5. What is the maximum number of#18 TEW control conductors permitted to be installed into a 6 inch rigid metal conduit? a. 196 b. 138 c. 259 d.

Size: px
Start display at page:

Download "5. What is the maximum number of#18 TEW control conductors permitted to be installed into a 6 inch rigid metal conduit? a. 196 b. 138 c. 259 d."

Transcription

1 I Practice Exam Questions :loo(p c:.e.c A construction drawing has a scale of 1:200. If a line on the drawing measured 11.5mm, what would be the actual measured length on the project? a. 2300cm b. 230mm c. 2.3 meters d mm 2. Which section in a construction set of drawings would you find information on ventilation ducts? a. structural b. mechanical c. architectural d. electrical 3. What is the maximum number of 90 bends permitted in a run of rigid PVC if installed underground? a. 2 b. 6 c. 4 d. unlimited 4. When installing branch circuit conductors underground, what is the minimum depth of the sand that must be under the conductors? a. 50mm b. 75mm c. 100mm d. 150mm 5. What is the maximum number of#18 TEW control conductors permitted to be installed into a 6 inch rigid metal conduit? a. 196 b. 138 c. 259 d What is the maximum current rating offour-1250kcmil RW-90 Al (XLPE) 600V no jacket conductors installed in a run of EMT for a volt, three phase, four wire feeder? a. 424 amps b. 516 amps c. 530 amps d. 645 amps 7. What is the maximum rating/setting of over-current device required to protect a residential branch circuit that has two baseboard heaters connected? a. 15 amps b. 20 amps c. 25 amps d. 30 amps 8. An isolation switch is required to be installed on a commercial roof-top heating/cooling unit. What is the minimum enclosure requirement in this case? a. CSA enclosure 1 b. CSA enclosure 3R c. CSA enclosure 5 d. CSA enclosure What is the minimum size of conductor permitted to be used for a class 2 circuit in a run of ENT? a.24awg b. 22 AWG c. 19 AWG d. 16 AWG

2 2 Practice Exam Ouestions 10. What is the minimum separation required between power conductors and communication conductors when they are installed in the same trench, and at the same depth? a. 150mm b. 300mm c. 600mm d. 1 meter 11. Two baseboard heaters are installed on a residential branch circuit and are connected using 14/2 NMD-90. If the heaters are 1000 watt and 1500 watt respectively, what is the maximum length of the 14/2 NMD-90 cable? a. 6.1 meters b meters c meters d meters 12. What is the minimum size of bond conductor required in a run ofpvc, that supplies a 25 Hp, 600 volt, 3-phase refrigeration compressor, that is protected using time-delay fuses, and fed using RW -90 XLPE conductors? a. #14AWG b. #12AWG c. #10AWG d. #8AWG 13. What is the purpose of a lightning arrester? a. to prevent lightning from striking an electrical installation b. to prevent transient voltages from accumulating c. to monitor how many times lightning strikes an electrical installation d. to conduct excess voltage (from a lightning strike) to ground 14. When installing auxiliary gutter, what is the maximum distance between supports? a. 1 meter b. 1.5 meters c. 2 meters d. 3 meters 15. What is the maximum amount of current that anyone conductor can carry in a 22/6 ELC cable? a. 2 amps b. 2.5 amps c. 3 amps d. 3.5 amps 16. What is the recommended tightening torque, when terminating a 750kcmil copper conductor to a lug that takes a W' hex socket? a newton-meters b newton-meters c newton-meters d newton-meters

3 3 Practice Exam Questions 17. What is the minimum dimension of "X" in the pull box shown? a. 424mm b. 504mm c. 378mm d. 318mm 18. What is the minimum ampacity of the RW-90 (XLPE) primary conductors that feed a 600 volt primary, 120/208 volt secondary, 112kV A 3-phase, Dry-Type transformer? a. #1 R W -90 (XLPE) b. #1/0 RW -90 (XLPE) c. #2/0 RW-90 (XLPE) d. #3/0 R W -90 (XLPE) 19. A 600 volt primary, 120/208 volt secondary, dry-type transformer has 70 amp time-delay fuses for it's primary over-current protection. A lighting panel is installed on the secondary side directly to the transformer with no over-current protection. Based on this information, what is the minimum rating of the lighting panel? a. 100 amps b. 200 amps c. 225 amps d. 400 amps 20. What is the minimum number of conductors required to connect the metallic gradient control mat to the switch operating handle grounding conductor, for a high-voltage gang-operated switch? a. two b. one c. three d. four 21. What is the minimum size of copper conductor required to supply a control circuit of 5 amps at 600 volts if using 2 parallel runs? a. #1/0 AWG b. #12AWG c. #14AWG d. #18 AWG 22. Using the diagram below, what is the minimum number of conductors required in the conduit marked "X"? Sta Sta two b. three c. four d. five Start/Sto Station Motor 0 Starter rt/stop tio 1 I Conduit "X" I

4 4 Practice Exam Ouestions 23. Which of-the following types of cables meet the minimum flame spread requirements for buildings of non-combustible construction without additional fire protection? a. jacketed and unmarked armoured cable b. NMW-U c. NMD-90 d. AC Where would you find information on hazardous materials in a commercial establishment? a. posted in the main office b. on WHMIS information sheets c. on safety material handling sheets d. on material safety data sheets 25. In which of the following is it permitted to install high voltage conductors? a. wlreway b. EMT c. rigid PVC d. elevator shaft 26. What is the purpose of installing GFCI protection? a. to monitor neutral current b. to monitor current in the ungrounded conductor c. to monitor leakage current d. to monitor current in the bond conductor 27. What does the symbol to the right indicate? a. a check valve b. a filter c. a receiver d. a pneumatic valve 28. Three cable trays are to be installed in a tier. What is the minimum space between cable trays? a. 600mm b.450mm c. 300mm d. 150mm 29. A 40 HP, 600 volt, 3-phase synchronous motor has a marked service factor of 1.1 and is protected with time-delay fuses. What is the minimum size of bond conductor required in the flexible metal conduit that supplies this motor, if RW-90 (XLPE, 600 volt, unjacketed) conductors are used? a. #12AWG b. #loawg c. #8 AWG d. #6AWG

5 5 30. What is the maximum rating/setting of the over-current device used to protect fluorescent lighting fixtures in a commercial building if the fixtures are fed with #12/2 AC-90 cables? a. 15 amps b. 20 amps c. 25 amps d. 30 amps 31. What is the maximum ampacity of a #10/4 SOW flexible cord that is used to feed a 3-phase, 600 volt pump motor? a. 60 amps b. 45 amps c. 30 amps d. 25 amps 32. A line voltage switch is to be installed in an elevator machine room, what is the minimum enclosure type necessary for this installation? a. CSA enclosure type 1 b. CSA enclosure type 2 c. CSA enclosure type 5 d. CSA enclosure type What is the maximum distance from a panelboard to the first support, on a run of27mm EMT installed in a commercial building? a. 3.0 meters b. 2.0 meters c. 1.5 meters d. 1.0 meters 34. You have just installed four baseboard heaters on the same branch circuit in a dwelling unit. If the circuit is fed using #8/2 NMD-90, what is the maximum rating/setting of the over-current device protecting this circuit? a. 15 amps b. 20 amps c. 30 amps d. 40 amps 35. When installing insulated conductors in the same raceway that have different voltage ratings, how is the overall voltage rating determined? a. by using a voltage correction factor b. by using the lowest voltage rating c. by using the highest voltage rating d. by using the average voltage rating 36. What is the proper procedure for terminating stranded aluminum conductors? a. apply compound over the conductor and connector after installation b. apply compound over the conductor and connector before installation c. apply compound over the conductor and wipe off the excess before installation d. clean the conductor and connector, then apply compound over both before installation

