1 Florida s Turnpike Enterprise High Tension Median Cable Barrier Pilot Project William H. Cook, P.E. Florida s Turnpike Assistant Roadway Engineer

2 Florida Turnpike Enterprise Miami (MP 0) to Wildwood (MP 309) Limited access tolled facility Begins on Heft in Miami-Dade and ends at I-75 in Central Florida Approximately 309 mainline miles

3 Florida s Turnpike Enterprise Median Protection Program Median Safety Study Performed in 1999 Study Identified median protection needs. Guardrail was the recommended barrier for median cross over protection.

4 Florida s Turnpike Enterprise Median Protection Program Initial Median Protection Program was included with resurfacing projects using double face guardrail.

5 Florida s Turnpike Median Crash Data Florida's Turnpike Median Crash Data SR Fatal Crossover Crashes Fatalities

6 Florida s Turnpike Enterprise Median Protection Program Policy change in 2004 All medians on Florida s Turnpike to be closed by June 2005 Guardrail was the preferred barrier FDOT interested in H.T.C.B as alternate barrier

7 Florida s Turnpike Enterprise Median History with H.T.C.B in Florida? - ZERO Predominantly used W beam or Concrete Barrier Wall

8 High Tension Cable Barrier Pilot Project High Tension Wire Rope Safety Fence (Cable Barrier) was added to Miami Dade Median Protection Project as Pilot for FDOT. MP 3 to MP 10 Goals: To evaluate cable barrier as an alternate roadside barrier. (Safety, cost, time) Evaluation includes design, construction and maintenance advantages/disadvantages of cable barrier

9 HEFT Typical Section MP 3 TO MP 10: Four lane divided freeway w/ 64 to 88 foot median width Design Speed = 70 mph w/ AADT = 60,000 vph 1:6 24 ft 64 ft to 88 ft 24 ft

10 High Tension Cable Barrier Pilot Project Systems Evaluated Brifen USA: MP 3.2 to MP 5.2 Approximately 10,200 ft of barrier

11 High Tension Cable Barrier Pilot Project - Systems Evaluated Safence: MP 5.2 to MP 6.8 Approximately 7,200 ft of barrier

12 High Tension Cable Barrier Pilot Project - Systems Evaluated CASS: MP 6.8 to MP 9.2 Approximately 10,485 ft of barrier

13 Florida s Turnpike High Tension Cable Barrier Design Brifen,USA CASS SAFENCE Post Spacing Deflection 10 max per spec 10 max per spec 10 max per spec Location 12 from edge of travel min. 12 from edge of travel min. 12 from edge of travel min. Number of Cables 4 3 4

14 Florida s Turnpike High Tension Cable Barrier Design All systems to be NCHRP 350 TL-3 min with an FHWA acceptance letter. Specifications were developed using FHWA acceptance letter, manufacturers specification literature, site requirements, and input from other states. End terminals had to be NCHRP 350 approved or protected with existing guardrail. Minimal impact to existing median drainage. Asphalt mowing strip was provided

15 Florida s Turnpike High Tension Cable Barrier Design End Terminals Brifen, USA and CASS had NCHRP 350 approved end terminals, SAFENCE was not NCHRP approved at the time and required protection. Soil conditions were issue for end terminals limerock and unsuitable soils. CASS system has end terminal that can be incorporated into guardrail end terminal used at one location.

16 Florida s Turnpike High Tension Cable Barrier Specification One specification for each manufacturer Maximum of 10 deflection was allowed Post spacing was based on FHWA acceptance letter and deflection requirement. All cable systems must be approved for NCHRP TL-3 minimum. Contractor was required to provide letter from manufacturer that the design and materials installed met manufacturers requirements.

17 Florida s Turnpike High Tension Cable Barrier Specification All post were to be socket type, no driven post All manufacturers were to perform on site training of construction and maintenance personnel and provide certification letters for each construction and maintenance individual trained Tension logs were required five days after initial tension Tension meters used on site were to become property of FDOT

18 Florida s Turnpike High Tension Cable Barrier Construction Cost Median Protection projects were let Lump Sum no bid items were require Contractor supplied an estimate of $19 per foot for cable barrier after bid award. Current estimate for H.T.C.B is $15 per foot for latest cable project Canal Protection.

19 Florida s Turnpike High Tension Cable Barrier Construction Contractor: J Fletcher Creamer & Son, Inc. Contract Time was 276 days Project included guardrail and H.T.C.B. installation. Tension Tolerance for cables after installation was a problem - major Two of the three systems experienced inadequate tension at the first tension reading. Two of the three systems required continuous tension monitoring during and after construction for tension. Two systems required repeated field tensioning to reach and maintain the correct cable tension. One tension meter required repair. Ambient air temperature became a major concern when taking tension readings tension varied from top rope to bottom rope in summer temperature with asphalt mowing strip.

20 Brifen, USA

21 SAFENCE

22 CASS

23 Florida s Turnpike High Tension Cable Barrier Maintenance Maintenance personnel recommend socketed posts Maintenance has experienced a learning curve with repairs. Cost of maintenance was been an issue higher than anticipated. Average time to repair runs 15 to 30 minutes. Average number of posts to repair 6 Most posts repaired 56

24 Florida s Turnpike High Tension Cable Barrier Maintenance Tension tracking of cables is concern to maintenance personnel due to tension issues during construction. All H.T.C.B. systems are holding the proper tension. Issue has been resolved. No cable damaged to date. Qualified maintenance personnel training required. Anticipate maintenance costs to decline.

