Parcels M and M-1 (7 & 8) South Boston. Massachusetts Clean Energy Center 2017 Massachusetts Offshore Wind Ports & Infrastructure Assessment

Size: px
Start display at page:

Download "Parcels M and M-1 (7 & 8) South Boston. Massachusetts Clean Energy Center 2017 Massachusetts Offshore Wind Ports & Infrastructure Assessment"

Transcription

1 Parcels M and M-1 (7 & 8) South Boston Massachusetts Clean Energy Center 2017 Massachusetts Offshore Wind Ports & Infrastructure Assessment 271

2 Parcels M and M-1 (7 & 8) Existing Site Information Item Existing Conditions at Site Ownership Acreage Nautical Distance to Leading Edge of Offshore Wind Areas Public: Boston EDIC Leased to Massachusetts Port Authority 13.9 acres (5.6 ha) 132 nm (244 km) (around Cape Cod due to vessel restrictions at Cape Cod Canal) Quayside Length North Jetty: 1,000 ft (305 m) Berth Depth Channel Controlling Depth Load Bearing Capacity On-Site Power Infrastructure and Buildings Key Environmental Information Overhead Restrictions ft ( m) MLLW ft ( m) MLLW <2,000 psf (9.8 t/m 2 ) paved upland areas <1,000 psf (4.9 t/m 2 ) quayside where concrete deck intact Electric and water from temp. lines 4 commercial/industrial buildings Excavation onsite will require a Soil Management Plan No bridge restrictions Logan Airport: FAA restricts to feet (38-46 m) MSL onsite Massachusetts Clean Energy Center 2017 Massachusetts Offshore Wind Ports & Infrastructure Assessment 272

3 Parcels M and M-1 (7 & 8) South Boston Parcels M-1/7 and M-1/8 and M along North Jetty, South Boston, MA: This site is well placed in the entrance reaches of Boston Harbor in the Ray Flynn Maritime District. It contains a 1,000-foot (305 m) long quayside that is operational but not in good condition. Its location across the Harbor from Logan International Airport imposes height restrictions onsite. It is thought that the site could be converted into an offshore wind logistics and O&M hub without significant modification, or the site could function as storage and laydown space to support other sites in Boston Harbor that might be better suited for manufacturing. While the acreage is limited, the site lies in the midst of other potential sites in Boston that could be considered for offshore wind, and a synergistic approach to use for multiple properties may be a successful combination. Innovation-based Solutions: Repair of the old wharf or install a new quayside/bulkhead; and Broader uses could be accommodated with ground improvement in addition to a new bulkhead and quayside at a larger investment. Massachusetts Clean Energy Center 2017 Massachusetts Offshore Wind Ports & Infrastructure Assessment 273

4 274

5 275

6 276

7 277

8 278

9 279

10 280

11 281

12 282

13 283

14 284

15 285

16 Parcels M and M-1 (7 & 8) Reuse Card Reuse Case Statistics Summary Table: Parcels M / M1, Boston Reuse Case Acreage Used for this Reuse Case Pre-production Storage Area Post-production Laydown Area # Buildings (see Notes for details) Ground Bearing Strength Quay Length Berth Depth at Quayside Notes: Operations & Maintenance / Secondary Steel: acres hectares acres hectares acres hectares psf t/m 2 feet meters feet meters , Cables: , Bldg. 1: O&M Command Ctr. (400 x 200 / 122m x 61m); Bldg. 2: (Retain Existing) (125 x 100 / 38m x 30m); Bldg. 3: (Retain Existing) (165 x 100 / 50m x 30m). Bldg. 1: Manufacturing Bldg. (600 x 300 / 183m x 91m); Bldg. 2: Storage Bldg. (150 x 150 / 46m x 46m). Storage: , Bldg. 1: Warehouse (150 x 150 / 46m x 46m). Gravity Foundations: , Monopiles / Transition Pieces / Towers: , Blades: , Nacelles: , Bldg. 1: Multiuse Bldg. (300 x 200 / 91m x 61m). Foundation elevator needed. Bldg. 1: Rolling Bldg. (650 x 150 / 198m x 46m); Bldg. 2: Assembly Bldg. (650 x 150 / 198m x 46m); Bldg. 3: Coating Bldg. (300 x 150 / 91m x 46m); Bldg. 4: Office/Storage Bldg.: (150 x 150 / 46m x 46m). Bldg. 1: Fabrication Bldg. (700 x 250 / 213m x 76m); Bldg. 2: Multi-Use Bldg. (260 x 130 / 79m x 40m); Bldg. 3: Office/Storage Bldg. (150 x 150 / 46m x 46m). Bldg. 1: Production Bldg. (700 x 300 / 213m x 91m); Bldg. 2: Multipurpowe Bldg. (300 x 200 / 91m x 61m). *Quayside improvements required and included in reuse scenario unless noted in site card table. Massachusetts Clean Energy Center 2017 Massachusetts Offshore Wind Ports & Infrastructure Assessment 286

17 Parcels M and M-1 (7 & 8) Cost Reuse Summary Costs Scenario Name Item Redevelopment Classification Redevelopment Costs Reuse Costs Total Costs Reuse Case 1A Operations and Maintenance Low $5,180,000 $2,893,000 $8,073,000 Reuse Case 1A Secondary Steel Low $5,180,000 $7,124,000 $12,305,000 Reuse Case 2A Cables Medium $7,868,000 $3,321,000 $11,189,000 Reuse Case 2B Storage Medium $7,868,000 $4,608,000 $12,476,000 Reuse Case 2C Gravity Foundations Medium $7,868,000 $995,000 $8,863,000 Reuse Case 3A Monopile Foundations High $15,524,000 $22,101,000 $37,626,000 Reuse Case 3A Transition Pieces High $15,524,000 $22,101,000 $37,626,000 Reuse Case 3A Towers High $15,524,000 $22,101,000 $37,626,000 Reuse Case 3B Blades Medium $7,868,000 $19,995,000 $27,864,000 Reuse Case 3C Nacelles High $15,524,000 $24,880,000 $40,404,000 Massachusetts Clean Energy Center 2017 Massachusetts Offshore Wind Ports & Infrastructure Assessment 287

