2017 Jefferson County Outreach Jefferson County Maintenance. Matthew Burkett ~ Jefferson County Maintenance Manager

Size: px
Start display at page:

Download "2017 Jefferson County Outreach Jefferson County Maintenance. Matthew Burkett ~ Jefferson County Maintenance Manager"

Transcription

1 Outreach 2017

2 2017 Jefferson County Outreach Jefferson County Maintenance Matthew Burkett ~ Jefferson County Maintenance Manager

3 MATERIAL Jefferson County Outreach Winter Maintenance Information vs Winter Anti-Skid used as of March 1= 6,953 Cost $173,825 ($25/Ton) Anti-Skid used as of Feb 24 = 11,325 Cost $271,800 ($24/Ton) Salt used as of March 1= 8,641 Cost $587,588 ($68/Ton) Salt used as of Feb 24 = 12,394 Cost $718,852 ($58/Ton) Salt Brine used as of March 1= 56,505 Cost $11,866 ($.21/Gal) Salt Brine used as of Feb 24 = 34,807 Cost $7,309 ($.21/Gal)

4 2017 Jefferson Cycle Maintenance

5 2017 Northern Low Cost Safety Initiative SR 28. Install inlet box and 200 ft. of 15 combo pipe to capture water from underground springs that caused ice to build up on the shoulder and travel lane, directing the water to a cross pipe. BEFORE AFTER

6 2017 Southern Low Cost Safety Initiative SR Install inlet box and parallel pipe to eliminate an ice problem on the north side of the roadway. A ditch was redirected on the south side of the roadway at the same location. BEFORE AFTER

7 2017 Planned Pipe Replacement 3500 Feet of Pipe Replacement (3,705 feet completed in 2016)

8 2017 Planned Shoulder Cutting 248 Miles of Shoulder Cutting and Grading planned for miles completed in 2016

9 2017 Planned Sealcoat Program 400,000 Gallons of Material For Seal Coat planned for 2017 (100 Miles of Roadway) 369,478 Gallons completed in (96 Miles of Roadway)

10 2017 Planned Crack Sealing 201 Miles of Crack Sealing planned for miles completed in 2016

11 Department Force Bridge Replacement 2017 Jefferson County Department Force Bridge SR 3031 in Oliver Township, Segment 0060/Offset 2241 River Road over Sandy Creek *Anticipated start date June 5, 2017 to August 10, 2017

12 Plans for the future Maintenance Activities In Spring of 2016, Jefferson County PennDOT joined forces with Clarion County PennDOT, piloting a combined crew (DOT Crew). This DOT Crew allowed us to stretch resources between the two counties allowing both counties to complete all of our normal activities along with paving activities in both counties. Jefferson made a request to Central Office to receive additional funding in our county maintenance budget through the Decade of Investment (DOI) funding. The request was made to address SR This is the county s worst IRI and OPI road in our secondary system that has an average daily traffic of greater then The patch work was completed in the fall of last year. Plans for the DOT Crew this year will be to pave SR 2023 using the approved DOI funds, beginning in April. This road will be paved from Anita to State Route 322 in Brookville.

13 Spring 2017 Tree Trimming ground to sky on SR 2023 DOT Crew + DOI Funding

14 DOT Crew + DOI Funding Fall 2016 / Spring 2017 We will replace any pipes that will need replaced within the next 10 years on 2023 then move to the Punxsutawney area replacing pipes

15 DOT Crew + DOI Funding Spring of 2016 Full depth asphalt base repairs In the Punxsutawney area on the secondary roads

16 DOT Crew + DOI Funding Spring of 2017 Full overlay shoulder to shoulder paving on SR 2023 from Anita to Humphry s Bridge in Brookville.

17 DOT Crew + DOI Funding Fall of 2017 If there are any unused funds available after paving is complete we will upgrade guide rail on SR 2023.

18 AGILITY 2017 Cooperatives Union Township Work plan in negotiations. Young Township Negotiating future work plans. Rose Township Painting lines in exchange for cleaning inlets PSP Punxsutawney Barracks Winter services exchanged for traffic control on I-80 for paint operations Oliver Township Negotiating future work plans. * Jefferson County is open to listen to any new ideas pertaining to agility and encourages talks to discuss possibilities.

19 2017 Equipment Auctions Spring Auction Fleet Management Division (Harrisburg) Municipal: April 19, 2017 Open to Public May 23, 2017 Fall Auction Western Pennsylvania Training Facility (Cheswick) Municipal: August 23, 2017 Public: September 26, 2017

20 Emerging Issues in Maintenance Cost to maintain equipment Long term roadway repairs Continued increased cost of construction materials and stone Continued safety awareness for employees and traveling public

21 CONTACT INFORMATION For more information regarding Jefferson County PennDOT s 2017 Projects, you can contact our office at

Winter Maintenance on Provincial Highways. District Municipality of Muskoka Winter Maintenance Update December 14, 2015

Winter Maintenance on Provincial Highways. District Municipality of Muskoka Winter Maintenance Update December 14, 2015 Winter Maintenance on Provincial Highways District Municipality of Muskoka Winter Maintenance Update December 14, 2015 Outline 1. Auditor General s Report 2. MTO Action Plan 3. Recent Winter Maintenance

More information

Wentzville Parkway South Phase 2 & 2A

Wentzville Parkway South Phase 2 & 2A Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total