25 Florida s Turnpike High Tension Cable Barrier Maintenance Contract Issues 4 Posts Repair 4 Posts Repair Special End Terminal Work not Included: Re-Tensioning & Testing Standard End Treatments (protected)

26 Video Maintenance repair Start time 9:15 A.M. 8 posts repair

27 Maintenance Video

28 High Tension Cable Barrier Pilot Project Performance From May 2005 to April reported impacts 0 penetrations 0 fatalities due to crossover

29 Florida s Turnpike High Tension Cable Barrier Impact photos First vehicle to impact cable barrier March 2005 no injuries

30 Florida s Turnpike High Tension Cable Barrier Impact phots Left tire mark

31 Florida s Turnpike High Tension Cable Barrier Impact photos

32 Florida s Turnpike High Tension Cable Barrier Impact photos

33 Florida s Turnpike High Tension Cable Barrier Impact photos

34 Florida s Turnpike High Tension Cable Barrier Impact photos

35 Florida s Turnpike High Tension Cable Barrier Impact photos

36 Florida s Turnpike High Tension Cable Barrier One year Evaluation - Conclusion All three systems have performed well for all impacts no crossovers or injuries. Cable Tension tolerances need to clearly define for construction and maintenance. Ambient air verses material temperature which should be used manufacturer input. Deflection - real world vs. test environment Tension log - additional maintenance was not anticipated

37 Questions? Contact: William H. Cook, P.E. Florida s Turnpike Enterprise (407) Ext William.cook@dot.state.fl.us

DISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (15-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual

DISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (15-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual DISTRIBUTION: Electronic Recipients List MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards Unit ISSUED BY: Office of Project Management and Technical Support TRANSMITTAL LETTER NO.

More information

In-service Performance Evaluation of Cable Median Barriers on Florida s Limited Access Facilities

In-service Performance Evaluation of Cable Median Barriers on Florida s Limited Access Facilities 0 0 0 0 In-service Performance Evaluation of Cable Median Barriers on Florida s Limited Access Facilities Authors: Priyanka Alluri, Ph.D.* * Corresponding Author Research Associate Lehman Center for Transportation

More information

Median Barriers in North Carolina

Median Barriers in North Carolina Median Barriers in North Carolina AASHTO Subcommittee on Design - 2006 June 13-16, 2006 Jay A. Bennett North Carolina DOT State Roadway Design Engineer Brian Murphy, PE Traffic Safety Engineer Safety Evaluation

More information

Crash Testing Growth Common Roadside Hardware Systems Draft FHWA and AASHTO Requirements for Implementing MASH 2015

Crash Testing Growth Common Roadside Hardware Systems Draft FHWA and AASHTO Requirements for Implementing MASH 2015 64 th Annual Illinois Traffic Safety and Engineering Conference October 14, 2015 Crash Testing Growth Common Roadside Hardware Systems Draft FHWA and AASHTO Requirements for Implementing MASH 2015 1 https://www.youtube.com/watch?feature

More information

ArmorGuard Barrier Portable Longitudinal Barrier

ArmorGuard Barrier Portable Longitudinal Barrier ArmorGuard Barrier Portable Longitudinal Barrier Installation & Maintenance Manual AGB I&M 082409 Page 1 of 12 ArmorGuard Barrier Table of contents Preface... 2 Applications and System Characteristics

More information

Median Barriers in North Carolina -- Long Term Evaluation. Safety Evaluation Group Traffic Safety Systems Management Section

Median Barriers in North Carolina -- Long Term Evaluation. Safety Evaluation Group Traffic Safety Systems Management Section Median Barriers in North Carolina -- Long Term Evaluation Safety Evaluation Group Traffic Safety Systems Management Section Background In 1998 North Carolina began a three pronged approach to prevent and

More information

KENTUCKY TRANSPORTATION CENTER

KENTUCKY TRANSPORTATION CENTER Research Report KTC-08-14/SPR329-06-1F KENTUCKY TRANSPORTATION CENTER EVALUATION OF MEDIAN BARRIER SAFETY ISSUES OUR MISSION We provide services to the transportation community through research, technology

More information

TRACC. Trinity Attenuating Crash Cushion

TRACC. Trinity Attenuating Crash Cushion TRACC Trinity Attenuating Crash Cushion CSP Pacific Business Unit of Fletcher Concrete & Infrastructure Limited 306 Neilson Street Onehunga, Auckland Phone: (09) 634 1239 or 0800 655 200 Fax: (09) 634

More information

High Tension Cable Barrier

High Tension Cable Barrier High Tension Cable Barrier (and Rumble Strips) Practices & Guidelines 2017 Tri-Party Transportation Conference Red Deer, Alberta Hal Cook, P. Eng. Design, Project Management and Training Section Technical

More information

Implementation of AASHTO s Manual for Assessing Safety Hardware (MASH) 2016

Implementation of AASHTO s Manual for Assessing Safety Hardware (MASH) 2016 Implementation of AASHTO s Manual for Assessing Safety Hardware (MASH) 2016 Update from the Technical Committee on Roadside Safety Keith Cota, New Hampshire DOT MASH 2016 Overview Background Ballot Results/Dates

More information

PN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS

PN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS PN 420-10/21/2016 - SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS DESCRIPTION: The surface tolerance specification requirements are modified as follows for all pavements of constant width with at least

More information

Benefit-Cost Analysis of Curve Safety Treatments. Bryan Wilson, Brad Brimley Texas A&M Transportation Institute

Benefit-Cost Analysis of Curve Safety Treatments. Bryan Wilson, Brad Brimley Texas A&M Transportation Institute Benefit-Cost Analysis of Curve Safety Treatments Bryan Wilson, Brad Brimley Texas A&M Transportation Institute B/C Analysis B/C analysis encouraged by TxDOT HSIP HSIP calls the ratio a Safety Improvement

More information

AASHTO Manual for Assessing Safety Hardware, AASHTO/FHWA Joint Implementation Plan Standing Committee on Highways September 24, 2015

