1 System Impact Study for Puget Sound Energy s Share of Frederickson I Generation Project Pierce County, WA Puget Sound Energy OASIS Reference No February 4, 2004 Puget Sound Energy, Inc. Electric Transmission Department Page 1

2 SYSTEM IMPACT STUDY OASIS Reference No MW GENERATION ADDITION TO PSE FREDERICKSON BUS February 4, 2004 PSE Electric Transmission INTRODUCTION This study is in response to OASIS Reference No and the System Impact Study Agreement executed by Puget Sound Energy, Inc. (PSE), Energy Supply on June 24, The request is for 150 MW of Firm Network Resource Transmission Service from the existing Frederickson I combined-cycle generation plant delivered to PSE s Frederickson Substation. Frederickson is located in Pierce County, Washington. This study summarizes the results of analyses done to develop reliable transmission alternatives that integrate the proposed generation at Frederickson. CONCLUSION With certain transmission improvements, the proposed generation level of 150 MW can be reliably integrated into the PSE transmission system through installation of a new 230/ transformer at PSE s Frederickson Substation. A single line would be constructed between the existing Frederickson I substation bus and PSE s Frederickson Substation, with substation breakers at both ends of the line. Dependent on the status of Frederickson LP s 300 MW project (Frederickson II), the following network upgrades may be required: a new 115kV bus section breaker at PSE s Frederickson substation; the re-conductoring of the Frederickson-Gravelly Lake line to Bittern Conductor, 1272 ACSR; and increasing the thermal line rating of the PSE section of the White River to South Tacoma line. An estimate of the cost for transmission interconnection facilities and network transmission improvements is approximately $9,000,000 if the Frederickson II project is constructed and $14,500,000 if the Frederickson II project is not constructed. Studies were conducted with and without the new Frederickson II project added. Depending on the status of this project and PSE s Frederickson generation, actual flows on the proposed interconnection varied including situations where power flowed from the 115kV system to the 230kV system with all lines in service. Seasonal loading and variations in flows on the Bonneville Power Administration s (BPA) Raver-Paul 500 kv transmission line also impacted flow levels. Because this proposal interconnects BPA s and PSE s system via the Frederickson I bus, evaluation of impacts to BPA s system may be required. STUDY ASSUMPTIONS Summer and winter seasons were studied with high Raver-Paul loading and high north to south flows on lines going through Pierce County (import conditions from Canada). Flow conditions with high south to north (export) flows to Canada were also checked for the summer and winter. The summer season included heavy and light load conditions for both north to south and south to north. The winter season studies were with heavy Page 2

3 loading. The new interconnection was modeled in addition to the existing two combustion turbines at PSE s Frederickson, which were generating at 74.4 MW each in summer simulations and 80 MW each in winter simulations. Studies were conducted with and without the proposed Frederickson II 300 MW project and its required system upgrades (OASIS Nos and 17888). Analysis of the proposed solution included studies with no generation on line at PSE s Frederickson and at Frederickson II. The lines that cross Pierce County toward Thurston and Lewis Counties in the south are: Raver-Paul 500 kv line White River-Cowlitz/Frederickson I-Olympia line Covington-Cowlitz-Chehalis line PSE Frederickson-St. Clair line Electron Heights-Blumaer line The time frame used for simulations was 2005 with the following improvements assumed to be completed: BPA s G1 project which includes: Kangley-Echo Lake 500 kv line Snoking 500/ transformer Bothell-Sammamish line re-conductored and tapped into Snoking Horseranch tap to the Monro-Snohomish line re-routed into Snohomish Schultz-Hanford line (BPA s G2 project) New Gravelly Lake switching station with new line to St. Clair via Holden. Alderton-Stewart line section upgraded to Tern at 100C Boeing Auburn-Deringer line section upgraded to Tern at 100C For studies including the Frederickson II project the following system improvements were modeled: PSE Frederickson to Woodland line Woodland to Gravelly Lake line Re-conductor of the PSE Frederickson Gravelly Lake line Upgrade the following lines to the indicated higher ratings: White River-Alderton #2, 75C Tanglewood-Saint Clair, 100C Boeing Auburn-Boeing Auburn #2, 75C Fairchild-Alderton, 75C W. River-Sumner-Pioneer, 100C White River-Stewart, 100C Woodland-Fairchild, 75C Reactive power margin and voltage stability was not determined. It is anticipated that the addition of the proposed generation with full reactive capability will improve voltage regulation in the area. This can be confirmed with reactive margin studies. Transient stability was not confirmed, and would be done when stability models and machine specific parameters are provided. Page 3

4 OUTAGE ASSUMPTIONS Outages taken included single contingency (N-1) outages and common mode outages in the Puget Sound region. The single contingency outages include all lines on PSE, BPA, Tacoma City Light (TCL). The common mode outages include all of PSE s system and BPA s and above system. Common mode outages include: White River north 230 bus, south 230 bus, north115 bus, and south 115 bus Alderton 115 bus, PSE Frederickson 115 bus, Woodland 115 bus Krain Corner 115 bus, Electron Heights 115 bus, Saint Clair 115 bus Blumaer 115 bus, West Olympia 115 bus, Plum Street 57.5 bus PSE Olympia north 115 bus, and south 115 bus, Tono 115 phase shifter Gravelly Lake 115 bus BPA Olympia east 230 bus, west 230 bus, and 115 bus All double circuit outages in Pierce County. The following included existing RAS for generation dropping: Raver-Paul 500 line; Trip BC Hydro, FDG/WHG, FDX I, Coulee Raver-Paul-Centralia G2 500 BKF; Trip BC Hydro, FDG/WHG, FDX I Paul-Allston 1&2 500 lines on common right-of-way; Trip BC Hydro, FDX I, Coulee The formula for tripping BC Hydro generation is: Trip generation = 1.3 x (West Side NI north-to-south 1450 MW) FDG/WHG stands for tripping Fredonia and Whitehorn combustion turbines. FDX I stands for tripping Frederickson I Generation Coulee stands for Grand Coulee units needed to bring total generation tripped to 2850 MW (BPA maximum RAS level) BKF stands for breaker failure. FINDINGS General: The PSE Frederickson Substation bus is currently interconnected to the local transmission system through three lines. They are: Alderton PSE Frederickson, Electron Heights -Boeing Puyallup PSE Frederickson, and PSE Frederickson - St. Clair. The usual flow on these lines is from the northeast to the southwest, corresponding to the flow pattern on BPA s 230 and 500 kv lines across the same area. The Frederickson I plant is currently tied to BPA s South Tacoma substation by a radial line owned by EPCOR. BPA s South Tacoma substation has lines to PSE White River, Tacoma City Light (TCL) Cowlitz, and BPA Olympia substations. The most severe outage under high north to south (import conditions from Canada) flows for this region is a breaker failure at BPA s Paul substation, which trips both the Raver-Paul 500 kv line and the Centralia #2 generator. BPA arms a generator tripping Remedial Action Scheme (RAS) when there are high north to south flows on the Raver- Paul 500 kv line. The RAS sends trip signals to selected generators north of this line when the RAS detects that the line is lost from service. By tripping generation to the north, the flow that shifts from the 500 kv line to the underlying 230 and line is reduced. The generators that are armed are determined according to the flow level on Page 4

5 the Raver-Paul line and include the Frederickson I plant. Frederickson I is also tripped for RAS addressing the Paul-Alston 500 kv double circuit outage and the Alston-Keeler 500 kv outage to the south of Paul substation which is in northern Lewis County. The proposed addition of the interconnection between Frederickson I to PSE Frederickson substation tends to shunt flow off BPA s system at BPA South Tacoma and on to PSE s system for the Paul breaker outage. The primary impact of this is that for the case without the Frederickson II project, the PSE Frederickson - St. Clair line can become overloaded above its thermal capability. The solution studied was to reconductor this line with Bittern, 1272 ACSR, conductor with a thermal rating of 100C. In addition, an overload is seen on the.5 mile PSE owned portion of the White River-South Tacoma line. The thermal rating of this line can be increased from 75C to 100C. For the case with the Frederickson II project modeled, there were no additional network upgrades required. See attached Diagrams 1 4 showing the existing system, the system with just the Frederickson II improvements, and the proposed interconnection with and without Frederickson II. Depending on the status of Frederickson II (where applicable) and PSE s Frederickson generation, actual flows on the proposed interconnection varied including situations where power flowed from the 115kV system to the 230kV system with all lines in service. Seasonal loading and variations in flows on the Raver-Paul 500 kv transmission line also impacted flow levels. The maximum base case (all lines in service) flow from the to system was 132 MVA under light summer export conditions with PSE Frederickson and Frederickson II on line (Table 5). The maximum base case flow from the to system was 236 MVA under heavy winter import conditions with PSE Frederickson and Frederickson II off line (Table 9). In most other cases the addition of the interconnection, which provides another source to PSE s Pierce County system, is beneficial to line loading and voltage support on PSE s system. This new source relieves loading on PSE s White River 230/ transformers (up to 17%) and the network in the Frederickson area as well as the 230/ transformers serving Thurstan County at PSE s Tono substation (up to 23%) and BPA s Olympia substation (up to 18%). Some existing overloads were found in the area which were relatively insensitive to the proposed interconnection. These were on the White River Lea Hill line (via Sherwood Tap) and the Krain Corner Stevenson 55 kv line. These should be addressed independently of the generation interconnection. Study Results: Attached Result Tables: With Frederickson II: Tables 1 through 6: Seasonal Import and Export Branch Violations comparing the existing system, the existing system with the Frederickson II improvements, and the existing system with the Frederickson II improvements and the proposed interconnection for all three Frederickson generation plants (PSE Frederickson, Frederickson I, Frederickson II) on line. Page 5

6 Tables 7 through 12: Seasonal Import and Export Branch Violations comparing the existing system, the existing system with the Frederickson II improvements, and the existing system with the Frederickson II improvements and the proposed interconnection with the PSE Frederickson and Frederickson II generation plants off line. Without Frederickson II: Tables 13 through 18: Seasonal Import and Export Branch Violations comparing the existing system, the existing system with the proposed interconnection, the existing system with the proposed interconnection and the reconductor of the PSE Frederickson- Gravelly Lake line with both Frederickson generation plants (PSE Frederickson, Frederickson I) on line. Tables 19 through 24: Seasonal Import and Export Branch Violations comparing the existing system, the existing system with the proposed interconnection, the existing system with the proposed interconnection and the reconductor of the PSE Frederickson- Gravelly Lake line with PSE Frederickson off line. Page 6

