From 2 Lanes to $14,000 Draft Antonio 031 North of FM Lane Divided SL 1604 FM 1303 to FM Expand From 2 Lanes to 4 $20,000 Draft Antonio Lane Divided 83 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

91 SL mi North of Expand From 2 Lanes to $26,000 Draft Antonio 066 FM 2536 to US Lane Divided 90 W Tyler US 271 Smith C/L, SW to Widen 2 Ln Road to 4 Ln 2022 $31,300 Draft 061 FM 16 Divided Hwy With Depressed Median Tyler US 271 SL 485 in Widen 2-Ln Road to 4 Lanes 2022 $22,700 Draft 036 Gladewater, SW W/Flush Med to SH 135 & to Smith C/L Depressed Median For The Rest Tyler US 69 At FM 346, E of Construct Grade-Separated $15,450 Draft 063 Flint Interchange Tyler FM 2493 FM 2813 in Widen From 2 Lns to 4 Lns $13,400 Draft 081 Gresham, S to W/Flush Median (Cont Left FM 346 in Flint Turn Ln) Tyler FM 2493 FM 346 in Flint, Widen From 2 Lanes to $32,640 Draft 083 S to 0.3 mi S of Lanes With Flush Median FM 344 (Cherokee C/L) 84 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

92 Tyler US mi SE of SH Widen 2 Lane Road to 4 Lane 2021 $44,000 Draft , SE to Divided Hwy W/Depressed Cherokee C/L at Median Neches River Tyler US 175 Anderson C/L, SE Roadwork to Tie Back Into 2021 $4,500 Draft 042 to 0.5 mi E of Existing Roadway Anderson C/L (Cr3509) Tyler US mi NE of FM Widen Roadway For Passing $7,500 Draft , J'Ville Cl, Lanes-Super2 SW to Anderson C/L at Neches River Waco US 84 Harris Creek Rd Add Frontage Rds & Op at FM $34,500 Draft 099 to South Bosque 2837 to Reduce Congestion, River Enhance Sfty & Extend Freeway-Controlled Access Facility Waco US mi W of FM Widen From Four to Six Lanes $9,833 Draft to FM and Resurface 3423 (Indian Trail) 85 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

93 Waco US 190 FM 3423 (Indian Widen From Four to Six Lanes 2019 $23,500 Draft 145 Trail) to 0.25 mi and Resurface W of Paddy Hamilton Waco US 190 At Clear Creek Rd Roadway Reconfiguration to $4,000 Draft 146 Improve Turning Movements Waco US 190 Paddy Hamilton Safety Treat Fixed Objects Safety $2,088 Project 056 Rd to I-35 Waco SL 396 At Memorial Dr, Upgrade Existing Signals Safety 2019 $600 Project 047 Speight Ave to & Bagby Ave Wichita SH 114 FM 1769 to Jack Upgrade to Super $6,000 Draft Falls 041 County Line Wichita FM 369 Near US 82/277 Intersection Improvements 2021 $1,300 Draft Falls 069 to LP 473/ SH 79 Yoakum US 90A Guadalupe C/L to Safety Treat Fixed Objects Safety 2019 $1,066 Project mi E of Guadalupe C/L 86 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

94 Yoakum US 90A mi E of Safety Treat Fixed Objects Safety 2019 $1,000 Project 055 Guadalupe C/L to US 183(Water St) Yoakum US 59 US 87 to SH 185 Contruct Frontage Road 2020 $4,500 Draft 098 Yoakum BU 59-T At FM 236 Improve Traffic Signals Safety 2019 $227 Project Yoakum US 59 BU 59 North of Upgrade to Rural Freway I $18,749 Draft 146 Elcampo to SH System Project (Projects 71 F,H,G) Yoakum US 59 Fort Bend C/L to Upgrade to Rural Freeway 2020 $208,00 Draft 098 SH 60 0 Yoakum SL mi W of SH Safety Treat Fixed Objects Safety $417 Project to US 59 Yoakum US 87 At Elm Creek - Str Replace Bridge and 2021 $5,060 Project 039 # Approaches Yoakum US 87 At Rocky Creek - Replace Bridge and 2021 $1,700 Project 040 Str # Approaches TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

95 Yoakum US 87 At Guadalupe Construct One Way Bridge 2020 $13,404 Project 088 River and Relief - and Appr (Northbound) Str # & 038 Yoakum SH 35 At FM 2668 Improve Traffic Signal Safety 2019 $272 Project 094 (Nicholas Ave) Yoakum SH mi N. of FM Acp Overlay & Add Shoulders 2019 $3,000 Project to FM 1468 Yoakum SH 35 BS 35H W to Improve Guardrail to Design Safety 2019 $133 Project 040 Jackson C/L Standards Yoakum SH mi S of FM Safety Treat Fixed Objects Safety $406 Project (Mixville Rd) to Fort Bend C/L Yoakum SH mi W. of FM Pavement Repair and 2020 $1,190 Project to Colorado Surfacing C/L Yoakum SH 71 Fayette C/L to I- Pavement Repair and 2020 $4,095 Project (West Bound) Surfacing 88 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

96 Yoakum US 77 At Big Rocky Replace Bridge and 2019 $2,504 Project 063 Creek - Str # Approaches Yoakum US 77A 0.5 mi S of FM Safety Treat Fixed Objects, Safety $372 Project to 1.0 mi S Improve Guardrail to Design of FM 340 Stan Dards Yoakum US 77A At Rocky Creek - Replace Bridge and 2021 $2,944 Project 036 Str # Approaches 011 Yoakum US 183 Lakeside Drive to Add 3 Lanes For A 4-Lane 2019 $2,100 Project 059 Hospital Drive Undivided way With Continuous Left Turn Lane Yoakum SH 72 FM 237 to US 87 Construct Auxillary Lanes For 2021 $31,500 Project 051 Super 2 and Rehabilitate Roadway Yoakum SH 72 Karnes C/L to Add 2 Lanes For 4-Lane 2020 $30,700 Project Miles East Undivided of FM 2980 Yoakum SH 72 At Guadalupe Replace Bridge and $4,600 Project 013 River - Str # Approaches TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

97 Yoakum SH 80 Guadalupe C/L to Safety Treat Fixed Objects Safety $920 Project mi N of FM 1682 Yoakum SH 80 At Guadalupe Replace Bridge and 2020 $10,580 Project 032 River - Str Appraoches Yoakum SH mi W of FM Safety Treat Fixed Objects Safety $86 Project to FM 1682 Yoakum SH 95 FM 1115 to Rehabilitate Roadway and 2019 $3,500 Project mi S of FM Add Shoulders 1115 (Csj Break) Yoakum SH mi S of FM Rehabilitate Roadway and 2019 $6,500 Project (Csj Break) Add Shoulders to US 90 Yoakum SH 95 Fayette C/L to Safety Treat Fixed Objects Safety $457 Project mi S of FM 532 Yoakum SH 95 FM 966 to UA 77 Safety Treat Fixed Objects Safety $1,210 Project Yoakum SH mi E of US 77 Safety Treat Fixed Objects Safety 2019 $964 Project 049 to Jackson C/L 90 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

98 Yoakum SH 111 At Lavaca River Replace Bridge and 2022 $600 Project 050 Relief - Str # Approaches Yoakum SH 111 At Lavaca River - Replace Bridge and 2022 $8,300 Project 051 Str # Approaches 025 Yoakum BU 77S LP 463 to Airline Install Median Barrier and 2021 $2,500 Draft 052 Road Acp Overlay Yoakum SH 172 SH 35 to Calhoun Safety Treat Fixed Objects Safety 2020 $77 Project 047 C/L Yoakum US 90A Gonzales C/L to Safety Treat Fixed Objects Safety $307 Project mi W of FM 3435 Yoakum FM 616 At Chocolate Replace Bridge and $756 Project 038 Bayou - Str # Approaches Yoakum FM mi N of US Safety Treat Fixed Safety $2,311 Project to 3.3 mi N of Objects,Provide Additional US 59 Paved Surface Width 91 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

99 Yoakum SL 463 BU 59 to Lone Add 2 Lanes 2019 $4,000 Draft 060 Tree Road 92 5 TxDOT has recommended the South Orient Railroad for inclusion in the National Multimodal Freight Network

100 Appendix C Unconstrained Freight Improvement Strategy

101 Appendix C: Unconstrained Freight Improvement Strategy District CSJ Facility Location Description Project Abilene I-20 I-20 West Bound Bridge Rehab Safety TBD $445 Project at Union Pac RR to I-20 West Bound at Union Pac RR Abilene I-20 I-20 East Bound Bridge Rehab Safety TBD $247 Project at Union Pac RR to I-20 East Bound at Union Pac RR Abilene I-20 N Scurry St to Install Median Barrier Safety TBD $1,441 Project Moss Lake Rd Abilene I-20 At BI 20-M to Rehabilitate Bridge 2019 $850 Project East of Sweetwater Abilene I-20 At Noodle Creek Replace Bridge and Safety $74 Project (I-20 & Nfr & Sfr) Approach Railing Or Add to 0.10 mi E of Safety End Treatment Or FM 1085 Replace Guardfence Abilene I-20 Abilene West City Add Two Main Lanes For A TBD $60,000 Project Limits to Near Six Lane Freeway and Catclaw Creek Replace Overpass Structures 2

102 Abilene I-20 At Indian Creek (I- Replace Bridge and Safety $403 Project & N Frtg Rd) Approach Railing Or Add to 0.35 mi W of Safety End Treatment Or FM 707 Replace Guardfence Abilene I-20 At Draw (I-20 WB) Replace Bridge and Safety $131 Project to 0.20 mi E of Approach Railing Or Add US 83 Safety End Treatment Or Replace Guardfence Abilene I-20 SH 351 to Add Two Main Lanes For A TBD $40,000 Project Abilene East City Six Lane Freeway and Limits Replace Overpass Structures Abilene I-20 Near Catclaw Add Two Main Lanes For A TBD $200,000 Project Creek to Sh351 Six Lane Freeway and Replace Overpa SS Structures Abilene BI 20-M At The UPRR in Replace Bridge & TBD $5,800 Project Sweetwater (Psn Approaches 044) Abilene BI 20-R 500' West of Intersection Safety 2019 $950 Project Pioneer Street to Improvements For Rxr Poplar Street Preemption Abilene BI 20-R 500' West of Signal Modifications For Safety 2019 $3,200 Project Pioner to Poplar Rxr Preemption Street 3

103 Abilene I-20 Locust St to Install Median Barrier Safety TBD $958 Project Eastland County Line Abilene US 83 King County Line Construct Super Two TBD $13,560 Project to US 380 Abilene US 83 US 380 to Fisher Construct Super Two TBD $9,605 Project County Line Abilene US 83 Stonewall County Construct Super Two TBD $1,359 Project Line to Jones County Line Abilene US 83 Fisher County Construct Super Two TBD $1,394 Project Line to SH 92 in Hamlin Abilene US 83 SH 92 in Hamlin Construct Super Two TBD $10,531 Project to US 277 North of Anson Abilene US Miles North Construct New Overpass 2020 $13,000 Project of FM Miles South of FM 3034 Abilene US 83 North of FM 707 Add Frontage Road at US TBD $5,000 Project to Near Antilley 83 Connecting FM 707 to Road Antilley. 4

104 Abilene US 83 At US 83/84 "Y" Construct New Grade 2022 $15,000 Project Interchange Separated Interchange Abilene US 87 US 87 at FM 700 Bridge Rehab Safety TBD $446 Project to US 87 at FM 700 Abilene US 83 North of Construct Super Two TBD $1,098 Project Aspermont to US 380 Abilene US 180 City of Gail to Construct Super "2" 2024 $11,500 Project Scurry County way Facility Line Abilene US 180 Borden County Construct Super "2" 2024 $10,600 Project Line to City of way Facility Snyder Abilene FM 700 FM 700 & 11th Install Intersection Safety $38 Project to FM 700 & Flashing Beacon 11th Abilene FM 89 Near Chimney Access Management 2024 $10,000 Draft Rock Road to Rebecca Lane in Abilene Amarillo US 83 Oklahoma State Milled Edgeline Rumble Safety TBD $169 Project Line to SH 15 Strips 5

105 Amarillo US 83 Oklahoma State Construct Super 2 TBD $6,900 Project Line to North of Perryton Amarillo US 83 At FM 377 Improve Traffic Signals Safety TBD $232 Project Amarillo US 83 SL 143 to Profile Edgeline Markings Safety TBD $50 Project Miles SE of SH 70 Amarillo US 83 South of Perryton Construct Super 2 TBD $10,300 Project to Wolf Creek Amarillo US 385 US 87 in Hartley Construct Super 2 TBD $16,500 Project to Channing Amarillo US 385 US 87 to Milled Edgeline Rumble Safety TBD $79 Project Channing Strips Amarillo US 87 At d Creek 5 Replace Bridge Rail Safety TBD $115 Project mi N of Can River Amarillo US 87 At Drain Jct Loop Replace Bridge Rail Safety TBD $68 Project Amarillo US 87 SBl at BNSF RR Replace Bridge and TBD $3,500 Project Approaches 6

106 Amarillo US 287 Oklahoma State Milled Edgeline Rumble Safety TBD $48 Project Line to Sherman Strips County Line Amarillo US 287 Dallam County Mulled Edgeline Rumble Safety TBD $58 Project Line to US 54 Strips Amarillo US 287 US 87 to Mcclary Preserve and Improve TBD $12,400 Project Rd Safety On A Freight Corridor Amarillo US 87 South City Limits Preserve and Improve TBD $13,700 Project of Dumas to SH Safety On A Freight 152 Corridor Amarillo US 87 Divided 4 Lane Preserve and Improve TBD $14,000 Project South of Dumas Safety On A Freight to Potter County Corridor Line Amarillo I-40 Various Locations Install Crashwalls at Safety TBD $4,000 Project On I-40 Various Locations On I-40 Amarillo I-40 At Drain 0.1 Replace Bridge Rail Safety TBD $46 Project Miles E of SH 214 Amarillo I-40 At Drain 3.9 Replace Bridge Rail Safety TBD $45 Project Miles E of SH 214 7

107 Amarillo I-40 At Drain 0.3 Replace Bridge Rail Safety TBD $261 Project Miles W of FM 3319 Amarillo SL 279 At Western Street Improve Traffic Signals Safety TBD $149 Project Amarillo BI 40-D At Draw 0.8 mi Replace Bridge Rail Safety TBD $155 Project NE of 9th St Amarillo BI 40-D On BI 40-D EB to Replace Existing Bridge TBD $1,800 Project at BNSF RR Amarillo BI 40-D On BI 40-D WB to Replace Existing Bridge TBD $1,800 Project at BNSF RR Amarillo US 60 At FM 2590 Improve Traffic Signals Safety TBD $76 Project Amarillo US 60 At FM 2590 in Improve Traffic Signals Safety TBD $125 Project Canyon Amarillo I-27 Western Street in Widen Freeway to 6 Lane TBD $69,700 Project Amarillo, South Section By Adding 2 to LP 335 Additional Lanes Amarillo I-27 On I-27 SBl at Replace and Widen Deck, Safety TBD $2,250 Project th Ave Backwalls and Structural Repair 8

108 Amarillo I-27 On I-27 NBl at Replace and Widen Deck, Safety TBD $2,250 Project th Ave Backwalls and Structural Repair Amarillo I-27 At 45th Avenue Improve Traffic Signals Safety TBD $110 Project Amarillo I-27 SL 335 to US 60 Widen to 6 Lanes TBD $83,500 Project Amarillo I-27 Various Locations Install Crashwalls at Safety TBD $1,000 Project On I-27 Various Locations On I-40 Amarillo US 60 At SL 335 Replace Bridge Rail Safety TBD $209 Project Amarillo US 60 Potter County EBL - Preserve and TBD $5,200 Project Line to 5 Miles Improve Safety On A West of Panhanle Freight Corridor Amarillo US mi W of SH Preservation and Safety TBD $8,221 Project to 3.86 mi Improvements On A East of Freight Corridor Panhandle Cl Amarillo US 60 5 Miles West of EBL - Preserve and TBD $4,200 Project Panhandle to Improve Safety On A 0.71 mi W of SH Freight Corridor 207 (Panhandle) 9

109 Amarillo US 60 CR S East of Preserve and Improve TBD $10,000 Project Panhandle to CR Safety On A W West of White Energy/Freight Corridor Deer Amarillo US 60 CR W West of Preservation and Safety TBD $15,800 Project White Deer to Improvements On A Gray County Line Freight Corridor Amarillo US mi East of Preservation and Safety TBD $993 Project Pahandle Cl to Improvements On A CR S East of Freight Corridor Panhandle Amarillo US 60 At SH 273 in Improve Traffic Signals Safety TBD $110 Project Pampa Amarillo US 60 At Barnes Street Improve Traffic Signals Safety TBD $140 Project in Pampa Amarillo US 60 SH 70 to SH 152 Preservation and Safety TBD $5,168 Project Improvements On A Freight Corridor Amarillo US 60 LP 171 in Pampa Construct Super 2 TBD $15,700 Project to Roberts County Line Amarillo US 60 FM 748 in Miami Preserve and Improve TBD $6,300 Project to Hemphill Safety On A Freight County Line Corridor 10

110 Amarillo US 60 Roberts County Preserve and Improve TBD $8,300 Project Line to US 83 Safety On A Freight Corridor Amarillo US 385 Channing to Construct Super 2 TBD $5,700 Project Oldham County Line Amarillo US 385 Channing to Milled Edgeline Rumble Safety TBD $31 Project Oldham County Strips Line Amarillo US 385 Hartley County Milled Edgeline Rumble Safety TBD $57 Project Line to Canadian Strips River Amarillo US 385 Hartley County Construct Super 2 TBD $9,900 Project Line to Canadian River Bridge Amarillo US 385 I-40 in Vega to Construct Super 2 TBD $4,200 Project Deaf Smith County Line Amarillo US 385 Canadian River Milled Edgeline Rumble Safety TBD $165 Project to Deaf Smith Strips County Line Amarillo US 385 Oldham County Construct Super 2 TBD $17,600 Project Line to South of FM

111 Amarillo US 385 Oldham County Milled Edgeline Rumble Safety TBD $84 Project Line to South of Strips FM 1062 Amarillo US 385 At Moreman Improve Traffic Signals Safety TBD $83 Project Road Amarillo US 385 South of FM Construct Super 2 TBD $11,000 Project to Hereford Amarillo US 385 South of FM Milled Edgeline Rumble Safety TBD $52 Project to Strips Miles North of FM 1058 Amarillo US 385 Hereford to Construct Super 2 TBD $5,700 Project Castro County Line Amarillo US 54 Rita Blanca Preserve and Improve TBD $250 Project Bridge to Dallam Safety On A Freight County Line Corridor Amarillo US 54 Hartley County Preserve and Improve TBD $3,500 Project Line to US 87 Safety On A Freight Corridor Amarillo I-40 At Drainage Ditch Replace Bridge Rail Safety TBD $47 Project Mi E of Ih27 Amarillo I-40 On Avondale St Replace Bridge Rail Safety TBD $138 Project at I-40 12

112 Amarillo I-40 At Drainage Ditch Replace Bridge Rail Safety TBD $85 Project Mi E of Sl335W Amarillo I-40 Bih 40 D to SL B-2 Full Build: Reconstruct TBD $22,000 Project Soncy Road Mainlane Bridge at Sl335 (2nd Level) and Frontage Road Box Amarillo I-40 At Whitaker Replace Existing Bridge TBD $12,600 Project Street and Approaches WB Lanes Amarillo I-40 At Whitaker Replace Existing Bridge TBD $7,500 Project Street and Approaches EB Lanes Amarillo I-40 At SL 335 Replace Existing Bridge TBD $9,300 Project (Lakeside Dr) and Approaches WB Lanes Amarillo I-40 At SL 335 Replace Existing Bridge TBD $8,500 Project (Lakeside Dr) and Approaches EB Lanes Amarillo I-40 At FM 1258 Replace Existing Bridge TBD $6,000 Project and Approaches WB Lanes Amarillo I-40 At FM 1258 Replace Existing Bridge TBD $6,300 Project and Approaches EB Lanes 13

113 Amarillo I-40 Whitaker Road to A-4 Full Build: Construct Ic, TBD $98,000 Project SS 468 (Airport Ramps, Frt Rd Box at SL Blvd) 335 Amarillo I-40.3 Miles East of Ramps and Miscellaneous $5,100 Draft Eastern Street to Improvements US 287 Split Amarillo I Miles East of EBL - Preserve and TBD $5,400 Project Conway to 1.2 Improve Safety On A Miles East of FM Freight Corridor 2880 Amarillo I Miles East of EBL - Preserve and TBD $6,500 Project FM 2880 to 1 Improve Safety On A Mile East of FM Freight Corridor 294 Amarillo US Miles SE Milled Edgeline Rumble Safety TBD $104 Project of FM 807 to Strips Moore County Line Amarillo US 87 Hartley County Milled Edgeline Rumble Safety TBD $99 Project Line to Strips Miles West of US 287 Amarillo SH 70 At Kentucky Improve Traffic Signals Safety TBD $83 Project 14

114 Amarillo SH 70 At SH 152 Improve Traffic Signala Safety TBD $83 Project Amarillo VA Randall County B-2 Full Build: Construct TBD $94,000 Project Line to SW 9th Mainlanes, Frontage Avenue Roads and Mainlane Bridge at Ih40 (3rd Level) Amarillo VA FM 2590 to B-2 Full Build: Construct TBD $134,000 Project Potter County Mainlanes and Frontage Line Roads Amarillo SL 335 At Drainage Ditch Replace Bridge Rail Safety TBD $72 Project Mi E of Us287 Amarillo SL 335 At Drainage Ditch Replace Bridge Rail Safety TBD $125 Project Mi E of Us287 Amarillo SL 335 Randall County A-4 Full Build: Convert TBD $62,000 Project Line to SE 3rd Non-Freeway to Freeway, Avenue Ic at I-40 East Amarillo SL th Avenue to A-4 Full Build: Convert TBD $5,000 Project Potter County Non-Freeway to Freeway Line at I-40 East Amarillo SL Miles West of Convert Non-Freeway to TBD $50,000 Project FM 1541 to 0.2 Freeway Miles South of 34th Avenue 15

115 Amarillo SL 335 I-27 to Bell Street B-1 Phase Iii:Construct TBD $8,500 Project Mainlanes and Mainlane Bridge at I-27 (3rd Level) Amarillo SL 335 East of Coulter to B-1 Phase Iii:Construct TBD $8,500 Project I-27 Mainlanes and Mainlane Bridge at I-27 (3rd Level) Amarillo SL 335 SW 9th to FM C-1 Phase I: Convert From 2023 $39,410 Draft Lane to 4 Lane Divided Amarillo SL 335 SW 9th to FM C-1 Phase Ii: Convert From TBD $71,000 Project Lane to Freeway Atlanta US mi W of FM Widen 4-Lane Undivided 2026 $23,360 Draft to FM way to 4-Lane Divided 2148(S) Atlanta US mi W. of FM Profile Centerline & Safety TBD $269 Project to 3.6 mi W. Edgeline Markings of FM 2148 Centerline Bars & Edgeline Bars Atlanta US 67 Arkansas State Improve Guardrail to Safety TBD $65 Project Line to FM Design Standards 2148(N) Atlanta US 67 FM 989 to FM Install Continuous Turn Safety TBD $1,990 Project Lane, Milled Edgeline Rumble Strips 16

116 Atlanta US mi W of US Widen Existing 2-Lane TBD $12,829 Project to FM 992 way to 4-Lane Divided Atlanta US 82 Red River C/L to Profile Centerline & Safety TBD $258 Project US 259 Edgeline Markings Centerline Bars & Edgeline Bars Atlanta US 82 Red River C/L to Reconstruct 2 Lane 2021 $21,000 Project mi W of US Roadway to Provide 259 Passing Lanes Atlanta US 82 FM 992 to FM Widen Existing 2-Lane TBD $4,989 Project way to 4-Lane Divided Atlanta US 82 FM 1840 to SH Widen Existing 2-Lane $17,190 Project way to 4-Lane Divided Atlanta US 82 SH 98 to 0.4 mi Widen Existing 2-Lane TBD $7,456 Project S. of I-30 way to 4-Lane Divided Atlanta US 82 FM 992 to 0.5 mi Improve Guardrail to Safety TBD $138 Project W. of SH 8 Design Standards Atlanta US mi W. of SH 8 Improve Guardrail to Safety TBD $101 Project to FM 1398 Design Standards Atlanta US mi W of I-369 Widen Existing 2-Lane 2023 $19,633 Draft in Texarkana to way to 4-Lane Divided 0.7 mi W of FM 989 in Nash 17

117 Atlanta US 82 FM 1398 to US Improve Guardrail to Safety TBD $143 Project Design Standards Atlanta US 82 At FM 2148 Widen to Add Turn Lanes TBD $2,300 Project Intersection Atlanta US 59 At Draw Replace Mbgf Safety TBD $65 Project Atlanta FM 1186 US 59 to Panola Safety Treat Fixed Objects Safety TBD $139 Project C/L Atlanta US 59 BU 59D to US 79 Profile Centerline & Safety TBD $138 Project Edgeline Markings Centerline Bars & Edgeline Bars Atlanta Atlanta US 59 At Elm Branch Replace Mbgf Safety TBD $75 Project US 59 At Kyle Creek Replace Mbgf Safety TBD $65 Project Atlanta US 59 At Intersection of Construct Grade 2019 $16,613 Project FM 1794 Separation to Interstate Standards (Future I-369) Atlanta SH mi S. of SH Widen Existing 2-Lane 2019 $14,655 Project to US 59 way to 4-Lane Divided Atlanta US 259 US 82 to 0.3 mi Improve Guardrail to Safety TBD $15 Project S. of FM 44 Design Standards 18

118 Atlanta US 259 Oklahoma State Profile Edgeline Markings Safety TBD $168 Project Line to US 82 Atlanta US mi E. of SH Texturize Shoulders & Cl Safety TBD $767 Project to FM 2685 Texturing Atlanta US 80 Wood C/L to SH Profile Centerline & Safety TBD $103 Project E Edgeline Markings Centerline Bars & Edgeline Profile Atlanta US 80 At East Lansing Install Traffic Signal Safety TBD $471 Project Road Intersection Atlanta US 80 Gregg C/L to FM Improve Guardrail to Safety TBD $117 Project Design Standards Atlanta US 80 FM 450 to SL Improve Guardrail to Safety TBD $363 Project Design Standards Atlanta US 80 At Bolivar Improve Trafic Signal Safety TBD $132 Project Intersection Atlanta US 80 At FM 1997 Improve Traffic Signal Safety TBD $145 Project Intersection Atlanta US 80 At Washington Improve Traffic Signal Safety TBD $162 Project Intersection Atlanta US 80 SL 390 to I-20 Improve Guardrail to Safety TBD $92 Project Design Standards 19

119 Atlanta SH 43 At Intersection of Install Traffic Signal & Safety TBD $170 Project Bomar Street Safety Lighting at Intersection Atlanta SH 43 US 59 to Panola Profile Centerline & Safety TBD $569 Project C/L Edgeline Markings Centerline Bars & Edgeline Bars Atlanta US 59 At FM 989 Install Advance Safety TBD $181 Project Intersection Warning Signals and Signs, Safety Lighting at Intersection Atlanta US mi S. of Reconstruct 2 Lane TBD $50,000 Project Sulphur Relief #2 Roadway to Provide to 0.7 mi N. of Passing Lanes FM 1734 Atlanta US mi S. of Texturize Shoulders & Cl Safety TBD $300 Project Robert Nance Texturing Road to Camp C/L Atlanta US 271 FM 2088 to Profile Centerline Safety TBD $54 Project Lantana Rd Markings Centerline Bars Atlanta US 271 SH 300 to Gregg Widen Existing 4-Lane TBD $81,000 Project C/L, 0.1 mi N of Undivided way to 4- FM 2275 Lane Divided 20

120 Atlanta SH 315 FM 1970 to SH Widen Existing 2-Lane TBD $46,000 Project way to 4-Lane Divided Atlanta SH 315 Rusk C/L to US Safety Treat Fixed Objects Safety TBD $673 Project Atlanta SH 315 Rusk C/L to US Profile Edgeline & Safety TBD $452 Project Centerline Markings Atlanta I mi W. of FM Install Safety Lighting Safety TBD $713 Project to 0.7 mi W. Of Sh 43 Atlanta I-20 Gregg C/L to 0.5 Ramp Improvements TBD $3,642 Project mi W. of SH 43 Atlanta I-20 FM 450 to 0.5 mi Reconstruct & Widen TBD $155,000 Project W. of SH 43 Existing Interstate From 4 Lanes to 6 Lanesand Add One-Way Frontage Roads Atlanta I-20 At SL 281(SB) Bridge Preventative Safety TBD $300 Project Maintenance Atlanta I-20 At SL 281(NB) Bridge Preventative Safety TBD $425 Project Maintenance Atlanta I-20 At CR 3110 Bridge Preventative Safety TBD $325 Project (Galilee Rd) Maintenance 21

121 Atlanta I-20 At Sewell Bridge Preventative Safety TBD $200 Project Creek(EB) Maintenance Atlanta I-20 At FM 968 Bridge Preventative Safety TBD $325 Project Maintenance Atlanta I-20 At FM 3251 Bridge Preventative Safety TBD $350 Project Maintenance Atlanta I-20 At Cox Creek Replace Bridge and Safety TBD $63 Project Approach Railing Or Add Safety End Treatment Or Replace Guardfence Atlanta I mi W. of SH Ramp Improvements TBD $2,379 Project to East End of Eight Mile Creek Bridge Atlanta I-20 At SH 43 Bridge Preventative Safety TBD $325 Project Maintenance Atlanta I-20 East End of Eight Ramp Improvements TBD $5,735 Project Mile Creek Bridge to Louisiana State Line Atlanta I-20 At FM 31(WB) Bridge Preventative Safety TBD $450 Project Maintenance Atlanta I-20 At FM 31(EB) Bridge Preventative Safety TBD $575 Project Maintenance 22

122 Atlanta I-30 Franklin C/L to Ramp Improvements TBD $5,782 Project Morris C/L Atlanta I-30 At Intersection of Intersection & Ramp TBD $1,900 Project US 271 Improvements Atlanta I-30 Titus County Line Ramp Improvements TBD $1,460 Project to West End of Sulphur River Bridge Atlanta I-30 West End of Ramp Improvements TBD $2,991 Project Sulphur River Bridge to SH 98 Atlanta I-30 SH 98 to 0.3 mi Ramp Improvements TBD $3,487 Project W. of SS 74 Atlanta I mi W. of SS Ramp Improvements TBD $2,881 Project to FM 2253 Atlanta FM mi E. of FM Provide Additional Paved Safety TBD $2,483 Project to FM 9 Surface Width, Milled Edgeline Rumble Strips, Milled Centerline Rumble Strips 23

123 Atlanta FM min. of I- Texturize Shoulders & Cl Safety TBD $117 Project to min. Texturing of I-30 Atlanta FM 1397 University Avenue Widen Existing 2-Lane TBD $13,000 Project to 0.1 mi N. of way to 4-Lane Divided North Park Road Atlanta FM 559 FM 1397 to FM Install Led Flashing Safety TBD $75 Project Chevrons On Curve Atlanta SL 281 At Intersection of Improve Traffic Safety TBD $136 Project Page Road Signals,Interconnect Signals,Install Flashing Yellow Arrow,Install Raised Median,Safety Lighting Atlanta SL 281 Gregg C/L to I-20 Profile Edgeline & Safety TBD $141 Project Centerline Markings Atlanta SL 281 At I-20 Improve Traffic Signals, Safety TBD $196 Project Install Flashing Yellow, Safety Lighting at Intersection Austin I-35 At Theon Road Replace Bridge Overpass 2019 $12,654 Draft (Ronald Reagan and Tie-In Approaches Blvd) 24

124 Austin I-35 Corn Hill (Bud Construct Ramps and 2019 $10,969 Draft Stockton LP) Convert to One Way Undrpss to FM Frontage Roads 972 Overpass Austin I-35 SH 29 to North of Future Transportation TBD $129,100 Project SH 130 Corridor Austin I-35 South of Williams Add Northbound Frontage 2023 $18,000 Draft Drive to Lakeway Road Drive Austin I-35 At SH 29 Operational TBD $12,600 Project Improvements- Interchange Austin I-35 At Northwest Construct New Overpass TBD $2,500 Project Blvd. Crossing I-35 at Northwest Boulevard Austin I FT. South of Pavement Markings & TBD $114 Project Mcneil Road to Signing at Uprr X-Ing & 600 FT. North of Gtwn Industrial Lead Mcneil Road Austin I-35 Rm 1431 to SH Add NB & SB Express TBD $145,050 Project N Lanes, Reconstruct Ramps & Improve Freight Movement 25

125 Austin I-35 Rm 1431 to SH Future Transporation TBD $113,100 Project Cooridor Austin I-35 At SH 29 Operational TBD $12,600 Project Improvements- Interchange Austin I-35 North of RM Add Partial Cont Flow 2024 $37,200 Draft to SE Inner Intersection, Turnaround Loop Brg & Aux Lns, Replace Brg at RM 2243, Rev SB Ramps & Wdn Ml & Fr Austin I-35 At Westinghouse Operational TBD $37,200 Project Road Improvements- Interchange Austin I-35 Rm 1431 to RM Operational TBD $26,200 Project Improvements-Ramp Reversals Austin I-35 FM 3406 to RM Widen NB Frontage Rd to 2019 $10,427 Draft Lanes With Associated Paving, Grad Ing,Drainage and Driveway Improvements 26

126 Austin I-35 SH 45N to US 79 Replace Bridges at US 79 TBD $50,619 Project & RM 620, Increase Brg Clearances, Widen SBml Brg at Mcneil & Add Aux Lanes Austin I-35 SH 45N to FM Add NB & SB Express Lns, TBD $85,640 Project Reconstruct Ramps, Replace Brg at Grand Ave Pkwy, Add Aux Lns & Imprv Freight Movement Austin SL 275 I-35 SBfr to Install Left Turn Lane, Safety TBD $751 Project Parmer Lane(FM Convert 4 Lane Undivided 734) to Super 2 With Paved Shoulders Austin I-35 Riverside Dr to Add NB & SB Expr Lns, TBD $195,584 Project LP 275-Slaughter Direct Access Ramps & Lane Aux Lns, Widen Fr & Reconstr Ramps, & Replace Ml Brg at Slaughter Ln Austin I-35 Airport Blvd. to Realign Southbound TBD $1,003 Project North of 51st Entrance Ramp Near 51st Street Street 27

127 Austin I-35 South of Holly Add Cds, Aux Lanes, Ramp 2019 $162,303 Draft Street to North of Improvements, Pavement Oltorf Rehab, Bike & Ped Imprvmnts, Frontage Rd Intersection Improvmnts Austin I-35 US 183 to Add NB & SB Expr Lns, 2025 $786,200 Draft Riverside Dr Reconstr Ml & Ramps, Replace Brgs, Add Turnaround Brgs, Cds, Aux Lns & Ddi at Airport Blvd Austin I-35 FM 1825 to US Add NB & SB Express Lns, TBD $212,150 Project Reconstruct Ramps, Replace Brgs at Braker & Rundburg Ln, Add Turnaround Brgs & Aux Lns Austin I-35 I-35 NBfr and 8th Install Traffic Signal Safety TBD $197 Project Street Inter. Austin I Miles South Safety Lighting Safety TBD $223 Project of Rundberg Lane to 0.2 Miles North of Rundberg Lane 28

128 Austin I-35 LP 275-Slaughter Add NB & SB Expr Lns, TBD $120,573 Project Lane to Hays Onion Crk Pkwy County Line Turnaround, Fr Aux Lanes, Reconstr Ramps & Imprv Freight Movement Austin I-35 Hays County Line Future Transportation TBD $38,598 Project to SH 45Se Cooridor Austin I-35 FM 1626 to Reconstruct Frontage TBD $11,340 Project Yarrington Rd Roads Austin I-35 North of River Reconstruct Ramps 2020 $10,534 Draft Ridge Parkway to Loop 82 Austin I-35 Blanco River to Operational TBD $7,563 Project River Ridge Improvements-Rampm Parkway Reversals Austin I-35 Kyle Crossing to Reverse NB Ramps 2021 $27,191 Draft RM 150 Austin I-35 South of Robert S Future Transportation TBD $152,888 Project Light to Hays Cooridor County Line 29

129 Austin I-35 South of Robert S Future Transportation TBD $237,976 Project Light Blvd to Cooridor North of Yarrington Road Austin I-35 North of Future Transportation TBD $276,954 Project Yarrington Road Corridor to Loop 82 Austin I-35 Loop 82 to South Future Transportation TBD $67,088 Project of SH 80 Cooridor Austin I-35 North of Operational TBD $51,500 Project Wonderworld Dr Improvements- to South of Interchange Wonderworld Dr Austin I-35 North of Mccarty Operational TBD $38,556 Project Ln to South of Improvements- Mccarty Ln Interchange Austin I-35 South of SH 80 Future Transportation TBD $59,862 Project to North of Posey Cooridor Road Austin I-35 North of Operational TBD $81,008 Project Centerpoint to Improvements- South of Interchange Centerpoint 30

130 Austin I-35 Posey Road to Future Transportation TBD $12,750 Project Loop 82 Cooridor Austin US 290 N. of Old 4-Lane With Center Turn TBD $8,000 Project Antonio Rd to Lane Dusty Farm Lane Austin US 290 Jenschke Lane to 4-Lane With Center Turn TBD $6,300 Project Cemetery Rd Lane Austin US 290 West of RM 1826 Construct 6-Lane Turnpike 2022 $350,000 Draft to SL 1 With Frontage Roads (Toll) Austin SL 360 US 183 to US Corridor Study TBD $3,000 Project Austin SL 360 Bull Creek to Upgrade Bridge and Safety TBD $915 Project mi N of RM Approach Railing 2222 Austin SH 71 East of Riverside Construct Frontage Road 2021 $3,000 Project to US 183 and Ramp Austin SL 360 At Courtyard Grade Separate 2024 $34,000 Draft Drive Intersection Austin SL 360 At Lakewood Grade Separate 2023 $24,000 Draft Drive Intersection 31

131 Austin SL 360 At Walsh Tarlton Grade Separate 2025 $25,000 Draft Lane Intersection Austin SL 360 At Westbank Grade Separate 2025 $25,000 Draft Dr/Scottish Intersection Woods Trl Austin SL 360 At Lost Creek Grade Separate 2026 $24,000 Draft Blvd. Intersection Austin SL 360 At RM 2244 Construct Diverging 2026 $25,000 Draft Diamond Intersection Austin US 290 At SH 130 Construct 2 Tolled Direct $101,000 Project Connectors Austin US 290 At SH 130 Construct One Direct $31,500 Project Connector Austin US mi W of Red Improve Traffic Signal, Safety TBD $70 Project Elm Pkwy to Install Flashing Yellow Bastrop County Arrow Line Austin US 290 Travis County Improve Traffic Signal, Safety TBD $276 Project Line to 0.2 mi E Install Flashing Yellow of SH 95S Arrow 32

132 Austin US mi E of FM Widen to 4 Lane Divided $1,800 Project to 9.12 mi E FM 696 Austin US 290 Bastrop C/L to Widen to 4 Lane Divided 2019 $30,248 Project Navarro Street Austin US mi E of FM Rehabilitate Bridge For Safety TBD $112 Project to 5.8 mi E The Bridge Maintenance of FM 141 and Improvement Program Austin US mi E of FM Bridge Rehab-Repair Safety TBD $666 Project to 1.9 mi E Deck, Upgrade Rail- of FM 141 Rehabilitate Bridge For The Bridge Maintenance & Improvment Program Austin US mi East of Install Median Barrier Safety TBD $664 Project CR 226 to Lee/Fayette County Line Austin SH mi West of Construction of $621 Project RM 243 to 306' Continuous Left Turn Lane West of RM 243 Austin SH FT. West of Intersection TBD $913 Project CR 200 to 700 Improvements to Add Turn FT. East of CR Lanes and Improve Sight 200 Distance 33

133 Austin US 183 +/ FT Construct Median and Left TBD $600 Project North of CR 259 Turn Lane to +/ FT South of CR 259 Austin US 183 At Pecan Park Improve Traffic Signals Safety TBD $58 Project Blvd Austin US 183 SH 45/Rm 620 Add 2 Express Lanes In TBD $117,500 Project to Travis County Each Direction Line Austin US 183 Williamson Add 2 Express Lanes In TBD $117,500 Project County Line to SL Each Direction 1 Austin US mi South of Grading, Base, Acp, Pvmt TBD $2,347 Project Lava Hill Rd to Mrk 0.11 N of Mckenzie Intersection Austin US 183 Intersection of Intersection TBD $1,687 Project US 183 and I-10 Improvements Austin US 79 Red Bud Lane to Intersection TBD $3,153 Project Kenney Fort Blvd Improvements at E Palm Valley Blvd and Harrell Parkway 34

134 Austin US 77 Milam County 4-Lane Divided TBD $45,000 Project Line to SL 123 Austin US 77 SL 123 to South 4-Lane Divided TBD $53,000 Project of CR 327 Austin US 77 South of CR Lane Divided TBD $36,000 Project to North of Industrial Park Rd Austin US mi N of Provide Additional Paved $6,000 Project Fayette C/L to Surface Width Fayette C/L Austin US 77 North of CR Lane Divided TBD $29,000 Project to Fayette County Line Austin US 77 North of 4-Lane Divided TBD $18,000 Project Industrial Park Rd to North of CR 223 Austin US mi N of Improve Traffic Signal, Safety TBD $104 Project Green Mile to SH Install Flashing Yellow 29 Arrow Austin US 281 At Pr 4 Install Intersection Safety TBD $61 Project Flashing Beacon and Safety Lighting 35

135 Austin US 281 SH 29 to 0.1 mi Improve Traffic Signal, Safety TBD $128 Project S of CR 340A Install Flashing Yellow Arrow Austin US 281 Pr 4 to RM Lane With Center Turn TBD $18,220 Project Lane Austin SH 71 SH 71/Us 183 Construct Frontage Road, 2021 $26,000 Project Interchange to Ramps and Direct Presidential Blvd. Connects Austin US mi South of New Frontage Road TBD $5,600 Project Thompson Ln to 0.07 mi SW of Airport Commerce Dr Austin SH mi East of Extend Westbound Left TBD $155 Project Navarro Creek Turn Lane Rd. to mi Each of Navarro Creek Rd. Austin SH 71 At Buck Lane Install Intersection Safety TBD $61 Project Flashing Beacon & Safety Lighting Austin SH 71 Travis/Bastrop Install Median Barrier Safety TBD $854 Project County Line to SH 21 36

