Southern Star Central Gas Pipeline Contractor Covered Task List Last updated 8/15/2018

Size: px
Start display at page:

Download "Southern Star Central Gas Pipeline Contractor Covered Task List Last updated 8/15/2018"

Transcription

1 007 Operate Valves 008 Measurement of Wall Thickness with Ultrasonic Device 018 Inspect Navigable Waterway Crossing (b) 201 Abnormal Operating Conditions Related to Welding on Pipelines Monitoring of Welding Process (a) (c) Visual Inspection of Welds not Non-Destructively Tested (b) (c) 204 Non-Destructive Testing (Dye Penetrant) Non-Destructive Testing (Mag Particle) Non-Destructive Testing (Ultrasonic) Non-Destructive Testing (X-Ray) Plastic Pipe Joining: Butt Fusion Plastic Pipe Joining: Mechanical Joining Plastic Pipe Joining: Electrofusion Joining Oral Oral Oral No 1:0 1 No 1:0 1 No 1: Perform Plastic Fusion Inspection Oral 213 Joining of Metal Pipe and Components by means other than Welding - Threaded and Flanged Connections 214 Joining of Metal Pipe and Components by means other than Welding - Threaded Connections Page 1 Copyright Veriforce, LLC. All rights reserved. Rev. 10

2 215 Joining of Metal Pipe and Components by means other than Welding- Flanged Connections Joining of Metal Pipe - Compression Couplings Small Diameter Metal Tubing and Fitting Installation Install Tracer (electrically conductive) Wire (e) NA 302 Installation of Customer Meters and Service Regulators (Residential and Small Commercial) of Buried Pipelines When Exposed Protection of Coating When Backfilling and From Below Ground Supports (d) (c)(6) ( c ) (b) NA Oral Protection of Coatings From Above Ground Structures (d) 406 Conduct Test to Determine Cathodic Protection Current Requirements (a) (d)(6) 407 Perform Cathodic Protection Survey (a) (e) (e) (d)(6) Oral (a) 408 Inspect Cathodic Protection Rectifier (b) ( c ) 409 Inspect Interference Bonds (c) ( c ) 410 Clear Shorted Casing (c) (b)(1) (a) 411 Inspect/Test to Assure Electrical Isolation is Adequate (d) (d)(6) Install CP Leads on Pipeline Using Exothermic Weld Anode Installation on Submerged Pipeline or Facilities Inspect for Internal Corrosion Whenever Pipe is Removed (b)(1) 415 Monitoring for Internal Corrosion with Probes and Coupons (d)(5) 416 Monitoring for Internal Corrosion with Gas Samples (c) (b) Page 2 Copyright Veriforce, LLC. All rights reserved. Rev. 10

3 417 Atmospheric Corrosion Monitoring General and Localized Corrosion Measurement (Remedial Measures) (a)(b) 419 Cathodic Protection Potential Measurement (a) (d)(8) (b) (a) 420 Soil Resistivity 421 Measurement of Depth of Pitting with Pit Gage Assessment of Pipeline Segments Using Long Range Guided Wave UT 423 Perform Direct Current Voltage Gradient (DCVG) Survey (d)(7) 424 Perform AC Current Attenuation (ACCA) Survey (e) (d)(7) 425 Perform Alternating Current Voltage Gradient (ACVG) Survey (h)(3) (d)(7) 426 Inspect Pipe Coating with Holiday Detector (a) (a) Inspection of Above or Below Ground Coatings Oral 428 Pin Brazing to Install CP Leads on Pipeline Monitoring for corrosion - bacteria testing - serial dilution method (MIC) 435 Measure and Identify Mechanical Damage on Installed Pipe and Components Perform Close Survey (e) (e) (d)(6) & (7) (a) 437 Perform Hot Spot Survey (e) (a) 480 Apply Approved Coating by Hand Application (a) Apply Approved Coatings by Mechanical Spray and Hand Application Methods (a) Apply Approved Coatings by Wrap Application (a) Page 3 Copyright Veriforce, LLC. All rights reserved. Rev. 10

4 501 Conduct a Pressure Test (d) 502 Conduct Pressure Test on Pipe that is to be Operated at a Pressure <100 psig 601 Start-up/Shut-down of Pipeline to Assure Operation Within MAOP / MOP (b) (b)(5) 602 Monitoring Pipeline Pressure (b)(5) Compressor Units: Startup, Operation, Shutdown and Purging Before Returning to Service (b)(7) (b)(6) ( c )(9) Oral 605 Locate Line/Install Temporary Marking of Buried Pipeline (c)(5) (c)(5) 606 Locate and Mark Submerged Pipelines (c)(5) 607 Damage Prevention: Observation of Excavating and Backfilling (c)(6) (b) (c)(6) 608 Damage Prevention for Blasting Near a Pipeline (c)(6) (c)(6) Oral 609 Inspect and Maintain Odorization Equipment (e) 610 Monitor Odorant Concentration (f) 611 Hot Tap (Steel Pipe) Hot Tap (Plastic Pipe) Purge Pipeline Facilities With Gas (a) 614 Purge Pipeline Facilities With Air or Inert Gas (b) (c)(10) Oral 616 Atmospheric Monitoring during Hot Work Operations ( c )(11) 619 Damage Prevention during Vacuum Excavation and Backfilling Activities 661 Launching and/or Receiving Internal Devices (Pigs) (c) (d)(5)(iv ) (d)(9) (c)(6) (c)(6) Oral Page 4 Copyright Veriforce, LLC. All rights reserved. Rev. 10

