1 Nevada Department of Transportation SB 377 Quarterly Report January 1 to March 31, 2011 In the 2009 Legislative Session, Senate Bill 377 (SB 377) was passed into law. This allowed the Director of the Nevada Department of Transportation (NDOT) to solicit informal bids for projects with an estimated cost not in excess of $250,000. Per the quarterly reporting requirements contained in SB 377, this report provides the following information (refer to attached spreadsheet): (a) The name of the contractor to whom the contract was awarded (b) The amount of the contract awarded (c) brief description of the project (d) The names of all contractors from whom bids were solicited SUMMRY In the period of January 1, 2011 to March 31, 2011, NDOT executed fourteen contracts that were solicited for informal bids. For the contracts executed this quarter, fifty-seven different contractors were solicited. The number of contractors contacted on an individual solicitation varied from a minimum of three to a maximum of thirteen. These fourteen contracts have a total value of $1,760, The contracted amount of projects in District I (southern Nevada) ranged from $123, to $244, The scope of work on the projects included: Bridge deck seal on Tropicana venue bridge Repave on-ramp at I-515 and I-15 interchange The contracted amount of the project in District II (northwest Nevada) $147,960. The scope of work on the project included: ITS devices on I-80 at the Trinity Interchange The contracted amount of projects in District III (northeast Nevada) ranged from $91, to $245, The scope of work on the projects included: Guardrail repair on I-80 in Eureka County Remove and replace cattle guards in Elko County Right-of-way fencing in Elko County Construct sidewalk on SR 225, Mountain City Highway The contracted amount of projects by rchitecture Division ranged from $29, to $253, The scope of work on the projects included: Vehicle storage building reroofing at Eureka Maintenance Station Epoxy paint floors at the Carson City and Las Vegas lab buildings Residential reroofs of two residential buildings and shop building roof repair at the Orovada Maintenance Station Boiler replacement at the Goldfield and Big Smoky Maintenance Stations 1
2 Replacement of transfer switches at NDOT HQ in Carson City Installation of an emergency backup generator at the Ely Maintenance Station Installation of fuel storage tanks at the Tonopah Maintenance Station SPECIFIC INFORMTION ON THESE INFORML BIDS IS PROVIDED IN TBULR FORM BY (SEE TTCHED). THE NEXT QURTERLY REPORT WILL BE DUE FTER JUNE 30,
3 SB 377 INFORML BIDS (QUOTES </= $250,000) REPORT COVERING JNURY 1, MRCH 31, 2011 QUOTE EXECUTION DTE ROUTE COUNTY DESCRIPTION MOUNT OF WRD CONTRCTOR LL CONTRCTORS SOLICITED Rafael Construction I Q P /4/2011 SR 593 CL Tropicana bridge deck seal $244, Rafael Construction Williams Brothers, Inc. Sunflower Construction Company Industrial Support Technologies Las Vegas Paving Corporation ggregate Industries SWR, Inc. Rafael Construction Peek Construction I Q P /11/2011 I-515 CL Repave on-ramp at I-515 and I-15 interchange $123, Las Vegas Paving Corp. Harber Company TB Contractors MMC Inc. William Brothers, Inc. E & M Enterprises PR Electric Contractors, Inc. Titan Electric Contracting, Inc. TransCore ITS, LLC Silver Knolls Electric, Inc. Western Traffic Signal Maintenance, LLC II Q P /7/2011 I-80 CH Install 2 ITS poles with CCTV and flow detectors on State Route I-80 at the Trinity Interchange, Churchill County $147, PR Electric Contractors, Inc. Truckee Meadows Electric, Inc..M. Smith Electric, Inc. Merit Electric Company Lux Energies, Inc. Gust Electric Inc. Diverse Electrical Systems, LLC Commercial Solar Services Williams Brother, Inc. 1 May 2011
4 SB 377 INFORML BIDS (QUOTES </= $250,000) REPORT COVERING JNURY 1, MRCH 31, 2011 QUOTE DTE ROUTE COUNTY DESCRIPTION MOUNT OF WRD CONTRCTOR LL CONTRCTORS SOLICITED cha Construction, LLC Staker Parson Companies III Q Repair guardrail and replace guardrail blocks on P /4/2011 I-80 EU $245, cha Construction LLC I-80 in District III Highway Striping & Signs LLC Spanish Springs Construction Q & D Construction, Inc. Rudder Construction, Inc. Curtis & Sons Construction, Inc. ggregate Industries SWR, Inc. cha Construction, LLC ggregate Industries SWR, Inc. III Q P /4/2011 I-80 EL Remove and replace cattle guards at various locations in District III $199, cha Construction LLC Curtis & Sons Construction, Inc. KWIK Construction LLC Q & D Construction, Inc. Monarch Construction LLC Rudder Construction, Inc. Spanish Springs Construction Washburn Fencing, Inc. rtistic Fence Co. Inc. III Q P /4/2011 SR 228 EL Right-of-Way Fencing $121, Washburn Fencing, Inc. General Fence, Inc. Glacier Construction Inc. Lamoille Fencing cha Construction, LLC III Q P /25/2011 SR 225 EL Construct sidewalk on SR 225, Mountain City Highway $91, cha Construction LLC Monarch Construction LLC ll merican Concrete & Masonry Inc. guila Construction LLC 2 May 2011