More information

HURON COUNTY ENGINEER S OFFICE

HURON COUNTY ENGINEER S OFFICE HURON COUNTY ENGINEER S OFFICE 2017 ENGINEER S ANNUAL REPORT The Ohio Revised Code requires that each Ohio County Engineer publish an annual report to the commissioners outlining the general condition

More information

Better roads for Van Buren s future

Better roads for Van Buren s future Better roads for Van Buren s future August 7, 2018 Road Millage Ballot Proposal What does the Road Commission maintain? 1330 miles of road 350 primary road miles 980 local road miles 66 Bridges 9099 traffic

More information

STH 60 Northern Reliever Route Feasibility Study Report

STH 60 Northern Reliever Route Feasibility Study Report #233087 v3 STH 60 Northern Reliever Route Feasibility Study Report Washington County Public Works Committee Meeting September 28, 2016 1 STH 60 Northern Reliever Route Feasibility Study Hartford Area Development

More information

Agility Service Exchanges

Agility Service Exchanges Roads - Unpaved 618-7112-01 Shaping Miles 618-7113-01 Re-stabilization Square Yard 618-7114-01 Dust Palliative-Bit/Calcium Chloride/Other Square Yard 618-7114-02 Dust Palliative-Spot Square Yard 618-7115-01

More information

Inventory Levels - All Prices. Inventory Levels - By Price Range

Inventory Levels - All Prices. Inventory Levels - By Price Range Inventory Levels - All Prices Idaho Falls Bonneville Total 3-Mar-17 152 108 260 2-Mar-18 109 78 187-28% Inventory Levels - By Price Range 3-Mar-17 2-Mar-18 0-100,000 41 6 100,001-125,000 19 8 125,001-150,000

More information

OHIO Department of Transportation Project # Franklin County, OH. ISSA Presidents Award Submission Strawser Construction Inc.

OHIO Department of Transportation Project # Franklin County, OH. ISSA Presidents Award Submission Strawser Construction Inc. OHIO Department of Transportation Project #140378 Franklin County, OH ISSA Presidents Award Submission Strawser Construction Inc. Columbus, Ohio Strawser Construction Project Team Chris Anspaugh Regional

More information

.MAINTENANCE. Strategic Initiative Four:

.MAINTENANCE. Strategic Initiative Four: The accompanying fact sheets explain specific components of the department s effort to prioritize maintenance activities. This information provides the basis of ODOT s 2001 Strategic Initiative Four: Re-Defining

More information

2018 Proposed Budget. Table of Contents. Appropriation Act. 1. Budget by Fund. 2. Michigan Transportation Funds.. 3. Work Performed for Others...

2018 Proposed Budget. Table of Contents. Appropriation Act. 1. Budget by Fund. 2. Michigan Transportation Funds.. 3. Work Performed for Others... 2018 Proposed Budget Table of Contents Appropriation Act. 1 Budget by Fund. 2 Michigan Transportation Funds.. 3 Work Performed for Others.... 4 Construction and Preservation... 5 Primary Construction......

More information

ORANGE COUNTY TRANSPORTATION AUTHORITY. Agreement to Purchase Compressed Natural Gas Articulated Buses. Staff Report

ORANGE COUNTY TRANSPORTATION AUTHORITY. Agreement to Purchase Compressed Natural Gas Articulated Buses. Staff Report ORANGE COUNTY TRANSPORTATION AUTHORITY Agreement to Purchase Compressed Natural Gas Articulated Staff Report November 8, 2012 To: From: Subject: Transit Committee Will Kempton, Chief Executive Officer

More information

2005 Land Development Review/ State of Public Works

2005 Land Development Review/ State of Public Works 2005 Land Development Review/ State of Public Works Overview Of Public Works Department Organization 2005 Land Development Review 2005 Positives Challenges Facing Public Works Department Organizational

More information

Clarksville Street Department. Fiscal Year 2018 Budget Presentation

Clarksville Street Department. Fiscal Year 2018 Budget Presentation Clarksville Street Department Fiscal Year 2018 Budget Presentation Clarksville Street Department FY 2018 Proposed Budget 4.2% 42.0% Salaries/Benefits 53.8% Operating Expenses Capital Outlay Clarksville

More information

Public Meeting: Metropolitan Washington Airports Authority (MWAA) TNC (Transportation Network Company) Lot on S. Eads Street

Public Meeting: Metropolitan Washington Airports Authority (MWAA) TNC (Transportation Network Company) Lot on S. Eads Street Public Meeting: Metropolitan Washington Airports Authority (MWAA) TNC (Transportation Network Company) Lot on S. Eads Street Department of Environmental Services, Transportation Division Sept. 27, 2018

More information

Right-of-Way Obstruction Permit Fee Structure Minneapolis Department of Public Works May 10, 2001

Right-of-Way Obstruction Permit Fee Structure Minneapolis Department of Public Works May 10, 2001 Right-of-Way Obstruction Permit Fee Structure Minneapolis Department of Public Works May 10, 2001 Revised April 5, 2005 Revised January 27, 2006 Prepared by: Steve Collin, Engineer 2.5 Revised by Douglas

More information

Introduction and Background Study Purpose

Introduction and Background Study Purpose Introduction and Background The Brent Spence Bridge on I-71/75 across the Ohio River is arguably the single most important piece of transportation infrastructure the Ohio-Kentucky-Indiana (OKI) region.

