1 Whale s Tooth Parking Lot, Railyard & Island Sand New Bedford Massachusetts Clean Energy Center 2017 Massachusetts Offshore Wind Ports & Infrastructure Assessment 152
2 Whale s Tooth Parking Lot, Railyard & Island Sand Existing Site Information Item Existing Conditions at Site Ownership Acreage Nautical Distance to Leading Edge of Offshore Wind Areas Public: City of New Bedford, Harbor Development Commission 32 acres (13 ha) 35 nmi (65 km) Quayside Length 250 ft (76.2 m) Berth Depth Channel Controlling Depth Load Bearing Capacity On-Site Power Infrastructure and Buildings Key Environmental Information Overhead Restrictions 24 ft (7.3m) MLLW 26.5 ft (8 m) MLLW <2,500 psf (12.2 t/m 2 ) paved upland areas <1,500 psf (<7.32 t/m 2 ) quayside None None Railyard has an environmental cap. Subsurface excavation requires Soil Management Plan. Route 6 Swing Bridge: no vertical restriction when open; 95 ft (29 m) H 153 Massachusetts Clean Energy Center 2017 Massachusetts Offshore Wind Ports & Infrastructure Assessment
3 Whale s Tooth Parking Lot, Railyard & Island Sand New Bedford Whale s Tooth, Railyard, Island Sand: This site has been identified as a potential future railroad station associated with the proposed South Coast Rail project, which is being considered by the Commonwealth of Massachusetts to develop commuter rail service between Boston and the South Coast of Massachusetts. If these properties are used for an expanded rail operation as planned, they will not be available to support offshore wind activities. If there is room to accommodate offshore wind activities at this site, it is thought that it would function best as a transfer and storage site for small components and as an adjunct quayside (through Island Sand) for the neighboring manufacturing sites in the Port of New Bedford. Innovation-based Solutions: Use of inter-site transport systems such as a SPMTs and barge system to move components around to other sites that are better suited for actual manufacturing; and Conduct small-footprint manufacturing and conduct storage at the site. Massachusetts Clean Energy Center 2017 Massachusetts Offshore Wind Ports & Infrastructure Assessment 154
4 155 Massachusetts Clean Energy Center 2017 Massachusetts Offshore Wind Ports & Infrastructure Assessment
5 Massachusetts Clean Energy Center 2017 Massachusetts Offshore Wind Ports & Infrastructure Assessment 156
6 157 Massachusetts Clean Energy Center 2017 Massachusetts Offshore Wind Ports & Infrastructure Assessment
7 Massachusetts Clean Energy Center 2017 Massachusetts Offshore Wind Ports & Infrastructure Assessment 158
8 159 Massachusetts Clean Energy Center 2017 Massachusetts Offshore Wind Ports & Infrastructure Assessment
9 Massachusetts Clean Energy Center 2017 Massachusetts Offshore Wind Ports & Infrastructure Assessment 160
10 Whale s Tooth Parking Lot, Railyard & Island Sand Reuse Card Reuse Case Statistics Summary Table: Whale s Tooth & New Bedford Railyard, New Bedford Reuse Case Acreage Used for this Reuse Case Pre-production Storage Area Post-production Laydown Area # Buildings (see Notes for details) Ground Bearing Strength Quay Length Berth Depth at Quayside Notes: acres hectares acres hectares acres hectares psf t/m 2 feet meters feet meters Secondary Steel: , Bldg. 1: Fabrication / Manufacturing (600' x 200' / 183m x 61m). Storage Yard: , Bldg. 1: Small Storage Building (150' x 80' / 46m x 24m). *Quayside improvements required and included in reuse scenario unless noted in site card table. **Storage Yard Case: Most of useable area is open storage. 161 Massachusetts Clean Energy Center 2017 Massachusetts Offshore Wind Ports & Infrastructure Assessment
11 Whale s Tooth Parking Lot, Railyard & Island Sand Cost Summary Scenario Name Item Redevelopment Classification Reuse Costs Individual Costs Total Costs Reuse Case 1A Secondary Steel Low $7,244,000 $3,509,000 $10,753,000 Reuse Case 2A Storage Medium $7,473,000 $2,345,000 $9,819,000 Massachusetts Clean Energy Center 2017 Massachusetts Offshore Wind Ports & Infrastructure Assessment 162
