1 Foxground and Bypass ENVIRONMENT PROTECTION LICENCE NO: MONTHLY REPORT January 2016
2 Contents 1. Introduction Non-compliances Rainfall Sediment Basin Discharges Air Monitoring Results Noise Monitoring Results Environmental Complaints Blast Monitoring... 6 Page 2 of 7
3 1. Introduction The Foxground and Bypass will provide a four-lane highway (two lanes in each direction) with median separation for 12.5 kilometres of the Princes Highway between Toolijooa Road and Croziers Road. The upgrade will include a bypass of the existing winding highway at Foxground and a bypass of with access ramps at the north and south of the town. RMS has contracted Fulton Hogan to design and construct the Foxground and bypass. The early works construction started in September 2014 with project completion expected in mid- 2018, weather permitting. In accordance with condition R4.1 of the Environment Protection Licence (EPL) No the following report details all required monitoring undertaken over the reporting period. 2. Non-compliances There were no non-compliances with the EPL conditions in January. 3. Rainfall There are three RMS automatic weather stations on the project. The results of rainfall monitoring for January 2017 are: Location Monthly (mm) recorded Woodhill Mountain Rd RMS automatic weather station 28.4 Toolijooa Ridge RMS automatic weather station 25.6 Austral Park Rd RMS automatic weather station 19.8 Page 3 of 7
4 4. Sediment Basin Discharges Table 1 Basin discharge monitoring results January 2017 Date Location ph NTU (Field) Suspended Solids (mg/l) Oil & Grease Compliant 11/01/2017 SB Nil Y 5. Air Monitoring Results Table 2 Monitoring results January 2017 EPA ID# Location Ash Content g/m 2.month Combustible Matter g/m 2.month Total Insoluble Matter g/m 2.month DMG1 DMG2 DMG3 DMG4 455 Princes Hwy, Broughton Village 254 Austral Park Rd, Broughton 200 Princes Hwy, 104 North St, DMG5 5 Kangaroo Valley Rd, DMG6 DMG (Control1) DMG (Control 2) 215A Princes Highway Jaspers Brush Control 1 89 Toolijooa Rd, Toolijooa 170B Woodhill Mountain Rd, Page 4 of 7
5 6. Noise Monitoring Results Table 3 Noise monitoring results January 2017 EPA LOCATION ID# DESCRIPTION Date L(A) eq(15min) Comments 8 Receiver Horses (50-55), constant highway noise with trucks Broughton Village 12/01/ (55-60), car (75-78) and constant cicadas (45-50). Cut 2 works (50-55) 9 Receiver Highway and cicadas Austral Park Road, Broughton 12/01/ constant (45-50), Trucks (80-82), FH LV (68-73). 10 Receiver Broughton 12/01/ Receiver /01/ Receiver /01/ Receiver North Street, 14 Receiver North Street, 15 Receiver George Street, 16 Mark Radium Park, 12/01/ /01/ /01/ /01/ Large volume of highway trucks (65-70). Constant highway noise (55-65). Gate 11 earthworks constant (55-65 constant cicadas (50-60), highway constant (60-65), highway trucks (70-75), haul trucks from cut 8 (63-69), constant excavator (50-52) surface miner and dozer constant (58-60), constant highway noise and cicadas (55-60), highway trucks (65-70), haul trucks (55-60) gate 19 and gate 20/kvr works constant (46-48), trucks (48-50), cars (68-74), birds constant (44), dog bark (50) gate 20/kvr works constant (48-52), birds constant (44-48), highway just audible (40-44), cars + trucks ( ) highway constant (50-65), cicadas constant (43-45), birds (45-50), gate 19 works just audible (40-45) highway constant (50-55), hwy trucks (60-65), KVR works (55-58), roller (55-60), motorbikes (56-58), birds and dogs constant (55-58), traffic logistics at gate 20 (50-55) Page 5 of 7
6 17 Receiver Huntingdale Park Road, Princes Highway, Jaspers Brush 12/01/ /01/ highway constant (55-60), gate 20/KVR works constant (55-65), cars (62-67), dogs (60-62), excavator constant (55-70), bulldozer (55-65) highway constant (55-60), hwy trucks (60-70), birds constant (45-50), cicadas constant (45-50), dogs (50), train horn (70), SB12 works just audible over traffic (50-55) 7. Environmental Complaints One Environmental Complaint was received in January. Table 4 Environmental complaints January 2017 Details of complaint: Issue: Action taken: Additional actions: Complainant called about noise coming from works at Cut 8. Noise Attended noise monitoring was performed at 14:05 on the day the complaint was received. Ongoing monitoring has been maintained and the complainant has been met with by FH. The business owner wants NO Saturday works, but Leqs measured are typically and well within permitted range of acoustic impacts. Ongoing monitoring & consultation with EPA and complainant 8. Blast Monitoring Blasting operations for the project has ceased. Page 6 of 7
