1 ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # TRACS No. Project No. County District Gross Length Net Length Prepared By: 999 UN 999 H873601C 999-A-(436)T UNKNOWN CENTRAL 0 Rik Richter Highway Termini Location Work Description STATEWIDE VARIOUS LOCATIONS WEIGH-IN-MOTION INSTALLATIONS
2 Printed: 8/23/2017 Page 1 of 8 BID RESULTS FOR Bid Opening Date : 7/28/2017, Prequalification Required, Engineer Specialist : Rik Richter Completion Date: 200 Working Days The proposed Weigh-In-Motion Installations project is located at 16 locations statewide. The proposed work consists of installing Weigh-in-Motion (WIM) systems that includes installation of loop detectors, quartz piezoelectric sensors, poles, cabinets, foundations, equipment and solar panels. The work also includes horizontal directional drilling of conduit, loop lead in cable, pull boxes, activation of the WIM systems,.and other related items. Bid Rank Department Estimate Bid Amount Contractor Extended Sum of s +% $2,060, DEPARTMENT ESTIMATE $2,060, % $2,318, % $2,486, % $2,584, % $3,015, ROADWAY ELECTRIC, LLC 2035 W. MOUNTAIN VIEW ROAD PHOENIX, AZ C S CONSTRUCTION, INC N 20TH AVE SUITE A PHOENIX, AZ DIGITAL TRAFFIC SYSTEMS, INC AIR PARK ROAD ASHLAND, VA N.G.U CONTRACTING, INC W. Happy Valley Road, Ste. 141 #496 Glendale, AZ Winning Bidder is 12.5% Over Department Estimate (Difference = $258,270.00) $2,318, $2,486, $2,584, $3,015,838.94
3 Printed: 8/23/2017 Page 2 of 8 Measure Description Quantity Unit Price Extended Amount EACH-DAY BARRICADE (TYPE II, VERT.PANEL, TUBULAR MARKER) Bid Rank Department Estimate 10, $0.300 $3, ROADWAY ELECTRIC, LLC $0.150 $1, % 2 C S CONSTRUCTION, INC. $0.150 $1, % 3 DIGITAL TRAFFIC SYSTEMS, INC. $1.190 $11, % 4 N.G.U CONTRACTING, INC. $0.250 $2, % EACH-DAY BARRICADE (TYPE III, HIGH LEVEL FLAG TREES) Bid Rank Department Estimate 1, $0.750 $ ROADWAY ELECTRIC, LLC $0.350 $ % 2 C S CONSTRUCTION, INC. $0.450 $ % 3 DIGITAL TRAFFIC SYSTEMS, INC. $3.570 $3, % 4 N.G.U CONTRACTING, INC. $0.590 $ % EACH-DAY PORTABLE SIGN STANDS (RIGID) Bid Rank Department Estimate $0.600 $ ROADWAY ELECTRIC, LLC $0.650 $ % 2 C S CONSTRUCTION, INC. $1.000 $ % 3 DIGITAL TRAFFIC SYSTEMS, INC. $4.760 $ % 4 N.G.U CONTRACTING, INC. $0.590 $ % EACH-DAY PORTABLE SIGN STANDS (SPRING TYPE) Bid Rank Department Estimate 1, $0.800 $1, ROADWAY ELECTRIC, LLC $0.550 $ % 2 C S CONSTRUCTION, INC. $0.700 $ % 3 DIGITAL TRAFFIC SYSTEMS, INC. $4.760 $6, % 4 N.G.U CONTRACTING, INC. $0.590 $ % EACH-DAY WARNING LIGHTS (TYPE A) Bid Rank Department Estimate 3, $0.200 $ ROADWAY ELECTRIC, LLC $0.200 $ % 2 C S CONSTRUCTION, INC. $0.200 $ % 3 DIGITAL TRAFFIC SYSTEMS, INC. $0.600 $2, % 4 N.G.U CONTRACTING, INC. $0.170 $ % EACH-DAY WARNING LIGHTS (TYPE C) Bid Rank Department Estimate 10, $0.300 $3, ROADWAY ELECTRIC, LLC $0.200 $2, % 2 C S CONSTRUCTION, INC. $0.200 $2, % 3 DIGITAL TRAFFIC SYSTEMS, INC. $0.600 $6, % 4 N.G.U CONTRACTING, INC. $0.170 $1, %
4 Printed: 8/23/2017 Page 3 of 8 Measure Description Quantity Unit Price Extended Amount EACH-DAY TRUCK MOUNTED ATTENUATOR Bid Rank Department Estimate $ $61, ROADWAY ELECTRIC, LLC $ $9, % 2 C S CONSTRUCTION, INC. $ $61, % 3 DIGITAL TRAFFIC SYSTEMS, INC. $ $42, % 4 N.G.U CONTRACTING, INC. $ $77, % EACH-DAY TEMPORARY SIGN (LESS THAN 10 S.F.) Bid Rank Department Estimate $0.550 $ ROADWAY ELECTRIC, LLC $0.400 $ % 2 C S CONSTRUCTION, INC. $0.500 $ % 3 DIGITAL TRAFFIC SYSTEMS, INC. $5.950 $1, % 4 N.G.U CONTRACTING, INC. $0.540 $ % EACH-DAY TEMPORARY SIGN (10 S.F. OR MORE) Bid Rank Department Estimate 1, $0.650 $ ROADWAY ELECTRIC, LLC $0.400 $ % 2 C S CONSTRUCTION, INC. $0.500 $ % 3 DIGITAL TRAFFIC SYSTEMS, INC. $5.950 $7, % 4 N.G.U CONTRACTING, INC. $0.650 $ % EACH-DAY FLASHING ARROW PANEL Bid Rank Department Estimate $ $ ROADWAY ELECTRIC, LLC $ $ % 2 C S CONSTRUCTION, INC. $ $1, % 3 DIGITAL TRAFFIC SYSTEMS, INC. $ $5, % 4 N.G.U CONTRACTING, INC. $ $ % EACH-DAY CHANGEABLE MESSAGE BOARD (CONTRACTOR FURNISHED) Bid Rank Department Estimate $ $3, ROADWAY ELECTRIC, LLC $ $3, % 2 C S CONSTRUCTION, INC. $ $5, % 3 DIGITAL TRAFFIC SYSTEMS, INC. $ $24, % 4 N.G.U CONTRACTING, INC. $ $3, % HOUR FLAGGING SERVICES (CIVILIAN) Bid Rank Department Estimate $ $12, ROADWAY ELECTRIC, LLC $ $13, % 2 C S CONSTRUCTION, INC. $ $12, % 3 DIGITAL TRAFFIC SYSTEMS, INC. $ $17, % 4 N.G.U CONTRACTING, INC. $ $10, %
5 Printed: 8/23/2017 Page 4 of 8 Measure Description Quantity Unit Price Extended Amount HOUR FLAGGING SERVICES (DPS) Bid Rank Department Estimate $ $53, ROADWAY ELECTRIC, LLC $ $53, % 2 C S CONSTRUCTION, INC. $ $53, % 3 DIGITAL TRAFFIC SYSTEMS, INC. $ $53, % 4 N.G.U CONTRACTING, INC. $ $53, % EACH POLE (TYPE A) Bid Rank Department Estimate $ $12, ROADWAY ELECTRIC, LLC $ $6, % 2 C S CONSTRUCTION, INC. $ $8, % 3 DIGITAL TRAFFIC SYSTEMS, INC. $1, $20, % 4 N.G.U CONTRACTING, INC. $ $14, % EACH BREAKAWAY BASE FOR LIGHTING POLE OR SIGNAL FLASHER Bid Rank Department Estimate $ $6, ROADWAY ELECTRIC, LLC $ $6, % 2 C S CONSTRUCTION, INC. $ $8, % 3 DIGITAL TRAFFIC SYSTEMS, INC. $ $3, % 4 N.G.U CONTRACTING, INC. $ $8, % EACH POLE FOUNDATION (TYPE A) Bid Rank Department Estimate $ $11, ROADWAY ELECTRIC, LLC $ $12, % 2 C S CONSTRUCTION, INC. $ $12, % 3 DIGITAL TRAFFIC SYSTEMS, INC. $1, $23, % 4 N.G.U CONTRACTING, INC. $1, $20, % L.FT. ELECTRICAL CONDUIT (3") (PVC) Bid Rank Department Estimate $ $11, ROADWAY ELECTRIC, LLC $ $15, % 2 C S CONSTRUCTION, INC. $ $7, % 3 DIGITAL TRAFFIC SYSTEMS, INC. $ $8, % 4 N.G.U CONTRACTING, INC. $ $13, % L.FT. ELECTRICAL CONDUIT (3") (HDPE) (DIRECTIONAL DRILL) Bid Rank Department Estimate $ $33, ROADWAY ELECTRIC, LLC $ $45, % 2 C S CONSTRUCTION, INC. $ $24, % 3 DIGITAL TRAFFIC SYSTEMS, INC. $ $71, % 4 N.G.U CONTRACTING, INC. $ $50, %
6 Printed: 8/23/2017 Page 5 of 8 Measure Description Quantity Unit Price Extended Amount EACH PULL BOX (NO. 7) Bid Rank Department Estimate $ $28, ROADWAY ELECTRIC, LLC $ $20, % 2 C S CONSTRUCTION, INC. $1, $37, % 3 DIGITAL TRAFFIC SYSTEMS, INC. $ $30, % 4 N.G.U CONTRACTING, INC. $ $24, % EACH CONTROL CABINET (TYPE III) Bid Rank Department Estimate $2, $43, ROADWAY ELECTRIC, LLC $1, $16, % 2 C S CONSTRUCTION, INC. $1, $15, % 3 DIGITAL TRAFFIC SYSTEMS, INC. $1, $29, % 4 N.G.U CONTRACTING, INC. $3, $46, % EACH LOOP DETECTOR (WIM) (6' X 9') Bid Rank Department Estimate $1, $36, ROADWAY ELECTRIC, LLC $ $35, % 2 C S CONSTRUCTION, INC. $ $23, % 3 DIGITAL TRAFFIC SYSTEMS, INC. $1, $47, % 4 N.G.U CONTRACTING, INC. $1, $44, % L.FT. LOOP DETECTOR LEAD-IN CABLE Bid Rank Department Estimate 1, $1.500 $2, ROADWAY ELECTRIC, LLC $0.750 $1, % 2 C S CONSTRUCTION, INC. $1.000 $1, % 3 DIGITAL TRAFFIC SYSTEMS, INC. $1.640 $2, % 4 N.G.U CONTRACTING, INC. $2.120 $3, % L.SUM MOBILIZATION Bid Rank Department Estimate $205, $205, ROADWAY ELECTRIC, LLC $264, $264, % 2 C S CONSTRUCTION, INC. $249, $249, % 3 DIGITAL TRAFFIC SYSTEMS, INC. $306, $306, % 4 N.G.U CONTRACTING, INC. $273, $273, % L.SUM FORCE ACCOUNT WORK (PULLBOX AND CONDUIT RECONDITITIONING) Bid Rank Department Estimate $3, $3, ROADWAY ELECTRIC, LLC $3, $3, % 2 C S CONSTRUCTION, INC. $3, $3, % 3 DIGITAL TRAFFIC SYSTEMS, INC. $3, $3, % 4 N.G.U CONTRACTING, INC. $3, $3, %
