1 001 Provide Security for Pipeline Facilities Oral 003 Test Breakout Tank Overfill Protective Devices Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective Devices Oral 005 Repair Breakout Tank Overfill Protective Devices Inspection of Breakout Tanks Oral and Certificate 007 Operate Valves 008 Measurement of Wall Thickness with Ultrasonic Device 103 Non-destructive Testing (Other than testing of welds) -- Mag Particle 201 Abnormal Operating Conditions Related to Welding on Pipelines (h) Monitoring of Welding Process (a) (c) Visual Inspection of Welds not Non-Destructively Tested (b) (c) 204 Non-Destructive Testing (Dye Penetrant) Non-Destructive Testing (Mag Particle) Non-Destructive Testing (Ultrasonic) Non-Destructive Testing (X-Ray) Plastic Pipe Joining: Butt Fusion Plastic Pipe Joining: Mechanical Joining Oral Oral Oral No 1:0 1 No 1:0 1 Page 1 Copyright Veriforce, LLC. All rights reserved. Rev. 19

2 210 Plastic Pipe Joining: Electrofusion Joining No 1: Perform Plastic Fusion Inspection Oral 213 Joining of Metal Pipe and Components by means other than Welding - Threaded and Flanged Connections 214 Joining of Metal Pipe and Components by means other than Welding - Threaded Connections 215 Joining of Metal Pipe and Components by means other than Welding- Flanged Connections Joining of Metal Pipe - Compression Couplings Small Diameter Metal Tubing and Fitting Installation of Buried Pipelines When Exposed Protection of Coating When Backfilling and From Below Ground Supports (d) (c)(6) ( c ) (b) Oral Protection of Coatings From Above Ground Structures (d) 406 Conduct Test to Determine Cathodic Protection Current Requirements (a) 407 Perform Cathodic Protection Survey (a) (e) (e) Oral (a) 408 Inspect Cathodic Protection Rectifier (b) ( c ) 409 Inspect Interference Bonds (c) ( c ) 410 Clear Shorted Casing (c) (b)(1) (a) 411 Inspect/Test to Assure Electrical Isolation is Adequate (d) Install CP Leads on Pipeline Using Exothermic Weld Anode Installation on Submerged Pipeline or Facilities Inspect for Internal Corrosion Whenever Pipe is Removed (b)(1) (c) Page 2 Copyright Veriforce, LLC. All rights reserved. Rev. 19

3 415 Monitoring for Internal Corrosion with Probes and Coupons (d)(5) 416 Monitoring for Internal Corrosion with Gas Samples (b) 417 Atmospheric Corrosion Monitoring General and Localized Corrosion Measurement (Remedial Measures) (a)(b) 419 Cathodic Protection Potential Measurement (a) (d)(8) (b) (a) 420 Soil Resistivity 421 Measurement of Depth of Pitting with Pit Gage Perform Direct Current Voltage Gradient (DCVG) Survey (d)(7) 424 Perform AC Current Attenuation (ACCA) Survey (e) (d)(7) 425 Perform Alternating Current Voltage Gradient (ACVG) Survey (h)(3) (d)(7) 426 Inspect Pipe Coating with Holiday Detector (a) (a) Inspection of Above or Below Ground Coatings Oral 428 Pin Brazing to Install CP Leads on Pipeline Monitoring for corrosion - bacteria testing - serial dilution method (MIC) 430 Installation and Testing of Mechanical Electrical Connections 434 Visual Inspection of Installed Pipe and Components for Mechanical Damage 435 Measure and Identify Mechanical Damage on Installed Pipe and Components (a) Perform Close Survey (e) (e) & (7) (a) 437 Perform Hot Spot Survey (e) (a) Page 3 Copyright Veriforce, LLC. All rights reserved. Rev. 19

4 480 Apply Approved Coating by Hand Application (a) Apply Approved Coatings by Mechanical Spray and Hand Application Methods (a) Apply Approved Coatings by Wrap Application (a) Conduct a Pressure Test (d) 502 Conduct Pressure Test on Pipe that is to be Operated at a Pressure <100 psig 601 Start-up/Shut-down of Pipeline to Assure Operation Within MAOP / MOP (b) (b)(5) 602 Monitoring Pipeline Pressure (b)(5) Compressor Units: Startup, Operation, Shutdown and Purging Before Returning to Service 604 Locate, Mark, and Remediate Exposed Pipelines in the Gulf of Mexico (b)(7) (b)(6) ( c )(9) Oral (b) Locate Line/Install Temporary Marking of Buried Pipeline (c)(5) (c)(5) 606 Locate and Mark Submerged Pipelines (c)(5) 607 Damage Prevention: Observation of Excavating and Backfilling (c)(6) (b) (c)(6) 608 Damage Prevention for Blasting Near a Pipeline (c)(6) (c)(6) Oral 609 Inspect and Maintain Odorization Equipment (e) 610 Monitor Odorant Concentration (f) 611 Hot Tap (Steel Pipe) Hot Tap (Plastic Pipe) Purge Pipeline Facilities With Gas (a) 614 Purge Pipeline Facilities With Air or Inert Gas (b) (c)(10) Oral Page 4 Copyright Veriforce, LLC. All rights reserved. Rev. 19

5 616 Atmospheric Monitoring during Hot Work Operations ( c )(11) 619 Damage Prevention during Vacuum Excavation and Backfilling Activities 621 Provide or Assure Adequate Pipeline Support during Operator Initiated Excavation Activities 661 Launching and/or Receiving Internal Devices (Pigs) (c) (d)(5)(iv ) (d)(9) 701 Patrolling Pipeline and Leakage Survey without Instrument (d)(4) (c)(6) (c)(6) Oral Yes 1: (a) Oral 702 Leakage Survey with Leak Detection Device Placing/Maintaining Line Markers (a) (c) 704 Permanent Field Repair by Grinding Permanent Field Repair Using Composite Materials (Clockspring) 706 Permanent Field Repair Using Composite Materials (Armor Plate) 707 Permanent Field Repair Using Bolt-On Clamp/Sleeve (a) 708 Permanent Field Repair Using Full Encirclement Weld Sleeve 709 Inspection and Testing of Relief Devices (Compressor Stations, Meter Stations, Regulating Stations) 710 Inspect/Test Compressor Station Remote Shutdown Devices (ESD/EBD) (a) (a) (b) Oral (c) 711 Inspect, Test, and Maintain Systems (c) (b)(1) (b)(1) 712 Programmable Logic lers (c) (b)(1) (a) 713 Test/Maintain Gas Detection and Alarm Systems (c) 714 Inspect and Maintain Pressure ing and Regulating Devices (a) (b) Yes 1:3 1 Page 5 Copyright Veriforce, LLC. All rights reserved. Rev. 19