5 SB 377 INFORML BIDS (QUOTES </= $250,000) REPORT COVERING JNURY 1, MRCH 31, 2011 QUOTE DTE ROUTE COUNTY DESCRIPTION MOUNT OF WRD CONTRCTOR LL CONTRCTORS SOLICITED R & R Q P /18/2011 US 50 EU Vehicle storage building reroof at the Eureka Maintenance Station $29, R & R 2k Construction White Pine Construction D & D Roofing and Sheet Metal, Inc. dvance Installation Q P /4/2011 CC, CL Epoxy paint floors at the Carson City and Las Vegas Lab Buildings $46, Farr Construction Corp. Farr Construction Corp. Great Basin Painting Fasani Painting Q P /6/2011 US 95 HU Residential reroofs of two residences and shop building roof repair at the Orovada Maintenance Station $34, Bison Construction Bison Construction D&D Roofing and Sheet Metal, Inc. 2k Construction Q P /18/2011 ES Boiler replacement at the Goldfield and Big Smoky Maintenance Stations $68, O'Flaherty Plumbing and Heating O'Flaherty Plumbing and Heating NDI Plumbing Sierra ir Q P /7/2011 CC Replacement of transfer switches at the NDOT HQ in Carson City $43, Deverse Electrical Systems LLC Diverse Electrical Systems LLC Silver Knolls Electric, Inc. Briggs Electric, Inc. Q P /26/2011 WP Installation of an emergency backup generator at the Ely NDOT Maintenance Station $109, Titan Electrical Contracting, Inc. Titan Electrical Contracting, Inc. Stetson Electric, Inc. Gust Electric Inc. Q P /9/2011 NY Installation of storage tanks at the Tonopah Maintenance Station in Nye County, NV $253, Bramco Construction Corp. Bramco Construction Corp. Granite Construction Co. Q & D Construction Inc. 3 May 2011
Vehicle Classification Distribution Report By Route
2017 Vehicle Classification Distribution Report By Route Compiled by Nevada Department of Transportation Traffic Information Division 1263 S. Stewart St. Carson City, NV 89712 Printed June 2017 4 PREFACE
More informationANNUAL VEHICLE MILES OF TRAVEL
NEVADA DEPARTMENT OF TRANSPORTATION AVMT AVMT AVMT AVMT AVMT AVMT AVMT ANNUAL VEHICLE MILES OF TRAVEL In Cooperation with U.S. Department of Transportation Federal Highway Administration, Nevada Division
More informationARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS
ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # 2016153 TRACS No. Project No. County District Gross
More informationWentzville Parkway South Phase 2 & 2A
Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total
More informationTABLE OF CONTENTS NEVADA STANDARD SIGNS MANUAL 2006
Regulatory RNV1-1 30 36 DUAL LEFT RNV1-1_30x36.sgn 1-1 RNV1-2 30 36 DUAL RIGHT RNV1-2_30x36.sgn 1-2 RNV1-3 30 36 DUAL LEFT/U-TURN RNV1-3_30x36.sgn 1-3 RNV2-1 36 30 T T RNV2-1_36x30.sgn 1-4 RNV2-2 36 30
More informationINDIANA DEPARTMENT OF TRANSPORTATION PAGE 1 NOTICE TO HIGHWAY CONTRACTORS
INDIANA DEPARTMENT OF TRANSPORTATION PAGE 1 NOTICE TO HIGHWAY CONTRACTORS DATE OF LETTING: March 04, 2015 TIME OF LETTING: 10:00 AM EASTERN STD DESIGN BUILD CONTRACTS Sealed proposals for certain highway
More informationRLY AGENDA REPORT. Meeting Date: January 22, 2018 Item Number: E 9 To: From:
RLY AGENDA REPORT Meeting Date: January 22, 208 Item Number: E 9 To: From: Honorable Mayor & City Council Chad Lynn, Assistant Director of Public Works Judi Tamasi, Senior Management Analyst Subject: AMENDMENT
More informationNAC Chapter 445B. LCB File No. T PROPOSED TEMPORARY REGULATION OF THE DEPARTMENT OF MOTOR VEHICLES
NAC Chapter 445B LCB File No. T021-06 PROPOSED TEMPORARY REGULATION OF THE DEPARTMENT OF MOTOR VEHICLES NOTICE OF PUBLIC WORKSHOP/HEARING FOR THE ADOPTION OF REGULATIONS FOR THE DEPARTMENT OF MOTOR VEHICLES
More information2018 Federal Priorities One Region One Voice
2018 Federal Priorities One Region One Voice Overview of the Regional Transportation Commission of Washoe County, Nevada The Region The RTC is a multi-purpose transportation agency that serves the Reno-Sparks
More informationTransWest Express Transmission AC and DC Project Interregional Transmission Project Submittal
TransWest Express Transmission AC and DC Project 2018 2019 Interregional Transmission Project Submittal Submittals to California Independent System Operator, WestConnect and Northern Tier Transmission
More informationDistrict-Wide Prop 39, Interior LED Lighting Upgrades Pre-Conference Meeting Re-Bid No January 9 at 10:00 AM Las Positas College
January 9 at 10:00 AM Las Positas College AGENDA I. Welcome & Introduction II. Project Overview III. Site, Constraints & Challenges IV. Bid Document Summary V. Bid Schedule II. Project Overview A. Project
More informationTransportation & Transit Activities
Transportation & Transit Activities IN THE TAHOE REGION Tahoe Basin AND SURROUNDING REGION Attractive to outdoor enthusiasts with over 85% of Basin land publicly owned, over 75% by the USFS The Basin is
More information./9 EALLQ.M... (FLLN NV XA42T) Complete 7D Complete 7D
American Tel & Tel Co long lines Traffic Dept TRAFFC ROUT NG GU DE SECTON 10 NEVADA 139th Revised Page 1 NPA SWTCHNG OFFCES WTH ASSOCA TED NFORMATON AND NTERTOll ROUTES TER~CODE NOS / T C EFFECTVE NPA
More informationPrepared for: SEAT BELT USE SURVEY OTS Grant Number 23-CP-4 UNLV Account Number DK. Final Report UNLV/TRC/PR/03-09.