18 Parcels M & M-1 Redevelopment Cost Details Redevelopment Classification Item Unit Cost Units Quantity Amount Low Medium High Clear surfaces $1 SQFT 450,000 $450,000 Subtotal $4,317,000 Fill subsurface voids $38 TN 1,500 $57,000 20% $863,000 Regrade $1 SQFT 450,000 $450,000 Total $5,180,000 Refurbish Wharf (400 x 60) $6,000 LF 400 $2,400,000 Install heavy duty transport lane (1600 x 100) $6 SQFT 160,000 $960,000 Clear surfaces (west) $1 SQFT 770,000 $770,000 Subtotal $6,557,000 Remove buildings $8 SQFT 35,000 $280,000 20% $1,311,000 Fill subsurface voids $38 TN 1,500 $57,000 Total $7,868,000 Clear surfaces $1 SQFT 450,000 $450,000 Add 2' CGF $25 TN 50,000 $1,250,000 Install 2' CGF $8 CYD 33,333 $267,000 Add 1' DGA $38 TN 25,000 $950,000 Install 1' DGA $8 CYD 16,667 $133,000 Refurbish Wharf (400 x 60) $6,000 LF 400 $2,400,000 Clear surfaces (west) $2 SQFT 770,000 $1,540,000 Subtotal $12,937,000 Remove Small Secondary Buildings $8 SQFT 35,000 $280,000 20% $2,587,000 Demolish Existing Large "M" Building / Regrade $30 SQFT $1,800,000 Total $15,524,000 Fill subsurface voids $38 TN 1,500 $57,000 Clear surfaces $2 SQFT 450,000 $900,000 Add 2' CGF $25 TN 50,000 $1,250,000 Install 2' CGF $8 CYD 33,333 $267,000 Add 1' DGA $38 TN 25,000 $950,000 Install 1' DGA $8 CYD 16,667 $133,000 Refurbish Wharf (830 x 60) $6,000 LF 830 $4,980,000 Install crane pads (60 x 60) $780,000 LS 1 $780,000 Parcels M & M-1 Reuse Cost Details Redevelopment Classification Item Unit Cost Units Quantity Amount Gravity Foundations Support Building (250 x 180) $16.20 SQFT 45,000 $729,000 Subtotal $829,000 Appurtenances, Doors, Electrical etc. $100, per unit 1 $100,000 20% $166,000 Elevator $ ,00 EA/Installed 1 $ Total $995,000 Massachusetts Clean Energy Center 2017 Massachusetts Offshore Wind Ports & Infrastructure Assessment 394

19 Parcels M & M-1 Reuse Cost Details Redevelopment Classification Item Unit Cost Units Quantity Amount Monopile Foundations Transition Pieces Towers Rolling Buidling (650 x 150) $44.90 SQFT 97,500 $4,378,000 Subtotal $18,418,000 Appurtenances, Doors, Electrical etc. $600, per unit 1 $600,000 20% $3,684,000 Overhead cranes $1,000, per unit 2 $2,000,000 Total $22,101,000 Assembly Buidling (650 x 150) $44.90 SQFT 97,500 $4,378,000 Appurtenances, Doors, Electrical etc. $600, per unit 1 $600,000 Overhead cranes $1,000, per unit 2 $2,000,000 Coating Buidling (130 x 260) $44.90 SQFT 33,800 $1,518,000 Appurtenances, Doors, Electrical etc. $600, per unit 1 $600,000 Overhead cranes $1,000, per unit 1 $1,000,000 Warehouse Building (150 x 150) $16.20 SQFT 22,500 $365,000 Appurtenances, Doors, Electrical etc. $200, LS 1 $200,000 Rolling Buidling (650 x 150) $44.90 SQFT 97,500 $4,378,000 Subtotal $18,418,000 Appurtenances, Doors, Electrical etc. $600, per unit 1 $600,000 20% $3,684,000 Overhead cranes $1,000, per unit 2 $2,000,000 Total $22,101,000 Assembly Buidling (650 x 150) $44.90 SQFT 97,500 $4,378,000 Appurtenances, Doors, Electrical etc. $600, per unit 1 $600,000 Overhead cranes $1,000, per unit 2 $2,000,000 Coating Buidling (130 x 260) $44.90 SQFT 33,800 $1,518,000 Appurtenances, Doors, Electrical etc. $600, per unit 1 $600,000 Overhead cranes $1,000, per unit 1 $1,000,000 Warehouse Building (150 x 150) $16.20 SFT 22,500 $365,000 Appurtenances, Doors, Electrical etc. $200, LS 1 $200,000 Install Crane Pad (50' x 50') $780, per unit 1 $780,000 Rolling Buidling (650 x 150) $44.90 SQFT 97,500 $4,378,000 Subtotal $18,418,000 Appurtenances, Doors, Electrical etc. $600, per unit 1 $600,000 20% $3,684,000 Overhead cranes $1,000, per unit 2 $2,000,000 Total $22,101,000 Assembly Buidling (650 x 150) $44.90 SQFT 97,500 $4,378,000 Appurtenances, Doors, Electrical etc. $600, per unit 1 $600,000 Overhead cranes $1,000, per unit 2 $2,000,000 Coating Buidling (130 x 260) $44.90 SQFT 33,800 $1,518,000 Appurtenances, Doors, Electrical etc. $600, per unit 1 $600,000 Overhead cranes $1,000, per unit 1 $1,000,000 Warehouse Building (150 x 150) $ ,500 $365,000 Appurtenances, Doors, Electrical etc. $200, $200,000 Install Crane Pad (50' x 50') $780, per unit 1 $780,000 Massachusetts Clean Energy Center 2017 Massachusetts Offshore Wind Ports & Infrastructure Assessment 395

20 Parcels M & M-1 Reuse Cost Details Redevelopment Classification Item Unit Cost Units Quantity Amount Blades Secondary Steel Nacelles Cables Production Building (700 x 350) $44.90 SQFT 245,000 $11,001,000 Subtotal $16,663,000 Appurtenances, Doors, Electrical etc. $600, per unit 1 $600,000 20% $3,333,000 Overhead cranes $1,000, per unit 2 $2,000,000 Total $19,995,000 Building (130 x 260) $44.90 SQFT 33,800 $1,518,000 Appurtenances, Doors, Electrical etc. $200, per unit 1 $200,000 Support Building $ ,500 $365,000 Appurtenances, Doors, Electrical etc. $200, per unit 1 $200,000 Crane pad (50 x 50 x 5) $780, per unit 1 $780,000 Warehouse Building (300 x 200) $16.20 SQFT 60,000 $972,000 Subtotal $5,937,000 Appurtenances, Doors, Electrical etc. $200, per unit 1 $200,000 20% $1,187,000 Quay side 400ftPier/Dock $1, FT 400 $400,000 Total $7,124,000 Paving and Surface Grading 300 x 200 $8.00 SQFT 60,000 $480,000 Install New Concrete Slab at Quayside $6,000 LF 600 $3,600,000 Repair Piles $19,000 EA 15 $285,000 Building (700 x 350) $44.90 SQFT 245,000 $11,001,000 Subtotal $20,733,000 Appurtenances, Doors, Electrical etc. $600, per unit 1 $600,000 20% $4,147,000 Overhead cranes $1,000, per unit 1 $1,000,000 Total $24,880,000 Building (600 x 200) $44.90 SQFT 120,000 $5,388,000 Appurtenances, Doors, Electrical etc. $400, per unit 1 $400,000 Overhead cranes $1,000, per unit 1 $1,000,000 Office Building $ ,500 $365,000 Appurtenances, Doors, Electrical etc. $200, per unit 1 $200,000 Crane pad (50 x 50 x 5) $780, per unit 1 $780,000 Add extension to building (100 x 260) $44.90 per unit 26,000 $1,167,000 Subtotal $2,767,000 Appurtenances, Doors, Electrical etc. $600, per unit 1 $600,000 20% $553,000 Overhead cranes, small $500, per unit 2 $1,000,000 Total $3,321,000 Operations and Maintenance Storage Pile Supported Pier / Docks $1, FT 350 $350,000 Subtotal $2,411,000 O&M Building (150 x 150) $16.20 SQFT 22,500 $365,000 20% $482,000 Appurtenances, Doors, Electrical etc. $200, per unit 1 $200,000 Total $2,893,000 O&M Command Center & Storehouse $ ,000 $1,296,000 Appurtenances, Doors, Electrical etc. $200, per unit 1 $200,000 Install crane pad (50' x 50' x 5') $780,000 per unit 1 $780,000 Subtotal $3,840,000 Refurbish Wharf $6,000 LF 400 $2,400,000 20% $768,000 Demo Building $100,000 LS 1 $100,000 Total $4,608,000 Storage Building (150' x 150') $16 SQFT 22,500 $360,000 Appurtenances, Doors, Electrical etc. $200,000 per unit 1 $200,000 Massachusetts Clean Energy Center 2017 Massachusetts Offshore Wind Ports & Infrastructure Assessment 396

