AP.1 APPENDIX TO PRE-FEASIBILITY STUDY ON BUSWAY EXTENSION PROJECT (CULCULATION OF BUS SHELTER S DIMENSIONS AND CONSTRUCTION COST BREAK DOWN)

Size: px
Start display at page:

Download "AP.1 APPENDIX TO PRE-FEASIBILITY STUDY ON BUSWAY EXTENSION PROJECT (CULCULATION OF BUS SHELTER S DIMENSIONS AND CONSTRUCTION COST BREAK DOWN)"

Transcription

1 Final Report, Volume 2: Pre-Feasibility Studies (Appendix) AP.1 APPENDIX TO PRE-FEASIBILITY STUDY ON BUSWAY EXTENSION PROJECT (CULCULATION OF BUS SHELTER S DIMENSIONS AND CONSTRUCTION COST BREAK DOWN) AP1.1 Design Condition in 2007 AP1.1.1 Number of Passengers by Each Bus Loading Facility Calculation that is to define the dimensions of the bus loading facilities was carried out using the actual estimated numbers of passengers for Bus Terminal and Transfer Center, and standardized numbers of passengers for bus stop. (1) Bus Terminals and Transfer Centers For Bus Terminals and Bus-to-bus Transfer Centers, numbers of the transferring passengers as well as boarding/alighting passengers were tabulated in Table AP.1.1. Table AP1.1 NB of Passengers at Bus Terminal and Transfer Center (daily) Traffic Volume (Buses/hour) NB of Daily Bording/Alighting/Transfering Passenger Bus Type NB (1) Bording (2) Alighting (3) Transfering (4) Σ(1)~(3) PB01 Kota Terminal ,650 1,280 9,380 12,310 L.Bulus Terminal Articulated 16 5,900 8, ,250 PB02 Ragunan Terminal Articulated 4 1,940 1, ,560 PB03 KP. Rambutan Terminal Single 30 9,900 9, ,250 PB04 Kalideres Terminal 27 5,880 4, ,490 Articulated P.Gadung Terminal 27 2,430 2, ,600 01x02x04 Monas Transer Center ,315 23,251 01x02x04 Harmoni Transer Center ,668 7,553 03x04 Senen Transer Center ,254 2,915 22,230 27,399 (2) Bus Stops The figure AP.1.1 indicates the distribution of the numbers of boarding and alighting passengers according to the result of the demand forecast. Since there are around 80 bus stops, design was carried out using 4 standardized numbers of passengers that were classified by Table AP.1.2,. Table AP1.2 Class of the Bus Stops NB of Passengers Boarding Alighting Class-A Class-B Class-C Class-D AP1-1

2 8,000 7,000 6,000 Class-D NB of Alighting Passenger 5,000 4,000 3,000 Class-B Class-C 2,000 1,000 A 0 0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 NB of Boarding Passenger Figure AP1.1 NB of Boarding/Alighting Passengers at Bus Stop (daily) AP1.2 Size of the Bus Loading facilities AP1.2.1 Form of Loading Area In Highway Capacity Manual, four different types of bus berths are exhibited as figure AP.1.2 Liner Type and Sawtooth Type were adopted in this design, since these are easy to install to the restricted area, such as bus stop along the road. Figure 1.2 Bus Loading Area Design 1 1 Source: Highway Capacity Manual 2000 Transportation Research Board National Research Council,, USA AP1-2

3 It is recognized that the Liner Type is less efficient than other types, so that Sawthooth Type was adopted when more than three berths would be required. AP1.2.2 Calculation of Number of Bus Berth (1) Dwell Time 1) Passenger Volume per Bus Headway a. Hourly Passenger Volume Hourly passenger volume was converted from daily volume using following formula. PVhourly = PVdaily PF Where as; PV hourly : Hourly passenger volume (shown as 3 in Table AP.1.4 ) PV daily : Daily passenger volume (shown as 2 in Table AP.1.4 ) PF: Peak Factor (0.1) Peak factor of 10 percent was assumed considering the present condition. b. Passenger Volume per Bus Headway Passenger volume per bus headway was calculated by the following formula. PV = PVhourly BV AF int Where as; PVint: Passenger volume per bus headway (shown as 4 in Table AP.1.4) BV: Hourly bus traffic volume (shown as 1 in Table AP.1.4) AF: Proportion of the passenger volume on heavier-direction during the peak hour (0.65) 2) Average dwell time (td) The results of the calculations are tabulated in Table AP.1.4 In Transit Capacity and Quality Service Manual, the time requires for single boarding/ alighting passenger (dwell times) is suggested as per fare condition (Table AP.1.2). Since there is no available data in Indonesia regarding the dwell time, the times tabulated in Table AP.1.3 were adopted in the study. The average dwell time for each bus stopping was calculated by multiplying passenger volume that is built up within the bus interval (shown as 4 in Table AP.1.4) and the tabulated time. AP1-3

4 And in the study, alighting time of 2.0 seconds was used for both boarding and alighting, since the pre-payment fare system would be adopted. Table1.3 Required Times for Each Bus Passenger 2 Boarding/ Alighting Time (sec) Boarding* Pre-Payment 2.0 Single Ticket/Token 2.6 Exact Fare 3.0 Alighting 1.7 to 2.0 *Note: Add 0.5 seconds is standees are present on the bus Remarks (2) Number of Bus Berths The results are tabulated in Table AP Number of bus berths was set bus traffic volume (shown as 1 in Table AP. 2.6) less than bus berth capacity (shown as 7 in Table AP.2.6) multiplied by number of effective loading area.(neb; see 3) ) 1 7 x N eb 1) Capacity of Bus Loading Facilities Capacity of a bus stop was calculated by the following formula. B s = N eb B bb = N eb t c + 3,600( g / C) ( g / C) t d + Z acvt d Where as; Bs: Maximum number of buses per bus stop per hour N eb : Number of effective loading area (see 3) ) Bbb : The number of operating buses per hour (shown as 7 in Table AP. 2.6 ) g/c:ratio of effective green time to a cycle (see 2) ) tc:clearance time for sequentially arriving buses (15 sec) td:average dwell time (shown as 5 in Table AP. 2.6) Zd:Probability not to emerge bus queues (0.675) Cv:Variation coefficient of stopping time (0.6) 2 Source: Transit Capacity and Quality Service Manual Transportation Research Board National Research Council,, USA AP1-4

5 Route Name Table AP.1.4 Calculation Sheet for Dwell Time Bus Type NB 1 Bording 2 Alighting 3 Transfering 4 Σ1~ Required Dwell Time (sec) Kota Terminal ,650 1,280 9,380 12,310 1, PB01 L.Bulus Terminal Articulated 16 5,900 8, ,250 1, PB02 Ragunan Terminal Articulated 4 1,940 1, , PB03 KP. Rambutan Terminal Single 30 9,900 9, ,250 1, PB04 Kalideres Terminal 27 5,880 4, ,490 1, Articulated P.Gadung Terminal 27 2,430 2, , x02x04 Monas Transer Center ,315 23,251 2, x02x04 Harmoni Transer Center ,668 7, x04 Senen Transer Center ,254 2,915 22,230 27,399 2, Class-A Bus Stop Articulated , PB01 PB01 (D.M. - K.S. *1 ) PB01 (Kota - D.M. K.S.-H.I. *2 ) PB02-1 PB02-2 PB03-1 PB03-2 PB04 Facility's Name 1 Traffic Volume (Buses/hour) Class-B Bus Stop Articulated 16 1,300 1, , Class-C Bus Stop Articulated 16 2,275 2, , Class-D Bus Stop Articulated 16 4,550 5, , Class-A Bus Stop Articulated , Class-B Bus Stop Articulated 49 1,300 1, , Class-C Bus Stop Articulated 49 2,275 2, , Class-D Bus Stop Articulated 49 4,550 5, , Class-A Bus Stop Articulated , Class-B Bus Stop Articulated 22 1,300 1, , Class-C Bus Stop Articulated 22 2,275 2, , Class-D Bus Stop Articulated 22 4,550 5, , Class-A Bus Stop Articulated , Class-B Bus Stop Articulated 6 1,300 1, , Class-C Bus Stop Articulated 6 2,275 2, , Class-D Bus Stop Articulated 6 4,550 5, , Class-A Bus Stop Articulated , Class-B Bus Stop Articulated 4 1,300 1, , Class-C Bus Stop Articulated 4 2,275 2, , Class-D Bus Stop Articulated 4 4,550 5, , Class-A Bus Stop Single , Class-B Bus Stop Single 30 1,300 1, , Class-C Bus Stop Single 30 2,275 2, , Class-D Bus Stop Single 30 4,550 5, , Class-A Bus Stop Single , Class-B Bus Stop Single 15 1,300 1, , Class-C Bus Stop Single 15 2,275 2, , Class-D Bus Stop Single 15 4,550 5, , Class-A Bus Stop Articulated , Class-B Bus Stop Articulated 27 1,300 1, , Class-C Bus Stop Articulated 27 2,275 2, , Class-D Bus Stop Articulated 27 4,550 5, , ) Green Time Ratio (g/c) 2 NB of Daily Bording/Alighting/Transfering Passenger Passenger Volume at Peak 1Hour Passenger Volume per Headway In the study, green time ratio (shown as 6 in Table AP.1.6) was assumed in following condition. g / C = 1.00 : in case of no signalized intersection near the bus loading facility which is accessed by the pedestrian bridge g / C = 0.75 : in case of no signalized intersection near the bus loading facility which is accessed by the cross-walk with traffic signals AP1-5

6 g / C = 0.50 : in case of a signalized intersection near the bus loading facility 3) Number of Effective Loading Area (Neb) The capacity of plural bus berths varies according to the layout of bus berth. As shown in Table AP.1.5, increasing the number of loading areas at a parallel bus berths has an ever-decreasing effect on capacity as the number of berths increase because the stopping buses interfere with other buses. On the other hand, no decreasing effect is needed to consider in the sawtooth design. Loading Area NB Table 1.5 Effective Loading in case of Parallel Berth (N eb ) On-Line Loading Areas Off-Line Loading Areas Efficiency NB of Cumulative Efficiency % Effective Loading % NB of Cumulative Effective Loading Areas Areas Note: On-line values were assumed that buses do not overtake each other. Table 1.6 Calculation Sheets for Number of Bus Berths Route Name PB01 1 Traffic Volume (Buses/hour) Bus Type NB Parallel [On-Line] of Berth by Type Parallel [Off-Line] Sawtooth Type Kota Terminal Para(On) 2 L.Bulus Terminal Articulated Para(On) 2 PB02 Ragunan Terminal Articulated Para(On) 1 PB03 KP. Rambutan Terminal Single Para(On) 2 PB04 Facility's Name 5 Required Dwell Time (sec) 6 Green Time Ratio Clearan ce Time between Buses 7 Bus Berth Capacity (buses/h Bus Berth Configuration 8 Required NB 9 Adopted Berth Design Layout NB of Berth Kalideres Terminal Articulated Para(On) 1 P.Gadung Terminal Para(On) 1 01x02x04 Monas Transer Center Saw 3 01x02x04 Harmoni Transer Center Para(On) 1 03x04 Senen Transer Center Saw 3 AP1-6

