2 Tender Close Hwy. 1, Paving, CS West Regina Bypass to Dewdney (Advanced Tender) Paving Southern Tendered Tendered Length = 8.21 km Excavation = m³ Subbase = t Base = t Asphalt Concrete = t Hwy. 2, Resurfacing, Jct Hwy 2 and Hwy 11 (North and West), km to & km 0.00 to 3.60 & km 0.00 to 1.83 & km to Resurfacing Northern December 2012 December 2012 Length = km Asphalt Concrete = t Hwy. 2, Resurfacing, North of Prince Albert to North of Spruce Home (EPS), Resurfacing Northern December 2012 December 2012 km 8.26 to Length = km Asphalt Concrete = t Hwy. 9, Bridge, Replacement, Yorkton Creek, km to Bridge Central November 2012 November 2012 Length = 0.00 km Excavation = m³ Base = t Asphalt Concrete = t Hwy. 9, Culvert Replacement, North of Canora, km 2.96 Culvert Replacement Central Tendered Tendered Length = 0.00 km Hwy. 10, Resurfacing, 4.5 km North of Edgeley to Jct. Hwy tendering with Passing Lanes on Hwy 10, km to Resurfacing Southern November 2012 December 2012 Length = km Asphalt Concrete = t Page 1 of 8

3 Tender Close Hwy. 10, Grade & Pave, Hwy 10 Passing Lanes - tendering with Resurfacing on Hwy 10-06, km 0.00 to Grade and Pave Southern November 2012 December 2012 Length = km Excavation = m³ Subbase = t Base = t Asphalt Concrete = t Hwy. 11, Resurfacing, Jct Hwy 20 to Bethune (Advanced Tender), km 0.00 to Resurfacing Southern Tendered Tendered Length = km Asphalt Concrete = t Hwy. 14, Resurfacing, West of its Jct. with Hwy 374 to approximately 10 km west, Resurfacing Central November 2012 December 2012 km to Length = km Base = t Asphalt Concrete = t Haul = t-km Hwy. 14, Bridge, Replacement, Suicide Creek, km to Bridge Central November 2012 November 2012 Length = 0.00 km Excavation = m³ Base = t Asphalt Concrete = t Hwy. 15, Resurfacing, Melville to Fenwood, km 0.00 to Resurfacing Central December 2012 December 2012 Length = km Base = t Asphalt Concrete = t Hwy. 16, Resurfacing, Bredenbury to Saltcoats (EPS), km to Resurfacing Central November 2012 November 2012 Length = km Asphalt Concrete = t Page 2 of 8

4 Tender Close Hwy. 22, Grade & Pave, Jct. Hwy. 6 at Southey to 15.5 km W at Earl Grey, km 0.00 to Grade and Pave Southern March 2013 March 2013 Length = km Excavation = m³ Subbase = t Base = t Asphalt Concrete = t Hwy. 32, Resurfacing, 0.5 km east of the Prelate access to the Jct of Hwy 21 at Leader (EPS), km to Resurfacing Southern November 2012 December 2012 Length = km Asphalt Concrete = t Haul = t-km Hwy. 35, Bridge, Replacement, Long Creek, km 2.45 Bridge Southern November 2012 November 2012 Length = km Hwy. 41, Resurfacing, Jct. Hwy 368 to E of Jct. Hwy 20, km to Resurfacing Northern December 2012 December 2012 Length = km Base = t Asphalt Concrete = t Hwy. 42, Resurfacing, Tuxford to 11.2 kms NW, km 0.00 to Resurfacing Southern November 2012 November 2012 Length = km Base = t Asphalt Concrete = t Hwy. 51, Paving, Major to Jct. 317, km 0.00 to 9.70 Paving Central December 2012 December 2012 Length = 9.70 km Subbase = t Base = t Asphalt Concrete = t Haul = t-km Page 3 of 8

5 Tender Close Hwy. 55, Resurfacing, West of Green Lake to West of Jct. Hwy. 903 and East of Tolko Access to Jct. 903, km 1.90 to & km to & km to Resurfacing Northern December 2012 December 2012 Length = km Asphalt Concrete = t Hwy. 56, Bridge, Replacement over Qu'Appelle River, km 0.21 to 0.21 Bridge Southern Tendered Tendered Length = 0.00 km Hwy. 58, Grade & Pave, Jct. of Hwy. 13 at Lafleche to km North to its Jct. with Hwy. 43 at Gravelbourg, Grade and Pave Southern November 2012 March 2013 km 0.00 to Length = km Subbase = t Base = t Asphalt Concrete = t Hwy. 123, Grading, Various sections southwest of Cumberland House (Advanced Tender), km to & km to & km to Grading Northern Tendered Tendered Length = 9.08 km Excavation = m³ Hwy. 224, Grading, Grieg Lake Access Road, km 0.00 to 9.18 Grading Northern November 2012 November 2012 Length = 9.18 km Excavation = m³ Various Bridge, Culverts Replacing Bridges Bridge Northern Various Various Length = 0.00 km Various Culvert Replacement, Various locations Culvert Replacement Central Various Various Length = 0.00 km Page 4 of 8

6 Tender Close Other Contracts Various Southern Region, #1 Southern November 2012 November 2012 = t Various Southern Region, #2 Southern November 2012 November 2012 = t Various Southern Region, #3 Southern November 2012 December, 2012 = t Various Southern Region, #4 Southern November 2012 November 2012 = t Various Southern Region, #5 Southern November 2012 November 2012 = t Page 5 of 8