6 715 Test and Maintain Pressure Switches and Transmitters in Pressure ing and Regulating Service (a) (b) 716 Inspect, Maintain, and Operate Valves Maintaining Vaults With Pressure Regulating and Pressure ing Equipment 718 Monitoring for Internal Corrosion with Liquid Samples Permanent Field Repair Using Composite Materials (Wrapmaster) 721 Permanent Field Repair Using Composite Materials (Black Diamond) 722 Permanent Field Repair Using Composite Materials (Aqua Wrap) (a) (b) (a) Leakage Survey with Remote Laser Leak Detection Device (a) 724 Permanent Field Repair Using Composite Materials (PipeWrap A+ / Atlas CFP) ( a ) 725 Aerial Leakage Survey: Transmission Above Ground Supports and Anchors: Inspection, Preventive and Corrective Maintenance 762 Line Stopping Utilizing a Hot Tap Fitting 907 AC Mitigation (e) (a) 908 Installation of Cathodic Protection (c)(6) 910 Inspection of Construction Activities (c)(6) Yes 1:0 3 Yes 1:2 3 Yes 1:3 1 Yes 1:3 1 Oral Page 6 Copyright Veriforce, LLC. All rights reserved. Rev. 19

Columbia Pipeline Group Contractor Covered Task List Last updated 1/8/2018

Columbia Pipeline Group Contractor Covered Task List Last updated 1/8/2018 001 Provide Security for Pipeline Facilities 195.436 Oral 003 Test Breakout Tank Overfill Protective Devices 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective Devices 195.428 Oral

More information

Williams Contractor Covered Task List Last updated 11/7/2017

Williams Contractor Covered Task List Last updated 11/7/2017 003 Test Breakout Tank Overfill Protective Devices 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective Devices 195.428 Oral 005 Repair Breakout Tank Overfill Protective Devices 195.428

More information

Boardwalk Pipeline Partners, LP Contractor Covered Task List Last updated 9/17/2018

Boardwalk Pipeline Partners, LP Contractor Covered Task List Last updated 9/17/2018 003 Test Breakout Tank Overfill Protective Devices 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective Devices 195.428 Oral 005 Repair Breakout Tank Overfill Protective Devices 195.428

More information

Southern Star Central Gas Pipeline Contractor Covered Task List Last updated 8/15/2018

Southern Star Central Gas Pipeline Contractor Covered Task List Last updated 8/15/2018 007 Operate Valves 008 Measurement of Wall Thickness with Ultrasonic Device 018 Inspect Navigable Waterway Crossing 195.412(b) 201 Abnormal Operating Conditions Related to Welding on Pipelines 192.225

More information

TransCanada US Contractor Covered Task List Last updated 9/27/2018

TransCanada US Contractor Covered Task List Last updated 9/27/2018 003 Test Breakout Tank Overfill Protective Devices 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective Devices 195.428 Oral 005 Repair Breakout Tank Overfill Protective Devices 195.428

More information

Energy Transfer Partners LP Contractor Covered Task List Last updated 3/2/2018

Energy Transfer Partners LP Contractor Covered Task List Last updated 3/2/2018 001 Provide Security for Pipeline Facilities 195.436 Oral 003 Test Breakout Tank Overfill Protective Devices 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective Devices 195.428 Oral

More information

Dominion Energy Questar Pipeline LLC Contractor Covered Task List Last updated 10/3/2017

Dominion Energy Questar Pipeline LLC Contractor Covered Task List Last updated 10/3/2017 007 Operate Valves 008 Measurement of Wall Thickness with Ultrasonic Device 103 Non-destructive Testing (Other than testing of welds) -- Mag Particle 104 Non-destructive Testing (Other than testing of

More information

EnLink Midstream Contractor Covered Task List Last updated 11/8/2017

EnLink Midstream Contractor Covered Task List Last updated 11/8/2017 003 Test Breakout Tank Overfill Protective Devices 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective Devices 195.428 005 Repair Breakout Tank Overfill Protective Devices 195.428

More information

Energy Transfer Partners LP Contractor Covered Task List Last updated 12/10/2018

Energy Transfer Partners LP Contractor Covered Task List Last updated 12/10/2018 001 Provide Security for Pipeline Facilities 195.436 Oral 003 Test Breakout Tank Overfill Protective Devices 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective Devices 195.428 005

More information

DCP Midstream Contractor Covered Task List Last updated 7/11/2018

DCP Midstream Contractor Covered Task List Last updated 7/11/2018 001 Provide Security for Pipeline Facilities 195.436 Oral 007 Operate Valves 008 Measurement of Wall Thickness with Ultrasonic Device 009 Movement and/or Relocation of Liquid Pipelines 195.424 011 Inspect,

More information

Howard Midstream Energy Partners LLC Contractor Covered Task List Last updated 10/11/2013

Howard Midstream Energy Partners LLC Contractor Covered Task List Last updated 10/11/2013 001 Provide Security for Pipeline Facilities 195.436 Oral 003 Test Breakout Tank Overfill Protective Devices 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective Devices 195.428 005

More information

Enbridge Gas Transmission and Midstream and Enbridge Liquid Pipelines (Express-Platte) Contractor Covered Task List Last updated 8/30/2018