AASHTO Manual for Assessing Safety Hardware, AASHTO/FHWA Joint Implementation Plan Standing Committee on Highways September 24, 2015 AASHTO Manual for Assessing Safety Hardware, 2015 AASHTO/FHWA Joint Implementation Plan Standing Committee on Highways September 24, 2015 Full Scale MASH Crash Tests (NCHRP 22-14(02)) Conducted several

More information

Roadside Safety MASH

Roadside Safety MASH Ministry of Transportation MEA 2016 ANNUAL WORKSHOP AND GENERAL MEETING Roadside Safety MASH MTO Design & Contract Standards Office Highway Standards Branch November 24, 2016 Roadside Safety - MASH Highway

More information

ArmorGuard Barrier Portable Longitudinal Barrier

ArmorGuard Barrier Portable Longitudinal Barrier ArmorGuard Barrier Portable Longitudinal Barrier Installation & Maintenance Manual AGB I&M 112811 Page 1 of 13 ArmorGuard Barrier Table of contents Preface... 2 Applications and System Characteristics

More information

I-4 Beyond the Ultimate. Florida Transportation Builders Association January 18, 2019

I-4 Beyond the Ultimate. Florida Transportation Builders Association January 18, 2019 I-4 Beyond the Ultimate Florida Transportation Builders Association January 18, 2019 FDOT District 5 Improving Mobility & Safety in Central Florida FDOT District 5 is: Designing and building a better Interstate

More information

Guide Rail Safety Symposium

Guide Rail Safety Symposium Ministry of Transportation Guide Rail Safety Symposium MTO Provincial Roadside Safety Update Mark C. Ayton, P. Eng. Senior Engineer, Highway Design MTO Highway Standards Branch MTO Provincial Roadside

More information

Florida s Turnpike Enterprise. Incident Management Program for All Levels & Specialty Towing & Roadside Repair (STARR)

Florida s Turnpike Enterprise. Incident Management Program for All Levels & Specialty Towing & Roadside Repair (STARR) Florida s Turnpike Enterprise Incident Management Program for All Levels & Specialty Towing & Roadside Repair (STARR) Florida s Turnpike System Largest Toll System in Florida 460 Centerline Miles 2 Million

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION 2007

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION 2007 07-08001 Sheet 1 of 2 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION 2007 SECTION 805 WORK ZONE TRAFFIC CONTROL AND SAFETY TYPICAL TRAFFIC CONTROL, 2-LANE

More information

MASH 2016 Implementation: What, When and Why

MASH 2016 Implementation: What, When and Why MASH 2016 Implementation: What, When and Why Roger P. Bligh, Ph.D., P.E. Senior Research Engineer Texas A&M Transportation Institute June 7, 2016 2016 Traffic Safety Conference College Station, Texas Outline

More information

2 Min. Min. Edge of. Edgeline See Note 3 PLAN VIEW. See Note 3. This distance may vary

2 Min. Min. Edge of. Edgeline See Note 3 PLAN VIEW. See Note 3. This distance may vary 8" Physical gore ( ) ( ) 250 Varies 250 TYPICAL RUMBLE STRIP PLACEMENT AT EXIT AND ENTRANCE RAMPS This distance may vary This distance may vary ( ) 2 16" edge of R=12" Max ( ) Physical gore Texturing 1.

More information

Cable Median Barrier Program in Washington State

Cable Median Barrier Program in Washington State Cable Median Barrier Program in Washington State 2012 Cable Median Barrier Report WA-RD 812.1 Dave Olson June 2013 Mark Sujka Brad Manchas RESEARCH REPORT WA RD 812.1 CABLE MEDIAN BARRIER PROGRAM IN WASHINGTON

More information

HMA Thin Lifts for Pavement Preservation in Tennessee

HMA Thin Lifts for Pavement Preservation in Tennessee HMA Thin Lifts for Pavement Preservation in Tennessee The Tennessee Program 5,109 Interstate Lane Miles 26,244 State Route LM 31,353 Total* MARK WOODS, P.E. TDOT DIV. OF MATERIALS AND TESTS * As of 2008

More information

1962: HRCS Circular 482 one-page document, specified vehicle mass, impact speed, and approach angle for crash tests.

1962: HRCS Circular 482 one-page document, specified vehicle mass, impact speed, and approach angle for crash tests. 1 2 3 1962: HRCS Circular 482 one-page document, specified vehicle mass, impact speed, and approach angle for crash tests. 1973: NCHRP Report 153 16-page document, based on technical input from 70+ individuals

More information

PRODUCT DESCRIPTION. X-Tension DS. is suitable for all road types: Motorways, country roads, city streets for speed categories up to 110 km/h.

PRODUCT DESCRIPTION. X-Tension DS. is suitable for all road types: Motorways, country roads, city streets for speed categories up to 110 km/h. INDEX Introduction 2 Product Description 3 Installation 6 Specifications 7 Crash Tests Table 8 Reusability 9 FAQ 10 Annexes 14 Drawings 15 Pictures 16 Crash Tests Results 18 Approvals 23 INTRODUCTION Improving

More information

Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director

Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director Project No. 080598 PID 21272 CUY-SR-237-4.93 - PART I (FRONT STREET); CUY-237-4.55 - P Federal Type: RAILROAD

More information

Evaluating The Relevancy Of Current Crash Test Guidelines For Roadside Safety Barriers On High Speed Roads

Evaluating The Relevancy Of Current Crash Test Guidelines For Roadside Safety Barriers On High Speed Roads Evaluating The Relevancy Of Current Crash Test Guidelines For Roadside Safety Barriers On High Speed Roads Connie Xavier Dominique Lord Chiara Dobrovolny Roger Bligh TRB 1 st International Roadside Safety

More information

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study Florida Department of Transportation District Six Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study What

