GENERAL DIRECTION SOUGHT AND SPECIFIC QUESTIONS TO BE ANSWERED

Size: px
Start display at page:

Download "GENERAL DIRECTION SOUGHT AND SPECIFIC QUESTIONS TO BE ANSWERED"

Transcription

1 DATE: June 28, 2011 STAFF: Brian Janonis Brian Moeck, PRPA Pre-taped staff presentation: none WORK SESSION ITEM FORT COLLINS CITY COUNCIL SUBJECT FOR DISCUSSION Electric Transmission Update. EXECUTIVE SUMMARY Brian Moeck, General Manager of Platte River Power Authority, will provide an update on the reconstruction of the Dixon Creek to Horseshoe 230 kv transmission line, along with a general discussion on undergrounding transmission facilities. Additionally, Mr. Moeck will provide information on the proposed construction of walls around the Dixon Creek Substation at Overland Trail and Drake and the Timberline Substation, just south of Prospect on Timberline GENERAL DIRECTION SOUGHT AND SPECIFIC QUESTIONS TO BE ANSWERED This work session is for information purposes upon request of City Council. No specific direction from Council is being sought at this time. BACKGROUND / DISCUSSION Platte River is currently in the process of reconstructing the Dixon Creek to Horseshoe line. Dixon Creek Substation is located at the west end of Drake Road and Horseshoe Substation is just north of 57th Avenue on Shields/North Taft Avenue in Loveland. The project is being completed in three segments. The first segment built for the project was the new 2.5 mile-long underground section that runs from Trilby and Shields in Fort Collins to the Horseshoe Substation in Loveland. That segment of the project was completed in late summer The second segment of the project is the rebuilding of an existing 115kV wood pole overhead transmission line owned by Tri-State that connects a small switching station at the south end of Horsetooth Reservoir to the Trilby Substation at Shields and Trilby. Tri-State Generation and Transmission Association owns the 115kV transmission line which was installed in the early 1970s. Platte River and Tri-State agreed on a contract which allows Platte River to rebuild the four-mile overhead transmission line and convert it to a double circuit 230kV design. Platte River will own the 230kV circuit for the connection to the underground transmission segment to Loveland and pay for the rebuilding. Tri-State will own the 115kV circuit connecting the Horsetooth Tap Switching Station to the Trilby Substation. No new right-of-way was needed for this segment of the project, which was completed three months ago.

2 June 28, 2011 Page 2 The final transmission segment to be installed for the project is the rebuild of the existing Western Area Power Transmission 115kV transmission line from Dixon Creek Substation to the south end of Horsetooth Reservoir. Platte River plans to rebuild this almost four mile long transmission segment within the existing right-of-way using overhead poles that are identical to the poles installed several years ago along Overland Trail when Platte River rebuilt that portion of Western s transmission line. The rebuilt transmission line will support two transmission circuits: one will be the replacement for an existing Western transmission line using a slightly larger conductor size; the second circuit will be the Platte River 230kV circuit. As noted in the attached Platte River ten-year transmission study (Attachment 1), the next transmission line project Platte River has planned in the Fort Collins area will be construction of a new line to connect a new substation in the Northeast portion of the City. This is not anticipated to occur until after 2015 when the City advises Platte River that transmission support is needed for a new NE Fort Collins distribution substation. Undergrounding Transmission Lines Questions have been raised about the feasibility of undergrounding transmission lines in Fort Collins. Utilities staff, along with PRPA, have developed a very rough non-engineered estimate of the cost of undergrounding the transmission lines within the city. A map detailing the area transmission lines along with ownership information is attached (Attachment 2). The roughly estimated cost to underground the lines within the city is approximately $350 million. PRPA estimates that it would take approximately 10 years to underground all of the lines within the city. NOTE: Western Area Power Authority and Tri-State share many of the transmission poles in the City. They would have to be consulted and their approval gained to underground their lines. Staff has calculated the approximate rate impact if the project were financed over a 30-year period at 5%. The table below reflects the approximate rate increases required. As noted, costs are a very rough estimate. Engineered plans will be required to determine actual pricing. Rate Class Rate Increase R Residential 18.3% RD Residential Demand 20.2% GS General Service 21.7% GS50 Small Commercial 24.5% GS750 Large Commercial Industrial 30.2% CONTRACT Contract Customer 36.1% FLOOD LIGHTS Flood Lights 7.1% TRAFFIC Traffic signals 27.7% Since no customer benefits more than any other from undergrounding the transmission line then the cost could also be allocated as a fixed cost. The increase per customer would be $29 per month per account.

3 June 28, 2011 Page 3 ATTACHMENTS 1. PRPA Ten-Year Transmission Plan Study Report 2. Foothills Area Map Transmission Plan

4 Platte River Power Authority Ten-Year Transmission Plan ( ) Prepared by PRPA System Planning January 27, 2011

5 Table of Contents I. Executive Summary II. III. IV. Scope Assumptions Criteria V. Procedure VI. VII. VIII. Results o Operating Horizon o Near-Term Planning Horizon o Longer-Term Planning Horizon o Transient Stability Analysis o Prior Outage Initial Conditions o PRPA Sub-Area Reactive Power Assessment o Short-Circuit Analysis Conclusions Additional Reports Exhibit 1 Exhibit 2 Exhibit 3 Exhibit 4 Exhibit 5 Exhibit 6 Exhibit 7 Exhibit 8 Exhibit 9 Exhibit 10 Exhibit Transmission System Map and Plan of Service Diagrams Foothills Study Area PRPA 10-year Load Forecast by Substation PRPA Load and Resource Allocations Study Procedure Forced Outage Contingencies Transient Stability Fault Descriptions PRPA Sub-Area Reactive Power Assessment Matrix Power Flow Study Results Transient Stability Study Tabular Results Transient Stability Study Plots Page 2 of 881

6 I. Executive Summary The Platte River Power Authority (PRPA) Ten-Year Transmission Plan ( ) is developed to ensure the reliable delivery of electricity to its municipal owners in Estes Park, Fort Collins, Longmont, and Loveland, Colorado and to other PRPA transmission customers. The planning studies and reliability assessments for the near-term and longer-term planning horizons demonstrate that the PRPA transmission system meets the performance requirements of the Western Electricity Coordinating Council (WECC) and of the North American Electric Reliability Corporation (NERC) Standards TPL-001 through PRPA transmission projects planned for the next ten years are listed in the following Table 1 in order of in-service date, and are illustrated on the Transmission System Map and Plan of Service Diagrams in Exhibit 1. Table 1: PRPA Planned Transmission Projects In-Service Project Name Description Purpose March 2011 Richard Lake 115kV Substation Addition of Richard Lake-Waverly 115kV Line. New delivery point to serve growing load for TSGT. Interconnection April 2011 Loveland East 115kV Substation Expansion Add 115/12.47kV transformer T3 and complete ring bus configuration. New delivery point to serve growing load. May 2011 July 2011 December 2011 May 2012 October 2011 May 2012 College Lake 230kV Substation Fordham-Fort St. Vrain 230kV Line Harmony 230kV Substation Terminals Upgrade Meadow 115kV Ring Breaker Timberline 230/115kV Substation Expansion Dixon-Horseshoe 230kV Line Sectionalize Dixon-Laporte Tap 230kV Line section with new substation and 0.5 mile of double-circuit 230 kv line. Approximately 21.4 miles of underground/overhead sections. Expansion of Fordham to 230/115kV Substation with two 230/115kV transformers. Rebuild Del Camino Tap-Meadow-LongmontNW- Fordham 115kV Lines to double-circuit 230kV capability. Create LongmontNW- Rogers-Terry 115kV 3-Terminal Line. Upgrade Longs Peak-Fort St.Vrain 230kV Line. Modify CT tap and transformer relaying. Add one breaker to complete the 115 kv ring bus. Add 115/13.8kV transformers T3 & T4. Approximately 9.4 miles. Rebuild WAPA s Dixon-Horsetooth Tap 115kV Line to doublecircuit 230kV capability. Rebuild TSGT s Horsetooth Tap-Trilby 115kV line to doublecircuit 230kV capability. New Trilby- Horseshoe 230 kv underground line. Expansion of Horseshoe to 230/115kV Substation with two 230/115kV transformers and two 35-MVAR 115kV Capacitor Banks. New delivery point to serve growing load for PSCo. Necessary to meet WECC and NERC performance requirements. Provide a second 230kV source to the Longmont area. Remove conditional line ratings on the Boyd and Timberline lines. Improve reliability to Meadow Substation. Meet PRPA design criteria. New delivery point to serve growing load. Necessary to meet WECC and NERC performance requirements. Provide a second 230kV source to the Loveland area. Page 3 of 881