Enbridge Gas Transmission and Midstream and Enbridge Liquid Pipelines (Express-Platte) Contractor Covered Task List Last updated 8/30/2018 001 Provide Security for Pipeline Facilities 195.436 Oral 003 Test Breakout Tank Overfill Protective Devices 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective Devices 195.428 Oral

More information

Saddle Butte Rockies Midstream LLC Contractor Covered Task List Last updated 12/6/2017

Saddle Butte Rockies Midstream LLC Contractor Covered Task List Last updated 12/6/2017 003 Test Breakout Tank Overfill Protective N/A 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective N/A 195.428 Oral 005 Repair Breakout Tank Overfill Protective N/A 195.428 007 Operate

More information

Epic Consolidated Operations LLC Contractor Covered Task List Last updated 9/6/2018

Epic Consolidated Operations LLC Contractor Covered Task List Last updated 9/6/2018 003 Test Breakout Tank Overfill Protective 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective 195.428 Oral 005 Repair Breakout Tank Overfill Protective 195.428 006 Inspection of Breakout

More information

Noble Energy Contractor Covered Task List Last updated 2/20/2019

Noble Energy Contractor Covered Task List Last updated 2/20/2019 003 Test Breakout Tank Overfill Protective Devices 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective Devices 195.428 005 Repair Breakout Tank Overfill Protective Devices 195.428

More information

Black Hills Energy Contractor Covered Task List Last updated 10/10/2018

Black Hills Energy Contractor Covered Task List Last updated 10/10/2018 007 Operate Valves 103 Non-destructive Testing (Other than testing of welds) -- Mag Particle 201 Abnormal Operating Conditions Related to Welding on Pipelines 195.452(h) 192.225 192.227 192.715 192.717

More information

Appendix B Kinder Morgan Operator Qualification Program List of Covered Tasks Hazardous Liquid Pipelines Part 195 revised 8/24/2018

Appendix B Kinder Morgan Operator Qualification Program List of Covered Tasks Hazardous Liquid Pipelines Part 195 revised 8/24/2018 Abnormal Operating Conditions Outside of 101.01 Room Abnormal Operating Conditions Inside of 101.02 Room 102.01 Measure Structure-to-Soil Potentials 102.02 Advanced Cathodic Testing 102.03 Active Corrosion/MIC

More information

Appendix B Kinder Morgan Operator Qualification Program List of Covered Tasks Hazardous Liquid Pipelines Part 195 revised 12/12/2017

Appendix B Kinder Morgan Operator Qualification Program List of Covered Tasks Hazardous Liquid Pipelines Part 195 revised 12/12/2017 Abnormal Operating Conditions Outside of 101.01 Room Abnormal Operating Conditions Inside of 101.02 Room 102.01 Measure Structure-to-Soil Potentials 102.02 Advanced Cathodic Testing 102.03 Active Corrosion/MIC

More information

Appendix A Kinder Morgan Operator Qualification Program List of Covered Tasks - Natural Gas - Part 192 Revised 12/13/2017

Appendix A Kinder Morgan Operator Qualification Program List of Covered Tasks - Natural Gas - Part 192 Revised 12/13/2017 01.01.01 Abnormal Operating Conditions (AOC) - Outside of Room 01.01.02 Abnormal Operating Conditions (AOC) - Inside of Room (new task effective 1/1/2018) 02.01.01 Gas Detection & Alarm System Maintenance

More information

ASMECourseCatalog.

ASMECourseCatalog. ASMECourseCatalog www.energyu.org www.midwestenergy.org ASME Abnormal Operating Conditions... 6 ASME GAS01 Hazards of Natural Gas and Prevention of Accidental Ignition... 6 ASME 0001 Measure Structure-to-Electrolyte

More information

Florida City Gas Contractor Covered Task List

Florida City Gas Contractor Covered Task List 001A Abandonment and deactivation of facilities 192.727 001B 001C 001SUBA Abandonment and deactivation of facilities (service lines not in use) Abandonment and deactivation of facilities (service lines

More information

COVERED TASK Conduct Cathodic Protection Surveys 1 DESCRIPTION ELEMENTS OF TASK 4 PART QUESTION NOTES ABNORMAL OPERATING CONDITIONS

COVERED TASK Conduct Cathodic Protection Surveys 1 DESCRIPTION ELEMENTS OF TASK 4 PART QUESTION NOTES ABNORMAL OPERATING CONDITIONS COVERED Conduct Cathodic Protection Surveys 1 Annual surveys are conducted for each operator s pipeline system that is under cathodic protection to ensure that the protection is adequate. This task is

More information

Operator Qualification (OQ) Report

Operator Qualification (OQ) Report AOCF 66102/67107 Abnormal Operating Conditions Field for Natural Gas and Hazardous Liquids 5/15/2014 5/15/2017 AOCG 67107 Abnormal Operating Conditions for Natural Gas 5/16/2014 5/16/2017 TM001 66101 02

More information

PIPELINE CORROSION CONTROL

PIPELINE CORROSION CONTROL NCCER 13614 Progress Blvd, Alachua, Florida 32615 Phone: (888) 622-3720 E-mail: info@nccer.org PIPELINE CORROSION CONTROL Competencies / Objectives Level One MODULE 66101-02 INTRODUCTION TO THE PIPELINE

More information

PIGGING PRODUCTS. Capex supply. PIG LAUNCHER and RECEIVER

PIGGING PRODUCTS. Capex supply. PIG LAUNCHER and RECEIVER PIGGING PRODUCTS Capex supply PIG LAUNCHER and RECEIVER Before Cleaning After Cleaning TYPES OF PIGS DISPLACEMENT AND BATCHING PIGS AND PIG WITH BLADES (FOR CLEANING) 2 to 6 3 and 4 PIG with blades 5 to

More information

New UST Installation Inspection Checklist

New UST Installation Inspection Checklist Nebraska State Fire Marshal Fuels Division - FLST Section 246 South 14 TH Street - Lincoln, NE 68508-1804 (402) 471-9466 New UST Installation Inspection Checklist (Petroleum or Hazardous Substances) Inspection

