ELECTRICAL UTILITY COST REDUCTION THROUGH PREDICTIVE CONTROL BACKGROUND
|
|
- Marshall Sutton
- 6 years ago
- Views:
Transcription
1 ELECTRICAL UTILITY COST REDUCTION THROUGH PREDICTIVE CONTROL Project Manager: Chris Hayes BACKGROUND Kraft Foods 35 Reduction of Energy Costs Over The Next 5 Yrs. (5 Benchmark) Kraft Foods Financial Model (Utility Standard) Explained Compressed Air Project (Estimated $54,000 Annual Savings) T-8 Lighting Project (Estimated $76,000 Annual Savings) Indiana Michigan Power and The Industrial Tariff 322 Charges On-Peak / Off-Peak Demand Charges Energy Charge and Power Factor Correction Fuel Adjustment Charge / Tariff Service Charge Net Savings Merger Rider
2 Utility Bill Calculations Demand Charge = $ * Peak Power (KVA) + Energy Charge = $ * Kwh * pfconstant + Fuel adjustment charge + Tariff Charge - Net Savings Rider Total Monthly Billed Amount Where pfconstant = (.1275*(KVARhrs/KWhrs)^2) (the power factor constant) Practical Example of the Effects of Peak Power KVA Peaks From March 11th to March 17th, Measured in Minute intervals Max of KVA DATE HOUR SPIKE
3 7 ELECTRICAL CHARGES METERED DEMAND PF DEMAND ENERGY FUEL MONTHLY MERGER BILL 7 KWH KVA CONSTANT CHARGE CHARGE ADJUSTMENT TARIFF SAVINGS ACTUAL JAN $48, $,8.42 $2, $ $ $66,6.63 FEB $55, $18, $3, $ $ $76, MAR $66, $20, $3, $ $ $89, APR $65, $17, $3, $ $ $85, MAY $65, $20, $3, $ $ $89, JUN $68,6.59 $21, $3, $ $ $92, JUL $72, $24,6.44 $9, $ $1, $105,9.39 AUG $75, $28,428. $11, $ $1, $114, SEP $72, $24, $9,446. $ $1, $104, OCT N/A N/A $8, $ $1, $105,290. NOV N/A N/A $7, $ $1, $95, Peak Power Charges Contribute to approximately 70 of The Total Bill Fuel Costs Have Risen Nearly Since Last Year (From $ Per KWH to $ Per KWH) I & M Power is in The Process of Negotiating a 9 to 12 Rate Increase Through The Indiana Utility Commission. RECOMMENDATIONS Solution Broken Down Into two Stages Stage 1 o Monitor the Energy Usage and Peak Power on Each of The Three Main Substation Switchgear, o Analyze the Data o Determine The Source of The Highest Peaks (Guilty Party). Stage 2 o Using Stage 1 Data, Install Addition Metering Equipment on Those Identified Devices In Order To verify and Control The Peak Values. o Analyze the Peak Trending Pattern o Develop A Hypothesis To Limit Peak Power Exposure. o Test and Verify Results
4 RECOMMENDATIONS STAGE 1 The Use of Idled Existing Equipment Spit Core Current Transformers Current Transformers, 00/5 current Ratio, 1 Accuracy, Installed 1 Per Phase. Watt/VAR Transducer,0-5A Current Input, Watt & VAR 0-1mA Output. Signal Converter, Relay Output, 0-1mA Input, 0 to 10,000 Proportional Closure Rate. Metermate Power Monitor, 120VAC, 8 Meter Inputs Derived From Isolated Pulse Contacts, Max Operating Rate of 10 Pulses Per Second Per Input, Asynchronous Serial Transmission RS232C Compatible 0,,, 4, 9 Baud Data Analysis Statistical Process Control Historical Trends MES/OEE Line Usage Historical Data Guilty Party Identification BLOCK DIAGRAM
5 RECOMENDATIONS STAGE 2 Install Additional Equipment on Assumed Guilty Party Devices Utilize Upgraded Technology Into Design Veris H8035, H8036 power Meters Single Package Industrial Grade CTs / Power Metering Electronics Split Core Installation RS 485 Communications (Modbus) Tie in PLC Processor (SLC ) Programming Concerns If-Then Structured programming, Inputted information Received Form Metering Equipment Compared to Information Gathered From Historical MES/OEE Line Utilization and Peak Electrical Data. Hardware Concerns Identify Method of Tying In (Modbus to Ethernet Conversion) Number of production lines running /1/7 CORRELATION BETWEEN PRODUCTION LINE UTILIZATION AND PEAK KVA POWER Lines Running - Aug 7 7 Daily Max KVA Values - August 7 Daily Peak Power (KVA) /1/7 7
6 RECOMMENDATIONS STAGE 2 SLC FC Style Split Core CT Veris H8036 CT PC KW/VAR Transducer Metermate Signal Converter DECISION RATIONAL Milestone Schedule Project Completion Dec. 12 th, 8 AR Approval Stage 1 Equipment Procurement Stage 2 Equipment Installation Metermate Live Date Time Allotted For Metermate Programming Data Analysis Stage 2 Equipment Procurement Stage 2 Equipment Installation Programming Complete Preliminary Testing Top/Down Structure Control Revisions Complete Final Testing Project Completion Expenses Needed Anticipated Cost < $5M Veris Current Transformers (Quantity TBD) SLC I/O Modules, as Needed Wiring (Belden, 14AWC THNN Control)
