1 NEC 2011 Code Changes Articles CHANGES FROM 2008 TO 2011 CODE ARE IN RED Chapter 2 - Wiring and Protection ARTICLE 280 Surge Arresters, Over 1kV III. Connecting Surge Arresters Connection (NEC 2008) The arrester grounding conductor will be connected to one of the following: (1)Grounded service conductor (2) Grounding electrode conductor (3) Grounding electrode for the service (4) Equipment grounding terminal in the service equipment Connection (NEC 2011) The arrester will be connected to one of the following: (1)Grounded service conductor (2) Grounding electrode conductor (3) Grounding electrode for the service (4) Equipment grounding terminal in the service equipment 2012 All Star Training Inc. 1
2 Interconnections (NEC 2008) The grounding conductor of a surge arrester protecting a transformer that supplies a secondary distribution system will be interconnected as specified in section (A), (B), or (C). (A) Metallic Interconnections A metallic interconnection will be made to the secondary grounded circuit conductor or the secondary circuit grounding conductor provided that, in addition to the direct grounding connection at the surge arrester, the following also occurs: (B) Through Spark Gap or Device Where the surge arrester grounding conductor is not connected as listed in section (A) or where the secondary is not grounded as listed in section (A) but is otherwise grounded as listed in section , an interconnection will be made through a spark gap or listed device as required by section (B)(1) or (B)(2): Interconnections (NEC 2011) The surge arrester protecting a transformer that supplies a secondary distribution system will be interconnected as specified in section (A), (B), or (C). (A) Metallic Interconnections A metallic interconnection will be made to the secondary grounded circuit conductor or the secondary circuit grounding electrode conductor provided that, in addition to the direct grounding connection at the surge arrester, the following occurs: (B) Through Spark Gap or Device 2012 All Star Training Inc. 2
3 Where the surge arrester grounding electrode conductor is not connected as in section (A) or where the secondary is not grounded as in section (A) but is otherwise grounded as in section , an interconnection will be made through a spark gap or listed device as required by section (B)(1) or (B)(2): Grounding Conductor Connections and Enclosures (NEC 2008) Except as indicated in this article, surge-arrester grounding conductor connections will be made as shown in Article 250, Parts III and X. Grounding conductors installed in metal enclosures will adhere to section (E) Grounding Electrode Conductor Connections and Enclosures (NEC 2011) Except as indicated in this article, surge-arrester grounding electrode conductor connections will be made as shown in Article 250 Parts III and X. Grounding electrode conductors installed in metal enclosures will adhere to section (E). ARTICLE 285 Surge-Protective Devices (SPD s), 1 kv or Less III. Connecting SPD s Type 1 SPD s (Surge Arresters) (NEC 2008) (B) At the Service When installed at services, the grounding conductor of a Type 1 SPD will be connected to one of the following grounds: (1) Grounded service conductor 2012 All Star Training Inc. 3
4 (2) Grounding electrode conductor (3) Grounding electrode for the service (4) Equipment grounding terminal in the service equipment Type 1 SPD s (Surge Arresters) (NEC 2011) (B) At the Service When installed at services, Type 1 SPD s will be connected to one of the following grounds: (1) Grounded service conductor (2) Grounding electrode conductor (3) Grounding electrode for the service (4) Equipment grounding terminal in the service equipment Type 3 SPD s (NEC 2008) Type 3 SPD s (TVSS s) will be allowed to be anywhere on the load side of branch circuit overcurrent protection up to the equipment served, provided the connection is a minimum of 10 m (30 ft.) of conductor distance from the service or separately derived system disconnect Type 3 SPD s (NEC 2011) Type 3 SPD s (TVSS s) will be allowed to be installed on the load side of branch circuit overcurrent protection up to the equipment served. If included in the manufacturer s instructions, the Type 3 SPD connection will be a minimum of 10 m (30 ft.) of conductor distance from the service or separately derived system disconnect All Star Training Inc. 4
5 Connection Between Conductors (NEC 2008) An SPD (surge arrester or TVSS) will be allowed to be connected between any two conductors ungrounded conductors, grounded conductor, grounding conductor. During a surge the grounded conductor and the grounding conductor will be interconnected only by the normal operation of the SPD (surge arrester or TVSS) Connection Between Conductors (NEC 2011) An SPD (surge arrester or TVSS) will be allowed to be connected between any two conductors ungrounded conductors, grounded conductor, equipment grounding conductor, or grounding electrode conductor. During a surge the grounded conductor and the equipment grounding conductor will be interconnected only by the normal operation of the SPD (surge arrester or TVSS) Grounding Conductor Connections and Enclosures (NEC 2008) Except as indicated in this article, SPD grounding connections will be made as shown in Article 250 Part III. Grounding conductors installed in metal enclosures will adhere to section (E) Grounding Electrode Conductor Connections and Enclosures (NEC 2011) Except as indicated in this article, SPD grounding connections will be made as shown in Article 250 Part III. Grounding electrode conductors installed in metal enclosures will adhere to section (E). Chapter 3 - Wiring Methods and Materials 2012 All Star Training Inc. 5
6 ARTICLE 300 Wiring Methods Conductors (NEC 2008) (A) Single Conductors Single conductors specified in Table (A) will only be installed if they are part of a recognized wiring method of Chapter 3. (B) Conductors of the Same Circuit All conductors of the same circuit and, where used, the grounded conductor and all equipment grounding conductors and bonding conductors will be installed within the same raceway, auxiliary gutter, cable tray, cablebus assembly, trench, cable, or cord, unless otherwise allowed in accordance with section 300.3(B)(1) through section 300.3(B)(4). (1) Paralleled Installations Conductors will be allowed to be run in parallel according to section The requirement to run all circuit conductors within the same raceway, auxiliary gutter, cable tray, trench, cable, or cord will apply separately to each portion of the paralleled installation, and the equipment grounding conductors will adhere to section Parallel runs in cable tray will adhere to section 392.8(D). (C) Conductors of Different Systems (1) 600 Volts, Nominal, or Less Conductors of ac and dc circuits, rated 600 volts, nominal, or less, will be allowed to occupy the same equipment wiring enclosure, cable, or raceway. All conductors will have an insulation 2012 All Star Training Inc. 6
7 rating equal to at least the maximum circuit voltage applied to any conductor within the enclosure, cable, or raceway. Further Information #2: No listing in Conductors (A) Single Conductors Single conductors specified in Table (A) will only be installed if they are part of a recognized wiring method of Chapter 3. (B) Conductors of the Same Circuit (1) Paralleled Installations Conductors will be allowed to run in parallel according to section (H). The requirement to run all circuit conductors within the same raceway, auxiliary gutter, cable tray, trench, cable, or cord will apply separately to each portion of the paralleled installation, and the equipment grounding conductors will adhere to section Parallel runs in cable tray will adhere to section 392.8(D). (C) Conductors of Different Systems (1) 600 Volts, Nominal, or Less Conductors of ac and dc circuits, rated 600 volts, nominal, or less, will be allowed to occupy the same equipment wiring enclosure, cable, or raceway. All conductors will have an insulation rating equal to at least the maximum circuit voltage applied to any conductor within the enclosure, cable, or raceway All Star Training Inc. 7