7 Tender Close Passing lane from 1.2 km north of Jct. 20 to Bethune Micro Surfacing Southern November 2012 November 2012 Length = 25 lane kilometres Various Hwy Culvert Replacement, 4 culvert installations, various locations Culvert Replacement Southern various various various Central Region, # 1 Central December 2012 January 2013 = t various Central Region, #2 Central February 2013 March 2013 = t various Southern Region Bit Mix #1 Southern March 2013 March 2013 = t various Northern/Central Bit Mix #2 Northern/ Central March 2013 March 2013 = t Page 6 of 8

8 Tender Close Various Northern Region, #1 Northern December, 2012 December, 2012 = t Various Northern Region, #2 Northern December, 2012 December, 2012 = t Various Northern Region, #3 Northern December, 2012 December, 2012 = t Various Northern Region, #4 Northern December, 2012 December, 2012 = t Excavation (m 3 ) Granular (t) Asphalt Concrete (t) Seal Coat (m 2 ) Total Types of Projects include 2 Grading, 2 Paving, 3 Grade & Pave, 11 Resurfacing, over 8 Bridge and Culverts, 1 Micro Surfacing, and 13. Page 7 of 8

9 Tender Close Projects Announced on Previous Tender Plans Hwy. 13, Resurfacing, Griffin to Weyburn, km 0.00 to Resurfacing Southern November 2012 November 2012 Length = km Subbase = t Base = t Asphalt Concrete = t Hwy. 33, Resurfacing, Sedley to Lajord, km to Resurfacing Southern November 2012 November 2012 Length = km Base = t Asphalt Concrete = t Page 8 of 8

FALL 2017 ADVERTISING SCHEDULE

FALL 2017 ADVERTISING SCHEDULE INFRASTRUCTURE FALL 2017 ADVERTISING SCHEDULE CONSTRUCTION AND MATERIAL SUPPLY TENDERS Manitoba Infrastructure Contract Services Branch 1630 215 Garry Street Winnipeg, MB R3C 3P3 204 945 3637 The Construction

More information

INFRASTRUCTURE AND TRANSPORTATION ADVERTISING SCHEDULE 2015/2016 CONSTRUCTION AND MATERIAL SUPPLY TENDERS

INFRASTRUCTURE AND TRANSPORTATION ADVERTISING SCHEDULE 2015/2016 CONSTRUCTION AND MATERIAL SUPPLY TENDERS INFRASTRUCTURE AND TRANSPORTATION ADVERTISING SCHEDULE 2015/2016 CONSTRUCTION AND MATERIAL SUPPLY TENDERS Manitoba Infrastructure and Transportation Contract Services Branch 1630-215 Garry Street Winnipeg,

More information

Tire Replacement Vendor List

Tire Replacement Vendor List Tire Replacement Vendor List Commerical Services Division This list should be used to find approved tire vendors for CVA vehicle tire replacement. This list expires June 30, 2019. Last Revised: June 2018

More information

Fiscal Year 2016 CDOT RAP USAGE REPORT Asphalt Pavement Projects Awarded in Fiscal Year 2016 (July June 2016)

Fiscal Year 2016 CDOT RAP USAGE REPORT Asphalt Pavement Projects Awarded in Fiscal Year 2016 (July June 2016) Fiscal Year 2016 CDOT RAP USAGE REPORT Asphalt Pavement s Awarded in Fiscal Year 2016 (July 2015 - June 2016) Region 1 STA 0703-426 20510 I-70:WB EJMT to MM 218 SMA PG 76-28 11930 N/A N/A ER 0703-424 20351

More information

Wentzville Parkway South Phase 2 & 2A

Wentzville Parkway South Phase 2 & 2A Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total

More information

O-Train Light Rail Transit Stage 2 Look Ahead

O-Train Light Rail Transit Stage 2 Look Ahead National Capital Heavy Construction Association January 15, 2018 O-Train Light Rail Transit Stage 2 Look Ahead John Manconi, General Manager Transportation Services Department City of Ottawa 1 3 Current

More information

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/26/00 PAGE : 1 TABULATION OF BIDS

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/26/00 PAGE : 1 TABULATION OF BIDS PAGE : 1 CONTRACT DESCRIPTION : LEFT & RIGHT TURN LANES AND FLASHING BEACON SYSTEM CONTRACT LOCATION: LOCATED ON TH 7 FROM 327 M WEST OF JCT TH 25 TO 445 M EAST OF JCT TH 25 RECOMMENDATION: AWARD TO LOW

More information

Corridor Sketch Summary

Corridor Sketch Summary Corridor Sketch Summary SR 241: I-82 Jct (Sunnyside) to SR 24 Jct Corridor Highway No. 241 Mileposts: 7.53 to 25.21 Length: 17.65 miles Corridor Description The seventeen and one-half mile corridor begins

More information

April 2014: Capital Improvements Update. through $ 102,233,755 Available Funding through 2019 $ 149,764,558. Staff s Recommendation

April 2014: Capital Improvements Update. through $ 102,233,755 Available Funding through 2019 $ 149,764,558. Staff s Recommendation Capital Improvements Update April 2014: Pl dp j t Planned Projects through 2019 - $ 102,233,755 Available Funding through 2019 $ 149,764,558 pp p,, Un-appropriated - $ 47,530,803 Staff s Recommendation

More information

Transportation Improvement Program (TIP) Candidate Project List for Public Review

Transportation Improvement Program (TIP) Candidate Project List for Public Review 2011-2014 Transportation Improvement Program (TIP) Candidate List for Public Review Table 1 Annual Listing Of Federal Aid Obligation For Federal Fiscal Year 2010 North Dakota s Number Transit 410083 Transit

More information

Trainini Photo Calendar in exclusive Co-Operation with Ztrack Magazine

Trainini Photo Calendar in exclusive Co-Operation with Ztrack Magazine Trainini Photo Calendar 2018 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 January 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 February

