Lighting Contractor Scope of Work Provided for: Las Virgenes Municipal Water District HQ and Tapia Buildings
|
|
- Roxanne Gordon
- 5 years ago
- Views:
Transcription
1 Lighting Cntractr Scpe f Wrk Prvided fr: Las Virgenes Municipal Water District HQ and Tapia Buildings
2 This page intentinally left blank.
3 Table f Cntents Part I: Technical Specificatins 3 Summary f Scpe f Wrk 3 Technical Specificatins 0 Table 1: Specificatins per Retrfit Descriptin 0 Table 2: Prpsed Fixtures Wattage and Mdel Number 0 Appendix 01 Lighting Audit Tables Summary, per site 2 Part II: Prject Implementatin Best Practices Terms and Cnditins 3 Terms and Cnditins 3 Prevailing Wages 4 Prject Management 5 Meetings 5 Lgistics 6 Submittals 6
4 Part I: Technical Specificatins The Cunty f Ls Angeles/Suthern Califrnia Reginal Energy Netwrk (SCalREN), as well as TRC as the assigned technical cnsultant, remains prduct and vendr neutral. The specified prducts represent examples f the pssible prducts that culd be used fr the prject. The prducts were chsen and are recmmended based n their technlgical feasibility, efficiency and impact n the prject ecnmics. It shuld be nted that if the Agency likes t mve frward with prducts ther than thse prpsed in this dcument, the analysis wuld need t be revised based n updated prduct perfrmance and csts and the prject financials may change accrdingly. The Technical Specificatins are in accrdance t the Audit and Prject Prpsal as presented t the Agency. The scpe represented by the replacement table belw, Table 1, is t be the basis fr the Cntractr's Price Prpsal and any deviatin r prduct substitutin is t be reflected here and be apprved by the Agency befre a Price Prpsal is develped. Summary f Scpe f Wrk A rm-by-rm descriptin f the scpe is prvided in Attachment A, the Lighting Audit Table, which cntains the lcatins and specific fixture details f the fllwing retrfit measures: Prvide material submittals fr District s apprval prir t placement f rders. Prvide detailed cnstructin schedule that identify the date f each fixture replacement f time f cnstructin during in rder t crdinate District staff s dwntime fr the replacement wrk. Replace exterir high intensity discharge (HID) area fixtures with light-emitting dide (LED) fixtures. Replace exterir HID wall munted fixtures with LED fixtures. Replace exterir linear flurescent fixtures with LED fixtures. Replace exterir screw-in incandescent lamps with LED lamps. Replace interir ceiling munted r pendant HID fixtures with LED fixtures. Replace interir wall munted HID fixtures with LED fixtures. Replace r retrfit interir linear flurescent fixtures with LED fixtures and retrfit kits. Replace interir screw-in incandescent lamps with LED lamps. Install ccupancy sensrs in all apprpriate rms, as recmmended in the attached spreadsheet. Remval f all parts f ld fixtures n lnger in use.
5 Technical Specificatins 1) The Cntractr shall install lighting equipment per Attachment A Lighting Audit Table and per Replacement Schedule as nted n Table 1 (belw). Attachment A shuld als be used t dcument as-built cnditins and supprt the prject clse ut. Table 1: Specificatins per Retrfit Descriptin Fixture Retrfit Cde Baseline Descriptin Prpsed Descriptin F31C 3ft 22W T8 lamp in Indirect Cve Fixture GE 13W 36" T8 LED tube type C (LED13T8/3/840) F41R 4ft 32W T8 lamp in Recessed Fixture GE 13W 48" T8 LED tube type C (LED15T8/4/840) CFL13 13W Screw-in CFL CREE A19 LED, 9W (BA OMF2) F42SM (2) 4ft 32W T8 lamp in Surface Munted Fixture Lithnia 32W Striplight (ZL1N-L LM-FST-MVOLT-40K-XX) F42SM (2) 4ft 32W T8 lamp in Surface Munted Fixture Lithnia 32W Striplight (ZL1N-L LM-FST-MVOLT-40K-XX) F42RTDI (2) 4ft 32W T8 lamp in 2x4 Recessed Trffer Direct Indirect Fixture GE 13W 48" T8 LED tube type C (LED15T8/4/840) F41RT14 4ft 32W T8 lamp in 1x4 Recessed Trffer Fixture GE 13W 48" T8 LED tube type C (LED15T8/4/840) F42PI (2) 4ft 32W T8 lamp in Indirect Pendant Fixture GE 13W 48" T8 LED tube type C (LED15T8/4/840) F32PI (2) 3ft 22W T8 lamp in Indirect Pendant Fixture GE 13W 36" T8 LED tube type C (LED13T8/3/840) F41RT14 4ft 32W T8 lamp in 1x4 Recessed Trffer Fixture GE 13W 48" T8 LED tube type C (LED15T8/4/840) MR50 50W MR16 Lamp GE 7W MR16 LED (LED7XDMR ) F21CI 2ft 17W T8 lamp in Indirect Cve Fixture GE 9W 24" T8 LED tube type C (LED9T8/2/840) CFL18WM 18W Pin Based CFL in Wall Munted Fixture GE 18.5W Pin-Lamp (LED19GX24Q-V/840) MR50 50W MR16 Lamp GE 7W MR16 LED (LED7XDMR ) PAR50 50W PAR30 Lamp CREE 10.5W PAR30 LED (BPAR30L C-12DE26-1C100) F42CI (2) 4ft 32W T8 lamp in Indirect Cve Fixture GE 13W 48" T8 LED tube type C (LED15T8/4/840) F31C 3ft 22W T8 lamp in Indirect Cve Fixture GE 13W 36" T8 LED tube type C (LED13T8/3/840) F41R 4ft 32W T8 lamp in Recessed Fixture GE 13W 48" T8 LED tube type C (LED15T8/4/840) F41SM 4ft 32W T8 lamp in Surface Munted Fixture GE 13W 48" T8 LED tube type C (LED15T8/4/840)
6 Fixture Retrfit Cde Baseline Descriptin Prpsed Descriptin F42RT24 (2) 4ft 32W T8 lamp in 2x4 Recessed Trffer Fixture Lithnia 38W Trffer Retr Kit (2VTL4R 40L ADP EZ1 LP840) HPS35RC-Ext 35W HPS Recessed Can Fixture, Exterir CREE CR6, 12W (CR6-800L-40K) CFL32WP 32W Pin Based CFL in Wall Munted Fixture GE 18.5W Pin-Lamp (LED19GX24Q-V/840) F41RT14 4ft 32W T8 lamp in 1x4 Recessed Trffer Fixture GE 13W 48" T8 LED tube type C (LED15T8/4/840) MR50 50W MR16 Lamp GE 7W MR16 LED (LED7XDMR ) F42PI (2) 4ft 32W T8 lamp in Indirect Pendant Fixture GE 13W 48" T8 LED tube type C (LED15T8/4/840) F41RT14 4ft 32W T8 lamp in 1x4 Recessed Trffer Fixture GE 13W 48" T8 LED tube type C (LED15T8/4/840) F21C 2ft 17W T8 lamp in Cve Fixture GE 9W 24" T8 LED tube type C (LED9T8/2/840) F31C 3ft 22W T8 lamp in Indirect Cve Fixture GE 13W 36" T8 LED tube type C (LED13T8/3/840) F41RT14 4ft 32W T8 lamp in 1x4 Recessed Trffer Fixture GE 13W 48" T8 LED tube type C (LED15T8/4/840) F41RT 4ft 32W T8 lamp in Recessed Fixture GE 13W 48" T8 LED tube type C (LED15T8/4/840) F41RT 4ft 32W T8 lamp in Recessed Fixture GE 13W 48" T8 LED tube type C (LED15T8/4/840) F41RT 4ft 32W T8 lamp in Recessed Fixture GE 13W 48" T8 LED tube type C (LED15T8/4/840) F42RT24 (2) 4ft 32W T8 lamp in 2x4 Recessed Trffer Fixture Lithnia 38W Trffer Retr Kit (2VTL4R 40L ADP EZ1 LP840) F21C 2ft 17W T8 lamp in Cve Fixture GE 9W 24" T8 LED tube type C (LED9T8/2/840) F31C 3ft 22W T8 lamp in Indirect Cve Fixture GE 13W 36" T8 LED tube type C (LED13T8/3/840) F41RT-28 4ft 28W T8 lamp in Recessed Fixture GE 13W 48" T8 LED tube type C (LED15T8/4/840) F41POS 4ft 32W T8 lamp in Pendant Open Strip Fixture GE 13W 48" T8 LED tube type C (LED15T8/4/840) N Change N Change N Change
