GLAST LAT Project Subsystem Managers Meeting, May 13, Introduction. Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager

Size: px
Start display at page:

Download "GLAST LAT Project Subsystem Managers Meeting, May 13, Introduction. Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager"

Transcription

1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope: Introduction Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager Rev B 1

2 Two towers in the Grid! Rev B 2

3 Master Schedule LAT complete and tested January 16, 2006 To NRL for environmental testing Delivery to Observatory Integration June 1, 2006 Mate with spacecraft and GBM and test Launch August 31, 2007 Kennedy Space Flight Center Spitzer Telescope Launch on a Delta II Heavy Rev B 3

4 Module Schedule M/E March 2005 Forecast Dates and Float (working days) to "Ship LAT" Mech/ACD TKR CAL ELEC I&T Grid 11/08/04A - Module A 02/04/05A - 12/08/04A - 02/17/05A - 7-Apr Module B 02/24/05A - 01/14/05A - 03/09/05A - 28-Apr Module 1 28-Apr /14/05A - 22-Apr May Module 2 22-Apr /14/05A - 29-Apr May Module 3 28-Apr /14/05A - 6-May May Module 4 16-May /22/05A - 13-May Jun Module 5 3-Jun /22/05A - 20-May Jun Module 6 22-Jun Apr May Jun Module 7 5-Jul Apr Jun Jul Module 8 13-Jul Apr Jun Jul Module 9 22-Jul May Jun Aug Module 10 2-Aug May Jun Aug Module Aug May Jul Aug Module Aug May Jul Aug Module Aug May Jul Sep Module 14 9-Sep May Jul Sep ACD 11-Jul X-LAT 1-Jun Radiators 22-Jul Harness 5-Jul PDU 21-Jul GASU 15-Aug EPU 13-Sep SIU 23-Sep FSW 29-Apr Inst Global Items 26-Oct System Test 10-Jan LAT Arrives at NRL 16-Jan EMI/EMC Test 15-Feb Sine Vibe 28-Feb Acoustic Test 12-Mar TVAC 29-Apr Weight & CG 1-May Preship Review 2-May Ship LAT 7-May Rev B 4

5 LAT Schedule TKR A 2/4/05A TKR 14 9/9/05 ACD 7/11/05 CAL A 12/08/04A CAL 5/25/05 DAQ 9/23/05 FSW Complete 4/29/05 TEM/PS A 2/17/05A TEM/PS 7/26/05 X-LAT 6/1/05 FSW Formal Test 07/14/05 GRID Assembly 2/25/05A Install Twrs A&B 8 wks 2 Tower CPT 3 wks Install Twrs wks Install Tower 14 1 wk 09/23/05 Install Gbl Items 4 wks 10/26/05 01/16/05 05/07/06 System Test 9 wks Ship LAT 1 wk Enviro Test 12 wks LAT RFI Observ. Integration Launch 2007 Rev B 5

6 Current Critical Path to Ship LAT to Spectrum Astro Elex: SIU/SIB B/P Fab Protoflights 6/6/05 Elex: LCB Flight Units 8/11/05 Elex: EPU/SIU Integration Boxes 1-5 9/23/05 Elex: EPU/SIU Box 5th RFI 9/23/05 Elex: LCB Fab Protoflight 6/3/05 Integrate LAT- Wide Electronics 10/18/05 System Test 1/06/06 Integrate X-Lat Thermal Plate 10/26/05 Integrate ACD 10/21/05 Pre- Environmental Test Review 1/10/06 Environmental Test 5/02/06 Ship LAT to Spectrum Astro 5/07/06 Float 16 days Rev B 6

7 Current Critical Path to Ship LAT to Spectrum Astro 1st critical path: a) Electronics SIB/SIU Protoflight b) Electronics LCB Protoflight 16 days float to Ship LAT to Spectrum Astro 2nd critical path: Tracker MCM Fabrication Towers days behind 1st critical path 3rd critical path: Tracker Tray Assembly Towers days behind 2nd critical path 1st critical path to I&T Module A: I&T Functional Test Completed April 7 Rev B 7

8 Tracker Milestones Activity Description Instrument Project Office (Level 3) Tracker Baseline Finish 2-1m e a Var Bsln Var Early Finish FY05 FE MA AP MA JU JU AU SE OCO Flight Tracker Tower 1 RFI 03/22/ /28/05 Flight Tracker Tower 2 RFI 04/20/ /22/05 Flight Tracker Tower 6 RFI 06/16/ /22/05 Flight Tracker Tower 7 RFI 06/27/ /05/05 Flight Tracker Tower 8 RFI 07/06/ /13/05 Flight Tracker Tower 9 RFI 07/15/ /22/05 Flight Tracker Tower 10 RFI 07/26/ /02/05 Flight Tracker Tower 11 RFI 08/04/ /11/05 Flight Tracker Tower 12 RFI 08/15/ /22/05 Flight Tracker Tower 13 RFI 08/24/ /31/05 Flight Tracker Tower 14 RFI 09/02/ /09/05 Flight Tracker Tower 15 RFI 09/13/ /20/05 Flight Tracker Tower 16 RFI 09/22/ /29/05 Run Date 04/12/05 15:20 Data Date 04/01/05 Primavera Systems, Inc. GLAST LAT PROJECT Level 3 Milestones Baseline Variance (Organized by Subsystem) LT-LZ: Baseline Variance FL-LZ: AV: Level 3 Milestones 414,5,7 Report #10 Sheet 1 Rev B 8