12 Whale s Tooth / New Bedford Railyard Redevelopment Cost Details Redevelopment Classification Item Unit Cost Units Quantity Amount Low Medium Level and Regrade $2 SQFT 410,000 $820,000 Subtotal $6,037,000 Add 1' DGA $38 TN 22,778 $866,000 20% $1,207,000 Place 1' DGA $8 CYD 15,185 $121,000 Total $7,244,000 Install Signaling and traffic controls $100,000 LS 1 $100,000 Travel lane design to accomodate RR crossing $20,000 LS 1 $20,000 Travel lane: install heavy duty paving (600' x 50') $8 SQFT 30,000 $240,000 Install ramp to accomodate grade change (225' x 50') $8 SQFT $90,000 Part time travel lane, heavy duty paving (60,000) $8 SQFT $480,000 Move, reinforce utilities $50,000 LS 1 $50,000 Level and Regrade, south area $2 SQFT 250,000 $500,000 Install heavy duty paving $8 SQFT 250,000 $2,000,000 Repair quayside/bulkhead 250' x 60' $3,000 LF 250 $750,000 Level and Regrade $2 SQFT 410,000 $820,000 Subtotal $6,228,000 Add 2' DGA $38 TN 45,556 $1,731,000 20% $1,246,000 Place 2' DGA $8 CYD 30,370 $243,000 Total $7,473,000 Install Signaling and traffic controls $100,000 LS 1 $100,000 Travel lane design to accomodate RR crossing $20,000 LS 1 $20,000 Travel lane: install heavy duty paving (600' x 50') $8 SQFT 30,000 $240,000 Install ramp to accomodate grade change (225' x 50') $8 SQFT 11,250 $90,000 Part time travel lane, heavy duty paving (60,000 SQFT) $8 SQFT 60,000 $480,000 Move, reinforce utilities $50,000 LS 1 $50,000 Level and Regrade, south area $2 SQFT 250,000 $500,000 Add 2' DGA $38 TN 27,778 $1,056,000 Place 2' DGA $8 CYD 18,519 $148,000 Repair quayside/bulkhead (250' x 60') $3,000 LS 250 $750,000 Whale s Tooth / New Bedford Railyard Reuse Cost Details Redevelopment Classification Item Unit Cost Units Quantity Amount Secondary Steel Fabrication Building 600 x 200 $16 SQFT 120,000 $1,944,000 Subtotal $2,924,000 Appurtenances, Doors, Electrical etc. $200,000 per unit 1 $200,000 20% $585,000 Install crane pad (60' x 60') $780,000 per unit 1 $780,000 Total $3,509,000 Storage Storage Building (150' x 80') $16 SQFT 12,000 $194,000 Subtotal $1,954,000 Appurtenances, Doors, Electrical etc. $200,000 per unit 1 $200,000 20% $391,000 Install 2 crane pads (60' x 60') $780,000 per unit 2 $1,560,000 Total $2,345,000 Massachusetts Clean Energy Center 2017 Massachusetts Offshore Wind Ports & Infrastructure Assessment 370
13 Whale s Tooth / New Bedford Railyard Total Cost Details Scenario Name Sce Item Redevelopment Classification Redevelopment Costs Reuse Costs Total Costs Reuse Case 1A Secondary Steel Low $7,244,000 $3,509,000 $10,753,000 Reuse Case 2A Storage Medium $7,473,000 $2,345,000 $9,819,000 Massachusetts Clean Energy Center 2017 Massachusetts Offshore Wind Ports & Infrastructure Assessment 371
North Terminal New Bedford. Massachusetts Clean Energy Center 2017 Massachusetts Offshore Wind Ports & Infrastructure Assessment
North Terminal New Bedford Massachusetts Clean Energy Center 2017 Massachusetts Offshore Wind Ports & Infrastructure Assessment 163 North Terminal Existing Site Information Item Existing Conditions at
More informationParcels M and M-1 (7 & 8) South Boston. Massachusetts Clean Energy Center 2017 Massachusetts Offshore Wind Ports & Infrastructure Assessment
Parcels M and M-1 (7 & 8) South Boston Massachusetts Clean Energy Center 2017 Massachusetts Offshore Wind Ports & Infrastructure Assessment 271 Parcels M and M-1 (7 & 8) Existing Site Information Item
More informationSPECIAL LEGISLATIVE COMMISSION TO STUDY POTENTIAL ECONOMIC OPPORTUNITIES IN THE DEVELOPMENT OF PORT FACILITIES IN THE STATE OF RHODE ISLAND
Quonset Update April 7, 2011 SPECIAL LEGISLATIVE COMMISSION TO STUDY POTENTIAL ECONOMIC OPPORTUNITIES IN THE DEVELOPMENT OF PORT FACILITIES IN THE STATE OF RHODE ISLAND QUONSET BUSINESS PARK 8,800 Jobs
More informationAppendix G Aquilla Lake Pool Rise Recreational Resources
Appendix G Aquilla Lake Pool Rise Recreational Resources 1. INTRODUCTION The purpose of this appendix is to document the impacts of a 2.5 ft (Alternative A), 4.5 ft (Alternative B), and 6.5 ft. (Alternative
More informationQuonset Business Park
Quonset Business Park September 28, 2010 Katherine Trapani Planning Manager Quonset Development Corporation Quonset Business Park 3,160 Total Acres 168 Companies 8,842 Jobs QDC Input into URI Study Water
More informationSUMMARY 3-0 BRADFORD ALBANY TOWNSHIP. 1 OF 1 P:\8417\ Bridge A\AT\Albany A.MDB 7/21/2014 7:32:31 AM REVISION NO COUNTY
7/18/2014 - UCTURE REVISION NO REVISIONS DATE BY DIICT COUNTY ROUTE SECTION SHEET - SEE SPECIAL PROVISIONS SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP T-410 4 OF 8 QUANTITY ITEM NO UNIT DESCRIPTION DESIGN NO
More informationJoint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment
Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment For NPCC Governmental / Regulatory Affairs Advisory Group May 21 st, 2009 ON IT Executive Summary Engineers from Con
More informationVirginia Offshore Wind Port Readiness Study
Virginia Offshore Wind Port Readiness Study Briefing to Virginia Offshore Wind Development Authority Richmond, VA 23 April 2015 George Hagerman VCERC Director of Research Virginia Tech Advanced Research
More informationMidtown Corridor Alternatives Analysis Capital Cost Estimation Methodology and Assumptions
Midtown Corridor Alternatives Analysis Capital Cost Estimation Methodology and Assumptions 1/3/2014 Prepared by the SRF Consulting Group Team for Table of Contents Introduction... 1 Alternatives Overview...