7 COSTS Transmission costs for improvements to interconnect the proposed 150 MW of Frederickson I generation at PSE Frederickson include the following. Interconnection Costs independent of Frederickson II: ($ x1000) Frederickson I, extend the bus and install a breaker 1,000 Frederickson I to PSE Frederickson, install 1 mile cable 3,000 PSE Frederickson Substation, install 230/ transformer and breaker 5,000 PSE Frederickson Substation, install bus section breaker 600 Total $ 9,600 Additional Network Upgrade Costs with no Frederickson II: PSE Frederickson-Gravelly Lake line, reconductor 16.2 miles to Bittern 4,800 PSE White River-South Tacoma line, increase rating on.5 mile line from 75C to 100C 100 Total $ 4,900 All costs are estimates. Final costs may vary significantly from these estimates. Page 7

8 Diagram 1: Existing Frederickson Area Transmission System Transformer PSE White River North TCL Cowlitz Circuit Breaker Cable Termination BPA N. Tacoma To BPA Covington BPA S. Tacoma To BPA Chehalis Frederickson I PSE Alderton BPA Olympia PSE Gravelly Lk To Krain Corner 55 kv PSE Frederickson PSE St Clair To Tono To Krain Corner PSE Blumaer PSE Yelm PSE Electron Hts 55 kv

9 Diagram 2: Proposed Frederickson II Transmission System Transformer Circuit Breaker Cable Termination PSE White River North New Construction TCL Cowlitz Reconductor Line BPA N. Tacoma To BPA Covington BPA S. Tacoma To BPA Chehalis Frederickson I PSE Alderton 250 MW PSE Woodland Frederickson II BPA Olympia PSE Gravelly Lk 300 MW To Krain Corner 55 kv PSE Frederickson 150 MW PSE St Clair To Tono To Krain Corner PSE Blumaer PSE Yelm PSE Electron Hts 55 kv

10 Diagram 3: Proposed Frederickson I Transmission System With Frederickson II Transformer Circuit Breaker Cable Termination PSE White River North New Construction TCL Cowlitz Reconductor Line BPA N. Tacoma To BPA Covington BPA S. Tacoma To BPA Chehalis Frederickson I PSE Alderton 250 MW PSE Woodland Frederickson II BPA Olympia PSE Gravelly Lk 300 MW To Krain Corner 55 kv PSE Frederickson 150 MW PSE St Clair To Tono To Krain Corner PSE Blumaer PSE Yelm PSE Electron Hts 55 kv

11 Diagram 4: Proposed Frederickson I Transmission System Without Frederickson II Transformer Circuit Breaker Cable Termination New Construction PSE White River North TCL Cowlitz Reconductor Line BPA N. Tacoma To BPA Covington BPA S. Tacoma To BPA Chehalis Frederickson I PSE Alderton 250 MW BPA Olympia PSE Gravelly Lk To Krain Corner 55 kv PSE Frederickson 150 MW PSE St Clair To Tono To Krain Corner PSE Blumaer PSE Yelm PSE Electron Hts 55 kv

12 Table 1 - HS05 Import Branch Violations: PSE FDX and FDX II On 05HS3AP: IMPORT 2850, 1244/650/125, RAVER-PAUL = 1650MW, FDX I=250MW HS OP CASE: BPA G1 AND G2 IN SERVICE Branches with MVA flow more than 95.0 % of nominal rating Base system:fdxi=250, PSEFDX=149 FDXII Upgrades:FDXI=250, FDXII=300, PSEFDX=149 FDXII Upgrds & FDX TFR:FDXI=250, FDXII=300, PSEFDX=149 ** Base Case ** FREDRKST 230 FREDRICK TR BUS WRV S 115 CEDARHST 115 EDGEWOOD LN BUS WRV S 115 EDGEWOOD 115 WHITE RV LN DC WOO-FRS & ALD-FRS 115 FREDRICK 115 TILCM TP LN DC WOO-FRS & ALD-FRS 115 TILCM TP 115 GRAVTAP LN CRW PAUL-ALSTON 1 & 2 COSMOPLS 115 ABERDEEN LN CRW PAUL-ALSTON 1 & 2 CHEHALIS 230 LONGVW T LN CRW PAUL-ALSTON 1 & 2 CHEHALIS 230 LONGVW T LN CRW PAUL-ALSTON 1 & 2 COSMOPLS 115 RAYMOND LN CRW PAUL-ALSTON 1 & 2 HOLCOMB 115 RAYMOND LN CRW PAUL-ALSTON 1 & 2 HOLCOMB 115 VALLEY T LN BKF RAVER-PAUL & CENT G2 KAPOWSIN 115 ELECTHTS LN BKF RAVER-PAUL & CENT G2 LACEY 115 TANGLEWD LN BKF RAVER-PAUL & CENT G2 LONGMR T 115 YELM LN BKF RAVER-PAUL & CENT G2 FREDRICK 115 TILCM TP LN BKF RAVER-PAUL & CENT G2 TILCM TP 115 GRAVELLY LN BKF RAVER-PAUL & CENT G2 OLYMPIA 230 TACOMA S LN Table 1 05HS_imp_Table_1650_FDX2_PSEFDXon.xls

13 Table 2 - LS05 Import Branch Violations: PSE FDX and FDX II On 05LS2BP: IMPORT 2850, 1244/650/125, RAVER-PAUL = 1650MW, FDX I=250MW LS OP CASE: BPA G1 AND G2 IN SERVICE Branches with MVA flow more than 95.0 % of nominal rating Base system:fdxi=250, PSEFDX=149 Alt 1e:FDXI=250, FDXII=300, PSEFDX=149 Alt 1e & FDX TFR:FDXI=250, FDXII=300, PSEFDX=149 ** Base Case ** FREDRKST 230 FREDRICK TR DC WOO-FRS & ALD-FRS 115 TILCM TP 115 FREDRICK LN DC WOO-FRS & ALD-FRS 115 TILCM TP 115 GRAVTAP LN CRW PAUL-ALSTON 1 & 2 CHEHALIS 230 LONGVW T LN CRW PAUL-ALSTON 1 & 2 CHEHALIS 230 LONGVW T LN CRW PAUL-ALSTON 1 & 2 RAYMOND 115 COSMOPLS LN CRW PAUL-ALSTON 1 & 2 HOLCOMB 115 RAYMOND LN CRW PAUL-ALSTON 1 & 2 HOLCOMB 115 VALLEY T LN BKF RAVER-PAUL & CENT G2 TILCM TP 115 FREDRICK LN BKF RAVER-PAUL & CENT G2 GRAVELLY 115 TILCM TP LN BKF RAVER-PAUL & CENT G2 OLY VAIL 115 BLUMAER LN BKF RAVER-PAUL & CENT G2 LONGMR T 115 OLY VAIL LN BKF RAVER-PAUL & CENT G2 YELM 115 LONGMR T LN Table 2 05LS_imp_1650_FDX2_PSEFDXon.xls Mon: monzonepsregion-

14 Table 3 - HW05 Import Branch Violations: PSE FDX and FDX II On 05HW3A: IMPORT 2850, 1244/650/125, RAVER-PAUL = 1376MW, FDX I=250MW HW OP CASE: BPA G1 AND G2 IN SERVICE Branches with MVA flow more than 95.0 % of nominal rating Base system:fdxi=250, PSEFDX=160 Alt 1e:FDXI=250, FDXII=300, PSEFDX=160 Alt 1e & FDX TFR:FDXI=250, FDXII=300, PSEFDX=160 ** Base Case ** FREDRKST 230 FREDRICK TR BUS BERRYDALE 115 BONNEYLK 115 WHITE RV LN BUS WRV N 115 PIPE LK 115 BERRYDAL LN BUS WRV S 115 EDGEWOOD 115 WHITE RV LN BUS KRN CRN 115 LK.TAPPS57.5 WHITE RV LN BKF RAVER-PAUL & CENT G2 KAPOWSIN 115 ELECTHTS LN BERRYDAL 115 PIPE LK WHITE RV 115 BONNEYLK LN KRAINCOR57.5 STEVNSON WILKNSON57.5 ELECTHTS LN KRAINCOR57.5 KRAINCOR LK.TAPPS57.5 WHITE RV LN BONNEYLK 115 WHITE RV PIPE LK 115 BERRYDAL LN Table 3 05HW_imp_FDX2_PSEFDXon.xls

15 Table 4 - HS05 Export Branch Violations: PSE FDX and FDX II On 05HS3AP: EXPORT 2000, 378/650/125, FDX I=250MW HS OP CASE: BPA G1 AND G2 IN SERVICE Branches with MVA flow more than 95.0 % of nominal rating Base system:fdxi=250, PSEFDX=149 Alt 1e:FDXI=250, FDXII=300, PSEFDX=149 Alt 1e & FDX TFR:FDXI=250, FDXII=300, PSEFDX=149 ** Base Case ** FREDRKST 230 FREDRICK TR BUS MAP VL S 230 MSTREET 115 ELLINGTP LN BUS MAP VL S 230 ELLINGTP 115 SHERWD T LN BUS MAP VL S 230 WHITE RV 115 SHERWD T LN BUS TAL S 230 WHITE RV 115 SHERWD T LN DC WOO-FRS & ALD-FRS 115 ORTING 115 ELECTHTS LN DC WOO-FRS & ALD-FRS 115 FREDRICK 115 TILCM TP LN DC WOO-FRS & ALD-FRS 115 ORTING 115 RHODESLK LN MAPLE VL 230 TALBOT S WHITE RV 115 SHERWD T LN Table 4 05HS_exp_FDX2_PSEFDXon.xls

16 Table 5 - LS05 Export Branch Violations: PSE FDX and FDX II On 05LS2BP: EXPORT 2000, 467/650/125, FDX I=250MW LS OP CASE: BPA G1 AND G2 IN SERVICE Branches with MVA flow more than 95.0 % of nominal rating Base system:fdxi=250, PSEFDX=149 Alt 1e:FDXI=250, FDXII=300, PSEFDX=149 Alt 1e & FDX TFR:FDXI=250, FDXII=300, PSEFDX=149 ** Base Case ** FREDRKST 230 FREDRICK TR BUS WDLND 115 HEMLOCK 115 ALDERTON LN BUS WDLND 115 SW28TIE 115 FREDRICK LN BUS WDLND 115 HEMLOCK 115 MERIDTAP LN BUS WDLND 115 SW28TIE 115 MERIDTAP LN DC WOO-FRS & ALD-FRS 115 ORTING 115 ELECTHTS LN DC WOO-FRS & ALD-FRS 115 ORTING 115 RHODESLK LN DC WOO-FRS & ALD-FRS 115 RHODESLK 115 WR-KCTAP LN FREDRICK 115 WOODLNDP HEMLOCK 115 ALDERTON LN FREDRICK 115 WOODLNDP SW28TIE 115 FREDRICK LN FREDRICK 115 WOODLNDP HEMLOCK 115 MERIDTAP LN FREDRICK 115 WOODLNDP SW28TIE 115 MERIDTAP LN Table 5 05LS_exp_FDX2_PSEFDXon.xls

