.MAINTENANCE. Strategic Initiative Four:

Size: px
Start display at page:

Download ".MAINTENANCE. Strategic Initiative Four:"

Transcription

1 The accompanying fact sheets explain specific components of the department s effort to prioritize maintenance activities. This information provides the basis of ODOT s 2001 Strategic Initiative Four: Re-Defining County Priorities. The timeline on the back of this sheet outlines the comprehensive distribution of this information. Each county will have a work plan similar to the one included in this packet that captures the various aspects of maintenance work required to maintain Ohio s roads for the following three key areas: Staffing Consideration Snow and Ice Control Construction Inspection (Exhibit A) Basic Roadside Conditions Pavement Deficiency Pavement Marking Guardrail Deteriorated & Damaged Sign Deterioration Pavement Drop-off Vegetation Obstruction Litter Appearance Drainage Ditch Obstruction (Exhibit B) Preventive Maintenance Effort Pavements Bridges Raised Pavement Markers Electrical Traffic Control Devices Signing Highway Lighting Mowing Surface Cleaning Underdrain Outlet Cleaning (Exhibit C) Continued on Back

2 INITIATIVE TIMELINE The following summarizes who is responsible for ensuring these new maintenance priorities are explained to the department s work force. It also highlights timelines for the distribution of this information. Information regarding the Maintenance Initiative will be provided to the district highway management administrators during the regularly scheduled meetings. The district highway management administrators will be responsible for implementing changes and ensuring all highway workers are informed about the new work plans, OPI measures and preventive maintenance activities in their respective counties. At the meeting to be held on December 12, the schedule for the 2002 district management administrators meetings will be established. It is anticipated the future meetings will be held the second Wednesday of every other month. The regional county managers meetings are held twice yearly in March and September. The maintenance initiatives will be an important topic at these meetings which are conducted in various locations. The agenda is established approximately two weeks prior to the meeting date. Information regarding the Maintenance Initiative will be provided to district deputy directors through the monthly executive leadership meetings. The schedule for the remaining 2001 meetings include: November 1, and December 19. Representatives from the Central Office Division of Highway Management will travel to each district to work with the district deputy directors and administrators to discuss county work plans and compliance with the new initiatives.

3 COUNTY WORK PLAN A B C District 1 Annual Work Plan Summary Fiscal Year 2002 Available Resources Category Number of Employees Highway Workers Project Inspector All Other Workers Total Maintenence OPI Category Priority System Current OPI General System Guardrail Pavement Deficiency Pavement Drop Off Vegetation Obstruction Litter Drainage Ditch Obstruction Sign Deterioration Pavement Markings Snow & Ice Total Preventive Maintenance Category Maintenance Cycle RPM Replacement 3 year cycle Electrical Traffic Contr. Devic Annually Signing (8 Yr. Initial), 15 year Highway Lighting Annually Mowing and Vegetation times per year Surface Cleaning Underdrain Outlet Cleaning Pavement Prev. Maintenence Bridge Prev. Maintenance Total Annually 3 year cycle Annually Annually Grand Total Total Hours Comp. Time Current Deficiencies Priority System General System Total Work Effort Labor (hours) Contract ($) Current OPI Spring Winter 2001 Priority Lane Miles General Lane Miles Deductions Training All other Leave Other Direct Labor Project Inspection Total Hours less Deductions CP7 Contract Budgets OPI Goal Total Work Effort Deficiencies as of June 30, 2002 Projected Date to Meet OPI Goal Priority System General System Labor (hours) Contract ($) Priority System General System Priority System General System Number of Units Per Category Fiscal Year 2002 Preventive Maintenance Goal Number of Units Proposed Percent of Preventive Maintenance Goal Met (district) (district) each 118 each 520 lane miles 1500 each 7191 swath miles 53.8 pass. miles 9 each 318 lane miles 7 each

4 PAVEMENT DEFICIENCY This category is a combination of Pavement Deterioration, Pavement Obstruction, Pavement Bleeding and Excessive Crack Sealing. The importance of Pavement Deficiency is that all of these deficiencies pose danger to motorists as ruts, potholes and other obstructions make it difficult or impossible for drivers to maintain control of their vehicle. Because of the potential dangers unsecured pavements cause, its is important to address Pavement Deficiency. Condition: Pavement Deterioration Description: Any deterioration which exceeds two inches in depth or square inches (8" x 8") in area or exposes the base or reinforcing steel. Any deterioration of the pavement surface requiring immediate repair is a recordable condition. Examples include pot holes, construction joints, shoveling, spalling, and rutting greater than two inches. Scope of Observation: All of the pavement surface in the sample section including the paved shoulder. One Unit of Count: Each two square yards of the condition (Maximum of 50 per two mile section). Notes: Bridge decks are not to be surveyed. Continued on Back

5 PAVEMENT DEFICIENCY CONTINUED Condition: Pavement Bleeding (Flushing) and Excessive Crack Sealing Description: Any pavement or crack sealing exceeding one square yard in area. Also, any longitudinal or transverse crack sealing exceeding four inches in width. Scope of Observation: All of the pavement surface of the sample section including the paved shoulder. One Unit of Count: Bleeding and crack sealing - each 100 linear feet of the condition in each lane (Maximum of 50 per two mile section). Notes: Pavement bleeding or excessive crack sealing, or both cause a reduction in skid resistance due to excess bitumen or crack sealant on the pavement surface. Pavement bleeding and excessive crack sealing material can be observed for two lanes of pavement while driving at 20 mph. An adequate estimate of the number of units present can be established by slowing to 10 mph when a slippery condition is encountered. Condition: Pavement Obstruction Description: Pavement conditions which adversely affects user safety. Examples include sags, slips, manholes, and inlets that are two inches above or below the pavement surface, and blow ups. Obstructions extending into both lanes are two units of measure. Scope of Observation: All of the pavement surface of the sample section, including paved shoulders. One Unit of Count: Each two square yards where one or more of this condition is present. Notes: Pavement obstructions and hazards should be recorded for all lanes of pavement driving at 20 mph.