136 Austin SH mi W of Construct Frontage Roads 2019 $29,762 Draft SH 95 to and Bridge mi W of SH 95 Austin SH 21 At Gills Branch & Rehabilitate Bridge & TBD $1,750 Project Mkt RR Approaches Austin SH 21 At Gills Branch Rehabilitate Bridge and TBD $540 Project Approaches Austin US 183 At CR 213 Install Intersection Safety TBD $58 Project Flashing Beacon and Safety Lighting at Intersection Austin US mi N of SH Install Intersection Safety TBD $70 Project to 0.1 mi S Flashing Beacon of SH 138 Austin US 183 Burnet County 4-Lane Divided-Rural TBD $72,050 Project Line to SH 29 Depressed Median (Mad 4) Austin US 183 FM 1869 to Cole Add Continuous Left Turn TBD $6,000 Project Drive Lane and Shoulders Austin SH mi W of CR Install Left Turn Lane TBD $750 Project to CR

137 Austin SH mi SW of US Brige Rehab- Replace Safety TBD $453 Project to 4.1 mi SW Bearing, Etc. Rehabilitate of US 290 Bridge For Bridge Maintenance and Improvement Program Austin SH 95 At Drain - Str Bridge Widening & TBD $353 Project Replace Approaches Austin SH mi N of FM Upgrade Bridge and Safety TBD $100 Project to 0.58 mi N Approach Railing of BU 79B Austin SH 29 SH 130 to SH 95 Upgrade Metal Beam Safety TBD $859 Project Guard Fence & Safety Treat Fixed Objects & Centerlne Texturing Austin SH 29 At Smith Branch Upgrade Bridge and Safety TBD $100 Project Approach Railing Austin SH 29 At CR 366 Install Intersection Safety TBD $55 Project Flashing Beacon and Safety Lighting Austin SH 138 US 183 to SH Improve Guardrail & Safety $500 Project Safety Treat Fixed Objects 38

138 Austin SH 138 US 183 to SH Add Shoulders & Rehab $8,000 Project Austin SH 195 Approx 2930' Construct Overpass TBD $1,900 Project North of Shell Rd to Approx 3720' South of Shell Rd Austin SH 195 At Berry Creek Reconstruct Road and Add TBD $790 Project Drive Deceleration, Acceleration & U-Turn Lanes Austin SH 130 At FM 812 Install Intersection Safety TBD $135 Project Flashing Beacon Austin SH 130 SH 45 to US 290 Add One Lane In Each TBD $57,306 Project Direction Austin SH 130 US 290 to SH 71 Add One Lane In Each $104,000 Project Direction Austin SH FT. South of Intersection TBD $1,950 Project Pflugerville Pkwy Improvements to 650 FT. North of Pflugerville Pkwy Austin SH 21 SH 80 to Provide Super 2 Passing TBD $8,505 Project Caldwell County Lanes Line 39

139 Austin SH 21 SH 80 to FM 150 Widen to 4-Lane Divided TBD $36,300 Project Roadway Austin SH 21 FM 150 to Widen to 4-Lane Divided TBD $48,000 Project Caldwell C/L 1.5 Roadway mi West of SH 130 Austin SH mi W of Add Shoulders TBD $6,509 Project William Pettus Rd to Caldwell County Line Austin SH 21 Hays County Line Provide Super 2 Passing TBD $1,950 Project to Bastrop Lanes County Line Austin SH 21 Hays C/L 1.5 mi Widen to 4-Lane Divided TBD $30,000 Project West of SH 130 Roadway to Bastrop C/L Austin SH 21 Caldwell County Provide Super 2 Passing TBD $7,529 Project Line to SH 71 Lanes Austin SH 21 Caldwell C/L to Widen to 4-Lane Divided TBD $21,000 Project FM 812 Roadway Austin SH 21 FM 812 to SH 71 Widen to 4-Lane Divided TBD $56,000 Project Roadway 40

140 Austin SH Miles East Widen to 4 Lane Divided TBD $26,840 Project of FM 1441 to Paint Creek Rd Austin RM 620 SH 71 to Widen From 4 to 6-Lane TBD $80,000 Project Colorado River Divided Austin SH 45 Loop 1 to 0.1 mi Upgrade Bridge and Safety TBD $156 Project East of Aw Approach Railing Grimes Austin SH 71 US 290 West to Construct Tolled Lanes & 2022 $100,000 Draft Silvermine Dr Frontage Roads Austin SH 71 At Fall Creek Install Intersection Safety TBD $57 Project Road Flashing Beacon and Safety Lighting at Intersection Austin SH 71 Blanco County 4-Lane Divided Rural TBD $13,000 Project Line to FM 2322 Surfaced Median W/ Ltl Austin FM 969 FM 973 to Widen Roadway 2019 $7,080 Project Hunters Bend Rd. Austin FM 969 At SL 111 Improve Traffic Signal, Safety TBD $308 Project Install Flashing Yellow Arrow Austin RM 1431 Sam Bass Rd to I- Widen From 4 to 6-Lane TBD $51,600 Project Divided 41

141 Austin RM 2222 City Park Road to Add Acceleration Lane and TBD $1,000 Project SL 360 Raised Center Median Austin RM mi E of Improve Traffic Signal, Safety TBD $266 Project Cuernavaca to Install Flashing Yellow 0.1 mi W of Arrow Cuernavaca Austin SL 1 North of Grade Separation of Main TBD $59,132 Project Slaughter Lane to Lanes at Slaughter and South of Lacrosse With 2 Through- Lacrosse Lanes In Each Direction Austin SL 1 US 183 to RM Add Direct Connectors TBD $145,000 Project With Transitions Austin FM 734 Metric Blvd to Lengthen Left Turn Lane Safety TBD $85 Project mi S of Metric Blvd Austin FM 734 Brushy Creek Upgrade Bridge and Safety TBD $1,877 Project Bridge to 0.01 mi Approach Railing N of SH 45 Austin FM 734 Rm 1431 to 438 Upgrade to 6 Lane Divided TBD $17,000 Project FT South of SH 45 Austin FM 734 SH 130 to 0.17 Construction of Median TBD $276 Project mi E of SH 130 and Left Turn Lane 42

142 Austin FM 734 +/-1500 FT West Adding 2nd Left Turn TBD $600 Project of Mccallen Pass Lanes to Two Intersections to +/-400 FT East to Create Dual Left of Harris Ridge Operations Blvd Beaumont US 90 At SH 321 Improve Traffic Signals Safety TBD $133 Project Beaumont US mi W of Improve Traffic Signals Safety TBD $437 Project SH 321 to mi E of Main Beaumont US 90 FM 160, East to Widen & Reconstruct to 4 TBD $40,000 Project SH 61 Lane Divided Rural Beaumont US 90 At SL 227 Improve Traffic Signals Safety TBD $143 Project Beaumont US 90 FM 563 to FM Widen to 4 Lanes With Cltl TBD $8,250 Project Beaumont US 90 At Hillebrandt Upgrade Bridge and Safety TBD $82 Project Bayou to (Str Approach Railing ) Beaumont US 90 At Caldwood Upgrade Bridge and Safety TBD $83 Project Cutoff to (Str Approach Railing ) 43

143 Beaumont US 90 At Pinchback to Upgrade Bridge and Safety TBD $72 Project (Str Approach Railing ) Beaumont I-10 Jefferson County Install Mast Lighting Safety TBD $3,085 Project Line, East to West of Vidor Beaumont I-10 US 69 North Install Mast Lighting Safety TBD $1,878 Project Interchange to Neches River Bridge Beaumont I-10 Hollywood Widen Freeway to 6 Main TBD $250,000 Project Overpass, East to Lanes and Reconstruct 7th Street Interchange Beaumont US 96 At FM 776 Improve Traffic Signals Safety TBD $162 Project Beaumont US mi N of Re Milled Edgeline Rumble Safety TBD $11 Project to mi Strips N of FM 2800 Beaumont US 96 At Goode Branch Upgrade Bridge and Safety TBD $44 Project to (Str Approach Railing ) 44

144 Beaumont US 96 At Gum Slough to Upgrade Bridge and Safety TBD $58 Project (Str Approach Railing ) Beaumont US 96 At Little Marsh Upgrade Bridge and Safety TBD $47 Project Slough to (Str Approach Railing ) Beaumont US 96 At Big Marsh to Upgrade Bridge and Safety TBD $47 Project (Str Approach Railing ) Beaumont US 96 At Quinn Marsh Upgrade Bridge and Safety TBD $71 Project to (Str Approach Railing ) Beaumont US 96 At Knupple Install Intersection Safety TBD $72 Project Flashing Beacon, Safety Lighting at Intersection Beaumont US 69 US 96 to Resurface Roadway TBD $400 Project Jefferson Co Line Beaumont US 69 Hardin County Install Mast Lighting Safety TBD $1,800 Project Line, South to North of SH

145 Beaumont US 59 Jacinto C/L Convert to 4 Lane Fwy W/ 2023 $47,900 Project to North End of Frontage Rds & Grade Cleveland Bypass Separations Beaumont US 69 Angelina County Reconstruct Existing 2 TBD $18,000 Project Line to Tyler Lane way to 4 Lanes County Line Divided Beaumont US 69 Jasper County Reconstruct Existing 2 TBD $90,000 Project Line to 1.35 mi Lane way to 4 Lanes South of RR 255 Divided Beaumont US mi N FM Safety Treat Fixed Objects Safety TBD $91 Project to FM 1013 Beaumont US mi S of FM Safety Treat Fixed Objects Safety TBD $261 Project to 1.6 mi N Hardin C/L Beaumont US 69 At FM 421 Improve Traffic Signals Safety TBD $106 Project Beaumont US 69 I-10 South Install Mast Lighting Safety TBD $4,066 Project Interchange to SH 347 Beaumont US 69 Spur 93, South to Rehabilitate Existing TBD $5,000 Project Spur 380 Frontage Roads (White Top) 46

146 Beaumont US 69 At The Lnva Upgrade Bridge and Safety TBD $54 Project Canal to (Str Approach Railing ) Beaumont US 69 At Airport Road to Upgrade Bridge and Safety TBD $143 Project (Str Approach Railing ) Beaumont US 69 At Nederland Ave Upgrade Bridge and Safety TBD $103 Project to (Str Approach Railing ) Beaumont US 69 Nederland Ramp and Intersection TBD $2,000 Project Avenue, South to Improvements FM 365 Beaumont Beaumont US 69 At 39th Improve Traffic Signals Safety TBD $159 Project US 69 FM 365 to SH 73 Safety Lighting Safety TBD $1,950 Project Beaumont US 190 Polk Co/L, East Construct Passing Lanes TBD $5,012 Project to Miles, West of FM

147 Beaumont US 190 At Neches River Replace Bridge and TBD $2,808 Project Relief to (Str Approaches ) Beaumont US 190 At Neches River Replace Bridge and TBD $11,557 Project Approaches Beaumont SH 63 On Texas Side of Replace Bridge Approach TBD $1,900 Project Sabine River Beaumont SH 63 At Brack Creek to Rehab Bridge TBD $520 Project (Str ) Beaumont SH 63 At Sabine River Replace Bridge TBD $15,000 Project Br at Louisiana St Beaumont SH 63 At Sabine River Replace Bridge TBD $0 Project Br at Louisiana St Beaumont SH 63 On Louisiana Replace Bridge Approach TBD $1,900 Project Side of Sabine River 48

148 Beaumont SH Miles N of FM Safety Treat Fixed Objects Safety TBD $410 Project to 1.0 Miles N of FM 3247 Beaumont Beaumont SH 87 At Park Ave Improve Traffic Signals Safety TBD $96 Project SH 87 At BU 90Y Improve Traffic Signals Safety TBD $148 Project Beaumont SH 105 Montgomery Reconstruct Pavement to TBD $10,000 Project County Line to 4 Lane Divided Rural Cleveland Bypass Beaumont SH mi E. of Safety Treat Fixed Objects, Safety TBD $208 Project FM 770 (S) to Texturize Shoulders 1.07 mi W of SH (Milled In) 326 Beaumont SH 105 FM 770, (East Widen way to Super 2 TBD $6,200 Project Intersection), Standard East to Miles East FM 770 Beaumont SH mi W of SH Safety Treat Fixed Objects, Safety TBD $31 Project to mi Texturize Shoulders W of Jefferson (Milled In) C/L 49

149 Beaumont SH 65 At East Fork Replace Bridge and TBD $600 Project Double Bayou to Approaches (Str ) Beaumont SH 124 At Buccaneer Dr Improve Traffic Signals Safety TBD $109 Project Beaumont SH 124 At W. Buccaneer Improve Traffic Signals Safety TBD $168 Project Dr. Beaumont SH 146 At Smiths Gully to Upgrade Bridge and Safety TBD $77 Project (Str Approach Railing ) Beaumont SH 146 At Mcgar Gully to Upgrade Bridge and Safety TBD $45 Project (Str Approach Railing ) Beaumont SH 146 At The Irrigation Upgrade Bridge and Safety TBD $56 Project Canal to (Str Approach Railing ) Beaumont SH 146 I-10 to FM 1405 Install Raised Median Safety TBD $2,778 Project 50

150 Beaumont SH 146 At FM 565 Improve Traffic Signals Safety TBD $137 Project Beaumont SH 12 Evangeline Ln. to Safety Treat Fixed Objects, Safety TBD $5,300 Project SH 62 Milled Edgeline Rumble Strips, Milled Centerline Rumble Strip,Install Passing Ln On 2Ln Rd Beaumont SH 12 At Linscomb Rd. Install Intersection Safety TBD $36 Project Flashing Beacon, Safety Lighting at Intersection Beaumont I-10 SH 146 to 0.25 Extend WB Turn Lane TBD $288 Project mi E. of SH 146 (WB Frontage Beaumont SH 73 FM 1663, East to Rehab and Extend Existing TBD $4,431 Project Miles West of Frontage Roads Jefferson Co/L Beaumont SH Miles West of Grade Separation & Close Safety TBD $1,110 Project Jefferson Co/L to Crossover Jefferson Co/L Beaumont SH 73 Chambers County Grade Separation & Close Safety TBD $9,296 Project Line, East to 0.5 Crossover Miles East of SH

151 Beaumont SH mi W of Safety Lighting Safety TBD $215 Project Englin to 0.1 mi E of Boondocks Beaumont SH 105 At Tarkington Upgrade Bridge and Safety TBD $45 Project Bayou Relief to Approach Railing (Str ) Beaumont SH 105 At Tarkington Upgrade Bridge and Safety TBD $121 Project Bayou to (Str Approach Railing ) Beaumont SH mi North of Milled Edgeline Rumble Safety TBD $2,016 Project FM 686 to 0.1 mi Strips,Install Passing South of FM 686 Lanes On 2 Lane Roadwy, Milled Centerline Rumble Strips Beaumont SH 321 SH 105 to 0.30 Safety Treat Fixed Objects Safety TBD $1,906 Project mi S of FM 1008 Beaumont FM 366 At Hogaboom Rd Improve Traffic Signals Safety TBD $91 Project Beaumont I-10 At Draw to (Str Upgrade Bridge and Safety TBD $49 Project Approach Railing 030) 52

152 Beaumont I-10 Cr 131 (Walden Widen Freeway From 4 to 2024 $155,000 Draft Road), East to US 6 Lanes 90 Beaumont I-10 US 69 (South Install Mast Lighting Safety TBD $1,391 Project Junction) to US 90 Beaumont I mi W of Safety Lighting Safety TBD $502 Project Walden to mi E of Walden Beaumont FM mi E of Provide Additional Paved Safety TBD $868 Project Byron Rd, East to Surface Width, Milled 0.02 mi W of FM Edgeline Rumble Strips, 1135 Milled Centerline Rumble Strips Beaumont FM 365 At Hillebrandt Replace Bridge and TBD $5,610 Project Bayou to (Str Approaches ) Beaumont FM 365 At Rhodair Gully Bridge Rehabilitation TBD $2,300 Project Beaumont FM 365 FM 1406, East to Add Shoulders and TBD $5,542 Project I-10 Overlay 53

153 Beaumont FM 365 At Pignut Gully Replace Bridge and TBD $175 Project Approaches Beaumont SH 105 SH 146, East to Widen way to Super 2 TBD $4,500 Project Hardin County Standard Line Beaumont FM mi E of FM Safety Treat Fixed Objects Safety TBD $410 Project to 0.6 mi E of FM 787 Beaumont SH 99 At I-10 East Construct 4 Dcs (Toll) TBD $76,000 Project (Segment I-2) Beaumont SH 99 Harris C/L to FM Construct 4-Lane Tollway TBD $40,075 Project (Segment I- & Interchanges 2) Beaumont SH 99 Harris C/L to US Construct 4-Lane Tollway TBD $156,943 Project (Segment H) With Interchanges and Two Non-Continuous Frontage Roads and Periodic Passing Lanes Beaumont SH 99 Liberty C/L to I- Construct 4-Lane Tollway TBD $65,998 Project (E) With Interchanges and (Segmenti-1) Two Non-Continuous Frontage Roads and Periodic Passing Lanes 54

154 Beaumont SH mi N of Construct 4 Mainlane TBD $17,410 Project Fisher Rd to 0.62 Tollway Overpass (Toll) mi W of Fisher Rd (Segment I-2) Brownwoo I-20 At Intersection of Reconstruct Interchange TBD $3,500 Project d LP 254 Brownwoo I-20 CR 235 Cross Replace Bridge TBD $1,750 Project d Brownwoo US 84 Taylor C/L253 mi Improve Guardrail Safety TBD $242 Project d SE of FM 702 Brownwoo US mi SE of FM Improve Guardrail Safety TBD $255 Project d to mi NW of US 283 Brownwoo US 67 Brown C/L924 Profile Center and Safety TBD $101 Project d mi E of 1176 Edgeline Markings Brownwoo US 84 US 84 WB Hords Replace Bridge and TBD $650 Project d Creek Appraoches Brownwoo US 84 US 84 EB at Replace Bridge and TBD $650 Project d Hords Creek Approaches Brownwoo US mi W of US Profile Center and Safety TBD $203 Project d to Coleman Edgeline Markings C/L 55

155 Brownwoo US 84 US 67 to Mills Improve Guardrail Safety TBD $227 Project d C/L Brownwoo US 84 Brown C/L to FM Improve Guardrail Safety TBD $247 Project d S Brownwoo US 84 Brown C/L to FM Profile Center and Safety TBD $135 Project d Edgeline Brownwoo US 84 FM 573 S to SH Improve Guardrail Safety TBD $254 Project d Brownwoo US 84 FM 573 to SL 15 Profile Center and Safety TBD $137 Project d Edgeline Brownwoo US 67 At Fort Worth & Rehab Existing Roadway, TBD $3,000 Project d Western Railroad Base, Acp, Storm Sewer, Guard Rail, Increase Overhead Clearance at Rr Underpass Brownwoo US 67 US 84 to Improve Guardrail Safety TBD $630 Project d Comanche C/L Brownwoo US 67 Comanche C/L to Profile Center and Safety TBD $206 Project d mi W of US Edgeline 84 Brownwoo US 67 Erath County Construct Super 2 TBD $400 Project d Line65 Miles South of The Erath C/L 56

156 Brownwoo US 377 Baker Street to Widen 4 Lane Undivided TBD $3,000 Project d FM 2524 to 4 Lane Divided With Flush Median Brownwoo US 377 US 67 to Profile Center and Safety TBD $312 Project d Mcculloch C/L Edgeline Brownwoo US 377 US 67 to Add Passing Lanes and TBD $9,455 Project d Mcculoch C/L Acp Overlay Brownwoo US 377 FM 2524 to Widen 4 Lane Undivided TBD $3,500 Project d Lipscomb St to 4 Lane Divided With Flush Median Brownwoo US 190 US 281 to Upgrade Guardrail Safety TBD $262 Project d mi NE of FM 2657 Brownwoo US 190 US 190 at Bridge Rail Replacement TBD $80 Project d Cooksey Creek Brownwoo US 281 Coryell C/L to US Upgrade Guardrail Safety TBD $655 Project d Brownwoo US 281 US 183 to Burnet Widen 4 Lane Undivided TBD $10,500 Project d C/L to 4 Lane Divided With Flush Median 57

157 Brownwoo SH 6 West City Limit of Expand 2 Lanes to 4 $9,690 Project d Deleon, East to Lanes With Center Turn East City Limit of Lane Deleon Brownwoo US 190 FM 45 to SH 16 Profile Center and Safety TBD $211 Project d Edgeline Markings Brownwoo US 190 SH 16 to Profile Center and Safety TBD $133 Project d Lampasas C/L Edgeline Markings Brownwoo US 183 US 190 to Profile Center and Safety TBD $202 Project d mi NW of FM 580 Edgeline Brownwoo US 183 US 190N to Profile Center and Safety TBD $66 Project d Burnet C/L Edgeline Brownwoo SH 279 FM 1849 to Add Passing Lanes TBD $8,500 Project d Brownwood City Limit Bryan SH 6 At Mud Creek Replace Bridge and TBD $500 Project Branch Approaches Bryan US Miles South Construct Turn Lanes TBD $3,390 Project of FM 391 to 1.02 Miles North of Osr 58

158 Bryan US 190 FM 2818 to Bs- Widen Non-Freeway TBD $20,000 Project R North Facility Consisting of Grading, Structures, Base and Surface Bryan SH 6 At Draw On Efr Replace Bridge and Safety TBD $65 Project and Wfr Approach Railing Or Add End Treatment Or Replace Guardfence Bryan SH 6 At Draw On NBml Replace Bridge and Safety TBD $64 Project and SBml Approach Railing Or Add End Treatment Or Replace Guardfence Bryan SH 6 At Burton Creek Replace Bridge and Safety TBD $125 Project On SBml Approach Railing Or Add End Treatment Or Replace Guardfence Bryan SH 6 At Burton Creek Replace Bridge and Safety TBD $125 Project On NBml Approach Railing Or Add End Treatment Or Replace Guardfence Bryan SH 6 At SH 30 Replace Bridge and Safety TBD $120 Project Approach Railing Or Add End Treatment Or Replace Guardfence 59

159 Bryan SH 6 At SH 30 Replace Bridge and Safety TBD $120 Project Approach Railing Or Add End Treatment Or Replace Guardfence Bryan SH 6 At Draw at Draw Replace Bridge and Safety TBD $55 Project On Efr and Wfr Approach Railing Or Add End Treatment Or Replace Guardfence Bryan US 190 At FM 974 On Replace Bridge and Safety TBD $117 Project SBml Approach Railing Or Add End Treatment Or Replace Guardfence Bryan US 190 Bs-6R North to Widen Non-Freeway TBD $20,000 Project SH 21 Facility Consisting of Grading, Structures, Base and Surface Bryan BS 6-R FM 2818 to 0.4 Miscellaneous Safety TBD $126 Project Miles South of Construction Consisting of FM 2818 Installation of A Raised Median, Surface and Markers Bryan SH 6 At Millican Creek Replace Bridge and Safety TBD $50 Project North Approach Railing Or Add End Treatment Or Replace Guardfence 60

160 Bryan SH 6 At Millican Creek Replace Bridge and Safety TBD $49 Project Approach Railing Or Add End Treatment Or Replace Guardfence Bryan SH 6 At Draw Replace Bridge and Safety TBD $35 Project Approach Railing Or Add End Treatment Or Replace Guardfence Bryan SH 6 At Upshur Creek Replace Bridge and Safety TBD $58 Project Approach Railing Or Add End Treatment Or Replace Guardfence Bryan SH 6 Bs-6R South to Widen Non-Freeway TBD $25,000 Project SH 40 Facility Consisting of Grading, Structures, Base and Surface Bryan SH 6 At FM 2 Safety Improvement Work Safety TBD $11,604 Project Consisting of Grading, Structures, Flexible Base, Surfacing and Pavement Markings Bryan SH 6 At Beason Creek Replace Bridge and Safety TBD $200 Project Approach Railing Bryan SH 6 At BNSF & UPRR Replace Bridge and Safety TBD $400 Project Approach Railing 61

161 Bryan US 84 SH 75 to FM Safety Work Consisting of Safety TBD $70 Project Rolled Or Milled In Texture Shoulders and Centerine Bryan US 84 FM 1364 to US Safety Work Consisting of Safety TBD $185 Project Rolled Or Milled In Texture Shoulders and Centerline Bryan US 290 At Indian Creek Replace Bridge and Safety TBD $51 Project Approach Railing Or Add End Treatment Or Replace Guardfence Bryan US 290 At Mayfield Creek Replace Bridge and Safety TBD $35 Project Approach Railing Or Add End Treatment Or Replace Guardfence Bryan US 290 At Drainage Ditch Replace Bridge and Safety TBD $50 Project Approach Railing Or Add End Treatment Or Replace Guardfence Bryan US 190 At Carters Creek Replace Bridge and TBD $950 Project Approaches Bryan SH 21 BS 6-R to SH 6 Widen Non-Freeway 2025 $13,000 Draft Facility 62

162 Bryan US 190 N Wilson Street New Non-Freeway Facility TBD $25,000 Project in Madisonville to Loop Around Madisonville SS 174 Bryan US 190 Town Branch Replacment of Existing TBD $475 Project Bridge Facility Consisting of Grading Structures and Base Bryan US 190 SS 174 to 0.2 W New Non-Freeway Facility TBD $55,000 Project of FM 2346 Loop Around Madisonville Bryan SH 75 Madison County Safety Work Consisting of Safety TBD $72 Project Line to I-45 Exit Texturizing Centerline Ramp Bryan US 190 The Bell County Widen Non-Freeway TBD $14,200 Project Line to 2.0 Facility Consisting of mieast of The Grading, Structures Flex Bell County Line Base, Pavement, Signs and Pavement Marking and Markers Bryan US Miles North Improve Cloverleaf TBD $20,000 Project of US Bu290 to Interchange 0.2 Miles South of US Bu290 Bryan US mi W of CR Safety Work Consisting of Safety TBD $49 Project to 0.2 mi E Rolled Or Milled Texture of US 77 Shoulders and Centerline 63

163 Bryan US mi W of SH Safety Work Consisting of Safety TBD $26 Project to 0.5 mi W of Rolled Or Milled In Texture CR 330 Shoulders and Centerline Bryan US mi W of The Replace Bridge and TBD $7,000 Project Little Brazos Approaches River to 0.6 mi E of The Little Brazos River Bryan US 79 At Brazos River Replace Bridge and TBD $15,000 Project Approaches Bryan US 79 Five Lane Section Widen to Four Lane TBD $60,000 Project in Buffalo to FM Divided Rural Section 39 Bryan US 79 Freestone County Safety Work Consisting of Safety TBD $125 Project Line to SH 75 Rolled Or Milled In Texture Shoulders Bryan US 77 At FM 485 Safety Improvement Work Safety TBD $15,231 Project Consisting of Grading, Structures, Flexible Base, Surfacing and Pavement Markings 64

164 Bryan US 77 At US 79 Miscellaneous Safety TBD $61 Project Construction Consisting of Installation of An Intersection Flashing Beacon Bryan US 77 US 79 to Lee Safety Work Consisting of Safety TBD $105 Project County Line Rolled Or Milled In Texture Shoulders and Centerline Bryan SH 30 Navasota River Replacment of Existing TBD $3,500 Project Relief #1 Bridge Facility Consisting of Grading Structures and Base Bryan SH 30 Navasota River Replace Bridge and TBD $5,500 Project Relief #2 Approaches Bryan SH 30 At Gibbons Creek Replace Existing Bridge TBD $6,000 Project Consisting of Grading, Structures, and Base Bryan SH 30 At Navasota River Replace Bridge and TBD $7,500 Project Approaches Bryan US 190 SH 19 to Safety Work Consisting of Safety TBD $138 Project Jacinto County Rolled Or Milled In Texture Line Shoulders and Centerline 65

165 Bryan FM mi W of FM Rehabilitate Existing Road TBD $1,250 Project to Caney Consisting of Grading, Creek Relief Structures Flex Base and Bridge Surface Bryan FM 27 Caney Creek Widen Existing Road TBD $500 Project Relief Bridge to Consisting of Improve CR 941 Shdrs, Seal Coat Bryan FM 27 FM 80 to US 84 Safety Work Consisting of Safety TBD $54 Project Milled Edgeline and Centerline Rumble Strips Bryan OSR Brazos County Rehabilitation of Existing TBD $15,000 Project Line to 6.5 mi Road Consisting of East of FM 39 Grading, Structures, Base, (Pond Branch) Surface and Pavement Markings Bryan OSR Brazos County Safety Work Consisting of Safety TBD $250 Project Line to SH 75 Profile Marking Texture Shoulders Centerline Bryan OSR At Navasota River Replace Bridge and TBD $4,600 Project Approaches Bryan OSR At Cottonwood Replace Bridge TBD $635 Project Creek 66

166 Bryan OSR At Red Bank Widen Bridge TBD $504 Project Creek Bryan OSR At Branch of Replace Bridge TBD $553 Project Carryall Creek Bryan OSR At Carryall Creek Widen Bridge TBD $504 Project Bryan OSR At East Caney Replace Bridge TBD $750 Project Creek Bryan OSR SH 75 to SH 21 Safety Work Consisting of Safety TBD $134 Project Profile Marking Texture Shoulders and Centerline Bryan FM 60 Burleson County Safety Work Consisting of Safety TBD $55 Project Line to FM 2818 Rolled Or Milled In Texture Shoulders and Centerline Bryan FM 60 SH 6 (Fr South) Replace Bridge and Safety TBD $172 Project to SH 6 (Fr North) Approach Railing Or Add End Treatment Or Replace Guardfence 67

167 Bryan FM 2154 SH 40 to Safety Work Consisting of Safety TBD $174 Project Miles North of SH Rolled Or Milled In Texture 6 Shoulders and Centerline Bryan FM 2154 SH 40 to Greens Widen Non-Freeway 2024 $29,000 Draft Prairie Trail Facility Bryan FM 39 Osr to Grimes Safety Work Consisting of Safety TBD $160 Project County Line Profile Marking Texture Shoulders and Centerline Bryan FM 39 Trinity River Replacment of Existing TBD $950 Project Relief Bridge Facility Consisting of Grading Structures and Base Bryan I-45 US 84 to 1.6 One-Way Frontage Road TBD $2,000 Project Miles North of Conversion FM 27 Bryan I-45 US 84 to Navarro Safety Treat Fixed Objects Safety TBD $466 Project County Line Bryan I Miles South One-Way Frontage Road TBD $1,740 Project of US 84 to US Conversion 84 Bryan I-45 Leon County Line Safety Treat Fixed Objects Safety TBD $466 Project to US 84 68

168 Bryan I Miles South Schematic Development TBD $300 Project of US 79 to For One-Way Frontage Freestone County Road Conversion Line Bryan I-45 At SH 164 Safety Work Consisting of Safety TBD $100 Project A Dragnet Vehicle Arresting Barrier Bryan I Miles South Ramp Relocation TBD $7,653 Project of US 79 to 1.0 Consisting of Grading, Miles North of US Structures, Flexible Base, 79 Hma, Concrete Pavement, Signs and Pavement Markings Bryan I-45 SH 7 to Safety Treat Fixed Objects Safety TBD $536 Project Freestone County Line Bryan I-45 Madison County Safety Treat Fixed Objects Safety TBD $536 Project Line to SH 7 Bryan I-45 Walker County Safety Treat Fixed Objects Safety TBD $215 Project Line to Leon County Line 69

169 Bryan I-45 SH 30 to 0.7 Widen Freeway Consisting TBD $130,000 Project Miles South of of Grading, Structures, FM 1696 Flexible Base, Hma, Concrete Pavement, Signs and Pavement Markings Bryan I Miles South Widen Freeway Consisting TBD $155,000 Project of FM 1696 to of Grading, Structures, 0.8 Miles North Flexible Base, Hma, of FM 2989 Concrete Pavement, Signs and Pavement Markings Bryan I-45 SH 30 to Safety Treat Fixed Objects Safety TBD $627 Project Madison County Line Bryan I Miles North Widen Freeway Consisting 2021 $170,380 Draft of SH 19 to SH of Grading, Structures, 30 Flexible Base, Hma, Concrete Pavement, Signs and Pavement Markings Bryan I-45 Montgomery Safety Treat Fixed Objects Safety TBD $627 Project County Line to SH 30 Bryan FM 2818 FM 2154 to FM Miscellaneous Safety Safety TBD $1,112 Project Work Consisting of The Installation of A Raised Curbed Median 70

170 Bryan FM Miles North Safety Work Consisting of Safety TBD $60 Project of FM 1179 to Rolled Or Milled In Texture 1.1 mi South of Shoulders and Centerline FM 2347 Bryan SH 30 BS 6-R to FM Widen to 4 Lanes TBD $25,000 Project Construct Raised Medians Bryan FM 2818 US 190 to 0.22 Safety Work Consisting of Safety TBD $65 Project mi North of FM Rolled Or Milled In Texture 1179 Shoulders and Centerline Childress US 83 FM 2033, South Super 2 TBD $1,720 Project to Collingsworth C/L Childress US 83 Wheeler C/L, Super 2 TBD $6,100 Project South to Miles Childress US Miles Super 2 TBD $1,400 Project South of Wheeler C/L, S to FM 1439 Childress US 83 FM 338, South to Super 2 TBD $5,692 Project Childress C/L Childress US 83 Collingsworth Super 2 TBD $1,575 Project C/L, South to FM

171 Childress US 82 King C/L, East to Super 2 TBD $10,885 Project SH 6 Corpus I-37 Ih37/Us77 Construct Additional Travel TBD $71,000 Project Christi Interchange to Lanes South of Sh188 (Control Break) Corpus I-37 At Ih37/I69E Modify Exit Ramp to TBD $8,000 Project Christi Interchange to I69E/FM 624 Direct On Exit 14A Connector Corpus SH 359 SH 443 mi N of Rehabiliate Roadway and 2019 $5,520 Project Christi Cr325 (Control Add Passing Lanes Break) Corpus SH 359 Patricio Rehabilitate Roadway and 2019 $8,250 Project Christi County Line to US Add Passing Lanes 181 Corpus US 59 2 Miles SW of FM Route Feasibility Study US TBD $1,200 Project Christi to 2 Miles 59 Beeville NE of US 181 Corpus US 59 On Us59 at Replace Bridge and TBD $10,000 Project Christi Antonio River Approaches Str.9 to 3.0 mi SW of US

172 Corpus US 181 At Sh80/BU Reconstruct Intersection TBD $5,000 Project Christi E Intersection Corpus US 181 On US 181 at SH Construct Grade Safety $6,110 Project Christi Intersection Separation Corpus US 181 Sunset Road to Construct Auxiliary Lanes $11,000 Draft Christi FM 3239 (Buddy and Ramp Reversal To Ganem) Exist 4-Ln Freeway Corpus US 181 On Us181 at Constr. Grade Separation Safety $40,000 Draft Christi Sh35 Over Sunset Rd By Intersection Building 4-Ln Divided Mainlanes at Existing at Grade Inters Corpus US mi W of CR Construct/Extend Turn TBD $2,000 Project Christi to 1.2 M E Lanes of CR 3667 Corpus SH 89 On SH 89 at Construct Grade Safety $6,110 Project Christi Us181 Separation Intersection Corpus US 77 Cr4 to FM 70 Construct Exit Ramps NB TBD $3,000 Project Christi Only Corpus US 77 CR 2130 to 1.5 Construct Mainlanes, TBD $80,000 Project Christi mi N. of SH 285 Frontage Roads and Structures 73

173 Corpus US 183 On US 183 Str5 Bridge Replacement 2019 $3,220 Project Christi at Manahuilla Creek to 2.3 mi N. of US 59 Corpus US 183 SH 239 to Rehabilitate Roadway and $18,000 Project Christi Refugio County Add Passing Lanes Line Corpus US 183 Goliad County Rehabilitate Roadway and $9,000 Project Christi Line to SH 202 Add Passing Lanes Corpus SH 35 On SH 35 at Construct Grade Safety $14,775 Project Christi Corpus Christi St. Separation Inter Corpus SH Mile Construct Oak Lane 2019 $15,000 Project Christi Northeast of Oak Interchange Lane to 0.4 Mile Southwest of Oak Lane Corpus SH mi W. of FM Construct Grade Safety TBD $9,900 Project Christi to 2.0 mi Separation W. of FM 1069 Corpus SH 361 On Sh361 at Preliminaty Eng. For TBD $30 Project Christi Sh35 Inters. of Preemption of Traffic FTrgs Signal at Inters. 74

174 Corpus SH 361 At Sh35 Upgrade/Add Direct 2026 $60,000 Draft Christi Interchange6 mi Connectors SE On SH 361 Corpus US 281 US 281 at CR Construct Grade Safety $25,000 Project Christi & 117 Inter Separation Corpus SH 80 SH 123 to BU Rehab Roadway, Widen TBD $3,500 Project Christi E and Add Signal Corpus BU 181E Inter. SH 80 to Rehab Roadway, Widen TBD $8,500 Project Christi US 181 and Add Signal Corpus SH 119 Dewitt County Rehab Roadway and Add TBD $6,000 Project Christi Line to US ' Shldrs Corpus SH 119 SH 80 to Dewitt Rehab Roadway and Add TBD $11,000 Project Christi County Line 10' Shldrs Corpus US 77 Chiltipin Creek Br Upgrade to Freeway TBD $40,000 Project Christi (Control Break) to Standards Business North (Sinton) 75

175 Corpus US 77 Business South Upgrade to Freeway TBD $40,000 Project Christi (Sinton) to Standards Chiltipin Creek Br (Control Break) Corpus SH 44 SH 44 to US 77 Construct Direct TBD $45,000 Project Christi Connectors On New Location Corpus SH 141 US 281 to Construct Passing Lanes $3,000 Project Christi Kleberg County Line Corpus SH 141 Jim Wells County Contruct Passing Lanes $7,000 Project Christi Line to ta Gertrudis Ave. Corpus SH 202 Blanco Creek Str Replace Bridge and TBD $2,530 Project Christi On SH 202 to Approaches 3.2 mi W of US 183 Corpus SH 358 Airline Road to Ramp Reversal Phase Ii-C TBD $35,000 Project Christi Everhart Road (Braided Ramps) Corpus FM 624 Orange Grove to Widen and Add Passing 2019 $18,000 Project Christi US 281 Lanes Corpus FM 665 US 77 to FM 43 Add Passing Lanes TBD $20,000 Project Christi

176 Corpus SH 357 FM 665 (Old Construct 2 Additional TBD $12,000 Project Christi Brownsville Rd) Lanes With Continuous to Cuernavaca Left Turn Lane Street Dallas SH 78 In Garland From Traffic Signals and Safety TBD $3,204 Project I-635 to Forest Intersection Improvement Lane Dallas SH 78 Miller Rd to SH Construct 0 to 4 Lane TBD $12,607 Project way Dallas SH 66 At Lake Ray Slope Failure Repair TBD $1,500 Project Hubbard Bridge EB to North Slope Near East End Dallas I-30 I-45 to Bass Pro Rcnst 6 Ln Discont to 6 Ln TBD ######## Project Drive (In Garland) Contin Frtg Rd; I-45 to Us80:Rcns & Wdn 8 to 10 Ml; Us80 to Bass Pro: Rcnst & Wdn 6 to 8 Ml Dallas I-30 I-35E to I-45 Reconstruct and Widen 8 TBD $121,289 Project to 10 Mainlanes and Reconstruct and Widen 4 Ln Discontinuous to 6 Lane Continuous Frontage Roads 77

177 Dallas I-30 Bass Pro Drive in Widen 6 to 8 Mainlanes. TBD $24,077 Project Garland to Dalrock Rd Dallas I-30 US 80 to North Full Depth Concrete TBD $1,376 Project Galloway Repair On EB Frontage Roads Dallas I-30 Gus Thomasson Full Depth Concrete TBD $2,475 Project Rd to North Pavement Main Lanes Galloway Ave Dallas I mi W End of Flexible Pavement Repair, TBD $5,650 Project Ray Hubbard Br Overlay and Pavement to Hunt County Markings (Frontage Roads Line Only) Dallas I-30 Dalrock Rd Reconstruct & Widen 6 to TBD $71,629 Project (Dallas C/L) to 8 Ml & Reconstruct 0/4 SH 205 Discont to 6 Lane Continuous Frontage Roads Across Lake Ray Hubbard Dallas I-30 SH 205 to West Reconstruct and Widen TBD $235,925 Project of FM 2642 From 4 to 6 Mainlanes (Hunt C/L) and Reconstruct Existing 4 Ln Frtg Roads Dallas I-30 Dalrock to Construct 0 to 6 Lane TBD $197,017 Project Horizon Frontage Roads 78

178 Dallas SH 5 SH 121 to CR Reconstruct and Widen TBD $70,443 Project Two Lane Rural way to Four Lane Urban Dallas SH 5 Spur 399 to SH Reconstruct and Widen 2023 $75,909 Draft /4 Lane Undivided Roadway to 4/6 Lane Divided Urban Roadway Dallas US 75 Dallas County Widen Freeway and Add 2034 ######## Project Line to SH 121 / Managed Lanes Spur 399 Dallas US 75 Dallas County Remove Hov Lanes and TBD $7,261 Project Line to Bethany Add Peak Hour Travel Drive Lanes Dallas US 75 Bethany Drive to Reconstruct Ridgeview TBD $23,335 Project SH 121 Interchange Dallas US 75 I-635 to Collin Widen Freeway and Add 2034 ######## Project County Line Managed Lanes Dallas US 75 At Forest Lane Improve Traffic Signals Safety TBD $406 Project Dallas US 75 I-635 to Collin Remove Hov Lanes and TBD $5,584 Project County Line Add Peak Hour Travel Lanes 79

179 Dallas US 75 At Walnut Hill Ln Improve Traffic Signals Safety TBD $446 Project in The City of Dallas Dallas US 75 North of CR 370 Widen and Reconstruct TBD $46,883 Project to CR 375 From 4 Lane to 6 Lane (Grayson County Freeway and Reconstruct Line) Existing 4 Lane to 4/6 Lane Frontage Roads Dallas US 75 Frontage Rds One Course Surface TBD $618 Project North of Mantua Treatment, Back Filling, Rd to CR 375 Signing and Restriping of (Grayson C/L) Frontage Roads Dallas SH 342 Simpson Stuart Mill, Full Depth Repair & TBD $1,507 Project Rd to SL 12 Overlay Dallas US 77 At UPRR and Replace Bridge and TBD $8,014 Project Waxahachie Approaches Creek Dallas US 77 South of FM 66 Reconstruct and Convert 2 TBD $11,778 Project to North of Lane Undivided to 4 Lane Mcmillan Street Divided One-Way Couplet 80