21 Parcels M & M-1 Total Cost Details Scenario Name Sce Item Redevelopment Classification Redevelopment Costs Reuse Costs Total Costs Reuse Case 1A Operations and Maintenance Low $5,180,000 $2,893,000 $8,073,000 Reuse Case 1A Secondary Steel Low $5,180,000 $7,124,000 $12,305,000 Reuse Case 2A Cables Medium $7,868,000 $3,321,000 $11,189,000 Reuse Case 2B Storage Medium $7,868,000 $4,608,000 $12,476,000 Reuse Case 2C Gravity Foundations Medium $7,868,000 $995,000 $8,863,000 Reuse Case 3A Monopile Foundations High $15,524,000 $22,101,000 $37,626,000 Reuse Case 3A Transition Pieces High $15,524,000 $22,101,000 $37,626,000 Reuse Case 3A Towers High $15,524,000 $22,101,000 $37,626,000 Reuse Case 3B Blades Medium $7,868,000 $19,995,000 $27,864,000 Reuse Case 3C Nacelles High $15,524,000 $24,880,000 $40,404,000 Massachusetts Clean Energy Center 2017 Massachusetts Offshore Wind Ports & Infrastructure Assessment 397

North Terminal New Bedford. Massachusetts Clean Energy Center 2017 Massachusetts Offshore Wind Ports & Infrastructure Assessment

North Terminal New Bedford. Massachusetts Clean Energy Center 2017 Massachusetts Offshore Wind Ports & Infrastructure Assessment North Terminal New Bedford Massachusetts Clean Energy Center 2017 Massachusetts Offshore Wind Ports & Infrastructure Assessment 163 North Terminal Existing Site Information Item Existing Conditions at

More information

Whale s Tooth Parking Lot, Railyard & Island Sand New Bedford

Whale s Tooth Parking Lot, Railyard & Island Sand New Bedford Whale s Tooth Parking Lot, Railyard & Island Sand New Bedford Massachusetts Clean Energy Center 2017 Massachusetts Offshore Wind Ports & Infrastructure Assessment 152 Whale s Tooth Parking Lot, Railyard

More information

Quonset Business Park

Quonset Business Park Quonset Business Park September 28, 2010 Katherine Trapani Planning Manager Quonset Development Corporation Quonset Business Park 3,160 Total Acres 168 Companies 8,842 Jobs QDC Input into URI Study Water

More information

SPECIAL LEGISLATIVE COMMISSION TO STUDY POTENTIAL ECONOMIC OPPORTUNITIES IN THE DEVELOPMENT OF PORT FACILITIES IN THE STATE OF RHODE ISLAND

SPECIAL LEGISLATIVE COMMISSION TO STUDY POTENTIAL ECONOMIC OPPORTUNITIES IN THE DEVELOPMENT OF PORT FACILITIES IN THE STATE OF RHODE ISLAND Quonset Update April 7, 2011 SPECIAL LEGISLATIVE COMMISSION TO STUDY POTENTIAL ECONOMIC OPPORTUNITIES IN THE DEVELOPMENT OF PORT FACILITIES IN THE STATE OF RHODE ISLAND QUONSET BUSINESS PARK 8,800 Jobs

More information

MULTI-PURPOSE FLOATING PLATFORMS

MULTI-PURPOSE FLOATING PLATFORMS MULTI-PURPOSE FLOATING PLATFORMS INDUSTRIAL APPLICATIONS Port Construction Port Expansion Offshore Storage Offshore Drilling Support Marine Offloading Facilities Breakwaters www.truenorthservicesllc.com

More information

Appendix G Aquilla Lake Pool Rise Recreational Resources

Appendix G Aquilla Lake Pool Rise Recreational Resources Appendix G Aquilla Lake Pool Rise Recreational Resources 1. INTRODUCTION The purpose of this appendix is to document the impacts of a 2.5 ft (Alternative A), 4.5 ft (Alternative B), and 6.5 ft. (Alternative

More information

H&W LOGISTICS BASE Technical Specifications

H&W LOGISTICS BASE Technical Specifications H&W LOGISTICS BASE The Irish Sea Projects are a substantial work volume in a relatively short period The distance from H&W to the Irish Sea planned offshore Windfarms is comparable to other ports Irish

More information

Table C-1. POLB Middle Harbor Redevelopment Construction/Demolition Activities and Noise Data

Table C-1. POLB Middle Harbor Redevelopment Construction/Demolition Activities and Noise Data Appendix C Noise Table C-1. POLB Middle Harbor Redevelopment Construction/Demolition Activities and Noise Data Activity Equipment HP Wharf Demolition Landside (A) Wharf Demolition Marine (B) Sheet Pile

More information

Structure of Wind Supply Chain Onshore to Offshore. Ed Weston Director, GLWN Copyright 2012 GLWN A WIRE-Net Initiative

Structure of Wind Supply Chain Onshore to Offshore. Ed Weston Director, GLWN Copyright 2012 GLWN A WIRE-Net Initiative Structure of Wind Supply Chain Onshore to Offshore Ed Weston Director, GLWN eweston@glwn.org FIND Connections Company name WIND Classification Component Families Radius Search Active Suppliers Almost 1600

More information

PONTOONS. Port Construction Port Expansion Offshore Storage Offshore Drilling Support Marine Offloading Facilities Breakwaters

PONTOONS. Port Construction Port Expansion Offshore Storage Offshore Drilling Support Marine Offloading Facilities Breakwaters PONTOONS Port Construction Port Expansion Offshore Storage Offshore Drilling Support Marine Offloading Facilities Breakwaters www.truenorthservicesllc.com This presentation including graphics, logos and

More information

Port Everglades Master Plan Update 2006 Tenant Workshop. August 24, 2007

Port Everglades Master Plan Update 2006 Tenant Workshop. August 24, 2007 Tenant Workshop 20 Year Vision Plan presented at Workshop I 2 Tenant / Stakeholder Input 20 Year Vision Plan 3 Northport Slip Study 294 298 286 600 475 475 4 Conservation Easement Impact Map 5 Aviation

More information

FOR SALE OR LEASE EBERHARDT & BARRY INC.