More information

Effectiveness of Median Cable Barriers and Rumble Strips

Effectiveness of Median Cable Barriers and Rumble Strips Effectiveness of Median Cable Barriers and Rumble Strips Chris Poole, Iowa Department of Transportation Peter Savolainen, Iowa State University Mid-Continent Transportation Research Symposium August 16,

More information

800 Access Control, R/W Use Permits and Drive Design

800 Access Control, R/W Use Permits and Drive Design Table of Contents 801 Access Control... 8-1 801.1 Access Control Directives... 8-1 801.2 Access Control Policies... 8-1 801.2.1 Interstate Limited Access... 8-1 801.2.2 Limited Access... 8-1 801.2.3 Controlled

More information

Asphalt Pavement Construction Update

Asphalt Pavement Construction Update Asphalt Pavement Construction Update 2013 FTBA Construction Conference Richard Hewitt, PE State Construction Pavement Engineer Smoothness Developmental Specification Smoothness Developmental Specification

More information

NCDOT Rideability and IRI Special Provision. Nilesh Neel Surti, PE North Carolina DOT State Pavement Construction Engineer

NCDOT Rideability and IRI Special Provision. Nilesh Neel Surti, PE North Carolina DOT State Pavement Construction Engineer NCDOT Rideability and IRI Special Provision Nilesh Neel Surti, PE North Carolina DOT State Pavement Construction Engineer RPUG 2011 NCDOT - Ride Quality Background Fall 1995 Rideability addressed in Asphalt

More information

CR 510/85 Street from CR 512 to 58 Avenue

CR 510/85 Street from CR 512 to 58 Avenue Date: November 14, 2017 To: CR 510/ 85 Street PD& Project File From: Metric ngineering, Inc. Subject: FM No.: 405606-2-22-02 Air Quality Screening Test CR 510/85 Street from CR 512 to 58 Avenue Indian

More information

FHWA/IN/JTRP-2006/29. Final Report. Natalie Villwock Nicolas Blond Andrew Tarko

FHWA/IN/JTRP-2006/29. Final Report. Natalie Villwock Nicolas Blond Andrew Tarko FHWA/IN/JTRP-2006/29 Final Report RISK ASSESSMENT OF VARIOUS MEDIAN TREATMENTS OF RURAL INTERSTATES Natalie Villwock Nicolas Blond Andrew Tarko August 2008 INDOT Research TECHNICAL Summary Technology Transfer

More information

TOLL TRUCKWAYS: Increasing Productivity and Safety in Goods Movement. By Robert W. Poole, Jr., and Peter Samuel

TOLL TRUCKWAYS: Increasing Productivity and Safety in Goods Movement. By Robert W. Poole, Jr., and Peter Samuel TOLL TRUCKWAYS: Increasing Productivity and Safety in Goods Movement By Robert W. Poole, Jr., and Peter Samuel Trucks Are America s Lifeblood Trucks carry 90% of all freight (by value). Truck shipment

More information

SUCCESSFUL PERFORMANCE PAVEMENT PROJECTS 2015 TxAPA Annual Meeting September 23, 2015 Austin District Mike Arellano, P.E. Date

SUCCESSFUL PERFORMANCE PAVEMENT PROJECTS 2015 TxAPA Annual Meeting September 23, 2015 Austin District Mike Arellano, P.E. Date SUCCESSFUL PERFORMANCE PAVEMENT PROJECTS 2015 TxAPA Annual Meeting September 23, 2015 Austin District Mike Arellano, P.E. Date AUSTIN DISTRICT SAFETY PERFORMANCE OF HIGH- FRICTION MIXTURES Mike Arellano,

More information

MEMORANDUM FPN: State Road: 91 County: Osceola (92)

MEMORANDUM FPN: State Road: 91 County: Osceola (92) Traffic and Revenue Consultant Florida s Turnpike Enterprise Florida Department of Transportation MEMORANDUM Date: October 14, 2013 To: From: Copies: Subject: Tom Neyer, Production Project Manager Emam

More information

Chapter 4 COLLISION REDUCTION PROGRAM

Chapter 4 COLLISION REDUCTION PROGRAM Chapter 4 COLLISION REDUCTION PROGRAM Table of Contents 4.0 Background...4-3 4.1 Safety Improvement Projects SHOPP 201.010 Program...4-3 4.1.1 Spot Improvements..4-3 4.1.2 Wet Improvements...4-4 4.1.3

More information

VULCAN BARRIER TL-3 GENERAL SPECIFICATIONS

VULCAN BARRIER TL-3 GENERAL SPECIFICATIONS VULCAN BARRIER TL-3 GENERAL SPECIFICATIONS I. GENERAL A. The VULCAN BARRIER TL-3 (VULCAN TL-3) shall be a highly portable and crashworthy longitudinal barrier especially suited for use as a temporary barrier

More information

METAL BEAM GUARDFENCE TRANSITION AND END TREATMENT IDENTIFICATION GUIDE

METAL BEAM GUARDFENCE TRANSITION AND END TREATMENT IDENTIFICATION GUIDE 2016 TxDOT Design Division METAL BEAM GUARDFENCE TRANSITION AND END TREATMENT IDENTIFICATION GUIDE A guide to help TxDOT employees identify metal beam guardfence transitions and end treatments for the

More information

Development and Validation of a Finite Element Model of an Energy-absorbing Guardrail End Terminal

Development and Validation of a Finite Element Model of an Energy-absorbing Guardrail End Terminal Development and Validation of a Finite Element Model of an Energy-absorbing Guardrail End Terminal Yunzhu Meng 1, Costin Untaroiu 1 1 Department of Biomedical Engineering and Virginia Tech, Blacksburg,

More information

Development of Crash Modification Factors for Rumble Strips Treatment for Freeway Applications: Phase I Development of Safety Performance Functions