7 Page 7 of 7
DUNMORE QUARRY. Transport Management Plan. Boral Resources (NSW) Pty Ltd 4/04/2016. Prepared for:
DUNMORE QUARRY Transport Management Plan Prepared for: Boral Resources (NSW) Pty Ltd 4/04/2016 The Transport Planning Partnership Pty Ltd ACN: 607 079 005 1609_Dunmore TMP Final DUNMORE QUARRY Transport
More informationWAMBO COAL ENVIRONMENTAL REPORTING 1 FEBRUARY 28 FEBRUARY 2019
WAMBO COAL ENVIRONMENTAL REPORTING 1 FEBRUARY 28 FEBRUARY 2019 April 2019 Environment Protection Licence Number: 529 Licensee: Wambo Coal Pty Limited, PMB 1, Singleton NSW 2330 Premises: Wambo Coal Pty
More informationEMGA Mitchell McLennan Pty Limited (EMM) has been engaged to complete quarterly attended noise
12 December 2014 Level 5, 21 Bolton Street Newcastle NSW 2300 PO Box 506 Leonard Sharp Environment and Community Liaison Officer Broken Hill Operations Pty Ltd CBH Resources Rasp Mine Newcastle, NSW, 2300
More informationReport Ref: Hexham OSR Quarterly Noise Survey JUL-SEP 13.docx
Report Ref: 7943-412.1 Hexham OSR Quarterly Noise Survey JUL-SEP 13.docx OneSteel Recycling Pty Ltd 57 Riverside Road, Chipping Norton, NSW 21 Attention Roger Baines 17 October By email Dear Roger RE Attended
More informationCity Of London Environmental & Engineering Services Department Wastewater Treatment Operations
City Of London Environmental & Engineering Services Department Wastewater Treatment Operations Greenway Wastewater Treatment Centre 2016 Annual Report February 2017 Page 1 of 96 SUMMARY This annual report
More informationComments. (Potential) noncompliance/br. each. Mine operating 24 hours a day. Mine operating 24 hours a day. Mine operating 24 hours a day
NOISE RESULTS 13 License Number: 3391 Monitoring Frequency: Twice per year (July and December) Licensee: RIX'S CREEK PTY. LIMITED Sampling method: 72 hour continuous (LA10, 15 minute) PO BOX 4 Limits:
More informationTOPLINE DRIVING SCHOOL
1) What is the main purpose of the traffic laws? a) to correct poor driving habits b) to provide revenue for the government c) to regulate traffic movement and prevent accidents d) to check the physical
More informationENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT
CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS VAUXHALL WASTEWATER TREATMENT PLANT 2013 ANNUAL REPORT FEBRUARY 2014 Vauxhall Wastewater Treatment Plant 2013
More informationSnow Dump Sites. APWA & PNS North American Snow Conference. April Designing a new snow dump site. Designing a new snow dump site
Snow Dump Sites Understanding What to Do with Collected Snow Québec City Among cities with a population of 500,000 or more, Québec City ranks second in the world for the highest snowfall, behind Sapporo,
More informationI-405 Sepulveda Pass Improvements Project
I-405 Sepulveda Pass Improvements Project Community Meeting November 15, 2012 1 Wilshire Segment Overview of Wilshire Segment There are a total of 23 bridges being constructed on this project; almost half
More informationSOUTH ACCESS TO THE GOLDEN GATE BRIDGE DOYLE DRIVE DOYLE DRIVE. Doyle Drive Presentation Golden Gate Bridge Board Meeting July 24, 2009
DOYLE DRIVE Doyle Drive Presentation Golden Gate Bridge Board Meeting July 24, 2009 Presentation Overview Introduction Project Acceleration Construction Contracts Construction Activities Lane and Road
More informationMETROPOLITAN COAL ENVIRONMENTAL PROTECTION LICENCE MONITORING SUMMARY
Introduction The Protection of the Environment Operations Act 1997 (POEO Act) requires that holders of an environment protection licence make their pollution monitoring data publicly available in a timely
More informationHowever, due to the location, all garage parkers will need to continue to use the South end garage for entrance and exit.