Prepared for: Office of Traffic Safety Division of Traffic Safety Department of Motor Vehicles and Public Safety 55 Wright Way Carson City, NV 89711-0999 SEAT BELT USE SURVEY- 2003 OTS Grant Number 23-CP-4
More informationAPPROVE CONTRACT MODIFICATION AWARD
5 One Gateway Plaza Los Angeles, CA 9 012.2952 213.922.2000 Tel metro. net SYSTEM SAFETY AND OPERATIONS COMMITTEE SEPTEMBER 20, 2012 SUBJECT: ACTION: ENGINE REBUILD KITS APPROVE CONTRACT MODIFICATION AWARD
More informationSAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY
THIS PRINT COVERS CALENDAR ITEM NO. : 10.3 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Authorizing the Department of Public Works (DPW) to award DPW Contract
More informationNevada Truck Parking Implementation Plan Task 4: Draft Needs Assessment Truck Parking Supply
Nevada Truck Parking Implementation Plan Task 4: Draft Needs Assessment Truck Parking Supply prepared for Nevada Department of Transportation prepared by with American Transportation Research Institute
More informationAgenda. Utility Undergrounding Strategies & Laguna Canyon Road Master Plan
Utility Undergrounding Strategies & Laguna Canyon Road Master Plan January 17, 2017 City Council Meeting 2 Agenda Progress since March 2016 Status of undergrounding and road widening between El Toro Rd.
More informationReport Number: COD Resolution: GG
Corporate Services Report If this information is required in an alternate accessible format, please contact the Municipal Clerk at 905-623-3379 ext. 2102. Report To: General Government Committee Date of
More informationS T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/27/06 PAGE : 1 TABULATION OF BIDS
PAGE : 1 NUMBER OF DAYS: 63 BRIDGE COUNT : 9 CONTRACT DESCRIPTION : BITUMINOUS OVERLAY & BRIDGE APPROACH PANEL REPLACEMENT CONTRACT LOCATION: LOCATED ON TH 90 FROM 0.8 MILE WEST OF THE BLUE EARTH RIVER
More informationCONTRACT AWARD INFORMATION
COUNTY OF DUTCHESS DIVISION OF CENTRAL SERVICES Contract Administration CONTRACT AWARD INFORMATION Title: Bid No: Contract Period: Authorized Users: Guide Rail & Accessories, Drain Grates and Sign, Delineator
More informationRequest for Statements of Qualification Gardnerville Station (Eagle Gas Station Redevelopment Project) 1395 Highway 395 N Gardnerville, NV
Gardnerville Station (Eagle Gas Station Redevelopment Project) 1395 Highway 395 N Gardnerville, NV Issued: Monday, Site Tour: Friday, January 30, 2015 at 10:00 a.m. Submittal Deadline: 5:00 p.m. on Friday,
More informationCapital Project Tracking Report
BTC Annex IT Services: Installation Firm: DataPlus Communications Funding: $167,170 Start: March 2018 End: May 2018 NTP & Preconstruction Meeting. Bus Shelter Pad & Installation Phase 6 TBD Start: TBD
More informationMetro Highway Program
Metro Highway Program ACEC November 2018 I-5 North HOV and Truck Lanes 14 miles of HOV lanes in both directions 2 miles of truck climbing lanes at the south end 7 bridge modifications at: Gavin Canyon
More informationARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS
ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # 2017021 TRACS No. Project No. County District Gross
More informationSTREET LIGHTING AND ELECTRICAL SYSTEM UNDERGROUNDING
CIP_215 Title Pages 216:Layout 1 6/22/15 1:48 PM Page 19 STREET LIGHTING AND ELECTRICAL SYSTEM UNDERGROUNDING Rain or Shine WORK By Kent Pulver FY 216-22 Capital Improvement Program Description FY 215
More informationWORKERS' COMPENSATION AND EMPLOYERS LIABILITY TENNESSEE NCCI CONTRACTING INDUSTRY GROUP As of March 1, 2013.