7 ID Ta sk Name Duration Start Finish PROJECT MILESTONE SCHEDULE r, '08 May 4, '08 Jun 8, '08 Jul 13, '08 Aug 17, '08 Sep 21, '08 Oct 26, '08 No v, '08 W T F S S M T W T F S S M T W T F S 1 AR Approved 11 days? Fri 5/2/08 Fri 5/16/08 2 Stage 1 Equipment Received days? Mon 5/19/08 Fri 6/6/08 3 Stage 1 Equipment Installed 19 days? Mon 6/9/08 Thu 7/3/08 4 Metermate Live date 10 days? Mon 7/7/08 Fri 7/18/08 5 Data Analysis Complete 20 days? Mon 7/21/08 Fri 8//08 6 Stage 2 Equipment Received days? Mon 8/11/08 Fri 8/29/08 7 Stage 2 Equipment Installed 20 days? Mon 9/1/08 Fri 9/26/08 8 Programming Complete 10 days? Mon 9//08 Fri 9/26/08 9 Prelimenray Testing Complete days? Mon 9/29/08 Fri 10/17/08 10 Cotrl Revisions Complete 20 days? Mon 10/20/08 Fri 11/14/08 11 Final Testing days? Mon 11/17/08 Fri 12/5/08 12 Project Completion 5 days? Mon 12/8/08 Fri 12/12/08 FINANCIALS Ja n Feb Mar Sav. Red S aving s at 7 P ea k K V A Re duction $3, $3, $4, Savings at 10 Pea k KV A Re duction $4, $5, $6, A p r May Jun Sav. Red Savings at 7 P ea k K V A Re duction $4, $4, $ Savings at 10 Pea k KV A Re duction $6, $6, $2, Jul Aug Sep Sav. Red Savings at 7 P ea k K V A Re duction $8, $5, $6, Savings at 10 Pea k KV A Re duction $10, $7, $8, Oct Nov Dec Sav. Red Savings at 7 Peak KVA Reduction N/A N/A N/A N/A N/A N/A Savings at 10 Pea k KV A Re duction N/A N/A N/A N/A N/A N/A A 7 Reduction of Peak KVA, Yields a Savings of Approximately $56M or a 5.5 Reduction A 10 Reduction of Peak KVA Yields a Savings of Approximately $76M or a 7.4 Reduction
8 ISSUES/RISKS (1) I & M Rate Increase (2) Tight Control Of Expenses (3) Power Outages SEVERITY OF CONSEQUENCES IMPOSSIBLE IMPROBABLE REMOTE OCCASIONAL PROBABLE FREQUENT CATASTROPHIC CRITICAL 3 1 MARGINAL 2 NEGLIGABLE Power Coordination ALTERNATIVE PROJECT BENEFITS Comparing Buss Bar Load Values to That of Annual Study NFPA 70E Arc Flash Compliance OP Sizing Requirements Continuous Improvement Opportunities Monitoring All Utilities (Natural Gas, Waste Water) CTs at the MCC Line-Starter Level Predictive Maintenance Thermo graphic
9 References: [1] Randy Peters (private communication), 8. [2] Paul Lin, P.E. (private communication), 8. [3] Morlan & Associates, Inc Flex Core Div. Technical Staff, Metermate Instruction manual, Morlan & Associates, Inc Flex Core Div. [4] Morlan & Associates, Inc Flex Core Div. Technical Staff, Watt/VAR Transducer Model GWV5 Specifications, Morlan & Associates, Inc Flex Core Div. [5] Morlan & Associates, Inc Flex Core Div. Technical Staff, Signal Converter Model VFC Specifications, Morlan & Associates, Inc Flex Core Div. [6] Morlan & Associates, Inc Flex Core Div. Technical Staff, Split core current transformer Model FC Specifications, Morlan & Associates, Inc Flex Core Div. [7] J. Teresko Power Plays, November 3, [8] J. Smith, Basics of Power Management Equipment Plant Engineering, April 1 st, 4. [9] j. Eggink, Managing Your Power: How to Get Started Plant Engineering, January 1 st,.
ELECTRICAL UTILITY COST REDUCTION THROUGH PREDICTIVE CONTROL December 2008 BACKGROUND
ELECTRICAL UTILITY COST REDUCTION THROUGH PREDICTIVE CONTROL December 2008 Project Manager: Chris Hayes Advisor: Paul I-Hai Lin 1 BACKGROUND Kraft Foods 35 uction of Energy Costs Over The Next 5 Yrs. (2005
More informationCommercial-in-Confidence Ashton Old Baths Financial Model - Detailed Cashflow
Year 0 1 2 3 4 5 6 7 8 9 10 11 12 13 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 2,038 2,922 4,089 4,349 6,256 7,124 8,885 8,885 8,885 8,885 8,885 8,885 9,107
More informationCOMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates For Internal Use Only. FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year
More informationCOMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun
More informationElectric Vehicle Program
Cause No. 43960 INDIANAPOLIS POWER & LIGHT COMPANY Electric Vehicle Program Year 3 2013 Report May 2, 2014 Contents Background... 2 Project Objectives... 3 Current Status... 3 Significant Milestones...