More information

The Vehicle Weight and Dimension Regulations, 1999

The Vehicle Weight and Dimension Regulations, 1999 VEHICLE WEIGHT AND DIMENSION, 1999 H-3.01 REG 2 1 The Vehicle Weight and Dimension Regulations, 1999 Repealed by Chapter H-3.01 Reg 8 (effective November 12, 2010). Formerly Chapter H-3.01 Reg 2 (effective

More information

IMPROVING CITIES THROUGH PUBLIC-PRIVATE PARTNERSHIPS. Toronto Forum For Global Cities December 2008

IMPROVING CITIES THROUGH PUBLIC-PRIVATE PARTNERSHIPS. Toronto Forum For Global Cities December 2008 IMPROVING CITIES THROUGH PUBLIC-PRIVATE PARTNERSHIPS Toronto Forum For Global Cities December 2008 TORONTO S CHALLENGE GTA suffers from traffic congestion The average Torontonian spends seven hours a week

More information

Construction Staging Area 4 Avenue Road

Construction Staging Area 4 Avenue Road REPORT FOR ACTION Construction Staging Area 4 Avenue Road Date: September 27, 2017 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District

More information

PUBLIC INFRASTRUCTURE PROJECTS

PUBLIC INFRASTRUCTURE PROJECTS PUBLIC INFRASTRUCTURE PROJECTS FM 664 / OVILLA ROAD WIDENING & IMPROVEMENTS FM 664 / OVILLA ROAD CONNECTS US 287 WITH I-45 (SOURCE: TEXAS DEPARTMENT OF TRANSPORTATION. 2016 FM 664 / OVILLA ROAD WIDENING

More information

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/01/00 PAGE : 1 TABULATION OF BIDS

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/01/00 PAGE : 1 TABULATION OF BIDS PAGE : 1 CONTRACT DESCRIPTION : MILL & OVERLAY, GRADING, BIT SURFACING, BR NO 02038 ETC CONTRACT LOCATION: LOCATED ON TH 47 FROM 153RD AVE NW IN RAMSEY TO 180TH LANE NW AND AT FORD BROOK IN BURNS TOWNSHIP

More information

Guam Transportation Program Project Updates. Joanne M.S. Brown Director Carl Dominguez Deputy Director February 6, 2012

Guam Transportation Program Project Updates. Joanne M.S. Brown Director Carl Dominguez Deputy Director February 6, 2012 Guam Transportation Program Project Updates Joanne M.S. Brown Director Carl Dominguez Deputy Director February 6, 2012 Agenda Road Construction Highlights Ongoing Construction Route 17 Rehabilitation and

More information

Alignment Comparison Report (May 9, 2002) PARK BRIDGE TO BRAKE CHECK (10 Mile Bridge) TRANS CANADA HIGHWAY (CCR)

Alignment Comparison Report (May 9, 2002) PARK BRIDGE TO BRAKE CHECK (10 Mile Bridge) TRANS CANADA HIGHWAY (CCR) Alignment Comparison Report (May 9, 2002) PARK BRIDGE TO BRAKE CHECK (10 Mile Bridge) TRANS CANADA HIGHWAY (CCR) INTRODUCTION The Ministry of Transportation (MoT), Region 2, Highway Engineering staff were

More information

US 67 WIDENING PROJECT

US 67 WIDENING PROJECT US 67 WIDENING PROJECT From Belt Line Rd. to I-20 History & Background The US 67 improvements from Belt Line Rd to I-20 were originally part of TxDOT s Southern Gateway project, studied as part of the

More information

Determination of Monthly Means of Daily Solar Radiation and its Variability: A Summary (continued)

Determination of Monthly Means of Daily Solar Radiation and its Variability: A Summary (continued) Introduction Section 5.3 MONTHLY MEANS OF DAILY SOLAR RADIATION AND ITS VARIABILITY R.E. Schulze, M. Maharaj and R.D. Chapman The maps and statistics of solar radiation in this Section supersede the ones

More information

Ministry of Transportation and Infrastructure CONSTRUCTION AND REHABILITATION COST GUIDE

Ministry of Transportation and Infrastructure CONSTRUCTION AND REHABILITATION COST GUIDE Ministry of Transportation and Infrastructure CONSTRUCTION AND REHABILITATION COST GUIDE Jan 2011 CONSTRUCTION AND REHABILITATION COST GUIDE INDEX Index... 1 Introduction... 2 Barriers... 3 Bridge Structure

More information

CONSTRUCTION & DEMOLITION (C&D) RECYCLING APPLICATION COMMERCIAL RECYCLING SERVICE PROVIDER

CONSTRUCTION & DEMOLITION (C&D) RECYCLING APPLICATION COMMERCIAL RECYCLING SERVICE PROVIDER CONSTRUCTION & DEMOLITION (C&D) RECYCLING APPLICATION COMMERCIAL RECYCLING SERVICE PROVIDER The Construction & Demolition Recycling Permit allows removal of recyclable materials from construction sites

More information

OHIO Department of Transportation Project # Franklin County, OH. ISSA Presidents Award Submission Strawser Construction Inc.

