SOUND TRANSIT FEDERAL WAY LINK EXTENSION

Size: px
Start display at page:

Download "SOUND TRANSIT FEDERAL WAY LINK EXTENSION"

Transcription

1 OUND TRANIT FEDERAL WAY LINK EXTENION 2/25/ :31:32 PM BRHARRI C:\PWWORKING\EA\D \A_FWLE_I-5_MAINLINE.DWG ROADWAY RECONTRUCT DRAFT EI - CONCEPTUAL DEIGN TRACK PLAN & PROFILE AND ROADWAY RECONTRUCTION TA TO TA I5-A9-PP09 105

2 OUND TRANIT FEDERAL WAY LINK EXTENION 2/25/ :31:43 PM BRHARRI C:\PWWORKING\EA\D \A_FWLE_I-5_MAINLINE.DWG RECONTRUCT ROADWAY DRAFT EI - CONCEPTUAL DEIGN TRACK PLAN & PROFILE AND ROADWAY RECONTRUCTION TA TO TA I5-A10-PP10 106

3 2/25/ :31:54 PM BRHARRI C:\PWWORKING\EA\D \A_FWLE_I-5_MAINLINE.DWG OUND TRANIT FEDERAL WAY LINK EXTENION DRAFT EI - CONCEPTUAL DEIGN TRACK PLAN & PROFILE AND ROADWAY RECONTRUCTION TA TO TA I5-A11-PP11 107

4 OUND TRANIT FEDERAL WAY LINK EXTENION 2/25/ :32:04 PM BRHARRI C:\PWWORKING\EA\D \A_FWLE_I-5_MAINLINE.DWG DRAFT EI - CONCEPTUAL DEIGN TRACK PLAN & PROFILE AND ROADWAY RECONTRUCTION TA TO TA I5-A12-PP12 108

5 OUND TRANIT FEDERAL WAY LINK EXTENION 2/25/ :32:14 PM BRHARRI C:\PWWORKING\EA\D \A_FWLE_I-5_MAINLINE.DWG DRAFT EI - CONCEPTUAL DEIGN TRACK PLAN & PROFILE AND ROADWAY RECONTRUCTION TA TO TA I5-A13-PP13 109

6 OUND TRANIT FEDERAL WAY LINK EXTENION 2/25/ :32:24 PM BRHARRI C:\PWWORKING\EA\D \A_FWLE_I-5_MAINLINE.DWG DRAFT EI - CONCEPTUAL DEIGN TRACK PLAN & PROFILE AND ROADWAY RECONTRUCTION TA TO TA I5-A14-PP14 110

7 OUND TRANIT FEDERAL WAY LINK EXTENION 2/25/ :32:36 PM BRHARRI C:\PWWORKING\EA\D \A_FWLE_I-5_MAINLINE.DWG DRAFT EI - CONCEPTUAL DEIGN TRACK PLAN & PROFILE AND ROADWAY RECONTRUCTION TA TO TA I5-A15-PP15 111

8 2/25/ :32:46 PM BRHARRI C:\PWWORKING\EA\D \A_FWLE_I-5_MAINLINE.DWG OUND TRANIT FEDERAL WAY LINK EXTENION DRAFT EI - CONCEPTUAL DEIGN TRACK PLAN & PROFILE AND ROADWAY RECONTRUCTION TA TO TA I5-A17-PP16 112

9 AUMPTION: Kent/Des Moines I-5 ta on Alterna ve(s) I-5 Boardings 2,000 Boardings (interim terminus) 3,000 Additional Property Required for 236th LN Relocated Northbound RapidRide top Relocated outhbound RapidRide top 236TH LN North Entry ta on Configura on Terminus / In-Line Interim Terminus ta on Type Center Pla orm - Elevated Pla orm Width 34' Tail track 900' Crossover Yes TP Yes Program KC Metro Ancillary paces (F) 200 T Ancillary paces (F) 1,800 Total Ancillary paces (F) 2,000 R 99 30TH AVE NEW ACCE ROAD tation Plaza outh Entry Paratransit/Patron Drop-off hort-term Parking taff & ervice Vehicle Parking TP & ignal Bungalow I-5 Ver cal Circula on # of entrances 2 # of escalators 1 # of staircases (patron) 1 # of elevators 2 # of emergency stairs 2 Bus/ Paratransit Facili es Bus bays (KCM) 2 bays, one 60' coach each Bus bays (T) 1 bay, two 60' coaches Rapid Ride On-street at R 99 Bus layover (KCM) 2 bays, two 60' coaches each Bus layover (T) 1 bay, two 60' coaches Paratransit spaces 1 permanent, 1 interim Communica ons Facility Tier 2 Parking & Ameni es Bike storage Patron drop-off hort-term patron parking taff parking ervice/emer. vehicle park. ignal bungalow / TP park. Long-term patron parking Temporary patron parking* Total proposed patron parking* 900 F 6 spaces 7 to 10 spaces 4 spaces 2 spaces, separate lot 2 spaces, dedicated 500 spaces (structure) 500 spaces (surface) 1000 paces *Only required for interim terminus condi on 240TH T TATION PLAZA VERTICAL CIRCULATION TICKETING / HALL PLATFORM ANCILLARY PACE TP BU LAYOVER BU PICK-UP / DROP OFF PARATRANIT BICYCLE TORAGE CONTRUCTION TAGING / PARKING TATION AREA FOOTPRINT IGNALIZED INTERECTION (EXITING) IGNALIZED INTERECTION (PROPOED) N KENT/DE MOINE I-5 TATION ITE PLAN FWLE_I5_AP

10 I-5 EL BU DROP-OFF BU LAYOVER TATION PARKING ECTION LOOKING OUTH TAIR ELEV ELEV TAIR EL EL BIKE EL TORAGE ANCILLARY EL ECTION LOOKING EAT TATION PLAZA VERTICAL CIRCULATION TICKETING / HALL PLATFORM ANCILLARY PACE TP BU LAYOVER BU PICK-UP / DROP OFF PARATRANIT BICYCLE TORAGE CONTRUCTION TAGING / PARKING KENT/DE MOINE I-5 TATION ECTION FWLE_I5_AX