17 Table 6 - HW05 Export Branch Violations: PSE FDX and FDX II On 05HW: EXPORT 1700/300, 854/650/125, FDX I=250MW HW OP CASE: BPA G1 AND G2 IN SERVICE Branches with MVA flow more than 95.0 % of nominal rating Base system:fdxi=250, PSEFDX=149 Alt 1e:FDXI=250, FDXII=300, PSEFDX=149 Alt 1e & FDX TFR:FDXI=250, FDXII=300, PSEFDX=149 ** Base Case ** FREDRKST 230 FREDRICK TR BUS MAP VL S 230 MSTREET 115 ELLINGTP LN BUS MAP VL S 230 ELLINGTP 115 SHERWD T LN BUS MAP VL S 230 WHITE RV 115 SHERWD T LN BUS MAP VL S 230 TALBOT 115 TALBOT N TR BUS TAL S 230 ELLINGTP 115 MSTREET LN BUS TAL S 230 ELLINGTP 115 SHERWD T LN BUS TAL S 230 WHITE RV 115 SHERWD T LN BUS TAL S 230 TALBOT 115 TALBOT N TR TFR BER WHITE RV 115 SHERWD T LN TFR WRV 2 WHITE RV 115 WHITE RV TR OLYMPIA 115 OLYMPIA OLYMPIA 230 OLYMPIA TR KRAINCOR57.5 STEVNSON ELECTHTS57.5 WILKNSON LN MAPLE VL 230 TALBOT S ELLINGTP 115 MSTREET LN MAPLE VL 230 TALBOT S ELLINGTP 115 SHERWD T LN MAPLE VL 230 TALBOT S WHITE RV 115 SHERWD T LN MAPLE VL 230 TALBOT S TALBOT 115 TALBOT N TR Table 6 05HW_exp_FDX2_PSEFDXon.xls

18 Table 7 - HS05 Import Branch Violations: PSE FDX and FDX II Off 05HS3AP: IMPORT 2850, 1244/650/125, RAVER-PAUL = 1650MW, FDX I=250MW HS OP CASE: BPA G1 AND G2 IN SERVICE Branches with MVA flow more than 95.0 % of nominal rating Base system:fdxii=0, PSEFDX=0 Alt 1e:FDXI=250, FDXII=0, PSEFDX=0 Alt 1e & FDX TFR:FDXI=250, FDXII=0, PSEFDX=0 ** Base Case ** FREDRKST 230 FREDRICK TR BUS WRV N 115 GARDELLA 115 ALDERTON LN BUS WRV N 115 WHITE RV 115 GARDELLA LN BUS WRV S 115 EDGEWOOD 115 CEDARHST LN BUS WRV S 115 STEWART 115 CEDARHST LN BUS WRV S 115 EDGEWOOD 115 WHITE RV LN CRW PAUL-ALSTON 1 & 2 COSMOPLS 115 ABERDEEN LN CRW PAUL-ALSTON 1 & 2 CHEHALIS 230 LONGVW T LN CRW PAUL-ALSTON 1 & 2 CHEHALIS 230 LONGVW T LN CRW PAUL-ALSTON 1 & 2 COSMOPLS 115 RAYMOND LN CRW PAUL-ALSTON 1 & 2 HOLCOMB 115 RAYMOND LN CRW PAUL-ALSTON 1 & 2 HOLCOMB 115 VALLEY T LN BKF RAVER-PAUL & CENT G2 GARDELLA 115 ALDERTON LN BKF RAVER-PAUL & CENT G2 COULEE&1 300 COULEE LN BKF RAVER-PAUL & CENT G2 COULEE&1 300 COULEE& LN BKF RAVER-PAUL & CENT G2 COULEE&4 300 OLYMPIA LN BKF RAVER-PAUL & CENT G2 TACOMA S 230 OLYMPIA LN BKF RAVER-PAUL & CENT G2 TACOMA&1 230 WHITE RV LN BKF RAVER-PAUL & CENT G2 RHODESLK 115 WR-KCTAP LN BKF RAVER-PAUL & CENT G2 WHITE RV 115 BONNEYLK LN BKF RAVER-PAUL & CENT G2 WHITE RV 115 GARDELLA LN SL RAVER-PAUL WHITE RV 115 GARDELLA LN CHEHALIS 115 CHEHALIS COSMOPLS 115 RAYMOND LN CHEHALIS 115 PE ELL COSMOPLS 115 RAYMOND LN HOLCOMB 115 PE ELL COSMOPLS 115 RAYMOND LN CHEHALIS 230 LONGVW T CHEHALIS 230 LONGVW T LN Table 7 05HS_imp_Table_1650_FDX2_PSEFDXoff.xls

19 CEDARHST 115 EDGEWOOD GARDELLA 115 ALDERTON LN CEDARHST 115 EDGEWOOD WHITE RV 115 GARDELLA LN CEDARHST 115 STEWART WHITE RV 115 GARDELLA LN FRUTLAND 115 WOODLDSW WHITE RV 115 GARDELLA LN PIONEER 115 SUMNER GARDELLA 115 ALDERTON LN PIONEER 115 SUMNER WHITE RV 115 GARDELLA LN PIONEER 115 WOODLNDP GARDELLA 115 ALDERTON LN PIONEER 115 WOODLNDP WHITE RV 115 GARDELLA LN WHITE RV 115 EDGEWOOD GARDELLA 115 ALDERTON LN WHITE RV 115 EDGEWOOD WHITE RV 115 GARDELLA LN WHITE RV 115 SUMNER GARDELLA 115 ALDERTON LN WHITE RV 115 SUMNER WHITE RV 115 GARDELLA LN WOODLDSW 115 WOODLNDP WHITE RV 115 GARDELLA LN Table 7 05HS_imp_Table_1650_FDX2_PSEFDXoff.xls

20 Table 8 - LS05 Import Branch Violations: PSE FDX and FDX II Off 05LS2BP: IMPORT 2850, 1244/650/125, RAVER-PAUL = 1650MW, FDX I=250MW LS OP CASE: BPA G1 AND G2 IN SERVICE Branches with MVA flow more than 95.0 % of nominal rating Base system:fdxi=250, PSEFDX=0 Alt 1e:FDXI=250, FDXII=0, PSEFDX=0 Alt 1e & FDX TFR:FDXI=250, FDXII=0, PSEFDX=0 ** Base Case ** FREDRKST 230 FREDRICK TR BUS WRV S 115 CEDARHST 115 EDGEWOOD LN BUS WRV S 115 WHITE RV 115 EDGEWOOD LN CRW PAUL-ALSTON 1 & 2 CHEHALIS 230 LONGVW T LN CRW PAUL-ALSTON 1 & 2 CHEHALIS 230 LONGVW T LN CRW PAUL-ALSTON 1 & 2 RAYMOND 115 COSMOPLS LN CRW PAUL-ALSTON 1 & 2 HOLCOMB 115 RAYMOND LN CRW PAUL-ALSTON 1 & 2 HOLCOMB 115 VALLEY T LN BKF RAVER-PAUL & CENT G2 TACOMA S 230 OLYMPIA LN Table 8 05LS_imp_1650_FDX2_PSEFDXoff.xls Mon: monzonepsregion-

21 Table 9 - HW05 Import Branch Violations: PSE FDX and FDX II Off 05HW3A: IMPORT 2850, 1244/650/125, RAVER-PAUL = 1411 MW, FDX I=250MW HW OP CASE: BPA G1 AND G2 IN SERVICE Branches with MVA flow more than 95.0 % of nominal rating Base system:fdxi=250, PSEFDX=0 Alt 1e:FDXI=250, FDXII=0, PSEFDX=0 Alt 1e & FDX TFR:FDXI=250, FDXII=0, PSEFDX=0 ** Base Case ** FREDRKST 230 FREDRICK TR BUS BERRYDALE 115 WR-KCTAP 115 BONNEYLK LN BUS BERRYDALE 115 WHITE RV 115 BONNEYLK LN BUS WRV N 115 PIPE LK 115 BERRYDAL LN BUS WRV N 115 GARDELLA 115 WHITE RV LN BUS WRV S 115 CEDARHST 115 EDGEWOOD LN BUS WRV S 115 KRAINCOR57.5 KRAINCOR TR BUS WRV S 115 EDGEWOOD 115 WHITE RV LN BUS ALDERTON 115 WHITE RV 115 BONNEYLK LN BUS BPA OLY 115 WHITE RV 115 BONNEYLK LN BUS KRN CRN 115 LK.TAPPS57.5 WHITE RV LN TFR WRV 1 WHITE RV 115 WHITE RV TR TFR WRV 2 WHITE RV 115 WHITE RV TR BKF RAVER-PAUL & CENT G2 WHITE RV 115 BONNEYLK LN SL RAVER-PAUL WHITE RV 115 BONNEYLK LN BERRYDAL 115 PIPE LK WR-KCTAP 115 BONNEYLK LN BERRYDAL 115 PIPE LK WHITE RV 115 BONNEYLK LN KRAINCOR57.5 STEVNSON WILKNSON57.5 ELECTHTS LN KRAINCOR57.5 KRAINCOR LK.TAPPS57.5 WHITE RV LN OLYMPIA 115 OLYMPIA OLYMPIA 115 OLYMPIA TR ALDERTON 115 HEMLOCK WHITE RV 115 BONNEYLK LN BONNEYLK 115 WR-KCTAP PIPE LK 115 BERRYDAL LN WHITE RV57.5 WHITE RV KRAINCOR57.5 KRAINCOR TR BONNEYLK 115 WHITE RV PIPE LK 115 BERRYDAL LN Table 9 05HW_imp_FDX2_PSEFDXoff.xls

22 Table 10 - HS05 Export Branch Violations: PSE FDX and FDX II Off 05HS3AP: EXPORT 2000, 378/650/125, FDX I=250MW HS OP CASE: BPA G1 AND G2 IN SERVICE Branches with MVA flow more than 95.0 % of nominal rating Base system:fdxi=250, PSEFDX=0 Alt 1e:FDXI=250, FDXII=0, PSEFDX=0 Alt 1e & FDX TFR:FDXI=250, FDXII=0, PSEFDX=0 ** Base Case ** FREDRKST 230 FREDRICK TR BUS WRV S 115 CEDARHST 115 EDGEWOOD LN BUS WRV S 115 EDGEWOOD 115 WHITE RV LN Table 10 05HS_exp_FDX2_PSEFDXoff.xls

23 Table 11 - LS05 Export Branch Violations: PSE FDX and FDX II Off 05LS2BP: EXPORT 2000, 467/650/125, FDX I=250MW LS OP CASE: BPA G1 AND G2 IN SERVICE Branches with MVA flow more than 95.0 % of nominal rating Base system:fdxi=250, PSEFDX=0 Alt 1e:FDXI=250, FDXII=0, PSEFDX=0 Alt 1e & FDX TFR:FDXI=250, FDXII=0, PSEFDX=0 ** Base Case ** FREDRKST 230 FREDRICK TR Table 11 05LS_exp_FDX2_PSEFDXoff.xls