9 DAQ Milestones Activity Description Baseline Finish 2-1m e a Var Bsln Var Early Finish Electronics Elex Ground Support Equipment Final EGSE incl S/C Sim, FSW-Elec to I&T 04/01/ /29/05 Elex Global Items Flight PDU Box-Elec to I&T 07/01/ /21/05 Flight GASU Box-Elec to I&T 07/19/ /15/05 LCB Flight Units - Elec to Elec 07/20/ /11/05 Flight Event Processor Units-Elec to I&T 08/19/ /13/05 1st Flight EPU/SIU-Elec to I&T 08/19/ /13/05 2nd Flight EPU/SIU-Elec to I&T 08/24/ /16/05 3rd Flight EPU/SIU-Elec to I&T 08/26/ /19/05 4th Flight EPU/SIU-Elec to I&T 08/30/ /22/05 5th Flight EPU/SIU-Elec to I&T 09/02/ /23/05 Flight Software Demo: Inter-task Communications 03/11/ /15/05 Demo: Housekeeping 03/18/ /29/05 Demo: Watchdog 04/15/ /22/05 Demo: Mode Control 04/22/ /20/05 Demo: Charge Injection Calibration 04/29/ /27/05 Demo: Event Integrity and Delivery 05/06/ /03/05 Demo: Diagnostics 05/06/ /03/05 Demo: GRB Detection and Response 05/20/ /10/05 FY05 FE MA AP MA JU JU AU SE OCO Run Date 04/12/05 16:09 Data Date 04/01/05 Primavera Systems, Inc. GLAST LAT PROJECT Level 3 Milestones Baseline Variance (Organized by Subsystem) LT-LZ: Baseline Variance FL-LZ: AV: Level 3 Milestones 414,5,7 Report #10 Sheet 2 Rev B 9

10 ACD and Mechanical Milestones P Activity Description Instrument Project Office (Level 3) Baseline Finish 2-1m e a Var Bsln Var Early Finish FY05 FE MA AP MA JU JU AU SE OCO ACD ACD Test Scripts (from ACD to I&T) 03/15/05* /31/05 ACD Flight Unit at SLAC, Tested/Inspected & 06/09/ /11/ Mechanica X-LAT Thermal Plate RFI from Mech to I&T 04/20/ /01/05 Run Date 04/12/05 15:27 Data Date 04/01/05 Primavera Systems, Inc. GLAST LAT PROJECT Level 3 Milestones Baseline Variance (Organized by Subsystem) LT-LY: Baseline Variance FL-LY: AV: Level 3 Milestones 416,8 Report #10 Sheet 1 Rev B 10

11 Contingency Lien List Sys Eng Manufacturing engineering support Sys Eng Total Tracker ASIC grinding & dicing Tracker Total ACD Overruns in and ACD Total A PSA Extend QA support (cost TBD) A PSA Total Total Rev B 11

12 Issues 1. Tracker cables schedule impact 2. ACD delays cost impact 3. DAQ delays schedule impact a. SIU/EPU on critical path b. TEM/TPS may pace installation 4. FSW Release imminent 5. CAL no issues 6. Mechanical a. Lockheed work is meeting revised schedule b. 2 nd grid is stalled at Tapemation 7. I&T going smoothly a. Planning picking up pace for testing at NRL b. Review meeting at NRL, May 2 & 3 Rev B 12

13 Agenda 8:00 Introduction/Project Status L. Klaisner/T. Boysen 30 min 8:30 Tracker P. Drell/ R. Johnson 30 min 9:00 Integration and Test of first two flight K. Fouts/E. Bloom Towers in grid E. DoCouto e Silva 60 min 10:00 Break 10:15 ACD D. Thompson 15 min 10:30 Mechanical M. Campell 15 min 10:45 Calorimeter N. Johnson 15 min 11:00 PSA D. Marsh 15 min 11:15 ISOC R. Cameron 15 min 11:30 SAS R Dubois 15 min 11:45 Lunch 1:00 All hands meeting (Orange Room) S. Ritz 60 min 2 Tower Installation celebration 2:30 Electronics M. Huffer 30 min 3:00 Flight Software J. Fisher 15 min 3:15 TBD Topics Rev B 13

GLAST LAT Project Monthly Status Review, September 30, Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager

GLAST LAT Project Monthly Status Review, September 30, Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager Gamma-ray Large Area Space Telescope GLAST Large Area Telescope: Project Status Overview Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager Klaisner@slac.stanford.edu 650-926-2726 Rev.

More information

GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule Review 01/05/06

GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule Review 01/05/06 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule Review 01/05/06 Ken Fouts SU-SLAC Subsystem Engineering Manager kfouts@slac.stanford.edu

More information

GLAST Mission - LAT Project DOE/NASA Review, March 31, 2004

GLAST Mission - LAT Project DOE/NASA Review, March 31, 2004 Gamma-ray Large Area Space Telescope GLAST Mission Large Area Telescope Project Project Status March 31, 2004 Lowell A. Klaisner, Project Manager Stanford Linear Accelerator Center klaisner@slac.stanford.edu

More information

Monthly Cost/Schedule/Mission Review. GLAST LAT Calorimeter May 24, Gamma-ray Large Area Space Telescope. GLAST Calorimeter.