7 Fixture Retrfit Cde Baseline Descriptin Prpsed Descriptin F32PI (2) 3ft 22W T8 lamp in Indirect Pendant Fixture GE 13W 36" T8 LED tube type C (LED13T8/3/840) F41RT ft 28W T8 lamp in 1x4 Recessed Trffer Fixture GE 13W 48" T8 LED tube type C (LED15T8/4/840) F41R 4ft 32W T8 lamp in Recessed Fixture GE 13W 48" T8 LED tube type C (LED15T8/4/840) MR50 50W MR16 Lamp GE 7W MR16 LED (LED7XDMR ) F22CI-T5 (2) 2ft 14W T5 lamps in Indirect Cve Fixture GE 9W 24" T8 LED tube type C (LED9T8/2/840) F41CI 4ft 32W T8 lamp in Indirect Cve Fixture GE 13W 48" T8 LED tube type C (LED15T8/4/840) HPS35RC-Ext 35W HPS Recessed Can Fixture, Exterir CREE CR6, 12W (CR6-800L-40K) F42RTDI (2) 4ft 32W T8 lamp in 2x4 Recessed Trffer Direct Indirect Fixture GE 13W 48" T8 LED tube type C (LED15T8/4/840) F21C 2ft 17W T8 lamp in Cve Fixture GE 9W 24" T8 LED tube type C (LED9T8/2/840) F31C 3ft 22W T8 lamp in Indirect Cve Fixture GE 13W 36" T8 LED tube type C (LED13T8/3/840) F42RT24 (2) 4ft 32W T8 lamp in 2x4 Recessed Trffer Fixture Lithnia 38W Trffer Retr Kit (2VTL4R 40L ADP EZ1 LP840) F44RT24 (4) 4ft 28W T8 lamp in 2x4 Recessed Trffer Fixture Lithnia 38W Trffer Retr Kit (2VTL4R 40L ADP EZ1 LP840) F42RT24 (2) 4ft 32W T8 lamp in 2x4 Recessed Trffer Fixture Lithnia 38W Trffer Retr Kit (2VTL4R 40L ADP EZ1 LP840) F44RT24 (4) 4ft 28W T8 lamp in 2x4 Recessed Trffer Fixture Lithnia 38W Trffer Retr Kit (2VTL4R 40L ADP EZ1 LP840) F42RT24 (2) 4ft 32W T8 lamp in 2x4 Recessed Trffer Fixture Lithnia 38W Trffer Retr Kit (2VTL4R 40L ADP EZ1 LP840) F44RT24 (4) 4ft 28W T8 lamp in 2x4 Recessed Trffer Fixture Lithnia 38W Trffer Retr Kit (2VTL4R 40L ADP EZ1 LP840) F42RT24 (2) 4ft 32W T8 lamp in 2x4 Recessed Trffer Fixture Lithnia 38W Trffer Retr Kit (2VTL4R 40L ADP EZ1 LP840) F44RT24 (4) 4ft 28W T8 lamp in 2x4 Recessed Trffer Fixture Lithnia 38W Trffer Retr Kit (2VTL4R 40L ADP EZ1 LP840) F42RT24 (2) 4ft 32W T8 lamp in 2x4 Recessed Trffer Fixture Lithnia 38W Trffer Retr Kit (2VTL4R 40L ADP EZ1 LP840) F44RT24 (4) 4ft 28W T8 lamp in 2x4 Recessed Trffer Fixture Lithnia 38W Trffer Retr Kit (2VTL4R 40L ADP EZ1 LP840) F42RT24 (2) 4ft 32W T8 lamp in 2x4 Recessed Trffer Fixture Lithnia 38W Trffer Retr Kit (2VTL4R 40L ADP EZ1 LP840) F44RT24 (4) 4ft 28W T8 lamp in 2x4 Recessed Trffer Fixture Lithnia 38W Trffer Retr Kit (2VTL4R 40L ADP EZ1 LP840) F42RT24 (2) 4ft 32W T8 lamp in 2x4 Recessed Trffer Fixture Lithnia 38W Trffer Retr Kit (2VTL4R 40L ADP EZ1 LP840) F44RT24 (4) 4ft 28W T8 lamp in 2x4 Recessed Trffer Fixture Lithnia 38W Trffer Retr Kit (2VTL4R 40L ADP EZ1 LP840)
8 Fixture Retrfit Cde Baseline Descriptin Prpsed Descriptin F41SM-28 4ft 28W T8 lamp in Surface Munted Fixture GE 13W 48" T8 LED tube type C (LED15T8/4/840) F21C 2ft 17W T8 lamp in Cve Fixture GE 9W 24" T8 LED tube type C (LED9T8/2/840) F31C 3ft 22W T8 lamp in Indirect Cve Fixture GE 13W 36" T8 LED tube type C (LED13T8/3/840) F41T8-Lamps 4ft 32W T8 lamp in Pendant Munted Array Fixture GE 13W 48" T8 LED tube type C (LED15T8/4/840) F41T8-Lamps 4ft 32W T8 lamp in Pendant Munted Array Fixture GE 13W 48" T8 LED tube type C (LED15T8/4/840) F41T8-Lamps 4ft 32W T8 lamp in Pendant Munted Array Fixture GE 13W 48" T8 LED tube type C (LED15T8/4/840) F41SM 4ft 32W T8 lamp in Surface Munted Fixture GE 13W 48" T8 LED tube type C (LED15T8/4/840) F41SM 4ft 32W T8 lamp in Surface Munted Fixture GE 13W 48" T8 LED tube type C (LED15T8/4/840) INC60 60W Incandescent Screw-in Lamps CREE A19 LED, 9W (BA OMF2) F41SM 4ft 32W T8 lamp in Surface Munted Fixture GE 13W 48" T8 LED tube type C (LED15T8/4/840) CFL23CM 23W CFL in Ceiling Munted Garage Fixtures Lithnia 32W Striplight (ZL1N-L LM-FST-MVOLT-40K-XX) IND200SM 200W Inductin Surface Munted Fixture Lithnia 32W Striplight (ZL1N-L LM-FST-MVOLT-40K-XX) LED 80 N Change N Change RC32 32W pin based CFL in Recessed Can GE 18.5W Pin-Lamp (LED19GX24Q-V/840) F41SM 4ft 32W T8 lamp in Surface Munted Fixture GE 13W 48" T8 LED tube type C (LED15T8/4/840) F41SM 4ft 32W T8 lamp in Surface Munted Fixture GE 13W 48" T8 LED tube type C (LED15T8/4/840) F41SM 4ft 32W T8 lamp in Surface Munted Fixture GE 13W 48" T8 LED tube type C (LED15T8/4/840) F42RC (2) 4ft 32W T8 lamp in Recessed Cve GE 13W 48" T8 LED tube type C (LED15T8/4/840) F42SM (2) 4ft 32W T8 lamp in Surface Munted Fixture Lithnia 32W Striplight (ZL1N-L LM-FST-MVOLT-40K-XX)
9 2) Energy savings ptential has been estimated using the prpsed list f fixtures as shwn n Table 2 (belw). Table 2: Prpsed Fixtures Wattage and Mdel Number Prpsed Fixtures Cper Champ 113W VMV Class 1 Div 2 LED (VMV11L/UNV1) Cper Champ 29W VMV Class 1 Div 2 LED (VMV3L/UNV1) Cper Champ 43W VMV Class 1 Div 2 LED (VMV5L/UNV1) Cper Champ 62W VMV Class 1 Div 2 LED (VMV7L/UNV1) Cper Champ 85W VMV Class 1 Div 2 LED (VMV9L/UNV1) CREE 10.5W PAR30 LED (BPAR30L C-12DE26-1C100) Cree 101W LED Cbrahead (BXSPCHT3MEA40K-Uxxxxx) Cree 25W Fld Light (FLD EDG N6 AA 02 E UL XX 350) Cree 46W Fld Light (FLD EDG N6 AA 04 E UL XX 350) Cree 53W LED Cbrahead (BXSPBHT3MEA40K-Uxxxxx) CREE 9W BR30 LED (BBR FLF-12DE26-4U100) CREE A19 LED, 13.5W (BA OMF) CREE A19 LED, 9W (BA OMF2) CREE CR6, 12W (CR6-800L-40K) CREE EDG-SEC 66W (SEC-EDG-XXX-WM-06-E-UL-XX-350) GE 12W Pin-Lamp (LED12G24Q-V/840) GE 13W 36" T8 LED tube type C (LED13T8/3/840) GE 13W 48" T8 LED tube type C (LED15T8/4/840) GE 18.5W Pin-Lamp (LED19GX24Q-V/840) GE 29W LED Wallpack (EWS2-0-A7-D1-40) GE 35W Canpy (ECB-B-0-A5-F A) GE 7W MR16 LED (LED7XDMR ) GE 9W 24" T8 LED tube type C (LED9T8/2/840) Lithnia 112W IBH High Bay (IBH 12000LM) Lithnia 20W Trffer Retr Kit (2VTL2R 20L ADP EZ1 LP840) Lithnia 25W Trffer (2TL4-30L-XX-XXX-EZB-LP840) Lithnia 27W Vapr Tight Fixture (DMW2 L LM) Lithnia 32W Striplight (ZL1N-L LM-FST-MVOLT-40K-XX) Lithnia 34.9W (STL4-40L-EZB-LP840) Lithnia 38W Trffer Retr Kit (2VTL4R 40L ADP EZ1 LP840) Lithnia 48W Trffer Retr Kit (2VTL4R 48L ADP EZ1 LP840)