6 PAVEMENT MARKING Deficiencies in pavement striping and auxiliary marking are caused by maintenance activities such as crack sealing and drag patching, in addition to fading and wear that results over time. The focus is to ensure lane dividing lines, no passing areas and pavement edge lines are clearly visible to the traveling public. Additionally, all auxiliary markings such as crosswalks turn lanes and school zones must be identified to ensure pedestrian and vehicular safety. Condition: Pavement Striping Deterioration and Defacing Description: Striping in excess of 100 lineal feet that is faded, missing or does not delineate the pavement edge or corner. Scope of Observation: All of the pavement surface of the sample section. One Unit of Count: Each 528 feet of edge or center stripe (one tenth of a mile). Notes: Pavement edge line is required on any pavement exceeding 100 feet in length. Where lack of striping is extensive, estimate the percent of the total survey section which requires each edge and center stripe. Multiply the percent of each edge and center line times the total mileage. The resulting mileage should be multiplied by 10 to find the units. If striping deterioration is the result of recent repaving and No Pavement Edgeline caution signs are posted the survey crews shall not count the striping deterioration. Maximum Number of Deficiencies: Two-lane may have 0, four-lane divided may have 120 and six-lane divided may have 10. Continued on Back

7 Condition: Pavement Auxiliary Marking Deterioration Description: Markings are missing or do not delineate. Scope of Observation: All pavement surface of the sample section. One Unit of Count: Each location where markings are insufficient. PREVENTIVE MARKING CONTINUED Notes: Auxiliary markings are in school zones, at railroad crossings, interchange gore areas, stop lines, lane arrows and other roadway areas where special markings improve safety.

8 GUARDRAIL DETERIORATED AND DAMAGED Guardrail is designed to protect motorists however, it can become a hazarad if deteriorated and damaged guardrail is not replaced. All guardrail must be capable of meeting its design requirements. Condition: Guardrail Deteriorated and Damaged Description: Any guardrail, anchor assembly, bridge anchor assembly or impact attenuator which does not properly function as a safety barrier due to damage or deterioration of the post, hardware, or element. Double-sided rail should be rated as a deficiency in each direction. Concrete barrier (permanent) that is damaged or deteriorated to the point it would not perform as intended will also be reported as a condition in this category. Scope of Observation: All guardrail or concrete barrier. One Unit of Count: Each guardrail panel where the condition exists or each end assembly, bridge assembly, or non-functional impact attenuator. Every 12.5 feet where permanent concrete barrier deficiencies exist. Notes: Guardrail deterioration includes two continuous rotten or missing posts. Includes three continuous missing or rotated spacer blocks. Each run of guardrail must be personally inspected to insure its proper functioning. Particular attention should be given to the stability of the posts and damaged end assemblies, impact attenuators, and bridge assemblies which will not function as designed. Guardrails will be reviewed by sight.

9 SIGN DETERIORATION All traffic signs are installed for a specific purpose. Any missing or damaged signs translate to a situation or road condition that is not being relayed to drivers. This category includes missing delineators and unnecessary signs that confuse the traveling public rather than assist them. Condition: Sign Deterioration Description: Any sign or delineators which does not properly function. Scope of Observation: All signs within the sample section. One Unit of Count: Each sign which does not properly function. Notes: Sign deterioration includes loss of message or any part thereof, damaged or twisted posts or supports, and any loss in reflectivity which prevents the sign from being clearly read either during daylight or darkness. Additionally if 10 or more delineators are missing on the interstate one more deficiency will be added. Mile markers that are misplaced by plus or minus a tenth mile will be one unit of count. Sign posts which remain in the ground after the removal of the signage will be considered a deficiency. Signs that are remain posted that are no longer necessary and may confuse the traveling public, such as obsolete detour or construction indicators, will be counted as a deficiency.

10 PAVEMENT DROP OFF This condition causes vehicles leaving their lane to drop off to the paved surface, making it difficult to regain control, potentially causing damage to signage and guardrail. Often a driver will over correct and cross into oncoming traffic. Either situation risks property damage and personal injury. Condition: Pavement Drop-Off Description: Any drop-off between pavement, including paved shoulder, and unpaved shoulder exceeding two inches in depth and six lineal feet in length. Scope of Observation: The entire edge of one shoulder on the sample section. For divided highways, rate both outside shoulders in the direction of the survey. One Unit of Count: Each lineal feet of the condition. Notes: A drop-off between the shoulder and the pavement edge, including paved shoulder, exceeding two inches and which measures more than six lineal feet should be classified as one unit of pavement drop-off. Pavement drop-off should be recorded driving at 20 mph.

11 VEGETATION OBSTRUCTION Overgrown vegetation can pose a safety risk by restricting motorists ability to see posted signs, guardrail and other potential hazards along the road. Many dangerous situations can be avoided by keeping vegetation along the road cut back. Obstructed signs can be problematic because the traveling public is not being informed of a condition that warrants a sign. Guardrail is by design a hazard and must be visible to drivers. Additionally, sight distance problems caused by vegetation at intersections and ramps could result in crashes. By controlling the growth of vegetation; signs can be observed, guardrail can be seen and other potential harmful situations can be eliminated. Condition: Vegetation Obstruction Description: Any deviation from policy or directive including growth obscuring signage or sight distance and vegetation control around guardrail and signs. Scope of Observation: All roadway and median on sample section. One Unit of Count: Each guardrail run or sign that is obscured.

12 LITTER APPEARANCE The department receives numerous complaints regarding litter along the states roads. While litter is visually unappealing, it can also be dangerous to motorists. Litter can obstruct drainage and could be propelled into traffic during mowing operations. These conditions can be reduced by routine litter control. Condition: Litter Appearance Description: Any tenth mile segment of section where the countable litter items exceed 10. This includes large objects on pavements or the shoulder, or both. Large items (i.e. tires, boxes) shall be considered as one deficiency each. More than one deficiency per one tenth mile could be counted. Scope of Observation: The entire sample section. One Unit of Count: Each tenth mile segment where condition exists and each larger item. Notes: Drive at 20 mph and count every observable piece of litter that can be detected from the vehicle. A recordable condition occurs every time the count exceeds 10 items on a tenth of a mile highway section. After two or three tenth mile sections have been checked, it should be possible to establish the number of recordable conditions for the entire survey section by general inspection alone.

13 DRAINAGE DITCH OBSTRUCTION Drainage obstruction often results in standing water in the right of way. This is a hazard to drivers needing the recovery zone to regain control of their vehicle. A long-term effect of poor drainage is erosion of base material leading to major surface failure. Condition: Drainage Ditch Obstruction Description: Any ditch where 50 percent of the cross section is obstructed. Scope of Observation: All ditches in the sample section. One Unit of Count: Each 100 lineal feet of ditch where condition exists. Notes: A drainage ditch obstruction creates a functional failure of the ditch. All ditches should be surveyed for the entire sample section. The ditches can be examined traveling at 20 mph. Drive pipes that are damaged or obstructed causing water to undermine or cross the pavement shall be counted. Obstruction may include excessive brush, rock falls, slips and cattails extending within 100 lineal feet.