We apologize for any inconvenience that this construction may cause and appreciate your patience while we work hard to improve The Crescent for our customers. Effective Tuesday, July 28 Shoring for the
More informationReport Ref: Hexham OSR Quarterly Noise Survey OCT-DEC 13.docx
Report Ref: 7943-413.1 Hexham OSR Quarterly Noise Survey OCT-DEC 13.docx OneSteel Recycling Pty Ltd 55 57 Riverside Road, Chipping Norton, NSW 2170 Attention Roger Baines 14 January 2014 By email Dear
More informationFall 2012 Tender Release
Tender Close 001-10-70 Hwy. 1, Paving, CS 1-10-70 West Regina Bypass to Dewdney (Advanced Tender) Paving Southern Tendered Tendered Length = 8.21 km Excavation = 45 500 m³ Subbase = 613 000 t Base = 163
More informationNorth Okanagan Monthly Statistics Graphs July 2016
Monthly Statistics Graphs July 6 July 6 Statistics Table of Contents Table of Contents Single Family Monthly Listings by Price Single Family YTD Listings by Price Single Family Monthly Sales by Price Single
More informationEquipment Log Book. Unit #
Equipment Log Book Unit # EDMS ID# 004256563 January 2013 Introduction The purpose of this booklet is to assist with the operations inspection and maintenance of Heavy Equipment. For more details see TOP
More informationEraring Power Station - EPA Licence Coal Unloader - EPA Licence Environmental Monitoring Data July 2016
Eraring Power Station - EPA Licence 1429 Rocky Point Rd, Morriset NSW 2264 Coal Unloader - EPA Licence 4297 Eraring Coal Delivery Facility, Construction Rd, Dora Creek NSW 2264 Environmental Monitoring
More informationWaste Licence Reg. No W Noise Compliance Annual Report: South Dublin County Council s (SDCC) Ballymount Baling Station
Noise and Vibration Consultants Ltd Reg No: IE 8298170M Principal: Brendan O Reilly MPhil (Noise & Vibration) ISEE SFA EAA Brendan O Reilly Phone: 046-9073497 Durhamstown Mobile:087-8199010 Bohermeen Email:
More informationUpdate of noise database for prediction of noise on construction and open sites
Update of noise database for prediction of noise on construction and open sites Phase 3: Noise measurement data for construction plant used on quarries July 2006 www.defra.gov.uk Department for Environment,
More informationAND LIVESTOCK OPERATIONS
(Adopted February 14, 1997)(Amended December 11, 1998) (Amended September 10, 1999)(Amended April 2, 2004) RULE 1186. PM 10 EMISSIONS FROM PAVED AND UNPAVED ROADS, AND LIVESTOCK OPERATIONS (a) (b) Purpose
More informationBORAL CONCRETE GLENORIE
BORAL CONCRETE GLENORIE > Glenorie Progress Association meeting 14 March 2018 Glenorie RSL Club Glenorie A recap of our last discussion (Oct 2017)... Who are we? Boral Concrete (NSW/ACT) is part of the
More informationNorth Okanagan Monthly Statistics Graphs July 2017
Monthly Statistics Graphs July 7 July 7 Statistics Table of Contents Table of Contents Single Family Monthly Listings by Price Single Family YTD Listings by Price 4 Single Family Monthly Sales by Price
More informationNorth Okanagan Monthly Statistics Graphs March 2018
Monthly Statistics Graphs March March Statistics Table of Contents Table of Contents Single Family Monthly Listings by Price Single Family YTD Listings by Price Single Family Monthly Sales by Price Single
More informationAppendix C Noise and Vibration Worksheets
PUBLIC WORKS BUREAU OF ENGINEERING Appendix C Noise and Vibration Worksheets Central Outfall Sewer at 59 th Street Page C-1 CEQA Initial Study and 4 th Avenue Project January 2012 Receptor Noise Level
More informationNorth Okanagan Monthly Statistics Graphs September 2018
Monthly Statistics Graphs September September Statistics Table of Contents Table of Contents Single Family Monthly Listings by Price Single Family YTD Listings by Price Single Family Monthly Sales by Price
More informationAPPENDIX H. Transportation Impact Study