More information

Western ND Meeting. February 19, 2014 Grant Levi, NDDOT Director

Western ND Meeting. February 19, 2014 Grant Levi, NDDOT Director Western ND Meeting February 19, 2014 Grant Levi, NDDOT Director 1 Traffic Trends in North Dakota 2 Truck Traffic 2008 3 Truck Traffic 2012 4 Average Daily Traffic 5 ND Vehicle Miles Traveled Statewide

More information

SH 249 IN GRIMES COUNTY. Open House April 3, 2014

SH 249 IN GRIMES COUNTY. Open House April 3, 2014 SH 249 IN GRIMES COUNTY Open House April 3, 2014 Meeting Agenda Purpose of Meeting Today: Review the purpose and need for the SH 249 Grimes County project Review the proposed project and alternatives Discuss

More information

OHIO Department of Transportation Project # Franklin County, OH. ISSA Presidents Award Submission Strawser Construction Inc.

OHIO Department of Transportation Project # Franklin County, OH. ISSA Presidents Award Submission Strawser Construction Inc. OHIO Department of Transportation Project #140378 Franklin County, OH ISSA Presidents Award Submission Strawser Construction Inc. Columbus, Ohio Applicant Information Strawser Construction Inc. 1392 Dublin

More information

Columbia County Road Department. Department Presentation June, 2013 By David Hill

Columbia County Road Department. Department Presentation June, 2013 By David Hill Columbia County Road Department Department Presentation June, 2013 By David Hill Columbia County Road Department Presentation: Work Performed Revenues / Expenses Projects Completed / Planned Issues and

More information

I.D.O.T. Update Version -

I.D.O.T. Update Version - I.D.O.T. Update - 2007 Version - RUBBLIZATION Rubblization with HMA Overlay Rehabilitation method for deteriorated concrete pavements Alternative to extensive patching or reconstruction Pavement in effect

More information

Characterization of Combined Use of County Road Segment

Characterization of Combined Use of County Road Segment Department of Public Works Inyo County, California Characterization of Combined Use of County Road Segment Segment Name: _Lone Pine No. 1_ Purpose: Which of the following does the combined-use segment

More information

Public Information Workshop

Public Information Workshop Public Information Workshop Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 29, 2018 Welcome to the Public Information Workshop for Harborview Road Project Development and Environment (PD&E)

More information

WIM #37 was operational for the entire month of September Volume was computed using all monthly data.

WIM #37 was operational for the entire month of September Volume was computed using all monthly data. SEPTEMBER 2016 WIM Site Location WIM #37 is located on I-94 near Otsego in Wright county. The WIM is located only on the westbound (WB) side of I-94, meaning that all data mentioned in this report pertains

More information

Operations Center FAQs

Operations Center FAQs RICHARDSON INDEPENDENT SCHOOL DISTRICT Where all students learn, grow and succeed Operations Center FAQs Richardson ISD is constructing an operations center on vacant district land between Greenville Avenue

More information

YELM HWY AND MERIDIAN RD INTERSECTION IMPROVEMENTS PROJECT CONTEXT

YELM HWY AND MERIDIAN RD INTERSECTION IMPROVEMENTS PROJECT CONTEXT PROJECT CONTEXT 510 Hicks L A C E Y Mullen Rd SE Thurston County Fairgrounds Rd SE Carpenter Long Woodland Elementary Rd SE Marvin Old Paci c H w y 510 Reservation Rd SE Nisqually Indian Community Nis

More information

Overview. Prioritization of Safety Strategies Development of the Minnesota Sinusoidal Rumble Strip Implementation and Public Relations Considerations

Overview. Prioritization of Safety Strategies Development of the Minnesota Sinusoidal Rumble Strip Implementation and Public Relations Considerations Victor Lund, PE, Traffic Engineer St. Louis County, Minnesota October 11, 2018 Overview Prioritization of Safety Strategies Development of the Minnesota Sinusoidal Rumble Strip Implementation and Public

More information

New Jersey Turnpike Authority Interchange 6 to 9 Widening Program

New Jersey Turnpike Authority Interchange 6 to 9 Widening Program New Jersey Turnpike Authority Interchange 6 to 9 Widening Program Tuesday, September 18, 2007 Public Hearings: Time: 5:00 PM - 8:00 PM Wednesday, September 19, 2007 Senior Center 3 Municipal Drive Bordentown,

More information

CSG National Conference Nashville

CSG National Conference Nashville CSG National Conference Nashville South Dakota Needs and Funding Challenges and Successes December 11, 2015 Road to Success Bipartisan Roads and Funding Task Force Alliance of interest groups Roads are

More information

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction 550 North to 650 North $ 1,750,000 $ 1,582,113 To widen an existing bridge on 1200 West over Box Elder Creek that will

More information

Kentucky Highway District 6

Kentucky Highway District 6 Kentucky Highway District 6 ROAD AND BRIDGE CONDITIONS, TRAFFIC SAFETY, TRAVEL TRENDS, AND NEEDS MARCH 2018 PREPARED BY WWW.TRIPNET.ORG Founded in 1971, TRIP of Washington, DC, is a nonprofit organization

More information

Northeast Pavement Preservation Partnership Burlington, Vermont. Rhode Island DOT