Section 6H.01 Typical Applications

Section 6H.01 Typical Applications December 27, 2010 Draft Page 6H-1 Section 6H.01 Typical Applications Support: 01 Whenever the acronym TTC is used in this Chapter, it refers to temporary traffic control. 02 The needs and control of all

More information

Performance-Based Communication Tools for Maintenance Budgets. 11th National Conference on Transportation Asset Management July 12th, 2016.

Performance-Based Communication Tools for Maintenance Budgets. 11th National Conference on Transportation Asset Management July 12th, 2016. Performance-Based Communication Tools for Maintenance Budgets 11th National Conference on Transportation Asset Management July 12th, 2016 Rob Zilay Presentation Outline Performance-based maintenance tools

More information

2 Min. Min. Edge of. Edgeline See Note 3 PLAN VIEW. See Note 3. This distance may vary

2 Min. Min. Edge of. Edgeline See Note 3 PLAN VIEW. See Note 3. This distance may vary 8" Physical gore ( ) ( ) 250 Varies 250 TYPICAL RUMBLE STRIP PLACEMENT AT EXIT AND ENTRANCE RAMPS This distance may vary This distance may vary ( ) 2 16" edge of R=12" Max ( ) Physical gore Texturing 1.

More information

CONTENTS I. INTRODUCTION... 2 II. SPEED HUMP INSTALLATION POLICY... 3 III. SPEED HUMP INSTALLATION PROCEDURE... 7 APPENDIX A... 9 APPENDIX B...

CONTENTS I. INTRODUCTION... 2 II. SPEED HUMP INSTALLATION POLICY... 3 III. SPEED HUMP INSTALLATION PROCEDURE... 7 APPENDIX A... 9 APPENDIX B... Speed Hump Program CONTENTS I. INTRODUCTION... 2 II. SPEED HUMP INSTALLATION POLICY... 3 1. GENERAL... 3 2. ELIGIBILITY REQUIREMENTS... 3 A. PETITION... 3 B. OPERATIONAL AND GEOMETRIC CHARACTERISTICS OF

More information

PN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS

PN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS PN 420-10/21/2016 - SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS DESCRIPTION: The surface tolerance specification requirements are modified as follows for all pavements of constant width with at least

More information

Agility Service Exchanges

Agility Service Exchanges Roads - Unpaved 618-7112-01 Shaping Miles 618-7113-01 Re-stabilization Square Yard 618-7114-01 Dust Palliative-Bit/Calcium Chloride/Other Square Yard 618-7114-02 Dust Palliative-Spot Square Yard 618-7115-01

More information

1400 MISCELLANEOUS Traffic Engineering Manual

1400 MISCELLANEOUS Traffic Engineering Manual TABLE OF CONTENTS Part 14 - MISCELLANEOUS 1400 GENERAL... 14-3 1415 RUMBLE STRIPS (INCLUDING STRIPES) IN THE ROADWAY... 14-4 1415-1 General... 14-4 1415-2 Transverse Rumble Strips... 14-4 1415-2.1 General...

More information

Collision Analysis Safety Tables

Collision Analysis Safety Tables Crash Severity Geography of Geography of Time and Date of Crash Conditions Features Features.. Queries Selected: Town(Hartford), Date(Year:All or //05 to 9/7/06), Severity(All), Route Class(Interstate),

More information

Alberta Transportation Rumble Strips - C-TEP Lunch and Learn

Alberta Transportation Rumble Strips - C-TEP Lunch and Learn Alberta Transportation Rumble Strips - C-TEP Lunch and Learn Bill Kenny P.Eng, Director: Design, Project Management and Training, Technical Standards Branch. - July 2011 What are Rumble Strips? A preventative

More information

SPEED HUMP POLICY. It is the policy of Hamilton Township to consider requests for speed humps as outlined below:

SPEED HUMP POLICY. It is the policy of Hamilton Township to consider requests for speed humps as outlined below: SPEED HUMP POLICY It is the policy of Hamilton Township to consider requests for speed humps as outlined below: 1. Residents who desire the installation of speed humps may request the Township to initiate

More information

Act 229 Evaluation Report

Act 229 Evaluation Report R22-1 W21-19 W21-20 Act 229 Evaluation Report Prepared for Prepared by Table of Contents 1. Documentation Page 3 2. Executive Summary 4 2.1. Purpose 4 2.2. Evaluation Results 4 3. Background 4 4. Approach

More information

2. ELIGIBILITY REQUIREMENTS

2. ELIGIBILITY REQUIREMENTS Speed Hump Policy 1. GENERAL The purpose of this policy is to provide guidelines for the application of speed humps. A "speed hump" is a gradual rise and fall of pavement surface across the width of the

More information

RSMS. RSMS is. Road Surface Management System. Road Surface Management Goals - CNHRPC. Road Surface Management Goals - Municipal

RSMS. RSMS is. Road Surface Management System. Road Surface Management Goals - CNHRPC. Road Surface Management Goals - Municipal RSMS Road Surface Management System RSMS is. CNHRPC Transportation Advisory Committee 6/1/12 1 2 a methodology intended to provide an overview and estimate of a road system's condition and the approximate

More information

Roadway Contributing Factors in Traffic Crashes

Roadway Contributing Factors in Traffic Crashes Transportation Kentucky Transportation Center Research Report University of Kentucky Year 2014 Roadway Contributing Factors in Traffic Crashes Kenneth R. Agent University of Kentucky, ken.agent@uky.edu

More information

STATE ND PROJECT NO. CP 0883 (14) & CP 1152 (14) SHEET NO. TOTAL SHEETS 9 31 SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT REQUIRED UNITS PER AMOUNT UNITS

STATE ND PROJECT NO. CP 0883 (14) & CP 1152 (14) SHEET NO. TOTAL SHEETS 9 31 SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT REQUIRED UNITS PER AMOUNT UNITS STATE ND PROJECT NO. CP 0883 (14) & CP 1152 (14) SHEET NO. TOTAL SHEETS 9 31 SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT REQUIRED UNITS PER AMOUNT UNITS SUB TOTAL SIGN NUMBER SIGN SIZE DESCRIPTION AMOUNT

More information

2014 Fall Asphalt Conference October 7, 2014 Richmond, VA Review of Virginia s 2013 Work Zone Crash Statistics

2014 Fall Asphalt Conference October 7, 2014 Richmond, VA Review of Virginia s 2013 Work Zone Crash Statistics 2014 Fall Asphalt Conference October 7, 2014 Richmond, VA Review of Virginia s 2013 Work Zone Crash Statistics David Rush WZ Safety Program Manager Traffic Engineering Division Review of Virginia s 2013