180 Dallas I-35E US 77 South to Recon 5 Interchanges(Bus TBD $213,432 Project US 77 North Us287/Us287 Bypass/Lofland/Butcher (FM 387)/Sterret Rd) and Frontage Roads & Ramp Modifications Dallas I-35E At FM 1446 Reconstruct Interchange TBD $30,000 Project at FM 1446 Including Frontage Roads and Ramps Construction Dallas I-35E At FM 66 Reconstruct Interchange TBD $30,000 Project at FM 66 Including Frontage Roads and Ramps Construction Dallas US 377 At SH 114 in Replace Bridge and TBD $2,190 Project Roanoke Approaches Dallas US 377 South of FM Reconstruct and Widen 2 TBD $76,567 Project to Crawford Lane Rural way As 4 Road Lane Divided Urban Dallas US 377 SH 114 to South Reconstruct and Widen 2 TBD $56,132 Project of FM 1171 Lane Rural way to 4 Lane Divided Urban 81

181 Dallas US 377 Crawford Rd to Reconstruct and Widen 2 TBD $53,070 Project North of Hickory Lane Rural way As 4 Creek (C-S Break) Lane Divided Urban Dallas US 377 At Marshall Creek Installation of Traffic Safety TBD $195 Project in The City of Signals Roanoke Dallas US 377 North of Hickory Reconstruct and Widen 2 TBD $11,780 Project Creek to FM Lane Rural way As Lane Divided Urban Dallas I-35W SH 114 to I- Widen 4 Lane Rural to 6 TBD $440,678 Project /Ih35E Lane Urban Freeway With Interchange Ramp Relocation and Construct 0 to 4 Lane Frontage Roads Dallas I-35W Tarrant County Widen 4 Lane Rural TBD $103,200 Project Line to SH 114 Freeway to 6 Lane Urban Freeway With Ramp Relocation and 2 Lane Frontage Roads Dallas I-35W SH 114 to I- Widen 4 Ln Rural to 6 Ln TBD $439,571 Project /Ih35E Urban Freeway W/Ramp Interchange Relocation, Construct 0 to 4 Ln Frtg Rds & 0 to 4 Ln Managed Lanes 82

182 Dallas I-35W Tarrant County Reconstruct From 4 Lanes TBD $135,620 Project Line to SH 114 to 6 Gp Lanes and Add Managed Toll Lane Connections Dallas I-35W At W Graham Br Replace Bridge and Safety TBD $1,035 Project & KCS RR NB & Approach Railing SB Dallas SH 289 N Bus 289C, Reconstruct and Widen 2 TBD $15,401 Project North of Celina to Lane Rural way to 4 N CR 60/CR 107 Lane Divided Urban (Grayson C/L) Dallas SH 289 CR 83 to Carter Slope Failure Repair TBD $610 Project Ranch Rd Dallas SH 289 Rockhill Parkway Improve Traffic Signals Safety TBD $32 Project to North of Eldorado Parkway Dallas SH 289 Alliance Blvd to Int Improvements to Rmv TBD $4,777 Project Dexter Dr and On Dbl Int,Add Dual Lft Turn to Plano Pkwy Lns& Rght Turn Ln At Ea From Ventura to Approach;Rcnst Alliance Burnham Blvd Int;Add Sidewalks 83

183 Dallas SH 289 At Pgbt Widen Bridge to Provide 2 TBD $3,781 Project Left Turn Lanes For Pgbt Entrance Ramps; Widen SB Right Turn Lane at Pgbt Dallas SH 289 Warren Parkway Intersection TBD $2,316 Project to FM 3537 Improvements at Main, Stonebriar/Rolater, Wade, Lebanon & Warren Including Turn Lanes & Signal Improvments Dallas SH 289 SH 190 (Pgbt) to Improve Traffic Signals Safety TBD $38 Project West Plano Pkwy and Interconnect Signals Dallas SH 289 At Lorimar Rd Improve Traffic Signals, Safety TBD $10 Project Interconnect Signals Dallas SH 289 At W Park Blvd Improve Traffic Signals, Safety TBD $12 Project Interconnect Signals Dallas SH 289 Eldorado Pkwy to Improve Traffic Signals Safety TBD $109 Project John Hickman Pkwy Dallas SH 289 At Campbell Rd Improve Traffic Signals Safety TBD $303 Project in The City of Dallas 84

184 Dallas SH 310 At Lamar St and Replace Bridge and TBD $31,220 Project Union Pacific RR Approaches Dallas SH 310 Pennsylvania Reconstruct I-45 and Sm 2019 $9,581 Draft Avenue to North Wright Interchange of Al Lipscomb Way Dallas I-45 At South of Matt Slope Failure Repair TBD $1,100 Project Rd Dallas I-45 At FM 664 Construct Interchange TBD $34,000 Project Dallas BI 45-G Martin Luther Installation of Traffic Safety TBD $209 Project King Dr to FM Signals 1181 (Greenville Rd) Dallas BI 45-F Southbound at Replace Bridge and TBD $1,752 Project Draw Approaches Dallas BI 45-F Southbound at Replace Bridge and TBD $2,414 Project Briar Creek Approaches 85

185 Dallas BI 45-F Northbound at Replace Bridge and TBD $1,752 Project Draw Approaches Dallas BI 45-F Northbound at Replace Bridge and TBD $2,414 Project Briar Creek Approaches Dallas I-345 I-30 Interchange Repair Steel Elements TBD $4,439 Project to Spur 366 Subject to Fatigue Loading Interchange On Ramps and Direct Connectors Dallas I-45 Lenway St. to Reconstruct I-45 and Sm 2019 $24,341 Draft Good Latimer Wright Interchange Dallas I-345 North Good Full Depth Concrete TBD $351 Project Latimer Expy to Repair On Frontage Roads SS 366 Dallas SS 482 At SH 114 & SH Reconstruct Interchange TBD $103,620 Project (Ph 2) Dallas SH Mile East of Recon Existing 8 Gp Lns, $59,500 Draft Loop 12 to West to 6 Conc Hov/M Lns, and End of Elm Fork 4/6 Disc to 6/8 Ln Cont Trinity Rv Br Frontage Rds 86

186 Dallas SH 183 West End of Elm Recon and Widen 6/8 to 2027 $160,850 Draft Fork Trinity Rv Br 6/8 Gp Lns, 2 to 4/6 to West of I-35E Hov/M Lns & Recon 4/6 Disc to 4/8 Ln Cont Frontage Rds (Ult) Dallas US 80 Belt Line Rd to Reconstruct and Widen $143,886 Draft Lawson Rd to 6 Mainlanes and 4 to 6 (Dallas/Kaufman Lane Frontage Roads C/L) Dallas US 80 East of Town Reconstruct and Widen 4 TBD $338,928 Project East Blvd to Belt to 6 Mainlanes and 4 to 6 Line Rd Lane Frontage Roads and Reconstruct I-635 Interchange Dallas US 80 N Galloway Ave Mill, Base Repair & TBD $640 Project to Hillcrest St Overlay Frontage Road Dallas US 80 At FM 460 Replace Bridge and TBD $1,665 Project Approaches Dallas US 80 FM 460 to FM Reconstruct Existing TBD $2,080 Project Pavement and Add Shoulders On Frontage Road 87

187 Dallas US 80 At SH 205/FM Intersection TBD $8,941 Project Improvements Dallas US 80 I-30 to East Town Reconstruct and Widen 4 TBD $136,302 Project East Blvd to 6 Mainlanes and 4 to 6 Lane Frontage Roads Dallas I-20 Lawson Rd to Add Continuous Frontage TBD $60,540 Project Kaufman County Roads Line Dallas I-20 Seagoville Rd to Full Depth Concrete TBD $5,021 Project Lawson Rd Repair On Mainlanes and Frontage Roads Dallas I-20 Dallas County Add Continuous Frontage TBD $325,430 Project Line to SP 557 Roads Dallas US 287 I-45 to County Reconstruct and Widen to TBD $46,131 Project Road SE 2040 Four Lanes Dallas US 380 Airport Rd to 4th Widen 4 Lane Roadway to TBD $30,000 Project Street 6 Lanes With Raised Median Dallas US 380 At Airport Drive Add Second Westbound TBD $493 Project Left Turn Lane Dallas US 380 4th Street to CR Widen 4 Lane Roadway to TBD $2,548 Project Lane With Raised Median 88

188 Dallas US 380 US 377 to West Widen 4 to 6 Lanes 2021 $110,578 Draft of CR 26 (County Divided Urban W/ Int Imp Line) at FM 423, FM 720, Navo Rd, Teel Pkwy and Legacy Dr Dallas US 377 SL 288 to US Add Raised Median With 2021 $15,720 Draft / US 380 Left Turn Lanes, Add Right Intersection Turn Lanes and Restripe For Shared Use Dallas US 287 At St. Paul Road Slope Failure Repairs TBD $1,230 Project Dallas US 287 Johnson County Installation of Its Fiber & Technology TBD $472 Project Line to SH 360 Equipment and Ops. Improv Dallas US 287 At Walnut Grove Construct Interchange TBD $21,776 Project Road Dallas BU 287S Yorkstown Dr to Installation of Traffic Safety TBD $210 Project S.E. Main St Signals Dallas SH 34 Kings Creek to Rehab Existing Roadway TBD $2,646 Project FM 1388 and Add Shoulders 89

189 Dallas SH 34 At Kings Creek Replace Bridge and TBD $3,419 Project Approaches Dallas SH 34 At Kings Creek Replace Bridge and TBD $2,592 Project Relief No 3 Approaches Dallas I-35 US 77 (North of Widen 6 Lane Rural to 8 TBD $124,360 Project Denton) to Cooke Lane Urban Freeway County Line Dallas I-35 At FM 3163 Rehabilitate Bridge Deck TBD $893 Project Dallas US 77 US 380 to FM Base Repair, Mill, Overlay TBD $2,546 Project and Pavement Markings Dallas I-35 US 77 (North of Reconstruct and Widen 4 TBD $582,280 Project Denton) to Cooke to 6 Lane Rural Freeway County Line With Ramp Modifications and Reconstruct 4 Lane Frontage Roads Dallas I-35 At Trietsch Replace Bridge and Safety TBD $195 Project Branch Approach Railing Dallas I-35 US 380 to US 77 Widen 6 Lane Rural to 8 TBD $23,770 Project North of Denton Lane Urban Freeway 90

190 Dallas I-35 US 380 to US 77 Reconstruct and Widen 4 TBD $70,666 Project North of Denton to 6 Lane Rural Freeway With Ramp Modifications and 4 Lane to 4/6 Lane Frontage Roads Dallas US 77 I-35E to US 380 Base Repair, Mill, Overlay TBD $5,501 Project and Pavement Markings Dallas I-35E Turbeville Rd to Reconstruct 6/8 to 8 Gp TBD $388,006 Project US 77 Lanes; Reconstruct and Convert 2 Reversible to 4 Concurrent Managed Lanes Dallas I-35E Dallas County Recon & Convert 2-R to $720,605 Draft Line to FM 407 Con Mgd;Recon 6 to 6/8 Cd Lns (Dallas C/L to SH 121);Recon 8 to 8 Gp Lns(Sh 121 to FM 407) Dallas I-35E FM 407 to Reconstruct Existing 4 Gp 2025 $499,218 Draft Turbeville Road Lanes (NB Only); Widen and Convert 2 Reversible to 4 Concurrent Managed Lanes Dallas I-35E SH 183 to Loop Reconstruct and Widen TBD $179,023 Project (NW Hwy) From 6 Lanes to 8 Lanes 91

191 Dallas I-35E I-30 to North of 8/10/12 Lanes With TBD $846,802 Project Oak Lawn Ave Auxiliary Lanes and Two- Lane Reversible Hov/M Lane With 4/6 Frontage Roads Dallas I-35E Lombardy Lane Construct SB Frontage TBD $6,568 Project to Spur 482 Road and Entrance and (Storey Rd) Exit Ramps Dallas I-35E North of Oak Slope Failure Repairs TBD $3,700 Project Lawn to South of Commonwealth Dr. Dallas I-35E North of Oak 8/10/12 Lanes With TBD $513,292 Project Lawn Ave to SH Auxiliary Lanes and Two- 183 Lane Reversible Hov/M Lane With 4/6 Frontage Roads Dallas I-35E I-30 to Reunion Convert Existing $2,763 Project Blvd Reversible Hov Lanes to 2 Reversible Express Lanes 92

192 Dallas I-35E I-635 to Denton Recon & Convert 2-Rev to 2026 $494,847 Draft County Line 4-Con Mgd Ln;Recon 6 to 8 Gp Lns(I-635 to SH 121);Recon 6 to 6/8 Cd Lns (Sh 121 to Denton C/L) Dallas I-35E South of Slope Failure Repair TBD $3,100 Project Commonwealth Dr to SS 348 Dallas I-35E Oak Lawn Ave to Full Depth Repair, Mill and TBD $12,424 Project Northwest Inlay On Mainlanes way Dallas SL 354 At Lombardy Improve Traffic Signals Safety TBD $290 Project Lane Dallas SS 366 I-35E to US 75 Install Guide Signs TBD $141 Project Dallas US 175 Seagoville Rd to Slope Failure Repairs TBD $2,906 Project Malloy Bridge Rd Dallas US 175 East of E. Malloy Ramp Modifications 2019 $2,000 Draft Bridge Rd to Kaufman County Line 93

193 Dallas US 175 I-20 to Kaufman Mill, Full Depth Pvmt. TBD $4,125 Project County Line Repair, Acp Overlay and Pavement Markings On Mainlanes and Frontage Roads Dallas US 175 FM 148 to CR Construct New 2-Lane 2020 $11,419 Draft in Crandall Frontage Roads; Convert Existing Fr Rd From 2- Lane 2-Way to 2-Lane 1- Way Fr Rd & Ramp Modifications Dallas US 175 E of FM 148 to Flexible Pavement Repair, TBD $2,752 Project East of CR 4106 Level Up, Sealcoat and Pavement Markings On Frontage Roads Dallas US 175 Various Locations Replace Bridge and Safety TBD $1,312 Project From Dallas C/L Approach Railing to FM 1390 Dallas US 175 Brushy Creek Mill Overlay and Pavement TBD $5,401 Project Relief to FM Markings (Mainlanes Only) 2860 Dallas US 175 At Little Replace Bridge and Safety TBD $157 Project Cottonwood Approach Railing Creek 94

194 Dallas US 67 At Lake Ridge Construct Interchange - TBD $19,428 Project Pkwy Phase 1 Dallas US 67 FM 1382 to Construct 0 to 1 Rev TBD $40,112 Project South of I-20 Hov/Managed Lane Dallas SH 78 SH 66 to Walnut Construct 0 to 4 Lane TBD $10,269 Project St way Dallas SS 348 Luna Rd to Slope Failure Repairs TBD $550 Project Spangler Rd Dallas SH 114 At Belt Line Road Intersection TBD $100 Project Improvements Dallas SS 244 Northwest Traffic Signal and Safety TBD $380 Project way at Plano Pedestrian Improvements Rd Dallas SS 244 On Northwest Traffic Signal and Safety TBD $359 Project Hwy at Jupiter in Pedestrian Improvements Dall Dallas SL 12 At Skillman Reconstruct Grade TBD $14,922 Project Separation As A Spui Dallas SH 114 West of US 377 Construct 0 to 6 Lane TBD $47,724 Project to East of US 377 Grade Separation Over US

195 Dallas SH 121 On Southbound Construct Right Turn Lane TBD $168 Project Frtg Rd at Ohio Drive Dallas SS 399 At SH 5 Construct Grade Safety TBD $16,105 Project Separation Dallas SH 352 At Prairie Creek Improve Traffic Signals Safety TBD $259 Project Dallas SH 352 At St Augustine in Improve Traffic Signals Safety TBD $264 Project The City of Dallas Dallas I-35E I-20 to US 67 Construct 0 to 1 TBD $54,336 Project Reversible Hov/Managed Lanes Dallas I-35E At Bear Creek Intersection Improvement TBD $1,800 Project Road Dallas SH 205 N of SH 66 to S Widen Two Lane Rural TBD $84,814 Project of FM 548 way to Four Lane Divided (Ultimate Six) Dallas I-20 Sp 557 to East of Add Continuous Frontage TBD $122,260 Project CR 138 (Wilson Roads Rd) 96

196 Dallas SH 121 North of FM 455 Rcnst & Widen From 2 Ln TBD $46,555 Project to CR 635 to 4 Ln Rural Divided; (Fannin County Construct 0 to 2 Ln Line) Discontinuous Frontage Road and FM 2862 Interchange Dallas SH 121 Collin County Rcnst & Widen From 2 Ln 2027 $50,525 Draft Outer Loop to to 4 Ln Rural Divided; North of FM 455 Construct 0 to 4 Ln Discontinuous Frontage Road and FM 455 Interchange Dallas SH 121 South of SH 160 Reconstruct and Widen TBD $16,200 Project to North of SH Two Lane Rural to Four 160 Lane Rural Divided Dallas SL 12 At Mockingbird / Replace Bridge and TBD $3,997 Project Peavy Approaches Dallas SL 12 At Samuel Blvd Improve Traffic Signals Safety TBD $331 Project Dallas SL 12 At Lake June Rd Improve Traffic Signals Safety TBD $281 Project in The City of Dallas 97

197 Dallas SL 12 At Military Pkwy Improve Traffic Signals Safety TBD $449 Project in The City of Dallas Dallas SL 12 At Forney Rd in Improve Traffic Signals Safety TBD $309 Project The City of Dallas Dallas SL 12 At East Lake Improve Traffic Signals Safety TBD $320 Project lands in The City of Dallas Dallas SL 12 At Jim Miller Rd Improve Traffic Signals Safety TBD $311 Project in The City of Dallas Dallas SL 12 At Singing Hills in Improve Traffic Signals Safety TBD $221 Project The City of Dallas Dallas SL 12 Sp 408 to South Constr 0 to 2 Rev TBD $672,000 Project of SH 183 Hov/Mngd Ln;Sh183 to Sh356:Wdn 6 to 8 Gp & 4/6 Disc to 6/8 C- Fr;Sh356 to Sp408:Wdn 4 Disc to 4/8 C-Fr Dallas SL 12 At SH 183 Reconstruct Interchange TBD $214,398 Project (Ph 2) Dallas SL 12 At I-30 Construct Direct TBD $50,000 Project Connectors (Phase 1) 98

198 Dallas I-30 SH 161 to NW Construct 0 to 4 Lane TBD $22,698 Project th Street in Frontage Roads Grand Prairie Dallas I-30 NW 7th Street to Construct 0 to 2/3 Lane TBD $14,446 Project Beltline Road Westbound Frontage Road and Ramp Modifications Dallas FM 423 Panther Creek Improve Traffic Signals Safety TBD $36 Project Parkway to FM 720 (Little Elm Parkway) Dallas FM 423 FM 720 (Little Improve Traffic Signals Safety TBD $34 Project Elm Parkway) to King Road Dallas FM 423 King Road to Improve Traffic Signals Safety TBD $48 Project Lebanon Road Dallas SS 303 At Duncanville Rd Improve Traffic Signals Safety TBD $265 Project Dallas SL 288 US 380 West of Construct Two Lane Rural TBD $11,099 Project Denton to I-35 at Roadway On New Location LP 288 Ph 1 of Ultimate Freeway - Extension of Loop

199 Dallas SL 288 I-35W South of Construct Two Lane Rural TBD $31,583 Project Denton to US Roadway On New Location 380 West of Ph 1 of Ultimate Freeway - Denton Extension of Loop 288 Dallas I-635 Miller Road to Widen 8 to 10 Gp Lanes, 2020 $294,443 Draft West of The KCS Widen 2 to 4 Concurrent RR (West of SH Hov/Managed Lanes & 78) Reconst 4/6 Discontinuous to 4/6 Continuous Frtg Rds Dallas I-635 At Inwood Rd Improve Traffic Signals Safety TBD $479 Project Dallas I-635 East of US 75 to Widen 8 to 10 Gp Lns, 2020 $469,344 Draft Miller Road Widen 2 to 4 Concurrent Hov/Managed Ln Reconst Exist 4/6 Discontinuous to 4/6 Continuous Frtg Rds Dallas I-635 East of Luna Rd Construct 2 Lane TBD $600 Project Crossover Between EB and WB Frontage Roads Dallas I-635 West of The KCS Wdn 8 to 10 Gp Lns, 2020 $749,518 Draft RR (West of SH Reconst Exist 2 to 4 Conc 78) to I-30 Hov/Mngd Lns, Rcnst Exist 4/6 Disc to 4/6 Cont Frtg Rds & I635/I30 In 100

200 Dallas I-635 At Seagoville Rd Replace Bridge Deck Safety TBD $3,891 Project NB Dallas I-635 At Seagoville Rd Replace Bridge Deck Safety TBD $3,891 Project SB Dallas I-20 At Bonnie View Improve Approach, Widen TBD $2,357 Project Rd in City of Bridge From 5 to 7 Lanes Dallas and Replace Traffic Signal System Dallas I-20 SH 342 to Concrete Full Depth TBD $2,035 Project Bonnie View Repair On WB Frtg Rd Lane Dallas I-20 At Houston Replace Bridge Deck Safety TBD $2,057 Project School Rd EB Dallas I-20 At Newton Creek Replace Bridge Deck Safety TBD $1,096 Project EB Dallas I-20 At Houston Replace Bridge Deck Safety TBD $2,057 Project School Rd WB Dallas I-20 North Main Construct 0 to 4 Lane TBD $5,277 Project Street to Camp Frontage Roads Wisdom Road in Duncanville 101

201 Dallas I-20 Dallas County Reconstruct Freeway From TBD $34,000 Project Line to SH to 10 Lanes and 4/6 Lane Continuous Frontage Roads Dallas I-635 Royal Lane to Construct 0 to 2 Lane WB TBD $19,140 Project West of Belt Line Frontage Road and Ramp Rd Modifications Dallas I-635 Tarrant / Dallas Install Guide Signs TBD $181 Project County Line to 1900' East of Luna Rd Dallas FM 2934 Teel Parkway to Improve Traffic Signals Safety TBD $47 Project Legacy Dr E Dallas SH 170 Tarrant County Construct Six Lane Tollway TBD $21,303 Project Line to SH 114 Between Existing Frontage Interchange Roads El Paso I mi E of Van Construct New Safety Rest Safety $23,000 Project Horn to Area Evergreen Rd El Paso US 67 The Junction of Mill & Inlay Existing 2019 $900 Project US 67/90 to Pavement and Upgrade mi South Sidewalks to Meet Ada of Junction US Standards 67/90 102

202 El Paso US mi S of Jct Seal Coat TBD $1,100 Project US 67/90 to mi S of Jct US 67/90 El Paso US 67 Puerto Rico St to New Two-Lane Twin Bridge TBD $6,409 Project International Structure For Southbound Demarcation Line Traffic Into Mexico El Paso US 67 Rio Grande River Bridge Replacement TBD $4,567 Project to NE of Rio Grande River El Paso US 54 Kenworthy St. to Construction of Main 2023 $41,039 Draft FM 2529 Lanes and Grade (Mccombs St) Seperations El Paso US 54 Hondo Pass Drive Widen By Adding 2 Inside TBD $15,239 Project 01- to SL 375 Lanes, mast 095 3, 4 Illumination, and Overhead Sign Bridges El Paso US 54 Hondo Pass Drive Construct Ramp Reversals TBD $20,822 Project to SL 375 and Intersection Improvements at Hondo Pass, Diana, and SL 375 El Paso US 54 LP 375 (Cesar Interchange 2019 $84,635 Draft Chavez) to E Improvements Yandell Dr 103

203 El Paso US mi E of RM Construct Super $12,102 Project Intersection to New Mexico State Line El Paso US mi W of RM Construct Super $6,051 Project Intersection to 8.64 mi E of RM 54 Intersection El Paso US 62 Global Reach Dr Build Frontage Roads and 2019 $121,734 Draft to FM 659 Mainlanes With Grade (Zaragoza Rd) Separations at Intersections El Paso US 62 Global Reach Dr Add Capacity (Main Lanes) $191,000 Project 02- to FM , 4 (Zaragoza Rd) El Paso US 62 FM 659 Widen 4-Lane Undivided TBD $48,082 Project (Zaragoza Road) to 6-Lane Divided and to Desert Storm Construct Overp Ass Road 104

204 El Paso US mi W of El Construct Super $8,744 Project Paso/Hudspeth Cl to mi E of El Paso/Hudspeth Cl El Paso US mi W of Construct Super $3,025 Project Hudspeth/Culber son Cl to 0.11 mi W of RM 54 Intersection El Paso FM 76 Jct SH 20 to Replace WB & EB Bridges TBD $4,378 Project mi E of SH and Approaches 20 El Paso FM 659 I-10 to Loop 375 Widen From 4 Lane to $28,800 Draft Lane El Paso FM 659 I-10 to FM 76 Widen From 4 Lane to $7,177 Draft Lane El Paso SS 601 Airport Road to Operational Improvements TBD $22,000 Project LP 375 (Purple at Spur 601, Walter Jones, Heart way) and Airport Rd 105

205 El Paso I-10 FM 1905 Rehab and Operational TBD $7,435 Project (Antonio Street) Improvements-Westbound to State Spur 37 Frontage Road and (Westway Blvd) Turnaround (Phase Iii) El Paso I-10 NM/Tx Stateline Expand From 4 to 6 Lanes 2021 $61,659 Draft to SH 20 (Mesa) El Paso I-10 FM 1905 Rehab and Operational $8,500 Project (Antonio Street) Improvements - to State Spur 37 Eastbound Frontage Road (Westway Blvd) (Phase Iv) El Paso I-10 Executive Dr to E-3 Rail Replacement TBD $4,394 Project Schuster Ave El Paso I-10 SH 20 (Mesa Expand From 6 to 8 Lanes 2022 $58,850 Draft 02- Street) to I-10/Us 160 3, 4 85/Sunland Park Interchange El Paso I-10 At Mcrae Roadway Rehabilitation TBD $2,500 Project Intersection and Intersection Improvements El Paso I-10 Lee Trevino to Construct Interchanges 2024 $16,820 Project East of FM 659 (Zaragoza Rd) 106

206 El Paso I FT E of US Micromill and Longitudiual 2023 $16,075 Project (Paisano Dr) Joint Repair to 90 FT W of FM 2316 (Mcrae Blvd) El Paso I-10 US 62 (Paisano Add 1 Lane In Each 2025 $8,000 Draft 03- Dr) to Airway Blvd Direction By Restriping 159 3, 4 El Paso I mi W of FM Replace Bridge and Safety TBD $354 Project to 0.3 mi W Approach Railing of Jct FM 793 El Paso I mi E of LP Replace Bridge and Safety TBD $398 Project to 1.8 mi W Approach Railing of FM 1110 El Paso I mi W of Ot Replace Bridge and TBD $1,337 Project Smith Rd to 0.43 Approaches mi E of Ot Smith Rd El Paso SL 375 Spur 601 to Widen From 4 to 6 Lanes 2019 $44,664 Draft Montana Ave (Us On Mainlanes and 62/180) Construct 2 Lane Frontage Roads El Paso SL 375 Spur 601 to Dyer Add 1 Lane Each Direction 2025 $35,000 Draft (BU 54A) 107

207 Fort Worth US 180 CR 122 to East of Construct Super 2 TBD $3,844 Project Ross Watson Rd Fort Worth US 180 East of Ross Construct Super 2 TBD $11,021 Project Watson Rd to US 281 Fort Worth I FT West of Rehabilitate Existing Fr TBD $4,874 Project FM 5 to 550 FT Rds; Convert to One Way East of FM 5 Operation; Add Turnarounds On East & West Sides; Install Signals Fort Worth I-20 Ranch House Relocation Entrance and TBD $4,000 Project Road to FM 1187 Exit Ramps Fort Worth I-20 FM 1187/3325 Construction of New TBD $5,000 Project to Walsh Ranch Interchange at Walsh Parkway Ranch Parkway, Int. With Minor Arterial 2 and Turnaround at FM 1187/3325 Fort Worth I-20 Ranch House Add Lane to WB and EB TBD $4,000 Project Road to FM 3325 Frontage Roads Fort Worth I-20 West of FM 3325 Add Two General Purpose TBD $5,000 Project to East of FM Lanes WB

208 Fort Worth I-20 West of FM 3325 Add One General Purpose TBD $2,500 Project to East of FM Lane EB 3325 Fort Worth I-20 I-30 to Walsh Add One General Purpose TBD $2,500 Project Ranch Parkway Lane EB Fort Worth I-20 Ranch House Relocate Exit and TBD $8,000 Project Road to FM 3325 Entrance Ramps Fort Worth I Miles West Construct WB and EB TBD $1,000 Project of FM 5 to FM 5 Auxiliary Lane Fort Worth I-20 Walsh Ranch Construct Interchange at TBD $5,000 Project Parkway to at Minor 1 Arterial For Walsh Proposed Minor Ranch Pkwy 1 Fort Worth US 180 West of Center Pavement Widening, TBD $2,240 Project Point Rd to East Drainage & Intersection of Center Point Improvements Rd Fort Worth SH 183 At Bryant Irvin Rebuild Intersection, Add TBD $2,451 Project U-Turnarounds, Replace Traffic Signals, Add Sidewalk With Curb Ramps, Pvt Mrkrs, Repl Signs 109

209 Fort Worth I-820 N Interchange at Recon Fr Sh121/183 Int TBD $166,327 Project SH 121 to to Sh121/10 Int to 10Ml Randol Mill Road W/2Man Toll W /4/6Ftg-C & Fr Sh121/10 to Ran.Mil 10Ml W/2/6Ftg-Dc W/Aux Ln Fort Worth I-820 I-20 to Recon From 4/8 Ln With 2025 $685,000 Draft Meadowbrook Dr 2/4/6 Frtg-C to 8 Ln With 4/6 Frtg-C & 2 Hov/M-R Fr US 287 to I-20 Fort Worth I-820 SH 183 Over I- Replace Existing 2 Bridges TBD $3,361 Project (3 Lns EB, 2 Lns WB) Into One Bridge (3 Lns In Each Direction) Fort Worth I-820 I-20/Ih820 Widen Freeway at TBD $100,000 Project Interchange to Interchange With I-20 West of Anglin Eastbound and Drive Westbound Fort Worth I-820 I-820 NB Over Replace Bridge As A Part TBD $8,200 Project West Fork of of I-820 Corridor Trinity Improvements 110

210 Fort Worth I-820 SH 121/SH 183 Rm to Trin:Recon to 6 Lns $123,000 Draft Interchange to + Aux,&Const I-820/Sh Randol Mill Road 121 Dir Con Trin to N Int:Widen to 11 Lns,1/3 Lns NB Cont Fr,2 SB Con Fr Fort Worth I-20 Fwwr to Campus Relocate Existing TBD $800 Project Drive Westbound Entrance Ramp Fort Worth I-820 SB I-820 Over W Replace Bridge Structure TBD $6,356 Project Fork Trinity As Part of I-820 Corridor Improvements Fort Worth I-820 SB Ih820 Over W Replace Bridge Structure TBD $4,631 Project Fork Trinity Relief As Part of I-820 Corridor Improvements Fort Worth I-820 NB Ih820 Over W Replace Bridge Structure TBD $4,631 Project Fork Trinity Relief As Part of I-820 Corridor Improvements Fort Worth I mi SW of Install Protection Safety TBD $290 Project FM 1220 to mi NE of FM

211 Fort Worth I Miles N of Replace Electrical TBD $371 Project Team Ranch Conductors and Conduit Road to 1.3 Miles For Roadway Illumination S of Team Ranch Road Fort Worth I Miles N of Replace Electrical TBD $177 Project Westpoint Blvd to Conductors and Conduit 0.3 Miles S of For Roadway Illumination Normandale St Fort Worth I-820 I-30 West to I- Widen and Add Lane to TBD $3,703 Project Approach and Departure Ramp Fort Worth I-20 I-820 to Add 1 General Purpose 2021 $45,000 Project Chisholm Trail Lane In Each Direction Parkway Fort Worth I-20 At Chisholm Trail Add Direct Connect Ramps 2027 $25,000 Draft Parkway Fort Worth US 180 Stephens County Construct Super 2 TBD $7,421 Project Line to CR 122 Fort Worth US 81 BU 81D to BU Preliminary Engineering TBD $20 Project F 112

212 Fort Worth US 81 North of Pioneer Construct 2 Way Frontage TBD $36,600 Project Rd. to Rds to 1 Way Frontage Tarrant/Wise Rds and Ramp County Line Modifications Fort Worth US Miles Construct Grade Safety TBD $7,087 Project North of CR 4228 Separation at CR to Miles 4227/CR 4228 South of CR 4228 Fort Worth US 81 At Ramhorn Hill Construct Grade Safety TBD $4,473 Project Road Separation Fort Worth US 81 CR 4838 to CR Grade Separation Safety TBD $9,632 Project Fort Worth US 81 BU 380F to FM Preliminary Engineering TBD $20 Project Fort Worth BU 287P At W. Bailey Construct New Overpass TBD $11,000 Project Boswell Rd in Bridge Saginaw Fort Worth I-35W I-20 to SH 174 Reconstruct Freeway TBD $482,000 Project Mainlanes. Add 1 Gp Lane Each Direction For Total of 4 Gp Lanes Each Direction 113

213 Fort Worth I-35W I-20 to SH 174 Installation of Its Fiber and Technology TBD $1,670 Project Equipment and Ops. Improv Fort Worth I-35W I-35W NB Over Remove Thru Lane TBD $4,319 Project BI 35-V (I-35W Overpass & Replace With SB to Exit to at Grade Thru Lanes Alvarado) Fort Worth I-35W mi S of FM Safety Lighting Safety TBD $598 Project to mi N of FM 917 Fort Worth US 287 FM 3479 Construct Turnaround 2020 $1,538 Draft (Harmon Road) From NB to SB at North to Southbound Tarrant Parkway Entrance Ramp Reconstruct Existing SB Frontage Rd From FM 3479 to US 287 Fort Worth US 81 Avondale-Haslet Construct 2 Way Frontage TBD $44,608 Project Rd to H 35W Rds to 1 Way Frontage Rds and Ramp Modifications Fort Worth US 81 West of FM 3479 Review Schematic For TBD $10 Project to FM 3479 Southbound Exit Ramp to FM 3479 Revision Fort Worth US 81 I-35W to Alliance Install Protection, Safety Safety TBD $535 Project Ct. Treat Fixed Objects 114

214 Fort Worth US 81 Tarrant/Wise Construct 2 Way Frontage TBD $7,262 Project County Line to Rds to 1 Way Frontage Avondale-Haslet Rds and Ramp Rd Modifications Fort Worth I-35W I-820 to US Widen 4 to 8 Gp Lanes TBD $34,544 Project /287 and Add 2 Managed Lanes Between I-820 and Basswood Blvd. Fort Worth I-35W I-30 to I-820 Widen 4/6/8 to 8 Gp TBD $350,000 Project Lanes W/Collector Distributor Auxiliary Lanes and Fr Rds Connections Including SH 121 Interchange Fort Worth I-35W At Morningside Replace Bridge & Safety TBD $169 Project Drive Approach Railing/ Safety End Treatment/ Replace Guardfence Fort Worth I-35W At Felix Street Replace Bridge & Add Safety TBD $181 Project Safety End Treatment Or Replace Guardfence 115

215 Fort Worth I-35W At East Ripy Replace Bridge & Safety TBD $155 Project Street Approach Railing & Add Safety End Treatment/Replace Guardfence Fort Worth I-35W At Allen Ave. Replace Bridge & Safety TBD $170 Project Approach Railing & Add Safety End Treatment/Replace Guardfence Fort Worth I-35W At Berry Street Replace Bridge & Safety TBD $155 Project Approach Railing & Add Safety End Treatment/Replace Guardfence Fort Worth I-35W At Seminary Drive Replace Bridge & Safety TBD $103 Project Approach Railing & Add Safety End Treatment/Replace Guardfence Fort Worth SH 174 I-35W to Wicker Installation of Its Fiber & Technology TBD $330 Project Hill Drive Equipment to and Ops. Summercrest/Gardens Improv Blvd; NW & Its Equipment at Wicker Hill Road 116

216 Fort Worth US 67 Comanche Construct 4 Lane Divided TBD $9,000 Project County Line to way Dublin Relief Route Fort Worth US 377 BU 377J to N of Widen 2 to 4 Divided TBD $3,975 Project BU 377J Fort Worth US 377 N of BU 377J to Widen 2 to 4 Divided TBD $50,000 Project Hood County Line Fort Worth US 377 End of Brazos Widen 4 Lane to 6 Lane TBD $11,100 Project River Bridge to Divided With Interchange South of at SH 144 and FM 51 Brazos River Bridge Fort Worth US 377 Erath County Line Widen 2 to 4 Divided TBD $60,000 Project to BU 377 Fort Worth US 377 East of Old Acton Widen 4 Lane W/Ctwltl to TBD $30,000 Project way to End 6 Lane Divided With of Brazos River Interchange at BU 377H Bridge in Granb Fort Worth US 377 FM 167 North to Widen 4 Lane to 6 Lane TBD $46,700 Project East of Old Acton Divided way 117

217 Fort Worth US 377 Big Bear Creek to Convert 6 Lane Roadway Safety TBD $3,332 Project I-820 (W Twltl) to 6 Lane Roadway With Raised Median Fort Worth I-35W US 81/287 Split Reconstruct & Widen TBD $270,381 Project to Denton County From 4 Lane W/4/6 Frtg Line Rd-D to 6 Lane W/4/6 Frtg Rd-C and 4 Hov/Managed-C Fort Worth SH 183 At UPRR Railroad Replace Railroad TBD $6,383 Project & UPRR Spur Underpass Fort Worth SH 183 At Dart Railroad Replace Railroad TBD $6,129 Project Underpasses Fort Worth SH 183 Handley-Ederville Corridor Imprvmnts at 3 TBD $0 Project Rd. to Rufe Snow Locations, Including Drive; in Richland Sidewalks & C and G, Hills Intrsct Realignment & Adding Right Turn Lns Fort Worth SH 183 I-30 to Sam Reconstruct Roadway TBD $50,000 Project Calloway Road 118

218 Fort Worth US 380 BU 81D to US 81 Improve Exit Ramp From Safety TBD $2,163 Project West Bound US 380 to North Bound US 81 Fort Worth US 380 FM 1156 to Wise Construct Super 2 TBD $5,228 Project County Line Fort Worth US 380 At Union Replace Railroad TBD $8,000 Project Pacific/Missouri Underpass Pacific R Fort Worth US 380 West of FM 1658 Intersection TBD $912 Project to East of FM Improvements Add Lt & Rt 1658 Turn Lanes Fort Worth US 380 Jack County Line Construct Super 2 TBD $7,568 Project to SH 114 Fort Worth US 380 FM 1658 to Wise Widen 2 to 4 Lane Divided TBD $50,000 Project County Line Fort Worth SH 199 US 281 to Wise Construct Super 2 TBD $8,358 Project County Line Fort Worth SH 199 Jack County Line Construct Super 2 TBD $4,826 Project to Parker County Line Fort Worth SH 199 Wise County Line Construct Super 2 TBD $6,890 Project to FM

219 Fort Worth SH 199 At FM 51 Improve Traffic Signals Safety TBD $126 Project Fort Worth SH mi S of FM Construct 0 to $85,300 Draft to S End of Mainlanes, Realign Lake Worth Br Frontage Roads, and Construct Bridges Over Lake Worth Fort Worth SH 199 Parker County Construct 6 Lane Freeway TBD $44,855 Project Line to 0.4 mi S With Frontage Roads & of Stewart St Tms Fort Worth SH 199 Azle Avenue to I- Construct 0 to $200,000 Draft Mainlanes and Interchange at I-820 Fort Worth SH 199 SH 199 at Clear Rehabilitate This Nhrp TBD $1,538 Project Fork of Trinity Eligible Bridge and Approaches Fort Worth SH 199 I-820 to West Reconstruct 4/6 to 4/ $65,000 Draft Fork of Trinity Lane Divided Urban River Fort Worth BU 287P Dallas St to Widen From 2 to 4 Lanes TBD $11,250 Project Heritage Parkway 120

220 Fort Worth US 287 I-820/I-20 Recon Frwy to Add 2 TBD $75,000 Project Interchange to Hov/M-R Village Creek Road Fort Worth US 287 At Miller Int Improv; Upgrade Traffic TBD $858 Project Ave/Wilbarger St Signal; Vehicle & Ped Illum Intersect & Signals; Sidewalk; Ada Ramps; Pav Mrk; Bus Impr; Lands & Irr Fort Worth US 287 I-20 Interchange Widen Freeway to TBD $6,000 Project to Accommodate Managed Kennedale/Suble Lane Addition tt Road Fort Worth US 287 Little Road to Sublett Exit Ramp TBD $1,180 Project South of Sublett Relocation (Us 287 SB to Road Sublett Rd) Fort Worth US 287 I-20 to Johnson Installation of Its Fiber & Technology TBD $2,228 Project County Line Equipment and Ops. Improv Fort Worth US 281 Archer County Upgrade to Super 2 TBD $10,152 Project Line; in Sections Design, Ext Culverts, Sets, to 0.05 Mile 2" Overlay and Pavement South of Lynn Markings Creek 121

221 Fort Worth US mi N of Upgrade to Super 2 TBD $6,509 Project Martin Road to Design, Ext Culverts, Sets, SH 114 2" Overlay and Pavement Markings Fort Worth US 281 SH 199 to Palo Upgrade to Super Design, TBD $8,750 Project Pinto County Line Ext Culverts, Sets, 2" Overlay and Pavement Markings Fort Worth US 281 At UP & MP RR Replace Existing Railroad TBD $2,739 Project Underpass Underpass Fort Worth SH 6 Comanche Construct Super 2 TBD $4,058 Project County Line to US 67 (Dublin Relief Route) Fort Worth SH 6 FM 847 to CR Construct Super 2, 2024 $4,865 Draft Grading, Base, Ext Culverts, Overlay, Pavement Markings Fort Worth SH 6 FM 914 to US Widen Shoulders, Extend TBD $5,682 Project Culverts, Mill, Seal Coat Fort Worth SH 6 CR 303 to US Construct Super 2, 2024 $7,618 Draft Grading, Base, Ext Culverts, Overlay, Pavement Markings 122