11 AUMPTION: 272nd tar Lake ta on Alterna ve(s) I-5 Boardings 2,000 Boardings (interim terminus) 4,000 TP & ignal Bungalow ta on Configura on Terminus / In-Line Interim Terminus ta on Type Center Pla orm - Trench Pla orm Width 34' Tail track 900' Crossover Yes TP Yes Relocated Road Program KC Metro Ancillary paces (F) 200 T Ancillary paces (F) 1,800 Total Ancillary paces (F) 2, ND T hort-term & taff Parking ervice Vehicle Parking Paratransit/Patron Drop-off KCM Ancillary paces 26TH AVE I-5 OFF-RAMP North Entry outh Entry T Ancillary paces I-5 Ver cal Circula on # of entrances 2 # of escalators 2 # of staircases (patron) 2 # of elevators 2 # of emergency stairs 2 Bus/ Paratransit Facili es Bus bays (KCM) Bus bays (T) Rapid Ride Bus layover (KCM) Bus layover (T) Paratransit Communica ons Facility Tier 2 Parking & Ameni es Bike storage Patron drop-off hort-term patron parking taff parking ervice/emer. vehicle park. ignal bungalow / TP park. Exis ng patron parking Addi onal patron parking Total proposed patron parking 1 bay, one 60' coach. Maintain exis ng bays at I-5 offramp and 272nd treet. N/A N/A 2 bays, one 60' coach each N/A 1 permanent, 1 interim 900 F 6 spaces 7 to 10 spaces 4 spaces, share w/short trm 2 spaces, separate lot 2 spaces, dedicated 540 spaces 700 spaces 1240 spaces (structure) TATION PLAZA VERTICAL CIRCULATION TICKETING / HALL PLATFORM ANCILLARY PACE TP BU LAYOVER BU PICK-UP / DROP OFF PARATRANIT BICYCLE PARKING TORAGE CONTRUCTION TAGING / PARKING TATION AREA FOOTPRINT IGNALIZED INTERECTION (EXITING) IGNALIZED INTERECTION (PROPOED) N 272ND TAR LAKE TATION ITE PLAN FWLE_I-5_AP

12 ELEV I-5 EL I-5 OFF RAMP 26TH AVE HORT TERM / TAFF PARKING EL ECTION LOOKING NORTH TAIR ELEV ELEV TAIR EL EL EL ECTION LOOKING EAT TATION PLAZA VERTICAL CIRCULATION TICKETING / HALL PLATFORM ANCILLARY PACE TP BU LAYOVER BU PICK-UP / DROP OFF PARATRANIT BICYCLE TORAGE CONTRUCTION TAGING / PARKING ND TAR LAKE TATION ECTION FWLE_I-5_AX

13 AUMPTION: 316TH T Federal Way Transit Center ta on Alterna ve(s) I-5; R 99 to I-5 Boardings 9,000 20TH AVE 21T AVE Existing Parking tructure Existing Transit Center Entry From Grade Entry From Transit Center 317TH T ta on Configura on Terminus / In-Line Terminus ta on Type Center Pla orm - Elevated Pla orm Width 34' Tail track 900' Crossover Yes TP Yes Program KC Metro Ancillary paces (F) 200 T Ancillary paces (F) 1,800 upport ervices (F) 5,000 Total Ancillary paces (F) 7,000 TP & ignal Bungalow upport ervices Facility Ancillary paces taff & upport ervices Parking 320TH T 23RD AVE Paratransit/Patron Drop-off hort-term Parking Ver cal Circula on # of entrances 2 # of escalators 3 # of staircases (patron) 3 # of elevators 2 # of emergency stairs 2 Bus/ Paratransit Facili es Bus bays (KCM) 2 bays, one 60' coach each Bus bays (T) 1 bay, two 60' coaches Rapid Ride Transit Island (Exis ng) Bus layover (KCM) 3 bays, one 40' coach each 5 bays, one 60' coach each (relocated from transit ctr.) Bus layover (T) 1 bay, two 60' coaches Paratransit spaces 2 spaces Communica ons Facility Tier 3 Parking & Ameni es Bike storage Patron drop-off hort-term patron parking taff parking upport ervices parking ervice/emer. vehicle park. ignal bungalow / TP park. Exis ng patron parking Addi onal patron parking Total proposed patron parking 900 F 6 spaces 7 to 10 spaces 4 spaces 15 spaces 2 spaces, separate lot 2 spaces, dedicated 1,190 spaces 400 spaces 1590 spaces (structure) TATION PLAZA VERTICAL CIRCULATION TICKETING / HALL PLATFORM ANCILLARY PACE TP BU LAYOVER BU PICK-UP / DROP OFF PARATRANIT BICYCLE TORAGE CONTRUCTION TAGING / PARKING TATION AREA FOOTPRINT IGNALIZED INTERECTION (EXITING) IGNALIZED INTERECTION (PROPOED) N FEDERAL WAY TRANIT CENTER TATION ITE PLAN FWLE_I-5_AP

14 EXITING BRIDGE EXITING PARKING TRUCTURE EL TATION PARKING BU LAYOVER BU DROP-OFF EL EXITING TRANIT CENTER ECTION LOOKING WET TAIR 2 ELEV EL EL TAIR TRANIT CENTER EL UPPORT ERVICE EL ANCILLARY BIKE EL TORAGE GRADE ECTION LOOKING NORTH TATION PLAZA VERTICAL CIRCULATION TICKETING / HALL PLATFORM ANCILLARY PACE TP BU LAYOVER BU PICK-UP / DROP OFF PARATRANIT BICYCLE TORAGE CONTRUCTION TAGING / PARKING FEDERAL WAY TRANIT CENTER TATION ECTION FWLE_I-5_AX

SOUND TRANSIT FEDERAL WAY LINK EXTENSION

SOUND TRANSIT FEDERAL WAY LINK EXTENSION Federal Way Link Extension F-15 Appendix F Conceptual Design Drawings 10/31/016 4:3:3 PM CFOX C:\PWWORKING\EA\D107884\A_FWLE_I-5_MAINLINE.DWG OUND TRANIT FEDERAL WAY LINK EXTENION Federal Way Link Extension