WORKERS' COMPENSATION AND EMPLOYERS LIABILITY TENNESSEE NCCI CONTRACTING INDUSTRY GROUP 50-6-113 As of March 1, 2013 Class Code Sort CODE DESCRIPTION 0042 LANDSCAPE GARDENING & DRIVERS 0050 FARM MACHINERY
More informationResidential and Municipal Solid Waste Collections Contract. January 15, 2019
Residential and Municipal Solid Waste Collections Contract January 15, 2019 1 Overview Background and history RFP Process and Results Automated and Manual Collections CalRecycle Compliance Recommendation
More informationUNLV Animal Care Facility. University of Nevada Las Vegas CAM 1513/PC ADDENDUM B August 19, 2016
UNLV Animal Care Facility University of Nevada Las Vegas ADDENDUM B August 19, 2016 Owner: Architect: To: University of Nevada Las Vegas 4505 S. Maryland Parkway Las Vegas, Nevada 89154 Tate Snyder Kimsey
More informationPresentation to the Senate Committee on Transportation. April 7, Carson City, NV
Presentation to the Senate Committee on Transportation April 7, 2015 Carson City, NV A Robust Market with a True Need On average, 38 million people visited Las Vegas annually between 2005 and 2013. Over
More informationRolling Road (Route 638) Widening Project
Rolling Road (Route 638) Widening Project From: 0.369 Mile North of Fairfax County Parkway (Route 286) To: Old Keene Mill Road (Route 644) State Project No. 0638-029-156, P104, R204, C504; UPC 5559 Public
More informationExisting Facilities. 9. Bordeaux 10. Slater 11. Chugwater 12. LaGrange 13. Lambert 14. Farthing 15. Altus 16. Horse Creek 17.
High Plains ECONOMIC DEVELOPMENT D i s t r i c t Rail Transportation Southeast Wyoming Southeast Wyoming is served by both the Burlington Northern Santa Fe Railroad (BNSF) and the Union Pacific Railroad
More informationCITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE
CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE TUESDAY, DECEMBER 5, 2017 1 DISCUSSION TOPICS Update of Infrastructure Action Plan (IAP) o Sidewalk and Roadway projects
More information*019 WADSWORTH-FERNLEY 46 EAST FERNLEY 48 STOREY CHURCHILL DOUGLAS MINERAL. Fernley. Silver Springs LAHONTAN RESERVOIR SEE ENLARGEMENT
*019 Fernley SEE ENLARGEMENT STOREY Silver Springs LAHONTAN RESERVOIR CHURCHILL Silver City Dayton L Y O N Wabuska 118 DOUGLAS Weed Heights Mason YERINGTON SEE ENLARGEMENT 339 823 Wellington 824 Smith
More informationSTOREY CARSON CITY DOUGLAS NEVADA MILES KILOMETERS NEVADA DEPARTMENT OF TRANSPORTATION LOCATION DIVISION CARTOGRAPHY (775)
H U M B O L D T E L K O W A S H O E P E R S H I N G L A N D E R E U R E K A STOREY C H U R C H I L L W H I T E P I N E CARSON CITY L Y O N DOUGLAS M I N E R A L N Y E E S M E R A L D A L I N C O L N NEVADA
More informationManaged Electric Vehicle Charging: New Opportunities for Demand Response.
Managed Electric Vehicle Charging: New Opportunities for Demand Response www.peakload.org Utilities & Electric Vehicles The Case for Managed Charging November 15, 2017 Erika H. Myers Director of Research
More informationMobility Corridor Updates. Transit & Active Transportation Projects
Mobility Corridor Updates Transit & Active Transportation Projects Manjeet Ranu, SEO East San Fernando Valley Transit Corridor Metro Board LPA selection: June 2018 Recently awarded $200 million in Senate
More informationADDENDUM NO. 3 BID NO TRANSIT VEHICLE ADVERTISING
600 S. Grand Central Parkway, Suite 350 Las Vegas, Nevada 89106-4512 702-676-1500 Fax: 702-676-1518 Tina Quigley, General Manager May 15, 2013 ADDENDUM NO. 3 BID NO. 13-053 TRANSIT VEHICLE ADVERTISING
More informationSOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015
SOUTHERN GATEWAY Transportation and Trinity River Project Committee 11 May 2015 Southern Gateway Project History Began in 2001 as a Major Investment Study [ MIS ], Schematic, and Environmental Assessment
More informationCITY OF SACRAMENTO CALIFORNIA. May 28, 2002
NEIGHBORHOOD SERVICES DEPARTMENT Max B. Fernandez Area 1 Director CITY OF SACRAMENTO CALIFORNIA May 28, 2002 1231 I Street, Suite 400 SACRAMENTO, CA 95814-2977 PH 916-264-7940 FAX 916-264-8937 Law and
More informationFlorida s Turnpike Enterprise High Tension Median Cable Barrier Pilot Project. William H. Cook, P.E. Florida s Turnpike Assistant Roadway Engineer
Florida s Turnpike Enterprise High Tension Median Cable Barrier Pilot Project William H. Cook, P.E. Florida s Turnpike Assistant Roadway Engineer Florida Turnpike Enterprise Miami (MP 0) to Wildwood (MP
More information35 One Gateway Plaza Los Angeles, CA
35 One Gateway Plaza Los Angeles, CA 90012-2952 2 13-9 2 2.2000 Tel metro. net SYSTEM SAFETY AND OPERATIONS COMMITTEE FEBRUARY 21, 2013 SUBJECT: ACTION: TURBOCHARGERS APPROVE CONTRACT AWARDS RECOMMENDATION
More informationRepresenting Nevada s Rural Electric Cooperatives, Power Districts, and Municipal Utilities.
