1 Middle Harbor Project: Draft EIS/EIR LA Chamber of Commerce June 26, 2008, APM Maersk HQ Pier 400 Richard D. Cameron Director of Environmental Planning, Port of Long Beach

2 CEQA/NEPA Process Summary The Port of Long Beach has determined: The need to redevelop two older container terminals into one green, modern terminal That a formal environmental review of the project is necessary The Port is the state lead agency under the California Environmental Quality Act (CEQA) for the preparation of the Environmental Impact Report

3 CEQA/NEPA Process Summary The Army Corps of Engineers (ACOE) is the federal lead agency under the National Environmental Policy Act (NEPA) for the preparation of the Environmental Impact Statement (EIS) Notice of Preparation issued December 30, 2005 Public scoping meetings conducted January 30, 2006 and February 6, 2006

4 Existing Middle Harbor Terminals California United Terminals (CUT) 170-acre break-bulk/container terminal, Piers D and E Long Beach Container Terminal (LBCT) 101-acre container terminal at Pier F

5 Existing Terminal Operations 2005 baseline (CEQA) 294 acres 1.2 million TEUs 185 annual vessel trips 6,528 daily truck trips 2 gates 138 trains (Pier F only) 4,480 linear feet berth length 625 employees

6 Proposed Project Objectives Project Objectives: Consolidate two older container shipping terminals into one green, modern terminal Rehabilitate and modernize existing port facilities Implement Green Port Policy and Clean Air Action Plan Provide efficient terminal traffic flow and cargo handling Link new improved dock and wharf operations to planned and existing on-dock rail yard operations Upgrade electrical utilities to support future Port terminal operations (i.e., shoreside electrical power) Upgrade public safety facilities (e.g. fire stations)

7 Project Alternatives Evaluated potential alternatives Alternatives deemed not feasible Four alternatives considered and analyzed: 345-acre alternative 315-acre alternative Landside-only alternative CEQA No Project alternative

8 Middle Harbor Terminal

9 Proposed Project (345-Acre Alternative) 2025 Terminal Operations 345 acres 4,250 linear feet berth length 2,961 employees 3.3 million TEUs 364 annual vessel trips 10,112 daily truck trips 2 gates 2,098 annual trains

10 Phase 1 Redevelopment Renovate existing Pier E container terminal Widen and deepen Slip 3 Fill 22 acres of Slip 1 New green LEED marine operations buildings

11 Phase 2 Development Renovate existing Pier F container terminal Connect Pier E terminal to Pier F container terminal by filling an additional 40 acres Expand on-dock rail yard Phase II

12 Proposed Project (345-Acre Alternative) Construction Mitigation Measures Electric dredging Fill mitigation bank credits approximately 45 acre credits Low-sulfur fuels Installation of diesel oxidation catalysts on construction equipment Cleaner construction equipment (Tier 3) Temporary noise barriers Time limits for certain activities (e.g. pile-driving activities) Fugitive dust measures Recycling/reuse of construction and demolition materials

13 Proposed Project (345-Acre Alternative) Proposed Construction and Operational Traffic Mitigation Measures: - Construction Traffic Management Plan - Restrict construction-related traffic during morning and afternoon peak commute hours - Install signals at three intersections - I-710 Freeway impact/long-term Improvements Project

14 Proposed Project (345-Acre Alternative) Proposed Operational Air Quality Mitigation Measures: - 100% vessel cold-ironing - 100% vessel compliance with VSR (40-nm) - Use of low-sulfur fuels in 100% of vessels (mains and aux) - Compliance with Clean Trucks Program (CTP) 2007 or better trucks - Tier 4 cargo-handling equipment by 2010 (yard tractors) and 2014 for other on-terminal equipment

15 Proposed Project (345-Acre Alternative) Proposed Operational Air Quality Mitigation Measures (cont.): - Slide valves on ocean-going vessels (retro and new ship builds) - Clean rail yard standards - Truck idling reduction measures - LEED building standards - Solar panels and tree planting (Primary Greenhouse Gas emission reduction measures)

16 Proposed Project (345-Acre Alternative) Mitigated heath risk assessments Reduction in health risks identified Air pollution assessments Overall reductions of 50 percent or greater

17 Air Pollution Analysis (345-Acre Alternative) Changes in Annual Average Daily Emissions Baseline 2030 Percent Change VOC % CO 6,220 2,384-62% NOx 13,995 8,821-37% SOx 2,903 1,014-65% PM % PM %

18 Proposed Project (345-Acre Alternative) Cumulative Impacts: Air Quality Traffic Biological/Invasive Species Environmental Justice (Traffic and Air Quality related) Potential Long-Term Mitigation Fair Share participation in future 710 Improvements Goods movement impact reductions

19 Public Review Released Final Draft EIR/EIS for 45-day public review on May 19, 2008 Conduct two public hearings June 11, 6:30 p.m. at City Hall Council Chambers, 333 W. Ocean Blvd., Long Beach June 18, 6:30 p.m. at Silverado Park, 1545 W. 31 st St., West Long Beach 45-day public comment period ends on July 11, 2008

20 Next steps - Final EIR Respond to comments, prepare final EIR/EIS Release final EIR/EIS for 10-day public review Harbor Commission to consider certification of EIR/EIS and approval of project

21 Thank You

California s Emission Reduction Plan for Ports and International Goods Movement

California s Emission Reduction Plan for Ports and International Goods Movement California s Emission Reduction Plan for Ports and International Goods Movement Alternative Maritime Power Conference Los Angeles Harbor Hotel April 24, 2006 California Environmental Protection Agency

More information

Terry Brennan, June 18, 2008

Terry Brennan, June 18, 2008 10-615 10-616 PORT OF LONG BEACH CHAPTER 10 COMMENTS RECEIVED AND REPONSES TO COMMENTS Terry Brennan, June 18, 2008 TB-1. TB-2. The comment is acknowledged and appreciated The comment concurs with the

More information

What does Sustainability mean?