7 Table 1 (Continued) In-Service Project Name Description Purpose May 2012 Fordham 115kV Substation Expansion Add 115/12.47kV transformer T3. New delivery point to serve growing load. November 2013 Crossroads 115kV Substation Expansion Add 115/12.47kV transformer T2 and a Ring Breaker. New delivery point to serve growing load. November 2013 May 2013 May 2015 August 2015 May 2016 Rebuild LongmontNW- Harvard 115kV Line Timberline 230/115kV Substation Expansion Boyd 230/115kV Substation Expansion Fort Collins Northeast 115/13.8kV Substation Timberline 230/115kV T1 Replacement Connect Harvard 115/12.47 kv transformers T1 & T2 to different bays at LongmontNW Substation. Create two 115kV underground lines to cross Harvard Street. Add 230/115kV transformer T2. Add 230/115kV transformer T2. Rebuild TSGT s Timnath-Boxelder 115 kv Line double-circuit. Create Richard Lake- Boxelder/FortNE 115 kv Line. (Alternative site near Cobb Lake 115 kv Substation.) Replace 230/115kV transformer T1 with new transformer. Improve reliability to each transformer. Meet PRPA design criteria. Improve system reliability in the Fort Collins area. Improve system reliability in the Loveland area. New delivery point to serve growing load. Improve system reliability in the Fort Collins area. Existing transformer installed II. Scope The study area is the Foothills Area Transmission System (Foothills System) located in northern Colorado as shown in Exhibit 2. The PRPA transmission system is situated in the Foothills System. The near-term (years one through five) and longer-term (years six through ten) planning horizons were studied and the results documented herein over a range of forecasted system demands and subject to the various contingency conditions defined in the NERC Standards TPL-001 through -004 for Categories A, B, C, and D. III. Assumptions 1. Loads are represented at the high-voltage busses. 2. PRPA detailed representation with substation transformers and low-voltage bus loads are not used in this study. However, power factors have been adjusted for high-voltage bus representation. 3. Voltage criteria violations on the transmission system are of more concern at load busses than at non-load busses. Page 4 of 881

8 IV. Criteria PRPA adheres to NERC Transmission Planning Standards and WECC Reliability Criteria, as well as internal company criteria for planning studies. PRPA s power flow simulation criteria: Category A System Normal N-0 System Performance Under Normal (No Contingency) Conditions (Category A) NERC Standard TPL Voltage: 0.95 to 1.05 per unit Line Loading: 100 percent of continuous rating Transformer Loading: 100% of highest 65 C rating Category B Loss of generator, line, or transformer (Forced Outage) N-1 System Performance Following Loss of a Single Element (Category B) NERC Standard TPL Voltage: 0.92 to 1.07 per unit (PRPA) 0.90 to 1.10 per unit (all others) Line Loading: 100 percent of continuous rating or emergency rating if applicable Transformer Loading: 100% of highest 65 C rating Category C Loss of Bus or a Breaker Failure (Forced Outage) N-2 or More System Performance Following Loss of Two or More Elements (Category C) NERC Standard TPL Voltage and Thermal: Allowable emergency limits will be considered as determined by the affected parties and the available emergency mitigation plan. Curtailment of firm transfers, generation redispatch, and load shedding will be considered if necessary. Category D Extreme Events (Forced Outages) N-2 or More System Performance Following Extreme Events (Category D) NERC Standard TPL Voltage and Thermal: Evaluate for risks and consequences. If applicable, use allowable emergency limits as determined by available emergency mitigation plan. Curtailment of firm transfers, generation redispatch, and load shedding will be considered if necessary. Transient stability criteria require that all generating machines remain in synchronism and all power swings should be well damped. Also, transient voltage performance should meet the following criteria: Following fault clearing for Category B contingencies, voltage may not dip more than 25% of the pre-fault voltage at load buses, more than 30% at non-load buses, or more than 20% for more than 20 cycles at load buses. Following fault clearing for Category C contingencies, voltage may not dip more than 30% of the pre-fault voltage at any bus or more than 20% for more than 40 cycles at load buses. Page 5 of 881

9 In addition, transient frequency performance should meet the following criteria: Following fault clearing for Category B contingencies, frequency should not dip below 59.6 Hz for 6 cycles or more at a load bus. Following fault clearing for Category C contingencies, frequency should not dip below 59.0 Hz for 6 cycles or more at a load bus. Note that load buses include generating unit auxiliary loads. NERC Standards require that the system remain stable and no Cascading occurs for Category A, B, and C disturbances. Cascading is defined in the NERC Glossary as The uncontrolled successive loss of system elements triggered by an incident at any location. Cascading cannot be restrained from sequentially spreading beyond an area predetermined by studies. A potential triggering event for Cascading will be investigated upon one of the following results: A generator pulls out of synchronism in transient stability simulations. Loss of synchronism occurs when a rotor angle swing is greater than 180 degrees. Rotor angle swings greater than 180 degrees may also be the result of a generator becoming disconnected from the BES; or A transmission element experiences thermal overload and its transmission relay loadability is exceeded. (PRPA sets its transmission relays so they do not operate below 150% of the continuous rating of a circuit.) V. Procedure The studies were performed by PRPA System Planning using the Siemens-PTI PSS/E computer simulation software versions and The transmission system models were developed from models prepared by WECC. Previous planning studies by PRPA, the Foothills Planning Group, and the Colorado Coordinated Planning Group (CCPG) have concluded the heavy summer loading scenarios cover the most critical system conditions over the range of forecasted system demand levels. Both heavy and light load scenarios were studied for each the near-term and longer-term planning horizons to conduct a thorough assessment for all seasons. Transmission topology and system demand were modified according to which season and year are studied. Light load scenarios apply to Spring and Fall system conditions and heavy load scenarios apply to Summer and Winter system conditions. WECC Approved base cases were selected accordingly and load, generation, and transmission topologies were updated as necessary with the most recent modeling representations of the planned PRPA and Foothills systems. The study cases include both existing and planned facilities, the expected system conditions, and the effects of any Bulk Electric System (BES) equipment planned to be out-of-service during the critical demand levels. 1 All normal operating procedures and the effects of all control devices and protection systems are modeled. 1 PRPA makes every effort to avoid removing a BES facility or equipment including protection systems from service for planned maintenance or construction during the summer peak demand levels or during other high-risk system conditions when PRPA may implement No Touch procedures. PRPA performs system studies when a BES facility is scheduled to be removed from service. Page 6 of 881

10 Reactive power resources are included in the model to ensure adequate reactive resources are available to meet system performance. The PRPA 10-year Load Forecast by Substation is listed in Exhibit 3. PRPA uses its high load forecast for reliability margin to reflect uncertainties in projected BES conditions. The PRPA Load and Resource Allocations for each base case studied are provided in Exhibit 4. These exhibits represent the projected PRPA customer demands, firm transfers, and generation dispatch modeled in the bases cases. All projected firm transfers are modeled according to the data for loads, resources, obligations, and interchanges described in the Associated Material document provided with each approved WECC base case. The generation dispatch in each base case was modified to fully stress the PRPA system by setting Rawhide to its maximum output. See Exhibit 5 for the study procedure where the modified generation dispatch values are documented. All Category A and B contingencies and certain Category C and D contingencies were simulated using the Matrix routine written for contingency analysis on the PSS/E computer simulation software. The Category C and D multiple contingencies studied are those that would produce more severe system results or impacts based on the Transmission Planners knowledge of the system and engineering judgment. The rationale for selection considers facilities at significant substations, large generation stations, and lines involved with large bulk transfer paths, common rights-of-way, common structures, and shared circuit breakers. Computer simulation software solution methods are as follows: Pre-contingency Post-Contingency Area Interchange Control Off Off Phase-Shifter Lock Lock TFMR LTC Adjust Adjust Switched Shunt Reactor/Capacitor Adjust Lock DC Taps Adjust Adjust All busses and branches in Zones 706 and 754 of the WECC base cases are monitored for criteria violations. A list of simulated forced outage contingencies is provided in Exhibit 6. The PRPA transmission system is fully contained within Zones 706 and 754 and completely studied by the list of contingencies. Study results were reviewed and assessed for compliance with the WECC and NERC standards. Planned upgrades, additions, or corrective actions needed to meet the performance requirements are identified and included in the transmission plan for Category A, B, and C contingency conditions which cause a criteria violation. System performance problems associated with Category D extreme events are evaluated for possible actions to reduce the likelihood or mitigate the consequences of the extreme event. Page 7 of 881

11 VI. Results Operating Horizon (2010) Powerflow and transient stability studies were performed for the operating horizon. The results and mitigating actions are documented in the Foothills Area 2010 Summer Assessment report dated July 12, 2010, and in several planned outage study reports conducted throughout 2010 for the Foothills Area. The summer season has system performance problems that may occur for contingencies during higher load levels and lower CBT generation levels. The winter season has fewer problems than the summer season for contingencies during higher load levels and lower CBT levels. The difference between these summer and winter study results is typical for the PRPA transmission system, the Foothills System, and the CCPG footprint, and also demonstrates the historical pattern of why the summer season representation is the most critical system condition studied over a range of forecasted system demand levels in these areas. With the Rawhide Plant generating at its maximum capacity, mitigating actions are necessary to reduce Rawhide generation for two NERC Category C contingencies and for one NERC Category D extreme event involving two or more of the four 230kV transmission lines connected to the generation facility. The findings are documented in the Rawhide Operating Limitations Study Report dated July 12, These symptoms continue into the near and longer term planning horizons. In past Ten-Year Transmission Plan study reports these conditions were mitigated by the Laporte 230 kv Substation Expansion Project. However, for financial reasons in 2010 this project was removed from PRPA s ten-year capital budget in favor of allowable mitigating actions. Transient stability studies were performed for the operating horizon in a 2010 Heavy Summer scenario and the results documented in the TOT 7 Transfer Path Transient Stability Study dated November 8, 2010 (TOT 7 Study). The TOT 7 Study showed the TOT 7 transfer path and the surrounding Foothills transmission system remains stable with satisfactory damping characteristics. Also the transient voltage dip and frequency results from the study show the system responds adequately to the simulated disturbances. Near-Term Planning Horizon ( ) PRPA has transmission plans to achieve the required system performance throughout the planning horizon. In 2004 the Ten-Year Transmission Plan included two significant 230 kv projects necessary to meet system performance requirements in the near-term planning horizon. These two projects are the Fordham-Fort St.Vrain 230 kv Line in the Longmont area originally expected to be in service by Spring 2007, and the Dixon-Horseshoe 230 kv Line in the Fort Collins/Loveland area originally expected to be in service by Spring PRPA has been (and still is) working diligently to complete these projects as soon as possible but has experienced a number of delays. Reasons for the delay have been the County land use 1041 Regulation processes, right-of-way acquisitions, negotiations for rebuilds of transmission facilities owned by others, changes in line routing, modifications to transmission line design, a Page 8 of 881