8 Further Information #2: See 690.4(B) for photovoltaic source and output circuits Protection Against Physical Damage (NEC 2008) If subject to physical damage, conductors will be protected (E) Cables and Raceways Installed Under Roof Decking A cable-type or raceway-type wiring method, installed in exposed or concealed locations under metal-corrugated sheet roof decking, will be installed and supported so that the nearest outside surface of the cable or raceway is not less than 38 mm (1 ½ in.) from the nearest surface of the roof decking. (G) Insulated Fittings If raceways contain 4 AWG or larger insulated circuit conductors and these conductors enter a cabinet, box, enclosure, or raceway, the conductors will be protected by a substantial fitting providing a smoothly rounded insulating surface, unless the conductors are separated from the fitting or raceway by substantial insulating material that is securely fastened. (H) Structural Joints No listing in Protection Against Physical Damage (NEC 2011) If they are subject to physical damage, conductors, raceways, and cables will be protected. (E) Cables, Raceways, or Boxes Installed in or Under Roof Decking 2012 All Star Training Inc. 8
9 A cable raceway, or box, installed in exposed or concealed locations under metal-corrugated sheet roof decking, will be installed and supported so that there is no less than 38 mm (1 ½ in.) measured from the lowest surface of the roof decking to the top of the cable, raceway, or box. A cable, raceway, or box will not be installed in concealed locations in metal-corrugated, sheet decking-type roof. (G) Insulated Fittings Where raceways contain 4 AWG or larger insulated circuit conductors and these conductors enter a cabinet, box, enclosure, or raceway, the conductors will be protected by an identified fitting providing a smoothly rounded insulating surface, unless the conductors are separated from the fitting or raceway by identified insulating material that is securely fastened in place. (H) Structural Joints A listed expansion/deflection fitting or other approved means will be used where a raceway crosses a structural joint intended for expansion, contraction or deflection, used in buildings, bridges, parking garages, or other structures Underground Installation (NEC 2008) (C) Underground Cables Under Buildings Exception #1: Not listed in 2008 Exception #2: Not listed in 2008 (I) Conductors of the Same Circuit 2012 All Star Training Inc. 9
10 Exception #1: Conductors in parallel in raceways or cables will be allowed, but each raceway or cable must contain all conductors of the same circuit including equipment grounding conductors. Exception #2: Isolated phase, polarity, grounded conductor, and equipment grounding and bonding conductor installations will be allowed in nonmetallic raceways or cables with a nonmetallic covering or non metallic sheath in close proximity where conductors are paralleled as allowed in section 310.4, and where the conditions of section (B) are met Underground Installation (NEC 2011) (C) Underground Cables Under Buildings Exception #1: Type MI Cable will be allowed under a building without insulation in a raceway where embedded in concrete, fill or other masonry according to section (6) or in underground runs where suitably protected against physical damage and corrosive conditions according to section (10) Exception #2: Type MC Cable listed for direct burial or concrete encasement will be allowed under a building without installation in a raceway according to section (A)(5) and in wet locations according to section (11). (I) Conductors of the Same Circuit Exception #1: Conductors will be allowed to be installed in parallel in raceways, multiconductor cables, or direct-buried single conductor cables. Each raceway or multi-conductor cable will contain all conductors of the same circuit, including equipment grounding conductors. Each direct-buried single conductor cable will be located in close proximity in the trench to the 2012 All Star Training Inc. 10
11 other single conductor cables in the same parallel set of conductors in the circuit, including equipment grounding conductors. Exception #2: Isolated phase, polarity, grounded conductor, and equipment grounding and bonding conductor installations will be allowed in nonmetallic raceways or cables with a nonmetallic covering or non metallic sheath in close proximity where conductors are paralleled as allowed in section (H), and where the conditions of section (B) are met Raceways Exposed to Different Temperatures (NEC 2008) (A) Sealing If portions of a cable raceway or sleeve are known to be subjected to different temperatures, and where condensation is known to be a problem, the raceway or sleeve will be filled with an approved material to prevent the circulation of warm air to a colder section of the raceway or sleeve. An explosion proof seal will not be required for this purpose Raceways Exposed to Different Temperatures (NEC 2011) (A) Sealing If portions of a raceway or sleeve are known to be subjected to different temperatures, and where condensation is known to be a problem, the raceway or sleeve will be filled with an approved material to prevent the circulation of warm air to a colder section of the raceway or sleeve. An explosion proof seal will not be required for this purpose Raceways in Wet Locations Abovegrade (NEC 2008) 2012 All Star Training Inc. 11
12 Where raceways are installed in wet locations abovegrade, the interior of these raceways will be considered to be a wet location. Insulated conductors and cables installed in raceways in wet locations abovegrade will adhere to section 310.8(C) Raceways in Wet Locations Abovegrade (NEC 2008) Where raceways are installed in wet locations abovegrade, the interior of these raceways will be considered to be a wet location. Insulated conductors and cables installed in raceways in wet locations abovegrade will adhere to section (C) Securing and Supporting (NEC 2008) (2) Non-Fire Rated Assemblies Wiring located within the cavity of a non-fire-rated floor-ceiling or roof-ceiling assembly will not be secured to, or supported by, the ceiling assembly, including the ceiling support wires. An independent means of secure support will be provided and will be attached to the assembly Securing and Supporting (NEC 2011) (2) Non-Fire Rated Assemblies Wiring located within the cavity of a non-fire-rated floor-ceiling or roof-ceiling assembly will not be secured to, or supported by, the ceiling assembly, including the ceiling support wires. An independent means of secure support will be provided and will be attached to the assembly. Where independent support wires are used, they will be distinguishable by color, tagging, or other effective means Boxes, Conduit Bodies, or Fittings Where Required (NEC 2008) 2012 All Star Training Inc. 12
13 A box will be installed at each outlet and switch point for concealed knob-and-tube wiring. Fittings and connectors will be used only with the wiring methods for which they are designed. Where the wiring method is conduit, tubing, Type AC cable, Type MC cable, Type MI cable, non-metallic-sheathed cable, or other cables, a box or conduit body will be installed at each conductor splice point, or pull point, unless otherwise allowed in section (A) through section (M) Boxes, Conduit Bodies, or Fittings Where Required (NEC 2011) A box will be installed at each outlet and switch point for concealed knob-and-tube wiring. Fittings and connectors will be used only with the wiring methods for which they are designed. Where the wiring method is conduit, tubing, Type AC cable, Type MC cable, Type MI cable, non-metallic-sheathed cable, or other cables, a box or conduit body will be installed at each conductor splice point, or pull point, unless otherwise allowed in section (A) through section (L) Spread of Fire or Products of Combustion (NEC 2008) Electrical installations in hollow spaces, vertical shafts, and ventilation or air-handling ducts will be made so that the possible spread of fire or products of combustion will not be substantially increased. Openings around electrical insertions, through fire-resistant-rated walls, partitions, floors, or ceilings will be firestopped using approved methods to maintain the fire resistance rating Spread of Fire or Products of Combustion (NEC 2011) 2012 All Star Training Inc. 13