Northeast Pavement Preservation Partnership Burlington, Vermont. Rhode Island DOT Northeast Pavement Preservation Partnership Burlington, Vermont Rhode Island DOT April 8, 2014 SHRP2 R26 (Preservation of High-Traffic Volume Roadways) and MAP-21 Impacts to RIDOT Pavement Management David

More information

Dempster Street Road Improvements. Preparing for Construction

Dempster Street Road Improvements. Preparing for Construction Dempster Street Road Improvements Preparing for Construction November 9, 2009 1 Purpose of Tonight s Presentation To inform and update the Village Board, business owners and residents about... 1) Final

More information

Funding Scenario Descriptions & Performance

Funding Scenario Descriptions & Performance Funding Scenario Descriptions & Performance These scenarios were developed based on direction set by the Task Force at previous meetings. They represent approaches for funding to further Task Force discussion

More information

City of Vallejo Public Works Department

City of Vallejo Public Works Department Streets & Potholes Frequently Asked Questions A Guide to Potholes What is a pothole? How do we fix a pothole? Why do some potholes get fixed faster? I reported a pothole but it wasn't fixed - why not?

More information

Inventory Levels - All Prices. Inventory Levels - By Price Range

Inventory Levels - All Prices. Inventory Levels - By Price Range Inventory Levels - All Prices Idaho Falls Bonneville Total 7-Apr-17 154 111 265 6-Apr-18 113 91 204-23% Inventory Levels - By Price Range 7-Apr-17 6-Apr-18 0-100,000 36 10 100,001-125,000 13 9 125,001-150,000

More information

THE PARTNERSHIP OF RAIL & COAL MOVING AHEAD 2014 RMCMI ANNUAL MEETING SEPTEMBER 19, 2014

THE PARTNERSHIP OF RAIL & COAL MOVING AHEAD 2014 RMCMI ANNUAL MEETING SEPTEMBER 19, 2014 THE PARTNERSHIP OF RAIL & COAL MOVING AHEAD 2014 RMCMI ANNUAL MEETING SEPTEMBER 19, 2014 1 BNSF is a Leading U.S. Railroad A Berkshire Hathaway company 32,500 route miles in 28 states and two Canadian

More information

Effectiveness of Median Cable Barriers and Rumble Strips

Effectiveness of Median Cable Barriers and Rumble Strips Effectiveness of Median Cable Barriers and Rumble Strips Chris Poole, Iowa Department of Transportation Peter Savolainen, Iowa State University Mid-Continent Transportation Research Symposium August 16,

More information

WOLVERINE TO BHP JANSEN NEW TRANSMISSION LINE PROJECT FALL 2017

WOLVERINE TO BHP JANSEN NEW TRANSMISSION LINE PROJECT FALL 2017 WOLVERINE TO BHP JANSEN NEW TRANSMISSION LINE PROJECT FALL 2017 TODAY WE LL TALK ABOUT Our challenges and how we re meeting them Why we re building this project Our planning process and considerations

More information

New Jersey Department of Transportation

New Jersey Department of Transportation Prepared by: New Jersey Department of Transportation October 2013 TABLE OF CONTENTS Page CURRENT STATUS OF STATE HIGHWAY SYSTEM... 1 Description of System... 1 Figure 1: NJ Roadway System, Breakdown By...

More information

APPENDIX G. Greenhouse Gas and Climate Change Analysis

APPENDIX G. Greenhouse Gas and Climate Change Analysis APPENDIX G Greenhouse Gas and Climate Change Analysis GHG Running Exhaust and Fuel Cycle Emissions (CO2e) Year Emission Factor (g/mi)* ADT (vehicles per day) Length (mi) g/day MT/day MT/year 2015 638.13

More information

Elected Officials Briefing. North Metro Rail Line Update. February 9, 2017

Elected Officials Briefing. North Metro Rail Line Update. February 9, 2017 Elected Officials Briefing North Metro Rail Line Update February 9, 2017 Dave Genova, RTD General Manager and CEO Openings 2016-2017 Flatiron Flyer, Jan. 3, 2016 University of Colorado A Line, April 22,

More information

Rolling Road (Route 638) Widening Project

Rolling Road (Route 638) Widening Project Rolling Road (Route 638) Widening Project From: 0.369 Mile North of Fairfax County Parkway (Route 286) To: Old Keene Mill Road (Route 644) State Project No. 0638-029-156, P104, R204, C504; UPC 5559 Public

More information

WIM #48 is located on CSAH 5 near Storden in Cottonwood county.

WIM #48 is located on CSAH 5 near Storden in Cottonwood county. WIM Site Location WIM #48 is located on CSAH 5 near Storden in Cottonwood county. System Operation WIM #48 was operational for the entire month of August 2017. Volume was computed using all monthly data.