More information

PHMSA Office of Pipeline Safety Dave Mulligan Western Region

PHMSA Office of Pipeline Safety Dave Mulligan Western Region PHMSA Office of Pipeline Safety Dave Mulligan Western Region Chevron Pipeline Releases Salt Lake City, Utah June 11, 2010 & December 1, 2011 Dave Mulligan U.S. Department of Transportation (US DOT) Pipeline

More information

CONTENTS. Foreword...iii. 1. Introduction...1

CONTENTS. Foreword...iii. 1. Introduction...1 Installation of Aboveground Storage Systems for Motor-Vehicle Fueling CONTENTS Foreword...iii SECTIONS 1. Introduction...1 1.1 Background...1 1.2 Purpose...1 1.3 Scope...1 1.4 Source...1 1.5 Use of PEI/RP100...1

More information

PROCEDURE EXTRUDED HOT TAP & LINE STOP TEES DESIGN & MANUFACTURING VALIDATION

PROCEDURE EXTRUDED HOT TAP & LINE STOP TEES DESIGN & MANUFACTURING VALIDATION 6534 Petropark Dr. Houston, TX 77041 USA Tel: +1 713-937-6193 Fax: +1 713-937-8695 www.uni-forge.com PROCEDURE EXTRUDED HOT TAP & LINE STOP TEES DESIGN & MANUFACTURING VALIDATION Prepared by: Approved

More information

HDPE FUSIBLE VALVES EXPECT INNOVATION

HDPE FUSIBLE VALVES EXPECT INNOVATION AVK HDPE FUSIBLE VALVES HDPE FUSIBLE VALVES EXPECT INNOVATION AVK HDPE VALVES SERIES 89 FUSIBLE BUTTERFLY VALVE Series 89 fusible butterfly valves are designed for quick, direct heat butt-fusion or electrofusion

More information

Pipe Support The Fast, Economical Solution for Low Pressure Pipeline Repair

Pipe Support The Fast, Economical Solution for Low Pressure Pipeline Repair CLOCK SPRING Pipe Support The Fast, Economical Solution for Low Pressure Pipeline Repair 3 x 18 repairs were made in support locations. The Pipe could not be raised so blocks were inserted and the supports

More information

Inspector's Initials: Tank Owner or Agent Signature: Title: Date:

Inspector's Initials: Tank Owner or Agent Signature: Title: Date: STATE OF TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF UNDERGROUND STORAGE TANKS 4 TH Floor, L & C Tower 401 Church Street Nashville, TN 37243-1541 UST OPERATIONS INSPECTION Mo /Day

More information

This article discusses a tank

This article discusses a tank CASE HISTORY Hot Oil Aboveground Storage Tank Bottom Corrosion Failure and Cathodic Protection Upgrade Part 2 KEVIN C. GARRITY AND PHILIP D. SIMON, CC Technologies, Inc. Several types of anode installations

More information

Monthly Checklist For Depot

Monthly Checklist For Depot Monthly Checklist For Depot ANNEXURE 1.L(iv) TANK FARM Notes : i. The scope covers piping, valve & fittings, general housekeeping, pumps & motors, effluent management, fire protection and security within

More information

Monitoring Cathodic Protection of Natural Gas Pipelines

Monitoring Cathodic Protection of Natural Gas Pipelines Monitoring Cathodic Protection of Natural Gas Pipelines Period #8 Basic Corrosion Course 2017 February 21-23, 2017 Steve Glover - Vectren 0 Chapter Objective: Introduction Reasons to monitor What to monitor

More information

GUIDELINE FOR GLOVEBOXES THIRD EDITION AGS-G001 February 2007

GUIDELINE FOR GLOVEBOXES THIRD EDITION AGS-G001 February 2007 GUIDELINE FOR GLOVEBOXES THIRD EDITION AGS-G001 February 2007 AMERICAN GLOVEBOX SOCIETY STANDARDS DEVELOPMENT COMMITTEE All Rights Reserved Copyright 2007 No portion may be duplicated without written consent

More information

No Infrared Refrigerant Leak Detector

No Infrared Refrigerant Leak Detector No. 22791 Infrared Refrigerant Leak Detector Operator s Manual Product Description The Robinair No. 22791 uses infrared optics to create a refrigerant leak detector that combines sensitivity, speed, battery

More information

PEI/RP Recommended Practices for Installation of Bulk Storage Plants

PEI/RP Recommended Practices for Installation of Bulk Storage Plants PEI/RP800-08 Recommended Practices for Installation of Bulk Storage Plants Recommended Practices for Installation of Bulk Storage Plants CONTENTS Foreword...iii. SECTIONS 1. Introduction Page 1.1 Background...1

More information

This publication is copyrighted and intended for the sole use of General Industries - 07/07/2016

This publication is copyrighted and intended for the sole use of General Industries - 07/07/2016 AQUASWEEP JUNE 2009 INSTALLATION INSTRUCTIONS FOR AQUASWEEP UNDERGROUND OIL WATER SEPARATORS PREFACE i. Install the AquaSweep Oil Water Separator using personnel who have knowledge and experience in procedures

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS R913 FRP COMPOSITE STEEL UNDERGROUND STORAGE TANKS INSTALLATION INSTRUCTIONS February 2017 1.0 EXCAVATION AND BEDDING 1.1 The bottom of the excavation shall be covered with a minimum of 12 inches (305

More information

Application for Permit to Install Underground Storage Tanks (Petroleum or Hazardous Substances) 1. Owner Information 2. Installation Site Information

Application for Permit to Install Underground Storage Tanks (Petroleum or Hazardous Substances) 1. Owner Information 2. Installation Site Information Papillion/La Vista Fire Marshal s Office Fuels Division FLST Section 146 rth Adams Street Papillion, NE 68046 (402) 829-1398 Application for Permit to Install Underground Storage Tanks (Petroleum or Hazardous

More information

CASE STUDY ON PIPELINE UNDER-PROTECTION ALONG WITH MITIGATION METHODS. Vipul Vilas Sawant. Mahanagar Gas Ltd, Mumbai, India

CASE STUDY ON PIPELINE UNDER-PROTECTION ALONG WITH MITIGATION METHODS. Vipul Vilas Sawant. Mahanagar Gas Ltd, Mumbai, India Paper No. CAP34 CASE STUDY ON PIPELINE UNDER-PROTECTION ALONG WITH MITIGATION METHODS Vipul Vilas Sawant Mahanagar Gas Ltd, Mumbai, India vsawant@mahanagargas. com ABSTRACT Mahanagar Gas Ltd is a City

More information

Report No.: Name of Ship: Plans referred during Initial Survey:

Report No.: Name of Ship: Plans referred during Initial Survey: Report on the Surveys Concerning International Oil Pollution Prevention Certificate Part 7 Survey of installation for discharges from cargo spaces Initial/ Annual/ Intermediate/ Renewal/ Change of Flag

More information

Cathodic Protection for AST s. Why is Cathodic Protection Important?