14 Electrical installations in hollow spaces, vertical shafts, and ventilation of air-handling ducts will be made so that the possible spread of fire or products of combustion will not be substantially increased. Openings around electrical insertions into or through fire-resistant-rated walls, partitions, floors, or ceilings will be fire stopped using approved methods to maintain the fire resistance rating Wiring in Ducts Plenums and Other Air-Handling Spaces (NEC 2008) The provisions of this section will apply to the installation and uses of electrical wiring and equipment in ducts, plenums, and other air-handling spaces. (B) Ducts or Plenums Used for Environmental Air Only wiring methods consisting of Type MI cable, Type MC cable employing a smooth or corrugated impervious metal sheath without an overall non-metallic covering, electrical metallic tubing, flexible metallic tubing, intermediate metal conduit, or rigid metal conduit without an over all non-metallic covering will be installed in ducts or plenums specifically fabricated to transport environmental air. Flexible metal conduit will be allowed, in lengths not to exceed 1.2 m (4 ft.), to connect physically adjustable equipment and devices allowed to be in these ducts and plenum chambers. The connectors used with flexible metal conduit will close any openings in the connection. Equipment and devices will be allowed within such ducts or plenum chambers only if necessary for their direct action upon, or sensing of, the contained air. Where equipment or devices are installed and illumination is necessary to facilitate maintenance and repair, enclosed gasketed-type luminaries will be allowed. (C) Other Space Used for Environmental Air 2012 All Star Training Inc. 14
15 This section applies to space used for environmental air-handling purposes other than ducts and plenums as specified in (A) and section (B). It does not include habitable rooms or areas of buildings, the prime purpose of which is not air handling. Further Information #2: The space over a hung ceiling used for environmental air-handling purposes is an example of the type of other space to which this section applies. (1) Wiring Methods The wiring methods for such other space will be limited to totally enclosed, non-ventilated insulated busway having no provisions for plug-in connections, Type MI cable, Type MC cable without an overall non metallic covering, Type AC cable, or other factory-assembled multiconductor control or power cable that is listed for the use, or listed prefabricated cable assemblies of metallic manufactured wiring systems without nonmetallic sheath. Other types of cables, conductors, and raceways will be allowed to be installed in electrical metallic tubing, flexible metallic tubing, and intermediate metal conduit, rigid metal conduit without an overall nonmetallic covering, flexible metal conduit, or, where accessible, surface metal raceway or metal wireway with metal covers or solid bottom metal cable tray with solid metal covers. (2) Equipment Electrical equipment with a metal enclosure or with a nonmetallic enclosure listed for the use and having adequate fire-resistant and low-smoke-producing characteristics, and associated wiring material suitable for the ambient temperature will be allowed to be installed in such other space unless prohibited elsewhere in this Code. Further Information: No listing in All Star Training Inc. 15
16 Exception: Integral fan systems will be allowed where specifically identified for such use Wiring in Ducts Not Used for Air-Handling Fabricated Ducts for Environmental Air, and Other Spaces for Environmental Air (Plenums) (NEC 2011) The provisions of this section will apply to the installation and uses of electrical wiring and equipment in ducts used for dust, loose stock, or vapor removal; ducts specifically fabricated for environmental air; and other spaces used for environmental air (plenums). (B) Ducts Specifically Fabricated for Environmental Air Only wiring methods consisting of Type MI cable, or Type MC cable, employing a smooth or corrugated impervious metal sheath without an overall non-metallic covering, electrical metallic tubing, flexible metallic tubing, intermediate metal conduit, or rigid metal conduit without an over all non-metallic covering will be installed in ducts specifically fabricated to transport environmental air. Flexible metal conduit will be allowed, in lengths not to exceed 1.2 m (4 ft.), to connect physically adjustable equipment and devices allowed to be in these fabricated ducts and plenum chambers. The connectors used with flexible metal conduit will effectively close any openings in the connection. Equipment and devices will be allowed within such ducts only if necessary for the direct action upon, or sensing of, the contained air. Where equipment or devices are installed and illumination is necessary to facilitate maintenance and repair, enclosed gasketed-type luminaries will be allowed. (C) Other Space Used for Environmental Air (Plenums) 2012 All Star Training Inc. 16
17 This section applies to space not specifically fabricated for environmental air-handling purposes but used for air-handling purposes as a plenum. This section will not apply to habitable rooms or areas of buildings, the prime purpose of which is not air handling. Further Information #2: The phase Other Spaces Used for Environmental Air (Plenum) as used in this section correlates with the use of the term plenum in NFPA 90A-2009, Standars for the Installation od Air-Conditioning and Ventilating Systems, and other mechanical codes where the plenum is used for return air purposes, as well as some other air-handling spaces. (1) Wiring Methods The wiring methods for such other spaces will be limited to totally enclosed, non-ventilated insulated busway having no provisions for plug-in connections, Type MI cable, Type MC cable without an overall non metallic covering, Type AC cable, or other factory-assembled multiconductor control or power cable that is listed for use within an air-handling space, or listed prefabricated cable assemblies of metallic manufactured wiring systems without nonmetallic sheath. Other types of cables, conductors, and raceways will be allowed to be installed in electrical metallic tubing, flexible metallic tubing, and intermediate metal conduit, rigid metal conduit without an overall nonmetallic covering, flexible metal conduit, or, where accessible, surface metal raceway or metal wireway with metal covers. (2) Cable Tray Systems The provision in (a) or (b) will apply to the use of metallic cable tray systems in other spaces used for environmental air (plenums), where accessible as follows: 2012 All Star Training Inc. 17
18 (a) Metal Cable Tray Systems. Metal cable tray systems will be allowed to support the wiring methods in section (C)(1). (b) Solid Side and Bottom Metal Cable Tray Systems. Solid side and bottom metal cable tray systems with solid metal covers will be allowed to enclose wiring methods and cables, not already covered in section (C)(1), according to section (A) and (B). (3) Equipment Electrical equipment with a metal enclosure, or electrical equipment with a nonmetallic enclosure listed for use within an air-handling space and having adequate fire-resistant and lowsmoke-producing characteristics, and associated wiring material suitable for the ambient temperature will be allowed to be installed in such other spaces unless prohibited elsewhere in this Code. Further Information: One method of defining adequate fire-resistant and low-smoke producing characteristics for electrical equipment with a nonmetallic enclosure is in ANSI/UL , Fire Test Heat and Visible Smoke Release for Discrete Products and Their Accessories Insulated in Air-Handling Spaces. Exception: Integral fan systems will be allowed where specifically identified for use within an air-handling space. II. Requirements for over 600 Volts, Nominal Aboveground Wiring Methods (NEC 2008) Aboveground conductors will be installed in rigid metal conduit, in intermediate metal conduit, in electrical metallic tubing, in rigid nonmetallic conduit, in cable trays, as busways, as cablebus, 2012 All Star Training Inc. 18