24 Table 12 - HW05 Export Branch Violations: PSE FDX and FDX II Off 05HW: EXPORT 1700/300, 854/650/125, FDX I=250MW HW OP CASE: BPA G1 AND G2 IN SERVICE Branches with MVA flow more than 95.0 % of nominal rating Base system:fdxi=250, PSEFDX=0 Alt 1e:FDXI=250, FDXII=0, PSEFDX=0 Alt 1e & FDX TFR:FDXI=250, FDXII=0, PSEFDX=0 ** Base Case ** FREDRKST 230 FREDRICK TR BUS MAP VL S 230 ELLINGTP 115 MSTREET LN BUS MAP VL S 230 ELLINGTP 115 SHERWD T LN BUS MAP VL S 230 WHITE RV 115 SHERWD T LN BUS MAP VL S 230 TALBOT N 230 TALBOT TR BUS TAL S 230 ELLINGTP 115 MSTREET LN BUS TAL S 230 ELLINGTP 115 SHERWD T LN BUS TAL S 230 WHITE RV 115 SHERWD T LN BUS TAL S 230 TALBOT 115 TALBOT N TR BUS BERYDL 115 WHITE RV 115 BONNEYLK LN BUS WRV N 230 WHITE RV 115 WHITE RV TR BKR WRV S 115 EDGEWOOD 115 CEDARHST LN BKR WRV S 115 EDGEWOOD 115 WHITE RV LN BUS BPA OLY 115 WHITE RV 115 BONNEYLK LN BUS KRN CRN 115 WHITE RV57.5 LK.TAPPS LN TFR BER WHITE RV 115 SHERWD T LN TFR WRV 1 WHITE RV 115 WHITE RV TR TFR WRV 2 WHITE RV 115 WHITE RV TR OLYMPIA 115 OLYMPIA OLYMPIA 230 OLYMPIA TR BERRYDAL 115 PIPE LK WHITE RV 115 BONNEYLK LN KRAINCOR57.5 STEVNSON ELECTHTS57.5 WILKNSON LN KRAINCOR57.5 KRAINCOR WHITE RV57.5 LK.TAPPS LN MAPLE VL 230 TALBOT S WHITE RV 115 SHERWD T LN MAPLE VL 230 TALBOT S TALBOT 115 TALBOT N TR Table 12 05HW_exp_FDX2_PSEFDXoff.xls

25 Table 13 - HS05 Import Branch Violations: PSE FDX On 05HS3AP: IMPORT 2850, 1244/650/125, RAVER-PAUL = 1650MW, FDX I=250MW HS OP CASE: BPA G1 AND G2 IN SERVICE Branches with MVA flow more than 95.0 % of nominal rating Base system:fdxi=250, PSEFDX=149 FDX 230/115kV:FDXI=250, PSEFDX=149 FDX 230/115kV TFR Alt1:FDXI=250, PSEFDX=149 ** Base Case ** FREDRKST 230 FREDRICK TR BUS WRV S 115 CEDARHST 115 EDGEWOOD LN BUS WRV S 115 EDGEWOOD 115 WHITE RV LN BUS TACOMA S 230 FREDRICK 115 TILCM TP LN BUS TACOMA S 230 TILCM TP 115 GRAVELLY LN CRW PAUL-ALSTON 1 & 2 COSMOPLS 115 ABERDEEN LN CRW PAUL-ALSTON 1 & 2 CHEHALIS 230 LONGVW T LN CRW PAUL-ALSTON 1 & 2 CHEHALIS 230 LONGVW T LN CRW PAUL-ALSTON 1 & 2 COSMOPLS 115 RAYMOND LN CRW PAUL-ALSTON 1 & 2 HOLCOMB 115 RAYMOND LN CRW PAUL-ALSTON 1 & 2 HOLCOMB 115 VALLEY T LN BKF RAVER-PAUL & CENT G2 KAPOWSIN 115 ELECTHTS LN BKF RAVER-PAUL & CENT G2 FREDRICK 115 TILCM TP LN BKF RAVER-PAUL & CENT G2 TILCM TP 115 GRAVELLY LN BKF RAVER-PAUL & CENT G2 OLYMPIA 230 TACOMA S LN BKF RAVER-PAUL & CENT G2 TACOMA&1 230 WHITE RV LN SL RAVER-PAUL FREDRICK 115 TILCM TP LN Table 13 05HS_imp_PSEFDXon_1650.xls

26 Table 14 - LS05 Import Branch Violations: PSE FDX On 05LS2BP: IMPORT 2850, 1244/650/125, RAVER-PAUL = 1650MW, FDX I=250MW LS OP CASE: BPA G1 AND G2 IN SERVICE Branches with MVA flow more than 95.0 % of nominal rating Base system:fdxi=250, PSEFDX=149 FDX 230/115kV:FDXI=250, PSEFDX=149 FDX 230/115kV TFR Alt1:FDXI=250, PSEFDX=149 ** Base Case ** FREDRKST 230 FREDRICK TR BUS TACOMA S 230 TILCM TP 115 FREDRICK LN BUS TACOMA S 230 GRAVELLY 115 TILCM TP LN CRW PAUL-ALSTON 1 & 2 CHEHALIS 230 LONGVW T LN CRW PAUL-ALSTON 1 & 2 CHEHALIS 230 LONGVW T LN CRW PAUL-ALSTON 1 & 2 RAYMOND 115 COSMOPLS LN CRW PAUL-ALSTON 1 & 2 HOLCOMB 115 RAYMOND LN BKF RAVER-PAUL & CENT G2 TILCM TP 115 FREDRICK LN BKF RAVER-PAUL & CENT G2 GRAVELLY 115 TILCM TP LN Table 14 05LS_imp_PSEFDXon_1650.xls

27 Table 15 - HW05 Import Branch Violations: PSE FDX On 05HW3A: IMPORT 2850, 1244/650/125, RAVER-PAUL = 1376MW, FDX I=250MW HW OP CASE: BPA G1 AND G2 IN SERVICE Branches with MVA flow more than 95.0 % of nominal rating Base system:fdxi=250, PSEFDX=160 FDX TFR:FDXI=250, PSEFDX=160 Alt 1 & FDX TFR:FDXI=250, PSEFDX=160 ** Base Case ** FREDRKST 230 FREDRICK TR BUS BERRYDALE 115 BONNEYLK 115 WHITE RV LN BUS WRV N 115 PIPE LK 115 BERRYDAL LN BUS WRV S 115 WHITE RV 115 EDGEWOOD LN BUS BPA OLY 115 TILCM TP 115 FREDRICK LN BUS KRN CRN 115 WHITE RV57.5 LK.TAPPS LN BKF RAVER-PAUL & CENT G2 TILCM TP 115 FREDRICK LN BKF RAVER-PAUL & CENT G2 TILCM TP 115 GRAVELLY LN BERRYDAL 115 PIPE LK WHITE RV 115 BONNEYLK LN KRAINCOR57.5 STEVNSON ELECTHTS57.5 WILKNSON LN KRAINCOR57.5 KRAINCOR WHITE RV57.5 LK.TAPPS LN BONNEYLK 115 WHITE RV PIPE LK 115 BERRYDAL LN Table 15 05HW_imp_PSEFDXon.xls

28 Table 16 - HS05 Export Branch Violations: PSE FDX On 05HS3AP: EXPORT 2000, 378/650/125, FDX I=250MW HS OP CASE: BPA G1 AND G2 IN SERVICE Branches with MVA flow more than 95.0 % of nominal rating Base system:fdxi=250, PSEFDX=149 FDX TFR:FDXI=250, PSEFDX=149 Alt 1 & FDX TFR:FDXI=250, PSEFDX=149 ** Base Case ** FREDRKST 230 FREDRICK TR Table 16 05HS_exp_2000_PSEFDXonl_GEN.xls

29 Table 17 - LS05 Export Branch Violations: PSE FDX On 05LS2BP: EXPORT 2000, 467/650/125, FDX I=250MW LS OP CASE: BPA G1 AND G2 IN SERVICE Branches with MVA flow more than 95.0 % of nominal rating Base system:fdxi=250, PSEFDX=149 FDX TFR:FDXI=250, PSEFDX=149 Alt 1 & FDX TFR:FDXI=250, PSEFDX=149 ** Base Case ** FREDRKST 230 FREDRICK TR BUS TACOMA S 230 FREDRICK 115 SW28TIE LN BUS TACOMA S 230 HEMLOCK 115 MERIDTAP LN BUS TACOMA S 230 MERIDTAP 115 SW28TIE LN FREDRKST 230 TACOMA S FREDRICK 115 SW28TIE LN FREDRKST 230 TACOMA S HEMLOCK 115 MERIDTAP LN FREDRKST 230 TACOMA S MERIDTAP 115 SW28TIE LN Table 17 05LS_exp_2000_PSEFDXon_GEN.xls

30 Table 18 - HW05 Export Branch Violations: PSE FDX On 05HW: EXPORT 1700/300, 854/650/125, FDX I=250MW HW OP CASE: BPA G1 AND G2 IN SERVICE Branches with MVA flow more than 95.0 % of nominal rating Base system:fdxi=250, PSEFDX=160 FDX TFR:FDXI=250, PSEFDX=160 Alt 1 & FDX TFR:FDXI=250, PSEFDX=160 ** Base Case ** FREDRKST 230 FREDRICK TR BUS MAP VL S 230 MSTREET 115 ELLINGTP LN BUS MAP VL S 230 ELLINGTP 115 SHERWD T LN BUS MAP VL S 230 WHITE RV 115 SHERWD T LN BUS MAP VL S 230 TALBOT 115 TALBOT N TR BUS TAL S 230 MSTREET 115 ELLINGTP LN BUS TAL S 230 ELLINGTP 115 SHERWD T LN BUS TAL S 230 WHITE RV 115 SHERWD T LN BUS TAL S 230 TALBOT 115 TALBOT N TR TFR BER WHITE RV 115 SHERWD T LN TFR WRV 2 WHITE RV 115 WHITE RV TR OLYMPIA 115 OLYMPIA OLYMPIA 230 OLYMPIA TR KRAINCOR57.5 STEVNSON ELECTHTS57.5 WILKNSON LN MAPLE VL 230 TALBOT S WHITE RV 115 SHERWD T LN MAPLE VL 230 TALBOT S TALBOT 115 TALBOT N TR Table 18 05HW_exp_2000_PSEFDXon_GEN.xls