More information

Station Plaza STATION AREA FOOTPRINT SIGNALIZED INTERSECTION (EXISTING) KENT/DES MOINES I-5 STATION OPTION SITE PLAN

Station Plaza STATION AREA FOOTPRINT SIGNALIZED INTERSECTION (EXISTING) KENT/DES MOINES I-5 STATION OPTION SITE PLAN Federal Way Link Extension F-29 Appendix F Conceptual Design Drawings SOUND TRANSIT FEDERAL WAY LINK EXTENSION 30 2/25/2015 12:30:48 PM BRHARRIS C:\PWWORKING\SEA\D1078842\A_FWLE_I-5_MAINLINE.DWG DRAFT

More information

Letter EL652 City of Mercer Island. Page 1. No comments n/a

Letter EL652 City of Mercer Island. Page 1. No comments n/a Letter EL652 City of Mercer Island Page 1 No comments n/a Page 2 Response to comment EL652 1 Section 4.5.3 of the Final EIS presents the range of potential impacts of the project. This project also lists

More information

CEE nd Midterm Examination (50 minutes)

CEE nd Midterm Examination (50 minutes) CEE 30 nd Midterm, Fall 009 CEE 30 nd Midterm Examination (50 minute) Pleae write your name on thi cover. Pleae write you lat name on all other exam page You are allowed to ue one 8.5 by heet of note..

More information

1.0 Purpose and Need for Federal Way Link Extension

1.0 Purpose and Need for Federal Way Link Extension 1.0 Purpose and Need for Federal Way Link Extension The Central Puget Sound Regional Transit Authority (Sound Transit) is proposing the Federal Way Link Extension (FWLE) to expand the regional light rail

More information

Federal Way Link Extension

Federal Way Link Extension Federal Way Link Extension Draft EIS Summary Route & station alternatives and impacts Link Light Rail System Map Lynnwood Mountlake Terrace Lynnwood Link Extension Shoreline 14th Northgate 40 Northgate

More information

Note: The October 2007 version of this report has been updated in this December 2008 report to present costs in year 2007 dollars.

Note: The October 2007 version of this report has been updated in this December 2008 report to present costs in year 2007 dollars. Sound Transit Phase 2 South Corridor LRT Design Report: SR 99 and I-5 Alignment Scenarios (S 200 th Street to Tacoma Dome Station) Tacoma Link Extension to West Tacoma Prepared for: Sound Transit Prepared

More information

Key Transfer Stations - Technical Memo

Key Transfer Stations - Technical Memo DOCUMENT 5 October 2008 Key - Technical Memo 1.0 INTRODUCTION In May 2008 Council approved a Primary Rapid Transit Network which includes both Light Rail Transit (LRT) and Bus Rapid Transit (BRT) corridors.

More information

WELCOME. Transit Options Amherst - Buffalo Public Workshops

WELCOME. Transit Options Amherst - Buffalo Public Workshops WELCOME Transit Options Amherst - Buffalo Public Workshops Sponsored by Niagara Frontier Transportation Authority Greater Buffalo Niagara Regional Transportation Council Where do you live? Where do you

More information

3.0 Transportation Environment and Consequences

3.0 Transportation Environment and Consequences 3.0 Transportation Environment and Consequences 3.1 Summary This chapter describes the characteristics of the transportation system in the FWLE vicinity and discusses potential impacts and mitigation measures

More information

Develop ground transportation improvements to make the Airport a multi-modal regional

Develop ground transportation improvements to make the Airport a multi-modal regional Project Overview TRANSPORTATION IMPROVEMENTS WHAT ARE THE PROJECT GOALS? Transportation transportation hub. Develop ground transportation improvements to make the Airport a multi-modal regional Land Use

More information

Bi-County Transitway/ Bethesda Station Access Demand Analysis

Bi-County Transitway/ Bethesda Station Access Demand Analysis Bi-County Transitway/ Bethesda Station Access Demand Analysis Prepared for: Washington Metropolitan Area Transit Authority Office of Planning and Project Development May 2005 Prepared by: in conjunction

More information

4 Circulation & Transportation

4 Circulation & Transportation 4.1 Mobility Network The mobility network at the new St. Paul s hospital and health campus is comprised of an interconnected system of sidewalks, cycle paths, transit routes and roadways. Figure 4-1: Indicative

More information

ACEforward. Livermore Valley Chamber of Commerce Business Alliance Meeting. September 6, 2017

ACEforward. Livermore Valley Chamber of Commerce Business Alliance Meeting. September 6, 2017 ACEforward Livermore Valley Chamber of Commerce Business Alliance Meeting September 6, 2017 Current ACE Connectivity Map WESTBOUND TRAINS ACE 1 ACE 3 ACE 5 ACE 7 Stockton 4:20AM 5:35AM 6:40AM 7:05AM Tracy

More information

41 One Gateway Plaza Los Angeles, CA

41 One Gateway Plaza Los Angeles, CA 41 One Gateway Plaza Los Angeles, CA 90012-2952 213.922.20C metro. net SYSTEM SAFETY AND OPERATIONS COMMITTEE FEBRUARY 21, 2013 EXECUTIVE MANAGEMENT COMMITTEE FEBRUARY 21, 2013 SUBJECT: ACTION: ADMINISTRATIVE

More information

Denver Metro Association of Realtors

Denver Metro Association of Realtors Denver Metro Association of Realtors North Metro Rail Line October 2, 2014 1 The RTD FasTracks Plan 122 miles of new light rail and commuter rail 18 miles of Bus Rapid Transit (BRT) service 31 new Park-n-Rides;

More information

PARKING. VA NWIHCS Employee Parking Changes Beginning April 2, 2018

PARKING. VA NWIHCS Employee Parking Changes Beginning April 2, 2018 OMAHA VA CAMPUS PARKING page 2 OFF-SITE PARKING page 3 Lot and Shuttle Center Mall VA NWIHCS Employee Changes Beginning April 2, 2018 For the most up to date information, click on the Button on the NWIHCS

More information

Which US President was most responsible for the development of the US Interstate System?