More informationEconomics of Integrating Renewables DAN HARMS MANAGER OF RATE, TECHNOLOGY & ENERGY POLICY SEPTEMBER 2017
Economics of Integrating Renewables DAN HARMS MANAGER OF RATE, TECHNOLOGY & ENERGY POLICY SEPTEMBER 2017 Presentation Outline Understanding LPEA s expenses and what drives them Economics of net metering
More informationUniversity of Michigan Eco-Driving Index (EDI) Latest data: October 2017
University of Michigan Eco-Driving Index () http://www.ecodrivingindex.org Latest data: October 2017 Developed and issued monthly by Michael Sivak and Brandon Schoettle Sustainable Worldwide Transportation
More informationResidential Load Profiles
Residential Load Profiles TABLE OF CONTENTS PAGE 1 BACKGROUND... 1 2 DATA COLLECTION AND ASSUMPTIONS... 1 3 ANALYSIS AND RESULTS... 2 3.1 Load Profiles... 2 3.2 Calculation of Monthly Electricity Bills...
More informationDistribution Capacity Impacts of Plug In Electric Vehicles. Chris Punt, P.E. MIPSYCON 2014
Distribution Capacity Impacts of Plug In Electric Vehicles Chris Punt, P.E. MIPSYCON 2014 1 Outline EV Benefits EV Growth Where are we today? Where are we going? Potential Distribution Capacity Issues
More informationIrrigation energy efficiency How to analyse your energy costs. Nick Bullock The Energy Guys
Irrigation energy efficiency How to analyse your energy costs Nick Bullock The Energy Guys March 2017 1 PILOT Energy Audits: Pivots AIM: data on energy use simple field data How energy efficient is system?
More informationTVA Distributor Retail Rates and Comprehensive Services Program Power Factor Case Studies. Gerald Johns, P.E. Power Utilization Engineer, TVA
TVA Distributor Retail Rates and Comprehensive Services Program Power Factor Case Studies Gerald Johns, P.E. Power Utilization Engineer, TVA 1 TVA Comprehensive Services Power Factor Studies/Recommendations
More informationMARKET RATES UPDATE Paula Gold-Williams Cory Kuchinsky
MARKET RATES UPDATE I N T R O D U C T I O N BY: Paula Gold-Williams President & Chief Executive Officer (CEO) P R E S E N T E D BY: Cory Kuchinsky Interim Vice President, Financial Services September 24,
More informationBenefits of a Cooling Tower VFD Retrofit
Benefits of a Cooling Tower VFD Retrofit Greg Owen Electrical Engineer Ryan Carlson Electrical Engineer 54 th Annual MIPSYCON Conference November 7, 2018 Agenda Project Introduction Project Development
More informationFOR IMMEDIATE RELEASE
Article No. 7761 Available on www.roymorgan.com Roy Morgan Unemployment Profile Monday, 8 October 2018 Unemployment down to 9.4% in September off two-year high Australian employment has grown solidly over
More informationANCR CRU Statistics February 2007 to December 2007
ANCR CRU Statistics February 2007 to December 2007 o Jan/07 Feb/07* Mar/07 Apr/07 May/07 Jun/07 Jul/07 Aug/07 Sep/07 Oct/07 Nov/07 Dec/07 Total notes data from Perimeter phone system unavailable prior
More informationFOR IMMEDIATE RELEASE
Article No. 7353 Available on www.roymorgan.com Roy Morgan Unemployment Profile Wednesday, 11 October 2017 2.498 million Australians (18.9%) now unemployed or under-employed In September 1.202 million
More informationGAZIFÈRE INC. Prime Rate Forecasting Process 2017 Rate Case
Overview A consensus forecast is used to estimate the prime rate charged by commercial banks. As the prime rate is subject to competitive pressures faced by individual lenders and is set on an individual
More information1. Trends in the current fiscal year and previous fiscal year 3. Business overview 2. Secular trends in first quarter financial results
FY2/19 (March 2018~May 2018) Fact Book 1. Trends in the current fiscal year and previous fiscal year 3. Business overview (1) Performance overview P. 1 (1) No. of students at the end of month P. 6 (2)
More informationCHOPTANK ELECTRIC COOPERATIVE, INC. P.S.C. Md. No. 3 Sixteenth Revised Page No A LIGHTING SERVICE Rate Schedule L - S AVAILABILITY
Sixteenth Revised Page No. 57 907A LIGHTING SERVICE Rate Schedule L - S AVAILABILITY Available to municipal organizations for controlled street, highway and area lighting from dusk to dawn. Also available
More informationFY2/18 2Q(March 2017~August 2018)
FY2/18 2Q(March 2017~August 2018) Fact Book 1. Trends in the current fiscal year and previous fiscal year 3. Business overview (1) Performance overview P.1 (1) No. of students at the end of month P.7 (2)
More informationWater side Economizer WC chiller