12 delay in the issuance of long-term bonds due to uncertain financial markets, and occasional construction delays. At this time the expected completion dates for the Fordham-Fort St.Vrain 230 kv Line and the Dixon-Horseshoe 230 kv Line are July 2011 and May 2012 respectively. The schedule for implementation of these and all other PRPA transmission projects is given in Table 1 at the beginning of this report. The lead times for the Fordham-Fort St.Vrain 230 kv Line and the Dixon-Horseshoe 230 kv Line projects are designed for completion to occur as soon as possible by coordinating multiple contractors for overhead and underground line construction activities to work around each other simultaneously on both projects, while at the same time trying to avoid activities that require line outages during the summer months. Detailed transmission construction schedules for these and other near-term projects and a Ten-Year Capital Transmission Budget for all PRPA transmission projects were developed by PRPA System Engineering. Each year since 2004 PRPA has addressed the criteria violations with mitigation actions in its annual Operating Assessments provided to the WECC Reliability Coordinator, the Transmission Operators, and the Balancing Authorities in the area so all affected parties are prepared to respond to system problems that might occur. In the meantime until these transmission projects can be completed, PRPA will continue to perform annual operating assessments and provide the results and mitigating actions to affected parties. The majority of performance problems appearing on the PRPA system in the 2010 Summer and Winter construction operating assessments are due to the delay of these two significant 230 kv line projects. As project in-service dates change PRPA makes the associated changes to system topologies in the WECC base case models. Power flow and transient stability studies were performed for the near-term planning horizon and the results are documented in this report for the 2015 Heavy Summer and the 2014 Light Autumn scenarios. The same seasons were studied in the CCPG NERC/WECC Compliance Report and Reactive Margin Analysis dated December 28, 2010 (CCPG Study). All but one of the criteria violations are associated with the Rawhide Plant generating at its maximum capacity and can be mitigated by a reduction of generation levels. There were no transient stability criteria violations for the PRPA transmission system. (See the Transient Stability Analysis section for details.) Voltage stability studies were performed for the near-term planning horizon and the results documented in the CCPG Study for the 2015 Heavy Summer and 2014 Light Autumn scenarios. There were no criteria violations for the PRPA transmission system. Power flow results of the near-term planning horizon studies for the PRPA transmission system are summarized in the following Table 2. The primary reasons for the more favorable nearterm results, as compared to the 2010 Summer operating horizon results, are the additions of the Fordham-Fort St.Vrain 230 kv Line and the Dixon-Horseshoe 230 kv Line. Page 9 of 881

13 Table 2: Near-Term Planning Horizon ( ) Case Criteria Violations Mitigation Plan 2014 Light NERC Category C forced outage of Rawhide-Ault & Rawhide- Autumn 2 Timberline 230kV lines overloads Dixon-Rawhide-Timberline 2015 Heavy Summer 3 3-terminal 230kV line by 103% of 472MVA rating. NERC Category D extreme event for loss of Ault-Timberline & Rawhide-Timberline & Ault-Rawhide 230kV lines overloads Dixon-Rawhide-Timberline 3-terminal 230kV line by 103% of 472MVA rating. NERC Category C forced outage of Rawhide Timberline & Dixon Rawhide Timberline 3-terminal 230kV lines (Timberline BKRFAIL 1186) overloads Ault Rawhide 230kV line by 123% of 378 MVA rating. NERC Category C forced outage of Rawhide-Ault & Rawhide- Timberline 230kV lines overloads Dixon-Rawhide-Timberline 3-terminal 230kV line by 102% of 472MVA rating. NERC Category D extreme event for loss of Ault-Timberline & Rawhide-Timberline & Ault-Rawhide 230kV lines overloads Dixon-Rawhide-Timberline 3-terminal 230kV line by 103% of 472MVA rating. NERC Category C forced outage of Rawhide Timberline & Dixon Rawhide Timberline 3-terminal 230kV lines (Timberline BKRFAIL 1186) overloads Ault Rawhide 230kV line by 116% of its 378 MVA rating and the Laporte 230/115kV Transformer by 115% of 184MVA rating. NERC Category C forced outage of Longs Peak County Line & Slater-Longs Peak-Meadow 3-terminal 115kV line causes Longs Peak bus voltage to 1.07pu. Reduce Rawhide Generation to 640MW (net) in 15 minutes from time of forced outage to avoid conductor sag limit. Evaluate the Ault-Rawhide terminal equipment for rating increase to 472 MVA conductor sag limit. In the meantime, reduce Rawhide Generation to 560MW (net) in 6 minutes from time of forced outage to avoid conductor sag limit. Reduce Rawhide Generation to 640MW (net) in 15 minutes from time of forced outage to avoid conductor sag limit. Evaluate the Ault-Rawhide terminal equipment for rating increase to 472 MVA conductor sag limit, allowing more time for generation reduction to unload the transformer. In the meantime, reduce Rawhide Generation to 575MW (net) in 7 minutes from time of forced outage to avoid conductor sag limit. De-energize capacitor bank at Longs Peak Substation to reduce bus voltage. 2 Study case used w as derived by CCPG and its members and originated from the WECC 14LA 1 approved case 14la1sa1p.sav that w as posted to / w w w.w ecc.biz on Study case used w as derived by CCPG and its members and originated from the WECC 15H S2 approved case 15hs2a1p.sav that w as posted to / on Page 10 of 881

14 Longer-Term Planning Horizon ( ) Power flow and transient stability studies were performed for the longer-term planning horizon and the results documented in this report for the 2018 Light Autumn and the 2020 Heavy Summer scenarios, and in the CCPG Study for the 2020 Heavy Summer scenario. All criteria violations are associated with the Rawhide Plant generating at its maximum capacity and can be mitigated by a reduction of generation levels. There were no transient stability criteria violations for the PRPA transmission system. (See the Transient Stability Analysis section for details.) In the 2020 Heavy Summer scenario it was determined there was one criteria violation associated with TSGT facilities. For a NERC Category B forced outage of Slater-Longs Peak- Meadow 3-terminal 115kV line there is an overload on the Dacono-Erie 115kV line of 111% of 109MVA rating. After conferring with TSGT, this criteria violation can be mitigated by adjusting or replacing metering equipment at the Erie Substation thus increasing the facility rating of the Dacono-Erie 115kV line to 166MVA. The Weld-Promontory 230 kv Project was removed from the study cases due to lack of support for the project. A similar form of this project remains in the TSGT planning stages and PRPA will monitor the progress of this 230 kv project through the Foothills Planning Group where coordinated transmission planning occurs with three other interconnected transmission owners. Voltage stability studies were performed for the longer-term planning horizon and the results documented in the CCPG Study for the 2020 Heavy Summer scenario. There were no criteria violations for the PRPA transmission system. Results of the longer-term planning horizon studies for the PRPA transmission system are summarized in the following Table 3 and indicate favorable system improvements from planned transmission projects added to the system. Page 11 of 881

15 Table 3: Longer-Term Planning Horizon ( ) Case Criteria Violations Mitigation Plan 2018 Light NERC Category C forced outage of Rawhide-Ault & Rawhide- Autumn 4 Timberline 230kV lines overloads Dixon-Rawhide-Timberline 2020 Heavy Summer 5 3-terminal 230kV line by 103% of 472MVA rating. NERC Category D extreme event for loss of Ault-Timberline & Rawhide-Timberline & Ault-Rawhide 230kV lines overloads Dixon-Rawhide-Timberline 3-terminal 230kV line by 103% of 472MVA rating. NERC Category C forced outage of Rawhide Timberline & Dixon Rawhide Timberline 3-terminal 230kV lines (Timberline BKRFAIL 1186) overloads Ault Rawhide 230kV line by 123% of 378 MVA rating. NERC Category C forced outage of Rawhide-Ault & Rawhide- Timberline 230kV lines overloads Dixon-Rawhide-Timberline 3-terminal 230kV line by 102% of 472MVA rating. NERC Category D extreme event for loss of Ault-Timberline & Rawhide-Timberline & Ault-Rawhide 230kV lines overloads Dixon-Rawhide-Timberline 3-terminal 230kV line by 103% of 472MVA rating. NERC Category C forced outage of Rawhide Timberline & Dixon Rawhide Timberline 3-terminal 230kV lines (Timberline BKRFAIL 1186) overloads Ault Rawhide 230kV line by 116% of its 378 MVA rating and the Laporte 230/115kV Transformer by 119% of 184MVA rating. Reduce Rawhide Generation to 640MW (net) in 15 minutes from time of forced outage to avoid conductor sag limit. Evaluate the Ault-Rawhide terminal equipment for rating increase to 472 MVA conductor sag limit. In the meantime, reduce Rawhide Generation to 560MW (net) in 6 minutes from time of forced outage to avoid conductor sag limit. Reduce Rawhide Generation to 640MW (net) in 15 minutes from time of forced outage to avoid conductor sag limit. Evaluate the Ault-Rawhide terminal equipment for rating increase to 472 MVA conductor sag limit, allowing more time for generation reduction to unload the transformer. In the meantime, reduce Rawhide Generation to 575MW (net) in 7 minutes from time of forced outage to avoid conductor sag limit. 4 Study case used w as C:\ Study_Program_2010\ Projects\ Transplan\ 2018LA _PRPA \ 18LA_PRPA.sav w hich w as created from the CCPG derived case w hich originated from the WECC 14LA1 approved case 14la1sa1p.sav that was posted to / on Study case used w as derived by CCPG and its members and originated from the WECC 2020H S approved case 20hs1a1p.sav that w as posted to / w w w.w ecc.biz on Page 12 of 881