222 Fort Worth US 67 Somervell County Upgrade to Super 2 Safety TBD $507 Project Line to mi Design, Add 4' Shoulders, S of Somervell Ext Culverts, Sets, and Pvt County Lin Markings Fort Worth US mi S of FM Upgrade to Super 2 Safety TBD $3,000 Project to Erath Design, Add 4' Shoulders, County Line Ext Culverts, Sets, and Pvt Markings Fort Worth US 67 Somervell County Construct Super 2 TBD $6,384 Project Line to Pr 21 Fort Worth US mi West of Install Delineators & Safety TBD $55 Project I-35W to Advanced Intersection mi East of I-35W Warning Signs Fort Worth I-20 West of Recnst & Wdn 2 Ln Brg at TBD $1,440 Project Bankhead Bnkhd, Ramp Mods and 2 way to East Ln Frds In Each Dir W/ Aux of Bankhead Ln Btwn Rmps W of way Bnkhd, Cnst Uturn Brg E Of Fort Worth I-20 Ric Williamson Construct New WB and EB TBD $10,000 Project Memorial Frontage Roads way to South Bowie Drive 123

223 Fort Worth I-20 Ric Williamson Construct WB and EB TBD $2,000 Project Memorial Auxilary Lane way to South Bowie Drive Fort Worth I-20 Bethel Rd to SH Construct WB & EB Auxility TBD $2,000 Project Lane Fort Worth I-20 Holland Lake Construct WB and EB TBD $3,400 Project Drive to FM 2552 Auxiliary Lanes Fort Worth I Miles West of Construct WB & EB TBD $1,500 Project Bankhead Auxiliary Lane way to 0.2 Miles East of Bankhead way Fort Worth I Miles West of Construct EB Auxiliary TBD $750 Project Centerpoint Rd to Lane 0.5 Miles East of Centerpoint Rd Fort Worth I-20 Lakeshore Drive Construct WB and EB TBD $1,000 Project to Miles Auxiliary Lane West of FM 5 Fort Worth I-20 Sp 312 to US Add One Gp Lane In Each TBD $50,000 Project Direction 124

224 Fort Worth SH 114 FM 1709 to Reconst Remaining TBD $180,000 Project Dallas County Components of Dfwc Incl Line SH 114 Exp Ln Con, Int at International Pkwy/Dfw Airport, Texan Trl, & 1709 Conn Fort Worth SH mi W of Improve Traffic Signals Safety TBD $250 Project SH 114 to E Wall Street Fort Worth SH 26 I-820 to Brown Reconstruct From 4 Lane TBD $44,000 Project Trail to 6 Lane Divided Fort Worth SH 26 Flory St to Rodger Install Raised Median, Safety TBD $675 Project Line Drive Profile Edgeline Markings Fort Worth SH 26 Mustang Improve Traffic Signals Safety TBD $229 Project Drive082 mi SE of SH 114 Fort Worth SH 121 I-820 to Handley- Reconst Frwy From 6 Gp TBD $83,163 Project Ederville Road Lns to 6 Gp Lns W/ 2 Managed Toll Lns and 4/6 Ftg Rds Continuous Fort Worth SH 121 Handley-Ederville Repair/Replace Existing Safety TBD $686 Project Rd to Riverside Metal Beam Guard Fence Dr 125

225 Fort Worth SH 121 Glade Rd to SH Reconstruct Shoulder For $26,000 Draft Peak Hour ization Fort Worth SH mi N of SH Improve Traffic Signals Safety TBD $389 Project to mi SW of FM 2499 Fort Worth US 67 Park Road 21, Reconstruct 2 Lane to 4 TBD $6,600 Project East to FM 1434 Lane Divided Fort Worth US 67 Pr 21 to BU 67 Construct Super 2 TBD $2,047 Project Fort Worth SH 114 Young County Construct Super 2 TBD $6,746 Project Line to US 281 Fort Worth FM 156 North of Add Left & Right Turn Bay TBD $502 Project Westport of S Side of Intersection, Parkway to South Add Right Turn Bay On N of Westport Side of Intersection Parkway Fort Worth FM 156 Intermodal Widen 2 to 4 Lane Divided TBD $53,610 Project Parkway to US 81/287 Fort Worth FM 157 Mid Cities Blvd to Widen From 4 to 6 Lanes TBD $10,770 Project Midway Drive 126

226 Fort Worth I-30 At Minor 1 Construction of The West TBD $27,800 Project Arterial to West Side Ramps at Linkcrest of Linkcrest Interchange Fort Worth I-30 Sp 580 to I-820 Add One General Purpose TBD $12,000 Project Lane WB & EB Fort Worth I-30 Sp 580 to Chapel Construct New WB and EB TBD $10,000 Project Creek Blvd Frontage Roads Fort Worth I-30 University Dr to Add One General Purpose TBD $1,000 Project Forest Park Blvd Lane EB Fort Worth I-30 Main Street to I- Installation of Its Fiber, Its Technology TBD $89 Project W Equipment, Satellite and Ops. Building Improv Fort Worth I-30 I-820 to Camp Reconstruct Freeway From TBD $550,000 Project Bowie Blvd 6 to 8 Main Lanes and Reconstruct 2/8 to 2/8 Lane Frontage Roads Fort Worth I-30 Linkcrest Drive to Add 1 Gp Lane In Each TBD $72,000 Project I-820 Direction, Const Frontage Roads, Reconst Sp580 Interchange 127

227 Fort Worth I-30 WB Ih30 Col Dist Replace Bridge Deck and TBD $943 Project From Univeristy Approach Slabs Dr to Over WB Ih30 Exit Ramp to Montgomer Fort Worth I-30 Oakland Blvd in Construct Additional Thru TBD $300,000 Project FT Worth, E to Lanes & Upgrade to Cooper Street Standards & Tms Fort Worth I-30 Morrison Drive Rehab & Widen The TBD $3,366 Project Over Ih30 Bridge and Appr Fort Worth I-30 Cooper Street to Widen From 6 to 10 Lanes TBD $52,050 Project Dallas County With 2 Reversible Line Managed Lanes, Modifications to SH 360 Connections, and Ramp Modifications Fort Worth I-30 dy Lane Over Increase Vert Undcl and TBD $3,492 Project I 30 Widen Fort Worth I-30 I-35W to I-820 Installation of Its Fiber, Its Technology TBD $1,412 Project Equipment, Satellite and Ops. Building Improv Fort Worth US 380 US 281 to FM Construct Super 2 TBD $4,949 Project

228 Fort Worth FM 1187 Chisholm Trail Widen 2 to 4 Lane Divided TBD $30,000 Project Parkway to Bf 1187C Fort Worth FM 1187 At Stephenson Intersection Safety TBD $1,320 Project Levy Rd Improvements, Upgrade Signals and Drainage Fort Worth FM 1187 I-35W to Newt Reconstruct Existing 2 TBD $60,000 Project Patterson Road Lanes to 4 Lane Divided Urban Fort Worth FM 1187 East of I-35W Add Turn Lanes and TBD $4,381 Project Frontage Road to Widen Shoulders West of Hunters Field Blvd Fort Worth FM 1709 US 377 to SH Design of Signal Safety TBD $50 Project Interconnect and Cctv System Fort Worth FM 1709 US 377 to SH Improve Traffic Signals, Safety TBD $947 Project Install Flashing Yellow Arrow Fort Worth FM 1938 FM 1709 to Install Raised Median, Safety TBD $2,524 Project Starnes Rd Profile Edgeline Markings Fort Worth FM 1938 Starnes Rd to Install Raised Medians Safety TBD $2,949 Project Harwood Rd and Profile Edgeline Markings 129

229 Fort Worth SH 360 Ave K/Brown Reconstruct From 6 Lanes TBD $46,058 Project Blvd to Abram to 8 Lanes Street Fort Worth SH 360 North of E Abram Widen & Reconstruct 6 to $56,300 Draft St to I-20 8 Lanes Interchange Fort Worth SH 360 Trinity River to I- Repair Concrete Pavement TBD $4,535 Project Failures, Diamond Grind, Pavement Markings Fort Worth SH mi N of SH Install Protection For Safety TBD $303 Project to mi Railroad Bridge Column, N of SH 180 Drainage & Pavement Markings Fort Worth SH mi SE of Profile Edgeline Markings Safety TBD $475 Project SH 121 to mi S of SH 183 Fort Worth I-20 I-820 to Park Widen Freeway to 2025 $278,000 Draft Springs Blvd Accommodate Managed Lane Addition Fort Worth I-20 EB and WB I-20 Replace Bridge & Safety TBD $1,038 Project Over Bowen Rd Approach Railing Or Add to EB and WB I- Safety End Treatment Or 20 Over Rush Guardfence Creek 130

230 Fort Worth I-20 Bowen Rd WB Construct New Texas TBD $328 Project Entrance Ramp Uturn to Bowen Rd WB Exit Ramp Fort Worth I-20 Park Springs Blvd Reconstruct Freeway From TBD $366,000 Project to Dallas County 8 to 10 Lanes And4/6 Line Lane Continuous Frontage Roads Fort Worth I-20 Collins Street to Add Auxiliary Lane For SH TBD $1,794 Project Great Southwest 360 Direct Connect Parkway Entrances Fort Worth I mi E of SH Install Led Flashing Safety TBD $456 Project to mi Chevrons On Curve, W of SH 121 Improve Guardrail to Design Standard Fort Worth FM 3029 At FM 1938 Improve Traffic Signals, Safety TBD $58 Project Add Right Turn Lane Fort Worth SH 170 I-35W to Denton Construct 6 Lane Tollway TBD $277,232 Project County Line Houston US 90A FM 1952 to SP Add 10-Foot Shoulders, TBD $9,831 Project Overlay and Replace Bridge Culverts 131

231 Houston US 90A Wharton County Add 10-Foot Shoulders, TBD $5,607 Project Line to FM 1952 Overlay and Replace/Extend Culverts Houston US 90A SH 99 to 0.3 mi Widen to 8-Lane Divided TBD $10,000 Project W of SH 6 and Construct Dc to SH 99 (Phase 1 of 3) Houston US 90A FM 762 to FM Widen to 6-Lane Divided TBD $20,000 Project (Phase 3 of 3) Houston US 90A FM 359 to SH 99 Widen to 6-Lane Divided TBD $35,000 Project (Phase 2 of 3) Houston US 90A At Ditch H and Replace Bridge and Safety TBD $197 Project Drainage Ditch Approach Railing Houston US 90A At SH 99 Construct Grade TBD $27,000 Project Separation and Intersection Improvements Houston US 90A St Augustine to Reconstruction of TBD $1,943 Project East of Griggs Rd Frontage Roads and Intersections Houston US 90A US Replace Bridge and TBD $3,500 Project A/S.Wayside Approaches (NBi# at Country Club ) Byu 132

232 Houston I-69 At Middle Bayou Replace Bridge and Safety TBD $107 Project and Coon Creek Approach Railing to Tributary Houston I-69 Reading Road to Install Its Equipment and Technology 2023 $17,966 Draft SH 99 Infrastructure and Ops. Improv Houston I-69 I-69 Southwest Reconstruction of Direct $12,631 Project Fwy North Bound Connector to I-610 North Bound Connector Houston I-69 Fort Bend C/L to Upgrade Mast & Safety TBD $2,024 Project South of Underpass Lighting Bissonnet Houston I-69 South of Upgrade Mast & Safety TBD $3,425 Project Bissonnet to Underpass Lighting North of Beechnut Houston I-69 N of Beechnut to Upgrade Mast Safety TBD $3,130 Project Hillcroft Lighting Houston I-69 Hillcroft to Install Mast Lighting Safety TBD $2,220 Project Chimney Rock Houston US 290 Badtke to Install Its Equipment and Technology 2023 $26,932 Draft Mueschke Infrastructure and Ops. Improv 133

233 Houston SH 3 At FM 1959, and Add Right Turn Lanes TBD $348 Project to at El Dorado Blvd Intersections(SB) Houston SH 3 At Edgebrook Improve Traffic Signals Safety TBD $350 Project Dive and Safety Lighting at Intersection Houston SH 75 League Line Widen to 4-Lane Divided TBD $5,800 Project Road to FM Roadway Teas Nursery Road Houston SH 75 FM 830 to Widen to 4-Lane Divided TBD $12,000 Project League Line Roadway Road Houston SH 75 FM 2432 to FM Widen to 4-Lane Divided TBD $12,000 Project Roadway Houston SH 75 Gladstell Street Widen to 4 Lanes TBD $1,390 Project to I-45 Underpass Houston I-45 Harris County Ramp Modifications, TBD $4,105 Project Line to Rayford- Addition of Auxiliary Lanes Sawdust Road and Striping 134

234 Houston I-45 At Woodlands Construct Single Point 2025 $49,129 Draft Pkwy Urban Interchange (Spui) Houston I-45 FM 2920 to Ramp Modifications, TBD $8,895 Project Montgomery Addition of Auxiliary Lanes County Line and Striping Houston I-45 SB Frtg Rd Bridge Replace SB Frontage Road TBD $2,100 Project at Cypress Creek Bridge and Approaches Houston I-45 At Cypresswood Add Left and Right Turn TBD $971 Project Lanes Houston I-45 South of West Reconstruct Main Lanes, TBD $260,550 Project Road to N of BW Frontage Lanes and 8 Construct 4 Additional Managed Lanes Houston I-45 South of Reconstruct Main Lanes, TBD $392,850 Project Shepherd Drive Frontage Lanes and to South of West Construct 4 Additional Road Managed Lanes Houston I-45 At West Road Improve Traffic Signals Safety TBD $550 Project 135

235 Houston FM 521 BW 8 to Fort Widen to 4-Lane Divided $18,500 Draft Bend C/L Section and Construct Grade Separation at Uprr (Dot# Y) Houston FM 521 Harris County Widen to 4-Lane Divided $3,970 Draft Line to South of Section FM 2234 Houston FM 521 SH 6 to FM 2234 Reconstruct and Widen to 2024 $75,227 Draft Lanes With Raised Medians, Intersection Improvements, Signal Improvements & Ped Access Houston US 290 SH 6 to Harris Reconstruct & Widen TBD $317,000 Project County Line From 4 to 6 Lanes Houston I-69 Harris County Install Its Equipment and Technology 2023 $13,912 Draft Line to Liberty Infrastructure and Ops. County Line Improv Houston I-69 At Jacinto Misc Repair, Paint Truss TBD $2,600 Project River and Paint Outer Edges of Concrete Bridge Approaches Houston SH 35 BS 35C North to 4-Lane Tollway (Most TBD $35,500 Project SH 6 Feasible Toll ) 136

236 Houston SH 35 SH 6 to BS 35C 4-Lane Tollway (Most TBD $38,700 Project South Feasible Toll ) Houston SH 35 Bellfort to to Construct 6-Lane Tollway TBD $110,000 Project North of Almeda- With 2 2-Lane Frontage Genoa Roads On New Location Houston SH 35 I-45 to Griggs Rd 8-Lane Tollway On New TBD $55,000 Project Location and Traffic Management System (Most Feasible Toll ) Houston SH mi N of Construct 8-Lane Tollway TBD $27,000 Project Wayside Dr to On New Location With 0.13 mi S of Grade Separation Wayside Dr Houston SH 35 South of Wayside 8-Lane Tollway On New TBD $25,700 Project Dr to Bellfort Location With 2-2 Lane Frontage Roads Houston SH 35 At BW 8 I/C Construct Tolled TBD $200,000 Project Interchange On A New Location Houston SH 35 North of Almeda- Construct 6-Lane Tollway TBD $51,000 Project Genoa to Harris With 2 2-Lane Frontage County Line Roads On New Location 137

237 Houston SH 35 North of Griggs to Construct 8-Lane Tollway TBD $70,000 Project Miles On A New Location North of Wayside Houston SH 35 At Jamison Bridge Deck Replacement TBD $1,357 Project Slough to and at Oyster Creek Houston SS 10 SH 36, 5.2 mi W Widen to 4-Lane Divided TBD $35,700 Project of Rosenberg to Roadway US 59 Houston SH 36 Austin C/L to SP Widen Existing Pavement TBD $97,300 Project in to 4-Lane Divided Rural Rosenberg Houston SS 10 SH 36 North to I- Install Its Equipment and Technology 2023 $4,452 Draft Infrastructure and Ops. Improv Houston SH 36 Austin County Install Its Equipment and Technology 2023 $9,908 Draft Line to Spur 10 Infrastructure and Ops. Improv Houston SH 36 US 59 to FM Widen to 4-Lane Divided 2023 $29,500 Draft Rural 138

238 Houston SH 36 North of CR Gs Over New SH 35, TBD $7,300 Project /Hogg Ranch Overlay and Restripe Rd to SH 35 Pavement From 2 to 4 Lanes Houston SH 36 S of Brazoria to S Widen to 4-Lane Divided 2023 $45,500 Draft of Jones Creek Rural at FM 2004 Bridge Houston SH 36 S. of Jones Creek Widen to 4-Lane Divided 2023 $14,411 Draft Bridge to 0.2 mi Rural N of Brazos Riv Diversion Ch Houston SH 6 N of Brooks St to Widen From 6 to 8 Lanes TBD $7,500 Project Lexington Blvd Houston SH 6 At BS 35 Improve Traffic Signals Safety TBD $300 Project Houston I-10 FM 359 to Widen to 6 Main Lanes TBD $111,500 Project Waller-Fort Bend With 4 Managed Lanes C/L and Reconstruct Interchange at Woods and Igloo Roads Houston I-10 Waller-Fort Bend Widen to 6 Main Lanes TBD $35,000 Project County Line to With 4 Managed Lanes; Fort Bend-Harris Reconstruct 2-3 Lane Fr's; County Line Reconstruct Interchanges at FM 1463 and Pin Oak 139

239 Houston I-10 I-10 North Frtg Replace Bridge and TBD $1,000 Project Rd at Snake Approaches (NBI No Creek ) Houston I-10 Fort Bend County Reconfigure to Remove TBD $17,300 Project Line to SH 6 Diamond Lanes and Add 4 Managed Lanes Houston I-10 At N Shepherd Dr Replace Bridge and TBD $4,000 Project Approaches (NBI No ) Houston I-10 At Durham Dr Replace Bridge and TBD $4,000 Project Approaches (NBI No ) Houston I-10 At Tc Jester Blvd Replace Bridge and TBD $6,500 Project Approaches (NBI No ) Houston I-610 W of Construct Interchange TBD $136,199 Project Mangum/18th St With Managed Lanes and On Hempstead to Dc's With Two 2-Lane S of Old Katy Rd Frontage Roads On I-610 (Seg 1) Houston I-610 At I-10 E Replace Bridge and TBD $20,000 Project Approaches (NBI No ) 140

240 Houston I Miles East Construct Interchange TBD $104,600 Project of SH 35 to With SH Miles West of SH 35 Houston I-610 I-610 EB at Replace Bridge & TBD $5,920 Project Holmes Rd/UPRR Approaches (NBi# ) Houston I-610 I-610 WB at Replace Bridge & TBD $5,920 Project Holmes Approaches (NBi# Rd/UPRR/Theres ) a Houston I-610 I-610 Construct Direct $62,692 Project (Southbound) to Connector (I-610 SB to I- at I NB) and Hov Access to Uptown Transit Center Houston I-610 I-610 (NB) to at I- Construct Direct $72,035 Project (Str #104) Connector (I-610 NB to I- 69 SB) Houston I-610 I-69 NB (W of I- Reconstruct I-69 Sw Frwy $42,814 Project ) to I-610 SB NB (EB) to I-610 SB Direct (Bissonnet Connector Street) Houston I-610 At I-69 Reconstruction of I-610 $62,030 Project Main Lane Bridge Within The Interchange 141

241 Houston I-610 I-69 to I-10(W) Construct 4 Express Lanes TBD $310,000 Project Houston SH 105 Grimes County Construct 4-Lane Divided 2023 $70,600 Draft Line to FM 149 Rural Roadway Houston SH 105 FM 2854 to I-45 Access Management TBD $650 Project Houston SH 105 At Crockett Improve Traffic Signals Safety TBD $300 Project Martin Road Houston SH 105 Jacinto C/L Reconstruct Pavement to 2023 $29,600 Draft to Liberty C/L 4 Lane Divided Rural Houston SL mi E of I-45 Reconstruct Pavement 4 TBD $18,700 Project to FM 3083 Lanes to 6 Lanes Divided Houston SL 336 FM 1314 to I-45 Widen to 4-Lane Divided TBD $12,000 Project Roadway Houston SH 146 Fairmont Widen to 6 Lanes With $41,570 Draft Parkway to Red 2-Lane Frontage Roads Bluff Houston SH 146 North of Fairmont Construct New Concrete 2023 $250 Draft Parkway Pavement to Remove Bottle Neck 142

242 Houston SH 146 SH Nasa to 6th Profile Centerline Safety TBD $35 Project Street Markings Houston SH 146 NB at Moses Raise Approach at Bridge TBD $304 Project Bayou Bridge Houston SH 146 FM 1764 to FM Widen to 6-Lane Arterial TBD $12,000 Project Houston SH 146 FM 519 to Loop Construct Rr Overpass TBD $30,000 Project Houston SH 146 FM 1765 to Widen to 6-Lane Arterial TBD $68,000 Project Galveston Y Houston BS 146E At Wyoming Improve Traffic Signals Safety TBD $346 Project Street Houston SH 146 Ferry Rd to BS Construct 4 Mainlanes TBD $47,091 Project E and Grade Separation Houston I-45 I-45 NB at BNSF Replace Bridge and TBD $15,000 Project RR Approaches (NBi# ) Houston I-45 Tidwell Road to Reconstruct Main Lanes, TBD $348,300 Project South of Frontage Lanes and Shepherd Drive Construct 4 Additional Managed Lanes 143

243 Houston I-45 I-10 to I-610 Reconstruct Main Lanes, TBD $238,800 Project Frontage Lanes and Construct 4 Additional Managed Lanes Houston I-45 I-45 SB Mckinney Replace Bridge TBD $8,300 Project Exit to at Buffalo Approaches (NBi# Bayou ) Houston I-45 At Broadway Intersection TBD $3,000 Project Improvements Houston I-45 I-610 to Tidwell Reconstruct Main Lanes, TBD $348,300 Project Frontage Lanes and Construct 4 Additional Managed Lanes Houston I-45 At I-610 Reconstruct Interchange TBD $528,700 Project Houston I-45 I-69 South to I-10 Remove Existing Pierce TBD $158,100 Project Elevated and Construct Parkway Connectors Into Dowmtown Houston Houston I-45 At I-10 West Reconstruct Interchange 2024 $721,400 Draft Including I-10 Express Lanes 144

244 Houston SH 225 BW 8 to Upgrade Illumination Safety TBD $5,100 Project Battleground Road Houston SH 225 At BW 8 Construct Direct TBD $116,000 Project Connectors Houston SH 225 At Independence Reconstruct Approach TBD $589 Project Pkwy Slabs, Abutments and Wingwalls Houston SH 225 N Allen-Genoa Rd Reconstruct Richey St TBD $1,220 Project to Pasadena Blvd Intersection and Frontage Road Full Depth Repairs Houston I-10 Spur 330 to Construct East Bound TBD $5,500 Project Thompson Road Entrance Ramp Houston I-10 At Waco Street Replace Bridge and $8,700 Project Approaches Houston I-10 Garth Road to Install Its Equipment & Technology $4,030 Draft Chambers C/L Infrastructure and Ops. Strand Fiber Trunk Line, Improv Closed-Circuit Cameras, Dms & Traveltime Readers Houston I-10 John Martin to EB Ramps Reversal TBD $3,000 Project Garth 145

245 Houston I-10 S Main St to SS Reconstruction of TBD $4,069 Project Frontage Roads Houston SS 330 At Wade Road Install Intersection Safety TBD $200 Project Flashing Beacon and Safety Lighting at Intersection Houston FM 359 West of Cross Construct Two 2-Lane TBD $13,889 Project Creek Ranch Blvd Frontage Roads to FM 1463/FM 359 Houston FM 359 W of Cross Creek Construct 4 Toll Lanes TBD $38,100 Project Ranch Road to FM 1463/FM 359 Houston FM 359 FM 1093/FM Widen to 4 Lanes Arterial, TBD $16,001 Project to West of Non Toll Cross Creek Ranch Blvd Houston FM 762 FM 762/FM Widen to 4 Lanes Divided TBD $15,709 Project to S of Lcisd School On Crabb River Rd 146

246 Houston SH mi N of FM Construct Grade TBD $14,800 Project to 0.3 mi S Separation of FM 523 Houston FM 1495 At Old Brazos Replace Bridge and TBD $15,000 Project River/E 2nd/RR Approaches (NBi# ) Houston SH 288 At CR 57, CR 60 Construct U-Turns and TBD $2,330 Project and CR 63 Acceleration/Deceleration Lanes Houston SH 288 At Rodeo Palms Construct Grade TBD $18,000 Project Parkway Separation Houston SH 288 At CR 48 Construct Grade TBD $19,000 Project Separation Houston SH 288 At CR 57 Construct Grade TBD $12,000 Project Separation Houston SH 288 At CR 64 Construct Grade TBD $14,000 Project Separation Houston SH 288 At CR 63 Construct Grade TBD $10,000 Project Separation Houston SH 288 At CR 60 Construct Grade TBD $15,000 Project Separation 147

247 Houston SH 288 FM 518 to CR 59 Construct 2-Lane NB 2025 $13,981 Draft Frontage Road With Pedestrian and Bicycle Accomodations Houston SH 288 At CR 45 and CR Construct U-Turns and TBD $970 Project Acceleration/Deceleration Lanes Houston SH 288 At CR 32 Construct Truck Weigh TBD $1,967 Project Facility Houston SH 249 Spring Construct 6 Lane Tollway TBD $82,800 Project Creek/Harris With Grade Separations at County Line to Stagecoach Rd and FM 1774/FM Woodlands Parkway 149 in Pinehurst Houston FM 149 FM 1097 to SH Reconstruct Roadway, Add TBD $6,900 Project Shoulders, Storm Sewer Houston SH 249 BW 8 to I-45 Reconstruct Freeway TBD $48,000 Project (Super Street) Houston SH 249 South of Restripe to 8 Main Lanes TBD $3,200 Project Chasewood Park With Ramp Reversal at Drive to North of Spring Cypress Road Gregson Road 148

248 Houston Houston SH 249 At Antoine Improve Traffic Signals Safety TBD $350 Project SH 249 At FM 1960 Improve Traffic Signals Safety TBD $550 Project Houston Greens JFK to US 59 Widen To 4 Lane Divided TBD $16,000 Project Road Houston Clinton Port of Houston Reconstruct Clinton Drive TBD $22,295 Project Dr. Gate 8 to IH 610 Houston Fairmont From BW 8 to 7th Construct Geometric TBD $5,097 Project Parkway Street Improvements and ITS/traffic Signal Improvements At 14 Intersections Houston FM 518 FM 865 to SH 35 Widen From 4 to 6 Lanes TBD $32,900 Project Houston FM 646 At FM 1764 Improve Traffic Signals Safety TBD $350 Project Houston FM 517 FM 646 to I-45 Access Management TBD $800 Project Treatment Houston FM mi E of SH Widen From 2 Lanes to 4- TBD $12,500 Project (N) to SH Lane Divided 146 (N) 149

249 Houston FM 646 FM 3436 to SH Widen From 2 Lanes to $7,000 Draft Lane Divided Houston SH NASA FM 528 to Construct 4-Lane Divided TBD $5,105 Project Landing Roadway On New Blvd/Nasa 1 Alignment With Bypass at I-45 Pedestrian/Bicycle Accomodations Houston SH NASA Space Center Profile Centerline Safety TBD $27 Project Boulevard to Markings Miles East Lakeshore Drive Houston FM 529 Settlers Village to Upgrade Traffic Signal Safety TBD $735 Project US 290 Systems Houston FM 529 Waller County Widen 2 to 4 Lanes TBD $25,000 Project Line to SH 99 Houston FM 529 At Greenhouse Improve Traffic Signals Safety TBD $300 Project Road Houston FM 2100 SH 99 to Extension of FM 2100 As 2024 $28,400 Draft Huffman- 2-Lane Rural Roadway Cleveland Rd (North) 150

250 Houston FM mi S of Prop Left & Right Turn TBD $269 Project Huffman- Lanes,Shoulder Cleveland Rd to Widening,Milling, Asphalt mi S of Concrete Pavement Huffman- Overlay & Pavement Cleveland Rd Makers Houston FM 1093 James Lane to Widen to 4 Lanes Arterial, TBD $5,654 Project FM 1093/FM Non Toll 359 Houston FM 1093 Austin County Widen Existing Pavement TBD $70,000 Project Line to FM 359 in to 4-Lane Divided Rural Fulshear Road Houston FM 1093 FM 1463/FM Construct Two 2-Lane TBD $3,267 Project to 2400' E Frontage Roads of FM 1463/FM 359 Houston FM 1093 FM 1463/FM Construct 4 Toll Lanes TBD $16,518 Project to W of FM 723 Houston FM 1093 At SH 99 Construct Direct TBD $20,000 Project Connector (EB Westpark Tollway to NB SH 99) Houston FM 1774 Waller County Widen to 4-Lane Divided $11,700 Draft Line to FM 1486 Rural 151

251 Houston FM 528 BS 35 to LP 409 Widen to 4-Lanes TBD $5,700 Project (Sh 35 Bypass) Houston FM 528 SH 35 Business Construct 2-Lane Urban TBD $10,000 Project to SH 6 Undivided On New Location With Railroad Grade Separation (Phase 1) Houston FM 2759 S. of sbury Widen to 4 Lanes Divided TBD $12,268 Project Rd. to FM 762/FM 2759 On Crabb River Road Houston SH 332 E of FM 521 to Reconstruct & Widen TBD $38,300 Project SH 288 From 2 Ln Rural to 4 Ln Div Rural Rdwy Houston SH 332 At Brazos River Removal of Bridge TBD $490 Project and FM 521 Houston FM 1960 At Jones Road Construct Grade TBD $25,000 Project Separation Houston Houston FM 1960 At Cutten Road Improve Traffic Signals Safety TBD $300 Project FM 1960 At Mills Road Improve Traffic Signals Safety TBD $350 Project 152

252 Houston FM 1960 SH 249 to I-45 New Fiber/Radio Systems Technology TBD $900 Project and Ops. Improv Houston FM 1960 At Treaschwig Improve Traffic Signals Safety TBD $350 Project Road Houston FM 1960 At Denton Road Improve Traffic Signals Safety TBD $350 Project Houston SH 6 Memorial Drive Reconstruct to 8-Lane TBD $40,000 Project to Piping Rock Divided With Curb and Gutter Houston SH 6 Piping Rock Lane Widen From 6 to 8 Lanes TBD $20,000 Project to Richmond Ave With Intersection Improvements Houston SH 6 At FM 529 Intersection 2019 $3,598 Project Improvements Houston SH 6 US 290 to Pine Upgrade Traffic Signal Safety TBD $1,385 Project Forest Systems Houston SH 6 At Clay Road Intersection TBD $18,000 Project Improvements Houston SH 6 Pine Forest Lane Install Safety Lighting Safety TBD $2,506 Project to 0.5 Miles North of I

253 Houston SH 6 At West Road Improve Traffic Signals Safety TBD $350 Project Houston SH 6 At Forest Trails Improve Traffic Signals Safety TBD $350 Project Drive Houston SH 6 Westpark Dr to New Fiber/Radio Systems Technology TBD $228 Project Fort Bend C/L and Ops. Improv Houston SH 6 Harris C/L to New Fiber/Radio Systems Technology TBD $342 Project Voss and Ops. Improv Houston FM 2218 SH 36 to US 59 Widen From 2 Lanes to $35,228 Draft Lane Divided Houston FM 2004 At Oyster Creek Bridge Deck Replacement TBD $1,308 Project Houston FM 2004 FM 523 to Add Shoulders, Widen TBD $32,000 Project Galveston County Bridges, Replace Bridge at Line Chocolate Bayou and Overlay Houston FM 646 FM 3436 to FM Widen to 4 Lane Divided 2023 $21,200 Draft Rural Road 154

254 Houston FM 3083 SH 105 W to I-45 Widen to 4-Lane Divided TBD $15,100 Project Roadway Houston SH 99 BS 146 East Construct Two 2-Ln TBD $12,836 Project (Segment 1-2) to Frontage Roads Chambers County Line Houston SH 99 BS 146 West to Construct 4-Lane Tollway TBD $58,395 Project SH 146 With Interchanges and Two Non-Continuous Frontage Roads Houston SH 99 At BS 146E Install Traffic Signal Safety TBD $41 Project Houston SH 99 BS 146 East Construct 4-Lane Tollway TBD $16,030 Project (Segment I-2) to & Interchanges Chambers County Line Houston SH 99 FM 1405 Construct Two 2-Ln TBD $22,326 Project (Segment I-2) to Frontage Roads Harris C/L Houston BW 8 At SH 288 Construct Two Direct TBD $0 Project Connectors Houston FM 518 SH 288 to FM Widen From 4 to 6 Lanes TBD $22,100 Project With Curb, Gutter and Raised Median 155

255 Houston SH 99 Harris County Widen Existing Pavement TBD $88,100 Project Line to FM 1093 to Ultimate 6 Lane (Segment D) Freeway (Phase 2) Houston SH 99 At US 59 in Sugar Construct 4-Lane Toll Way TBD $39,800 Project Land (Segment 3rd Level Overpass D) Houston SH 99 At FM Construct 2 Dcs (WB- TBD $38,000 Project /Westpark NB,NB-EB) (Toll) (Segment Tollway to D) Interchange Houston SH Miles South Construct Overpass and TBD $10,800 Project of Peek Road to Approaches (Segment D 0.28 Miles North Toll) of Peek Road Houston SH mi N Widen Existing Pavement TBD $8,710 Project Kingsland Blvd to Ultimate 6 Lane (Segment D to Freeway (Phase 2) Fort Bend County Line Houston SH rd Street to Rehabilitation of Existing TBD $1,535 Project nd Street Rd and Intersection Improvements 156

256 Laredo I mi South Construct 2 Lane TBD $4,522 Project of RRgs at Relief Undivided Facility With Rt to mi Elevated Intersect North of RRgs at Relief Rt Laredo BI 35-C mi S of SH The Replacement of An TBD $600 Project to mi S Existing Bridge of SH 97 at Nueces River Laredo I Feet North For The Widening and TBD $500 Project of Elm Creek Int Rehabilitation of An Wfr to 200 Feet Existing way South of Elm Creek Int Wfr Laredo I FT.North For The Widening and TBD $500 Project Bi35C Underpass Rehabilitation of An Int to Existing way FT.South Bi35C Underpass Int Laredo I-35 Webb County Replace Bridge and Safety TBD $439 Project Line to FM 133 Approach Railing Or Add Safety End Treatm Ent Or Replace Guardfence 157

257 Laredo I FT South of Construction of A New Two $841 Draft Martinena to Lane Roadway Webb/Lasalle County Line Laredo I mi West of For The Construction of TBD $20,000 Project Ih35 / Us59-Sl20 Direct Connector to 0.50 mi South Interchange (Dc#8) of Us59-Sl20 Laredo I mi East of For The Construction of TBD $30,000 Project Ih35/ Us59-Sl20 Direct Connector to 0.50 mi North Interchange(Dc#3) of Ih35 / Us59- Sl20 Laredo I mi East of For The Construction of TBD $20,000 Project Ih35/Us59-Sl20 Direct Connector to 0.5 mi North of Interchange (Dc#4) I-35/Us59-Sl20 Laredo I mi South of For The Construction of TBD $15,000 Project Us59-Sl20 to 0.5 Direct Connector mi East of Interchange (Dc#6) Ih35/Us59-Sl20 Laredo US mi W of Pr Profile Edgeline Markings, Safety TBD $213 Project to 0.5 mi E of Profile Centerline SH 163 Markings 158

258 Laredo US mi E of SH Profile Edgeline Markings, Safety TBD $159 Project to mi Profile Centerline NW of SS 406 Markings Laredo US mi NW of Profile Edgeline Markings, Safety TBD $214 Project SS 406 to Profile Centerline mi E of SS 349 Markings Laredo US mi E of SL Profile Edgeline Markings, Safety TBD $117 Project to Kinney Profile Centerline County Line Markings Laredo US 90 Val Verde County Profile Edgeline Markings, Safety TBD $341 Project Line to mi Profile Centerline E of SL 166 Markings Laredo US 90 Valverde County Replace Bridge and Safety TBD $775 Project Line to at Approach Railing Or Add Sycamore Creek Safety End Treatm Ent Or Replace Guardfence Laredo US 90 Val Verde County Milled Edgeline and Safety TBD $293 Project Line to Centerline Rumble Strips mi E of Val Verde Cl Laredo US mi E of Milled Edgeline and Safety TBD $48 Project Val Verde Cl to Centerline Rumble Strips mi W of SL

259 Laredo US mi E of SL Profile Edgeline Markings, Safety TBD $355 Project to Uvalde Profile Centerline County Line Markings Laredo US mi E of SL Milled Edgeline and Safety TBD $355 Project to Uvalde Centerline Rumble Strips County Line Laredo US M S of The Replacement of An TBD $26,000 Project Zavala/Uvalde Existing Bridge ClAt Nueces to 2.44 M S of Zavala/Uvalde Cl Laredo US 83 US 57 to Dimmit Profile Edgeline Markings, Safety TBD $408 Project County Line Profile Centerline Markings Laredo US 83 Zavala County Profile Edgeline Markings, Safety TBD $170 Project Line to mi Profile Centerline E of FM 1917 Markings Laredo US mi E of FM Profile Edgeline Markings, Safety TBD $359 Project to Profile Centerline mi N of FM 133 Markings Laredo US mi N of FM Profile Edgeline Markings, Safety TBD $220 Project to Webb Profile Centerline County Line Markings 160

260 Laredo SH mi E of FM Milled Edgeline and Safety TBD $371 Project to SH 44 Center Line Rumble Strip Laredo SL 20 At Del Mar Blvd Improve Traffic Signals Safety TBD $84 Project Laredo SL 20 At International Improve Traffic Signals Safety TBD $90 Project Blvd Laredo US 59 At International Construction of 2024 $14,786 Draft Airport Interchange Laredo US 277 Edwards County Profile Edgeline Markings, Safety TBD $556 Project Line to US 377 Profile Centerline Markings Laredo US 277 US 377 to Profile Edgeline Markings, Safety TBD $403 Project mi N of SL 79 Profile Centerline Markings Laredo FM 117 Uvalde County Profile Edgeline Markings, Safety TBD $214 Project Line to US 57 Profile Centerline Markings Laredo FM 133 Dimmit County Profile Edgeline Markings, Safety TBD $134 Project Line to I-35 Profile Centerline Markings Laredo SH 44 La Salle County Profile Edgeline Markings, Safety TBD $578 Project Line to Duval Profile Centerline County Line Markings 161

261 Laredo SH 44 La Salle County Safety Treat Fixed Object Safety TBD $922 Project Line to 23 Miles E of La Salle County Line Laredo SH 44 Webb County Profile Edgeline Markings, Safety TBD $188 Project Line to US 59 Profile Centerline Markings Laredo FM Miles East of Widen Rdwy to Provide TBD $18,000 Project US 83 to La Salle Passing Lanes (Super 2) County Line Laredo US 57 Maverick County Profile Edgeline Markings, Safety TBD $313 Project Line to US 83 Profile Centerline Markings Laredo US 57 US 83 to Frio Profile Edgeline Markings, Safety TBD $541 Project County Line Profile Centerline Markings Laredo US mi SE of Texturizing Shoulder and Safety TBD $114 Project US 277 to Kinney Centerline County Line Laredo US 277 SS 317 to Val Adding Passing Lanes TBD $2,470 Project Verde/Kinney County Line 162

262 Laredo US 277 Val Verde/Kinney Adding Passing Lanes & TBD $11,191 Project County Line to Surfacing Kinney/Maverick County Line Laredo US 277 Val Verde/Kinney Texturizing Shoulders and Safety TBD $134 Project County Line to Centerline Kinney/Maverick County Line Laredo US 277 Kinney/Maverick Adding Passing Lanes & TBD $9,353 Project County Line to Surfacing mi S of FM 1665 Southern Int Laredo US 277 Kinney/Maverick Texturizing Shoulders and Safety TBD $168 Project County Line to Centerline mi S of FM 1665 Southern Int Laredo US mi S of FM Adding Passing Lanes & TBD $1,616 Project Southern Surfacing Int to Elm Creek Laredo US mi S of FM Texturizing Shoulders and Safety TBD $90 Project Southern Centerline Int to FM

263 Laredo SL 480 US 57 to US 277 For The Construction of A TBD $80,868 Project 14- N 2 Lane Undivided Facility 010 1, 4 and Railroad Grade Separation Laredo SL mi South For The Construction of An TBD $4,123 Project of US 57 to Interchange mi North of US 57 Laredo SL mi South For The Construction of An TBD $4,980 Project of US 277 to US Interchange 277 Laredo US 57 SS 216 to 1 mi Install Continuous Turn Safety TBD $76 Project NW of SS 216 Lane Laredo US 277 SL 480 to Profile Edgeline Markings, Safety TBD $157 Project mi W of Profile Centerline Dimmit County Markings Line Laredo US mi South of Replace Bridge and Safety TBD $74 Project US 57 to at Approach Railing Or Add Rosita Creek Safety End Treatm Ent Or Replace Guardfence Laredo US mi W of Profile Edgeline Markings, Safety TBD $233 Project Dimmit County Profile Centerline Line to Dimmit Markings County Line 164

264 Laredo SH mi E of US The Rehabilitation of A TBD $196 Project at Draw to Bridge Facility mi E of US 83 Laredo SH 85 US 83 to Profile Edgeline Markings, Safety TBD $336 Project mi W of N Profile Centerline Jefferson Markings Laredo SH mi SW of The Replacement of An TBD $707 Project FM 468 at Allen Existing Bridge Creek to mi SW of FM 468 Laredo SH 97 FM 624 to Widen Pavement to TBD $0 Project mi W of Provide Passing Lanes Lasalle/Mcmulle n C/L Laredo SH 97 Bi-35C to FM Profile Edgeline Markings, Safety TBD $289 Project Profile Centerline Markings Laredo SH 16 Mcmullen County Profile Edgeline Marking, Safety TBD $207 Project Line to mi Profile Centerline N of County Rd Markings

