1 Asset Protection Cathodic Protection Testing of Insulating Joints Approved by: Manager Pipeline Standards 1 PURPOSE This work instruction describes the requirements and process for testing the integrity of an insulating flange or monolithic insulating joint. All tests shall comply with APT O&MS Health, Safety and Environmental Management Systems and meet the requirements of all relevant statutory gas supply legislation. 2 REFERENCES 9019 Cathodic Protection System Maintenance and Testing Procedure 3 GENERAL INFORMATION Insulating flanges and monolithic insulating joints are installed in metallic pipelines and networks for corrosion control purposes and to isolate pipelines from earthing systems. Checks of insulating flanges and monolithic insulating joints are carried out to verify the ability to insulate by using one of the following methods. Simulated Failure of an Insulating Joint. Basic Potential Difference. Interruption of CP Current. High Voltage Application. Model RF-IT Pipeline Insulator Tester Method. Periodic inspection of an insulating joint is usually not required. However, inspections may be required when investigating Cathodic Protection problems both upstream and downstream of an insulating joint. of the magnetic field induction ring then touch the test lead probe on the adjacent side of the magnetic field induction ring, but on the same side of the insulation joint. Hold both probes onto the pipeline as shown in Figure 1. (Scratching through any painted surfaces will ensure a good contact between the test probes and the pipeline). With the two test probes connected to the pipeline depress the trigger switch located underneath the handle of the A.C. Generator. This will allow current to flow from the fixed test probe on the A.C. Generator to the test probe located on the other side of the Magnetic Field Induction Ring. As the trigger switch is depressed, observe the A.C. Generator Meter and the Magnetic Field Induction Ring Meter. Both indicating needles should deflect, simulating a fault condition and demonstrating that the equipment is working correctly. 4 PROCEDURE 4.1 Simulated Failure of an Insulating Joint Method Equipment Pre-Test Place a magnetic field induction ring around a section of pipe approximately 300mm-400mm away from the insulating joint being tested. Using an A.C. Generator touch the pipeline with the fixed probe one side Equipment Configuration, Pre-Start Test Set Up Figure Testing an Insulating Joint Leave the Magnetic Field Induction Ring in the same location as for the pre-start test. Touch the pipeline with the fixed probe on the A.C. Generator then Issue 2 October 2007 Page 1 of 5

2 touch the pipeline with the test lead probe ensuring that the Magnetic Field Induction Ring and insulating joint are in between the two probe connections, as shown in Figure 2. Hold both probes onto the pipeline. (Scratching through any painted surfaces will ensure a good contact between the test probes and the pipeline). Insulating Joint Test Set Up Configuration Figure 2 With the two probes connected to the pipeline depress the trigger switch located underneath the handle of the A.C. Generator. Observe one of the following conditions: Both the Magnetic Field Induction Ring and the A.C. Generator meter needles deflect, indicating that the insulating joint is faulty and requires repair. The A.C Generator meter indicating needle deflects, but the Magnetic Field Induction Ring Meter indicating needle does not, proving the integrity of the insulating joint and therefore no action is required. Record the Test Results on the Insulating Joint Test Report Form. A sample form is shown in Appendix A. 4.2 Basic Potential Difference method This method is used when conducting an integrity check of an insulating joint protecting a facility such as a district, field regulator or gate station by monitoring ON potential measurements using a Digital Volt Meter and a Cu/CuS0 4 Half Cell. The protected side of the insulating joint will have a negative potential in the range of -1500mV to - 850mV. The facility side of the insulating joint will also exhibit a negative voltage but should be less negative than that of the protected side. If the facility side of the insulating joint is earthed then the potential should be between -500mV and - 700mV. This will be consistent with the natural potential with respect to the Cu/CuS0 4 of the earthing structure. If the facility piping is either unearthed or disconnected from the earth then that pipe could have zero potential. This should never be the case and further investigation will be required. Studs and nuts of insulating flanges in good condition should be independent of earth and pipeline potential and at the same potential as the Cu/CuS0 4 half cell. Underground insulating joints installed protecting facilities have a cross bond connected for electrical continuity and to reduce Cathodic Protection attenuation. Removal of the cross bond to test the Insulating Joint using the Potential Difference method may not be as effective as the method where the Cathodic Protection current is interrupted. Record all details as required on the Insulation Joints Test Report Form as shown in Appendix A. 4.3 Interruption of Cathodic Protection Unit - current method This method applies to assets cathodically protected by a Cathodic Protection Rectifier unit. It does not apply to sites Cathodically Protected using sacrificial anodes. Issue 2 October 2007 Page 2 of 5

