1 CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS VAUXHALL WASTEWATER TREATMENT PLANT 2013 ANNUAL REPORT FEBRUARY 2014

2 Vauxhall Wastewater Treatment Plant 2013 Annual Report February 2014 SUMMARY This annual report is in response to requirements under Certificate of Approval for Vauxhall BHVK issued July 21, a) A summary and interpretation of all monitoring data and a comparison to the effluent limits outlined in Condition 7, including an overview of the success and adequacy of the works; The monthly average concentrations and loading compliance criteria for BOD, phosphorous and suspended solids were achieved in The monthly average un-ionized ammonia compliance concentration criteria were also achieved in The monthly average data is in Table 1 of the report. The annual average daily flow of ML/day was less than the Certificate of Approval limit of 20.7 ML/day. The rainfall in 2013 was 1,075 mm which is higher than the average (975 mm) for the period 1986 to The goals of a Pollution Prevention and Control Plan (PPCP) are to outline the nature, cause and extent of pollution problems, examine alternatives and propose remedial measures for reducing and mitigating pollution from sewer overflows and then recommend an implementation program for achieving those goals. The City of London has contracted engineering consulting firm CH2M HILL Canada Limited to develop the plan through a detailed analysis of the impacts of rainfall events on our existing sewer systems and the Thames River. The operation s staff was successful in meeting all the compliance criteria and the Works are adequate. b) A description of any operating problems encountered and corrective actions taken; The Chemically Enhances Primary Treatment (CEPT) commissioning was started in High flows are needed to test the system. c) A summary of all maintenance carried out on any major structure, equipment, apparatus, mechanism or thing forming part of the Works; A Work Order list for the Vauxhall Wastewater Treatment Plant is attached. d) A summary of any effluent quality assurance or control measures undertaken in the reporting period; A Plant and effluent monitoring program was conducted and the data is in tables of this report. Samples were obtained as required in the Certificate of Approval. e) A summary of the calibration and maintenance carried out on all effluent monitoring Page 1 of 71

3 equipment; Attached in appendix. f) A description of efforts made and results achieved in meeting the Effluent Objectives of Condition 6; The monthly average concentration objectives were achieved 100% of the time for BOD, suspended solids, un-ionized ammonia and E. Coli in Samples for ph in 2013 were between 7.3 and 8.0 which were within the objective range of 6.5 to 9.0. g) A tabulation of the volume of sludge generated in the reporting period, an outline of anticipated volumes to be generated in the next reporting period and a summary of the locations to where the sludge was disposed; The volume of sludge hauled from Vauxhall in 2013 was 27,272 cubic metres with average solids content of 4.4%. Details are in the table Sludge Summary included in the report. We anticipate in 2014 that a similar volume of sludge will be generated as in The sludge was hauled in 2013 to the Greenway Incinerator facility and anticipate in 2014 we will continue to haul sludge to Greenway for incineration or treated with the Bioset process and disposed at the W12A landfill. h) A summary of any complaints received during the reporting period and any steps taken to address the complaints; There were no odour complaints in i) A summary of all By-pass, spill or abnormal discharge events; There were 18 by-pass events with a total volume of 24,398 cubic metres of raw sewage and 21,222 cubic metres of primary treated sewage (secondary treatment bypass). The raw bypass in 2013 is equivalent to 0.42% of the sewage treated at Vauxhall. The by-passes are listed in the tables of the report. The rainfall in 2013 was 1,075 mm which is higher than the average (975 mm) for the period 1986 to Page 2 of 71

4 Vauxhall WWTP Aerial 2013 Page 3 of 71

5 TABLE 1 VAUXHALL 2013 MONTHLY AVERAGE SUMMARY DATE MONTHLY TOTAL BOD SUSPENDED SOLIDS EFFLUENT AMMONIA PHOSPHOROUS E. COLI AVERAGE FLOW RAW UV CHANNEL RAW UV CHANNEL DISSOLVED RAW UV CHANNEL MONTHLY TEMPERATURE (ML/D) (MG/L) KG/DAY ACTUAL LIMIT ACTUAL LIMIT (MG/L) ACTUAL LIMIT ACTUAL LIMIT OXYGEN ACTUAL UNIONIZED LIMIT (MG/L) ACTUAL LIMIT ACTUAL LIMIT GEOMETRIC MEAN (Celsius) (MG/L) (MG/L) KG/DAY KG/DAY (MG/L) (MG/L) KG/DAY KG/DAY (MG/L) (MG/L) KG/DAY (MG/L) (MG/L) (MG/L) (MG/L) KG/DAY KG/DAY (ORGS/100MLS) January , February , March , April , May , June , July , August , September , October , November , December , objective AVERAGE , Page 4 of 71

6 TABLE 2 VAUXHALL 2013 MONTHLY SAMPLE COUNT SUMMARY DATE TEMPERATURE BOD SUSPENDED SOLIDS ph AMMONIA TKN PHOSPHOROUS E. Coli ACTUAL UNIONIZED RAW UV CHANNEL RAW UV CHANNEL UV CHANNEL RAW RAW UV CHANNEL January February March April May June July August September October November December TOTAL Page 5 of 71

7 VAUXHALL 2013 PLANT BYPASSES V1 CITY OF LONDON PLANT MM/DD/YY ENVIRONMENTAL SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS DIVISION ######## WEATHER SEWAGE ANALYSES HAULED SLUDGE D TEMP. FLOW THRU PLANT BY-PASS BOD 5 DAY SUSPENDED PH TOTAL AMMONIAV. CHANNEL D.O. A R W D C PLANT P T (mg/l) SOLIDS -(mg/l) PHOS. PLANT T A I I CUBIC METERS H E U A (mg/l) (mg/l) G % E I N R R F X 1000 S O A M ph N M I E. E N D E A I PER DAY VOLUME HRS. U S S M P I M C C C C C C C C U C N F B C F W N (10 3 m 3 /D) (10 3 m 3 S O ) B P M E O O RAW O H RAW O H RAW O H RAW O H V H T C F S A T A RATE O P L H O R N N N A N A N A N A A E O L T O L I L D E I O N A I I T M T M T M T M N N L U L L O MAX. MIN. TOTAL N D R I T Z A A B A B A B A B N S I E I N D S O A U E C E C E C E C E E I N D E U R D T R T R T R T R L T MPN T S D S E Y mm (mg/l) (mg/l) (mg/l) (mg/l) (C) (mg/l) Jan WSW Jan SW Apr sw Apr sw May se Jun ssw Jun ssw Jul-13 9 SSW Jul WSW Jul SSW Aug nw Aug sw Aug ssw Sep sw Sep w Oct w Oct ese Nov sw Page 6 of 71

8 Vauxhall Raw Bypass Total ,398 count 18 Start Date Start Time Finish date Finish time duration volume Reason for bypass Authority (hours) (m 3 ) 13-Jan-13 7:18 AM 13-Jan-13 8:00 AM ,7 C & D 29-Jan-13 9:58 AM 29-Jan-13 9:14 PM ,181 1, 2, 7 C & D 09-Apr-13 8:25 PM 09-Apr-13 9:13 PM ,057 1,7 C & D 10-Apr-13 2:06 PM 10-Apr-13 2:42 PM ,154 1,7 C & D 28-May-13 5:32 PM 29-May-13 4:35 AM ,104 1,7 C & D 16-Jun-13 8:36 PM 16-Jun-13 9:23 PM ,167 1,3 C & D 22-Jun-13 7:30 PM 22-Jun-13 8:02 PM ,112 1,7 C & D 08-Jul-13 7:10 PM 08-Jul-13 9:05 PM ,7 C & D 10-Jul-13 5:00 PM 10-Jul-13 6:42 PM ,150 1,7 C & D 27-Jul-13 8:57 PM 27-Jul-13 9:12 PM ,7 C & D 01-Aug-13 1:46 AM 01-Aug-13 2:40 AM ,002 1,7 C & D 08-Aug-13 12:12 AM 08-Aug-13 1:47 AM ,101 1,7 C & D 28-Aug-13 3:00 AM 28-Aug-13 5:47 AM ,7 C & D 11-Sep-13 5:30 PM 11-Sep-13 10:30 PM ,419 1,7 C & D 20-Sep-13 8:40 PM 21-Sep-13 3:50 PM ,735 1,7 C & D 04-Oct-13 9:47 AM 04-Oct-13 10:10 AM ,7 C & D 06-Oct-13 9:02 PM 06-Oct-13 10:28 PM ,7 C & D 17-Nov-13 8:10 PM 17-Nov-13 8:33 PM ,7 C & D 1 Heavy Precipitation A Avoid loss of life 2 Snow melt B Avoid personal injury 3 Equipment failure C Avoid dangeer to public health 4 Equipment maintenance D Avoid severe property damage 5 Sewer problem E Prior written acknowledgement 6 Power failure 7 Exceed design capacity Page 7 of 71