More information

If it ain t broke, don t t fix it. HMA Thin Lifts for Pavement Preservation in Tennessee 2008 SEAUPG CONFERENCE-BIRMINGHAM, ALABAMA

If it ain t broke, don t t fix it. HMA Thin Lifts for Pavement Preservation in Tennessee 2008 SEAUPG CONFERENCE-BIRMINGHAM, ALABAMA $9 $8 $7 $6 $5 $4 $3 $2 $1 Month-Year Ton Tonne 2008 SEAUPG CONFERENCE-BIRMINGHAM, ALABAMA The Tennessee Program HMA Thin Lifts for Pavement Preservation in Tennessee Mark Woods TDOT 5,109 Interstate Lane

More information

City of Holland Summary of Sustainability Activities. Western Michigan Regional Green Communities Workshop February 17, 2012

City of Holland Summary of Sustainability Activities. Western Michigan Regional Green Communities Workshop February 17, 2012 City of Holland Summary of Sustainability Activities Western Michigan Regional Green Communities Workshop February 17, 2012 March 2009 - Creation of the Holland Community Sustainability Committee (SusCom)

More information

PUBLIC INFRASTRUCTURE PROJECTS

PUBLIC INFRASTRUCTURE PROJECTS PUBLIC INFRASTRUCTURE PROJECTS FM 664 / OVILLA ROAD WIDENING & IMPROVEMENTS FM 664 / OVILLA ROAD CONNECTS US 287 WITH I-45 (SOURCE: TEXAS DEPARTMENT OF TRANSPORTATION. 2016 FM 664 / OVILLA ROAD WIDENING

More information

West Broadway Reconstruction/LRT Design. March 19, 2015

West Broadway Reconstruction/LRT Design. March 19, 2015 West Broadway Reconstruction/LRT Design March 19, 2015 1 Meeting Agenda 6:05 6:30 PM Brief presentation What we heard Project overview 6:30 8:00 PM Visit Six Topic Areas Road and LRT design elements Pedestrian

More information

2017 TRAFFIC ENGINEERING REPORT

2017 TRAFFIC ENGINEERING REPORT 2017 TRAFFIC ENGINEERING REPORT Year 2018 Toll Bridge Traffic Volume And Revenue Projections Retainer Agreement C-686A Submitted to: Delaware River Joint Toll Bridge Commission New Hope Headquarters and

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: October 29, 2009 SUBJECT: BETWEEN $1,000,000 TO $5,000,000 FOR THE PERIOD AUGUST 1, 2009 TO SEPTEMBER 30, 2009 INFORMATION

More information

EXCEPTION TO STANDARDS REPORT

EXCEPTION TO STANDARDS REPORT EXCEPTION TO STANDARDS REPORT PROJECT DESCRIPTION AND NEED The project is located in Section 6, Township 23 North, Range 9 East and Section 31 Township 24 North, Range 9 East, in the Town of Stockton,

More information

Inventory Levels - All Prices. Inventory Levels - By Price Range

Inventory Levels - All Prices. Inventory Levels - By Price Range Inventory Levels - All Prices Idaho Falls Bonneville Total 3-Nov-17 198 128 326 2-Nov-18 155 134 289-11% Inventory Levels - By Price Range 3-Nov-17 2-Nov-18 0-100,000 17 11 100,001-125,000 15 9 125,001-150,000

More information

Mobility Management: Caltrain

Mobility Management: Caltrain Mobility Management: Caltrain Community Relations Committee October 4, 2017 Agenda Item 7 Presentation Outline Operating Statistics Ridership On-time Performance Fleet Reliability Capital Program Review

More information

Safety Audits in Iowa

Safety Audits in Iowa Safety Audits in Iowa National RSA Peer Exchange April 29-10, 2008 Little Rock, AR Tom Welch, P.E. State Safety Engineer Office of Traffic and Safety Iowa Department of Transportation From 3R to 1R We

More information

Transportation accomplishments

Transportation accomplishments 1 1 Welcome Transportation accomplishments Federal Funding State Funding Challenges Future Projects 2 Transportation Project: The NDDOT had a record construction season in 2011. Completed $595.6 million

More information

Highway Construction Worker Dies When Struck By Semi-Tractor Trailer Incident Number: 03KY030

Highway Construction Worker Dies When Struck By Semi-Tractor Trailer Incident Number: 03KY030 Highway Construction Worker Dies When Struck By Semi-Tractor Trailer Incident Number: 03KY030 Kentucky Fatality Assessment and Control Evaluation Program Kentucky Injury Prevention and Research Center

More information

Status Report on Bridges and Roads Repair/Renovations

Status Report on Bridges and Roads Repair/Renovations Basis FOR Analysis Compliance with the Clean Water Act as set forth in a Consent Decree approved by the U.S. District Court of Guam in February 2004 Layon site selected by Government of Guam and approved

More information

2012 Michigan Winter Operations Conference

2012 Michigan Winter Operations Conference 2012 Michigan Winter Operations Conference Feel the Burn! Using Liquids to Keep Winter Roads Clear Before We Get Started! 1 WE MUST REMEMBER - PLOWING IS STILL THE BEST METHOD OF REMOVING SNOW CHEMICALS

More information

Partial Automation for Truck Platooning

Partial Automation for Truck Platooning Partial Automation for Truck Platooning Observations and Lessons Learned to Date from California's Experience with Truck Platooning Matt Hanson 2017 ITS CA Conference September 18, 2017 Burlingame, CA

More information

FasTracks News. RTD s Eagle P3 Transit Project Nears Halfway Mark to Opening Day EP3 will add three commuter rail lines to metro area in 2016

FasTracks News. RTD s Eagle P3 Transit Project Nears Halfway Mark to Opening Day EP3 will add three commuter rail lines to metro area in 2016 July 29, 2013 Welcome to Inside RTD FasTracks a monthly e- update to keep you informed about the progress of the Regional Transportation District's FasTracks program. FasTracks News RTD s Eagle P3 Transit