Representing Nevada s Rural Electric Cooperatives, Power Districts, and Municipal Utilities. Prepared for the Governor s Committee on Energy Choice Workgroups Generation, Transmission & Delivery Energy
More informationWESTERN BLUE CHIP ECONOMIC FORECAST FOR JANUARY, 2017
WESTERN BLUE CHIP ECONOMIC FORECAST FOR JANUARY, 2017 2016 : ANNUAL PERCENTAGE CHANGE SUMMARY State Arizona 4.7 4.6 2.7 1.6 14.6 California 4.7 4.1 2.6 0.9 16.1 Colorado 4.6 4.0 2.6 1.7 10.8 Idaho 3.1
More informationODOT District Two Monthly Construction Update
Ohio Department of Transportation Construction Update DISTRICT 2 KIRK SLUSHER, P.E., ACTING DEPUTY DIRECTOR 317 East Poe Rd. Bowling Green, Ohio 43402-1330 www.transportation.ohio.gov/dist2 ODOT District
More informationODOT District Two Monthly Construction Update
Ohio Department of Transportation Construction Update DISTRICT 2 KIRK SLUSHER, P.E., ACTING DEPUTY DIRECTOR 317 East Poe Rd. Bowling Green, Ohio 43402-1330 www.transportation.ohio.gov/dist2 ODOT District
More informationDate: November 13, Board of Directors. Neil McFarlane
Date: November 13, 2013 To: From: Board of Directors Neil McFarlane Subject: RESOLUTION 13-11-69 OF THE TRI-COUNTY METROPOLITAN TRANSPORTATION DISTRICT OF OREGON (TRIMET) AUTHORIZING A CONTRACT WITH MANSFIELD
More informationCity Council Report. Mayor and City Council
City Council Report To: From: Mayor and City Council City Council Meeting: February 23, 2016 Agenda Item: 3.J Edward King, Director, Big Blue Bus, Transit Services Department Subject: Custodial and Maintenance
More informationSTOREY C A RSON DOUGLAS NEVADA MILES 50 KILOMETERS NEVADA DEPARTMENT OF TRANSPORTATION LOCATION DIVISION CARTOGRAPHY (775)
H U M B O L D T E L K O W A S H O E P E R S H I N G L A N D E R E U R E K A C H U R C H I L L OREY W H I T E P I N E L Y O N C A RSON C IT Y DOUGLAS M I N E R A L N Y E E S M E R A L D A L I N C O L N
More informationSWANTOWN MARINA MARINE FUELING FACILITY. Ed Galligan Executive Director
SWANTOWN MARINA MARINE FUELING FACILITY Ed Galligan Executive Director Agenda of Events Welcome & History Fueling Facility Design Overview Fuel Consumption Survey & Updated Financial Evaluations Facility
More informationCY 2013 and CY 2014 NOVA District Advertisement Schedule Design-Bid-Build
1 2013 Planned s System Route UPC Category Locality Project Description 395 98836 Bridge Arlington Clean/Re-Paint 7 Bridges I-395 Corridor Arlington/Alexandria 4/9/2013 $ 3.45 HOT Lanes Bicycle/Pedestrian
More informationSAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY
THIS PRINT COVERS CALENDAR ITEM NO. : 10.4 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Authorizing the Department of Public Works (DPW) to award DPW Contract
More informationOHIO Department of Transportation Project # Franklin County, OH. ISSA Presidents Award Submission Strawser Construction Inc.