5 701 Patrolling Pipeline and Leakage Survey without Instrument (d)(4) (a) Oral 702 Leakage Survey with Leak Detection Device Placing/Maintaining Line Markers (a) (c) 704 Permanent Field Repair by Grinding Permanent Field Repair Using Composite Materials (Clockspring) 706 Permanent Field Repair Using Composite Materials (Armor Plate) (a) (a)(2) (a) (a)(2) 707 Permanent Field Repair Using Bolt-On Clamp/Sleeve (a) (a)(2) 708 Permanent Field Repair Using Full Encirclement Weld Sleeve 709 Inspection and Testing of Relief Devices (Compressor Stations, Meter Stations, Regulating Stations) 710 Inspect/Test Compressor Station Remote Shutdown Devices (ESD/EBD) (a)(2) (a) (a) (b) Oral Certificate and Oral Certificate and Oral (c) 711 Inspect, Test, and Maintain Systems (c) (b)(1) (b)(1) 712 Programmable Logic lers (c) (b)(1) (a) 713 Test/Maintain Gas Detection and Alarm Systems (c) 714 Inspect and Maintain Pressure ing and Regulating Devices 715 Test and Maintain Pressure Switches and Transmitters in Pressure ing and Regulating Service (a) (b) (a) (b) 716 Inspect, Maintain, and Operate Valves Monitoring for Internal Corrosion with Liquid Samples (a) (b) Aerial Leakage Survey: Transmission Aerial Leakage Survey: Transmission (UV/IR) Yes 1:3 1 Page 5 Copyright Veriforce, LLC. All rights reserved. Rev. 10

6 762 Line Stopping Utilizing a Hot Tap Fitting Page 6 Copyright Veriforce, LLC. All rights reserved. Rev. 10

Northern Natural Gas Contractor Covered Task List Last updated 4/26/2018

Northern Natural Gas Contractor Covered Task List Last updated 4/26/2018 001 Provide Security for Pipeline Facilities 195.436 Oral 003 Test Breakout Tank Overfill Protective Devices 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective Devices 195.428 Oral

More information

EnLink Midstream Contractor Covered Task List Last updated 11/8/2017

EnLink Midstream Contractor Covered Task List Last updated 11/8/2017 003 Test Breakout Tank Overfill Protective Devices 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective Devices 195.428 005 Repair Breakout Tank Overfill Protective Devices 195.428

More information

DCP Midstream Contractor Covered Task List Last updated 7/11/2018

DCP Midstream Contractor Covered Task List Last updated 7/11/2018 001 Provide Security for Pipeline Facilities 195.436 Oral 007 Operate Valves 008 Measurement of Wall Thickness with Ultrasonic Device 009 Movement and/or Relocation of Liquid Pipelines 195.424 011 Inspect,

More information

Columbia Pipeline Group Contractor Covered Task List Last updated 1/8/2018

Columbia Pipeline Group Contractor Covered Task List Last updated 1/8/2018 001 Provide Security for Pipeline Facilities 195.436 Oral 003 Test Breakout Tank Overfill Protective Devices 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective Devices 195.428 Oral

More information

Williams Contractor Covered Task List Last updated 11/7/2017

Williams Contractor Covered Task List Last updated 11/7/2017 003 Test Breakout Tank Overfill Protective Devices 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective Devices 195.428 Oral 005 Repair Breakout Tank Overfill Protective Devices 195.428

More information

Boardwalk Pipeline Partners, LP Contractor Covered Task List Last updated 9/17/2018

Boardwalk Pipeline Partners, LP Contractor Covered Task List Last updated 9/17/2018 003 Test Breakout Tank Overfill Protective Devices 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective Devices 195.428 Oral 005 Repair Breakout Tank Overfill Protective Devices 195.428

More information

Dominion Energy Questar Pipeline LLC Contractor Covered Task List Last updated 10/3/2017

Dominion Energy Questar Pipeline LLC Contractor Covered Task List Last updated 10/3/2017 007 Operate Valves 008 Measurement of Wall Thickness with Ultrasonic Device 103 Non-destructive Testing (Other than testing of welds) -- Mag Particle 104 Non-destructive Testing (Other than testing of

More information

Enbridge Gas Transmission and Midstream and Enbridge Liquid Pipelines (Express-Platte) Contractor Covered Task List Last updated 8/30/2018

Enbridge Gas Transmission and Midstream and Enbridge Liquid Pipelines (Express-Platte) Contractor Covered Task List Last updated 8/30/2018 001 Provide Security for Pipeline Facilities 195.436 Oral 003 Test Breakout Tank Overfill Protective Devices 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective Devices 195.428 Oral

More information

Saddle Butte Rockies Midstream LLC Contractor Covered Task List Last updated 12/6/2017

Saddle Butte Rockies Midstream LLC Contractor Covered Task List Last updated 12/6/2017 003 Test Breakout Tank Overfill Protective N/A 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective N/A 195.428 Oral 005 Repair Breakout Tank Overfill Protective N/A 195.428 007 Operate

More information

Howard Midstream Energy Partners LLC Contractor Covered Task List Last updated 10/11/2013

Howard Midstream Energy Partners LLC Contractor Covered Task List Last updated 10/11/2013 001 Provide Security for Pipeline Facilities 195.436 Oral 003 Test Breakout Tank Overfill Protective Devices 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective Devices 195.428 005

More information

Epic Consolidated Operations LLC Contractor Covered Task List Last updated 9/6/2018

Epic Consolidated Operations LLC Contractor Covered Task List Last updated 9/6/2018 003 Test Breakout Tank Overfill Protective 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective 195.428 Oral 005 Repair Breakout Tank Overfill Protective 195.428 006 Inspection of Breakout

More information

TransCanada US Contractor Covered Task List Last updated 9/27/2018

TransCanada US Contractor Covered Task List Last updated 9/27/2018 003 Test Breakout Tank Overfill Protective Devices 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective Devices 195.428 Oral 005 Repair Breakout Tank Overfill Protective Devices 195.428

More information

Energy Transfer Partners LP Contractor Covered Task List Last updated 3/2/2018

Energy Transfer Partners LP Contractor Covered Task List Last updated 3/2/2018 001 Provide Security for Pipeline Facilities 195.436 Oral 003 Test Breakout Tank Overfill Protective Devices 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective Devices 195.428 Oral