265 Laredo US mi W of Profile Edgeline Markings, Safety TBD $471 Project FM 2895 to Profile Centerline mi E of SH Markings 20 Laredo US mi W of Profile Edgeline Markings, Safety TBD $328 Project Duval County Profile Centerline Line to mi Markings W of FM 2895 Laredo US 59 Duval County Widen Roadway to Provide TBD $45,000 Project Line to mi Passing Lanes (Super 2) W of FM 2895 Laredo US 59 Webb County Profile Edgeline Markings, Safety TBD $261 Project Line to 0.98 Profile Centerline Miles West of SH Markings 16 Laredo FM 624 SH 97 to Profile Edgeline Markings, Safety TBD $423 Project mi W of Profile Centerline Mcmullen Cl Markings Laredo FM 140 Uvalde County Profile Edgeline Markings, Safety TBD $65 Project Line to Frio Profile Centerline County Line Markings Laredo FM mi S of FM Restoration and Add TBD $6,338 Project Int to Shoulders mi North of FM

266 Laredo FM 1021 FM 3443 to Replace Bridge and Safety TBD $203 Project mi North Approach Railing Or Add of FM 2644 Safety End Treatm Ent Or Replace Guardfence Laredo Laredo FM 1472 At Flecha Lane Improve Traffic Signals Safety TBD $87 Project FM 1472 At Killam Blvd Improve Traffic Signals Safety TBD $98 Project Laredo FM mi W of Profile Edgeline Marking, Safety TBD $266 Project Mcmullen Cl to Profile Centerline Marking Mcmullen County Line Laredo FM mi W of Safety Treat Fixed Object Safety TBD $1,074 Project Mcmullen Cl to Mcmullen County Line Lubbock US 84 US 84 at Preliminary Engineering TBD $167 Project Milwaukee Avenue to Interchange Lubbock I ' North of FM Bridge Maintenance Safety TBD $306 Project NB to 120' South of FM 54 NB 167

267 Lubbock I ' North of FM Bridge Maintenance Safety TBD $306 Project SB to 120' South of FM 54 SB Lubbock I-27 80' North of N Bridge Maintenance Safety TBD $507 Project Loop 369 to 80'south of N Loop 369 Lubbock I mi North of Bridge Maintenance Safety TBD $269 Project FM 597 to 0.7 mi North of FM 597 Lubbock BI 27-U Intersection of to Bridge Maintenance Safety TBD $140 Project Running Water Draw Lubbock US 87 Intersection of to Safety - Install Flashing Safety TBD $86 Project US 87 at FM 41 Beacon Lubbock US Miles West of New Interchange TBD $20,000 Project Mlk to Zenith Ave Lubbock US 385 Deaf Smith Super 2 TBD $7,500 Project County Line to CR 713 Lubbock US 385 SH 194 to Lamb Super 2 TBD $9,300 Project County Line 168

268 Lubbock US mi SE of Safety-Rumble Strips Safety TBD $79 Project SH 194 to Lamb County Line Lubbock US 385 US 70 to 12.3 Texturize Shoulders Safety TBD $25 Project Miles North of (Milled-In) Littlefield Lubbock US 385 Castro County Super 2 TBD $3,300 Project Line to US 70 Lubbock US 385 Castro Co. Line to Safety - Rumble Strips Safety TBD $29 Project US 70 Lubbock US mi North of Texturize Shoulders Safety TBD $37 Project Littlefield to SL (Milled-In) 430 in Littlefield Lubbock US 385 US 84 to Hockley Rumble Strips (Milled-In) Safety TBD $28 Project Co Line Lubbock FM FT. South of Intersection TBD $16 Project th St. to 91 FT. Improvements North of 13th St. Levelland Lubbock US 385 Hockley Co Line Rumble Strips (Milled-In) Safety TBD $60 Project to SH 137 Lubbock US mi E of US Rumble Strips (Milled-In) Safety TBD $128 Project to Dawson Co Line 169

269 Lubbock US 180 Ave G in Super 2 TBD $15,000 Project Seminole to Dawson County Line Lubbock US 180 Gaines Co Line to Rumble Strips (Milled-In) Safety TBD $71 Project mi W of SH 137 Lubbock US 180 Gaines County Super 2 TBD $7,800 Project Line to Lamesa City Limits Lubbock SH 137 Terry Co Line to Rumble Strips (Milled-In) Safety TBD $90 Project FM 2592 Lubbock SH mi S of US Texturize Shoulders Safety TBD $41 Project to Martin (Milled-In) C/L Lufkin SH 21 At Trinity River Repair Substructure TBD $916 Project Lufkin US mi N of US Const 4 Lane Frwy On 2022 $88,600 Project to US 287 West Side of Corrigan Lufkin US 59 US 287 to 2.3 mi Construct 4 Lane Frwy On 2022 $69,600 Project S of US 287 West Side of Corrigan 170

270 Lufkin US 59 Just S of FM Convert to 4 Lane Fwy W/ 2023 $67,910 Project to Liberty Frontage Rds & Grade C/L Separations Lufkin US 69 FM 844 to Widen From 2 Lanes to 4 $65,099 Draft Zavalla Lane Divided Rural Lufkin SH 103 Angelina County Improve Guardrail to Safety TBD $878 Project Line to Design Standards Augustine County Line Lufkin SL 287 BU 59G to Add Auxiliary Lanes 2026 $4,200 Project Copeland Street Odessa I Miles West of Facility Upgrades to Meet TBD $7,700 Project FM 2903 to 2.7 Freeway Standards Miles East of FM 2903 Odessa I-20 BI 20-B to CR Convert Rural Freeway to TBD $60,000 Project Urban Freeway Odessa I mi West of I-20 Corridor Study TBD $68,000 Project FM 866 to East End of Monahans Draw Bridge Odessa I-20 FM 1936 to Loop Improve Add TBD $14,510 Project West Capacity 171

271 Odessa I-20 Loop 338 West Improve Add TBD $11,700 Project to Monahans Capacity Draw Odessa I-20 At Loop 338 Reconstruct Interchange TBD $25,000 Project West Odessa I-20 East End of I-20 Corridor Study TBD $24,000 Project Monahans Draw Bridge to Midland County Line Odessa I-20 Monahans Draw Improve Add TBD $6,700 Project to US 385 Capacity Odessa I-20 Jbs Parkway to Improve Add 2022 $7,200 Draft Midland County Capacity Line Odessa I-20 Ector County Line I-20 Corridor Study TBD $120,000 Project to 0.4 mi East of SH 349 Overpass Odessa I Miles East of Replace Existing TBD $28,160 Project Midkiff Rd to 1.0 Underpass With A 4-Lane Miles West of Wide Overpass Structure, Midkiff Rd Urban Median, Y-Ramps Configuration Odessa I-20 At CR 1250 Construct West Bound TBD $3,000 Project Access Ramps 172

272 Odessa I-20 Ector County Line Improve Add 2022 $34,300 Draft to FM 1788 Capacity Odessa I-20 FM 1788 to Loop Improve Add 2024 $32,500 Draft West Capacity Odessa I mi East of SH I-20 Corridor Study TBD $30,000 Project Overpass to Martin County Line Odessa I-20 East of Lamesa Extend On/Off Ramps, TBD $6,322 Project to East of SH 158 Ramp Reversal Odessa I-20 At SL 250 Install Traffic Signal and Safety TBD $513 Project Safety Lighting at Intersection Odessa US 67 Reagan County Roadway Widening to A TBD $14,752 Project Line to SH 329 Modified Super 2 Odessa US 285 NM State Line to Roadway Widening to A $1,550 Draft Reeves County Modified Super 2 Line Odessa US 285 Culberson County Roadway Widening to A $32,004 Draft Line to RM 652 Modified Super 2 173

273 Odessa US 285 SH 302 to FM Roadway Widening to A $33,427 Draft Modified Super 2 Odessa US 285 At SH 302 Install Intersection Safety TBD $61 Project Flashing Beacon, Install Advanced Intersection Warning Signals and Signs Odessa US 285 I-20 to 2.0 mi Roadway Widening to A TBD $15,000 Project South of CR 113 Modified Super 2 Odessa US mi South of Roadway Widening to A TBD $27,800 Project CR 113 to Pecos Modified Super 2 County Line Odessa US 285 Reeves County Roadway Widening to A TBD $28,000 Project Line to 0.3 mi Modified Super 2 South of FM 1776 Odessa US mi South of Roadway Widening to A TBD $19,000 Project FM 1776 to 1.5 Modified Super 2 mi North of I-10 Odessa I-10 Reconstruction of Reconstruction of Safety Safety TBD $13,000 Project Sra at I-10 to 1 Rest Area mi East of FM

274 Odessa Odessa US 285 At Nelson St. Improve Traffic Signals Safety TBD $41 Project US 285 At FM 1053 Improve Traffic Signals Safety TBD $41 Project Odessa US 385 Andrews City Roadway Reconstruction TBD $48,000 Project Limits to Ector County Line Odessa US 385 At N Ave G Improve Traffic Signals Safety TBD $41 Project Odessa US 385 Ector County Line Roadway Reconstruction TBD $28,600 Project to FM 1882 Odessa US 385 At Yukon Rd Improve Traffic Signals Safety TBD $45 Project Odessa US 385 At 87th St Reconstruct Intersection TBD $1,500 Project With Traffic Signals & Illumination Odessa US 385 At South SL 338 Construct Overpass 2026 $23,000 Draft Odessa US 385 Upton County Widening to An Ultimate 4- TBD $40,284 Project Line in Crane at Lane Divided way Lilley Lane 175

275 Odessa US 385 In Mccamey at Edening to An Ultimate 4- TBD $18,716 Project Nimitz Street to Lane Divided way Crane County Line Odessa US 385 Crane County Widening to An Ultimate $35,000 Project Line to Nimitz Lane Divided way Street in Mccamey Odessa SH 349 At CR 130 Safety Lighting at Safety TBD $68 Project Intersection Odessa SH 349 At CR 140 Safety Lighting at Safety TBD $68 Project Intersection Odessa SH 349 At CR 114 Safety Lighting at Safety TBD $68 Project Intersection Odessa SH Mile West of Wrong Way Warning Signs Safety TBD $8 Project West Loop 250 to SL 250 Odessa SH 176 At FM 1788 Construct Overpass Safety TBD $11,457 Project Odessa SH 176 At SH 137 Construct Overpass 2019 $5,500 Project Odessa SH 176 SH 115 to Roadway Widening to A TBD $13,600 Project mi South of FM Modified Super

276 Odessa SL mi E of CR Construct Mainlanes TBD $20,000 Project to 0.5 mi E of CR 1135 Odessa FM 1788 BI 20-E to CR Operational Improvements TBD $2,000 Project Odessa SH 349 BI 20-E to LP 40 Operational Improvements TBD $200 Project Odessa SH 302 At 8th St Improve Traffic Signals Safety TBD $45 Project Odessa SL 338 At E Hammett Dr Install Intersection Safety TBD $64 Project Flashing Beacon, Install Advanced Intersection Warning Signals - Existing Warning Signs Odessa SL 338 At Jbs Pwky Install Intersection Safety TBD $64 Project Flashing Beacon, Install Advanced Intersection Warning Signals - Existing Warning Signs Odessa SL 338 At 52nd/56th St Install Intersection Safety TBD $84 Project Flashing Beacon, Install Advanced Intersection Warning Signals - Existing Warning Signs 177

277 Odessa SL 338 At 52nd/56th St Reconstruct Intersection Safety TBD $4,000 Project With Traffic Signals & Illumination Odessa SH 191 East Loop 338 to Ramp Improvements TBD $5,000 Project Midland County Line Odessa SH 191 East SL 338 to Wrong Way Driver Warning Safety TBD $27 Project Midland County Signs Line Odessa SH 191 Ector County Line Ramp Improvements TBD $44,000 Project to SH 349 Odessa SH 191 Ector County Line Wrong Way Driver Warning Safety TBD $19 Project to SH 158 Signs Paris I-30 At Riley Creek, Replace Bridge and Safety TBD $137 Project Lindley Creek, to Approach Railing Or Add and Elm Creek Safety End Treatment Or Replace Guardfence Paris I-30 Hunt County Line Widen 4-Lane Freeway to TBD $39,000 Project to 0.21 mi East 6-Lane Freeway of FM 2297 Paris I-30 SH 34 to Hopkins Widen 4-Lane Freeway to TBD $60,000 Project County Line 6-Lane Freeway Paris I W of FM Widen 4-Lane to 6-Lane TBD $66,000 Project to US 69 Freeway 178

278 Paris I-30 At SH 154 and at Replace Bridge and Safety 2020 $198 Project Rock CR Relief Approach Railing Or Add #1 Safety End Treatment Or Replace Guardfence Paris I mi East of Widen 4-Lane Freeway to TBD $27,000 Project FM 2297 to 6-Lane Freeway Caney Creek Bridge Paris US 82 Division Street to Install Continuous Turn Safety TBD $572 Project mi E of FM Lane 194 Paris US 82 FM 194 to Red Construct Super 2 TBD $4,481 Project River County Line Paris US 82 West Division Widen From 2-Lane to 4- TBD $20,000 Project Street in Blossom Lane to Red River County Line Paris US 82 Lamar County Construct Super 2 TBD $9,000 Project Line to FM 2825 Paris US 82 Lamar County Widen From 2-Lane to 4- TBD $50,000 Project Line to SH 37 Lane Paris US 82 At Skaggs Road Interchange Modification TBD $6,000 Project

279 Paris US 82 BU 82 J to Bowie Widen From 2-Lane to 4- TBD $56,000 Project County Line Lane Paris US 82 SH 37 to BU 82 J Widen From 2-Lane to 4- TBD $4,000 Project Lane Paris US 75 State Line to US Widen From 4 Lane to 6 TBD $7,575 Project Lane Paris US 75 Red River to US Fdrcp, Slab Jacking, and TBD $204 Project Diamond Grinding Concrete Pavement Paris US 75 At Center Street Replace Bridge and TBD $4,000 Project (Southbound) Approaches Paris US 75 At Center Street Replace Bridge and TBD $4,000 Project (Northbound) Approaches Paris US 75 At Lamar Street Replace Bridge and TBD $4,000 Project (Southbound) Approaches Paris US 75 At Washington Replace Bridge and TBD $4,000 Project Street Approaches (Northbound) Paris US 75 At Washington Replace Bridge and TBD $4,000 Project Street Approaches (Southbound) 180

280 Paris US 75 SH 91 to 1.5 mi Safety Treat Fixed Objects Safety TBD $350 Project N of FM 1417 Paris US 75 SH 91 to Widen From 4 Lane to 6 TBD $10,555 Project mi S of Center Lane Street Paris US 75 SH 91 to Reconstruct and Widening 2020 $71,930 Draft mi S of Center From 4-Ln to 6-Ln Street Paris US 75 SH 91 to FM 131 Fdrcp, Slab Jacking, and TBD $30 Project Diamond Grinding Concrete Pavement Paris US 75 At Post Oak Replace Bridge and 2019 $1,619 Project Creek (SB) Approaches Paris US 75 At Post Oak Replace Bridge and 2019 $1,619 Project Creek (NB) Approaches Paris US 75 NB Over US 75 Replace Bridge and TBD $1,460 Project SB Connection Approaches Paris US mi S of Widen From 4 Lane to 6 TBD $32,160 Project Center Street to Lane FM

281 Paris US mi S of Widening From 4-Ln to $58,650 Draft Center Street to Ln FM 1417 Paris US 75 Centerline of FM Fdrcp, Slab Jacking, and TBD $10 Project to mi Diamond Grinding N of FM 902 Concrete Pavement Paris US 75 FM 902 to Collin Widen From 4 Lane to 6 $15,000 Project County Line Lane Paris US mi S of FM Fdrcp, Slab Jacking, and TBD $20 Project to Centerline Diamond Grinding of FM 902 Concrete Pavement Paris US 75 Inter of Loy Lake Build New Ramps TBD $7,230 Project and US 75 to Inter of FM 691 and US 75 Paris US 75 FM 120 to SH 91 Safety Treat Fixed Objects Safety TBD $514 Project Paris US mi N of Loy Rubblization Test Section TBD $1,000 Project Lake to 0.90 mi N of Loy Lake Paris US 75 At FM 120, US Construct Ramp Reversal TBD $3,349 Project South Bound Fr to at Crawford Lane 182

282 Paris US Miles N of Repair Slope Failure and TBD $1,250 Project Randall Lake Roadway Road to 0.4 Miles S of Randall Lake Road Paris US 75 US 69 to SH 91 Widen From 4 Lane to 6 TBD $60,685 Project Lane Paris US 75 At US 82 Widen Frontage Roads TBD $21,700 Project and Reconfigure Ramps Paris US 75 US 69 to SH 91 Fdrcp, Slab Jacking, and TBD $1,066 Project Diamond Grinding Concrete Pavement Paris US 271 LP 286 in Paris Widen From 2-Lane to 4- TBD $1,682 Project to Pattonville Lane Divided Paris US 271 SL 286 to Red Construct Super 2 TBD $7,266 Project River County Line Paris US 271 SL 286 to Red Improve Guardrail Design Safety TBD $586 Project River County Line Standards; Texturize Shoulders and Centerline Rumble Strips Paris US 271 LP 286 in Paris Widen From 2-Lane to 4- TBD $26,700 Project to Pattonville Lane Divided Paris US 271 Pattonville to Red Add 2 Additional Lanes to TBD $22,000 Project River County Line Provide 4 Lane Facility 183

283 Paris US 271 Lamar County Improve Guardrail Design Safety TBD $1,680 Project Line to SH 37 Standards; Texturize Shoulders and Centerline Rumble Strips Paris US 271 Lamar County Add 2 Lanes to Provide TBD $14,000 Project Line to BU 271-D For A 4 Lane Facility Paris US 271 BU 271-D, 0.76 Add 2 Lanes to Provide A TBD $18,500 Project mi West of SH 4 Lane Facility 37, S to mi N of Trent Lake Bridge Paris SH 121 Cr 635 to North Reconstruct and Widen 3 TBD $2,169 Project of CR 635 Lane Undivided to 4 Lane Divided Rural Roadway Paris I-30 Caney Creek Widen 4-Lane Freeway to TBD $18,000 Project Bridge to Franklin 6-Lane Freeway County Line Paris I-30 SH 37 to SS 423 Construct Ramp Reversal TBD $1,854 Project Paris I-30 Hopkins County Widen 4-Lane Freeway to TBD $30,000 Project Line to Titus 6-Lane Freeway County Line 184

284 Pharr US 83 Webb/Zapata Widen From 2 Lane TBD $40,120 Project Couny Line to Undivided to 4 Lane 9.90 mi S of Undivided Webb/Zapata Cnty Line Pharr US mi S of Widen From 2 Lane TBD $22,170 Project Webb/Zapata Undivided to 4 Lane Cnty Line to 1.47 Undivided mi N of FM 3169 Pharr US mi N of FM Widen From 2 Lane Rural TBD $10,980 Project to to 4 Lane Divided Urban mi S of FM 3169 Pharr US mi S of FM Widen From 2 Lane TBD $12,150 Project to 3.75 mi Undivided To 4 Lane S of FM 3169 Divided Pharr US mi S of FM Widen From 2 Lane TBD $12,000 Project to Undivided to 4 Lane mi S of FM 3169 Pharr US mi S of FM Widen From 2 Lane Rural TBD $46,530 Project to 0.05 mi to 4 Lane Divided N of Lopeno Ave Pharr US 83 At Pete Solis Rd. Close Crossover Safety TBD $300 Project 185

285 Pharr US 83 At Delfino Lopez Install Intersection Safety TBD $55 Project St. Flashing Beacon, Safety Lighting at Intersection Pharr US 83 At Pete Solis Rd. Install Intersection Safety TBD $84 Project Flashing Beacon, Safety Lighting at Instersection Pharr US mi W of FM Construct Overpassess at TBD $35,000 Project to 0.44 mi FM 2221, Tom Gill Rd., & E of Liberty Blvd. Liberty Blvd. Pharr US 83 Tom Gill Rd. to Improve Traffic Signals, Safety TBD $89 Project FM 1427 Interconnect Signals Pharr BU 83-S I-2 to FM 494 Improve Traffic Signal, Safety TBD $713 Project Interconnect Signals Pharr BU 83-S FM 2061/FM Improve Traffic Signals, Safety TBD $178 Project to Sugar Interconnect Signals Rd. Pharr BU 83-S FM 1423 (Val Improve Traffic Signals, Safety TBD $238 Project Verde Rd) to 1st Interconnect Signals St. Pharr BU 83-S Midway Rd. to Improve Traffic Signals, Safety TBD $653 Project FM 1015 Interconnect Signals 186

286 Pharr I-69E At I-69E & FM Proposed Continuous 2025 $17,810 Draft Intersection Frontage Rds. & to at Sherer Intersection Improvement Rd./Bus 77 Intersection Pharr I-69E Spur 54 to Upgrade to Interstate TBD $65,270 Project mi S of Standards Cameron/Willacy Cl Pharr I-69E At State Spur Improve Traffic Signals Safety TBD $238 Project Pharr I-69E At FM 2994 Improve Traffic Signals Safety TBD $119 Project Pharr SH 4 SH 32 to 1.35 mi Construct 2 Lane TBD $4,348 Project NE to Proposed Undivided Roadway Port Entr. Pharr BU 77-X Arroyo Colorado Construct 6 Lane 2023 $28,850 Draft Bridge to SH 345 W/Raised Median Pharr BU 77-X At Pfc Juan Garza Install Intersection Safety TBD $56 Project Rd. Flashing Beacon, Safety Lighting at Intersection 187

287 Pharr I-2 At US 83/Us 281 Interchange 2024 $150,000 Draft Interchange Improvements Pharr I-2 At 2nd St. Build Overpass TBD $22,090 Project Overpass Pharr I-2 At 2nd St. to, Construct Overpass TBD $30,000 Project Pharr US 83 FM 1427 to Bus Improve Traffic Signals, Safety TBD $89 Project Interconnect Signals Pharr US 281 FM 732 to FM Widen to 4 Lane Rural 2021 $10,000 Draft Pharr SH 48 Mclelland St. to Install Traffic Signal Safety TBD $225 Project Medical St. Pharr SH 48 Minnesota Ave. Optimize Signal Timing Safety TBD $78 Project to FM 802 Pharr SH 48 Walmart Dr. to Optimize Signal Timing Safety TBD $78 Project FM 802 Pharr SH 48 SH 4 to FM 511 Widen to 6 Lane 2024 $28,043 Draft 05- W/Raised Median 076 2, 4 188

288 Pharr SH 48 At Austin Rd. Install Traffic Signal, Safety TBD $144 Project Safety Lighting at Intersection Pharr SH 48 At Zena Dr. Install Traffic Signal, Safety TBD $144 Project Safety Lighting Intersection Pharr SH mi E of FM Texturuze Shouders Safety TBD $138 Project to 0.38 mi W (Profile Pavement of SH 100 Markers) Pharr US mi S of FM Rural Expressway Facility TBD $180,000 Project to mi N of FM 755 Pharr US mi N. of Rural Expressway Facility TBD $48,300 Project FM 755 to mi N. of FM 755 Pharr US mi S of FM Rural Expressway Facility 2023 $58,200 Draft to Hidalgo/Brooks County Line Pharr US 281 Hidalgo/Brooks Rural Expresswat Facility TBD $124,600 Project County Line to mi N of SH

289 Pharr US mi S of SH Rural Expressway Facility 2022 $85,000 Draft to mi N of FM 490 Pharr US 281 At Bus 83 Improve Traffic Signals Safety TBD $59 Project Pharr US 77 Kenedy/Kleberg Construct Mainlanes & TBD $62,106 Project C.L. to 0.71 mi N. Overpasses of La Parra Ave. Pharr US Miles North Construct Mainlanes & TBD $16,800 Project of Norias Rd to Overpasses Norias Rd. Pharr US 77 Norias Rd to 1.34 Construct Mainlanes & TBD $22,200 Project mi N of Overpasses Willacy/Kenedy C.L. Pharr I-69E mi S of Upgrade to Interstate TBD $43,250 Project Cameron/Willacy Standards Cl to Cameron/Willacy Cl Pharr BU 77-X At State Spur Improve Traffic Signals Safety TBD $119 Project Pharr BU 77-X At Commerce St. Improve Traffic Signals Safety TBD $59 Project 190

290 Pharr SH 107 US 281 to East of Construct 6 Lane Divided 2020 $16,817 Draft FM 493 Rural Pharr SH mi W of FM Safety Lighting Safety TBD $402 Project to 0.4 mi W of FM 2128 Pharr SH 107 FM 1425 to West Rehabilitate and Widen to TBD $12,000 Project Levee 4 Lane Rural Pharr SH 186 Hidalgo/ Willacy Rehabilitate Roadway TBD $35,028 Project C.L. to King St (Super 2) Pharr SH 107 FM 1924 North Construct 6 Lane Divided 2025 $18,000 Draft to FM 676 Rural Pharr SH 107 FM 681 to FM Widen to 4 Lane 2026 $7,500 Draft W/Raised Median Pharr SH mi S of FM Construct Controlled 2019 $14,911 Draft to 1.13 mi Access Tolled Facility SE of UPRR Ovrpss at FM 3248 Pharr FM mi N of Bus Replace Bridge & TBD $675 Project to at Edinburg Reconstruct Approaches Main Canal 191

291 Pharr FM 494 Mile 3 N (FM Widen to 4 Lane TBD $9,000 Project ) to Mile 5 Pharr FM 676 SH 107 to Taylor Widen to 4 Lane With Left 2022 $10,075 Draft Rd. Turn Lane Pharr FM 1015 Mile 12 Rd. to SH Proposed 4 Lane Divided 2025 $8,600 Draft Urban Pharr FM 106 At SL 499 Improve Traffic Signals Safety TBD $59 Project Pharr FM 1426 I-2 to Nolana LP. Proposed 6 Lane W/ 2023 $16,000 Draft Raised Median Pharr SH 4 Polk Ave. to I-69 Install Traffic Signal Safety TBD $75 Project E Southbound Frontage Pharr FM 907 Nolana Loop to I- Widen to 4 Lane Divided - TBD $10,582 Project Curb & Gutter Pharr FM 907 SH 107 to Proposed 4 Lane C&G W/ TBD $24,000 Project Nolana Loop Shoulders Pharr FM 1924 FM 492 to FM Improve Traffic Signals, Safety TBD $891 Project Interconnect Signals 192

292 Pharr FM 3461 FM 2061 to I- Proposed 6 Lane TBD $13,000 Project C W/Raised Median Pharr FM th St. to Mccoll Widen to 6 Lane 2020 $8,873 Draft Rd Pharr FM 1925 FM 681 to Proposed 4 Lane C&G W/ 2026 $24,000 Draft Wallace St. Shoulders Pharr FM Miles East Reconstruct & Add TBD $18,358 Project of FM 907 to FM Passing Lanes (Super 2) 1015 Pharr FM 1925 FM 907 to SH 68 Reconstruct & Add Lanes TBD $10,000 Project (Super 2) Pharr FM 1925 At Spur 1925 Install Intersection Safety TBD $56 Project (Monte Cristo Flashing Beacon, Safety Rd.) Lighting at Intersection Pharr FM 2061 SH 495 to Hall Proposed 6 Lane W/ TBD $9,119 Project Acres Rd. Raised Median Pharr FM 2061 At El Rancho Improve Traffic Signals Safety TBD $59 Project Rd./Hall Acres Rd. Pharr FM 2220 FM 1925 to 1 mi Realignment of Ware Road TBD $2,000 Project South of FM

293 0034- US mi S of Profile Edgeline and Safety TBD $231 Project Angelo Taylor Co Line to Centerline Markings US US 83 US 67 to Concho Safety Treated Fixed Safety TBD $520 Project Angelo Co Line Objects US 83 US 67 to Concho Add Passing Lanes TBD $9,087 Project Angelo County Line US 83 Runnels County Add Passing Lanes TBD $9,087 Project Angelo Line to 11.4 mi S of Runnels County Line US 83 West Bryan Grading, Base, Paving, 2020 $1,000 Project Angelo Street in Eden to Structures US US mi S of Add Passing Lanes TBD $9,146 Project Angelo Runnels County Line to West Bryan Street in Eden US 83 US 87 to 0.5 Widen Grading, Base, 2020 $3,700 Project Angelo Miles South of Paving, Structures US US 83 US 87 to Menard Safety Treated Fixed Safety TBD $248 Project Angelo Co Line Objects 194

294 0036- US 83 Kerr Co Line to Safety Treated Fixed Safety TBD $130 Project Angelo mi S of Object Kerr Co Line US mi S of Safety Treated Fixed Safety TBD $780 Project Angelo Kerr Co Line to Objects mi S of Kerr Co Line US 83 Rm 337 to Safety Treated Fixed Safety TBD $400 Project Angelo mi N of Uvalde Object Co Line US 87 On US 87 NB Replace Traffic Signal and TBD $350 Project Angelo (Koenigheim Reconfigure Intersection Street) to at West Concho Avenue US 87 NB Bridge Over Retrofit Bridge Rail Safety TBD $300 Project Angelo North Concho River US 87 On US 87 Approx Reconstruction of Safety Safety TBD $500 Project Angelo Miles West of Rest Area Ede US 87 Concho Street in Grading, Base, Paving, 2020 $1,000 Project Angelo Eden to ta Fe Structures Street in Eden 195

295 0070- US mi E of US 83 Safety Treated Fixed Safety TBD $380 Project Angelo to mi W of Objects Mcculloch Co Line US 67 At US 87 Improve Traffic Signals, Safety TBD $918 Project Angelo Interconnect Signals, Install Sidew Alks US 67 Coleman County Add Passing Lanes TBD $11,200 Project Angelo Line to US US 290 I-10 to Gillespie Safety Treated Fixed Safety TBD $510 Project Angelo Co Line Objects US 290 I-10 to Gillespie Add Passing Lanes TBD $11,600 Project Angelo Co Line I Miles West Relocate EB Exit Ramp TBD $2,450 Project Angelo of Rio Grande St 365 and Extend South to SH 163 in Frontage Road Ozona I-10 On I Miles Reconstruction of Safety Safety TBD $1,650 Project Angelo West of Sonora A Rest Area to Mile Post Exit I-10 At FM 2169 Replace Abutment Safety TBD $266 Project Angelo Backwall and Construct Approach Slabs 196

296 0158- US mi SW of Safety Treated Fixed Safety TBD $465 Project Angelo Runnels Co Line Object to Chadbourne St US 277 US 87 to 0.4 Construct Traffic Signal TBD $650 Project Angelo Miles South of and Entrance Ramp US US mi S of US Safety Treated Fixed Safety TBD $650 Project Angelo to Schleicher Objects Co Line US 277 Tom Green Co Safety Treated Fixed Safety TBD $284 Project Angelo Line to Objects mi S of Tom Green Co Line US 277 Schleicher Co Safety Treated Fixed Safety TBD $171 Project Angelo Line to I-10 Objects US 277 St. Ann's Street in Add Passing Lanes TBD $6,600 Project Angelo Sonora to mi North of Edwards Co Line US 277 St Anns St to Safety Treated Fixed Safety TBD $325 Project Angelo mi N of Objects Edwards Co Line 197

297 0160- US mi N of Profile Edgeline and Safety TBD $321 Project Angelo Edwards Co Line Centerline Markings to Edwards County Line US 277 SH 70 to SH 158 Add Passing Lanes TBD $7,075 Project Angelo West in Bronte SH 70 Nolan County Add Passing Lanes TBD $4,631 Project Angelo Line to US US 277 SH 158 West in Add Passing Lanes TBD $11,741 Project Angelo Bronte to Tom Green County Line US 277 Coke County Line Add Passing Lanes TBD $11,659 Project Angelo to US SH mi SE of Safety Treated Fixed Safety TBD $650 Project Angelo Coke Co to US 67 Object SH 158 At SH 137 Construct Overpass Safety TBD $17,109 Project Angelo SH 137 Rm 33 to Safety Treated Fixed Safety TBD $575 Project Angelo mi N of Crockett Object Co Line SH 137 Reagan Co Line Safety Treated Fixed Safety TBD $390 Project Angelo to US 190 Object 198

298 2279- US 190 At Pecos River Replace Bridge and TBD $3,000 Project Angelo Approaches I-35 Guadalupe River Operational Improvements 2022 $75,000 Draft Antonio to Hays / Comal Including Ramp Revisions County Line and Intersection Improvements-Convert Frontage Road to One Way I-35 Guadalupe/Com Expand From 6 Ln to 10 TBD $116,178 Project Antonio al County Line to Ln Expy - Add 4 New FM 1103 Managed Lanes I-35 Guadalupe River Operational Improvements 2025 $25,000 Draft Antonio to FM 1103 Including Ramp Revisions Intersection Improvement I-35 Bexar/Guadalup Expand From 8 Ln to 12 TBD $259,547 Project Antonio e County Line to Ln Expy Thru FM 3009 & 6 Guadalupe/Com Ln to 10 Ln Expy From FM al County Line 3009 to Comal C/L -Add 4 New Managed Lanes I-35 I-410 N to Expand From 8 Ln to 12 TBD $617,968 Project Antonio Guadalupe/Bexa Ln Expy-Add 4 New r County Line Managed Lanes Including Managed Lane Conns at LP

299 0016- SL 368 Burr Road to I-35 Roadway Rehabilitation TBD $14,000 Project Antonio and Complete Streets Improvements SL 368 At Casa Blanca Improve Traffic Signals & Safety TBD $218 Project Antonio Safety Lighting at Intersection SL 368 At Eleanor Improve Traffic Signals & Safety TBD $193 Project Antonio Safety Lighting at Intersection SL 368 At Salado Creek Replace Bridge and TBD $6,100 Project Antonio and Ira Lee Rd. Approaches I mi S of I-10 Install Warning/Guide Safety TBD $159 Project Antonio to 0.3 mi N of I- Signs-Overhead Advance 10 Flashers & Horizontal Signing I-35 I-410 S to I-410 Expand 8 to 12 Ln Expy - TBD $568,531 Project Antonio N Add 4 New Managed Lanes- Including Managed Lane Conns at I-410 N & I- 410 S I-35 Various Locations Repair / Replace Bridge TBD $2,843 Project Antonio On I-35 to Laredo Expansion Joints St to 0.2 mi W of I

300 0017- I-35 Austin St. to Rehabilitate Frontage TBD $6,674 Project Antonio Crestway/Randol Roads ph I-35 SL 353 Wrong Way Driver Safety TBD $142 Project Antonio (Nogalitos) to Advanced Technologies Mccullough Ave I SW of I- Wrong Way Driver Safety TBD $205 Project Antonio to mi Advanced Technologies S of I I mi South of Replace NB and SB TBD $10,665 Project Antonio AT&T Center Bridges and Approaches Parkway at UPRR US 90 FM 3447 Intersection TBD $454 Project Antonio Improvements US 90 At CR 482 Install Flashing Beacon Safety TBD $63 Project Antonio (Bippert Ln) and Safety Lighting at Intersection US 90 At CR 485 Install Flashing Beacon & Safety TBD $63 Project Antonio Safety Lighting at Intersection US 90 SH 211 to 0.8 Expand From 4 Lane 2024 $90,000 Draft Antonio Miles W of I-410 Divided to 6 Lane Expressway 201

301 0024- US Miles W of I- Expand From 4 Lane 2024 $10,000 Draft Antonio to I-410 Divided to 6 Lane Expressway US 90 At Zarzamora Construct Westbound TBD $16,000 Project Antonio Entrance Ramp I-10 At Presa Street Construct New Entrance TBD $30,000 Project Antonio and Exit Ramps I-10 At Presa Street Add Eastbound Exit Ramp TBD $10,000 Project Antonio I-10 Loop 1604 to Expand From 4 Lane to 6 TBD $171,000 Project Antonio Guadalupe/Bexa Lane Expressway r County Line I-10 Bexar/Guadalup Expand From 4 Lane to 6 TBD $229,000 Project Antonio e County Line to Lane Expressway US 90A FM 78 At Improve Traffic Signal & Safety TBD $222 Project Antonio Foster/Rittiman Safety Lighting at Intersection FM 78 At FM 1044 Install Intersection Safety TBD $122 Project Antonio Flashing Beacon & Safety Lighting at Intersection 202

302 0072- I-10 Cascade Reconfigure Ramps and TBD $20,000 Project Antonio Caverns/Scenic Widen Frontage Road to Loop to Convert to One Way Kendall/Bexar Operation County Line I-10 SH 46 to Expand From 4 to 8 Lane TBD $83,000 Project Antonio Bexar/Kendall Expressway-2 New County Line General Purpose & 2 New Hov Lanes I-10 Kendall/Bexar Expand From 4 to 8 Lane TBD $107,000 Project Antonio County Line to Expressway-2 New FM 3351 General Purpose & 2 New Hov Lanes SL 345 At Cinnamon Improve Traffic Signals & Safety TBD $223 Project Antonio Creek Dr Safety Lighting at Intersection I-10 Various Locations Repair / Replace Bridge TBD $2,017 Project Antonio On I-10 to Expansion Joints Mulberry to Poplar St US 87 At SH 46 Improve Traffic Signals Safety TBD $50 Project Antonio US 281 At CR 429 Install Flashing Beacon & Safety TBD $63 Project Antonio Safety Lighting at Intersection 203

303 0073- US 281 At Eurostar Dr Install Flashing Beacon & Safety TBD $63 Project Antonio Safety Lighting at Intersection I mi S of I-10 Install Warning/Guide Safety TBD $89 Project Antonio to 0.4 mi N of I- Signs -Overhead Advanced 10 Flashers; Horizontal Signing & Install Pavement Markings I-37 LP 13 to I-410 Construction of A Partial TBD $2,900 Project Antonio Frontage Road, Ramps and Intersection Improvements US 181 At Old Corpus Improve Traffic Signals, Safety TBD $229 Project Antonio Christi Hwy Interconnect Signals and Safety Lighting at Intersection US 181 At FM 775 Improve Traf Signals, Safety TBD $255 Project Antonio Install Adv Intersec Warning Signal/ Signs, Safety Lighting at Intersec, Transverse Rumble Strips US 181 At FM 775 Construct Grade Safety TBD $19,499 Project Antonio Separation SH 27 At FM 394 Improve Traffic Signals Safety TBD $204 Project Antonio

304 0142- SH 27 At Methodist Improve Traffic Signals Safety TBD $204 Project Antonio Encampment Road SH 27 At RM 783 Improve Traffic Signals Safety TBD $204 Project Antonio SH 27 Spur 100 to Expand From 2 Lanes to 4 TBD $55,400 Project Antonio Kendall/Kerr Lanes With Flush Median County Line I-10 North Creek Rd. Complete WB Frontage TBD $5,000 Project Antonio to US 87 Rd, Revise EB Exit to US 87, Construct Turnarounds & Intersection Operational Improvements at US US 87 At FM 1628 Improve Traffic Signals & Safety TBD $218 Project Antonio Safety Lighting at Intersection SH mi W of FM Safety Treat Fixed Objects, Safety TBD $653 Project Antonio to 0.2 mi E Resurfacing, Widen Paved of FM 3009 Shoulders SH 46 At FM 3009 Install Traffic & Advance Safety TBD $163 Project Antonio Warning Signals/Signs, Safety Lighting at Intersection & Transverse Rumble Strips 205

305 0215- SH 46 At FM 311 Install Flashing Beacon & Safety TBD $63 Project Antonio Safety Lighting at Intersection SH 46 At Cranes Mill Install Flashing Beacon & Safety TBD $63 Project Antonio Safety Lighting at Intersection SH 46 Bentwood Dr. to Expand From 2 Lanes to 6 TBD $22,342 Project Antonio FM 3159 Lanes With Raised Median Or Cltl SH 46 Herff Road to Expand From 2 Lanes to 4 $11,001 Draft Antonio Ammann Road Lanes With Raised Median Or Continuous Left Turn Lane SH mi W of Pr 31 Resurface, Texturize Safety TBD $195 Project Antonio to 0.1 mi W of Pr Shoulders, Widen Paved 31 Shoulders SH 46 Bulverde Rd. to Expand From 2 Lanes to 6 TBD $7,658 Project Antonio Farhills Dr. Lanes With Raised Median Or Cltl FM 117 At FM 1581 Install Intersection Safety TBD $96 Project Antonio Flashing Beacon, Advance Warning Signals/Signs & Safety Lighting at Intersection 206

306 0236- FM 117 At FM 1581 Construct Grade Safety TBD $6,168 Project Antonio Separation US mi N of FM Expand 2 Lanes to 4 TBD $705 Project Antonio to 1.5 mi N Lanes Divided Rural of FM SH 16 Guilbeau Rd to Operational Improvements 2023 $35,000 Draft Antonio Loop Expansion SH 16 I-410 to Guilbeau Operational Improvements 2023 $65,000 Draft Antonio Road - Expansion SH 16 At Gilbeau Rd Improve Traffic Signals & Safety TBD $240 Project Antonio Safety Lighting at Intersection SH 16 At Texel Rd Improve Traffic Signals & Safety TBD $218 Project Antonio Safety Lighting at Intersection SH 16 At Mainland Dr Improve Traffic Signals & Safety TBD $218 Project Antonio Safety Lighting at Intersection SH 85 I-35 to BI 35D Rehabilitate Existing TBD $1,284 Project Antonio Roadway 207

307 0301- SH 85 Dimmit/Frio Widen to Provide Passing TBD $17,000 Project Antonio County Line to I- Lanes & Operational 35 Improvements SH 85 BI 35D to FM Rehab and Widen to TBD $25,000 Project Antonio Provide Passing Lanes & Operational Improvements SH 85 FM 1582 to Rehab and Widen to TBD $18,860 Project Antonio Atascosa County Provide Passing Lanes & Line Operational Improvements SH 85 Frio County Line Rehab and Widen to TBD $1,360 Project Antonio to FM 140 Provide Passing Lanes & Operational Improvements SH 97 US 281 Intersection Operational $228 Project Antonio Improvements SH 97 Mcmullen/Atasco Widen Rdwy to Provide TBD $2,903 Project Antonio sa C/L to 2.6 mi Passing Lanes N. of Mcmullen/Atasco sa C/L SH 123 Guadalupe/Hays Widen Roadway to Provide TBD $50,000 Project Antonio County Line to Operational Improvements Cordova Ln. 208