10 3) The lighting equipment shall meet the fllwing requirements: a. It is recmmended that prpsed LED prducts are t be installed as specified. Equipment shall be installed per manufacturer's specificatins. b. Any fixture that is t be cnnected t dimming cntrls must be dimmable via a 0-10V lw vltage signal dwn t at least 5% f the maximum. c. Aesthetic ptins such as clr temperature and fixture finish shall be apprved by the Agency prir t rdering equipment. d. Any fixture lcated in damp, wet r hazardus spaces must be apprved by the Agency prir t installatin t verify applicability t the space and classificatin rating. 4) During installatin Cntractr shall: a. Demlish and dispse f any material remved as part f a replacement r retrfit. b. Ensure the cmpatibility, safety and applicability f the prpsed lighting fixture, retrfit r lamp with the electrical system and munting surface. c. Ensure all fixtures and retrfit kits are munted securely t the munted surfaces. Refer t the manufacturer s installatin instructins f each prpsed prduct fr munting details. d. Ensure all electrical cnnectins and lw vltage signals are wired apprpriately. e. Ensure that fixtures nt specified t have a new integrated cntrls, r t be cnnected t new autmated cntrls, be cnnected t the existing lighting cntrls. f. Remval f all parts f ld fixtures n lnger in use. 5) After installatin Cntractr shall: a. Prvide a detailed and itemized invice in acceptable SCE frmat, which includes manufacturer and mdel number and clearly states the quantity f each type f fixture installed. Additinally, the invice shall shw a breakdwn f material, labr, tax, shipping, and any ther applicable prject csts. 6) Cntractr s Respnsibilities fr SCE Incentives: a. The Cunty f Ls Angeles/Suthern Califrnia Reginal Energy Netwrk (SCalREN) will be respnsible fr submitting utility incentive applicatins fr the prject n behalf f the District. b. Cntractr is respnsible fr cnfirming that the selected LED fixtures r lamps meet the prject requirements, including required certificatins fr utility incentives, where applicable. If the cntractr r District selects an alternate prduct r mdel, the cntractr shall prir t issuing a purchase rder cmplete the fllwing steps: 1) verify that the prduct is n the DLC V4.0 qualified prducts list, and 2) btain cnfirmatin frm SCalREN that the prduct cmplies with Suthern Califrnia Edisn s (SCE) incentive requirements. c. T be eligible fr utility incentives, all fixtures at the Tapia facility must be new fixture replacements.
11 d. The lighting prject at the LVMWD Tapia facility must have all cnstructin cmpleted by r befre February 28, e. After cnstructin, cntractr shall prvide a detailed and itemized invice in acceptable SCE frmat, which includes manufacturer and mdel number and clearly states the quantity f each type f fixture installed. Additinally, the invice shall shw a breakdwn f material, labr, tax, shipping, and any ther applicable prject csts. f. Cntractr will furnish the final cnstructin As-Built Dcuments. g. Cntractr will cperate with testing prcess and final inspectin. Appendix 01 Lighting Audit Tables Summary, per site HQ Building Prpsed Fixture Cper Champ 113W VMV Class 1 Div 2 LED (VMV11L/UNV1) 8 CREE 10.5W PAR30 LED (BPAR30L C-12DE26-1C100) 5 Cree 46W Fld Light (FLD EDG N6 AA 04 E UL XX 350) 2 CREE A19 LED, 9W (BA OMF2) 19 CREE CR6, 12W (CR6-800L-40K) 42 CREE EDG-SEC 66W (SEC-EDG-XXX-WM-06-E-UL-XX-350) 11 GE 12W Pin-Lamp (LED12G24Q-V/840) 18 GE 13W 36" T8 LED tube type C (LED13T8/3/840) 13 GE 13W 48" T8 LED tube type C (LED15T8/4/840) 464 GE 18.5W Pin-Lamp (LED19GX24Q-V/840) 227 GE 29W LED Wallpack (EWS2-0-A7-D1-40) 8 GE 35W Canpy (ECB-B-0-A5-F A) 9 GE 7W MR16 LED (LED7XDMR ) 26 GE 9W 24" T8 LED tube type C (LED9T8/2/840) 102 Lithnia 25W Trffer (2TL4-30L-XX-XXX-EZB-LP840) 1 Lithnia 27W Vapr Tight Fixture (DMW2 L LM) 7 Lithnia 32W Striplight (ZL1N-L LM-FST-MVOLT-40K-XX) 156 Lithnia 34.9W (STL4-40L-EZB-LP840) 2 Lithnia 38W Trffer Retr Kit (2VTL4R 40L ADP EZ1 LP840) 66 Lithnia 48W Trffer Retr Kit (2VTL4R 48L ADP EZ1 LP840) 3 Cper Champ 113W VMV Class 1 Div 2 LED (VMV11L/UNV1) 8 1,189 Qty Tapia Building Prpsed Fixture Cper Champ 43W VMV Class 1 Div 2 LED (VMV5L/UNV1) 28 Cree 101W LED Cbrahead (BXSPCHT3MEA40K-Uxxxxx) 94 Qty
12 Cree 25W Fld Light (FLD EDG N6 AA 02 E UL XX 350) 2 Cree 46W Fld Light (FLD EDG N6 AA 04 E UL XX 350) 22 Cree 53W LED Cbrahead (BXSPBHT3MEA40K-Uxxxxx) 17 CREE 9W BR30 LED (BBR FLF-12DE26-4U100) 18 CREE A19 LED, 13.5W (BA OMF) 68 CREE A19 LED, 9W (BA OMF2) 13 CREE CR6, 12W (CR6-800L-40K) 8 CREE EDG-SEC 66W (SEC-EDG-XXX-WM-06-E-UL-XX-350) 60 GE 12W Pin-Lamp (LED12G24Q-V/840) 4 GE 13W 48" T8 LED tube type C (LED15T8/4/840) 18 Lithnia 20W Trffer Retr Kit (2VTL2R 20L ADP EZ1 LP840) 8 Lithnia 27W Vapr Tight Fixture (DMW2 L LM) 221 Lithnia 32W Striplight (ZL1N-L LM-FST-MVOLT-40K-XX) 333 Lithnia 38W Trffer Retr Kit (2VTL4R 40L ADP EZ1 LP840) Part II: Prject Implementatin Best Practices Terms and Cnditins Terms and Cnditins The Cntractr is expected t perfrm the cnstructin wrk in cmpliance with the Agency s Cntract terms and the specific prject requirements listed belw. Details f these items will be discussed at the Pre- Cnstructin meeting and memrialized in the meeting minutes fr that meeting. Cntract terms and cnditins put frth by the Agency as part f this prject shuld nt cnflict with the Scpe f Wrk terms and cnditins. If a discrepancy shuld arise, the Agency s Cntract terms and cnditins shuld take precedence. Cntractr shall adhere t the fllwing terms and cnditins thrughut the prject: a. Cntractr shall cnduct all wrk as indicated in Attachment A b. The Cntractr shall prvide cpies f a valid Califrnia C-10 Electrical license at a minimum and a cpy f DIR registratin c. Cntractr shall cmply with safety requirements and practices in accrdance with Agency requirements and Califrnia Occupatinal Health and Safety Administratin (Cal/OSHA). d. Cntractr shall d all that is necessary t maintain a safe wrking envirnment fr Cntractr s emplyees, Agency and facility emplyees and the general public present. e. Cntractr shall wrk with the Agency facility staff t understand and abide by any site specific security prcedures. f. Cntractr shall clean up any cnstructin dust, dirt and debris frm wrk surfaces r equipment after wrk is cmpleted each day and prir t ccupancy. g. Cntractr shall be very careful t leave the facility with n damage t its structure, cntents, existing finishes, and with n evidence f cutting r patching.