More information

SC Highway 41 Existing Conditions

SC Highway 41 Existing Conditions SC Highway 41 Existing Conditions Existing Typical Cross Section purposes only and does not replace the required NEPA process necessary for alignment The NEPA process is anticipated to begin in the next

More information

Oregon s EV Charging Network National Association of State Energy Officials June 12, 2012

Oregon s EV Charging Network National Association of State Energy Officials June 12, 2012 Oregon s EV Charging Network National Association of State Energy Officials June 12, 2012 Art James Oregon Department of Transportation Office of Innovative Partnerships 1 OREGON In Perspective Population

More information

The USDOT Congestion Pricing Program: A New Era for Congestion Management

The USDOT Congestion Pricing Program: A New Era for Congestion Management The USDOT Congestion Pricing Program: A New Era for Congestion Management Patrick DeCorla-Souza, AICP Federal Highway Administration Presentation at Congestion Pricing Discovery Workshop Los Angeles, CA

More information

THE USE OF PERFORMANCE METRICS ON THE PENNSYLVANIA TURNPIKE

THE USE OF PERFORMANCE METRICS ON THE PENNSYLVANIA TURNPIKE Wilke, P.W.; Hatalowich, P.A. 1 THE USE OF PERFORMANCE METRICS ON THE PENNSYLVANIA TURNPIKE Paul Wilke, P.E. Principal Engineer Corresponding Author Applied Research Associates Inc. 3605 Hartzdale Drive

More information

ODOT District Two Monthly Construction Update

ODOT District Two Monthly Construction Update Ohio Department of Transportation Construction Update DISTRICT 2 KIRK SLUSHER, P.E., ACTING DEPUTY DIRECTOR 317 East Poe Rd. Bowling Green, Ohio 43402-1330 www.transportation.ohio.gov/dist2 ODOT District

More information

Utility work, road construction substantially done on Fourth Street

Utility work, road construction substantially done on Fourth Street November 2010 Fourth Street in downtown is reopen to vehicle traffic between Minnesota and Broadway streets. Utility relocation and road construction are substantially complete there. Utility work, road

More information

An Introduction to Automated Vehicles

An Introduction to Automated Vehicles An Introduction to Automated Vehicles Grant Zammit Operations Team Manager Office of Technical Services - Resource Center Federal Highway Administration at the Purdue Road School - Purdue University West

More information

Recommended Transportation. Capital Improvement Program

Recommended Transportation. Capital Improvement Program Recommended 2018-2022 Transportation Capital Improvement Program 1 Overview 2017 Review 2018-2022 Considerations 2018-2022 Recommended CIP 2 Limited Resources are Directed to the Highest Priority Number

More information

Mobility Corridor Updates. Transit & Active Transportation Projects

Mobility Corridor Updates. Transit & Active Transportation Projects Mobility Corridor Updates Transit & Active Transportation Projects Manjeet Ranu, SEO East San Fernando Valley Transit Corridor Metro Board LPA selection: June 2018 Recently awarded $200 million in Senate

More information

DIVISION V SURFACINGS AND PAVEMENTS

DIVISION V SURFACINGS AND PAVEMENTS 36-3.01 GENERAL DIVISION V SURFACINGS AND PAVEMENTS 36 GENERAL 04-20-18 Replace section 36-3 with: 36-3 PAVEMENT SMOOTHNESS 36-3.01A Summary Section 36-3 includes specifications for measuring the smoothness

More information

Open Session Item. Construction Bid Award Pavement Maintenance & Rehabilitation Program FY 16 Chip Seal Applications, Contract No.

Open Session Item. Construction Bid Award Pavement Maintenance & Rehabilitation Program FY 16 Chip Seal Applications, Contract No. Board of County Commissioners of Washington County, Maryland Agenda Report Form Open Session Item SUBJECT: Construction Bid Award Pavement Maintenance & Rehabilitation Program FY 16 Chip Seal Applications,

More information

FLEET SERVICES OVERVIEW and ACCOMPLISHMENTS Public Works Commission August 10, 2017

FLEET SERVICES OVERVIEW and ACCOMPLISHMENTS Public Works Commission August 10, 2017 FLEET SERVICES OVERVIEW and ACCOMPLISHMENTS Public Works Commission August 10, 2017 DESCRIPTION OF FLEET OPERATION Fleet operations include vehicle and equipment maintenance, procurement and surplus services,

More information

January 13, 2012 AACE Annual Meeting, Wickenburg, AZ. I-15 in Arizona. Its Past, Present, and Future

January 13, 2012 AACE Annual Meeting, Wickenburg, AZ. I-15 in Arizona. Its Past, Present, and Future January 13, 2012 AACE Annual Meeting, Wickenburg, AZ I-15 in Arizona. Its Past, Present, and Future Jean A. Nehme, Ph.D., P.E. State Bridge Engineer, ADOT Presentation Overview Location, History, and Photographs

More information

BARRETT ROAD (C.R. 178) ROADWAY RESURFACING FROM LEWIS ROAD TO SPAFFORD ROAD IN OLMSTED TOWNSHIP, OHIO ITEMIZED UNIT PRICE BID ROADWAY