Appendices Water side Economizer WC chiller Power Loading Lighting Load W/ft^2 Area (ft^2) W kw 3.5 48152 168532 Water Cooled Chiller kw/ton 0.7 UA Supply Fan BHP kw wall 1069 58 43 window 3642 roof 295
More informationPresented by Eric Englert Puget Sound Energy September 11, 2002
Results from PSE s First Year of Time of Use Program Presented by Eric Englert Puget Sound Energy September 11, 2002 Puget Sound Energy Overview 973,489 Total Electric Customers 908,949 are AMR Capable
More informationAlgebra II Pacing Guide
Unit 13: Exploring a Business Venture (10 days) 8 May 13 - May 24 n/a MISD Pacing Guide Date Range Unit 01: Introduction to Functions in 15 Aug. 21 - Sept. 11 Sept. 12 Unit 02: Absolute Value Functions,,
More informationYour electricity bill
Your electricity bill Bill date: February 22, 2017 Summary of what you owe Amount due on your last bill $1,271.36 Payment made on Jan 30, thank you -$1,271.36 Your balance forward $0.00 Your new charges
More informationThe Peoples Gas Light and Coke Company
History of Gas Charges Due to the Operation of Rider 2 (Cents per Therm) Factors for Transportation Customers (Riders FST, SST, P, CFY and AGG) Non- Total Standby Standby Aggregation Commodity Commodity
More informationFOR IMMEDIATE RELEASE
Article No. 6928 Available on www.roymorgan.com Roy Morgan Unemployment Profile Wednesday, 17 August 2016 Australian real unemployment jumps to 10.5% (up 0.9%) in July during post-election uncertainty
More informationNEW HAMPSHIRE GAS CORPORATION WINTER PERIOD ORIGINAL FILING CONTENTS 3. CONVERSION OF GAS COSTS - GALLONS TO THERMS SCHEDULE A
NEW HAMPSHIRE GAS CORPORATION COST OF GAS RATE FILING - DG 13- WINTER PERIOD 2013-2014 ORIGINAL FILING CONTENTS 1. TARIFF PAGE - COST OF GAS RATE 2. MARKED TARIFF PAGE - COST OF GAS RATE 3. CONVERSION
More informationFOR IMMEDIATE RELEASE
Article No. 7845 Available on www.roymorgan.com Roy Morgan Unemployment Profile Friday, 18 January 2019 Unemployment in December is 9.7% and under-employment is 8.8% FOR IMMEDIATE RELEASE Australian unemployment
More informationNJ Solar Market Update
NJ Solar Market Update April 16, 20 Renewable Energy Committee Meeting Trenton, NJ Prepared by Charlie Garrison Solar Installed Capacity Data The preliminary installed solar capacity as of 3/31/ is approximately
More informationPDR Energy Baseline Alternative. Proposal for Discussion October 27, 2015
PDR Energy Baseline Alternative Proposal for Discussion October 27, 2015 Update Since Last Meeting Since the October 12 th Working Group Meeting Stem, Solar City, AMS and CESA have had over a half-dozen
More informationP.O BOX 429, NUKU ALOFA, Tel: (676) Fax: (676)
P.O BOX 429, NUKU ALOFA, Tel: (676) 27-390 Fax: (676) 23-047 Email: jvanbrink@tongapower.to 22 October 2012 Lord Dalgety Electricity Commission Tu atakilangi Nuku alofa Dear Lord Dalgety Compliance Reporting
More informationSound Transit Operations July 2016 Service Performance Report. Ridership
Ridership Total Boardings by Mode Mode Jul-15 Jul-16 % YTD-15 YTD-16 % ST Express 1,618,779 1,545,852-4.5% 10,803,486 10,774,063-0.3% Sounder 333,000 323,233-2.9% 2,176,914 2,423,058 11.3% Tacoma Link
More informationCapacity Analysis Report. For. William E. Dunn Water Reclamation Facility 4111 Dunn Drive Palm Harbor, Florida 34683
Capacity Analysis Report For William E. Dunn Water Reclamation Facility 4111 Dunn Drive Palm Harbor, Florida 34683 Florida Department of Environmental Protection Facility Identification No. FLA0128775
More informationMassachusetts Electric Company and Nantucket Electric Company, Docket No. D.T.E
Amy G. Rabinowitz Counsel April 3, 2003 By Hand Mary L. Cottrell, Secretary Department of Telecommunications and Energy One South Station, 2 nd Floor Boston, MA 02110 Re: Massachusetts Electric Company
More informationConstruction Sector Indices
STATISTICAL RELEASE UGANDA BUREAU OF STATISTICS January to April 212 Construction Sector Indices HIGHLIGHTS Annual Changes show that the prices for the Whole Construction Sector (covering material prices,
More informationThe Changing Relationship Between the Price of Crude Oil and the Price At the Pump
In 2007, what goes up, does not necessarily come down... May 3, 2007 The Changing Relationship Between the Price of Crude Oil and the Price At the Pump Prepared by: Tim Hamilton Petroleum Industry Consultant
More informationincrease of over four per cent compared to the average of $409,058 reported in January 2010.