Which US President was most responsible for the development of the US Interstate System? EE 30 Midterm Sample Quetion Short Anwer Which US Preident wa mot reponible for the deelopment of the US Intertate Sytem? Eienhower What metric i ued to calculate interection Leel of Serice? Etimated aerage

More information

METRO Orange Line BRT American Boulevard Station Options

METRO Orange Line BRT American Boulevard Station Options METRO Orange Line BRT American Boulevard Station Options Bloomington City Council Work Session November 18, 2013 Christina Morrison BRT/Small Starts Project Office Coordinating Planning and Design AMERICAN

More information

Waco Rapid Transit Corridor (RTC) Feasibility Study

Waco Rapid Transit Corridor (RTC) Feasibility Study Waco Rapid Transit Corridor (RTC) Feasibility Study Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System Jimi Mitchell, Project Manager AECOM

More information

West Santa Ana Branch Transit Corridor. Informational Briefing Gateway Cities Service Council April 13, 2017

West Santa Ana Branch Transit Corridor. Informational Briefing Gateway Cities Service Council April 13, 2017 West Santa Ana Branch Transit Corridor Informational Briefing Gateway Cities Service Council April 13, 2017 Project Study Area 98 square miles 20 individual cities plus unincorporated LA County 1.2 million

More information

Business Advisory Committee. July 7, 2015

Business Advisory Committee. July 7, 2015 Business Advisory Committee July 7, 2015 1 Today s Topics Outreach Update TI #1 and 2: Target Field Station Connection to I-94: Recommendation 85 th Station Configuration 93 rd Station Configuration DEIS

More information

3.0 Transportation Environment and Consequences

3.0 Transportation Environment and Consequences 3.0 Transportation Environment and Consequences 3.1 32BSummary This chapter describes the characteristics of the transportation system in the Federal Way Link Extension (FWLE) vicinity and discusses potential

More information

Charter Bus Staging and Pick-Up

Charter Bus Staging and Pick-Up W Area Dr Charter Bus Staging and Pick-Up Event Charter Bus Loading Zone AirTrain Domestic Terminals: Level 1 (Arrivals) Designated spaces in Courtyards 1, 3, or 4 Terminal 2 International Terminal: Level

More information

March Government Center Station

March Government Center Station March 2014 Government Center Station Green Reconstruction Line / Blue Project Line Option for Green Construction Line / Blue Staging Line February 12, 2010 Project Purpose Accessibility Last Key Station

More information

2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS. Eastside Transportation Partnership September 9, 2016

2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS. Eastside Transportation Partnership September 9, 2016 2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS Eastside Transportation Partnership September 9, 2016 1 2 PSRC 2016 Project Selection Process 2018-2020 Estimated FHWA Funds Available: (Summary)

More information

San Francisco Municipal Transportation Agency Capital Programs and Construction Division

San Francisco Municipal Transportation Agency Capital Programs and Construction Division A. Boarding Platform Height The level-boarding platform, which is 14 inches high, is considered the most desirable system in terms of passenger loading and unloading dwell times. This platform system is

More information

CTA Blue Line Study Area

CTA Blue Line Study Area 1 CTA Blue Line Study Area HISTORY OF THE CTA BLUE LINE / I-290 SYSTEM Blue Line / I-290 infrastructure is 55 years old First integrated transit / highway facility in the U.S. PROJECT STUDY AREA EXISTING

More information

Chicago Milwaukee Intercity Passenger Rail Corridor

Chicago Milwaukee Intercity Passenger Rail Corridor Chicago Milwaukee Intercity Passenger Rail Corridor Past, Present, and Future Arun Rao, Passenger Rail Manager Wisconsin Department of Transportation Elliot Ramos, Passenger Rail Engineer Illinois Department

More information

Shady Grove. Station Access Improvement Study. Final Report July Washington Metropolitan Area Transit Authority

Shady Grove. Station Access Improvement Study. Final Report July Washington Metropolitan Area Transit Authority Shady Grove Station Access Improvement Study Final Report July 2011 Washington Metropolitan Area Transit Authority Acknowledgements Washington Metropolitan Area Transit Authority Station Area Planning

More information

3.1 Introduction Transportation Elements and Study Area Meeting the Need for the Project

3.1 Introduction Transportation Elements and Study Area Meeting the Need for the Project Chapter 3 Transportation Environment and Consequences 3. Introduction This chapter summarizes the characteristics of the transportation system in the East Link Project vicinity and discusses potential

More information

VIRGINIA RAILWAY EXPRESS MANASSAS PARK STATION PARKING EXPANSION. Public Meeting June 20, 2017

VIRGINIA RAILWAY EXPRESS MANASSAS PARK STATION PARKING EXPANSION. Public Meeting June 20, 2017 MANASSAS PARK STATION PARKING EXPANSION Public Meeting June 20, 2017 1 AGENDA Project Status Schematic Design Circulation Traffic Analysis Proposed Garage Location Next Steps Cost Estimate 2 PROJECT PHASES

More information

UCLA Lake Arrowhead Conference. October 18, 2010

UCLA Lake Arrowhead Conference. October 18, 2010 BART Click to Capacity edit Master Overview title style for UCLA Lake Arrowhead Conference October 18, 2010 0 BART Basics 360,000 daily riders 104 miles 43 stations 1.3 billion annual passenger miles 1

More information

Orange Line Bus Rapid Transit (BRT) Improvements San Fernando Valley Service Council April 3, 2019

Orange Line Bus Rapid Transit (BRT) Improvements San Fernando Valley Service Council April 3, 2019 Orange Line Bus Rapid Transit (BRT) Improvements San Fernando Valley Service Council April 3, 2019 1 Measure M Transit Projects in San Fernando Valley 2 1 2 Measure M Transit Projects Schedule Project

More information

Conceptual renderings subject to change

Conceptual renderings subject to change Conceptual renderings subject to change OCTA Special Needs Committee Presentation Tuesday, Project Presenter Jamie Lai, P.E. Transit Manager, City of Anaheim The ARTIC Project Manager 2 The ARTIC Project

More information

Troost Corridor Transit Study

Troost Corridor Transit Study Troost Corridor Transit Study May 23, 2007 Kansas City Area Transportation Authority Agenda Welcome Troost Corridor Planning Study Public participation What is MAX? Survey of Troost Riders Proposed Transit

More information

Transportation Improvement Program (TIP) Candidate Project List for Public Review

Transportation Improvement Program (TIP) Candidate Project List for Public Review 2011-2014 Transportation Improvement Program (TIP) Candidate List for Public Review Table 1 Annual Listing Of Federal Aid Obligation For Federal Fiscal Year 2010 North Dakota s Number Transit 410083 Transit

More information

PAPER FOR AREMA 2006 ANNUAL CONFERENCE LOS ANGELES UNION STATION RUN-THROUGH TRACKS UNION STATION TERMINAL IMPROVEMENTS. Paul Mak, PE, SE HDR Inc

PAPER FOR AREMA 2006 ANNUAL CONFERENCE LOS ANGELES UNION STATION RUN-THROUGH TRACKS UNION STATION TERMINAL IMPROVEMENTS. Paul Mak, PE, SE HDR Inc PAPER FOR AREMA 2006 ANNUAL CONFERENCE LOS ANGELES UNION STATION RUN-THROUGH TRACKS UNION STATION TERMINAL IMPROVEMENTS Paul Mak, PE, SE HDR Inc 801 S. Grand Ave. Suite 500, Los Angeles, CA 90017. Tel

More information

Making. Connections: Access, Connectivity and Parking at the Downtown SMART Station. Petaluma SMART Station Area TOD Master Plan.