3 This method is employed during an ON/OFF potential survey or where a fault has been detected and further testing is warranted. Connect an interrupter in series with the output of the site Cathodic Protection Unit. Set the interrupter to switch at intervals. Typical intervals are 13 seconds ON and 2 seconds OFF. Note: If a Cathodic Protection Unit is fitted with an interrupter package, the portable interrupter will not be required. Measure the potential shift on either side of the insulating joint being tested with respect to a Cu/CuSO 4 half cell. The interrupted (cathodic protection unit) side of the insulation joint should have a significant shift in potential, whilst the other side of the insulation joint should have a negligible shift in potential. This would indicate the insulation is sound. If a significant shift is detected on both sides of the insulation joint, this would indicate the insulation is faulty. Where an underground insulating joint is being subjected to this test any permanent cross bond shall be removed from the associated test point and potential shifts on either side of the insulating joint are to be measured. The side that is no longer connected to the local Cathodic Protection Unit should experience a potential much lower than the side still connected, if any. Record all details as required on the Insulation Joints Test Report Form as shown in Appendix A. Replace all permanent cross bonds after testing has been completed. Where fitted remove the portable interrupter and replace the Cathodic Protection Unit output link. 4.4 High Voltage Application Method This test method is used for testing individual bolts or insulating flanges. Remove any surge diverting device installed across the insulating joint. Connect a high voltage test instrument set on the 500Vdc setting to the unprotected side of the insulating joint or to one side of a stud and bolt assembly. Caution: This method subjects the insulating joint to a much higher than normal voltage. Extreme care must be exercised when conducting this type of test. The instrument probe shall be placed directly across the item under test. The minimum resistance reading should be 5MΩ. Record all details as required on the Insulation Joints Test Report Form specified by your manager or supervisor. A sample form is shown in Appendix A. 4.5 Model RF- IT Pipeline Insulator Tester Method The Model RF-IT Insulator Tester consists of a portable battery powered electronic instrument with detachable probes for making positive electrical contact across an insulator. The RF-IT works using radio frequency. The radio frequency signal is applied to one side of an insulator by one of two probes. The second probe then receives a high frequency signal. If the received signal is almost as strong as the applied signal, the insulator is shorted. The RF-IT has an internal band-pass filter which will filter out all frequencies above and below 221kHz. This allows the taking of measurements on pipelines that are under cathodic protection or have other induced or impressed currents or signals. Note: As the RF-IT uses radio frequency to measure the effectiveness of an insulator, the measurement results cannot be displayed in ohms. Newer model RF-IT units use a digital meter that mimics an analogue needle type meter. Older RF-IT units use a digital bar graph meter. Both units sweep from left to right. The RF-IT Insulator Tester is factory calibrated and needs no field adjustments. Calibrations Issue 2 October 2007 Page 3 of 5