7 Printed: 8/23/2017 Page 6 of 8 Measure Description Quantity Unit Price Extended Amount L.SUM FORCE ACCOUNT WORK (LANDSCAPE REPAIRS) Bid Rank Department Estimate $3, $3, ROADWAY ELECTRIC, LLC $3, $3, % 2 C S CONSTRUCTION, INC. $3, $3, % 3 DIGITAL TRAFFIC SYSTEMS, INC. $3, $3, % 4 N.G.U CONTRACTING, INC. $3, $3, % L.SUM FORCE ACCOUNT WORK (QUARTZ SENSOR INSTALLATION AND TRAINING) Bid Rank Department Estimate $25, $25, ROADWAY ELECTRIC, LLC $25, $25, % 2 C S CONSTRUCTION, INC. $25, $25, % 3 DIGITAL TRAFFIC SYSTEMS, INC. $25, $25, % 4 N.G.U CONTRACTING, INC. $25, $25, % L.SUM MISCELLANEOUS WORK (RECORD DRAWING DOCUMENTATION) Bid Rank Department Estimate $3, $3, ROADWAY ELECTRIC, LLC $14, $14, % 2 C S CONSTRUCTION, INC. $2, $2, % 3 DIGITAL TRAFFIC SYSTEMS, INC. $28, $28, % 4 N.G.U CONTRACTING, INC. $52, $52, % EACH MISCELLANEOUS WORK (QUARTZ SENSOR, 1.75M 40M CABLE AND GROUT) Bid Rank Department Estimate $8, $960, ROADWAY ELECTRIC, LLC $7, $892, % 2 C S CONSTRUCTION, INC. $8, $1,074, % 3 DIGITAL TRAFFIC SYSTEMS, INC. $7, $927, % 4 N.G.U CONTRACTING, INC. $9, $1,188, % EACH MISCELLANEOUS WORK (QUARTZ SENSOR, 1.75M 100M CABLE AND GROUT) Bid Rank Department Estimate $8, $204, ROADWAY ELECTRIC, LLC $8, $201, % 2 C S CONSTRUCTION, INC. $9, $216, % 3 DIGITAL TRAFFIC SYSTEMS, INC. $8, $202, % 4 N.G.U CONTRACTING, INC. $11, $264, % EACH MISCELLANEOUS WORK (INSTALL CABINET EQUIPMENT, TEST AND CALIBRATE) Bid Rank Department Estimate $6, $96, ROADWAY ELECTRIC, LLC $ $13, % 2 C S CONSTRUCTION, INC. $2, $33, % 3 DIGITAL TRAFFIC SYSTEMS, INC. $ $10, % 4 N.G.U CONTRACTING, INC. $2, $38, %
8 Printed: 8/23/2017 Page 7 of 8 Measure Description Quantity Unit Price Extended Amount EACH MISCELLANEOUS WORK (DATA RECORDER) Bid Rank Department Estimate $13, $208, ROADWAY ELECTRIC, LLC $38, $609, % 2 C S CONSTRUCTION, INC. $35, $562, % 3 DIGITAL TRAFFIC SYSTEMS, INC. $38, $609, % 4 N.G.U CONTRACTING, INC. $44, $704, % EACH MISCELLANEOUS WORK (COMMUNICATION EQUIPMENT) Bid Rank Department Estimate $1, $16, ROADWAY ELECTRIC, LLC $1, $17, % 2 C S CONSTRUCTION, INC. $1, $16, % 3 DIGITAL TRAFFIC SYSTEMS, INC. $1, $21, % 4 N.G.U CONTRACTING, INC. $1, $24, % EACH MISCELLANEOUS WORK (40 WATT - 12 VOLT SOLAR PANEL MODULE) Bid Rank Department Estimate $ $3, ROADWAY ELECTRIC, LLC $ $3, % 2 C S CONSTRUCTION, INC. $ $3, % 3 DIGITAL TRAFFIC SYSTEMS, INC. $ $4, % 4 N.G.U CONTRACTING, INC. $ $5, % EACH MISCELLANEOUS WORK (90 WATT - 12 VOLT SOLAR PANEL MODULE) Bid Rank Department Estimate $ $ ROADWAY ELECTRIC, LLC $ $ % 2 C S CONSTRUCTION, INC. $ $ % 3 DIGITAL TRAFFIC SYSTEMS, INC. $ $ % 4 N.G.U CONTRACTING, INC. $ $1, % EACH MISCELLANEOUS WORK (TOP OF POLE MOUNT WITH 4" WELDED GIMBAL) Bid Rank Department Estimate $ $1, ROADWAY ELECTRIC, LLC $ $10, % 2 C S CONSTRUCTION, INC. $ $ % 3 DIGITAL TRAFFIC SYSTEMS, INC. $ $2, % 4 N.G.U CONTRACTING, INC. $2, $33, % EACH MISCELLANEOUS WORK (12 VOLT 6 AMP CHARGE CONTROLLER WITH LVD) Bid Rank Department Estimate $ $ ROADWAY ELECTRIC, LLC $ $5, % 2 C S CONSTRUCTION, INC. $ $10, % 3 DIGITAL TRAFFIC SYSTEMS, INC. $ $11, % 4 N.G.U CONTRACTING, INC. $ $8, %
9 Printed: 8/23/2017 Page 8 of 8 Measure Description Quantity Unit Price Extended Amount EACH MISCELLANEOUS WORK (100 AMP HOUR 12 VOLT SEALED LEAD ACID BATTERIES) Bid Rank Department Estimate $ $3, ROADWAY ELECTRIC, LLC $ $4, % 2 C S CONSTRUCTION, INC. $ $6, % 3 DIGITAL TRAFFIC SYSTEMS, INC. $ $7, % 4 N.G.U CONTRACTING, INC. $ $8, %
ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS
ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # 2016153 TRACS No. Project No. County District Gross
More informationCITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity
202-00019 Removal of Inlet 15 EA 202-00035 Removal of Pipe 121 LF 202-00200 Removal of Sidewalk 1,057 SY 202-00203 Removal of Curb and Gutter 2,142 LF 202-00206 Removal of Concrete Curb Ramp 320 SY 202-00207
More informationHILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000.