What does Sustainability mean? Christopher Cannon, Chief Sustainability Officer June 28, 2017 What does Sustainability mean? The ability to meet today s global economic, environmental and social needs without compromising the opportunity

More information

THE PORT OF LOS ANGELES OCCUPIES 4,300 ACRES OF LAND ALONG 43 MILES OF WATERFRONT. THE PORT OF LOS ANGELES IS THE LARGEST PORT IN THE

THE PORT OF LOS ANGELES OCCUPIES 4,300 ACRES OF LAND ALONG 43 MILES OF WATERFRONT. THE PORT OF LOS ANGELES IS THE LARGEST PORT IN THE THE PORT OF LOS ANGELES OCCUPIES 4,300 ACRES OF LAND ALONG 43 MILES OF WATERFRONT. THE PORT OF LOS ANGELES IS THE LARGEST PORT IN THE U.S. AND 13TH LARGEST WORLDWIDE. THE PORT OF LONG BEACH IS THE SECOND

More information

Christopher Cannon, Chief Sustainability Officer Port of Los Angeles AAPA Environmental Committee Meeting November 14/15, 2017

Christopher Cannon, Chief Sustainability Officer Port of Los Angeles AAPA Environmental Committee Meeting November 14/15, 2017 Christopher Cannon, Chief Sustainability Officer Port of Los Angeles AAPA Environmental Committee Meeting November 14/15, 2017 Green Port Building Blocks Environmental responsibility and economic growth

More information

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily 5.8 TRAFFIC, ACCESS, AND CIRCULATION This section describes existing traffic conditions in the project area; summarizes applicable regulations; and analyzes the potential traffic, access, and circulation

More information

San Pedro Bay Ports. Port of Los Angeles 7.9 million TEUs Port of Long Beach 6.0 million TEUs. Total 13.9 million TEUs in 2011

San Pedro Bay Ports. Port of Los Angeles 7.9 million TEUs Port of Long Beach 6.0 million TEUs. Total 13.9 million TEUs in 2011 Port Background San Pedro Bay Ports Port of Los Angeles 7.9 million TEUs Port of Long Beach 6.0 million TEUs Total 13.9 million TEUs in 2011 San Pedro Bay Port Complex Emissions and the Clean Air Action

More information

OVERVIEW, NEAR-TERM PRIORITIES & NEXT STEPS

OVERVIEW, NEAR-TERM PRIORITIES & NEXT STEPS Pacific Ports Clean Air Collaborative March 2018 OVERVIEW, NEAR-TERM PRIORITIES & NEXT STEPS Heather Tomley Director of Environmental Planning Port of Long Beach San Pedro Bay Ports Air Quality Improvements

More information

SECTION 4: CLEAN AIR ACTION PLAN INITATIVES - OVERVIEW

SECTION 4: CLEAN AIR ACTION PLAN INITATIVES - OVERVIEW SECTION 4: CLEAN AIR ACTION PLAN INITATIVES - OVERVIEW This section presents an overview of the Clean Air Action Plan, which consists of six primary elements: 1. Source category control measures for existing

More information

Monitoring, Reporting and Reducing Air Emissions from Marine Operations. Till Stoeckenius, ENVIRON Int. Corp. GreenTech June St.

Monitoring, Reporting and Reducing Air Emissions from Marine Operations. Till Stoeckenius, ENVIRON Int. Corp. GreenTech June St. Monitoring, Reporting and Reducing Air Emissions from Marine Operations Till Stoeckenius, ENVIRON Int. Corp. GreenTech 2014 10-12 June St. John, NB Overview Air quality impacts of marine port operations

More information

VILLASPORT ATHLETIC CLUB AND SPA Draft Environmental Impact Report. Volume I

VILLASPORT ATHLETIC CLUB AND SPA Draft Environmental Impact Report. Volume I VILLASPORT ATHLETIC CLUB AND SPA Draft Environmental Impact Report Volume I SCH No. 2014092038 Prepared for: City of Roseville Planning Department 311 Vernon Street Roseville, California 95746 Prepared

More information

Technology Advancement Program. Presented by: Heather Tomley, Port of Long Beach Kevin Maggay, Port of Los Angeles

Technology Advancement Program. Presented by: Heather Tomley, Port of Long Beach Kevin Maggay, Port of Los Angeles Technology Advancement Program Presented by: Heather Tomley, Port of Long Beach Kevin Maggay, Port of Los Angeles Overview Key to the ports Clean Air Action Plan Goals and structure of the Technology Advancement

More information

Item No.: 5B-Supp Date of Meeting: July 17, Briefing on Air Quality Grant Funding

Item No.: 5B-Supp Date of Meeting: July 17, Briefing on Air Quality Grant Funding Item No.: 5B-Supp Date of Meeting: July 17, 2018 Briefing on Air Quality Grant Funding Briefing NWSA staff is exploring the following grant opportunities to supplement costs associated with emission reduction

More information

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1 Executive Summary Introduction The Eastside Transit Corridor Phase 2 Project is a vital public transit infrastructure investment that would provide a transit connection to the existing Metro Gold Line

More information

TRANSPORTATION AIR QUALITY SUBCOMMITTEE. Port of Houston Authority Air Quality and Sustainability Initiatives December 8, 2015

TRANSPORTATION AIR QUALITY SUBCOMMITTEE. Port of Houston Authority Air Quality and Sustainability Initiatives December 8, 2015 TRANSPORTATION AIR QUALITY SUBCOMMITTEE Port of Houston Authority Air Quality and Sustainability Initiatives December 8, 2015 Ken Gathright Environmental Affairs Department Topics Covered Air Quality Best

More information

Landside Access Modernization Program (LAMP)