More information

Energy Transfer Partners LP Contractor Covered Task List Last updated 12/10/2018

Energy Transfer Partners LP Contractor Covered Task List Last updated 12/10/2018 001 Provide Security for Pipeline Facilities 195.436 Oral 003 Test Breakout Tank Overfill Protective Devices 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective Devices 195.428 005

More information

Noble Energy Contractor Covered Task List Last updated 2/20/2019

Noble Energy Contractor Covered Task List Last updated 2/20/2019 003 Test Breakout Tank Overfill Protective Devices 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective Devices 195.428 005 Repair Breakout Tank Overfill Protective Devices 195.428

More information

Black Hills Energy Contractor Covered Task List Last updated 10/10/2018

Black Hills Energy Contractor Covered Task List Last updated 10/10/2018 007 Operate Valves 103 Non-destructive Testing (Other than testing of welds) -- Mag Particle 201 Abnormal Operating Conditions Related to Welding on Pipelines 195.452(h) 192.225 192.227 192.715 192.717

More information

Appendix B Kinder Morgan Operator Qualification Program List of Covered Tasks Hazardous Liquid Pipelines Part 195 revised 8/24/2018

Appendix B Kinder Morgan Operator Qualification Program List of Covered Tasks Hazardous Liquid Pipelines Part 195 revised 8/24/2018 Abnormal Operating Conditions Outside of 101.01 Room Abnormal Operating Conditions Inside of 101.02 Room 102.01 Measure Structure-to-Soil Potentials 102.02 Advanced Cathodic Testing 102.03 Active Corrosion/MIC

More information

Appendix B Kinder Morgan Operator Qualification Program List of Covered Tasks Hazardous Liquid Pipelines Part 195 revised 12/12/2017

Appendix B Kinder Morgan Operator Qualification Program List of Covered Tasks Hazardous Liquid Pipelines Part 195 revised 12/12/2017 Abnormal Operating Conditions Outside of 101.01 Room Abnormal Operating Conditions Inside of 101.02 Room 102.01 Measure Structure-to-Soil Potentials 102.02 Advanced Cathodic Testing 102.03 Active Corrosion/MIC

More information

Appendix A Kinder Morgan Operator Qualification Program List of Covered Tasks - Natural Gas - Part 192 Revised 12/13/2017

Appendix A Kinder Morgan Operator Qualification Program List of Covered Tasks - Natural Gas - Part 192 Revised 12/13/2017 01.01.01 Abnormal Operating Conditions (AOC) - Outside of Room 01.01.02 Abnormal Operating Conditions (AOC) - Inside of Room (new task effective 1/1/2018) 02.01.01 Gas Detection & Alarm System Maintenance

More information

ASMECourseCatalog.

ASMECourseCatalog. ASMECourseCatalog www.energyu.org www.midwestenergy.org ASME Abnormal Operating Conditions... 6 ASME GAS01 Hazards of Natural Gas and Prevention of Accidental Ignition... 6 ASME 0001 Measure Structure-to-Electrolyte

More information

Florida City Gas Contractor Covered Task List

Florida City Gas Contractor Covered Task List 001A Abandonment and deactivation of facilities 192.727 001B 001C 001SUBA Abandonment and deactivation of facilities (service lines not in use) Abandonment and deactivation of facilities (service lines

More information

Operator Qualification (OQ) Report

Operator Qualification (OQ) Report AOCF 66102/67107 Abnormal Operating Conditions Field for Natural Gas and Hazardous Liquids 5/15/2014 5/15/2017 AOCG 67107 Abnormal Operating Conditions for Natural Gas 5/16/2014 5/16/2017 TM001 66101 02

More information

COVERED TASK Conduct Cathodic Protection Surveys 1 DESCRIPTION ELEMENTS OF TASK 4 PART QUESTION NOTES ABNORMAL OPERATING CONDITIONS

COVERED TASK Conduct Cathodic Protection Surveys 1 DESCRIPTION ELEMENTS OF TASK 4 PART QUESTION NOTES ABNORMAL OPERATING CONDITIONS COVERED Conduct Cathodic Protection Surveys 1 Annual surveys are conducted for each operator s pipeline system that is under cathodic protection to ensure that the protection is adequate. This task is

More information

PIGGING PRODUCTS. Capex supply. PIG LAUNCHER and RECEIVER

PIGGING PRODUCTS. Capex supply. PIG LAUNCHER and RECEIVER PIGGING PRODUCTS Capex supply PIG LAUNCHER and RECEIVER Before Cleaning After Cleaning TYPES OF PIGS DISPLACEMENT AND BATCHING PIGS AND PIG WITH BLADES (FOR CLEANING) 2 to 6 3 and 4 PIG with blades 5 to

More information

PIPELINE CORROSION CONTROL

PIPELINE CORROSION CONTROL NCCER 13614 Progress Blvd, Alachua, Florida 32615 Phone: (888) 622-3720 E-mail: info@nccer.org PIPELINE CORROSION CONTROL Competencies / Objectives Level One MODULE 66101-02 INTRODUCTION TO THE PIPELINE

More information

PHMSA Office of Pipeline Safety Dave Mulligan Western Region

PHMSA Office of Pipeline Safety Dave Mulligan Western Region PHMSA Office of Pipeline Safety Dave Mulligan Western Region Chevron Pipeline Releases Salt Lake City, Utah June 11, 2010 & December 1, 2011 Dave Mulligan U.S. Department of Transportation (US DOT) Pipeline

More information

PROCEDURE EXTRUDED HOT TAP & LINE STOP TEES DESIGN & MANUFACTURING VALIDATION

PROCEDURE EXTRUDED HOT TAP & LINE STOP TEES DESIGN & MANUFACTURING VALIDATION 6534 Petropark Dr. Houston, TX 77041 USA Tel: +1 713-937-6193 Fax: +1 713-937-8695 www.uni-forge.com PROCEDURE EXTRUDED HOT TAP & LINE STOP TEES DESIGN & MANUFACTURING VALIDATION Prepared by: Approved

More information

New UST Installation Inspection Checklist

New UST Installation Inspection Checklist Nebraska State Fire Marshal Fuels Division - FLST Section 246 South 14 TH Street - Lincoln, NE 68508-1804 (402) 471-9466 New UST Installation Inspection Checklist (Petroleum or Hazardous Substances) Inspection

More information

The Implementation of a Storage Facility Inspection Program. Presented By: John R. Rueckel PCA Engineering, Inc.