FOR SALE OR LEASE EBERHARDT & BARRY INC. FOR SALE OR LEASE Property Video: https://vimeo.com/215049252/1384e4fcbe 500,000± SF Manufacturing / Distribution Facility - 25.48± Acres Formerly 1888 Mills 904 N. Hightower Street Thomaston, Upson County,

More information

Virginia Offshore Wind Port Readiness Study

Virginia Offshore Wind Port Readiness Study Virginia Offshore Wind Port Readiness Study Briefing to Virginia Offshore Wind Development Authority Richmond, VA 23 April 2015 George Hagerman VCERC Director of Research Virginia Tech Advanced Research

More information

PONTOONS. Port Construction Port Expansion Offshore Storage Offshore Drilling Support Marine Offloading Facilities Breakwaters

PONTOONS. Port Construction Port Expansion Offshore Storage Offshore Drilling Support Marine Offloading Facilities Breakwaters PONTOONS Port Construction Port Expansion Offshore Storage Offshore Drilling Support Marine Offloading Facilities Breakwaters www.truenorthservicesllc.com This presentation including graphics, logos and

More information

Issued: July 17 PORT LOAD CHART

Issued: July 17 PORT LOAD CHART 1 of 6 PRT LAD CHART About the Port Load Chart The Port Load Chart is intended to provide guidance on the maximum allowable loads permitted on wharves, piers and shed floors at PoM owned facilities within

More information

Bid Summary Still Creek Wastewater Improvements Phase III City Job No. 411-D November 21, 2013

Bid Summary Still Creek Wastewater Improvements Phase III City Job No. 411-D November 21, 2013 Bid Summary Still Creek Wastewater Improvements Phase III City Job No. 411-D4-1102 November 21, 2013 Doughtie Construction Co., Elliott Construction Dudley Construction Ltd. SUBTOTAL GENERAL ITEMS : $191,713.00

More information

2701 INTERTECH DRIVE, YOUNGSTOWN, MAHONING COUNTY, INDUSTRIAL PROPERTY FOR SALE 143,789 SF on ACRES $4,300,000

2701 INTERTECH DRIVE, YOUNGSTOWN, MAHONING COUNTY, INDUSTRIAL PROPERTY FOR SALE 143,789 SF on ACRES $4,300,000 2701 INTERTECH DRIVE, YOUNGSTOWN, MAHONING COUNTY, 44504 143,789 SF on 20.177 ACRES $4,300,000 BUILDING OVERVIEW PARKER HANNIFIN FACILITY GEAR PUMP DIVISION Zoning - Industrial Light Manufacturing 143,789

More information

Port Everglades Master Plan Update Phase II Workshop The Board of County Commissioners of Broward County

Port Everglades Master Plan Update Phase II Workshop The Board of County Commissioners of Broward County Phase II Workshop The Board of County Commissioners of Broward County Economic Impact of Port Everglades Cargo and Cruise Activities (2006) Total Jobs: 188,203 Direct (local): 10,982 Induced (local/regional):

More information

Quonset Business Park Port of Davisville

Quonset Business Park Port of Davisville Quonset Business Park Port of Davisville 2014 Annual Statutory Report 3,212 Total Acres Over 200 Companies More than 10,000 Jobs Table of Contents 2. Background and Mission 3. Highlights 4. Key Statistics

More information

Port of Grays Harbor Capital Improvement Plan

Port of Grays Harbor Capital Improvement Plan Marine Terminals Communication Equipment VHF Radio 3,000 3,000 3,000 3,000 3,000 Deeper Draft Deeper Draft Phase 2 4,713,000 1,172,000 Jet Array Jet Array Renovation 200,000 200,000 200,000 200,000 200,000

More information

Benalec Secures DOE Approval for All 3 Phases of its Tanjung Piai Project

Benalec Secures DOE Approval for All 3 Phases of its Tanjung Piai Project PRESS RELEASE FOR IMMEDIATE RELEASE 23 June 2016 Contact: Ms Ai Lin Leaw Tel: +603-5569 7366 Email: ailin.leaw@benalec.com.my Benalec Secures DOE Approval for All 3 Phases of its Tanjung Piai Project KUALA

More information

Big Easy RV & Boat Storage A Green Energy Project Jana Lane Wildomar, California

Big Easy RV & Boat Storage A Green Energy Project Jana Lane Wildomar, California Big Easy RV & Boat Storage A Green Energy Project 36215 Jana Lane Wildomar, California 1 PROJECT OVERVIEW Project Description The construction and operation of a solar generation facility consisting of

More information

Midtown Corridor Alternatives Analysis Capital Cost Estimation Methodology and Assumptions

Midtown Corridor Alternatives Analysis Capital Cost Estimation Methodology and Assumptions Midtown Corridor Alternatives Analysis Capital Cost Estimation Methodology and Assumptions 1/3/2014 Prepared by the SRF Consulting Group Team for Table of Contents Introduction... 1 Alternatives Overview...

More information

COST ESTIMATES: Curb-Running

COST ESTIMATES: Curb-Running COST ESTIMATES: Curb-Running PROJECT FEASIBILITY COST ESTIMATE SUMMARY Geary Bus Rapid Transit Study Alternative: Side Lane (Curb Running) Date: 4/12/07 Percent Cost Total Project Capital Outlay I- Roadway

More information

Middle Harbor Project: Draft EIS/EIR LA Chamber of Commerce June 26, 2008, APM Maersk HQ Pier 400

Middle Harbor Project: Draft EIS/EIR LA Chamber of Commerce June 26, 2008, APM Maersk HQ Pier 400 Middle Harbor Project: Draft EIS/EIR LA Chamber of Commerce June 26, 2008, APM Maersk HQ Pier 400 Richard D. Cameron Director of Environmental Planning, Port of Long Beach CEQA/NEPA Process Summary The

More information

CECO BUILDING SYSTEMS

CECO BUILDING SYSTEMS Picture does not reflect current roof condition CECO BUILDING SYSTEMS 249,312 + /- Square Feet on 19.51 + /- acres Rocky Mount, North Carolina PRELIMINARY CECO BUILDING SYSTEMS 100 RED IRON ROAD ROCKY

More information

Appendix I Draft Transmission Towers and Lines Relocation Options at the Port of Long Beach

Appendix I Draft Transmission Towers and Lines Relocation Options at the Port of Long Beach Appendix I Draft Transmission Towers and Lines Relocation Options at the Port of Long Beach Transmission Towers & Lines Relocation Options at the Port of Long Beach December 2008 Prepared by Parsons 2201

More information

Box 4 Book 1. Photographs (Lakefront - Toledo) Number Date Description

Box 4 Book 1. Photographs (Lakefront - Toledo) Number Date Description Photographs (Lakefront - Toledo) Box 4 Book 1 Number Date Description 7/29/1946 General view of track and dock area 92 9/19/1946 East Approach C & O Overhead Bridge 9-A 6/28/1947 Lakefront Project from

More information

CreekSide XVI & XVIII

CreekSide XVI & XVIII Project Overview CreekSide XVI & XVIII Building Dimensions CreekSide XVI - 155,866 square feet CreekSide XVIII - 236,140 square feet 32 clear height 50 x 54 column spacing and 60 speed bay CreekSide Advantage

More information

Capital Improvement Projects Status Report December 2014 (Actuals through October) Percent Design Complete. Design Finish. Construction Finish

Capital Improvement Projects Status Report December 2014 (Actuals through October) Percent Design Complete. Design Finish. Construction Finish Title I. Terminals Berth 90-93 - World Cruise Center 4. B. 93 - Cruise Terminal - Customs and Border Protection Improvements Conceptual (2525300) d 11/27/14 100% N/A $140,000 $73,479 52% 5. B. 91-93 -

More information

Sequence, Synergy, and Subsidy

Sequence, Synergy, and Subsidy San Francisco 2008 Sequence, Synergy, and Subsidy Multi-Modal Train Stations as Anchors of Downtown Revitalization Alden S. Raine, PhD AECOM Transportation Downtown Multi-Modal Hubs: the Anti-Silos Downtown