19 in other identified raceways, or as exposed runs of metal-clad cable suitable for the use and purpose. In locations accessible to qualified persons only, exposed runs of Type MV cables, bare conductors, and bare busbars will also be allowed. Busbars will be allowed to be either copper or aluminum Aboveground Wiring Methods (NEC 2011) Aboveground conductors will be installed in rigid metal conduit, in intermediate metal conduit, in electrical metallic tubing, in RTRC and PVC conduit, in cable trays, in auxiliary gutters as busways, as cablebus, in other identified raceways, or as exposed runs of metal-clad cable suitable for the use and purpose. In locations accessible to qualified persons only, exposed runs of Type MV cables, bare conductors, and bare busbars will also be allowed. Busbars will be allowed to be either copper or aluminum Underground Installations (NEC 2008) (B) Protection from Damage Conductors emerging from the ground will be enclosed in listed raceways. Raceways installed on poles will be of rigid metal conduit, intermediate metal conduit, Schedule 80 PVC conduit, or equivalent, extending from the minimum cover depth specified in Table to a point 2.5 m (8ft.) above finished grade. Conductors entering a building will be protected by an approved enclosure or raceway from the minimum cover depth to the point of entrance. Where directburied conductors, raceways, or cables are subject to movement by settlement or frost, they will be installed to prevent damage to the enclosed conductors or to the equipment connected to the raceways. Metallic enclosures will be grounded All Star Training Inc. 19
20 Underground Installations (NEC 2011) (B) Wet Locations The interior of enclosures or raceways installed underground will be considered to be a wet location. Insulated conductors and cables installed in these enclosures or raceways in underground installations will be listed for use in wet locations and will adhere to section (C). Any connections or splices in an underground installation will be approved for wet locations. (C) Protection from Damage Conductors emerging from the ground will be enclosed in listed raceways. Raceways installed on poles will be of rigid metal conduit, intermediate metal conduit, RTRC-XW Schedule 80 PVC conduit, or equivalent, extending from the minimum cover depth specified in Table to a point 2.5 m (8ft.) above finished grade. Conductors entering a building will be protected by an approved enclosure or raceway from the minimum cover depth to the point of entrance. Where direct-buried conductors, raceways, or cables are subject to movement by settlement or frost, they will be installed to prevent damage to the enclosed conductors or to the equipment connected to the raceways. Metallic enclosures will be grounded All Star Training Inc. 20
Have You Been Grounded Lately
Have You Been Grounded Lately Thurs, Oct. 26, 2017 9:15-10:15 Phil Simmons Author, Electrical Grounding and Bonding Author Cengage Learning Phil Simmons Have You Been Grounded Lately 2017 NEC Changes Relative
More informationNEC 2014 Code Changes
NEC 2014 Code Changes Articles 310 310.120 CHANGES FROM 2011 TO 2014 CODE ARE IN RED ARTICLE 310 Conductors for General Wiring I. General 310.2 Definitions Electrical Ducts Electrical conduits, or other
More informationMecklenburg County Common Code Defects
Electrical Code Defects Improper Over Current Protection Code Description 310.15 Ampacities for s Rated 0 2000 Volts. (A) General. (1) Tables or Engineering Supervision. Ampacities for conductors shall
More informationChapter 2 Wiring and Protection Article 200 Use and Identification of Grounded Neutral Conductor Chapter 1 General...9
Article 90 Introduction...1 90.1 Purpose of the NEC...1 90.2 Scope of the NEC...2 90.3 Code Arrangement...4 90.4 Enforcement...5 90.5 Mandatory Requirements and Explanatory Material...6 90.6 Formal Interpretations...6
More informationSUPPLEMENTAL CORRECTION SHEET FOR SOLAR PHOTOVOLTAIC SYSTEMS - ELECTRICAL
SUPPLEMENTAL CORRECTION SHEET FOR SOLAR PHOTOVOLTAIC SYSTEMS - ELECTRICAL This is intended to provide uniform application of the codes by the plan check staff and to help the public apply the codes correctly.
More informationThis is intended to provide uniform application of the codes by the plan check staff and to help the public apply the codes correctly.
SUPPLEMENTAL CORRECTION SHEET FOR SOLAR PHOTOVOLTAIC SYSTEMS (ELEC) This is intended to provide uniform application of the codes by the plan check staff and to help the public apply the codes correctly.
More informationThe following are specific provisions of 1910(a)(2) that could be seen in the LBM sector
Know the Rules on Temporary Wiring OSHA Standard 1910.305, Wiring methods, components, and equipment for general use, addresses wiring methods, components, and equipment for general use as one of several
More information2016 Photovoltaic Solar System Plan Review List
Building Division 555 Santa Clara Street Vallejo CA 94590 707.648.4374 2016 Photovoltaic Solar System Plan Review List GENERAL PROJECT INFORMATION PLAN CHECK NO DATE JOB ADDRESS CITY ZIP REVIEWED BY PHONE
More informationCHAPTER 10 ELECTRICAL
1001.0 General Requirements. 1001.1 Electrical Wiring and Equipment. Electrical wiring and equipment shall comply with the requirements of NFPA 70, National Electrical Code (NEC), or local ordinances.
More informationCHAPTER 10 ELECTRICAL. Notes:
CHAPTER 10 ELECTRICAL 1001.0 General Requirements. Electrical wiring and equipment shall comply with the requirements of NFPA 70, National Electrical Code (NEC), or local ordinances. 1002.0 Solar Photovoltaic
More informationContinued from Part 2 Rules
Continued from Part 2 Rules 26 50. 51 250.94 Grounding (Bonding) of Communications Systems An accessible bonding point must be provided at service equipment or the disconnecting means of separate buildings
More informationCHAPTER V RESIDENTIAL WIRING
CHAPTER V RESIDENTIAL WIRING 5.1. THE SERVICE ENTRANCE Buildings and other structures receive the electrical energy through the service entrance. In residential wiring, the electric company supply this
More informationSpring Test 10 due 05/11/2013
Spring Test 10 due 05/11/2013 Multiple Choice Identify the letter of the choice that best completes the statement or answers the question. 1. When installed in an agricultural building that houses livestock
More informationSee Part 3 for the Introduction for Article 314
See Part 3 for the Introduction for Article 314 76 314.25 Covers and Canopies When the installation is complete, each outlet box must be provided with a cover or faceplate, unless covered by a fixture
More informationSECTION 1: Field Inspection Guide for Rooftop Photovoltaic (PV) Systems
COUNTY OF SANTA CRUZ PLANNING DEPARTMENT 701 OCEAN STREET, 4 th FLOOR, SANTA CRUZ, CA 95060 (831) 454-2580 FAX: (831) 454-2131 TDD: (831) 454-2123 KATHLEEN MOLLOY PREVISICH, PLANNING DIRECTOR Photovoltaic
More information2011 NEC Code Updates Part 3
www.garyklinka.com Page 1 of 22 Instructions: Fee $35 1. Print these pages. 2. Circle the correct answers and transfer them to the answer sheet. 3. Page down to the last page for the verification forms
More informationGenerator Fire Safety: Generator assemblies should be located outside the building.