9 Vauxhall Secondary bypass Total ,222 count 2 Start Date Start Time Finish date Finish time duration volume Reason for bypass Authority (hours) (m 3 ) 20-Sep-13 8:40 PM 21-Sep-13 3:50 PM ,131 1,7 C & D 04-Oct Oct-13 9:30 PM 07-Oct-13 4:40 AM ,091 1,7 C & D 17-Nov Heavy Precipitation A Avoid loss of life 2 Snow melt B Avoid personal injury 3 Equipment failure C Avoid dangeer to public health 4 Equipment maintenance D Avoid severe property damage 5 Sewer problem E Prior written acknowledgement 6 Power failure 7 Exceed design capacity Page 8 of 71

10 Vauxhall Raw and Secondary bypass Total 45,620 count 18 Start Date Start Time Finish date Finish time duration volume Reason for bypass Authority (hours) (m 3 ) 13-Jan-13 7:18 AM 13-Jan-13 8:00 AM 16 1,7 C & D 29-Jan-13 9:58 AM 29-Jan-13 9:14 PM 2,181 1, 2, 7 C & D 09-Apr-13 8:25 PM 09-Apr-13 9:13 PM 1,057 1,7 C & D 10-Apr-13 2:06 PM 10-Apr-13 2:42 PM 1,154 1,7 C & D 28-May-13 5:32 PM 29-May-13 4:35 AM 2,104 1,7 C & D 16-Jun-13 8:36 PM 16-Jun-13 9:23 PM 1,167 1,3 C & D 22-Jun-13 7:30 PM 22-Jun-13 8:02 PM 1,112 1,7 C & D 08-Jul-13 7:10 PM 08-Jul-13 9:05 PM 371 1,7 C & D 10-Jul-13 5:00 PM 10-Jul-13 6:42 PM 1,150 1,7 C & D 27-Jul-13 8:57 PM 27-Jul-13 9:12 PM 25 1,7 C & D 01-Aug-13 1:46 AM 01-Aug-13 2:40 AM 2,002 1,7 C & D 08-Aug-13 12:12 AM 08-Aug-13 1:47 AM 1,101 1,7 C & D 28-Aug-13 3:00 AM 28-Aug-13 5:47 AM 4 1,7 C & D 11-Sep-13 5:30 PM 11-Sep-13 10:30 PM 5,419 1,7 C & D 20-Sep-13 8:40 PM 21-Sep-13 3:50 PM 19,866 1,7 C & D 04-Oct-13 9:47 AM 04-Oct-13 10:10 AM 71 1,7 C & D 06-Oct-13 9:30 PM 07-Oct-13 4:40 AM 6,730 1,7 C & D 17-Nov-13 8:10 PM 17-Nov-13 8:33 PM 90 1,7 C & D 1 Heavy Precipitation A Avoid loss of life 2 Snow melt B Avoid personal injury 3 Equipment failure C Avoid dangeer to public health 4 Equipment maintenance D Avoid severe property damage 5 Sewer problem E Prior written acknowledgement 6 Power failure 7 Exceed design capacity Page 9 of 71

11 VAUXHALL 2013 PLANT SUMMARY CITY OF LONDON PLANT MM/DD/YY ENVIRONMENTAL SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS DIVISION ######## WEATHER SEWAGE ANALYSES HAULED SLUDGE TEMP. FLOW THRU PLANT BY-PASS BOD 5 DAY SUSPENDED ph TOTAL AMMONIA U.V. D.O. m 3 R W D C PLANT P T (mg/l) SOLIDS -(mg/l) PHOSPHORUS CHANNEL PLANT I I CUBIC METERS (mg/l) A H E U A (mg/l) G % N R X 1000 S I R F O A M ph N M E. E N D E A I PER DAY VOLUME HRS. U S S M P I M U C U C U C U C U C F B C F W N (10 3 m 3 /D) (10 3 m 3 S O RAW ) B P M E O O RAW V H V H RAW V H RAW V H V H C F S A T A RATE O P L H O R N N A A A A A O L T O L I L D E I O N A I I N N N N N L U L L O MAX. MIN. TOTAL N D R I T Z A N N N N N I E I N D S U A U E E E E E E N D E S R D L L L L L MPN T S D E mm (mg/l) (mg/l) (mg/l) (mg/l) (C) (mg/l) Jan-13 SSW Jan-13 SW Jan-13 SW Jan-13 SW Jan-13 SW Jan-13 SW Jan-13 SSW Jan-13 SW Jan-13 SW Jan-13 SW Jan-13 SW Jan-13 SW Jan WSW Jan-13 SW Jan-13 SW Jan-13 SW Jan-13 SW Jan-13 SW Jan-13 WSW Jan-13 W Jan-13 SW Jan-13 W Jan-13 ENE Jan-13 S Jan-13 W Jan-13 W Jan ENE Jan W Jan SW Jan SW Jan W , Feb-13 w Feb-13 1 sw Feb-13 ne Feb-13 sw Feb-13 ssw Feb-13 sw Feb-13 sw Feb ne Feb-13 nnw Feb-13 2 e Feb sw Feb-13 sw Feb-13 w Feb-13 sw , Feb-13 w Feb-13 wnw V1 Page 10 of 71

12 VAUXHALL 2013 PLANT SUMMARY CITY OF LONDON PLANT MM/DD/YY ENVIRONMENTAL SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS DIVISION ######## WEATHER SEWAGE ANALYSES HAULED SLUDGE TEMP. FLOW THRU PLANT BY-PASS BOD 5 DAY SUSPENDED ph TOTAL AMMONIA U.V. D.O. m 3 R W D C PLANT P T (mg/l) SOLIDS -(mg/l) PHOSPHORUS CHANNEL PLANT I I CUBIC METERS (mg/l) A H E U A (mg/l) G % N R X 1000 S I R F O A M ph N M E. E N D E A I PER DAY VOLUME HRS. U S S M P I M U C U C U C U C U C F B C F W N (10 3 m 3 /D) (10 3 m 3 S O RAW ) B P M E O O RAW V H V H RAW V H RAW V H V H C F S A T A RATE O P L H O R N N A A A A A O L T O L I L D E I O N A I I N N N N N L U L L O MAX. MIN. TOTAL N D R I T Z A N N N N N I E I N D S U A U E E E E E E N D E S R D L L L L L MPN T S D E mm (mg/l) (mg/l) (mg/l) (mg/l) (C) (mg/l) Feb-13 n Feb-13 ese Feb-13 3 wsw Feb w Feb-13 w Feb e Feb-13 sw Feb-13 w Feb-13 w Feb se Feb e Feb-13 se Mar-13 ne Mar-13 n Mar-13 nnw Mar-13 ne Mar-13 ssw Mar-13 se Mar-13 ssw Mar-13 nw Mar-13 ese Mar-13 sse Mar sse Mar sw Mar-13 nw Mar-13 nw Mar w Mar e Mar-13 w Mar sw Mar-13 se Mar-13 sw Mar-13 sw Mar-13 ssw Mar-13 wnw Mar-13 calm Mar-13 sw Mar-13 nw Mar-13 w Mar-13 sw Mar-13 w Mar-13 sw Mar-13 se Apr wnw Apr-13 WSW Apr-13 WNW Apr-13 SSW V1 Page 11 of 71