More information

Traffic Engineering Study

Traffic Engineering Study Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested

More information

CHAPTER 71: TRAFFIC REGULATIONS

CHAPTER 71: TRAFFIC REGULATIONS Section CHAPTER 71: TRAFFIC REGULATIONS General Provisions 71.01 Restrictions on direction of travel 71.02 Right-of-way; stop and yield signs 71.03 Interference with traffic control devices or railroad

More information

Kentucky Highway District 6

Kentucky Highway District 6 Kentucky Highway District 6 ROAD AND BRIDGE CONDITIONS, TRAFFIC SAFETY, TRAVEL TRENDS, AND NEEDS MARCH 2018 PREPARED BY WWW.TRIPNET.ORG Founded in 1971, TRIP of Washington, DC, is a nonprofit organization

More information

M.D. OF PINCHER CREEK NO. 9. Approved by Council Date: March 22, 2016

M.D. OF PINCHER CREEK NO. 9. Approved by Council Date: March 22, 2016 1.0 LEGISLATION Municipal Government Act, M-26, RSA 2000 Highways Development and Protection Act, H-8.5, RSA 2004 2.0 PURPOSE The Municipal District of Pincher Creek No.9 (MD) is the only agency responsible

More information

DELINEATOR REFERENCE POINT 200' TYPICAL SPACING (YELLOW DELINEATORS) END OF MERGE LANE TAPER DELINEATOR REFERENCE POINT

DELINEATOR REFERENCE POINT 200' TYPICAL SPACING (YELLOW DELINEATORS) END OF MERGE LANE TAPER DELINEATOR REFERENCE POINT 200' TYP. 0' < EACH SIDE BOTH ROADWAYS END OF MERGE LANE TAPER TYPICAL FOR ALL 2-LANE MERGES EXCEPT WHERE THERE IS A MERGE FROM THE RIGHT AND NO OFFSET IN THE THROUGH LANES END OF MERGE LANE TAPER 200'

More information

a. A written request for speed humps must be submitted by residents living along the applicable street(s) to the Public Works Department.

a. A written request for speed humps must be submitted by residents living along the applicable street(s) to the Public Works Department. WASHOE COUNTY POLICY FOR INSTALLATION OF SPEED HUMPS BACKGROUND The quality of life in residential neighborhoods can be significantly affected by the traffic issues of speeding and high vehicle volumes.

More information

2017 Jefferson County Outreach Jefferson County Maintenance. Matthew Burkett ~ Jefferson County Maintenance Manager

2017 Jefferson County Outreach Jefferson County Maintenance. Matthew Burkett ~ Jefferson County Maintenance Manager Outreach 2017 2017 Jefferson County Outreach Jefferson County Maintenance Matthew Burkett ~ Jefferson County Maintenance Manager MATERIAL 2016-2017 Jefferson County Outreach Winter Maintenance Information

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (MEAN ROUGHNESS INDEX ACCEPTANCE CRITERIA)

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (MEAN ROUGHNESS INDEX ACCEPTANCE CRITERIA) MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (MEAN ROUGHNESS INDEX ACCEPTANCE CRITERIA) CFS:TEH 1 of 10 APPR:KPK:JFS:07-07-16 FHWA:APPR:07-15-16 a. Description. This

More information

THE USE OF PERFORMANCE METRICS ON THE PENNSYLVANIA TURNPIKE

THE USE OF PERFORMANCE METRICS ON THE PENNSYLVANIA TURNPIKE Wilke, P.W.; Hatalowich, P.A. 1 THE USE OF PERFORMANCE METRICS ON THE PENNSYLVANIA TURNPIKE Paul Wilke, P.E. Principal Engineer Corresponding Author Applied Research Associates Inc. 3605 Hartzdale Drive

More information

Median Barriers in North Carolina -- Long Term Evaluation. Safety Evaluation Group Traffic Safety Systems Management Section

Median Barriers in North Carolina -- Long Term Evaluation. Safety Evaluation Group Traffic Safety Systems Management Section Median Barriers in North Carolina -- Long Term Evaluation Safety Evaluation Group Traffic Safety Systems Management Section Background In 1998 North Carolina began a three pronged approach to prevent and

More information

Appendix J Traffic Impact Study

Appendix J Traffic Impact Study MRI May 2012 Appendix J Traffic Impact Study Level 2 Traffic Assessment Limited Impact Review Appendix J [This page was left blank intentionally.] www.sgm-inc.com Figure 1. Site Driveway and Trail Crossing

More information

DISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (15-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual

DISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (15-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual DISTRIBUTION: Electronic Recipients List MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards Unit ISSUED BY: Office of Project Management and Technical Support TRANSMITTAL LETTER NO.

More information

COUNTY ROAD SPEED LIMITS. Policy 817 i

COUNTY ROAD SPEED LIMITS. Policy 817 i Table of Contents COUNTY ROAD SPEED LIMITS Policy 817.1 PURPOSE... 1.2 APPLICABILITY... 1.3 DEFINITIONS... 1.4 STATE ENABLING LEGISLATION... 2.5 SPEED LIMITS ON COUNTY ROADS (CCC 11.04)... 2.6 ESTABLISHING

More information

New Buck O Neil (U. S. 169) Crossing Benefit-Cost Analysis. Kansas City, Missouri

New Buck O Neil (U. S. 169) Crossing Benefit-Cost Analysis. Kansas City, Missouri New Buck O Neil (U. S. 169) Crossing Benefit-Cost Analysis Kansas City, Missouri New Buck O Neil (U. S. 169) Crossing Benefit-Cost Analysis prepared for Kansas City, Missouri prepared by Burns & McDonnell

More information

Chapter 4 COLLISION REDUCTION PROGRAM

Chapter 4 COLLISION REDUCTION PROGRAM Chapter 4 COLLISION REDUCTION PROGRAM Table of Contents 4.0 Background...4-3 4.1 Safety Improvement Projects SHOPP 201.010 Program...4-3 4.1.1 Spot Improvements..4-3 4.1.2 Wet Improvements...4-4 4.1.3

More information

TRAFFIC CALMING PROGRAM

TRAFFIC CALMING PROGRAM TRAFFIC CALMING PROGRAM PROGRAM BASICS Mount Pleasant Transportation Department 100 Ann Edwards Lane Mt. Pleasant, SC 29465 Tel: 843-856-3080 www.tompsc.com The Town of Mount Pleasant has adopted a traffic