OHIO Department of Transportation Project # Franklin County, OH. ISSA Presidents Award Submission Strawser Construction Inc. OHIO Department of Transportation Project #140378 Franklin County, OH ISSA Presidents Award Submission Strawser Construction Inc. Columbus, Ohio Strawser Construction Project Team Chris Anspaugh Regional

More information

Year to Date Summary. Average and Median Sale Prices

Year to Date Summary. Average and Median Sale Prices A Publication of RMLS, The Source for Real Estate Statistics in Your Community Residential Review: Southwest Washington September 2018 Reporting Period September Residential Highlights Southwest Washington

More information

2015 ND Asphalt Conference. March 31, 2015 NDDOT Director Grant Levi, P.E.

2015 ND Asphalt Conference. March 31, 2015 NDDOT Director Grant Levi, P.E. 2015 ND Asphalt Conference March 31, 2015 NDDOT Director Grant Levi, P.E. 1 NDDOT 2013-15 Budget $2.84 billion total appropriation $1.16 billion one time for enhanced state highway investments. (Early

More information

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/27/06 PAGE : 1 TABULATION OF BIDS

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/27/06 PAGE : 1 TABULATION OF BIDS PAGE : 1 NUMBER OF DAYS: 63 BRIDGE COUNT : 9 CONTRACT DESCRIPTION : BITUMINOUS OVERLAY & BRIDGE APPROACH PANEL REPLACEMENT CONTRACT LOCATION: LOCATED ON TH 90 FROM 0.8 MILE WEST OF THE BLUE EARTH RIVER

More information

December Individual Quality Review Calendar FY 18 FY 19. Mon Tues Wed Thu Fri Sat. Sun METRO1 SAMPLE TO REGION

December Individual Quality Review Calendar FY 18 FY 19. Mon Tues Wed Thu Fri Sat. Sun METRO1 SAMPLE TO REGION December 2017 Sun Mon Tues Wed Thu Fri Sat 1 2 3 4 5 6 7 8 9 METRO1 SAMPLE TO REGION 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Christmas METRO1 Schedules issued to IQR Updated 1/5/18

More information

This corridor section will carry commuter trains from Portland to Longview/Kelso, CHSR inter-city and inter-city express trains.

This corridor section will carry commuter trains from Portland to Longview/Kelso, CHSR inter-city and inter-city express trains. Alignment is double tracked for 186 mph speeds. This corridor section will carry commuter trains from Portland to Longview/Kelso, CHSR inter-city and inter-city express trains. BNSF right-of-way will be

More information

Middle Georgia Regional Investment List

Middle Georgia Regional Investment List MGRC 003 Baldwin Kings Road Safety Enhancements $6,579,700 x MGRC 005 Baldwin Log Cabin Road Widening $11,109,500 x MGRC 154 Baldwin Widen & Resurface N. Jefferson St. $6,897,900 x MGRC 155 Baldwin Widen

More information

I-405 Sepulveda Pass Improvements Project

I-405 Sepulveda Pass Improvements Project I-405 Sepulveda Pass Improvements Project Community Meeting November 15, 2012 1 Wilshire Segment Overview of Wilshire Segment There are a total of 23 bridges being constructed on this project; almost half

More information

Confederation Line West Queensway Terrace North. May 27, 2017

Confederation Line West Queensway Terrace North. May 27, 2017 Confederation Line West Queensway Terrace North May 27, 2017 Agenda Background Lincoln Fields Station Concept LRT alignment, southwest of Lincoln Fields to Queensway, including: Pedestrian bridge replacement

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 9/8/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

Municipal Road and Bridge Revolving Loan Fund Program Summary Rhode Island Department of Transportation

Municipal Road and Bridge Revolving Loan Fund Program Summary Rhode Island Department of Transportation Municipal Road and Bridge Revolving Loan Fund 2014 Program Summary Rhode Island Department of Transportation The Basics The FY2014 Budget passed by the Rhode Island General Assembly included Article 20,

More information

Oklahoma Department of Transportation

Oklahoma Department of Transportation Updated on /8/08 List Bid Opening of April 9, 08 ACSTP-06C(0)PM J.P. Number: 7900 07 Proposal No.: 80 BLAINE BRIDGE AND APPROACHES Highway No.: SH-8 SH-8: OVER SPRING CREEK,.0 MILE SOUTH OF THE SH- JUNCTION

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. District(s): 8 30=047 Start Dt: 05/01/17 Comp. Dt:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. District(s): 8 30=047 Start Dt: 05/01/17 Comp. Dt: Letting: 17030200 Letting Dt: March 02, 2017 9:30 A.M. State Proj.: 5101-14 Contract ID: Contract Description: Contract Location: Recommendation: 170020 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

Penn West Petroleum Ltd. Well Blowout W5M August 17, 2010

Penn West Petroleum Ltd. Well Blowout W5M August 17, 2010 Penn West Petroleum Ltd. Well Blowout 14-20-065-10W5M August 17, 2010 ERCB Investigation Report August 24, 2011 ENERGY RESOURCES CONSERVATION BOARD ERCB Investigation Report: Penn West Petroleum Ltd.,

More information

Odense Tramway Construction Project

Odense Tramway Construction Project Odense Tramway Construction Project Odense Tramway has a clear Mission and Vision, both supported by tangible objectives that will be the reference during the tender process Mission, Vision and Objectives

More information

1855 Victoria Ave. Regina Canada S4P 3T2 TRAVEL. On Saskatchewan Highways 2016

1855 Victoria Ave. Regina Canada S4P 3T2 TRAVEL. On Saskatchewan Highways 2016 1855 Victoria Ave. Regina Canada S4P 3T2 TRAVEL On Saskatchewan Highways 2016 TRAVEL On Saskatchewan Highways 2016 Prepared by Information Management Branch Traffic Services Unit Cover The cover features

More information

System Impact Study Report

System Impact Study Report System Impact Study Report for Transmission Service Request #699453 July 2005 Prepared By: G.R.Belanger Supervisor Grid Development Submitted By: G.R.Belanger Supervisor Grid Development Approved By: A.C.Thomson

More information

What Does it All Mean?