More information

CECO BUILDING SYSTEMS

CECO BUILDING SYSTEMS Picture does not reflect current roof condition CECO BUILDING SYSTEMS 249,312 + /- Square Feet on 19.51 + /- acres Rocky Mount, North Carolina CECO BUILDING SYSTEMS 100 RED IRON ROAD ROCKY MOUNT, NC 27804

More information

Quonset s Port of Davisville Infrastructure Rehabilitation/Replacement Program. Investing In Rhode Island s Success

Quonset s Port of Davisville Infrastructure Rehabilitation/Replacement Program. Investing In Rhode Island s Success Quonset s Port of Davisville Infrastructure Rehabilitation/Replacement Program Investing In Rhode Island s Success Quonset Business Park 3,212 Total Acres Over 200 Great Rhode Island Companies Nearly 11,000

More information

CHAPTER 10 FLOATING WHARVES

CHAPTER 10 FLOATING WHARVES CHAPTER 10 FLOATING WHARVES Both the US Army and Navy have floating equipment suitable for constructing floating wharves. The most promising equipment of each service is discussed below. Section I. Army

More information

hi-energy.org.uk ENERGY INFRASTRUCTURE Over 163m invested in port and harbour sites since 2010

hi-energy.org.uk ENERGY INFRASTRUCTURE Over 163m invested in port and harbour sites since 2010 ENERGY hi-energy.org.uk Over 163m invested in port and harbour sites since 2010 Kishorn Port Ltd, Wester Ross DEVELOPING A GLOBALLY COMPETITIVE RENEWABLE ENERGY INDUSTRY Cover photograph: Global Energy

More information

Confederation Line West Alignment Improvement. September 21, 2016

Confederation Line West Alignment Improvement. September 21, 2016 Confederation Line West Alignment Improvement September 21, 2016 Agenda Background Lincoln Fields Station and alignment improvement LRT alignment, west of Lincoln Fields to Queensview, including: Pedestrian

More information

NCDOT s Recent Experience With Static Load Testing on Large Prestressed Concrete Piles

NCDOT s Recent Experience With Static Load Testing on Large Prestressed Concrete Piles NCDOT s Recent Experience With Static Load Testing on Large Prestressed Concrete Piles Michael Valiquette NCDOT Geotechnical Engineering Unit October 29, 2014 Oregon Inlet Gallant s Channel Cape Fear River

More information

G9 Offshore Wind Health & Safety Association ALL ENERGY Stephen Rose Head of Offshore Wind Generation, SSE G9 Focal Group Leader

G9 Offshore Wind Health & Safety Association ALL ENERGY Stephen Rose Head of Offshore Wind Generation, SSE G9 Focal Group Leader G9 Offshore Wind Health & Safety Association ALL ENERGY 2015 Stephen Rose Head of Offshore Wind Generation, SSE G9 Focal Group Leader Why the G9? Overview Work of the Focal Group Collation of SHE Data

More information

Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14

Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14 Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14 Hardesty & Hanover, LLC Alternative 1 Bogie Support System Alternative Based on AW Sketch of New Bridge Component

More information

Innovative Axial Flux Air Cored Permanent Magnet Generator suitable for Slow, Medium Speed and Direct Drive Wind Turbines

Innovative Axial Flux Air Cored Permanent Magnet Generator suitable for Slow, Medium Speed and Direct Drive Wind Turbines Innovative Axial Flux Air Cored Permanent Magnet Generator suitable for Slow, Medium Speed and Direct Drive Wind Turbines Dr Makhlouf Benatmane CEO NGenTec Ltd 1 Starting from a blank sheet, we created

More information

827 Sans Souci Parkway Wilkes-Barre, Pennsylvania 18706

827 Sans Souci Parkway Wilkes-Barre, Pennsylvania 18706 For Sale or Lease 225,000± SF Industrial Building 827 Sans Souci Parkway Wilkes-Barre, Pennsylvania 18706 Approximate Property Boundary 28.79± Acre Site Property Description Size: The main production facility

More information

INDUSTRIAL DEVELOPMENT SITE DLH PARCEL #34 +/ GROSS ACRES DLH PARCELS #114 & #115 +/ GROSS ACRES

INDUSTRIAL DEVELOPMENT SITE DLH PARCEL #34 +/ GROSS ACRES DLH PARCELS #114 & #115 +/ GROSS ACRES INDUSTRIAL DEVELOPMENT SITE DLH PARCEL #34 +/- 55.39 GROSS ACRES DLH PARCELS #114 & #115 +/- 133.36 GROSS ACRES YOUR GATEWAY TO GLOBAL DISTRIBUTION LANCASTER-HUTCHINS ROAD HUTCHINS, TEXAS DLH PARCEL #34

More information

STRUCTURE 5A PURPOSE

STRUCTURE 5A PURPOSE STRUCTURE 5A This structure is a six unit pumping plant located on the south side of U.S. Highway 441 and Canal 51 (West Palm Beach Canal) between the canal and the borrow canals of Levees 7 and 40 about

More information

FS Track-2. FS Track-2 Product Sheet. Single axis Azimuth tracker Fast and easy installation Adjustable bearings allow for high ramming tolerances

FS Track-2. FS Track-2 Product Sheet. Single axis Azimuth tracker Fast and easy installation Adjustable bearings allow for high ramming tolerances FS Track-2 Single axis Azimuth tracker Fast and easy installation Adjustable bearings allow for high ramming tolerances The solar tracker FS Track-2 is a PV system which follows the sun by tracking east

More information

Renewable Energy Innovation Outlook: Offshore Wind Technology

Renewable Energy Innovation Outlook: Offshore Wind Technology Renewable Energy Innovation Outlook: Offshore Wind Technology 11 th Council May 216 Why innovation in offshore wind? More consistent wind resource Utility-scale low carbon electricity Electricity generation

More information

SH GROUP FACILITIES. Kuopiovej Svendborg. Denmark

SH GROUP FACILITIES. Kuopiovej Svendborg. Denmark SH GROUP FACILITIES Kuopiovej 20. 5700 Svendborg. Denmark. +45 6221 7810. sh@shgroup.dk www.shgroup.dk SH GROUP A/S - HEADQUATERS DENMARK SH Group head office administration, service, sales and engineering

More information

F9 PROPERTIES LUMBER LIQUIDATORS FACILITY 307,184 + /- Square Feet on /- acres Toano, Virginia

F9 PROPERTIES LUMBER LIQUIDATORS FACILITY 307,184 + /- Square Feet on /- acres Toano, Virginia F9 PROPERTIES LUMBER LIQUIDATORS FACILITY 307,184 + /- Square Feet on 74.4 + /- acres Toano, Virginia (PRELIMINARY) F9 LUMBER LIQUIDATORS 3000 JOHN DEERE DR STONEHOUSE COMMERCE PARK SIZE: GROUND: NUMBER

More information

SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP. 1 OF 1 P:\8417\ Bridge A\AT\Albany A.MDB 7/21/2014 7:32:31 AM REVISION NO COUNTY

SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP. 1 OF 1 P:\8417\ Bridge A\AT\Albany A.MDB 7/21/2014 7:32:31 AM REVISION NO COUNTY 7/18/2014 - UCTURE REVISION NO REVISIONS DATE BY DIICT COUNTY ROUTE SECTION SHEET - SEE SPECIAL PROVISIONS SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP T-410 4 OF 8 QUANTITY ITEM NO UNIT DESCRIPTION DESIGN NO