6 6 Practice Exam Ouestions 37. When using solid state devices, which of the following is a code requirement? a. must be used to isolate equipment for maintenance b. must prevent any voltage feedback c. must NOT be used for computer equipment d. must provide an additional disconnecting means 38. Where can a bare high-voltage bus be installed? a. in an electrical equipment vault b. indoors in an electrical equipment room c. on the ceiling of an industrial plant d. above an overhead crane 39. When can a final inspection be done on the electrical installation of a single residential dwelling by the inspection department? a. after the rough-in and service inspection b. after the service has been energized c. after the roof and windows have been installed d. after the entire electrical installation is complete 40. A type B & C fire extinguisher has what chemicals inside? a. halon, C02, and oxygen b. co2 and oxygen c. water and baking soda d. halon and C An electrician is required to use a powder actuated tool to fasten materials to a structure. Which of the following materials could the powder actuated tool be used to safely fasten? a. steel to wood b. concrete to wood c. wood to concrete d. wood to wood 42. What is the maximum current rating of code fuses? a. 600 amps b. 400 amps c. 225 amps d. 30 amps 43. When can an electrician rough-in the electrical wiring of a single family dwelling? a. before the mechanical trades b. after the mechanical trades c. before the plumber d. after the plumber

7 7 Practice Exam Questions 44. What is the maximum distance that an auxiliary gutter can extend from the equipment that it is connected to? a. 3 m beyond the equipment b. 4.5 m beyond the equipment c. 6 m beyond the equipment d. 7.5 m beyond the equipment 45. When is it permissible to splice a service neutral conductor? a. in a meter base b. in the service lateral conduit/raceway c. underground d. at the service entrance head 46. What is the maximum voltage rating of a # 3 TW -75 aluminum conductor? a. 300 volts b. 600 volts c volts d volts 47. What size of single conductor RW-75 aluminum conductors (installed in free air) are required to supply a single-phase, 240 volt, non-continuous load of amps, if the conductors are present and in contact with each other? a. #1 AWG b. #2AWG c. #1I0AWG d. #3/0 AWG 48. Which of the following systems is NOT required to be grounded? a. 347 volt lighting systems b. 347/600 volt services c. 208 volt electric heating systems d. electric arc furnaces 49. Which of the following conditions can rigid PVC conduit be used? a. in a class III hazardous location b. in fiberglass insulation c. in grade level concrete slabs d. in a paint spray booth 50. Where must the V-ground slot be located of 5-15R receptacles used in the bedroom area of a dwelling unit, if they are installed in a vertical plane? a. uppermost b. lowermost c. doesn't matter d. the receptacles cannot be mounted on a vertical plane

8 8 ' Practice Exam Questions 51. Which of the following boxes can be used in masonry construction? a LA b L c d. MBD l 52. What is the largest size of solid conductor that is permitted to be laid into a raceway? a. #12AWG b. #loawg c. #8AWG d. #6AWG 53. What is the minimum size of single conductor RW-90 XLPE 600 volt (no jacket) run arielly between buildings, required to supply a circuit with a 35 amp continuous load? a. #12AWG b. #loawg c. #8AWG d. #6AWG 54. There are three-14/3 NMD~90 cables that run through a wooden support beam that is 750mm thick. What is the maximum amount of non-continuous load that can be connected to each insulated wire of these cables? a. 15 amps b. 12 amps c amps d. 18 amps 55. What is the allowable ampacity of#l AWG type NS-75 Aluminum triplex cable that feeds a residential overhead service? a. 125 amps b. 140 amps c. 160 amps d. 185 amps 56. What is the minimum size ofrw-90 XLPE 600 volt (no jacket) aluminum conductors that are required to supply a 200 amp, 120/240 volt, single-phase residential service? a. #4/0AWG b. #250 kcmil c. #3/0 AWG d. #2/0AWG 57. What is the minimum size of copper ground conductor that is permitted to be run on the surface of wood joists without the use of mechanical protection? a. #10AWG b. #8 AWG c. #6AWG d. #4AWG

9 9 Practice Exam Questions 58. What is the outside diameter of a #8 RW-90 XLPE aluminum conductor? a mm b mm c. 5.99mm d mm 59. When is bonding equipment to the grounded system neutral conductor permitted? a. anywhere in the system b. when a system is resistance grounded c. for a pole-top lighting system d. on the supply side of the main service switch 60. What is the maximum load in watts that is permitted to be connected to a 20 amp, 2-pole, circuit breaker that is fed from a 120/240 volt, single-phase, three-wire service if#10/2 AC-90 cable is used as the conductors? a watts b watts c watts d watts 61. What type of wiring method does a portable cord-connected, 2000 watt, 240 volt, electric heater require to connect it to an electrical supply? a. AC-90 b. SO c. NMD-90 d. RA When is an inspection application to be filed with the inspection department? a. within 48 hours of beginning electrical work on a commercial installation b. at the same time that the permit is taken out c. at the same time as work commences on the installation d. within one week of commencing work on the installation 63. Your boss sends you to purchase some NMW-U cable to make-up a string of temporary lights for a construction site. What is the minimum size of conductor that you must purchase? a. #16 AWG copper b. #14 AWG copper c. #12 AWG copper d. #10 AWG copper 64. What is the minimum distance from the outer surface of metal studs, joists or other similar metal members, when running armoured cables through them, before mechanical protection is required? a. 50mm b. 30mm c. 25mm d.32mm

10 10 Practice Exam Ouestions 65. How far around a wire binding screw must an aluminum conductor extend to be properly terminated? a. half-way b. two-thirds c. three-quarters d. all the way around 66. When mounting a device box to a metal stud, what is the maximum distance from the back or end of the box that the mounting screws can project into the box? a. 3.2mm b. 6.4mm c mm d. 25 mm 67. What is the minimum thickness of boards when used to support a 4-gang switch box to wooden studs in a residential installation? a. 13 mm b. 19mm c. 25 mm d. 40mm 68. What is the minimum bending radius for AC-90 cables? a. six times the internal diameter b. ten times the external diameter c. ten times the internal diameter d. six times the external diameter 69. What is the maximum volume of box that can be supported by a raceway? a ml b ml c ml d ml 70. A heat pump rated 40 amps, 120 volts, single-phase is installed 40 meters away from the source of supply. What is the minimum size ofr-90 XLPE conductors that are required to keep the voltage drop within code requirements? a. #10 R-90 XLPE b. #8 R-90 XLPE c. #6 R-90 XLPE d. #4 R-90 XLPE 71. There is a 24 volt emergency lighting circuit with a rating of 60 amp-hours at a maximum of 200 watts of connected load. What length of time can this system operate at maximum capacity? a. 6.0 hours b. 6.5 hours c. 7.0 hours d. 7.2 hours

11 11 Practice Exam Questions 72. A split-phase AC motor has three leads. The leads are marked A, Band C. If the resistance readings between A and B = 5250, A and C = 7750, and Band C = 2500, which leads belong to the run winding? a. AandB b. AandC c. B andc d. C and A 73. A 3-phase capacitor bank is rated at 60 amps at 600 volts. What is the minimum size of 3-wire Teck-90 cable that can be used to supply this capacitor bank? a. #8/3 Teck-90 b. #4/3 Teck-90 c. #2/3 Teck-90 d. #00/3 Teck What is the maximum rating ofthe overload relays that are used to protect a 40 Hp, 600 volt, 3- phase refrigeration compressor? a amps b amps c amps d amps 75. Where is the proper location of the disconnecting means for an un-interruptible power supply to be when used to isolate the UPS from the building's power system? a. on the supply side of the UPS b. between the UPS and the load c. not required d. on the load side of the transfer switch 76. What is the minimum size of conductor that is permitted to be installed in a run of PVC for a fire alarm system? a. #12 TW-75 b. #14 R90 XLPE c. #16TEW d. #18 GTF 77. When performing preventative maintenance on a reversing motor starter, you notice that a contactor is humming very loudly. What is the likely cause? a. the input voltage is too high b. the input voltage is too low c. the contactor has loose laminations d. the shaded pole is broken or missing