13 VAUXHALL 2013 PLANT SUMMARY CITY OF LONDON PLANT MM/DD/YY ENVIRONMENTAL SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS DIVISION ######## WEATHER SEWAGE ANALYSES HAULED SLUDGE TEMP. FLOW THRU PLANT BY-PASS BOD 5 DAY SUSPENDED ph TOTAL AMMONIA U.V. D.O. m 3 R W D C PLANT P T (mg/l) SOLIDS -(mg/l) PHOSPHORUS CHANNEL PLANT I I CUBIC METERS (mg/l) A H E U A (mg/l) G % N R X 1000 S I R F O A M ph N M E. E N D E A I PER DAY VOLUME HRS. U S S M P I M U C U C U C U C U C F B C F W N (10 3 m 3 /D) (10 3 m 3 S O RAW ) B P M E O O RAW V H V H RAW V H RAW V H V H C F S A T A RATE O P L H O R N N A A A A A O L T O L I L D E I O N A I I N N N N N L U L L O MAX. MIN. TOTAL N D R I T Z A N N N N N I E I N D S U A U E E E E E E N D E S R D L L L L L MPN T S D E mm (mg/l) (mg/l) (mg/l) (mg/l) (C) (mg/l) Apr-13 W Apr-13 sw Apr-13 sw Apr sw Apr sw Apr sw Apr e Apr e Apr wsw Apr nw Apr-13 w Apr sw Apr-13 8 ssw Apr-13 ESE Apr wsw Apr wnw Apr-13 ese Apr-13 s Apr-13 sw Apr-13 nw Apr-13 s Apr-13 s Apr-13 E Apr E Apr-13 s Apr-13 sw < May-13 ssw May-13 se May-13 sw May-13 SE May-13 ENE May-13 w May-13 sw < May sw May-13 s May-13 5 sw May WNW May W May-13 ssw May-13 sw < May-13 w May-13 sw May-13 s May-13 s May-13 ESE May-13 se May-13 sw V1 Page 12 of 71

14 VAUXHALL 2013 PLANT SUMMARY CITY OF LONDON PLANT MM/DD/YY ENVIRONMENTAL SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS DIVISION ######## WEATHER SEWAGE ANALYSES HAULED SLUDGE TEMP. FLOW THRU PLANT BY-PASS BOD 5 DAY SUSPENDED ph TOTAL AMMONIA U.V. D.O. m 3 R W D C PLANT P T (mg/l) SOLIDS -(mg/l) PHOSPHORUS CHANNEL PLANT I I CUBIC METERS (mg/l) A H E U A (mg/l) G % N R X 1000 S I R F O A M ph N M E. E N D E A I PER DAY VOLUME HRS. U S S M P I M U C U C U C U C U C F B C F W N (10 3 m 3 /D) (10 3 m 3 S O RAW ) B P M E O O RAW V H V H RAW V H RAW V H V H C F S A T A RATE O P L H O R N N A A A A A O L T O L I L D E I O N A I I N N N N N L U L L O MAX. MIN. TOTAL N D R I T Z A N N N N N I E I N D S U A U E E E E E E N D E S R D L L L L L MPN T S D E mm (mg/l) (mg/l) (mg/l) (mg/l) (C) (mg/l) May sw May wnw May-13 N R May-13 nnw May-13 nnw May sw May se May-13 ssw May-13 sw May s Jun ssw Jun sw Jun-13 nw Jun-13 nw Jun-13 e Jun sw Jun-13 ne Jun-13 wnw Jun-13 ene Jun sw Jun-13 sw < Jun ssw Jun nw Jun-13 nnw Jun-13 sw Jun ssw Jun-13 sw Jun-13 ssw < Jun-13 nw Jun-13 nw Jun-13 ne Jun ssw Jun-13 s na na Jun-13 nw Jun-13 1 nw Jun-13 ssw Jun s Jun ne Jun wsw Jun-13 sw Jul-13 NE Jul-13 ENE Jul-13 3 NE Jul-13 9 SSW Jul ESE Jul SW Jul WSW V1 Page 13 of 71

15 VAUXHALL 2013 PLANT SUMMARY CITY OF LONDON PLANT MM/DD/YY ENVIRONMENTAL SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS DIVISION ######## WEATHER SEWAGE ANALYSES HAULED SLUDGE TEMP. FLOW THRU PLANT BY-PASS BOD 5 DAY SUSPENDED ph TOTAL AMMONIA U.V. D.O. m 3 R W D C PLANT P T (mg/l) SOLIDS -(mg/l) PHOSPHORUS CHANNEL PLANT I I CUBIC METERS (mg/l) A H E U A (mg/l) G % N R X 1000 S I R F O A M ph N M E. E N D E A I PER DAY VOLUME HRS. U S S M P I M U C U C U C U C U C F B C F W N (10 3 m 3 /D) (10 3 m 3 S O RAW ) B P M E O O RAW V H V H RAW V H RAW V H V H C F S A T A RATE O P L H O R N N A A A A A O L T O L I L D E I O N A I I N N N N N L U L L O MAX. MIN. TOTAL N D R I T Z A N N N N N I E I N D S U A U E E E E E E N D E S R D L L L L L MPN T S D E mm (mg/l) (mg/l) (mg/l) (mg/l) (C) (mg/l) Jul-13 9 SSW Jul SE Jul WSW Jul-13 SW Jul-13 NW Jul-13 E Jul-13 ESE Jul-13 E Jul-13 E Jul-13 SW Jul-13 NW Jul SW Jul-13 NNW Jul-13 NE Jul-13 SSW Jul-13 4 SW < Jul-13 SSW Jul-13 ESE Jul-13 SW Jul SSW Jul-13 2 SW Jul-13 SE Jul-13 SW < Jul-13 SW Aug nw Aug sw Aug-13 nw Aug-13 sw Aug-13 ssw Aug-13 sw Aug-13 sse Aug sw Aug-13 NNW Aug-13 nnw Aug-13 sw Aug-13 sw Aug-13 nw Aug-13 sw Aug-13 ssw Aug-13 w Aug-13 sw Aug-13 se Aug-13 sw Aug-13 sw Aug-13 sw Aug-13 nw Aug-13 nw V1 Page 14 of 71

16 VAUXHALL 2013 PLANT SUMMARY CITY OF LONDON PLANT MM/DD/YY ENVIRONMENTAL SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS DIVISION ######## WEATHER SEWAGE ANALYSES HAULED SLUDGE TEMP. FLOW THRU PLANT BY-PASS BOD 5 DAY SUSPENDED ph TOTAL AMMONIA U.V. D.O. m 3 R W D C PLANT P T (mg/l) SOLIDS -(mg/l) PHOSPHORUS CHANNEL PLANT I I CUBIC METERS (mg/l) A H E U A (mg/l) G % N R X 1000 S I R F O A M ph N M E. E N D E A I PER DAY VOLUME HRS. U S S M P I M U C U C U C U C U C F B C F W N (10 3 m 3 /D) (10 3 m 3 S O RAW ) B P M E O O RAW V H V H RAW V H RAW V H V H C F S A T A RATE O P L H O R N N A A A A A O L T O L I L D E I O N A I I N N N N N L U L L O MAX. MIN. TOTAL N D R I T Z A N N N N N I E I N D S U A U E E E E E E N D E S R D L L L L L MPN T S D E mm (mg/l) (mg/l) (mg/l) (mg/l) (C) (mg/l) Aug-13 s Aug-13 sw Aug-13 sw Aug-13 w Aug ssw Aug-13 sw Aug-13 sw Aug-13 se Sep ssw Sep-13 wnw Sep nw Sep-13 w < Sep-13 sw Sep-13 se Sep sw Sep-13 ne Sep-13 sw Sep-13 sw Sep sw Sep-13 sw Sep sw Sep-13 s Sep-13 wsw Sep-13 nne Sep-13 ssw Sep-13 sw Sep-13 ssw Sep w Sep ese Sep-13 nnw Sep-13 ene Sep-13 ese Sep-13 s Sep-13 wsw , Sep-13 sw Sep-13 w Sep-13 sw Sep-13 ssw Oct-13 w Oct-13 ssw Oct-13 w Oct w Oct e Oct ese Oct sw Oct-13 calm Oct-13 w V1 Page 15 of 71

17 VAUXHALL 2013 PLANT SUMMARY CITY OF LONDON PLANT MM/DD/YY ENVIRONMENTAL SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS DIVISION ######## WEATHER SEWAGE ANALYSES HAULED SLUDGE TEMP. FLOW THRU PLANT BY-PASS BOD 5 DAY SUSPENDED ph TOTAL AMMONIA U.V. D.O. m 3 R W D C PLANT P T (mg/l) SOLIDS -(mg/l) PHOSPHORUS CHANNEL PLANT I I CUBIC METERS (mg/l) A H E U A (mg/l) G % N R X 1000 S I R F O A M ph N M E. E N D E A I PER DAY VOLUME HRS. U S S M P I M U C U C U C U C U C F B C F W N (10 3 m 3 /D) (10 3 m 3 S O RAW ) B P M E O O RAW V H V H RAW V H RAW V H V H C F S A T A RATE O P L H O R N N A A A A A O L T O L I L D E I O N A I I N N N N N L U L L O MAX. MIN. TOTAL N D R I T Z A N N N N N I E I N D S U A U E E E E E E N D E S R D L L L L L MPN T S D E mm (mg/l) (mg/l) (mg/l) (mg/l) (C) (mg/l) Oct-13 sw Oct-13 w Oct-13 ese Oct-13 e Oct-13 s Oct se Oct ssw Oct sw Oct wsw Oct sw Oct-13 wsw Oct w Oct-13 wsw Oct w Oct ssw Oct w Oct sw Oct-13 wsw Oct-13 wsw Oct-13 ene Oct-13 ssw Oct-13 sw Nov-13 2 sw Nov-13 wnw Nov-13 w Nov-13 sw Nov-13 ssw Nov ssw Nov-13 sw Nov w Nov-13 se Nov-13 w Nov-13 ssw Nov-13 nw Nov-13 w Nov-13 sw Nov-13 sw Nov-13 sse Nov sw Nov-13 wsw Nov-13 w Nov-13 e Nov-13 w Nov s Nov wsw Nov wsw Nov-13 sw V1 Page 16 of 71