Monthly Cost/Schedule/Mission Review. GLAST LAT Calorimeter May 24, Gamma-ray Large Area Space Telescope. GLAST Calorimeter. Gamma-ray Large Area Space Telescope Monthly Cost/Schedule/Mission Review GLAST LAT Calorimeter May 24, 2005 W Neil Johnson neil.johnson@nrl.navy.mil wnjohnson 1 Outline Technical Status: Last Month's

More information

GLAST Large Area Telescope: Cost/Schedule Review June 30, 2005 AntiCoincidence Detector (ACD) Subsystem WBS: 4.1.6

GLAST Large Area Telescope: Cost/Schedule Review June 30, 2005 AntiCoincidence Detector (ACD) Subsystem WBS: 4.1.6 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope: Cost/Schedule Review June 30, 2005 AntiCoincidence Detector (ACD) Subsystem WBS: 4.1.6 David J. Thompson Thomas E. Johnson NASA Goddard

More information

Electrical Ground Support Equipment Schedule and Cost. EGSE Schedule and Cost

Electrical Ground Support Equipment Schedule and Cost. EGSE Schedule and Cost Electrical Ground Support Equipment Schedule and Cost Scott Williams Stanford University scott.williams@stanford.edu S. Williams 1 Schedule The schedule is driven by the delivery of electronics hardware

More information

GLAST Large Area Telescope: Planning Meeting September 3, 2003 AntiCoincidence Detector (ACD) Subsystem WBS: 4.1.6

GLAST Large Area Telescope: Planning Meeting September 3, 2003 AntiCoincidence Detector (ACD) Subsystem WBS: 4.1.6 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope: Planning Meeting September 3, 2003 AntiCoincidence Detector (ACD) Subsystem WBS: 4.1.6 David J. Thompson Thomas E. Johnson NASA Goddard

More information

GLAST Large Area Telescope:

GLAST Large Area Telescope: Gamma-ray Large Area Space Telescope GLAST Large Area Telescope: Calorimeter (CAL) Subsystem WBS: 4.1.5 W. Neil Johnson Naval Research Lab, Washington DC Calorimeter Subsystem Manager neil.johnson@nrl.navy.mil

More information

Commercial-in-Confidence Ashton Old Baths Financial Model - Detailed Cashflow

Commercial-in-Confidence Ashton Old Baths Financial Model - Detailed Cashflow Year 0 1 2 3 4 5 6 7 8 9 10 11 12 13 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 2,038 2,922 4,089 4,349 6,256 7,124 8,885 8,885 8,885 8,885 8,885 8,885 9,107

More information

GLAST LAT Project 3-4 May MGSE Design. LAT Environmental Test PDR 1

GLAST LAT Project 3-4 May MGSE Design. LAT Environmental Test PDR 1 LAT LAT Environmental Environmental Test Test Planning Planning and and Design Design Review Review 3-4 3-4 4 May May 2005 2005 MGSE Design Martin Martin Nordby Nordby Mike Mike Foss Foss Marc Marc Campell

More information

GLAST Large Area Telescope:

GLAST Large Area Telescope: GLAST Large Area Telescope: Gamma-ray Large Area Space Telescope MGSE Integration Readiness Status Two Tower Operations Eric Gawehn SU-SLAC LAT I&T MGSE Dept. Manager egawehn@slac.stanford.edu 650 926

More information

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS* COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates For Internal Use Only. FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year

More information

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS* COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun

More information

Units of Instruction MISD Pacing Guide Days Date Range Test Date

Units of Instruction MISD Pacing Guide Days Date Range Test Date MISD Pacing Guide Date Range Test Date Introduction: Processes of Investigations (1 day) Aug. 21 Unit 01: Matter (12 days) Aug. 22-Sept. 7 Sep. 10 Unit 02: Atomic Structure and the Periodic Table (15 days)

More information

Algebra II Pacing Guide

Algebra II Pacing Guide Unit 13: Exploring a Business Venture (10 days) 8 May 13 - May 24 n/a MISD Pacing Guide Date Range Unit 01: Introduction to Functions in 15 Aug. 21 - Sept. 11 Sept. 12 Unit 02: Absolute Value Functions,,

More information

Calorimeter Subsystem. Status and Issues. W. Neil Johnson Naval Research Laboratory. Gamma-ray Large Area Space Telescope

Calorimeter Subsystem. Status and Issues. W. Neil Johnson Naval Research Laboratory. Gamma-ray Large Area Space Telescope Gamma-ray Large Area Space Telescope Calorimeter Subsystem Status and Issues W. Neil Johnson Naval Research Laboratory neil.johnson@nrl.navy.mil W N Johnson Calorimeter Subsystem Status Outline Introduction

More information

GLAST Large Area Telescope: Planning Meeting December 10, 2003 AntiCoincidence Detector (ACD) Subsystem WBS: 4.1.6

GLAST Large Area Telescope: Planning Meeting December 10, 2003 AntiCoincidence Detector (ACD) Subsystem WBS: 4.1.6 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope: Planning Meeting December 10, 2003 AntiCoincidence Detector (ACD) Subsystem WBS: 4.1.6 David J. Thompson Thomas E. Johnson NASA Goddard

More information

CALL FOR IDEAS FOR THE RE-USE OF THE MARS EXPRESS PLATFORM PLATFORM CAPABILITIES. D. McCoy

CALL FOR IDEAS FOR THE RE-USE OF THE MARS EXPRESS PLATFORM PLATFORM CAPABILITIES. D. McCoy Mars Express Reuse: Call for Ideas CALL FOR IDEAS FOR THE RE-USE OF THE MARS EXPRESS PLATFORM PLATFORM CAPABILITIES D. McCoy PARIS 23 MARCH 2001 page 1 Mars Express Reuse: Call for Ideas PRESENTATION CONTENTS

More information

Operations and and Logistics

Operations and and Logistics 3-4 May 2005 LAT LAT Environmental Environmental Test Test Planning Planning and and Design Design Review Review 3-4 3-4 May May 2005 2005 Operations and and Logistics Paul Paul Dizon Dizon LAT Environmental

More information

NJ Solar Market Update As of 6/30/15

NJ Solar Market Update As of 6/30/15 NJ Solar Market Update As of 6/30/ Prepared by Charlie Garrison July 17, 20 SOLAR INSTALLED CAPACITY DATA The preliminary installed solar capacity as of 6/30/ is approximately 1,500.7 MW. Approximately

More information

GLAST Large Area Telescope:

GLAST Large Area Telescope: DRAFT Rev 3 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope: Calorimeter Overview WBS 4.1.5 W. Neil Johnson Naval Research Lab, Washington DC Calorimeter Subsystem Manager johnson@gamma.nrl.navy.mil

More information

Status report / Activity Plan of OBD Task Force

Status report / Activity Plan of OBD Task Force -20-12e Status report / Activity Plan of OBD Task Force 26 th Sep., 2017 Mayumi Sophie Morimoto (JASIC) OBD TF Goal agreed at 1 st OBD TF (15 th Dec. 2016) Develop harmonized OBD GTR by end of 2018*. *Approved

More information

ANCR CRU Statistics February 2007 to December 2007

ANCR CRU Statistics February 2007 to December 2007 ANCR CRU Statistics February 2007 to December 2007 o Jan/07 Feb/07* Mar/07 Apr/07 May/07 Jun/07 Jul/07 Aug/07 Sep/07 Oct/07 Nov/07 Dec/07 Total notes data from Perimeter phone system unavailable prior

More information

2013 / 2014 Revenue Comparison: OCTOBER

2013 / 2014 Revenue Comparison: OCTOBER CAR RENTAL GROSS REVENUES 2013 / Revenue Comparison: OCTOBER COMPANY 2013 incr./decr. % change Advantage 1,049,117.25 1,679,547.68 630,430.43 60.1% Alamo/National 5,448,360.80 8,262,318.28 2,813,957.48

More information

OPERATIONS TOTALS ,135 7,511 8,823 8,056 8,021 8,319 8,039 8,283 8,001 8,738 8,219 8,094 98,239

OPERATIONS TOTALS ,135 7,511 8,823 8,056 8,021 8,319 8,039 8,283 8,001 8,738 8,219 8,094 98,239 2007 OPERATIONS AIRCRAFT OPS-2006 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC TOTAL AIR CARRIER - ITINERANT 748 725 907 804 930 969 832 996 841 899 990 1,249 10,890 AIR TAXI - ITINERANT 3,744 3,638

More information

NJ Solar Market Update

NJ Solar Market Update NJ Solar Market Update April 16, 20 Renewable Energy Committee Meeting Trenton, NJ Prepared by Charlie Garrison Solar Installed Capacity Data The preliminary installed solar capacity as of 3/31/ is approximately

More information

DDG 51 Program. Sea, Air, Space Exposition Washington, DC 04 April Presented by: CAPT Casey Moton, USN DDG 51 Program Manager PMS 400D

DDG 51 Program. Sea, Air, Space Exposition Washington, DC 04 April Presented by: CAPT Casey Moton, USN DDG 51 Program Manager PMS 400D Sea, Air, Space Exposition Washington, DC 04 April 2017 DDG 51 Program Presented by: CAPT Casey Moton, USN DDG 51 Program Manager PMS 400D 1 Agenda DDG 51 Shipbuilding Profile DDG 113-123 Production Status

More information

Operational Overview. Operational Forum, 24 th March 2010

Operational Overview. Operational Forum, 24 th March 2010 Operational Overview Operational Forum, 24 th March 21 Weather Weather February 21 The cold weather continued throughout February with all but one day being colder than the 17-year seasonal normal CWV.

More information

HELICOPTER OPERATIONS WITHIN THE LONDON HEATHROW AND LONDON CITY CONTROL ZONES

HELICOPTER OPERATIONS WITHIN THE LONDON HEATHROW AND LONDON CITY CONTROL ZONES Column Title Explanation 1 2 Total daily number of helicopter flights recorded within the London Heathrow and London City CTRs. 3 to 6 Total daily number of helicopter flights recorded within the London

More information

12/14/07 Table 2.1 NANRICH WATER MANAGEMENT CONSULTANTS LTD STATION ANALYSIS. Station Name MATTHEW CREEK ABV DIVERSIONS Station No.

12/14/07 Table 2.1 NANRICH WATER MANAGEMENT CONSULTANTS LTD STATION ANALYSIS. Station Name MATTHEW CREEK ABV DIVERSIONS Station No. Table 1.2 12/14/07 Table 2.1 NANRICH WATER MANAGEMENT CONSULTANTS LTD STATION ANALYSIS Station Name MATTHEW CREEK ABV DIVERSIONS Station No. 08NG086 YEAR 2007 STAGE RECORD: Type of Gauge, Automatic X Logger

More information

Preston s Edmond Market Report

Preston s Edmond Market Report Preston s Edmond arket Report April 2 Prepared By Brian Preston RE/AX Associates obile: 45-826-5725 Office: 45-359-87 bpreston88@sbcglobal.net www.edmond4sale.com Realtor of the Year 1995 & 22 Lifetime

More information

Local Market Update 2012 Year In Review

Local Market Update 2012 Year In Review Northwest Area Home Sales for the Year 2012 Sales of single-family homes reported in Toledo and the surrounding area by the Toledo Board of REALTORS totaled 6,793. This was an increase of 6% compared to

More information

Total Production by Month (Acre Feet)

Total Production by Month (Acre Feet) Production by Month (acre-feet) 2008 2009 2010 2011 2012 2013 2014 2015 2016 January 25 339.10 228.90 249.50 297.99 243.06 327.14 247.66 212.37 February 234.00 218.80 212.10 241.52 245.82 279.08 234.16

More information

NJ Solar Market Update As of 2/29/16

NJ Solar Market Update As of 2/29/16 NJ Solar Market Update As of 2/29/16 Prepared by Charlie Garrison March 24, 2016 SOLAR INSTALLED CAPACITY DATA The installed solar capacity as of 2/29/16 is approximately 1,644.3 MW. Approximately 20.3

More information

7th Grade Social Studies Pacing Guide Units of Instruction MISD Pacing Guide Days Date Range Test Date

7th Grade Social Studies Pacing Guide Units of Instruction MISD Pacing Guide Days Date Range Test Date 7th Grade Social Studies MISD Pacing Guide Date Range Test Date Unit 01: Thinking Like a Historian (5 days for the entire unit) 5 Aug 27-31 Unit 02: Natural Texas and Its People 1200s-1800s (5 days for

More information

PM Light Tactical Vehicles

PM Light Tactical Vehicles January 2010 PM Light Tactical Vehicles 1 Product Manager Mr. Dennis Haag MISSION ACAT 1C The lifecycle management of light battlefield distribution systems enabling the Modular, Joint and Expeditionary

More information

Copyright 2016 Boeing. All rights reserved.