7 Table 1.6 Calculation Sheets for Number of Bus Berths (Continued) Route Name PB01 [g/c=1.00] PB01 [g/c=0.75] PB01 [g/c=0.50] PB02-1 [g/c=1.00] PB02-1 [g/c=0.75] PB02-1 [g/c=0.50] PB02-2 [g/c=1.00] PB02-2 [g/c=0.75] PB02-2 [g/c=0.50] PB03-1 [g/c=1.00] PB03-1 [g/c=0.75] PB03-1 [g/c=0.50] PB03-2 [g/c=1.00] PB03-2 [g/c=0.75] PB03-2 [g/c=0.50] PB04 [g/c=1.00] PB04 [g/c=0.75] PB04 [g/c=0.50] Facility's Name 1 Traffic Volume (Buses/hour) Bus Type NB 5 Required Dwell Time (sec) 6 Green Time Ratio Clearan ce Time between Buses 7 Bus Berth Capacity (buses/h Bus Berth Configuration Parallel [On-Line] 8 Required NB of Berth by Type Parallel [Off-Line] Sawtooth 9 Adopted Berth Design Layout NB of Berth Type Class-A Bus Stop Articulated Para(On) 1 Class-B Bus Stop Articulated Para(On) 1 Class-C Bus Stop Articulated Para(On) 1 Class-D Bus Stop Articulated Para(On) 1 Class-A Bus Stop Articulated Para(On) 1 Class-B Bus Stop Articulated Para(On) 1 Class-C Bus Stop Articulated Para(On) 1 Class-D Bus Stop Articulated Para(On) 1 Class-A Bus Stop Articulated Para(On) 1 Class-B Bus Stop Articulated Para(On) 1 Class-C Bus Stop Articulated Para(On) 1 Class-D Bus Stop Articulated Para(On) 2 Class-A Bus Stop Articulated Para(On) 1 Class-B Bus Stop Articulated Para(On) 1 Class-C Bus Stop Articulated Para(On) 1 Class-D Bus Stop Articulated Para(On) 1 Class-A Bus Stop Articulated Para(On) 1 Class-B Bus Stop Articulated Para(On) 1 Class-C Bus Stop Articulated Para(On) 1 Class-D Bus Stop Articulated Para(On) 1 Class-A Bus Stop Articulated Para(On) 1 Class-B Bus Stop Articulated Para(On) 1 Class-C Bus Stop Articulated Para(On) 1 Class-D Bus Stop Articulated Para(On) 2 Class-A Bus Stop Articulated Para(On) 1 Class-B Bus Stop Articulated Para(On) 1 Class-C Bus Stop Articulated Para(On) 1 Class-D Bus Stop Articulated Para(On) 1 Class-A Bus Stop Articulated Para(On) 1 Class-B Bus Stop Articulated Para(On) 1 Class-C Bus Stop Articulated Para(On) 1 Class-D Bus Stop Articulated Para(On) 1 Class-A Bus Stop Articulated Para(On) 1 Class-B Bus Stop Articulated Para(On) 1 Class-C Bus Stop Articulated Para(On) 1 Class-D Bus Stop Articulated Para(On) 2 Class-A Bus Stop Single Para(On) 1 Class-B Bus Stop Single Para(On) 1 Class-C Bus Stop Single Para(On) 1 Class-D Bus Stop Single Para(On) 1 Class-A Bus Stop Single Para(On) 1 Class-B Bus Stop Single Para(On) 1 Class-C Bus Stop Single Para(On) 1 Class-D Bus Stop Single Para(On) 2 Class-A Bus Stop Single Para(On) 1 Class-B Bus Stop Single Para(On) 1 Class-C Bus Stop Single Para(On) 1 Class-D Bus Stop Single Para(On) 2 Class-A Bus Stop Single Para(On) 1 Class-B Bus Stop Single Para(On) 1 Class-C Bus Stop Single Para(On) 1 Class-D Bus Stop Single Para(On) 1 Class-A Bus Stop Single Para(On) 1 Class-B Bus Stop Single Para(On) 1 Class-C Bus Stop Single Para(On) 1 Class-D Bus Stop Single Para(On) 1 Class-A Bus Stop Single Para(On) 1 Class-B Bus Stop Single Para(On) 1 Class-C Bus Stop Single Para(On) 1 Class-D Bus Stop Single Para(On) 2 Class-A Bus Stop Articulated Para(On) 1 Class-B Bus Stop Articulated Para(On) 1 Class-C Bus Stop Articulated Para(On) 1 Class-D Bus Stop Articulated Para(On) 1 Class-A Bus Stop Articulated Para(On) 1 Class-B Bus Stop Articulated Para(On) 1 Class-C Bus Stop Articulated Para(On) 1 Class-D Bus Stop Articulated Para(On) 2 Class-A Bus Stop Articulated Para(On) 1 Class-B Bus Stop Articulated Para(On) 1 Class-C Bus Stop Articulated Para(On) 1 Class-D Bus Stop Articulated Para(On) 2 AP1-7

8 AP1.2.3 Required Floor Area of Bus Shelters Waiting areas of the bus shelters that are shown as 10 in Table AP.1.7 were calculated by multiplying 1.2 and boarding/alighting passenger volume per bus headway (shown as 4 in Table AP.1.7). 1.2 m 2 is assumed as the minimum area when the standing and free circulation through the queuing area possible without disturbing others within the queue (equivalent to LOS A in Figure below). Figure 1.3 Level of Service of Queuing Area 3 3 Exhibit 11-9 Queuing Area Los Shown in the Highway Capacity Manual 2000 Transportation Research Board National Research Council, USA AP1-8

9 Table 1.7 Calculation Sheets for Waiting Area and Ticketing System Route Name PB01 (1) (2) (3) 1Hour Headway (sqm) Bording Alighting Transfering /direction /direction In Out Bi-Direction Kota Terminal 1,650 1,280 9,380 5, L.Bulus Terminal 5,900 8, , PB02 Ragunan Terminal 1,940 1, , PB03 KP. Rambutan Terminal 9,900 9, , PB04 Kalideres Terminal 5,880 4, , P.Gadung Terminal 2,430 2, , x02x04 Monas Transfer Center ,315 5, x02x04 Harmoni Transer Center ,668 3, x04 Senen Transfer Center 2,254 2,915 22,230 8, Class-A Bus Stop PB01 PB01 (D.M. - K.S.*1) PB01 (Kota - D.M. K.S.-H.I. PB02-1 PB02-2 PB03-1 PB03-2 PB04 Facility's Name 2 NB of Daily Bording/Alighting/Transfering Passenger 3 Passenger Volume at Peak 4 Passenger Volume per 5 Passenger Volume Passing Through the Gate /peak 1min 10 Required Waiting Area 11 Required NB of Ticketing Gate Ticketing Gate Way Total NB of Ticketing Gate Machine Class-B Bus Stop 1,300 1, Class-C Bus Stop 2,275 2, Class-D Bus Stop 4,550 5, Class-A Bus Stop Class-B Bus Stop 1,300 1, Class-C Bus Stop 2,275 2, Class-D Bus Stop 4,550 5, Class-A Bus Stop Class-B Bus Stop Class-C Bus Stop Class-D Bus Stop Class-A Bus Stop Class-B Bus Stop 1,300 1, Class-C Bus Stop 2,275 2, Class-D Bus Stop 4,550 5, Class-A Bus Stop Class-B Bus Stop 1,300 1, Class-C Bus Stop 2,275 2, Class-D Bus Stop 4,550 5, Class-A Bus Stop Class-B Bus Stop 1,300 1, Class-C Bus Stop 2,275 2, Class-D Bus Stop 4,550 5, Class-A Bus Stop Class-B Bus Stop 1,300 1, Class-C Bus Stop 2,275 2, Class-D Bus Stop 4,550 5, Class-A Bus Stop Class-B Bus Stop 1,300 1, Class-C Bus Stop 2,275 2, Class-D Bus Stop 4,550 5, Required Ticket Vending Machine AP1.2.4 Ticketing Equipments (1) Turn Style Gate In Japan, it is known that 25 passenger can pass through the turn style gate in maximum. In the study, 20 passengers that are 80% of 25 passengers were adopted and following formula was used to calculate the required number of the gates, and the results were shown in Table AP.1.7. Where as; N g max = ( P, P ) b a PF 20 / 60 Ng: Number of ticketing gate (shown as 11 in Table AP. 1.7) Pb: Daily Boarding Passenger (shown as 2 in Table AP. 1.7) Pa: Daily Alighting Passenger (Ditto) PF: Peak Factor mentioned in AP (1) AP1-9

10 From the result of the calculations, it was found that one gate has sufficient capacity for the passengers in 2007 to board or alight. In the study, one gate facility was allocated for each boarding side and alighting side, and also one reversible gate facility was installed. (2) Ticket Vending Machine Number of ticket vending machines was calculated by using formula below, and results were shown in Table AP.1.7. Capacity of the vending machine was assumed as 4 passengers/second according to the experience in Japan. N tv = Pb PF / 60 4 Where as; Ntv: Number of ticket vending machine (shown as 12 in Table AP1.7) AP1.3 Adjustment Work In aforementioned procedure, general data such as boarding/alighting time, clearance time, probability, etc was adopted the values that generally used in USA. Therefore, adjustment work will be occasionally needed using actual observed data on service section. AP1.4 Construction COST BREAK DOWN AP1.4.1 Civil Works This item consists of the civil works relating to busway and bus shelter construction. Major works of this item are demolition/construction of the pavement/curb, widening/construction of the bridge, construction of the pedestrian bridge, installation of the stair, etc. The cost of civil works shown in the main text of the Vol.2 Pre Feasibility Study is total of the tabulated cost in B.1.2 and Contingency and VAT. AP1-10