OHIO Department of Transportation Project #140378 Franklin County, OH ISSA Presidents Award Submission Strawser Construction Inc. Columbus, Ohio Applicant Information Strawser Construction Inc. 1392 Dublin
More informationS.M. Wright Project (I-45, US 175, SH 310) and Road to Work Opportunity Program. Transportation and Trinity River Project Committee May 23, 2016
635 S.M. Wright Project (I-45, US 175, SH 310) and Road to Work Opportunity Program Transportation and Trinity River Project Committee May 23, 2016 Project Scope Increase safety by removing the existing
More informationSTREET LIGHTING AND ELECTRICAL SYSTEM UNDERGROUNDING. Underground Vault
CIP_215 Title Pages 217:Layout 1 8/16/16 4:2 PM Page 7 STREET LIGHTING AND ELECTRICAL SYSTEM UNDERGROUNDING Underground Vault A D O P T E D C A P I T A L I M P R O V E M E N T P R O G R A M B U D G E T
More informationAttending Meeting (has not voted) Advance Bylaw Ballot
Not Voted / Meeting (has 1 Arizona Public Service 1 1 Avista Corporation 1 1 Balancing Authority of Northern California 1 1 1 1 BC Hydro 1 1 Black Hills Corporation 1 1 Bonneville Power Administration
More informationCUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS TRAFFIC CONTROL STANDARDS
CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS TRAFFIC CONTROL STANDARDS Supplement to O.D.O.T. TRAFFIC ENGINEERING MANUAL November 26, 2013 Revisions to the June 22, 2011 edition are noted by a vertical line
More informationFINAL ROAD SAFETY AUDIT REPORT SR 592 (FLAMINGO ROAD) IN CLARK COUNTY FROM MP CL TO MP CL POST CONSTRUCTION PHASE RSA
FINAL ROAD SAFETY AUDIT REPORT SR 592 (FLAMINGO ROAD) IN CLARK COUNTY FROM MP CL 21.46 TO MP CL 31.378 POST CONSTRUCTION PHASE RSA 3R PRESERVATION PROJECT STAGE Prepared for: Nevada Department of Transportation
More informationSTATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. District(s): 8 30=047 Start Dt: 05/01/17 Comp. Dt:
Letting: 17030200 Letting Dt: March 02, 2017 9:30 A.M. State Proj.: 5101-14 Contract ID: Contract Description: Contract Location: Recommendation: 170020 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION
More informationPublic Works Department
Public Works Department SUBJECT: Consideration of Resolutions authorizing one-year contract extensions for snow/ice removal services during the 2015-2016 winter season with: 1. Tovar Snow Professionals
More informationImportance of ITS Preventive Maintenance and Transitioning to an Accelerated ITS design Approach for Illinois Tollway September 14th, 2018
Importance of ITS Preventive Maintenance and Transitioning to an Accelerated ITS design Approach for Illinois Tollway September 14th, 2018 Amarpal Matharu, PE, MBA Traffic Operation Manager, Illinois Tollway
More informationFLORIDA SHERIFFS ASSOCIATION & FLORIDA ASSOCIATION OF COUNTIES
FLORIDA SHERIFFS ASSOCIATION & FLORIDA ASSOCIATION OF COUNTIES Name of Dealership Type of Vehicle Zone 8'6 X 25' DECK OVER FLATBED TRAILER- 16,000 LB GVWR (Specification #60) Base Unit Price Texas Trailers
More informationSTATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt:
Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 4308-34 Contract ID: Contract Description: Contract Location: Recommendation: 170004 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION
More informationLicensed Class C Virginia Contractor No.
month period is seven hundred and fifty thousand dollars (750,000) or more, the Bidder is required under Title 54.11100, Code of Virginia (1950), as amended, to be licensed by the State Board of Contractors
More informationSTOREY CARSON CITY DOUGLAS NEVADA MILES KILOMETERS NEVADA DEPARTMENT OF TRANSPORTATION LOCATION DIVISION CARTOGRAPHY (775)
H U M B O L D T E L K O W A S H O E P E R S H I N G L A N D E R E U R E K A OREY C H U R C H I L L W H I T E P I N E CARSON CITY L Y O N DOUGLAS M I N E R A L N Y E E S M E R A L D A L I N C O L N NEVADA
More informationTotal $ 595,800 $ 1,409,700 $ 187,700 $ 180,000 $ 86,500 $ 907,100 $ 3,366,800
Capital Investments - General Fund 1% Sales Tax 2% Sales Tax Occupation Fees in Lieu and/or "2A" CI CE Tax or PEG Contributions Total 2015 Budget - Original H Street Re-build - Phase 2 $ 595,800 $ 184,200
More informationNew Franchise Agreement: Recyclables, Organics, and Waste. Town of Truckee Town Council Meeting July 25, 2017
New Franchise Agreement: Recyclables, Organics, and Waste Town of Truckee Town Council Meeting July 25, 2017 Agenda Overview of Process, Context Review Regulatory Drivers Review of Current Services Potential
More informationSKID RESISTANCE EVALUATION PROGRAM
SKID RESISTANCE EVALUATION PROGRAM P a u l O w e n s Director ISH C Research and Training Center West Lafayette, Indiana H IS T O R Y Indiana started skidding roads in 1968 with a towed-trailer type skid