Copyright 2016 Boeing. All rights reserved. Boeing s Commercial Crew Program John Mulholland, Vice President and Program Manager International Symposium for Personal and Commercial Spaceflight October 13, 2016 CST-100 Starliner Spacecraft Flight-proven

More information

NE (SE) Beam

NE (SE) Beam Predicted clear day beam and diffuse irradiances (/ W m 2 ) on vertical and horizontal surfaces on specified days in northern (N) and southern (S) hemispheres (see notes at foot of table): LATITUDE 60

More information

Sunrise: 05:48 N (S) Beam

Sunrise: 05:48 N (S) Beam Predicted clear day beam and diffuse irradiances (/ W m 2 ) on vertical and horizontal surfaces on specified days in northern (N) and southern (S) hemispheres (see notes at foot of table): LATITUDE 40

More information

GAZIFÈRE INC. Prime Rate Forecasting Process 2017 Rate Case

GAZIFÈRE INC. Prime Rate Forecasting Process 2017 Rate Case Overview A consensus forecast is used to estimate the prime rate charged by commercial banks. As the prime rate is subject to competitive pressures faced by individual lenders and is set on an individual

More information

Local Climatological (Data Summary Molim, Illinois

Local Climatological (Data Summary Molim, Illinois SWS Miscellaneous Publication 98-13 STATE OF ILLINOIS DEPARTMENT OF ENERGY AND NATURAL RESOURCES Local Climatological (Data Summary Molim, Illinois 1872-1992 by Audrey A. Bryan and Wayne Wendland Climatological

More information

GLAST Large Area Telescope:

GLAST Large Area Telescope: GLAST Large Area Telescope: Gamma-ray Large Area Space Telescope MGSE, Flight Integration HDWR, Design / Status Review Eric Gawehn SU-SLAC LAT I&T MGSE Dept. Manager egawehn@slac.stanford.edu 650 926 3622

More information

increase of over four per cent compared to the average of $409,058 reported in January 2010.

increase of over four per cent compared to the average of $409,058 reported in January 2010. SINGLE FAMILY RESIDENTIAL BREAKDOWN uary 211 26.8 % 1.7 % 7.%.4%.1 % Good Start to 211 TORONTO - February 4, 211 Greater Toronto REALTORS reported 4,337 transactions through the TorontoMLS system in uary

More information

Gamma-ray Large Area Space Telescope (GLAST) Large Area Telescope (LAT) DAQ. Latch-up Test of 3 DC-DC MAXIM Converters

Gamma-ray Large Area Space Telescope (GLAST) Large Area Telescope (LAT) DAQ. Latch-up Test of 3 DC-DC MAXIM Converters Page 1 of 11 Document # Date Effective LAT-TD-2234-1 6/6/3 Author(s) Supersedes Riccardo Rando Hartmut Sadrozinski GLAST LAT Jozsef Ludvig PROCUREMENT DOCUMENT Subsystem/Office DAQ Document Title Latch-up

More information

National Routing Number Administration p-ani Activity and Projected Exhaust Report

National Routing Number Administration p-ani Activity and Projected Exhaust Report National Routing Number Administration 2016 p-ani Activity and Projected Exhaust Report The ATIS Industry Numbering Committee developed the P-ANI Administration Guidelines, which contain the following

More information

Local Climatological Data Summary Aurora, Illinois

Local Climatological Data Summary Aurora, Illinois SWS Miscellaneous Publication 98-15 STATE OF ILLINOIS DEPARTMENT OF NATURAL RESOURCES Local Climatological Data Summary Aurora, Illinois 1901-1996 Herbert Hoffman 1, Audrey A. Bryan 2 and Wayne Wendland

More information

Date Event or Holiday :Sun, 2:Mon North Orchard Delong Preschool North Orchard Delong Preschool

Date Event or Holiday :Sun, 2:Mon North Orchard Delong Preschool North Orchard Delong Preschool 2018 6 1 1:Sun, 2:Mon 2018-2019 Date Event or Holiday Aug 16 Board Meeting 6pm Aug 23 Open House June 2018 July 2018 August 2018 Sep 06 Board Meeting 6pm Su M Tu W Th F Sa Su M Tu W Th F Sa Su M Tu W Th

More information

Solar Electric Propulsion Benefits for NASA and On-Orbit Satellite Servicing

Solar Electric Propulsion Benefits for NASA and On-Orbit Satellite Servicing Solar Electric Propulsion Benefits for NASA and On-Orbit Satellite Servicing Therese Griebel NASA Glenn Research Center 1 Overview Current developments in technology that could meet NASA, DOD and commercial

More information

Presentation to the Customer Service, Operations and Safety Committee OPERATIONS PERFORMANCE INDICATORS

Presentation to the Customer Service, Operations and Safety Committee OPERATIONS PERFORMANCE INDICATORS Presentation to the Customer Service, Operations and Safety Committee OPERATIONS PERFORMANCE INDICATORS May 19, 2005 Department of Operations 100 95 90 85 80 75 70 65 A B C D RAIL PERFORMANCE INDEX FY

More information

GLAST Large Area Telescope:

GLAST Large Area Telescope: Gamma-ray Large Area Space Telescope GLAST Large Area Telescope: AntiCoincidence Detector (ACD) Mechanical Ground Support Equipment Thomas E. Johnson, ACD Instrument Manager Thomas.E.Johnson@nasa.gov (301)

More information

Glendale Water & Power Smart Grid Project

Glendale Water & Power Smart Grid Project Glendale Water & Power Smart Grid Project Key Dates in Project History Key Dates Project History On July 10, 2007, City Council directed GWP to develop a long term plan for smart meters On October 23,

More information

Price Category Breakdown - February 2010

Price Category Breakdown - February 2010 SINGLE FAMILY RESIDENTIAL BREAKDOWN ruary 21 ruary Sales and Average Price Increase Annually TORONTO - Wednesday, March 3, 21 7.3 % 24.6 % 1.8 % 7.3%.2%.1 % Greater Toronto REALTORS reported 7,291 sales

More information

Technical Publications Register (Recorders, Air Data, Ice Detection)

Technical Publications Register (Recorders, Air Data, Ice Detection) 31-32-64 Quick Access Recorder D51439-1 Rev. 1, Apr 16/93 IPL CMM 23-51-01 (PUB 367) Contran - See PUB 367 D60323 Rev 1, Apr 95 Operation and Installation Manual CMM 30-80-00 (PUB 364/5/6) MK12B IDS IDU3B

More information

April 10, Dear Customer:

April 10, Dear Customer: Dear Customer: April 10, Attached is the monthly water supply outlook and projected operations for Yellowtail Dam and Powerplant. If you have any questions or concerns, please feel free to call me at 406-247-7334

More information

Year to Date Summary. Average and Median Sale Prices

Year to Date Summary. Average and Median Sale Prices A Publication of RMLS, The Source for Real Estate Statistics in Your Community Residential Review: Southwest Washington September 2018 Reporting Period September Residential Highlights Southwest Washington

More information

Bulk Storage Containers

Bulk Storage Containers UCSB AST SPCC SELF-INSPECTION CHECKLIST Year: Responsible Department: Tank Location: Tank ID: Bulk Storage Containers Total tank capacity: Petroleum type and amount: Secondary containment type: (diesel,

More information

Operational Forum Meeting

Operational Forum Meeting Operational Forum Meeting Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. 2 April 216 Radisson

More information

ANCR CRU Statistics Februa.. to December 2007

ANCR CRU Statistics Februa.. to December 2007 ANCR CRU Statistics Februa.. to December 2007 Jan/07 Feb/07* Mar/07 Apr/07 May/07 Jun/07 Jul/07 Aug/07 Sep/07 Oct/07 Nov/07 Dec/07 Total notes Answered dato from Perimeter phone system unavailable prior

More information

Macroeconomic Outlook. Presented by Dr. Bruce A. Scherr Chairman of the Board Chief Executive Officer Emeritus

Macroeconomic Outlook. Presented by Dr. Bruce A. Scherr Chairman of the Board Chief Executive Officer Emeritus Macroeconomic Outlook Presented by Dr. Bruce A. Scherr Chairman of the Board Chief Executive Officer Emeritus Waterways Symposium Cincinnati, OH November 15-17, 2016 Topics Energy Macro Implications Inflation

More information

Hospitality & Tourism Management January 2015 Calendar Sunday Monday Tuesday Wednesday Thursday Friday Saturday 1 2 3

Hospitality & Tourism Management January 2015 Calendar Sunday Monday Tuesday Wednesday Thursday Friday Saturday 1 2 3 Jan-14 Week 1 Week 2 January 2015 Calendar 1 2 3 New Year's Day - 4 5 6 7 8 9 10 New Intake-L4 (EFTH) Assign-Presentation L4 Assign-Presentation L5 Last Exam Reg- CTH Assign Marking Assign Marking Module-

More information

The Advanced Instrumentation and Technology Centre (AITC)

The Advanced Instrumentation and Technology Centre (AITC) The Advanced Instrumentation and Technology Centre (AITC) ACSER CUBESAT2017: Launching CubeSats for and from Australia 19 th -20 th April 2017 QB50 Test Campaign and CubeSat testing at the AITC Mike Petkovic

More information

Port Botany. Trade Statistics Bulletin 1 July June 2018

Port Botany. Trade Statistics Bulletin 1 July June 2018 Port Botany Trade Statistics Bulletin 1 July 2017 30 June 2018 FY 2017/18 Port Botany Container Trade Jul 2017 Aug 2017 Sep 2017 Oct 2017 Nov 2017 Dec 2017 Jan 2018 Feb 2018 Mar 2018 Apr 2018 May 2018

More information

System Management Principles Statement

System Management Principles Statement System Management Principles Statement Compliance report for December 213 and January 214 Summary of balancing actions and breaches for December 213 - January 214 Performance compared to last year Summary

More information

EUROPEAN COMMISSION ENTERPRISE AND INDUSTRY DIRECTORATE-GENERAL

EUROPEAN COMMISSION ENTERPRISE AND INDUSTRY DIRECTORATE-GENERAL EUROPEAN COMMISSION ENTERPRISE AND INDUSTRY DIRECTORATE-GENERAL Sustainable Growth and EU 2020 Sustainable Mobility and Automotive Industry Brussels, 7 March 2014 ENTR/B4/GG (2014)651836 by email to: 1998Agreement-Missions@lists.unece.org,

More information

M onthly arket. Jan Table of Contents. Monthly Highlights

M onthly arket.   Jan Table of Contents. Monthly Highlights Table of Contents Market Inventory...2 www.gaar.com Monthly Highlights January 2014 had a 12.29% increase in the number of homes sales when compared to same time last year. The average sale price of single-family