18 VAUXHALL 2013 PLANT SUMMARY CITY OF LONDON PLANT MM/DD/YY ENVIRONMENTAL SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS DIVISION ######## WEATHER SEWAGE ANALYSES HAULED SLUDGE TEMP. FLOW THRU PLANT BY-PASS BOD 5 DAY SUSPENDED ph TOTAL AMMONIA U.V. D.O. m 3 R W D C PLANT P T (mg/l) SOLIDS -(mg/l) PHOSPHORUS CHANNEL PLANT I I CUBIC METERS (mg/l) A H E U A (mg/l) G % N R X 1000 S I R F O A M ph N M E. E N D E A I PER DAY VOLUME HRS. U S S M P I M U C U C U C U C U C F B C F W N (10 3 m 3 /D) (10 3 m 3 S O RAW ) B P M E O O RAW V H V H RAW V H RAW V H V H C F S A T A RATE O P L H O R N N A A A A A O L T O L I L D E I O N A I I N N N N N L U L L O MAX. MIN. TOTAL N D R I T Z A N N N N N I E I N D S U A U E E E E E E N D E S R D L L L L L MPN T S D E mm (mg/l) (mg/l) (mg/l) (mg/l) (C) (mg/l) Nov-13 w Nov-13 w Nov-13 nw Nov-13 w Nov-13 w Dec-13 ssw Dec-13 NNW Dec-13 SE Dec-13 E Dec-13 SSW Dec-13 NW Dec-13 sw Dec-13 se Dec wsw Dec-13 w Dec-13 w Dec-13 w Dec-13 sw Dec-13 ene Dec-13 wsw Dec-13 sw Dec-13 w Dec-13 sw Dec ssw Dec sw Dec wnw Dec e Dec-13 w Dec sw Dec e Dec sw Dec w Dec-13 wsw Dec-13 ssw Dec w Dec w V1 AVERAGE TOTAL 5, ,272 MAX , MIN # OF SAMPLES Page 17 of 71

19 STD 0.12 Max 7.97 Min 7.3 average 7.58 count 52 RECORD_# CUST SAMP REF NO SAMPLE DATE ANALYTE RESULT UNIT SAMPLE SOURCE VAUX. UV ph 7.51 ph units GRAB VAUX. UV ph 7.47 ph units GRAB VAUX. UV ph 7.51 ph units GRAB VAUX. UV ph 7.53 ph units GRAB VAUX. UV ph 7.3 ph units GRAB VAUX. UV ph 7.54 ph units GRAB VAUX. UV ph 7.44 ph units GRAB VAUX. UV ph 7.53 ph units GRAB VAUX. UV ph 7.53 ph units GRAB VAUX. UV ph 7.48 ph units GRAB VAUX. UV ph 7.43 ph units GRAB VAUX. UV ph 7.55 ph units GRAB VAUX. UV ph 7.51 ph units GRAB VAUX. UV ph 7.46 ph units GRAB VAUX. UV ph 7.63 ph units GRAB VAUX. UV ph 7.85 ph units GRAB VAUX. UV ph 7.68 ph units GRAB VAUX. UV ph 7.61 ph units GRAB VAUX. UV ph 7.76 ph units GRAB VAUX. UV ph 7.66 ph units GRAB VAUX. UV ph 7.64 ph units GRAB VAUX. UV ph 7.56 ph units GRAB VAUX. UV ph 7.52 ph units GRAB VAUX. UV ph 7.42 ph units GRAB VAUX. UV ph 7.75 ph units GRAB VAUX. UV ph 7.68 ph units GRAB VAUX. UV ph 7.78 ph units GRAB VAUX. UV ph 7.64 ph units GRAB VAUX. UV ph 7.44 ph units GRAB VAUX. UV ph 7.97 ph units GRAB VAUX. UV ph 7.61 ph units GRAB VAUX. UV ph 7.63 ph units GRAB VAUX. UV ph 7.72 ph units GRAB VAUX. UV ph 7.7 ph units GRAB VAUX. UV ph 7.62 ph units GRAB VAUX. UV ph 7.59 ph units GRAB VAUX. UV ph 7.57 ph units GRAB VAUX. UV ph 7.67 ph units GRAB VAUX. UV ph 7.48 ph units GRAB Page 18 of 71

20 STD 0.12 Max 7.97 Min 7.3 average 7.58 count 52 RECORD_# CUST SAMP REF NO SAMPLE DATE ANALYTE RESULT UNIT SAMPLE SOURCE VAUX. UV ph 7.62 ph units GRAB VAUX. UV ph 7.54 ph units GRAB VAUX. UV ph 7.6 ph units GRAB VAUX. UV ph 7.61 ph units GRAB VAUX. UV ph 7.42 ph units GRAB VAUX. UV ph 7.52 ph units GRAB VAUX. UV ph 7.64 ph units GRAB VAUX. UV ph 7.52 ph units GRAB VAUX. UV ph 7.55 ph units GRAB VAUX. UV ph 7.42 ph units GRAB VAUX. UV ph 7.67 ph units GRAB VAUX. UV ph 7.6 ph units GRAB VAUX. UV ph 7.46 ph units GRAB Page 19 of 71

21 VAUXHALL 2013 NITROGEN ANALYSES REPORT CITY OF LONDON PLANT: VAUXHALL NOTE: ALL RESULTS IN PPM AS "N ENVIRONMENTAL SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS DIVISION TKN - TOTAL KJELDAHL NITROGE DATE # 1 SECTION # 2 SECTION RAW PRIMARY SECONDARY PRIMARY SECONDARY UV channel FREE TKN ALKA FREE TKN ALKA FREE TKN NO3 FREE TKN ALKA FREE TKN NO3 FREE TEMP ph UNIONIZED TKN NO3 NO2 ALKA NH3 NH3 NH3 NH3 NH3 NH3 NH Jan-13 2-Jan Jan-13 4-Jan-13 5-Jan-13 6-Jan-13 7-Jan Jan-13 9-Jan Jan Jan Jan Jan Jan Jan Jan Jan Jan Jan Jan Jan Jan Jan Jan Jan Jan Jan Jan Jan Jan Jan-13 1-Feb-13 2-Feb-13 3-Feb-13 4-Feb Feb-13 6-Feb Feb-13 8-Feb-13 9-Feb Feb Feb Feb Feb Feb Feb Feb-13 Page 20 of 71

22 VAUXHALL 2013 NITROGEN ANALYSES REPORT CITY OF LONDON PLANT: VAUXHALL NOTE: ALL RESULTS IN PPM AS "N ENVIRONMENTAL SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS DIVISION TKN - TOTAL KJELDAHL NITROGE DATE # 1 SECTION # 2 SECTION RAW PRIMARY SECONDARY PRIMARY SECONDARY UV channel FREE TKN ALKA FREE TKN ALKA FREE TKN NO3 FREE TKN ALKA FREE TKN NO3 FREE TEMP ph UNIONIZED TKN NO3 NO2 ALKA NH3 NH3 NH3 NH3 NH3 NH3 NH Feb Feb Feb Feb Feb Feb Feb Feb Feb Feb Feb Feb-13 1-Mar-13 2-Mar-13 3-Mar-13 4-Mar Mar-13 6-Mar Mar-13 8-Mar-13 9-Mar Mar Mar Mar Mar Mar Mar Mar Mar Mar Mar Mar Mar Mar Mar Mar Mar Mar Mar Mar Mar Mar Mar-13 1-Apr-13 2-Apr Apr-13 4-Apr Page 21 of 71

City Of London Environmental & Engineering Services Department Wastewater Treatment Operations