SECTION 33 70 00 - ELECTRICAL DISTRIBUTION PACKAGED GENERATOR ASSEMBLIES Generator Fire Safety: Generator assemblies should be located outside the building. All fuel piping from the outside of the building
More informationPhotovoltaic Solar Plan Review
PAIGE B. VAUGHAN, CBO Director of Building and Safety Phone (310) 605-5509 Fax Line (310) 605-5598 E-mail:lbutler@comptoncity.org Building & Safety Department Photovoltaic Solar Plan Review Plan Check
More informationElectrical Tech Note 111 Biosystems & Agricultural Engineering Department Michigan State University
Electrical Tech Note 111 Biosystems & Agricultural Engineering Department Michigan State University Electrical Code Changes in Michigan 1 (Based on Part 8, P.A. 230, the 2005 NEC and the 2003 MRC) This
More informationTECHNICAL GUIDELINE. Medium Voltage Conductor Ampacities ALUMINUM COPPER. Single Conductor 5kV - 35kV
Medium Voltage Ampacities Single 5kV - 35kV 2 130 145 150 165 2 100 115 115 130 1 155 175 170 190 1 120 135 130 150 1/0 180 200 195 215 1/0 140 155 150 170 2/0 205 225 225 255 2/0 160 175 175 200 3/0 240
More informationSpring Test 7 due 05/03/2013
Spring Test 7 due 05/03/2013 Multiple Choice Identify the choice that best completes the statement or answers the question. 1. A raceway contains two 3-phase, 3-wire circuits that supply 38 ampere continuous
More informationSECTION 300 OVERHEAD SERVICE
SECTION 300 OVERHEAD SERVICE 300.01 General Company provides, installs, and maintains service drop to point of delivery approved by Company. Customer provides point of attachment which is acceptable to
More informationThe Reliable Choice. Field Pocket Guide
The Reliable Choice Field Pocket Guide Allowable Ampacities of STABILOY Brand XHHW-2 and Copper 75 C (167 F) 90 C (194 F) 75 C (167 F) 90 C (194 F) Conductor Size (AWG or kcmil) Types RHW, THHW, THW, THWN,
More informationCorflex. Continuous Corrugated Aluminum Sheathed PL, MC and MV Industrial Cables. Introduction Applications... 3
Corflex Continuous Corrugated Aluminum Sheathed PL, MC and MV Industrial Cables Introduction................................. 2 Applications................................. 3 Corflex PL 300V Instrumentation
More informationPretest Module 24 Three-phase Service Entrance
Pretest Module 24 Three-phase Service Entrance 1. What is the most widely used three-phase service entrance system? 2. What are the three most common voltage combinations for three-phase, four-wire systems?
More informationELECTRICAL - GENERAL REQUIREMENTS SELF INSPECTION CHECKLIST
Name of School: OPTIONAL INFORMATION Date of Inspection: Vocational Program/Course/Room: Signature of Inspector: ELECTRICAL - GENERAL REQUIREMENTS SELF INSPECTION CHECKLIST Guidelines: This checklist covers
More informationTEMPORARY ELECTRIC WIRING FOR CARNIVALS, CONVENTIONS, EXHIBITIONS, FAIRS AND SIMILAR USES
INFORMATION BULLETIN / PUBLIC - ELECTRICAL CODE REFERENCE NO.: LAMC 93.0230 Effective: 3-24-69 DOCUMENT NO. P/EC 2002-006 Revised: 11-17-00 Previously Issued As: RGA #7-69 TEMPORARY ELECTRIC WIRING FOR
More information90.2 Scope. The installation of electrical conductors, equipment and raceways for:
NEC Generator Primer Rules on the installation of generators and transfer switches 1 90.2 Scope The installation of electrical conductors, equipment and raceways for: public and private premises Conductors
More informationAGRICULTURAL UNDERGROUND SERVICE 500 HP OR LESS
Prepared by: ABB1 AGRICULTURAL UNDERGROUND SERVICE 500 HP OR LESS 05619 Asset Type: Electric Metering Function: Design and Construction Issued by: Lisseth Villareal (LDV2) Date: 07-31-15 Rev. #10: This
More informationUNDERGROUND SERVICES - SECONDARY
UNDERGROUND SERVICES - SECONDARY Contents - Underground Services... U-1 General Requirements for Underground Service...U-2 Names of Parts for Underground Service... U-3 Service Termination in a Service
More informationSection 02: Pre-Installation Procedures
Section 02: Pre-Installation Procedures Foundation! WARNING The MUST be placed on a surface that will support the combined weight of the, options, fixtures, and tooling, etc. (refer to the Specifications
More informationCOMMERCIAL QUICK REFERENCE
COMMERCIAL QUICK REFERENCE PROVO CITY POWER STANDARDS ELECTRICAL ENGINEERING UPDATED: 2016 SPECIFICATIONS SUBJECT TO CHANGE WITHOUT NOTIFICATION. 18" MIN. OF TAIL. (NEUTRAL CONDUCTOR MUST BE WHITE OR
More informationPentahead bolts See note 2. Conduit run as specified. Company facility. Refer to drawing SS8.6-2 or SS8.6-3 STANDARD SERVICE INSTALLATION
PULL BOX F SECONDARY SYSTEM Typical grade Pentahead bolts See note 2 Conduit run as specified Plastic or fiberglass for grass areas or Polymer concrete for light duty areas (see notes 2, 3, & 4) Company
More informationDefinitions of and have been revised. a. automatic b. nonautomatic c. none of the above d. both a and b
www.garyklinka.com Page 1 of 12 Instructions: Fee $25 1. Print these pages. 2. Circle the correct answers and transfer them to the answer sheet. 3. Page down to the last page for the verification forms
More informationSINGLE PHASE WIRING SPECIFICATIONS
SINGLE PHASE WIRING SPECIFICATIONS 1-866-MEC-ELEC (1-866-632-3532) Office Locations: Hondo Office 237 Hwy 173 N Hondo, TX 78661-0370 Fax 830.426.3335 Dilley Office 1718 W. FM 117 Dilley, TX 78017 Fax 830.965.1425
More informationSentinel Field Satellite Controller Metal Pedestal, Plastic Pedestal and Wall Mount Models Installation Instructions
WARNING HIGH VOLTAGE 115V 4 M AP Sentinel Field Satellite Controller Metal Pedestal, Plastic Pedestal and Wall Mount Models Installation Instructions Important: For your protection and the safety of the
More informationFee $20 Course: NEC Changes 1 This course is valid for these credentials: Credential Description Cred Code Credit Hours
www.garyklinka.com Page 1 of 18 Instructions: Fee $20 1. Print these pages. 2. Circle the correct answers and transfer them to the answer sheet. 3. Page down to the last page for the verification forms
More informationARKANSAS ELECTRICIANS
CONTINUING EDUCATION FOR ARKANSAS ELECTRICIANS 2014 NEC Code Change 8 Hours AMERICAN ELECTRICAL INSTITUTE N16 W23217 Stone Ridge Drive, Suite 290 Waukesha, WI 53188 855-780-5046 www.aeitraining.com DISCLAIMER
More informationBulletin Wiring methods for Solar Photovoltaic Systems Rule and , Tables 11 and 19
-4-0 Bulletin -4-0 Wiring methods for Solar Photovoltaic Systems Rule -018 and -020, Tables 11 and 19 Scope Issued May 2012 (1) Introduction (2) New cable types RPV & RPVU (3) Wiring methods within photovoltaic
More informationSECTION LOW VOLTAGE DISTRIBUTION EQUIPMENT
SECTION 16400 LOW VOLTAGE DISTRIBUTION EQUIPMENT A. General 1. The University does not accept Series-Rated equipment for power distribution switchboards, distribution panels and branch circuit panelboards.