More informationDepartment of Planning and Land Services Development Engineering GATES PERMITTING, DESIGN & INSPECTION GUIDE
Pierce County Department of Planning and Land Services Development Engineering GATES PERMITTING, DESIGN & INSPECTION GUIDE Effective Date: 12/2/2002 Revision Date: 02/19/2010 Introduction The purpose of
More information827 Sans Souci Parkway Wilkes-Barre, Pennsylvania 18706
For Sale or Lease 225,000± SF Industrial Building 827 Sans Souci Parkway Wilkes-Barre, Pennsylvania 18706 Approximate Property Boundary 28.79± Acre Site Property Description Size: The main production facility
More informationTable C-1. POLB Middle Harbor Redevelopment Construction/Demolition Activities and Noise Data
Appendix C Noise Table C-1. POLB Middle Harbor Redevelopment Construction/Demolition Activities and Noise Data Activity Equipment HP Wharf Demolition Landside (A) Wharf Demolition Marine (B) Sheet Pile
More informationLocation Concept Plan Amendment Recommendation Approved 2011 Concept Plan
Valley Line West LRT Concept Plan Recommended Amendments Lewis Farms LRT Terminus Site Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan Lewis Farms LRT terminus site, 87 Avenue/West
More informationMULTI-PURPOSE FLOATING PLATFORMS
MULTI-PURPOSE FLOATING PLATFORMS INDUSTRIAL APPLICATIONS Port Construction Port Expansion Offshore Storage Offshore Drilling Support Marine Offloading Facilities Breakwaters www.truenorthservicesllc.com
More informationPPA s Port Infrastructure Development Plans Seminars on Improving Transport Maritime Safety and Development of Port Infrastructure
PPA s Port Infrastructure Development Plans Seminars on Improving Transport Maritime Safety and Development of Port Infrastructure BANGKOK, THAILAND December 19-21, 2016 PPA is a public corporate body
More informationAra Tūhono Pūhoi to Wellsford Road of National Significance: Pūhoi to Warkworth Section
Ara Tūhono Pūhoi to Wellsford Road of National Significance: Pūhoi to Warkworth Section Adding the Perspective of the Heavy Haulage Industry PRESENTATION OVERVIEW *General support for the RoNS project
More informationCT Consultants, Inc.
Cost 1 202 AHRESTY DRIVE REMOVAL 1 LS 2 202 EXISTING SILO DEMOLISHED AND REMOVED, AS PER PLAN 1 LS 3 203 EXCAVATION (NOT INCLUDING UNDERCUT) 2,372 CY 4 203 EMBANKMENT 3,306 CY 5 204 PROOF ROLLING 10 HRS
More informationCOST ESTIMATES: Curb-Running
COST ESTIMATES: Curb-Running PROJECT FEASIBILITY COST ESTIMATE SUMMARY Geary Bus Rapid Transit Study Alternative: Side Lane (Curb Running) Date: 4/12/07 Percent Cost Total Project Capital Outlay I- Roadway
More informationMountainland Association of Governments SPRINGVILLE-SPANISH FORK AREA TRANSPORTATION STUDY APRIL 2012
Mountainland Association of Governments SPRINGVILLE-SPANISH FORK AREA TRANSPORTATION STUDY APRIL 2012 PLANNING FOR OUR FUTURE Planners with the Mountainland Association of Governments (MAG) have evaluated
More informationMiddle Harbor Project: Draft EIS/EIR LA Chamber of Commerce June 26, 2008, APM Maersk HQ Pier 400
Middle Harbor Project: Draft EIS/EIR LA Chamber of Commerce June 26, 2008, APM Maersk HQ Pier 400 Richard D. Cameron Director of Environmental Planning, Port of Long Beach CEQA/NEPA Process Summary The
More informationTHE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO
THE CORNERSTONE APARTMENTS SITUATED AT N/E/C OF STAUDERMAN AVENUE AND FOREST AVENUE VILLAGE OF LYNBROOK NASSAU COUNTY, NEW YORK TRAFFIC IMPACT STUDY R&M PROJECT NO. 2018-089 September 2018 50 Elm Street,
More informationTable Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily
5.8 TRAFFIC, ACCESS, AND CIRCULATION This section describes existing traffic conditions in the project area; summarizes applicable regulations; and analyzes the potential traffic, access, and circulation
More informationSTATE OF NEW HAMPSHIRE Inter-Department Communication
STATE OF NEW HAMPSHIRE Inter-Department Communication DATE: February 11, 2010 AT (OFFICE): NHPUC FROM: Torn Frantz Director, Electric Division SUBJECT: DE 09-277: Petition by Public Service Company of
More informationPort Everglades Master Plan Update 2006 Tenant Workshop. August 24, 2007
Tenant Workshop 20 Year Vision Plan presented at Workshop I 2 Tenant / Stakeholder Input 20 Year Vision Plan 3 Northport Slip Study 294 298 286 600 475 475 4 Conservation Easement Impact Map 5 Aviation
More information44
44 44 44 44 44 44 44 44 44 44 44 44 44 44 44 44 44 WETLAND IMPACTS Wetland No. 1 Approximate Station Cowardin Class 2 WESPAK-SE Wetland Type 3 Temporary Impact Area (acres) 4 Permanent