BARRETT ROAD (C.R. 178) ROADWAY RESURFACING FROM LEWIS ROAD TO SPAFFORD ROAD IN OLMSTED TOWNSHIP, OHIO ITEMIZED UNIT PRICE BID ROADWAY IZED PRICE BID DESCRIPTION PRICE BID ROADWAY 1 201 11000 CLEARING AND GRUBBING 1 - - LUMP 2 202 23000 PAVEMENT REMOVED NR SQ YD 20 3 202 35100 PIPE REMOVED, 24" AND UNDER NR FT 134 4 202 58000 MANHOLE

More information

SPECIFICATIONS AND DOCUMENTS FOR PURCHASE OF ROAD MATERIALS AND RENTAL OF CERTAIN PIECES OF CONSTRUCTION EQUIPMENT

SPECIFICATIONS AND DOCUMENTS FOR PURCHASE OF ROAD MATERIALS AND RENTAL OF CERTAIN PIECES OF CONSTRUCTION EQUIPMENT SPECIFICATIONS AND DOCUMENTS FOR PURCHASE OF ROAD MATERIALS AND RENTAL OF CERTAIN PIECES OF CONSTRUCTION EQUIPMENT (Gravel, Crushed Rock, Sand, Road Oils, Recycled Aggregate, Bituminous Milling, Sealcoating,

More information

Public Works Committee Meeting AGENDA. June 5, 2018 City Hall

Public Works Committee Meeting AGENDA. June 5, 2018 City Hall Public Works Committee Meeting AGENDA June 5, 2018 City Hall I CALL TO ORDER II. MATTERS BEFORE COMMITTEE 1. Monthly Solid Waste Report 2. Monthly Streets & Transportation Report III. ADJOURN Public Works

More information

Public Meeting. SD Highway 28 From US81 W 11 miles through Lake Norden Hamlin County PH 0028(37)329 PCN 04JY

Public Meeting. SD Highway 28 From US81 W 11 miles through Lake Norden Hamlin County PH 0028(37)329 PCN 04JY Public Meeting SD Highway 28 From US81 W 11 miles through Lake Norden Hamlin County PH 0028(37)329 PCN 04JY Neil Schochenmaier, PE Road Design Engineering Supervisor March 16, 2017 Purpose of the Meeting

More information

PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCE

PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCE PURCHASING DEPARTMENT DIVISION OF BUDGET & FINANCE 100 West Washington Street, Room 3200 Hagerstown, MD 21740-4748 P: 240.313.2330 F: 240.313.2331 www.washco-md.net Q-18-655 ADDENDUM NO. 1 REQUEST FOR

More information

Final Administrative Decision

Final Administrative Decision Final Administrative Decision Date: August 30, 2018 By: David Martin, Director of Planning and Community Development Subject: Shared Mobility Device Pilot Program Operator Selection and Device Allocation

More information

Green Line LRT: Beltline Segment Update April 19, 2017

Green Line LRT: Beltline Segment Update April 19, 2017 Green Line LRT: Beltline Segment Update April 19, 2017 Quick Facts On April 11, 2017, City Council approved Administration s recommendation for the Green Line to be underground in the Beltline from 2 Street

More information

2016 Build a Better Mousetrap Competition: Recognizing Innovative Inventions and Improvements. PennDOT Local Technical Assistance Program

2016 Build a Better Mousetrap Competition: Recognizing Innovative Inventions and Improvements. PennDOT Local Technical Assistance Program 2016 Build a Better Mousetrap Competition: Recognizing Innovative Inventions and Improvements PennDOT Local Technical Assistance Program Have You Built a Better Mousetrap? Have you or one of your coworkers

More information

Alpine Highway to North County Boulevard Connector Study

Alpine Highway to North County Boulevard Connector Study Alpine Highway to North County Boulevard Connector Study prepared by Avenue Consultants March 16, 2017 North County Boulevard Connector Study March 16, 2017 Table of Contents 1 Summary of Findings... 1

More information

Mobility Corridor Updates. Transit & Active Transportation Projects

Mobility Corridor Updates. Transit & Active Transportation Projects Mobility Corridor Updates Transit & Active Transportation Projects Laura Cornejo, DEO Regional Planner Regional Operator Metro is LA County s Regional Builder/Funder Rail Bus Service (Metro/Muni/Local)

More information

Florida Public Service Commission 2011 Hurricane Season Preparation Briefing

Florida Public Service Commission 2011 Hurricane Season Preparation Briefing Florida Public Service Commission 2011 Hurricane Season Preparation Briefing OUC The Reliable One May 4, 2011 Byron Knibbs Vice President, Sustainable Services (407) 434-2194 bknibbs@ouc.com 1 Florida

More information

Ghana Kumasi-Paga Road Rehabilitation Project. Report date: March 2001 Field survey: July Project Profile and Japan s ODA Loan

Ghana Kumasi-Paga Road Rehabilitation Project. Report date: March 2001 Field survey: July Project Profile and Japan s ODA Loan Ghana Kumasi-Paga Road Rehabilitation Project Report date: March 2001 Field survey: July 2000 1. Project Profile and Japan s ODA Loan Site Map: major road network in the Republic of Ghana Kumasi-Paga Road

More information

Business Advisory Committee. July 7, 2015

Business Advisory Committee. July 7, 2015 Business Advisory Committee July 7, 2015 1 Today s Topics Outreach Update TI #1 and 2: Target Field Station Connection to I-94: Recommendation 85 th Station Configuration 93 rd Station Configuration DEIS