PROJECT NAME: Anamosa Street Reconstruction - Midway Street to Miiwuakee Street PROJECT NUMBER: PROJECT NO. 07-1473 / CIP NO. 50559 LET DATE: April 11, 2017 LOW BID AMOUNT: $3,941,397.20 ENGINEER'S ESTIMATE
More informationFertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1,
BID TABS PROJECT 18-1029 22 nd AVENUE RECONSTRUCTION BID DATE: MAY 9, 2018 Stark Pavement Corp. Lalonde Contractors Cornerstone Pavers LLC Brookfield, WI Waukesha, WI Racine, WI Item Number Roadway Quantity
More informationMaine Turnpike Authority
Company Name Total Bid Amount R J Grondin & Sons - Gorham, ME $1,436,720.00 Shaw Brothers Construction, Inc. - Gorham, ME $1,476,398.83 Pratt & Sons, Inc. - Minot, ME $1,733,615.00 Page 1 of 13 R J Grondin
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/16
17,810.73 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/16-65.00 125 CONTRACT ID: 118802088 PROJECT: STP 2014(614)G CONTRACT: 05143227 AWARD AMOUNT: $600,782.63 PROJECTED AMOUNT: $632,782.63 ADJ. PROJECTED
More informationImportance of ITS Preventive Maintenance and Transitioning to an Accelerated ITS design Approach for Illinois Tollway September 14th, 2018
Importance of ITS Preventive Maintenance and Transitioning to an Accelerated ITS design Approach for Illinois Tollway September 14th, 2018 Amarpal Matharu, PE, MBA Traffic Operation Manager, Illinois Tollway
More informationCounty of Los Angeles Department of Public Works Construction Division BID SUMMARY (sorted by Unit Price Total)
County of Los Angeles Department of Public Works Construction Division BID SUMMARY (sorted by Unit Price Total) 1 CONSTRUCTION SCHEDULE 1 $2,000.00 LS $2,000.00 $2,000.00 $2,000.00 $2,000.00 $2,000.00
More informationMaine Turnpike Authority
Company Name Total Bid Amount Liddell Brothers, Inc. - Halifax, MA $1,590,213.00 Northeast Traffic Control Services, Inc. - Plymouth, MA $1,932,117.00 Page 1 of 5 Liddell Brothers, Inc. Halifax, MA 202.2061
More informationBIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID
SPECIFICATION 16-11031-C CITY OF BERKELEY BID PROPOSAL A: BASE BID 1 MOBILIZATION 1 LS 2 TRAFFIC CONTROL 1 LS 3 CONTRACTOR INFORMATION SIGN 2 EA 4 CONSTRUCTION AREA SIGN 18 EA 5 PROJECT IDENTIFICATION
More informationSTATE ND PROJECT NO. CP 0883 (14) & CP 1152 (14) SHEET NO. TOTAL SHEETS 9 31 SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT REQUIRED UNITS PER AMOUNT UNITS
STATE ND PROJECT NO. CP 0883 (14) & CP 1152 (14) SHEET NO. TOTAL SHEETS 9 31 SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT REQUIRED UNITS PER AMOUNT UNITS SUB TOTAL SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT
More informationSN01 STANDARD NOTES CITY OF SAMMAMISH 2018 FLASHING YELLOW ARROW SIGNALS PROJECT NO. DATE BY APPR REVISION COSA0023 KING COUNTY WASHINGTON
STANDARD NOTES SN01 2 OF 8 ROADWAY PLAN PL01 3 OF 8 ROADWAY PLAN PL02 4 OF 8 LANE 10 105 150 205 270 450 500 550 11 12 SHOULDER 115 125 MINIMUM LANE CLOSURE TAPER LENGTH = L 165 225 295 180 245 320 5 25
More informationOhio Department of Transportation Official Bid Tabulation Jerry Wray, Director
Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 170559 PID 102381 SCI-US 52-19.01 Federal Type: TWO LANE RESURFACING Letting Date: 11/2/2017 Completion Date:
More informationBID PROPOSAL. Item Description Unit Quantity Unit Price Total Price No. (Unit Price to be written in Words) (Figures) (Figures)
BID PROPOSAL PROPOSAL OF, a corporation a partnership consisting of an individual doing business as THE SAN ANTONIO WATER SYSTEM: Pursuant to Instructions and Invitations to Bidders, the undersigned proposes
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/06/15 HIGHWAY: COUNTY: 09/07/2012 ESTIMATE PAID: AWARD DATE: 09/27/2012 ESTIMATE PERIOD:
60,795.01 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/06/15 58 CONTRACT ID: 092406377 PROJECT: NH 2013(045) CONTRACT: 09123218 AWARD : $340,789.00 PROJECTED : $362,789.00 ADJ. PROJECTED : $423,584.01
More informationBID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST
PAGE 1 BID OPENING: AUGUST 11, 2011 ENGINEER'S ESTIMATE: $3,108,320.60 CONTRACT NO.110269 SABINO CANYON AND TANQUE VERDE INTERSECTION IMPROVEMENTS *FOR A MORE DETAILED ITEM DESCRIPTION* *REFER TO PROPOSAL
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 HIGHWAY: COUNTY: 08/12/2015 ESTIMATE PAID: AWARD DATE: 08/14/2015 ESTIMATE PERIOD:
209,750.00 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 650 365.00 CONTRACT ID: 628798001 PROJECT: RMC - 628798001 CONTRACT: 08151502 AWARD : $276,487.00 PROJECTED : $276,487.00 ADJ. PROJECTED :
More informationSTATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max:
Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 1401-171 Contract ID: Contract Description: Contract Location: Recommendation: 170002 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION
More information2150 F&I 4" PVC pipe LF 100 $ F&I 6" PVC pipe LF 100 $ F&I 8" PVC pipe LF 100 $ 90.00
1 of 5 2100 F&I 4" ductile iron pipe LF 200 $ 143.00 $28,600.00 2102 F&I 6" ductile iron pipe LF 200 $ 135.00 $27,000.00 2104 F&I 8" ductile iron pipe LF 200 $ 141.00 $28,200.00 2105 F&I 10" ductile iron