Landside Access Modernization Program (LAMP) Landside Access Modernization Program (LAMP) LAX Los Angeles International Airport is the 2 nd busiest airport in the United States and is the largest airport in California. Since the start of the economic

More information

PPA s Port Infrastructure Development Plans Seminars on Improving Transport Maritime Safety and Development of Port Infrastructure

PPA s Port Infrastructure Development Plans Seminars on Improving Transport Maritime Safety and Development of Port Infrastructure PPA s Port Infrastructure Development Plans Seminars on Improving Transport Maritime Safety and Development of Port Infrastructure BANGKOK, THAILAND December 19-21, 2016 PPA is a public corporate body

More information

Key Project Elements Status Report

Key Project Elements Status Report Los Angeles County Metropolitan Transportation Authority Key Project Elements Status Report presented to the Corridor Advisory Committee August 18, 2016 Background Motion 22.1 elements are grouped into

More information

CHEVRON REFINERY MODERNIZATION PROJECT FINAL EIR

CHEVRON REFINERY MODERNIZATION PROJECT FINAL EIR CHEVRON REFINERY MODERNIZATION PROJECT FINAL EIR VOLUME 3A: RESPONSES TO COMMENTS AND DRAFT EIR TEXT REVISIONS CHAPTER 1. INTRODUCTION AND SUMMARY OF CHANGES... 1-1 1.1 PURPOSE OF THE FINAL EIR... 1-1

More information

Table C-1. POLB Middle Harbor Redevelopment Construction/Demolition Activities and Noise Data

Table C-1. POLB Middle Harbor Redevelopment Construction/Demolition Activities and Noise Data Appendix C Noise Table C-1. POLB Middle Harbor Redevelopment Construction/Demolition Activities and Noise Data Activity Equipment HP Wharf Demolition Landside (A) Wharf Demolition Marine (B) Sheet Pile

More information

Current Trends in the Development of Green Ports. APP 102 nd Annual Conference August 16-19, 2015 Kaohsiung, Taiwan

Current Trends in the Development of Green Ports. APP 102 nd Annual Conference August 16-19, 2015 Kaohsiung, Taiwan Current Trends in the Development of Green Ports APP 102 nd Annual Conference August 16-19, 2015 Kaohsiung, Taiwan Agenda Introduction to M&N Services Current Trends in the Development of Green Ports Development

More information

DATE: MAY 3, 2007 ENVIRONMENTAL MANAGEMENT DIVISION

DATE: MAY 3, 2007 ENVIRONMENTAL MANAGEMENT DIVISION DATE: MAY 3, 2007 FROM: ENVIRONMENTAL MANAGEMENT DIVISION SUMMARY: This Board item requests that the Board of Harbor Commissioners approve the allocation and expenditure, from funds previously disbursed

More information

Appendix C. Traffic Impact Study

Appendix C. Traffic Impact Study Appendix C Traffic Impact Study TRAFFIC STUDY FOR THE EAGLE ROCK AGGREGATE TERMINAL Prepared by: FEHR & PEERS 201 Santa Monica Blvd. Suite 500 Santa Monica, CA 90401-2213 T. (310) 458-9916 F. (310) 394-7663

More information

Broward County Intermodal Center And People Mover. AASHTO Value Engineering Conference Presentation. September 1, 2009 San Diego, CA

Broward County Intermodal Center And People Mover. AASHTO Value Engineering Conference Presentation. September 1, 2009 San Diego, CA Project Development & Environment Study Broward County Intermodal Center And People Mover AASHTO Value Engineering Conference Presentation September 1, 2009 San Diego, CA Background P D & E Study Regional

More information

RECOMMENDATION APPROVED; RESOLUTION NO (PERMIT 930) ADOPTED BY THE BOARD OF HARBOR COMMISSIONERS. August 17, 2017

RECOMMENDATION APPROVED; RESOLUTION NO (PERMIT 930) ADOPTED BY THE BOARD OF HARBOR COMMISSIONERS. August 17, 2017 RECOMMENDATION APPROVED; RESOLUTION NO. 17-8154 (PERMIT 930) ADOPTED BY THE BOARD OF HARBOR COMMISSIONERS August 17, 2017 LA THE PORT OF LOS ANGELES Executive Director's Report to the Board of Harbor Commissioners

More information

Mobile Source Air Toxics: Overview and Regulatory Background

Mobile Source Air Toxics: Overview and Regulatory Background Mobile Source Air Toxics: Overview and Regulatory Background Melanie Zeman USEPA Region 2 Northern Transportation & Air Quality Summit August 14, 2008 About MSATs More than 1000 compounds have been identified

More information

Approaches to Address Emissions Associated with Freight. South Coast Air Quality Management District October 2018

Approaches to Address Emissions Associated with Freight. South Coast Air Quality Management District October 2018 Approaches to Address Emissions Associated with Freight South Coast Air Quality Management District October 2018 1 Our Challenge The Los Angeles area has historically suffered from some of the worst air

More information

Appendix D. China Shipping Past Performance Review

Appendix D. China Shipping Past Performance Review Appendix D China Shipping Past Performance Review August 214 CHINA SHIPPING PERFORMANCE REVIEW ANALYSIS This technical memorandum describes the findings of a review of air quality impacts from operations

More information

CleanAir Logix Environmentally Responsible Logistics Solutions Green Tech Town Hall

CleanAir Logix Environmentally Responsible Logistics Solutions Green Tech Town Hall CleanAir Logix Environmentally Responsible Logistics Solutions Green Tech Town Hall June 19, 2008 The Problem Air Quality & Pollution Harmful air pollutants must be dramatically eliminated &/or reduced