More informationCarson City School District Completed School Bond
Carson City School District 2010 Completed School Bond Discussion Projects categorized and prioritized based on: Health safety & welfare Code compliance Energy and operational efficiency Educational program
More informationWestern ND Meeting. February 19, 2014 Grant Levi, NDDOT Director
Western ND Meeting February 19, 2014 Grant Levi, NDDOT Director 1 Traffic Trends in North Dakota 2 Truck Traffic 2008 3 Truck Traffic 2012 4 Average Daily Traffic 5 ND Vehicle Miles Traveled Statewide
More informationExpo Light Rail Line Project Status Update Meeting Holman United Methodist Church January 27, 2011
Project Status Update Meeting Project Status Update Meeting Holman United Methodist Church January 27, 2011 Phase 1 Project Description Phase 1 from Downtown Los Angeles to Culver City: 8.6 mile corridor
More informationHydroGenerations PROGRAM HANDBOOK
HydroGenerations PROGRAM HANDBOOK TABLE OF CONTENTS Please ensure you are reading the most recent version of this handbook by visiting the NV Energy website, www.nvenergy.com/hydro. Contents HydroGenerations
More informationFixed Asset Allocations by Budget Unit for FY
1100 112 Treasurer-Tax Collector Upgrading current business license program for greater Business License Software & Services 8965 Computer Software 1 10,900 10,900 10,900 efficiency for citizens and staff
More informationOne Gateway Plaza Metropolitan Transportation Authority Los Angeles, CA EXECUTE CONTRACT MODIFICATIONS FOR BUS INSPECTION SERVICES
@ Metro Los Angeles County One Gateway Plaza Metropolitan Transportation Authority Los Angeles, CA 90012-2952 I I I REGULAR BOARD MEETING JUNE 28,2012 SUBJECT: BUS INSPECTION SERVICES ACTION: EXECUTE CONTRACT
More informationLos Angeles County One Gateway Plaza q.200n Tpl Metropolitan Transportation Authority Los Angeles, CA metro.4 I
Los Angeles County One Gateway Plaza 213.92q.200n Tpl Metropolitan Transportation Authority Los Angeles, CA 90012-2952 metro.4 I Metro 1 I 48 I I SYSTEM SAFETY AND OPERATIONS COMMITTEE MARCH 15,2012 SUBJECT:
More informationPURCHASING MEMORANDUM
http://www.ogs.state.ny.us AWARD NUMBER: 22285 DATE: April 11, 2013 Contract Management Specialist customer.services@ogs.state.ny.us CONTRACTOR: United Metro Energy Corp. CONTRACT NOS. PC66028 CONTRACT
More informationOhio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director
Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director Project No. 080598 PID 21272 CUY-SR-237-4.93 - PART I (FRONT STREET); CUY-237-4.55 - P Federal Type: RAILROAD
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 HIGHWAY: COUNTY: 08/12/2015 ESTIMATE PAID: AWARD DATE: 08/14/2015 ESTIMATE PERIOD:
209,750.00 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 650 365.00 CONTRACT ID: 628798001 PROJECT: RMC - 628798001 CONTRACT: 08151502 AWARD : $276,487.00 PROJECTED : $276,487.00 ADJ. PROJECTED :
More informationALTERNATIVE PROJECT DELIVERY
ALTERNATIVE PROJECT DELIVERY Varuna Singh SH 288 IN HARRIS COUNTY SH 288 in Harris County SEGMENT 1: 8 New Tolled Direct Connectors at SH 288 and Beltway 8 Existing traffic uses frontage roads today to
More information800 Access Control, R/W Use Permits and Drive Design
Table of Contents 801 Access Control... 8-1 801.1 Access Control Directives... 8-1 801.2 Access Control Policies... 8-1 801.2.1 Interstate Limited Access... 8-1 801.2.2 Limited Access... 8-1 801.2.3 Controlled
More informationAppendix C. 5% Design Plan and Profile Drawings/ Additional Design Information. South Oak Cliff Corridor Blue Line Extension
Appendix C 5% Design Plan and Profile Drawings/ Additional Design Information The 5% plan and profile drawings were provided in a separate volume with the Draft Local EA and have not changed. Hard copies
More informationRENEWABLE ENERGY TECHNOLOGIES INCOME TAX CREDIT UPDATE. Section , Hawaii Revised Statutes Maui Solar Summit 2013
1 RENEWABLE ENERGY TECHNOLOGIES INCOME TAX CREDIT UPDATE Section 235-12.5, Hawaii Revised Statutes Maui Solar Summit 2013 2013 LEGISLATIVE SESSION Many renewable energy bills were introduced. S.B. 1198
More information79th OREGON LEGISLATIVE ASSEMBLY Regular Session. House Bill 3157
th OREGON LEGISLATIVE ASSEMBLY--0 Regular Session House Bill Sponsored by Representatives DOHERTY, MCLAIN (at the request of Radio Cab Company) SUMMARY The following summary is not prepared by the sponsors
More informationDate: 04/20/2018 City Project No.: Addendum No.: 4. The following changes shall be made to the project plans and specifications:
DEVELOPMENT SERVICES PHONE: (209) 668-5520 ENGINEERING DIVISION FAX: (209) 668-5563 156 S. BROADWAY, SUITE 150 TDD: (800) 735-2929 TURLOCK, CA 95380 engineering@turlock.ca.us Date: 04/20/2018 City Project