308 0366- SH 123 Cordova Ln. to I- Expand From 2 Lanes to $16,200 Draft Antonio Lanes With Center Left Turn Lane SH 123 At BS 123 Install Signal and TBD $800 Project Antonio Construct Intersection Operational Improvements SH 123 SH 123B in Expand to 4 Lane Divided TBD $180,000 Project Antonio Seguin to Roadway Wilson/Guadalup e County Line SH 123 SH 46 to 0.1 mi Profile Edgeline & Safety TBD $238 Project Antonio N of FM 1681 Centerline Markings SH 123 SH 46 to Rehabilitate and Widen to TBD $20,500 Project Antonio Wilson/Guadalup Add Shoulders e County Line SH mi N of FM Profile Edgeline & Safety TBD $124 Project Antonio to BU 87U Centerline Markings SH 123 FM 1347 to 1.0 Profile Edgeline & Safety TBD $79 Project Antonio mi N of FM 887 Centerline Markings SH 123 BS 87 to Construct North Bound TBD $18,505 Project Antonio Wilson/Karnes Passing Lanes; Base County Line Repair, Seal Coat and Overlay 209

309 0366- BS 123B At Continental Install Intersection Safety TBD $62 Project Antonio Drive Flashing Beacon & Safety Lighting at Intersection SH 72 SH 97 to SH 16 Rehab and Widen TBD $30,276 Project Antonio Roadway to Provide Passing Lanes and Operational Improvements SH 16 At Tyler Road Install Flashing Beacon Safety TBD $63 Project Antonio and Safety Lighting at Intersection SH 16 At FM 624 Install Flashing Beacon & Safety TBD $89 Project Antonio Advance Intersec Warning Signals, Safety Lighting at Intersection & Transverse Rumble Strips SH 16 At FM 624 Construct Grade Safety TBD $6,779 Project Antonio Separation SL 13 At Somerset Improve Traffic Signals & Safety TBD $218 Project Antonio Road Safety Lighting at Intersection I-410 US 90 to I-35 S Expand From 6 to 8 Lane TBD $310,000 Project Antonio Between US 90 & Valley Hi; & From 4 to 6 Lane Between Valley Hi & I-35 S; Reconstruct I-35 Inc 210

310 0521- I mi E of I-37 Install Warning/Guide Safety TBD $79 Project Antonio to 0.4 mi W of I- Signs -Overhead Advance 37 Flashers & Horizontal Signing I-410 At I-10 E Phase 2 Interchange TBD $83,920 Project Antonio Improvements I-410 At I-10 E Phase 3 Interchange TBD $266,080 Project Antonio Improvements I-410 At I-37 Mast Illumination Safety TBD $1,152 Project Antonio Interchange I-10 US 90A to SH Expand From 4 Lane to $200,000 Draft Antonio Lane Expressway I-10 SH 130 to SH 80 Expand From 4 Lane to 6 TBD $225,000 Project Antonio Lane Expressway SH 16 At Viewpoint Install Flashing Beacon & Safety TBD $63 Project Antonio Safety Lighting at Intersection SH 85 FM 140 to SH 97 Rehab and Widen to TBD $8,500 Project Antonio Provide Passing Lanes & Operational Improvements FM 471 At Heath Road Improve Traffic Signals & Safety TBD $215 Project Antonio Safety Lighting at Intersection 211

311 0849- FM 471 At SH 211 Construct Grade Safety TBD $3,996 Project Antonio Separation FM 1344 FM 541 to Rehab and Widen Narrow TBD $8,749 Project Antonio Karnes/Wilson Roadway to Add Shoulders County Line FM 1344 FM 541 to Provide Additional Paved Safety TBD $2,435 Project Antonio mi N of CR 209 Surface Width, Milled Edgeline and Centerline Rumble Strips FM 2252 At Evans Road Construct Intersection TBD $4,200 Project Antonio Operational Improvements, Including Widening of Cibolo Creek Bridge FM 1976 At Bently Dr Improve Traffic Signals & Safety TBD $218 Project Antonio Safety Lighting at Intersection FM 1976 At Montgomery Improve Traffic Signals & Safety TBD $222 Project Antonio Rd/Eagle Crest Safety Lighting at Blvd Intersection FM 1957 At Richland Hills Improve Traffic Signals Safety TBD $222 Project Antonio

312 2104- FM 1957 At Stevens Install Traffic Signal & Safety TBD $178 Project Antonio Parkway Safety Lighting at Intersection SL mi North of Expand From 2 Lanes to $1,800 Draft Antonio FM 1303 to FM Lane Divided SL 1604 US 87 to US 181 Expand From 2 Lanes to $40,000 Draft Antonio Lane Divided SL 1604 US 181 to 0.38 Expand From 2 Lanes to $23,200 Draft Antonio mi North of FM Lane Divided SL 1604 US 90 to West Expand to 6 Lane TBD $118,486 Project Antonio Military Dr Expressway -Construct 2 New Managed Lanes; Including Managed Lane Direct Connectors at US SL 1604 At FM 1535 Improve Traffic Signal Safety TBD $313 Project Antonio SL 1604 Redland Rd. to I- Expand to 8 Lane TBD $179,659 Project Antonio North Expressway -Construct 4 New Managed Lanes 213

313 2452- SL 1604 FM 78 to I-10 Expand From 4 Lane TBD $80,000 Project Antonio East Divided to 4 Lane Expressway SL 1604 US 281 to Expand to 8 Lane TBD $47,809 Project Antonio Redland Road Expressway -Construct 4 New Managed Lanes SL 1604 At Hanover Cove Construct Grade Safety TBD $18,303 Project Antonio Separation SL 1604 At Rocket Lane Construct Grade Safety TBD $14,782 Project Antonio Separation SL 1604 I-10 East to FM Expand From 2 Lanes to $20,000 Draft Antonio Houston Lane Divided St SL 1604 FM Expand From 2 Lanes to $20,000 Draft Antonio Houston St to US Lane Divided FM 2673 Rm 2722 to FM Profile Edgeline & Safety TBD $137 Project Antonio Centerline Markings SL 534 At Legion Dr Install Flashing Beacon Safety TBD $63 Project Antonio and Safety Lighting at Intersection SH 151 LP 1604 to I-410 Expand From 4 Lane to 6 TBD $80,000 Project Antonio Lane Expressway 214

314 Tyler SH mi S of FM Widen 2 Ln Roadway For TBD $10,300 Project (Van Zandt Passing Lanes-Super2 C/L),S to 0.1 mi N of SL 7 in Athens (Watson) Tyler SH 19 Van Zandt C/L,S Install Profile Edgeline & Safety TBD $268 Project to mi N of Centerline Markings Us175/Ne Sl7 (Cr3718) Tyler SH mi N of FM Install Profile Edgeline & Safety TBD $204 Project at Montalba, Centerline Markings S to Us287 Tyler US mi N of SH Constr Rt & Lft Trn Lanes TBD $393 Project , S 0.3 mi to & Accel/Decel Lanes at Camp New H.S. 100% Paid For Wedgewood and Constructed By City of Rd(Elkhart City Elkhart Lim) Tyler US 287 FM 2419, S to Widen 2 Ln Rdwy to TBD $7,650 Project SH 294 in Super-2 (3 Ln) Criteria Elkhart Tyler US 287 FM 2419, S to Install Profile Edgeline Safety TBD $69 Project mi N of SH Markings 294, Near Elkhart 215

315 Tyler US 259 FM 850, S & SE Repair, Repave, Add 10' TBD $7,000 Project to SL 571 in Outside & 4' Inside Henderson (SBl) Shoulders-SBl Tyler SH 31 South St in Widen 4 Lns to 6 Ln Dvd 2025 $13,000 Draft Longview, N to Hwy W/Raised Median & US 80 Rplc Uprr U/P Tyler US 259 US 259 in NE Widen 2 Ln Roadway to 4 TBD $31,300 Project Kilgore at SH 31, Lanes With Depressed S to 0.8 mi S of Median FM 2204 (Rusk C/L) Tyler US mi N of FM Widen 2 Ln Roadway to 4 TBD $25,600 Project , S to 1.7 mi Lanes With Depressed S of SH 42 at BU Median 259 Tyler US 271 FM 16, SW to FM Impr Guardrail to Design Safety TBD $93 Project Standards Tyler US 69 I-20, S to CR Install Profile Edgeline Safety TBD $75 Project Jim Hogg Rd Markings Tyler US 69 SS 147 in Tyler, S Repair and Resurface TBD $1,200 Project to SH 64 (Erwin Roadway St.) Tyler US 69 At FM 855 in Mt Install Safety Lighting Safety TBD $23 Project Selman 216

316 Tyler US mi N of FM Construct Grade TBD $20,000 Project W to 0.5 mi Separated Interchange S of FM 2493-E Tyler FM 2493 SL 323 in Tyler, S Widen From 4 Lanes to $52,300 Draft to FM 2813 Lanes With Flush Median Tyler FM 2493 At Blue Mountain Install Safety Lighting Safety TBD $32 Project Blvd to 1.2 mi N of Toll 49 in Tyler Tyler FM 2493 At Hollywest Dr in Install Safety Lighting Safety TBD $32 Project Tyler to 0.6 mi S of SH 57 (Grande) Tyler US 175 SH 19/Sl 7 in Widen SBl to 28', Repair & TBD $5,500 Project Athens, SE to FM Resurface Both Lanes 804 Tyler US mi E of Widen From 2 Lanes to 4 TBD $125,000 Project Anderson Lanes W/Depressed C/L(Cr3509),Se Median to FM 347, in Jacksonville Tyler FM 347 US 175 in Install Profile Edgeline Safety TBD $11 Project Jacksonville, S to Markings Old Us175/Woodrow 217

317 Tyler US 69 At Tena St to Improve & Interconnect Safety TBD $140 Project mi S of FM Traffic Signals 768, Jacksonville Tyler US mi N of FM Construct Grade- Safety TBD $12,150 Project , SE to 1.03 Separated Interchange mi S of FM 779 Tyler US 69 At CR 2311 to Install Safety Lighting Safety TBD $32 Project mi N of Sl564 Tyler US 69 At FM 17 in Alba Install Safety Lighting Safety TBD $63 Project Tyler US mi East of FM Clean/Paint Steel Safety TBD $1,284 Project to Girders,Repl Br Str# Rail,Concrete Deck Over Overlay UPRR Tyler US mi NE of FM Widen Roadway For TBD $7,300 Project (S), SW to Passing Lanes-Super2 0.5 mi NE of LP 256 in Palestine Tyler US 79 Cherokee C/L at Widen Roadway For TBD $3,300 Project Neches River, SE Passing Lanes-Super2 to 2.8 mi NE of FM 2574(S), Sw 218

318 Tyler US mi W of Install Profile Edgeline & Safety TBD $106 Project SH 110-New Centerline Markings Smmrfld Cl to mi E of SH 204-J'Ville Cl Tyler US 79 At CR 445 to 1.3 Install Safety Lighting Safety TBD $33 Project mi N of Sh42 Tyler SH 64 Van Zandt C/L, Install Profile Edgeline & Safety TBD $73 Project SE to FM 2661 Centerline Markings Tyler SH 64 At CR 483, 2.7 Install Safety Lighting Safety TBD $33 Project mi E of SH 42 to at Joinerville Tyler US 271 Upshur C/L, 0.1 Widen From 2 Lanes to 4 TBD $5,000 Project mi N of FM 2275, Lanes W/Flush Median S to SL 485 in Gladewater Tyler SH 110 At Toll49 to 2.2 Improve & Interconnect Safety TBD $75 Project mi S of FM Traffic Signals 2964(Shiloh) in Tyler Tyler SH 110 At Grande Blvd to Improve & Interconnect Safety TBD $130 Project mi S of FM Traffic Signals 2964(Shiloh) in Tyler 219

319 Tyler SH mi N of FM Widen From 2 Lane to 4 TBD $41,000 Project in Librty Lane Divided Roadway Cty,N to US 271, in Gladewater Tyler SH 135 At Peavine Rd to Install Safety Lighting Safety TBD $71 Project mi S of I-20 in Kilgore Tyler US 259 At FM 449 to N Install Safety Lighting Safety TBD $64 Project of Longview Tyler SH 31 SL 323, in Tyler, Widen 2 Lanes to 4 Lane TBD $85,000 Project E to Cr236,MPO Divided way Bndry,1.6 mi E of FM 757 Tyler SH 31 FM 850(E), E to Install Profile Edgeline Safety TBD $113 Project FM 757 Markings Tyler SH mi W of FM Install Safety Lighting Safety TBD $66 Project (N), E to 0.1 mi E of FM 850(S) Tyler SH 31 Cr236,MPO Widen 2 Lanes to 4 Lane TBD $76,500 Project Bndry,1.6 mi E of Divided way FM757,E to 0.9 mi W of FM 2767 (Gregg C/L) 220

320 Tyler SH mi W of FM Widen 2 Lanes to 4 Lane TBD $41,000 Project (Smith Divided way C/L), E to FM 1639 (Begin 4- Ln) Tyler SH 31 At FM349 in Improve & Interconnect Safety TBD $243 Project Kilgore Traffic Signals, Install Flashing Yellow Arrow Tyler SH 31 FM 3053, E to Improve Drainage, Safety TBD $614 Project FM 1639 Upgrade Guard Rail Tyler I-20 At Blackberry, Replace Bridge Rail Safety TBD $374 Project Flat & Caney Creek to & at Andy, Rats & Flat Crk Tribs Tyler I-20 At Mustang & Big Replace Bridge Rail Safety TBD $460 Project dy Crk & at to Pole, Glade & Neches River Tribs Tyler I-20 At FM 849 in The Improve Vertical TBD $3,350 Project Hideaway Lake Clearance By Replacing Community Bridge 221

321 Tyler I-20 1 mi E of Toll 49 Ramp Reversal & One-Way 2020 $15,000 Draft (Harvey Rd), E to Frontage Roads US 69 in Lindale Tyler I-20 Van Zandt C/L, E Widen Controlled Access TBD $223,431 Project to 1.4 mi E of US Facility From 4 Lanes to 6 69 Lanes Tyler I mi E of US Widen Controlled Access TBD $247,112 Project , E to 0.9 mi E Facility From 4 Lanes to 6 of US 271 Lanes Tyler I mi E of US Widen Controlled Access TBD $143,667 Project , E to Gregg Facility From 4 Lanes to 6 C/L Lanes Tyler I-20 At Mlk 0.16 mi E Improve Vertical TBD $4,000 Project of SH 322 in Clearance By Replacing Longview Bridge Tyler I mi W of Improve Left Exit 2023 $50,000 Draft Us259 (Mm Interchange Over Uprr 588), E to 1.3 mi E of Sh31 (Mm 590) Tyler I mi E of SH 31 Widen Controlled Access TBD $167,340 Project (MM 590), E to Facility From 4 Lanes to 6 Harrison C/L Lanes 222

322 Tyler I mi E of SH 31 Widen Controlled Access TBD $136,914 Project (MM 590), E to Facility From 4 Lanes to 6 Harrison C/L Lanes Tyler SL 256 At FM 322 in Improve & Interconnect Safety TBD $236 Project Palestine Traffic Signals, Install Flashing Yellow Arrow Tyler SH 42 At CR 133, 1.4 Install Safety Lighting Safety TBD $37 Project mi N of SH 135 to at Leveretts Chapel Tyler US 175 At FM 1616 in Install Flashing Beacon Safety TBD $76 Project Athens Tyler SL 571 US 79, SW of Construct 2 Lane Roadway TBD $30,000 Project Henderson, SW & On New Location (Ph 1 of E to US 259, S of 4 Ln Divided way) Henderson Waco I-35 S LP 340 to N LP Reconst.,Widen Mainlanes TBD $200,000 Project From 6 to 8,Reconst.Frontage Rd and Extend Frontage Roads Where Discontinuous and Realign Ramps 223

323 Waco I-35 12th Street to BU Replace 5 Bridges 2019 $22,000 Project Approaches Within I-35 Construction Project Waco SH 6 At Trib of Shaw Add Safety End Treatment Safety TBD $33 Project Creek to (Str #112) Waco US 84 At SH 6 UP (NB Replace Brdige and TBD $3,200 Project Fr) to (Str #82) Approaches Waco US 84 At SH 6 UP (SB Replace Bridge and TBD $3,200 Project Fr) to (Str #079) Approaches Waco SS 298 Lake Air Dr to Widen to Six Lanes TBD $8,800 Project New Road Divided, Relocate Main Lanes to Frontage Roads, Construct Dual Left Turn Lane Waco US 84 FM 1695 to Tx Realign On and Off Ramps TBD $1,500 Project Central Pkwy From Diamond to "X" Configuration Waco US 84 FM 1245 to Widen Shoulders and Add TBD $3,959 Project Navasota River Passing Lanes 224

324 Waco US 84 Navasota River to Widen Shoulders and Add TBD $6,983 Project SH 14 Passing Lanes Waco US 84 FM 1365 to 1.05 Widen From Two to Four TBD $10,000 Project mi E of FM 1365 Lane Divided With (Mexia C/L) Continuous Left Turn Lane Waco SH 36 Coryell Co Line to Widen Roadway and Add TBD $2,596 Project Lake Belton Brdg Passing Lanes Waco SH 36 At East Pepper Add Safety End Treatment Safety TBD $160 Project Creek to (Str #047) Waco SH 36 At West Pepper Add Safety End Treatment Safety TBD $120 Project Creek to (Str #048) Waco SL 363 At 57th St Rehabilitate Bridge and TBD $2,600 Project Underpass to Approaches (NBml) (Str #034) Waco US 190 At Hill Hollow Add Safety End Treatment Safety TBD $30 Project Branch to (Str #035) 225

325 Waco US mi S of FM Widen to 4 Lane Divided TBD $62,800 Project in Rural Heidenheimer to Milam C/L Waco US 190 At Br of Little Add Safety End Treatment Safety TBD $90 Project Nolan Creek to (Str #071) Waco US 190 At Br of S Nolan Add Safety End Treatment Safety TBD $35 Project Creek to (Str #082) Waco US 190 At Br of S Nolan Add Safety End Treatment Safety TBD $35 Project Creek to (Str #083) Waco US 190 At South Nolan Add Safety End Treatment Safety TBD $49 Project Creek to (Str #088) Waco US 190 At Br of S Nolan Add Safety End Treatment Safety TBD $30 Project Creek to (Str #090) Waco US 190 At Br of S Nolan Add Safety End Treatment Safety TBD $40 Project Creek to (Str #094) 226

326 Waco US 190 At Br of S Nolan Add Safety End Treatment Safety TBD $45 Project Creek to (Str #113) Waco US 190 At Br of S Nolan Add Safety End Treatment Safety TBD $45 Project Creek to (Str #114) Waco US 190 FM 2410 to 0.25 Widen From Four to Six TBD $19,684 Project mi W of Paddy Lanes Hamilton Rd Waco US 190 E Central Texas Construction of A West to TBD $5,000 Project Expy W to E East Turnaround at FM Central Texas 2410 Expy E Waco US 190 US 190 Ebml at Scour Counter Measures Safety TBD $250 Project South Nolan Creek to (Str #099) Waco US mi W of Widen From Four to Six TBD $15,500 Project Paddy Hamilton Lanes Rd to FM 2410 in W Belton Waco US 190 FM 2410 in W Widen From Four to Six TBD $35,000 Project Belton to I-35 Lanes and Resurface 227

327 Waco US mi W of Widen From Four to Six 2019 $17,654 Draft Paddy Hamilton Lanes Rd to FM 2410 in W Belton Waco SH 6 Hamilton Co Line Add Passing Lanes, Mill TBD $7,700 Project to mi N of and Inlay SH 22 Waco SH mi N of SH Add Passing Lanes, Mill TBD $4,800 Project to SH 22 and Inlay Waco SH 6 SH 22 to FM 219 Add Passing Lanes, Mill TBD $6,500 Project and Inlay Waco SH 6 FM 219 to Add Passing Lanes, Mill TBD $6,600 Project Mclennan Co and Inlay Line Waco SH 6 Lady Bird Rd to Widen From Two to Four TBD $7,000 Project Mclaughlin Rd Lanes Divided (Spur 412) Waco SH 6 US 84 to I-35 Frontage Roads and TBD $17,000 Project Realign On and Off Ramps Waco SL 340 Brazos River to Construction of Ramps, TBD $25,000 Project Spur 484 Frontage Road, and Grade Seperated Interchange 228

328 Waco SL 396 At Union Pacific Rehabilitate Bridge and TBD $5,333 Project RR Op to (Valley Approaches Mills Dr(Str #34) Waco SH mi S of FM Widen Pavement to Add TBD $5,000 Project to Holland Passing Lanes City Limits Waco FM 56 At Cr 3350 Increase Superelevation Safety TBD $373 Project Waco FM mi E of Widen Roadway and Add TBD $2,000 Project Mclennan Co Shoulders Line to 5th St in Moody Waco SH 195 Hallmark Avenue Safety Lighting Safety TBD $696 Project to Jasper Road Waco SH mi N of FM Turnaround Underpass For TBD $800 Project to 0.1 mi S Northbound and of FM 3470 Southbound Traffic On SH 195 Frontage Roads and FM 3470 Waco FM 439 At North Nolan Replace Bridge and TBD $1,900 Project Creek to (Str Approaches #011) 229

329 Waco FM mi E of FM Install Chevron On Curve, Safety TBD $179 Project to mi E Increase Superelevation of FM 93 Waco SL 340 US 84 to LP 484 Widen to Four Lanes TBD $20,000 Project Divided Waco FM 1695 US 84 to FM Widen From Four to Six TBD $21,100 Project Lanes With Curb and Gutter Drainage and Continuous Sidewalks Wichita US 287 US 287 NB to at Deck and Concrete Safety TBD $1,384 Project Falls Pease River Structure Repair Wichita US 70 At BNSF and Replace Bridge and TBD $5,000 Project Falls Dugan Creek Approaches (NB) Wichita US 70 At BNSF and Replace Bridge and TBD $5,000 Project Falls Dugan Creek (SB) Approaches Wichita US 70 At FM 433 Replace Bridge and TBD $2,500 Project Falls Approaches Wichita US 70 FM 1763 to at Deck Replacement and Safety TBD $385 Project Falls US 70 NB Substructure Repair 230

330 Wichita US 287 BU 287H South Widen Shoulders TBD $1,970 Project Falls of Electra to Near Burnett Ranch Road Wichita US mi W of Safety Lighting Safety TBD $179 Project Falls FM 1739 to mi E of 1739 Wichita US 287 At LP 11 (NB) Replace Bridge and TBD $3,500 Project Falls Approaches Wichita US 287 At LP 11 (SB) Replace Bridge and TBD $3,500 Project Falls Approaches Wichita BU 287F BU 287F WB to Deck and Concrete Safety TBD $362 Project Falls at Paradise Structure Repair Creek Wichita US 82 US 82 EB Over Rehabilitate Bridge and TBD $792 Project Falls SH 79 SB Approaches Wichita US 82 Near Bryant Upgrade to 4 Lane Divided TBD $13,500 Project Falls Edwards Road to Facility Montague Cl 231

331 Wichita US 82 At Dry Fork Little Replace Bridge and TBD $1,350 Project Falls Wichita River Approaches Wichita US 82 Nocona, West to Upgrade to 4 Lane Divided 2021 $12,900 Draft Falls Near FM 1816 Facility Wichita US 82 Clay C/L to Upgrade to 4 Lane Divided TBD $13,800 Project Falls Approx 0.5 mi E Facility of US 81 (Ringgold Wichita US mi East of US Upgrade to 4 Lane Divided 2021 $13,200 Draft Falls to Near FM Facility 1816 Wichita US 82 FM 2739 to I-35 Mobility Study TBD $1,000 Project Falls Wichita US 82 I-35 to Grayson Mobility Study TBD $1,000 Project Falls County Line Wichita US Miles North Add Shoulders TBD $4,300 Project Falls of Throckmorton C/L to Throckmorton Cl Wichita US 82 Knox County Line Upgrade to Super 2 TBD $8,500 Project Falls to BU 183B 232

332 Wichita SH mi W of US Centerline Texturing Safety TBD $67 Project Falls to FM 1285 Wichita SH 114 FM 1285 to Centerline Texturing Safety TBD $63 Project Falls Archer County Line Wichita I-35 On I-35 at The Widen to 8 Lane Freeway TBD $26,200 Project Falls Red River Bridge Facility Wichita I-35 Red River Bridge Widen From 6 Lane to 8 TBD $26,000 Project Falls to 0.2 Miles Lane Freeway Facility South of US 82 Wichita I Miles South Widen to 6 Lane Freeway TBD $205,000 Project Falls of US 82 to Red Facility River Bridge Wichita I mi N of US Safety Lighting Safety TBD $369 Project Falls to mi N of FM 372 Wichita I Miles North Widen From 6 Lane to 8 TBD $52,000 Project Falls of FM 3002 to Lane Freeway Facility 0.2 Miles South of US 82 Wichita I-35 Denton County Widen to A 8 Lane TBD $30,000 Project Falls Line to 0.7 Miles Freeway Facility North of FM

333 Wichita I-35 Denton County Widen 4 to 6 Lane Rural TBD $73,770 Project Falls Line to North of Freeway FM 3002 Wichita I mi S of FM Safety Lighting Safety TBD $195 Project Falls to mi N of FM 3002 Wichita FM 51 At Elm Fork Replace Bridge and TBD $3,750 Project Falls Trinity River Approaches Wichita SH 240 At China Creek Replace Bridge and TBD $700 Project Falls Approaches Wichita SS 325 FM 890 to 0.6 mi Reconfigure Ramp TBD $2,000 Project Falls North of FM 890 Yoakum US 59 FM 1686 to SL Upgrade to Rural Freeway $26,000 Draft Yoakum US 59 BU 59-T to FM Add 2 Lanes For A 4-Lane 2023 $17,000 Draft Divided way Yoakum US 59 BU 59 South of El Upgrade to Rural Freeway TBD $2,010 Project Campo to Jackson C/L 234

334 Yoakum US 59 FM 961 to BU 59 Upgrade to Rural Freeway TBD $2,430 Project North of El Campo Yoakum US mi S of FM Upgrade to Rural Freeway 2021 $57,000 Project (Pump Station Rd) to FM 961 Yoakum US mi North of Upgrade to Rural Freeway 2021 $80,000 Project FM 102 to 2.0 mi S of FM 102(Pump Station Rd Yoakum US 59 FT. Bend County Develope Preliminary TBD $2,016 Project Line to Caney Schematic Creek Yoakum US 59 SH 60 to 0.26 mi Upgrade to Rural Freeway 2021 $88,000 Project N. of FM 102 Yoakum US 87 FM 2922 to Construct Super 2 Lane TBD $8,387 Project mi S. of Gcr 181(Ramsey St) Yoakum US mi S of Gcr Construct Super 2 Lane TBD $13,917 Project (Ramsey St) to Dewitt County Line 235

335 Yoakum Yoakum US 87 At FM 2433 Grade Seperation Safety 2024 $12,000 Project SH 35 At SH 172 Grade Seperation Safety TBD $15,357 Project Yoakum SH 71 At Safety Lighting at Safety TBD $54 Project Bordovksy/Trinity Intersection School Rd Yoakum SH 71 At Schobel Rd Safety Lighting at Safety TBD $56 Project Intersection Yoakum SH 71 FM 1300 to FM Widen Roadway to 2021 $6,160 Project Accommodate 14' Two Way Left Turn Lanes Yoakum US 77 Fayette C/L to US Improve Guardrail to Safety TBD $292 Project A Design Standards, Safety Treat Fixed Ob Jects Yoakum I-10 Colorado River Add Lanes For 6-Lane TBD $174,940 Project Bridge to Austin Facility C/L Yoakum I-10 At Union Pacific Widen Bridge and TBD $4,830 Project Railroad - Str # Approaches Yoakum SH 80 UA 90 to 1.23 mi Construct Super 2 Lanes 2023 $18,000 Project N. of FM

336 Yoakum SH mi N. of FM Construct Super 2 Lanes 2023 $17,000 Project to US 87 Yoakum SH 172 Baker Street in Safety Treat Fixed Objects Safety TBD $606 Project Ganado to Washington Street in La Ward Yoakum SH 172 Washington Safety Treat Fixed Objects Safety TBD $270 Project Street in La Ward to SH 35 Yoakum US 90A At FM 443 Safety Lighting at Safety TBD $26 Project Intersection Yoakum I-10 SH 71 to Add Lanes For 6-Lane TBD $28,964 Project Colorado River Facility Bridge Yoakum SL 463 Mockingbird Construct East Bound TBD $4,584 Project Lane to BU 59T Frontage Road Yoakum US 77 FM 236 to BU Add 2 Lanes For A 4-Lane 2023 $23,000 Project T Divided way Yoakum US 77 US 77(Frontage Construct Traffic Signal Safety TBD $350 Project Rd) at Mallette Dr 237

337 Appendix D Rail Projects

338 Introduction This document provides a summary of the revised project list for the update of the Texas Freight Mobility Plan (TFMP). The projects were identified by the Class I and shortline railroads operating within the state, the Houston-Galveston Area Council (H-GAC), the North Central Texas Council of Governments (NCTCOG), the Gulf Coast Rail District (GCRD), the ports, and the TxDOT Rail Division. The projects lists are draft and presented to facilitate TxFAC review and discussion of projects to be included in the TFMP. The revised project list reflects 82 rail projects with a total estimated cost of $896 million. However, estimates for one-third of the projects are not available. Exhibit C-1 shows the breakout of the rail projects by source/sponsor. Exhibit C-1: Rail Projects by /Sponsor /Sponsor # of Projects d (in millions)** Shortline Railroads 22 $134 H-GAC, NCTCOG, Gulf Coast Rail District, or Port of Houston 22 $307 TxDOT Rail Division 19 $228 Ports 19 $227 Total 82 $896 * Class I includes BNSF Railway (BNSF), Union Pacific (UP), and Kansas City Southern (KCS) **s were not available for all projects 2

339 Urban Projects Location Project Name Project Description d ($000) / Sponsor Class I Railroad Stakeholder(s) Public Benefit Amarillo Farmers Avenue Grade Separation BNSF Hereford Subdivision, MP Road crosses four tracks. (DOT #014695D) TBD TxDOT Rail Division BNSF Per FHWA / FRA policy and guidance. Baytown FM 565 and 1405 Grade Separation Grade separation to support industrial growth in Chambers County TBD HGAC/Gulf Coast Rail District UP Per FHWA / FRA policy and guidance. Construction of a second bridge for a rail Savings in freight crossing of the Neches River at shipping, inventory, Beaumont: The existing single track lift emissions, crashes bridge is a significant capacity constraint and congestion costs on a major intercontinental rail line associated with Beaumont Neches River Rail Crossing between Los Angeles and New Orleans. More than 30 trains per day cross the existing bridge at reduced speeds and $120,000 TxDOT Rail Division BNSF, KCS, UP avoiding diversion to longer rail routes or to truck. The annual are often delayed by trains direct benefit to be entering/leaving the Port of Beaumont, generated by the which is adjacent to the existing lift project is estimated at bridge, and by watercraft moving along $4.5 million (in the Neches, requiring the bridge to lift. 2016$). Create northbound wye connection Corpus Christi Sinton Grade Crossing Relief toward Houston from Gregory. This is to support the Port of Corpus Christi's TBD TxDOT Rail Division UP Per FHWA / FRA policy and guidance expansion out of LaQuinta 3

340 Urban Projects Location Project Name Project Description d ($000) / Sponsor Class I Railroad Stakeholder(s) Public Benefit BNSF Galveston Subdivision, MP Booth Royal Lakes Blvd Grade Separation Road crosses main and siding track and experiences regular switching operations to serve Houston Power & Light Plant TBD TxDOT Rail Division BNSF Per FHWA / FRA policy and guidance (DOT #274661A) Eliminate multiple angled at-grade crossings adjacent to multiple rail yards. Griggs & Long BNSF Mykawa Subdivision, MP Identified by FRA in Houston Grade Grade separate crossings at Griggs and TBD HGAC BNSF, UP April 2016 as site of Separation Long. (DOT #023214G, N) 10 or more incidents in the last 10 years. v/elib/details/l US-90 Grade Construct grade separation at US-90 and Eliminate traffic delay Houston Separation at relocate wye connection at north end of TBD HGAC BNSF, UP on US-90 due to rail Dayton Yard Dayton Yard crossing occupation Houston West Belt Grade Separation (Phase 2) Construct grade separation at Lyons Avenue and close 3 at-grade crossings on West Street. $28,500 HGAC/Gulf Coast Rail District BNSF, UP Per FHWA / FRA policy and guidance 4

341 Urban Projects Location Project Name Project Description d ($000) / Sponsor Class I Railroad Stakeholder(s) Public Benefit Construction of a second main line in Houston from the GH&H Junction to Houston Second Main Line Construction (Houston) Strang on the Port Terminal Railway Association track: This would eliminate more than 2.5 hours of train delay daily, which is caused by this single track constraint that connects to double track in both directions. Supports port and TBD HGAC/Port of Houston/G ulf Coast Rail District BNSF, KCS, UP, PTRA Per FHWA / FRA policy and guidance. chemical industry expansion. Broadway bridge is funded and to be constructed. Houston Second Main Line Construction Second Main, Dawes to Dayton, TX (BNSF-UP 50/50 Line) TBD HGAC/Gulf Coast Rail District BNSF, KCS, UP Per FHWA / FRA policy and guidance. Houston Alameda- Genoa Road Grade Separation BNSF Mykawa Subdivision, MP Crosses three tracks at end of BNSF yard (DOT #023207W) TBD HGAC BNSF Per FHWA / FRA policy and guidance Dallas DART - Double Track and CTC Madill Subdivision, Phase I Construct minimum of two-main track and centralized traffic control system from Irving to Carrollton, including improvements to Carrollton interlocking. TBD NCTCOG BNSF Expand DART passenger service and increase capacity of existing freight operations 5

342 Urban Projects Location Project Name Project Description d ($000) / Sponsor Class I Railroad Stakeholder(s) Public Benefit DART - Double Expand DART Track and CTC Construct minimum of two-main track passenger service and Dallas Madill and centralized traffic control system TBD NCTCOG BNSF increase capacity of Subdivision, from Carrollton to Frisco. existing freight Phase II operations Denton Denton Maintenance Of Way Rail Relocation Relocation of the UPRR Maintenance of way track and stub track in Downtown Denton $50,000 NCTCOG UP Enhanced mobility for both passenger and freight rail operations Safety / reliability Dallas Linfield Road Crossing Closure Close the at-grade crossing at Linfield Rd and build a pedestrian overpass $7,556 NCTCOG UP improvements for Pedestrian mobility and enhanced mobility for freight rail operations Dallas Prairie Creek Rd Grade Separation and Crossing Closure Grade separation of Prairie Creek Rd located on the UPRR Main line and crossing closure at Sam Houston Rd $6,873 NCTCOG UP Safety / reliability improvements for roadway traffic and enhanced mobility for both passenger and freight rail operations 6

343 Urban Projects Location Project Name Project Description d ($000) / Sponsor Class I Railroad Stakeholder(s) Public Benefit Dallas Trinity Mills Grade Separation Trinity Mills Rd Grade Separation (Madill Subdivision) TBD NCTCOG BNSF Per FHWA / FRA policy and guidance Construct double-main track from Tower DFW Double Track Rail on TRE 55 to Dallas Union Station to enhance passenger operations. Project also includes evaluation of operational protocols to maximize freight movement $98,055 NCTCOG BNSF, TRE Enhance mobility for both passenger and freight rail operations across the DFW Metroplex. Enhance safety and DFW TRE - Rehabilitate and Double Track West Fork Trinity River Bridge Rehabilitate existing bridge and add second bridge and approximately 0.7 miles of and main line track. $3,000 NCTCOG BNSF, UP, TRE increase capacity of existing passenger and freight operations. (NOTE: DART submitted this project for TIGER funding in 2016, requesting $17.4M) 7

344 Urban Projects Location Project Name Project Description d ($000) / Sponsor Class I Railroad Stakeholder(s) Public Benefit Safety / reliability Ennis Ennis Ave Grade Separation Grade separation of Ennis Ave and UPRR $37,968 NCTCOG UP improvements for roadway traffic and enhanced mobility for both passenger and freight rail operations Safety / reliability Enhance UPRR Bridges at Belknap and improvements for Ennis Ennis Sealed Corridor Baylor St and Close the at-grade crossing at Milam Rd, Brown Rd, Tyler $25,000 NCTCOG UP Pedestrian mobility and enhanced St, and Baylor St. mobility for freight rail operations Fort Worth Blue Mound Road Grade Separation BNSF Wichita Falls Subdivision, MP 7.6. Blue Mound Rd Grade Separation (DOT #274640G) TBD NCTCOG BNSF Per FHWA / FRA policy and guidance Fort Worth Downtown Ft Worth Sealed Corridor Identify key rail infrastructure upgrades in the Tower 55 area of downtown Fort Worth to create a sealed corridor for enhanced freight and passenger mobility $50,000 NCTCOG BNSF, UP Safety / reliability improvements for roadway traffic and enhanced mobility for both passenger and freight rail operations 8

345 Urban Projects Location Project Name Project Description d ($000) / Sponsor Class I Railroad Stakeholder(s) Public Benefit Fort Worth Hemphill Street Grade Separation BNSF Fort Worth Subdivision, MP Hemphill St. Grade Separation provides opportunity to extend Tower 55 tracks to Birds sidings. (DOT #020486J) TBD NCTCOG BNSF Per FHWA / FRA policy and guidance Fort Worth Seminary Drive Grade Separation BNSF Fort Worth Subdivision, MP Seminary DR Grade Separation (DOT #020478S) TBD NCTCOG BNSF Per FHWA / FRA policy and guidance Fort Worth Sycamore School Road Grade Separation BNSF Fort Worth Subdivision, MP Sycamore School Rd Grade Separation (DOT # T) TBD NCTCOG BNSF, UP Per FHWA / FRA policy and guidance Overpass construction project at Doris Grade Road to provide alternative road access Kendleton separation overpass to local residents and rail employees. The project will also allow for TBD TxDOT Rail Division KCS Per FHWA / FRA policy and guidance project additional rail capacity expansion in Kendleton rail yard. Relieve congestion in downtown Laredo Laredo Laredo Grade Separations caused by the 14 at-grade crossings along the existing Texas-Mexico approach TBD TxDOT Rail Division KCS, UP Per FHWA / FRA policy and guidance to the existing Laredo rail bridge 9

346 Urban Projects Location Project Name Project Description d ($000) / Sponsor Class I Railroad Stakeholder(s) Public Benefit Laredo Laredo Bridge double track Double track bridge at Laredo to improve rail traffic flows to/from Mexico. TBD TxDOT Rail Division KCS, UP Per FHWA / FRA policy and guidance. Laredo 2nd ML from Laredo Bridge to Pt Laredo 2nd main line from Laredo rail bridge to Pt Laredo to facilitate additional movements to and from the border TBD TxDOT Rail Division UP Grade separation opportunities and decreased delays at grade crossings Wichita Falls 7th Street Grade Separation BNSF Wichita Falls Subdivision, MP Road crosses 9 tracks in middle of BNSF yard. (DOT # N) TBD TxDOT Rail Division BNSF Per FHWA / FRA policy and guidance Rural Projects Location Project Name Project Description d ($000) / Sponsor Class I Railroad Stakeholder(s) Public Benefit Corsicana Grade Crossing Rationalization Consider grade separations and closures to mitigate 15 crossings in approximately 2 miles. TBD TxDOT Rail Division BNSF Per FHWA / FRA policy and guidance 10

347 Rural Projects Location Project Name Project Description d ($000) / Sponsor Class I Railroad Stakeholder(s) Public Benefit Eagle Pass Rail Improvements Potential improvements could include: double-tracking segments between BNSF and UP sidings and between UP Eagle Pass Eagle Pass Rail Improvements siding and tracks at Eagle Pass in the vicinity of the bridge to Piedras Negras, TBD TxDOT Rail Division BNSF, UP Per FHWA / FRA policy and guidance. an intermodal facility with laydown pad for container movements, and improvements to assist CBP in conducting border security measures. BNSF Hereford Subdivision, MP Farwell US-70 / US-84 Grade Separation Grade crossing at Transcon double main and third main line from Slaton Subdivision. 60% of project is in TX and TBD TxDOT Rail Division BNSF Per FHWA / FRA policy and guidance 40% in NM (DOT #014787R) 11

348 Rural Projects Location Project Name Project Description d ($000) / Sponsor Class I Railroad Stakeholder(s) Public Benefit Rehabilitation of the South Orient rail Fort Stockton to Alpine South Orient Rail Line Rehab (Alpine) line between Fort Stockton and Alpine to open the interchange with UP at Alpine: This section of the rail line is constructed of rail manufactured in 1912 that is substandard for today s loadings. Rehabilitation is essential to enable shipments to/from the border at Presidio and to provide interchange capability with UP and foster competition for SORR freight between BNSF and UP. This would also allow crude oil shipments west to California $75,500 TxDOT Rail Division NA Direct benefits to shippers that can use rail instead of truck in the form of reduced shipping costs and provide societal benefits in the form of reduced emissions, traffic accidents and pavement maintenance costs. across UP s Sunset Route. 12

349 Rural Projects Location Project Name Project Description d ($000) / Sponsor Class I Railroad Stakeholder(s) Public Benefit Rehabilitation of the Northeast Texas Rural Rail Transportation District (NETEX) rail line from Greenville to Mount Pleasant (66 miles): TxDOT owns the 31 miles of the NETEX ROW and has a security interest in the infrastructure Northeast Texas from a Grant Funding Agreement in Greenville to Mount Pleasant Rural Rail Transportation District Rail Line Track speeds on the NETEX line are limited to 10 mph due to defective cross ties and bridge deficiencies. The $32,000 TxDOT Rail Division NA Per FHWA / FRA policy and guidance. Rehab rail line must be rehabilitated to continue providing service to existing customers and to attract new business to the line and the region. TxDOT would seek additional ownership in the line and infrastructure as a condition to rehabilitating the line. Hearne Hearne Area Crossing Mitigation. Grade crossing closures or separations to improve vehicular fluidity and improve safety of the Hearne Terminal area. TBD TxDOT Rail Division UP Per FHWA / FRA policy and guidance. 13