More information2701 INTERTECH DRIVE, YOUNGSTOWN, MAHONING COUNTY, INDUSTRIAL PROPERTY FOR SALE 143,789 SF on ACRES $4,300,000
2701 INTERTECH DRIVE, YOUNGSTOWN, MAHONING COUNTY, 44504 143,789 SF on 20.177 ACRES $4,300,000 BUILDING OVERVIEW PARKER HANNIFIN FACILITY GEAR PUMP DIVISION Zoning - Industrial Light Manufacturing 143,789
More informationEXCEPTION TO STANDARDS REPORT
EXCEPTION TO STANDARDS REPORT PROJECT DESCRIPTION AND NEED The project is located in Section 6, Township 23 North, Range 9 East and Section 31 Township 24 North, Range 9 East, in the Town of Stockton,
More informationLog Barging Proposal. to to get export log trucks off Tahunanui Drive & Rocks Roads
Log Barging Proposal to to get export log trucks off Tahunanui Drive & Rocks Roads Nelsust April April 2011 2011 Log Barging Proposal A study into the possibility of reducing heavy traffic through Tahunanui
More informationValve and Piping Replacements Various Facilities Deer Island Treatment Plant
Massachusetts Water Resources Authority Presentation to MWRA Board of Directors Valve and Piping Replacements Various Facilities Deer Island Treatment Plant Richard Adams Manager, Engineering Services
More informationBid Summary Still Creek Wastewater Improvements Phase III City Job No. 411-D November 21, 2013
Bid Summary Still Creek Wastewater Improvements Phase III City Job No. 411-D4-1102 November 21, 2013 Doughtie Construction Co., Elliott Construction Dudley Construction Ltd. SUBTOTAL GENERAL ITEMS : $191,713.00
More information5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES
5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES 5.1 INTRODUCTION This chapter of the TMP presents an opinion of probable cost estimates for the proposed Horizon Year roadway network improvements
More informationFranklin County Engineer's Office - Highway Design ALKIRE RD & DEMOREST RD ROUNDABOUT CR NO. 11 & CR NO. 25 Bid Tabulation
7/07/2015 Page 1 of 20 Strawser Paving Co., Inc. Shelly & Sands, Inc. Double Z Construction Co Columbus Asphalt Paving, Inc. 1595 Frank Road P.O.Box 2469 2550 Harrison Road 1196 Technology Dr Columbus,
More informationGrays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14
Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14 Hardesty & Hanover, LLC Alternative 1 Bogie Support System Alternative Based on AW Sketch of New Bridge Component
More informationTruck Traffic Impact Analysis
Truck Traffic Impact Analysis FOR Proposed Demolition Project AT 3300 Panorama Drive Morro Bay, CA Prepared for Rhine LP & CVI Group, LLC Prepared by 1998 Santa Barbara Avenue, Suite 200 San Luis Obispo,
More informationTown of Londonderry, New Hampshire NH Route 28 Western Segment Traffic Impact Fee Methodology
Town of Londonderry, New Hampshire NH Route 28 Western Segment Traffic Impact Fee Methodology Prepared by the Londonderry Community Development Department Planning & Economic Development Division Based
More informationCHAPMANVILLE, WEST VIRGINIA
AVAILABLE SPACE CHAPMANVILLE MANUFACTURING / WAREHOUSE BUILDING CHAPMANVILLE, WEST VIRGINIA LOCATION Building Address - 2871 Thunder Road Chapmanville, WV 25508 Located in City Limits - No Zoning - None
More informationALABAMA DEPARTMENT OF TRANSPORTATION DATE : 06/14/13 PAGE : VENDOR RANKING
PAGE : 001-1 VENDOR RANKING CONTRACT TIME : 09/01/13 COMPLETION DATE CONTRACT DESCRIPTION : PROJECT(S) : IM-I059(370) for constructing the Ramp Widening and Auxiliary Lane (Grade, Drain, Base, Pave and
More informationTHE PORT OF LOS ANGELES OCCUPIES 4,300 ACRES OF LAND ALONG 43 MILES OF WATERFRONT. THE PORT OF LOS ANGELES IS THE LARGEST PORT IN THE
THE PORT OF LOS ANGELES OCCUPIES 4,300 ACRES OF LAND ALONG 43 MILES OF WATERFRONT. THE PORT OF LOS ANGELES IS THE LARGEST PORT IN THE U.S. AND 13TH LARGEST WORLDWIDE. THE PORT OF LONG BEACH IS THE SECOND
More informationNOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 5/03/2013
NOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 5/03/2013 Control 6237-93-001 Project RMC - 623793001 Highway US0075 County DALLAS Ladies/Gentlemen: Attached please find an addendum on the above captioned
More informationVIRGINIA RAILWAY EXPRESS MANASSAS PARK STATION PARKING EXPANSION. Site Evaluation & Recommendation. October 18, 2016
MANASSAS PARK STATION PARKING EXPANSION Site Evaluation & Recommendation October 18, 2016 1 INFORMATION ITEM Project Overview Parking Demand Site Evaluation VRE Recommended Preferred Alternative Next Steps