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (IRI ACCEPTANCE CRITERIA)

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (IRI ACCEPTANCE CRITERIA) MICHIGAN DEPARTMENT OF TRANSPORTATION 03SP502(P) SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (IRI ACCEPTANCE CRITERIA) C&T:TEH 1 of 8 C&T:APPR:JFS:MJE:01-28-08 FHWA:APPR:02-01-08 a. Description. Provide

More information

2013 Changes to the 2011 MMUTCD, Part 6 September 2013

2013 Changes to the 2011 MMUTCD, Part 6 September 2013 2013 Changes to the 2011 MMUTCD, Part 6 September 2013 The requirements for drum spacing in Sections 6C.07 (Page 557 (MI)) and 6F.63 (Page 604 (MI)) have been revised to more closely match the pavement

More information

SPEED HUMP POLICY and PROCEDURES for RESIDENTIAL AREAS

SPEED HUMP POLICY and PROCEDURES for RESIDENTIAL AREAS SPEED HUMP POLICY and PROCEDURES for RESIDENTIAL AREAS City of Panama City, Florida Public Works Department 9 Harrison Avenue Panama City, Florida 32401 Phone: (850) 872-3015 Effective 1/22/08 Table of

More information

Wentzville Parkway South Phase 2 & 2A

Wentzville Parkway South Phase 2 & 2A Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total

More information

EXECUTIVE SUMMARY. Introduction

EXECUTIVE SUMMARY. Introduction EXECUTIVE SUMMARY Introduction The purpose of this study is to ensure that the Village, in cooperation and coordination with the Downtown Management Corporation (DMC), is using best practices as they plan

More information

DESIGNATED CONSTRUCTION ZONE SPEED FINES DOUBLE. Manitoba Infrastructure and Transportation. Infrastructure and Transportation. Traffic Engineering

DESIGNATED CONSTRUCTION ZONE SPEED FINES DOUBLE. Manitoba Infrastructure and Transportation. Infrastructure and Transportation. Traffic Engineering CONSTRUCTION DESIGNATED ZONE SPEED FINES DOUBLE Manitoba Infrastructure and Transportation Work Zone Traffic Control Manual Provincial Roads and Provincial Trunk Highways Infrastructure and Transportation

More information

800 Access Control, R/W Use Permits and Drive Design

800 Access Control, R/W Use Permits and Drive Design Table of Contents 801 Access Control... 8-1 801.1 Access Control Directives... 8-1 801.2 Access Control Policies... 8-1 801.2.1 Interstate Limited Access... 8-1 801.2.2 Limited Access... 8-1 801.2.3 Controlled

More information

City of Grand Forks Staff Report

City of Grand Forks Staff Report City of Grand Forks Staff Report Service/Safety Committee December 15, 2015 City Council December 21, 2015 Agenda Item: Amendment No. 1 to Engineering Services Agreement with CPS for City Project No. 7143,

More information

Highway 23 New London Access & Safety Assessment. Public Open House #2 October 3, :00 to 7:00 PM

Highway 23 New London Access & Safety Assessment. Public Open House #2 October 3, :00 to 7:00 PM Public Open House #2 October 3, 2017 5:00 to 7:00 PM Highway 9 OVERVIEW OF ASSESSMENT Assessment Limits Highway 23 from County Road 40 to North Shore Dr Purpose: Identify opportunities to reduce serious

More information

ODOT District Two Monthly Construction Update

ODOT District Two Monthly Construction Update Ohio Department of Transportation Construction Update DISTRICT 2 KIRK SLUSHER, P.E., ACTING DEPUTY DIRECTOR 317 East Poe Rd. Bowling Green, Ohio 43402-1330 www.transportation.ohio.gov/dist2 ODOT District

More information

2018 NDACE CONFERENCE

2018 NDACE CONFERENCE 2018 NDACE CONFERENCE Setting Speed Limits Ward County Highway Department 1 NDCC 39-09-02. Speed limitations (2003) NDCC 39-09-02 f -Fifty-five miles [88.51 kilometers] an hour on gravel, dirt, or loose

More information

Clarksville Street Department. Fiscal Year 2018 Budget Presentation

Clarksville Street Department. Fiscal Year 2018 Budget Presentation Clarksville Street Department Fiscal Year 2018 Budget Presentation Clarksville Street Department FY 2018 Proposed Budget 4.2% 42.0% Salaries/Benefits 53.8% Operating Expenses Capital Outlay Clarksville

More information

Metropolitan Freeway System 2013 Congestion Report

Metropolitan Freeway System 2013 Congestion Report Metropolitan Freeway System 2013 Congestion Report Metro District Office of Operations and Maintenance Regional Transportation Management Center May 2014 Table of Contents PURPOSE AND NEED... 1 INTRODUCTION...

More information

EXCEPTION TO STANDARDS REPORT

EXCEPTION TO STANDARDS REPORT EXCEPTION TO STANDARDS REPORT PROJECT DESCRIPTION AND NEED The project is located in Section 6, Township 23 North, Range 9 East and Section 31 Township 24 North, Range 9 East, in the Town of Stockton,

More information

Ohio Department of Transportation. Special Hauling Permits Section West Broad St. Columbus, Ohio Third Floor Mailstop #5140

Ohio Department of Transportation. Special Hauling Permits Section West Broad St. Columbus, Ohio Third Floor Mailstop #5140 Ohio Department of Transportation Special Hauling Permits Section 1980 West Broad St. Columbus, Ohio 43223 Third Floor Mailstop #5140 1 When is a Permit Needed? Whenever a vehicle/load are to move on the

More information

Construction Noise Memorandum

Construction Noise Memorandum Construction Noise Memorandum To: Ms. Paula Daneluk Date: June 13, 2013 Development Impact 9370 Studio Court, Suite 160 Elk Grove, CA 95758 From: Paul Bollard Bollard Acoustical Consultants, Inc. 3551

More information

CATEGORY 500 PAVING SECTION 535 PAVEMENT SURFACE PROFILE

CATEGORY 500 PAVING SECTION 535 PAVEMENT SURFACE PROFILE CATEGORY 500 PAVING 1 of 9 SECTION 535.01 DESCRIPTION. This work shall consist of measuring the roughness of the final surface of hot mix asphalt (HMA) or portland cement concrete (PCC) pavements. The

More information

AGC/MoDOT Annual COOP Meeting. Safety/Traffic Division & Specialty Contractors/Suppliers Breakout Session. December 5, 2018