16 Transient Stability Analysis The purpose of the Transient Stability analysis is to evaluate the stability performance of the PRPA transmission system and of generators at the Rawhide Power Plant and surrounding area. This analysis was performed for the near-term and longer-term planning horizons to evaluate how the system responds to SLG and 3 faults with various clearing times and forced outages. The rationale for the selection of contingencies and extreme events to be evaluated considers facilities at significant substations and power plants, lines involved with large bulk transfer paths, common rights-of-way, common structures, and shared circuit breakers to satisfy all contingency conditions and types of faults defined in NERC Table 1 of the TPL standards. A list and description of the disturbances run in the transient stability simulations are provided in Exhibit 7. There were no transient stability criteria violations for the PRPA transmission system which remains stable with satisfactory damping characteristics for all NERC Category A, B, and C events. The following two NERC Category D extreme events resulted in Rawhide generator instability for all cases studied: 1. Category D2 a 3 fault at the Ault end of the Ault-Rawhide 230 kv line with failure of a pilot protection system and operation of a backup Zone 2 relay with a delayed clearing 6 time of 30 cycles. The Rawhide units pulled out of synchronism for this extreme event. In order to evaluate these results as a potential triggering event for cascading, a follow-up analysis was performed along with tripping all Rawhide generators which pulled out of synchronism. The follow-up analysis demonstrated a stable system with satisfactory damping characteristics and no cascading. (The critical clearing time for Rawhide generation to remain stable for this extreme event is 20 cycles for the 2020 Heavy Summer case.) Simulating the same disturbance but with a 30-cycle SLG fault, which changes this event to a Category C8, results in a stable system with satisfactory damping characteristics. a) All 230kV transmission lines exiting the Rawhide plant have redundant pilot relaying schemes and therefore will reduce the likelihood of this extreme event from occurring. 2. Category D4 a 3 fault on the Rawhide 230 kv bus with a stuck breaker (BKR 2122) and a Breaker Failure (BF) delayed clearing time of 18 cycles. BKR 2122 BF relaying disconnects all Rawhide peaking Units A, B, C, D, and F from the 230 kv bus. Rawhide Unit 1 pulled out of synchronism for this extreme event. In order to evaluate these results as a potential triggering event for cascading, a follow-up analysis was performed along with tripping Rawhide Unit 1 which pulled out of synchronism. The follow-up analysis demonstrated a stable system with satisfactory damping characteristics and no cascading. (The critical clearing time for Rawhide Unit 1 to remain stable for this extreme event is 15 cycles for the 2020 Heavy Summer case.) Simulating the same disturbance but with an 18-cycle SLG fault, 6 Delayed Clearing is defined in the NERC Glossary of Terms as Fault clearing consistent with correct operation of a breaker failure protection system and its associated breakers, or of a backup protection system with an intentional time delay. Page 13 of 881

17 which changes this event to a Category C9, results in a stable system with satisfactory damping characteristics. a) Possible action to reduce the likelihood of the event Evaluate reducing the clearing times for both BF and Circuit Switcher Failure relaying at Rawhide. Prior Outage Initial Conditions The purpose of the Prior Outage Initial Conditions (POIC) analysis is to evaluate the strength of the transmission system to withstand forced outage contingencies during the prior outage of a facility susceptible to a long-term repair period that might span across a summer peak in the planning horizon. Powerflow studies were performed and the results documented herein for the 2020 Heavy Summer scenario to assess the impacts of a damaged underground transmission cable, a damaged autotransformer, or a damaged generator for which longer repair periods could occur in the PRPA transmission system. Four 230 kv underground transmission cable circuits, one 345/230 kv transformer, nine 230/115 kv transformers, and Rawhide Unit 1 were studied for prior outage scenarios. The same Category A, B, C and D contingencies simulated for the near-term and longer-term planning horizon assessments were also simulated for this POIC assessment. There were no N- 1-0 Category A problems. The system performance for N-1-1 Category B contingencies had a small number of criteria violations which could be mitigated by monitoring transformer alarms or by shedding some load if necessary. The worst N-1-2 or More Category C problem was the prior outage of a Fordham-Fort St.Vrain 230 kv Line underground cable section followed by the forced double-circuit tower outage of the Longs Peak-County Line 115 kv Line and the Longs Peak-Meadow-Del Camino 3-Terminal 115 kv Line which reduced the Longmont/Del Camino/Brighton area voltages to 0.50 per unit supported only by the Beaver Creek-Erie 230 kv Line and the Estes-Longmont Northwest 115kV Line. PRPA Sub-Area Reactive Power Assessment The purpose of this reactive power assessment is to verify that PRPA will continue to satisfy the requirements of its Reactive Power Supply Guidelines in the planning horizon. The PRPA Sub- Area is a boundary metering system within the PSCo Balancing Authority Area necessary for the operations and measurement of load and losses on a real-time basis in the PRPA system. A PRPA Sub-Area reactive power assessment was performed and the results documented herein for the 2020 Heavy Summer scenario. The results demonstrate PRPA has the capability to meet the peak Sub-Area reactive power demand in the ten-year planning horizon with a margin for dynamic reserve using its own reactive power supply facilities installed inside the Sub-Area metered boundaries. The greatest reactive power demand occurs in the summer season. During off-peak times the Sub-Area may be importing vars from elsewhere but internal reactive power facilities are available if necessary to adjust the interchange within safe voltage operating limits. The following new PRPA reactive power supply facilities are included in the Ten-Year Transmission Plan: 70 Mvar from two 35-Mvar 115 kv shunt capacitors at the Horseshoe 230/115 kv Substation in Mvar of charging from underground cable on three 230 kv line projects in Longmont, Loveland, and Fort Collins in 2011 Page 14 of 881

18 In the 2020 Heavy Summer scenario the PRPA Sub-Area is exporting 87 Mvar with all shunt capacitors in-service and Rawhide generating a net plant 84 Mvar. See Exhibit 8 for the PRPA Sub-Area reactive power assessment results. Short-Circuit Analysis The purpose of a short-circuit analysis in the planning horizon is to determine whether planned facilities will cause the short-circuit rating of existing BES equipment to be exceeded. Shortcircuit studies were performed by PRPA System Engineering for the 2018 Heavy Summer system topology and the results documented in a PRPA 2018 System Forecast Fault Current Study memo dated December 4, All fault currents are within BES equipment ratings. The planned system topology in the 2018 Heavy Summer scenario studied in 2009 is similar to the 2020 Heavy Summer planned system topology in 2010 for the Foothills Area. Other Exhibits See Exhibit 9 for all steady-state thermal and voltage Matrix study results for each planning horizon assessment and for the POIC assessment. For all transient stability results 7 reference Exhibit 10 for a tabular summary and Exhibit 11 for plots of generator angles and rotor speeds, bus voltages and bus frequencies for all simulated disturbances. VII. Conclusions The PRPA Ten-Year Transmission Plan ( ) ensures a transmission system designed for the reliable delivery of electricity to its municipal owners in Estes Park, Fort Collins, Longmont, and Loveland, Colorado and to other PRPA transmission customers. The PRPA transmission system is planned such that it will meet the NERC and WECC performance requirements and can be operated to supply projected customer demands and firm transfers at all demand levels over the range of forecasted system demands under the conditions defined for Categories A, B, C, and D of the NERC Standards TPL-001 through The PRPA and Foothills transmission systems are steady-state thermal or steady-state voltage limited systems (not stability limited) in the operating horizon and throughout the ten-year planning horizon. 7 Transient Stability results are provided in both tables and graphical plots. Stability results for machines which are disconnected from the transmission system may appear similar to those of a machine that pulls out of synchronism and should be disregarded. Page 15 of 881

19

20 ATTACHMENT 2

21 ATTACHMENT 3

Interconnection System Impact Study Report Request # GI

Interconnection System Impact Study Report Request # GI Executive Summary Interconnection System Impact Study Report Request # GI-2008-23 34 MW Solar Generation Ranch at Hartsel, Colorado Public Service Company of Colorado Transmission Planning August 19, 2010