More informationSN01 STANDARD NOTES CITY OF SAMMAMISH 2018 INTERSECTION IMPROVEMENTS PROJECT NO. DATE BY APPR REVISION COSA0023 KING COUNTY WASHINGTON
STANDARD NOTES SN01 2 OF 17 STANDARD NOTES SN02 3 OF 17 SITE PREP & T.E.S.C. NOTES GENERAL NOTES SITE PREP & T.E.S.C. PLAN SP01 4 OF 17 SITE PREP & T.E.S.C. NOTES GENERAL NOTES SITE PREP & T.E.S.C. PLAN
More informationFor Conduit Inspections
Underground Conduit Standards - Table of Content 5/8/2017 Section S22 Underground Conduit Standard Index: Description: 00 Table of Content 01 General Notes 02 Definition of Terms 03 Primary Riser Conduit
More informationOhio Department of Transportation Official Bid Tabulation Jerry Wray, Director
Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 140123 PID 82645 LOR- SR 0057 19.42 Federal Type: INTERCHANGE Letting Date: 4/17/2014 Completion Date: 7/15/2016
More informationCITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS
CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS CITY OF SAN ANTONIO DEPT. OF CAPITAL IMPROVEMENTS MANAGEMENT SERVICES N. NEW BRAUNFELS AVE. SIDEWALK PROJECT FROM RITTIMAN
More informationSTATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 961 PORTABLE TRAFFIC SIGNALS OCTOBER 17, 2008
961.01 Description 961.02 Prequalification 961.03 Requirements STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 961 PORTABLE TRAFFIC SIGNALS OCTOBER 17, 2008 961.01 Description. This
More informationPage 1 of KA
Page 1 of 10 5 Contact the Area Engineer at 620-384-7821 for RAP sample location. Page 2 of 10 SS-1HP or approved alternate shall be used for Tack. Page 3 of 10 Ú City limit or Urban boundary No Centerline
More informationCounty of Los Angeles Department of Public Works BID SUMMARY
PROJECT NAME CENTRAL AVENUE, ET AL. PROJECT ID RDC0013675 Engineer's Estimate (1) All American Asphalt (2) Sequel Contractors, Inc. (3) Sully-Miller Contracting Company (4) Palp, Inc. 5,177,177.00 5,292,979.00
More informationFederal Project No.: NHPP-967-7(083)
Order : N20 Schedule of Items Page: 2 Oversight/State Project : (NFO)9999-967-430,N501 Federal Project : NHPP-967-7(083) 0010 ATTD 00124 ROCK EXCAVATION CY 0020 302 504 00525 CONCRETE CLASS A3 MISC. CY
More informationOhio Department of Transportation Official Bid Tabulation Jerry Wray, Director
Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 190109 PID 96986 CUY-SR 10-16.13 Steel Federal Type: BRIDGE REPAIR Letting Date: 3/21/2019 Completion Date: 9/30/2020
More informationTABLE OF CONTENTS. Important Notices Underground Plant Protection Information. Commercial/Industrial Information Sheet
DRAWING NUMBER INTRODUCTORY INFORMATION Important Notices Underground Plant Protection Information Code Clearances Commercial/Industrial Information Sheet Work Management Customer Projects Engineering
More informationItems Unit Quantity Unit Price Total Unit Price Total
Engineer's Plote Construction, Inc. Estimate 1100 Brandt Drive Hoffman Estates, IL 60192 s Unit Quantity 1 SUPPLEMENTAL WATERING UNIT 4 $100.00 400.00 $40.00 160.00 2 TOP SOIL FURNISH AND PLACE, 6 INCH
More informationADDENDUM No. 1 Prospective Bidders
Page 1 of 1 Attachment to Addendum # 1 Revised Itemized Bid ADDENDUM No. 1 TO: Prospective Bidders FROM: Gregory Tate, Construction Contracts Administrator DATE: January 24, 2019 PROJECT: Traffic Signal
More informationCounty of Los Angeles Department of Public Works BID SUMMARY
PROJECT NAME 3RD STREET - INDIANA STREET TO RECORD AVENUE PROJECT ID RDC0015034 Engineer's Estimate (1) Sully-Miller Contracting Company (2) TORO ENTERPRISES, INC. (3) Sequel Contractors, Inc. (4) All
More informationIngham County Request for Proposals Okemos Road and Sandhill Road Widening, Packet #15-15
COST FORM (1 of 5) Packet #15-15, Okemos Road & Sandhill Road Widening Project (Please Type or Print Clearly in Ink) Pay Description Unit Quantity Unit Price Total 1500001 Mobilization, Max. LS 1 2020002
More informationFederal Project No.: HSIP-5A27(567)
Order : A11 Schedule of Items Page: 2 Oversight/State Project : (NFO)0001-020-S82,C501 Federal Project : HSIP-5A27(567) 0010 513 00100 0020 517 00101 MOBILIZATION LUMP SUM LUMP SUM CONSTRUCTION SURVEYING
More informationOhio Department of Transportation Official Bid Tabulation Jerry Wray, Director
Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 110146 PID 82278 HAM-IR-75-5.58 Federal Type: INTERCHANGE Letting Date: 5/5/2011 Completion Date: 7/31/2014 Contract
More informationSTANDARD DRAWING INDEX
ATTACHMENT B STANDARD DRAWING INDEX DESCRIPTION EXISTING DRAWING NO. GENERAL Typical Layout for Improvement Plans City of Stockton Standard Border and Title Block for 8 1/2 x11 Sheet City of Stockton Standard
More informationMr. Dave Gertz Director of Engineering TrafFix Devices, Inc. 220 Calle Pintoresco San Clemente, California Dear Mr. Gertz:
Mr. Dave Gertz Director of Engineering TrafFix Devices, Inc. 220 Calle Pintoresco San Clemente, California 92672 Dear Mr. Gertz: Thank you for your letter of August 19 requesting the Federal Highway Administration
More informationCUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS TRAFFIC CONTROL STANDARDS
CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS TRAFFIC CONTROL STANDARDS Supplement to O.D.O.T. TRAFFIC ENGINEERING MANUAL November 26, 2013 Revisions to the June 22, 2011 edition are noted by a vertical line