11 (1) Cost Break Down 1) PB01 The Study on Integrated Transportation Master Plan for JABODETABEK (Phase II) No. Description Unit Unit Cost (thousand Quantity Cost (million Rp.) Rp.) 1 General 2, General Lm 420 5,525 2,321 Remarks 2 Drainage 5, Drainage Lm 1,075 5,175 5,563 3 Earth Works Commn Excavation m , Embankment with Material from 3.2 Common or Borrow Excavation m Demolition of Pavement m , Demolition of Curb m , Pavement 12,480 Travelled Way m ,640 9,996 Sidewalk m ,050 2,484 7 Structure 2, Pedestrian Bridge m2 8, ,440 Monas T.C Pedestrian Bridge Stair m2 6, Brdge Widening m2 6, Box Culvert (2.5x2.5) m 3, Duku Atas F.O. 8 Miscellaneous 2, Precast Concrete Curb Lm 54 21,713 1, Lane Marking m , Traffic Sign Each Street Lighting Median Each 27, Street Tree Median Each Traffic Separater Lm 59 11, Total 25,292 5,269 Mllion Rp./Km AP1-11

12 2) PB02 No. Description Unit Unit Cost (thousand Quantity Cost (million Rp.) Rp.) 1 General 5, General Lm ,300 5,586 Remarks 2 Drainage 2, Drainage Lm 1,075 2,580 2,774 3 Earth Works Commn Excavation m , Embankment with Material from 3.2 Common or Borrow Excavation m Demolition of Pavement m , Demolition of Curb m , Pavement 4,110 Travelled Way m ,355 2,603 Sidewalk m ,840 1,507 7 Structure 26, Pedestrian Bridge m2 8, Pedestrian Bridge Stair m2 6, , Brdge Widening m2 6,600 3,808 25, Box Culvert (2.5x2.5) m 3, R.Said Station 8 Miscellaneous 2, Precast Concrete Curb Lm 54 13, Lane Marking m , Traffic Sign Each Street Lighting Median Each 27, Street Tree Median Each Traffic Separater Lm 59 22,300 1,316 Total 42,566 8,868 Mllion Rp./Km 3) PB03 No. Description Unit Unit Cost (thousand Quantity Cost (million Rp.) Rp.) 1 General 9, General Lm ,290 9,362 Remarks 2 Drainage 8, Drainage Lm 1,075 8,140 8,751 3 Earth Works 1, Commn Excavation m ,661 1,010 Embankment with Material from 3.2 Common or Borrow Excavation m Demolition of Pavement m , Demolition of Curb m , Pavement 18,088 Travelled Way m ,645 13,597 Sidewalk m ,145 4,492 7 Structure 4, Pedestrian Bridge m2 8, ,200 Mangga Dua 7.05 Pedestrian Bridge Stair m2 6, , Brdge Widening m2 6, , Box Culvert (2.5x2.5) m 3, Miscellaneous 6, Precast Concrete Curb Lm 54 47,741 2, Lane Marking m ,034 1, Traffic Sign Each Street Lighting Median Each 27, Street Tree Median Each Traffic Separater Lm 59 47,530 2,804 Total 49,182 10,246 Mllion Rp./Km AP1-12

13 4) PB04 No. Description Unit Unit Cost (thousand Quantity Cost (million Rp.) Rp.) 1 General 9, General Lm ,680 9,946 Remarks 2 Drainage 1, Drainage Lm 1,075 1,180 1,269 3 Earth Works Commn Excavation m , Embankment with Material from 3.2 Common or Borrow Excavation m Demolition of Pavement m , Demolition of Curb m , Pavement 5,759 Travelled Way m ,396 5,759 Sidewalk m Structure 6, Pedestrian Bridge m2 8, Senen T.C Pedestrian Bridge Stair m2 6, , Brdge Widening m2 6, , Box Culvert (2.5x2.5) m 3, Miscellaneous 4, Precast Concrete Curb Lm 54 4, Lane Marking m , Traffic Sign Each Street Lighting Median Each 27, Street Tree Median Each Traffic Separater Lm 59 47,360 2,794 Total 28,561 5,950 Mllion Rp./Km (2) Quantity Calculations Quantities tabulated in the spreadsheets shown in B.1.2 were calculated adding Normal Section to Bus Shelter. 1) Normal Section STATION LENGT H (m) Common Excavation (cu.m) EARTHWORK Demolition of Pave. (sq.m) Demolition of Curb (m) DRAINAG E (m) Pave. (m) Sidewalk (m) PAVEMENT Curb (m) Separater (m) BRIDGE (sqm) Marking (sq.m) MISCELLANEOUS Retaining Street Wall Lighting (sq.m) PB01 12,925-13, ,275-13, , , ,655 2, ,700-14, , , , , ,250-14, , , ,600-18,450 3,850 1, ,400 3, , , ,194.5 TOTAL 5,525 16,317 3,040 19,600 5,175 65,075 31,050 21,400 11, , Street Tree AP1-13

14 (Continued) STATION LENGT H (m) Common Excavation (cu.m) EARTHWORK PAVEMENT MISCELLANEOUS Demolition DRAINAG Demolition of Pave. Pave. (m) Sidewalk Curb (m) Separater BRIDGE Retaining E (m) Marking Street (sqm) Wall of Curb (m) (m) (m) (sq.m) Lighting (sq.m) (sq.m) PB , ,050-1, , ,150-1, ,808 1,430-1, , ,600-5,275 3, ,350 1, ,275-5, ,690-9,600 3,910 11,965 11,730 23, , ,820 2, ,600-10, , ,200-10, , , ,480-11,950 1,470 7,673 3,528 5,880 1,470 9,114 4, , ,950-12, ,300 1, ,600-13, ,660 2,240 1, ,800 4, TOTAL 13,300 27,204 18,886 34,460 2,580 17,133 18,840 12,440 22,300 3,808 6, PB ,050 1,650 1, , , ,900 3,300 1, ,050-2, , ,840-6,020 3,180 1, , ,360 2, ,020-6, ,275-6, , , ,440-9,725 2, ,570 1, ,725-11,180 1, , ,180-11, ,470-12, ,197 1, , ,100-13,250 1, , , ,250-15,400 2, ,300 1, ,400-17,750 2,350 20,727 3,055 9,400 2,350 23,970 14,100 9,400 4, , ,750-20,570 2,820 27,664 1,128 5,640 2,820 31,302 16,920 11,280 5,640 1, ,570-22,950 2,380 24,847 2,142 9,520 2,380 28,084 14,280 9,520 4,760 1,356.6 TOTAL 22,290 77,661 16,536 39,535 8,140 90,350 56,145 44,795 47, , PB ,550 9,550 14, , , ,550-10,900 1, ,400 1, , ,900-13,200 2, , , PB , , ,900 1, ,150-2,700 1, , ,700-6,650 3, ,900 1, ,650-9,300 2, ,650 10,600 6, ,300 1, ,300-10,480 1,180 1, ,720 1,180 12,154 2,360 2, TOTAL 23,680 16,403 5,690 41,720 1,180 36, ,310 47, , Street Tree 2) Bus Shelter Costs relating to bus stop were calculated by multiplying Number of Bus Shelters by Type and Quantity of Each Bus Shelter. AP1-14

15 a. Number of Bus Shelters by Type Shelter for Bus Terminal Shelter for Transfer Center Shelter for Bus Stop PB01 PB02 PB03 PB04 Total Lebak Bulus 1 1 Ragunan 1 1 KP.Rambutan 1 1 Kalideres & Pulogadung 2 2 Monas 1 1 Senen 1 1 Ic Ic Ip Ip IIc IIc IIc IIc IIp IIp IIIc IIIp Total b. Quantities of Each Bus Shelter The following quantities of shelters are excluded quantities in normal sections. ITEM UNIT QUANTITY NOTE Lebak Bulus Terminal DEMOLITION OF PAVE. sq.m DEMOLITION OF CURB m PAVEMENT sq.m CURB m LANE MARK sq.m P. BRIDGE STAIR sq.m Ragunan Terminal DEMOLITION OF PAVE. sq.m DEMOLITION OF CURB m 40.0 PAVEMENT sq.m CURB m LANE MARK sq.m P. BRIDGE STAIR sq.m KP.Rambutan Terminal DEMOLITION OF PAVE. sq.m DEMOLITION OF CURB m PAVEMENT sq.m 8.2 CURB m 82.0 LANE MARK sq.m P. BRIDGE STAIR sq.m AP1-15

16 (Continued) ITEM UNIT QUANTITY NOTE Kalideres & Pulogadung Terminal DEMOLITION OF PAVE. sq.m DEMOLITION OF CURB m PAVEMENT sq.m CURB m LANE MARK sq.m P. BRIDGE STAIR sq.m Monas Transfer Center DEMOLITION OF PAVE. sq.m 31.3 DEMOLITION OF CURB m PAVEMENT sq.m 1,565.0 CURB m LANE MARK sq.m P. BRIDGE STAIR sq.m 30.0 Senen Transfer Center DEMOLITION OF PAVE. sq.m 45.0 DEMOLITION OF CURB m PAVEMENT sq.m 1,700.0 CURB m LANE MARK sq.m P. BRIDGE STAIR sq.m 30.0 Ic1 Type Shelter DEMOLITION OF PAVE. sq.m DEMOLITION OF CURB m PAVEMENT sq.m 220m x 0.25m CURB m LANE MARK sq.m 35.0 Cross-Walk: 22.1m x 3.0m x 1/2 P. BRIDGE STAIR sq.m Ic2 Type Shelter DEMOLITION OF PAVE. sq.m DEMOLITION OF CURB m PAVEMENT sq.m 220m x 0.25m CURB m LANE MARK sq.m 35.0 Cross-Walk: 22.1m x 3.0m x 1/2 P. BRIDGE STAIR sq.m Ip1 Type Shelter DEMOLITION OF PAVE. sq.m DEMOLITION OF CURB m PAVEMENT sq.m 220m x 0.25m CURB m LANE MARK sq.m P. BRIDGE STAIR sq.m 30.0 Ip2 Type Shelter DEMOLITION OF PAVE. sq.m DEMOLITION OF CURB m PAVEMENT sq.m 220m x 0.25m CURB m LANE MARK sq.m P. BRIDGE STAIR sq.m 30.0 AP1-16