Making. Connections: Access, Connectivity and Parking at the Downtown SMART Station. Petaluma SMART Station Area TOD Master Plan. Petaluma SMART Station Area TOD Master Plan Photo by Scott Hess, see http://cityofpetaluma.net/ Making June 23, 2011 Connections: Access, Connectivity and Parking at the Downtown SMART Station Petaluma

More information

PAPER FOR AREMA 2004 ANNUAL CONFERENCE LOS ANGELES UNION STATION RUN-THROUGH TRACKS. Paul Mak, PE, SE - DMJM HARRIS

PAPER FOR AREMA 2004 ANNUAL CONFERENCE LOS ANGELES UNION STATION RUN-THROUGH TRACKS. Paul Mak, PE, SE - DMJM HARRIS 1 PAPER FOR AREMA 2004 ANNUAL CONFERENCE LOS ANGELES UNION STATION RUN-THROUGH TRACKS Paul Mak, PE, SE - DMJM HARRIS 515 S. Flower Street 9th Floor, Los Angeles, CA 90071. Tel 213-593-8337 Fax 213-593-8622

More information

50TH STREET CONCEPTUAL DESIGN

50TH STREET CONCEPTUAL DESIGN NUE NUE NUE 51 AVE REET 5.49 A-A SECTION 50TH STREET - STA 0+560 1.2 33.46 19.10 8.75 1.00 3.00 3.00 1.00 CN SPUR IF NECESSARY, GRADING ON PRIVATE TO BE BUS STOP 3697 IVE IVE BUS STOP 2279 4.25 REET REMOVE

More information

8 Evaluation. Sacramento Intermodal Transportation Facility Technical Report #13 Intermodal Alternatives Study. City of Sacramento

8 Evaluation. Sacramento Intermodal Transportation Facility Technical Report #13 Intermodal Alternatives Study. City of Sacramento 8 Evaluation Figure 8.1 SITF Design Charrette with City of Sacramento Staff and SMWM/Arup. 8.1 Site Planning and Architecture The two options present completely different site strategies: The Move the

More information

IMPROVEMENT CONCEPTS

IMPROVEMENT CONCEPTS IMPROVEMENT CONCEPTS for the South Novato Transit Hub Study Prepared by: January 11, 2010 DKS Associates With Wilbur Smith Associates IMPROVEMENT CONCEPTS Chapter 1: Introduction 1. INTRODUCTION The strategic

More information

I-90 ALLSTON INTERCHANGE A MULTIMODAL TRANSPORTATION PROJECT PUBLIC INFORMATION MEETING

I-90 ALLSTON INTERCHANGE A MULTIMODAL TRANSPORTATION PROJECT PUBLIC INFORMATION MEETING I-90 ALLSTON INTERCHANGE A MULTIMODAL TRANSPORTATION PROJECT PUBLIC INFORMATION MEETING DECEMBER 8, 2015 JACKSON MANN COMMUNITY CENTER Meeting Agenda Welcome & Introductions Introduce Concept 3K West Station

More information

Crowne Plaza Lake Placid - Library

Crowne Plaza Lake Placid - Library Library Fireplace 26.94 ft ervice entrance Main entrance and emergency exit ired Internet = indow indow *indows are opaque and face into Pre-Function pace, not outdoors. 29.26 ft LOCATIO: Ground floor,

More information

Appendix B. Tier 2 Final Environmental Assessment I-66 Transit/TDM Technical Report

Appendix B. Tier 2 Final Environmental Assessment I-66 Transit/TDM Technical Report Tier 2 Final Environmental Assessment I-66 Transit/TDM Technical Report Appendix B Bus Bay, Maintenance, and Storage Capacity Analysis Technical Memorandum FINAL MAY 2016 INTRODUCTION This technical memorandum

More information

MIDDAY STORAGE. VRE has temporarily used Ivy City Coach Yard since 1992 Insufficient today Restricts further growth

MIDDAY STORAGE. VRE has temporarily used Ivy City Coach Yard since 1992 Insufficient today Restricts further growth MIDDAY STORAGE VRE has temporarily used Ivy City Coach Yard since 1992 Insufficient today Restricts further growth Will diminish to zero Agreement allows reduction in VRE storage starting July 2018 Washington

More information

Station Evaluation. Durham-Orange Light Rail Transit Project Spring 2012

Station Evaluation. Durham-Orange Light Rail Transit Project Spring 2012 Station Evaluation Durham-Orange Light Rail Transit Project Spring 2012 Key Ingredients for Station Development Platform Designs UNC Hospitals Station The UNC Hospitals Station Option D would be the westerly

More information

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014. King County Metro Columbia Street Transit Priority Improvements Alternative Analysis Downtown Southend Transit Study May 2014 Parametrix Table of Contents Introduction... 1 Methodology... 1 Study Area...