More information

Pacific Ports Conference on Clean Air Policies and Strategies

Pacific Ports Conference on Clean Air Policies and Strategies Pacific Ports Conference on Clean Air Policies and Strategies 2006. 12. 13 Overview of Busan Port 2 nd Largest City in Korea World s 5 th Largest Container Port Global Production Base City of Tourism &

More information

Green Terminal Operations

Green Terminal Operations Green Terminal Operations Marine Terminal Management Training Program Session VII Long Beach, CA October 16, 2007 T.L. Garrett Pacific Merchant Shipping Association The Air is Getting Cleaner! 2007 Cleanest

More information

Reducing Emissions from Marine Shipping Update on Local Initiatives. Santa Barbara Channel Shipping Lanes

Reducing Emissions from Marine Shipping Update on Local Initiatives. Santa Barbara Channel Shipping Lanes Reducing Emissions from Marine Shipping Update on Local Initiatives District: Brian Shafritz Mary Byrd Partners: Sean Hastings, NOAA Channel Islands National Marine Sanctuary Kristi Birney, Environmental

More information

Port of Seattle: Where a Sustainable World is Headed Sarah Flagg Seaport Air Quality Program Manager Port of Seattle

Port of Seattle: Where a Sustainable World is Headed Sarah Flagg Seaport Air Quality Program Manager Port of Seattle Port of Seattle: Where a Sustainable World is Headed Sarah Flagg Seaport Air Quality Program Manager Port of Seattle AAPA Port Operations, Safety & Information Technology Seminar Seminar 1 June 11, 2009

More information

January 2012 (Revised July 2012) US Army Corps of Engineers Savannah District South Atlantic Division

January 2012 (Revised July 2012) US Army Corps of Engineers Savannah District South Atlantic Division ENVIRONMENTAL IMPACT STATEMENT APPENDIX K: Air Emission Inventory and Assessment SAVANNAH HARBOR EXPANSION PROJECT Chatham County, Georgia and Jasper County, South Carolina January 2012 (Revised July 2012)

More information

REALIZING THE AIR QUALITY BENEFITS OF PORT INFRASTRUCTURE PROJECTS. A Case Study of the Alameda Corridor

REALIZING THE AIR QUALITY BENEFITS OF PORT INFRASTRUCTURE PROJECTS. A Case Study of the Alameda Corridor REALIZING THE AIR QUALITY BENEFITS OF PORT INFRASTRUCTURE PROJECTS A Case Study of the Alameda Corridor April 29, 25 Dr. Margaret Lobnitz, Weston Solutions, Inc. 1 BACKGROUND In mid-198 s, growing concern

More information

Exposition Corridor Transit Project

Exposition Corridor Transit Project Exposition Corridor Transit Project Phase 2 Environmental Planning Community Meeting June 9, 2008 Exposition Corridor Transit Project Phase 2 AGENDA Remaining Grade Crossing Recommendations June 9, 2008

More information

AMBER M. KLESGES BOARD SECRETARY. No.\w-Tm

AMBER M. KLESGES BOARD SECRETARY. No.\w-Tm \C. 9! J RECOMMENDATION APPROVED; RESOLUTION NO. 16-7999 AND TEMPORARY ORDER 16-7209 & PERMANENT ORDER 16-7210 ADOPTED; BY THE BOARD OF HARBOR COMMISSIONERS \b 1 September 15, 2016 1A THE PORT OF LOS ANGELES

More information

Berth [TraPac] Container Terminal Project Environmental Impact Report Addendum #2 [SCH No , APP No ]

Berth [TraPac] Container Terminal Project Environmental Impact Report Addendum #2 [SCH No , APP No ] Berth 136-147 [TraPac] Container Terminal Project Environmental Impact Report Addendum #2 [SCH No. 2003104005, APP No. 150819-102] Prepared by City of Los Angeles Harbor Department Environmental Management

More information

Questions/Comments During Workshop

Questions/Comments During Workshop Potential Changes to the PERP Regulation and Portable Engine ATCM September 13, 2016 Fresno California Environmental Protection Agency Air Resources Board Questions/Comments During Workshop We want as

More information

2011 Air Emissions Inventory

2011 Air Emissions Inventory SECTION 3 HARBOR CRAFT This section presents emissions estimates for the commercial harbor craft source category, including source description (3.1), geographical delineation (3.2), data and information

More information

TRUCKS IN WEST OAKLAND COMMUNITY WORKSHOP

TRUCKS IN WEST OAKLAND COMMUNITY WORKSHOP AGENDA I. Registration & Light Dinner II. Meeting begins Welcome & Introductions Agenda Review Facilitator: Surlene Grant, Envirocom Communications Strategies, LLC III. How Trucks Serve the Port Richard

More information

Corridor Management Committee. March 7, 2012

Corridor Management Committee. March 7, 2012 Corridor Management Committee March 7, 2012 2 Today s Topics SWLRT Project Office Update Engineering Services Procurement Update Legislative Leadership Tour Annual New Starts Report Update on Proposed

More information

LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY (LACMTA) AND FEDERAL TRANSIT ADMINISTRATION (FTA)

LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY (LACMTA) AND FEDERAL TRANSIT ADMINISTRATION (FTA) LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY (LACMTA) AND FEDERAL TRANSIT ADMINISTRATION (FTA) NOTICE OF PREPARATION (NOP)/NOTICE OF INTENT (NOI) OF AN ENVIRONMENTAL IMPACT STATEMENT (EIS)/ENVIRONMENTAL

More information

MARINE VESSEL REPOWER APPLICATION

MARINE VESSEL REPOWER APPLICATION CARL MOYER MEMORIAL AIR QUALITY STANDARDS ATTAINMENT PROGRAM MARINE VESSEL REPOWER APPLICATION Revised 08/2016 1 of 10 CARL MOYER RURAL ASSISTANCE PROGRAM Instruction Sheet The California Air Pollution

More information

Long Beach Harbor Department Green Port Policy - White Paper

Long Beach Harbor Department Green Port Policy - White Paper The Port of Long Beach (Port) has a strong, long-standing commitment to the environment. In 2003, the Port brought its existing environmental programs under one umbrella known as the Healthy Harbor Program,

More information

1.1 Purpose of This Environmental Impact Report EIR Process Use of This Report Report Organization...

1.1 Purpose of This Environmental Impact Report EIR Process Use of This Report Report Organization... Table of Contents SUMMARY PAGE S.1 Project Location and Project Characteristics... S-1 S.2 Project Objectives... S-9 S.3 Project Approvals... S-11 S.4 Impacts and Mitigation Measures... S-12 S.5 Alternatives...