SINGLE FAMILY RESIDENTIAL BREAKDOWN uary 211 26.8 % 1.7 % 7.%.4%.1 % Good Start to 211 TORONTO - February 4, 211 Greater Toronto REALTORS reported 4,337 transactions through the TorontoMLS system in uary
More informationFINAL FACILITY STUDY. 230/69/13.8 kv Transformer Addition(s) at Badwater Substation 2009 T1. September 10, 2010
FINAL FACILITY STUDY 230/69/13.8 kv Transformer Addition(s) at Badwater Substation 2009 T1 September 10, 2010 I. Introduction This is a revised facility study performed for Transmission Queue Request 2009
More informationAppendix E Hydrology, Erosion and Sediment Transport Studies
Appendix E Hydrology, Erosion and Sediment Transport Studies Hatch 2012/10 Appendix E1 EA Hydrology Memorandum February 2011 (Hatch. 2011a) Hatch 2012/10 Project Memo February 23, 2011 TO: Larry King FROM:
More informationNJ Solar Market Update As of 6/30/15
NJ Solar Market Update As of 6/30/ Prepared by Charlie Garrison July 17, 20 SOLAR INSTALLED CAPACITY DATA The preliminary installed solar capacity as of 6/30/ is approximately 1,500.7 MW. Approximately
More informationTRAFFIC VOLUME TRENDS
Page 1 U. S. Department Transportation Federal Highway Administration Office Highway Policy Information TRAFFIC VOLUME TRENDS September Travel on all roads and streets changed by +2.5 (5.8 billion vehicle
More information2017 Adjusted Count Report February 12, 2018
A statewide multi-use trail user study and volunteer data collection program 2017 Adjusted Count Report February 12, 2018 The following report includes the final adjusted infrared (IR) counter data at
More informationEnergy Performance Information Request Timeline
Energy Performance Information Request Timeline Project Title: UT Project # Project Manager: Submitted by: Day Submitted: The timeline below outlines a comprehensive list of required documents and when
More informationCCoWS. Central Coast Watershed Studies. Summary of Precipitation and Streamflow for Potrero and San Clemente Creeks in Water-Year 2008
Central Coast Watershed Studies CCoWS Summary of Precipitation and Streamflow for Potrero and San Clemente Creeks in Water-Year 2008 Santa Lucia Preserve Monterey County, California Publication No. WI-2009-01
More informationTRAFFIC VOLUME TRENDS July 2002
TRAFFIC VOLUME TRENDS July 2002 Travel on all roads and streets changed by +2.3 percent for July 2002 as compared to July 2001. Estimated Vehicle-Miles of Travel by Region - July 2002 - (in Billions) West
More informationFOR IMMEDIATE RELEASE
Article No. 5842 Available on www.roymorgan.com Roy Morgan Unemployment Profile Thursday, 2 October 2014 Unemployment climbs to 9.9% in September as full-time work lowest since October 2011; 2.2 million
More information/ PRELIMINARY STEEL IMPORTS INCREASE 15% IN APRIL Import Market Share 27% in April
News Release FOR IMMEDIATE RELEASE May 23, 2014 CONTACT Lisa Harrison 202.452.7115/ lharrison@steel.org PRELIMINARY STEEL IMPORTS INCREASE 15% IN APRIL Import Market Share 27% in April Washington, D.C.
More informationPrice Category Breakdown - February 2010
SINGLE FAMILY RESIDENTIAL BREAKDOWN ruary 21 ruary Sales and Average Price Increase Annually TORONTO - Wednesday, March 3, 21 7.3 % 24.6 % 1.8 % 7.3%.2%.1 % Greater Toronto REALTORS reported 7,291 sales
More informationNovember 2018 Customer Switching Report for the Electricity and Gas Retail Markets
An Coimisiún um Rialáil Fóntas Commission for Regulation of Utilities November 2018 Customer Switching Report for the Electricity and Gas Retail Markets Information Paper Reference: CRU18266 Date Published:
More informationUnits of Instruction MISD Pacing Guide Days Date Range Test Date
MISD Pacing Guide Date Range Test Date Introduction: Processes of Investigations (1 day) Aug. 21 Unit 01: Matter (12 days) Aug. 22-Sept. 7 Sep. 10 Unit 02: Atomic Structure and the Periodic Table (15 days)
More informationMeter Insights for Downtown Store
Meter Insights for Downtown Store Commodity: Analysis Period: Prepared for: Report Date: Electricity 1 December 2013-31 December 2014 Arlington Mills 12 February 2015 Electricity use over the analysis
More informationGlendale Water & Power Smart Grid Project
Glendale Water & Power Smart Grid Project Key Dates in Project History Key Dates Project History On July 10, 2007, City Council directed GWP to develop a long term plan for smart meters On October 23,
More informationNEWS Release. U.S. Manufacturing Technology Orders. Year-to-date U.S. manufacturing technology orders up 4.1% over 2011
U.S. Manufacturing Technology Orders A statistical program of AMT NEWS Release FOR RELEASE: October 8, 2012 Contact: Pat McGibbon, AMT, 703-827-5255 Year-to-date U.S. manufacturing technology orders up
More informationNEU Electric and Natural Gas Price Update
Exelon s $24 Billion Energy Bill Senate Bill 2814 Short-Term Energy Price Outlook On November 15, 2016, Exelon, through its legislative supporters, introduced Senate Bill 2814, a massive 446 page document
More informationPast Due. Account Charges. Contract Charges Security Deposit Due - Jun 09, , Customer Service. Jun 19, PAST DUE $1,693.