APPENDIX H Transportation Impact Study BUENA VISTA LAGOON ENHANCEMENT PROJECT TRANSPORTATION IMPACT STUDY Prepared for: San Diego Association of Governments Prepared by: VRPA Technologies, Inc. 9520 Padgett
More informationAppendix E3. Open Pit Pioneering and Pre-production
Appendix E3 Open Pit Pioneering and Pre-production File Note From: George Dermer To: File Date: January 11, 2012 Re: KSM Mitchell Pit Mine Pre-Production and Start-up plan Summary: Pre-Production mining
More informationMetro Highway Program
Metro Highway Program ACEC November 2018 I-5 North HOV and Truck Lanes 14 miles of HOV lanes in both directions 2 miles of truck climbing lanes at the south end 7 bridge modifications at: Gavin Canyon
More informationMoose Lake Utilities Repair
Eielson Air Force Base R e a d y T o G o A t 5 0 B e l o w Moose Lake Utilities Repair 1 Overview Project Duration: late February 30 September Cost: $31.4M for the Entire Moose Lake Subdivision Phase A
More informationTCO REVIEW. 1 September February Michael Arnold Tolling Customer Ombudsman
TCO REVIEW September 203 28 February 204 Michael Arnold Tolling Customer Ombudsman TOLLING CUSTOMER OMBUDSMAN REVIEW SEPTEMBER 203 28 FEBRUARY 204 Introduction There have been a number of tolling road
More informationDesert - Borrego Springs
Desert - Borrego Springs Tilting T (near Borrego Springs Resort) Palm Canyon Drive (looking east toward Christmas Circle) Palm Canyon Drive (east of Borrego Valley Rd) Overview Planning Group Preferences
More informationClean Air Construction Standard Draft for Public Comment November 5, 2018
Clean Air Construction Standard Draft for Public Comment November 5, 2018 Applicability & Effective Date Effective January 1, 2020, the following requirements apply to City of Portland (City) and Multnomah
More informationDodgem Cars have returned to Sidetracked in to 16 years old. July 2011
Dodgem Cars have returned to Sidetracked in 2011 Parties at Birthday - Sports Group - Youth Group Parties 7 to 16 years old July 2011 7 to 9 year old Suits 7 to 9 year olds Mini-Kart Party 7 to 16 year
More informationMS150 Rider Route (Highlighted) Preferred Vehicle Alternate Route
Saturday Starting Line Tully Stadium VOLUNTEER HOURS - 5:00 AM TO 9:00 AM - The Starting Line is going to have some streets blocked by police to control traffic. You should be arriving early enough to
More informationMetropolitan Domestic Water Improvement District Board of Directors Meeting. August 8, July 2011 Report
Metropolitan Domestic Water Improvement District Synopsis The purpose of this agenda item is to provide the Board with an update of the District s activities for the past month. This is not an action item,
More informationTransport Management Plan
Coraki Quarry Transport Management Plan Prepared for: Quarry Solutions Pty Ltd Date: 16 September 2016 File Ref: 1837.DA1.031 Resources Environment Planning Laboratories www.groundwork.com.au Coraki Quarry
More informationInformation Meeting Transfer Station Options. September 30, 2014
Information Meeting Transfer Station Options September 30, 2014 Outline of Presentation Why we are looking at changes Background on current Transfer Station Options that were considered need, function
More informationHonorable Mayor and Members of the City Council. Disabled Placard Parking Policy for City-Owned Garages
Office of the City Manager CONSENT CALENDAR April 2, 2013 To: From: Honorable Mayor and Members of the City Council Christine Daniel, City Manager Submitted by: Andrew Clough, Director, Public Works Subject:
More informationDefinitions of Acoustical Terms
Appendix E Noise Definitions of Acoustical Terms Sound Measurements Decibel (db) A Weighted Decibel (dba) Maximum Sound Level (Lmax) Minimum Sound Level (Lmin) Equivalent Sound Level (Leq) Percentile
More informationGreater Albuquerque Area Monthly Housing Trends vs. 2011