More informationSERVICE ATTACHMENT ON A BUILDING WITH BUS DUCT SERVICE ENTRANCE AND INDOOR METERING
SERVICE ATTACHMENT ON A BUILDING WITH BUS DUCT SERVICE ENTRANCE AND INDOOR METERING Obtain acceptance and specific details from the local Company office. 1. Service entrance duct (see Note 1). Company
More informationTHREE PHASE WIRING SPECIFICATIONS
THREE PHASE WIRING SPECIFICATIONS 1-866-MEC-ELEC (1-866-632-3532) Office Locations: Hondo Office 237 Hwy 173 N Hondo, TX 78661-0370 Fax 830.426.3335 Dilley Office 1718 W. FM 117 Dilley, TX 78017 Fax 830.965.1425
More informationMECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 2/8/12 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions
MECKLENBURG COUNTY Land Use and Environmental Service Agency Code Enforcement 2/8/12 ELECTRICAL CONSISTENCY MEETING Code Consistency Questions 1. I am inspecting a building addition. They have a 480V to
More information9/7/2010. Objectives. Article 90. Introduction NEC Significant Changes. Review significant revisions in the 2011 NEC
2011 NEC Significant Changes Courtesy of NJATC Courtesy of NFPA Presented By: Michael J. Johnston Executive Director of Standards and Safety, NECA Objectives Review significant revisions in the 2011 NEC
More informationChapter 8 Interior Wiring and Lighting
Chapter 8 Interior Wiring and Lighting Review Questions 1. What tool if any, is used to remove a fuse that is to be replaced? 1. Pliers 2. Screwdriver 3. Fuse puller 4. None 2. OSHA has established specific
More information2011/2008/2005 NATIONAL ELECTRICAL CODE SOLAR PV CODE COMPLIANCE REFERENCE
2011/2008/2005 NATIONAL ELECTRICAL CODE SOLAR PV CODE COMPLIANCE REFERENCE PAGE 1 OF 5 This Reference provides a very comprehensive list of aspects of a solar PV installation that could be reviewed, clarifying
More informationA Look at the 2017 NEC Significant Changes
A Look at the 2017 NEC Significant Changes A Look at the 2017 NEC Significant Changes Michael J. Johnston NECA James T. Dollard Local 98 Philadelphia Electrical JATC This session is eligible for 1 Continuing
More informationELECTRIC SERVICE RULES DISTRIBUTED GENERATION Issued Jan 2016
DISTRIBUTED GENERATION CHAPTER 5 500. SCOPE This chapter includes distributed or customer-owned generation connected in parallel and operating with Alliant Energy s electric distribution system. For all
More informationCONTINUING EDUCATION FOR OREGON ELECTRICIANS NEC Code Change Part 2 Course # Hours
AMERICAN ELECTRICAL INSTITUTE 2017 PART 2 3 CONTINUING EDUCATION FOR OREGON ELECTRICIANS 2017 NEC Code Change Part 2 Course #90817 8 Hours AMERICAN ELECTRICAL INSTITUTE N16 W23217 Stone Ridge Drive, Suite
More informationWIRING DESIGN & PROTECTION REQUIREMENTS CHECKLIST
WIRING DESIGN & PROTECTION REQUIREMENTS CHECKLIST Use & Identification of Grounded and Grounding Conductors YES NO N/A Grounded conductors are identifiable and distinguishable from all other conductors.
More informationSOLAR PHOTOVOLTAIC SYSTEMS INSPECTOR CHECKLIST
SOLAR PHOTOVOLTAIC SYSTEMS INSPECTOR CHECKLIST The following checklist is an outline of the general requirements found in the 1999 National Electrical Code (NEC) Article 690 for Photovoltaic (PV) Power
More informationPHOTOVOLTAIC ELECTRICAL POWER SYSTEMS INSPECTOR/INSTALLER CHECKLIST
PHOTOVOLTAIC ELECTRICAL POWER SYSTEMS INSPECTOR/INSTALLER CHECKLIST The following checklist is an outline of the general requirements found in the 2005 National Electrical Code (NEC) Article 690 for Photovoltaic
More informationBulletin Wiring methods for Solar Photovoltaic Systems Rules and , Tables 11 and 19
Bulletin 50-4-1 Wiring methods for Solar Photovoltaic Systems Rules 50-018 and 50-020, Tables 11 and 19 Issued December 2012 Supersedes Bulletin 50-4-0 (1) (2) (3) (4) (5) Scope Introduction New cable
More informationSection 6 Electric Metering: Residential
Section 6 Electric Metering: Residential 6.1. Scope This section provides specific information for residential metering that is not covered by the basic requirements in Section 5, Electric Metering: General.
More informationChapter 5. Imagine That Engineering Inc. Assured Equipment Grounding Conductor Program (AEGCP) Ground Fault Circuit Interrupter (GFCI)
Chapter 5 Imagine That Engineering Inc. Assured Equipment Grounding Conductor Program (AEGCP) Ground Fault Circuit Interrupter (GFCI) Imagine That Engineering Inc. has adopted this program for equipment
More informationD9-3. No. WIRING DIAGRAM CONNECTIONS FOR UNDERGROUND SELF CONTAINED METERS JRH JED krich95 LINE LINE ABCN SOURCE SOURCE GROUND GROUND STUD STUD SOURCE
SOURCE 20V 240V STUD (PER NEC) A customer supplied and installed teaser wire is required from the neutral lug to a 5th terminal mounted on the left side of the meter block between the line and load terminals.