City Of London Environmental & Engineering Services Department Wastewater Treatment Operations City Of London Environmental & Engineering Services Department Wastewater Treatment Operations Greenway Wastewater Treatment Centre 2016 Annual Report February 2017 Page 1 of 96 SUMMARY This annual report

More information

Design Criteria Data

Design Criteria Data MEDFORD/JACKSON CO. OR Latitude = 42.37 N WMO No. 72597 Longitude =122.8 W Elevation = 1329 feet Period of Record = 1973 to 1996 Average Pressure = 28.61 inches Hg Design Criteria Data Mean Coincident

More information

Design Criteria Data

Design Criteria Data OKLAHOMA CITY OK Latitude = 35.4 N WMO No. 72353 Longitude = 97.6 W Elevation = 133 feet Period of Record = 1973 to 1996 Average Pressure = 28.62 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Design Criteria Data

Design Criteria Data DES MOINES IA Latitude = 41.53 N WMO No. 72546 Longitude = 93.65 W Elevation = 965 feet Period of Record = 1973 to 1996 Average Pressure = 28.96 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Design Criteria Data

Design Criteria Data LAS VEGAS/MCCARRAN NV Latitude = 36.8 N WMO No. 72386 Longitude =115.1 W Elevation = 2179 feet Period of Record = 1973 to 1996 Average Pressure = 27.67 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Design Criteria Data

Design Criteria Data PHOENIX/SKY HARBOR AZ Latitude = 33.43 N WMO No. 72278 Longitude =112. W Elevation = 116 feet Period of Record = 1973 to 1996 Average Pressure = 28.72 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Design Criteria Data

Design Criteria Data SPOKANE WA Latitude = 47.63 N WMO No. 72785 Longitude =117.5 W Elevation = 2366 feet Period of Record = 1973 to 1996 Average Pressure = 27.5 inches Hg Design Criteria Data Mean Coincident (Average) Values

More information

Design Criteria Data

Design Criteria Data SPRINGFLD MO Latitude = 37.23 N WMO No. 7244 Longitude = 93.38 W Elevation = 127 feet Period of Record = 1973 to 1996 Average Pressure = 28.66 inches Hg Design Criteria Data Mean Coincident (Average) Values

More information

Design Criteria Data

Design Criteria Data ANCHORAGE AK Latitude = 61.17 N WMO No. 7273 Longitude =15. W Elevation = 131 feet Period of Record = 1973 to 1996 Average Pressure = 29.6 inches Hg Design Criteria Data Mean Coincident (Average) Values

More information

Design Criteria Data

Design Criteria Data RAPID CITY SD Latitude = 44.5 N WMO No. 72662 Longitude =3. W Elevation = 3169 feet Period of Record = 1973 to 1996 Average Pressure = 26.67 inches Hg Design Criteria Data Mean Coincident (Average) Values

More information

Design Criteria Data

Design Criteria Data PHILADELPHIA PA Latitude = 39.88 N WMO No. 7248 Longitude = 75.25 W Elevation = 3 feet Period of Record = 1973 to 1996 Average Pressure = 29.98 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Design Criteria Data

Design Criteria Data MACON/LEWIS WILSON GA Latitude = 32.7 N WMO No. 72217 Longitude = 83.65 W Elevation = 361 feet Period of Record = 1973 to 1996 Average Pressure = 29.66 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Design Criteria Data

Design Criteria Data PIERRE SD Latitude = 44.38 N WMO No. 726686 Longitude =1.2 W Elevation = 1742 feet Period of Record = 1973 to 1996 Average Pressure = 28.1 inches Hg Design Criteria Data Mean Coincident (Average) Values

More information

Design Criteria Data

Design Criteria Data COLUMBIA SC Latitude = 33.95 N WMO No. 7231 Longitude = 81.12 W Elevation = 226 feet Period of Record = 1973 to 1996 Average Pressure = 29.8 inches Hg Design Criteria Data Mean Coincident (Average) Values

More information

Design Criteria Data

Design Criteria Data INDIANAPOLIS IN Latitude = 39.73 N WMO No. 72438 Longitude = 86.27 W Elevation = 87 feet Period of Record = 1973 to 1996 Average Pressure = 29.15 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Design Criteria Data

Design Criteria Data JACKSONVILLE FL Latitude = 3.5 N WMO No. 7226 Longitude = 81.7 W Elevation = 3 feet Period of Record = 1973 to 1996 Average Pressure = 3.1 inches Hg Design Criteria Data Mean Coincident (Average) Values

More information

Design Criteria Data

Design Criteria Data DENVER/STAPLETON CO Latitude = 39.75 N WMO No. 72469 Longitude =14.8 W Elevation = 5332 feet Period of Record = 1973 to 1995 Average Pressure = 24.66 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Design Criteria Data

Design Criteria Data LOUISVILLE/STANDIFORD KY Latitude = 38.18 N WMO No. 72423 Longitude = 85.73 W Elevation = 489 feet Period of Record = 1973 to 1996 Average Pressure = 29.49 inches Hg Design Criteria Data Mean Coincident

More information

Design Criteria Data

Design Criteria Data DAYTON/JAMES M COX OH Latitude = 39.9 N WMO No. 72429 Longitude = 84.2 W Elevation = 14 feet Period of Record = 1973 to 1996 Average Pressure = 28.95 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Design Criteria Data

Design Criteria Data BIRMINGHAM AL Latitude = 33.57 N WMO No. 72228 Longitude = 86.75 W Elevation = 63 feet Period of Record = 1973 to 1996 Average Pressure = 29.36 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Design Criteria Data

Design Criteria Data MINNEAPOLIS-ST PAUL MN Latitude = 44.88 N WMO No. 72658 Longitude = 93.22 W Elevation = 837 feet Period of Record = 1973 to 1996 Average Pressure = 29.7 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Design Criteria Data

Design Criteria Data WASHINGTON/DULLES VA Latitude = 38.95 N WMO No. 7243 Longitude = 77.45 W Elevation = 322 feet Period of Record = 1973 to 1996 Average Pressure = 29.68 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Design Criteria Data

Design Criteria Data MIDLAND TX Latitude = 31.95 N WMO No. 72265 Longitude =2. W Elevation = 2861 feet Period of Record = 1973 to 1996 Average Pressure = 27.3 inches Hg Design Criteria Data Mean Coincident (Average) Values

More information

Design Criteria Data

Design Criteria Data RENO/CANNON INTL NV Latitude = 39.5 N WMO No. 72488 Longitude =119.7 W Elevation = 44 feet Period of Record = 1973 to 1996 Average Pressure = 25.57 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Design Criteria Data

Design Criteria Data DULUTH MN Latitude = 46.83 N WMO No. 72745 Longitude = 92.18 W Elevation = 1417 feet Period of Record = 1973 to 1996 Average Pressure = 28.43 inches Hg Design Criteria Data Mean Coincident (Average) Values

More information

Design Criteria Data

Design Criteria Data LANDER/HUNT WY Latitude = 42.82 N WMO No. 72576 Longitude =18.7 W Elevation = 5558 feet Period of Record = 1973 to 1996 Average Pressure = 24.44 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Design Criteria Data

Design Criteria Data MINOT AFB ND Latitude = 48.42 N WMO No. 727675 Longitude =11.3 W Elevation = 1667 feet Period of Record = 1967 to 1996 Average Pressure = 28.16 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Design Criteria Data

Design Criteria Data CHARLESTON/KANAWHA WV Latitude = 38.37 N WMO No. 72414 Longitude = 81.6 W Elevation = 981 feet Period of Record = 1973 to 1996 Average Pressure = 29. inches Hg Design Criteria Data Mean Coincident (Average)

More information

Design Criteria Data

Design Criteria Data ALBUQUERQUE NM Latitude = 35.5 N WMO No. 72365 Longitude =16.6 W Elevation = 5315 feet Period of Record = 1967 to 1996 Average Pressure = 24.72 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Design Criteria Data

Design Criteria Data BURLINGTON VT Latitude = 44.47 N WMO No. 72617 Longitude = 73.15 W Elevation = 341 feet Period of Record = 1973 to 1996 Average Pressure = 29.61 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Design Criteria Data

Design Criteria Data HONOLULU/OAHU HI Latitude = 21.35 N WMO No. 91182 Longitude =157.9 W Elevation = 16 feet Period of Record = 1967 to 1996 Average Pressure = 29.96 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Design Criteria Data