4 are made using the probe wire conductors supplied with the unit. Note: Do not make changes or substitutes for probes and wires. When the battery output becomes too low to power the instrument (below 7 volts DC), the black lines on the LCD meter will flash on and off. Replace with 6 AA size alkaline batteries. Older model RF-IT units with the bar graph do not show battery condition. The display will grow faint and fade as the battery output falls below 7 volts. Push the red button on the panel to turn the tester On. Push again to turn the tester Off Note: if the tester is not turned off manually, it will turn off automatically after 10 minutes. If the tester seems to fail during testing, firstly check the On off switch. Pre Operation Check of the RF-IT Tester Insert the black probe into either port locator on the front end of the tester. Insert the red probe into the other port locator on the front of the tester. Turn the unit On. Observe the LCD meter. The meter should show black lines across the entire meter face. Note: Older model RF-IT units show solid black square dots completely across the top and bottom of the meter face. Between the bars at each side, two black arrows should flash slowly. The tester is now ready to operate. Operation to Check Single In-Line Insulator Place the solid black probe s steel point on one side of the insulator, making positive contact to the metal pipe. Place the flexible cable (or solid) red probe s steel point on the opposite side of the insulator, making positive contact to the metal pipe. If the insulator is shorted, (low electrical resistance), the LCD meter will be down low (left side of the meter) towards the 0. The older models will show only one or two black square dots on both the top and bottom rows on the LCD meter. If the LCD meter reads 100%, all the way to the right hand side of the meter, the insulator is performing well. The Older model RF-IT units will show solid black square dots completely across the top and bottom rows. LCD readings between these extremes, gives the operator the degree of quality of the insulator. The lower the LCD reading, the lower the electrical resistance of the insulator. A low resistance reading may be cause to watch for impending failure. Operation for Checking Insulated Flange Bolts On single insulated pipeline flange type insulators (where the bolts are insulated only halfway through the flange) make positive contact with the fixed probe of the tester to the insulated flange and make positive contact with the flexible probe to each bolt on the same side of the flange. Read the meter for every bolt. Meter readings will be the same as described in the previous operation. On double insulated pipeline flange type insulators, make positive contact with the fixed probe of the tester to one side of the double flange and the flexible probe to each bolt, individually on the opposite side of the flange. Read the meter for every bolt. The meter readings will be as described as when checking single in-line insulators. Note: In the event of an insulated flange indicating a definite electrical short, but all bolts indicate they are insulated properly, the electrical short exists across the flange insulator. Issue 2 October 2007 Page 4 of 5

5 Appendix A Insulation Joint Test Report Date Joint Number Location IJ Resistance (MΩ) Potential Shift (mv) Upstream side Downstream side TESTER CP SUPERVISOR Tested by. Received by Signature Signature. Date Date.. Issue 2 October 2007 Page 5 of 5

WYOMING STORAGE TANK PROGRAM GALVANIC (SACRIFICIAL ANODE) CATHODIC PROTECTION SYSTEM EVALUATION

WYOMING STORAGE TANK PROGRAM GALVANIC (SACRIFICIAL ANODE) CATHODIC PROTECTION SYSTEM EVALUATION WYOMING STORAGE TANK PROGRAM GALVANIC (SACRIFICIAL ANODE) CATHODIC PROTECTION SYSTEM EVALUATION A site drawing depicting the UST Cathodic Protection (CP) system and all reference electrode placements should

More information

Test Stations and Pipe-to-Soil Potential Measurements

Test Stations and Pipe-to-Soil Potential Measurements Test Stations and Pipe-to-Soil Potential Measurements Period #7 Practical Applications Course 2017 Mark James NACE CP II #5619, NACE CIP I #37041 1 Introduction Test Stations Wire Connection to Pipe Pipe-to-Soil

More information

SafetyPAT Plus A B P/N:

SafetyPAT Plus A B P/N: SafetyPAT Plus A B C P/N:110401103864 Test Instrument Solutions SafetyPat Plus Instructions A.Features SafetyPat Plus The SafetyPat Plus is a handheld battery powered unit suitable for carrying out electrical

More information

AERL CoolPro CP User's Manual

AERL CoolPro CP User's Manual AERL CoolPro CP User's Manual 1 of 14 TABLE OF CONTENTS 1 Overview...3 2 Cathodic Protection Background...4 2.1 Ground Bed Resistance...4 2.2 Corrosion Potential...4 2.3 Reference Cell measurement...4

More information

FINAL REPORT CATHODIC PROTECTION EVALUATION. 42-Inch Water Transmission Pipeline Contract 1 Station 0+00 to South Texas Water Authority

FINAL REPORT CATHODIC PROTECTION EVALUATION. 42-Inch Water Transmission Pipeline Contract 1 Station 0+00 to South Texas Water Authority FINAL REPORT CATHODIC PROTECTION EVALUATION 42-Inch Water Transmission Pipeline Contract 1 Station 0+00 to 50+00 South Texas Water Authority Prepared for: South Texas Water Authority P.O. Box 1701 Kingsville,