More information

Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary

Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County Executive Summary October 2014 Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County Executive Summary October 2014 Prepared

More information

Bella Vista Bypass Benefit Cost Analysis

Bella Vista Bypass Benefit Cost Analysis Bella Vista Benefit Cost Analysis The Benefit Cost Analysis (BCA) was performed in accordance with the ARRA guidance provided in the Federal Register. These benefits and costs were quantified in accordance

More information

REGULAR SESSION, BOARD OF PUBLIC WORKS AND SAFETY, DECEMBER 27, 2017

REGULAR SESSION, BOARD OF PUBLIC WORKS AND SAFETY, DECEMBER 27, 2017 The Board of Public Works and Safety of Plymouth, Indiana, met in Regular Session on December 27, 2017, at 6:00 p.m. in the meeting room of the Plymouth Fire Department, 111 N. Center St., Plymouth, IN.

More information

Delaware County Engineer s Office

Delaware County Engineer s Office Delaware County Engineer s Office JANUARY 2017 County Engineer Responsibility Serve as engineer to the Board of County Commissioners and 18 Boards of Township Trustees for roads, bridges and land surveying

More information

COUNTY ROAD SPEED LIMITS. Policy 817 i

COUNTY ROAD SPEED LIMITS. Policy 817 i Table of Contents COUNTY ROAD SPEED LIMITS Policy 817.1 PURPOSE... 1.2 APPLICABILITY... 1.3 DEFINITIONS... 1.4 STATE ENABLING LEGISLATION... 2.5 SPEED LIMITS ON COUNTY ROADS (CCC 11.04)... 2.6 ESTABLISHING

More information

The Eastern Connector Study November, 2007 planning for the future

The Eastern Connector Study November, 2007 planning for the future The Eastern Connector Study November, 2007 planning for the future In late 2006, Albemarle County and the City of Charlottesville jointly initiated the Eastern Connector Corridor Study. The Project Team

More information

Sustainable Transportation At Stony Brook University Friday, September 21, 2012 SUNY Sustainability Conference Syracuse Center of Excellence

Sustainable Transportation At Stony Brook University Friday, September 21, 2012 SUNY Sustainability Conference Syracuse Center of Excellence Sustainable Transportation At Stony Brook University Friday, September 21, 2012 SUNY Sustainability Conference Syracuse Center of Excellence James O Connor, Director of Sustainability & Transportation

More information

Local Public Agency Obligated Projects SFY 2018

Local Public Agency Obligated Projects SFY 2018 Local Public Agency Obligated Projects SFY 2018 DES # Project Description/Location Sponsor County Project Type Funding Type Federal Programmed Previously Obligated (Prior to SFY 2018) SFY 2018 Obligated

More information

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN Page 1 of 3 CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN The six-year Capital Improvement Plan (CIP) includes capital projects for 2017 2022. This plan includes capital projects that add

More information

system performance I-820 East Loop FM 156 TxDOT is working to expand its busiest metropolitan corridors.

system performance I-820 East Loop FM 156 TxDOT is working to expand its busiest metropolitan corridors. system performance TxDOT is working to expand its busiest metropolitan corridors. Nine of the state s 100 most congested highways are located in Tarrant County. Six of these highways will be expanded and

More information

BINGHAMTON METROPOLITAN TRANSPORTATION STUDY

BINGHAMTON METROPOLITAN TRANSPORTATION STUDY BINGHAMTON METROPOLITAN TRANSPORTATION STUDY ANNUAL LISTING OF FEDERAL AID PROJECT OBLIGATIONS FEDERAL FISCAL YEAR Federal regulations require an annual listing of transportation projects, including investments

More information

Project Home - Sites in Central Pennsylvania

Project Home - Sites in Central Pennsylvania 5 Project Home - Sites in Central Pennsylvania Property Report (SEEDCO INDUSTRIAL PARK) Availability For Sale Sale Price $24,000.00 For Lease Sale Price Comments KOZ & KOEZ Sites $23,000 - $25,000/acre

More information

2701 INTERTECH DRIVE, YOUNGSTOWN, MAHONING COUNTY, INDUSTRIAL PROPERTY FOR SALE 143,789 SF on ACRES $4,300,000

2701 INTERTECH DRIVE, YOUNGSTOWN, MAHONING COUNTY, INDUSTRIAL PROPERTY FOR SALE 143,789 SF on ACRES $4,300,000 2701 INTERTECH DRIVE, YOUNGSTOWN, MAHONING COUNTY, 44504 143,789 SF on 20.177 ACRES $4,300,000 BUILDING OVERVIEW PARKER HANNIFIN FACILITY GEAR PUMP DIVISION Zoning - Industrial Light Manufacturing 143,789

More information

CITY OF WINDCREST ROADWAY CAPITAL IMPROVEMENT PROGRAM STATUS REPORT JULY 2014

CITY OF WINDCREST ROADWAY CAPITAL IMPROVEMENT PROGRAM STATUS REPORT JULY 2014 CITY OF WINDCREST ROADWAY CAPITAL IMPROVEMENT PROGRAM STATUS REPORT JULY 2014 IN THE SPOTLIGHT Roadway Improvement Projects - Package #2 Construction Package #2 is the second of four groupings of similar

More information