Cathodic Protection for AST s. Why is Cathodic Protection Important? Cathodic Protection for AST s Presented by: James T. Lary Corrpro Companies, inc. 1055 West Smith Road Medina, Ohio 44256 jlary@corrpro.com 330-241-6615 Why is Cathodic Protection Important? Preserve Assets

More information

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER SAMPLE / INJECTION PUMP

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER SAMPLE / INJECTION PUMP INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER SAMPLE / INJECTION PUMP MODEL SSO-9MED DRAWING NUMBERS AD243DI AD243DK AD243DK.K1 MANUAL NUMBER IOM-175 REVISION Rev. B, 3/21/2017 TABLE OF CONTENTS

More information

Asset Protection Cathodic Protection Testing of Insulating Joints. Work Instruction No.:

Asset Protection Cathodic Protection Testing of Insulating Joints. Work Instruction No.: Asset Protection Cathodic Protection Testing of Insulating Joints Approved by: Manager Pipeline Standards 1 PURPOSE This work instruction describes the requirements and process for testing the integrity

More information

An Introduction to Constructing and Maintaining Cathodic Protection Systems

An Introduction to Constructing and Maintaining Cathodic Protection Systems An Introduction to Constructing and Maintaining Cathodic Protection Systems Course No: T02-009 Credit: 2 PDH J. Paul Guyer, P.E., R.A., Fellow ASCE, Fellow AEI Continuing Education and Development, Inc.

More information

Rolls -Royce M250--C47M OPERATION AND MAINTENANCE

Rolls -Royce M250--C47M OPERATION AND MAINTENANCE TABLE 603 Inspection Checksheet Owner Date A/C Make/Model S/N Reg No. TSN Engine S/N TSN TSO This inspection checksheet is to be used when performing scheduled inspections. This form may be locally reproduced

More information

ANNUAL UST SYSTEM INSPECTION CHECKLIST

ANNUAL UST SYSTEM INSPECTION CHECKLIST APPENDIX A-3: SAMPLE FORM FOR ANNUAL UNDERGROUND STORAGE SYSTEM INSPECTION CHECKLIST Page 1 ANNUAL UST SYSTEM INSPECTION CHECKLIST Facility ID# Facility Name/Address Qualified Technician Signature Date

More information

PIPELINE INSPECTION SURVEY QUESTIONNAIRE

PIPELINE INSPECTION SURVEY QUESTIONNAIRE ARKA PETROGAS PIPELINE PIPELINE INSPECTION SURVEY QUESTIONNAIRE Project: PipeLine Name: ARKALINE Proj. No.:.. Please complete questionnaire as accurate as possible. Phone: +98 21-65611626 Fax: +98 21-65611627

More information

The Implementation of a Storage Facility Inspection Program. Presented By: John R. Rueckel PCA Engineering, Inc.

The Implementation of a Storage Facility Inspection Program. Presented By: John R. Rueckel PCA Engineering, Inc. The Implementation of a Storage Facility Inspection Program Presented By: John R. Rueckel PCA Engineering, Inc. Storage Facility Inspection Why implement an inspection program? Regulatory Requirements

More information

INSTALLATION, OPERATION, & MAINTENANCE MANUAL Models # MM-30, MM-30HT, MM-50, MM-50HT, & MM-50 EXL with Special HP Tool and Special HP EXL Tool

INSTALLATION, OPERATION, & MAINTENANCE MANUAL Models # MM-30, MM-30HT, MM-50, MM-50HT, & MM-50 EXL with Special HP Tool and Special HP EXL Tool INSTALLATION, OPERATION, & MAINTENANCE MANUAL Models # MM-30, MM-30HT, MM-50, MM-50HT, & MM-50 EXL with Special HP Tool and Special HP EXL Tool INSTALLATION INSTRUCTIONS FOR THE MODEL MM-30 & MODEL MM-50

More information

FINAL REPORT CATHODIC PROTECTION EVALUATION. 42-Inch Water Transmission Pipeline Contract 1 Station 0+00 to South Texas Water Authority

FINAL REPORT CATHODIC PROTECTION EVALUATION. 42-Inch Water Transmission Pipeline Contract 1 Station 0+00 to South Texas Water Authority FINAL REPORT CATHODIC PROTECTION EVALUATION 42-Inch Water Transmission Pipeline Contract 1 Station 0+00 to 50+00 South Texas Water Authority Prepared for: South Texas Water Authority P.O. Box 1701 Kingsville,

More information

Broetje-Automation Company Standard Structural component specification for welded parts

Broetje-Automation Company Standard Structural component specification for welded parts Broetje-Automation Company Standard Table of Contents Application Area and Purpose 3 1 Structural components pursuant to DIN 1090 4 1.1 Structural component classification 4 1.1.1 Steel components < Strength

More information

Highway Crossings - Cased or Uncased

Highway Crossings - Cased or Uncased Highway Crossings - Cased or Uncased Maryland Quality Initiative Annual Conference Baltimore Convention Center Baltimore, Maryland Steve Nanney PHMSA Office of Pipeline Safety January 31, 2013-1 - PHMSA

More information

The Gradient Control Mat (GCM)

The Gradient Control Mat (GCM) The (GCM) Installation Instructions INTRODUCTION Most gradient control mats are designed and installed around above ground pipeline appurtenances to limit power frequency voltages. The Dairyland gradient