More informationMoDOT 2016 UNIT BID PRICES Northwest District
MoDOT 2016 UNIT BID PRICES Northwest District 2013000 CLEARING AND GRUBBING ACRE 7.95 20 1926.49132 20000 1 159 2022010 REMOVAL OF IMPROVEMENTS L.S. 1.00 56 24479.13304 201719 750 56 2024043 REMOVAL OF
More informationWork Zone Safety. Mike Marr Industrial Safety Consultant Ohio Bureau of Workers Compensation Division of Safety & Hygiene
Work Zone Safety Mike Marr Industrial Safety Consultant Ohio Bureau of Workers Compensation Division of Safety & Hygiene 1 Agenda Manuals/Codes/Statistics Setup & Removal of Work Zones Devices and Locations
More informationCLAY COUNTY MISSOURI HIGHWAYS AND TRANSPORTATION COMMISSION PLANS FOR PROPOSED STATE HIGHWAY NOT TO SCALE LENGTH OF PROJECT
DI E INDE OF SHEETS TYPICAL SECTIONS (TS) ( SHEET)--- QUANTITIES (QU) (7 SHEETS)--------- 3 PLAN-PROFILE (PP)------------------ REFERENCE POINTS (RP)-------------- COORDINATE POINTS (CP)------------- CULVERT
More informationMacomb County Department of Roads Bid Comparison
Macomb County Department of Roads Bid Comparison Contract ID: 1643 Description: M-53 Freeway to 33 Mile Road Connector to the proposed 33 Mile Road & McKay Road Roundabout Location: Projects(s): M-53 &
More informationKANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION 2007
07-08001 Sheet 1 of 2 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION 2007 SECTION 805 WORK ZONE TRAFFIC CONTROL AND SAFETY TYPICAL TRAFFIC CONTROL, 2-LANE
More informationRESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS SECTION VI RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS
SECTION VI SERVICE REQUIREMENTS This section discusses the requirements for establishing electric service to new residential subdivisions in Palo Alto. Subdivisions are normally constructed on dedicated
More informationROADWAY LIGHTING SYSTEMS (2545)
GENERAL LIGHTING MATERIAL REQUIREMENTS General material requirements must be in accordance with MnDOT 2545.2. SERVICE CABINETS 3850 Lighting service cabinets Type L1, Type L2, Type A, Type B, and Type
More informationSTREET IMPROVEMENTS PROPOSAL BID ITEMS
STREET IMPROVEMENTS 1 Excavation 3,525 CY $ $ 2 A.C. Planing (2" to 4" Depth) 20,586 SY $ $ 3 Furnish & Install Asphalt Concrete 4,270 TON $ $ 4 Furnish & Install Aggregate Base 2,955 TON $ $ 5 Remove
More informationPlan Check Policies and Guidelines
Plan Check Policies and Guidelines VII. A. INTRODUCTION Traffic signing and striping plans are required for all General Plan Roads and any roadway that is 56-foot wide curb-to-curb (78 R/W) or wider. Transportation
More informationSan Antonio, Texas 78222
1.01 3 EA Pump Removal $1,125.00 $3,375.00 1.02 3 EA Pump Installation $1,200.00 $3,600.00 1.03 1 EA Downhole Video Survey $2,000.00 $2,000.00 1.04 1 EA Geophysical Logging $2,500.00 $2,500.00 2.01 50
More informationSPECIAL SPECIFICATION 6576 Solar Panel Power Supply System
2004 Specifications CSJ 1068-04-126, 0197-02-108 SPECIAL SPECIFICATION 6576 Solar Panel Power Supply System 1. Description. This work shall consist of furnishing and installing an integrated solar Panel
More informationSteese Rd - Curb & Sidewalk Improvement
REF. NO. ITEM NO. Steese Rd - Curb & Sidewalk Improvement DESCRIPTION QTY UNITS UNIT COST SUB-TOTAL 1 103.05 Requirement of Contract Bid 1 LS 24,048.00 24,048.00 2 201 Clearing and Grubbing 1 LS 11,077.00
More informationBID TABULATION PAGE 1 OF 4. BL S.R. Harbins Road/Alcovy Road - Intersection Improvements Department of Transporation. CMES, Inc.
BID TABULATION PAGE 1 OF 4 E.R. Snell Contractor, Inc. G.P.'s Enterprises, Inc. Est. 1 005 Traffic Control Project No M-0679 1 LS $27,811.00 $27,811.00 $48,800.00 $48,800.00 $22,021.80 $22,021.80 2 010
More information2015 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2015 ENGLISH
Page 1 2015 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2015 ENGLISH ITEM ITEM DESCRIPTION UNITS N TOTAL QUANTITY AVERAGE PRICE 106.05100 FIELD LABORATORY
More information2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM
ADDENDUM NO. 1 March 17, 2015 2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM SCHEDULE OF PRICES (BLR 12000a) Replace the schedule of prices with the attached pages. SUMMARY OF QUANTITIES Replace the
More informationGrays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14
Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14 Hardesty & Hanover, LLC Alternative 1 Bogie Support System Alternative Based on AW Sketch of New Bridge Component
More informationPlan Check Policies and Guidelines
VIII. TRAFFIC SIGNING AND STRIPING PLANS A. INTRODUCTION Traffic signing and striping plans are required for all General Plan Roads and any roadway that is 56-foot wide curb-to-curb (78 R/W) or wider.
More informationTRAFFIC CONTROL PLAN ONE-LANE TWO-WAY TRAFFIC CONTROL TCP(1-2)-12 ONE LANE TWO-WAY CONTROL WITH YIELD SIGNS ONE LANE TWO-WAY CONTROL WITH FLAGGERS
DISCLAIMER: The use of this standard is governed by the "Texas Engineering Practice Act". No warranty of any kind is made by TxDOT for any purpose whatsoever. TxDOT assumes no responsibility for the conver-
More informationCentral Florida Regional Transportation Authority d.b.a.