What Does it All Mean? What Does it All Mean? There are several hopeful indicators that 2017 could be the turn around year for our Market. There is progress being made on bike lanes, a few cross walks have been installed and

More information

HMA Thin Lifts for Pavement Preservation in Tennessee

HMA Thin Lifts for Pavement Preservation in Tennessee HMA Thin Lifts for Pavement Preservation in Tennessee The Tennessee Program 5,109 Interstate Lane Miles 26,244 State Route LM 31,353 Total* MARK WOODS, P.E. TDOT DIV. OF MATERIALS AND TESTS * As of 2008

More information

REGULAR SESSION, BOARD OF PUBLIC WORKS AND SAFETY, DECEMBER 27, 2017

REGULAR SESSION, BOARD OF PUBLIC WORKS AND SAFETY, DECEMBER 27, 2017 The Board of Public Works and Safety of Plymouth, Indiana, met in Regular Session on December 27, 2017, at 6:00 p.m. in the meeting room of the Plymouth Fire Department, 111 N. Center St., Plymouth, IN.

More information

W&OD TRAIL BRIDGE OVER LEE HIGHWAY I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237)

W&OD TRAIL BRIDGE OVER LEE HIGHWAY I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237) W&OD TRAIL BRIDGE OVER LEE HIGHWAY A COMPONENT OF THE I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237) October 11, 2018 Bill Cuttler, PE

More information

Foxground and Berry Bypass. January 2016

Foxground and Berry Bypass. January 2016 Foxground and Bypass ENVIRONMENT PROTECTION LICENCE NO: 20462 MONTHLY REPORT January 2016 Contents 1. Introduction... 3 2. Non-compliances... 3 3. Rainfall... 3 4. Sediment Basin Discharges... 4 5. Air

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 2/19/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

South Gloucestershire Challenge Fund and Cycle Ambition Fund

South Gloucestershire Challenge Fund and Cycle Ambition Fund South Gloucestershire Challenge Fund and Cycle Ambition Fund The Challenge Fund A4174 scheme is coordinated and delivered by South Gloucestershire Council who were awarded 14 million pounds from the Department

More information

What Does it All Mean?

What Does it All Mean? What Does it All Mean? There are several hopeful indicators that 2017 could be the turn around year for our Market. There is progress being made on bike lanes, a few cross walks have been installed and

More information

CONFEDERATION LINE EAST SEGMENT

CONFEDERATION LINE EAST SEGMENT The O-Train Confederation Line project is the first stage in Ottawa s future light rail network. The 12.5 kilometre electric rail system will replace existing diesel powered buses, providing rapid transit

More information

2017 Jefferson County Outreach Jefferson County Maintenance. Matthew Burkett ~ Jefferson County Maintenance Manager

2017 Jefferson County Outreach Jefferson County Maintenance. Matthew Burkett ~ Jefferson County Maintenance Manager Outreach 2017 2017 Jefferson County Outreach Jefferson County Maintenance Matthew Burkett ~ Jefferson County Maintenance Manager MATERIAL 2016-2017 Jefferson County Outreach Winter Maintenance Information

More information

LOCATED IN THE EAST CENTRAL REGION OF ALBERTA (SE of EDMONTON) 8,458 RESIDENTS 10 COUNTY HAMLETS: 7 NEIGHBOURING COUNTIES

LOCATED IN THE EAST CENTRAL REGION OF ALBERTA (SE of EDMONTON) 8,458 RESIDENTS 10 COUNTY HAMLETS: 7 NEIGHBOURING COUNTIES LOCATED IN THE EAST CENTRAL REGION OF ALBERTA (SE of EDMONTON) 8,458 RESIDENTS 10 COUNTY HAMLETS: ARMENA DUHAMEL KELSEY KINGMAN PELICAN POINT MEETING CREEK NEW NORWAY OHATON ROUND HILL TILLICUM 7 NEIGHBOURING

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Shaw Brothers Construction, Inc. - Gorham, ME $659,771.50 R J Grondin & Sons - Gorham, ME $690,828.50 Gendron & Gendron - Lewiston, ME $753,187.00 Gordon Contracting - Sangerville,

More information

Delivering the North West Rail Link. Colin Rudd, Deputy Project Director, NWRL David Polkinghorne, Design Team Leader, TJHD

Delivering the North West Rail Link. Colin Rudd, Deputy Project Director, NWRL David Polkinghorne, Design Team Leader, TJHD Delivering the North West Rail Link Colin Rudd, Deputy Project Director, NWRL David Polkinghorne, Design Team Leader, TJHD November 26, 2013 The starting point Project overview $8.3 billion budget Open

More information

HURON COUNTY ENGINEER S OFFICE

HURON COUNTY ENGINEER S OFFICE HURON COUNTY ENGINEER S OFFICE 2017 ENGINEER S ANNUAL REPORT The Ohio Revised Code requires that each Ohio County Engineer publish an annual report to the commissioners outlining the general condition

More information

SECONDARY ROAD CONSTRUCTION PROGRAM

SECONDARY ROAD CONSTRUCTION PROGRAM Iowa Department of Transportation SECONDARY ROAD CONSTRUCTION PROGRAM County: Linn County Fiscal : 2014 Version: Original COUNTY CERTIFICATION The detailed construction program for the secondary road system

More information

BC Hydro System 2016 Annual Progress Report

BC Hydro System 2016 Annual Progress Report March 11, 2016 Philip Augustin, P.E. Chair, Technical Studies Subcommittee 503-464-7783 philip.augustin@pgn.com Mr. Enoch Davies WECC Technical Staff 155 North 400 West, Suite 200 Salt Lake City, UT 84103-1114

More information

SKID RESISTANCE EVALUATION PROGRAM

SKID RESISTANCE EVALUATION PROGRAM SKID RESISTANCE EVALUATION PROGRAM P a u l O w e n s Director ISH C Research and Training Center West Lafayette, Indiana H IS T O R Y Indiana started skidding roads in 1968 with a towed-trailer type skid