17 (Continued) ITEM UNIT QUANTITY NOTE IIc1 Type Shelter DEMOLITION OF PAVE. sq.m DEMOLITION OF CURB m PAVEMENT sq.m m x 0.25m CURB m LANE MARK sq.m 40.0 Cross-Walk: 25.6m x 3.0m x 1/2 P. BRIDGE STAIR sq.m IIc2 Type Shelter DEMOLITION OF PAVE. sq.m DEMOLITION OF CURB m PAVEMENT sq.m m x 0.25m CURB m LANE MARK sq.m 30.0 Cross-Walk: 19.6m x 3.0m x 1/2 P. BRIDGE STAIR sq.m IIc3 Type Shelter DEMOLITION OF PAVE. sq.m DEMOLITION OF CURB m PAVEMENT sq.m 220m x 0.25m CURB m LANE MARK sq.m Cross-Walk: 22.1m x 3.0m x 1/2 P. BRIDGE STAIR sq.m IIc4 Type Shelter DEMOLITION OF PAVE. sq.m DEMOLITION OF CURB m PAVEMENT sq.m 220m x 0.25m CURB m LANE MARK sq.m Cross-Walk: 22.1m x 3.0m x 1/2 P. BRIDGE STAIR sq.m IIp1 Type Shelter DEMOLITION OF PAVE. sq.m DEMOLITION OF CURB m PAVEMENT sq.m m x 0.25m CURB m 44.0 LANE MARK sq.m 70.0 Zebra=2*1/2*3*45/2 P. BRIDGE STAIR sq.m 30.0 IIp2 Type Shelter DEMOLITION OF PAVE. sq.m DEMOLITION OF CURB m PAVEMENT sq.m 220m x 0.25m CURB m LANE MARK sq.m P. BRIDGE STAIR sq.m 30.0 IIIc Type Shelter DEMOLITION OF PAVE. sq.m DEMOLITION OF CURB m PAVEMENT sq.m 220m x 0.25m CURB m LANE MARK sq.m P. BRIDGE STAIR sq.m AP1-17

18 (Continued) ITEM UNIT QUANTITY NOTE IIIp Type Shelter DEMOLITION OF PAVE. sq.m DEMOLITION OF CURB m PAVEMENT sq.m 220m x 0.25m CURB m LANE MARK sq.m P. BRIDGE STAIR sq.m 30.0 AP1.4.2 Bus Shelter Installation Bus Shelter Installation consists of new bus shelter constructions and existing bus shelter extensions. Both costs shown in the B.2.1 and B.2.2 need to add the contingency and VAT to calculate the cost described in the main text of Vol.2. Pre Feasibility Study. (1) New Construction Costs relating to bus shelter installation were calculated by multiplying Number of Bus Shelters by Type (mentioned in B.1) and Quantity of Each Bus Shelter. Lebak Bulus BUS SHELTER sq.m FLOOR AREA BUS STOP DISP. Set 2.0 Ragunan BUS SHELTER sq.m FLOOR AREA BUS STOP DISP. Set 1.0 KP.Rambutan BUS SHELTER sq.m FLOOR AREA BUS STOP DISP. Set 2.0 Kalideres & Pulogadung BUS SHELTER sq.m 92.5 FLOOR AREA BUS STOP DISP. Set 1.0 Monas BUS SHELTER sq.m FLOOR AREA BUS STOP DISP. Set 6.0 Senen BUS SHELTER sq.m FLOOR AREA BUS STOP DISP. Set 6.0 Ic1 BUS SHELTER sq.m 80.5 FLOOR AREA BUS STOP DISP. Set 2.0 AP1-18

19 (Continued) ITEM UNIT QUANTITY NOTE Ic2 BUS SHELTER sq.m FLOOR AREA BUS STOP DISP. Set 2.0 Ip1 BUS SHELTER sq.m 50.3 FLOOR AREA BUS STOP DISP. Set 2.0 Ip2 BUS SHELTER sq.m 77.3 FLOOR AREA BUS STOP DISP. Set 2.0 IIc1 BUS SHELTER sq.m 35.5 FLOOR AREA BUS STOP DISP. Set 2.0 IIc2 BUS SHELTER sq.m FLOOR AREA BUS STOP DISP. Set 2.0 IIc3 BUS SHELTER sq.m 47.5 FLOOR AREA BUS STOP DISP. Set 2.0 IIc4 BUS SHELTER sq.m 65.5 FLOOR AREA BUS STOP DISP. Set 2.0 IIp1 BUS SHELTER sq.m 55.0 FLOOR AREA BUS STOP DISP. Set 2.0 IIp2 BUS SHELTER sq.m FLOOR AREA BUS STOP DISP. Set 2.0 IIIc BUS SHELTER sq.m FLOOR AREA BUS STOP DISP. Set 2.0 IIIp BUS SHELTER sq.m FLOOR AREA BUS STOP DISP. Set 2.0 (2) Extension of Existing DKI Shelter Existing 20 bus shelters constructed by DKI alongside of PB01 must be extended to suite to articulated bus. 45 sqm was considered as requirement floor area for extension for each bus shelter. AP1-19

20 AP1.4.3 Ticketing System Installation This item consists of the installation of ticketing gate and the ticket vending machine. From Kota to Blok M, no additional equipment for the ticketing system was considered, since existing system would be able to apply for the demand in The cost tabulated below need to add the Contingency and VAT (31% in total) to calculate the cost shown in the main text Vol.2 Pre Feasibility Study. ITEM Unit Cost PB01 PB02 PB03 PB04 (million Rp.) Quantity Amount Quantity Amount Quantity Amount Quantity Amount Ticket Facilities Sets of Ticketing Gate One Direction (Enter/Exit) , , , ,890 Bi-Direction , , , ,600 Ticket Vending Machine , , , ,400 Total 15,320 16,940 39,110 39,890 AP1.4.4 Traffic Signal Installation Main part of this item is bus priority signal installation, but also the center facility including software of the Bus Location System. The total cost of the item is that total a cost tabulated in the table plus 1,572 million Rp (including contingency and VAT). that is the cost for center facility of the Bus Location System. Regarding the signals, three types of signals such as Signals at intersections, Signals nearby the crosswalks to the mid-block bus shelters and Signals at u-turn openings were considered. The cost tabulated below need to add the Contingency and VAT (31% in total) to calculate the cost shown in the main text Vol.2 Pre Feasibility Study. AP1-20

21 (1) Signals at Intersections 1) PB01 The Study on Integrated Transportation Master Plan for JABODETABEK (Phase II) Description Unit Quantity Unit price Amount Total Remarks F/C L/C F/C L/C x1000 Yen x1000 Rp x1000 Rp x1000 Rp Rp. million Bus priority signal Local controller no. 15 1,400 10,000 1,636, ,000 1,786 Footing & wiring included Bus priority/preemption software set , ,760 75, aspect vehicle lantern set , ,768 60, Signal wiring included Signal pole (straight) no. 60 1, Roadside tag reader set ,000 1,168,800 90,000 1,259 Tag reader pole no , ,640 60, Conduit m 3, , Supply & installation Handhole unit , Timing parameter set set , ,320 60, Miscellaneous works LS 1 6, , , , Sub-total 4,453,128 1,210,000 5,663 2) PB02 Description Unit Quantity Unit price Amount Total Remarks F/C L/C F/C L/C x1000 Yen x1000 Rp x1000 Rp x1000 Rp Rp. million Bus priority signal Local controller no. 11 1,400 10,000 1,199, ,000 1,310 Footing & wiring included Bus priority/preemption software set , ,424 55, aspect vehicle lantern set , ,563 44, Signal wiring included Signal pole (straight) no. 60 1, Roadside tag reader set , ,120 66, Tag reader pole no , ,136 44, Conduit m 2, , Supply & installation Handhole unit , Timing parameter set set , ,568 44, Miscellaneous works LS 1 6, , , , Sub-total 3,390, ,000 4,304 3) PB03 Description Unit Quantity Unit price Amount Total Remarks F/C L/C F/C L/C x1000 Yen x1000 Rp x1000 Rp x1000 Rp Rp. million Bus priority signal Local controller no. 24 1,400 10,000 2,618, ,000 2,858 Footing & wiring included Bus priority/preemption software set , , , aspect vehicle lantern set , ,229 96, Signal wiring included Signal pole (straight) no. 60 1, Roadside tag reader set ,000 1,870, ,000 2,014 Tag reader pole no , ,024 96, Conduit m 4, , Supply & installation Handhole unit , Timing parameter set set , ,512 96, Miscellaneous works LS 1 6, , , , Sub-total 6,844,493 1,976,000 8,820 AP1-21

22 4) PB04 Description Unit Quantity Unit price Amount Total Remarks F/C L/C F/C L/C x1000 Yen x1000 Rp x1000 Rp x1000 Rp Rp. million Bus priority signal Local controller no. 15 1,400 10,000 1,636, ,000 1,786 Footing & wiring included Bus priority/preemption software set , ,760 75, aspect vehicle lantern set , ,922 72, Signal wiring included Pedestrian lantern set ,500 77,920 15, New signal Mastarm no ,000 46,752 40, New signal Signal pole (straight) no ,000 28,051 6, Roadside tag reader set ,000 1,402, ,000 1,511 Tag reader pole no , ,768 72, Conduit m 3, , Supply & installation Conduit for new signal m , Supply & installation Handhole unit , Timing parameter set set , ,320 60, Miscellaneous works LS 1 6, , , , Sub-total 4,993,893 1,580,000 6,574 (2) Signals at Cross Walk/U-turn Opening Unit cost of the Signals for Cross-Walk and U-turn was estimated roughly refer to the cost estimated in B.4.2. ITEM Unit Cost PB01 PB02 PB03 PB04 (million Rp.) Quantity Amount Quantity Amount Quantity Amount Quantity Amount Traffic Signals CrossWalk to Bus Shelter , , , ,460 U-turn opening , , Total 4,240 3,400 4,620 5,460 AP1-22

23 Appendix 2 (1): Economic Analysis of Busway Total 2004~20010 Total 2004~ Costs (billion rupiahs) 1) Widdening Land & Compensation 1, ,174 Civil work for widdening Sub-total 1, ,317 2) Bus Shelter Land & Compensation 0 0 Investment Cost Sub-total ) Signal & Bus Location System Land & Compensation 0 0 Civil Work Sub-total ) Bus Operation Bus operation cost is included in VOC of bus for busway. 5) O&M of facilities Total Financial Cost Land & Compensation 1, ,174 Construction Cost O&M Total (Financial Cost) 1, ,308 SCF 1) Widdening Land & Compensation 70% Civil work for widdening 85% Sub-total ) Bus Shelter Land & Compensation 0 0 Investment Cost 80% Sub-total ) Signal & Bus Location System Land & Compensation 70% Civil Work 85% Sub-total ) Bus Operation 5) O&M of facilities 85% Total Economic Cost Land & Compensation Construction Cost O&M Total (Economic Cost) 1, Discounted total costs 12% AP2-1