More information

STAFF REPORT INFORMATION ONLY

STAFF REPORT INFORMATION ONLY Insert TTC logo here STAFF REPORT INFORMATION ONLY Presentation: Subway Closures - 2016 Year In Review and 2017 Forecast Date: January 18, 2017 To: From: TTC Board Chief Executive Officer Summary The purpose

More information

Monthly Operating Report. January 2019

Monthly Operating Report. January 2019 Monthly Operating Report January 2019 January overview For the month of January 2019» The Customer business recorded: Mass market electricity and gas sales of 281 GWh (January 20: 282 GWh) Mass market

More information

Capital Project Tracking Report

Capital Project Tracking Report BTC Annex IT Services: Installation Firm: DataPlus Communications Funding: $167,170 Start: March 2018 End: May 2018 NTP & Preconstruction Meeting. Bus Shelter Pad & Installation Phase 6 TBD Start: TBD

More information

TECHNICAL SERVICE BULLETIN

TECHNICAL SERVICE BULLETIN TECHNICAL SERVICE BULLETIN To: Minuteman Dealers and Customers From: Minuteman Technical Support Date: 1/12/2011 Subject: TSB for the KIT # K-FRSPEEDSWT. For the FR17115, FR17220, FR20115 and FR20220 models.

More information

Streetcar Update. Review of December 2018

Streetcar Update. Review of December 2018 Streetcar Update Review of December 2018 Number of Incidents Safety Metrics: Near Miss Near Miss Incident Breakdown 19% decrease near-miss events year over year (2017 versus 2018) 66% decrease at 5 th

More information

System Management Principles Statement

System Management Principles Statement System Management Principles Statement Compliance report for June 214 to August 214 Summary of balancing actions and breaches for June 214 to Aug 214 Performance compared to last year Summary Report Jun-14

More information

Who are the. Metalforming? The leading trade association for the metalforming industry.

Who are the. Metalforming? The leading trade association for the metalforming industry. Confederation of British Metalforming John Houseman Director General Who are the Confederation of British Metalforming? The leading trade association for the metalforming industry. National Metalforming

More information

Florida Courts E-Filing Authority Board. Service Desk Report October 2018

Florida Courts E-Filing Authority Board. Service Desk Report October 2018 Florida Courts E-Filing Authority Board Service Desk Report October 218 Customer Service Incidents October 218 Status August 218 September 218 October 218 Incidents Received 3,157 2,685 3,779 Incidents

More information

Refrigeration Screw Compressor Controller Introduction

Refrigeration Screw Compressor Controller Introduction Refrigeration Screw Compressor Controller Introduction Portland, Oregon June 28, 2017 Doug Scott VaCom Technologies Topics New Controller Introduction Suction Group Control VaCom Refrigeration Approach

More information

Commonwealth of the Northern Mariana Islands

Commonwealth of the Northern Mariana Islands Commonwealth of the Northern Mariana Islands ~ FISCAL YEAR ~ 2017 2018 % change ~ CALENDAR YEAR ~ 2017 2018 % change YTD OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP TOTAL 481,793 41,910 47,261 58,558

More information

Monthly Statistical Digest

Monthly Statistical Digest Tucson Association of REALTORS Monthly Statistical Digest June 27 FOR IMMEDIATE RELEASE: July 13, 27 CONTACT: Judy Lowe, President - (52) 529-5189 Rick Hodges, CEO - (52) 327-4218 LETTER FROM E PRESIDENT

More information

W (W) Beam

W (W) Beam Predicted clear day beam and diffuse irradiances (/ W m 2 ) on vertical and horizontal surfaces on specified days in northern (N) and southern (S) hemispheres (see notes at foot of table): LATITUDE 0 N/S

More information

Water side Economizer WC chiller

Water side Economizer WC chiller Appendices Water side Economizer WC chiller Power Loading Lighting Load W/ft^2 Area (ft^2) W kw 3.5 48152 168532 Water Cooled Chiller kw/ton 0.7 UA Supply Fan BHP kw wall 1069 58 43 window 3642 roof 295

More information

CMM 23-51-01 (PUB 367) Contran - See PUB 367 D60323 Rev 1, Apr 95 Operation and Installation Manual CMM 30-80-00 (PUB 364/5/6) MK12B IDS IDU3B - See PUB 364/5/6 127389-3 Rev. 0, May 84 Installation Manual

More information

WIM #37 was operational for the entire month of September Volume was computed using all monthly data.

WIM #37 was operational for the entire month of September Volume was computed using all monthly data. SEPTEMBER 2016 WIM Site Location WIM #37 is located on I-94 near Otsego in Wright county. The WIM is located only on the westbound (WB) side of I-94, meaning that all data mentioned in this report pertains

More information

Electric Vehicle Program

Electric Vehicle Program Cause No. 43960 INDIANAPOLIS POWER & LIGHT COMPANY Electric Vehicle Program Year 3 2013 Report May 2, 2014 Contents Background... 2 Project Objectives... 3 Current Status... 3 Significant Milestones...