More information

UCLA Lake Arrowhead Conference. October 18, 2010

UCLA Lake Arrowhead Conference. October 18, 2010 BART Click to Capacity edit Master Overview title style for UCLA Lake Arrowhead Conference October 18, 2010 0 BART Basics 360,000 daily riders 104 miles 43 stations 1.3 billion annual passenger miles 1

More information

UCLA Lake Arrowhead Conference. October 18, 2010

UCLA Lake Arrowhead Conference. October 18, 2010 BART Click to Capacity edit Master Overview title style for UCLA Lake Arrowhead Conference October 18, 2010 0 BART Basics 360,000 daily riders 104 miles 43 stations 1.3 billion annual passenger miles 1

More information

CREATING CONNECTIONS IN RICHMOND HILL

CREATING CONNECTIONS IN RICHMOND HILL CREATING CONNECTIONS IN RICHMOND HILL Mohamed Alkoka, Director, Corridor Infrastructure Metrolinx Anthony Irving, Manager, Community Relations Metrolinx May 15, 2017 1 GRIDLOCK COSTS OUR ECONONY Residents

More information

Franconia Springfield Station Vision Plan

Franconia Springfield Station Vision Plan Franconia Springfield Station Vision Plan September 2008 Prepared for the Washington Metropolitan Area Transit Authority (Metro) Washington Metropolitan Area Transit Authority TABLE OF CONTENTS SECTION

More information

Balancing the Transportation Needs of a Growing City

Balancing the Transportation Needs of a Growing City Balancing the Transportation Needs of a Growing City FY 2019 and FY 2020 Capital Budget SFMTA Board Meeting Ed Reiskin, Director of Transportation April 3, 2018 1 FY 2019-23 Capital Improvement Program

More information

Limerick, Colbert Station and Plaza

Limerick, Colbert Station and Plaza Limerick, Colbert Station and Plaza Colbert Station Redevelopment Proposed Design April 2014 IARNROD EIREANN ARCHITECTS SECTION 1 LIMERICK, COLBERT The proposal for Colbert Station and Plaza consist of

More information

Willamette River Transit Bridge. Portland - Milwaukie Light Rail Willamette River Bridge Willamette River Bridge Advisory Committee

Willamette River Transit Bridge. Portland - Milwaukie Light Rail Willamette River Bridge Willamette River Bridge Advisory Committee Portland - Milwaukie Light Rail Willamette River Bridge Willamette River Bridge Advisory Committee 05.28.09 09 Bridge Type - Cost Vertical Clearance Bicycle Pedestrian Path Width Bridge Type - Cost WRBAC

More information

Level 2 Alternatives Screening Report

Level 2 Alternatives Screening Report FEDERAL WAY TRANSIT EXTENSION Level 2 Alternatives Screening Report CENTRAL PUGET SOUND REGIONAL TRANSIT AUTHORITY Table of Contents 1.0 Executive Summary 1.1 Purpose of This Report. 1 1 1.2 Purpose and

More information

Pace Bus Depot Location Analysis

Pace Bus Depot Location Analysis Pace Bus Depot Location Analysis Key Notes 1. Options refer to conceptual sketches prepared by Kimley Horn. 2. The depot is assumed to accommodate Pace routes as they currently exist: 17 routes on the

More information

East River Tunnel. Index

East River Tunnel. Index Natural geography has Long Island equally convenient to Midtown and Lower Manhattan. However, built geography, specifically Pennsylvania tation, clearly favors Midtown. LIRR passengers commute to Lower

More information

engineering phase and during the procurement of design build contracts.

engineering phase and during the procurement of design build contracts. CONSIDERATION OF ALTERNATIVES Below-grade trench alignment along Aviation Boulevard, adjacent to LAX south runways. miles. MOS-Century would extend from the Metro Exposition Line to the Aviation/ Century

More information

Getting to EvCC: Bus, Bike & Carpool

Getting to EvCC: Bus, Bike & Carpool Getting to EvCC: Bus, Bike & Carpool September 201 March 2018 Campus Map CARPOOL LOT BICYCLE BICYCLE REPAIR COLLEGE BROADWAY & TOWER SB BROADWAY & TOWER NB North Area Transit & Bicycle s Transit s Transit

More information

Appendix E Description of Alternatives DRAFT ENVIRONMENTAL IMPACT STATEMENT

Appendix E Description of Alternatives DRAFT ENVIRONMENTAL IMPACT STATEMENT Appendix E Description of Alternatives DRAFT ENVIRONMENTAL IMPACT STATEMENT Chicago Red Line Extension Project Description of Alternatives October 31, 2012 Updated July 29, 2015 Prepared for: Chicago Transit

More information

San Rafael Transit Center. Update. Golden Gate Bridge, Highway & Transportation District Transportation Committee of the Board of Directors

San Rafael Transit Center. Update. Golden Gate Bridge, Highway & Transportation District Transportation Committee of the Board of Directors Transportation Committee November 17, 2016 Agenda Item No. 5, Update on the San Rafael Transit Center Relocation San Rafael Transit Center Relocation Study Update 11/17/16 Golden Gate Bridge, Highway &

More information

Orange Line Bus Rapid Transit Project Plan Update. Metro Transit June 2014 D R A F T

Orange Line Bus Rapid Transit Project Plan Update. Metro Transit June 2014 D R A F T Orange Line Bus Rapid Transit Metro Transit D R A F T Contents 1 Background 4 2 Scope 6 2.1 Mode 2.2 Stations 2.3 Guideway 2.4 Right of Way Needs 2.5 Technology 2.6 Fare Collection 2.7 Branding and Marketing

More information

CTA Blue Line Study Area

CTA Blue Line Study Area CTA Blue Line Study Area HISTORY OF THE CTA BLUE LINE / I-290 SYSTEM Blue Line / I-290 infrastructure is 55 years old First integrated transit / highway facility in the U.S. PROJECT STUDY AREA EXISTING

More information

Customer Service, Operations and Safety Committee Tariff Modifications July 21, 2005

Customer Service, Operations and Safety Committee Tariff Modifications July 21, 2005 Customer Service, Operations and Safety Committee Tariff Modifications July 21, 2005 Purpose and Background Customer Service, Operations and Safety Committee approved proposed policy on June 16; Board

More information

Fremont. Emerson. Plymouth. Ramp A/7th St Transit Center 8th/7th St & Hennepin 8th/7th St & Nicollet 8th/7th St & 3rd Ave 8th/7th St & Park

Fremont. Emerson. Plymouth. Ramp A/7th St Transit Center 8th/7th St & Hennepin 8th/7th St & Nicollet 8th/7th St & 3rd Ave 8th/7th St & Park Brooklyn Center Transit Center BROOKLYN CENTER Xerxes & 56th Ave Brooklyn & 51st Ave 44th Ave & Penn-Oliver Fremont & 42nd Ave Fremont & Dowling Fremont & 35th Ave Fremont/Emerson & Lowry Fremont/Emerson