Development of Crash Modification Factors for Rumble Strips Treatment for Freeway Applications: Phase I Development of Safety Performance Functions LATIN AMERICAN AND CARIBBEAN CONFERENCE FOR ENGINEERING AND TECHNOLOGY (LACCEI 2014) Development of Crash Modification Factors for Rumble Strips Treatment for Freeway Applications: Phase I Development

More information

AASHTO Policy on Geometric Design of Highways and Streets

AASHTO Policy on Geometric Design of Highways and Streets AASHTO Policy on Geometric Design of Highways and Streets 2001 Highlights and Major Changes Since the 1994 Edition Jim Mills, P.E. Roadway Design Office 605 Suwannee Street MS-32 Tallahassee, FL 32399-0450

More information

US 70 Corridor Planning for the Future

US 70 Corridor Planning for the Future New Bern/James City Area - Work Session US 70 Corridor Planning for the Future Brinson Elementary School Thursday, January 31, 2008 Agenda Sign-in, in, View Maps, Talk to Project Team Public Q & A Session

More information

DELINEATOR REFERENCE POINT 200' TYPICAL SPACING (YELLOW DELINEATORS) END OF MERGE LANE TAPER DELINEATOR REFERENCE POINT

DELINEATOR REFERENCE POINT 200' TYPICAL SPACING (YELLOW DELINEATORS) END OF MERGE LANE TAPER DELINEATOR REFERENCE POINT 200' TYP. 0' < EACH SIDE BOTH ROADWAYS END OF MERGE LANE TAPER TYPICAL FOR ALL 2-LANE MERGES EXCEPT WHERE THERE IS A MERGE FROM THE RIGHT AND NO OFFSET IN THE THROUGH LANES END OF MERGE LANE TAPER 200'

More information

Smoothness Specification Update

Smoothness Specification Update Florida Department of TRANSPORTATION Smoothness Specification Update 38 th Annual Asphalt Conference September 9, 2014 Intents Separate Rolling Straightedge from Laser Profiler Create Ride Quality (Smoothness)

More information

PN 420-7/18/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS

PN 420-7/18/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS PN 420-7/18/2014 - SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS DESCRIPTION: The surface tolerance specification requirements are modified as follows for all mainline lanes and collector-distributor road

More information

CDOT SPF Development and 10 Years of Application. A Practical Approach...

CDOT SPF Development and 10 Years of Application. A Practical Approach... CDOT SPF Development and 10 Years of Application A Practical Approach...... Jake Kononov, P.E. Ph.D. Bryan K. Allery, P.E. National SPF Summit Chicago 2009 In Order to Manage Safety Effectively, We Need

More information

PERFORMANCE ACTIVITY 603 SIGNS

PERFORMANCE ACTIVITY 603 SIGNS PERFORMANCE ACTIVITY 603 SIGNS WORK DESCRIPTION 3 WORK DESCRIPTION 4 WORK DESCRIPTION 6 New Install Maintenance / Replace Temporary 603 SIGNS ACTIVITY DESCRIPTION Install new signs and maintain and replace

More information

[Insert name] newsletter CALCULATING SAFETY OUTCOMES FOR ROAD PROJECTS. User Manual MONTH YEAR

[Insert name] newsletter CALCULATING SAFETY OUTCOMES FOR ROAD PROJECTS. User Manual MONTH YEAR [Insert name] newsletter MONTH YEAR CALCULATING SAFETY OUTCOMES FOR ROAD PROJECTS User Manual MAY 2012 Page 2 of 20 Contents 1 Introduction... 4 1.1 Background... 4 1.2 Overview... 4 1.3 When is the Worksheet

More information

NCDOT Report on Improving Safety on Secondary Roads

NCDOT Report on Improving Safety on Secondary Roads April 8, 2016 NCDOT Report on Improving Safety on Secondary Roads Kevin Lacy, PE, State Traffic Engineer Overview Crash data and Safety Performance on Secondary Roads Driver Behavior Roadway Environment

More information

Rolling Road (Route 638) Widening Project

Rolling Road (Route 638) Widening Project Rolling Road (Route 638) Widening Project From: 0.369 Mile North of Fairfax County Parkway (Route 286) To: Old Keene Mill Road (Route 644) State Project No. 0638-029-156, P104, R204, C504; UPC 5559 Public

More information

Limited Use Document This presentation is provided in the interest of the free exchange of ideas but may not represent the final or complete results

Limited Use Document This presentation is provided in the interest of the free exchange of ideas but may not represent the final or complete results Limited Use Document This presentation is provided in the interest of the free exchange of ideas but may not represent the final or complete results of the research. The presentation is regarded as fully

More information

Lighting Justification Report

Lighting Justification Report Lighting Justification Report SR 847 / NW 47th Avenue Project Development & Environment Study From SR 860/NW 183rd Street to Premier Parkway County: Miami-Dade and Broward Efficient Transportation Decision

More information

The Design-Builder shall meet local road criteria provided by the local governing agencies.

The Design-Builder shall meet local road criteria provided by the local governing agencies. 11 ROADWAYS 11.1 General The -Builder shall conduct all Work necessary to meet the requirements of roadways. Roadway classifications include mainline, acceleration lanes, deceleration lanes, auxiliary

More information

TTI TRAFFIC SAFETY CONFERENCE. John A. Barton, P.E.