The Implementation of a Storage Facility Inspection Program. Presented By: John R. Rueckel PCA Engineering, Inc. The Implementation of a Storage Facility Inspection Program Presented By: John R. Rueckel PCA Engineering, Inc. Storage Facility Inspection Why implement an inspection program? Regulatory Requirements

More information

Inspector's Initials: Tank Owner or Agent Signature: Title: Date:

Inspector's Initials: Tank Owner or Agent Signature: Title: Date: STATE OF TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF UNDERGROUND STORAGE TANKS 4 TH Floor, L & C Tower 401 Church Street Nashville, TN 37243-1541 UST OPERATIONS INSPECTION Mo /Day

More information

Pipe Support The Fast, Economical Solution for Low Pressure Pipeline Repair

Pipe Support The Fast, Economical Solution for Low Pressure Pipeline Repair CLOCK SPRING Pipe Support The Fast, Economical Solution for Low Pressure Pipeline Repair 3 x 18 repairs were made in support locations. The Pipe could not be raised so blocks were inserted and the supports

More information

This article discusses a tank

This article discusses a tank CASE HISTORY Hot Oil Aboveground Storage Tank Bottom Corrosion Failure and Cathodic Protection Upgrade Part 2 KEVIN C. GARRITY AND PHILIP D. SIMON, CC Technologies, Inc. Several types of anode installations

More information

Monthly Checklist For Depot

Monthly Checklist For Depot Monthly Checklist For Depot ANNEXURE 1.L(iv) TANK FARM Notes : i. The scope covers piping, valve & fittings, general housekeeping, pumps & motors, effluent management, fire protection and security within

More information

Monitoring Cathodic Protection of Natural Gas Pipelines

Monitoring Cathodic Protection of Natural Gas Pipelines Monitoring Cathodic Protection of Natural Gas Pipelines Period #8 Basic Corrosion Course 2017 February 21-23, 2017 Steve Glover - Vectren 0 Chapter Objective: Introduction Reasons to monitor What to monitor

More information

FINAL REPORT CATHODIC PROTECTION EVALUATION. 42-Inch Water Transmission Pipeline Contract 1 Station 0+00 to South Texas Water Authority

FINAL REPORT CATHODIC PROTECTION EVALUATION. 42-Inch Water Transmission Pipeline Contract 1 Station 0+00 to South Texas Water Authority FINAL REPORT CATHODIC PROTECTION EVALUATION 42-Inch Water Transmission Pipeline Contract 1 Station 0+00 to 50+00 South Texas Water Authority Prepared for: South Texas Water Authority P.O. Box 1701 Kingsville,

More information

HDPE FUSIBLE VALVES EXPECT INNOVATION

HDPE FUSIBLE VALVES EXPECT INNOVATION AVK HDPE FUSIBLE VALVES HDPE FUSIBLE VALVES EXPECT INNOVATION AVK HDPE VALVES SERIES 89 FUSIBLE BUTTERFLY VALVE Series 89 fusible butterfly valves are designed for quick, direct heat butt-fusion or electrofusion

More information

No Infrared Refrigerant Leak Detector

No Infrared Refrigerant Leak Detector No. 22791 Infrared Refrigerant Leak Detector Operator s Manual Product Description The Robinair No. 22791 uses infrared optics to create a refrigerant leak detector that combines sensitivity, speed, battery

More information

Broetje-Automation Company Standard Structural component specification for welded parts

Broetje-Automation Company Standard Structural component specification for welded parts Broetje-Automation Company Standard Table of Contents Application Area and Purpose 3 1 Structural components pursuant to DIN 1090 4 1.1 Structural component classification 4 1.1.1 Steel components < Strength

More information

The Gradient Control Mat (GCM)

The Gradient Control Mat (GCM) The (GCM) Installation Instructions INTRODUCTION Most gradient control mats are designed and installed around above ground pipeline appurtenances to limit power frequency voltages. The Dairyland gradient

More information

GUIDELINE FOR GLOVEBOXES THIRD EDITION AGS-G001 February 2007

GUIDELINE FOR GLOVEBOXES THIRD EDITION AGS-G001 February 2007 GUIDELINE FOR GLOVEBOXES THIRD EDITION AGS-G001 February 2007 AMERICAN GLOVEBOX SOCIETY STANDARDS DEVELOPMENT COMMITTEE All Rights Reserved Copyright 2007 No portion may be duplicated without written consent

More information

Methodologies and practices for non-piggable lines Andreas Landsteiner Integrity Department - Transalpine Pipeline (TAL)

Methodologies and practices for non-piggable lines Andreas Landsteiner Integrity Department - Transalpine Pipeline (TAL) Methodologies and practices for non-piggable lines Andreas Landsteiner Integrity Department - Transalpine Pipeline (TAL) COPEX 2010 Brussels 1 Presentation overview (1) What are non-piggable lines? (2)

More information

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER SAMPLE / INJECTION PUMP

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER SAMPLE / INJECTION PUMP INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER SAMPLE / INJECTION PUMP MODEL SSO-9MED DRAWING NUMBERS AD243DI AD243DK AD243DK.K1 MANUAL NUMBER IOM-175 REVISION Rev. B, 3/21/2017 TABLE OF CONTENTS

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS R913 FRP COMPOSITE STEEL UNDERGROUND STORAGE TANKS INSTALLATION INSTRUCTIONS February 2017 1.0 EXCAVATION AND BEDDING 1.1 The bottom of the excavation shall be covered with a minimum of 12 inches (305

More information

An Introduction to Constructing and Maintaining Cathodic Protection Systems

An Introduction to Constructing and Maintaining Cathodic Protection Systems An Introduction to Constructing and Maintaining Cathodic Protection Systems Course No: T02-009 Credit: 2 PDH J. Paul Guyer, P.E., R.A., Fellow ASCE, Fellow AEI Continuing Education and Development, Inc.