24 Appendix 2 (2): Economic Analysis of Busway Total 2004~20010 Total 2004~ Benefits (billion rupiahs) 1) VOC Savings 668 1, ) Travel Cost Savings High income group 468 1, Middle income group 538 1, Low income group Total Travel Cost Savings 1,031 2, Total Benefits 1,699 4, Discounted benefits DR 1) VOC Savings 12% ) Travel Cost Savings 12% 1, Total benefits 12% 1, Net Benefits (billion rupiahs) Net Benefits (economic prices) 3, ,420 Net Benefits (discounted at 12 %) 1, Accumulated Net Benefits (discounted at 12 %) ,153 NPV 12% (discount rate) 1,153 billion rupiahs EIRR 31.9% AP2-2

25 Appendix 3: Economic Analysis of TDM Total 2004~2010 Total 2004~ Costs (billion rupiahs) 1) Financial Cost Land & Compensation 0 0 Manual surveillance system ERP system IU O&M (System) O&M (IU) Total 1,589 2, , ) Economic Cost Land & Compensation Manual surveillance system 85% ERP system 80% IU 80% O&M (System) 85% O&M (IU) 85% Total 1,286 2, , Discounted total costs 12% Benefits (billion rupiahs) 1) VOC Savings 2,147 9, ,033 2) Travel Cost Savings High income group 864 3, Middle income group 1,492 4, Low income group Total travel cost savings 2,489 8, , Total benefits 4,636 18, ,170 1,746 1,631 1,534 1,455 1,393 1,347 1,317 1,304 1,309 1,332 1,379 Discounted benefits DR 1) VOC Savings 12% 3, ) Travel Cost Savings 12% 3, Total benefits 12% 6, Net Benefits (billion rupiahs) Net Benefits (economic prices) 16, , ,554 1,456 1,375 1,310 1,262 1,230 1,215 1,217 1,238 1,282 Net Benefits (discounted at 12 %) 5, Accumulated Net Benefits (discounted at 12 %) ,095 1,745 2,081 2,784 3,372 3,867 4,289 4,652 4,968 5,246 5,495 5,722 5,931 NPV 12% (discount rate) 5,930 billion rupiahs EIRR - B/C 7.2 AP2-3

26 Appendix 4: Financial Analysis of TDM (Restricted Area: Alt 4) Total 2004~2010 Total 2004~ Costs (billion rupiahs) TDM Land & Compensation 0 0 Manual surveillance system ERP system IU (Subsidies: 50%) O&M (System) O&M (IU): Owner's cost 0 0 Total 1,213 1, Revenue 1) Traffic Generation (Trip per day) High 552, , , , , , , , ,960 1,055,109 1,133,707 1,218,160 1,308,904 1,406,408 1,511,175 1,623,747 Middle 704, , , , , , , , , , , , , , , ,291 Low 74,135 61,279 50,652 41,868 34,607 28,606 23,645 19,544 16,155 13,353 11,038 9,124 7,541 6,234 5,153 4,259 Total 1,330,950 1,328,251 1,332,214 1,342,621 1,359,340 1,382,316 1,411,562 1,447,151 1,489,213 1,537,931 1,593,537 1,656,309 1,726,575 1,804,708 1,891,126 1,986,297 2) Trip in TDM Area (Trip per day) Rp. 8,000 High 505, , , , , , , , , ,438 1,027,790 1,103,312 1,184,383 1,271,411 1,364,833 1,465,121 Middle 611, , , , , , , , , , , , , , , ,037 Low 28,738 23,671 19,497 16,059 13,228 10,895 8,974 7,392 6,088 5,015 4,131 3,402 2,802 2,308 1,901 1,566 Total 1,145,974 1,149,858 1,158,669 1,172,389 1,191,046 1,214,711 1,243,490 1,277,530 1,317,008 1,362,136 1,413,162 1,470,365 1,534,056 1,604,585 1,682,334 1,767,724 Rp. 16,000 High 485, , , , , , , , , , ,810 1,052,358 1,129,125 1,211,491 1,299,866 1,394,688 Middle 472, , , , , , , , , , , , , , , ,695 Low 3,064 2,567 2,150 1,801 1,509 1,264 1, Total 960, , ,751 1,004,366 1,027,123 1,054,174 1,085,689 1,121,860 1,162,900 1,209,047 1,260,560 1,317,725 1,380,855 1,450,291 1,526,405 1,609,598 Rp. 20,000 High 472, , , , , , , , , , ,615 1,020,696 1,094,790 1,174,264 1,259,506 1,350,937 Middle 384, , , , , , , , , , , , , , , ,818 Low Total 857, , , , , , ,797 1,029,803 1,071,443 1,117,944 1,169,557 1,226,556 1,289,241 1,357,938 1,433,003 1,514,820 3) Proposed Levy and Trip in TDM Area per day Proposed Levy per Trip Rp.8,000 Rp.8,000 Rp.8,000 Rp.8,000 Rp.8,000 Rp.16,000 Rp.16,000 Rp.16,000 Rp.16,000 Rp.16,000 Rp.20,000 Rp.20,000 Rp.20,000 Rp.20,000 Rp.20,000 Rp.20,000 High 505, , , , , , , , , , ,615 1,020,696 1,094,790 1,174,264 1,259,506 1,350,937 Middle 611, , , , , , , , , , , , , , , ,818 Low 28,738 23,671 19,497 16,059 13,228 1,264 1, Total Trip in TDM Area 1,145,974 1,149,858 1,158,669 1,172,389 1,191,046 1,070,174 1,101,689 1,137,860 1,178,900 1,225,047 1,189,557 1,246,556 1,309,241 1,377,938 1,453,003 1,514,820 4) Revenue (billion rupiahs) From Total Day Trip 15,917 74,946 2,292 2,300 2,317 2,345 2,382 4,281 4,407 4,551 4,716 4,900 5,948 6,233 6,546 6,890 7,265 7,574 Peak 6 hours 41% 41% 41% 41% 41% 41% 41% 41% 41% 41% 41% 41% 41% 41% 41% 41% Exemption of 3 in One 82% 82% 82% 82% 82% 82% 82% 82% 82% 82% 82% 82% 82% 82% 82% 82% Return Traffic 60% 60% 60% 60% 60% 60% 60% 60% 60% 60% 60% 60% 60% 60% 60% 60% Revenue 3,211 15, ,200 1,257 1,321 1,390 1,465 1, Profits (billion rupiahs) 1) Cost 1,213 1, ) Revenue 3,211 15, ,200 1,257 1,321 1,390 1,465 1,528 3) Profit 1,998 13, ,156 1,212 1,273 1,340 1,414 1,474 NPV: 18% (discount rate) 2,997 billion rupiahs FIRR: B/C: 6.0 AP2-4

27 Appendix 5 (1): Economic Analysis of Serpong Line Double Tracking, Access Improvement and Integrated Land Development Total 2004~2020 Total 2004~ Costs (billion rupiahs) 1) Serpong Line Double Tracking Land & Compensation Civil and Track Work Electric Facility 690 1, Building and Depot Rolling Stock 1,553 1, O&M 778 2, Sub-total 4,021 5, ) Station Square Land & Compensation Investment Cost O&M 0 0 Sub-total ) Access Road Land & Compensation Civil Work O&M Sub-total 996 1, Total Financial Cost Land & Compensation Construction Cost 3,370 3, O&M 807 2, Total (Financial Cost) 5,115 7, ,052 1, SCF 1) Serpong Line Double Tracking Land & Compensation 70% Civil and Track Work 85% Electric Facility 80% Building and Depot 85% Rolling Stock 80% 1,242 1, O&M 85% 661 1, Sub-total 3,279 4, ) Station Square Land & Compensation 70% Investment Cost 80% O&M 85% Sub-total ) Access Road Land & Compensation 70% Civil Work 85% O&M 85% Sub-total Total Economic Cost Land & Compensation Construction Cost 2,751 3, O&M 686 2, Total (Economic Cost) 4,094 5, Discounted total costs 12% 2, AP2-5

Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report

Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report REVISIONS 1. Table 39: New Public Investments for Operation and Maintenance Costs 2. Appendix A-10: Passenger Rail Service - Operations

More information

COST ESTIMATES: Curb-Running

COST ESTIMATES: Curb-Running COST ESTIMATES: Curb-Running PROJECT FEASIBILITY COST ESTIMATE SUMMARY Geary Bus Rapid Transit Study Alternative: Side Lane (Curb Running) Date: 4/12/07 Percent Cost Total Project Capital Outlay I- Roadway

More information

City of Pacific Grove

City of Pacific Grove Regional Study Utilizing Caltrans Intersection Evaluation Section 7: City of Pacific Grove s: FIRST STREET AT CENTRAL AVENUE Transportation Agency for Monterey County Prepared by Transportation Agency

More information

Presentation Overview. Stop, Station, and Terminal Capacity

Presentation Overview. Stop, Station, and Terminal Capacity Stop, Station, and Terminal Capacity Mark Walker Parsons Brinckerhoff Presentation Overview Brief introduction to the project Station types & configurations Passenger circulation and level of service Station

More information

Road Network Development

Road Network Development Appendix 1 Projects and Programs by Transportation Sector Project / Program Within 4 Years Road Network Development Next 7 Up to 2020 Years Length (Km) (Billion. Rp) R01 Jakarta Outer Ring Road 36.5 7,035

More information

5. OPPORTUNITIES AND NEXT STEPS

5. OPPORTUNITIES AND NEXT STEPS 5. OPPORTUNITIES AND NEXT STEPS When the METRO Green Line LRT begins operating in mid-2014, a strong emphasis will be placed on providing frequent connecting bus service with Green Line trains. Bus hours

More information

HDR Engineering. HART North / South. Tampa Bay Applications Group Meeting May 14, 2009

HDR Engineering. HART North / South. Tampa Bay Applications Group Meeting May 14, 2009 HDR Engineering HART North / South BRT Corridor PD&E Tampa Bay Applications Group Meeting May 14, 2009 1 Agenda Update on Project Development and Environment (PD&E) Study Project Overview System Branding

More information

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Barrhaven Fellowship CRC 3058 Jockvale Road Ottawa, ON K2J 2W7 December 7, 2016 116-649 Report_1.doc D. J.