12 1 2 Practice Exam Ouestions 78. What would be the result of your weld, if the mold you were using for a thermit-weld was damp or wet? a. the weld would be very shinny b. the weld would be porous c. the weld would be very smooth d. the weld would be normal 79. If the peak voltage is volts, what will an AC voltmeter read? a volts b. 110 volts c. 120 volts d volts 80. AN electrical connection needs to be made to a portable motor, which type of equipment wire is required? a. type S b. festoon c. type GTF d. type SJ 81. The correct wiring method to be used for electrical equipment in a class 1 Zone 1 location must be: a. rigid PVC b. threaded metal conduit c. NMW-U d. festoon 82. A welder has a duty cycle of 70% and an FLA of 32 amps. Calculate the minimum ampacity of the supply conductors for this welder as per code. a. 40 amps b. 32 amps c amps d amps 83. Three-way switches are required to control the light in a residential stairway: a. ifthere is a doorway in the basement b. if there are 4 or more risers on the stairway c. if the switch is located more than 3.5 meters from the door d. only if the stairway leads to another level in the house 84. What is the minimum ampacity of the conductors required to supply a 60 amp fusible switch from a 400 amp splitter if the tap conductor length is 4.5 meters? a. 400 amps b. 135 amps c. 100 amps d. 60 amps

13 13 Practice Exam Questions 85. What is the minimum distance that the termination point of the supply conductors must be, from any part of a 150 Hp motor? a mm b. 900mm c. 600mm d. 450mm 86. What is the minimum temperature rating of the supply conductors for a 75 Hp, 575 volt, 3- phase, class "F", totally enclosed non-ventilated, squirrel cage induction motor, connected 4Y? a. 110 C b. 90 C c. 75 C d. 125 C 87. What would happen if the centrifugal switch in a split-phase, I-phase, capacitor start motor was stuck in the open position? a. the motor would start slowly in reverse b. the motor would not start but current would flow to the run winding c. the starting torque would be greatly reduced d. the motor would start but no current would flow to the start winding 88. What is the proper type of insulating tape to be used for overhead services, when making connections at the service head? a. rubber splicing tape b. self-sealing thermoplastic tape c. standard vinyl electrical tape d. weather-resistant epoxy coated tape 89. What is the CSA configuration for a residential dryer receptacle? a. 5-15R b. 5-30R c R d. 6-30R 90. What is the minimum size of RW-90 XLPE (600 volt, unjacketed) conductors that are required for a 1000 amp, 120/208 volt, 3-phase service, if they are installed using detail 3 of Diagram B4-4? a. 350 kcmil RW-90 b. 500 kcmil RW-90 c. 600 kcmil RW-90 d. 750 kcmil RW Which of the following is not a requirement when installing deck boxes in close proximity to inground pools? a. must be installed above the normal water level of the pool b. must have provisions for 3 bond wires inside the box and 1-#6 AWG outside c. must be installed on GFCI protected circuits only d. must be installed so that the top of the box is level with the pool deck

14 14 Practice Exam Ouestions 92. When grounding a high-voltage outdoor station, what is the minimum number of ground rod electrodes necessary to complete the station ground electrode? a. one rod, 3 m long and 19 mm diameter b. four rods, 3 m long and 15.8 mm diameter c. two rods, 3 m long and 19 mm diameter d. four rods, 3 m long and 19 mm diameter 93. What is the minimum size of ground wire required to connect the non-current carrying metal parts of a pothead to the station ground electrode? a. #2/0 A WG copper b. #3/0 A WG copper c. #6 AWG copper d. #4 AWG copper 94. What is the main purpose of the semi-conducting tape used in a high-voltage stress cone? a. to bleed excess voltage to ground b. to determine the voltage rating of the stress cone c. to insulate the termination from the ground lead connection d. to relieve mechanical stress at the termination 95. What is the minimum size of ground wire required for the proper installation of a 1500 watt, 125 volt, heated livestock watering bowl in a feedlot? a. #14AWG b. #12AWG c. #10AWG d. #6AWG 96. Which of the following luminaires are permitted to be installed in a multi-purpose gymnasium? a. standard 4' 2-lamp T8 fluorescent wrap b. 500 watt incandescent potlight c. 400 watt HPS fixture with thermal protection d. standard 8' 2 lamp T12 fluorescent with metal cage 97. What is the minimum number of open breaker spaces that must be left for future use in a 100 amp, 120/240 volt, I-phase residential panel? a. one b. two c. three d. four 98. What is the minimum width and thickness of a copper bonding strap, when used to bond a metal transformer enclosure? a. 19 mm wide and 1.4 mm thick b. 12 mm wide and 1.2 mm thick c. 16 mm wide and 1.6 mm thick d. 19 mm wide and 1.2 mm thick

15 e. f. Practice Exam Ouestions When installing a 5-15R receptacle (single-phase 3-wire circuit) on a recreational vehicle lot, what should be the configuration of the ground pin (if the receptacle is mounted on a vertical plane)? a. uppermost b. lowermost c. doesn't matter d. cannot be installed on a vertical plane 100. Which of the following methods should be used when drying the windings of a distribution transformer? a. short the secondary, apply primary voltage b. short the primary, apply secondary voltage c. apply an appropriate amount of DC to the primary, short the secondary d. short the secondary, apply secondary voltage to the primary 101. Based on the readings given in the diagram to the right, what is the problem? a. line 3 fuse is blown b. line2 fuse is blown c. line 1 fuse is blown d. all three fuses are blown )'~.'.~.,.. "\ Volts rl /':>;7\ Volts 102. Using the diagram to the right, what is the minimum number of control wires that must be installed in conduit "A" to control a hoist? The hoist can only move in the direction on the control station when the pushbutton is held closed. a. three up Down b. five c. seven d. nine agrllp.t,k t.t~, Ea.~t r- \tv't'~t I, 103. What is the maximum rating/setting of the overload devices that can be used to protect a 30Hp, 460 volt, 3-phase synchronous motor/generator with a marked service factor of 1.2? a amps b amps c amps d amps

16 g. Practice Exam Ouestions Using the drawing to the right, which set of contacts should be closed in order for the wound rotor motor to reach its maximum speed? a. contact set "A" c b. contact set "B" c. contact set "C" d. contact set "D" D 105. A single-phase commercial store service at 120/240 volts has an ammeter reading of 170 amps and a wattmeter reading of36000 watts. What is the power factor of this service? a. 94% b.88% c. 82% d.70% 106. Four, 600 volt, 3-phase induction motors are connected to a splitter. What is the minimum size of RW-90 XLPE conductors that fed the splitter if the motors have ratings of20 Hp, 20 Hp, 15 Hp and 10 Hp respectively? a. #6AWG b. #4AWG c. #3 AWG d. #2 AWG 107. What is the maximum number of consumer services in abuilding that may be supplied from one 347/600 volt, 3-phase supply service? a. only one b. two c. four d. five 108. Using the diagram below, which voltmeter will read 120 volts when the gas burner is deenergized? a. VM # 7 b. VM # 2 c. VM # 3 d. VM # 1