13 h. District is respnsible fr securing all necessary permits, including Title 24 energy cde dcumentatin and cmpliance permit. Cntractr shall abide by permit cnditins, lcal laws and regulatins. i. All wrk shall be warranted against defects in material and wrkmanship fr a perid f ne year frm the date f acceptance. j. All wrk shall be perfrmed in accrdance with all Natinal, State, and lcal cdes. k. Size, quantity and cnditin f existing equipment reprted in this dcument fr guidance nly. Cntractr shall independently verify all existing site cnditins. It is Cntractr's respnsibility t include the prper Adjustment Factr(s) and the necessary tasks and quantities in the Price Prpsal fr cmpletin f the wrk described herein. The risk assciated with incrrect Adjustment Factr(s), missing tasks, and inaccurate quantities frm the Price Prpsal shall be brne by Cntractr. l. Cntractr is t prvide unit-based pricing fr each fixture type, as part f the Price Prpsal. Unit prices t be prvided in Appendix A. m. It is the Cntractr s respnsibility t submit a final versin f the Lighting Audit Table, Attachment A in parallel with the submittal f the Cst Prpsal. Any revisins required t the Scpe f Wrk must be clearly indicated in the final Lighting Audit Table and reflected in the Cst Prpsal. The final Lighting Audit Table serves t infrm the Agency f the apprpriate revisins. n. Cntractr will be cmpensated fr wrk perfrmed and fixtures installed. Any increase n the Base Price due t larger inventry will require written apprval by the Agency and will fllw prcedures set frth fr change rders. Any decrease n Base Price due t smaller inventry will result in a lwer Base Price t the Cntractr.. Prir t rdering f equipment and fixtures, Cntractr is t verify fixture quantities, types and installatin needs. Final prject invice price will be based upn the quantity f each fixture type installed multiplied by the unit price fr that fixture. The Agency will nt be incur additinal csts fr restcking fees based n discrepancies in the inventry, as it is the Cntractr s respnsibility t verify the inventry prir t rdering materials. p. Cntractr is required t prvide a detailed and itemized invice, which includes manufacturer and mdel number and clearly states the quantity f each fixture installed. Additinally, the invice shall shw a breakdwn f material, labr, tax, shipping, and any ther applicable prject csts. q. Cntractr shall prvide factry start up and training (if necessary) t ensure prper functinality f new lighting equipment and cntrls. r. Cntractr must meet apprpriate insurance and bnd requirements utlined by the Agency. s. Any additinal cst f business fees/expenses assciated with perfrming wrk are t be included in the Cst Prpsal. t. Cntractr shall cperate t cmplete the Utility required pst-prject cmpletin requirements and facilitate the Agency securing the reserved Rebate, Incentives and On Bill Financing funds. Prevailing Wages a. Cntractr shall be required t pay the prevailing rate f wages in accrdance with the Labr Cde and the State f Califrnia prevailing wage laws.
14 Prject Management Cntractr shall fulfill the fllwing requirements t facilitate prject management: Meetings a. Cntractr shall perfrm the rles and assume respnsibilities as per the respnsibility matrix prvided in Appendix A. b. Substitutin requests must be prvided t the Agency and the Cunty f Ls Angeles/Suthern Califrnia Reginal Energy Netwrk (SCalREN) PM and apprved befre the submittal f the prpsal. c. Cntractr shall prvide an verall schedule fr each week, a minimum 1 week lk-ahead schedule identifying wrk areas fr each day and/r night. d. Cntractr shall riginate a daily prgress reprt lg. At the end f each shift, Cntractr shall e- mail the daily prgress reprt lg fr that shift t the Agency CM t facilitate next-day verificatin/inspectin; cmmunicatin shall als include prblems (e.g., access issues) and details fr next day s wrk schedule. e. Cntractr and/r the Agency can initiate a supplemental task rder. All parties are respnsible fr reviewing supplemental task rders. f. Cntractr shall ntify the Agency CM when the prject has been cmpleted. Clse-ut will include true-up f the quantity f each retrfit cde installed. Cntractr and CM shall jintly generate punch list items. Cntractr shall perfrm punch list items. Cntractr shall furnish the final updated Recrd Drawings (i.e. as-built lighting audit tables and anntated flr plans shwing rm numbers that crrespnd with the rm numbers in the lighting audit tables) which when apprved will cnstitute the As-Built Dcuments. Cntractr shall cperate with testing f any cntrls and final inspectin. Cntractr shall attend the fllwing meetings cmplete with preparatin and fllw-up: a. Pre-cnstructin lgistics meeting fr intrductin t team members, t understand rles and respnsibilities, t discuss the cnstructin schedule and t learn the submittal transmittal prcess. At the Pre-Cnstructin Meeting, the CM shall establish a mechanism fr nging verificatin/inspectin f wrk. b. Submittal review meetings, as needed fr discussin f majr submittal-related issues that cannt be reslved thrugh the submittal transmittal prcess. c. Cnstructin kickff meeting t reslve any remaining pre-cnstructin issues, discuss safety cncerns, and begin cnstructin n site. d. Regular cnstructin meetings, as needed t discuss punchlist items, the prgress f the cnstructin and safety issues with upcming wrk. e. Final jb walk t cnvey substantial cmpletin t prject team members and request final acceptance. Cntractr shall schedule this meeting and the Agency CM, facility persnnel shall attend.
15 Lgistics f. Cntractr shall review meeting minutes circulated after each meeting and reslve all actin items assigned t Cntractr by the due date indicated in the minutes. Cntractr shall crdinate lgistics with the Agency t ensure safe and timely executin f the wrk. At a minimum, Cntractr shall perfrm the fllwing activities: a. Agency representative shall prvide a site-specific safety briefing t the Cntractr upn apprval f the cnstructin schedule. Cntractr shall submit a Safety Plan per Cal OSHA standards as required in the cntract t the Agency. b. The Agency will be respnsible fr ntifying tenants f the cnstructin schedule. c. Cntractr shall wrk with the Agency and facility persnnel t understand and abide by security prcedures, as applicable. d. The Agency will assist t crdinate parking fr the Cntractr s vehicles. The parking strategy will be finalized in the pre-cnstructin lgistics meeting. e. The Agency shall designate an area f the facility fr equipment strage and staging. The strage and staging area will be finalized in the pre-cnstructin meeting. f. Cntractr shall crdinate with the Agency prir t mving the Cntractr s equipment, tls, and materials nt the cnstructin site at the start f the prject. g. Cntractr shall be respnsible fr the security f the Cntractr s prperty, equipment, cnstructin materials and all ther items cntained in the Cntractr s staging area r elsewhere n the cnstructin site. h. Cntractr shall ntify Agency ne week prir t any scheduled shutdwns f electrical systems, equipment r utilities. The Agency shall be respnsible fr ntifying tenants f the scheduled shutdwns. i. All equipment and materials demlished under the terms f this prject are t becme the prperty f the Cntractr and t be remved frm the site and prperly dispsed. Recyclable, nnhazardus material will be recycled. j. Cntractr will check in at a predetermined lcatin n site at the start f each shift. The Agency Cnstructin Manager (CM) will facilitate access t scheduled lcatins. k. Lamps and PCB-laden ballasts will be dispsed f in accrdance with state and City requirements. Recyclable, nn-hazardus material will be recycled. l. Wrk areas will be cleaned up prir t vacating fr the day. Submittals Cntractr shall prvide submittals as utlined belw. Precnstructin Within (20) Twenty wrking days f awarding f the cntract, Cntractr shall prvide the fllwing submittals: a. Prpsed cnstructin schedule with majr milestnes indicated. May include but nt limited t:
16 Clse-Out Equipment rder Anticipated equipment delivery date Cnstructin start and cmpletin by site r majr area Prject walk thrugh and punch list develpment Prject sign ff Wrk Plan Safety Plan submittal per Cal OSHA standards Cnstructin permits Prduct data sheets, cut sheets and munting details fr all fixtures. Within (10) ten days f ntifying the Agency f substantial cmpletin, Cntractr shall prvide the fllwing submittals: a. Final signed-ff punch list b. Executed final acceptance frm c. As-built line by line recrd listing actual installed number f lamps, ballasts, light fixtures, fixture accessries, fixture retrfit kits, and ccupancy sensrs by area (updated lighting table prvided as a part f this Scpe f Wrk) d. O&M manuals and training materials e. Warranty dcumentatin f. Materials list f cmpnents installed fr rerdering purpses g. Material dispsal and recycling dcuments Submittals shall nt be cnsidered cmplete until they are reviewed and apprved by the Agency. Cntractr shall make crrectins and transmit the revised submittal fr apprval.