More informationAGENDA. NEC Code-Making Panel 4. Report on Proposal Meeting. January 16-21, Hilton Head, SC
National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org AGENDA NEC Code-Making Panel 4 Report on Proposal Meeting January 16-21,
More informationWISCONSIN ELECTRICIANS
Wisconsin Contractors Institute 2017 PART 2 3 CONTINUING EDUCATION FOR WISCONSIN ELECTRICIANS 2017 NEC Code Change Part 2 8 Hours WISCONSIN CONTRACTORS INSTITUTE N16 W23217 Stone Ridge Drive, Suite 290
More informationINSTALL SERVICE- ENTRANCE SYSTEMS
SUBCOURSE EN5141 EDITION B US ARMY ENGINEER SCHOOL INSTALL SERVICE- ENTRANCE SYSTEMS INSTALL SERVICE- ENTRANCE SYSTEMS Subcourse Number EN5141 EDITION B United States Army Engineer School Fort Leonard
More informationOutdoor Power Transmission & Distribution
Description: The purpose of the section is to highlight the current applicable UMCP Design Standards and requirements for Outdoor Power Transmission and Distribution, including but not limited to the following:
More informationSolar PV Standard Plan Simplified Microinverter and ACM Systems for One- and Two-Family Dwellings
TOOLKIT DOCUMENT #4 Solar Standard Plan Simplified Microinverter and M Systems for One- and Two-Family Dwellings SCOPE: Use this plan ONLY for systems using utility-interactive Microinverters or Modules
More informationAMENDMENT ELECTRIC SERVICE MANUAL 2014
AMENDMENT (Pages 20,43,50,72,74,,76,78,83,86,99) ELECTRIC SERVICE MANUAL 2014 Effective April 1, 2015 18-7 6.0 SERVICE AND SERVICE ENTRANCES (General), Continued Conductor Sizing It is recommended that
More information4 018 (See App B) m Revised wording and clarification of requirements when selecting conductors
2012 Canadian Electrical Code Changes (CSA Errata not included) M = minor / S = significant / D = deleted N.m (Newton.metre) m New unit of torque Definitions cablebus m newly recognized wiring method ground
More information(The actual state exam will be closer to 50 questions in 4 hours time) Master Electrician Practice Test
(The actual state exam will be closer to 50 questions in 4 hours time) Master Electrician Practice Test 1. Accessible as applied to wiring methods means capable of being removed or exposed without damaging
More information10 Commercial, Industrial, Agricultural Services
10 Commercial, Industrial, Agricultural Services This section describes the Power Company requirements for commercial, industrial, and agricultural services. This section covers single phase and three
More information9. Non-Residential Services (Commercial, Industrial, and Agricultural)
Section 9 2016 Electric Service Requirements, 3rd Edition Section 9 Non-Residential Services Directory Page 9.1 General Requirements 68 9.2 Direct-Connect Metering, Single Installations 69 9.3 Direct-Connect
More informationSTOUGHTON UTILITIES ELECTRIC SERVICE RULES AND INFORMATION
CHAPTER 1 - GENERAL INFORMATION 100. Purpose 101. Codes and rules 102. Continuity of service 103. Frequency, Voltage, and Amperage Limitations 104. High voltages 105. Unusual capacity requirements 106.
More informationROCKY MOUNTAIN CHAPTER IAEI MARCH 15-16, 2012
ROCKY MOUNTAIN CHAPTER IAEI MARCH 15-16, 2012 1) Can a switched outlet be on a small appliance branch circuit for dining room lighting? No, a switched outlet on a general purpose branch circuit may be
More informationBulletin Wiring methods for Solar Photovoltaic Systems Rules, 2-034, , and , Tables 11 and 19
Bulletin 50-4-4 Wiring methods for Solar Photovoltaic Systems Rules, 2-034, 50-014, 50-018 and 50-020, Tables 11 and 19 Scope (1) Introduction (2) New cable types RPV & RPVU (3) Wiring methods within photovoltaic
More informationELECTRIC POLICY INTRODUCTION CHAPTER I GENERAL
INTRODUCTION This policy has been adopted by the Board of Public Works as a guide to obtaining electric service and to set forth the services available, conditions for service, and standards for materials
More informationContents. Obtaining Electric Service from Your Cooperative...1. Bonding Frames of Major Appliances...4. Voltage Drop...8. Drawings...
Contents Obtaining Electric Service from Your Cooperative...1 Bonding Frames of Major Appliances...4 Voltage Drop...8 Drawings...14 Agricultural Buildings...23 Optional Standby Systems...42 Grounding &
More informationACCESSORIES FOR LPOF, HPPT AND XLPE HIGH VOLTAGE CABLE SYSTEMS PRODUCT CATALOGUE
ACCESSORIES FOR LPOF, HPPT AND XLPE HIGH VOLTAGE CABLE SYSTEMS PRODUCT CATALOGUE hvgrid-tech designs and manufactures high voltage cable accessories for all types of cable systems, ranging from 69 kv to
More information2010 National Electric Code
PDHonline Course E361 (4 PDH) 2010 National Electric Code Instructor: Thomas Mason, P.E. 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088 www.pdhonline.org
More informationWestern Section 101 st Annual Meeting Hot Springs, Arkansas September 21, 2005 Charlie Trout Code Breakfast
Western Section 101 st Annual Meeting Hot Springs, Arkansas September 21, 2005 Charlie Trout Code Breakfast 1.Question: An add on unit for a hydromassage bathtub consists of a small 1-gallon water heater
More informationgrounded in service wired to innovate STABILOY Type XHHW-2 and USE-2/RHH/RHW-2
grounded in service wired to innovate STABILOY Type XHHW-2 and USE-2/RHH/RHW-2 grounded in service wired to innovate www.cable.alcan.com Type XHHW-2 and Type USE-2/RHH/RHW-2 Alcan manufactures XHHW-2 and
More informationU-18. Company furnishes and installs: 10. Service lateral and connectors. 11. Conduit package, Amperes.
SERVICE TERMINATION IN A TERMINATION COMPARTMENT DIRECT BURIED OR CONCRETE ENCASED LATERAL ALL 1-PHASE VOLTAGES, 400-800 AMPERES ALL 3-PHASE VOLTAGES, 400-3000 AMPERES ONLY Obtain acceptance for 1-phase
More informationUNDERGROUND SERVICE. Items to consider. There will be charges from ComEd if you convert from overhead to underground service.