350 Rural Projects Location Project Name Project Description d ($000) / Sponsor Class I Railroad Stakeholder(s) Public Benefit Odem Wye connection on N. East quadrant Streamlines train movements through Odem TBD TxDOT Rail Division UP Reduces vehicle time spent at grade crossings while trains move through Odem. Sherman Grade Crossing Rationalization Consider grade separations and closures to mitigate 18 crossings in approximately 5 miles. TBD TxDOT Rail Division BNSF Per FHWA / FRA policy and guidance Reduced emissions, Tenaha Tenaha Wye Connection New Wye Connection at Tenaha, TX (Longview Subdivision) TBD TxDOT Rail Division BNSF traffic accidents and pavement maintenance costs. Vernon US 283 Grade Separation BNSF Red River Valley Subdivision, MP Road crosses three tracks. (DOT #274661A) TBD TxDOT Rail Division BNSF Per FHWA / FRA policy and guidance 14

351 Location Project Name Project Description Big Spring East Leg of the Wye and Interchange Tracks Required unit-train interchange between Shortline Rail Projects UP and BSR capable of progressive moves to/from the east Additional interchange is required to handle the demand for increased rail business into the City of Big Spring TX owned industrial park d ($000) /Sponsor Shortline Railroad Stakeholder(s) $13,900 TSLRRA/BSR BSR Public Benefit Per FHWA / FRA policy and guidance Big Spring Replace Worn 90 Pound Rail Replace inadequate 90 lb. rail produced in the 1920's with new 112 lb. rail for 1.7 miles of main lead track $3,800 TSLRRA/BSR BSR Per FHWA / FRA policy and guidance Brady to Lometa 286k Upgrade Upgrades all bridges to 286k. $3,800 Brady to Lometa Brady to Lometa Brady to Lometa Brady to Lometa 2 Bridge Repairs System Crossing Replacement Radio Towers Class 2 Tie and Surface Makes repairs to priority defects on bridges. $5,671 Replaces at grade crossing surface. $463 Installs Communications for operational safety. $150 Upgrades track from Class 1 to Class 2 $7,404 TSLRRA/ Omnitrax TSLRRA/ Omnitrax TSLRRA/ Omnitrax TSLRRA/ Omnitrax TSLRRA/ Omnitrax CTXR CTXR CTXR CTXR CTXR Per FHWA / FRA policy and guidance Per FHWA / FRA policy and guidance Per FHWA / FRA policy and guidance Per FHWA / FRA policy and guidance Per FHWA / FRA policy and guidance 15

352 Location Project Name Project Description Brady to Lometa Brownsville Brownsville Brownsville Class 1 Tie and Surface 2 Repairs Br Hwy 48, 2.7 & 5.90 System Crossing Replacement Unit Train Siding Palo Alto Upgrades track from Excepted Track to Class 1 Makes repairs to priority defects on bridges. Shortline Rail Projects d ($000) $8,190 $530 Replaces at grade crossing surface. $1,131 Constructs Unit Train Siding $4,300 Brownsville Upgrade Rail Upgrades rail and replaces turnouts. $1,240 Etter TXNW /BNSF Interchange /Sponsor TSLRRA/ Omnitrax TSLRRA/ Omnitrax TSLRRA/ Omnitrax TSLRRA /Omnitrax TSLRRA/ Omnitrax Shortline Railroad Stakeholder(s) CTXR Construction of 11,000 feet of track $5,595 TSLRRA/TNW TNW BRG BRG BRG BRG Public Benefit Per FHWA / FRA policy and guidance Per FHWA / FRA policy and guidance Per FHWA / FRA policy and guidance Per FHWA / FRA policy and guidance Per FHWA / FRA policy and guidance Per FHWA / FRA policy and guidance 16

353 Shortline Rail Projects Location Project Name Project Description Harwood TXGN/Union Pacific interchange d ($000) /Sponsor Shortline Railroad Stakeholder(s) Construction of 8,000 feet of track $3,297 TSLRRA/TNW TNW Public Benefit Per FHWA / FRA policy and guidance Provide rail infrastructure to Per FHWA / FRA policy and guidance Houston accommodate new traffic and new New interchange tracks with two Class I's, public rail team and storage tracks $51,000 TSLRRA/SJTC SJTC connection with UP & BNSF Per FHWA / FRA policy McKinney McKinney Sub Rehabilitation Raise rail line capacity to handle 286k cars and increase velocity $8,500 TSLRRA/DGNO DGNO and guidance 17

354 Shortline Rail Projects Location Project Name Project Description d ($000) /Sponsor Shortline Railroad Stakeholder(s) Public Benefit Per FHWA / Mission Mission Wye Project Build an East Leg connection to the Mission Railpark. Would include the installation of 2 turnouts, 858' of Track, $300 TSLRRA/ Ironhorse RVSC FRA policy and guidance and realignment of 1'100' of Track. Panhandle to Borger 2 Bridge Repairs Makes repairs to priority defects on bridges. $175 TSLRRA/ Omnitrax PNR Per FHWA / FRA policy and guidance Panhandle to Borger System Crossing Replacement Replaces priority at grade crossing surfaces. $216 TSLRRA /Omnitrax PNR Per FHWA / FRA policy and guidance Panhandle to Borger Borger Yard - REMOVE 75# RAIL Relays 75# rail with rail removed from other locations in yard. $3,759 TSLRRA/ Omnitrax PNR Per FHWA / FRA policy and guidance West leg Rail Per FHWA / Panhandle to Borger Relay and Panhandle Relays Rail on West Leg and Panhandle Wye $4,312 TSLRRA/ Omnitrax PNR FRA policy and guidance Wye 18

355 Shortline Rail Projects Location Project Name Project Description d ($000) /Sponsor Shortline Railroad Stakeholder(s) Public Benefit Panhandle to Borger Mainline Tie and Surface (McBride and Abell Yards Installs cross ties and surfaces railroad. $5,793 TSLRRA/ Omnitrax PNR Per FHWA / FRA policy and guidance included) 19

356 Port-Rail Projects Port/Location Project Description d ($000) /Sponsor Beaumont Line Track; Rail-to-rail grade separation on the low line track $6,000 Port Access Study (Rail) Beaumont On-port Rail; Expansion of on-port rail to accommodate two additional unit trains- includes 13,000+ feet of new track $13,143 Port Access Study (Rail) Beaumont Demolition of North Yard and Realignment of BNSF Track $450 Texas Ports Capital Program Beaumont Siding Track Parallel to Union Pacific Mainline to allow oil trains to get off the mainline $15,600 Texas Ports Capital Program Brownsville Brownsville Sub; New siding near Olmito, Palo Alto Yard next to FM 511 (110 car capacity) $5,000 Port Access Study (Rail) Calhoun Rail addition; Add working and storage tracks to accommodate crude growth TBD Port Access Study (Rail) Corpus Christi Corpus Christi Freeport Bulk Terminal; Bulk Liquids loading terminal to support water to rail intermodal movement of petroleum liquids Ship Channel; Extend Double track From Bulk Terminal to East end of the inner harbor Velasco; Extend rail to provide on-dock rail service to Velasco Terminal 4 tracks 2000' ft. each $3,600 Port Access Study (Rail) $4,000 Port Access Study (Rail) $12,000 Port Access Study (Rail) Galveston Port of Galveston; Restore on-dock rail to slips 37/38 $3,000 Port Access Study (Rail) Galveston Pelican Island Bridge; Construct new rail bridge to serve future terminal TBD Port Access Study (Rail) 20

357 Port-Rail Projects Port/Location Project Description d ($000) /Sponsor Harlingen Construction of new rail spur $2,500 Port of Harlingen Houston Houston Broadway Street: Convert a 0.28-mile (1,478-foot) segment of single-track railway to double-track railway near the Houston Ship Channel (HSC) in Houston, Texas. SH 146 and Old SH 146: Construction of approximately 6,500 linear feet of new single track rail line from near the intersection of the existing UPRR ROW at Red Bluff Rd. to the proposed warehouse development. The project will include three at-grade crossings with signalization at SH 146 and Old SH 146, plus modification to switched and turnouts for tying into the existing mainline, and for future expansion. The project may also include approximately 1,200 linear feet of soundwall. $21,300 Port of Houston $13,600 Port of Houston Houston Houston Port Arthur Port Terminal Railroad Association (PTRA) Track way 225 to Red Bluff Road): Construct 2nd rail track allowing PTRA access from 225 to Red Bluff Road to connect with crossing at Red Bluff Road being constructed in 2015, connection to future Bayport Container Terminal. SH 146 and Red Bluff Area: Constructing double track and a run-around track from Red Bluff Road/SH 146 road crossing to future container terminal development. Rail extension: Construct approximately 4,000 ft. of rail which includes tie-in to KCS and added spur to the existing port track. Project includes track extension and relocated switch, stabilizing 6 acres of laydown yard which is capped with RCC or a flexible base. $78,320 Port of Houston $10,116 Port of Houston $4,500 Port of Port Arthur 21

358 Port-Rail Projects Port/Location Project Description d ($000) /Sponsor Port Arthur Rail reliever improvements $4,287 Texas Ports Capital Program Victoria Bloomington (UP); Replace rail lift bridge over the channel at Bloomington (UP/Port) $30,000 Port Access Study (Rail) 22

359 Appendix E Port Projects

360 Appendix E-1: Port Projects in 5- Freight Investment Plan Port CSJ Facility Location Description Project Corpus US 181 FM 3239 (Buddy Reverse Entrance and Exit 2020 $4,000 Draft Christi Ganem Dr.) to FM Ramps In Northbound 2986 (Wildcat Direction Dr.) Houston SH 146 Red Bluff to Nasa Widen to 8-Lanes, Gs at $29,000 Draft Major Intersections and 2 2-Lane Frontage Roads 2

361 Appendix E-2: Port Projects in Unconstrained Freight Investment Strategy, on Texas way Freight Network Port CSJ Facility Location Description Project Beaumont US 69 Spur 93, South Rehabilitate Existing Manag TBD $5,000 Project to Spur 380 Frontage Roads (White Top) and Corpus US 181 On US 181 at SH Constr. Grade Separation Safety $40,000 Draft Christi Intersection Over Sunset Rd By Building 4-Ln Divided Mainlanes at Existing at Grade Inters Houston SH 146 Fairmont Widen to 6 Lanes With $41,570 Draft Parkway to Red Lane Frontage Roads Bluff Houston SH 225 At BW 8 Construct Direct Connectors TBD $116,000 Project Houston Fairmon From BW 8 to Construct Geometric TBD $5,097 Project t 7th Street Improvements and Parkway ITS/traffic Signal Improvements At 14 Intersections Brownsville SH 48 SH 4 to FM 511 Widen to 6 Lane W/Raised 2024 $28,043 Draft Median 3

362 Appendix E-3: Port Projects in Unconstrained Freight Investment Strategy, off Texas way Freight Network Port Project Description d (from Type Port) Beaumont Beaumont Beaumont Overpass at Carroll Street Crossing Port Main Lead Track Access Roadway to Hwy 90 with Overpass at KCS and new entrance/security checkpoint Second Access Roadway to I-10 (0.5 mile of Old Hwy 90 between new overpass and I-10) 10,000 Texas Ports Capital Program Road 9,000 Texas Ports Capital Program Road 2,000 Texas Ports Capital Program Road Brownsville SH 32/East Loop; From SH 4 to FM Construct two lane road 5,700 Port Access Study (Roadway) Road Brownsville Brownsville Brownsville Brownsville SH 32/East Loop; From FM 3551 to FM Construct two lane road SH 32/East Loop; From FM 3550 to FM Construct two lane road SH 32/East Loop; From FM 3068 to FM Widen to 4 lane divided SH 32/East Loop; From FM 1419 to US 77/83 near Veterans International Bridge - Construct 6 lane divided urban & 4 lane divided urban roadways 12,000 Port Access Study (Roadway) Road 24,000 Port Access Study (Roadway) Road 19,800 Port Access Study (Roadway) Road 65,208 Port Access Study (Roadway) Road Brownsville South Port Connector; SH 4 to Oosts Rd. - Construct direct connector to Port - 2 lane road 14,164 Port Access Study (Roadway) Road 4

363 Port Project Description d (from Type Port) Brownsville FM 511; Replacement of Bridge & Abutments on FM 511 approx. 0.4 Mi. So. of SH 4 over drainage ditch 914 Port Access Study (Roadway) Road Corpus Christi Truck queuing area project 4,000 Texas Ports Capital Program Road Corpus Christi Freeport Houston SH Construct relief route around Ingleside to serve existing and future port customers (e.g., Kewit, Oxy, Cheniere) Pine Street/FM 1495; Replace the bridge at Pine Street/ FM1495 (TxDOT) over the Stauffer Channel Federal Road Grade Separation (From PTRA RR Crossing to PTRA RR Crossing): Grade Separation over PTRA railroad along Federal Road (Major Thoroughfare) 12,000 TxDOT Road 15,000 Port Access Study (Roadway) Road 15,000 Port of Houston Road Houston Grand Parkway NE Segments 669,200 Port of Houston Road Palacios Palacios Port Arthur Richman Road; Design and construction of the extension of Richman Road, adding utilities and lighting Port roads and storm drainage improvements Road and Site Access - Phase 2. Improve connectivity on downriver side of SH Texas Ports Capital Program Road 805 Texas Ports Capital Program Road 1,200 Texas Ports Capital Program Road Beaumont Development of Carroll St. & Buford St. Lots 5,700 Texas Ports Capital Program Site 5

364 Port Project Description d (from Type Port) Beaumont Multimodal Loading or Industrial Facility 45,000 Texas Ports Capital Program Site Corpus Christi Permian yard project 11,400 Texas Ports Capital Program Site 6

365 Appendix E-4: Strategic Port Projects Port Arthur Project Description d Project On THFN Beaumont/ SH 87; Traffic light synchronization throughout the cities of Port $900 Port Access Study Yes Port Arthur Arthur, Bridge City, and Orange (Roadway) Corpus Joe Fulton International Trade Corridor (JFITC) (CR 55B) (Phase I); $5,000 Port Access Study Yes Christi JFITC Realignment from 0.5 mi west of Navigation to 0.5 mi east of (Roadway) Navigation to the north to provide additional land for a truck Queuing area to improve safety and traffic flow. Corpus Joe Fulton (CR 55B) (Phase 2); Upgrade intersection at JFITC and $3,350 Port Access Study Yes Christi Navigation to improve safety and access to the Bulk Terminal (Roadway) Corpus Joe Fulton (CR 55B) (Phase 3); Construct a truck queuing area with $5,050 Port Access Study Yes Christi intelligent transportation technology to reduce queuing of truck (Roadway) along the JFITC. Corpus US 181; Spur 202 to Kay Bailey Hutchison reconstruction $75,000 Port Access Study Yes Christi (Roadway) Corpus US 181; Resurface road and improve shoulders from Gregory to TBD Port Access Study Yes Christi Sinton (Roadway) Corpus SH 35: SH 35 ramp reversal to serve future SH 35 entrance to La $2,576 Port of Corpus Yes Christi Quinta property Christi Galveston 61st Street; Broadway/SH 87 to Harborside Drive/SH lane $17,300 Port Access Study TBD Yes extension (Roadway) Galveston SH 275 / Harborside Drive; Synchronize the traffic lights through $650 Port Access Study TBD Yes the downtown area on Harbor Side Drive (Roadway) Houston Jacintoport Direct Connectors; Construct Jacintoport Direct $25,000 Port Access Study Yes Connectors to BW 8 (Roadway) 7

366 Port Arthur Project Description d Project On THFN Houston Jacintoport Blvd.; Jacintoport Road/Penn City corridor $27,000 Port Access Study Yes Improvement- widen to 4 lanes (Roadway) Houston Spencer way; Upgrade Spencer way bridge over Bayport $16,300 Port Access Study Yes mainline double track (Roadway) Houston Sheldon Road; Sheldon Road expansion (Jacintoport Road to I-10) $17,000 Port Access Study Yes - widen to 4 lanes (Roadway) Houston SH-225 expansion/improvement (8-East 146) TBD Port of Houston Yes Houston SH-225 expansion/improvement (8-West 610) TBD Port of Houston Yes Houston SH-225 and I-610 Interchange TBD Port of Houston Yes Houston I-610 bridge at HSC $1,250,000 Port of Houston Yes Houston Fairmont Parkway (Widening) TBD Port of Houston Yes Houston Port Arthur SH-330 (improve northbound connectivity to I-10-2 lanes or direct connect) US 87: US 87 Should be reviewed for lane width, truck access, turn radii and maintenance (Gulfway Drive and Houston Ave). $20,000 Port of Houston Yes TBD TxDOT Yes Victoria SH 35; Replace bridge over Victoria Channel $12,000 Port Access Study (Roadway) Yes Victoria SH 35/SH 185; Construct a grade separation on SH 185/SH 35 $21,000 Port Access Study Yes intersection (Roadway) Calhoun FM 1593; Construct a truck staging area for ingress and egress to $3,000 Port Access Study TBD No the port area (Roadway) Calhoun Overweight Corridor; Heavy weight corridor between the Port and $150 Calhoun Port No Formosa Authority 8

367 Port Arthur Project Description d Project On THFN Corpus La Quinta Terminal Heavy Haul Road and public access east and $21,000 Port of Corpus No Christi west of US way 181 Christi Corpus Nueces Bay Causeway; Reconstruct Nueces Bay Causeway at $54,000 Port of Corpus No Christi Rincon Canal to be higher and wider to improve the operating Christi conditions for barges. Freeport Southern I-69 Connection Route Around Houston: IH 69 routed around Houston that allows connectivity for all MPO port team members to the interstate network. The IH 69 connector to Trinity Bay would turn north and connect to Cleveland, Texas. This would offer connectivity to all ports and route truck traffic around Houston reducing traffic through the heart of the city. TBD Port of Freeport No Galveston New Facility near 51st Street; Port of Galveston 51st Street Flyover $17,000 Port Access Study TBD No to Harborside Drive (Roadway) Galveston Old Port Industrial Road; Rehabilitate 33rd Street and the $1,361 Port Access Study TBD No intersection at 28th Street and at Harborside Drive (Roadway) Galveston Old Port Industrial Road; Phase 2 Improvements and repairs to Old $2,217 Port Access Study TBD No Port Industrial Road, 33d street to the Pelican Island Causeway (Roadway) Galveston Pelican Island Vehicular and Railroad Bridges Preliminary Study $400 Port No Houston Applet Drive; Improvements from Jacintoport to Market widen to $8,300 Port Access Study No 4 lanes (Roadway) Houston Barbours Cut Blvd; Barbours Cut Blvd expansion to 6 lanes $13,000 Port Access Study (Roadway) Houston Haden Road; Haden Road extension to Penn City Rd connector $9,500 Port Access Study (Roadway) No No 9

368 Port Arthur Project Description d Project On THFN Houston Independence Parkway; Independence Parkway (improve $15,000 Port Access Study No Northbound connectivity to SH 225) construct dedicated turning (Roadway) lane Houston Jacintoport Blvd.; Connect Jacintoport Road to Penn City Rd (Penn $17,500 Port Access Study No City Connector) (Roadway) Houston Barbours Cut Blvd. direct connectors; Direct-connector from $35,000 Port Access Study No Barbours Cut Terminal to SH146 and SH 225 (Roadway) Houston FM-1942 from Hatcherville Road to SH-146 road improvement TBD Port of Houston No Houston Houston Hatcherville Rd from FM-1942 to Liberty/Chambers Co.Line road widening FM 565 from SH-146 to SH-99 widening and addition of turning lanes TBD Port of Houston No TBD Port of Houston No Houston I-69 Bypass TBD Port of Houston No Orange Overweight Corridor: Preliminary study for overweight corridor designation - Hwy 62, US 87, and FM 1006 TBD Port of Orange No Port Arthur Spur 215; Spur 215 to SH 87 construct a right turn lane $4,000 Port Access Study (Roadway) Victoria Dupont Road; Replace bridge over Victoria Channel $2,000 Port Access Study (Roadway) Victoria McCoy Road/SH 185; Interchange improvements and signalization $300 Port Access Study (Roadway) Victoria SH 185; Construct a bypass of Bloomington along SH 185 $40,000 Port Access Study (Roadway) No No No No 10

369 Port Arthur Project Description d Project On THFN Victoria FM 1432; Construct grade separation on FM 1432 $15,000 Port Access Study (Roadway) No 11

370 Appendix F Airport Projects

371 Appendix F-1: Airport Projects in 5- Freight Investment Plan Airport CSJ way Location Description Project AUS US 183 Williamson Widen From 3 to 4 General 2019 $60, County Line to SL Purpose Lanes 1 DFW SH 161 South of SH 183 Widen and Reconstruct 4 $57, to North of Belt to 8 General Purpose Line Rd Lanes ELP SS 601 Spur 601 at LP Construct Northbound $33, Westbound and Eastbound- Southbound Direct Connectors On Spur 601 at Loop 375 IAH FM Bf 1960A to E of Widen to 6-Ln Divided W/ 2020 $51, Twigsworth Ln Raised Medians, Channelized Turn Lanes 2

372 Appendix F-2: Airport Projects in Unconstrained Freight Investment Strategy Airport CSJ way Location Description Project AFW SH 114 FM 1709 to Reconst Remaining TBD Project Dallas County Components of Dfwc Incl SH $180,000 Line 114 Exp Ln Con, Int at International Pkwy/Dfw Airport, Texan Trl, & 1709 Conn AFW FM 157 Mid Cities Blvd Widen From 4 to 6 Lanes TBD $10,770 Project to Midway Drive AFW N/A Westport Amazon Widen to 4 lanes TBD TBD Airport N/A Parkway Driveway to FM Survey 156 AUS SH 71 SH 71/Us 183 Construct Frontage Road, 2021 $26,000 Project Interchange to Ramps and Direct Connects Presidential Blvd. AUS SH mi East of Extend Westbound Left Turn TBD $155 Project Navarro Creek Lane Rd. to mi Each of Navarro Creek Rd. ELP US 54 Hondo Pass Widen By Adding 2 Inside TBD $15,239 Project Drive to SL 375 Lanes, mast Illumination, and Overhead Sign Bridges 3

373 Airport CSJ way Location Description Project ELP US 62 Global Reach Dr Add Capacity (Main Lanes) $191,000 Project to FM 659 (Zaragoza Rd) ELP I-10 SH 20 (Mesa Expand From 6 to 8 Lanes 2022 $58, Street) to I- 10/Us 85/Sunland Park Interchange ELP I-10 US 62 (Paisano Add 1 Lane In Each 2025 $8, Dr) to Airway Direction By Restriping Blvd ELP SL 375 Spur 601 to Add 1 Lane Each Direction 2025 $35, Dyer (BU 54A) IAH FM 1960 At Treaschwig Improve Traffic Signals Safety TBD $350 Project Road IAH N/A Lee FM 1960 to Will Widen to 4 lanes TBD TBD Airport N/A Road* Clayton Pkwy Survey LRD I FT.North For The Widening and Manag TBD $500 Project Bi35C Rehabilitation of An Existing and Underpass Int to way FT.South Bi35C Underpass Int 4

374 Airport CSJ way Location Description Project SAT I-35 Guadalupe River Operational Improvements 2022 $75, to Hays / Comal Including Ramp Revisions County Line and Intersection Improvements-Convert Frontage Road to One Way SAT I-10 Various Repair / Replace Bridge Manag TBD $2,017 Project Locations On I- Expansion Joints and 10 to Mulberry to Poplar St SAT SH 16 At FM 624 Construct Grade Separation Safety TBD $6,779 Project * Not on Texas way Freight Network 5

375 Appendix G Border Crossing Projects

376 Appendix G-1: Border Crossing Projects in 5- Freight Investment Plan District CSJ Facility Location Description Project El Paso US mi W of US Install Led Flashing Safety 2019 $150 Project to mi W Chevrons of US 62 El Paso US 62 At Montana Ave Intersection Operational 2020 $595 Project Improvements at Montana Ave/Paisano Dr El Paso US 54 Loop 375 Installation of Bluetooth Technology 2020 $730 Project (Transmountain) Detectors and Radar and Ops. to FM 2529 Vehicle Sensin G Devices Improv (Mccombs) (Rvsd) El Paso US 62 Geronimo Dr to Intersection Operational 2019 $503 Project Sioux Dr Improvements Montana Ave at Airport Rd/Mescalero Dr El Paso FM 659 Sun Fire Blvd to Widen From 4 Lane to $17,253 Draft US 62/180 Lane (Montana Ave) El Paso FM mi N of Operational Improvements $7,983 Draft Saul Kleinfeld to at Zaragoza Rd/Montwood E of Loop Dr/LP 375 Intersection 375 2

377 El Paso SS 601 Spur 601 at LP Construct Northbound $33,931 Draft Westbound and Eastbound- Southbound Direct Connectors On Spur 601 at Loop 375 El Paso I-10 Raynor St to US Add 1 Lane In Each 2020 $5,200 Draft (Paisano Dr) Direction By Restriping El Paso I mi E of Remove and Replace $16,810 Project Portirio Diaz St to Bonded Overlay mi W of Cotton St El Paso I mi S of SH Replace Bridge and Safety $684 Project to 0.8 mi W of Approach Railing US 62 El Paso I-10 FM 2316 (Mcrae) Mill and Inlay 2021 $8,500 Project to mi E of FM 2316 El Paso I-10 Airway Blvd to Ramp and Intersection 2019 $10,500 Project Viscount Blvd Improvements at Airways, Hawkins and V Iscount (Phase 2) El Paso I-10 Horizon (FM Frontage Road Overlay 2020 $3,100 Project ) to Clint (Seal Coat) (FM 1110) 3

378 El Paso I mi S of FM Replace Bridge and Safety $107 Project to mi Approach Railing S of SL 375 El Paso SL 375 Bob Hope Dr to Construct Managed Lanes $34,500 Draft FM 659 (Zaragoza) El Paso SL 375 FM 76 North LP 375 (Americas) Ramps $27,500 Draft Loop to Zaragoza Reconfiguration and Poe Frontage Road Extension W/Grade Separation at Railroad Crossing El Paso SL 375 Pellicano to Safety Lighting Safety 2020 $1,273 Project Rojas El Paso South Presidio Bridge Reconstruction of 2019 $10,000 TxDOT N/A Orient international rail bridge Rail Railroad Division El Paso South Presidio County Rehabilitation of the South 2019 $7,000 TxDOT N/A Orient Orient (FASTLANE Grant) Rail Railroad Division Laredo I-35 Shiloh Drive to Widen of Mainlanes and Rr 2021 $54,000 Draft Miles N. of Grade Separation US 59/ I-69W 4

379 Laredo I mi South of Construction of Direct 2019 $30,000 Draft Us59-Sl20 to Connector Interchange 0.50 mi East of (Dc#5) Ih35 / Us59-Sl20 Laredo US 59 At Del Mar Construction of Interchange 2022 $24,100 Draft Laredo US 59 At Shiloh Construction of Interchange 2022 $21,500 Draft Laredo US mi S of Construction of Interchange 2021 $19,691 Draft Jacaman Rd to 0.50 mi N of Jacaman Rd Laredo US 59 At University Blvd Construction of Interchange 2022 $16,850 Draft Pharr US mi North of Widen From 2 Lane Rural 2022 $27,043 Draft Starr/Zapata to 4 Lane Divided Cl31 mi North of FM 2098 (South Leg) 5

380 Pharr US mi South of Widen From 2 Lane Rural 2022 $24,257 Draft Placido Rd. to to 4 Lane Divided 0.09 mi North of Loma Blanca Rd. Pharr US 83 FM 649 to FM Profile Edgeline Markings, Safety $139 Project Profile Centerline Markings Pharr US 281 FM Miles Widen to 4 Lane Rural 2021 $11,000 Draft West of FM Pharr SH 48 I-69E to SH 4 Proposed Raised Median 2019 $3,000 Draft Pharr SH 336 Intersection of Addition of North Bound $78 Project Bus 83 to 135 FT Right Turn Lane S of Intersection of Bus 83 Pharr FM At FM 1926 Addition of North and South $86 Project (23rd St.) to Bound Center Turn Lanes Hackberry Ave. Pharr FM At FM 1926 Addition of North & $95 Project (23rd St.) and Southbound Center Turn Kendlewood Ave. Lanes 6

381 Pharr FM At FM 1926 Addition of East, North & $141 Project (23rd St.) and Southbound Center Turn Ebony Ave. Lanes Pharr SS 115 At FM 1926 Addition of North and South $117 Project (23rd St.) to at Bound Center Turn Lanes SS 115 (23rd St.) 7

382 Appendix G-2: Border Crossing Projects in Unconstrained Freight Investment Strategy District CSJ Facility Location Description Project El Paso US 67 Puerto Rico St to New Two-Lane Twin Bridge TBD $ Project International Structure For Southbound 6,409 Demarcation Line Traffic Into Mexico El Paso US 67 Rio Grande River Bridge Replacement TBD $ Project to NE of 4,567 Rio Grande River El Paso US 54 Kenworthy St. to Construction of Main Lanes 2023 $ Draft FM 2529 and Grade Seperations 41,039 (Mccombs St) El Paso US 54 Hondo Pass Drive Widen By Adding 2 Inside TBD $ Project to SL 375 Lanes, mast 15,239 Illumination, and Overhead Sign Bridges El Paso US 54 Hondo Pass Drive Construct Ramp Reversals TBD $ Project to SL 375 and Intersection 20,822 Improvements at Hondo Pass, Diana, and SL 375 El Paso US 54 LP 375 (Cesar Interchange Improvements 2019 $ Draft Chavez) to E 84,635 Yandell Dr 8

383 El Paso US 62 Global Reach Dr Build Frontage Roads and 2019 $ Draft to FM 659 Mainlanes With Grade 121,734 (Zaragoza Rd) Separations at Intersections El Paso US 62 Global Reach Dr Add Capacity (Main Lanes) $ Project to FM ,000 (Zaragoza Rd) El Paso US 62 FM 659 Widen 4-Lane Undivided to TBD $ Project (Zaragoza Road) 6-Lane Divided and 48,082 to Desert Storm Construct Overp Ass Road El Paso FM 76 Jct SH 20 to Replace WB & EB Bridges TBD $ Project mi E of SH and Approaches 4, El Paso FM 659 I-10 to Loop 375 Widen From 4 Lane to $ Draft Lane 28,800 El Paso FM 659 I-10 to FM 76 Widen From 4 Lane to $ Draft Lane 7,177 El Paso SS 601 Airport Road to LP Operational Improvements TBD $ Project (Purple Heart at Spur 601, Walter Jones, 22,000 way) and Airport Rd 9

384 El Paso I-10 Executive Dr to E-3 Rail Replacement TBD $ Project Schuster Ave 4,394 El Paso I-10 SH 20 (Mesa Expand From 6 to 8 Lanes 2022 $ Draft Street) to I-10/Us 58,850 85/Sunland Park Interchange El Paso I-10 At Mcrae Roadway Rehabilitation TBD $ Project Intersection and Intersection 2,500 Improvements El Paso I-10 Lee Trevino to Construct Interchanges 2024 $ Project East of FM ,820 (Zaragoza Rd) El Paso I FT E of US Micromill and Longitudiual 2023 $ Project (Paisano Dr) Joint Repair 16,075 to 90 FT W of FM 2316 (Mcrae Blvd) El Paso I-10 US 62 (Paisano Add 1 Lane In Each 2025 $ Draft Dr) to Airway Blvd Direction By Restriping 8,000 El Paso I mi W of FM Replace Bridge and Safety TBD $ Project to 0.3 mi W Approach Railing 354 of Jct FM

385 El Paso I mi E of LP Replace Bridge and Safety TBD $ Project to 1.8 mi W Approach Railing 398 of FM 1110 Laredo I mi West of For The Construction of TBD $ Project Ih35 / Us59-Sl20 Direct Connector 20,000 to 0.50 mi South Interchange (Dc#8) of Us59-Sl20 Laredo I mi East of For The Construction of TBD $ Project Ih35/ Us59-Sl20 Direct Connector 30,000 to 0.50 mi North Interchange(Dc#3) of Ih35 / Us59- Sl20 Laredo I mi East of For The Construction of TBD $ Project Ih35/Us59-Sl20 Direct Connector 20,000 to 0.5 mi North of Interchange (Dc#4) I-35/Us59-Sl20 Laredo I mi South of For The Construction of TBD $ Project Us59-Sl20 to 0.5 Direct Connector 15,000 mi East of Interchange (Dc#6) Ih35/Us59-Sl20 Laredo US mi E of SL Profile Edgeline Markings, Safety TBD $ Project to Kinney Profile Centerline Markings 117 County Line Laredo SL 20 At Del Mar Blvd Improve Traffic Signals Safety TBD $ Project

386 Laredo SL 20 At International Improve Traffic Signals Safety TBD $ Project Blvd 90 Laredo US 59 At International Construction of Interchange 2024 $ Draft Airport 14,786 Laredo US mi SE of Texturizing Shoulder and Safety TBD $ Project US 277 to Kinney Centerline 114 County Line Laredo US 277 SS 317 to Val Adding Passing Lanes TBD $ Project Verde/Kinney 2,470 County Line Laredo US mi S of FM Adding Passing Lanes & TBD $ Project Southern Surfacing 1,616 Int to Elm Creek Laredo US mi S of FM Texturizing Shoulders and Safety TBD $ Project Southern Centerline 90 Int to FM 1588 Laredo SL 480 US 57 to US 277 For The Construction of A 2 TBD $ Project N Lane Undivided Facility and 80,868 Railroad Grade Separation Laredo SL mi South For The Construction of An TBD $ Project of US 57 to Interchange 4,123 mi North of US 57 12

387 Laredo SL mi South For The Construction of An TBD $ Project of US 277 to US Interchange 4, Laredo US 57 SS 216 to 1 mi Install Continuous Turn Safety TBD $ Project NW of SS 216 Lane 76 Laredo US 277 SL 480 to Profile Edgeline Markings, Safety TBD $ Project mi W of Dimmit Profile Centerline Markings 157 County Line Laredo US mi South of Replace Bridge and Safety TBD $ Project US 57 to at Approach Railing Or Add 74 Rosita Creek Safety End Treatm Ent Or Replace Guardfence Laredo FM 0.9 mi S of FM Restoration and Add TBD $ Project Int to Shoulders 6,338 mi North of FM 2644 Laredo FM FM 3443 to Replace Bridge and Safety TBD $ Project mi North of Approach Railing Or Add 203 FM 2644 Safety End Treatm Ent Or Replace Guardfence Laredo FM At Flecha Lane Improve Traffic Signals Safety TBD $ Project Laredo FM At Killam Blvd Improve Traffic Signals Safety TBD $ Project

388 Pharr US 83 At Pete Solis Rd. Close Crossover Safety TBD $ Project Pharr US 83 At Delfino Lopez Install Intersection Flashing Safety TBD $ Project St. Beacon, Safety Lighting at 55 Intersection Pharr US 83 At Pete Solis Rd. Install Intersection Flashing Safety TBD $ Project Beacon, Safety Lighting at 84 Instersection Pharr SH 4 SH 32 to 1.35 mi Construct 2 Lane Undivided TBD $ Project NE to Proposed Roadway 4,348 Port Entr. Pharr US 281 FM 732 to FM Widen to 4 Lane Rural 2021 $ Draft ,000 Pharr SH 48 Mclelland St. to Install Traffic Signal Safety TBD $ Project Medical St. 225 Pharr SH 48 Minnesota Ave. to Optimize Signal Timing Safety TBD $ Project FM Pharr SH 48 Walmart Dr. to Optimize Signal Timing Safety TBD $ Project FM Pharr SH 48 SH 4 to FM 511 Widen to 6 Lane W/Raised 2024 $ Draft Median 28,043 14

389 Pharr SH 48 At Austin Rd. Install Traffic Signal, Safety Safety TBD $ Project Lighting at Intersection 144 Pharr SH 48 At Zena Dr. Install Traffic Signal, Safety Safety TBD $ Project Lighting Intersection 144 Pharr SH mi S of FM Construct Controlled 2019 $ Draft to 1.13 mi Access Tolled Facility 14,911 SE of UPRR Ovrpss at FM 3248 Pharr FM Mile 12 Rd. to SH Proposed 4 Lane Divided 2025 $ Draft Urban 8,600 Pharr SH 4 Polk Ave. to I-69 E Install Traffic Signal Safety TBD $ Project Southbound 75 Frontage Pharr FM SH 495 to Hall Proposed 6 Lane W/ TBD $ Project Acres Rd. Raised Median 9,119 Pharr FM At El Rancho Improve Traffic Signals Safety TBD $ Project Rd./Hall Acres 59 Rd. 15

390 Appendix H Freight Programs

391 Program: Strategic Freight Planning Initiatives Develop and administer a comprehensive and multimodal TxDOT Freight Planning Program, focused on developing strategies, policies and methodologies that work to improve the freight transportation system in Texas. Develop a strategy to implement the recommendations of the Texas Freight Mobility Plan. Continue to build partnerships between public and private sector stakeholders through continued engagement of the Texas Freight Advisory Committee, Freight Leadership Summit and other initiatives. Develop and implement the TxDOT Freight Academy to provide freight training and education for TxDOT staff to expand their understanding of freight issues and logistics and supply chains concepts to facilitate better integration of freight considerations into TxDOT s planning, programming, implementation and decision making process. Develop a Statewide Freight Data Collection, Warehousing, and Archiving Program to gain a better understanding of statewide and regional freight movement and advancing freight performance measurements through multi-modal data information to support informed decision-making to address freight mobility. Expand TxDOT s Freight Modeling Capabilities to support effective freight planning, including evaluating the impact of congestion on cost of freight, forecasting freight demand, assisting in infrastructure investment decision-making and tracking performance measures. Expand TxDOT s Freight Planning Capacity to support the successful implementation of the Texas Freight Mobility Plan and continue development of the freight planning program within TxDOT. 2

392 Program: Freight Improvement Planning Studies Pursue the freight-related studies to address key issues and challenges identified in the Freight Plan. Develop a Freight Bottleneck Identification and Elimination Program to address congestion, improve safety and mobility of people and goods on the Texas Freight Network. Develop and apply freight fluidity performance indicators to evaluate multimodal freight system efficiency in Texas and support development of freight performance measurements. Conduct an Economic Impact Assessment of investing in the Texas Freight way Network to demonstrate the importance of linking transportation investments to economic goals and economic competitiveness. Conduct an Assessment of Current and Future Freight Clusters and their role in Texas economic competitiveness to identify areas where the transportation infrastructure is well suited to address current and future needs or locations where limited access or transportation infrastructure restraints may prevent business retention and expansion. Develop an Energy Sector Transportation and Safety Plan to identify additional transportation infrastructure needs in Texas as a result of recent oil development, assess the impact of this development on transportation infrastructure (including roadway, rail, maritime, and pipeline) and identify solutions to improve safety and mobility. Conduct a comprehensive statewide HAZMAT Transportation Study to ensure the safe and secure transportation of hazardous materials, including identifying dedicated routes, signage improvements and community impacts. 3

393 Program: Freight Improvement Planning Studies Conduct a statewide Air Cargo Landside Needs Assessment Study to analyze freight network capacity and access issues for major air cargo centers (particularly at times of peak demand), including improving first- and last-mile connections from airports to the freight network and updating roadway geometry to address large truck movements. Develop an Oversize and Overweight Vehicle Freight Movement Plan to provide statewide consistency and reliability for OS/OW commercial vehicles and to address the needs of oversize and overweight loads and the energy sector. Conduct a Rural and Agriculture Transportation Needs Assessment to analyze the infrastructure needs of major agricultural transportation providers, identify critical transportation routes, and improve the county and township road system that supports this important industry. Conduct a Statewide Truck Parking and Rest Stop Study to evaluate the current condition of truck parking within the state, analyze the impact of hours-of-service on trucker operations, identify potential community and safety impacts of inadequate truck parking facilities and develop strategies to meet current trucking needs and future demands. Conduct a Truck-Only Lane Feasibility Study to evaluate opportunities to separate trucks and autos on the Primary Freight Network to reduce congestion, improve safety and mobility for the motoring public and trucks. Develop an Off-Peak and 24-hour Operation Pilot Program in cooperation with the freight industry and the MPOs to maximize the existing capacity on the Texas Freight Network. Develop a Secondary way Freight Network Access Management Plan to preserve roadway efficiency and enhance traffic safety as well as foster coordination between TxDOT and partner agencies on transportation decisions. 4

394 Program: Education and Public Awareness Develop a Freight Movement Public Education and Awareness Program to educate the public, elected officials, policy makers and other stakeholders on the economic benefits of freight and safety-related issues. Develop a partnership and between TxDOT, the freight industry, colleges and universities, federal and state agencies to develop a freight movement education and public awareness campaign. Develop and implement truck safety awareness to educate drivers on how to drive safely with commercial vehicles, sharing the road program, at-grade rail crossing safety. Develop and implement strategies to increase public awareness about economic impacts of trucking, rail, ports, warehousing and distribution centers and other freight related activities to the state s economy and quality of life. Develop and implement strategies to raise awareness of freight issues within TxDOT, MPOs, local agencies, law enforcement agencies, and other agencies throughout the state to ensure freight considerations are integrated into the transportation planning, programming, design, construction, maintenance and operations of the transportation system. Conduct workshops and speaking engagements targeting the public and elected officials to raise awareness about benefits of freight movement to the Texas economy. Develop educational materials such as newsletters, brochures, fact sheets on different freight movement topics and distribute to the public, elected officials, and other stakeholders. 5

395 Program: Technology and Operations Develop and implement a statewide Freight Technology-Based Solutions Program focused on enhancing freight transportation system management and operations, and asset management by improving safety, increasing freight mobility for people and freight through deployment of Intelligent Transportation Systems (ITS). This program will comprise of: Develop a Statewide Traffic Management Center Concept of Operations and implementation Plan that integrates existing regional Traffic Management Centers across the State to facilitate dissemination of real- time traffic information including traffic incidents, construction, weather, and special events etc. Develop a Statewide Commercial Vehicle Traffic Incident Management Program to address commercial vehicle crashes and improve safety and mobility for the motoring public and trucks. Convene a Statewide Traffic Incident Management Taskforce comprised on law enforcement, fire department, emergency medical services, towing and recovery, local agencies, and TxDOT to comprehensively address commercial vehicle incidents on the freight network. Expand the deployment of sophisticated real-time traveler information technologies to mitigate congestion, improve safety and facilitate freight flows. Develop and Implement a way Freight Network Operations and Management Plan that outlines a comprehensive strategy for better operating and managing the existing highway infrastructure to maximize existing capacity of the Freight Network. Develop freight movement signal timing/coordination improvements to provide a cost effective strategy to reducing congestion problems, provide for fuel savings, and reducing travel times. Adopt, expand and deploy ITS technologies to improve mobility and safety for both passenger and freight. Expand Weigh-In Motion (WIM) program to major freight gateways, generators, and corridors. 6