31 Table 19 - HS05 Import Branch Violations: PSE FDX Off 05HS3AP: IMPORT 2850, 1244/650/125, RAVER-PAUL = 1650MW, FDX I=250MW HS OP CASE: BPA G1 AND G2 IN SERVICE Branches with MVA flow more than 95.0 % of nominal rating Base system:fdxi=250, PSEFDX=0 FDX 230/115kV:FDXI=250, PSEFDX=0 FDX 230/115kV TFR Alt1:FDXI=250, PSEFDX=0 ** Base Case ** FREDRKST 230 FREDRICK TR BUS WRV N 115 GARDELLA 115 ALDERTON LN BUS WRV N 115 WHITE RV 115 GARDELLA LN BUS WRV S 115 EDGEWOOD 115 CEDARHST LN BUS WRV S 115 STEWART 115 CEDARHST LN BUS WRV S 115 EDGEWOOD 115 WHITE RV LN CRW PAUL-ALSTON 1 & 2 COSMOPLS 115 ABERDEEN LN CRW PAUL-ALSTON 1 & 2 CHEHALIS 230 LONGVW T LN CRW PAUL-ALSTON 1 & 2 CHEHALIS 230 LONGVW T LN CRW PAUL-ALSTON 1 & 2 COSMOPLS 115 RAYMOND LN CRW PAUL-ALSTON 1 & 2 HOLCOMB 115 RAYMOND LN CRW PAUL-ALSTON 1 & 2 HOLCOMB 115 VALLEY T LN BKF RAVER-PAUL & CENT G2 GARDELLA 115 ALDERTON LN BKF RAVER-PAUL & CENT G2 TILCM TP 115 FREDRICK LN BKF RAVER-PAUL & CENT G2 TILCM TP 115 GRAVELLY LN BKF RAVER-PAUL & CENT G2 COULEE&1 300 COULEE LN BKF RAVER-PAUL & CENT G2 COULEE&1 300 COULEE& LN BKF RAVER-PAUL & CENT G2 COULEE&4 300 OLYMPIA LN BKF RAVER-PAUL & CENT G2 TACOMA S 230 COWLITZ LN BKF RAVER-PAUL & CENT G2 TACOMA S 230 OLYMPIA LN BKF RAVER-PAUL & CENT G2 TACOMA&1 230 WHITE RV LN BKF RAVER-PAUL & CENT G2 RHODESLK 115 WR-KCTAP LN BKF RAVER-PAUL & CENT G2 WHITE RV 115 BONNEYLK LN BKF RAVER-PAUL & CENT G2 WHITE RV 115 GARDELLA LN BKF RAVER-PAUL & CENT G2 SUMNER 115 WHITE RV LN SL RAVER-PAUL 500 WHITE RV 115 GARDELLA LN CEDARHST 115 EDGEWOOD GARDELLA 115 ALDERTON LN CEDARHST 115 EDGEWOOD WHITE RV 115 GARDELLA LN CEDARHST 115 STEWART WHITE RV 115 GARDELLA LN FRUTLAND 115 WOODLDSW WHITE RV 115 GARDELLA LN Table 19 05HS_imp_PSEFDXoff_1650.xls

32 PIONEER 115 SUMNER GARDELLA 115 ALDERTON LN PIONEER 115 SUMNER WHITE RV 115 GARDELLA LN PIONEER 115 WOODLNDP GARDELLA 115 ALDERTON LN PIONEER 115 WOODLNDP WHITE RV 115 GARDELLA LN WHITE RV 115 EDGEWOOD GARDELLA 115 ALDERTON LN WHITE RV 115 EDGEWOOD WHITE RV 115 GARDELLA LN WHITE RV 115 SUMNER GARDELLA 115 ALDERTON LN WHITE RV 115 SUMNER WHITE RV 115 GARDELLA LN WOODLDSW 115 WOODLNDP WHITE RV 115 GARDELLA LN Table 19 05HS_imp_PSEFDXoff_1650.xls

33 Table 20 - LS05 Import Branch Violations: PSE FDX Off 05LS2BP: IMPORT 2850, 1244/650/125, RAVER-PAUL = 1650MW, FDX I=250MW LS OP CASE: BPA G1 AND G2 IN SERVICE Branches with MVA flow more than 95.0 % of nominal rating Base system:fdxi=250, PSEFDX=0 FDX 230/115kV:FDXI=250, PSEFDX=0 FDX 230/115kV TFR Alt1:FDXI=250, PSEFDX=0 ** Base Case ** FREDRKST 230 FREDRICK TR BUS WRV S 115 CEDARHST 115 EDGEWOOD LN BUS WRV S 115 WHITE RV 115 EDGEWOOD LN CRW PAUL-ALSTON 1 & 2 CHEHALIS 230 LONGVW T LN CRW PAUL-ALSTON 1 & 2 CHEHALIS 230 LONGVW T LN CRW PAUL-ALSTON 1 & 2 RAYMOND 115 COSMOPLS LN CRW PAUL-ALSTON 1 & 2 HOLCOMB 115 RAYMOND LN CRW PAUL-ALSTON 1 & 2 HOLCOMB 115 VALLEY T LN BKF RAVER-PAUL & CENT G2 TACOMA S 230 OLYMPIA LN BKF RAVER-PAUL & CENT G2 TILCM TP 115 FREDRICK LN Table 20 05LS_imp_PSEFDXoff_1650.xls Mon: monzonepsregion-

34 Table 21 - HW05 Import Branch Violations: PSE FDX Off 05HW3A: IMPORT 2850, 1244/650/125, RAVER-PAUL = 1376MW, FDX I=250MW HW OP CASE: BPA G1 AND G2 IN SERVICE Branches with MVA flow more than 95.0 % of nominal rating Base system:fdxi=250, PSEFDX=0 FDX TFR:FDXI=250, PSEFDX=0 Alt 1 & FDX TFR:FDXI=250, PSEFDX=0 ** Base Case ** FREDRKST 230 FREDRICK TR BUS BERRYDALE 115 WR-KCTAP 115 BONNEYLK LN BUS BERRYDALE 115 WHITE RV 115 BONNEYLK LN BUS WRV N 115 PIPE LK 115 BERRYDAL LN BUS WRV N 115 GARDELLA 115 WHITE RV LN BUS WRV S 115 CEDARHST 115 EDGEWOOD LN BUS WRV S 115 KRAINCOR57.5 KRAINCOR TR BUS WRV S 115 EDGEWOOD 115 WHITE RV LN BUS ALDER 115 WHITE RV 115 BONNEYLK LN BUS BPA OLY 115 WHITE RV 115 BONNEYLK LN BUS KRN CRN 115 LK.TAPPS57.5 WHITE RV LN BKF RAVER-PAUL & CENT G2 WHITE RV 115 BONNEYLK LN BKF RAVER-PAUL & CENT G2 FREDRICK 115 TILCM TP LN BKF RAVER-PAUL & CENT G2 TILCM TP 115 GRAVELLY LN SL RAVER-PAUL 500 WHITE RV 115 BONNEYLK LN BERRYDAL 115 PIPE LK WR-KCTAP 115 BONNEYLK LN BERRYDAL 115 PIPE LK WHITE RV 115 BONNEYLK LN KRAINCOR57.5 STEVNSON WILKNSON57.5 ELECTHTS LN KRAINCOR57.5 KRAINCOR LK.TAPPS57.5 WHITE RV LN OLYMPIA 115 OLYMPIA OLYMPIA 115 OLYMPIA TR ALDERTON 115 HEMLOCK WHITE RV 115 BONNEYLK LN BONNEYLK 115 WR-KCTAP PIPE LK 115 BERRYDAL LN Table 21 05HW_imp_PSEFDXoff.xls

35 WHITE RV57.5 WHITE RV KRAINCOR57.5 KRAINCOR TR BONNEYLK 115 WHITE RV PIPE LK 115 BERRYDAL LN Table 21 05HW_imp_PSEFDXoff.xls

36 Table 22 - HS05 Export Branch Violations: PSE FDX Off 05HS3AP: EXPORT 2000, 378/650/125, FDX I=250MW HS OP CASE: BPA G1 AND G2 IN SERVICE Branches with MVA flow more than 95.0 % of nominal rating Base system:fdxi=250, PSEFDX=0 FDX TFR:FDXI=250, PSEFDX=0 Alt 1 & FDX TFR:FDXI=250, PSEFDX=0 ** Base Case ** FREDRKST 230 FREDRICK TR BUS WRV S 115 CEDARHST 115 EDGEWOOD LN BUS WRV S 115 EDGEWOOD 115 WHITE RV LN Table 22 05HS_exp_2000_PSEFDXoff_GEN.xls

Final System Impact Study for. Sierra Pacific Industries 31 MW Generation Project. Mount Vernon, WA. November 16, 2006

Final System Impact Study for. Sierra Pacific Industries 31 MW Generation Project. Mount Vernon, WA. November 16, 2006 Final System Impact Study for Sierra Pacific Industries 31 MW Generation Project Mount Vernon, WA November 16, 2006 Puget Sound Energy, Inc. Electric Transmission Department 1 1. Introduction On October

More information

Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers

Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers Puget Sound Area Study Team Bonneville Power Administration, Puget Sound Energy, Seattle City Light,

More information

2013 ANNUAL PROGRESS REPORT

2013 ANNUAL PROGRESS REPORT March 1, 2013 Mr. David Franklin, Chairman WECC Technical Studies Subcommittee Southern California Edison 1 Innovation Way Pomona, CA 91768-2560 Mr. Enoch Davies WECC Technical Staff 155 North 400 West,

More information

PSE Attachment K Puget Sound Area Transmission Meeting

PSE Attachment K Puget Sound Area Transmission Meeting PSE Attachment K Puget Sound Area Transmission Meeting Stephanie Lu Senior Engineer December 15, 2011 Agenda Attachment K Review Economic Studies Process PSE Planning Process and Assumptions PSE Projects

More information

Process Timeline. Area Bubbles. Legend. Problem Area that have been resolved. Recurring Areas from previous System Assessment.

Process Timeline. Area Bubbles. Legend. Problem Area that have been resolved. Recurring Areas from previous System Assessment. Process Timeline Legend Problem Area that have been resolved Recurring Areas from previous System Assessment New Areas Area Bubbles Flows Modeled for One-Year Heavy Winter Peak Conditions Base Case Conditions

More information

Update to the 2004 Puget Sound Area Study Group ( PSASG ) Report: Assessment of Puget Sound Area / Northern Intertie Curtailment Risk

Update to the 2004 Puget Sound Area Study Group ( PSASG ) Report: Assessment of Puget Sound Area / Northern Intertie Curtailment Risk Update to the 24 Puget Sound Area Study Group ( PSASG ) Report: Assessment of Puget Sound Area / Northern Intertie Curtailment Risk Chair: John Phillips, Puget Sound Energy Jerry Jackson III, Bonneville

More information

Transmission Planning. WECC 2014 Progress Report. March 14, 2014

Transmission Planning. WECC 2014 Progress Report. March 14, 2014 Transmission Planning WECC 2014 Progress Report March 14, 2014 Report Prepared By: Dennis Stevens -TPP (360) 619-6821 BPA TS TPP 2014-022 Page 1 Table of Contents 1 Introduction... 1 2 Planned Transmission

More information

Cross Cascades North Study Team Report

Cross Cascades North Study Team Report Cross Cascades North Study Team Report Acknowledgements ColumbiaGrid Members & Participants Avista Corporation Bonneville Power Administration Chelan County PUD Cowlitz County PUD Douglas County PUD Grant

More information

REDACTED. Eastside Needs Assessment Report Transmission System King County. Redacted Draft. October 2013 Puget Sound Energy

REDACTED. Eastside Needs Assessment Report Transmission System King County. Redacted Draft. October 2013 Puget Sound Energy Eastside Needs Assessment Report Transmission System King County Redacted Draft October 2013 Puget Sound Energy Report prepared by: Thomas J. Gentile, P.E. Quanta Technology Donald J. Morrow, P.E. Quanta

More information

100 MW Wind Generation Project

100 MW Wind Generation Project A subsidiary of Pinnacle West Capital Corporation 100 MW Wind Generation Project CUSTOMER FINAL Feasibility Study Results By Transmission Planning, APS December 21, 2007 Executive Summary This Feasibility

More information

THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS

THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS 2/27/2018 ELECTRIC TRANSMISSION PLANNING Table of Contents Table of Contents... 2 Executive

More information

Ten-year Plan. Figure 1 and Table 1. Each of the facilities shown in the plan is described in greater depth in the last appendix of this report.