More information

MIT300 Series Insulation and Continuity Testers

MIT300 Series Insulation and Continuity Testers MIT300_UG_en_V11.qxp 14/1/09 3:03 pm Page 1 M MIT300 Series Insulation and Continuity Testers Megger MIT300-EN MIT 300 EN Insulation Resistance Continuity Tester Megger MIT310A-EN MIT 310A EN Insulation

More information

GT/TDINT100 Issue: 1 Date: SEP 1993 Page 1 of 11

GT/TDINT100 Issue: 1 Date: SEP 1993 Page 1 of 11 British Railways Board Group Standard Page 1 of 11 Part A Synopsis This Directive gives the general requirements of telecommunications earthing systems, and encompasses the requirements for the earthing

More information

2.0 CONSTRUCTION 3.0 OPERATION. SA-1 Generator Differential Relay - Class 1E 2.5 TRIP CIRCUIT

2.0 CONSTRUCTION 3.0 OPERATION. SA-1 Generator Differential Relay - Class 1E 2.5 TRIP CIRCUIT 41-348.11C SA-1 Generator Differential Relay - Class 1E 2.0 CONSTRUCTION The type SA-1 relay consists of: Restraint Circuit Sensing Circuit Trip Circuit Surge Protection Circuit Operating Circuit Amplifier

More information

User's Manual. High Voltage Megohmmeter. Analog Insulation Tester plus AC Voltage and Continuity Tests. Model

User's Manual. High Voltage Megohmmeter. Analog Insulation Tester plus AC Voltage and Continuity Tests. Model User's Manual High Voltage Megohmmeter Analog Insulation Tester plus AC Voltage and Continuity Tests Model 380353 Warranty EXTECH INSTRUMENTS CORPORATION warrants this instrument to be free of defects

More information

Atlas ESR and ESR + Equivalent Series Resistance and Capacitance Meter. Model ESR60/ESR70. Designed and manufactured with pride in the UK.

Atlas ESR and ESR + Equivalent Series Resistance and Capacitance Meter. Model ESR60/ESR70. Designed and manufactured with pride in the UK. GB60/70-9 Atlas ESR and ESR + Equivalent Series Resistance and Capacitance Meter Model ESR60/ESR70 Designed and manufactured with pride in the UK User Guide Peak Electronic Design Limited 2004/2016 In

More information

l The Battery Tester is designed for measuring the l AC four-terminal method to measure the internal

l The Battery Tester is designed for measuring the l AC four-terminal method to measure the internal Certificate of Calibration We hereby certify that this product has been calibrated and found to be in accordance with the applicable SPECIFICATIONS and STANDARDS. Accuracies of the standard equipment used

More information

This instrument is manufactured in the United Kingdom. The company reserves the right to change the specification or design without prior notice.

This instrument is manufactured in the United Kingdom. The company reserves the right to change the specification or design without prior notice. M Megger Limited Archcliffe Road, Dover Kent CT17 9EN England T +44 (0)1 304 502101 F +44 (0)1 304 207342 E uksales@megger.com Megger Z.A. Du Buisson de la Couldre 23 rue Eugène Henaff 78190 TRAPPES France

More information

7. UST Piping Corrosion Protection. NCDENR Division of Waste Management Underground Storage Tank Section

7. UST Piping Corrosion Protection. NCDENR Division of Waste Management Underground Storage Tank Section 7. UST Piping Corrosion Protection NCDENR Division of Waste Management Underground Storage Tank Section 1 Where piping connects to tank Piping Corrosion Protection 2 Main run of piping 3 Where piping connects

More information

ES5 Security Theory/Regulations Answer Schedule

ES5 Security Theory/Regulations Answer Schedule ES5 Security Theory/Regulations Answer Schedule Notes:1. means that the preceding statement/answer earns 1 mark. 2. This schedule sets out the expected answers to the examination questions. The marker

More information

Operator Qualification (OQ) Report

Operator Qualification (OQ) Report AOCF 66102/67107 Abnormal Operating Conditions Field for Natural Gas and Hazardous Liquids 5/15/2014 5/15/2017 AOCG 67107 Abnormal Operating Conditions for Natural Gas 5/16/2014 5/16/2017 TM001 66101 02