Greater Albuquerque Area Monthly Housing Trends - 2010 vs. 2011 Class R1 (Existing Single-Family Detached) and Class R2 (Existing Condo/Townhome Attached) homes Data on this page was obtained from the
More informationProject: Borgfeld Dr Phase I (ROW )
Project: Borgfeld Dr Phase I (ROW ) Precinct: 3 From Timberline Dr US Hwy 281. Clear ROW and relocate fences necessary to facilitate utility relocation needed prior to the roadway reconstruction. Consultant:
More informationSection III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year
Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year Capital Improvement Plan FY2015/2016 through FY2020
More information29 CFR Material handling equipment
Earthmoving equipment; General. 1926.602(a)(1) These rules apply to the following types of earthmoving equipment: scrapers, loaders, crawler or wheel tractors, bulldozers, off-highway trucks, graders,
More informationMobility Corridor Updates. Transit & Active Transportation Projects
Mobility Corridor Updates Transit & Active Transportation Projects Laura Cornejo, DEO Regional Planner Regional Operator Metro is LA County s Regional Builder/Funder Rail Bus Service (Metro/Muni/Local)
More informationWorksite Safety Update Promoting safety in road construction
Worksite Safety Update Promoting safety in road construction No 133 April-May 2015 In this Edition: VicRoads Reverse Smart Trials Progress Report Page 1 Sale M1 Duplication Project Specifies Reversing
More informationMt Piper Ash Placement Project Lamberts North Air Quality Review September 2014 August 2015
Mt Piper Ash Placement Project Lamberts North Air Quality Review September 2014 August 2015 Table of Contents SUMMARY... 3 1.0 Introduction... 4 2.0 The Lamberts North Air Quality Management Plan... 4
More informationGreater Albuquerque Area Monthly Housing Trends vs. 2016
Month Greater Albuquerque Area Monthly Housing Trends - 2015 vs. 2016 Class R1 (Existing Single-Family Detached) and Class R2 (Existing Condo/Townhome Attached) homes Data on this page was obtained from
More informationElected Officials Briefing. North Metro Rail Line Update. February 9, 2017
Elected Officials Briefing North Metro Rail Line Update February 9, 2017 Dave Genova, RTD General Manager and CEO Openings 2016-2017 Flatiron Flyer, Jan. 3, 2016 University of Colorado A Line, April 22,
More informationMinto North Access Design
Minto North Access Design September 3, 2014 Minto North Access Design September 2, 2014 1 Introduction This document presents an updated plan for creating an access road to the Minto North pit. It shows
More informationServier International B.V. Annual Environmental Report 2008 IPC LICENCE REGISTER NUMBER 128
Servier International B.V. Annual Environmental Report 28 IPC LICENCE REGISTER NUMBER 128 May 29 May 29 Page 2 of 45 TABLE OF CONTENTS SECTION CONTENTS PAGE NO. 1. INTRODUCTION 4 2. SUMMARY INFORMATION
More informationGreater Albuquerque Area Monthly Housing Trends vs. 2017
Month Greater Albuquerque Association of REALTORS Greater Albuquerque Area Monthly Housing Trends - 2016 vs. 2017 Class R1 (Existing Single-Family Detached) and Class R2 (Existing Condo/Townhome Attached)
More informationConstruction Noise Memorandum
Construction Noise Memorandum To: Ms. Paula Daneluk Date: June 13, 2013 Development Impact 9370 Studio Court, Suite 160 Elk Grove, CA 95758 From: Paul Bollard Bollard Acoustical Consultants, Inc. 3551
More informationDRAFT Design Study Report February 2015 Eagle River Traffic Mitigation Phase 1 MOA Project No Appendix D Utilities
Appendix D Utilities This page intentionally left blank. Utilities There are numerous utilities present within the project area, including natural gas, sewer, water, electric, communications, and street
More informationBelow are details for liquid waste haulers on the process for discharging domestic wastewater at SA Water septic waste disposal stations (SWDS).