Ten-year Plan. Figure 1 and Table 1. Each of the facilities shown in the plan is described in greater depth in the last appendix of this report. Ten-year Plan As a result of the analysis completed for the 2009 System Assessment, the follow-up sensitivity studies, analysis completed by the study teams, and individual planning participant studies,

More information

Transmission Planning Report

Transmission Planning Report Transmission Planning Report Board of Directors Meeting December 15, 2010 1 Overview Study Team Reports Puget Sound Area Study Team Northern Mid-Columbia Study Team Cross Cascades Study Team Centralia

More information

Interconnection Feasibility Study Report GIP-222-FEAS-R3

Interconnection Feasibility Study Report GIP-222-FEAS-R3 Interconnection Feasibility Study Report GIP-222-FEAS-R3 System Interconnection Request #222 48 MW Steam Generating Facility Pictou County (53N) 2010 07 30 Control Centre Operations Nova Scotia Power Inc.

More information

2013 ANNUAL PROGRESS REPORT

2013 ANNUAL PROGRESS REPORT Bonneville Power Administration 2013 ANNUAL PROGRESS REPORT Report Prepared By: Dennis Stevens Bonneville Power Administration Transmission Planning TPP/OPP-3 (360) 619-6821 BPA TS TPP 2013-018 Page 1

More information

Interconnection Feasibility Study Report GIP-023-FEAS-R1. Generator Interconnection Request # MW Wind Generating Facility Inverness (L6549), NS

Interconnection Feasibility Study Report GIP-023-FEAS-R1. Generator Interconnection Request # MW Wind Generating Facility Inverness (L6549), NS Interconnection Feasibility Study Report GIP-023-FEAS-R1 Generator Interconnection Request # 23 100 MW Wind Generating Facility Inverness (L6549), NS February 16, 2006 Control Centre Operations Nova Scotia

More information

Feasibility Study Report

Feasibility Study Report Generator Interconnection Request Feasibility Study Report For: Customer --- Service Location: Rutherford County Total Output: 79.2 MW Commercial Operation Date: 9/1/2014 In-Service Date (if given): 9/1/2014

More information

Gateway South Transmission Project

Gateway South Transmission Project Phase 1 Comprehensive Progress Report Volume 1 - Technical Report Report Prepared by PacifiCorp Transmission Planning Department November 21, 2008 WECC1-V4 Phase 1 Comprehensive Progress Report Executive

More information

Falcon-Midway 115 kv Line Uprate Project Report

Falcon-Midway 115 kv Line Uprate Project Report Falcon-Midway 115 kv Line Uprate Project Report 12/1/2008 1 Background The function of this project is to uprate the 26.7 miles of Tri-State s 115 kv line between Midway and Falcon substations from 50

More information

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI Executive Summary Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI-2003-2 Xcel Energy Transmission Planning January 2004 This Interconnection Feasibility

More information

Interconnection System Impact Study Report Request # GI

Interconnection System Impact Study Report Request # GI Executive Summary Interconnection System Impact Study Report Request # GI-2008-23 34 MW Solar Generation Ranch at Hartsel, Colorado Public Service Company of Colorado Transmission Planning August 19, 2010

More information

North Oregon Coast Area Study. Adam Lint

North Oregon Coast Area Study. Adam Lint North Oregon Coast Area Study Adam Lint PAGE 2 North Oregon Coast System Overview - Clatsop Study Covers: Transmission Switching Stations (Clatsop District): Astoria Lewis and Clark 115 kv Distribution

More information

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation Prepared by: Entergy Services, Inc. T & D Planning L-ENT-17A 639 Loyola Avenue New Orleans, LA 70113 Rev Issue Date

More information

MILLIGAN SOLAR PROJECT

MILLIGAN SOLAR PROJECT February 16, 2009 Page 1 of 18 A subsidiary of Pinnacle West Capital Corporation MILLIGAN SOLAR PROJECT FINAL Feasibility Study Report APS Contract 52115 Prepared by: Arizona Public Service Company Transmission

More information

Consulting Agreement Study. Completed for Transmission Customer

Consulting Agreement Study. Completed for Transmission Customer Completed for Transmission Customer Proposed Resource & Transmission Carbon County, MT & 230 kv Transmission in North Wyoming August 2016 Table of Contents 1.0 Description... 1 2.0 Overall Assumptions...

More information

Interconnection Feasibility Study Report GIP-084-FEAS-R2

Interconnection Feasibility Study Report GIP-084-FEAS-R2 Interconnection Feasibility Study Report GIP-084-FEAS-R2 System Interconnection Request #84 50 MW Wind Generating Facility Pictou County (L-7004) August 17, 2007 Control Centre Operations Nova Scotia Power

More information

Generation Interconnection Request Queue = Denotes Inactive Requests

Generation Interconnection Request Queue = Denotes Inactive Requests Generation Interconnection Request Queue = Denotes Inactive Requests Queue Position Request Date Request Status Service Type ( or ER) Location Max Summer output Max Winter output Interconnection Facility

More information

Interconnection Feasibility Study Report GIP-226-FEAS-R3

Interconnection Feasibility Study Report GIP-226-FEAS-R3 Interconnection Feasibility Study Report GIP-226-FEAS-R3 System Interconnection Request #226 70 MW Wind Generating Facility Kings County (L-6013) 2010 07 21 Control Centre Operations Nova Scotia Power

More information

EL PASO ELECTRIC COMPANY (EPE) FACILITIES STUDY FOR PROPOSED HVDC TERMINAL INTERCONNECTION AT NEW ARTESIA 345 KV BUS

EL PASO ELECTRIC COMPANY (EPE) FACILITIES STUDY FOR PROPOSED HVDC TERMINAL INTERCONNECTION AT NEW ARTESIA 345 KV BUS EL PASO ELECTRIC COMPANY (EPE) FACILITIES STUDY FOR PROPOSED HVDC TERMINAL INTERCONNECTION AT NEW ARTESIA 345 KV BUS El Paso Electric Company System Operations Department System Planning Section May 2004

More information

Transmission Improvements Plan for 575 MW Network Service Request Wansley CC 7 Generation Facility (OASIS # ) Georgia Transmission Corporation

Transmission Improvements Plan for 575 MW Network Service Request Wansley CC 7 Generation Facility (OASIS # ) Georgia Transmission Corporation Transmission Improvements Plan for 575 MW Network Service Request CC 7 Generation Facility (OASIS # 143556) Georgia Transmission Corporation November 11, 2010 CC7 TIP 11-11-2010 (2).docx PROBLEM STATEMENT

More information

Transmission Coordination and Planning Committee 2014 Q4 Stakeholder Meeting. December 18, 2014

Transmission Coordination and Planning Committee 2014 Q4 Stakeholder Meeting. December 18, 2014 Transmission Coordination and Planning Committee 2014 Q4 Stakeholder Meeting December 18, 2014 Agenda 1. Introductions 2. TCPC Policies 3. BHCE Planning Department Update 4. 2014 LTP Study Results 5. Stakeholder

More information

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC OCTOBER 22, 2014 Emera Maine s Local System Plan Bangor Hydro District Needs Assessment/Potential Solutions Local Planning Advisory Committee Meeting E M i R t ti Emera Maine Representative: Jeffrey Fenn,

More information

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC OCTOBER 22, 2015 Emera Maine s Local System Plan Bangor Hydro District Needs Assessment/Potential Solutions Local Planning Advisory Committee Meeting Emera Maine Representative: Jeffrey Fenn, P.E., SGC

More information

System Impact Study Report

System Impact Study Report Report For: NTE Carolinas II, LLC ( Customer ) Queue #: 42432-01 Service Location: Rockingham County, NC Total Output: 477 MW (summer) / 540 MW (winter) Commercial Operation Date: 12/1/2020 42432-01 SIS

More information

Feasibility Study Report

Feasibility Study Report Report For: Fresh Air Energy II, LLC ( Customer ) Queue #: Service Location: Chester County, SC Total Output Requested By Customer: 74.5 MW Commercial Operation Date Requested By Customer: 1/7/2019 Feasibility

More information

Feasibility Study. Shaw Environmental, Inc. 12MW Landfill Gas Generation Interconnection. J.E.D. Solid Waste Management Facility. Holopaw Substation

Feasibility Study. Shaw Environmental, Inc. 12MW Landfill Gas Generation Interconnection. J.E.D. Solid Waste Management Facility. Holopaw Substation Feasibility Study Shaw Environmental, Inc. 12MW Landfill Gas Generation Interconnection J.E.D. Solid Waste Management Facility Holopaw Substation September 2013 1 of 12 Table of Contents GENERAL... 3 SHORT

More information

Local Transmission Plan. October 11, 2013 Revised August 25, 2014

Local Transmission Plan. October 11, 2013 Revised August 25, 2014 Local Transmission Plan October 11, 2013 Revised August 25, 2014 2 Central Hudson s System Zone G: Majority of Central Hudson s load Zone E: One small distribution substation Interconnections with Consolidated

More information

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015 No. Comment Submitted ISO Response Date Q&A Posted 1 Will the ISO consider proposals that are not within the impedance range specified? Yes. However, the benefits estimated and studies performed by the

More information

Interconnection Feasibility Study Report GIP-157-FEAS-R2

Interconnection Feasibility Study Report GIP-157-FEAS-R2 Interconnection Feasibility Study Report GIP-157-FEAS-R2 System Interconnection Request #157 100.5 MW Wind Generating Facility Guysborough County (L-6515) 2009 09 14 Control Centre Operations Nova Scotia

More information

Generation Interconnection Feasibility Study For XXXXXXXXXXXXXXXXXXXXXX MW generator at new Western Refinary Substation

Generation Interconnection Feasibility Study For XXXXXXXXXXXXXXXXXXXXXX MW generator at new Western Refinary Substation Generation Interconnection Feasibility Study For XXXXXXXXXXXXXXXXXXXXXX 131-250 MW generator at new Western Refinary Substation System Planning Section April, 2005 TABLE OF CONTENT 1 EXECUTIVE SUMMARY

More information

ATTACHMENT Y STUDY REPORT

ATTACHMENT Y STUDY REPORT Attachment Y Study Edwards Unit 1: 90 MW Coal Retirement December 31, 2012 ATTACHMENT Y STUDY REPORT 7/5/2013 PUBLIC / EXECUTIVE SUMMARY MISO received an Attachment Y Notification of Potential Generation

More information

Stability Study for the Mt. Olive Hartburg 500 kv Line

Stability Study for the Mt. Olive Hartburg 500 kv Line Stability Study for the Mt. Olive Hartburg 500 kv Line Peng Yu Sharma Kolluri Transmission & Distribution Planning Group Energy Delivery Organization Entergy Sevices Inc April, 2011 New Orleans, LA 1.