17 1 7 OPractice Exam Questions 109. What is the minimum ground depth that an intermediate post must have when part of a fence installation around electrical equipment? a. 1.0 meters b. 1.1 meters c. 1.5 meters d. 2.0 meters 110. What is the minimum size of2 conductor AC-90 that must be used to supply 84 watts of remote heads for a 12 volt DC emergency lighting system, if the cable runs a distance of 50 meters? a. #10AWG b. #8AWG c. #6AWG d. #4AWG

SERVICE ATTACHMENT ON A BUILDING WITH BUS DUCT SERVICE ENTRANCE AND INDOOR METERING

SERVICE ATTACHMENT ON A BUILDING WITH BUS DUCT SERVICE ENTRANCE AND INDOOR METERING SERVICE ATTACHMENT ON A BUILDING WITH BUS DUCT SERVICE ENTRANCE AND INDOOR METERING Obtain acceptance and specific details from the local Company office. 1. Service entrance duct (see Note 1). Company

More information

Spring Test 10 due 05/11/2013

Spring Test 10 due 05/11/2013 Spring Test 10 due 05/11/2013 Multiple Choice Identify the letter of the choice that best completes the statement or answers the question. 1. When installed in an agricultural building that houses livestock

More information

Pretest Module 24 Three-phase Service Entrance

Pretest Module 24 Three-phase Service Entrance Pretest Module 24 Three-phase Service Entrance 1. What is the most widely used three-phase service entrance system? 2. What are the three most common voltage combinations for three-phase, four-wire systems?

More information

CHAPTER V RESIDENTIAL WIRING

CHAPTER V RESIDENTIAL WIRING CHAPTER V RESIDENTIAL WIRING 5.1. THE SERVICE ENTRANCE Buildings and other structures receive the electrical energy through the service entrance. In residential wiring, the electric company supply this

More information

Spring Test 7 due 05/03/2013

Spring Test 7 due 05/03/2013 Spring Test 7 due 05/03/2013 Multiple Choice Identify the choice that best completes the statement or answers the question. 1. A raceway contains two 3-phase, 3-wire circuits that supply 38 ampere continuous

More information

(The actual state exam will be closer to 50 questions in 4 hours time) Master Electrician Practice Test

(The actual state exam will be closer to 50 questions in 4 hours time) Master Electrician Practice Test (The actual state exam will be closer to 50 questions in 4 hours time) Master Electrician Practice Test 1. Accessible as applied to wiring methods means capable of being removed or exposed without damaging

More information

Chapter 2 Wiring and Protection Article 200 Use and Identification of Grounded Neutral Conductor Chapter 1 General...9

Chapter 2 Wiring and Protection Article 200 Use and Identification of Grounded Neutral Conductor Chapter 1 General...9 Article 90 Introduction...1 90.1 Purpose of the NEC...1 90.2 Scope of the NEC...2 90.3 Code Arrangement...4 90.4 Enforcement...5 90.5 Mandatory Requirements and Explanatory Material...6 90.6 Formal Interpretations...6

More information

NEC 2011 Code Changes

NEC 2011 Code Changes NEC 2011 Code Changes Articles 280.21-300.50 CHANGES FROM 2008 TO 2011 CODE ARE IN RED Chapter 2 - Wiring and Protection ARTICLE 280 Surge Arresters, Over 1kV III. Connecting Surge Arresters 280.21 Connection

More information

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 2/8/12 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 2/8/12 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions MECKLENBURG COUNTY Land Use and Environmental Service Agency Code Enforcement 2/8/12 ELECTRICAL CONSISTENCY MEETING Code Consistency Questions 1. I am inspecting a building addition. They have a 480V to

More information

SINGLE PHASE WIRING SPECIFICATIONS

SINGLE PHASE WIRING SPECIFICATIONS SINGLE PHASE WIRING SPECIFICATIONS 1-866-MEC-ELEC (1-866-632-3532) Office Locations: Hondo Office 237 Hwy 173 N Hondo, TX 78661-0370 Fax 830.426.3335 Dilley Office 1718 W. FM 117 Dilley, TX 78017 Fax 830.965.1425

More information

THREE PHASE WIRING SPECIFICATIONS

THREE PHASE WIRING SPECIFICATIONS THREE PHASE WIRING SPECIFICATIONS 1-866-MEC-ELEC (1-866-632-3532) Office Locations: Hondo Office 237 Hwy 173 N Hondo, TX 78661-0370 Fax 830.426.3335 Dilley Office 1718 W. FM 117 Dilley, TX 78017 Fax 830.965.1425

More information

Electrical Tech Note 105 Agricultural Engineering Department Michigan State University

Electrical Tech Note 105 Agricultural Engineering Department Michigan State University Electrical Tech Note 105 Agricultural Engineering Department Michigan State University Journey Exam Study Guide and Sample Questions 1 Based on the 2002 NEC, Part 8 of PA 230, and the 2003 MRC The Journey

More information

Electrical Tech Note 106

Electrical Tech Note 106 Electrical Tech Note 106 Biosystems & Agricultural Engineering Department Michigan State University Master Exam Study Guide and Sample Questions 1 Based on the 2014 NEC, Part 8 of PA 230, PA 407, and the

More information

TEMPORARY ELECTRIC WIRING FOR CARNIVALS, CONVENTIONS, EXHIBITIONS, FAIRS AND SIMILAR USES

TEMPORARY ELECTRIC WIRING FOR CARNIVALS, CONVENTIONS, EXHIBITIONS, FAIRS AND SIMILAR USES INFORMATION BULLETIN / PUBLIC - ELECTRICAL CODE REFERENCE NO.: LAMC 93.0230 Effective: 3-24-69 DOCUMENT NO. P/EC 2002-006 Revised: 11-17-00 Previously Issued As: RGA #7-69 TEMPORARY ELECTRIC WIRING FOR

More information

Pretest Module 29 High Voltage Unit 1

Pretest Module 29 High Voltage Unit 1 Pretest Module 29 High Voltage Unit 1 1. Is a person qualified to work on high-voltage installations when this module is completed? 2. What is the code definition of high-voltage? 3. What is the IEEE definition

More information

Generator Fire Safety: Generator assemblies should be located outside the building.

Generator Fire Safety: Generator assemblies should be located outside the building. SECTION 33 70 00 - ELECTRICAL DISTRIBUTION PACKAGED GENERATOR ASSEMBLIES Generator Fire Safety: Generator assemblies should be located outside the building. All fuel piping from the outside of the building

More information

RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS SECTION VI RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS

RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS SECTION VI RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS SECTION VI SERVICE REQUIREMENTS This section discusses the requirements for establishing electric service to new residential subdivisions in Palo Alto. Subdivisions are normally constructed on dedicated

More information

Pentahead bolts See note 2. Conduit run as specified. Company facility. Refer to drawing SS8.6-2 or SS8.6-3 STANDARD SERVICE INSTALLATION

Pentahead bolts See note 2. Conduit run as specified. Company facility. Refer to drawing SS8.6-2 or SS8.6-3 STANDARD SERVICE INSTALLATION PULL BOX F SECONDARY SYSTEM Typical grade Pentahead bolts See note 2 Conduit run as specified Plastic or fiberglass for grass areas or Polymer concrete for light duty areas (see notes 2, 3, & 4) Company

More information

Chapter 8 Interior Wiring and Lighting

Chapter 8 Interior Wiring and Lighting Chapter 8 Interior Wiring and Lighting Review Questions 1. What tool if any, is used to remove a fuse that is to be replaced? 1. Pliers 2. Screwdriver 3. Fuse puller 4. None 2. OSHA has established specific

More information

Have You Been Grounded Lately

Have You Been Grounded Lately Have You Been Grounded Lately Thurs, Oct. 26, 2017 9:15-10:15 Phil Simmons Author, Electrical Grounding and Bonding Author Cengage Learning Phil Simmons Have You Been Grounded Lately 2017 NEC Changes Relative

More information

Preface...x Chapter 1 Electrical Fundamentals

Preface...x Chapter 1 Electrical Fundamentals Preface...x Chapter 1 Electrical Fundamentals Unit 1 Matter...3 Introduction...3 1.1 Matter...3 1.2 Atomic Theory...3 1.3 Law of Electrical Charges...4 1.4 Law of Atomic Charges...5 Negative Atomic Charge...5

More information

WIRING DESIGN & PROTECTION REQUIREMENTS CHECKLIST

WIRING DESIGN & PROTECTION REQUIREMENTS CHECKLIST WIRING DESIGN & PROTECTION REQUIREMENTS CHECKLIST Use & Identification of Grounded and Grounding Conductors YES NO N/A Grounded conductors are identifiable and distinguishable from all other conductors.