More informationTransportation Highway Engineering Conference February 24, 2015
Transportation Highway Engineering Conference February 24, 2015 Today s Agenda Move Illinois status Jane Addams Memorial (I-90) Rebuilding and Widening Project Building a 21 st century corridor Incorporating
More information10/18/2010. Lampson Transi-Lift Mobile Crane: Concept, Design, and Use. Bruce A. Stemp Lampson International. John Walewski Texas A & M University
Lampson Transi-Lift Mobile Crane: Concept, Design, and Use Bruce A. Stemp Lampson International John Walewski Texas A & M University it I. Introduction II. Evolution of nuclear facility construction III.
More informationLETTER THE BARNHART S KEY TO FIT ANY LOCK PAGE 3. A Mountain Top Experience Page 2. Barnhart s Modular Lift Tower In The Motor City Page 2
A Mountain Top Experience Page 2 Barnhart s Modular Lift Tower In The Motor City Page 2 THE LIFTING LETTER 2 0 0 4 T H I R D E D I T I O N A P U B L I C A T I O N O F B A R N H A R T Barnhart s Key To
More informationChapter 8.0 PROPOSED CAPITAL IMPROVEMENT PROGRAM
Chapter 8.0 PROPOSED CAPITAL IMPROVEMENT PROGRAM This chapter presents the proposed Capital Improvement Program (CIP) for the District based on the findings of this Master Plan. The Master Plan primarily
More informationTHE PORT OF VIRGINIA
THE PORT OF VIRGINIA A CATALYST FOR COMMERCE JOHN F. REINHART, CEO AND EXECUTIVE DIRECTOR VIRGINIA PORT AUTHORITY Stewards of Tomorrow 1 OUR TERMINALS RICHMOND MARINE TERMINAL Stewards of Tomorrow 2 INDUSTRY
More informationSITE PLANS ASSISTED LIVING REDEVELOPMENT
SITE PLANS ASSISTED LIVING REDEVELOPMENT PROJECT SUMMARY TOTAL LOT AREA - 39.0 ACRES EXISTING BUILDING FOOTPRINT 48,060 S.F. PROPOSED 25,869 S.F. TOTAL BUILDING FOOTPRINT 73,929 S.F. ZONING COMPLIANCE
More informationDowntown Lee s Summit Parking Study
Downtown Lee s Summit Parking Study As part of the Downtown Lee s Summit Master Plan, a downtown parking and traffic study was completed by TranSystems Corporation in November 2003. The parking analysis
More informationMUNCIPAL WORK PROGRAMS FY 2015/ /20. MPO Transportation Improvement Program 2015/ /20 Page 9-1
MUNCIPAL PROGRAMS BELLEAIR 2000 Curb/Sidewalk 35 2001 Roadway Projects 2,500 = ; = Local Funds 35 MPO Transportation Improvement Program 2015/16 2019/20 Page 9-1 MUNCIPAL PROGRAMS BELLEAIR BEACH 3000 Resurface/curb
More informationNo Thoroughfare. Gated Private Road Ahead
No Thoroughfare Gated Private Road Ahead 1 Think: Safety and Security In our Community 2 Mainlands Secondary Entrance Barrier Gate Proposal Technology and Cost Study (as Prepared by Gate Committee on April
More informationH&W LOGISTICS BASE Technical Specifications
H&W LOGISTICS BASE The Irish Sea Projects are a substantial work volume in a relatively short period The distance from H&W to the Irish Sea planned offshore Windfarms is comparable to other ports Irish
More informationPROPOSED AMENDMENTS TO RESIDENTIAL PARKING STANDARDS
PROPOSED AMENDMENTS TO RESIDENTIAL PARKING STANDARDS To review the proposed amendments Approval of the amendments (5-3) Ogden City Planning is proposing several amendments and clarifications to the parking
More informationHarlem Avenue between 63 rd and 65 th
Harlem Avenue between 63 rd and 65 th Community Advisory Group Meeting #3 December 1, 2017 Bedford Park Public Library 1 Meeting Agenda 1. Welcome/Introductions (3 mins) 2. Project Overview and Re-Cap
More informationUNLOCKING SMARTER ROUTES FOR HEAVY CARGO MAMMOET TERMINAL CRANE (MTC 15)
UNLOCKING SMARTER ROUTES FOR HEAVY CARGO MAMMOET TERMINAL CRANE (MTC 15) MAMMOET TERMINAL CRANE (MTC 15) The Mammoet Terminal Crane, MTC 15, quickly and simply turns any quay into a heavy lifting terminal,
More informationBenalec Secures DOE Approval for All 3 Phases of its Tanjung Piai Project
PRESS RELEASE FOR IMMEDIATE RELEASE 23 June 2016 Contact: Ms Ai Lin Leaw Tel: +603-5569 7366 Email: ailin.leaw@benalec.com.my Benalec Secures DOE Approval for All 3 Phases of its Tanjung Piai Project KUALA
More informationRosedale Sanitary Sewer Feasibility Review Report
Rosedale Sanitary Sewer Feasibility Review Report Submitted by: WEDLER ENGINEERING LLP 201 9300 Nowell Street Chilliwack BC V2P 4V7 Phone: 604 792 0651 Wedler File No: C13 5032/A December 6, 2013 STATEMENT
More informationIH 35 FEASIBILITY STUDY
IH 35 FEASIBILITY STUDY COOKE COUNTY, TEXAS February 1, 2007 Prepared by: Carter & Burgess, Inc. For: The Wichita Falls District of the Texas Department of Transportation INDEX I. INTRODUCTION. 3 II. PURPOSE