More information

Rolls -Royce M250--C47M OPERATION AND MAINTENANCE

Rolls -Royce M250--C47M OPERATION AND MAINTENANCE TABLE 603 Inspection Checksheet Owner Date A/C Make/Model S/N Reg No. TSN Engine S/N TSN TSO This inspection checksheet is to be used when performing scheduled inspections. This form may be locally reproduced

More information

SPCC Regulation Integrity and Leak Testing Methods

SPCC Regulation Integrity and Leak Testing Methods SPCC Regulation Integrity and Leak Testing Methods NISTM New England December 3 rd, 2015 Founded in 1988, Tanknology has grown to become one of the largest testing and inspection service companies in the

More information

PIPELINE INSPECTION SURVEY QUESTIONNAIRE

PIPELINE INSPECTION SURVEY QUESTIONNAIRE ARKA PETROGAS PIPELINE PIPELINE INSPECTION SURVEY QUESTIONNAIRE Project: PipeLine Name: ARKALINE Proj. No.:.. Please complete questionnaire as accurate as possible. Phone: +98 21-65611626 Fax: +98 21-65611627

More information

Official Journal of the European Union L 298/39

Official Journal of the European Union L 298/39 16.11.2011 Official Journal of the European Union L 298/39 B3 6.8 Bearings 1 2 2 1 Purpose of bearings, loads, material, construction; Types of bearings and their application. 6.9 Transmissions 1 2 2 1

More information

Processing Plant Enters. the Pipeline World. A Case Study of a Chemically Welded Anomaly Repair. By Randy Vaughn. R&F Pipecon Resources

Processing Plant Enters. the Pipeline World. A Case Study of a Chemically Welded Anomaly Repair. By Randy Vaughn. R&F Pipecon Resources Processing Plant Enters the Pipeline World A Case Study of a Chemically Welded Anomaly Repair By Randy Vaughn R&F Pipecon Resources Introduction A processing plant entered into the pipeline industry in

More information

INSTALLATION, OPERATION, & MAINTENANCE MANUAL Models # MM-30, MM-30HT, MM-50, MM-50HT, & MM-50 EXL with Special HP Tool and Special HP EXL Tool

INSTALLATION, OPERATION, & MAINTENANCE MANUAL Models # MM-30, MM-30HT, MM-50, MM-50HT, & MM-50 EXL with Special HP Tool and Special HP EXL Tool INSTALLATION, OPERATION, & MAINTENANCE MANUAL Models # MM-30, MM-30HT, MM-50, MM-50HT, & MM-50 EXL with Special HP Tool and Special HP EXL Tool INSTALLATION INSTRUCTIONS FOR THE MODEL MM-30 & MODEL MM-50

More information

CONTENTS. Foreword...iii. 1. Introduction...1

CONTENTS. Foreword...iii. 1. Introduction...1 Installation of Aboveground Storage Systems for Motor-Vehicle Fueling CONTENTS Foreword...iii SECTIONS 1. Introduction...1 1.1 Background...1 1.2 Purpose...1 1.3 Scope...1 1.4 Source...1 1.5 Use of PEI/RP100...1

More information

RELIABLE AND EFFICIENT SYSTEMS

RELIABLE AND EFFICIENT SYSTEMS RELIABLE AND EFFICIENT SYSTEMS Systems must be leak-free as possible All systems leak Piping materials are slightly porous Very small leaks are not detectable and do not affect system efficiency Some systems

More information

Highway Crossings - Cased or Uncased

Highway Crossings - Cased or Uncased Highway Crossings - Cased or Uncased Maryland Quality Initiative Annual Conference Baltimore Convention Center Baltimore, Maryland Steve Nanney PHMSA Office of Pipeline Safety January 31, 2013-1 - PHMSA

More information

CASE STUDY ON PIPELINE UNDER-PROTECTION ALONG WITH MITIGATION METHODS. Vipul Vilas Sawant. Mahanagar Gas Ltd, Mumbai, India

CASE STUDY ON PIPELINE UNDER-PROTECTION ALONG WITH MITIGATION METHODS. Vipul Vilas Sawant. Mahanagar Gas Ltd, Mumbai, India Paper No. CAP34 CASE STUDY ON PIPELINE UNDER-PROTECTION ALONG WITH MITIGATION METHODS Vipul Vilas Sawant Mahanagar Gas Ltd, Mumbai, India vsawant@mahanagargas. com ABSTRACT Mahanagar Gas Ltd is a City

More information

Client Success Story Sheri Baucom Senior Advisor II

Client Success Story Sheri Baucom Senior Advisor II Client Success Story - 2017 Sheri Baucom Senior Advisor II Overview The following is a description of an actual project completed in 2016 where RCP was deployed onsite to validate a pressure test using

More information

This publication is copyrighted and intended for the sole use of General Industries - 07/07/2016

This publication is copyrighted and intended for the sole use of General Industries - 07/07/2016 AQUASWEEP JUNE 2009 INSTALLATION INSTRUCTIONS FOR AQUASWEEP UNDERGROUND OIL WATER SEPARATORS PREFACE i. Install the AquaSweep Oil Water Separator using personnel who have knowledge and experience in procedures

More information

THE APPLICATION OF LONG RANGE GUIDED ULTRASONICS FOR THE INSPECTION OF RISER PIPES

THE APPLICATION OF LONG RANGE GUIDED ULTRASONICS FOR THE INSPECTION OF RISER PIPES THE APPLICATION OF LONG RANGE GUIDED ULTRASONICS FOR THE INSPECTION OF RISER PIPES J. McGregor, B. Nooteboom, N. Ivory PTAS-ITS Lot 1 and 2 Tapak Perindustrian Pekan Belait, Jalan Setia Di-Raja, Kuala