396 Program: Technology and Operations Form partnerships with the auto industry, telematics (such as GPS providers and telecommunications companies), academic institutions, research and development organizations, USDOT and other the public sector road authorities to foster innovative freight transportation technology solutions. Program: Border/Ports of Entry Establish a Texas Border Management Program that would enhance international border coordination strategies to improve freight safety, mobility and efficiency and to facilitate trade and travel without compromising the security at the Texas- Mexico border crossings. Enable comprehensive and coordinated Texas-Mexico border development, promoting trade and commerce and facilitating border infrastructure development. Assist in coordinating the permitting process for international border crossings among the various local, regional, statewide, and federal agencies. Help harmonize private and public sector activities and schedules to achieve maximum effective use of available international border crossing infrastructure. Expand the use of ITS technologies such as electronic screening, advanced traveler information and other technologies to enhance the fluidity and efficiency of border and to improve safety and mobility, reduces emissions, and improve security at the Texas-Mexico border crossings. 7

397 Program: way Develop a Texas way Freight Network Safety Program focused on improving safety and reducing rates of crashes, fatalities, and injuries associated with freight movement on the Texas Freight Network. Improve coordination between TxDOT, Texas Department of Motor Vehicles (TxDMV), Texas Department of Public Safety (DPS) and other state, federal and local agencies to address enforcement and safety concerns. Expand truck restrictions on the Primary Freight way Network to improve safety and mobility for the motoring public and trucks and improve supply chain reliability. Expand the Commercial Motor Vehicle Safety Program including developing a program to identify and address high truck crash and truck rollover areas. Implement safety measures such as rumble strips and median barriers on the Freight way Network to minimize head-on crashes and accidents. Address high truck crash rates and at-grade rail crossing along the Freight way Network. Develop a way Freight Network Design, Construction, and Safety Standards Program focused on reviewing and modifying standards to addressing safety and mobility needs for truck movements, increasing connectivity, and increasing freight network efficiency and operations. Assess existing design, construction and safety standards and develop specific way Freight Network specific design, construction and safety standards including bridge clearance, roadway geometry, interchange and intersection geometrics, interchange ramp curvature, signage, shoulder, and safety treatments. Implement the new 18 6 minimum bridge clearance standards for the way Freight Network to accommodate current and future freight movement needs for oversize and overweight loads as well military transportation needs. 8

398 Program: way Develop Secondary Freight Network intersection turning radii design guidelines to accommodate trucks, including placement of utility poles and signs in high-freight volume areas. Establish minimum capacity standards on the way Freight Network, such as six lanes in each direction on the Primary Freight way Network where warranted and minimum four lanes or super 2 s on the Secondary Freight way Network. Establish statewide alternative route standards, such as addressing frontage road gaps on the Freight way Network. Update geometric standards (both vertical and horizontal) for the Freight way Network that accommodates current and future freight mobility needs of trucks. Review and update pavement design standards to accommodate projected growth in volume freight corridors. Identify and designate Oversize /Overweight or Super Load Corridors and Military access facilities. Encourage MPOs to develop Critical Urban Freight Corridors in coordination with local jurisdictions to develop truck routes to address last mile freight issues to reduce inefficiencies, address congestion and improve safety and mobility for people and freight. Develop a Freight Network Bridge Reconstruction and Replacement Program for state highways to address deficient bridges, increase vertical clearance to accommodate OS/OW vehicles and facilitate efficient freight movement. Raise TxDOT bridge minimum vertical clearance standard from 16 6 to Replace bridges with a vertical clearance less than 15 to a clearance of 18 6 on the Freight way Network. Raise existing bridges under 16.6 on the Interstates where feasible. 9

399 Program: way Prioritize replacement of bridges on the Freight way Network are rated to carry less than 80,000 lbs. Identify and address bridges with obsolete designs and poor conditions on the way Freight Network. Develop an Interchange Reconstruction and Upgrade Program for all Interstates to address obsolete designs as well as left exits to improve safety and mobility for both passengers and freight. Conduct an assessment of operations and efficiency of Interchanges on the Freight Network and developing an implementation plan. Identify interchanges that do not operate efficiently due to heavy truck traffic and the size and relative lack of maneuverability of trucks. Identify interchanges with high traffic volumes, single lane ramps and tight curves that make them prone to congestion which causes them to operate under poor conditions. Analyze safety issues related to outdated intersection designs, such as high truck rollovers and crashes, lack of merging lanes, and multiple points of conflict between trucks and autos. Prioritize interchange improvements on interstate corridors based on safety, mobility, and infrastructure condition. Develop a Statewide Construction Management and Coordination Program to pro-actively minimize traffic impacts and improve safety and mobility for motorist and trucks. Establish inter-agency and intra-agency coordination working group charged with developing effective strategies for construction coordination. Enhance coordination between TxDOT and partner agencies to minimize large-scale impacts of construction across multiple corridors and jurisdictions. 10

400 Program: way Develop strategies to reduce potential conflicting lane and road closures, concurrent and multiple roadway construction projects. Develop guidance on how to reduce and manage traffic disruptions from road work and maintain safety and mobility in construction zones. Evaluate impacts for all projects within construction areas collectively, highlighting potential conflicts and cumulative mobility impacts. Establish open dialogue and communications with key community and business representatives to address construction-related impacts and flag policy level issues. Program: Rail The state should develop, in cooperation with the freight industry, a comprehensive Rail Freight Development and Improvement Program to expand rail freight capacity and improve rail freight mobility. Promote the role of Texas railroads in supporting economic sectors in the state through their level of investment in the state s rail infrastructure. Work with the railroads in preserving and improving rail freight infrastructure and service through increased public-private partnership opportunities. Promote the integration of rail freight movement with other modes of transportation, especially trucks. Facilitate the resolution of issues between the railroads and the public. Identify and Implement strategies to identify and address at-rail crossings on the Texas Freight Network. 11

401 Program: Rail Develop technical assistance programs that will enhance/expand the role of short line railroads. Expand coordination with Rural Rail Transportation Districts (RRTDs) to identify rural rail access needs and improvements. Implement a system-wide review of signal connections and timings at rail crossings. Program: Maritime Develop and administer a comprehensive Maritime Freight Development Program focused on working with Texas ports and other stakeholders to identify strategies that expand port and waterway capacity and improve waterway infrastructure. This program will: Enhance strategic partnering among local, state and federal agencies that have interest in the Gulf Intracoastal Waterway. Multi-agency participation, including Texas Department of Transportation, Texas Commission on Environmental Quality, Texas General Land Office and the US Army Corps of Engineers can enable an environmentally healthy gulf coast while encouraging economic development and enhanced freight movement along the GIWW. Seek RESTORE Act funding or similar restoration funding sources. Seek opportunities for beneficial use of dredged material projects to protect the GIWW from shoaling. Support full utilization and appropriation of both the Harbor Maintenance Trust Fund and the Inland Waterway Trust Fund, as laid out in the Water Resources Reform and Development Act of 2014 (WRRDA). Promote Texas port and waterway projects in the prioritization of projects seeking federal funds. 12

402 Program: Maritime Seek funding assistance for port capital projects, both inside the gate and outside the gate, in order to keep up with competitor ports in other states. Explore Public-Private Partnership opportunities. Encourage use of MARAD s Port Planning & Investment Toolkit. Continue to work with stakeholders to find P3 solutions that are acceptable to the users and industry. Engage the private sector benefactors of the maritime system to participate. Promote the development and expansion of the use of waterways to transport cargo, whether by container (Container on Barge) or as bulk cargo, by actively partnering with shippers, ports and other transportation entities. Engage shippers to develop service routes along the GIWW and support Texas ports acquiring the necessary equipment and infrastructure to implement the service. Program: Aviation Develop and administer a comprehensive Air Cargo Development and Improvement Program focused on working with Texas airports and other stakeholders to identify strategies that expand air cargo capacity, and improve air cargo transportation infrastructure. This program will comprise of the following: Address air cargo needs, issues and recommendations in the next update of the TxDOT Texas Airport System Plan (TASP). Integrate airport and air cargo planning initiatives into local, regional and statewide planning efforts. Identify opportunities to improve intermodal access and connectivity to air cargo facilities, especially first- and last-mile connections to the freight highway network. 13

403 Appendix I Map Packet for way Projects in the Unconstrained Freight Investment Plan by Needs and Funding Status

404 Exhibit I-1: Fully Funded Mobility Projects in the Unconstrained Freight Investment Plan I-1

405 Exhibit I-2: Partially Funded Mobility Projects in the Unconstrained Freight Investment Plan I-2

406 Exhibit I-3: Fully Funded Safety Projects in the Unconstrained Freight Investment Plan I-3

407 Exhibit I-4 Partially Funded Safety Projects in the Unconstrained Freight Investment Plan I-4

408 Exhibit I-5: Fully Funded Preservation Projects in the Unconstrained Freight Investment Plan I-5

409 Exhibit I-6: Partially Funded Projects in the Unconstrained Freight Investment Plan I-6

TxDOT Project : Pilot Implementation of a Web-based GIS System to Provide Information for Pavement Maintenance Decision- Making

TxDOT Project : Pilot Implementation of a Web-based GIS System to Provide Information for Pavement Maintenance Decision- Making 5-9035-01-P5 A FOUR-YEAR PAVEMENT MANAGEMENT PLAN (FY 2011 FY 2014) Authors: Wenxing Liu Sunny Jaipuria Mike Murphy Zhanmin Zhang TxDOT Project 5-9035-01: Pilot Implementation of a Web-based GIS System

More information

FOREWORD. There are five sections to this document:

FOREWORD. There are five sections to this document: 4/10/2019 @ 5:04:09 PM FOREWORD * This document contains candidate projects which have been identified by districts as ready for letting or obligation of funds in fiscal year 2020 by TxDOT. There are five

More information

PORTS-TO-PLAINS. Corridor Planning. Ports-to-Plains Stakeholder Meeting

PORTS-TO-PLAINS. Corridor Planning. Ports-to-Plains Stakeholder Meeting PORTS-TO-PLAINS Corridor Planning Stakeholder Workshop - Agenda 1 Purpose of Stakeholder Workshops 3 2 Rural Transportation System Overview 4 3 Ports-to-Plains 8 4 5 6 7 I-27 Expansion Key Considerations

More information

system performance I-820 East Loop FM 156 TxDOT is working to expand its busiest metropolitan corridors.

system performance I-820 East Loop FM 156 TxDOT is working to expand its busiest metropolitan corridors. system performance TxDOT is working to expand its busiest metropolitan corridors. Nine of the state s 100 most congested highways are located in Tarrant County. Six of these highways will be expanded and

More information

SOUTH TEXAS COMMISSION MEETING

SOUTH TEXAS COMMISSION MEETING SOUTH TEXAS COMMISSION MEETING September 26, 2013 Pharr District Commission Meeting Pharr District: Overview The Pharr District plans, designs, builds, operates and maintains the state transportation system

More information

Proposed Project I 35 Improvements from SH 195 to I 10

Proposed Project I 35 Improvements from SH 195 to I 10 I 35 ROADWAY Proposed Project I 35 Improvements from SH 195 to I 10 The existing I 35 facility from State Highway 195 (SH 195) north of Georgetown to Interstate 10 (I 10) in San Antonio varies from four

More information

PROJECTS TO BE DELAYED FROM FY 08 LETTING CATEGORIES 2, 3 AND 4, FEBRUARY THRU AUGUST 2008

PROJECTS TO BE DELAYED FROM FY 08 LETTING CATEGORIES 2, 3 AND 4, FEBRUARY THRU AUGUST 2008 PROJECTS TO BE DELAYED FROM FY 08 LETTING CATEGORIES 2, 3 4, FEBRUARY THRU AUGUST 2008 District ABILENE TAYLOR 0908-33-066 STP 2001(870)UM CS AUSTIN WILLIAMS 0440-01-035 STP ( ) SH 195 SH 138 AUSTIN WILLIAMS

More information

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP)

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) Project Overview Briefing Packet March 2017 PROJECT OVERVIEW Environmental Impact Statement (EIS) Project divided into 3 Segments Segment 1: Beltway 8

More information

Transportation Improvement Program (TIP) Candidate Project List for Public Review

Transportation Improvement Program (TIP) Candidate Project List for Public Review 2011-2014 Transportation Improvement Program (TIP) Candidate List for Public Review Table 1 Annual Listing Of Federal Aid Obligation For Federal Fiscal Year 2010 North Dakota s Number Transit 410083 Transit

More information

IH 35 FEASIBILITY STUDY

IH 35 FEASIBILITY STUDY IH 35 FEASIBILITY STUDY COOKE COUNTY, TEXAS February 1, 2007 Prepared by: Carter & Burgess, Inc. For: The Wichita Falls District of the Texas Department of Transportation INDEX I. INTRODUCTION. 3 II. PURPOSE

More information

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange I-820 (East) Project Description Fort Worth District Reconstruct Southern I-820/SH 121 Interchange I-820 from approximately 2,000 feet north of Pipeline Road/Glenview Drive to approximately 3,200 feet

More information

US 67 WIDENING PROJECT

US 67 WIDENING PROJECT US 67 WIDENING PROJECT From Belt Line Rd. to I-20 History & Background The US 67 improvements from Belt Line Rd to I-20 were originally part of TxDOT s Southern Gateway project, studied as part of the

More information

DEALERS - STATE OF TEXAS

DEALERS - STATE OF TEXAS DEALERS - STATE OF TEXAS 04/01/09 Updated 1. **American Tire Distributors # 551 9. **American Tire Distributors # 670 17. **Beasley Tire Service, Inc. 8308 Upland Avenue 2621 Lipan Street 12330 Eastex

More information

PUBLIC INFRASTRUCTURE PROJECTS

PUBLIC INFRASTRUCTURE PROJECTS PUBLIC INFRASTRUCTURE PROJECTS FM 664 / OVILLA ROAD WIDENING & IMPROVEMENTS FM 664 / OVILLA ROAD CONNECTS US 287 WITH I-45 (SOURCE: TEXAS DEPARTMENT OF TRANSPORTATION. 2016 FM 664 / OVILLA ROAD WIDENING

More information

2 Min. Min. Edge of. Edgeline See Note 3 PLAN VIEW. See Note 3. This distance may vary

2 Min. Min. Edge of. Edgeline See Note 3 PLAN VIEW. See Note 3. This distance may vary 8" Physical gore ( ) ( ) 250 Varies 250 TYPICAL RUMBLE STRIP PLACEMENT AT EXIT AND ENTRANCE RAMPS This distance may vary This distance may vary ( ) 2 16" edge of R=12" Max ( ) Physical gore Texturing 1.

More information

Request for Design Exception (#1) S.M. Wright Phase IIB

Request for Design Exception (#1) S.M. Wright Phase IIB Request for Design Exception (#1) S.M. Wright Phase IIB County: Dallas CSJ s: 0092-01-059, 0092-14-088 Project Limits: From Pennsylvania Avenue to North of Al Lipscomb Way Date: June 28, 2016 Proposed

More information

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015 SOUTHERN GATEWAY Transportation and Trinity River Project Committee 11 May 2015 Southern Gateway Project History Began in 2001 as a Major Investment Study [ MIS ], Schematic, and Environmental Assessment

More information

APPENDIX D: FISCAL CONSTRAINT

APPENDIX D: FISCAL CONSTRAINT APPENDIX D: FISCAL CONSTRAINT 1/23/ Constraint constraint is a planning tool the 2040 RTP utilizes to balance recommendations with reasonably expected revenues. The Transportation Policy Council (TPC)

More information

IH 45 (GULF FWY) IH 10 (Katy Fwy) to IH 610 S (South Loop) 2010 Rank: Rank: 12

IH 45 (GULF FWY) IH 10 (Katy Fwy) to IH 610 S (South Loop) 2010 Rank: Rank: 12 Mobility Investment Priorities Project Houston IH 45 IH 45 (GULF FWY) IH 10 (Katy Fwy) to IH 610 S (South Loop) Current Conditions From IH 10 to IH 610 south, IH 45 is a 6- to 9-lane facility with three

More information

US 59 (SOUTHWEST FWY) IH 610 (West Loop) to SH 288 (South Fwy)

US 59 (SOUTHWEST FWY) IH 610 (West Loop) to SH 288 (South Fwy) Mobility Investment Priorities Project Houston US 59 US 59 (SOUTHWEST FWY) IH 610 (West Loop) to SH 288 (South Fwy) Current Conditions From IH 610 West to SH 288, US 59 operates with four or five lanes

More information

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP)

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP) Public Information Packet FY - Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP) Comment Form Annual Element TIP Projects - TIP Projects Year - Metropolitan Transportation Improvement

More information

IMPROVEMENT CONCEPTS

IMPROVEMENT CONCEPTS IMPROVEMENT CONCEPTS for the South Novato Transit Hub Study Prepared by: January 11, 2010 DKS Associates With Wilbur Smith Associates IMPROVEMENT CONCEPTS Chapter 1: Introduction 1. INTRODUCTION The strategic

More information

December 12, Dear Secretary Foxx:

December 12, Dear Secretary Foxx: Chair Pete White City Councilmember Vice-Chair Jay Adams Mustang Mayor Secretary/Treasurer Matt Dukes Midwest City Mayor association of central oklahoma governments Executive Director John G. Johnson December

More information

Arizona-Sonora Border Master Plan. Plan Maestro para la Frontera Arizona-Sonora

Arizona-Sonora Border Master Plan. Plan Maestro para la Frontera Arizona-Sonora Arizona-Sonora Border Master Plan Plan Maestro para la Frontera Arizona-Sonora Project Objectives Develop and implement a plan for identifying, prioritizing, and promoting land port of entry (LPOE), multi-modal

More information

S.M. Wright Project (I-45, US 175, SH 310) and Road to Work Opportunity Program. Transportation and Trinity River Project Committee May 23, 2016

S.M. Wright Project (I-45, US 175, SH 310) and Road to Work Opportunity Program. Transportation and Trinity River Project Committee May 23, 2016 635 S.M. Wright Project (I-45, US 175, SH 310) and Road to Work Opportunity Program Transportation and Trinity River Project Committee May 23, 2016 Project Scope Increase safety by removing the existing

More information

Houston Region Freight Study. July 23, 2007

Houston Region Freight Study. July 23, 2007 Houston Region Freight Study July 23, 2007 Regional Setting Purpose of the Study Analyze freight movement (truck and rail) within the Houston region Identify a slate of improvements for consideration Develop

More information

Making Mobility Better, Together

Making Mobility Better, Together Making Mobility Better, Together Austin Transportation Department Gordon Derr, P.E., for Robert J. Spillar, P.E Director, Austin Transportation Department 1 AUSTIN TRANSPORTATION DEPARTMENT Our Mission

More information

STATE LOOP 195 PUBLIC MEETING. Footer Text

STATE LOOP 195 PUBLIC MEETING. Footer Text STATE LOOP 195 PUBLIC MEETING STATE LOOP 195 From FM 755 to 1 mile west of Loma Blanca Rd Public Meeting Agenda Welcome & Introductions Octavio Saenz TxDOT Public Information Officer Technical Overview

More information

Transportation. Background. Transportation Planning Goals. Level of Service Analysis 5-1

Transportation. Background. Transportation Planning Goals. Level of Service Analysis 5-1 Transportation portion of the city s stormwater utility, and state road and fuel taxes. Background The transportation needs of the City of Lacey and its planning areas are met by a growing multimodal network

More information

I-4 Beyond the Ultimate. Florida Transportation Builders Association January 18, 2019

I-4 Beyond the Ultimate. Florida Transportation Builders Association January 18, 2019 I-4 Beyond the Ultimate Florida Transportation Builders Association January 18, 2019 FDOT District 5 Improving Mobility & Safety in Central Florida FDOT District 5 is: Designing and building a better Interstate

More information

CONNECTED AND AUTOMATED TRANSPORTATION AND THE TEXAS AV PROVING GROUNDS PARTNERSHIP

CONNECTED AND AUTOMATED TRANSPORTATION AND THE TEXAS AV PROVING GROUNDS PARTNERSHIP CONNECTED AND AUTOMATED TRANSPORTATION AND THE TEXAS AV PROVING GROUNDS PARTNERSHIP Christopher Poe, Ph.D., P.E. Assistant Director, Connected and Automated Transportation Strategy Texas A&M Transportation

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 9/8/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 2/19/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

DEALERS - STATE OF TEXAS

DEALERS - STATE OF TEXAS DEALERS - STATE OF TEXAS 7/1/2011 Updated 1. **American Tire Distributors # 551 9. **American Tire Distributors # 670 17. **Beasley Tire Service, Inc. 8308 Upland Avenue 2621 Lipan Street 12330 Eastex

More information

Building our future, together. Steering Committee Presentation for the Comprehensive Plan Update April 23, 2013

Building our future, together. Steering Committee Presentation for the Comprehensive Plan Update April 23, 2013 Building our future, together Steering Committee Presentation for the Comprehensive Plan Update April 23, 2013 Vision In 2030, the City of Tyler will be nationally known for its commitment to community,

More information

Kentucky Highway District 6

Kentucky Highway District 6 Kentucky Highway District 6 ROAD AND BRIDGE CONDITIONS, TRAFFIC SAFETY, TRAVEL TRENDS, AND NEEDS MARCH 2018 PREPARED BY WWW.TRIPNET.ORG Founded in 1971, TRIP of Washington, DC, is a nonprofit organization

More information

Population Trends. US 12 Corridor Performance

Population Trends. US 12 Corridor Performance Corridor Context The corridor runs over 81 miles from Willmar to the Twins Cities metropolitan area. It connects the Twin Cities and the cities of Montrose, Howard Lake, Cokato, Dassel, Litchfield, Atwater,

More information

US 70 Corridor Planning for the Future

US 70 Corridor Planning for the Future New Bern/James City Area - Work Session US 70 Corridor Planning for the Future Brinson Elementary School Thursday, January 31, 2008 Agenda Sign-in, in, View Maps, Talk to Project Team Public Q & A Session

More information

CY 2013 and CY 2014 NOVA District Advertisement Schedule Design-Bid-Build

CY 2013 and CY 2014 NOVA District Advertisement Schedule Design-Bid-Build 1 2013 Planned s System Route UPC Category Locality Project Description 395 98836 Bridge Arlington Clean/Re-Paint 7 Bridges I-395 Corridor Arlington/Alexandria 4/9/2013 $ 3.45 HOT Lanes Bicycle/Pedestrian

More information

TEXAS RURAL TRANSPORTATION PLAN 2035 (TRTP 2035)

TEXAS RURAL TRANSPORTATION PLAN 2035 (TRTP 2035) TEXAS RURAL TRANSPORTATION PLAN 2035 (TRTP 2035) Helping shape the future of rural Texas Texas Rural Transportation Plan 2035 Texas Rural Transportation Plan 2035 What is it? Component of the Statewide

More information

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,

More information

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP): SEGMENT 3. April 19, 2018 NHHIP April 19, 2018

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP): SEGMENT 3. April 19, 2018 NHHIP April 19, 2018 NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP): SEGMENT 3 April 19, 2018 NHHIP OVERVIEW NHHIP divided into 3 Segments: Segment 1: I-45: Beltway 8 to I-610 (9 mi) 45 Segment 2: I-45: I-610 to I-10 (3

More information

TxDOT TRAFFIC INCIDENT MANAGEMENT UPDATE. ITS Texas 2016

TxDOT TRAFFIC INCIDENT MANAGEMENT UPDATE. ITS Texas 2016 TxDOT TRAFFIC INCIDENT MANAGEMENT UPDATE ITS Texas 2016 November 10, 2016 TxDOT- Traffic Operations Division November 10, 2016 Performance Measures (Lonestar ATMS) Lonestar ATMS Upgraded to Support Incident

More information

Chapter 7: Corridor Visions

Chapter 7: Corridor Visions Chapter 7: Corridor Visions (see also Appendix 7 for Details) January 24, 2008 NOTE: This document has been prepared using Federal funding from the United States Department of Transportation. The United

More information

H-GAC Ten-Year Plan, Funded Projects

H-GAC Ten-Year Plan, Funded Projects CORRIDOR-BASED MAJOR INVESTMENTS BW 8 16296 Harris HCTRA BW 8 IH 10 SH 225 WIDEN FROM 4 TO 8-LANES INCLUDING $ 823.00 BRIDGE ACROSS SHIP CHANNEL 14229 3256-04-070 Harris HCTRA BW 8 SH 225 IH 45 WIDEN FROM

More information

TXDOT PLANNING CONFERENCE. Quincy D. Allen, P.E. Houston District Engineer June 16, 2016

TXDOT PLANNING CONFERENCE. Quincy D. Allen, P.E. Houston District Engineer June 16, 2016 TXDOT PLANNING CONFERENCE Quincy D. Allen, P.E. Houston District Engineer June 16, 2016 Welcome to Houston Show video...http://youtu.be/knchpl8sdfu Population Growth in Texas Texas added 1.3 million people

More information

SH 249 IN GRIMES COUNTY. Open House April 3, 2014

SH 249 IN GRIMES COUNTY. Open House April 3, 2014 SH 249 IN GRIMES COUNTY Open House April 3, 2014 Meeting Agenda Purpose of Meeting Today: Review the purpose and need for the SH 249 Grimes County project Review the proposed project and alternatives Discuss

More information

TABLE 4-4 DAILY LRT ALTERNATIVE STATION PASSENGER VOLUMES IN 2030

TABLE 4-4 DAILY LRT ALTERNATIVE STATION PASSENGER VOLUMES IN 2030 Station Volumes and Boardings/Alightings The stations proposed for the LRT Alternative were selected due to their proximity to population and employment centers, major existing transportation facilities,

More information

REGIONAL REPORT PETITION: TEXAS DEPARTMENT OF TRANSPORTATION TYLER DISTRICT

REGIONAL REPORT PETITION: TEXAS DEPARTMENT OF TRANSPORTATION TYLER DISTRICT April 30, 2009 REGIONAL REPORT PETITION: TEXAS DEPARTMENT OF TRANSPORTATION TYLER DISTRICT 1. Group Identification North East Texas Regional Mobility Authority (NET RMA) Chairman Jeff Austin, III 305 South

More information

Tulsa Transportation Management Area. Urbanized Area Surface Transportation Program

Tulsa Transportation Management Area. Urbanized Area Surface Transportation Program Tulsa Transportation Management Area Urbanized Area Surface Transportation Program FFY 2022 Application Information Sponsor Location Description STP Request Other Funds Broken Arrow Elm Place: Kenosha

More information

Goods Movement Plans. Summary of Needs Assessments. January 21, 2015 GOODS MOVEMENT COLLABORATIVE AND GOODS MOVEMENT PLAN 6

Goods Movement Plans. Summary of Needs Assessments. January 21, 2015 GOODS MOVEMENT COLLABORATIVE AND GOODS MOVEMENT PLAN 6 Goods Movement Plans Summary of Needs Assessments January 21, 2015 GOODS MOVEMENT COLLABORATIVE AND GOODS MOVEMENT PLAN 6 Goods Movement Vision and Goals GOODS MOVEMENT COLLABORATIVE AND GOODS MOVEMENT

More information

Transportation Highway Engineering Conference February 24, 2015

Transportation Highway Engineering Conference February 24, 2015 Transportation Highway Engineering Conference February 24, 2015 Today s Agenda Move Illinois status Jane Addams Memorial (I-90) Rebuilding and Widening Project Building a 21 st century corridor Incorporating

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

EXCEPTION TO STANDARDS REPORT

EXCEPTION TO STANDARDS REPORT EXCEPTION TO STANDARDS REPORT PROJECT DESCRIPTION AND NEED The project is located in Section 6, Township 23 North, Range 9 East and Section 31 Township 24 North, Range 9 East, in the Town of Stockton,

More information

SPEED ZONING ON TEXAS HIGHWAYS

SPEED ZONING ON TEXAS HIGHWAYS SPEED ZONING ON TEXAS HIGHWAYS Where do speed zones come from? How do they come up with speed limits? Questions like this are common in the minds of most citizens when it comes to highway speed limits,

More information

Maryland Gets to Work

Maryland Gets to Work I-695/Leeds Avenue Interchange Reconstruction Baltimore County Reconstruction of the I-695/Leeds Avenue interchange including replacing the I-695 Inner Loop bridges over Benson Avenue, Amtrak s Northeast

More information

5 VAUGHAN METROPOLITAN CENTRE AND SURROUNDING AREAS TRANSPORTATION STUDY PROGRESS

5 VAUGHAN METROPOLITAN CENTRE AND SURROUNDING AREAS TRANSPORTATION STUDY PROGRESS 5 VAUGHAN METROPOLITAN CENTRE AND SURROUNDING AREAS TRANSPORTATION STUDY PROGRESS The Transportation Services Committee recommends the adoption of the recommendations contained in the following report

More information

Develop ground transportation improvements to make the Airport a multi-modal regional

Develop ground transportation improvements to make the Airport a multi-modal regional Project Overview TRANSPORTATION IMPROVEMENTS WHAT ARE THE PROJECT GOALS? Transportation transportation hub. Develop ground transportation improvements to make the Airport a multi-modal regional Land Use

More information

Annual Analysis of Progress on the Statewide Long-Range Transportation Plan Statewide Transportation Report

Annual Analysis of Progress on the Statewide Long-Range Transportation Plan Statewide Transportation Report Annual Analysis of Progress on the Statewide Long-Range Transportation Plan ------------------------------------- Statewide Transportation Report Legislative Report January 2015 Transportation Planning

More information

The Design-Builder shall meet local road criteria provided by the local governing agencies.

The Design-Builder shall meet local road criteria provided by the local governing agencies. 11 ROADWAYS 11.1 General The -Builder shall conduct all Work necessary to meet the requirements of roadways. Roadway classifications include mainline, acceleration lanes, deceleration lanes, auxiliary

More information

Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report

Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report REVISIONS 1. Table 39: New Public Investments for Operation and Maintenance Costs 2. Appendix A-10: Passenger Rail Service - Operations

More information

Safety Assessment. Intersection of Route 29 (Seminole Trail) and Ashwood Blvd (Route 1670). Albemarle County

Safety Assessment. Intersection of Route 29 (Seminole Trail) and Ashwood Blvd (Route 1670). Albemarle County Safety Assessment for Intersection of Route 29 (Seminole Trail) and Ashwood Blvd (Route 1670). Albemarle County Prepared by: VIRGINIA DEPARTMENT OF TRANSPORTATION Northwestern Regional Operations - Traffic

More information

GTA West Corridor Planning and EA Study Stage 1

GTA West Corridor Planning and EA Study Stage 1 GTA West Corridor Planning and EA Study Stage 1 Draft Development Strategy Presentation to Peel Goods Movement Task Force April 8 2011 Study Areas 2 Unique Approach Unprecedented two-stage EA process:

More information

Final Series of Public Meetings

Final Series of Public Meetings Final Series of Public Meetings Public Meeting Locations City Date Jasper Monday, September 26 Livingston Tuesday, September 27 Huntsville Wednesday, September 28 Bryan Thursday, September 29 Eldorado

More information

Mobility 2045 Plan Workshop

Mobility 2045 Plan Workshop Mobility 2045 Plan Workshop Regional Transportation Council October 12, 2017 Agenda Mobility Planning Mobility 2045 Innovative Funding and Strategic Partnerships Public Outreach Efforts Next Steps 2 Mobility

More information

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction 550 North to 650 North $ 1,750,000 $ 1,582,113 To widen an existing bridge on 1200 West over Box Elder Creek that will

More information

RTID Travel Demand Modeling: Assumptions and Method of Analysis

RTID Travel Demand Modeling: Assumptions and Method of Analysis RTID Travel Demand Modeling: Assumptions and Method of Analysis Overall Model and Scenario Assumptions The Puget Sound Regional Council s (PSRC) regional travel demand model was used to forecast travel

More information

Traffic Engineering Study

Traffic Engineering Study Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested

More information

Project Application. General Information ODOT PID. Primary County (3 char abrv) ODOT District

Project Application. General Information ODOT PID. Primary County (3 char abrv) ODOT District Current Status (Tier 1, Tier 2 or New) Proposed Status (Tier 1 or Tier 2) Project Application General Information ODOT PID ODOT District Primary County (3 char abrv) Facility Name (i.e. route, rail, terminal,

More information

TTI TRAFFIC SAFETY CONFERENCE. John A. Barton, P.E.

TTI TRAFFIC SAFETY CONFERENCE. John A. Barton, P.E. TTI TRAFFIC SAFETY CONFERENCE John A. Barton, P.E. Introduction TxDOT Mission Work with others to provide safe and reliable transportation solutions for Texas. 2 Mission Zero Is a Journey toward: Zero

More information

TURNPIKE SYSTEM. Summary information from: Texas Department of Transportation GENERAL INFORMATION & SYSTEM MAP JOA REALTY

TURNPIKE SYSTEM. Summary information from: Texas Department of Transportation   GENERAL INFORMATION & SYSTEM MAP JOA REALTY GENERAL INFORMATION & SYSTEM MAP TURNPIKE SYSTEM Summary information from: Texas Department of Transportation www.texastollways.com Joa Realty JoaRealty.com Email: help@joarealty.com Office: 512.480.8384

More information

Corridor Sketch Summary

Corridor Sketch Summary Corridor Sketch Summary SR 241: I-82 Jct (Sunnyside) to SR 24 Jct Corridor Highway No. 241 Mileposts: 7.53 to 25.21 Length: 17.65 miles Corridor Description The seventeen and one-half mile corridor begins

More information

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year Capital Improvement Plan FY2015/2016 through FY2020

More information

2013 Attorney Population Density by Metropolitan Statistical Area ATTORNEY POPULATION DENSITY BY METROPOLITAN STATISTICAL AREA

2013 Attorney Population Density by Metropolitan Statistical Area ATTORNEY POPULATION DENSITY BY METROPOLITAN STATISTICAL AREA STATE BAR OF TEXAS DEPARTMENT OF RESEARCH & ANALYSIS ATTORNEY POPULATION DENSITY BY METROPOLITAN STATISTICAL AREA 2013-14 For more information, contact: State Bar of Department of Research and Analysis

More information

Rocky Mount. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

Rocky Mount. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation 2020 Transportation Plan Developed by the Transportation Planning Division of the Virginia Department of Transportation in cooperation with the U.S. Department of Transportation, Federal Highway Administration

More information

Kentucky Highway District 1

Kentucky Highway District 1 Kentucky Highway District 1 ROAD AND BRIDGE CONDITIONS, TRAFFIC SAFETY, TRAVEL TRENDS, AND NEEDS FEBRUARY 2018 PREPARED BY WWW.TRIPNET.ORG Founded in 1971, TRIP of Washington, DC, is a nonprofit organization

More information

Trunk Highway 13 Corridor Study Update Existing and No-Build Conditions Technical Memo #2B: Traffic Forecasts and Operations Analysis SEH No.

Trunk Highway 13 Corridor Study Update Existing and No-Build Conditions Technical Memo #2B: Traffic Forecasts and Operations Analysis SEH No. TECHNICAL MEMORANDUM TO: FROM: Molly McCartney MnDOT Project Manager Haifeng Xiao, PE Tom Sohrweide, PE, PTOE DATE: November 27, 2012 RE: Trunk Highway 13 Corridor Study Update Existing and No-Build Conditions

More information

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition Welcome Meetings 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition 6:30 to 8:00 p.m. - Open House Why is Highway 212 Project Important? Important Arterial Route Local Support Highway 212

More information

Western ND Meeting. February 19, 2014 Grant Levi, NDDOT Director

Western ND Meeting. February 19, 2014 Grant Levi, NDDOT Director Western ND Meeting February 19, 2014 Grant Levi, NDDOT Director 1 Traffic Trends in North Dakota 2 Truck Traffic 2008 3 Truck Traffic 2012 4 Average Daily Traffic 5 ND Vehicle Miles Traveled Statewide

More information

Sepulveda Pass Corridor Systems Planning Study

Sepulveda Pass Corridor Systems Planning Study Los Angeles County Metropolitan Transportation Authority Sepulveda Pass Corridor Systems Planning Study Streets and Freeways Subcommittee January 17, 2013 1 Sepulveda Pass Study Corridor Extends for 30

More information

North Whitfield County Roadway Corridor Study

North Whitfield County Roadway Corridor Study North Whitfield County Roadway Corridor Study Report #3: Summary and Implementation Plan MA Project 11501 September 22, 2011 Prepared For: Greater Dalton Metropolitan Planning Organization Prepared By:

More information

Letter of Transmittal

Letter of Transmittal Letter of Transmittal To: Chris Lovell City of Richmond Hill Date: 5/2/6 Job 2582 Re: Richmond Hill-South Bryan County Transportation STudy WE ARE SENDING YOU THE FOLLOWING ITEMS ( attached) ( under separate

More information

Capital Improvement Plan Review

Capital Improvement Plan Review City of Manhattan Beach Public Works Department Fiscal Year 2014/2015 2018/2019 Capital Improvement Plan Review Community Meeting: April 10, 2014 Objectives Creating the Capital Improvement Plan Funding

More information

Project Working Group Meeting #5

Project Working Group Meeting #5 September 17, 2013 Project Working Group Meeting #5 1 September 17, 2013 www.i-80will.com Meeting Purpose Project update Discuss Range of Alternatives Discuss next steps 2 September 17, 2013 www.i-80will.com

More information

Metropolitan Freeway System 2013 Congestion Report

Metropolitan Freeway System 2013 Congestion Report Metropolitan Freeway System 2013 Congestion Report Metro District Office of Operations and Maintenance Regional Transportation Management Center May 2014 Table of Contents PURPOSE AND NEED... 1 INTRODUCTION...

More information

Business Advisory Committee. July 7, 2015

Business Advisory Committee. July 7, 2015 Business Advisory Committee July 7, 2015 1 Today s Topics Outreach Update TI #1 and 2: Target Field Station Connection to I-94: Recommendation 85 th Station Configuration 93 rd Station Configuration DEIS

More information

Individual and Family Health Insurance Rates

Individual and Family Health Insurance Rates Individual and Family Health Insurance Rates New Business Rates Effective January 1, 2018 * *rates subject to change A Division of Health Care Service Corporation, a Mutual Legal Reserve Company, an Independent

More information

2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS. Eastside Transportation Partnership September 9, 2016

2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS. Eastside Transportation Partnership September 9, 2016 2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS Eastside Transportation Partnership September 9, 2016 1 2 PSRC 2016 Project Selection Process 2018-2020 Estimated FHWA Funds Available: (Summary)

More information

Central Loop Bus Rapid Transit

Central Loop Bus Rapid Transit Central Loop Bus Rapid Transit Transportation Goals of the Chicago Central Area ACTION Plan, page 2-6 Central Area Plan Improve Transit in Central Area Improve Pedestrian Environment Manage Traffic Circulation

More information

I-90 ALLSTON INTERCHANGE A MULTIMODAL TRANSPORTATION PROJECT PUBLIC INFORMATION MEETING

I-90 ALLSTON INTERCHANGE A MULTIMODAL TRANSPORTATION PROJECT PUBLIC INFORMATION MEETING I-90 ALLSTON INTERCHANGE A MULTIMODAL TRANSPORTATION PROJECT PUBLIC INFORMATION MEETING DECEMBER 8, 2015 JACKSON MANN COMMUNITY CENTER Meeting Agenda Welcome & Introductions Introduce Concept 3K West Station

More information

CTA Blue Line Study Area

CTA Blue Line Study Area CTA Blue Line Study Area HISTORY OF THE CTA BLUE LINE / I-290 SYSTEM Blue Line / I-290 infrastructure is 55 years old First integrated transit / highway facility in the U.S. PROJECT STUDY AREA EXISTING

More information

2016 Congestion Report

2016 Congestion Report 2016 Congestion Report Metropolitan Freeway System May 2017 2016 Congestion Report 1 Table of Contents Purpose and Need...3 Introduction...3 Methodology...4 2016 Results...5 Explanation of Percentage Miles

More information

MetroExpress Improvements

MetroExpress Improvements Improvements Enhancements Short-term improvements to keep Austin moving. Investments Long-term projects to support our future. Mobility Hubs MetroRapid MetroRail Commuters Connectors Circulators Project

More information

I-405 Sepulveda Pass Improvements Project

I-405 Sepulveda Pass Improvements Project I-405 Sepulveda Pass Improvements Project Community Meeting November 15, 2012 1 Wilshire Segment Overview of Wilshire Segment There are a total of 23 bridges being constructed on this project; almost half

More information

Directions to Mt Pleasant, TX 252 mi about 5 hours 1 min

Directions to Mt Pleasant, TX 252 mi about 5 hours 1 min Directions to Mt Pleasant, TX 252 mi about 5 hours 1 min Loading... 2013 Google - Map data 2013 Google - https://maps.google.com/maps?f=d&source=s_d&saddr=mt+pleasant,+tx&daddr=diana,+tx+to:marshall,+tx+to:carthage,+tx+to:bossier+city,+la+to:m

More information

Alamo Natural Gas Vehicle Consortium

Alamo Natural Gas Vehicle Consortium Alamo Natural Gas Vehicle Consortium Overview of the Alamo Natural Gas Vehicle Consortium 10MAY12 Christopher Ashcraft 8700 Tesoro Dr., Suite 700 San Antonio, TX 78217 210-362-5228 cashcraft@aacog.com

More information

Metropolitan Freeway System 2007 Congestion Report

Metropolitan Freeway System 2007 Congestion Report Metropolitan Freeway System 2007 Congestion Report Minnesota Department of Transportation Office of Traffic, Safety and Operations Freeway Operations Section Regional Transportation Management Center March

More information

ODOT District Two Monthly Construction Update

ODOT District Two Monthly Construction Update Ohio Department of Transportation Construction Update DISTRICT 2 KIRK SLUSHER, P.E., ACTING DEPUTY DIRECTOR 317 East Poe Rd. Bowling Green, Ohio 43402-1330 www.transportation.ohio.gov/dist2 ODOT District

More information

5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES

5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES 5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES 5.1 INTRODUCTION This chapter of the TMP presents an opinion of probable cost estimates for the proposed Horizon Year roadway network improvements

More information

Workshop Agenda. Bransford Roundabout. Bedford Intersection/Roundabout. Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion

Workshop Agenda. Bransford Roundabout. Bedford Intersection/Roundabout. Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion Workshop Agenda Bransford Roundabout Bedford Intersection/Roundabout Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion Project Phasing Summary of Recommendation Purpose: Provide

More information