More informationCapital Improvement Plan Review
City of Manhattan Beach Public Works Department Fiscal Year 2014/2015 2018/2019 Capital Improvement Plan Review Community Meeting: April 10, 2014 Objectives Creating the Capital Improvement Plan Funding
More informationAppendix I Draft Transmission Towers and Lines Relocation Options at the Port of Long Beach
Appendix I Draft Transmission Towers and Lines Relocation Options at the Port of Long Beach Transmission Towers & Lines Relocation Options at the Port of Long Beach December 2008 Prepared by Parsons 2201
More informationInvestment Opportunities at POIC Lahad Datu
Investment Opportunities at POIC Lahad Datu Bilson Kurus, Ph.D POIC Sabah Sdn Bhd International Joint Workshop on New Trends In Nano-Bio Technology 28 th November 2013, Hotel Le Meridien, Kota Kinabalu,
More informationCybermarine Offshore Technologies LLC
Through the last 20 years, we at CYBERMARINE have been at the fore front of developing designs and providing engineering for asset owners, empowering shipyards and ship repair entities in adding value
More informationDurham-Orange County Corridor Alternatives Analysis JULY Prepared by: U R S Team
Durham-Orange County Corridor Alternatives Analysis Volume 3: Capital Cost Estimates Operations and Maintenance Cost Estimates Travel Time and Distance Calculations Ridership Summaries and Station to Station
More informationBox 4 Book 1. Photographs (Lakefront - Toledo) Number Date Description
Photographs (Lakefront - Toledo) Box 4 Book 1 Number Date Description 7/29/1946 General view of track and dock area 92 9/19/1946 East Approach C & O Overhead Bridge 9-A 6/28/1947 Lakefront Project from
More informationProposed Dounreay - Mybster 275 kv / 132 kv
Background Scottish Hydro-Electric Transmission Ltd (SHETL) is proposing a new 275 kilovolt (kv) (1 kilovolt = 1000volts) double circuit overhead line (OHL) between the Dounreay sub station and the new
More informationANDERSON PROPERTY SITE ANALYSIS
ANDERSON PROPERTY SITE ANALYSIS Introduction The Montgomery County Department of Transportation (MCDOT) initiated a feasibility study in the fall of 2012 to evaluate the need for transit service expansion
More informationAn innovative solution for water and sewer installation AXIS. Guided Boring System
An innovative solution for water and sewer installation AXIS TM Guided Boring System A need for new installation options A growing number of water and sewer projects are required to be placed precisely
More informationConverting BRT to LRT in the Nation s Capital Ottawa, Canada. John Manconi City of Ottawa Ottawa, Canada
Converting BRT to LRT in the Nation s Capital Ottawa, Canada John Manconi City of Ottawa Ottawa, Canada 1 The Challenge *Mackenzie King Bridge Ottawa, AM peak period 2 The Challenge Ottawa s population
More informationCommercial Electric Policy
Commercial Electric Policy 7/19/16 1 Table of Contents General Information..3 Construction.3 Ownership.4 Multi-Unit/Multi-Service Buildings....4 Secondary Termination Enclosures.4 Meter Bases.5 Temporary
More informationHYDROLOGIC/HYDRAULIC ANALYSIS REPORT FOR THE TROLLEY BROOK CULVERT ASHLAND, MA
HYDROLOGIC/HYDRAULIC ANALYSIS REPORT FOR THE TROLLEY BROOK CULVERT ASHLAND, MA Prepared for: THE TOWN OF ASHLAND BOARD OF SELECTMEN AND PLANNING DEPARTMENT Prepared by: June 3, 216 Hydrologic/Hydraulic
More informationNew Jersey Turnpike Authority Interchange 6 to 9 Widening Program
New Jersey Turnpike Authority Interchange 6 to 9 Widening Program Tuesday, September 18, 2007 Public Hearings: Time: 5:00 PM - 8:00 PM Wednesday, September 19, 2007 Senior Center 3 Municipal Drive Bordentown,
More informationTerminal Alternatives
Chapter 5 Terminal Alternatives Missoula International Airport Master Plan Update Prepared for Missoula County Airport Authority OCTOBER 2008 Contents Section Page 5 Terminal Alternatives...5-1 5.1 Terminal
More informationCalifornia s Emission Reduction Plan for Ports and International Goods Movement
California s Emission Reduction Plan for Ports and International Goods Movement Alternative Maritime Power Conference Los Angeles Harbor Hotel April 24, 2006 California Environmental Protection Agency
More informationMERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1
MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: 2190986ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1 October 6, 2010 110-502 Report_1.doc D. J. Halpenny
More informationFOR SALE OR LEASE EBERHARDT & BARRY INC.