REQUEST FOR QUALIFICATIONS FOR ENGINEERING SERVICES RELATED TO SALEM BIKE-PED CORRIDOR PHASE 2 DESIGN AND CONSTRUCTION SUPERVISION
REQUEST FOR QUALIFICATIONS FOR ENGINEERING SERVICES RELATED TO SALEM BIKE-PED CORRIDOR PHASE 2 DESIGN AND CONSTRUCTION SUPERVISION The Twn f Salem, New Hampshire is requesting qualificatins frm qualified
More informationTesting and Reporting Requirements for Linear Replacement Lamps
Testing and Reprting Requirements fr Linear Replacement Lamps The DLC defines all tube-style LED prducts that use the lamp hlders (i.e. sckets r tmbstnes) in the luminaire t mechanically r electrically
More informationSECOND DRAFT Testing and Reporting Requirements for Linear Replacement Lamps
SECOND DRAFT Testing and Reprting Requirements fr Nte: This draft represents updates t the existing Testing and Reprting Requirements fr t include 3-ft, 8-ft, and 2G11 base lamps. All changes frm the existing
More informationNON-ROAD DIESEL EMISSIONS FUEL EFFICIENCY PLAN GUIDELINE VANCOUVER FRASER PORT AUTHORITY
NON-ROAD DIESEL EMISSIONS FUEL EFFICIENCY PLAN GUIDELINE VANCOUVER FRASER PORT AUTHORITY January 31, 2017 VANCOUVER FRASER PORT AUTHORITY Nn-Rad Diesel Emissins Fuel Efficiency Plan Guideline Table f Cntents
More informationDRAFT Testing and Reporting Requirements for Linear Replacement Lamps
DRAFT Testing and Reprting Requirements fr Linear Replacement Lamps Nte: This draft represents updates t the existing Testing and Reprting Requirements fr Linear Replacement Lamps. All changes frm the
More informationDesign Standard - Fume Hoods & Fume Hood Exhausts
1.0 Intrductin Design Standard - Fume Hds & Fume Hd Exhausts The fume hd is the primary cntrl device in mst labratries fr prtecting emplyees and students frm expsure t hazardus chemicals. It is als an
More informationDraft ADEM Guidance Proposed Additions to the Alabama UST Regulations
Draft ADEM Guidance Prpsed Additins t the Alabama UST Regulatins Yu may have heard abut upcming changes t the undergrund strage tank regulatins (UST regulatins). On Octber 13, 2015 EPA finalized the first
More informationTexas Christian University Policy
Texas Christian University Plicy Plicy Number: 6.060 Subject: Off Rad Vehicle Plicy Effective Date: January 16, 2009 Apprved: By Chancellr s Cabinet, January 15, 2009 I. Purpse This plicy prvides guidelines
More informationADVISORY: General Motors Upfitter Integration Bulletin #108d P a g e 1 May 18, 2016
Subject: Aftermarket ALDL r DLC Interface Devices Causing Multiple Issues Mdels All Passenger Cars and Trucks Affected: Mdel Years: 2006 and beynd Date: February 4, 2013 Revisin Date: May 18, 2016 ADVISORY:
More informationHIGH POWER RGB LED SERIES. The HB Series Advantage! Architectural Illumination Systems!
The HB Series Advantage SGS listed cnfirming t UL Standard 2108 & 8750 Certified t CSA Standard C22.2 N.9 LED Life f 50K+ hurs, under nrmal perating cnditins Lw wattage, lw heat, lw vltage (12DVC & 24VDC
More informationModel: TM-3 INSTALLATION AND OPERATION INSTRUCTIONS
120 Mdel: TM-3 INSTALLATION AND OPERATION INSTRUCTIONS IF YOU CANNOT READ OR UNDERSTAND THESE INSTALLATION INSTRUCTIONS DO NOT ATTEMPT TO INSTALL OR OPERATE INTRODUCTION This Wired Wall Timer system was
More informationMEDMASTER TROFFER Luminaires for MRI/Imaging Suites LED MRIT SERIES
MEDMASTER TROFFER Luminaires fr MRI/Imaging Suites PRODUCT FEATURES: Recessed munt Grid; 2' 2', 2' 4' Nn-ferrus cnstructin safe fr sensitive MRI equipment High-utput, high-cri LED lamp ptins NSF2 rating
More informationCONTRACTOR MANAGEMENT SYSTEM LIGHT VEHICLE SITE ACCESS POLICY
Page: 1 f 8 TABLE OF CONTENTS 1. Purpse... 2 2. Scpe... 2 3. Definitins... 2 4. General Rules... 3 5. Vehicles... 3 6. Site Access Areas... 4 7. Cnditin f Vehicles... 5 8. Drivers Licence Cnfirmatin...
More informationBHC-P-11.1 Temporary Works
Berkeley Hme Cunties Safety Prcedures Cntents 1.0 Purpse 2.0 Scpe 3.0 Definitins 4.0 Main requirements 5.0 Guidance dcuments and references 6.0 Appendices Revisin register BHC-P-11.1 Temprary Wrks Date
More informationC-BOA Tool Validation of Energy Savings Estimation Methods
C-BOA Tl Validatin f Energy Estimatin Methds February 21, 2012 1 f 7 Table f Cntents Summary... 3 Recmmendatin... 3 Evaluatin Apprach... 3 Technical Advisry Grup Oversight... 3 Prject Specificatins...
More informationSERVICE FACTORY DIRECTED MODIFICATION MC IMMEDIATE INSPECTION REPAIR ONLY AS REQUIRED ENGINE PULLEY WEAR
SERVICE REPLACES: Please discard MC 06-07 dated June 27, 2006 MODEL: 2004-2005 VULCAN 2000 (VN2000-A1/L-A2/L) MC 06-07 Date: July 28, 2006 First Issued: June 27, 2006 Page 1 f 7 TITLE: ENGINE PULLEY WEAR
More informationPLANNING MEETINGS CHEFS, AWGIC AND HOST SOCIETY
Planning Meetings PLANNING MEETINGS CHEFS, AWGIC AND HOST SOCIETY The Arctic Winter Games Internatinal Cmmittee (AWGIC) establishes a series f planning meetings with each Hst Sciety and Chefs de Missin
More informationREQUEST FOR PROPOSAL MUNICIPAL ENGINEERING SERVICES
REQUEST FOR PROPOSAL MUNICIPAL ENGINEERING SERVICES The Twn f Sundre is requesting prpsals frm qualified engineering firms fr civil engineering services. This will invlve prviding advice and recmmendatins
More informationSafe Handling of High Voltage Electrical components in Electrical End of Life Vehicles
Safe Handling f High Vltage Electrical cmpnents in Electrical End f Life Vehicles The fllwing infrmatin is extracted frm the dcument Safe Handling f High Vltage Electrical cmpnents in Electrical End f
More informationCITY OF ELK GROVE SPEED CONTROL PROGRAM GUIDELINES
CITY OF ELK GROVE SPEED CONTROL PROGRAM GUIDELINES Revised July 11, 2018 Prepared by: City f Elk Grve Public Wrks Department 1. INTRODUCTION BACKGROUND In 2002, the Public Wrks Department develped the
More informationNIEVS PROJECT. First Registration Support Document Version 1.0
NIEVS PROJECT First Registratin Supprt Dcument Versin 1.0 CONTENTS CONTENTS... 2 INTRODUCTION... 3 SCOPE OF DOCUMENT... 3 FIRST REGISTRATION MIGRATION ACTIVITIES... 4 AFRL... 4 V55 MIGRATION... 4 SOM...
More information21 Econo Place, Silverdale, NSW 2752 P F SPAN TABLES
21 Ecn Place, Silverdale, NS 2752 P 1300 132 787 F 02 4774 2679 www.quickbuiltsystems.cm.au SPAN TABLES ROSS Engineers have prepared these tables fr use by peple skilled in the design and specificatin
More informationSummary of Regulations for Commercial Driver s Licenses from the Federal Motor Carrier Safety Administration (Excerpts 2010)
Summary f Regulatins fr Cmmercial Driver s Licenses frm the Federal Mtr Carrier Safety Administratin (Excerpts 2010) Classes f License: The Federal standard requires States t issue a CDL t drivers accrding
More informationABTQ-103 rev 01 Last review:
INSTALLATION, OPERATION & MAINTENANCE INSTRUCTIONS FOR ABTECH PCS Cntrl Statin Purpse f Instructins Wrking in hazardus areas, the safety f persnnel and plant depends n cmplying with all relevant safety
More informationEffective Date: 10-January Table of Contents
Versin: 3 Page: 1 f 7 Table f Cntents 1.0 Intrductin... 2 1.1 Purpse... 2 1.2 Scpe... 2 1.3 Definitins... 2 1.4 Training Requirements... 3 2.0 General Requirements... 3 3.0 Inspectin... 3 4.0 Testing...