More information

ANNUAL UST SYSTEM INSPECTION CHECKLIST

ANNUAL UST SYSTEM INSPECTION CHECKLIST APPENDIX A-3: SAMPLE FORM FOR ANNUAL UNDERGROUND STORAGE SYSTEM INSPECTION CHECKLIST Page 1 ANNUAL UST SYSTEM INSPECTION CHECKLIST Facility ID# Facility Name/Address Qualified Technician Signature Date

More information

Application for Permit to Install Underground Storage Tanks (Petroleum or Hazardous Substances) 1. Owner Information 2. Installation Site Information

Application for Permit to Install Underground Storage Tanks (Petroleum or Hazardous Substances) 1. Owner Information 2. Installation Site Information Papillion/La Vista Fire Marshal s Office Fuels Division FLST Section 146 rth Adams Street Papillion, NE 68046 (402) 829-1398 Application for Permit to Install Underground Storage Tanks (Petroleum or Hazardous

More information

Annex to the Accreditation Certificate D-PL according to DIN EN ISO/IEC 17025:2005

Annex to the Accreditation Certificate D-PL according to DIN EN ISO/IEC 17025:2005 Deutsche Akkreditierungsstelle GmbH Annex to the Accreditation Certificate D-PL-11065-01-00 according to DIN EN ISO/IEC 17025:2005 Period of validity: 08.02.2016 to 07.02.2021 Holder of certificate: Actemium

More information

Mitigation of External Corrosion on Buried Carbon Steel Pipeline Systems July/2018

Mitigation of External Corrosion on Buried Carbon Steel Pipeline Systems July/2018 Best Management Practice Mitigation of External Corrosion on Buried Carbon Steel Pipeline Systems July/2018 2018-0028 The Canadian Association of Petroleum Producers (CAPP) represents companies, large

More information

Val-Matic Extended Bonnet Assembly Instructions

Val-Matic Extended Bonnet Assembly Instructions Manual No. EBAI-OM-2 Val-Matic Extended Bonnet Assembly Instructions Operation, Maintenance and Installation Manual DESCRIPTION OF ASSEMBLY... 1 INSTALLATION INSTRUCTIONS... 1 TROUBLESHOOTING... 1 PARTS

More information

September 2012 / M&H C502 / Model 129

September 2012 / M&H C502 / Model 129 GENERAL FEATURES / GENERAL SPEC M&H AWWA C502 FIRE HYDRANTS Model 129 Traffic Model 250 PSI Working Pressure 500 PSI Hydrostatic Test AWWA UL / FM Approved Type: Compression type, opening against line

More information

GF Piping Systems. SurTap System Operation with VersaTap Fittings Manual

GF Piping Systems. SurTap System Operation with VersaTap Fittings Manual GF Piping Systems SurTap System Operation with VersaTap Fittings Manual Thank you for selecting Georg Fischer Central Plastics products. GFCP strives to deliver the best technology and materials combined

More information

FISC Puget Sound Manchester Fuel Department. Maintenance, Leak Detection in Large Underground Storage Tanks. Glenn E. Schmitt, P.E.

FISC Puget Sound Manchester Fuel Department. Maintenance, Leak Detection in Large Underground Storage Tanks. Glenn E. Schmitt, P.E. FISC Puget Sound Manchester Fuel Department Glenn E. Schmitt, P.E. Environmental Director Fleet and Industrial Supply Center Puget Sound Maintenance, Leak Detection in Large Underground Storage Tanks Ready.

More information

Cathodic Protection for AST s. Why is Cathodic Protection Important?

Cathodic Protection for AST s. Why is Cathodic Protection Important? Cathodic Protection for AST s Presented by: James T. Lary Corrpro Companies, inc. 1055 West Smith Road Medina, Ohio 44256 jlary@corrpro.com 330-241-6615 Why is Cathodic Protection Important? Preserve Assets

More information

Asset Protection Cathodic Protection Testing of Insulating Joints. Work Instruction No.:

Asset Protection Cathodic Protection Testing of Insulating Joints. Work Instruction No.: Asset Protection Cathodic Protection Testing of Insulating Joints Approved by: Manager Pipeline Standards 1 PURPOSE This work instruction describes the requirements and process for testing the integrity

More information

HOT TAPPING & PLUGGING SOLUTIONS

HOT TAPPING & PLUGGING SOLUTIONS HOT TAPPING & PLUGGING SOLUTIONS STOPPLE Plus System Combined with a LOCK-O-RING Plus completion plug, the STOPPLE Plus fitting reduces installation time, simplifies the setting process, and eliminates

More information

Report of Inspection

Report of Inspection P. O. Box 8238 Searcy, AR 72145 866.811.5237 / 501.279.1166 Fax: 501.279.1225 As required by NFPA 1911 19.3: CFS Inspections is accredited to the requirements of ISO/IEC 17020. Report of Inspection SAFET

More information

PIPELINE. catalogue. Pipeline construc on and maintenance Products & Solu ons

PIPELINE. catalogue. Pipeline construc on and maintenance Products & Solu ons PIPELINE catalogue Pipeline construc on and maintenance Products & Solu ons About us... Founded in 1993, as agent and distributor of world leader brands, in pipeline an -corrosion coa ng; such as Raychem.

More information

LAR Training. Series 8000 Pneumatic Safety Shut Off Valves Mark Lampe May,

LAR Training. Series 8000 Pneumatic Safety Shut Off Valves Mark Lampe May, LAR Training Series 8000 Pneumatic Safety Shut Off Valves Mark Lampe May, 18 2015 Series 8000 Pneumatic Valve Unique vertical space saving design Maintenance free gas and fluid seal that eliminates packing

More information

Baumann Sanitary Diaphragm Angle and Inline Control Valve

Baumann Sanitary Diaphragm Angle and Inline Control Valve Instruction Manual 84000 Valve Baumann 84000 Sanitary Diaphragm Angle and Inline Control Valve Contents Introduction... 1 Scope of Manual... 1 Safety Precautions... 2 Maintenance... 2 Flow Direction...