More information

IMPLEMENTATION STAKEHOLDER ADVISORY MEETING March 29, 2018

IMPLEMENTATION STAKEHOLDER ADVISORY MEETING March 29, 2018 IMPLEMENTATION STAKEHOLDER ADVISORY MEETING March 29, 2018 Role of the CAAP Implementation Stakeholder Advisory Meeting NEAR-TERM PRIORITIES FOR CAAP IMPLEMENTATION Heather Tomley Director of Environmental

More information

Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007

Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007 EAST-WEST CORRIDOR Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007 Presentation Agenda Project Overview / Purpose and Need Highway Component Transit Component

More information

Evolution Of Tier 4 Regulations & Project Specific Diesel Engine Emissions Requirements

Evolution Of Tier 4 Regulations & Project Specific Diesel Engine Emissions Requirements Evolution Of Tier 4 Regulations & Project Specific Diesel Engine Emissions Requirements Association of Equipment Managers (AEM) CONEXPO / CON-AGG 2014 Las Vegas, NV March 5, 2014 1 1 Topics To Be Covered

More information

Section 3.12 Traffic and Transportation

Section 3.12 Traffic and Transportation Section. Traffic and Transportation SECTION SUMMARY This section describes existing ground transportation within the Port and surrounding area associated with implementation of the proposed Project. An

More information

Port of Long Beach. Diesel Emission Reduction Program

Port of Long Beach. Diesel Emission Reduction Program Diesel Emission Reduction Program Competition Port of Long Beach, Planning Division July 16, 2004 Contact: Thomas Jelenić, Environmental Specialist 925 Harbor Plaza, Long Beach, CA 90802 (562) 590-4160

More information

ATTACHMENT C.1 EXXONMOBIL INTERIM TRUCKING FOR SYU PHASED RESTART AIR QUALITY ANALYSIS

ATTACHMENT C.1 EXXONMOBIL INTERIM TRUCKING FOR SYU PHASED RESTART AIR QUALITY ANALYSIS ATTACHMENT C.1 EXXONMOBIL INTERIM TRUCKING FOR SYU PHASED RESTART AIR QUALITY ANALYSIS Revision 2 Page 1 of 7 January 2018 ExxonMobil Production Company, a division of Exxon Mobil Corporation (ExxonMobil

More information

SHANGHAI GREEN PORT CONSTRUCTION SHANGHAI MUNICIPAL TRANSPORTATION COMMISSIN

SHANGHAI GREEN PORT CONSTRUCTION SHANGHAI MUNICIPAL TRANSPORTATION COMMISSIN SHANGHAI GREEN PORT CONSTRUCTION SHANGHAI MUNICIPAL TRANSPORTATION COMMISSIN 2018.3.20 目录 CONTENTS MAIN PROFILE OF SHANGHAI PORT GREEN PORT CONSTRUCTION VESSEL POLLUTION REDUCTION PLAN PORT AREA GOVERNANCE

More information

Highlights from EPA s Ports Initiative Sarah Froman U.S. EPA - Office of Transportation & Air Quality

Highlights from EPA s Ports Initiative Sarah Froman U.S. EPA - Office of Transportation & Air Quality Highlights from EPA s Ports Initiative Sarah Froman U.S. EPA - Office of Transportation & Air Quality AAPA Spring Conference April 5, 2017 Overview Background on EPA s Ports Work Highlights of Recent Activities

More information

Comprehensive Regional Goods Movement Plan and Implementation Strategy Goods Movement in the 2012 RTP/SCS

Comprehensive Regional Goods Movement Plan and Implementation Strategy Goods Movement in the 2012 RTP/SCS Comprehensive Regional Goods Movement Plan and Implementation Strategy Goods Movement in the 2012 RTP/SCS Annie Nam Southern California Association of Governments September 24, 2012 The Goods Movement

More information

Appendix G Traffic Study Methodology

Appendix G Traffic Study Methodology REVISED DRAFT ENVIRONMENTAL IMPACT REPORT/ Appendix G Traffic Forecasting Model Methodology In addition to the existing/baseline condition (year 2005), a level of service (LOS) analysis was conducted for

More information

Consistent implementation of the 2020 sulphur limit and work to further address GHG emissions from international shipping

Consistent implementation of the 2020 sulphur limit and work to further address GHG emissions from international shipping Consistent implementation of the 2020 sulphur limit and work to further address GHG emissions from international shipping IBIA/BMS United A glimpse into the future of shipping 30 May 2018, Athens, Greece

More information

House Transportation and Infrastructure Committee. Climate Change and Energy Independence: Transportation and Infrastructure Issues

House Transportation and Infrastructure Committee. Climate Change and Energy Independence: Transportation and Infrastructure Issues House Transportation and Infrastructure Committee Climate Change and Energy Independence: Transportation and Infrastructure Issues May 16, 2007 Room 2167, Rayburn House Office Building Washington, D.C.