More information

7. Protection System Testing

7. Protection System Testing MANUAL FOR INSTALLATION AND MONITORING OF UNDERGROUND STORAGE TANKS WITH FACTORY INSTALLED ANODES 1. SCOPE Manufactured by: Granby Industries 1020 André-Liné Granby, Québec, Canada, J2J 1J9. Telephone:

More information

SECTION FACILITY FUEL - NATURAL GAS PIPING AND SYSTEMS

SECTION FACILITY FUEL - NATURAL GAS PIPING AND SYSTEMS SECTION 23 11 23 PART 1 - GENERAL 1.1 SUMMARY A. Work Included: 1. Fuel Pipe and Pipe Fittings - General 2. Steel Pipe and Fittings, Above Grade 3. Steel Pipe and Fittings, Below Grade 4. Polyethylene

More information

Mitigation of External Corrosion on Buried Carbon Steel Pipeline Systems July/2018

Mitigation of External Corrosion on Buried Carbon Steel Pipeline Systems July/2018 Best Management Practice Mitigation of External Corrosion on Buried Carbon Steel Pipeline Systems July/2018 2018-0028 The Canadian Association of Petroleum Producers (CAPP) represents companies, large

More information

For Sales & Information, Call Toll Free: (888)

For Sales & Information, Call Toll Free: (888) Outline Dimensions Serial Number (2) 0.28" (7.1 mm) 0.56" (14 mm) 10.0" (254 mm) 2.87" (72.9 mm) (19 mm) 0.19"(4.8 mm) thick Enclosure 12.25" (311 mm) 13.75" (349 mm) 2.75" (69.9 mm) (19 mm) 6.50" (165

More information

7. UST Piping Corrosion Protection. NCDENR Division of Waste Management Underground Storage Tank Section

7. UST Piping Corrosion Protection. NCDENR Division of Waste Management Underground Storage Tank Section 7. UST Piping Corrosion Protection NCDENR Division of Waste Management Underground Storage Tank Section 1 Where piping connects to tank Piping Corrosion Protection 2 Main run of piping 3 Where piping connects

More information

Processing Plant Enters. the Pipeline World. A Case Study of a Chemically Welded Anomaly Repair. By Randy Vaughn. R&F Pipecon Resources

Processing Plant Enters. the Pipeline World. A Case Study of a Chemically Welded Anomaly Repair. By Randy Vaughn. R&F Pipecon Resources Processing Plant Enters the Pipeline World A Case Study of a Chemically Welded Anomaly Repair By Randy Vaughn R&F Pipecon Resources Introduction A processing plant entered into the pipeline industry in

More information

Official Journal of the European Union L 298/39

Official Journal of the European Union L 298/39 16.11.2011 Official Journal of the European Union L 298/39 B3 6.8 Bearings 1 2 2 1 Purpose of bearings, loads, material, construction; Types of bearings and their application. 6.9 Transmissions 1 2 2 1

More information

CHAPTER 115 LEAK DETECTION AND REPAIR (LDAR) PROGRAM CHANGES

CHAPTER 115 LEAK DETECTION AND REPAIR (LDAR) PROGRAM CHANGES CHAPTER 115 LEAK DETECTION AND REPAIR (LDAR) PROGRAM CHANGES FOR ALL FOUR OZONE NONATTAINMENT AREAS:! Delay of repair beyond the next process unit shutdown is allowed if the component is isolated from

More information

NYSDEC CBS Compliance Requirements

NYSDEC CBS Compliance Requirements NYSDEC CBS Compliance Requirements Peter J. Petriccione, P.E. H2M - Water September 24, 2015 Introduction Definition of a Hazardous Substance and a Chemical Bulk Storage Facility Design Requirements of

More information

THE KEY RELATIONSHIPS BETWEEN FIRE CODES, NEW YORK AST REGULATIONS AND SPCC PLANS

THE KEY RELATIONSHIPS BETWEEN FIRE CODES, NEW YORK AST REGULATIONS AND SPCC PLANS THE KEY RELATIONSHIPS BETWEEN FIRE CODES, NEW YORK AST REGULATIONS AND SPCC PLANS Presented by: Joyce A. Rizzo President JD2 Environmental, Inc. 800 East Washington Street West Chester, PA 19380 www.jd2env.com

More information

GF Piping Systems. SurTap System Operation with VersaTap Fittings Manual

GF Piping Systems. SurTap System Operation with VersaTap Fittings Manual GF Piping Systems SurTap System Operation with VersaTap Fittings Manual Thank you for selecting Georg Fischer Central Plastics products. GFCP strives to deliver the best technology and materials combined

More information

Oil & Gas Custody Transfer Data Sheet

Oil & Gas Custody Transfer Data Sheet Date Company Name Location / Lease Name Contact Name Contact Email General Information 1. Will the unit be delivering to a pipline? If what is the pipline pressure? Pressure 2. Will the unit be receiving

More information

PIPELINE. catalogue. Pipeline construc on and maintenance Products & Solu ons

PIPELINE. catalogue. Pipeline construc on and maintenance Products & Solu ons PIPELINE catalogue Pipeline construc on and maintenance Products & Solu ons About us... Founded in 1993, as agent and distributor of world leader brands, in pipeline an -corrosion coa ng; such as Raychem.