More information

3200 Series. Electrical Test Equipment Calibrator. Operation Manual

3200 Series. Electrical Test Equipment Calibrator. Operation Manual 3200 SERIES OPERATION MANUAL 3200 Series Electrical Test Equipment Calibrator Operation Manual Version 4.00 : Feb 2010 All product names are trademarks of their respective companies IMPORTANT NOTICE THIS

More information

3. OPERATION 2.1. RESTRAINT CIRCUIT 2.6. INDICATING CIRCUIT 2.2. OPERATING CIRCUIT 2.7. SURGE PROTECTION CIRCUIT 2.3.

3. OPERATION 2.1. RESTRAINT CIRCUIT 2.6. INDICATING CIRCUIT 2.2. OPERATING CIRCUIT 2.7. SURGE PROTECTION CIRCUIT 2.3. 41-348.1H Type SA-1 2.1. RESTRAINT CIRCUIT The restraint circuit of each phase consists of a center-tapped transformer, a resistor, and a full wave rectifier bridge. The outputs of all the rectifiers are

More information

Compact Scales. Software Revision V1.25 & above

Compact Scales. Software Revision V1.25 & above Compact Scales Software Revision V1.25 & above 2016 1 Easy Reference: Model name of the scale: Serial number of the unit: Software revision number (Displayed when power is first turned on): Date of Purchase:

More information

Atlas SCR. Triac and Thyristor Analyser Model SCR100. User Guide

Atlas SCR. Triac and Thyristor Analyser Model SCR100. User Guide GB100-5 Atlas SCR Triac and Thyristor Analyser Model SCR100 User Guide Peak Electronic Design Limited 2004/2011 In the interests of development, information in this guide is subject to change without notice

More information

The Electromagnet. Electromagnetism

The Electromagnet. Electromagnetism The Electromagnet When you have completed this exercise, you will be able to explain the operation of an electromagnet by using a coil of wire. You will verify your results with a compass and an iron nail.

More information

PSU1 Power Supply Unit

PSU1 Power Supply Unit OM2443 PSU1 Power Supply Unit Distributed By: GMW Associates 955 Industrial Road, San Carlos, CA, 94070 USA PHONE: +1 650-802-8292 FAX: +1 650-802-8298 EMAIL: sales@gmw.com WEB: www.gmw.com Table of Contents

More information

Troubleshooting Bosch Proportional Valves

Troubleshooting Bosch Proportional Valves Troubleshooting Bosch Proportional Valves An Informative Webinar Developed by GPM Hydraulic Consulting, Inc. Instructed By Copyright, 2009 GPM Hydraulic Consulting, Inc. TABLE OF CONTENTS Bosch Valves

More information

Cathodic Protection for AST s. Why is Cathodic Protection Important?

Cathodic Protection for AST s. Why is Cathodic Protection Important? Cathodic Protection for AST s Presented by: James T. Lary Corrpro Companies, inc. 1055 West Smith Road Medina, Ohio 44256 jlary@corrpro.com 330-241-6615 Why is Cathodic Protection Important? Preserve Assets

More information

UNIT 3: GENErAL ELECTriCAL SySTEM DiAGNOSiS

UNIT 3: GENErAL ELECTriCAL SySTEM DiAGNOSiS Electrical/Electronic Systems UNIT 3: GENErAL ELECTriCAL SySTEM DiAGNOSiS LESSON 3: TEST electrical circuits I. Types of electrical circuit tests and electrical faults A. Different types of electrical

More information

K100 K110 AEMC INSTRUMENTS ENGLISH. User Manual. n DC/AC MICROPROBE. Model K mv/ma OFF. DC/AC MicroProbe

K100 K110 AEMC INSTRUMENTS ENGLISH. User Manual. n DC/AC MICROPROBE. Model K mv/ma OFF. DC/AC MicroProbe n DC/AC MICROPROBE K100 K110 ON OL! 1 mv/ma OFF AEMC INSTRUMENTS DC/AC MicroProbe Model K100 ENGLISH User Manual Statement of Compliance Chauvin Arnoux, Inc. d.b.a. AEMC Instruments certifies that this