More information

9. Non-Residential Services (Commercial, Industrial, and Agricultural)

9. Non-Residential Services (Commercial, Industrial, and Agricultural) Section 9 2016 Electric Service Requirements, 3rd Edition Section 9 Non-Residential Services Directory Page 9.1 General Requirements 68 9.2 Direct-Connect Metering, Single Installations 69 9.3 Direct-Connect

More information

SECTION VII METERING INSTALLATIONS

SECTION VII METERING INSTALLATIONS SECTION VII METERING INSTALLATIONS 1. GENERAL Outdoor metering is required for all new service installations to one, two, and three family detached, semi-detached and row houses. 2. COMPANY FURNISHES AND

More information

CAL/OSHA ELECTRICAL LOW VOLTAGE

CAL/OSHA ELECTRICAL LOW VOLTAGE Preparation: Safety Mgr Authority: CEO Issuing Dept: Safety Page: Page 1 of 7 Purpose The purpose of this program is to prevent injuries due to electrical exposure to low voltage (less than or equal to

More information

UNDERGROUND SERVICE. Items to consider. There will be charges from ComEd if you convert from overhead to underground service.

UNDERGROUND SERVICE. Items to consider. There will be charges from ComEd if you convert from overhead to underground service. UNDERGROUND SERVCE tems to consider f your trenching route has to be dug by hand, or if a cable must be installed under a paved surface, additional charges apply. f your service cable has to be moved later

More information

LIST OF EDD DESCRIPTION/ SPECIFICATION AS 19 TH OCTOBER 2016

LIST OF EDD DESCRIPTION/ SPECIFICATION AS 19 TH OCTOBER 2016 No Description/ Specification Amendment 1 EDD 1 :2008 11/0.415 kv Distribution Transformer, Oil Filled - 2 ED 2 :1987 The Galvanization of Iron and Steel, Articles Other Than Steel Wire - 3 ED 3 :1979

More information

The Reliable Choice. Field Pocket Guide

The Reliable Choice. Field Pocket Guide The Reliable Choice Field Pocket Guide Allowable Ampacities of STABILOY Brand XHHW-2 and Copper 75 C (167 F) 90 C (194 F) 75 C (167 F) 90 C (194 F) Conductor Size (AWG or kcmil) Types RHW, THHW, THW, THWN,

More information

Volume 2 Charts, Formulas, and Other Useful Information

Volume 2 Charts, Formulas, and Other Useful Information Volume 2 Charts, Formulas, and Other Useful Information Aluminum Conductor Conductor Terminations 61 Compact Aluminum (Conduit Fill Tables) 68-79 Ampacity Dwelling Services 48 1-phase Loads on a 3-phase

More information

Mecklenburg County Common Code Defects

Mecklenburg County Common Code Defects Electrical Code Defects Improper Over Current Protection Code Description 310.15 Ampacities for s Rated 0 2000 Volts. (A) General. (1) Tables or Engineering Supervision. Ampacities for conductors shall

More information

UNDERGROUND SERVICES - SECONDARY

UNDERGROUND SERVICES - SECONDARY UNDERGROUND SERVICES - SECONDARY Contents - Underground Services... U-1 General Requirements for Underground Service...U-2 Names of Parts for Underground Service... U-3 Service Termination in a Service

More information

Metering and Service Installation:

Metering and Service Installation: Table of Contents 1. Metering Installation Requirements, General... 1 2. Type of Service... 2 3. Definitions... 2 4. Who Provides Metering Equipment?... 2 5. Establishment of Service... 2 6. Meter Access...

More information

10. METERING General Requirements

10. METERING General Requirements 10. METERING 10.1 General Requirements A. The Company will not supply service to a Customer whose wiring is designed for resale of electricity through submetering except for recreational campgrounds, marinas,

More information

AGRICULTURAL UNDERGROUND SERVICE 500 HP OR LESS

AGRICULTURAL UNDERGROUND SERVICE 500 HP OR LESS Prepared by: ABB1 AGRICULTURAL UNDERGROUND SERVICE 500 HP OR LESS 05619 Asset Type: Electric Metering Function: Design and Construction Issued by: Lisseth Villareal (LDV2) Date: 07-31-15 Rev. #10: This

More information

A. This Section includes Low Voltage Switchgear Work, as indicated on the drawings, and as specified herein.

A. This Section includes Low Voltage Switchgear Work, as indicated on the drawings, and as specified herein. 16425 SWITCHBOARD ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 26 24 13 An optional keynote to

More information

Section 6 Electric Metering: Residential

Section 6 Electric Metering: Residential Section 6 Electric Metering: Residential 6.1. Scope This section provides specific information for residential metering that is not covered by the basic requirements in Section 5, Electric Metering: General.

More information

9/16/2010. Chapter , The McGraw-Hill Companies, Inc. TRANSMISSION SYSTEMS. 2010, The McGraw-Hill Companies, Inc.

9/16/2010. Chapter , The McGraw-Hill Companies, Inc. TRANSMISSION SYSTEMS. 2010, The McGraw-Hill Companies, Inc. Chapter 3 TRANSMISSION SYSTEMS 1 Transmitting large amounts of electric energy over long distances is accomplished most efficiently by using high-voltages. Without transformers the widespread distribution

More information

Corrections most seen on plan review October 18, 2017 David Rankin Seattle Department of Construction and Inspections

Corrections most seen on plan review October 18, 2017 David Rankin Seattle Department of Construction and Inspections Corrections most seen on plan review October 18, 2017 David Rankin Seattle Department of Construction and Inspections One-Line / Riser Diagrams Drawings are not reviewed prior to submission. Because of

More information

Arc Fault Circuit Interrupter (AFCI) FACT SHEET

Arc Fault Circuit Interrupter (AFCI) FACT SHEET Arc Fault Circuit Interrupter (AFCI) FACT SHEET THE AFCI The AFCI is an arc fault circuit interrupter. AFCIs are newly-developed electrical devices designed to protect against fires caused by arcing faults

More information

SOUTHWEST LOUISIANA ELECTRIC MEMBERSHIP COORPORATION COMMERCIAL SERVICE REQUIREMENTS

SOUTHWEST LOUISIANA ELECTRIC MEMBERSHIP COORPORATION COMMERCIAL SERVICE REQUIREMENTS SOUTHWEST LOUISIANA ELECTRIC MEMBERSHIP COORPORATION COMMERCIAL SERVICE REQUIREMENTS November 17, 2016 Engineering Service Specifications Table of Contents Commercial Service Requirements SLEMCO Commercial

More information

Western Section 101 st Annual Meeting Hot Springs, Arkansas September 21, 2005 Charlie Trout Code Breakfast