Design Criteria Data BOSTON/LOGAN MA Latitude = 42.37 N WMO No. 7259 Longitude = 71.3 W Elevation = 3 feet Period of Record = 1967 to 1996 Average Pressure = 29.95 inches Hg Design Criteria Data Mean Coincident (Average) Values

More information

Design Criteria Data

Design Criteria Data CHICAGO/O HARE IL Latitude = 41.98 N WMO No. 7253 Longitude = 87.9 W Elevation = 673 feet Period of Record = 1967 to 1996 Average Pressure = 29.27 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Design Criteria Data

Design Criteria Data NEW YORK/JOHN F KENNEDY NY Latitude = 4.65 N WMO No. 74486 Longitude = 73.78 W Elevation = 23 feet Period of Record = 1973 to 1996 Average Pressure = 29.98 inches Hg Design Criteria Data Mean Coincident

More information

Design Criteria Data

Design Criteria Data MADISON/DANE CO. RGNL WI Latitude = 43.13 N WMO No. 72641 Longitude = 89.33 W Elevation = 866 feet Period of Record = 1973 to 1996 Average Pressure = 29.5 inches Hg Design Criteria Data Mean Coincident

More information

Monthly data generated on Wednesday, July 31, 2013 at 13:04 UTC

Monthly data generated on Wednesday, July 31, 2013 at 13:04 UTC MESONET CLIMATOLOGICAL DATA SUMMARY May 2013 Time Zone: Midnight-Midnight CST 1 82 40 63.9 NA 4 0 NA NA NA 0.01 28.18 29.90 N 19.2 46.3 24.90 66.6 71.4 77 66 2 54 36 43.5 NA 20 0 NA NA NA 0.05 28.67 30.42

More information

MONTHLY CLIMATOLOGICAL SUMMARY for JAN NAME: WMREC CITY: STATE: ELEV: 600 ft LAT: 39 38' 31" N LONG: 77 44' 00" W

MONTHLY CLIMATOLOGICAL SUMMARY for JAN NAME: WMREC CITY: STATE: ELEV: 600 ft LAT: 39 38' 31 N LONG: 77 44' 00 W MONTHLY CLIMATOLOGICAL SUMMARY for JAN. 2015 1 34.8 45.2 3:30p 22.1 5:30a 30.2 0.0 0.00 4.8 24.0 4:00p WSW 2 34.9 44.3 3:00p 24.0 12:00m 30.1 0.0 0.00 2.4 17.0 10:30a W 3 33.0 37.8 12:00m 23.3 1:00a 32.0

More information

Commercial-in-Confidence Ashton Old Baths Financial Model - Detailed Cashflow

Commercial-in-Confidence Ashton Old Baths Financial Model - Detailed Cashflow Year 0 1 2 3 4 5 6 7 8 9 10 11 12 13 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 2,038 2,922 4,089 4,349 6,256 7,124 8,885 8,885 8,885 8,885 8,885 8,885 9,107

More information

SASKATOON STATION

SASKATOON STATION SRC CLIMATE REFERENCE STATION DAILY DATA REPORT SASKATOON STATION 45718 Saskatchewan 52 9' N 6 36' W 497 m asl Estab. 1963 JULY Preliminary 16 Day Temperature Degree-days Precipitation Relative Humidity

More information

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS* COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates For Internal Use Only. FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year

More information

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS* COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun

More information

Capacity Analysis Report. For. William E. Dunn Water Reclamation Facility 4111 Dunn Drive Palm Harbor, Florida 34683

Capacity Analysis Report. For. William E. Dunn Water Reclamation Facility 4111 Dunn Drive Palm Harbor, Florida 34683 Capacity Analysis Report For William E. Dunn Water Reclamation Facility 4111 Dunn Drive Palm Harbor, Florida 34683 Florida Department of Environmental Protection Facility Identification No. FLA0128775

More information

Year to Date Summary. Average and Median Sale Prices

Year to Date Summary. Average and Median Sale Prices A Publication of RMLS, The Source for Real Estate Statistics in Your Community Residential Review: Southwest Washington September 2018 Reporting Period September Residential Highlights Southwest Washington

More information

Total Production by Month (Acre Feet)

Total Production by Month (Acre Feet) Production by Month (acre-feet) 2008 2009 2010 2011 2012 2013 2014 2015 2016 January 25 339.10 228.90 249.50 297.99 243.06 327.14 247.66 212.37 February 234.00 218.80 212.10 241.52 245.82 279.08 234.16

More information

METROPOLITAN COAL ENVIRONMENTAL PROTECTION LICENCE MONITORING SUMMARY

METROPOLITAN COAL ENVIRONMENTAL PROTECTION LICENCE MONITORING SUMMARY Introduction The Protection of the Environment Operations Act 1997 (POEO Act) requires that holders of an environment protection licence make their pollution monitoring data publicly available in a timely

More information

2017 Adjusted Count Report February 12, 2018

2017 Adjusted Count Report February 12, 2018 A statewide multi-use trail user study and volunteer data collection program 2017 Adjusted Count Report February 12, 2018 The following report includes the final adjusted infrared (IR) counter data at

More information

Bulk Storage Containers

Bulk Storage Containers UCSB AST SPCC SELF-INSPECTION CHECKLIST Year: Responsible Department: Tank Location: Tank ID: Bulk Storage Containers Total tank capacity: Petroleum type and amount: Secondary containment type: (diesel,

More information

Appendix F. Ship Drift Analysis West Coast of North America: Alaska to Southern California HAZMAT Report ; April 2000

Appendix F. Ship Drift Analysis West Coast of North America: Alaska to Southern California HAZMAT Report ; April 2000 Appendix F Ship Drift Analysis West Coast of North America: Alaska to Southern California HAZMAT Report 2000-2; April 2000 2.2 Drift Factors When its propulsion or steering device fails, a ship will drift

More information

The Peoples Gas Light and Coke Company

The Peoples Gas Light and Coke Company History of Gas Charges Due to the Operation of Rider 2 (Cents per Therm) Factors for Transportation Customers (Riders FST, SST, P, CFY and AGG) Non- Total Standby Standby Aggregation Commodity Commodity

More information

2014 Meteorological and Oceanographic Summary for the Bocas del Toro Research Station. Prepared by: Steven Paton

2014 Meteorological and Oceanographic Summary for the Bocas del Toro Research Station. Prepared by: Steven Paton 0 2014 Meteorological and Oceanographic Summary for the Bocas del Toro Research Station Prepared by: Steven Paton 1 Introduction This is the second of a series of yearly reports summarising the past year

More information

WIM #37 was operational for the entire month of September Volume was computed using all monthly data.

WIM #37 was operational for the entire month of September Volume was computed using all monthly data. SEPTEMBER 2016 WIM Site Location WIM #37 is located on I-94 near Otsego in Wright county. The WIM is located only on the westbound (WB) side of I-94, meaning that all data mentioned in this report pertains

More information

NEW HAMPSHIRE GAS CORPORATION WINTER PERIOD ORIGINAL FILING CONTENTS 3. CONVERSION OF GAS COSTS - GALLONS TO THERMS SCHEDULE A

NEW HAMPSHIRE GAS CORPORATION WINTER PERIOD ORIGINAL FILING CONTENTS 3. CONVERSION OF GAS COSTS - GALLONS TO THERMS SCHEDULE A NEW HAMPSHIRE GAS CORPORATION COST OF GAS RATE FILING - DG 13- WINTER PERIOD 2013-2014 ORIGINAL FILING CONTENTS 1. TARIFF PAGE - COST OF GAS RATE 2. MARKED TARIFF PAGE - COST OF GAS RATE 3. CONVERSION

More information

3 rd Quarter Summary of Meteorological and Ambient Air Quality Data Kennecott Utah Copper Monitoring Stations. Prepared for:

3 rd Quarter Summary of Meteorological and Ambient Air Quality Data Kennecott Utah Copper Monitoring Stations. Prepared for: 3 rd Quarter 2018 Summary of Meteorological and Ambient Air Quality Data Kennecott Utah Copper Monitoring Stations Prepared for: Prepared by: Mr. Bryce C. Bird Director Division of Air Quality 195 North

More information

Local Climatological (Data Summary Molim, Illinois

Local Climatological (Data Summary Molim, Illinois SWS Miscellaneous Publication 98-13 STATE OF ILLINOIS DEPARTMENT OF ENERGY AND NATURAL RESOURCES Local Climatological (Data Summary Molim, Illinois 1872-1992 by Audrey A. Bryan and Wayne Wendland Climatological