More information

Interconnection Feasibility Study Report Request # GI Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado

Interconnection Feasibility Study Report Request # GI Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado Executive Summary Interconnection Feasibility Study Report Request # GI-2016-6 Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado Public Service Company of Colorado Transmission

More information

Gateway South Transmission Project

Gateway South Transmission Project Phase 1 Comprehensive Progress Report Volume 1 - Technical Report Report Prepared by PacifiCorp Transmission Planning Department November 21, 2008 WECC1-V4 Phase 1 Comprehensive Progress Report Executive

More information

Midway/Monument Area TTC Study

Midway/Monument Area TTC Study Midway/Monument Area TTC Study (includes the following lines: Midway Geesen 115 kv, Geesen Falcon 115 kv, Falcon Fuller 115 kv, Fuller Black Squirrel 115 kv, and Black Squirrel Monument 115 kv) Johnny

More information

TRANSMISSION PLANNING CRITERIA

TRANSMISSION PLANNING CRITERIA CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003-3502 Effective Date: TRANSMISSION PLANNING CRITERIA PURPOSE This specification describes Con Edison s Criteria for assessing

More information

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI Executive Summary Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI-2003-2 Xcel Energy Transmission Planning January 2004 This Interconnection Feasibility

More information

Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood

Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood Prepared for: SCE&G Fossil/Hydro June 30, 2008 Prepared by: SCE&G Transmission Planning Table of Contents

More information

Falcon-Midway 115 kv Line Uprate Project Report

Falcon-Midway 115 kv Line Uprate Project Report Falcon-Midway 115 kv Line Uprate Project Report 12/1/2008 1 Background The function of this project is to uprate the 26.7 miles of Tri-State s 115 kv line between Midway and Falcon substations from 50

More information

Project #148. Generation Interconnection System Impact Study Report

Project #148. Generation Interconnection System Impact Study Report Project #148 Generation Interconnection System Impact Study Report June 05, 2012 Electric Transmission Planning Table of Contents Table of Contents... 2 Executive Summary... 3 Energy Resource Interconnection

More information

ATTACHMENT Y STUDY REPORT

ATTACHMENT Y STUDY REPORT Attachment Y Study Edwards Unit 1: 90 MW Coal Retirement December 31, 2012 ATTACHMENT Y STUDY REPORT 7/5/2013 PUBLIC / EXECUTIVE SUMMARY MISO received an Attachment Y Notification of Potential Generation

More information

THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS

THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS 2/27/2018 ELECTRIC TRANSMISSION PLANNING Table of Contents Table of Contents... 2 Executive

More information

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015 No. Comment Submitted ISO Response Date Q&A Posted 1 Will the ISO consider proposals that are not within the impedance range specified? Yes. However, the benefits estimated and studies performed by the

More information

Interconnection System Impact Study Final Report February 19, 2018

Interconnection System Impact Study Final Report February 19, 2018 Interconnection System Impact Study Final Report February 19, 2018 Generator Interconnection Request No. TI-17-0225 248.4 MW (Alternate Project Output of 217.35 MW) Wind Energy Generating Facility In Goshen

More information

El PASO ELECTRIC COMPANY 2014 BULK ELECTRIC SYSTEM TRANSMISSION ASSESSMENT FOR YEARS

El PASO ELECTRIC COMPANY 2014 BULK ELECTRIC SYSTEM TRANSMISSION ASSESSMENT FOR YEARS El Paso Electric Company El PASO ELECTRIC COMPANY 2014 BULK ELECTRIC SYSTEM TRANSMISSION ASSESSMENT FOR YEARS 2015 2024 A Review on System Performance Following Extreme Bulk Electric System Events of the

More information

DUKE ENERGY PROGRESS TRANSMISSION SYSTEM PLANNING SUMMARY

DUKE ENERGY PROGRESS TRANSMISSION SYSTEM PLANNING SUMMARY DUKE ENERGY PROGRESS TRANSMISSION SYSTEM PLANNING SUMMARY Transmission Department Transmission Planning Duke Energy Progress TABLE OF CONTENTS I. SCOPE 3 II. TRANSMISSION PLANNING OBJECTIVES 3 III. TRANSMISSION

More information

Stability Study for the Mt. Olive Hartburg 500 kv Line

Stability Study for the Mt. Olive Hartburg 500 kv Line Stability Study for the Mt. Olive Hartburg 500 kv Line Peng Yu Sharma Kolluri Transmission & Distribution Planning Group Energy Delivery Organization Entergy Sevices Inc April, 2011 New Orleans, LA 1.

More information

Service Requested 150 MW, Firm. Table ES.1: Summary Details for TSR #

Service Requested 150 MW, Firm. Table ES.1: Summary Details for TSR # Executive Summary Firm point to point transmission service has been requested by Transmission Service Request (TSR) #75669514, under the SaskPower Open Access Transmission Tariff (OATT). The TSR consists

More information

EL PASO ELECTRIC COMPANY (EPE) FACILITIES STUDY FOR PROPOSED HVDC TERMINAL INTERCONNECTION AT NEW ARTESIA 345 KV BUS

EL PASO ELECTRIC COMPANY (EPE) FACILITIES STUDY FOR PROPOSED HVDC TERMINAL INTERCONNECTION AT NEW ARTESIA 345 KV BUS EL PASO ELECTRIC COMPANY (EPE) FACILITIES STUDY FOR PROPOSED HVDC TERMINAL INTERCONNECTION AT NEW ARTESIA 345 KV BUS El Paso Electric Company System Operations Department System Planning Section May 2004

More information

Transmission Coordination and Planning Committee 2014 Q4 Stakeholder Meeting. December 18, 2014

Transmission Coordination and Planning Committee 2014 Q4 Stakeholder Meeting. December 18, 2014 Transmission Coordination and Planning Committee 2014 Q4 Stakeholder Meeting December 18, 2014 Agenda 1. Introductions 2. TCPC Policies 3. BHCE Planning Department Update 4. 2014 LTP Study Results 5. Stakeholder

More information

Project #94. Generation Interconnection System Impact Study Report Revision

Project #94. Generation Interconnection System Impact Study Report Revision Project #94 Generation Interconnection System Impact Study Report Revision October 2, 2009 Electric Transmission Planning Table of Contents Table of Contents...2 Executive Summary...3 Energy Resource Interconnection

More information

City of Palo Alto (ID # 6416) City Council Staff Report

City of Palo Alto (ID # 6416) City Council Staff Report City of Palo Alto (ID # 6416) City Council Staff Report Report Type: Informational Report Meeting Date: 1/25/2016 Summary Title: Update on Second Transmission Line Title: Update on Progress Towards Building

More information

100 MW Wind Generation Project

100 MW Wind Generation Project A subsidiary of Pinnacle West Capital Corporation 100 MW Wind Generation Project CUSTOMER FINAL Feasibility Study Results By Transmission Planning, APS December 21, 2007 Executive Summary This Feasibility

More information

Consulting Agreement Study. Completed for Transmission Customer

Consulting Agreement Study. Completed for Transmission Customer Completed for Transmission Customer Proposed Resource & Transmission Carbon County, MT & 230 kv Transmission in North Wyoming August 2016 Table of Contents 1.0 Description... 1 2.0 Overall Assumptions...

More information

Western Area Power Administration Sierra Nevada Region

Western Area Power Administration Sierra Nevada Region Western Area Power Administration Sierra Nevada Region 2014 Annual Ten-Year Transmission Plan Assessment Report November 20, 2014 For information or questions regarding this Transmission Assessment Report,

More information

Generator Interconnection System Impact Study For

Generator Interconnection System Impact Study For Generator Interconnection System Impact Study For Prepared for: January 15, 2015 Prepared by: SCE&G Transmission Planning Table of Contents General Discussion... Page 3 I. Generator Interconnection Specifications...

More information

Appendix D Black Hills Project Summary

Appendix D Black Hills Project Summary Page 1 of 28 Appendix D Black Hills Project Summary Table of Contents Black Hills Project Summary... D-1 Boone-Nyberg 115 kv Project... D-3 Rattlesnake Butte 115 kv Substation Terminal... D-6 Fountain

More information

SPS Planning Criteria and Study Methodology

SPS Planning Criteria and Study Methodology SPS Planning Criteria and Study Methodology SPS subscribes to the Southwest Power Pool ("SPP") Reliability Criteria, which incorporates compliance with the appropriate North American Electric Reliability

More information

Interconnection Feasibility Study Report GIP-023-FEAS-R1. Generator Interconnection Request # MW Wind Generating Facility Inverness (L6549), NS

Interconnection Feasibility Study Report GIP-023-FEAS-R1. Generator Interconnection Request # MW Wind Generating Facility Inverness (L6549), NS Interconnection Feasibility Study Report GIP-023-FEAS-R1 Generator Interconnection Request # 23 100 MW Wind Generating Facility Inverness (L6549), NS February 16, 2006 Control Centre Operations Nova Scotia

More information

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation Prepared by: Entergy Services, Inc. T & D Planning L-ENT-17A 639 Loyola Avenue New Orleans, LA 70113 Rev Issue Date

More information

Interconnection Feasibility Study Report Request # GI

Interconnection Feasibility Study Report Request # GI A. Executive Summary Interconnection Feasibility Study Report Request # GI-2011-04 587 MW Combined Cycle 2x1 Generators Cherokee Station, Denver, Colorado Public Service Company of Colorado Transmission