More information

RAILYARDS SUPPORT A VARIETY OF OPERATIONS INCLUDING: LOCOMOTIVES, ON-ROAD AND OFF-ROAD TRUCKS, CARGO-HANDLING EQUIPMENT, TRANSPORTATION

RAILYARDS SUPPORT A VARIETY OF OPERATIONS INCLUDING: LOCOMOTIVES, ON-ROAD AND OFF-ROAD TRUCKS, CARGO-HANDLING EQUIPMENT, TRANSPORTATION RAILYARDS SUPPORT A VARIETY OF OPERATIONS INCLUDING: LOCOMOTIVES, ON-ROAD AND OFF-ROAD TRUCKS, CARGO-HANDLING EQUIPMENT, TRANSPORTATION REFRIGERATION UNITS AND MAINTENANCE SHOPS. CHAPTER FIVE railyards

More information

Port Yard Hostler Demo Projects: Assessing LNG & Hybrid Yard Hostlers at POLB & POLA

Port Yard Hostler Demo Projects: Assessing LNG & Hybrid Yard Hostlers at POLB & POLA Port Yard Hostler Demo Projects: Assessing LNG & Hybrid Yard Hostlers at POLB & POLA Advanced Transportation Technologies Clean Transportation SM Solutions Brad Rutledge EPA West Coast Collaborative Trucking

More information

(lb/day) Excavation and Installation. NO NO NO NO NO Emission calculations assume that all construction phases overlap.

(lb/day) Excavation and Installation. NO NO NO NO NO Emission calculations assume that all construction phases overlap. from the OCSD Pump Station Table Sum-A Maximum Daily Construction by (pre-mitigation) Combustion PM10 Fugitive PM10 Total PM10 CO (lb/day) ROC (lb/day) NOx (lb/day) SOx (lb/day) (lb/day) (lb/day) (lb/day)

More information

2012 Air Emissions Inventory

2012 Air Emissions Inventory SECTION 3 HARBOR CRAFT This section presents emissions estimates for the commercial harbor craft source category, including source description (3.1), geographical domain (3.2), data and information acquisition

More information

Harlem Avenue between 63 rd and 65 th

Harlem Avenue between 63 rd and 65 th Harlem Avenue between 63 rd and 65 th Public Meeting #2 March 13, 2018 Summit Park District Welcome to the second Public Meeting for the preliminary engineering and environmental studies of Illinois 43

More information

South Gloucestershire Challenge Fund and Cycle Ambition Fund

South Gloucestershire Challenge Fund and Cycle Ambition Fund South Gloucestershire Challenge Fund and Cycle Ambition Fund The Challenge Fund A4174 scheme is coordinated and delivered by South Gloucestershire Council who were awarded 14 million pounds from the Department

More information

Request for Information for Ocean Going Vessel At Berth Emissions Reduction Technologies for use at the Port of Long Beach and the Port of Los Angeles

Request for Information for Ocean Going Vessel At Berth Emissions Reduction Technologies for use at the Port of Long Beach and the Port of Los Angeles Ocean Going Vessel At Berth Emissions Reduction Technologies for use at the Port of Long Beach and the Port of Los Angeles REQUEST FOR INFORMATION October 12, 2010 DATE: October 12, 2010 TO: SUBJECT: Vendors/Consultants

More information

IAPH Tool Box for Port Clean Air Programs

IAPH Tool Box for Port Clean Air Programs ENGINE STANDARDS Background Ports around the world depend on the efficiency of the diesel engine to power port operations in each source category ocean/sea-going vessels, harbor craft, cargo handling equipment,

More information

Questions & Answers. Vermont Clean Diesel Grant Program. Release Date: July 14, 2017 Proposals Due: August 14, 2017 at 4:00 pm

Questions & Answers. Vermont Clean Diesel Grant Program. Release Date: July 14, 2017 Proposals Due: August 14, 2017 at 4:00 pm Questions & Answers Vermont Clean Diesel Grant Program Release Date: July 14, 2017 Proposals Due: August 14, 2017 at 4:00 pm Q & A/ In Person Meeting: July 25, 2017 10:00 am - 12:00 pm National Life Building

More information

Control and Prohibition of Air Pollution from Diesel-Powered Motor Vehicles. (Diesel Powered Motor Vehicle Inspection and Maintenance Program)

Control and Prohibition of Air Pollution from Diesel-Powered Motor Vehicles. (Diesel Powered Motor Vehicle Inspection and Maintenance Program) ENVIRONMENTAL PROTECTION ENVIRONMENTAL REGULATION OFFICE OF AIR QUALITY MANAGEMENT Control and Prohibition of Air Pollution from Diesel-Powered Motor Vehicles (Diesel Powered Motor Vehicle Inspection and

More information

Strategic Plans for Sustainable Ports: The Northwest Ports Clean Air Strategy Experience. Amy Fowler, Puget Sound Clean Air Agency

Strategic Plans for Sustainable Ports: The Northwest Ports Clean Air Strategy Experience. Amy Fowler, Puget Sound Clean Air Agency Strategic Plans for Sustainable Ports: The Northwest Ports Clean Air Strategy Experience Amy Fowler, Puget Sound Clean Air Agency What s Ahead Why build a strategy focused on port-related emissions? The

More information

Air Action Program: Addressing Air Quality and Climate Change

Air Action Program: Addressing Air Quality and Climate Change Air Action Program: Addressing Air Quality and Climate Change Executive Summary Port Metro Vancouver is working hard to reduce air emissions of criteria contaminants, air toxics and greenhouse gases. Reducing

More information

Port of Richmond Clean Air Action Plan 2015 PROGRESS REPORT

Port of Richmond Clean Air Action Plan 2015 PROGRESS REPORT Port of Richmond Clean Air Action Plan 2015 PROGRESS REPORT 2015 CAAP Progress Report Page i Port of Richmond, CA 2015 Port of Richmond Clean Air Action Plan Progress Report Executive Summary The goal

More information

Capital Improvement Projects Status Report December 2014 (Actuals through October) Percent Design Complete. Design Finish. Construction Finish