11983978 Jun 19, 217 1 124 958 PAST DUE $1,693.97 Meter Reading Information Meter # 55271 May 3 655 Jun 15 6642 17 days 1397 on or about Aug 15 82 Past Due Balance payable includes an amount which is payable
More informationANCR CRU Statistics Februa.. to December 2007
ANCR CRU Statistics Februa.. to December 2007 Jan/07 Feb/07* Mar/07 Apr/07 May/07 Jun/07 Jul/07 Aug/07 Sep/07 Oct/07 Nov/07 Dec/07 Total notes Answered dato from Perimeter phone system unavailable prior
More informationOperational Opportunities to Minimize Renewables Curtailments
Operational Opportunities to Minimize Renewables Curtailments Clyde Loutan Principal, Renewable Energy Integration July 24, 2017 2017 CAISO - Public Page 1 Agenda Background Real-time control performance
More informationBalance from your previous bill $0.00 Meter # Basic Charge: 17 $ /day 3.23* Energy charge:¹ 2
11983979 Jun 19, 217 1 124 962 Jul 11, 217 $24.34 Meter Reading Previous Bill. Balance from your previous bill $. Meter # 552711 May 3 19813 Account Account charge 12.4* Charges 17 days 82 Jun 15 19895
More informationSOUTHERN CALIFORNIA EGG PRODUCTION COSTS AND INCOME 1979 TO 2003
SOUTHERN CALIFORNIA EGG PRODUCTION COSTS AND INCOME 1979 TO 2003 Prepared by Don Bell, Poultry Specialist (emeritus) University of California April 2, 2004 SOUTHERN CALIFORNIA EGG PRODUCTION COSTS/INCOME
More informationCCoWS. Central Coast Watershed Studies. Summary of Precipitation and Streamflow for Potrero and San Clemente Creeks in Water-Year 2007
Central Coast Watershed Studies CCoWS Summary of Precipitation and Streamflow for Potrero and San Clemente Creeks in Water-Year 2007 Santa Lucia Preserve Monterey County, California Publication No. WI-2008-01
More informationSeptember 2016 Water Production & Consumption Data
September 2016 Water Production & Consumption Data September 2016 monthly water production (288.48 AF) was lowest in at least 17 years. Monthly water production has increased slightly each month since
More informationOverview. Mercury Monitoring. Regulatory drivers Technology Overview Pros and Cons Alternative Hybrid Approach
Mercury Compliance Monitoring in 2015 and Beyond Volker Schmid Clean Air Engineering March 28, 2013 Overview Mercury Monitoring Regulatory drivers Technology Overview Pros and Cons Alternative Hybrid Approach
More informationDemand and Time of Use Rates. Marty Blake The Prime Group LLC
Demand and Time of Use Rates Marty Blake The Prime Group LLC Factors Affecting Electric Rates Generation plant cost increases Fuel price increases and volatility Carbon and environmental regulations Cost
More informationTotal Production by Month (Acre Feet)
Production by Month (acre-feet) 2008 2009 2010 2011 2012 2013 2014 2015 2016 January 25 339.10 228.90 249.50 297.99 243.06 327.14 247.66 212.37 February 234.00 218.80 212.10 241.52 245.82 279.08 234.16
More informationDRINKING WATER SYSTEM ANNUAL REPORT Reporting Period: January 1 st to December 31 st, 2016
DRINKING WATER SYSTEM ANNUAL REPORT Reporting Period: January 1 st to December 31 st, 2016 Water System: Coal Harbour Water System Water System Owner Regional District of Mount Waddington Primary Contact
More informationToo Good to Throw Away Implementation Strategy
Too Good to Throw Away Implementation Strategy Council Briefing by Sanitation Services October 4, 2006 Purpose of Briefing Summarize preparations for Too Good To Throw Away recycling services FY07 Recommend
More informationELECTRICITY TARIFFS 2013/2014
ELECTRICITY TARIFFS 2013/2014 Presented by Cobus Kritzinger Leon Swanepoel Deputy Director Finance Head Electro Technical Services CONTENTS BACKROUND ELECTRICITY SALES BULK PURCHASES SALARY INCREASE TARIFF
More informationUNITIL ENERGY SYSTEMS. INC. CALCULATION OF THE EXTERNAL DELIVERY CHARGE
Schedule LSM-DJD-1 Page 1 of 2 UNITIL ENERGY SYSTEMS. INC. CALCULATION OF THE EXTERNAL DELIVERY CHARGE Calculation Calculation of the Calculation of the of the EDC EDC/ Only EDC/Non- 1. (Over)/under Recovery
More informationWIM #37 was operational for the entire month of September Volume was computed using all monthly data.