More information

Generation Interconnection Feasibility Study For XXXXXXXXXXXXXXXXXXXXXX MW generator at new Western Refinary Substation

Generation Interconnection Feasibility Study For XXXXXXXXXXXXXXXXXXXXXX MW generator at new Western Refinary Substation Generation Interconnection Feasibility Study For XXXXXXXXXXXXXXXXXXXXXX 131-250 MW generator at new Western Refinary Substation System Planning Section April, 2005 TABLE OF CONTENT 1 EXECUTIVE SUMMARY

More information

System Impact Study Report

System Impact Study Report Report For: NTE Carolinas II, LLC ( Customer ) Queue #: 42432-01 Service Location: Rockingham County, NC Total Output: 477 MW (summer) / 540 MW (winter) Commercial Operation Date: 12/1/2020 42432-01 SIS

More information

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY California Independent System Operator Memorandum To: ISO Operations (MRTU) Committee From: Armando J. Perez, Director of Grid Planning cc: ISO Board of Governors ISO Officers Date: April 29, 2005 Re:

More information

Interconnection Feasibility Study Report GIP-226-FEAS-R3

Interconnection Feasibility Study Report GIP-226-FEAS-R3 Interconnection Feasibility Study Report GIP-226-FEAS-R3 System Interconnection Request #226 70 MW Wind Generating Facility Kings County (L-6013) 2010 07 21 Control Centre Operations Nova Scotia Power

More information

Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers

Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers Puget Sound Area Study Team Bonneville Power Administration, Puget Sound Energy, Seattle City Light,

More information

Interconnection Feasibility Study Report GIP-084-FEAS-R2

Interconnection Feasibility Study Report GIP-084-FEAS-R2 Interconnection Feasibility Study Report GIP-084-FEAS-R2 System Interconnection Request #84 50 MW Wind Generating Facility Pictou County (L-7004) August 17, 2007 Control Centre Operations Nova Scotia Power

More information

System Impact Study Report Request # T MW Firm Point-to-Point Transmission Service Request from Wyoming to Colorado

System Impact Study Report Request # T MW Firm Point-to-Point Transmission Service Request from Wyoming to Colorado System Impact Study T-2007-3 Final.doc System Impact Study Report Request # T-2007-3 900 MW Firm Point-to-Point Transmission Service Request from Wyoming to Colorado Executive Summary PSCo Transmission

More information

2012 LOCAL TRANSMISSION PLAN:

2012 LOCAL TRANSMISSION PLAN: Colorado PUC E-Filings System 2012 LOCAL TRANSMISSION PLAN: TRANSMISSION COORDINATION AND PLANNING COMMITTEE ANNUAL TRANSMISSION ASSESSMENT FOR BLACK HILLS/COLORADO ELECTRIC UTILITY COMPANY, L.P., D/B/A

More information

PJM Generator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study September 2008

PJM Generator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study September 2008 PJM enerator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study 504744 September 2008 PJM Interconnection 2008. All rights reserved R60 Robison Park-Convoy 345kV Impact Study eneral

More information

Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting

Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting BHE Wyoming Q4 Stakeholder Meeting November 17, 2016 @ 1:00PM MT Black Hills Energy Service Center 409 Deadwood Avenue, Rapid

More information

Interconnection Feasibility Study Report GIP-222-FEAS-R3

Interconnection Feasibility Study Report GIP-222-FEAS-R3 Interconnection Feasibility Study Report GIP-222-FEAS-R3 System Interconnection Request #222 48 MW Steam Generating Facility Pictou County (53N) 2010 07 30 Control Centre Operations Nova Scotia Power Inc.

More information

AMERICAN ELECTRIC POWER 2017 FILING FERC FORM 715 ANNUAL TRANSMISSION PLANNING AND EVALUATION REPORT PART 4 TRANSMISSION PLANNING RELIABILITY CRITERIA

AMERICAN ELECTRIC POWER 2017 FILING FERC FORM 715 ANNUAL TRANSMISSION PLANNING AND EVALUATION REPORT PART 4 TRANSMISSION PLANNING RELIABILITY CRITERIA AMERICAN ELECTRIC POWER 2017 FILING FERC FORM 715 ANNUAL TRANSMISSION PLANNING AND EVALUATION REPORT PART 4 TRANSMISSION PLANNING RELIABILITY CRITERIA AEP Texas (comprised of its Central and North Divisions

More information

Supplemental Report on the NCTPC Collaborative Transmission Plan

Supplemental Report on the NCTPC Collaborative Transmission Plan Supplemental Report on the NCTPC 2007-2017 Collaborative Transmission Plan May 16, 2008 1 Table of Contents I. Executive Summary...1 II. Richmond-Fort Bragg Woodruff Street 230 kv Line...2 II.A. Need for

More information

Feasibility Study Report

Feasibility Study Report Generator Interconnection Request Feasibility Study Report For: Customer --- Service Location: Rutherford County Total Output: 79.2 MW Commercial Operation Date: 9/1/2014 In-Service Date (if given): 9/1/2014

More information

Transmission Planning & Engineering P.O. Box MS 3259 Phoenix, Arizona

Transmission Planning & Engineering P.O. Box MS 3259 Phoenix, Arizona Transmission Planning & Engineering P.O. Box 53933 MS 3259 Phoenix, Arizona 85072-3933 March 9, 2016 Mr. Philip Augustin Chair, WECC Technical Studies Subcommittee Mr. Enoch Davies WECC Technical Staff

More information

CUSTOMER/ TWIN ARROWS PROJECT

CUSTOMER/ TWIN ARROWS PROJECT A subsidiary of Pinnacle West Capital Corporation CUSTOMER/ TWIN ARROWS PROJECT V1 Facility Study Report APS Contract 52149 Prepared by: Arizona Public Service Company Transmission & Distribution Asset

More information

Connection Engineering Study Report for AUC Application: AESO Project # 1674

Connection Engineering Study Report for AUC Application: AESO Project # 1674 APPENDIX A CONNECTION ASSESSMENT Connection Engineering Study Report for AUC Application: AESO Project # 1674 Executive Summary Project Overview FortisAlberta Inc. (FortisAlberta) submitted a System

More information

SMUD 2014 Ten-Year Transmission Assessment Plan. Final. December 18, 2014

SMUD 2014 Ten-Year Transmission Assessment Plan. Final. December 18, 2014 SMUD 2014 Ten-Year Transmission Assessment Plan Final December 18, 2014 I CONTENTS Executive Summary... III 1 Introduction... 2 1.1 Reliability Criteria and Guidelines... 2 1.2 Load Forecast... 2 1.3 Demand

More information

TEN YEAR PLANNING GUIDE SHASTA LAKE ELECTRIC UTILITY

TEN YEAR PLANNING GUIDE SHASTA LAKE ELECTRIC UTILITY TEN YEAR PLANNING GUIDE SHASTA LAKE ELECTRIC UTILITY 2011-2020 P+ PowerPlus Engineering A Department of STAR Energy Services, LLC TEN YEAR PLANNING GUIDE 2011-2020 SHASTA LAKE ELECTRIC UTILITY CITY OF

More information

DFO STATEMENT OF NEED REPORT

DFO STATEMENT OF NEED REPORT APPENDIX E DFO STATEMENT OF NEED REPORT Table of Contents 1.0 Executive Summary... 1 2.0 Description of the Area... 2 2.1 Geographic Study Area... 2 2.2 2016 System Configuration... 2 3.0 Area Loading

More information

FIRSTENERGY S PROPOSED SOLUTION AND REQUEST FOR CONSTRUCTION DESIGNATION

FIRSTENERGY S PROPOSED SOLUTION AND REQUEST FOR CONSTRUCTION DESIGNATION PJM RTEP - Artificial Island Area FIRSTENERGY S PROPOSED SOLUTION AND REQUEST FOR CONSTRUCTION DESIGNATION Part 1 Report REDACTED VERSION FirstEnergy Corp. Energy Delivery, Transmission Planning and Protection

More information

Q95 Vicksburg 69kV. System Impact Study. APS Contract No Arizona Public Service Company Transmission Planning.