More information

SPS Planning Criteria and Study Methodology

SPS Planning Criteria and Study Methodology SPS Planning Criteria and Study Methodology SPS subscribes to the Southwest Power Pool ("SPP") Reliability Criteria, which incorporates compliance with the appropriate North American Electric Reliability

More information

Interconnection Feasibility Study Report GIP-IR373-FEAS-R1

Interconnection Feasibility Study Report GIP-IR373-FEAS-R1 Interconnection Feasibility Study Report GIP-IR373-FEAS-R1 Generator Interconnection Request 373 109.5 MW Wind Generating Facility South Canoe Lake, NS Mar. 2, 2012 Control Centre Operations Nova Scotia

More information

CUSTOMER/ TWIN ARROWS PROJECT

CUSTOMER/ TWIN ARROWS PROJECT A subsidiary of Pinnacle West Capital Corporation CUSTOMER/ TWIN ARROWS PROJECT V1 Facility Study Report APS Contract 52149 Prepared by: Arizona Public Service Company Transmission & Distribution Asset

More information

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY California Independent System Operator Memorandum To: ISO Operations (MRTU) Committee From: Armando J. Perez, Director of Grid Planning cc: ISO Board of Governors ISO Officers Date: April 29, 2005 Re:

More information

Service Requested 150 MW, Firm. Table ES.1: Summary Details for TSR #

Service Requested 150 MW, Firm. Table ES.1: Summary Details for TSR # Executive Summary Firm point to point transmission service has been requested by Transmission Service Request (TSR) #75669514, under the SaskPower Open Access Transmission Tariff (OATT). The TSR consists

More information

Rogers Road to Clubhouse 230kV New Transmission Line April 1, 2016

Rogers Road to Clubhouse 230kV New Transmission Line April 1, 2016 New Transmission Line April 1, 2016 The enclosed information is proprietary to PSE&G and is provided solely for your use. It should not be copied, reproduced, or shared with others without PSE&G s prior

More information

Supplemental Report on the NCTPC Collaborative Transmission Plan

Supplemental Report on the NCTPC Collaborative Transmission Plan Supplemental Report on the NCTPC 2007-2017 Collaborative Transmission Plan May 16, 2008 1 Table of Contents I. Executive Summary...1 II. Richmond-Fort Bragg Woodruff Street 230 kv Line...2 II.A. Need for

More information

PJM Generator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study September 2008

PJM Generator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study September 2008 PJM enerator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study 504744 September 2008 PJM Interconnection 2008. All rights reserved R60 Robison Park-Convoy 345kV Impact Study eneral

More information

Large Load Serving Study Report for La Plata Electric Association, Inc. Alternatives. Addendum. San Juan Major Project

Large Load Serving Study Report for La Plata Electric Association, Inc. Alternatives. Addendum. San Juan Major Project Large Load Serving Study Report for La Plata Electric Association, Inc. Alternatives Addendum San Juan Major Project Tri-State Generation and Transmission Association Power System Planning December, 2008

More information

Feasibility Study Report

Feasibility Study Report Report For: Orion Renewable Resources LLC ( Customer ) Queue #: Service Location: Rockingham County, NC Total Output Requested By Customer: 100 MW Commercial Operation Date Requested By Customer: 11/1/2019

More information

Project #94. Generation Interconnection System Impact Study Report Revision

Project #94. Generation Interconnection System Impact Study Report Revision Project #94 Generation Interconnection System Impact Study Report Revision October 2, 2009 Electric Transmission Planning Table of Contents Table of Contents...2 Executive Summary...3 Energy Resource Interconnection

More information

2015 System Assessment

2015 System Assessment 2015 System Assessment Copies of this report are available from: ColumbiaGrid 8338 NE Alderwood Rd Suite 140 Portland, OR 97220 503.943.4940 www.columbiagrid.org July 2015 Photos provided by: Bonneville

More information

Facilities Study for Alberta to US Available Transfer Capability

Facilities Study for Alberta to US Available Transfer Capability Facilities Study for Alberta to US Available Transfer Capability Report No: NPP2002-05 June 3, 2002 System Planning & Grid Operations, Transmission Line of Business Engineering Services Executive Summary

More information

Connection Engineering Study Report for AUC Application: AESO Project # 1674

Connection Engineering Study Report for AUC Application: AESO Project # 1674 APPENDIX A CONNECTION ASSESSMENT Connection Engineering Study Report for AUC Application: AESO Project # 1674 Executive Summary Project Overview FortisAlberta Inc. (FortisAlberta) submitted a System

More information

Sub-Regional RTEP Committee PJM South

Sub-Regional RTEP Committee PJM South Sub-Regional RTEP Committee PJM South SRRTEP - South December 1, 2016 www.pjm.com PJM Baseline Project B2185 Update Problem: NERC Category B Violation (DVP Analysis) The 2017 summer base case indicates

More information

Project #148. Generation Interconnection System Impact Study Report

Project #148. Generation Interconnection System Impact Study Report Project #148 Generation Interconnection System Impact Study Report June 05, 2012 Electric Transmission Planning Table of Contents Table of Contents... 2 Executive Summary... 3 Energy Resource Interconnection

More information

Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting

Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting BHE Wyoming Q4 Stakeholder Meeting November 17, 2016 @ 1:00PM MT Black Hills Energy Service Center 409 Deadwood Avenue, Rapid

More information

2013 Biennial Transmission Expansion Plan

2013 Biennial Transmission Expansion Plan 2013 Biennial Transmission Expansion Plan Copies of this report are available from: ColumbiaGrid 8338 NE Alderwood Rd Suite 140 Portland, OR 97220 503.943.4940 www.columbiagrid.org February 2013 Photos

More information

XXXXXXXXXXXXXXXXXXXXXXXXX TRANSMISSION/GENERATION FEASIBILITY STUDY FATAL FLAW AND FEASIBILITY ANALYSIS

XXXXXXXXXXXXXXXXXXXXXXXXX TRANSMISSION/GENERATION FEASIBILITY STUDY FATAL FLAW AND FEASIBILITY ANALYSIS XXXXXXXXXXXXXXXXXXXXXXXXX TRANSMISSION/GENERATION FEASIBILITY STUDY FATAL FLAW AND FEASIBILITY ANALYSIS System Operations Department System Planning Section June 2001 TABLE OF CONTENTS 1.0 Executive Summary...Page

More information

Avista BPA, IPCO, PAC Project identified as long term need. Project Committed under Network Open Season. Plan of Service Determined

Avista BPA, IPCO, PAC Project identified as long term need. Project Committed under Network Open Season. Plan of Service Determined Name Region In Ten Year Plan? by Link to More Detail Stage Commitment Need/Driver & Other A1 Bronx-Cabinet 115 kv Rebuild Northeastern Yes 5, 10 ColGrid SA Rebuild/reconductor Bronx-Cabinet 115 kv Avista

More information

New Jersey State Report

New Jersey State Report New Jersey State Report July 2017 Table of Contents 1. Planning Generation Portfolio Analysis Transmission Analysis Load Forecast 2. Markets Capacity Market Results Market Analysis 3. Operations Emissions

More information

Illinois State Report

Illinois State Report July 2016 Illinois State Report Table of Contents 1. Planning Generation Portfolio Analysis Transmission Analysis Load Forecast Gas Pipeline Information 2 Executive Summary (July 2016) Existing Capacity:

More information

Outer Metro 115 kv Transmission Development Study. (Scott Co, Carver Co and Hennepin Co)

Outer Metro 115 kv Transmission Development Study. (Scott Co, Carver Co and Hennepin Co) Outer Metro 115 kv Transmission Development Study. (Scott Co, Carver Co and Hennepin Co) Participants: Great River Energy Xcel Energy Inc. Executive Summary This study is done to address various load serving

More information

Generation Interconnection Impact Study Results for Eurus Energy America Corporation s Eurus Combine Hills I, LLC Power Project.

Generation Interconnection Impact Study Results for Eurus Energy America Corporation s Eurus Combine Hills I, LLC Power Project. Generation Interconnection Impact Study Results for Eurus Energy America Corporation s Eurus Combine Hills I, LLC Power Project April 23, 2003 Introduction Eurus originally requested an interconnection

More information

Interconnection Feasibility Study Report Request # GI Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado

Interconnection Feasibility Study Report Request # GI Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado Executive Summary Interconnection Feasibility Study Report Request # GI-2016-6 Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado Public Service Company of Colorado Transmission

More information

Sub Regional RTEP Committee South

Sub Regional RTEP Committee South Sub Regional RTEP Committee South December 18, 2017 Baseline Reliability and Supplemental Projects Second Review 2 Date Project Last Presented: 10/30/2017 SRRTEP Problem Statement: DOM End of Life Criteria

More information

XXXXXXXXXXXXXXXXXXXX GENERATION INTERCONNECTION FACILITIES STUDY SHORT CIRCUIT ANALYSIS FOR PROPOSED GENERATION AT NEWMAN 115 kv BUS

XXXXXXXXXXXXXXXXXXXX GENERATION INTERCONNECTION FACILITIES STUDY SHORT CIRCUIT ANALYSIS FOR PROPOSED GENERATION AT NEWMAN 115 kv BUS XXXXXXXXXXXXXXXXXXXX GENERATION INTERCONNECTION FACILITIES STUDY SHORT CIRCUIT ANALYSIS FOR PROPOSED GENERATION AT NEWMAN 115 kv BUS El Paso Electric Company System Operations Department System Planning

More information

Interconnection System Impact Study Final Report February 19, 2018

Interconnection System Impact Study Final Report February 19, 2018 Interconnection System Impact Study Final Report February 19, 2018 Generator Interconnection Request No. TI-17-0225 248.4 MW (Alternate Project Output of 217.35 MW) Wind Energy Generating Facility In Goshen

More information

PG&E s 2012 Request Window Proposals

PG&E s 2012 Request Window Proposals 1 PG&E s 2012 Request Window Proposals Central Valley Patrick Tan Transmission System Planning PG&E September 27, 2012 Transmission Projects Overview 2 Projects Seeking CAISO Approval Pease 115/60 kv Transformer