AGC/MoDOT Annual COOP Meeting. Safety/Traffic Division & Specialty Contractors/Suppliers Breakout Session. December 5, 2018 AGC/MoDOT Annual COOP Meeting Safety/Traffic Division & Specialty Contractors/Suppliers Breakout Session December 5, 2018 District Work Zone Review St. Louis June 11-14, 2018 Central July 16-18, 2018 Northeast

More information

SPEED CUSHION POLICY AND INSTALLATION PROCEDURES FOR RESIDENTIAL STREETS

SPEED CUSHION POLICY AND INSTALLATION PROCEDURES FOR RESIDENTIAL STREETS SPEED CUSHION POLICY AND INSTALLATION PROCEDURES FOR RESIDENTIAL STREETS CITY OF GRAND PRAIRIE TRANSPORTATION SERVICES DEPARTMENT SPEED CUSHION INSTALLATION POLICY A. GENERAL Speed cushions are an effective

More information

COUNTY ROAD SPEED LIMITS. Policy 817 i

COUNTY ROAD SPEED LIMITS. Policy 817 i Table of Contents COUNTY ROAD SPEED LIMITS Policy 817.1 PURPOSE... 2.2 APPLICABILITY... 2.3 DEFINITIONS... 2.4 STATE ENABLING LEGISLATION... 3.5 SPEED LIMITS ON COUNTY ROADS (CCC 11.04)... 3.6 ESTABLISHING

More information

AASHTO Policy on Geometric Design of Highways and Streets

AASHTO Policy on Geometric Design of Highways and Streets AASHTO Policy on Geometric Design of Highways and Streets 2001 Highlights and Major Changes Since the 1994 Edition Jim Mills, P.E. Roadway Design Office 605 Suwannee Street MS-32 Tallahassee, FL 32399-0450

More information

3.15 SAFETY AND SECURITY

3.15 SAFETY AND SECURITY 3.15 SAFETY AND SECURITY Introduction This section describes the environmental setting and potential effects of the alternatives analyzed in this EIR with regard to safety and security in the SantaClara-Alum

More information

Designation of a Community Safety Zone in Honey Harbour in the Township of Georgian Bay

Designation of a Community Safety Zone in Honey Harbour in the Township of Georgian Bay TO: FROM: Chair and Members Engineering and Public Works Committee Mark Misko, C.E.T. Manager, Roads Maintenance and Construction DATE: March 23, 2016 SUBJECT: REPORT NO: Designation of a Community Safety

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 9/8/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

2016 Congestion Report

2016 Congestion Report 2016 Congestion Report Metropolitan Freeway System May 2017 2016 Congestion Report 1 Table of Contents Purpose and Need...3 Introduction...3 Methodology...4 2016 Results...5 Explanation of Percentage Miles

More information

Defensive Driving Policy

Defensive Driving Policy Date: 01 January 2015 To: All Chieftain Contract Services LLC Employees From: Scott Wiegers, Director of Safety, Chieftain Contract Services LLC Re: Defensive Driving Policy Defensive Driving Policy Chieftain

More information

POLICY FOR THE ESTABLISHMENT AND POSTING OF SPEED LIMITS ON COUNTY AND TOWNSHIP HIGHWAYS WITHIN MCHENRY COUNTY, ILLINOIS

POLICY FOR THE ESTABLISHMENT AND POSTING OF SPEED LIMITS ON COUNTY AND TOWNSHIP HIGHWAYS WITHIN MCHENRY COUNTY, ILLINOIS POLICY FOR THE ESTABLISHMENT AND POSTING OF SPEED LIMITS ON COUNTY AND TOWNSHIP HIGHWAYS WITHIN MCHENRY COUNTY, ILLINOIS MCHENRY COUNTY DIVISION OF TRANSPORTATION 16111 NELSON ROAD WOODSTOCK, IL 60098

More information

AMENDED CULVERT POLICY WITH MAIL BOX POLICY

AMENDED CULVERT POLICY WITH MAIL BOX POLICY AMENDED CULVERT POLICY WITH MAIL BOX POLICY REVISED MARCH 28, 2017 COMMISSIONERS COURT ORDER NO. 17-03-168 POLICY ACCEPTANCE AGREEMENT This page is to be signed by the Requesting Party and returned in

More information

FUTURE MOBILITY IN WYOMING:

FUTURE MOBILITY IN WYOMING: FUTURE MOBILITY IN WYOMING: Meeting the State s Need for Safe and Efficient Mobility February 2012 Prepared by: 1726 M Street, NW, Suite 401 Washington, D.C. 20036 202-466-6706 (voice) 202-785-4722 (fax)

More information

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards 9.00 Introduction and Goals 9.01 Administration 9.02 Standards 9.1 9.00 INTRODUCTION AND GOALS City streets serve two purposes that are often in conflict moving traffic and accessing property. The higher

More information

North Whitfield County Roadway Corridor Study

North Whitfield County Roadway Corridor Study North Whitfield County Roadway Corridor Study Report #3: Summary and Implementation Plan MA Project 11501 September 22, 2011 Prepared For: Greater Dalton Metropolitan Planning Organization Prepared By:

More information

Plan Check Policies and Guidelines

Plan Check Policies and Guidelines VIII. TRAFFIC SIGNING AND STRIPING PLANS A. INTRODUCTION Traffic signing and striping plans are required for all General Plan Roads and any roadway that is 56-foot wide curb-to-curb (78 R/W) or wider.

More information

CAPITAL FUND 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS

CAPITAL FUND 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 2019-2023 9510 STREET & SIDEWALK IMPROVEMENTS - 01 STREET AND SIDEWALK MAINTENANCE PROGRAM $1,250,000 $0 $1,250,000

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 2/19/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

ARTICLE 8 OFF-STREET PARKING AND PRIVATE DRIVEWAY STANDARDS

ARTICLE 8 OFF-STREET PARKING AND PRIVATE DRIVEWAY STANDARDS ARTICLE 8 OFF-STREET PARKING AND PRIVATE DRIVEWAY STANDARDS TABLE OF CONTENTS SECTION PAGE 8.1 GENERAL STANDARDS...8-2 8.2 PRIVATE DRIVEWAY PROVISIONS...8-4 8.3 OFF-STREET PARKING STANDARDS...8-5 8.4 OFF-STREET

More information

TRAFFIC DEPARTMENT 404 EAST WASHINGTON BROWNSVILLE, TEXAS City of Brownsville Speed Hump Installation Policy