Central Florida Regional Transportation Authority d.b.a. 455 N. Garland Avenue Orlando, FL 32801 AMENDMENT OF SOLICITATION 1. AMENDMENT NO: 2. SOLICITATION NO: 3. SOLICITATION DATE: 4. EFFECTIVE DATE:
More informationCHARACTERIZATION AND DEVELOPMENT OF TRUCK LOAD SPECTRA FOR CURRENT AND FUTURE PAVEMENT DESIGN PRACTICES IN LOUISIANA
CHARACTERIZATION AND DEVELOPMENT OF TRUCK LOAD SPECTRA FOR CURRENT AND FUTURE PAVEMENT DESIGN PRACTICES IN LOUISIANA LSU Research Team Sherif Ishak Hak-Chul Shin Bharath K Sridhar OUTLINE BACKGROUND AND
More informationPORTABLE TRAFFIC SIGNALS
3/7/2017 PORTABLE TRAFFIC SIGNALS Mike Winters John Thomas, Inc. JTI has been in the portable signal business for over 20 years. We manufacture the ADDCO PTS-2000, and rent and sell the signals across
More informationSECTION 12 - CONSTRUCTION AREA TRAFFIC CONTROL TABLE OF CONTENTS
SECTION 12 - CONSTRUCTION AREA TRAFFIC CONTROL TABLE OF CONTENTS Section Page 12-1 GENERAL...12.1 12-2 FLAGGING...12.1 12-2.01 Flaggers...12.1 12-2.02 Flagging Costs...12.1 12-3 TRAFFIC-HANDLING EQUIPMENT
More informationGARDEN STATE. 1 Active Work Zone When Flashing 36x36 W Advisory Speed 10 18x18 W Advisory Speed 15 18x18 W
ROAD SIGNS, SIGN POSTS AND TRAFFIC CONTROL ITEMS - BID TABULATION IFB #15-012 (All Bids) Garden State Highway Products Contact: Joe McCracken 1740 E. Oak Road Vineland, NJ 08361 Phone: 856-692-7572 Fax:
More informationTown of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166
Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166 Date: August 10, 2016 Subject: Bid for Construction of NW 89 th Avenue, NW 93 rd Street and NW
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: 02/10/2016 ESTIMATE PAID: AWARD DATE: 02/25/2016 ESTIMATE PERIOD:
47,635.79 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 161 3 CONTRACT ID: 092106270 PROJECT: STP 2014(101)TE CONTRACT: 02163244 AWARD : $899,908.10 PROJECTED : $905,908.10 ADJ. PROJECTED : $953,543.89
More informationIndianapolis Power & Light Company
Indianapolis Power & Light Company Electric Service and Meter Manual The Electric Service & Meter Manual is not copyrighted and permission is hereby given to reproduce this document. However, the Indianapolis
More informationOhio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director
Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Project No. 100281 PID 77255 LUC-IR-475-14.18 Federal Type: MAJOR RECONSTRUCTION Letting Date: 6/3/2010 Completion
More informationWork Zone Safety & New Interstate Resurfacing Provision
2017 CAPA Presentation Work Zone Safety & New Interstate Resurfacing Provision Steve Kite, PE State Work Zone Engineer Work Zone Safety Data In 2016, Approximately 600 construction projects across NC (not
More informationOhio Department of Transportation Official Bid Tabulation Jerry Wray, Director
Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 130407 PID 88799 AUG-VA-VAR-BRIDGES Federal Type: BRIDGE REPAIR Letting Date: 7/18/2013 Completion Date: 8/31/2014
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/17 HIGHWAY: US 287 COUNTY: 11/04/2015 ESTIMATE PAID: AWARD DATE: 11/19/2015 ESTIMATE PERIOD:
287,585.47 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/17 184 38.00 CONTRACT ID: 004301079 PROJECT: NH 2016(310) CONTRACT: 11153208 AWARD : $1,893,993.41 PROJECTED : $1,893,993.41 ADJ. PROJECTED :
More informationMaine Turnpike Authority
Company Name Total Bid Amount Sargent Corporation - Stillwater, ME $29,888,765.79 Reed & Reed, Inc. - Woolwich, ME $34,900,974.90 Page 1 of 25 Sargent Corporation Stillwater, ME 201.11 CLEARING AC 4.00
More informationDate: 04/20/2018 City Project No.: Addendum No.: 4. The following changes shall be made to the project plans and specifications:
DEVELOPMENT SERVICES PHONE: (209) 668-5520 ENGINEERING DIVISION FAX: (209) 668-5563 156 S. BROADWAY, SUITE 150 TDD: (800) 735-2929 TURLOCK, CA 95380 engineering@turlock.ca.us Date: 04/20/2018 City Project
More informationTHORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E
THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E Each bidder shall bid each item of the Base Bid Schedule and Alternate A Bid Schedule. Failure to bid an item shall be just cause
More informationMaine Turnpike Authority
Company Name Total Bid Amount CPM Constructors - Freeport, ME $1,309,765.25 Scott Construction Corporation - Portland, ME $1,528,840.00 Wyman & Simpson Inc. - Richmond, ME $1,674,845.00 Page 1 of 10 CPM
More informationS T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/27/06 PAGE : 1 TABULATION OF BIDS
PAGE : 1 NUMBER OF DAYS: 63 BRIDGE COUNT : 9 CONTRACT DESCRIPTION : BITUMINOUS OVERLAY & BRIDGE APPROACH PANEL REPLACEMENT CONTRACT LOCATION: LOCATED ON TH 90 FROM 0.8 MILE WEST OF THE BLUE EARTH RIVER
More informationRecent Transportation Projects
Dr. Dazhi Sun Associate Professor Director of Texas Transportation Institute Regional Division Department of Civil & Architectural Engineering Texas A&M University-Kingsville 1 Recent Transportation Projects
More informationOhio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director
Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director Project No. 080598 PID 21272 CUY-SR-237-4.93 - PART I (FRONT STREET); CUY-237-4.55 - P Federal Type: RAILROAD
More information2016 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2016 ENGLISH
Page 1 2016 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2016 ENGLISH ITEM ITEM DESCRIPTION UNITS N TOTAL QUANTITY AVERAGE PRICE 106.05100 FIELD LABORATORY
More informationSmartPole Meter for Service to Pole-Mounted Communication Equipment
SUMMARY This bulletin introduces a new PG&E meter, called a SmartPole meter, approved for use with overhead services connected to communication equipment mounted on wood poles. The SmartPole meter and
More information4 FEET HIGH CHAIN LINK FENCE AND GATE. TO INCLUDE TOP RAIL AND ALL OTHER HARDWARE, POSTS, ETC. NOT INCLUDED BELOW.
4 FEET HIGH CHAIN LINK FENCE AND GATE. TO INCLUDE TOP RAIL AND ALL OTHER HARDWARE, POSTS, ETC. NOT INCLUDED SIGNED BID / SIGNED ADDENDUM Yes / Yes Yes / Yes Yes / Yes YEARS EXPERIENCE 25 Years 24 Years,
More informationCITY OF SAN MARCOS ENGINEERING DIVISION
The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. A. AN APPLICANT S GUIDE TO PROCEDURES FOR: B. C. D.