More informationBC7 BATTERY CABINET INSTALLATION / OPERATION / MAINTENANCE
BC7 BATTERY CABINET INSTALLATION / OPERATION / MAINTENANCE 1. INTRODUCTION... 3 2. PRECAUTIONS... 3 3. INSPECTION UPON RECEIPT OF GOODS... 4 3.1 GENERAL... 4 3.2 VISIBLE DAMAGE... 4 3.3 CONCEALED DAMAGE...
More informationFUELS SAFETY BRANCH INFORMATION BULLETIN July 1994
FUELS SAFETY BRANCH INFORMATION BULLETIN July 1994 Guidelines fr Maintenance and Inspectin Prgrams fr Natural Gas and Prpane Appliances and their Fuel Features In Schls The Ontari Gas Utilizatin Cde states
More informationCERTIFICATE OF APPROVAL No CF 119 DORMA UK LTD
CERTIFICATE OF APPROVAL N CF 119 1 This is t certify that, in accrdance with TS00 General Requirements fr Certificatin f Fire Prtectin Prducts The undermentined prducts f Wilbury Way, Hitchin, Hertfrdshire
More informationUnderground Storage Tank Management Practices
Prgram #: Envirnmental Management Prgram Revisin # 1.0 Implementatin Date 1/30/08 Page #: 1 f 13 Authr: Envirnmental Prgrams Apprval: W. Brewer Undergrund Strage Tank Management Practices 1.0 Purpse /
More information3000-series Remote Start System with Keyless Entry. Owner's Guide
3000-series Remte Start System with Keyless Entry Owner's Guide Cngratulatins Cngratulatins n the purchase f yur state-f-the-art remte start system with keyless entry. Reading this Owner s Guide prir
More informationCAUTION: Do not install damaged parts!!!
Yur satisfactin is imprtant t us, please let us help! If yu have any questins r cncerns during the installatin, ur supprt representatives are available t assist yu. Please call: 1-877-769-3765 r Live Chat
More informationROOF INSPECTION GUIDE
INSURANCE INSTITUTE FOR BUSINESS & HOME SAFETY ROOF INSPECTION GUIDE COMMERCIAL ROOF-MOUNTED BALLASTED PHOTOVOLTAIC (PV) WIND PROTECTION ON LOW-SLOPED ROOFS Use the fllwing guidance t cnduct baseline and
More informationPRE-PLANNING & DELIVERY GUIDE
TM PRE-PLANNING & DELIVERY GUIDE Need Assistance? Call 1-888-329-4847 PRE-DELIVERY Spa Delivery Preparatin Yur spa delivery will arrive CURBSIDE at the specified delivery address yu prvided at the time
More informationFranchised Hauler Exemption for Recycling Application
Franchised Hauler Exemptin fr Recycling Applicatin City f Ann Arbr Franchised Hauler Exemptin fr Recycling Applicatin Exemptins frm cmmercial trash services prvided by the city-selected franchised hauler
More informationCASTLE ROCK BUSINESS AND DEVELOPMENT INCENTIVE PROGRAM
CASTLE ROCK BUSINESS AND DEVELOPMENT INCENTIVE PROGRAM PROGRAM OVERVIEW Ecnmic Vitality is a critical factr in ensuring Castle Rck s lng-term success and in achieving its Visin f being a Self-Sufficient
More informationGearbox Installation Manual
Gearbx Installatin Manual Rtrk Gears HOB/MPR & HOS/MPR ranges (Electrnic cpy available n www.rtrk.cm)! This manual cntains imprtant safety infrmatin. Please ensure it is thrughly read and understd befre
More informationTemporary Use and Vendor Stand Online Permit Submittal
Temprary Use and Vendr Stand Online Permit Submittal A Temprary Use Permit is an pen-air small business that is there fr a limited time fr the uses listed belw. Temprary Use Duratin Extensin Agricultural
More informationHub/Remote Operations in version 3.0
Hub/Remte Operatins in versin 3.0 In StckTrac Enterprise 3.0, the Hub and Remte perate quite a bit differently than they did in 2.0. In 2.0, the shps stred their business fr the day int daily files which
More informationDirector P. O. Box 1904 Service Engineering Operations Dearborn, Michigan Ford Customer Service Division
David J. Jhnsn Frd Mtr Cmpany Directr P. O. Bx 1904 Service Engineering Operatins Dearbrn, Michigan 48121 Frd Custmer Service Divisin TO: All U.S. Frd and Lincln Dealers SUBJECT: Certain 2005-2006 Frd
More informationSafety Management System. Initial Revision Date: Version Revision No. 02 DRIVING SAFETY
Dc N: DRIVING Issue Date JAN 1995 Revisin Versin Revisin N. 02 Next Revisin Preparatin: Safety Mgr Authrity: President Issuing Dept: Safety Page: Page 1 f 5 Purpse This prgram is written t be in cmpliance
More informationAPPLICATION FOR SPECIAL EVENT PERMIT EVENT BASICS
Date Applicatin Received: Permit Number: APPLICATION FOR SPECIAL EVENT PERMIT Please return cmpleted applicatin frm with permit fee and paperwrk t: Events Crdinatr, Twn f Beaufrt 701 Frnt Street P.O. Bx
More informationWayne County Community College District
Wayne Cunty Cmmunity Cllege District AUT 200 Engine Perfrmance III CREDIT HOURS: 3.00 CONTACT HOURS: 60.00 COURSE DESCRIPTION: This intermediate curse is designed t help the student diagnse and repair
More informationTRUCK AND TRANSPORT MECHANIC STATUTORY DECLARATION OF WORK EXPERIENCE
T qualify t challenge certificatin in this trade r be granted authrity t supervise and sign-ff n apprentices in this trade, individuals must have: wrked a minimum f 9,540 hurs perfrming the tasks listed
More informationOWNER S MANUAL. DCR-205-XX-DC Powered Drum Rotators
VESTIL MANUFACTURING CORP. 2999 N. Wayne St., Angla, IN 46703 Ph: 260-665-7586 Fax: 260-665-1339 E-mail: sales@vestil.cm Website: www.vestil.cm 0317 DCR-205-DC, MANUAL DCR-205-XX-DC Pwered Drum Rtatrs
More informationFOOD TRUCK VENDOR INSTRUCTIONS
FOOD TRUCK VENDOR INSTRUCTIONS City f Clumbia 208 S. Rapp Ave. Clumbia, IL 62236 618.281-7144 x 134 Please allw tw weeks fr prcessing. The fllwing dcuments must be submitted with this applicatin: - Cmpleted
More informationPARKING POLICY JULY 2012
1. DEFINITIONS DRAFT POLICY RELATING TO PARKING Designated parking area: means basement parking bays, pen parking bays and ther parking bays at the Mangaung Metrplitan Municipality s premises. Lading Zne:
More informationBuilding an ADDITION to an existing residence
Building an ADDITION t an existing residence Obtaining a permit fr yur cnstructin is a prcess that invlves review and apprval by multiple agencies. Brward Cunty Develpment and Envirnmental Regulatin Divisin,
More informationPRAIRIE 360 4X4 (KVF360-A/C), PRAIRIE 360 2X4 (KVF360-B), PRAIRIE 650 4X4 (KVF650-A/B), PRAIRIE 700 4X4 (KVF700-A/B/D),
SERVICE REPLACES: Please discard ATV 07-02 dated 4/5/07 MODEL: PRAIRIE 360 4X4 (KVF360-A/C), PRAIRIE 360 2X4 (KVF360-B), PRAIRIE 650 4X4 (KVF650-A/B), PRAIRIE 700 4X4 (KVF700-A/B/D), KFX700 (KSV700-A/B/C),
More informationStatement of Work (SOW) inemi Board Assembly TIG PCB Warpage Characterization and Minimization Project
Statement f Wrk (SOW) inemi Bard Assembly TIG PCB Warpage Characterizatin and Minimizatin Prject Versin # 3.1 Date: June 5, 2017 Prject Leader: Srinivasa Aravamudhan (Intel) inemi Staff: Haley Fu Backgrund/Prblem
More informationPre-Planning Delivery Guide
Pre-Planning Delivery Guide Need Assistance? Call 1-888-768-6772 Pre-Delivery Spa Delivery Preparatin Yur spa delivery will arrive CURBSIDE at the specified delivery address yu prvided at the time f yur
More informationTrack Lateral Stability
Discipline: Engineering (Track & Civil) Categry: Cde f Practice Track Lateral Stability Sectin 6 Applicability ARTC Netwrk Wide Primary Surce Dcument Status Versin Date Reviewed Prepared by Reviewed by
More informationHow to Sweat (Solder) Copper Pipe By See Jane DrillTM Copyright 2013, All Rights Reserved
Hw t Sweat (Slder) Cpper Pipe By See Jane DrillTM Cpyright 2013, All Rights Reserved Objective T learn hw t attach pieces f cpper pipe by sweating r sldering the metal tgether. This is a helpful skill
More informationLED Driver Feedback Signs
LED Driver Feedback Signs Installatin Instructins (029-04151-0000) Nvember 2012 Slar Kit 35AH / 55W 70AH / 55W 70AH / 85W M75-SOLAR-000S M75-SLR70-000S M75-SOLAR-000C E. 5676 Seltice Way Pst Falls, Idah
More informationRICHARD L. OREAIR & CO. Safety Management System
SAFETY Dc N: Revisin Date: Revisin N. 2 Initial Versin Preparatin: Safety Mgr Authrity: President Issuing Dept: Safety Page: Page 1 f 5 Purpse This prgram is written t be in cmpliance with lcal regulatry
More informationSolvent Filter. What is a Solvent Trap, Solvent Recycler or Solvent Filter? Why use a solvent filter? Why is the HIT Solvent Filter better?