More information

MEMORANDUM. Date: November 4, Cheryl Burrell, Pebble Beach Company. Rob Rees, P.E. Inclusionary Housing Transportation Analysis WC

MEMORANDUM. Date: November 4, Cheryl Burrell, Pebble Beach Company. Rob Rees, P.E. Inclusionary Housing Transportation Analysis WC MEMORANDUM Date: November 4, 2013 To: From: Subject: Cheryl Burrell, Pebble Beach Company Rob Rees, P.E. Inclusionary Housing Transportation Analysis As requested, Fehr & Peers is providing clarification

More information

Bi-County Transitway/ Bethesda Station Access Demand Analysis

Bi-County Transitway/ Bethesda Station Access Demand Analysis Bi-County Transitway/ Bethesda Station Access Demand Analysis Prepared for: Washington Metropolitan Area Transit Authority Office of Planning and Project Development May 2005 Prepared by: in conjunction

More information

IMPROVEMENT CONCEPTS

IMPROVEMENT CONCEPTS IMPROVEMENT CONCEPTS for the South Novato Transit Hub Study Prepared by: January 11, 2010 DKS Associates With Wilbur Smith Associates IMPROVEMENT CONCEPTS Chapter 1: Introduction 1. INTRODUCTION The strategic

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS South Asia Subregional Economic Cooperation Dhaka Northwest Corridor Road Project, Phase 2 (RRP BAN 40540) A. Introduction ECONOMIC AND FINANCIAL ANALYSIS 1. The proposed project primarily aims at capacity

More information

Van Ness Transit Corridor Improvement Project. Engineering, Maintenance and Safety Committee March 25, 2015

Van Ness Transit Corridor Improvement Project. Engineering, Maintenance and Safety Committee March 25, 2015 Van Ness Transit Corridor Improvement Project Engineering, Maintenance and Safety Committee March 25, 2015 Project Need 16,000 daily passenger boardings within the project corridor Average bus speed 8

More information

Table 8-1: Service Frequencies for All Short-List Alternatives by Day of Week and Time of Day Frequency Day of Week Time of Day Time Period

Table 8-1: Service Frequencies for All Short-List Alternatives by Day of Week and Time of Day Frequency Day of Week Time of Day Time Period 8. Operating Plans The following Section presents the operating plans for the Short-List Alternatives. The modern streetcar operating plans are presented for Alternatives 2 and 3, followed by bus rapid

More information

TBARTA USF to Wesley Chapel Express Bus Service Operating Plan. Draft 3/25/2014

TBARTA USF to Wesley Chapel Express Bus Service Operating Plan. Draft 3/25/2014 TBARTA USF to Wesley Chapel Express Bus Service Operating Plan Draft 3/25/2014 March 2014 Table of Contents 1.0 Introduction... 1 2.0 Study Area... 1 3.0 Existing Available Service... 3 4.0 Proposed Service...

More information

4.9 RAILWAY FACILITY DEVELOPMENT PLAN FOR THE SERPONG AND

4.9 RAILWAY FACILITY DEVELOPMENT PLAN FOR THE SERPONG AND Integrated Transport JABODETABEK (Phase II) Final Report, Volume 2: Pre-Feasibility Studies Chapter 4 Serpong Line Double Tracking, Access Improvement & Integrated Land Development 4.9 RAILWAY FACILITY

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS Second Jharkhand State Road Project (RRP IND 49125) ECONOMIC AND FINANCIAL ANALYSIS A. Introduction 1. The project involves capacity augmentation and rehabilitation of four state highway sections in the

More information

Hosur Krishnagiri Project Of NH-7

Hosur Krishnagiri Project Of NH-7 . INSPECTION AND MONITORING OF THE CONSTRUCTION WORKS. PROGRESS UP TO 31st October 2014.1. a. HIGHWAYS - MCW & Service Road Sl Description Unit Total Scope (Km) Completed Percentage achieved % 1 Clearing

More information

Memorandum. 1 Introduction. 2 O&M Cost Elements. 2.1 Service O&M Costs

Memorandum. 1 Introduction. 2 O&M Cost Elements. 2.1 Service O&M Costs To Barrow Emerson, SamTrans Melissa Reggiardo, SamTrans Date 9/13/2014 Copies Reference number From Subject Corey Wong, Arup Steve Crosley, Fehr + Peers ECR BRT Phasing Plan File reference 1 Introduction

More information

Hosur Krishnagiri Project Of NH-7

Hosur Krishnagiri Project Of NH-7 9. INSPECTION AND MONITORING OF THE CONSTRUCTION WORKS. PROGRESS UP TO 31 May 2015 1a. HIGHWAYS - MCW & Service Road Sl Description Unit Total Scope (Km) Completed Percentage achieved % 1 Clearing & Grubbing

More information

STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016

STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016 STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016 Shift Rapid Transit Initiative Largest infrastructure project in the city s history. Rapid Transit initiative will transform London s public transit

More information

Traffic Engineering Study

Traffic Engineering Study Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested

More information

Seoul. (Area=605, 10mill. 23.5%) Capital Region (Area=11,730, 25mill. 49.4%)

Seoul. (Area=605, 10mill. 23.5%) Capital Region (Area=11,730, 25mill. 49.4%) Seoul (Area=605, 10mill. 23.5%) Capital Region (Area=11,730, 25mill. 49.4%) . Major changes of recent decades in Korea Korea s Pathways at a glance 1950s 1960s 1970s 1980s 1990s 2000s Economic Development

More information

VAN NESS AVENUE BUS RAPID TRANSIT

VAN NESS AVENUE BUS RAPID TRANSIT VAN NESS AVENUE BUS RAPID TRANSIT Commission of the Environment Policy Committee May 22, 2014 Peter Gabancho Project Manager III Capital Programs & Construction SFMTA 1 Conceptual Visual Simulation Center-Running

More information

Alternatives Analysis Findings Report

Alternatives Analysis Findings Report 6.0 This chapter presents estimates of the potential capital, operations and maintenance costs associated with the alternatives carried forward for detailed evaluation. The methodology used to develop

More information

FE Review-Transportation-II. D e p a r t m e n t o f C i v i l E n g i n e e r i n g U n i v e r s i t y O f M e m p h i s

FE Review-Transportation-II. D e p a r t m e n t o f C i v i l E n g i n e e r i n g U n i v e r s i t y O f M e m p h i s FE Review-Transportation-II D e p a r t m e n t o f C i v i l E n g i n e e r i n g U n i v e r s i t y O f M e m p h i s Learning Objectives Design, compute, and solve FE problems on Freeway level of

More information

Table Operation Schedule. Section Section Distance (km) Schedule Speed (km/h)

Table Operation Schedule. Section Section Distance (km) Schedule Speed (km/h) 4.9.8 Stabling Yard Plan The Serpong double tracking project requires additional 166 train cars by 2020. (The number of existing ECs, 26 cars, has been deducted from the total number of train cars required

More information

Valley Metro Overview. ITE/IMSA Spring Conference March 6, 2014

Valley Metro Overview. ITE/IMSA Spring Conference March 6, 2014 Valley Metro Overview ITE/IMSA Spring Conference March 6, 2014 Valley Metro Who Are We? Operate Regional Transit Services Valley Metro and Phoenix are region s primary service providers Light Rail and

More information

Traffic Impact Analysis for 2171 Rosecrans Avenue

Traffic Impact Analysis for 2171 Rosecrans Avenue Traffic Impact Analysis for 2171 Rosecrans Avenue Prepared for: Continental Development Corporation Revised May 2016 LA16-2831 Prepared by: Fehr & Peers 600 Wilshire Blvd, Suite 1050 Los Angeles, CA 90017

More information

Transit Access Study

Transit Access Study West of Hudson Regional Transit Access Study Open House presentation July 20, 2010 1 Agenda Progress To date Summary of Level 2 Alternatives and Screening Service Plans Bus and Rail Operating and Capital

More information

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited.

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited. RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Guycoki (Eastern) Limited June 16, 2016 116-638 Brief_1.doc D. J. Halpenny & Associates Ltd. Consulting

More information

City of Marina. Regional Roundabout Study Utilizing Caltrans Intersection Control Evaluation Section 4: Transportation Agency for Monterey County

City of Marina. Regional Roundabout Study Utilizing Caltrans Intersection Control Evaluation Section 4: Transportation Agency for Monterey County Regional Roundabout Study Utilizing Caltrans Intersection Control Evaluation Section 4: City of Marina Study Intersections: RESERVATION ROAD AT BEACH ROAD RESERVATION ROAD AT DEFOREST ROAD CARDOZA AVENUE

More information

Three ULTra Case Studies examples of the performance of the system in three different environments

Three ULTra Case Studies examples of the performance of the system in three different environments Three ULTra Case Studies examples of the performance of the system in three different environments airport application: London Heathrow : linking business and staff car parks through the access tunnel

More information

TRAFFIC MANAGEMENT STANDARDS CITY OF GARLAND TRANSPORTATION DEPARTMENT

TRAFFIC MANAGEMENT STANDARDS CITY OF GARLAND TRANSPORTATION DEPARTMENT TRAFFIC MANAGEMENT STANDARDS CITY OF GARLAND TRANSPORTATION DEPARTMENT JUNE 1996 TABLE OF CONTENTS 1.0 Street Design Standards 1.1 Right-of-Way Requirements 1.2 Median Openings 1.3 Sidewalks 1.4 Traffic

More information

EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT

EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT (BRIEF) Table of Contents EUGENE-SPRINGFIELD, OREGON (USA)... 1 COUNTY CONTEXT AND SYSTEM DESCRIPTION... 1 SYSTEM OVERVIEW... 1 PLANNING

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

Engineering Dept. Highways & Transportation Engineering

Engineering Dept. Highways & Transportation Engineering The University College of Applied Sciences UCAS Engineering Dept. Highways & Transportation Engineering (BENG 4326) Instructors: Dr. Y. R. Sarraj Chapter 4 Traffic Engineering Studies Reference: Traffic

More information

Study on Economic Partnership Projects. in Developing Countries in FY2010. Study on the Kiev Metro Line 4 in Kiev City, Ukraine SUMMARY.