More information

Algeria, November 2016

Algeria, November 2016 Advanced Non-Destructive Testing for Tanks and Pipelines Algeria, November 2016 Params. K Details of Selected Advanced NDT Techniques On-Line Inspection What is On-Line Inspection? Check the Mechanical

More information

Mass Tank Inspection Services, LLC 29 Abbey Lane Middleboro, MA masstankinspection.com

Mass Tank Inspection Services, LLC 29 Abbey Lane Middleboro, MA masstankinspection.com June 18, 2018 Mrs. Nancy Cole Administrator Village of Eidelweiss 1680 Conway RD Madison, NH 03849 Mass Tank Inspection Services, LLC 29 Abbey Lane Middleboro, MA 02346 508-947-8826 masstankinspection.com

More information

Report No.: Name of Ship: Plans referred during Initial Survey:

Report No.: Name of Ship: Plans referred during Initial Survey: Report on the Surveys Concerning International Oil Pollution Prevention Certificate Part 7 Survey of installation for discharges from cargo spaces Initial/ Annual/ Intermediate/ Renewal/ Change of Flag

More information

DONKIN ASSET PROTECTION SYSTEM WARRANTY UP TO 20 YEARS* DONKIN ASSET PROTECTION SYSTEM

DONKIN ASSET PROTECTION SYSTEM WARRANTY UP TO 20 YEARS* DONKIN ASSET PROTECTION SYSTEM DONKIN ASSET PROTECTION SYSTEM WARRANTY UP TO 20 YEARS* DONKIN ASSET PROTECTION SYSTEM THE DONKIN ASSET PROTECTION SYSTEM FOR VALVES As part of AVK s commitment to provide our customers with solutions,

More information

Annex to the Accreditation Certificate D-PL according to DIN EN ISO/IEC 17025:2005

Annex to the Accreditation Certificate D-PL according to DIN EN ISO/IEC 17025:2005 Deutsche Akkreditierungsstelle GmbH Annex to the Accreditation Certificate D-PL-17579-01-00 according to DIN EN ISO/IEC 17025:2005 Period of validity: 07.07.2017 to 06.07.2022 Holder of certificate: gammatest

More information

Report of the Pipeline Safety Department. Home Explosion January 2, Whispering Hollow Drive Oklahoma City, Oklahoma

Report of the Pipeline Safety Department. Home Explosion January 2, Whispering Hollow Drive Oklahoma City, Oklahoma BOB ANTHONY TODD HIETT DANA MURPHY Commissioner Commissioner Commissioner OKLAHOMA CORPORATION COMMISSION P.O. BOX 52000 OKLAHOMA CITY, OKLAHOMA 73152-2000 Transportation Division Pipeline Safety Department

More information

7. UST Piping Corrosion Protection. NCDENR Division of Waste Management Underground Storage Tank Section

7. UST Piping Corrosion Protection. NCDENR Division of Waste Management Underground Storage Tank Section 7. UST Piping Corrosion Protection NCDENR Division of Waste Management Underground Storage Tank Section 1 Where piping connects to tank Piping Corrosion Protection 2 Main run of piping 3 Where piping connects

More information

LINE STOPPING. Extending and modifying your existing pressurized system while it s under full operating conditions.

LINE STOPPING. Extending and modifying your existing pressurized system while it s under full operating conditions. Extending and modifying your existing pressurized system while it s under full operating conditions. Line Stops are used to temporarily shut down a pipeline system to complete modifications or repairs.

More information

First Quality Solutions

First Quality Solutions First Quality Solutions Turbine Inspection Reports www.firstqualitysolutions.org VISUAL EXAMINATION REPORT Customer: Sample Turbine Outage PO: 104568912 Report No: S1 Component: Turbine Components WO:

More information

EXPECT RELIABILITY AVK RESILIENT SEATED GATE VALVES

EXPECT RELIABILITY AVK RESILIENT SEATED GATE VALVES EXPECT RELIABILITY AVK RESILIENT SEATED GATE VALVES AVK VALVES STANDARD FEATURES AVK STANDARD FEATURES AVK Gate Valves are made of ductile iron and meet or exceed AWWA C509 or C515 ASTM A582 stainless

More information

PIPELINE REPAIR OF CORROSION AND DENTS: A COMPARISON OF COMPOSITE REPAIRS AND STEEL SLEEVES

PIPELINE REPAIR OF CORROSION AND DENTS: A COMPARISON OF COMPOSITE REPAIRS AND STEEL SLEEVES Proceedings of the 2014 10th International Pipeline Conference IPC2014 September 29 - October 3, 2014, Calgary, Alberta, Canada IPC2014-33410 PIPELINE REPAIR OF CORROSION AND DENTS: A COMPARISON OF COMPOSITE

More information

Atmos Energy DOT Report-Distribution Leaks Cause of Leak WTX LA MS CO KS KY M-TX TN VA Total

Atmos Energy DOT Report-Distribution Leaks Cause of Leak WTX LA MS CO KS KY M-TX TN VA Total Atmos Energy 2017 2017 DOT Report-Distribution Leaks Cause of Leak WTX LA MS CO KS KY M-TX TN VA Total CORROSION Hazardous Main 61 10 24 13 15 5 148 2 1 279 Non-Hazardous Main 160 156 93 46 155 64 728

More information

PIPELINE INTEGRITY CONFERENCE BHR GROUP 5th-7th NOVEMBER 2008 SCHIPOL, THE NETHERLANDS PIPPELINE IN INDIA

PIPELINE INTEGRITY CONFERENCE BHR GROUP 5th-7th NOVEMBER 2008 SCHIPOL, THE NETHERLANDS PIPPELINE IN INDIA PIPELINE INTEGRITY CONFERENCE BHR GROUP 5th-7th NOVEMBER 2008 SCHIPOL, THE NETHERLANDS REHABILITATING A MAJOR OIL PIPPELINE IN INDIA K.G. GUPTA, INDIAN OIL CORPORATION LTD, INDIA R. JOHN, BERRY PLASTICS