More information

BID FORM PART A. Total Quantity 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b Maintenance of Traffic 1 LS $ -

BID FORM PART A. Total Quantity 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b Maintenance of Traffic 1 LS $ - BID FORM PART A Name & Category Unit Unit Cost (B) Cost (AxB) GENERAL REQUIREMENTS 1 Mobilization (Maximum 3.0% of the total Contract Price) 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b

More information

Custom Side of Pole Mount

Custom Side of Pole Mount Page 1 of 8 Custom Side of Pole Mount (One panel shown.) A. TOP CHANNEL B. BOTTOM CHANNEL C. PANEL RAILS: MAY EITHER BE ALUMINUM ANGLE WITH HOLES PUNCHED FOR MOUTING YOUR PANEL, OR T-SLOT UNIVERSAL ALUMINUM

More information

Construction Staging Area 4 Avenue Road

Construction Staging Area 4 Avenue Road REPORT FOR ACTION Construction Staging Area 4 Avenue Road Date: September 27, 2017 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District

More information

Pengerang Terminals Pengerang Rotterdam : Linked by Concept Pengerang Terminals Sdn Bhd. 8th January 2018

Pengerang Terminals Pengerang Rotterdam : Linked by Concept Pengerang Terminals Sdn Bhd. 8th January 2018 Pengerang Terminals Pengerang Rotterdam : Linked by Concept Pengerang Terminals Sdn Bhd 8th January 2018 Shareholders & Profile PITSB : 1 of 3 JV between Dialog & Vopak 51% 49% Pengerang Terminals Sdn

More information

MOORAGE BOAT LAUNCHE P N D ENGINEERS, INC.

MOORAGE BOAT LAUNCHE P N D ENGINEERS, INC. CONCRETE CRETE TIMBER MODU PIPE FLOATS COVERED MOORAGE FLOAT BOAT LAUNCHE FLOAT PLANES FISH CLEA SYSTEMS DESIGN CONCRETECRETE TIM MODULAR PIPE FLOATS COVERED MOORAGE BOAT LAUNCHES FLOAT PLANES FISH CLEANING

More information

Alstom Supplier Requirements for Scottish Supply Chain Opportunities FOR

Alstom Supplier Requirements for Scottish Supply Chain Opportunities FOR Alstom Supplier Requirements for OCEDG4-1ALLSUP0002EC ALSTOM SUPPLIER REQUIREMENTS FOR SCOTTISH SUPPLY CHAIN OPPORTUNITIES 3 2 1 authority, is strictly prohibited. Page 1 / 7 Alstom Supplier Requirements

More information

APPENDIX B. POTENTIAL CONSTRUCTION EQUIPMENT

APPENDIX B. POTENTIAL CONSTRUCTION EQUIPMENT . POTENTIAL CONSTRUCTION EQUIPMENT Table B-1. Alternative 1 (Options A and B) and Alternative 3 Alternative 1 (Options A and B) and Alternative 3 Overhead Transmission Line and Poles Removal of conductors

More information

HYDROLOGIC/HYDRAULIC ANALYSIS REPORT FOR THE TROLLEY BROOK CULVERT ASHLAND, MA

HYDROLOGIC/HYDRAULIC ANALYSIS REPORT FOR THE TROLLEY BROOK CULVERT ASHLAND, MA HYDROLOGIC/HYDRAULIC ANALYSIS REPORT FOR THE TROLLEY BROOK CULVERT ASHLAND, MA Prepared for: THE TOWN OF ASHLAND BOARD OF SELECTMEN AND PLANNING DEPARTMENT Prepared by: June 3, 216 Hydrologic/Hydraulic

More information

Introduction. Project Setting. Chapter 2 Project Description

Introduction. Project Setting. Chapter 2 Project Description Chapter 2 Introduction WETA proposes to construct a Central Bay (proposed project) to serve as the central San Francisco Bay base for WETA s ferry fleet, Operations Control Center (OCC), and Emergency

More information

LIFT TRUCKS FOR EVERY APPLICATION

LIFT TRUCKS FOR EVERY APPLICATION LIFT TRUCKS FOR EVERY APPLICATION Container ports and terminals Intermodal and barge handling Steel and aluminum Mining General manufacturing Pulp & paper, wood Automotive Wind power Oil & gas Nuclear

More information

Wind Power Solutions

Wind Power Solutions Wind Power Solutions Because ensuring a leak-free solution is critical. It has to be Hydratight. For more than 100 years, Hydratight has provided world-class bolted joint solutions, assessing and managing

More information

SITE PLANS ASSISTED LIVING REDEVELOPMENT

SITE PLANS ASSISTED LIVING REDEVELOPMENT SITE PLANS ASSISTED LIVING REDEVELOPMENT PROJECT SUMMARY TOTAL LOT AREA - 39.0 ACRES EXISTING BUILDING FOOTPRINT 48,060 S.F. PROPOSED 25,869 S.F. TOTAL BUILDING FOOTPRINT 73,929 S.F. ZONING COMPLIANCE

More information

2701 INTERTECH DRIVE, YOUNGSTOWN, MAHONING COUNTY, INDUSTRIAL PROPERTY FOR SALE 143,789 SF on ACRES $4,300,000

2701 INTERTECH DRIVE, YOUNGSTOWN, MAHONING COUNTY, INDUSTRIAL PROPERTY FOR SALE 143,789 SF on ACRES $4,300,000 2701 INTERTECH DRIVE, YOUNGSTOWN, MAHONING COUNTY, 44504 INDUSTRIAL PROPERTY FOR SALE 143,789 SF on 20.177 ACRES $4,300,000 BUILDING OVERVIEW PARKER HANNIFIN FACILITY GEAR PUMP DIVISION Zoning - Industrial

More information

Port of Salalah YOUR LOGISTICS ADVANTAGE

Port of Salalah YOUR LOGISTICS ADVANTAGE Port of Salalah YOUR LOGISTICS ADVANTAGE INTRODUCTION Port of Salalah began operations in Nov 1998 and has become one of the most important container and cargo terminals in the region Over 39,153,000 TEU

More information

Confederation Line West Queensway Terrace North. May 27, 2017

Confederation Line West Queensway Terrace North. May 27, 2017 Confederation Line West Queensway Terrace North May 27, 2017 Agenda Background Lincoln Fields Station Concept LRT alignment, southwest of Lincoln Fields to Queensway, including: Pedestrian bridge replacement

More information

ACTIVE STATOR - A MORE EFFICIENT DRIVE TRAIN CONCEPT FOR A WIND TURBINE. Dr. Makhlouf Benatmane - Director Business Development

ACTIVE STATOR - A MORE EFFICIENT DRIVE TRAIN CONCEPT FOR A WIND TURBINE. Dr. Makhlouf Benatmane - Director Business Development ACTIVE STATOR - A MORE EFFICIENT DRIVE TRAIN Dr. Makhlouf Benatmane - Director Business Development The Renewables power train Introduction The active Stator TM Concept DC - AC Architecture Conclusion