More information

Mass Tank Inspection Services, LLC 29 Abbey Lane Middleboro, MA masstankinspection.com

Mass Tank Inspection Services, LLC 29 Abbey Lane Middleboro, MA masstankinspection.com June 18, 2018 Mrs. Nancy Cole Administrator Village of Eidelweiss 1680 Conway RD Madison, NH 03849 Mass Tank Inspection Services, LLC 29 Abbey Lane Middleboro, MA 02346 508-947-8826 masstankinspection.com

More information

DONKIN ASSET PROTECTION SYSTEM WARRANTY UP TO 20 YEARS* DONKIN ASSET PROTECTION SYSTEM

DONKIN ASSET PROTECTION SYSTEM WARRANTY UP TO 20 YEARS* DONKIN ASSET PROTECTION SYSTEM DONKIN ASSET PROTECTION SYSTEM WARRANTY UP TO 20 YEARS* DONKIN ASSET PROTECTION SYSTEM THE DONKIN ASSET PROTECTION SYSTEM FOR VALVES As part of AVK s commitment to provide our customers with solutions,

More information

Client Success Story Sheri Baucom Senior Advisor II

Client Success Story Sheri Baucom Senior Advisor II Client Success Story - 2017 Sheri Baucom Senior Advisor II Overview The following is a description of an actual project completed in 2016 where RCP was deployed onsite to validate a pressure test using

More information

EXPECT RELIABILITY AVK RESILIENT SEATED GATE VALVES

EXPECT RELIABILITY AVK RESILIENT SEATED GATE VALVES EXPECT RELIABILITY AVK RESILIENT SEATED GATE VALVES AVK VALVES STANDARD FEATURES AVK STANDARD FEATURES AVK Gate Valves are made of ductile iron and meet or exceed AWWA C509 or C515 ASTM A582 stainless

More information

3-20 2FII & Groundhog Bonded Seat Butterfly Valve. Operation and Maintenance Manual. Job Name: Contractor: Date:

3-20 2FII & Groundhog Bonded Seat Butterfly Valve. Operation and Maintenance Manual. Job Name: Contractor: Date: 3-20 2FII & Groundhog Bonded Seat Butterfly Valve Operation and Maintenance Manual Job Name: Contractor: Date: Document #:3202FIIGD Revision Date: 1/10/11 SAFETY MESSAGES All safety messages in the instructions

More information

RELIABLE AND EFFICIENT SYSTEMS

RELIABLE AND EFFICIENT SYSTEMS RELIABLE AND EFFICIENT SYSTEMS Systems must be leak-free as possible All systems leak Piping materials are slightly porous Very small leaks are not detectable and do not affect system efficiency Some systems

More information

PIPELINE INTEGRITY CONFERENCE BHR GROUP 5th-7th NOVEMBER 2008 SCHIPOL, THE NETHERLANDS PIPPELINE IN INDIA

PIPELINE INTEGRITY CONFERENCE BHR GROUP 5th-7th NOVEMBER 2008 SCHIPOL, THE NETHERLANDS PIPPELINE IN INDIA PIPELINE INTEGRITY CONFERENCE BHR GROUP 5th-7th NOVEMBER 2008 SCHIPOL, THE NETHERLANDS REHABILITATING A MAJOR OIL PIPPELINE IN INDIA K.G. GUPTA, INDIAN OIL CORPORATION LTD, INDIA R. JOHN, BERRY PLASTICS

More information

Provides the perfect seal, protects flanges, valves and pipelines against corrosion whilst improving safety and reducing the risk of fire.

Provides the perfect seal, protects flanges, valves and pipelines against corrosion whilst improving safety and reducing the risk of fire. Provides the perfect seal, protects flanges, valves and pipelines against corrosion whilst improving safety and reducing the risk of fire. s are typically used on offshore installations, sea water environments,

More information

KENNEDY VALVE Plant and Industrial Group 1021 East Water Street Elmira, New York Telephone (607) Fax (607)

KENNEDY VALVE Plant and Industrial Group 1021 East Water Street Elmira, New York Telephone (607) Fax (607) KENNEDY VALVE Plant and Industrial Group 1021 East Water Street Elmira, New York 14901 Telephone (607) 734-2211 Fax (607) 734-3288 INSTALLATION, OPERATION, AND MAINTENANCE MANUAL General ECCENTRIC PLUG

More information

Sentinel Panametrics Custody Transfer Gas Ultrasonic Flowmeter

Sentinel Panametrics Custody Transfer Gas Ultrasonic Flowmeter GE Measurement & Control Sentinel Panametrics Custody Transfer Gas Ultrasonic Flowmeter Applications The Sentinel flowmeter is a complete ultrasonic flowmeter system for the measurement of natural gas

More information

Inline Ultrasonic Flowmeter

Inline Ultrasonic Flowmeter M-1500 Series Installation and Operating Manual The M-1500 series is an inline primary flow sensor and externally mounted controller unit. The flow sensor is a straight through flow tube that uses Transit

More information

Lorri Grainawi Steel Tank Institute. PA NISTM April 25, 2013 Harrisburg, PA

Lorri Grainawi Steel Tank Institute. PA NISTM April 25, 2013 Harrisburg, PA Lorri Grainawi Steel Tank Institute PA NISTM April 25, 2013 Harrisburg, PA PEI/RP1200-12 ------------------------------------------------------ 1. Introduction 2. Definitions 3. Safety 4. Tank Secondary

More information

Sentinel. Panametrics Custody Transfer Gas Ultrasonic Flowmeter. GE Sensing. Applications. Features

Sentinel. Panametrics Custody Transfer Gas Ultrasonic Flowmeter. GE Sensing. Applications. Features Applications The Sentinel flowmeter is a complete ultrasonic flowmeter system for the measurement of natural gas flow applications such as: Custody transfer Transmission and distribution Underground storage

More information

AUTOMOTIVE TECHNOLOGY 41 COURSE SYLLABUS

AUTOMOTIVE TECHNOLOGY 41 COURSE SYLLABUS AUTOMOTIVE TECHNOLOGY 41 COURSE SYLLABUS Course Description: Recommended: AT1 or pass the Auto Tech 1 Placement Test. Principles of engine rebuilding, includes diagnosis, removing, disassembly, cleaning,

More information

SECTION PIPING SPECIALTIES PART 1 GENERAL 1.1 SUMMARY

SECTION PIPING SPECIALTIES PART 1 GENERAL 1.1 SUMMARY SECTION 230533 - PIPING SPECIALTIES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Pressure gages. 2. Pressure gage taps. 3. Thermometers. 4. Thermometer supports. 5. Test plugs. 6. Static pressure

More information

Cable-Tight Wire Management System

Cable-Tight Wire Management System Cable-Tight Wire Management System Installation Guide Franklin Fueling Systems 3760 Marsh Rd. Madison, WI 53718 USA Tel: +1 608 838 8786 800 225 9787 Fax: +1 608 838 6433 www.franklinfueling.com Safety