TTI TRAFFIC SAFETY CONFERENCE. John A. Barton, P.E. TTI TRAFFIC SAFETY CONFERENCE John A. Barton, P.E. Introduction TxDOT Mission Work with others to provide safe and reliable transportation solutions for Texas. 2 Mission Zero Is a Journey toward: Zero

More information

INDIANA DEPARTMENT OF TRANSPORTATION PAGE 1 NOTICE TO HIGHWAY CONTRACTORS

INDIANA DEPARTMENT OF TRANSPORTATION PAGE 1 NOTICE TO HIGHWAY CONTRACTORS INDIANA DEPARTMENT OF TRANSPORTATION PAGE 1 NOTICE TO HIGHWAY CONTRACTORS DATE OF LETTING: March 04, 2015 TIME OF LETTING: 10:00 AM EASTERN STD DESIGN BUILD CONTRACTS Sealed proposals for certain highway

More information

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study FROM MICHIGAN AVENUE TO INDUSTRY ROAD BREVARD COUNTY, FLORIDA Financial Project ID No: 433605-1-22-01 Federal Aid Project

More information

Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs)

Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs) Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs) 26 th Annual Transportation Research Conference Saint Paul RiverCentre May 20, 2015 Presentation Outline

More information

SECTIO N 610 PAVEMENT SMO O THNESS

SECTIO N 610 PAVEMENT SMO O THNESS SECTIO N 610 PAVEMENT SMO O THNESS 610.1 Description. This work shall consist of measuring the smoothness of the final pavement surface. Smoothness shall be measured using the International Roughness Index

More information

SUMMARY CHANGES FOR NCHRP REPORT 350 GUIDELINES [NCHRP (02)] Keith A. Cota, Chairman Technical Committee on Roadside Safety June 14, 2007

SUMMARY CHANGES FOR NCHRP REPORT 350 GUIDELINES [NCHRP (02)] Keith A. Cota, Chairman Technical Committee on Roadside Safety June 14, 2007 SUMMARY CHANGES FOR NCHRP REPORT 350 GUIDELINES [NCHRP 22-14 (02)] Keith A. Cota, Chairman Technical Committee on Roadside Safety June 14, 2007 BACKGROUND Circular 482 (1962) First full scale crash test

More information

POLICY ON SPEED HUMPS

POLICY ON SPEED HUMPS POLICY ON SPEED HUMPS PURPOSE: The purpose of this policy is to provide guidelines for the installation of speed humps along local residential streets within Miami-Dade County. POLICY: Speed humps will

More information

If it ain t broke, don t t fix it. HMA Thin Lifts for Pavement Preservation in Tennessee 2008 SEAUPG CONFERENCE-BIRMINGHAM, ALABAMA

If it ain t broke, don t t fix it. HMA Thin Lifts for Pavement Preservation in Tennessee 2008 SEAUPG CONFERENCE-BIRMINGHAM, ALABAMA $9 $8 $7 $6 $5 $4 $3 $2 $1 Month-Year Ton Tonne 2008 SEAUPG CONFERENCE-BIRMINGHAM, ALABAMA The Tennessee Program HMA Thin Lifts for Pavement Preservation in Tennessee Mark Woods TDOT 5,109 Interstate Lane

More information

Wrong Way Driving - Statewide Initiative

Wrong Way Driving - Statewide Initiative Florida Department of TRANSPORTATION Wrong Way Driving - Statewide Initiative District 7 Safety Summit Traffic Engineering and Operations office January 13, 2015 Overview At the instance of the Secretary,

More information

PARAPETS / RAILS / MEDIANS / SIDEWALKS TABLE OF CONTENTS CHAPTER 25

PARAPETS / RAILS / MEDIANS / SIDEWALKS TABLE OF CONTENTS CHAPTER 25 TABLE OF CONTENTS CHAPTER 25 FILE NO. TITLE DATE TABLE OF CONTENTS AND INTRODUCTION 25.TOC-1 Table of Contents Chapter 25... 28Dec2016 25.00 Introduction Chapter 25... 28Dec2016 VDOT STANDARD PARAPETS

More information

June 27, In Reply Refer To: HSSD/B-176

June 27, In Reply Refer To: HSSD/B-176 June 27, 2008 1200 New Jersey Avenue, SE. Washington, DC 20590 In Reply Refer To: HSSD/B-176 Mr. John Addy Hill & Smith Springvale Business and Industrial Park Bliston, Wolverhampton, West Midlands, UK,

More information

ALABAMA DEPARTMENT OF TRANSPORTATION DATE : 06/14/13 PAGE : VENDOR RANKING

ALABAMA DEPARTMENT OF TRANSPORTATION DATE : 06/14/13 PAGE : VENDOR RANKING PAGE : 001-1 VENDOR RANKING CONTRACT TIME : 09/01/13 COMPLETION DATE CONTRACT DESCRIPTION : PROJECT(S) : IM-I059(370) for constructing the Ramp Widening and Auxiliary Lane (Grade, Drain, Base, Pave and

More information

Guardrail/Bridgerail Recommendations for Very Low Volume Local Roads in Kansas

Guardrail/Bridgerail Recommendations for Very Low Volume Local Roads in Kansas Guardrail/Bridgerail Recommendations for Very Low Volume Local Roads in Kansas MINK Conference September 20, 2017 Ronald J. Seitz, P.E. and Tod Salfrank The Problem The Local Road System in Kansas is Very

More information

Overview. Prioritization of Safety Strategies Development of the Minnesota Sinusoidal Rumble Strip Implementation and Public Relations Considerations

Overview. Prioritization of Safety Strategies Development of the Minnesota Sinusoidal Rumble Strip Implementation and Public Relations Considerations Victor Lund, PE, Traffic Engineer St. Louis County, Minnesota October 11, 2018 Overview Prioritization of Safety Strategies Development of the Minnesota Sinusoidal Rumble Strip Implementation and Public

More information

TRANSPORTATION - DISTRICT ONE

TRANSPORTATION - DISTRICT ONE Florida Department of TRANSPORTATION - DISTRICT ONE TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS 2017-2021 DISTRICT ONE HEADQUARTERS (BARTOW) SOUTHWEST AREA OFFICE (FORT MYERS) MISSION STATEMENT The Department

More information

Louisiana s s Work Zone Task Force Work Zone Improvements

Louisiana s s Work Zone Task Force Work Zone Improvements Louisiana s s Work Zone Task Force Work Zone Improvements Louisiana Asphalt Technology Conference Shreveport, Louisiana February 24, 2005 Charles Adams, P.E., PTOE Why Improve Work Zones? Number of Work

More information

June 5, In Reply Refer To: HSSD/B-178. Mr. Kevin K. Groeneweg Mobile Barriers LLC Genesee Trail Road Golden, CO Dear Mr.