More information

COASTAL MARSHLANDS PROTECTION ACT STAFF S FINDINGS & RECOMMENDATIONS. August 11, 2017

COASTAL MARSHLANDS PROTECTION ACT STAFF S FINDINGS & RECOMMENDATIONS. August 11, 2017 COASTAL MARSHLANDS PROTECTION ACT STAFF S FINDINGS & RECOMMENDATIONS August 11, 2017 TO: FROM: APPLICANT: AGENT: Coastal Marshlands Protection Committee: Commissioner Mark Williams, Chairman Mr. Henry

More information

Low Speed Wind Turbines. Current Applications and Technology Development

Low Speed Wind Turbines. Current Applications and Technology Development Low Speed Wind Turbines Current Applications and Technology Development Why low wind speed turbines? Easily accessible prime class 6 sites are disappearing. Many class 6 sites are located in remote areas

More information

SNAME Luncheon 14 Sept Wind Turbine Installation Vessels

SNAME Luncheon 14 Sept Wind Turbine Installation Vessels SNAME Luncheon 14 Sept 2010 Wind Turbine Installation Vessels Introductions SBM Offshore and GustoMSC Wind Turbine Vocabulary / Components Offshore Vessels Typical Installation Methods Market Evolution

More information

HUISDRILL DEEPWATER DRILLSHIP HUISMAN PRODUCT BROCHURE

HUISDRILL DEEPWATER DRILLSHIP HUISMAN PRODUCT BROCHURE HUISDRILL DEEPWATER DRILLSHIP HUISMAN PRODUCT BROCHURE RILLING GENERAL INTRODUCTION 2 Huisman offers complete drilling packages and is dedicated to explore and realise new solutions to improve drilling

More information

FACILITY EXPANDABLE TO 780,000 SF PROPERTY HIGHLIGHTS RESEARCH DR. (PARCEL 43B)

FACILITY EXPANDABLE TO 780,000 SF PROPERTY HIGHLIGHTS RESEARCH DR. (PARCEL 43B) 520,000 SF ON 104.46 ACRES 460-480 RESEARCH DR. (PARCEL 43B) CENTERPOINT COMMERCE & TRADE PARK EAST PITTSTON TOWNSHIP, PA 18640 FACILITY EXPANDABLE TO 780,000 SF LERTA APPROVED! 10-YEAR, 100% REAL ESTATE

More information

SPECIFICATIONS FOR 456,000 SF

SPECIFICATIONS FOR 456,000 SF 200 TECHNOLOGY DRIVE CENTERPOINT COMMERCE & TRADE PARK EAST JENKINS TOWNSHIP, PA SITE PLAN 1,038,500 SF SITE PLAN 456,000 SF - 775,000 SF Information shown is purported to be from reliable sources. No

More information

RAVESTEIN CONTAINER PONTOON. UK71

RAVESTEIN CONTAINER PONTOON.   UK71 RAVESTEIN CONTAINER PONTOON www.rcpbv.com UK71 Welcome Ravestein Container Pontoon BV was established in 1988 in order to put the Ravestein Container Pontoon system on the market. RCP, located in Deest

More information

SUBTOTAL SITE WORK & DEMOLITION (UTILITIES) $180, $348, $319,943.71

SUBTOTAL SITE WORK & DEMOLITION (UTILITIES) $180, $348, $319,943.71 BASE BID 1.00 GENERAL CONDITIONS 1.01 Mobilization (Maximum 5% of Base Bid) LS 1 84,000.00 $ 84,000.00 100,000.00 $ 100,000.00 85,000.00 $ 85,000.00 1.02 Bonding, Insurance, Permits (including Plumbing,

More information

Investment Portfolio. 48 Spiller Dr & 600 County Rd Westbrook, ME Property Highlights. Property Description. For Sale Industrial Buildings

Investment Portfolio. 48 Spiller Dr & 600 County Rd Westbrook, ME Property Highlights. Property Description. For Sale Industrial Buildings For Sale Industrial Buildings $12,500,000 Investment Portfolio 48 Spiller Dr & 600 County Rd Westbrook, ME 04092 Property Highlights 134,000± SF Building on 9.47± acres 28,580± SF Building on 3.06± acres

More information

Cybermarine Offshore Technologies LLC

Cybermarine Offshore Technologies LLC Through the last 20 years, we at CYBERMARINE have been at the fore front of developing designs and providing engineering for asset owners, empowering shipyards and ship repair entities in adding value

More information

Chapter 11 Route Window NE10 Gidea Park station. Transport for London

Chapter 11 Route Window NE10 Gidea Park station. Transport for London Chapter 11 Route Window NE10 Gidea Park station Transport GIDEA PARK STATION 11 Route Window NE10 Gidea Park station Transport Introduction 11.1 The construction activities in this route window are associated

More information

2013 ELR Addendum Note Implications of Siemens / ABP Announcement East Riding of Yorkshire Council

2013 ELR Addendum Note Implications of Siemens / ABP Announcement East Riding of Yorkshire Council Report Report GVA 1 st Floor, City Point 29 King Street Leeds LS1 2HL Implications of Siemens / ABP Announcement April 2014 gva.co.uk Contents 1. Introduction... 1 2. Siemens / ABP proposals... 2 3. Commercial

More information

SWANSTYNESIDE.CO.UK SWANS

SWANSTYNESIDE.CO.UK SWANS SWANSTYNESIDE.CO.UK SWANS Advanced Manufacturing on the Tyne SWANS Station Road, Wallsend, Tyne and Wear, NE28 6EQ Bespoke advanced manufacturing units to let or for sale A strategically located riverside

More information

ADDENDUM #1. A. Alternate Bid Item #3A - The procurement and installation of a new 12,000 gallon UL 2085 rated AGT tank for

ADDENDUM #1. A. Alternate Bid Item #3A - The procurement and installation of a new 12,000 gallon UL 2085 rated AGT tank for ADDENDUM #1 The Plymouth Airport Commission is committed to fulfilling the New Fuel Farm Facility project within the scope of the permit, not exceeding our funding and to satisfy the time constraint associated

More information

Oaks Commerce Center

Oaks Commerce Center Mansour Edlin Consulting 1515 Mockingbird Lane Charlotte, NC 28209 Oaks Commerce Center Water & Sanitary Sewer Improvements Phase I - Concept Utility Plan Gravity Sanitary Sewer A1 Connect to Existing

More information

TetraSpar. Industrialized Floating Foundation

TetraSpar. Industrialized Floating Foundation TetraSpar Industrialized Floating Foundation Pepe Carnevale, March 29th 2017 Stiesdal A/S 2017, All Rights Reserved 1 Introduction Henrik Stiesdal Former CTO of Siemens Wind Power, retired end 2014 Stiesdal

More information

TO LET / FOR SALE.