TRAFFIC DEPARTMENT 404 EAST WASHINGTON BROWNSVILLE, TEXAS City of Brownsville Speed Hump Installation Policy A. GENERAL Speed humps are an effective and appropriate device for safely reducing vehicle speeds on certain types of streets when installed accordance with the provisions of this policy. In order for

More information

DRIVER SPEED COMPLIANCE WITHIN SCHOOL ZONES AND EFFECTS OF 40 PAINTED SPEED LIMIT ON DRIVER SPEED BEHAVIOURS Tony Radalj Main Roads Western Australia

DRIVER SPEED COMPLIANCE WITHIN SCHOOL ZONES AND EFFECTS OF 40 PAINTED SPEED LIMIT ON DRIVER SPEED BEHAVIOURS Tony Radalj Main Roads Western Australia DRIVER SPEED COMPLIANCE WITHIN SCHOOL ZONES AND EFFECTS OF 4 PAINTED SPEED LIMIT ON DRIVER SPEED BEHAVIOURS Tony Radalj Main Roads Western Australia ABSTRACT Two speed surveys were conducted on nineteen

More information

East Lake Tarpon Special Fire Control District

East Lake Tarpon Special Fire Control District East Lake Tarpon Special Fire Control District Implementation Date: 11/2000 Forms or Attachments: None SOP 803 Vehicle Safety Revision Date(s): 07/2004 Reviewed Date(s): A. All operators of Departmental

More information

POLICY AND PROCEDURE FOR SPEED HUMP INSTALLATION. Effective Date: July 10, 2013

POLICY AND PROCEDURE FOR SPEED HUMP INSTALLATION. Effective Date: July 10, 2013 CITY OF MORENO VALLEY DEPARTMENT OF PUBLIC WORKS TRANSPORTATION ENGINEERING DIVISION Administration Policy #A-14A POLICY AND PROCEDURE FOR SPEED HUMP INSTALLATION Effective Date: July 10, 2013 Approved

More information

TRANSPORTATION RESEARCH BOARD. TRB Straight to Recording for All. Rumble Strips/Stripes: Practices and Challenges

TRANSPORTATION RESEARCH BOARD. TRB Straight to Recording for All. Rumble Strips/Stripes: Practices and Challenges TRANSPORTATION RESEARCH BOARD TRB Straight to Recording for All Rumble Strips/Stripes: Practices and Challenges NCHRP Synthesis Report 490: Practice of Rumble Strips and Rumple Stripes NCHRP Project 20-05,

More information

Understanding and Identifying Crashes on Curves for Safety Improvement Potential in Illinois

Understanding and Identifying Crashes on Curves for Safety Improvement Potential in Illinois Understanding and Identifying Crashes on Curves for Safety Improvement Potential in Illinois Priscilla Tobias, P.E. Mouyid Islam, Ph.D. Kim Kolody, P.E. Optional Agenda Image Title Background Workflow

More information

Making roads motorcycle friendly

Making roads motorcycle friendly DECEMBER 2014 Making roads motorcycle friendly A guide for road design, construction and maintenance keeping victorians connected 2 Contents Introduction 3 Why are motorcyclists at risk? 4 Targeting popular

More information

Pavement Management Index Values Development of a National Standard. Mr. Douglas Frith Mr. Dennis Morian

Pavement Management Index Values Development of a National Standard. Mr. Douglas Frith Mr. Dennis Morian Pavement Management Index Values Development of a National Standard Mr. Douglas Frith Mr. Dennis Morian Pavement Evaluation Conference October 25-27, 2010 Background NCHRP 20-74A Development of Service

More information

Missouri Seat Belt Usage Survey for 2017

Missouri Seat Belt Usage Survey for 2017 Missouri Seat Belt Usage Survey for 2017 Conducted for the Highway Safety & Traffic Division of the Missouri Department of Transportation by The Missouri Safety Center University of Central Missouri Final

More information

TRAFFIC ENGINEERING DIVISION INSTRUCTIONAL & INFORMATIONAL MEMORANDUM

TRAFFIC ENGINEERING DIVISION INSTRUCTIONAL & INFORMATIONAL MEMORANDUM VIRGINIA DEPARTMENT OF TRANSPORTATION TRAFFIC ENGINEERING DIVISION INSTRUCTIONAL & INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Portable Temporary Rumble Strips (PTRS) SPECIFIC SUBJECT: Guidelines for the

More information

TRAFFIC REGULATION APPROVAL PROCESS

TRAFFIC REGULATION APPROVAL PROCESS Approved: Effective: August 22, 2017 Review: June 21, 2017 Office: Traffic Engineering and Operations Topic No.: 750-010-011-e Department of Transportation PURPOSE TRAFFIC REGULATION APPROVAL PROCESS To

More information

Car Sharing at a. with great results.

Car Sharing at a. with great results. Car Sharing at a Denver tweaks its parking system with great results. By Robert Ferrin L aunched earlier this year, Denver s car sharing program is a fee-based service that provides a shared vehicle fleet

More information

PN 420-7/18/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS

PN 420-7/18/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS PN 420-7/18/2014 - SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS DESCRIPTION: The surface tolerance specification requirements are modified as follows for all mainline lanes and collector-distributor road

More information

PARAPETS / RAILS / MEDIANS / SIDEWALKS TABLE OF CONTENTS CHAPTER 25

PARAPETS / RAILS / MEDIANS / SIDEWALKS TABLE OF CONTENTS CHAPTER 25 TABLE OF CONTENTS CHAPTER 25 FILE NO. TITLE DATE TABLE OF CONTENTS AND INTRODUCTION 25.TOC-1 Table of Contents Chapter 25... 08Aug2018 25.00 Introduction Chapter 25... 03May2018 VDOT STANDARD PARAPETS

More information

OHIO Department of Transportation Project # Franklin County, OH. ISSA Presidents Award Submission Strawser Construction Inc.

OHIO Department of Transportation Project # Franklin County, OH. ISSA Presidents Award Submission Strawser Construction Inc. OHIO Department of Transportation Project #140378 Franklin County, OH ISSA Presidents Award Submission Strawser Construction Inc. Columbus, Ohio Strawser Construction Project Team Chris Anspaugh Regional

More information

TRAFFIC SIMULATION IN REGIONAL MODELING: APPLICATION TO THE INTERSTATEE INFRASTRUCTURE NEAR THE TOLEDO SEA PORT

TRAFFIC SIMULATION IN REGIONAL MODELING: APPLICATION TO THE INTERSTATEE INFRASTRUCTURE NEAR THE TOLEDO SEA PORT MICHIGAN OHIO UNIVERSITY TRANSPORTATION CENTER Alternate energy and system mobility to stimulate economic development. Report No: MIOH UTC TS41p1-2 2012-Final TRAFFIC SIMULATION IN REGIONAL MODELING: APPLICATION

More information

SECTION 602 PORTLAND CEMENT CONCRETE PAVEMENT SMOOTHNESS

SECTION 602 PORTLAND CEMENT CONCRETE PAVEMENT SMOOTHNESS SECTION 602 PORTLAND CEMENT CONCRETE PAVEMENT SMOOTHNESS 602.01 General 1. This specification establishes a standard for Portland cement concrete pavement smoothness, and defines defective pavement smoothness.