More information

Maddox Creek to Southwest Lima 345kV New Transmission Line November 15, 2016

Maddox Creek to Southwest Lima 345kV New Transmission Line November 15, 2016 New Transmission Line November 15, 2016 The enclosed information is proprietary to PSE&G and is provided solely for your use. It should not be copied, reproduced, or shared with others without PSE&G s

More information

OCTOBER 17, Emera Maine Representative: Jeffrey Fenn, P.E., LR/SGC Engineering LLC

OCTOBER 17, Emera Maine Representative: Jeffrey Fenn, P.E., LR/SGC Engineering LLC OCTOBER 17, 2018 Emera Maine s Local System Plan Bangor Hydro District Needs Assessment/Potential Solutions Local Planning Advisory Committee Meeting Emera Maine Representative: Jeffrey Fenn, P.E., LR/SGC

More information

ABB POWER SYSTEMS CONSULTING

ABB POWER SYSTEMS CONSULTING ABB POWER SYSTEMS CONSULTING DOMINION VIRGINIA POWER Offshore Wind Interconnection Study 2011-E7406-1 R1 Summary Report Prepared for: DOMINION VIRGINIA POWER Report No.: 2011-E7406-1 R1 Date: 29 February

More information

LLC FACILITIES STUDY TRANSMISSION SERVICE REQUEST

LLC FACILITIES STUDY TRANSMISSION SERVICE REQUEST Cleco Power LLC FACILITIES STUDY TRANSMISSION SERVICE REQUEST OASIS 71956063 0 Rev Issue Date Description of Revision Table of Contents 1. Purpose...3 2. System Impact Study Conclusions...3 2.1 The Pineville

More information

Sub Regional RTEP Committee - Southern. August 19, 2011

Sub Regional RTEP Committee - Southern. August 19, 2011 Sub Regional RTEP Committee - Southern August 19, 2011 2011 RTEP Analysis Summary 2010 2015 Project Updates 2016 Analysis NERC Category A, B NERC Category C (N-1-1 in progress) Load Deliverability Generator

More information

Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood

Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood Prepared for: SCE&G Fossil/Hydro June 30, 2008 Prepared by: SCE&G Transmission Planning Table of Contents

More information

INTERCONNECTION FACILITIES STUDY REPORT

INTERCONNECTION FACILITIES STUDY REPORT INTERCONNECTION FACILITIES STUDY REPORT Interconnection Request No. TI-12-0217 8 MW Hydropower Generating Facility POI on the Dallas Creek to South Canal 115kV Line in SW Colorado FINAL REPORT February

More information

XXXX. Knob Hill Wind Farm Project. Interconnection System Impact Study

XXXX. Knob Hill Wind Farm Project. Interconnection System Impact Study XXXX Knob Hill Wind Farm Project Report No. August 2010 British Columbia Hydro and Power Authority British Columbia Hydro and Power Authority 2010. All rights reserved.. DISCLAIMER OF WARRANTY, LIMITATION

More information

Q0044 interconnection at

Q0044 interconnection at Generation Interconnection Feasibility Study Report for Q0044 interconnection at Utah County Utah on PacifiCorp s Transmission System (138 kv Transmission System) September 15, 2004 Page 1 1.0 Description

More information

PJM Generator Interconnection R81 Emilie (Fords Mill) MW Impact Study Re-Study

PJM Generator Interconnection R81 Emilie (Fords Mill) MW Impact Study Re-Study PJM Generator Interconnection R81 Emilie (Fords Mill) 100.9 MW Impact Study Re-Study August 2008 DMS # 498781 General Queue R81 Emilie (Fords Mills) is a Fairless Energy, LLC request to obtain an additional

More information

Dunvegan Hydroelectric Project. For Glacier Power Limited. Preliminary Interconnection Study

Dunvegan Hydroelectric Project. For Glacier Power Limited. Preliminary Interconnection Study ` Dunvegan Hydroelectric Project For Glacier Power Limited Preliminary Interconnection Study Prepared by Pung Toy, P. Eng. and Ata Rehman, P. Eng. September 24, 2004 Table of Contents Table of Contents...

More information

Western Area Power Administration Sierra Nevada Region

Western Area Power Administration Sierra Nevada Region Western Area Power Administration Sierra Nevada Region 2014 Annual Ten-Year Transmission Plan Assessment Report November 20, 2014 For information or questions regarding this Transmission Assessment Report,

More information

TOLTEC POWER PARTNERSHIP TOLTEC POWER PROJECT INTERCONNECTION STUDY SYSTEM IMPACT STUDY

TOLTEC POWER PARTNERSHIP TOLTEC POWER PROJECT INTERCONNECTION STUDY SYSTEM IMPACT STUDY TOLTEC POWER PARTNERSHIP TOLTEC POWER PROJECT INTERCONNECTION STUDY SYSTEM IMPACT STUDY January 7, 2002 Prepared by Jorge Chacon (Consultant) Tucson Electric Power Company Ed Beck ii EXECUTIVE SUMMARY

More information

DFO STATEMENT OF NEED REPORT

DFO STATEMENT OF NEED REPORT APPENDIX E DFO STATEMENT OF NEED REPORT Table of Contents 1.0 Executive Summary... 1 2.0 Description of the Area... 2 2.1 Geographic Study Area... 2 2.2 2016 System Configuration... 2 3.0 Area Loading

More information

Western Area Power Administration Sierra Nevada Region

Western Area Power Administration Sierra Nevada Region Western Area Power Administration Sierra Nevada Region 2013 Annual Ten-Year Transmission Plan Assessment Report December 1, 2013 For information or questions regarding this Transmission Assessment Report,

More information

Attached is Idaho Power s 2013 WECC Annual Progress Report. Please contact me if you have any questions.

Attached is Idaho Power s 2013 WECC Annual Progress Report. Please contact me if you have any questions. March 8, 2013 David Franklin Chair, Technical Studies Subcommittee Southern California Edison 1 Innovation Way Pomona, CA 91768 MHanson@idahopower.com (208) 388-2253 Enoch Davies Western Electricity Coordinating

More information

Manitoba Hydro Generation Interconnection Exploratory Study Notice September 28, 2006

Manitoba Hydro Generation Interconnection Exploratory Study Notice September 28, 2006 Manitoba Hydro Generation Interconnection Exploratory Study Notice September 28, 2006 As per the Manitoba Hydro Open Access Interconnection Tariff, the Transmission Owner has contracted TransGrid Solutions

More information

Public Review Draft. June 30, System Assessment

Public Review Draft. June 30, System Assessment Public Review Draft June 30, 2009 2009 System Assessment 2 Copies of this report are available from: ColumbiaGrid 8338 NE Alderwood Rd Suite 140 Portland, OR 97220 503.943.4940 www.columbiagrid.org Spring/Summer

More information

Interconnection Feasibility Study Report Request # GI

Interconnection Feasibility Study Report Request # GI A. Executive Summary Interconnection Feasibility Study Report Request # GI-2011-04 587 MW Combined Cycle 2x1 Generators Cherokee Station, Denver, Colorado Public Service Company of Colorado Transmission

More information

Final Draft Report. Assessment Summary. Hydro One Networks Inc. Longlac TS: Refurbish 115/44 kv, 25/33/ General Description

Final Draft Report. Assessment Summary. Hydro One Networks Inc. Longlac TS: Refurbish 115/44 kv, 25/33/ General Description Final Draft Report Assessment Summary Hydro One Networks Inc. : Refurbish 115/44 kv, 25/33/42 MVA DESN Station CAA ID Number: 2007-EX360 1.0 General Description Hydro One is proposing to replace the existing

More information

Verde Transmission, LLC. Verde Project. System Impact Study Report

Verde Transmission, LLC. Verde Project. System Impact Study Report Verde Transmission, LLC Verde Project System Impact Study Report March 2017 Prepared by: Public Service Company of New Mexico Foreword This report was prepared for Verde Transmission, LLC by the PNM Transmission/

More information

DETOUR GOLD CORPORATION SYSTEM IMPACT ASSESSMENT FOR DETOUR LAKE PROJECT

DETOUR GOLD CORPORATION SYSTEM IMPACT ASSESSMENT FOR DETOUR LAKE PROJECT DETOUR GOLD CORPORATION SYSTEM IMPACT ASSESSMENT FOR DETOUR LAKE PROJECT Report No.: RP-160388-02-141-0001 CAA ID No. 2010-380 Rev. 01 Prepared by: AMEC Americas Limited Energy and Mining Division Power

More information

Sub Regional RTEP Committee Western Region ATSI

Sub Regional RTEP Committee Western Region ATSI Sub Regional RTEP Committee Western Region ATSI February 20, 2019 1 ATSI Needs Stakeholders must submit any comments within 10 days of this meeting in order to provide time necessary to consider these

More information

Interconnection Feasibility Study Report GIP-046-FEAS-R2

Interconnection Feasibility Study Report GIP-046-FEAS-R2 Interconnection Feasibility Study Report GIP-046-FEAS-R2 Generator Interconnection Request #46 32 MW Wind Generating Facility Colchester (L-6513), NS August 17, 2007 Control Centre Operations Nova Scotia

More information

Transmission Planning & Engineering P.O. Box MS 3259 Phoenix, Arizona

Transmission Planning & Engineering P.O. Box MS 3259 Phoenix, Arizona Transmission Planning & Engineering P.O. Box 53933 MS 3259 Phoenix, Arizona 85072-3933 March 9, 2016 Mr. Philip Augustin Chair, WECC Technical Studies Subcommittee Mr. Enoch Davies WECC Technical Staff

More information

Operational Planning Study Report. RTA to BCH transfer limit updates For Kitimat 4 Capacitor Banks

Operational Planning Study Report. RTA to BCH transfer limit updates For Kitimat 4 Capacitor Banks Operational Planning Study Report RTA to BCH transfer limit updates For Kitimat 4 Capacitor Banks Report No. T&S Planning 2013-062 British Columbia Hydro and Power Authority British Columbia Hydro and

More information

Sub Regional RTEP Committee South

Sub Regional RTEP Committee South Sub Regional RTEP Committee South October 30, 2017 Baseline Reliability and Supplemental Projects First Preliminary Review 2 Dominion: Baseline Violation 115 kv Line #43 Staunton to Harrisonburg End of

More information

TransWest Express Project

TransWest Express Project TransWest Express Project Phase One--Feasibility Study Final Study Report November 2006 A subsidiary of Pinnacle West Capital Corporation Executive Summary On October 21, 2005 Arizona Public Service Company

More information

The Long-Range Transmission Plan

The Long-Range Transmission Plan The Long-Range Transmission Plan 2015 2025 Matt Koenig Presentation to ESPWG / TPAS October 29 th, 2015 Long-Range Transmission Plan Driver of the Plan is to maintain local reliability 10-year planning

More information