More information

HOT TAPPING & PLUGGING SOLUTIONS

HOT TAPPING & PLUGGING SOLUTIONS HOT TAPPING & PLUGGING SOLUTIONS STOPPLE Plus System Combined with a LOCK-O-RING Plus completion plug, the STOPPLE Plus fitting reduces installation time, simplifies the setting process, and eliminates

More information

Report of the Pipeline Safety Department. Home Explosion January 2, Whispering Hollow Drive Oklahoma City, Oklahoma

Report of the Pipeline Safety Department. Home Explosion January 2, Whispering Hollow Drive Oklahoma City, Oklahoma BOB ANTHONY TODD HIETT DANA MURPHY Commissioner Commissioner Commissioner OKLAHOMA CORPORATION COMMISSION P.O. BOX 52000 OKLAHOMA CITY, OKLAHOMA 73152-2000 Transportation Division Pipeline Safety Department

More information

Installation Operation & Maintenance Manual. High Vacuum Lubricated Rotary Vane Pumps

Installation Operation & Maintenance Manual. High Vacuum Lubricated Rotary Vane Pumps Installation Operation & Maintenance Manual High Vacuum Lubricated Rotary Vane Pumps Part No. 9983-0000-P07 / November 2018 HIGH VACUUM LUBRICATED ROTARY VANE PUMPS TABLE OF CONTENTS CUSTOMER SERVICE 5

More information

Technical Offer. Antek Model 6200 Analyzer Determine Total Sulfur and Total Nitrogen in a single analyzer

Technical Offer. Antek Model 6200 Analyzer Determine Total Sulfur and Total Nitrogen in a single analyzer Technical Offer Antek Model 6200 Analyzer 2015.4 Determine Total Sulfur and Total Nitrogen in a single analyzer Meet sulfur regulations and control your process with continuous sulfur and/or nitrogen measurements

More information

Annex to the Accreditation Certificate D-PL according to DIN EN ISO/IEC 17025:2005

Annex to the Accreditation Certificate D-PL according to DIN EN ISO/IEC 17025:2005 Deutsche Akkreditierungsstelle GmbH Annex to the Accreditation Certificate D-PL-11065-01-00 according to DIN EN ISO/IEC 17025:2005 Period of validity: 08.02.2016 to 07.02.2021 Holder of certificate: Actemium

More information

EXPECT SUPREME PE BALL VALVES

EXPECT SUPREME PE BALL VALVES AVK MAGNUS BALL VALVES EXPECT SUPREME PE BALL VALVES AVK MAGNUS RANGE ACCESSORIES & OPTIONS The AVK MAGNUS Series 85/50 is an extensive range of PE ball valves up to OD180mm, which have been extensively

More information

LM 3188 PORT: LASER DUST MONITOR

LM 3188 PORT: LASER DUST MONITOR LM 3188 PORT: LASER DUST MONITOR CHOPPED LASER LIGHT SOURCE- EXCELLENT CHOICE FOR LOW DUST APPLICATIONS APPLICATIONS: Power plants Cement factories Iron and Steel factories Tunnels FEATURES: Manual Zero

More information

Baumann Sanitary Diaphragm Angle and Inline Control Valve

Baumann Sanitary Diaphragm Angle and Inline Control Valve Instruction Manual 84000 Valve Baumann 84000 Sanitary Diaphragm Angle and Inline Control Valve Contents Introduction... 1 Scope of Manual... 1 Safety Precautions... 2 Maintenance... 2 Flow Direction...

More information

Bolting QA/QC Bulletin

Bolting QA/QC Bulletin Bolting QA/QC Bulletin M&TE Review 8-27-14 There have been several incidents over the past few months regarding torqueing methods, calibration procedures and verification of conversion charts matching

More information

Biogas safety control equipment

Biogas safety control equipment Biogas safety control equipment As environmental concerns and energy efficiency are increasing, efficient economical and safe gas control systems become an increasingly important part of operating the

More information

PENNSYLVANIA ABOVE GROUND STORAGE TANKS

PENNSYLVANIA ABOVE GROUND STORAGE TANKS PENNSYLVANIA ABOVE GROUND STORAGE TANKS GZA GeoEnvironmental Inc. by Jeffrey Knepper, LRS, CPG July 27, 2017 PA CODE Chapter 245. Administration of the Storage Tank & Spill Prevention Program AST Definition

More information

SITRANS F flowmeters SITRANS F US. SITRANS FUT1010 Ultrasonic flowmeter. Overview. Application

SITRANS F flowmeters SITRANS F US. SITRANS FUT1010 Ultrasonic flowmeter. Overview. Application Overview SITRANS F flowmeters Application Liquid applications Gas applications Pipelines Custody transfer, allocation, Upstream Production wells, line balance, gathering, separation interface/densitometer

More information

Rosemount 402 and 402VP

Rosemount 402 and 402VP Rosemount 402 and 402VP Contacting Conductivity Sensors Instruction Manual LIQ-MAN-402 Rev. M May 2017 hasgkas Essential Instructions Read this page before proceeding! Emerson designs, manufactures and

More information

Val-Matic Extended Bonnet Assembly Instructions

Val-Matic Extended Bonnet Assembly Instructions Manual No. EBAI-OM-2 Val-Matic Extended Bonnet Assembly Instructions Operation, Maintenance and Installation Manual DESCRIPTION OF ASSEMBLY... 1 INSTALLATION INSTRUCTIONS... 1 TROUBLESHOOTING... 1 PARTS

More information

2" - 24" OS Series Butterfly Valves. Operation and Maintenance Manual. Job Name: Contractor: Date:

2 - 24 OS Series Butterfly Valves. Operation and Maintenance Manual. Job Name: Contractor: Date: s Operation and Maintenance Manual Job Name: Contractor: Date: Document #: IOM Revision Date: 10/2/2016 SAFETY MESSAGES All safety messages in the instructions are flagged with an exclamation symbol and

More information