More information

Dockless Vehicles. Lori Houston Assistant City Manager September 12, 2018

Dockless Vehicles. Lori Houston Assistant City Manager September 12, 2018 Dockless Vehicles Lori Houston Assistant City Manager September 12, 2018 Companies Currently Operating Bird Approx. 1,700 scooters Lime Approx. 300 scooters 3 Companies That Have Expressed Interest In

More information

VIRGINIA RAILWAY EXPRESS MANASSAS PARK STATION PARKING EXPANSION. Site Evaluation & Recommendation. October 18, 2016

VIRGINIA RAILWAY EXPRESS MANASSAS PARK STATION PARKING EXPANSION. Site Evaluation & Recommendation. October 18, 2016 MANASSAS PARK STATION PARKING EXPANSION Site Evaluation & Recommendation October 18, 2016 1 INFORMATION ITEM Project Overview Parking Demand Site Evaluation VRE Recommended Preferred Alternative Next Steps

More information

WELCOME TO BLUE HILL AVENUE STATION PUBLIC MEETING October 5, 2016

WELCOME TO BLUE HILL AVENUE STATION PUBLIC MEETING October 5, 2016 WELCOME TO BLUE HILL AVENUE STATION PUBLIC MEETING October 5, 2016 MBTA / MATTAPAN COMMUNITY MEETING: 15 September 2014 Public Libra 5:30 PM BLUE HILL AVENUE & CUMMINS HIGHWAY Introduction Project Status

More information

Welcome. Please Sign In

Welcome. Please Sign In Welcome South Bay Bus Rapid Transit (BRT) Draft Environmental Impact Report (DEIR) Public Meeting Please Sign In Please comment in any of the following manners: 1. Submit a comment form 2. Provide verbal

More information

NAVY YARD BALLPARK STATION ACCESS IMPROVEMENTS STUDY. Final Report. Washington Metropolitan Area Transit Authority

NAVY YARD BALLPARK STATION ACCESS IMPROVEMENTS STUDY. Final Report. Washington Metropolitan Area Transit Authority NAVY YARD BALLPARK STATION ACCESS IMPROVEMENTS STUDY Final Report Washington Metropolitan Area Transit Authority Office of Real Estate and Station Planning April 2016 [This page intentionally left blank]

More information

Recommendation for 2017 PSRC Funding Transportation Policy Board - June 8, 2017

Recommendation for 2017 PSRC Funding Transportation Policy Board - June 8, 2017 Recommendation for 2017 PSRC Funding Transportation Policy Board - June 8, 2017 Background PSRC s 2017 funding: Rural Town Centers and Corridor program Regional FTA competition May - Board released projects

More information

Existing CTA Blue Line: From Clinton Station to Forest Park Station IDOT Expansion Alternative: Forest Park Station to Mannheim Road

Existing CTA Blue Line: From Clinton Station to Forest Park Station IDOT Expansion Alternative: Forest Park Station to Mannheim Road Board 1: Blue Line Study Area History of the CTA Blue Line / I-290 system Blue Line / I-290 infrastructure is 55 years old First integrated transit / highway facility in the U.S. Project Study Area Existing

More information

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan Valley Line West LRT Concept Plan Recommended Amendments Lewis Farms LRT Terminus Site Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan Lewis Farms LRT terminus site, 87 Avenue/West

More information

VAN NESS AVENUE BUS RAPID TRANSIT

VAN NESS AVENUE BUS RAPID TRANSIT VAN NESS AVENUE BUS RAPID TRANSIT Peter Gabancho Project Manager III Capital Programs & Construction SFMTA Shari Tavafrashti Principal Engineer SFCTA 1 Project Purpose and Need Improve transit reliability,

More information

TBARTA USF to Wesley Chapel Express Bus Service Operating Plan. Draft 3/25/2014

TBARTA USF to Wesley Chapel Express Bus Service Operating Plan. Draft 3/25/2014 TBARTA USF to Wesley Chapel Express Bus Service Operating Plan Draft 3/25/2014 March 2014 Table of Contents 1.0 Introduction... 1 2.0 Study Area... 1 3.0 Existing Available Service... 3 4.0 Proposed Service...

More information

APPENDIX C: COSTS BACK-UP

APPENDIX C: COSTS BACK-UP APPENDIX C: COSTS BACK-UP SECTION 2010-2015 Executive Recap DESCRIPTION MAC LTCP PLAN RANGE LOW HIGH Humphrey Terminal Expansion - Phase I (Add 17 Gates) $224,077,000 - $263,620,000 OTHER PHASE SCOPE

More information

CEDAR AVENUE TRANSITWAY Implementation Plan Update

CEDAR AVENUE TRANSITWAY Implementation Plan Update CEDAR AVENUE TRANSITWAY Implementation Plan Update EECUTIVE SUMMARY DECEMBER 2015 Executive Summary In 2013, the Twin Cities metropolitan area s first bus rapid transit (BRT) line, the METRO Red Line,

More information

Keeping Seattle Moving Seattle City Council February 2013

Keeping Seattle Moving Seattle City Council February 2013 Keeping Seattle Moving Seattle City Council February 2013 Seattle City Council February 2013 1 Mobility Challenges Ahead Viaduct mitigation expires June 2014 Potential system-wide service cuts begin in

More information

State Avenue Corridor Bus Rapid Transit (BRT)

State Avenue Corridor Bus Rapid Transit (BRT) State Avenue Corridor Bus Rapid Transit (BRT) Moving Forward Incrementally April 2010 State Ave. BRT Update Bus Rapid Transit Overview State Ave. Alternatives Analysis Results What s Coming Up Right Away!