Capital Improvement Projects Status Report December 2014 (Actuals through October) Percent Design Complete. Design Finish. Construction Finish Title I. Terminals Berth 90-93 - World Cruise Center 4. B. 93 - Cruise Terminal - Customs and Border Protection Improvements Conceptual (2525300) d 11/27/14 100% N/A $140,000 $73,479 52% 5. B. 91-93 -

More information

Highlights from EPA s Ports Initiative Mike Moltzen U.S. EPA - Office of Transportation & Air Quality

Highlights from EPA s Ports Initiative Mike Moltzen U.S. EPA - Office of Transportation & Air Quality Highlights from EPA s Ports Initiative Mike Moltzen U.S. EPA - Office of Transportation & Air Quality AAPA Cruise Seminar February 14, 2017 Overview Background on EPA s Ports Work Highlights of Activities

More information

Electrical Power Generator Use and Procurement Guidance

Electrical Power Generator Use and Procurement Guidance Electrical Power Generator Use and Procurement Guidance For compliance with applicable air emission control regulations December 2016 Prepared by: Syracuse University Environmental Health & Safety Services

More information

Impact of Transportation Emissions on New Jersey s Air Quality

Impact of Transportation Emissions on New Jersey s Air Quality Impact of Transportation Emissions on New Jersey s Air Quality Sum of Ozone Precursors: VOC and NO x Emissions Percentage of Volatile Organic Compounds (VOCs and Oxides of Nitrogen (NOx by Source Category

More information

To Infill or Not to Infill?

To Infill or Not to Infill? To Infill or Not to Infill? Mark Fuhrmann Program Director, Rail New Starts Metropolitan Council/Metro Transit MarySue Abel Deputy Project Director, METRO Blue Line Extension Metropolitan Council/Metro

More information

EXECUTIVE SUMMARY. Introduction

EXECUTIVE SUMMARY. Introduction EXECUTIVE SUMMARY Introduction The purpose of this study is to ensure that the Village, in cooperation and coordination with the Downtown Management Corporation (DMC), is using best practices as they plan

More information

Air Quality Mandates Affecting the Caltrans Fleet Caltrans Division of Equipment Sacramento, CA June, 2009

Air Quality Mandates Affecting the Caltrans Fleet Caltrans Division of Equipment Sacramento, CA June, 2009 Air Quality Mandates Affecting the Caltrans Fleet Caltrans Division of Equipment Sacramento, CA June, 2009 Presentation Overview ARB On Road Mandate ARB Off Road Mandate South Coast AQMD Fleet Rules ARB

More information

APPENDIX E: ELECTRIC AND MAGNETIC FIELDS MANAGEMENT PLAN

APPENDIX E: ELECTRIC AND MAGNETIC FIELDS MANAGEMENT PLAN APPENDIX E: Final EIS/EIR E-1 FINAL ENVIRONMENTAL IMPACT STATEMENT/ENVIRONMENTAL IMPACT REPORT APPENDIX E: THIS PAGE INTENTIONALLY LEFT BLANK E-2 May 2011 LOS ANGELES DEPARTMENT OF WATER AND POWER Barren

More information

IV. REVISIONS TO THE DRAFT IS/MND

IV. REVISIONS TO THE DRAFT IS/MND IV. REVISIONS TO THE DRAFT IS/MND 1. REVISIONS TO THE DRAFT IS/MND This section presents corrections and clarifications that have been made to the text of the Draft IS/MND. These changes include revisions

More information

Update: VW Mitigation Fund Planning

Update: VW Mitigation Fund Planning Update: VW Mitigation Fund Planning February 8, 2017 Volkswagen Settlement 2015 U.S. EPA Notice of Violation to VW/Audi Approximately 500,000 diesel cars with 2.0 liter engines included software that circumvents

More information

WRAP Oil & Gas: 2002/2005 and 2018 Area Source Controls Evaluation

WRAP Oil & Gas: 2002/2005 and 2018 Area Source Controls Evaluation WRAP Oil & Gas: 2002/2005 and 2018 Area Source Controls Evaluation WRAP SSJF Oil and Gas Work Group Members and Other Interested Parties May 30, 2007 1 WRAP Phase II Project Overview Project is focused

More information

AMERICAN ASSOCIATION OF PORT AUTHORITIES

AMERICAN ASSOCIATION OF PORT AUTHORITIES AMERICAN ASSOCIATION OF PORT AUTHORITIES E N V I R O N M E N T C O M M I T T E E M E E T I N G N O V E M B E R 1 4, 2 0 1 7 WILLIAM M. GUERRY Partner Environmental 2 Volkswagen ( VW ) Settlements 3 Environmental

More information

from OCSD Chemical Treatment Facility. Table SUM-A Maximum Daily Construction by Phase (no mitigation) Phase CO (lb/day) ROC (lb/day) NOx (lb/day) SOx (lb/day) Combustion Fugitive PM10 Total PM10 PM10

More information

MITIGATION LIST USS IOWA PROJECT ENVIRONMENTAL IMPACT REPORT (EIR)

MITIGATION LIST USS IOWA PROJECT ENVIRONMENTAL IMPACT REPORT (EIR) MITIGATION LIST USS IOWA PROJECT ENVIRONMENTAL IMPACT REPORT (EIR) Prepared by: ENVIRONMENTAL MANAGEMENT DIVISION LOS ANGELES HARBOR DEPARTMENT With Assistance From: RBF CONSULTING Contact: ENVIRONMENTAL

More information

B. Approval of the Statement of Proceedings/Minutes for the meeting of October 24, 2017.

B. Approval of the Statement of Proceedings/Minutes for the meeting of October 24, 2017. COUNTY OF SAN DIEGO AIR POLLUTION CONTROL BOARD REGULAR MEETING MEETING AGENDA WEDNESDAY, NOVEMBER 15, 2017, 9:00 AM BOARD OF SUPERVISORS NORTH CHAMBER 1600 PACIFIC HIGHWAY SAN DIEGO, CA 92101 A. Roll