Western Section 101 st Annual Meeting Hot Springs, Arkansas September 21, 2005 Charlie Trout Code Breakfast Western Section 101 st Annual Meeting Hot Springs, Arkansas September 21, 2005 Charlie Trout Code Breakfast 1.Question: An add on unit for a hydromassage bathtub consists of a small 1-gallon water heater

More information

INDUSTRY WIDE LABOR-MANAGEMENT SAFETY COMMITTEE

INDUSTRY WIDE LABOR-MANAGEMENT SAFETY COMMITTEE INDUSTRY WIDE LABOR-MANAGEMENT SAFETY COMMITTEE SAFETY BULLETIN #23 GUIDELINES FOR WORKING WITH LIGHTING SYSTEMS AND OTHER ELECTRICAL EQUIPMENT All electrical systems and electrically energized equipment

More information

Engineering Service Specifications. Commercial Single-Phase Current Transformer Metering Schemes

Engineering Service Specifications. Commercial Single-Phase Current Transformer Metering Schemes Engineering Service Specifications Commercial Single-Phase Current Transformer Metering Schemes Specifications for Commercial Underground Current Transformer Metering Requirements for a Single-Phase Customer

More information

A. Submit manufacturer's literature and technical data before starting work.

A. Submit manufacturer's literature and technical data before starting work. SECTION 16425 SWITCHBOARD PART 1 GENERAL 1.01 SUMMARY A. Related Section: 1. 16450 - Grounding. 1.02 SUBMITTALS A. Submit manufacturer's literature and technical data before starting work. B. Submit Shop

More information

2016 Photovoltaic Solar System Plan Review List

2016 Photovoltaic Solar System Plan Review List Building Division 555 Santa Clara Street Vallejo CA 94590 707.648.4374 2016 Photovoltaic Solar System Plan Review List GENERAL PROJECT INFORMATION PLAN CHECK NO DATE JOB ADDRESS CITY ZIP REVIEWED BY PHONE

More information

A. This section includes unit capacitors for power factor correction.

A. This section includes unit capacitors for power factor correction. PART 1: GENERAL 1.01 Wiring Devices A. This section of the standard includes design requirements for wiring connections, including receptacles and switches to equipment specified in other sections. 1.02

More information

ADVANCED CALCULATIONS

ADVANCED CALCULATIONS ADVANCED CALCULATIONS 101. Why is it permissible in some cases to fuse a #14 AWG motor conductor with a 60 amp breaker when normally a #14 AWG should only be fused at 15 amps? a) the motor can't start

More information

SUPPLEMENTAL CORRECTION SHEET FOR SOLAR PHOTOVOLTAIC SYSTEMS - ELECTRICAL

SUPPLEMENTAL CORRECTION SHEET FOR SOLAR PHOTOVOLTAIC SYSTEMS - ELECTRICAL SUPPLEMENTAL CORRECTION SHEET FOR SOLAR PHOTOVOLTAIC SYSTEMS - ELECTRICAL This is intended to provide uniform application of the codes by the plan check staff and to help the public apply the codes correctly.

More information

RESIDENTIAL UNDERGROUND AND OVERHEAD SERVICE REQUIREMENTS SECTION II RESIDENTIAL UNDERGROUND AND OVERHEAD SERVICE REQUIREMENTS

RESIDENTIAL UNDERGROUND AND OVERHEAD SERVICE REQUIREMENTS SECTION II RESIDENTIAL UNDERGROUND AND OVERHEAD SERVICE REQUIREMENTS SECTION II This section discusses the City of Palo Alto's requirements for establishing electric service to new or upgraded residential installations. The same requirements apply to both underground and

More information

AFTER GAZETTING (WORKING DOCUMENT FOR A 3 YEAR PERIOD) DATE PAGE PARAGRAPH DESCRIPTION ORIGINATOR APPROVED

AFTER GAZETTING (WORKING DOCUMENT FOR A 3 YEAR PERIOD) DATE PAGE PARAGRAPH DESCRIPTION ORIGINATOR APPROVED PART B-07 TITLE: SERVICE CONNECTIONS SPECIFICTION NO: B-07 INCEPTION DATE: AFTER GAZETTING (WORKING DOCUMENT FOR A 3 YEAR PERIOD) AMENDMENTS / REVISIONS DATE PAGE PARAGRAPH DESCRIPTION ORIGINATOR APPROVED

More information

NEC 2014 Code Changes

NEC 2014 Code Changes NEC 2014 Code Changes Articles 310 310.120 CHANGES FROM 2011 TO 2014 CODE ARE IN RED ARTICLE 310 Conductors for General Wiring I. General 310.2 Definitions Electrical Ducts Electrical conduits, or other

More information

Fee $20 Course: NEC Changes 1 This course is valid for these credentials: Credential Description Cred Code Credit Hours

Fee $20 Course: NEC Changes 1 This course is valid for these credentials: Credential Description Cred Code Credit Hours www.garyklinka.com Page 1 of 18 Instructions: Fee $20 1. Print these pages. 2. Circle the correct answers and transfer them to the answer sheet. 3. Page down to the last page for the verification forms

More information

Electrical and Power Transmission Installers, Other CIP Task Grid. Secondary Competency Task List. Level 1 Level 2 Level 3

Electrical and Power Transmission Installers, Other CIP Task Grid. Secondary Competency Task List. Level 1 Level 2 Level 3 1 100 BASIC SAFETY 101 Demonstrate proper use of personal protective equipment. 5 102 Identify causes of job site accidents. 5 103 Identify job site hazards. 5 104 Working safely with job hazards. 5 105

More information

AMENDMENT ELECTRIC SERVICE MANUAL 2014

AMENDMENT ELECTRIC SERVICE MANUAL 2014 AMENDMENT (Pages 20,43,50,72,74,,76,78,83,86,99) ELECTRIC SERVICE MANUAL 2014 Effective April 1, 2015 18-7 6.0 SERVICE AND SERVICE ENTRANCES (General), Continued Conductor Sizing It is recommended that

More information

The following are specific provisions of 1910(a)(2) that could be seen in the LBM sector

The following are specific provisions of 1910(a)(2) that could be seen in the LBM sector Know the Rules on Temporary Wiring OSHA Standard 1910.305, Wiring methods, components, and equipment for general use, addresses wiring methods, components, and equipment for general use as one of several

More information

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/14/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/14/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions MECKLENBURG COUNTY Land Use and Environmental Service Agency Code Enforcement 9/14/11 ELECTRICAL CONSISTENCY MEETING Code Consistency Questions 1. I recently installed a 45-KVA transformer, 480-volt primary

More information

Electrical Tech Note 111 Biosystems & Agricultural Engineering Department Michigan State University

Electrical Tech Note 111 Biosystems & Agricultural Engineering Department Michigan State University Electrical Tech Note 111 Biosystems & Agricultural Engineering Department Michigan State University Electrical Code Changes in Michigan 1 (Based on Part 8, P.A. 230, the 2005 NEC and the 2003 MRC) This

More information

4 018 (See App B) m Revised wording and clarification of requirements when selecting conductors

4 018 (See App B) m Revised wording and clarification of requirements when selecting conductors 2012 Canadian Electrical Code Changes (CSA Errata not included) M = minor / S = significant / D = deleted N.m (Newton.metre) m New unit of torque Definitions cablebus m newly recognized wiring method ground

More information

An average of one worker is electrocuted on the job every day There are four main types of electrical injuries:

An average of one worker is electrocuted on the job every day There are four main types of electrical injuries: Electrical Safety Introduction An average of one worker is electrocuted on the job every day There are four main types of electrical injuries: Electrocution (death due to electrical shock) Electrical shock

More information

Bussmann series Quik-Spec Coordination Panelboard

Bussmann series Quik-Spec Coordination Panelboard Quik-Spec electrical gear 12 Contents Bussmann series Quik-Spec Coordination Panelboard Section page Description Quik-Spec Coordination Panelboards Up to 400 A 2 600 to 1200 A 3 Quik-Spec elevator disconnects

More information

SECTION 300 OVERHEAD SERVICE

SECTION 300 OVERHEAD SERVICE SECTION 300 OVERHEAD SERVICE 300.01 General Company provides, installs, and maintains service drop to point of delivery approved by Company. Customer provides point of attachment which is acceptable to

More information

Definitions of and have been revised. a. automatic b. nonautomatic c. none of the above d. both a and b

Definitions of and have been revised. a. automatic b. nonautomatic c. none of the above d. both a and b www.garyklinka.com Page 1 of 12 Instructions: Fee $25 1. Print these pages. 2. Circle the correct answers and transfer them to the answer sheet. 3. Page down to the last page for the verification forms

More information

Table of Contents. Unit 3 Magnetism Unit 1 Matter Unit 4 Electricity Unit 2 Electron Theory Unit 5 Electromagnetism...