More information

ELECTRICAL UTILITY COST REDUCTION THROUGH PREDICTIVE CONTROL BACKGROUND

ELECTRICAL UTILITY COST REDUCTION THROUGH PREDICTIVE CONTROL BACKGROUND ELECTRICAL UTILITY COST REDUCTION THROUGH PREDICTIVE CONTROL Project Manager: Chris Hayes BACKGROUND Kraft Foods 35 Reduction of Energy Costs Over The Next 5 Yrs. (5 Benchmark) Kraft Foods Financial Model

More information

F135 Propulsion Integration Topics for Symposium on Jet Engines Haifa, Israel

F135 Propulsion Integration Topics for Symposium on Jet Engines Haifa, Israel F135 Propulsion Integration Topics for Symposium on Jet Engines Haifa, Israel Tom Johnson Program Chief Engineer Operational Military Engines 25 October 2012 J6924_F135_Propulsion_2012-1 Agenda F135 Development

More information

Up and Down Months of the Stock Market

Up and Down Months of the Stock Market Up and Down Months of the Stock Market 1926-2017 Positive years (66) in the stock market were not good all year long and losing years (24) were not losers throughout the year. Winning years produce losing

More information

January Manufacturing Technology Orders Off After a Strong December

January Manufacturing Technology Orders Off After a Strong December Contact: Bonnie Gurney, AMT, 703-827-5277 bgurney@amtonline.org For Release: March 9, 2015 January Manufacturing Technology Orders Off After a Strong December January U.S. manufacturing technology orders

More information

Space Transportation Atlas V / Auxiliary Payload Overview

Space Transportation Atlas V / Auxiliary Payload Overview Space Transportation Atlas V / Auxiliary Payload Overview Lockheed Martin Space Systems Company Jim England (303) 977-0861 Program Manager, Atlas Government Programs Business Development and Advanced Programs

More information

The ISM Manufacturing Survey Points to Imminent Economic Recovery, Possibly in 2009 May 1, Chart 1

The ISM Manufacturing Survey Points to Imminent Economic Recovery, Possibly in 2009 May 1, Chart 1 Northern Trust Global Economic Research 50 South LaSalle Chicago, Illinois 3 northerntrust.com Asha G. Bangalore agb3@ntrs.com The ISM Manufacturing Survey Points to Imminent Economic Recovery, Possibly

More information

FY2/18 2Q(March 2017~August 2018)

FY2/18 2Q(March 2017~August 2018) FY2/18 2Q(March 2017~August 2018) Fact Book 1. Trends in the current fiscal year and previous fiscal year 3. Business overview (1) Performance overview P.1 (1) No. of students at the end of month P.7 (2)

More information

CVRP: Market Projections and Funding Needs

CVRP: Market Projections and Funding Needs CVRP: Market Projections and Funding Needs Public Workshop: Update to the 3-Year Plan for LDV & Transportation Equity Investments (4 Dec. 2018, El Monte CA) Brett Williams, PhD Senior Principal Advisor,

More information

September 2016 Water Production & Consumption Data

September 2016 Water Production & Consumption Data September 2016 Water Production & Consumption Data September 2016 monthly water production (288.48 AF) was lowest in at least 17 years. Monthly water production has increased slightly each month since

More information

M o n. a t i s t i c s. M o n t h l y NOVEMBER 2009

M o n. a t i s t i c s. M o n t h l y NOVEMBER 2009 M o n t h l y M o n t S h l t y a t i s t i c s NOVEMBER 29 For Immediate Release December 7, 29 CONTACT: Kimberly Clifton, President (52) 954-8 Wes Wiggins Vice President, MLS (52) 82-8792 Cheri Meadows

More information

Design Criteria Data

Design Criteria Data OKLAHOMA CITY OK Latitude = 35.4 N WMO No. 72353 Longitude = 97.6 W Elevation = 133 feet Period of Record = 1973 to 1996 Average Pressure = 28.62 inches Hg Design Criteria Data Mean Coincident (Average)

More information

7 Habits of Highly Effec3ve Product Development

7 Habits of Highly Effec3ve Product Development 7 Habits of Highly Effec3ve Product Development September 5, 2014 ASTR 2014, Sep 10-12, St. Paul, MN 1 John Lenss John has over 18 years of experience in performing HALT. He has produced excellent results

More information

Rapid Coupled Loads Analysis and Spacecraft Load Reduction using SoftRide

Rapid Coupled Loads Analysis and Spacecraft Load Reduction using SoftRide Rapid Coupled Loads Analysis and Spacecraft Load Reduction using SoftRide SSC09-IX-2 Raman S. Johal Paul S. Wilke Conor D. Johnson CSA Engineering, Inc. 2565 Leghorn Street Mountain View, CA 94043 (650)

More information

COMPILED BY GLASS S. Auction Report - LCV November 2013

COMPILED BY GLASS S. Auction Report - LCV November 2013 GLASS S Auction Report - LCV November 2013 Contents Market Commentary Page 3 Whole Market Summary Page 8 Average Sales Price Year on Year Page 9 Sales Price Compared to Number of Entries (all ages) Page

More information

Design Criteria Data

Design Criteria Data MEDFORD/JACKSON CO. OR Latitude = 42.37 N WMO No. 72597 Longitude =122.8 W Elevation = 1329 feet Period of Record = 1973 to 1996 Average Pressure = 28.61 inches Hg Design Criteria Data Mean Coincident

More information

Monthly Operating Report. February 2018

Monthly Operating Report. February 2018 Monthly Operating Report February 2018 February overview» For the month of February 2018 Contact recorded: Electricity and gas sales of 534 GWh (February 20: 551 GWh) Netback of $82.16/MWh (February 20:

More information

Port Botany Trade Statistics Bulletin. 1 July April 2017

Port Botany Trade Statistics Bulletin. 1 July April 2017 Port Botany Trade Statistics Bulletin 1 July 2016 30 April 2017 YTD April 2017 Port Botany Container Trade Jul 2016 Aug 2016 Sep 2016 Oct 2016 Nov 2016 Dec 2016 Jan 2017 Feb 2017 Mar 2017 Apr 2017 Export

More information

Monthly Operating Report. September 2016

Monthly Operating Report. September 2016 Monthly Operating Report September 20 September overview» For the month of September 20 Contact recorded: Electricity, gas and steam sales of 819 GWh (September 2015: 821 GWh) Netback of $79.50/MWh (September

More information

System Management Principles Statement

System Management Principles Statement System Management Principles Statement Compliance report for September 214 and October 214 Summary of balancing actions and breaches for September 214 October 214 Performance compared to last year Summary

More information