More information

Re: Appeal of Level I Coastal Development Permit No

Re: Appeal of Level I Coastal Development Permit No March 15, 2019 Los Angeles Board of Harbor Commissioners Harbor Administration Building 425 S. Palos Verdes Street San Pedro, California 90731 c/o Director of Planning and Strategy Harbor Department 425

More information

Truck Drayage Metrics

Truck Drayage Metrics Truck Drayage Metrics Frank Harder The Group, Inc. AAPA/EDF Environmental Performance Metrics Workshop October 10, 2012 www.tiogagroup.com/215-557-2142 Key Questions and Answers Key questions Where are

More information

Exhibit A Sound Transit Board Resolution R Selecting the bicycle, pedestrian, and parking access improvements to be built for the Puyallup

Exhibit A Sound Transit Board Resolution R Selecting the bicycle, pedestrian, and parking access improvements to be built for the Puyallup Exhibit A Sound Transit Board Resolution R2016-07 Selecting the bicycle, pedestrian, and parking access improvements to be built for the Puyallup Access Improvement Project. RESOLUTION NO. R2016-07 Selecting

More information

2008 Air Emissions Inventory SECTION 3 HARBOR CRAFT

2008 Air Emissions Inventory SECTION 3 HARBOR CRAFT SECTION 3 HARBOR CRAFT This section presents emissions estimates for the commercial harbor craft source category, including source description (3.1), data and information acquisition (3.2), operational

More information

MARPOL Annex VI Emission Control Areas. CDR Ryan Allain U.S. Coast Guard Environmental Standards Division Washington, D.C.

MARPOL Annex VI Emission Control Areas. CDR Ryan Allain U.S. Coast Guard Environmental Standards Division Washington, D.C. MARPOL Annex VI Emission Control Areas CDR Ryan Allain U.S. Coast Guard Environmental Standards Division Washington, D.C. ECA Requirements Why? Compliance with the MARPOL Annex VI air emission standards,

More information

EPA s Proposal for Nonroad Diesel Engines & Fuel. Chet France, U.S. EPA STAPPA / ALAPCO Spring Membership Meeting May 4, 2003

EPA s Proposal for Nonroad Diesel Engines & Fuel. Chet France, U.S. EPA STAPPA / ALAPCO Spring Membership Meeting May 4, 2003 EPA s Proposal for Nonroad Diesel Engines & Fuel Chet France, U.S. EPA STAPPA / ALAPCO Spring Membership Meeting May 4, 2003 1 2 Presentation Overview Scope of the Proposal Proposal Overview Cost Impacts

More information

CMAA Southern California Chapter Dinner Los Angeles World Airports Capital Program

CMAA Southern California Chapter Dinner Los Angeles World Airports Capital Program CMAA Southern California Chapter Dinner Los Angeles World Airports Capital Program Presented by Cynthia Guidry LAWA Capital Programming, Planning and Engineering Group July 23, 2015 2 World s busiest Origin

More information

McNICOLL BUS GARAGE. Public Open House June 12, 2017 Mary Ward Catholic School

McNICOLL BUS GARAGE. Public Open House June 12, 2017 Mary Ward Catholic School McNICOLL BUS GARAGE Public Open House June 12, 2017 Mary Ward Catholic School THE NEED FOR A NEW BUS GARAGE riders Increased ridership means buses Need for new buses garage And a new bus facility Garages

More information

Vessel Main Engine Fuel Incentive Program. CAAP Measure OGV4

Vessel Main Engine Fuel Incentive Program. CAAP Measure OGV4 Vessel Main Engine Fuel Incentive Program CAAP Measure OGV4 Joint ports CAAP adopted November 2006 CAAP included 5 Ocean Going Vessel control measures (OGV) OGV4 focused on vessel main engine fuel use

More information

On-Road Emissions Reductions and the Regional Comprehensive Goods Movement Plan Background and Policy Questions

On-Road Emissions Reductions and the Regional Comprehensive Goods Movement Plan Background and Policy Questions On-Road Emissions Reductions and the Regional Comprehensive Goods Movement Plan Background and Policy Questions Presented to SCAG Regional Goods Movement Study Steering Committee Tom Kear Cambridge Systematics

More information

UCSF Mount Zion Proposed Garage 2420 Sutter Street. November 18,

UCSF Mount Zion Proposed Garage 2420 Sutter Street. November 18, UCSF Mount Zion Proposed Garage 2420 Sutter Street November 18, 2010 1 UCSF Mount Zion UCSF Comprehensive Cancer Center -- only comprehensive cancer center in Northern California, designated by the National

More information

Mobile Source Committee Update

Mobile Source Committee Update OTC Stakeholder Meeting September 24 th, 2014 Washington, DC OZONE TRANSPORT COMMISSION Mobile Source Committee Update 1 Committee Charge Goal: To identify potential strategies for consideration at the

More information

Alternative Fuel Vehicle Program and Garbage Trucks

Alternative Fuel Vehicle Program and Garbage Trucks Alternative Fuel Vehicle Program and Garbage Trucks Transportation and Environment Committee March 26, 2007 Revision-4; 03/21/07 @ 6:09pm 1 Purpose Review alternative fuel vehicle program Review factors

More information

Figure 4.1 presents the distribution of the 1,343 pieces of equipment inventoried at the Port for 2006.

Figure 4.1 presents the distribution of the 1,343 pieces of equipment inventoried at the Port for 2006. SECTION 4 CARGO HANDLING EQUIPMENT This section presents emissions estimates for the cargo handling equipment source category, including source description (4.1), geographical delineation (4.2), data and

More information