Table of Contents. Unit 3 Magnetism Unit 1 Matter Unit 4 Electricity Unit 2 Electron Theory Unit 5 Electromagnetism... Introduction...x How to Use This Textbook...xi About the Author...xii About the Graphic Illustrator...xiii Mike Holt Enterprises Team...xiv Chapter 1 Electrical Fundamentals... 1 Unit 1 Matter... 3 Introduction...

More information

TRI-SERVICE ELECTRICAL WORKING GROUP (TSEWG) 03/05/09 TSEWG TP-11: UFC N BEST PRACTICES

TRI-SERVICE ELECTRICAL WORKING GROUP (TSEWG) 03/05/09 TSEWG TP-11: UFC N BEST PRACTICES TSEWG TP-11: UFC 3-500-10N BEST PRACTICES UFC 3-500-10N was developed by NAVFAC and was used as the starting point for the tri-services development of UFC 3-500-10, Design: Electrical Engineering. UFC

More information

A. This section includes enclosed dry type transformers for lighting and power loads, with primaries and secondaries rated 600 volts and less.

A. This section includes enclosed dry type transformers for lighting and power loads, with primaries and secondaries rated 600 volts and less. PART 1: GENERAL PART I: GENERAL 1.01 Wiring Devices A. This section of the standard includes design requirements for wiring connections, including receptacles and switches to equipment specified in other

More information

120-ELECTRICAL SAFETY PROGRAM

120-ELECTRICAL SAFETY PROGRAM 120.1 PURPOSE A. To set forth procedures for the safe use of electrical equipment, tools, and appliances at Central New Mexico Community College (CNM). 120.2 SCOPE A. This program applies to all CNM employees

More information

Section 02: Pre-Installation Procedures

Section 02: Pre-Installation Procedures Section 02: Pre-Installation Procedures Foundation! WARNING The MUST be placed on a surface that will support the combined weight of the, options, fixtures, and tooling, etc. (refer to the Specifications

More information

Western Section IAEI Code Panel Questions

Western Section IAEI Code Panel Questions Western Section IAEI 2013 Code Panel Questions 1. Do the factory wings that many fluorescent troffers have designed to fold out over the grid meet the requirements for securely fastened to the framing?

More information

SECTION 1: Field Inspection Guide for Rooftop Photovoltaic (PV) Systems

SECTION 1: Field Inspection Guide for Rooftop Photovoltaic (PV) Systems COUNTY OF SANTA CRUZ PLANNING DEPARTMENT 701 OCEAN STREET, 4 th FLOOR, SANTA CRUZ, CA 95060 (831) 454-2580 FAX: (831) 454-2131 TDD: (831) 454-2123 KATHLEEN MOLLOY PREVISICH, PLANNING DIRECTOR Photovoltaic

More information

Electrical Safety. Electrical Safety Webinar. Electrical. Printing Industries Alliance Printing Industries Alliance 1

Electrical Safety. Electrical Safety Webinar. Electrical. Printing Industries Alliance Printing Industries Alliance 1 Webinar 1 Electrical 2 1 Webinar Introduction An average of one worker is electrocuted on the job every day There are four main types of electrical injuries: Electrocution (death due to electrical shock)

More information

Switchgear Skid, C1192

Switchgear Skid, C1192 CUSTOM SOLUTIONS 15kV Modular Stairs stored on floor in front of battery bay Ground grid stored on front tongue of trailer Stairs deployed for unit access Storage box for fencing materials and other parts

More information

Photovoltaic Solar Plan Review

Photovoltaic Solar Plan Review PAIGE B. VAUGHAN, CBO Director of Building and Safety Phone (310) 605-5509 Fax Line (310) 605-5598 E-mail:lbutler@comptoncity.org Building & Safety Department Photovoltaic Solar Plan Review Plan Check

More information

2014 NEC Changes Part 4

2014 NEC Changes Part 4 www.garyklinka.com Page 1 of 14 Instructions: Fee $25 1. Print these pages. 2. Circle the correct answers and transfer them to the answer sheet. 3. Page down to the last page for the verification forms

More information

2. DEFINITIONS. 2.3 APPROVED Acceptable to the authority enforcing the National Electric Code

2. DEFINITIONS. 2.3 APPROVED Acceptable to the authority enforcing the National Electric Code 2. DEFINITIONS 2.1 ACCEPTABLE Acceptable to the Company. 2.2 ADVANCED METER A meter that is capable of remote reading, and is capable of storing electric consumption data at specified time intervals of

More information

Metering and Control Standards OFF-PEAK & DUAL FUEL WIRING DIAGRAMS

Metering and Control Standards OFF-PEAK & DUAL FUEL WIRING DIAGRAMS Metering and Control Standards OFF-PEAK & DUAL FUEL WIRING DIAGRAMS REVISED FEBRUARY 2017 TABLE OF CONTENTS Metering Equipment & Installation Standards... 1 Metering Equipment & Installation Standards

More information

Design Standard. Purpose: Design Standard:

Design Standard. Purpose: Design Standard: Design Standard Purpose: This design standard has the purpose of creating a consistent application of motor-control centers throughout the East Side Union High School District, therefore achieving a standard

More information

Busway. Siemens STEP 2000 Course. STEP 2000 Courses distributed by

Busway. Siemens STEP 2000 Course. STEP 2000 Courses distributed by Siemens STEP 2000 Course Busway It's easy to get in STEP! Download any course. Hint: Make sure you download all parts for each course and the test answer form. Complete each chapter and its review section

More information

SECTION MOTOR CONTROL

SECTION MOTOR CONTROL SECTION 26 24 19 MOTOR CONTROL PART 1 - GENERAL 1.1 SECTION INCLUDES A. Manual motor starters B. Magnetic motor starters C. Combination magnetic motor starters D. Solid-state reduced voltage motor starters

More information

INSTALL SERVICE- ENTRANCE SYSTEMS

INSTALL SERVICE- ENTRANCE SYSTEMS SUBCOURSE EN5141 EDITION B US ARMY ENGINEER SCHOOL INSTALL SERVICE- ENTRANCE SYSTEMS INSTALL SERVICE- ENTRANCE SYSTEMS Subcourse Number EN5141 EDITION B United States Army Engineer School Fort Leonard

More information

The 84 th NC Electrical Institute Code Questions April 9 th & 10 th 2013 North Raleigh Hilton Raleigh, NC

The 84 th NC Electrical Institute Code Questions April 9 th & 10 th 2013 North Raleigh Hilton Raleigh, NC The 84 th NC Electrical Institute Code Questions April 9 th & 10 th 2013 North Raleigh Hilton Raleigh, NC www.ncdoi.com www.ncbeec.org NC DEPARTMENT OF INSURANCE NC STATE BOARD OF EXAMINERS OF ELECTRICAL