June 5, In Reply Refer To: HSSD/B-178. Mr. Kevin K. Groeneweg Mobile Barriers LLC Genesee Trail Road Golden, CO Dear Mr. June 5, 2008 1200 New Jersey Avenue, SE. Washington, DC 20590 In Reply Refer To: HSSD/B-178 Mr. Kevin K. Groeneweg Mobile Barriers LLC 24918 Genesee Trail Road Golden, CO 80401 Dear Mr. Groeneweg: This

More information

Florida Strategic Highway Safety Planning Florida Strategic Highway Safety Plan (SHSP) Update and Performance Overview

Florida Strategic Highway Safety Planning Florida Strategic Highway Safety Plan (SHSP) Update and Performance Overview Session 1 Florida Strategic Highway Safety Planning Florida Strategic Highway Safety Plan (SHSP) Update and Performance Overview Joe Santos, PE, FDOT, State Safety Office October, 23, 2013 Florida Statistics

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Liddell Brothers, Inc. - Halifax, MA $1,590,213.00 Northeast Traffic Control Services, Inc. - Plymouth, MA $1,932,117.00 Page 1 of 5 Liddell Brothers, Inc. Halifax, MA 202.2061

More information

BID FORM PART A. Total Quantity 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b Maintenance of Traffic 1 LS $ -

BID FORM PART A. Total Quantity 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b Maintenance of Traffic 1 LS $ - BID FORM PART A Name & Category Unit Unit Cost (B) Cost (AxB) GENERAL REQUIREMENTS 1 Mobilization (Maximum 3.0% of the total Contract Price) 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b

More information

Florida s Transportation Future: Autonomous and Connected Vehicles

Florida s Transportation Future: Autonomous and Connected Vehicles Rick Scott, Governor Jay Trumbull, Chairman Florida s Transportation Future: Autonomous and Connected Vehicles By Beth Kigel, President and CEO, Palm Beach North Chamber of Commerce and Florida Transportation

More information

Work Zone Safety Initiatives and Research Efforts. Irene Soria Safety Evaluation Engineer Illinois Department of Transportation Safety Engineering

Work Zone Safety Initiatives and Research Efforts. Irene Soria Safety Evaluation Engineer Illinois Department of Transportation Safety Engineering Work Zone Safety Initiatives and Research Efforts Irene Soria Safety Evaluation Engineer Illinois Department of Transportation Safety Engineering TES Conference - October 17 th, 2012 Outline Work Zone

More information

Project Application. General Information ODOT PID. Primary County (3 char abrv) ODOT District

Project Application. General Information ODOT PID. Primary County (3 char abrv) ODOT District Current Status (Tier 1, Tier 2 or New) Proposed Status (Tier 1 or Tier 2) Project Application General Information ODOT PID ODOT District Primary County (3 char abrv) Facility Name (i.e. route, rail, terminal,

More information

July 17, In Reply Refer To: HSSD/B-176A

July 17, In Reply Refer To: HSSD/B-176A July 17, 2008 1200 New Jersey Avenue, SE. Washington, DC 20590 In Reply Refer To: HSSD/B-176A Mr. John Addy Hill & Smith Springvale Business and Industrial Park Bliston, Wolverhampton, West Midlands, UK,

More information

MnDOT s Experience with IRI Specifications

MnDOT s Experience with IRI Specifications MnDOT s Experience with IRI Specifications Spring 2013 NCC Meeting April 4, 2013 Philadelphia, PA Maria Masten, P.E. MnDOT Concrete Engineer Evolution of Smoothness No Equipment Certification 2002 Profiler

More information

Improving Roadside Safety by Computer Simulation

Improving Roadside Safety by Computer Simulation A2A04:Committee on Roadside Safety Features Chairman: John F. Carney, III, Worcester Polytechnic Institute Improving Roadside Safety by Computer Simulation DEAN L. SICKING, University of Nebraska, Lincoln

More information

US 81 Bypass of Chickasha Environmental Assessment Public Meeting

US 81 Bypass of Chickasha Environmental Assessment Public Meeting US 81 Bypass of Chickasha Environmental Assessment Public Meeting March 14, 2013 Introductions ODOT FHWA SAIC Meeting Purpose Present need for bypass Provide responses to 10/04/11 public meeting comments

More information

WOODVILLE HIGHWAY (SR 363) PD&E STUDY From Capital Circle Southeast To Paul Russell Road FPID NUMBER: Public Hearing

WOODVILLE HIGHWAY (SR 363) PD&E STUDY From Capital Circle Southeast To Paul Russell Road FPID NUMBER: Public Hearing WOODVILLE HIGHWAY (SR 363) PD&E STUDY From Capital Circle Southeast To Paul Russell Road FPID NUMBER: 424009-3 Public Hearing May 9, 2013 This Public Hearing is being held in accordance with the Federal-aid

More information

Conventional Approach

Conventional Approach Session 6 Jack Broz, PE, HR Green May 5-7, 2010 Conventional Approach Classification required by Federal law General Categories: Arterial Collector Local 6-1 Functional Classifications Changing Road Classification

More information

July 10, Refer to: HSA-10/CC-78A

July 10, Refer to: HSA-10/CC-78A July 10, 2003 Refer to: HSA-10/CC-78A Barry D. Stephens, P.E. Senior Vice President of Engineering ENERGY ABSORPTION Systems, Inc. 3617 Cincinnati Avenue Rocklin, California 95765 Dear Mr. Stephens: Your