Study on Economic Partnership Projects. in Developing Countries in FY2010. Study on the Kiev Metro Line 4 in Kiev City, Ukraine SUMMARY. Study on Economic Partnership Projects in Developing Countries in FY2010 Study on the Kiev Metro Line 4 in Kiev City, Ukraine SUMMARY March 2011 第 1 章 第 2 章 The Ministry of Economy, Trade and Industry

More information

CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6

CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6 2016 2019 CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6 STRATEGIC AREA OF FOCUS: SUB-PRIORITY: STRATEGY: INITIATIVE: INITIATIVE LEAD(S): BUILDING A SUSTAINABLE CITY

More information

Attachment C: Benefit-Cost Analysis Spreadsheet

Attachment C: Benefit-Cost Analysis Spreadsheet Attachment C: Benefit-Cost Analysis Spreadsheet TIGER VII Application Collier Blvd. Corridor Improvements June 5 th, 2015 Collier Blvd BCA Summary The Collier Boulevard Benefit Cost Analysis (BCA) has

More information

The capital cost estimates do not include allowances for: ROW acquisition. Third-party mitigation works. Hazardous materials handling.

The capital cost estimates do not include allowances for: ROW acquisition. Third-party mitigation works. Hazardous materials handling. Mode Selection Report 7 Cost Evaluation The cost evaluation criteria used in the evaluation of the transit modes are: Capital cost. operating costs. Fare revenue. Net cost per passenger/passenger-mile.

More information

Where will. BRT run? BRT will serve 20 stations along the line, connecting to bus routes and serving major destinations. How often will service run?

Where will. BRT run? BRT will serve 20 stations along the line, connecting to bus routes and serving major destinations. How often will service run? Where will 32 65 87 223 Rosedale Transit Center 225 227 264 801 ROSEVILLE 65 Snelling & County Road B BRT run? Snelling & Roselawn FALCON HEIGHTS BRT will serve 20 stations along the line, connecting to

More information

Traffic Analysis for Bon Air Bridge Mitigation Magnolia Storm Water Quality Project

Traffic Analysis for Bon Air Bridge Mitigation Magnolia Storm Water Quality Project Memo To: Paul DiDonato, ATI Architects and Engineers From: David Parisi, PE and Ashley Tam, EIT Date: February 23, 216 Subject: Traffic Analysis for Bon Air Bridge Mitigation Magnolia Storm Water Quality

More information

GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for:

GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for: GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT Prepared for: Invecta Development (Ottawa) Corporation 758 Shanks Height Milton, ON L9T 7P7 May

More information

The Boston South Station HSIPR Expansion Project Cost-Benefit Analysis. High Speed Intercity Passenger Rail Technical Appendix

The Boston South Station HSIPR Expansion Project Cost-Benefit Analysis. High Speed Intercity Passenger Rail Technical Appendix The Boston South Station HSIPR Expansion Project Cost-Benefit Analysis High Speed Intercity Passenger Rail Technical Appendix Prepared by HDR August 5, 2010 The Boston South Station HSIPR Expansion Project

More information

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: 2190986ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 October 6, 2010 110-502 Report_1.doc D. J. Halpenny

More information

ECONOMIC AND FINANCIAL ANALYSIS: PROJECT 1

ECONOMIC AND FINANCIAL ANALYSIS: PROJECT 1 Integrated Road Investment Program (RRP SRI 47273) A. Introduction ECONOMIC AND FINANCIAL ANALYSIS: PROJECT 1 1. Sri Lanka s road network is dense and well laid out, providing basic access to the country

More information

Preliminary Definition of Alternatives. 3.0 Preliminary Definition of Alternatives

Preliminary Definition of Alternatives. 3.0 Preliminary Definition of Alternatives 3.0 What preliminary alternatives are being evaluated? The alternatives for the East San Fernando Valley Transit Corridor project that were considered for screening include the No Build Alternative, Transportation

More information

US 29 Bus Rapid Transit Planning Board Briefing. February 16, 2017

US 29 Bus Rapid Transit Planning Board Briefing. February 16, 2017 US 29 Bus Rapid Transit Planning Board Briefing February 16, 2017 Project Goals Improve the quality of transit service Improve mobility opportunities and choices Enhance quality of life Support master

More information

Transport Sector Performance Indicators: Sri Lanka Existing Situation

Transport Sector Performance Indicators: Sri Lanka Existing Situation Transport Sector Performance Indicators: Sri Lanka Existing Situation Amal S. Kumarage Professor, Department of Civil Engineering, University of Moratuwa Chairman, National Transport Commission kumarage@sltnet.lk

More information

What IS BRT, Really? Not BRT and RNY

What IS BRT, Really? Not BRT and RNY What IS BRT, Really? 2007 Winter TexITE Meeting Presented by Jeff Arndt, TTI Not BRT and RNY 1 What is Bus Rapid Transit? A flexible, rubber-tired from of rapid transit that combines stations, vehicles,

More information

State Avenue Corridor Bus Rapid Transit (BRT)

State Avenue Corridor Bus Rapid Transit (BRT) State Avenue Corridor Bus Rapid Transit (BRT) Moving Forward Incrementally April 2010 State Ave. BRT Update Bus Rapid Transit Overview State Ave. Alternatives Analysis Results What s Coming Up Right Away!

More information

Service Quality: Higher Ridership: Very Affordable: Image:

Service Quality: Higher Ridership: Very Affordable: Image: Over the past decade, much attention has been placed on the development of Bus Rapid Transit (BRT) systems. These systems provide rail-like service, but with buses, and are typically less expensive to

More information

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards

CHAPTER 9: VEHICULAR ACCESS CONTROL Introduction and Goals Administration Standards 9.00 Introduction and Goals 9.01 Administration 9.02 Standards 9.1 9.00 INTRODUCTION AND GOALS City streets serve two purposes that are often in conflict moving traffic and accessing property. The higher

More information

Highway Transitway Corridor Study

Highway Transitway Corridor Study Highway Transitway Corridor Study Technical Memorandum 3: Corridor Concepts and Evaluation Prepared for: Metropolitan Council May 2014 SRF No. 7994 Table of Contents Introduction... 1 Concept Development...

More information

Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14

Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14 Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14 Hardesty & Hanover, LLC Alternative 1 Bogie Support System Alternative Based on AW Sketch of New Bridge Component

More information

Lakeside Terrace Development

Lakeside Terrace Development Lakeside Terrace Development City of Barrie, County of Simcoe Traffic Brief for: Type of Document: Final Report Project Number: JDE 1617 Date Submitted: April 29 th, 216 4/29/16 John Northcote, P.Eng.

More information

Wentzville Parkway South Phase 2 & 2A

Wentzville Parkway South Phase 2 & 2A Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total

More information

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES...

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES... Transportation Impact Fee Study September 2014 TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS......4 POTENTIAL FUNDING SOURCES...7 PROPOSED

More information

EAST-WEST BUS RAPID TRANSIT Service Plan and Operations and Maintenance (O&M) Cost Memo

EAST-WEST BUS RAPID TRANSIT Service Plan and Operations and Maintenance (O&M) Cost Memo EAST-WEST BUS RAPID TRANSIT Service Plan and Operations and Maintenance (O&M) Cost Memo This memo documents the proposed service plan, operating statistics, and O&M cost for the East-West BRT and background

More information

2030 Multimodal Transportation Study

2030 Multimodal Transportation Study 2030 Multimodal Transportation Study City of Jacksonville Planning and Development Department Prepared by Ghyabi & Associates April 29,2010 Introduction Presentation Components 1. Study Basis 2. Study

More information

Travel Time Savings Memorandum

Travel Time Savings Memorandum 04-05-2018 TABLE OF CONTENTS 1 Background 3 Methodology 3 Inputs and Calculation 3 Assumptions 4 Light Rail Transit (LRT) Travel Times 5 Auto Travel Times 5 Bus Travel Times 6 Findings 7 Generalized Cost

More information

Traffic Impact Study Speedway Gas Station Redevelopment

Traffic Impact Study Speedway Gas Station Redevelopment Traffic Impact Study Speedway Gas Station Redevelopment Warrenville, Illinois Prepared For: Prepared By: April 11, 2018 Table of Contents 1. Introduction... 1 2. Existing Conditions... 4 Site Location...

More information

Kandy Transport Improvement Project (KTIP) Ministry of Defense & Urban Development

Kandy Transport Improvement Project (KTIP) Ministry of Defense & Urban Development Under Strategic Cities Development Project (SCDP) Kandy Transport Improvement Project (KTIP) Ministry of Defense & Urban Development Amal S. Kumarage May 2014 P: 217,678 V: 34,317 P: 8,310 V: 4,051 Map

More information

Waco Rapid Transit Corridor (RTC) Feasibility Study

Waco Rapid Transit Corridor (RTC) Feasibility Study Waco Rapid Transit Corridor (RTC) Feasibility Study Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System Jimi Mitchell, Project Manager AECOM

More information

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project. EXECUTIVE SUMMARY This study addresses the traffic impacts associated with the proposed Shopko redevelopment located in Sugarhouse, Utah. The Shopko redevelopment project is located between 1300 East and

More information

City of Houston Fondren Road Paving and Drainage

City of Houston Fondren Road Paving and Drainage City of Houston Fondren Road Paving and Drainage From Braeswood Boulevard to Creekbend Drive TRC Meeting March 2016 Location and Vicinity Maps City Council District K Key Map 530 Z, 530 Y Land Use Commercial

More information

886 March Road McDonald's Transportation Study

886 March Road McDonald's Transportation Study McDonald's Restaurants of Canada Limited March 2013 886 March Road McDonald's Transportation Study Submitted by: HDR Corporation 100 York Boulevard, Suite 300 Richmond Hill, ON L4B 1J8 (905) 882-4100 www.hdrinc.com

More information

DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT

DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT DRAFT TRANSPORTATION IMPACT STUDY CASTILIAN REDEVELOPMENT PROJECT Prepared for: Submitted by: 299 Lava Ridge Ct. Suite 2 Roseville, CA. 95661 June 212 TABLE OF CONTENTS 1. Introduction... 1 Project Location

More information

Existing Traffic Conditions

Existing Traffic Conditions May 14, 2014 Ms. Lorraine Weiss City of San Mateo 330 West 20 th Avenue San Mateo, CA 94403 Subject: Traffic Operational Study for the Proposed Tilton Avenue Residential Development in San Mateo, California

More information

EFFECT OF PAVEMENT CONDITIONS ON FUEL CONSUMPTION, TIRE WEAR AND REPAIR AND MAINTENANCE COSTS

EFFECT OF PAVEMENT CONDITIONS ON FUEL CONSUMPTION, TIRE WEAR AND REPAIR AND MAINTENANCE COSTS EFFECT OF PAVEMENT CONDITIONS ON FUEL CONSUMPTION, TIRE WEAR AND REPAIR AND MAINTENANCE COSTS Graduate of Polytechnic School of Tunisia, 200. Completed a master degree in 200 in applied math to computer

More information

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014. King County Metro Columbia Street Transit Priority Improvements Alternative Analysis Downtown Southend Transit Study May 2014 Parametrix Table of Contents Introduction... 1 Methodology... 1 Study Area...