More information

27.6 Vdc 1 Amp Switch Mode Power Supply for Fire EN54-4:1997 +A1 +A2

27.6 Vdc 1 Amp Switch Mode Power Supply for Fire EN54-4:1997 +A1 +A2 1 27.6 Vdc 1 Amp Switch Mode Power Supply for Fire EN54-4:1997 +A1 +A2 STX2401-C STX2401-T FEATURES 0843-CPR-0213 14 Elmdene International Ltd Tel: +44(0)23 9269 6638 3 Keel Close, Interchange Park, Fax:

More information

DET Series EARTH GROUND ELECTRODE TESTERS

DET Series EARTH GROUND ELECTRODE TESTERS M DET Series EARTH GROUND ELECTRODE TESTERS USER GUIDE CONTENTS CONTENTS 2 INTRODUCTION 3 G SAFETY WARNINGS 4 G LIVE EARTH SAFETY PRECAUTIONS 5 G BATTERY INSTALLATION 5 G BATTERY CHARGING (DET4TCR ONLY)

More information

QUASAR KIT No THYRISTOR - TRIAC TESTER

QUASAR KIT No THYRISTOR - TRIAC TESTER QUASAR KIT No. 1087 THYRISTOR - TRIAC TESTER GENERAL DESCRIPTION With this new kit Quasar Kit offers you a very useful instrument for your bench that will help you to test THYRISTORS and TRIACS. These

More information

User Manual. Solar Charge Controller 3KW

User Manual. Solar Charge Controller 3KW User Manual Solar Charge Controller 3KW 1 CONTENTS 1 ABOUT THIS MANUAL... 3 1.1 Purpose... 3 1.2 Scope... 3 1.3 SAFETY INSTRUCTIONS... 3 2 INTRODUCTION... 4 2.1 Features... 4 2.2 Product Overview... 5

More information

CP GermanCp 41_CP C. Operating Instructions. CP 30 CP 330 CP 1100 AC/DC current probe /7.10

CP GermanCp 41_CP C. Operating Instructions. CP 30 CP 330 CP 1100 AC/DC current probe /7.10 CP 30 35 GermanCp 41_CP C Operating Instructions CP 30 CP 330 CP 1100 AC/DC current probe 3-349-600-37 1/7.10 Order Reference CP 30 CP 330 CP 1100 Order No. Z201B Z202B Z203B Battery is included. Thank

More information

Stratomaster Maxi Single

Stratomaster Maxi Single Stratomaster Maxi Single RV-3 Universal Engine RPM and Rotor RPM display The RV-3 unit is a 3.5 instrument providing a universal rev counter that can be adapted to a variety of roles. Typical uses are

More information

Sonic Meter. Soni. Operating Manual. Rev. A

Sonic Meter. Soni. Operating Manual. Rev. A Sonic Meter Soni Operating Manual Rev. A Important: Do not attempt to operate this instrument without completely reading this manual and understanding the correct operating procedures. For online technical

More information

Yaskawa Electric America Unit Troubleshooting Manual Section One: Introduction & Checks Without Power GPD 506/P5 and GPD 515/G5 (0.

Yaskawa Electric America Unit Troubleshooting Manual Section One: Introduction & Checks Without Power GPD 506/P5 and GPD 515/G5 (0. Yaskawa Electric America Unit Troubleshooting Manual Section One: Introduction & Checks Without Power GPD 506/P5 and GPD 515/G5 (0.4 ~ 160kW) Page 1 Introduction This manual is divided into three sections:

More information

User Guide. Model Insulation Tester / Megohmmeter. Introduction

User Guide. Model Insulation Tester / Megohmmeter. Introduction User Guide Model 380363 Insulation Tester / Megohmmeter Introduction Congratulations on your purchase of Extech s Insulation Tester/Megohmmeter. The Model 380363 provides three test ranges plus continuity

More information

MARTINDALE INSTRUCTIONS ELITE FUSE FINDER KIT ELECTRIC. Trusted by professionals. 4.4 Storage Conditions