More information

TRANSMISSION SYSTEMS

TRANSMISSION SYSTEMS TRANSMISSION SYSTEMS Transmitting large amounts of electric energy over long distances is accomplished most efficiently by using high-voltages. Without transformers the widespread distribution of electric

More information

SPECIFICATIONS OXYMAX SUB-SURFACE AERATION SYSTEM

SPECIFICATIONS OXYMAX SUB-SURFACE AERATION SYSTEM SPECIFICATIONS OXYMAX SUB-SURFACE AERATION SYSTEM 1.0 GENERAL 1.1 DESCRIPTION A. Manufacturer shall furnish an aeration system capable of providing more equal distribution of oxygenated water throughout

More information

2018 Consultant s Handbook Division 26 Electrical 2413 Switchboards

2018 Consultant s Handbook Division 26 Electrical 2413 Switchboards 1 General 1.1 Switchboards shall be U.L. listed and labeled. 1.2 Each switchboard shall have its own main disconnecting means unless it is located in the same room as its source of origin. In most cases

More information

SYLLABUS FOR ELECTRICAL SUPERVISOR CERTIFICATE OF COMPETENCY (SCC MV) Electrical Engineering Paper (Written Test)

SYLLABUS FOR ELECTRICAL SUPERVISOR CERTIFICATE OF COMPETENCY (SCC MV) Electrical Engineering Paper (Written Test) ANNEXURE I SYLLABUS FOR ELECTRICAL SUPERVISOR CERTIFICATE OF COMPETENCY (SCC MV) Electrical Engineering Paper (Written Test) Paper I & Paper II for General Category of S.C.C. Examination Paper I & Paper

More information

1. The term "withstand" means "the unit will remain in place without separation of any parts from the device when subjected to the seismic forces.

1. The term withstand means the unit will remain in place without separation of any parts from the device when subjected to the seismic forces. SECTION 262816 - ENCLOSED SWITCHES AND CIRCUIT BREAKERS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Fusible switches. 2. Nonfusible switches. 3. Receptacle switches. 4. Shunt trip switches. 5.

More information

10 Commercial, Industrial, Agricultural Services

10 Commercial, Industrial, Agricultural Services 10 Commercial, Industrial, Agricultural Services This section describes the Power Company requirements for commercial, industrial, and agricultural services. This section covers single phase and three

More information

Overcurrent Protection According to the 2011 NEC

Overcurrent Protection According to the 2011 NEC Overcurrent Protection According to the 2011 NEC Utah Electrical License This course will cover overcurrent protection according to the 2011 NEC. The key sections of Article 240 will be discussed. Overcurrent

More information

PRODUCT/SERVICE CLASSIFICATION CLASS 285 ELECTRICAL EQUIPMENT AND SUPPLIES (EXCEPT CABLE AND WIRE)

PRODUCT/SERVICE CLASSIFICATION CLASS 285 ELECTRICAL EQUIPMENT AND SUPPLIES (EXCEPT CABLE AND WIRE) Please indicate which products and services your company can supply by checking the appropriate box(es). Check only the first box if your company can supply all of the products and services shown for this

More information

90.2 Scope. The installation of electrical conductors, equipment and raceways for:

90.2 Scope. The installation of electrical conductors, equipment and raceways for: NEC Generator Primer Rules on the installation of generators and transfer switches 1 90.2 Scope The installation of electrical conductors, equipment and raceways for: public and private premises Conductors

More information

D9-3. No. WIRING DIAGRAM CONNECTIONS FOR UNDERGROUND SELF CONTAINED METERS JRH JED krich95 LINE LINE ABCN SOURCE SOURCE GROUND GROUND STUD STUD SOURCE

D9-3. No. WIRING DIAGRAM CONNECTIONS FOR UNDERGROUND SELF CONTAINED METERS JRH JED krich95 LINE LINE ABCN SOURCE SOURCE GROUND GROUND STUD STUD SOURCE SOURCE 20V 240V STUD (PER NEC) A customer supplied and installed teaser wire is required from the neutral lug to a 5th terminal mounted on the left side of the meter block between the line and load terminals.

More information

grounded in service wired to innovate STABILOY Type XHHW-2 and USE-2/RHH/RHW-2

grounded in service wired to innovate STABILOY Type XHHW-2 and USE-2/RHH/RHW-2 grounded in service wired to innovate STABILOY Type XHHW-2 and USE-2/RHH/RHW-2 grounded in service wired to innovate www.cable.alcan.com Type XHHW-2 and Type USE-2/RHH/RHW-2 Alcan manufactures XHHW-2 and

More information

SPECIFICATIONS ULTIMAX SUB-SURFACE DIRECTIONAL AERATION SYSTEM

SPECIFICATIONS ULTIMAX SUB-SURFACE DIRECTIONAL AERATION SYSTEM SPECIFICATIONS ULTIMAX SUB-SURFACE DIRECTIONAL AERATION SYSTEM 1.0 GENERAL 1.1 DESCRIPTION A. Manufacturer shall furnish an aspirating directional aerator (aspirator) or a high-flow directional aerator

More information

Low Voltage Switchgear Type WL Low Voltage Metal-Enclosed Switchgear

Low Voltage Switchgear Type WL Low Voltage Metal-Enclosed Switchgear 13 Low Voltage Switchgear Siemens Type WL low voltage metal-enclosed switchgear is designed, constructed and tested to provide superior power distribution, power monitoring and control. At the heart of

More information

SECTION LOW VOLTAGE DISTRIBUTION EQUIPMENT

SECTION LOW VOLTAGE DISTRIBUTION EQUIPMENT SECTION 16400 LOW VOLTAGE DISTRIBUTION EQUIPMENT A. General 1. The University does not accept Series-Rated equipment for power distribution switchboards, distribution panels and branch circuit panelboards.

More information

Cable Supports. Requirements for Cable Supports in the National Electrical Code reads as follows:

Cable Supports. Requirements for Cable Supports in the National Electrical Code reads as follows: QA1 General Information are used to support cables in vertical raceways or risers. Cable supports relieve the strain that would be placed on terminations, the interior of panels, or other devices to which

More information

ENTRANCE EQUIPMENT ER D PAGE 1 OF 5

ENTRANCE EQUIPMENT ER D PAGE 1 OF 5 PAGE 1 OF 5 USE: Requirements for entrance equipment. PREVIOUS REVISION 07-01-98 ORIGINATED 03-94 PREVIOUS NUMBER ER 100 (12-01-81) LATEST REVISION: Updated meter socket labeling specification and instrument

More information

320A Single Phase URD Meter Loop Installations

320A Single Phase URD Meter Loop Installations 320A Single Phase URD Meter Loop Installations Location: The meter loop shall be mounted on the side of the pedestal facing the consumer's lot. (The side being one of the four flat surfaces of the pedestal

More information

PART A General Conductor Requirements

PART A General Conductor Requirements PART A General Conductor Requirements 6.1 Conductor Insulation Property Table 310.13 of the NEC provides information on conductor properties such as permitted use, maximum operating temperature, and other

More information

CHAPTER 10 ELECTRICAL. Notes:

CHAPTER 10 ELECTRICAL. Notes: CHAPTER 10 ELECTRICAL 1001.0 General Requirements. Electrical wiring and equipment shall comply with the requirements of NFPA 70, National Electrical Code (NEC), or local ordinances. 1002.0 Solar Photovoltaic

More information

Michigan State University Construction Standards SECONDARY UNIT SUBSTATIONS PAGE

Michigan State University Construction Standards SECONDARY UNIT SUBSTATIONS PAGE PAGE 261116-1 SECTION 261116 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information