More information

SECTION 14: AERIAL LIFT PROGRAM

SECTION 14: AERIAL LIFT PROGRAM SECTION 14: AERIAL LIFT PROGRAM Fisher Auto Parts is committed to promoting a safe and healthy environment for all employees and customers. Protection from accidental loss of any resources, especially

More information

ALLEGAN COUNTY ROAD COMMISSION. Adopted by the Board of County Road Commissioners, December 28, Sign Policy

ALLEGAN COUNTY ROAD COMMISSION. Adopted by the Board of County Road Commissioners, December 28, Sign Policy ALLEGAN COUNTY ROAD COMMISSION Adopted by the Board of County Road Commissioners, December 28, 2016 Sign Policy Common/Policies/Sign Policy 2016 TABLE OF CONTENTS Page I. Purpose and Background.................................

More information

DRIVEWAY STANDARDS EXHIBIT A. The following definition shall replace the definition of driveway in Section 62:

DRIVEWAY STANDARDS EXHIBIT A. The following definition shall replace the definition of driveway in Section 62: 1365 S. Camino del Rio Durango, CO 81303 970-382-6363 DRIVEWAY STANDARDS Resolution 2014-40 EXHIBIT A The following definition shall replace the definition of driveway in Section 62: Driveway means a roadway,

More information

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS... Crosshaven Drive Corridor Study City of Vestavia Hills, Alabama Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA... 3 Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

More information

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below:

The major roadways in the study area are State Route 166 and State Route 33, which are shown on Figure 1-1 and described below: 3.5 TRAFFIC AND CIRCULATION 3.5.1 Existing Conditions 3.5.1.1 Street Network DRAFT ENVIRONMENTAL IMPACT REPORT The major roadways in the study area are State Route 166 and State Route 33, which are shown

More information

Procedure Effective date Rescinds Vehicle Placement In or Near Moving Traffic 17 November January 2005

Procedure Effective date Rescinds Vehicle Placement In or Near Moving Traffic 17 November January 2005 Procedure Effective date Rescinds Vehicle Placement In or Near Moving Traffic 17 November 2008 1 January 2005 Reference Norwich Township Fire Department SOG #30 Page 1 of 6 Purpose: The purpose of this

More information

CITY OF PORTSMOUTH DEPARTMENT OF PUBLIC WORKS (DPW) DRIVEWAY RULES AND PROCEDURES

CITY OF PORTSMOUTH DEPARTMENT OF PUBLIC WORKS (DPW) DRIVEWAY RULES AND PROCEDURES CITY OF PORTSMOUTH DEPARTMENT OF PUBLIC WORKS (DPW) DRIVEWAY RULES AND PROCEDURES The purpose of a driveway permit is to secure access from a private property to the public right-of-way. It is required

More information

Recent Transportation Projects

Recent Transportation Projects Dr. Dazhi Sun Associate Professor Director of Texas Transportation Institute Regional Division Department of Civil & Architectural Engineering Texas A&M University-Kingsville 1 Recent Transportation Projects

More information

Corridor Management Committee. March 7, 2012

Corridor Management Committee. March 7, 2012 Corridor Management Committee March 7, 2012 2 Today s Topics SWLRT Project Office Update Engineering Services Procurement Update Legislative Leadership Tour Annual New Starts Report Update on Proposed

More information

PERFORMANCE ACTIVITY 603 SIGNS

PERFORMANCE ACTIVITY 603 SIGNS PERFORMANCE ACTIVITY 603 SIGNS WORK DESCRIPTION 3 WORK DESCRIPTION 4 WORK DESCRIPTION 6 New Install Maintenance / Replace Temporary 603 SIGNS ACTIVITY DESCRIPTION Install new signs and maintain and replace

More information

Figure 1 Map of intersection of SR 44 (Ravenna Rd) and Butternut Rd

Figure 1 Map of intersection of SR 44 (Ravenna Rd) and Butternut Rd Abbreviated Study District: 12 County: Geauga Route: SR 44 Section: 1.58 GEA 44 1.58 213 HSP # 47 (Rural Intersection) Prepared April 23, 215 By Bryan Emery Existing Conditions This study contains the

More information

Work Zone Safety & New Interstate Resurfacing Provision

Work Zone Safety & New Interstate Resurfacing Provision 2017 CAPA Presentation Work Zone Safety & New Interstate Resurfacing Provision Steve Kite, PE State Work Zone Engineer Work Zone Safety Data In 2016, Approximately 600 construction projects across NC (not

More information

ODOT District Two Monthly Construction Update

ODOT District Two Monthly Construction Update Ohio Department of Transportation Construction Update DISTRICT 2 KIRK SLUSHER, P.E., ACTING DEPUTY DIRECTOR 317 East Poe Rd. Bowling Green, Ohio 43402-1330 www.transportation.ohio.gov/dist2 ODOT District

More information

SAN RAFAEL CITY COUNCIL AGENDA REPORT

SAN RAFAEL CITY COUNCIL AGENDA REPORT Agenda Item No: 5.a Meeting Date: November 20, 2017 Department: Public Works SAN RAFAEL CITY COUNCIL AGENDA REPORT Prepared by: Bill Guerin, Director of Public Works TOPIC: IMPLEMENTATION OF PARKING TIME

More information

Pavement Management Program Report

Pavement Management Program Report Pavement Management Program Report for the City of Placentia 2018 Citywide Pavement Management Program Update June 19, 2018 June 19, 2018 Luis Estevez Director of Public Works City of Placentia 401 East

More information

Support: The Crossbuck (R15-1) sign assigns right-of-way to rail traffic at a highway-rail grade crossing.

Support: The Crossbuck (R15-1) sign assigns right-of-way to rail traffic at a highway-rail grade crossing. TECHNICAL COMMITTEE: Railroad and Light Rail Transit Technical Committee DATE OF ACTION: June 25, 2004 TOPIC: Crossbuck with Yield or Stop Signs and Advance Signs. STATUS: Accepted by the National Committee

More information