More information

Up and Down Months of the Stock Market

Up and Down Months of the Stock Market Up and Down Months of the Stock Market 1926-2017 Positive years (66) in the stock market were not good all year long and losing years (24) were not losers throughout the year. Winning years produce losing

More information

Date Event or Holiday :Sun, 2:Mon North Orchard Delong Preschool North Orchard Delong Preschool

Date Event or Holiday :Sun, 2:Mon North Orchard Delong Preschool North Orchard Delong Preschool 2018 6 1 1:Sun, 2:Mon 2018-2019 Date Event or Holiday Aug 16 Board Meeting 6pm Aug 23 Open House June 2018 July 2018 August 2018 Sep 06 Board Meeting 6pm Su M Tu W Th F Sa Su M Tu W Th F Sa Su M Tu W Th

More information

ANCR CRU Statistics February 2007 to December 2007

ANCR CRU Statistics February 2007 to December 2007 ANCR CRU Statistics February 2007 to December 2007 o Jan/07 Feb/07* Mar/07 Apr/07 May/07 Jun/07 Jul/07 Aug/07 Sep/07 Oct/07 Nov/07 Dec/07 Total notes data from Perimeter phone system unavailable prior

More information

M o n. a t i s t i c s. M o n t h l y NOVEMBER 2009

M o n. a t i s t i c s. M o n t h l y NOVEMBER 2009 M o n t h l y M o n t S h l t y a t i s t i c s NOVEMBER 29 For Immediate Release December 7, 29 CONTACT: Kimberly Clifton, President (52) 954-8 Wes Wiggins Vice President, MLS (52) 82-8792 Cheri Meadows

More information

Algebra II Pacing Guide

Algebra II Pacing Guide Unit 13: Exploring a Business Venture (10 days) 8 May 13 - May 24 n/a MISD Pacing Guide Date Range Unit 01: Introduction to Functions in 15 Aug. 21 - Sept. 11 Sept. 12 Unit 02: Absolute Value Functions,,

More information

LOCAL CLIMATOLOGICAL DATA

LOCAL CLIMATOLOGICAL DATA ILLINOIS STATE WATER SURVEY DIVISION URBANA, ILLINOIS ISWS MP-21 Archive SWS0964 Illinois State Water Survey LOCAL CLIMATOLOGICAL DATA FDR HILLSBORO, IL. 1901-1962 LOCAL CLIMATOLOGICAL DATA 1901-1962 HILLSBORO

More information

3. Atmospheric Supply of Nitrogen to the Baltic Sea in 2009

3. Atmospheric Supply of Nitrogen to the Baltic Sea in 2009 3. Atmospheric Supply of Nitrogen to the Baltic Sea in 2009 Nitrogen emission data, as well as the model results presented here have been approved by the 35 th Session of the Steering Body of EMEP in Geneva

More information

September 2016 Water Production & Consumption Data

September 2016 Water Production & Consumption Data September 2016 Water Production & Consumption Data September 2016 monthly water production (288.48 AF) was lowest in at least 17 years. Monthly water production has increased slightly each month since

More information

Action Requested From AMWG

Action Requested From AMWG Action Requested From AMWG NONE, These Two Presentations Are For Information Transfer Only The information is derived from a multi-year synthesis research effort related to existing data on flow, sediment-transport

More information

Automotive Gas Oil (Diesel) Price Watch

Automotive Gas Oil (Diesel) Price Watch Automotive Gas Oil (Diesel) Price Watch (JANUARY 2018) Report Date: February 2018 Data Source: National Bureau of Statistics (NBS) Contents Executive Summary 1 PMS Prices Across States 2 PMS Prices Across

More information

FOR IMMEDIATE RELEASE

FOR IMMEDIATE RELEASE Article No. 7761 Available on www.roymorgan.com Roy Morgan Unemployment Profile Monday, 8 October 2018 Unemployment down to 9.4% in September off two-year high Australian employment has grown solidly over

More information

Appendix E Water Supply Modeling

Appendix E Water Supply Modeling Supply Modeling Modesto Irrigation District Treatment Plant Expansion Project Modeling I. Introduction The Modesto Irrigation District (MID) is situated adjacent to and north of the Tuolumne River. Over

More information

Docket No. DE Dated: 05/04/2015 Attachment CJG-1 Page 1

Docket No. DE Dated: 05/04/2015 Attachment CJG-1 Page 1 Docket No. DE - Dated: 0/0/0 Attachment CJG- Page 8 9 Summary of Forecasted Energy Service 0 Cost For January 0 Through December 0 TOTAL COST Cents per KWH Reference Fossil energy costs $ 9,9 $. Attachment

More information

DRINKING WATER SYSTEM ANNUAL REPORT Reporting Period: January 1 st to December 31 st, 2016

DRINKING WATER SYSTEM ANNUAL REPORT Reporting Period: January 1 st to December 31 st, 2016 DRINKING WATER SYSTEM ANNUAL REPORT Reporting Period: January 1 st to December 31 st, 2016 Water System: Coal Harbour Water System Water System Owner Regional District of Mount Waddington Primary Contact

More information

Climatography of the United States No

Climatography of the United States No Climate Division: CA 5 NWS Call Sign: Month (1) Min (2) Month(1) Extremes Lowest (2) Temperature ( F) Lowest Month(1) Degree s (1) Base Temp 65 Heating Cooling 100 Number of s (3) Jan 45.9 26.0 36.0 67

More information

Example Airshed. Sample January 2019 Monthly Ambient Air Quality Monitoring Report

Example Airshed. Sample January 2019 Monthly Ambient Air Quality Monitoring Report Example Airshed Sample January 219 Monthly Ambient Air Quality Monitoring Report 28 February 219 DISCLAIMER: This sample monthly report is provided as guidance only. The structure, look and layout of monthly

More information

Energy Performance Information Request Timeline

Energy Performance Information Request Timeline Energy Performance Information Request Timeline Project Title: UT Project # Project Manager: Submitted by: Day Submitted: The timeline below outlines a comprehensive list of required documents and when

More information

NE (SE) Beam

NE (SE) Beam Predicted clear day beam and diffuse irradiances (/ W m 2 ) on vertical and horizontal surfaces on specified days in northern (N) and southern (S) hemispheres (see notes at foot of table): LATITUDE 60

More information

Sunrise: 05:48 N (S) Beam

Sunrise: 05:48 N (S) Beam Predicted clear day beam and diffuse irradiances (/ W m 2 ) on vertical and horizontal surfaces on specified days in northern (N) and southern (S) hemispheres (see notes at foot of table): LATITUDE 40

More information

CLIMATOLOGICAL SUMMARY

CLIMATOLOGICAL SUMMARY DEPARTMENT OF REGISTRATION AND EDUCATION CTATP OF ILLINOIS ILLINOIS STATE WATER SURVEY DIVISION URBANA, ILLINOIS ISWS MP-19 Archive ISWS Illinois State Water Survey )CAL CLIMATOLOGICAL DATA MP-19 LOCAL

More information

M onthly arket. Jan Table of Contents. Monthly Highlights

M onthly arket.   Jan Table of Contents. Monthly Highlights Table of Contents Market Inventory...2 www.gaar.com Monthly Highlights January 2014 had a 12.29% increase in the number of homes sales when compared to same time last year. The average sale price of single-family

More information

Climatography of the United States No

Climatography of the United States No Climate Division: WY 9 NWS Call Sign: LND Temperature ( F) Month (1) Min (2) Month(1) Extremes Lowest (2) Lowest Month(1) Degree s (1) Base Temp 65 Heating Cooling 100 Number of s (3) Jan 31.9 8.7 20.3

More information

2016 Meteorological and Oceanographic Summary for the Bocas del Toro Research Station. Prepared by: Steven Paton

2016 Meteorological and Oceanographic Summary for the Bocas del Toro Research Station. Prepared by: Steven Paton 0 2016 Meteorological and Oceanographic Summary for the Bocas del Toro Research Station Prepared by: Steven Paton 1 Introduction This is the forth of a series of yearly reports summarising the past year

More information

Florida Courts E-Filing Authority Board. Service Desk Report October 2018

Florida Courts E-Filing Authority Board. Service Desk Report October 2018 Florida Courts E-Filing Authority Board Service Desk Report October 218 Customer Service Incidents October 218 Status August 218 September 218 October 218 Incidents Received 3,157 2,685 3,779 Incidents

More information

November 2018 Customer Switching Report for the Electricity and Gas Retail Markets

November 2018 Customer Switching Report for the Electricity and Gas Retail Markets An Coimisiún um Rialáil Fóntas Commission for Regulation of Utilities November 2018 Customer Switching Report for the Electricity and Gas Retail Markets Information Paper Reference: CRU18266 Date Published:

More information

Sprinkler System Waiver Application Packet

Sprinkler System Waiver Application Packet Sprinkler System Waiver Application Packet According to the City s municipal code, use of sprinklers is conditional upon use of a water budget and the City continues to discourage customers from irrigating

More information

LOCAL CLIMATOLOGICAL DATA Monthly Summary April 2012

LOCAL CLIMATOLOGICAL DATA Monthly Summary April 2012 Deg. Days Precip Ty Precip Wind Solar Hu- Adj. to Sea Level mid- ity Avg Res Res Peak Minute 1 fog 2 hvy fog 3 thunder 4 ice plt 5 hail 6 glaze 7 duststm 8 smk, hz 9 blw snw 1 2 3 4A 4B 5 6 7 8 9 11 12

More information

FOR IMMEDIATE RELEASE

FOR IMMEDIATE RELEASE Article No. 7845 Available on www.roymorgan.com Roy Morgan Unemployment Profile Friday, 18 January 2019 Unemployment in December is 9.7% and under-employment is 8.8% FOR IMMEDIATE RELEASE Australian unemployment

More information

INTECH AUGUST QHSE PERFORMANCE

INTECH AUGUST QHSE PERFORMANCE INTECH QHSE PERFORMANCE - MONTHLY QHSE PERFORMANCE Goal Zero Days ( worked days without Lost Time Injury (LTI)) 751 This Month Minor Accidents or Incidents 01 This Month Major Accidents or Incidents 00

More information

Price Category Breakdown - February 2010

Price Category Breakdown - February 2010 SINGLE FAMILY RESIDENTIAL BREAKDOWN ruary 21 ruary Sales and Average Price Increase Annually TORONTO - Wednesday, March 3, 21 7.3 % 24.6 % 1.8 % 7.3%.2%.1 % Greater Toronto REALTORS reported 7,291 sales

More information

Units of Instruction MISD Pacing Guide Days Date Range Test Date

Units of Instruction MISD Pacing Guide Days Date Range Test Date MISD Pacing Guide Date Range Test Date Introduction: Processes of Investigations (1 day) Aug. 21 Unit 01: Matter (12 days) Aug. 22-Sept. 7 Sep. 10 Unit 02: Atomic Structure and the Periodic Table (15 days)

More information

LOCAL CLIMATOLOGICAL DATA Monthly Summary April 2015

LOCAL CLIMATOLOGICAL DATA Monthly Summary April 2015 Deg. Days Precip Ty Precip Wind Solar Hu- Adj. to Sea Level mid- ity Avg Res Res Peak 2 Minute 1 fog 2 hvy fog 3 thunder 4 ice plt 5 hail 6 glaze 7 duststm 8 smk, hz 9 blw snw 1 2 3 4A 4B 5 6 7 8 9 11

More information

D G A G R I D A S H B O A R D : T O M A T O E S Last update: EU AVG PRICES

D G A G R I D A S H B O A R D : T O M A T O E S Last update: EU AVG PRICES tonnes Weightedaverages by volume of production per MS Ongoing adjustments on weights by variety group 000 tonnes D G A G R I D A S H B O A R D : T O M A T O E S Last update: 20.04.2018 EU AVG PRICES MS

More information

National Household Kerosene Price Watch

National Household Kerosene Price Watch National Household Kerosene Price Watch (MAY 2018) Report Date: June 2018 Data Source: National Bureau of Statistics (NBS) Contents Executive Summary 1 Kerosene Prices per litre Across States 2 Kerosene

More information

Liquefied Petroleum Gas (Cooking Gas) Price Watch

Liquefied Petroleum Gas (Cooking Gas) Price Watch Liquefied Petroleum Gas (Cooking Gas) Price Watch NOVEMBER 2017) Report Date: December 2017 Data Source: National Bureau of Statistics (NBS) Contents Executive Summary 1 Cooking Gas Prices Across States

More information

National Household Kerosene Price Watch

National Household Kerosene Price Watch National Household Kerosene Price Watch (DECEMBER 2017) Report Date: January 2018 Data Source: National Bureau of Statistics (NBS) Contents Executive Summary 1 Kerosene Prices per litre Across States 2

More information

Multiple Listing Service

Multiple Listing Service For Immediate Release: January 7, 21 CONTACT: Dan Santa Maria MLS President (52) 795-1492 Wes Wiggins Vice President, MLS (52) 382-8792 Cheri Meadows Senior Vice President, TAR (52) 327-4218 For Tucson

More information

Inventory Levels - All Prices. Inventory Levels - By Price Range

Inventory Levels - All Prices. Inventory Levels - By Price Range Inventory Levels - All Prices Idaho Falls Bonneville Total 7-Apr-17 154 111 265 6-Apr-18 113 91 204-23% Inventory Levels - By Price Range 7-Apr-17 6-Apr-18 0-100,000 36 10 100,001-125,000 13 9 125,001-150,000

More information

Inventory Levels - All Prices. Inventory Levels - By Price Range

Inventory Levels - All Prices. Inventory Levels - By Price Range Inventory Levels - All Prices Idaho Falls Bonneville Total 3-Mar-17 152 108 260 2-Mar-18 109 78 187-28% Inventory Levels - By Price Range 3-Mar-17 2-Mar-18 0-100,000 41 6 100,001-125,000 19 8 125,001-150,000

More information

LOCAL CLIMATOLOGICAL DATA Monthly Summary April 2017

LOCAL CLIMATOLOGICAL DATA Monthly Summary April 2017 Deg. Days Precip Ty Precip Wind Solar Hu- Adj. to Sea Level mid- ity Avg Res Res Peak 2 Minute 1 fog 2 hvy fog 3 thunder 4 ice plt 5 hail 6 glaze 7 duststm 8 smk, hz 9 blw snw 1 2 3 4A 4B 5 6 7 8 9 11

More information

National Household Kerosene Price Watch

National Household Kerosene Price Watch National Household Kerosene Price Watch (JANUARY 2018) Report Date: February 2018 Data Source: National Bureau of Statistics (NBS) Contents Executive Summary 1 Kerosene Prices per litre Across States 2

More information

LOW ENERGY AERATION AND PROBIOTICS RESOLVE SLUDGE MANAGEMENT ISSUES! Adam Wilson. Coffs Harbour Water

LOW ENERGY AERATION AND PROBIOTICS RESOLVE SLUDGE MANAGEMENT ISSUES! Adam Wilson. Coffs Harbour Water LOW ENERGY AERATION AND PROBIOTICS RESOLVE SLUDGE MANAGEMENT ISSUES! Paper Presented by: Adam Wilson Authors: Adam Wilson, Manager Water Treatment, Mick Piggott, Supt Woolgoolga Water Reclamation Plant,

More information

2017 Meteorological and Oceanographic Summary for the Bocas del Toro Research Station. Prepared by: Steven Paton

2017 Meteorological and Oceanographic Summary for the Bocas del Toro Research Station. Prepared by: Steven Paton 0 2017 Meteorological and Oceanographic Summary for the Bocas del Toro Research Station Prepared by: Steven Paton 1 Introduction This is the 5 th of a series of yearly reports summarising the past year

More information

1st Quarter Summary of Meteorological and Ambient Air Quality Data Kennecott Utah Copper Monitoring Stations

1st Quarter Summary of Meteorological and Ambient Air Quality Data Kennecott Utah Copper Monitoring Stations 1st Quarter 2014 Summary of Meteorological and Ambient Air Quality Data Kennecott Utah Copper Monitoring Stations Steven A. Root Digitally signed by Steven A. Root DN: cn=steven A. Root, o=weatherbank,

More information

increase of over four per cent compared to the average of $409,058 reported in January 2010.

increase of over four per cent compared to the average of $409,058 reported in January 2010. SINGLE FAMILY RESIDENTIAL BREAKDOWN uary 211 26.8 % 1.7 % 7.%.4%.1 % Good Start to 211 TORONTO - February 4, 211 Greater Toronto REALTORS reported 4,337 transactions through the TorontoMLS system in uary

More information

Septage Treatment at Small Wastewater Treatment Plants

Septage Treatment at Small Wastewater Treatment Plants Septage Treatment at Small Wastewater Treatment Plants Khamis Al-Omari Omari,, Hazen and Sawyer, P.C. 2008 MWEA Annual Conference (Session 3) Boyne Mountain Resort Boyne Falls, Michigan June 23, 2008 Acknowledgements

More information