More information

CENTRAL FLORIDA EXPRESSWAY AUTHORITY Master Plan Update Board Workshop #2

CENTRAL FLORIDA EXPRESSWAY AUTHORITY Master Plan Update Board Workshop #2 CENTRAL FLORIDA EXPRESSWAY AUTHORITY 2040 Master Plan Update Board Workshop #2 May 14, 2015 Workshop Agenda Introduction Schedule Review Community Outreach Update Transportation Planning and Regional Growth

More information

Beth Kigel. Florida Transportation Commissioner. Florida s Smart Future: Innovation in Policy and Technology Planning

Beth Kigel. Florida Transportation Commissioner. Florida s Smart Future: Innovation in Policy and Technology Planning Beth Kigel Florida Transportation Commissioner Florida s Smart Future: Innovation in Policy and Technology Planning A perspective of Florida s growth Key Statistics: Additional 6 million residents by 2030

More information

Illinois Safety Program IDOT District ATSSA Workshop

Illinois Safety Program IDOT District ATSSA Workshop Illinois Safety Program IDOT District ATSSA Workshop Roadway Departure & MASH DRAFT IDOT Facilitator: Dave Piper ATSSA Facilitator: Jim Thonn 1 Illinois Emphasis Area Priority Pyramid 2 Fatalities and

More information

S.M. Wright Project (I-45, US 175, SH 310) and Road to Work Opportunity Program. Transportation and Trinity River Project Committee May 23, 2016

S.M. Wright Project (I-45, US 175, SH 310) and Road to Work Opportunity Program. Transportation and Trinity River Project Committee May 23, 2016 635 S.M. Wright Project (I-45, US 175, SH 310) and Road to Work Opportunity Program Transportation and Trinity River Project Committee May 23, 2016 Project Scope Increase safety by removing the existing

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 140123 PID 82645 LOR- SR 0057 19.42 Federal Type: INTERCHANGE Letting Date: 4/17/2014 Completion Date: 7/15/2016

More information

Schedule 18 (Technical Requirements) DBFO Agreement EXECUTION VERSION APPENDIX B - SELECT DEPARTMENT STANDARD DRAWINGS AND REFERENCE TABLES

Schedule 18 (Technical Requirements) DBFO Agreement EXECUTION VERSION APPENDIX B - SELECT DEPARTMENT STANDARD DRAWINGS AND REFERENCE TABLES Schedule (Technical Requirements) DBFO Agreement EXECUTION VERSION APPENDIX B - SELECT DEPARTMENT STANDARD DRAWINGS AND REFERENCE TABLES Schedule (Technical Requirements) DBFO Agreement EXECUTION VERSION

More information

Horizontal Sight Distance Considerations Freeway and Interchange Reconstruction

Horizontal Sight Distance Considerations Freeway and Interchange Reconstruction 80 TRANSPORTATION RESEARCH RECORD 1208 Horizontal Sight Distance Considerations Freeway and Interchange Reconstruction In JOEL p. LEISCH With improvements being made to freeways and expressways, the problem

More information

Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director

Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Project No. 100281 PID 77255 LUC-IR-475-14.18 Federal Type: MAJOR RECONSTRUCTION Letting Date: 6/3/2010 Completion

More information

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP): SEGMENT 3. April 19, 2018 NHHIP April 19, 2018

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP): SEGMENT 3. April 19, 2018 NHHIP April 19, 2018 NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP): SEGMENT 3 April 19, 2018 NHHIP OVERVIEW NHHIP divided into 3 Segments: Segment 1: I-45: Beltway 8 to I-610 (9 mi) 45 Segment 2: I-45: I-610 to I-10 (3

More information

Targeted Group Business and Veteran- Owned Small Business Programs

Targeted Group Business and Veteran- Owned Small Business Programs This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp Targeted Group Business

More information

New Cars, Old Patients: New Insights into Crash Biomechanics

New Cars, Old Patients: New Insights into Crash Biomechanics New Cars, Old Patients: New Insights into Crash Biomechanics Innovations in Emergency Care William Beaumont Hospital March 12, 2018 Joel B. MacWilliams, B.A. International Center for Automotive Medicine

More information

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999 &+$37(5Ã)Ã Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999 &+$37(5) 52$'6,'()$&,/,7,(6 7$%/(2)&217(176 Section Subject Page Number Page Date F.1 VEHICLE INSPECTION STATIONS... F-3 April

More information

ANALYSIS OF CROSS-MEDIAN CRASHES ON ALABAMA DIVIDED PARTIAL CONTROL OF ACCESS ARTERIALS

ANALYSIS OF CROSS-MEDIAN CRASHES ON ALABAMA DIVIDED PARTIAL CONTROL OF ACCESS ARTERIALS Final Report ANALYSIS OF CROSS-MEDIAN CRASHES ON ALABAMA DIVIDED PARTIAL CONTROL OF ACCESS ARTERIALS Prepared by Brian L. Bowman, Ph.D., P.E. Randy W. Paulk, Graduate Research Assistant Civil Engineering

More information

Control of Pavement Smoothness in Kansas

Control of Pavement Smoothness in Kansas Report No. FHWA-KS-8-5 Final REPORT Control of Pavement Smoothness in Kansas William H. Parcells, Jr., P.E. Kansas Department of Transportation Topeka, Kansas May 29 KANSAS DEPARTMENT OF TRANSPORTATION

More information

To prevent future occurrences of similar incidents, the following recommendations have been made:

To prevent future occurrences of similar incidents, the following recommendations have been made: Kentucky Fatality Assessment and Control Evaluation (FACE) Program Incident Number: 10KY008 Release Date: March 30, 2012 Subject: Semi Tractor-Trailer Driver Dies in Median Crossover Crash; 10 Others Die

More information