MARTINDALE INSTRUCTIONS ELITE FUSE FINDER KIT ELECTRIC. Trusted by professionals. 4.4 Storage Conditions 4.4 Storage Conditions The FD650/R and FD500/T or FD600/T should be kept in warm dry conditions away from direct sources of heat or sunlight, with the battery removed and in such a manner as to preserve

More information

1.Safe testing IMPORTANT:

1.Safe testing IMPORTANT: Electricity is dangerous and can cause injury and death. Always treat it with the greatest of respect and care. If you are not quite sure how to proceed, then stop, take advice from a qualified person.

More information

Electronic Brake Control

Electronic Brake Control Electronic Brake Control For 2, 4, 6 and 8 brake applications READ THIS FIRST: Read and follow all instructions carefully before installing or operating the P3. Keep these instructions with the Brake Control

More information

Roller Door Operator

Roller Door Operator INSTALLATION INSTRUCTIONS AND OWNERS MANUAL Roller Door Operator IMPORTANT PLEASE READ THESE INSTRUCTIONS CAREFULLY PRIOR TO COMMENCING THE INSTALLATION OF THE OPERATOR UNIT CAUTION This Automatic Opener

More information

Digital/Analog Megohmmeter Model 1026 USER MANUAL

Digital/Analog Megohmmeter Model 1026 USER MANUAL Digital/Analog Megohmmeter Model 1026 USER MANUAL Limited Warranty The Megohmmeter Model 1026, is warranted to the owner for a period of 2 years from the date of original purchase against defects in manufacture.

More information

Three axis ( X, Y, Z ) electromagnetic field measurement 3 D EMF TESTER. Model : EMF-828

Three axis ( X, Y, Z ) electromagnetic field measurement 3 D EMF TESTER. Model : EMF-828 Three axis ( X, Y, Z ) electromagnetic field measurement 3 D EMF TESTER Model : EMF-828 TABLE OF CONTENTS 1. FEATURES...1 2. APPLICATIONS...2 3. CAUTION OF ELECTROMAGNETIC FIELD EXPOSURE... 2 4. SPECIFICATIONS...

More information

Saddle Butte Rockies Midstream LLC Contractor Covered Task List Last updated 12/6/2017

Saddle Butte Rockies Midstream LLC Contractor Covered Task List Last updated 12/6/2017 003 Test Breakout Tank Overfill Protective N/A 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective N/A 195.428 Oral 005 Repair Breakout Tank Overfill Protective N/A 195.428 007 Operate

More information

Atlas ESR. User Guide. Capacitance and Equivalent Series Resistance Meter. Model ESR60 (Enhanced)

Atlas ESR. User Guide. Capacitance and Equivalent Series Resistance Meter. Model ESR60 (Enhanced) Atlas ESR Capacitance and Equivalent Series Resistance Meter Model ESR60 (Enhanced) User Guide Peak Electronic Design Limited 2004/2008 In the interests of development, information in this guide is subject

More information

DT33B/C/D OPERATOR S MANUAL LIMITED WARRANTY AND LIMITATION OF LIABILITY

DT33B/C/D OPERATOR S MANUAL LIMITED WARRANTY AND LIMITATION OF LIABILITY BACK LIGHT D I G I TA L M U LT I M E T E R DT33B OPERATOR LIMITED WARRANTY AND LIMITATION OF LIABILITY This product will be free from defects in material and workmanship for one year from the date of purchase.

More information

Table of Contents Title Page No.

Table of Contents Title Page No. Table of Contents Title Page No. INTRODUCTION 1 SAFETY PRECAUTIONS / WARNINGS 2 CONTROLS AND INDICATORS 4 PREPARATION AND CAUTION BEFORE USE 5 TESTING PROCEDURES 6 A. AC/DC VOLTAGE MEASUREMENT 6 B. RESISTANCE

More information

CONTENTS 1. Introduction.1 2. Features Panel 3 4. Fail indicators.4 5. Operation 8 6. Battery replacement.12 7.