More informationFederal Project No.: OC-095-1(348)
Order : N83 Schedule of Items Page: 2 Oversight/State Project : (NFO)0095-127-857, C501 Federal Project : OC-095-1(348) 0010 513 00100 MOBILIZATION LUMP SUM LUMP SUM 0020 517 00101 CONSTRUCTION SURVEYING
More informationMaine Turnpike Authority
Interchange 44 Barrier Toll Plaza Open Road Tolling Conversion Mile 44.3 201.11 CLEARING 3.50 AC 202.071 REMOVING ASBESTOS CONTAINING MATERIALS, TOLL BOOTH LAB TOPS 1.00 LS 202.081 REMOVING EXISTING BUILDING
More informationProject Title: Using Truck GPS Data for Freight Performance Analysis in the Twin Cities Metro Area Prepared by: Chen-Fu Liao (PI) Task Due: 9/30/2013
MnDOT Contract No. 998 Work Order No.47 213 Project Title: Using Truck GPS Data for Freight Performance Analysis in the Twin Cities Metro Area Prepared by: Chen-Fu Liao (PI) Task Due: 9/3/213 TASK #4:
More informationSPECIAL SPECIFICATION 8676 Solar Panel Power Supply System
2004 Specifications CSJ 2552-01-033 SPECIAL SPECIFICATION 8676 Solar Panel Power Supply System 1. Description. This work shall consist of furnishing and installing an integrated Solar Panel Power Supply
More informationTable of Contents. Electrical Service Requirements. 1. General Requirements
Table of Contents 1. General Requirements 1.1 General Definition.................................................... 1 1 1.2 Booklet Purpose and Organization....................................... 1-1
More informationLicensed Class C Virginia Contractor No.
month period is seven hundred and fifty thousand dollars (750,000) or more, the Bidder is required under Title 54.11100, Code of Virginia (1950), as amended, to be licensed by the State Board of Contractors
More informationSIGNAL HEADS. The LED signal indication must operate on a nominal 120 VAC power source.
SIGNAL HEADS All signal heads and pedestrian signal heads must be Standard ITE black poly-carbonate signal heads. Standard ITE vehicle signal heads must utilize Light Emitting Diodes (LED) units. The vehicle
More informationALABAMA DEPARTMENT OF TRANSPORTATION DATE : 06/14/13 PAGE : VENDOR RANKING
PAGE : 001-1 VENDOR RANKING CONTRACT TIME : 09/01/13 COMPLETION DATE CONTRACT DESCRIPTION : PROJECT(S) : IM-I059(370) for constructing the Ramp Widening and Auxiliary Lane (Grade, Drain, Base, Pave and
More information- 1 - TRAFFIC CONTROL EQUIPMENT SPECIFICATIONS I. INTENT STATEMENT II. GENERAL EQUIPMENT CATEGORY SPECIFICATIONS
- 1 - TRAFFIC CONTROL EQUIPMENT SPECIFICATIONS I. INTENT STATEMENT II. GENERAL EQUIPMENT CATEGORY SPECIFICATIONS A. ARROW PANELS 1.) Arrow Board, Trailer Mounted 2.) Arrow Board, Stationary (board only)
More informationInstalling or Rebuilding Your Electric Service
Installing or Rebuilding Your Electric Service 2 3 Contents Policies for New and Rebuilt Electric Service 2-4 Paperwork and fees...2 Five-year policy...3 Proposed route location and conditions...3 Construction
More informationApplication for Service Residential Subdivision / Development
Application for Service Residential Subdivision / Development Please complete this application and submit the completed form and attachments to PG&E Application for Service at P.O. Box 24047 Fresno CA
More informationPalm Beach County Department of Environmental Resources Management Construction Contract Bid Evaluation Summary
Construction Contract Bid Evaluation Summary I. Lowest responsive, responsible bidder: Eastman Aggregate Enterprises, LLC (Primary) and Rio Bak Corporation (Secondary) II. Bidders, ranked from lowest to
More informationOTTAWA COUNTY ROAD COMMISSION Bid Comparison
OTTAWA COUNTY ROAD COMMISSION Bid Comparison Contract ID: Description: Location: Projects(s): 28th & Mason Reconstruct with pavement 28th Ave. and Mason St between Adams St. and 32nd Ave. Jamestown Township
More informationPORTABLE WEIGH-IN-MOTION FIELD EVALUATION. Minnesota Local Road Research Board
PORTABLE WEIGH-IN-MOTION FIELD EVALUATION Minnesota Local Road Research Board 11/24/ Acknowledgments 2 LRRB: Joe Triplett, Chisago County MnDOT Technical Liaison: Ben Timerson MnDOT ORS Project Coordinator:
More informationBL PIEZO ELECTRIC SENSOR
BL PIEZO ELECTRIC SENSOR INSTALLATION TDC Systems Limited Weston-Super-Mare ENGLAND Tel : +44 (0)1934 644299 Fax : +44 (0)1934 644255 Email : sales@tdcsystems.co.uk Web : www.tdcsystems.co.uk Introduction
More informationProject Book Worksheet for Cost Estimation
001.01 MOBILIZATION LS $34,716.18 007 3/17/2039 001.02 INCIDENTAL LS $23,929.43 019 3/17/2039 001.03 CONSTRUCTION STAKING LS $10,504.39 201 5/9/2013 001.04 REESTABLISH PROPERTY CORNERS EA $496.08 201 5/9/2013
More informationSPECIAL SPECIFICATION 1788 Surveillance Cabinet
1993 Specifications CSJ 2266-02-095 SPECIAL SPECIFICATION 1788 Surveillance Cabinet 1. General. This Item shall govern the furnishing and installation of Surveillance Cabinet to include the installation
More information(1 ) Active Construction Inc River Road East Tacoma, WA AMOUNT , , ,
78th Avenue Eastl184th Street EastlCRP 5661 I hereby certify this to be a true copy of the tabulation of the bids as received and opened. BID OPENING: FRIDAY, March 3, 2017 County Engine (1 ) Active Construction
More informationThe Traffi cade Way:
The Trafficade Way: To provide our customers with prompt, dependable and friendly service and to be recognized as the leaders and experts in the industries we serve. Index Sign Manufacturing Process...
More informationSouth Dock Replacement Prescott Park. This addendum forms part of the original document marked: Bid#44-14 South Dock Replacement Prescott Park.
City of Portsmouth Public Works Department June 27, 2014 Addendum #3 Bid #44-14 South Dock Replacement Prescott Park This addendum forms part of the original document marked: Bid#44-14 South Dock Replacement
More informationCITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE.
201-00000 Clearing and Grubbing 1 LS 202-00010 Removal of Tree 9 EA 202-00019 Removal of Inlet 8 EA 202-00034 Removal of Pipe (6 Inch) 196 LF 202-00035 Removal of Pipe (18 Inch) 10 LF 202-00036 Removal