SEPTEMBER 2016 WIM Site Location WIM #37 is located on I-94 near Otsego in Wright county. The WIM is located only on the westbound (WB) side of I-94, meaning that all data mentioned in this report pertains
More informationIllinois Regulatory and Energy Price Update
Illinois Regulatory and Energy Price Update February 2009 Highlights in this update: Commonwealth Edison Company releases revised cost of service study... 1 Proposed order issued in NICOR rate increase
More informationFacilitated Discussion on the Future of the Power Grid
Facilitated Discussion on the Future of the Power Grid EPRI Seminar: Integrated Grid Concept and Technology Development Tokyo Japan, August 20, 2015 Matt Wakefield, Director Information, Communication
More informationAll Annual Operating Plan Recipients
To: All Annual Operating Plan Recipients From: Lower Colorado Region Boulder Canyon Operations Office River Operations Group Daniel Bunk P.O. Box 647 Boulder City, NV 896-47 Phone: 72-293-83 The operation
More informationMacroeconomic Outlook. Presented by Dr. Bruce A. Scherr Chairman of the Board Chief Executive Officer Emeritus
Macroeconomic Outlook Presented by Dr. Bruce A. Scherr Chairman of the Board Chief Executive Officer Emeritus Waterways Symposium Cincinnati, OH November 15-17, 2016 Topics Energy Macro Implications Inflation
More informationFY2/17 3Q(March 2016~November2016)
FY2/17 (March 2016~November2016) Fact Book 1. Trends in the current fiscal year and previous fiscal year 3. Business overview (1) Performance overview P. 1 (1) No. of students at the end of month P. 7
More informationNJ Solar Market Update As of 2/29/16
NJ Solar Market Update As of 2/29/16 Prepared by Charlie Garrison March 24, 2016 SOLAR INSTALLED CAPACITY DATA The installed solar capacity as of 2/29/16 is approximately 1,644.3 MW. Approximately 20.3
More informationClimatography of the United States No
Climate Division: CA 5 NWS Call Sign: Month (1) Min (2) Month(1) Extremes Lowest (2) Temperature ( F) Lowest Month(1) Degree s (1) Base Temp 65 Heating Cooling 100 Number of s (3) Jan 45.9 26.0 36.0 67
More informationM onthly arket. Jan Table of Contents. Monthly Highlights
Table of Contents Market Inventory...2 www.gaar.com Monthly Highlights January 2014 had a 12.29% increase in the number of homes sales when compared to same time last year. The average sale price of single-family
More informationAnalysis of IEC Recommendations in Selected APEC Economies
Reducing Losses in Power Distribution through Improved Efficiency of Distribution Transformers (EWG 05 2015A) Analysis of IEC 6007620 Recommendations in Selected APEC Economies 18 December 2017 Bangkok,
More informationDRAFT. Total Month Average Point (MAP) A Massage 4/30/2014 8/1/2015 A CENTER E
Total Month Average Point (MAP) A Massage 4/30/2014 8/1/2015 A CENTER E 2.25 2.00 2.00 2.25 2.00 2.00 1.00 2.25 2.00 2.25 2.00 A Massage 10/31/2017 9/1/2015 B MEZZANINE 2.25 2.00 2.00 2.25 2.25 2.25 2.25
More informationAppendix E Water Supply Modeling
Supply Modeling Modesto Irrigation District Treatment Plant Expansion Project Modeling I. Introduction The Modesto Irrigation District (MID) is situated adjacent to and north of the Tuolumne River. Over
More informationFOR IMMEDIATE RELEASE
Article No. 7433 Available on www.roymorgan.com Roy Morgan Unemployment Profile Friday, 12 January 2018 2.6m Australians unemployed or under-employed in December The latest data for the Roy Morgan employment
More informationClimatography of the United States No
Climate Division: MA 3 NWS Call Sign: BOS Month (1) Min (2) Month(1) Extremes Lowest (2) Temperature ( F) Lowest Month(1) Degree s (1) Base Temp 65 Heating Cooling 100 Number of s (3) 36.5 22.1 29.3 72
More informationIOWA MOLD TOOLING CO., INC. BOX 189, GARNER, IA TEL: IMT PART NUMBER
CRANE LOG CALENDAR YEAR CRANE MODEL Daily Inspections Weekly Inspections Monthly Inspections Lubrication Record Maintenance Record Damage & Repair Record Modification Record Reference Specifications CRANE
More informationSTATISTICS BOTSWANA ELECTRICITY GENERATION & DISTRIBUTION 2016/2 STATS BRIEF, FIRST QUARTER Copyrights Statistics Botswana 2016
2016/2 ELECTRICITY GENERATION & DISTRIBUTION STATS BRIEF, FIRST QUARTER 2016 Copyrights Statistics Botswana 2016 Statistics Botswana. Private Bag 0024 Botswana Tel: (267) 367 1300. Fax: (267) 395 2201.