Liquid hauled waste Discharging domestic hauled waste Once a liquid waste hauler has authorisation and is issued their vehicle swipe cards, they must ensure all drivers attend the relevant SA Water/ Allwater
More informationDockless Vehicles. Lori Houston Assistant City Manager September 12, 2018
Dockless Vehicles Lori Houston Assistant City Manager September 12, 2018 Companies Currently Operating Bird Approx. 1,700 scooters Lime Approx. 300 scooters 3 Companies That Have Expressed Interest In
More informationCoal Dust Frequently Asked Questions
From: Subject: BNSF - Customers - What I Can Ship - Coal - Coal Dust FAQs Date: March 2, 2011 3:10:11 PM PST Coal Dust Frequently Asked Questions Why is BNSF establishing
More informationMICROMARKET REPORT EVERGREEN
quarter one 2012 www.coloradomicroreports.com EVERGREEN NEIGHBORHOODS 10 13 8 11 14 9 15 1 7 16 4 2 5 12 6 3 1. 2. 3. 4. Bear Mountain Brook Forest Conifer Mountain Evergreen Highlands 7. Hangen Ranch
More informationI101 Motorsport Precinct
I101. Motorsport I101.1. Precinct description The Motorsport Precinct applies to three of Auckland s motorsport parks: Colin Dale Park; Rosebank Road; and Waikaraka Park. The precinct does not include
More informationTomingley Gold Operations. Traffic Management Plan
Tomingley Gold Operations Traffic Management Plan Tomingley Gold Operations Traffic Management Plan TABLE OF REVISIONS Revision Number Revision Date Prepared By Approved by Comments Revision 1 August 2012
More informationRegistry News. MAIA Bulletin January 2013
Registry News MAIA Bulletin 2014-1 January 2013 Mini-Fenway Park Plates No Longer Available Effective December 31, 2013, due to a licensing agreement with Major League Baseball, Mini-Fenway Park plates
More informationUS 70 Corridor Planning for the Future
New Bern/James City Area - Work Session US 70 Corridor Planning for the Future Brinson Elementary School Thursday, January 31, 2008 Agenda Sign-in, in, View Maps, Talk to Project Team Public Q & A Session
More informationGuelph Driving School. 246 WOOLWICH ST. Unit C Guelph, Ontario N1H 3V9. Office: Cell:
246 WOOLWICH ST. Unit C Guelph, Ontario N1H 3V9 Office: 519-829-8801 Cell: 519-362-5664 Email: info@guelphdrivingschool.com 1 2 Are cars drivers responsible for their passengers buckling up? A. Only if
More informationsystem performance I-820 East Loop FM 156 TxDOT is working to expand its busiest metropolitan corridors.
system performance TxDOT is working to expand its busiest metropolitan corridors. Nine of the state s 100 most congested highways are located in Tarrant County. Six of these highways will be expanded and
More informationEffective [one year after date of adoption] the provisions of this rule shall apply to:
VENTURA COUNTY AIR POLLUTION CONTROL DISTRICT RULE 55.1 PAVED ROADS AND PUBLIC UNPAVED ROADS (Adopted / / ) A. Applicability Effective [one year after date of adoption] the provisions of this rule shall
More informationTRANSPORTATION AND ENVIRONMENTAL SERVICES Rapid Transit
S REGION OF WATERLOO TRANSPORTATION AND ENVIRONMENTAL SERVICES Rapid Transit TO: Chair Jim Wideman and Members of the Planning and Works Committee DATE: FILE CODE: A02-30/PW SUBJECT: NORTHFIELD DRIVE AT
More informationThe Corporation of Delta COUNCIL REPORT Regular Meeting. Noise Variance for Construction Works at the Vancouver Landfill
The Corporation of Delta COUNCIL REPORT Regular Meeting F.02 To: From: Mayor and Council Engineering Department File No.: 6280-01 Date: December 13,2016 Noise Variance for Construction Works at the Vancouver
More informationCity of Ironton WWTP. General Information County: Lawrence Counties Served: Lawrence. Type of System: Public: X Private: Year Established: 1953
City of Ironton WWTP General Information County: Lawrence Counties Served: Lawrence Type of System: Public: X Private: Year Established: 1953 Year of Upgrades: 1987 EPA District: Southeast Treatment Plant
More informationCommunity Involvement Group North. Meeting 13
Community Involvement Group North: Meeting 13 Meeting: Community Involvement Group North Date: Monday, 4 June 2018 Time: Location: Arrive at 6.15pm for 6.30pm IBM Building 55 Coonara Road West Pennant
More informationMeasure South Lane County Fire & Rescue General Obligation Bond November 3, 2015