Q95 Vicksburg 69kV. System Impact Study. APS Contract No Arizona Public Service Company Transmission Planning. A subsidiary of Pinnacle West Capital Corporation Q95 Vicksburg 69kV System Impact Study APS Contract No. 52246 By Arizona Public Service Company Transmission Planning December 1, 2010 Version 2.6 Final

More information

PSCo 10-Year Transmission Plan/20-Year Scenario Assessment

PSCo 10-Year Transmission Plan/20-Year Scenario Assessment PSCo 10-Year Transmission Plan/20-Year Scenario Assessment May 2009 This report contains transmission planning data that may be conceptual in nature and is subject to change. The transmission projects

More information

SYSTEM IMPACT STUDY EC300W ERIS FINAL REPORT. El Paso Electric Company

SYSTEM IMPACT STUDY EC300W ERIS FINAL REPORT. El Paso Electric Company SYSTEM IMPACT STUDY EC300W ERIS FINAL REPORT Prepared for: El Paso Electric Company Prepared by: Engineers, LLC 1526 Cole Boulevard Building 3, Suite 150 Lakewood, CO 80401 (303) 395-4018 FOREWORD This

More information

Western Area Power Administration Rocky Mountain Region Annual Progress Report. Projects. Weld Substation Stage 04

Western Area Power Administration Rocky Mountain Region Annual Progress Report. Projects. Weld Substation Stage 04 Western Area Power Administration Rocky Mountain Region 2014 Annual Progress Report Projects Weld Substation Stage 04 Lovell Yellowtail 115-kV rebuild Curecanti 230/115-kV 150 MVA transformer Terry Ranch

More information

Black Hills Project Summary

Black Hills Project Summary 2016 Rule 3627 Report Black Hills Project Summary Page 1 of 38 Black Hills Project Summary Colorado PUC E-Filings System D 1 2016 Rule 3627 Report Black Hills Project Summary Page 2 of 38 Category Transmission

More information

Feasibility Study Report

Feasibility Study Report Report For: Fresh Air Energy II, LLC ( Customer ) Queue #: Service Location: Chester County, SC Total Output Requested By Customer: 74.5 MW Commercial Operation Date Requested By Customer: 1/7/2019 Feasibility

More information

EL PASO ELECTRIC COMPANY (EPE) GENERATOR INTERCONNECTION SYSTEM IMPACT STUDY FOR PROPOSED XXXXXXXXXXXXXXXXXX GENERATION ON THE AMRAD-ARTESIA 345 KV

EL PASO ELECTRIC COMPANY (EPE) GENERATOR INTERCONNECTION SYSTEM IMPACT STUDY FOR PROPOSED XXXXXXXXXXXXXXXXXX GENERATION ON THE AMRAD-ARTESIA 345 KV EL PASO ELECTRIC COMPANY (EPE) GENERATOR INTERCONNECTION SYSTEM IMPACT STUDY FOR PROPOSED XXXXXXXXXXXXXXXXXX GENERATION ON THE AMRAD-ARTESIA 345 KV LINE El Paso Electric Company System Planning Department

More information

Public Service Company of Colorado System Impact Study Load Interconnection Request for a 50 MVA Load Near Collbran

Public Service Company of Colorado System Impact Study Load Interconnection Request for a 50 MVA Load Near Collbran System Impact Study_50 MVA Load Interconnnection Request Near Collbran.doc Public Service Company of Colorado System Impact Study Load Interconnection Request for a 50 MVA Load Near Collbran PSCo Transmission

More information

Dunvegan Hydroelectric Project. For Glacier Power Limited. Preliminary Interconnection Study

Dunvegan Hydroelectric Project. For Glacier Power Limited. Preliminary Interconnection Study ` Dunvegan Hydroelectric Project For Glacier Power Limited Preliminary Interconnection Study Prepared by Pung Toy, P. Eng. and Ata Rehman, P. Eng. September 24, 2004 Table of Contents Table of Contents...

More information

TOLTEC POWER PARTNERSHIP TOLTEC POWER PROJECT INTERCONNECTION STUDY SYSTEM IMPACT STUDY

TOLTEC POWER PARTNERSHIP TOLTEC POWER PROJECT INTERCONNECTION STUDY SYSTEM IMPACT STUDY TOLTEC POWER PARTNERSHIP TOLTEC POWER PROJECT INTERCONNECTION STUDY SYSTEM IMPACT STUDY January 7, 2002 Prepared by Jorge Chacon (Consultant) Tucson Electric Power Company Ed Beck ii EXECUTIVE SUMMARY

More information

Rocky Mountain Power Exhibit RMP (RAV-4SD) Docket No Witness: Rick A. Vail BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH

Rocky Mountain Power Exhibit RMP (RAV-4SD) Docket No Witness: Rick A. Vail BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH Rocky Mountain Power Exhibit RMP (RAV-4SD) Docket No. 17-035-40 Witness: Rick A. Vail BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH ROCKY MOUNTAIN POWER Exhibit Accompanying Supplemental Direct

More information

Interconnection Feasibility Study Report GIP-157-FEAS-R2

Interconnection Feasibility Study Report GIP-157-FEAS-R2 Interconnection Feasibility Study Report GIP-157-FEAS-R2 System Interconnection Request #157 100.5 MW Wind Generating Facility Guysborough County (L-6515) 2009 09 14 Control Centre Operations Nova Scotia

More information

Western Area Power Administration Sierra Nevada Region

Western Area Power Administration Sierra Nevada Region Western Area Power Administration Sierra Nevada Region 2013 Annual Ten-Year Transmission Plan Assessment Report December 1, 2013 For information or questions regarding this Transmission Assessment Report,

More information

Q217 Generator Interconnection Project

Q217 Generator Interconnection Project Q217 Generator Interconnection System Impact Study APS Contract No. 52588 By Arizona Public Service Company Transmission Planning November 25, 2013 Version 2.0 Prepared by Utility System Efficiencies,

More information

VACAR STABILITY STUDY OF PROJECTED 2014/2015 WINTER PEAK LOAD CONDITIONS

VACAR STABILITY STUDY OF PROJECTED 2014/2015 WINTER PEAK LOAD CONDITIONS VACAR STABILITY STUDY OF PROJECTED 2014/2015 WINTER PEAK LOAD CONDITIONS April 2009 Prepared by VACAR Stability Working Group: Kirit Doshi Anthony Williams John O Connor Joe Hood Art Brown Dominion Virginia

More information

MILLIGAN SOLAR PROJECT

MILLIGAN SOLAR PROJECT February 16, 2009 Page 1 of 18 A subsidiary of Pinnacle West Capital Corporation MILLIGAN SOLAR PROJECT FINAL Feasibility Study Report APS Contract 52115 Prepared by: Arizona Public Service Company Transmission

More information

The Long-Range Transmission Plan

The Long-Range Transmission Plan The Long-Range Transmission Plan 2015 2025 Matt Koenig Presentation to ESPWG / TPAS October 29 th, 2015 Long-Range Transmission Plan Driver of the Plan is to maintain local reliability 10-year planning

More information

SYSTEM IMPACT RESTUDY H252W ERIS REPORT. El Paso Electric Company

SYSTEM IMPACT RESTUDY H252W ERIS REPORT. El Paso Electric Company SYSTEM IMPACT RESTUDY H252W ERIS REPORT Prepared for: El Paso Electric Company Prepared by: Engineers, LLC 1526 Cole Boulevard Building 3, Suite 150 Lakewood, CO 80401 (303) 395-4018 FOREWORD This report

More information

AQUILA NETWORKS WESTPLAINS ENERGY COLORADO CATEGORY C CONTINGENCY STUDIES

AQUILA NETWORKS WESTPLAINS ENERGY COLORADO CATEGORY C CONTINGENCY STUDIES AQUILA NETWORKS WESTPLAINS ENERGY COLORADO CATEGORY C CONTINGENCY STUDIES 2008-2012 April 2008 Table of Contents 1.0 INTRODUCTION... 2 2.0 RESULTS... 2 2.1 CATEGORY C NO SOLVE CASES... 2 2.2 CATEGORY C

More information

Operational Planning Study Report. RTA to BCH transfer limit updates For Kitimat 4 Capacitor Banks

Operational Planning Study Report. RTA to BCH transfer limit updates For Kitimat 4 Capacitor Banks Operational Planning Study Report RTA to BCH transfer limit updates For Kitimat 4 Capacitor Banks Report No. T&S Planning 2013-062 British Columbia Hydro and Power Authority British Columbia Hydro and

More information

Engineering Study Report: FortisAlberta Inc. Plamondon 353S Capacity Increase. Contents

Engineering Study Report: FortisAlberta Inc. Plamondon 353S Capacity Increase. Contents APPENDIX A CONNECTION ASSESSMENT : FortisAlberta Inc. Plamondon 5S Capacity Increase Contents Executive Summary.... Introduction... 6. Project... 6.. Project Overview... 6.. Load Component... 6.. Generation

More information

Status of PNM s Completed Transmission Construction Projects 11/30/2017

Status of PNM s Completed Transmission Construction Projects 11/30/2017 Status of s Completed Transmission Construction Projects Second Tah Ta Hey 115/345 kv Transformer Yah Ta Hey Switching Station On January 9, 2015, filed with the NMPRC under NMPRC Rule 440 information

More information

PUD ELECTRIC SYSTEM INTERCONNECTION

PUD ELECTRIC SYSTEM INTERCONNECTION APPENDIX A PROCEDURES & REQUIREMENTS for OKANOGAN PUD ELECTRIC SYSTEM INTERCONNECTION Version 4.0 December 2011 Version 4.0 12/28/2011 Page 1 of 15 TABLE OF CONTENTS DEFINITIONS 1.0 Introduction 2.0 Procedures

More information

15 Nelson-Marlborough Regional Plan

15 Nelson-Marlborough Regional Plan 15 Nelson-Marlborough Regional Plan 15.1 Regional overview 15.2 Nelson-Marlborough transmission system 15.3 Nelson-Marlborough demand 15.4 Nelson-Marlborough generation 15.5 Nelson-Marlborough significant

More information

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC OCTOBER 22, 2014 Emera Maine s Local System Plan Bangor Hydro District Needs Assessment/Potential Solutions Local Planning Advisory Committee Meeting E M i R t ti Emera Maine Representative: Jeffrey Fenn,

More information

ATTACHMENT - DFO STATEMENT OF NEED

ATTACHMENT - DFO STATEMENT OF NEED ATTACHMENT - DFO STATEMENT OF NEED Table of Contents Executive Summary... 3 1. Description of the Area... 5 1.1 Geographic Study Area... 5 1.2 Current System Configuration... 7 1.3 Distributed Generation...