More information

ARTICLE 8 OFF-STREET PARKING AND PRIVATE DRIVEWAY STANDARDS

ARTICLE 8 OFF-STREET PARKING AND PRIVATE DRIVEWAY STANDARDS ARTICLE 8 OFF-STREET PARKING AND PRIVATE DRIVEWAY STANDARDS TABLE OF CONTENTS SECTION PAGE 8.1 GENERAL STANDARDS...8-2 8.2 PRIVATE DRIVEWAY PROVISIONS...8-4 8.3 OFF-STREET PARKING STANDARDS...8-5 8.4 OFF-STREET

More information

Highway Capacity Manual 2000 TRANSIT CONCEPTS CHAPTER 14 CONTENTS

Highway Capacity Manual 2000 TRANSIT CONCEPTS CHAPTER 14 CONTENTS CHAPTER 14 TRANSIT CONCEPTS CONTENTS I. INTRODUCTION...14-1 Role of Transit...14-1 Transit Characteristics...14-1 General Transit Capacity Concepts...14-3 Definitions...14-3 Vehicle Capacity...14-3 Person

More information

Effective [one year after date of adoption] the provisions of this rule shall apply to:

Effective [one year after date of adoption] the provisions of this rule shall apply to: VENTURA COUNTY AIR POLLUTION CONTROL DISTRICT RULE 55.1 PAVED ROADS AND PUBLIC UNPAVED ROADS (Adopted / / ) A. Applicability Effective [one year after date of adoption] the provisions of this rule shall

More information

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction 550 North to 650 North $ 1,750,000 $ 1,582,113 To widen an existing bridge on 1200 West over Box Elder Creek that will

More information

Pre-Project Proposal

Pre-Project Proposal Sky Way Transport Canada Ltd. 710-485 McGill Street, Montreal QC H2Y 2H4, Canada Concept of High-Speed Track SkyWay on the Route Heraklion-Chania, Crete Pre-Project Proposal SWC 2017 Montreal 2017 The

More information

Opportunities for Improved Bus Service on Finch Avenue 27 April 2011

Opportunities for Improved Bus Service on Finch Avenue 27 April 2011 Opportunities for Improved Bus Service on Finch Avenue 27 April 2011 Background The inclusion of Finch Avenue as one of the higher-priority applications of light rail transit (LRT) service embodied in

More information

BUS STOP DESIGN & PLANNING GUIDE

BUS STOP DESIGN & PLANNING GUIDE BUS STOP DESIGN & PLANNING GUIDE Prepared by the Operations and Planning Departments 2011 PURPOSE OF GUIDE The design of passenger waiting areas plays a significant role in a person s decision of whether

More information

Service and Operations Planning for Ottawa s New Light Rail Line Pat Scrimgeour

Service and Operations Planning for Ottawa s New Light Rail Line Pat Scrimgeour Service and Operations Planning for Ottawa s New Light Rail Line Pat Scrimgeour Manager, Transit Service Planning and Reporting OC Transpo Ottawa, Ontario Ottawa Light Rail Project 12.5 km, 13 stations

More information

BUS RAPID TRANSIT INTRODUCTION IN METRO MANILA USING IGES CO

BUS RAPID TRANSIT INTRODUCTION IN METRO MANILA USING IGES CO ESTIMATION OF CO BENEFIT FROM BUS RAPID TRANSIT INTRODUCTION IN METRO MANILA USING IGES CO BENEFIT GUIDELINE by Dr. Alexis Fillone, De La Salle University Manila Prof. Dr. Atsushi Fukuda, Nihon University,

More information

VAN NESS AVENUE BUS RAPID TRANSIT

VAN NESS AVENUE BUS RAPID TRANSIT VAN NESS AVENUE BUS RAPID TRANSIT Peter Gabancho Project Manager III Capital Programs & Construction SFMTA Shari Tavafrashti Principal Engineer SFCTA 1 Project Purpose and Need Improve transit reliability,

More information

EFFECT ON COST OF ROAD CONSTRUCTION & MAINTENANCE DUE TO OVERLOADING

EFFECT ON COST OF ROAD CONSTRUCTION & MAINTENANCE DUE TO OVERLOADING EFFECT ON COST OF ROAD CONSTRUCTION & MAINTENANCE DUE TO OVERLOADING INTERNATIONAL CONFERENCE ON ASSESSING THE NEED FOR THE MANAGEMENT OF AXLE LOADS IN DEVEOPING COUNTRIES, COLOMBO, SRI LANKA 16-17 JUNE

More information

I-290 Phase I Study Summary of NFPA-130 Analysis of Proposed CTA Station Platform Widths May 2016

I-290 Phase I Study Summary of NFPA-130 Analysis of Proposed CTA Station Platform Widths May 2016 I-290 Phase I Study Summary of NFPA-130 Analysis of Proposed CTA Station Platform Widths May 2016 INTRODUCTION As part of the I-290 reconstruction phase I study, IDOT has coordinated with the CTA regarding

More information

Georgia Department of Transportation 2006 Fact Sheet Lovejoy to Atlanta Rail Line visit the website at

Georgia Department of Transportation 2006 Fact Sheet Lovejoy to Atlanta Rail Line visit the website at Overview Georgia Department of Transportation 2006 Fact Sheet Lovejoy to Atlanta Rail Line visit the website at www.garail.com Commuter rail service between Lovejoy and Atlanta is ready for implementation:

More information

Kaohsiung City Government Kaohsiung: Heading towards an Eco-Mobility City

Kaohsiung City Government Kaohsiung: Heading towards an Eco-Mobility City Kaohsiung City Government 2013 Kaohsiung: Heading towards an Eco-Mobility City Outlines 1. About Kaohsiung 2. Goal 3. Strategies 2 3 1. About Kaohsiung 1.1 Basic Taiwan Area: 36,193 km 2 Population: 23.3

More information

Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY Boston Post Road Realignment and Roundabout Design Report

Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY Boston Post Road Realignment and Roundabout Design Report March 6, 2015 Ryan Coyne, PE City Engineer City of Rye 1051 Boston Post Road Rye, NY 10580 RE: JMC Project 14108 Boston Post Road Roundabout Boston Post Road and Parsons Street City of Rye, NY Dear Ryan:

More information

Effect of Police Control on U-turn Saturation Flow at Different Median Widths

Effect of Police Control on U-turn Saturation Flow at Different Median Widths Effect of Police Control on U-turn Saturation Flow at Different Widths Thakonlaphat JENJIWATTANAKUL 1 and Kazushi SANO 2 1 Graduate Student, Dept. of Civil and Environmental Eng., Nagaoka University of

More information

Greater Cleveland Regional Transit Authority. Bus Stop Design Guidelines

Greater Cleveland Regional Transit Authority. Bus Stop Design Guidelines Greater Cleveland Regional Transit Authority Bus Stop Design Guidelines Contents Purpose... I Bus Stop Design & Location... 1 Bus Stop Planning... 1 Bus Stop Safety & Consolidation... 1 As Needed Basis...

More information

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois Submitted by April 9, 2009 Introduction Kenig, Lindgren, O Hara, Aboona,

More information

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for:

L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY Prepared for: L1TILE BEARS DAY CARE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO MAY 2012 Prepared for: Hillside Construction, Inc. 216 Hemlock Street, Suite B Fort Collins, CO 80534 Prepared by: DELICH ASSOCIATES

More information

opinions, findings, and conclusions expressed in this

opinions, findings, and conclusions expressed in this DESIGN METHOD BASED ON OVERLAY PAVEMENT DISTRESS VISUAL N. K. Vaswani Dr. Research Scientist Senior opinions, findings, and conclusions expressed in this (The are those of author and not necessarily those

More information

Pace Bus Depot Location Analysis

Pace Bus Depot Location Analysis Pace Bus Depot Location Analysis Key Notes 1. Options refer to conceptual sketches prepared by Kimley Horn. 2. The depot is assumed to accommodate Pace routes as they currently exist: 17 routes on the

More information

Plan Check Policies and Guidelines

Plan Check Policies and Guidelines VIII. TRAFFIC SIGNING AND STRIPING PLANS A. INTRODUCTION Traffic signing and striping plans are required for all General Plan Roads and any roadway that is 56-foot wide curb-to-curb (78 R/W) or wider.

More information

Pedestrians, Cars, Buses and Trains? Considerations for Rapid Transit Service at Western University

Pedestrians, Cars, Buses and Trains? Considerations for Rapid Transit Service at Western University Pedestrians, Cars, Buses and Trains? Considerations for Rapid Transit Service at Western University Shift: The City of London s Rapid Transit Proposal Shift: The City of London s Rapid Transit Proposal

More information

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis

TRAFFIC DATA. Existing Derousse Ave./River Rd. AM LOS Analysis Existing Derousse Ave./River Rd. PM LOS Analysis Appendix E NJ TRANSIT Pennsauken Junction Transit Center and Park & Ride RiverLINE and Atlantic City Line Pennsauken Township, Camden County, New Jersey TRAFFIC DATA Background Traffic Information for

More information

1.0 Detailed Definition of Alternatives

1.0 Detailed Definition of Alternatives 1.0 Detailed Definition of Alternatives 1.1 Introduction This chapter provides supplemental information on the four alternatives, including both physical and operational characteristics (e.g. service plans)

More information

One Harbor Point Residential

One Harbor Point Residential Residential Gig Harbor, WA Transportation Impact Analysis January 23, 2017 Prepared for: Neil Walter Company PO Box 2181 Tacoma, WA 98401 Prepared by: TENW Transportation Engineering NorthWest 11400 SE

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS Second Rural Connectivity Investment Program (RRP IND 48226-002) ECONOMIC AND FINANCIAL ANALYSIS 1. The Second Rural Connectivity Investment Program (the investment program) will build or upgrade about

More information