More information

The City of Fredericksburg

The City of Fredericksburg The City of Fredericksburg 126 West Main Street Fredericksburg, TX 78624 (830)997-7521 ~ (830)997-1861 Fax www.fbgtx.org 2014 Utility & Service Rate Comparison Water Utility Sewer Utility Sanitation Service

More information

Child Protection and Permanency. Monthly Screening and Investigation Report September 2015

Child Protection and Permanency. Monthly Screening and Investigation Report September 2015 Child Protection and Permanency Monthly Screening and Investigation Report tember Allison Blake, Ph.D., L.S.W. Commissioner October 16, Data in this report is preliminary and may differ from any final

More information

STREET LIGHTING AND ELECTRICAL SYSTEM UNDERGROUNDING. Underground Vault

STREET LIGHTING AND ELECTRICAL SYSTEM UNDERGROUNDING. Underground Vault CIP_215 Title Pages 217:Layout 1 8/16/16 4:2 PM Page 7 STREET LIGHTING AND ELECTRICAL SYSTEM UNDERGROUNDING Underground Vault A D O P T E D C A P I T A L I M P R O V E M E N T P R O G R A M B U D G E T

More information

Hinkley Point C our approach to Health and Safety Iain Graham Head of Health & Safety

Hinkley Point C our approach to Health and Safety Iain Graham Head of Health & Safety Hinkley Point C our approach to Health and Safety Iain Graham Head of Health & Safety 1 Where are we? Hinkley Point 2 EDF Energy s Nuclear New Build Projects February 2018 EDF Energy plc. All rights Reserved

More information

THOMPSON-NICOLA DISTRICT HIGHWAY 5A SAFETY REVIEW

THOMPSON-NICOLA DISTRICT HIGHWAY 5A SAFETY REVIEW THOMPSON-NICOLA DISTRICT HIGHWAY 5A SAFETY REVIEW 5 5A 5 THOMPSON-NICOLA DISTRICT HIGHWAY 5A SAFETY REVIEW July 11, 2013 Prepared for: Honourable Minister Todd Stone Ministry of Transportation and Infrastructure

More information

September 2018 AVAILABILITY REPORT. Office, Warehouse & Retail space for lease. Integrity. Dedication. Professionalism.

September 2018 AVAILABILITY REPORT. Office, Warehouse & Retail space for lease.   Integrity. Dedication. Professionalism. AVAILABILITY REPORT Office, Warehouse & Retail space for lease www.districtrealty.com Integrity. Dedication. Professionalism. The information as herewith enclosed has been obtained from sources we believe

More information

Northwest Territories Highway Traffic, 2007

Northwest Territories Highway Traffic, 2007 Northwest Territories Highway Traffic, 2007 Northwest Territories Highway Traffic, 2007 Department of Transportation Government of the Northwest Territories August 2008 Acknowledgements This report was

More information

CPG is pleased to report the following accomplishments this quarter:

CPG is pleased to report the following accomplishments this quarter: MEMORANDUM To: From: Metrolinx Board of Directors Matthew Clark Chief Capital Officer (A), Capital Projects Group Date: February 7, 2019 Re: Capital Projects Group Quarterly Report Recommendation That

More information

This section is illustrated in Figure The length of this section is approximately 24.5 km.

This section is illustrated in Figure The length of this section is approximately 24.5 km. 4.2.5 Section 5: Ntafufu River to Lusikisiki (Magwa Intersection) This section is illustrated in Figure 4.19. The length of this section is approximately 24.5 km. It is proposed to upgrade and rehabilitate

More information

City of Grand Forks Staff Report

City of Grand Forks Staff Report City of Grand Forks Staff Report Committee of the Whole December 1, 016 City Council December 19, 016 Agenda Item: Bids for City Project No. 7551 Lift Station No. 17 & 17A Rehabilitation Submitted by:

More information

I-4 Beyond the Ultimate. Florida Transportation Builders Association January 18, 2019

I-4 Beyond the Ultimate. Florida Transportation Builders Association January 18, 2019 I-4 Beyond the Ultimate Florida Transportation Builders Association January 18, 2019 FDOT District 5 Improving Mobility & Safety in Central Florida FDOT District 5 is: Designing and building a better Interstate

More information

Greater Albuquerque Area Monthly Housing Trends vs. 2011

Greater Albuquerque Area Monthly Housing Trends vs. 2011 Greater Albuquerque Area Monthly Housing Trends - 2010 vs. 2011 Class R1 (Existing Single-Family Detached) and Class R2 (Existing Condo/Townhome Attached) homes Data on this page was obtained from the

More information

Clarksville Street Department. Fiscal Year 2018 Budget Presentation

Clarksville Street Department. Fiscal Year 2018 Budget Presentation Clarksville Street Department Fiscal Year 2018 Budget Presentation Clarksville Street Department FY 2018 Proposed Budget 4.2% 42.0% Salaries/Benefits 53.8% Operating Expenses Capital Outlay Clarksville

More information

This are the pictures from the Stockholders Report

This are the pictures from the Stockholders Report Utah Securities Corporation Utah Light and Traction Company Financial and Physical Data As of March 31, 1915 This are the pictures from the Stockholders Report Page 32 Electrically Operated Hydraulic Dredge

More information

Highway Drawings. Government of Maharashtra. Public Works Department

Highway Drawings. Government of Maharashtra. Public Works Department Government of Maharashtra Government of Maharashtra Construction of Two-laning Road with paved shoulders, under Package HAM-AU 108 in the State of Maharashtra, under MRIP on Hybrid Annuity Mode Package