More information

Daikin Steam Coils. Installation and Maintenance Manual IM 901. Types HI-F5, HI-F8, & E-F5. Group: Applied Air. Part Number: IM 901

Daikin Steam Coils. Installation and Maintenance Manual IM 901. Types HI-F5, HI-F8, & E-F5. Group: Applied Air. Part Number: IM 901 Installation and Maintenance Manual IM 901 Daikin Steam Coils Group: Applied Air Part Number: IM 901 Date: February 2008 Types HI-F5, HI-F8, & E-F5 2008 Daikin Applied Contents Introduction... 3 General

More information

TRADE EXPERIENCE LOG BOOK CANADIAN PETROLEUM CONTRACTORS ASSOCIATION. Petroleum Mechanic Training & Certification

TRADE EXPERIENCE LOG BOOK CANADIAN PETROLEUM CONTRACTORS ASSOCIATION. Petroleum Mechanic Training & Certification CANADIAN PETROLEUM CONTRACTORS ASSOCIATION Petroleum Mechanic Training & Certification TRADE EXPERIENCE LOG BOOK PM1 - Service & Maintenance PM2 - Underground Installation PM3 - Aboveground Installation

More information

KENNEDY VALVE Plant and Industrial Group 1021 East Water Street Elmira, New York Telephone (607) Fax (607)

KENNEDY VALVE Plant and Industrial Group 1021 East Water Street Elmira, New York Telephone (607) Fax (607) KENNEDY VALVE Plant and Industrial Group 1021 East Water Street Elmira, New York 14901 Telephone (607) 734-2211 Fax (607) 734-3288 INSTALLATION, OPERATION, AND MAINTENANCE MANUAL General ECCENTRIC PLUG

More information

3-20 2FII & Groundhog Bonded Seat Butterfly Valve. Operation and Maintenance Manual. Job Name: Contractor: Date:

3-20 2FII & Groundhog Bonded Seat Butterfly Valve. Operation and Maintenance Manual. Job Name: Contractor: Date: 3-20 2FII & Groundhog Bonded Seat Butterfly Valve Operation and Maintenance Manual Job Name: Contractor: Date: Document #:3202FIIGD Revision Date: 1/10/11 SAFETY MESSAGES All safety messages in the instructions

More information

7. Protection System Testing

7. Protection System Testing MANUAL FOR INSTALLATION AND MONITORING OF UNDERGROUND STORAGE TANKS WITH FACTORY INSTALLED ANODES 1. SCOPE Manufactured by: Granby Industries 1020 André-Liné Granby, Québec, Canada, J2J 1J9. Telephone:

More information

SECTION FACILITY FUEL - NATURAL GAS PIPING AND SYSTEMS

SECTION FACILITY FUEL - NATURAL GAS PIPING AND SYSTEMS SECTION 23 11 23 PART 1 - GENERAL 1.1 SUMMARY A. Work Included: 1. Fuel Pipe and Pipe Fittings - General 2. Steel Pipe and Fittings, Above Grade 3. Steel Pipe and Fittings, Below Grade 4. Polyethylene

More information

VRX Plunger. Advanced Control Valve

VRX Plunger. Advanced Control Valve VRX Plunger Advanced Control Valve Av-Tek is leading the way in the development, manufacturing, and implementation of high-quality valves for use municipal, industrial, and sea water industries. Our premium

More information

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA The following standard specification is intended to be edited according to the specifics of the project. Brackets [ ] and areas shaded in gray [e.g. format] indicate requirements that are optional depending

More information

AUTOMOTIVE TECHNOLOGY 41 COURSE SYLLABUS

AUTOMOTIVE TECHNOLOGY 41 COURSE SYLLABUS AUTOMOTIVE TECHNOLOGY 41 COURSE SYLLABUS Course Description: Recommended: AT1 or pass the Auto Tech 1 Placement Test. Principles of engine rebuilding, includes diagnosis, removing, disassembly, cleaning,

More information

Inline Ultrasonic Flowmeter

Inline Ultrasonic Flowmeter M-1500 Series Installation and Operating Manual The M-1500 series is an inline primary flow sensor and externally mounted controller unit. The flow sensor is a straight through flow tube that uses Transit

More information

SECTION PIPING SPECIALTIES PART 1 GENERAL 1.1 SUMMARY

SECTION PIPING SPECIALTIES PART 1 GENERAL 1.1 SUMMARY SECTION 230533 - PIPING SPECIALTIES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Pressure gages. 2. Pressure gage taps. 3. Thermometers. 4. Thermometer supports. 5. Test plugs. 6. Static pressure

More information

Cable-Tight Wire Management System

Cable-Tight Wire Management System Cable-Tight Wire Management System Installation Guide Franklin Fueling Systems 3760 Marsh Rd. Madison, WI 53718 USA Tel: +1 608 838 8786 800 225 9787 Fax: +1 608 838 6433 www.franklinfueling.com Safety

More information

Prevention vs. Reaction The Importance of Asset Integrity

Prevention vs. Reaction The Importance of Asset Integrity Prevention vs. Reaction The Importance of Asset Integrity How Your Assets Typically Age Inspections Potential Failure Condition Functional Failure Time P-F Interval Why is Asset Integrity so Important?

More information

GAS DISTRIBUTION PRODUCTS METER RISERS

GAS DISTRIBUTION PRODUCTS METER RISERS GAS DISTRIBUTION PRODUCTS METER RISERS INDUSTRIES ABOUT US THE ULTIMATE CONNECTION Our Company Continental Industries, headquartered in Tulsa, Oklahoma, was formed in 1958 and is today a leading manufacturer

More information

CHAPTER 115 LEAK DETECTION AND REPAIR (LDAR) PROGRAM CHANGES

CHAPTER 115 LEAK DETECTION AND REPAIR (LDAR) PROGRAM CHANGES CHAPTER 115 LEAK DETECTION AND REPAIR (LDAR) PROGRAM CHANGES FOR ALL FOUR OZONE NONATTAINMENT AREAS:! Delay of repair beyond the next process unit shutdown is allowed if the component is isolated from

More information