TO LET / FOR SALE. Wharfdale Road, Tyseley, Birmingham, B11 2DG TO LET / FOR SALE 20,000 sq ft to 10,000 sq ft (1,88 sq m to 13,93 sq m) BUILD TO SUIT INDUSTRIAL UNITS ANCILLARY OFFICES MANUFACTURING WAREHOUSING www.wharfdalepark.com

More information

Port Tariffs. for use of infrastructure and services provided by the Port of Tromsø

Port Tariffs. for use of infrastructure and services provided by the Port of Tromsø Port Tariffs for use of infrastructure and services provided by the Port of Tromsø Valid from 1 January 2018 List of Contents 1. General provisions...3 2. Entry dues...3 3. Use of port infrastructure...3

More information

Appendix C Capital Improvement Program Project Descriptions and Details

Appendix C Capital Improvement Program Project Descriptions and Details Appendix C Capital Improvement Program Project Descriptions and Details GIG HARBOR WW COMP PLAN DRAFT CAPITAL IMPROVEMENT PROGRAM LIFT STATION COST ESTIMATE Lift Station 1 Item Qty Units Unit Cost Extended

More information

Appendix F-1 Description of the Long-Term Alternatives

Appendix F-1 Description of the Long-Term Alternatives Appendix F-1 Description of the Long-Term Alternatives Memorandum Page 1 of 21 Project No. 9309 Phase 280 Date June 2, 2015 From Chris Sidlar (LEA) To Edward Presta / City of Toronto C.C. Terry Wallace

More information

Wentzville Parkway South Phase 2 & 2A

Wentzville Parkway South Phase 2 & 2A Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total

More information

HIGH VOLTAGE HP Water Cooled Dynamometer Calibrated Load Cell, Precision Control and Instrument Package

HIGH VOLTAGE HP Water Cooled Dynamometer Calibrated Load Cell, Precision Control and Instrument Package HIGH VOLTAGE Our new 105,292 sq.ft. Repair, Manufacturing & Distribution Facility: Superior Central Phoenix Location & Highway Access 1881 East University Drive, Phoenix, AZ 85034 8.7 Acres Located in

More information

PPA s Port Infrastructure Development Plans Seminars on Improving Transport Maritime Safety and Development of Port Infrastructure

PPA s Port Infrastructure Development Plans Seminars on Improving Transport Maritime Safety and Development of Port Infrastructure PPA s Port Infrastructure Development Plans Seminars on Improving Transport Maritime Safety and Development of Port Infrastructure BANGKOK, THAILAND December 19-21, 2016 PPA is a public corporate body

More information

Transportation Highway Engineering Conference February 24, 2015

Transportation Highway Engineering Conference February 24, 2015 Transportation Highway Engineering Conference February 24, 2015 Today s Agenda Move Illinois status Jane Addams Memorial (I-90) Rebuilding and Widening Project Building a 21 st century corridor Incorporating

More information

Rosedale Sanitary Sewer Feasibility Review Report

Rosedale Sanitary Sewer Feasibility Review Report Rosedale Sanitary Sewer Feasibility Review Report Submitted by: WEDLER ENGINEERING LLP 201 9300 Nowell Street Chilliwack BC V2P 4V7 Phone: 604 792 0651 Wedler File No: C13 5032/A December 6, 2013 STATEMENT

More information

SPAS Concepts Preliminary Rough Order of Magnitude Cost Estimates

SPAS Concepts Preliminary Rough Order of Magnitude Cost Estimates Appendix G LAX SPECIFIC PLAN AMENDMENT STUDY REPORT SPAS Concepts Preliminary Rough Order of Magnitude Estimates 2011/2012 Prepared for: Los Angeles World Airports One World Way Los Angeles, California

More information

PATRIOT PARK 4050 PATRIOT DRIVE

PATRIOT PARK 4050 PATRIOT DRIVE 50 PATRIOT RIVE URHAM, NORTH CAROLINA INUSTRIAL SPACE FOR LEASE ±159,600 SF - 322,800 SF Road Proposed PATRIOT RIVE BUILING 1 2 X 680 = 163,200 SF LOAING OCKS LOAING OCKS BUILING 2 2 X 665 = 159,600 SF

More information

355,100 Sq. Ft. Manufacturing/Warehouse Facility

355,100 Sq. Ft. Manufacturing/Warehouse Facility Industrial Manufacturing/Distribution Building, Pennsauken, New Jersey 355,100 Sq. Ft. Manufacturing/Warehouse Facility Manufacturing/Warehouse 336,500 sq. ft. Office/Finished Space 18,600 sq. ft. Divisible

More information

No Thoroughfare. Gated Private Road Ahead

No Thoroughfare. Gated Private Road Ahead No Thoroughfare Gated Private Road Ahead 1 Think: Safety and Security In our Community 2 Mainlands Secondary Entrance Barrier Gate Proposal Technology and Cost Study (as Prepared by Gate Committee on April

More information

資料3 PORT OF KAWASAKI

資料3 PORT OF KAWASAKI PORT OF KAWASAKI Ookawa-cho Shiraishi-cho Minami-Watarida-cho Asano-cho Ohgi-machi Ohgishima Mizue-cho Ikegami-cho Chidori-cho Higashi-Ohgishima PORT OF KA The Port of Kawasaki, has been an asset to the

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Liddell Brothers, Inc. - Halifax, MA $1,590,213.00 Northeast Traffic Control Services, Inc. - Plymouth, MA $1,932,117.00 Page 1 of 5 Liddell Brothers, Inc. Halifax, MA 202.2061

More information

Improving the Waterway While Using the Waterway ~ The Chelsea Street Bridge Replacement Project

Improving the Waterway While Using the Waterway ~ The Chelsea Street Bridge Replacement Project Improving the Waterway While Using the Waterway ~ The Chelsea Street Bridge Replacement Project An Overview of Chelsea River The Chelsea River- of strategic importance The Port of Boston handles approximately

More information

Investment Opportunities at POIC Lahad Datu

Investment Opportunities at POIC Lahad Datu Investment Opportunities at POIC Lahad Datu Bilson Kurus, Ph.D POIC Sabah Sdn Bhd International Joint Workshop on New Trends In Nano-Bio Technology 28 th November 2013, Hotel Le Meridien, Kota Kinabalu,

More information

Harbour Group / SCHRAMM Ports & Logistics Brunsbüttel Ports GmbH Glückstadt Port GmbH & Co. KG RENDSBURG PORT GmbH

Harbour Group / SCHRAMM Ports & Logistics Brunsbüttel Ports GmbH Glückstadt Port GmbH & Co. KG RENDSBURG PORT GmbH Harbour Group / SCHRAMM Ports & Logistics Brunsbüttel Ports GmbH Glückstadt Port GmbH & Co. KG RENDSBURG PORT GmbH Brunsbüttel Ports GmbH Elbehafen 25541 Brunsbüttel info-bp@schrammgroup.de www.schrammgroup.de

More information

EXHIBIT C [** Subdivision Name **] (** Filing No., Phase No. '] SUMMARY

EXHIBIT C [** Subdivision Name **] (** Filing No., Phase No. '] SUMMARY EXHIBIT C [** Subdivision Name **] (** Filing No., Phase No. '] SUMMARY DESCRIPTION QTY J ] COST/ _ ] TOTAL AMOUNT STREET IMPROVEMENTS 16,271 LF $151.6 $2,467,247 WATER DISTRIBUTION SYSTEM LF $412,110

More information

UNCOMPROMISING HANDLING PERFORMANCE DIESEL-ELECTRIC MODEL 7 MOBILE HARBOR CRANES

UNCOMPROMISING HANDLING PERFORMANCE DIESEL-ELECTRIC MODEL 7 MOBILE HARBOR CRANES UNCOMPROMISING HANDLING PERFORMANCE DIESEL-ELECTRIC MODEL 7 MOBILE HARBOR CRANES 2 3 MODEL 7 MOBILE HARBOR CRANES OUTSTANDING PERFORMANCE FOR TOUGH APPLICATIONS Gottwald Model 7 Mobile Harbor Cranes are

More information