More informationCounty of Santa Cruz 0579
County of Santa Cruz 0579 701 OCEAN STREET, ROOM 410, SANTA CRUZ, CA 95060-4070 (831) 454-2160 FAX (831) 454-2385 TOO (831) 454-2123 DIRECTOR OF PUBLIC WORKS SANTA CRUZ COUNTY BOARD OF SUPERVISORS 701
More informationImperial Irrigation District Energy Consumers Advisory Committee Agenda Report
Imperial Irrigation District Energy Consumers Advisory Committee Agenda Report 260 TO: FROM: SUBJECT: ECAC Members Jamie Asbury, deputy energy manager, Business/Regulatory Five (5) Generator Interconnection
More informationAPPENDIX A INTENT-TO-STUDY LETTER
APPENDIX A INTENT-TO-STUDY LETTER APPENDIX B COMMENTS AND RESPONSES COMMENTS AND RESPONSES A public information meeting was held on May 5, 2005. Comments and responses are summarized for this
More informationBUTTE COUNTY DEPARTMENT OF PUBLIC WORKS
PROJECT: 2014 Slurry Seal PROJECT LOCATION: Various Roads in the Thermalito and Oroville Areas Retro-Reflective Pavement Markers. ADVERTISED: February 27, 2014 ENGINEER'S ESTIMATE = $213,700.00 BIDS OPENED:
More informationSTAFF REPORT # CHANGE OF ZONING
STAFF REPORT #17-2000-0007 CHANGE OF ZONING PLANNING COMMISSION MEETING DATE: November 16, 2017 (Applicant Provided Materials / Traffic Study = Blue) 1. APPLICATION: A public hearing for an application
More informationNAME OF BIDDER MERCER GROUP INTERNATIONAL OF NJ, INC CALHOUN STREET CITY, STATE, ZIP TRENTON, NJ 08638
CONTRACT AWARD AB2018-03 REMOVAL AND DISPOSAL OF SOLID WASTE AND RECYCLABLES FROM VARIOUS LOCATIONS IN MERCER BID OPENING DATE: APRIL 10,2018 CONTRACT TERM: MAY 30, 2018 RES. NO. 2018-280 THROUGH APRIL
More informationCity of Grand Island Tuesday, October 10, 2017 Council Session
City of Grand Island Tuesday, October 10, 2017 Council Session Item G-12 #2017-276 - Approving Change Order No. 1 for Lift Station No. 20 Upgrade and Force Main Rehabilitation & Lift Station No. 14 Abandonment;
More informationFirst Coast TIM Meeting Tuesday, March 18, Meeting Minutes
First Coast TIM Meeting Tuesday, March 18, 2014 Meeting Minutes The list of meeting attendees and the Meeting Agenda are attached to these meeting minutes. Pete Vega welcomed everyone to the meeting. He
More informationESTIMATE PREPARATION ASSISTANCE
S T I P D i s t r i c t 1 C l a r k N o ESTIMATE PREPARATION ASSISTANCE PROJECT ESTIMATE INFORMATION TP a. Estimate prepared by (user's name): Paul H. Judd b. Date of initial estimate: 8/11/2010 c. Date
More informationBIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID
SPECIFICATION 16-11031-C CITY OF BERKELEY BID PROPOSAL A: BASE BID 1 MOBILIZATION 1 LS 2 TRAFFIC CONTROL 1 LS 3 CONTRACTOR INFORMATION SIGN 2 EA 4 CONSTRUCTION AREA SIGN 18 EA 5 PROJECT IDENTIFICATION
More informationCalifornia s RPS Program: Progress Towards California s 33% RPS Goal and the Role of Concentrating Solar Power CSP Conference
California s RPS Program: Progress Towards California s 33% RPS Goal and the Role of Concentrating Solar Power CSP Conference Presented by Edward Randolph Energy Division Director, California Public Utilities
More informationCUYAHOGA COUNTY, OHIO ADDENDUM NUMBER 2 FOR THE CLEANING AND TELEVISING OF SEWERS IN VARIOUS COMMUNITIES FOR A TWO-YEAR PERIOD,
CUYAHOGA COUNTY, OHIO ADDENDUM NUMBER 2 FOR THE CLEANING AND TELEVISING OF SEWERS IN VARIOUS COMMUNITIES FOR A TWO-YEAR PERIOD, 2017-2018 FOR THE CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS RQ# 39104 BIDS
More informationJanuary 13, 2012 AACE Annual Meeting, Wickenburg, AZ. I-15 in Arizona. Its Past, Present, and Future
January 13, 2012 AACE Annual Meeting, Wickenburg, AZ I-15 in Arizona. Its Past, Present, and Future Jean A. Nehme, Ph.D., P.E. State Bridge Engineer, ADOT Presentation Overview Location, History, and Photographs
More informationRobb Drive Development
O f f e r i n g M e m o r a n d u m Robb Drive Development Interstate 80 & Robb Drive Reno, Nevada 8 5 A c r e s p r e s e n t e d e x c l u s i v e l y b y R o n C o b b Principal Direct: (775) 329-4000
More informationBuffalo Drive Road Safety Audit
UPWP Task 6410-11 Contract No: 11-050 Buffalo Drive Road Safety Audit CC 215 to Blue Diamond Road (SR 160) PRE CONSTRUCTION PHASE AUDIT Prepared for: Regional Transportation Commission of Southern Nevada
More informationFlorida Department of Transportation. Road Ranger Performance Measures Annual Report. July 1, 2015 to June 30, 2016 Fiscal Year (FY) 2015/2016
Florida Department of Transportation Road Ranger Performance Measures Annual Report July 1, 2015 to June 30, 2016 Fiscal Year (FY) 2015/2016 Prepared by: Florida Department of Transportation Commercial
More information