Measure 20-237 South Lane County Fire & Rescue General Obligation Bond November 3, 2015 Measure 20-237 Impacts Measure 20-237 is for 5.5 years, funding needed fire apparatus Measure 20-237 is projected
More informationLa Canada Flintridge Parents for Healthy Air November 1, 2018 Presented by Elizabeth Krider, Ph.D., Esther Kornfeld and Tamar Tujian
Concerns regarding the Devil s Gate Sediment Removal Project 1. New science demands new assessment of health risks to 3,000 sensitive receptors nearby. a. Air pollution is the new tobacco health crisis,
More informationODOT District Two Monthly Construction Update
Ohio Department of Transportation Construction Update DISTRICT 2 KIRK SLUSHER, P.E., ACTING DEPUTY DIRECTOR 317 East Poe Rd. Bowling Green, Ohio 43402-1330 www.transportation.ohio.gov/dist2 ODOT District
More informationSpeed measurements were taken at the following three locations on October 13 and 14, 2016 (See Location Map in Exhibit 1):
2709 McGraw Drive Bloomington, Illinois 61704 p 309.663.8435 f 309.663.1571 www.f-w.com www.greennavigation.com November 4, 2016 Mr. Kevin Kothe, PE City Engineer City of Bloomington Public Works Department
More informationGreater Albuquerque Area Monthly Housing Trends vs. 2014
Month Greater Albuquerque Association of REALTORS Greater Albuquerque Area Monthly Housing Trends - 2013 vs. 2014 Class R1 (Existing Single-Family Detached) and Class R2 (Existing Condo/Townhome Attached)
More informationTable Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily
5.8 TRAFFIC, ACCESS, AND CIRCULATION This section describes existing traffic conditions in the project area; summarizes applicable regulations; and analyzes the potential traffic, access, and circulation
More informationTrailer Buyers Guide Riverside Road, Abbotsford, BC V2S 7P1. Ph: Fx:
By 1330 Riverside Road, Abbotsford, BC V2S 7P1 Ph: 604.853.5262 Fx: 604.853.5298 Table of Contents Trailer Buyers Guide...1 Overview...3 Needs vs. Desires...3 Vehicle...3 Drivers Licence...3 Application
More information52.1 SNOW REMOVAL AND ICE CONTROL (TRUCK)
52.1 SNOW REMOVAL AND ICE CONTROL (TRUCK) 52.1.1 GENERAL The Work consists of loading trucks, snowplowing and the application of sand, salt or a sand and salt mixture to roadway surfaces. 52.1.2 MATERIALS
More informationSOUTHWEST WASTE MANAGEMENT AUTHORITY.
SOUTHWEST WASTE MANAGEMENT AUTHORITY www.company.com Members Town of Shaunavon Town of Eastend RM of White Valley No. 49 RM of Grassy Creek No. 78 RM of Arlington No. 79 RM of Bone Creek No. 108 History
More informationSTREET IMPROVEMENTS PROPOSAL BID ITEMS
STREET IMPROVEMENTS 1 Excavation 3,525 CY $ $ 2 A.C. Planing (2" to 4" Depth) 20,586 SY $ $ 3 Furnish & Install Asphalt Concrete 4,270 TON $ $ 4 Furnish & Install Aggregate Base 2,955 TON $ $ 5 Remove
More information2019 Western North Carolina Weather Calendar. Department of Atmospheric Sciences The University of North Carolina at Asheville
209 Western North Carolina Weather Calendar Department of Atmospheric Sciences The University of North Carolina at Asheville www.atms.unca.edu 209 Western North Carolina Weather Calendar Climatological
More informationClick to edit Master text styles
I-405 Sepulveda Pass Improvements Project Quarterly Community Meeting November 17, 2011 1 Wilshire Segment 2 Quarterly Community Meetings 2012 Month Meeting(s) February 16 May 17 Quarterly Quarterly August
More informationCHAPTER 72: STOPPING, STANDING AND PARKING
CHAPTER 72: STOPPING, STANDING AND PARKING Section 72.01 Stopping vehicles in streets prohibited; exceptions 72.02 Obstruction of traffic 72.03 Method of parking 72.04 Parking prohibited in specified places
More informationRed Light Cameras in Austin. Austin Police Department Highway Enforcement Command
Red Light Cameras in Austin Austin Police Department Highway Enforcement Command video MLK WB/I35 EF SB Video 2014 Red Light Violations Ø 10 camera approaches (direction of cameras) in Austin throughout
More information2042 LAKE TAHOE BOULEVARD SOUTH LAKE TAHOE, CA
2042 LAKE TAHOE BOULEVARD SOUTH LAKE TAHOE, CA OV ERV IE W 2 0 4 2 L A K E T A H O E B O U L E VA R D ST AT EL IN E GO ND SOUTH LAKE TAHOE LV EB TAHOE VALLEY ER LA KE TA HO PIO NE EB LV D TR AIL D O AH
More informationImportance of ITS Preventive Maintenance and Transitioning to an Accelerated ITS design Approach for Illinois Tollway September 14th, 2018