Slvent Filter What is a Slvent Trap, Slvent Recycler r Slvent Filter? It is a device attached t the end f a threaded barrel that cllects all f the slvent and debris as it is cleaned frm the barrel and
More informationOPERATIONS. GSE Maintenance Manual
OPERATIONS GSE Maintenance Manual Originally Published May 2010 PAGE: 2 (GMM) Master Table f Cntents 0. Intrductin 0.1 Master Table f Cntents 0.2 Recrd f Revisin 0.3 Revisin Plicy 0.3.1 Distributin f Revisins
More informationSANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST UNDERGROUND STORAGE TANK INSTALLATION PLAN REVIEW CHECKLIST
July 1, 2010 SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST UNDERGROUND STORAGE TANK INSTALLATION PLAN REVIEW CHECKLIST Address: Permit #: Inspectr: Date: Status: Inspectr: Date:
More informationTraffic Logix SafePace 400 Radar Speed Sign Product Specifications Version 1.2
Traffic Lgix SafePace 400 Radar Speed Sign Prduct Specificatins Versin 1.2 Traffic Lgix Crp. I 3 Harriet Lane I Spring Valley, New Yrk 10977 T (866) 915-6449 F (866)995-6449 I www.trafficlgix.cm I inf@trafficlgix.cm
More informationHighfields Independent School and Day Nursery Mini Bus Policy
Highfields Independent Schl and Day Nursery Mini Bus Plicy Last Reviewed: Nv 2015 Apprved n: Cmmittee Respnsible: Pupil and Persnnel Next Review: Nv 2017 Apprved by: Full Gvs Highfields Schl is cmmitted
More informationPUBLIC ARTWORK LOAN AGREEMENT. THIS AGREEMENT is made and entered into on Town of Moraga ( Town ), a municipal corporation, and ( Artist/Donor ).
PUBLIC ARTWORK LOAN AGREEMENT THIS AGREEMENT is made and entered int n between the Twn f Mraga ( Twn ), a municipal crpratin, and ( Artist/Dnr ). RECITALS WHEREAS, pursuant t Reslutin 91-2015, the Twn
More informationProposed Changes to Ontario s Building Code Summer and Fall 2017 Consultation: Electric Vehicle Charging in Multi-Unit Residential Buildings
Prpsed Changes t Ontari s Building Cde Summer and Fall 2017 Cnsultatin: Electric Vehicle Charging in Multi-Unit Residential Buildings Purpse T prvide infrmatin n prpsed changes t the Building Cde regarding
More informationMobile Delineator Safe Work Practice Template with Application for Approval
Mbile Delineatr Safe Wrk Practice Template with Applicatin fr Apprval [Insert yur cmpany name and graphic, if desired. Expand space as required] [Insert yur cmpany dcument reference number, if desired.
More informationGLOBAL LIFT CORP. Owner s Manual. Superior Series Proformance Series S-350 / P-375
GLOBAL LIFT CORP Owner s Manual Superir Series Prfrmance Series S-350 / P-375 684 N Prt Crescent Rd Suite C Bad Axe, MI 48413 Tll Free: 866-712-0606 Fax: 989-269-5902 www.glballiftcrp.cm Page 1 SUPERIOR
More informationJohn Murphy, Chair. Steffan Defeo. Patricia Delaney. Eric Ladensack. Amy Scharf. Anne Wilson
Jhn Murphy, Chair Steffan Defe Patricia Delaney Eric Ladensack Amy Scharf Anne Wilsn Adpted by the Selectbard and Twn Treasurer 2016 Twn f Duxbury ACCOUNTING, AUDITING AND FINANCIAL REPORTING Prcedures
More informationC.O.I.S. Technical Data Sheet CAD Operation Installation Specification
Literature C.O.I.S. TD CSI 3 part 200 series dcuments 400 series dcuments 600 series dcuments C.O.I.S. Technical Data Sheet CAD Operatin Installatin Specificatin Dcument #409 Issued 08-2007 MODEL 100SS-R
More informationGLOBAL LIFT CORP Owner s Manual
GLOBAL LIFT CORP Owner s Manual 39 N. Caseville Rad PO Bx 559 Pigen, MI 48755 Tll Free: 866-712-0606 Fax: 989-453-3050 www.glballiftcrp.cm Page 1 COMMERCIAL SERIES POOL LIFTS C-350 ~ C-450 ~ C-550 TABLE
More informationEnergyBar 6. Setup Guide
EnergyBar 6 Setup Guide WELCOME Cngratulatins n yur purchase f the Apex EnergyBar 6! The EnergyBar 6 allws the Apex system t cntrl up t six 230 vlt items such as lights, pumps, fans, heaters, chillers
More informationCS ENERGY PROCEDURE FOR LADDERS CS-OHS-52. Key Changes Prepared By Checked By Approved By Date
CS ENERGY PROCEDURE FOR LADDERS CS-OHS-52 Respnsible Officer: Respnsible Executive: Grup Manager Health and Safety Executive General Manager Crprate DOCUMENT HISTORY Key Changes Prepared By Checked By
More informationGenesys Certification Study Guide
Genesys Certificatin Study Guide Genesys Certified Prfessinal 8 System Cnsultant, iwd Slutin (GCP8 - CiWD) Exam Cde Type f Exam Number f Items GCP8-CiWD (Prmetric cde: GE0_809) Written, multiple-chice
More informationTraffic Logix SafePace 475 Radar Speed Signs Product Specifications Version 1.2
Traffic Lgix SafePace 475 Radar Speed Signs Prduct Specificatins Versin 1.2 1 Table f Cntents Dimensins... 3 Sign Weight... 3 Accessries... 3 Technical Specificatins... 4 Pwer... 4 Radar... 4 Display...
More information6.2 An occasion for street acceptance shall only exist if the Board of Selectmen determines there is a public need.
Altn Highway Plicies and Regulatins Sectin 6. STREET ACCEPTANCE PROCEDURES 6.1 Any persn may petitin the Selectmen t accept a street under this Sectin, prvided the street is an existing radway which crrespnds
More informationACCESSORY DWELLING UNITS (ADU)
ACCESSORY DWELLING UNITS (ADU) San Francisc Public Wrks: Bureau f Street Use & Mapping Bureau f Urban Frestry Overview San Francisc Public Wrks Cde (SFPW) gverns permit requirements fr wrk in the public
More informationYou have a Chiller, Now What?
Yu have a Chiller, Nw What? Raschell Hickmtt Reginal Sales Manger Dimplex Thermal Slutins Klant Klers Brand Chillers Agenda This presentatin is develped t be a very brief and generic intrductin t anyne
More informationTraffic Logix SafePace 475 Radar Speed Signs Product Specifications Version 1.0
Traffic Lgix SafePace 475 Radar Speed Signs Prduct Specificatins Versin 1.0 1 Table f Cntents Dimensins... 3 Sign Weight... 3 Accessries... 3 Technical Specificatins... 4 Pwer... 4 Radar... 4 Display...