FOR SALE OR LEASE Property Video: https://vimeo.com/215049252/1384e4fcbe 500,000± SF Manufacturing / Distribution Facility - 25.48± Acres Formerly 1888 Mills 904 N. Hightower Street Thomaston, Upson County,
More informationSteese Rd - Curb & Sidewalk Improvement
REF. NO. ITEM NO. Steese Rd - Curb & Sidewalk Improvement DESCRIPTION QTY UNITS UNIT COST SUB-TOTAL 1 103.05 Requirement of Contract Bid 1 LS 24,048.00 24,048.00 2 201 Clearing and Grubbing 1 LS 11,077.00
More informationPort Everglades Master Plan Update Phase II Workshop The Board of County Commissioners of Broward County
Phase II Workshop The Board of County Commissioners of Broward County Economic Impact of Port Everglades Cargo and Cruise Activities (2006) Total Jobs: 188,203 Direct (local): 10,982 Induced (local/regional):
More informationAppendix G Traffic and Parking Report
Appendix G Traffic and Parking Report TABLE OF CONTENTS SECTION PAGE Executive Summary... v 1.0 Introduction... 1 1.1 Study Area... 3 2.0 Project Description... 4 2.1 Site Location... 4 2.2 Existing Project
More informationRailyard Alternatives & I-280 Boulevard Feasibility Study 1 RAILYARD ALTERNATIVES & I-280 BOULEVARD (RAB) FEASIBILITY STUDY
Railyard Alternatives & I-280 Boulevard Feasibility Study 1 RAILYARD ALTERNATIVES & I-280 BOULEVARD (RAB) FEASIBILITY STUDY RAB Citizen Working Group Meeting, August 1 st 2016 CITIZEN WORKING GROUP (CWG)
More informationABB Group August 27, 2010 Slide 1
Michael Bahrman P.E., ABB Grid Systems, August 31, 2010, Asia Pacific Clean Energy Summit 2010, Honolulu Integration of Variable Renewable Energy for Hawaii Transmission of Isolated Resources August 27,
More informationCOMPANY PROFILE 2018 MARINE, GENERAL & PRECISION ENGINEERS NEW
L A U N C H E D COMPANY PROFILE 2018 MARINE, GENERAL & PRECISION ENGINEERS NEW Z ABOUT US Petrel Engineering is a mechanical engineering company with integrated design, manufacturing and maintenance facilities.
More informationPortland Area Mainline Needs Assessment DRAFT. Alternative 4 Public Transportation: New or Improved Interstate Bus Service
Portland Area Mainline Needs Assessment DRAFT Alternative 4 Public Transportation: New or Improved Interstate Bus Service HNTB Corporation April 2018 Table of Contents 4.1 Overview... 4-1 4.2 Key Assumptions...