More information

Interconnection Feasibility Study Report GIP-IR373-FEAS-R1

Interconnection Feasibility Study Report GIP-IR373-FEAS-R1 Interconnection Feasibility Study Report GIP-IR373-FEAS-R1 Generator Interconnection Request 373 109.5 MW Wind Generating Facility South Canoe Lake, NS Mar. 2, 2012 Control Centre Operations Nova Scotia

More information

TransWest Express Project

TransWest Express Project TransWest Express Project Phase One--Feasibility Study Final Study Report November 2006 A subsidiary of Pinnacle West Capital Corporation Executive Summary On October 21, 2005 Arizona Public Service Company

More information

PJM Generator Interconnection R81 Emilie (Fords Mill) MW Impact Study Re-Study

PJM Generator Interconnection R81 Emilie (Fords Mill) MW Impact Study Re-Study PJM Generator Interconnection R81 Emilie (Fords Mill) 100.9 MW Impact Study Re-Study August 2008 DMS # 498781 General Queue R81 Emilie (Fords Mills) is a Fairless Energy, LLC request to obtain an additional

More information

Southwest Power Pool, Inc TPL Stability Study. MAINTAINED BY SOUTHWEST POWER POOL ENIGINEERING GROUP Modeling Group

Southwest Power Pool, Inc TPL Stability Study. MAINTAINED BY SOUTHWEST POWER POOL ENIGINEERING GROUP Modeling Group Southwest Power Pool, Inc. 2011 TPL Stability Study MAINTAINED BY SOUTHWEST POWER POOL ENIGINEERING GROUP Modeling Group PUBLISHED: 12/19/2011 Approved by TWG: 12/19/2011 2 2011 Stability Study Revisions

More information

A Cost Benefit Analysis of Faster Transmission System Protection Schemes and Ground Grid Design

A Cost Benefit Analysis of Faster Transmission System Protection Schemes and Ground Grid Design A Cost Benefit Analysis of Faster Transmission System Protection Schemes and Ground Grid Design Presented at the 2018 Transmission and Substation Design and Operation Symposium Revision presented at the

More information

Feasibility Study Report

Feasibility Study Report Report For: Orion Renewable Resources LLC ( Customer ) Queue #: Service Location: Rockingham County, NC Total Output Requested By Customer: 100 MW Commercial Operation Date Requested By Customer: 11/1/2019

More information

High Lonesome Mesa 100 MW Wind Generation Project (OASIS #IA-PNM ) Interconnection Facility Study. Final Report November 2, 2007

High Lonesome Mesa 100 MW Wind Generation Project (OASIS #IA-PNM ) Interconnection Facility Study. Final Report November 2, 2007 High Lonesome Mesa 100 MW Wind Generation Project (OASIS #IA-PNM-2006-02) Interconnection Facility Study Final Report November 2, 2007 Prepared by: Public Service Company of New Mexico Electric Services

More information

APPENDIX F: Project Need and Description

APPENDIX F: Project Need and Description APPENDIX F: Project Need and Description California ISO/MID F-1 Intentionally left blank California ISO/MID F-2 Name Brief Description Type Lugo Victorville 500 kv Upgrade (SCE portion) The project was

More information

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC OCTOBER 22, 2015 Emera Maine s Local System Plan Bangor Hydro District Needs Assessment/Potential Solutions Local Planning Advisory Committee Meeting Emera Maine Representative: Jeffrey Fenn, P.E., SGC

More information

Local Transmission Plan. October 11, 2013 Revised August 25, 2014

Local Transmission Plan. October 11, 2013 Revised August 25, 2014 Local Transmission Plan October 11, 2013 Revised August 25, 2014 2 Central Hudson s System Zone G: Majority of Central Hudson s load Zone E: One small distribution substation Interconnections with Consolidated

More information

Terry Blackwell Page 1 of 5. Education North Carolina State University BS, Electrical Engineering Power Systems emphasis

Terry Blackwell Page 1 of 5. Education North Carolina State University BS, Electrical Engineering Power Systems emphasis Terry Blackwell Page 1 of 5 Education 1977 North Carolina State University BS, Electrical Engineering Power Systems emphasis Professional Qualifications 1977 PE-Professional Engineer Business Experience

More information

Large Load Serving Study Report for La Plata Electric Association, Inc. Alternatives. Addendum. San Juan Major Project

Large Load Serving Study Report for La Plata Electric Association, Inc. Alternatives. Addendum. San Juan Major Project Large Load Serving Study Report for La Plata Electric Association, Inc. Alternatives Addendum San Juan Major Project Tri-State Generation and Transmission Association Power System Planning December, 2008

More information

Illinois State Report

Illinois State Report July 2016 Illinois State Report Table of Contents 1. Planning Generation Portfolio Analysis Transmission Analysis Load Forecast Gas Pipeline Information 2 Executive Summary (July 2016) Existing Capacity:

More information

Rogers Road to Clubhouse 230kV New Transmission Line April 1, 2016

Rogers Road to Clubhouse 230kV New Transmission Line April 1, 2016 New Transmission Line April 1, 2016 The enclosed information is proprietary to PSE&G and is provided solely for your use. It should not be copied, reproduced, or shared with others without PSE&G s prior

More information

Surry Skiffes Creek Whealton Modeling and Alternatives Analysis Review

Surry Skiffes Creek Whealton Modeling and Alternatives Analysis Review Surry Skiffes Creek Whealton Modeling and Alternatives Analysis Review US Army Corps of Engineers Norfolk District Regulatory Office Received by: RLS Date: Feb 11, 2016 TOPICS Project Purpose, Need, Timeline

More information

COLORADO SPRINGS UTILITIES RESPONSE TO Xcel ENERGY INTERCONNECTION SYSTEM IMPACT STUDY REQUEST # GI , RESTUDY 1 (August 6, 2009)

COLORADO SPRINGS UTILITIES RESPONSE TO Xcel ENERGY INTERCONNECTION SYSTEM IMPACT STUDY REQUEST # GI , RESTUDY 1 (August 6, 2009) COLORADO SPRINGS UTILITIES RESPONSE TO Xcel ENERGY INTERCONNECTION SYSTEM IMPACT STUDY REQUEST # GI-2007-12, RESTUDY 1 (August 6, 2009) On June 15, 2009 Xcel Energy released a restudy of a System Impact

More information

OCTOBER 17, Emera Maine Representative: Jeffrey Fenn, P.E., LR/SGC Engineering LLC

OCTOBER 17, Emera Maine Representative: Jeffrey Fenn, P.E., LR/SGC Engineering LLC OCTOBER 17, 2018 Emera Maine s Local System Plan Bangor Hydro District Needs Assessment/Potential Solutions Local Planning Advisory Committee Meeting Emera Maine Representative: Jeffrey Fenn, P.E., LR/SGC

More information

PSE Attachment K Puget Sound Area Transmission Meeting

PSE Attachment K Puget Sound Area Transmission Meeting PSE Attachment K Puget Sound Area Transmission Meeting Stephanie Lu Senior Engineer December 15, 2011 Agenda Attachment K Review Economic Studies Process PSE Planning Process and Assumptions PSE Projects

More information

2011 LOCAL TRANSMISSION PLAN:

2011 LOCAL TRANSMISSION PLAN: Colorado PUC E-Filings System 2011 LOCAL TRANSMISSION PLAN: TRANSMISSION COORDINATION AND PLANNING COMMITTEE ANNUAL TRANSMISSION ASSESSMENT FOR BLACK HILLS/COLORADO ELECTRIC UTILITY COMPANY, L.P., D/B/A

More information

North Oregon Coast Area Study. Adam Lint

North Oregon Coast Area Study. Adam Lint North Oregon Coast Area Study Adam Lint PAGE 2 North Oregon Coast System Overview - Clatsop Study Covers: Transmission Switching Stations (Clatsop District): Astoria Lewis and Clark 115 kv Distribution

More information

Burlington Lamar 345/230 kv Impact and 2013 Post TPL Assessment Study

Burlington Lamar 345/230 kv Impact and 2013 Post TPL Assessment Study Burlington Lamar 345/230 kv Impact and 2013 Post TPL Assessment Study Vince Leung May 1, 2014 Reviewed by: Chris Pink (edited July 8, 2014) Table of Contents Page Background... 4 Objectives... 5 Study

More information

LLC FACILITIES STUDY TRANSMISSION SERVICE REQUEST

LLC FACILITIES STUDY TRANSMISSION SERVICE REQUEST Cleco Power LLC FACILITIES STUDY TRANSMISSION SERVICE REQUEST OASIS 71956063 0 Rev Issue Date Description of Revision Table of Contents 1. Purpose...3 2. System Impact Study Conclusions...3 2.1 The Pineville

More information

Georgia Transmission Corporation Georgia Systems Operations Corporation

Georgia Transmission Corporation Georgia Systems Operations Corporation Georgia Transmission Corporation Georgia Systems Operations Corporation Reactive Power Requirements for Generating Facilities Interconnecting to the Georgia Integrated Transmission System with Georgia

More information