More informationInstallation Guide Contigo 6100
Installatin Guide Cmmercial Vehicle Prductivity and Security The is a high-perfrmance beacn designed fr cmmercial prductivity and security. It is ideally suited t installatins in delivery and service fleets
More informationGLOBAL LIFT CORP. Owner s Manual. Rotational Series R-375
GLOBAL LIFT CORP Owner s Manual Rtatinal Series R-375 684 N Prt Crescent Rd Suite C Bad Axe, MI 48413 Tll Free: 866-712-0606 Fax: 989-269-5902 www.glballiftcrp.cm Page 1 ROTATIONAL SERIES POOL LIFTS R-375
More informationBuilding a new single-family residence (SFR)
Building a new single-family residence (SFR) Obtaining a permit fr yur cnstructin is a prcess that invlves review and apprval by multiple agencies. Brward Cunty Develpment and Envirnmental Regulatin Divisin,
More informationLake Sands District Pinewood Derby Saturday, March 21 st, 2009 Bay Senior High School Gym (Just west of Tommy Oliver Stadium)
Bay Senir High Schl Gym Derby Car Specificatins Cub Scuts and Siblings under 11 years ld AND the Cubmaster Challenge Length, Width and Clearance: Width Maximum verall width, including wheels and axels,
More informationArchitectural Review Board Sign Review Application 139 S. Kirkwood Rd. Kirkwood, MO (314) Fax (314)
Architectural Review Bard Sign Review Applicatin 139 S. Kirkwd Rd. Kirkwd, MO 63122 (314) 822-5816 Fax (314) 822-5898 Prperty Address: Case # Persn Requesting Review Applicatin Date: Name: Address: City/State/Zip:
More informationWebinar: Ontario s 2012 Building Code: Electric Vehicle Charging. Presented by the Ministry of Municipal Affairs
Webinar: Ontari s 2012 Building Cde: Electric Vehicle Charging Presented by the Ministry f Municipal Affairs Ntice This presentatin is intended fr general infrmatin purpses related t electric vehicle charging
More informationGuidelines on Occasional Outside Professional Activities by Health Sciences Compensation Plan Participants; November 23, 1999.
SAN DIEGO: AUDIT & MANAGEMENT ADVISORY SERVICES 0919 June 13, 2011 RON ESPIRITU Assistant Vice Chancellr f Administratin UCSD Schl f Medicine 0602 Subject: Health Sciences Cmpensatin Plan Management Academic
More informationPSS INSTALLATION INSTRUCTIONS
PSS INSTALLATION INSTRUCTIONS Imprtant - Read Befre Starting! Befre starting yur installatin carefully read the fllwing warnings and instructins. Failure t prperly fllw the warnings and instructins culd
More informationPARKING ENFORCEMENT ON PRIVATE PROPERTY BY AUTHORIZED CITY BY-LAW ENFORCEMENT OFFICERS
ENFCEMENT ON PRIVATE PROPERTY BY AUTHIZED CITY BY-LAW ENFCEMENT OFFICERS T: Supervisr f Parking Services, City f Brantfrd: I, Of Name (print) Municipal Address (print) Brantfrd, ON Psitin (print) Type
More informationREAD ALL INSTRUCTIONS THOROUGHLY FROM START TO FINISH BEFORE BEGINNING INSTALLATION!
www.fabtechmtrsprts.cm 4331 EUCALYPTUS AVE ~~ CHINO, CA 91710 PHONE 909-597-7800 ** FAX 909-597-7185 1994-2001 DODGE RAM 1500 & 2500 4 WHEEL DRIVE FTS3400-50 FRONT DUAL SHOCK SYSTEM PARTS LIST: 1 EA. FT3400-50-100P
More informationArchitectural Review Board Sign Review Application 139 S. Kirkwood Rd. Kirkwood, MO (314) Fax (314)
Architectural Review Bard Sign Review Applicatin 139 S. Kirkwd Rd. Kirkwd, MO 63122 (314) 822-5816 Fax (314) 822-5898 Prperty Address: Case # Permit# _ Persn Requesting Review Applicatin Date: Name: Address:
More informationInstallation Guide Contigo 6150 & 6151
Installatin Guide Cntig 6150 & 6151 Cmmercial Vehicle Prductivity and Security The Cntig 6150 & 6151* (cllectively knwn as the Cntig 615X) are highperfrmance beacns designed fr cmmercial prductivity and
More informationTAFE Digital Application Form for Certificate III UEE30811 Electrotechnology Electrician
ELECTROTECHNOLOGY - CERT III ELECTRICIAN Natinal cde: UEE30811 Training package: UEE11 TAFE Digital Applicatin Frm fr Certificate III UEE30811 Electrtechnlgy Electrician OFFICE USE ONLY Date received:
More informationASA Sponsored ACI Shotcrete Nozzleman Certification Policy for Hosts and Participants
1- Intrductin ASA Spnsred ACI Shtcrete Nzzleman Certificatin Plicy fr Hsts and Participants This dcument describes the respnsibilities f and relatinship between ASA, ACI, the Hst, the Educatin/certificatin
More informationPrinter/Copier Request for Proposals
The First Unitarian Church f Hamiltn Printer/Cpier RFP Cntents Printer/Cpier Request fr Prpsals Intrductin... 2 Type f Prpsal... 2 Managed Printing Cntract... 2 Equipment Lease, Maintenance Cntract Cmbinatin...
More informationE+ Battery Care Guide
Electric Mtin Systems, LLC 45150 Business Curt, Suite 300 Dulles, VA 20166 USA E+ Battery Care Guide Welcme! Yur E+ Hub Battery Pack is a pwerful, sphisticated, and imprtant part f yur E+ Electric Bicycle.
More informationDriveCam Unit Installation Instructions
DriveCam Unit Installatin Instructins Installatin f the DriveCam Unit is nt cmplicated, thugh care must be taken t avid specific prblems. Sme vehicles require additinal cnsideratin t determine the ptimum
More informationAdvanced 3 Million Wireless USB Limousine Underbody Kit
Advanced 3 Millin Wireless USB Limusine Underbdy Kit Warning: Please check yur state and lcal laws befre installing this LED underbdy kit. Every state has different plicies and prcedures in place regarding
More informationTraffic Logix SafePace 450 (Full & Compact) Radar Speed Signs Product Specifications Version 1.6
Traffic Lgix SafePace 450 (Full & Cmpact) Radar Speed Signs Prduct Specificatins Versin 1.6 2014-2016 Traffic Lgix Crpratin www.tapcnet.cm 5100 West Brwn Deer Rad Brwn Deer, WI 53223 1 Table f Cntents
More informationRETAIL PROGRAMS FOR YANMAR TRACTORS DECEMBER 2015
RETAIL PROGRAMS FOR YANMAR TRACTORS DECEMBER 2015 WWW.YANMARTRACTOR.COM DATE: TO: SUBJECT: PROGRAM #: PROGRAM PERIOD: PRODUCTS: DECEMBER 1, 2015 ALL U.S. YANMAR TRACTOR DEALERS US-TD0115 DECEMBER 1, 2015
More informationRejuvenation Instructions
Rejuvenatin Instructins #521 200A Elbws UPR This NRI cvers the fllwing: Hw t prepare 200amp pre-mlded elbws fr injectin. Hw t install and re-infrce an injectin elbw. Hw t size an injectin elbw t match
More informationSOMSAS Student User Manual Overseas Short Term Programs
SOMSAS Student User Manual Overseas Shrt Term Prgrams Table f cntents WHAT IS SOMSAS? 2 CREATE A NEW APPLICATION 2 Shrt Term Prgram 3 ADD SUBJECTS TO YOUR APPLICATION 3 Hst Institutin Details 4 Partner
More informationTECHNICAL STANDARD ORDERS (TSO) CERTIFICATION CONSIDERATION IN CHINA FOR INTEGRATED MODULAR AVIONICS (IMA) HARDWARE ELEMENTS
TECHNICAL STANDARD ORDERS (TSO) CERTIFICATION CONSIDERATION IN CHINA FOR INTEGRATED MODULAR AVIONICS (IMA) HARDWARE ELEMENTS Presented By: Frank(Fei) Xia, AVIAGE SYSTEMS Date: April 21, 2016 ABOUT AVIAGE
More informationHD 22/08: Managing Geotechnical Risk Implementation Guidance Wales
HD 22/08: Managing Getechnical Risk Implementatin Guidance Wales DMRB 4.1.2 December 2009 1 Intrductin 1.1 Why Getechnical Certificatin? Grund-related prblems can adversely affect prject cst, cmpletin
More informationUpdate on Emerging Technologies of the RfG
An Cimisiún um Rialáil Fóntas Cmmissin fr Regulatin f Utilities Update n Emerging Technlgies f the RfG Reprting Perid May July 2018 Infrmatin Paper Reference: CRU18223 Date Published: 1/10/2018 Clsing
More informationADDENDUM NO. 1 REQUEST FOR PROPOSAL NO CLOSING DATE: September 14, 2012, 12:00 NOON (LOCAL TIME)
Michael Pachlk (Acting) Directr Purchasing & Materials Management Divisin City Hall 100 Queen Street West 18 th Flr, West Twer Trnt, Ontari M5H 2N2 Elena Carus, Manager Gds and Services August 28, 2012
More information