UNDERGROUND SERVCE tems to consider f your trenching route has to be dug by hand, or if a cable must be installed under a paved surface, additional charges apply. f your service cable has to be moved later
More informationDESIGN GUIDELINES LOW VOLTAGE SWITCHGEAR PAGE 1 of 5
DESIGN GUIDELINES LOW VOLTAGE SWITCHGEAR PAGE 1 of 5 1.1. APPLICABLE PUBLICATIONS 1.1.1. Publications listed below (including amendments, addenda, revisions, supplements, and errata), form a part of this
More informationMicroinverters and AC PV modules are becoming. Microinverters and AC PV Modules. Different Beasts. Perspectives on PV.
Perspectives on PV Microinverters and AC PV Modules Are Different Beasts by John Wiles Microinverters and AC PV modules are becoming very common in residential and small commercial PV systems. See photos
More informationBulletin Wiring methods for solar photovoltaic systems Rules 2-034, , , , , Tables 11 and 19
Bulletin 64-4-1 Wiring methods for solar photovoltaic systems Rules 2-034, 64-066, 64-210, 64-216, 64-220, Tables 11 and 19 Scope (1) Introduction (2) Cable types RPV & RPVU (3) Wiring methods within photovoltaic
More informationAn average of one worker is electrocuted on the job every day There are four main types of electrical injuries:
Electrical Safety Introduction An average of one worker is electrocuted on the job every day There are four main types of electrical injuries: Electrocution (death due to electrical shock) Electrical shock
More informationPRODUCTS COMMERCIAL BUILDING WIRE & CABLE
PRODUCTS COMMERCIAL BUILDING WIRE & CABLE Table of content About Nexans 3 Commercial Building Wire & Cable 4 Armored 5 ENERGEX AC-HCF - Green Striped Armor 6 ENERGEX AC 9 ENERGEX MC 120 Aluminum Armored
More informationPermit for Charging Equipment Installation Electric Vehicle Supply Equipment (EVSE)
Permit for Charging Equipment Installation Electric Vehicle Supply Equipment (EVSE) Town of Lake George, New York Compliance with the following permit will allow the installation and operation of electric
More informationIntroduction. Nexans wire and cable. Contact us for all your wire and cable needs
Introduction Nexans is one of the largest wire and cable manufacturers in the world, and in North America. In North America we manufacture in locations across the United States and Canada. We design and
More informationMichigan State University Construction Standards SECONDARY UNIT SUBSTATIONS PAGE
PAGE 261116-1 SECTION 261116 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationSECTION PANELBOARDS
SECTION 16470 PANELBOARDS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. The general provisions of the contract including General and Special Conditions and General Requirements shall apply to all work under
More informationSolar PV Standard Plan Simplified Microinverter and ACM Systems for One- and Two-Family Dwellings
TOOLKIT DOCUMENT #4 Your City logo here Solar Standard Plan Simplified Microinverter and M Systems for One- and Two-Family Dwellings SCOPE: Use this plan ONLY for systems using utility-interactive Microinverters
More informationDIVISION 16 - ELECTRICAL SECTION 16xx0 MANUFACTURED WIRING SYSTEM ACCESS FLOOR
DIVISION 16 - ELECTRICAL SECTION 16xx0 16xx0-1. GENERAL MANUFACTURED WIRING SYSTEM ACCESS FLOOR The modular convenience power system ensures the electrification and delivery of power from the power panels
More informationNEC Code-Making Panel 5. Second Draft Meeting Agenda. November 9-14, San Diego, CA Introduction of Members and Guests
National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org NEC Code-Making Panel 5 Second Draft Meeting Agenda November 9-14, 2015
More informationSolar PV Standard Electrical Plan
*** Provide this document to the inspector along with ALL system installation instructions *** Project Address: Permit Number: SCOPE: Standard plan for installation of solar PV systems utilizing 2 wire
More informationSolar PV Standard Electric Plan
*** Provide this document to the inspector along with ALL system installation instructions *** SCOPE: Standard plan for the installation of microinverter solar PV systems, not exceeding a total AC output
More informationGrounding Systems. Equipment Grounding & Grounded Conductors
Grounding Systems Equipment Grounding & Grounded Conductors Definitions A Grounded or Earthed system is one that is connected to the earth Grounded Conductor is a conductor that normally carries current
More informationSolar PV Standard Plan Simplified Microinverter and ACM Systems for Oneand Two-Family Dwellings
County of Santa Barbara Your City logo here Solar Standard Plan Simplified Microinverter and M Systems for Oneand Two-Family Dwellings SCOPE: Use this plan ONLY for systems using utility-interactive Microinverters
More informationUNDERSTANDING ELECTRICAL EQUIPMENT AND CONDITIONS OF INCREASED RISK
UNDERSTANDING ELECTRICAL EQUIPMENT AND CONDITIONS OF INCREASED RISK 5 October 2017 John A. Weber Principal Electrical Engineer, Hartford Steam Boiler Inspection and Insurance Company Electrical Power Transmission
More informationHealth Science & Human Services Center 100% CONSTRUCTION DOCUMENTS RSA Project No September 1, 2017(REVISED 9/21/17)
SECTION 000110 VOLUME 1 INTRODUCTORY INFORMATION 000107 Seals Page... Sept. 1, 2017 000110 Table of Contents... Sept. 1, 2017 Sept. 21, 2017 DIVISION 00 - BIDDING REQUIREMENTS AND CONTRACT FORMS 003132
More informationGUIDELINES ON ELECTRICAL SAFETY AT WORKPLACES
MINISTRY OF LABOUR, INDUSTRIAL RELATIONS AND EMPLOYMENT GUIDELINES ON ELECTRICAL SAFETY AT WORKPLACES Occupational Safety & Health Inspectorate These guidelines should be used with approved standards:
More informationRESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS SECTION VI RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS
SECTION VI SERVICE REQUIREMENTS This section discusses the requirements for establishing electric service to new residential subdivisions in Palo Alto. Subdivisions are normally constructed on dedicated
More informationWestern Section IAEI Code Panel Questions
Western Section IAEI 2013 Code Panel Questions 1. Do the factory wings that many fluorescent troffers have designed to fold out over the grid meet the requirements for securely fastened to the framing?
More informationWestern Section IAEI Code Panel Questions
Western Section IAEI 2013 Code Panel Questions 1. Do the factory wings that many fluorescent troffers have designed to fold out over the grid meet the requirements for securely fastened to the framing?
More informationElectrical. Earthing & Bonding. Installation Techniques. Learning Notes MODULE 2.2 UNIT PHASE:2
Electrical Learning Notes MODULE 2.2 UNIT 2.2.6 Installation Techniques Earthing & Bonding PHASE:2 Table of Contents INTRODUCTION... 3 DEFINITIONS... 4 EARTHING... 5 TYPES OF SYSTEM EARTHING... 10 EQUIPOTENTIAL
More information