More informationNJ Solar Market Update As of 10/31/15
NJ Solar Market Update As of 10/31/15 Prepared by Charlie Garrison Renewable Energy Committee Meeting November 10, 2015 SOLAR INSTALLED CAPACITY DATA The preliminary installed solar capacity as of 10/31/15
More informationCREDIT UNION ESTIMATES
MONTHLY CREDIT UNION ESTIMATES Prepared June 1, 2018 by Credit Union National Association Economics and Statistics Department cuna.org/mcue Loans Credit union loans outstanding grew 1.1% in, matching the
More informationImpact of Delhi s CNG Program on Air Quality
Impact of Delhi s CNG Program on Air Quality Urvashi Narain Presentation at Transport, Health, Environment, and Equity in Indian Cities Conference at Indian Institute of Technology, New Delhi December
More information/ PRELIMINARY STEEL IMPORTS INCREASE 2% IN MAY Import Market Share 23% in May
News Release FOR IMMEDIATE RELEASE June 25, 2013 CONTACT Lisa Harrison 202.452.7115/ lharrison@steel.org PRELIMINARY STEEL IMPORTS INCREASE 2% IN MAY Import Market Share 23% in May Washington, D.C. Based
More informationNovember 2017 Customer Switching Report for the Electricity and Gas Retail Markets
An Coimisiún um Rialáil Fóntas Commission for Regulation of Utilities November 2017 Customer Switching Report for the Electricity and Gas Retail Markets Information Paper Reference: CRU18011 Date Published:
More informationClimatography of the United States No
Climate Division: WY 9 NWS Call Sign: LND Temperature ( F) Month (1) Min (2) Month(1) Extremes Lowest (2) Lowest Month(1) Degree s (1) Base Temp 65 Heating Cooling 100 Number of s (3) Jan 31.9 8.7 20.3
More informationSolar photovoltaic research: Drakenstein Municipality
Rooftop Solar PV Solar photovoltaic research: Drakenstein Municipality Karin Kritzinger and Imke Meyer, Date 22/04/2015 Dialogue on Utility and Local Scale Renewable Energy in South Africa 22 April 2015-1
More informationRevising the Historic Monthly Mean Niagara River Flow at Buffalo to Reflect Better Estimates of Maid-of-the-Mist Pool Outflows
Revising the Historic Monthly Mean Niagara River Flow at Buffalo to Reflect Better Estimates of Maid-of-the-Mist Pool Outflows 1961-2007 Background The Niagara River flow at Buffalo is currently computed
More informationCREDIT UNION ESTIMATES
MONTHLY CREDIT UNION ESTIMATES Prepared November 1, 2017 by Credit Union National Association Economics and Statistics Department cuna.org/mcue Loans Credit union loans outstanding grew 0.7% in, compared
More informationNational Routing Number Administration p-ani Activity and Projected Exhaust Report
National Routing Number Administration 2016 p-ani Activity and Projected Exhaust Report The ATIS Industry Numbering Committee developed the P-ANI Administration Guidelines, which contain the following
More informationCREDIT UNION ESTIMATES
MONTHLY CREDIT UNION ESTIMATES Prepared July 2, 2018 by Credit Union National Association Economics and Statistics Department cuna.org/mcue Loans Credit union loans outstanding grew 1.3% in, compared to
More informationPredict Future Failures From Your Maintenance Records
Predict Future Failures From Your Maintenance Records Presented by: Paul Barringer, P.E. Barringer & Associates, Inc. Reliability, Engineering, and Manufacturing Consultants Humble, Texas 77347, USA Phone:
More informationCREDIT UNION ESTIMATES
MONTHLY CREDIT UNION ESTIMATES Prepared September 4, 2018 by Credit Union National Association Economics and Statistics Department cuna.org/mcue Loans Credit union loans outstanding grew 1.1% in, compared
More informationCREDIT UNION ESTIMATES
MONTHLY CREDIT UNION ESTIMATES Prepared May 1, 2018 by Credit Union National Association Economics and Statistics Department cuna.org/mcue Loans Credit union loans outstanding grew 1.1% in, compared to
More informationis attached to and becomes a part of a agreement dated, 20
Electric Process Heat Schedule Designation R1.2 Standard Contract Rider No. 1.2 DE 963-1635 8/18 THIS RIDER, dated, 20 is attached to and becomes a part of a agreement dated, 20 between (Legal Entity and
More informationSTEEL IMPORTS DOWN 5% YEAR-TO-DATE THROUGH FEBRUARY Finished Import Market Share YTD at 25%
News Release FOR IMMEDIATE RELEASE March 23, 2018 CONTACT Lisa Harrison 202.452.7115/lharrison@steel.org STEEL IMPORTS DOWN 5% YEAR-TO-DATE THROUGH FEBRUARY Finished Import Market Share YTD at 25% Washington,
More information