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt: Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 4308-34 Contract ID: Contract Description: Contract Location: Recommendation: 170004 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

2015 Calendar Way Down East. Limited Edition

2015 Calendar Way Down East. Limited Edition 2015 Calendar Way Down East From Limited Edition 2016 January 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 April 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

More information

2016 North Trunk Highway 65 Corridor Coalition Manufacturers Survey

2016 North Trunk Highway 65 Corridor Coalition Manufacturers Survey 2016 North Trunk Highway 65 Corridor Coalition Manufacturers Survey Purpose The North TH 65 Corridor Coalition is focused on improving transportation access and safety and supporting development along

More information

U.S. Army Corps of Engineers, Detroit District 2018 PHOTO CONTEST CALENDAR

U.S. Army Corps of Engineers, Detroit District 2018 PHOTO CONTEST CALENDAR U.S. Army Corps of Engineers, Detroit District 2018 PHOTO CONTEST CALENDAR First place photo by Danielle Adams featuring the James L. Oberstar at anchor off Picnic Rocks, a point between the Presque Isle

More information

Highways: Interstate. Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Maintenance: Interstate

Highways: Interstate. Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Maintenance: Interstate FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) BAKER COUNTY Highways: Interstate 4386501 I-10 BAKER CO SPRAYFIELD EB REST

More information

Columbia County Road Department. Department Presentation June, 2013 By David Hill

Columbia County Road Department. Department Presentation June, 2013 By David Hill Columbia County Road Department Department Presentation June, 2013 By David Hill Columbia County Road Department Presentation: Work Performed Revenues / Expenses Projects Completed / Planned Issues and

More information

Greater Albuquerque Area Monthly Housing Trends vs. 2016

Greater Albuquerque Area Monthly Housing Trends vs. 2016 Month Greater Albuquerque Area Monthly Housing Trends - 2015 vs. 2016 Class R1 (Existing Single-Family Detached) and Class R2 (Existing Condo/Townhome Attached) homes Data on this page was obtained from

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max: Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 1401-171 Contract ID: Contract Description: Contract Location: Recommendation: 170002 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

Minnesota s Truck Weight Education Program

Minnesota s Truck Weight Education Program 2018 Minnesota s Truck Weight Education Program Greg A. Hayes - Director Tom J. Nelson - Coordinator A Minnesota educational project to safeguard public roadways through voluntary vehicle Greg Hayes All

More information

TRANSPORTATION IMPROVEMENT PROGRAM

TRANSPORTATION IMPROVEMENT PROGRAM 2016 2021 TRANSPORTATION IMPROVEMENT PROGRAM 25 21 12 1 24 C B 26 13 29 30 3 6 19 7 27 14 18 17 15 16 28 22 11 10 9 A 7 D E 4 23 5 2 8 20 PROJECTS ON THE TIP PROJECTS ADDED TO THE TIP MAP I.D. PROJECT

More information

Suicide Deaths in BC

Suicide Deaths in BC Suicide Deaths in BC 2006-2016 This report summarizes all deaths classified as suicide between January 1, 2006 and December 31, 2016. This includes cases that have been completed and those still under

More information

OHIO Department of Transportation Project # Franklin County, OH. ISSA Presidents Award Submission Strawser Construction Inc.

OHIO Department of Transportation Project # Franklin County, OH. ISSA Presidents Award Submission Strawser Construction Inc. OHIO Department of Transportation Project #140378 Franklin County, OH ISSA Presidents Award Submission Strawser Construction Inc. Columbus, Ohio Applicant Information Strawser Construction Inc. 1392 Dublin

More information

Right-of-Way Obstruction Permit Fee Structure Minneapolis Department of Public Works May 10, 2001

Right-of-Way Obstruction Permit Fee Structure Minneapolis Department of Public Works May 10, 2001 Right-of-Way Obstruction Permit Fee Structure Minneapolis Department of Public Works May 10, 2001 Revised April 5, 2005 Revised January 27, 2006 Prepared by: Steve Collin, Engineer 2.5 Revised by Douglas

More information

Greater Albuquerque Area Monthly Housing Trends vs. 2017

Greater Albuquerque Area Monthly Housing Trends vs. 2017 Month Greater Albuquerque Association of REALTORS Greater Albuquerque Area Monthly Housing Trends - 2016 vs. 2017 Class R1 (Existing Single-Family Detached) and Class R2 (Existing Condo/Townhome Attached)

More information

Delaware County Engineer s Office

Delaware County Engineer s Office Delaware County Engineer s Office JANUARY 2017 County Engineer Responsibility Serve as engineer to the Board of County Commissioners and 18 Boards of Township Trustees for roads, bridges and land surveying

More information

Nonprofit Insurance Trust (NIT) Preferred Shop Network

Nonprofit Insurance Trust (NIT) Preferred Shop Network Nonprofit Insurance Trust (NIT) Preferred Shop Network NPIA, Inc. on behalf of the Nonprofit Insurance Trust and its members, has implemented a Preferred Shop Network for vehicle repairs. These shops have

More information

Fairbanks, Alaska. A Climate Almanac

Fairbanks, Alaska. A Climate Almanac A Climate Almanac History of Climate Observations at Fairbanks Cooperative climate observations were initiated in Fairbanks by the Rev. Hudson Stuck on September!, "#$!. Observations were made with Weather

More information

SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP. 1 OF 1 P:\8417\ Bridge A\AT\Albany A.MDB 7/21/2014 7:32:31 AM REVISION NO COUNTY

SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP. 1 OF 1 P:\8417\ Bridge A\AT\Albany A.MDB 7/21/2014 7:32:31 AM REVISION NO COUNTY 7/18/2014 - UCTURE REVISION NO REVISIONS DATE BY DIICT COUNTY ROUTE SECTION SHEET - SEE SPECIAL PROVISIONS SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP T-410 4 OF 8 QUANTITY ITEM NO UNIT DESCRIPTION DESIGN NO

More information

DIRECTIONS TO FRAC SITES

DIRECTIONS TO FRAC SITES DIRECTIONS TO FRAC SITES *To Abbott's Farm (Barnesville) from Griffin: Go south on the 4-lane U. S. Hwy. 19/41 Bypass. It's 19.1 mi. on the 4-lane from Williamson Rd. (Ga. Hwy. 362) to Brent Rd. on the

More information

Rural Planning. Highway Projects - CULLMAN COUNTY

Rural Planning. Highway Projects - CULLMAN COUNTY 4/17/2015 ALABAMA DEPARTMENT OF TRANSPORTATION Page - 1 of 9 Length CR-1742 4.770 Highway s - CULLMAN COUNTY RESURFACE CR-1742 FROM SR-74 (US-278) TO SR-67 RESURFACING 100063223 ST-022-888-011- ( ) CONSTRUCTION

More information

CREATING CONNECTIONS IN WATERLOO REGION

CREATING CONNECTIONS IN WATERLOO REGION CREATING CONNECTIONS IN WATERLOO REGION GORD TROUGHTON, DIRECTOR, CORRIDOR INFRASTRUCTURE CHRIS BURKE, DIRECTOR, SERVICE PLANNING ERIN MOROZ, DIRECTOR, COMMUNICATIONS AND COMMUNITY RELATIONS METROLINX

More information

RE: S.P (T.H. 210) in Crow Wing County Located on T.H. 210 from Brainerd (R.P ) to Ironton (R.P )

RE: S.P (T.H. 210) in Crow Wing County Located on T.H. 210 from Brainerd (R.P ) to Ironton (R.P ) District 3 Administration 7964 Industrial Park Road Baxter, MN 56425 Memo To: Dan Anderson Transportation District Engineer From: Scott Zeidler Senior Engineering Specialist Date: December 11, 2017 RE:

More information

Schedule 18 (Technical Requirements) DBFO Agreement EXECUTION VERSION APPENDIX B - SELECT DEPARTMENT STANDARD DRAWINGS AND REFERENCE TABLES

Schedule 18 (Technical Requirements) DBFO Agreement EXECUTION VERSION APPENDIX B - SELECT DEPARTMENT STANDARD DRAWINGS AND REFERENCE TABLES Schedule (Technical Requirements) DBFO Agreement EXECUTION VERSION APPENDIX B - SELECT DEPARTMENT STANDARD DRAWINGS AND REFERENCE TABLES Schedule (Technical Requirements) DBFO Agreement EXECUTION VERSION

More information

Population Trends. US 12 Corridor Performance

Population Trends. US 12 Corridor Performance Corridor Context The corridor runs over 81 miles from Willmar to the Twins Cities metropolitan area. It connects the Twin Cities and the cities of Montrose, Howard Lake, Cokato, Dassel, Litchfield, Atwater,

More information

KDOT PROJECT # 106 KA

KDOT PROJECT # 106 KA Page 1 of 10 KDOT PROJECT # FEDERL PROJECT # HSIP-450(101) KDOT PROJECT # FEDERL PROJECT # HSIP-450(101) Project Location #8 Page 2 of 10 01/05/2017 JG FED # HSIP-450(101) This project is for cutting shoulder

More information

DESCRIPTION QUANTITY PRICE TOTAL

DESCRIPTION QUANTITY PRICE TOTAL GENERAL 1 TRAFFIC CONTROL LS 1 $40,000 $40,000 $8,500.00 $8,500.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $15,000.00 $15,000.00 2 MOBILIZATION LS 1 $557,000 $557,000 $629,500.00 $629,500.00 $350,000.00

More information

Structural Plate Vertical Ellipse

Structural Plate Vertical Ellipse STEEL STRUCTURAL PLATE PRODUCTS Round Structural Plate (ftin) (ftin) (ftin) R-S-1 5-0 19.6 R-S-2 5-6 23.8 R-S-3 6-0 28.3 R-S-4 6-6 33.2 R-S-5 7-0 38.5 R-S-6 7-6 44.2 R-S-7 8-0 50.3 R-S-8 8-6 56.7 R-S-9

More information

# of Projects STIP Total Other FHWA Target FHWA Total FHWA Target AC Total AC

# of Projects STIP Total Other FHWA Target FHWA Total FHWA Target AC Total AC DISTRICT/ATP 6 Data Input Worksheet STIP 2014 2017 Needed for 10 yr workplan Needed for 10 yr workplan YEAR # of Projects STIP Total Other FHWA Target FHWA Total FHWA FTA State TH DIST C TH Total TH Bond

More information

The Saskatchewan Gazette PUBLISHED WEEKLY BY AUTHORITY OF THE QUEEN S PRINTER/PUBLIÉE CHAQUE SEMAINE SOUS L AUTORITÉ DE L IMPRIMEUR DE LA REINE

The Saskatchewan Gazette PUBLISHED WEEKLY BY AUTHORITY OF THE QUEEN S PRINTER/PUBLIÉE CHAQUE SEMAINE SOUS L AUTORITÉ DE L IMPRIMEUR DE LA REINE THE SASKATCHEWAN GAZETTE, NOVEMBER 26, 2010 679 The Saskatchewan Gazette PUBLISHED WEEKLY BY AUTHORITY OF THE QUEEN S PRINTER/PUBLIÉE CHAQUE SEMAINE SOUS L AUTORITÉ DE L IMPRIMEUR DE LA REINE PART II/PARTIE

More information