Importance of ITS Preventive Maintenance and Transitioning to an Accelerated ITS design Approach for Illinois Tollway September 14th, 2018 Amarpal Matharu, PE, MBA Traffic Operation Manager, Illinois Tollway
More informationPOSITION PAPER MMP Speed Bumps Within VCDD 2 January 13, 2017
POSITION PAPER MMP Speed Bumps Within VCDD 2 January 13, 2017 To: From: VCDD 2 Board of Supervisors Bryan Lifsey, VCDD 2 Supervisor PURPOSE: To provide the VCDD 2 representative to the Multi Modal Path
More informationPer Revised Concept Plan Residential Condo/Townhouse. Proposed Land Use per TIS
January 2, 2018 Mr. Paul DeBotton Marple Associates, L.P. 1604 Walnut Street, 4 th Floor Philadelphia, PA 19103 RE: Langford Run Road Traffic Analysis Proposed Mid County Shopping Center Marple Township,
More informationMassachusetts Private Passenger Automobile Statistical Plan Appendix C Traffic Law Violations
The following abbreviations are used in Appendix C: M.G.L. c., Chapter and Section of the Massachusetts General Laws CMR " Code of Massachusetts Regulations The following out-of-state incidents are to
More informationCHAPTER 69 PARKING REGULATIONS
69.01 Parking Limited or Controlled 69.08 Persons with Disabilities Parking 69.02 Park Adjacent to Curb 69.09 Truck Parking Limited 69.03 Park Adjacent to Curb One-way Street 69.10 Snow Removal 69.04 Angle
More informationCapital Improvement Plan Review
City of Manhattan Beach Public Works Department Fiscal Year 2014/2015 2018/2019 Capital Improvement Plan Review Community Meeting: April 10, 2014 Objectives Creating the Capital Improvement Plan Funding
More informationUnited States Stove Company Project # Model: KP60 AKA: AP60, VG60 Type: Pellet-Fired Room Heater May 31, 2018
United States Stove Company Project # 18-409 AKA: AP60, VG60 Type: Pellet-Fired Room Heater May 31, 2018 ASTM E2779 Standard Test Method for Determining Particulate Matter Emissions from Pellet Heaters
More informationCedar Blue Property Owners Association Board Meeting Minutes November 17, 2018
Cedar Blue Property Owners Association Board Meeting Minutes 1. Board Members Present: Dewayne Denwalt, Bruce Arnold,, Ronnie McGee, Clifford Cops, Jr., Tonya Glasgow, Park Manager. 2. Board Members Absent:
More informationCrestmont Development Update 2017 AGM
Crestmont Development Update 2017 AGM West Crestmont West Crestmont Will be built in phases finally reaching about 524 residential units. Rough grading for phases 9 & 10 already underway. First show home
More informationNew Ultra Low Sulfur Diesel fuel and new engines and vehicles with advanced emissions control systems offer significant air quality improvement.
New Ultra Low Sulfur Diesel fuel and new engines and vehicles with advanced emissions control systems offer significant air quality improvement. The U.S. Environmental Protection Agency (EPA) has issued
More informationP.S.C.U. No. 50 Original Sheet No ROCKY MOUNTAIN POWER ELECTRIC SERVICE SCHEDULE NO. 136 STATE OF UTAH
P.S.C.U. No. 50 Original Sheet No. 136.1 ROCKY MOUNTAIN POWER ELECTRIC SERVICE SCHEDULE NO. 136 STATE OF UTAH Transition Program for Customer Generators AVAILABILITY: At any point on the Company's interconnected
More informationThe Earthworks and Heavy Haulage Specialists
The Earthworks and Heavy Haulage Specialists JEFFSANN EXCAVATIONS PTY LIMITED Jeffsann Excavations is a family owned business servicing the greater Sydney Metropolitan area for over 25 years! Established
More informationADA CHANGES TO METRO'S BUS SERVICE
Los Angeles County Metropolitan Transportation Authority ADA CHANGES TO METRO'S BUS SERVICE PRESENTED TO: TECHNICAL ADVISORY COMMITTEE March 2, 2011 1 Daily Metro: Operates over 2,600 buses 191 different
More informationWentzville Parkway South Phase 2 & 2A
Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total
More informationAppendix D. Noise Calculations
Appendix D Noise Calculations Summary of Boating Activity Changes Associated with each Alternative Peak Day Boating Trips Structure Existing With Alt increase with alt 2 increase with alt 3 increase with
More informationSPECIFICATION FOR. MAINTENANCE OF POWERED LIFTING PLATFORMS (for use by disabled persons)
SPECIFICATION FOR MAINTENANCE OF POWERED LIFTING PLATFORMS (for use by disabled persons) INDEX MAINTENANCE REPORTS MANUFACTURER S REQUIREMENTS PERMIT TO WORK CERTIFICATION GUIDANCE MINOR REPAIRS Platform
More information