More information

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP)

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP) Public Information Packet FY - Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP) Comment Form Annual Element TIP Projects - TIP Projects Year - Metropolitan Transportation Improvement

More information

Central Park Drives Traffic Management Overview

Central Park Drives Traffic Management Overview Central Park Drives Traffic Management Overview Spring 2015 New York City Department of Transportation Existing Traffic Management From Labor Day thru Last Day of NYC Public School: 8-10 AM weekdays (Southbound)

More information

Chapter 8 - Special Rooms and Spaces

Chapter 8 - Special Rooms and Spaces Chapter 8 - Special Rooms and Spaces 801 General 801.1 Scope. Special rooms and spaces required to be accessible by the scoping provisions adopted by the administrative authority shall comply with the

More information

Swift Green Line April 11, 2019

Swift Green Line April 11, 2019 Swift Green Line April 11, 2019 Overview Swift BRT Overview Swift Green Line Project Snohomish County Partnership Early Results Swift Washington s first BRT Overlay BRT Stations approx. 3/4-1 mile apart

More information

Landside Access Modernization Program (LAMP)

Landside Access Modernization Program (LAMP) Landside Access Modernization Program (LAMP) LAX Los Angeles International Airport is the 2 nd busiest airport in the United States and is the largest airport in California. Since the start of the economic

More information

Clifton Corridor Transit Initiative. Briefing to Great Lakes Community February 11, 2016

Clifton Corridor Transit Initiative. Briefing to Great Lakes Community February 11, 2016 Clifton Corridor Transit Initiative Briefing to Great Lakes Community February 11, 2016 Neighborhood Concerns and Requests Provide a general overview and background of the project What are the different

More information

Risk Assessment Checklist for Wheelchair Transportation in Vehicles

Risk Assessment Checklist for Wheelchair Transportation in Vehicles Person s Name: Date of Birth: Address: Diagnosis: Sex: M/F/O It is recommended this be read in conjunc on with and in reference to the following documents: Australian/New Zealand Standard, Wheelchairs

More information

ARTERIAL BRT OVERVIEW

ARTERIAL BRT OVERVIEW ARTERIAL BRT OVERVIEW Key Question: Could arterial Bus Rapid Transit (BRT) routes improve near-term mobility in the northwest area until rail can be built? Key Findings: 6 arterial BRT routes have been

More information

Inspection Report: BOOM TRUCK-ANNUAL. Equipment Identification and Specifications

Inspection Report: BOOM TRUCK-ANNUAL. Equipment Identification and Specifications Inspection Report: OHA/ANI/AME tandards: OHA 1926.1400, 1910.180,1926.601 AME B30.5,B30.10 Date Inspected: 07/25/2016 Operation Hours: 11,121. Operation Miles: 107,160. Inspector: teve Marquis Equipment

More information

COST ESTIMATES: Curb-Running

COST ESTIMATES: Curb-Running COST ESTIMATES: Curb-Running PROJECT FEASIBILITY COST ESTIMATE SUMMARY Geary Bus Rapid Transit Study Alternative: Side Lane (Curb Running) Date: 4/12/07 Percent Cost Total Project Capital Outlay I- Roadway

More information

City of Bellevue East Link Light Rail B7/C9T to NE 2nd Portal (B7 Revised) Alternative RP03 Interim Analysis Report

City of Bellevue East Link Light Rail B7/C9T to NE 2nd Portal (B7 Revised) Alternative RP03 Interim Analysis Report East Link Light Rail B7/C9T to NE nd Portal (B7 Revised) Alternative RP3 Interim Analysis Report 538/RP3 Review Draft 3 May Arup North America Ltd 43 Columbia Street Suite Seattle WA 984 United States

More information

Draft Supplemental Transportation Analysis Santa Clara - Alum Rock Transit Corridor APPENDIX A TRAFFIX Level of Service Calculation Sheets 2012 BRT 20

Draft Supplemental Transportation Analysis Santa Clara - Alum Rock Transit Corridor APPENDIX A TRAFFIX Level of Service Calculation Sheets 2012 BRT 20 Draft Supplemental Transportation Analysis Santa Clara - Alum Rock Transit Corridor APPENDIX A TRAFFIX Level of Service Calculation Sheets 202 BRT 2030 BRT 2030 BRT Mitigation COMPARE Wed May 8 2:02: 20

More information

RECOMMENDED ALTERNATIVE REPORT

RECOMMENDED ALTERNATIVE REPORT DRAFT METROCENTER CORRIDOR STUDY RECOMMENDED ALTERNATIVE REPORT JULY 12, 2005 TABLE OF CONTENTS SECTION PAGE 1.0 INTRODUCTION... 1 2.0 TIER 1 ALTERNATIVES EVALUATION... 1 3.0 TIER 2 ALTERNATIVES EVALUATION...

More information

Sound Transit East Link: Bus/LRT System Integration Study

Sound Transit East Link: Bus/LRT System Integration Study Sound Transit East Link: Bus/LRT System Integration Study Prepared For: Sound Transit King County Metro Mercer Island WSDOT Prepared By: CH2M HILL July, 2014 1 SOUND TRANSIT EAST LINK: BUS/LRT SYSTEMES

More information

East San Fernando Valley Transit Corridor. TAC Briefing December 4, 2013

East San Fernando Valley Transit Corridor. TAC Briefing December 4, 2013 East San Fernando Valley Transit Corridor TAC Briefing December 4, 2013 Overview Measure R Project Long Range Transportation Plan Reserves $170.1 Million 2018 Revenue Operations Date Coordination with

More information

Welcome The City has undertaken a naming exercise for the existing and future LRT lines. The SE to West LRT, as the project has been called to date,

Welcome The City has undertaken a naming exercise for the existing and future LRT lines. The SE to West LRT, as the project has been called to date, Welcome The City has undertaken a naming exercise for the existing and future LRT lines. The SE to West LRT, as the project has been called to date, is now called the Valley Line. We are here to present

More information

I-10 West AA/EIS Pre-Screening and Tier 1 Analysis Results. Public Meeting. Wulf Grote, Director Project Development Rick Pilgrim, Project Manager

I-10 West AA/EIS Pre-Screening and Tier 1 Analysis Results. Public Meeting. Wulf Grote, Director Project Development Rick Pilgrim, Project Manager I-10 West AA/EIS Pre-Screening and Tier 1 Analysis Results Public Meeting Wulf Grote, Director Project Development Rick Pilgrim, Project Manager March 4 & 5, 2008 Today s Agenda Overview of Alternatives

More information

Key Project Elements Status Report

Key Project Elements Status Report Los Angeles County Metropolitan Transportation Authority Key Project Elements Status Report presented to the Corridor Advisory Committee August 18, 2016 Background Motion 22.1 elements are grouped into

More information

Strategies to keep people and goods moving in and through Seattle

Strategies to keep people and goods moving in and through Seattle Strategies to keep people and goods moving in and through Seattle SR 99 Closure and the Seattle Squeeze 2018-2024 DON Information Session Department of Transportation Delridge Community Center November

More information