More informationWaste and Recycling Disposal Service Requirements for New Residential Developments
Waste and Recycling Disposal Service Requirements for New Residential Developments Introduction This document applies to all residential building/development applications and outlines the minimum design
More informationRECOMMENDATION APPROVED; RESOLUTION NO (PERMIT 930) ADOPTED BY THE BOARD OF HARBOR COMMISSIONERS. August 17, 2017
RECOMMENDATION APPROVED; RESOLUTION NO. 17-8154 (PERMIT 930) ADOPTED BY THE BOARD OF HARBOR COMMISSIONERS August 17, 2017 LA THE PORT OF LOS ANGELES Executive Director's Report to the Board of Harbor Commissioners
More informationThe Grid Link Project. Summary of the Report for the Independent Expert Panel
The Grid Link Project Summary of the Report for the Independent Expert Panel Who are EirGrid - and what do we do? EirGrid is responsible for a safe, secure and reliable supply of electricity: now and in
More informationI-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange
I-820 (East) Project Description Fort Worth District Reconstruct Southern I-820/SH 121 Interchange I-820 from approximately 2,000 feet north of Pipeline Road/Glenview Drive to approximately 3,200 feet
More informationCustom Side of Pole Mount
Page 1 of 8 Custom Side of Pole Mount (One panel shown.) A. TOP CHANNEL B. BOTTOM CHANNEL C. PANEL RAILS: MAY EITHER BE ALUMINUM ANGLE WITH HOLES PUNCHED FOR MOUTING YOUR PANEL, OR T-SLOT UNIVERSAL ALUMINUM
More informationPARKING MANAGEMENT PLAN PROPOSED MIXED-USE DEVELOPMENT AT URL STAMFORD Parcel 38 Greyrock Place and Tresser Boulevard Stamford, CT April 2, 2014
PARKING MANAGEMENT PLAN PROPOSED MIXED-USE DEVELOPMENT AT URL STAMFORD Parcel 38 Greyrock Place and Tresser Boulevard Stamford, CT April 2, 2014 This plan has been prepared in support of a proposed mixed-use
More informationWentzville Parkway South Phase 2 & 2A
Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total
More informationLink LRT: Maintenance Bases, Vehicles and Operations for ST2 Expansion
Project Number SYS-LRT Subareas All Primary Mode Impacted Link Facility Type Link Service Version Number 4.0 Date Last Modified 7/24/2008 Project Locator Map Short Project Description Construct new light
More informationStation Evaluation. Durham-Orange Light Rail Transit Project Spring 2012
Station Evaluation Durham-Orange Light Rail Transit Project Spring 2012 Key Ingredients for Station Development Platform Designs UNC Hospitals Station The UNC Hospitals Station Option D would be the westerly
More informationTRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site
TRAFFIC IMPACT STUDY for USD #497 Warehouse and Bus Site Prepared by: Jason Hoskinson, PE, PTOE BG Project No. 16-12L July 8, 216 145 Wakarusa Drive Lawrence, Kansas 6649 T: 785.749.4474 F: 785.749.734
More informationMO 370 Interchange Ramp at Salt River Road - Phase 1
MO 3 Interchange Ramp at Salt River Road - Phase 1 Sponsor St Peters Project No. RB19-000023 Project Type New Road TOTAL FUNDING Total County Sponsor Federal $3,304,748.00 $1,652,298.00 $7,450.00 $945,000.00
More information4 COSTS AND OPERATIONS
4 COSTS AND OPERATIONS 4.1 INTRODUCTION This chapter summarizes the estimated capital and operations and maintenance (O&M) costs for the Modal and High-Speed Train (HST) Alternatives evaluated in this
More informationSTREET IMPROVEMENTS PROPOSAL BID ITEMS
STREET IMPROVEMENTS 1 Excavation 3,525 CY $ $ 2 A.C. Planing (2" to 4" Depth) 20,586 SY $ $ 3 Furnish & Install Asphalt Concrete 4,270 TON $ $ 4 Furnish & Install Aggregate Base 2,955 TON $ $ 5 Remove
More informationAPPROVED AROUND THE WORLD BENTEC RIGS
APPROVED AROUND THE WORLD BENTEC RIGS BENTEC Advanced technology for drilling operations. With years of experience, Bentec is one of the world s leading manufacturers of high-quality drilling and workover
More informationBOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM. Design Endorsement for Sterling Boulevard Extension
Date of Meeting: July 20, 2017 # 6 BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM SUBJECT: ELECTION DISTRICT: CRITICAL ACTION DATE: STAFF CONTACTS: Design Endorsement for Sterling Boulevard Extension
More informationCECO BUILDING SYSTEMS
Picture does not reflect current roof condition CECO BUILDING SYSTEMS 249,312 + /- Square Feet on 19.51 + /- acres Rocky Mount, North Carolina CECO BUILDING SYSTEMS 100 RED IRON ROAD ROCKY MOUNT, NC 27804
More informationLEGAL DESCRIPTION REZONE PARCEL
Certco, Inc. 5321 Verona Road Madison, WI 53711 LEGAL DESCRIPTION REZONE PARCEL A part of the Southwest Quarter of the Southwest Quarter of Section 05, Township 06 North, Range 09 East, City of Fitchburg,
More informationPN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS
PN 420-10/21/2016 - SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS DESCRIPTION: The surface tolerance specification requirements are modified as follows for all pavements of constant width with at least
More informationCORPUS CHRISTI BAY - AN UPDATE ON THE SOUTH TEXAS PORT CITY'S CRUDE OIL EXPORT INFRASTRUCTURE
CORPUS CHRISTI BAY - AN UPDATE ON THE SOUTH TEXAS PORT CITY'S CRUDE OIL EXPORT INFRASTRUCTURE February 25, 2018 Corpus Christi, TX, is quickly becoming a strategic hub for U.S. crude oil exports. Since
More information2017 Industrial Rail and Transportation Study. Becker, Minnesota
2017 Industrial Rail and Transportation Study Becker, Minnesota BECKR 140932 August 2, 2017 2017 Industrial Rail and Transportation Study Becker, Minnesota SEH No. BECKR 140932 August 2, 2017 I hereby