CONTENTS 1. Introduction.1 2. Features Panel 3 4. Fail indicators.4 5. Operation 8 6. Battery replacement.12 7. CONTENTS 1. Introduction.1 2. Features..1 3. Panel 3 4. Fail indicators.4 5. Operation 8 6. Battery replacement.12 7. Specifications 14 1. Introduction The network cable tester is a small hand-held cable

More information

ANALOGUE INSULATION-CONTINUITY and VOLTAGE METER

ANALOGUE INSULATION-CONTINUITY and VOLTAGE METER 99 Washington Street Melrose, MA 02176 Phone 781-665-1400 Toll Free 1-800-517-8431 Visit us at www.testequipmentdepot.com BST-IT26 ANALOGUE INSULATION-CONTINUITY and VOLTAGE METER INSTRUCTION MANUAL Index

More information

CHARGING SYSTEM 7.7 GENERAL TROUBLESHOOTING. Alternator. Voltage Regulator. Battery. Wiring. Voltage Regulator Inspection HOME

CHARGING SYSTEM 7.7 GENERAL TROUBLESHOOTING. Alternator. Voltage Regulator. Battery. Wiring. Voltage Regulator Inspection HOME CHARGING SYSTEM 7.7 GENERAL 8740 The charging system consists of the alternator and regulator. Charging system circuits are shown in Figure 7-5. Never install accessory wiring between battery post and

More information

Ensuring the Safety Of Medical Electronics

Ensuring the Safety Of Medical Electronics Chroma Systems Solutions, Inc. Ensuring the Safety Of Medical Electronics James Richards, Marketing Engineer Keywords: 19032 Safety Analyzer, Medical Products, Ground Bond/Continuity Testing, Hipot Testing,

More information

MIT300 Series Insulation and Continuity testers USER MANUAL

MIT300 Series Insulation and Continuity testers USER MANUAL M MIT300 Series Insulation and Continuity testers USER MANUAL GSAFETY WARNINGS Safety Warnings and Precautions must be read and understood before the instrument is used. They must be observed during use.

More information

UNIT 6: BATTERIES, UPS AND CABLES

UNIT 6: BATTERIES, UPS AND CABLES UNIT 6: BATTERIES, UPS AND CABLES 6.1 Batteries 6.1.1 Introduction i. Definition of Batteries: Stores chemical energy in cells and converts them into electrical energy in the form of direct current (D.C);

More information

MIT300 Series Insulation and Continuity testers USER MANUAL

MIT300 Series Insulation and Continuity testers USER MANUAL M MIT300 Series Insulation and Continuity testers USER MANUAL GSAFETY WARNINGS Safety Warnings and Precautions must be read and understood before the instrument is used. They must be observed during use.

More information

P3 Electronic Brake Control

P3 Electronic Brake Control P3 Electronic Brake Control For 2, 4, 6 and 8 brake applications READ THIS FIRST: Read and follow all instructions carefully before installing or operating the P3. Keep these instructions with the Brake

More information

1 A strong electromagnet is used to attract pins. core. current. coil. pins. What happens when the current in the coil is halved?

1 A strong electromagnet is used to attract pins. core. current. coil. pins. What happens when the current in the coil is halved? 1 strong electromagnet is used to attract pins. current core pins coil What happens when the current in the coil is halved? No pins are attracted. Some pins are attracted, but not as many. The same number

More information

Electric Vehicle Charging Safety Guidelines Part 2: Selection and Installation Edition DRAFT

Electric Vehicle Charging Safety Guidelines Part 2: Selection and Installation Edition DRAFT Date of publication: 1 November 2016Not yet published Issued by: Mark Wogan, Manager Energy Safety WorkSafe New ZealandNot yet issued Electric Vehicle Charging Safety Guidelines Part 2: Selection and Installation

More information

Introduction. System Components

Introduction. System Components The Selectra SERIES 94 is for use with either direct or indirect gas fired units (furnaces, ovens, etc.). The system may be field installed on existing equipment or specified for new equipment installation.

More information

Adapted from presentation developed by Scott Fausneaucht

Adapted from presentation developed by Scott Fausneaucht Adapted from presentation developed by Scott Fausneaucht Definition of Electricity Electrical Fundamentals Generation & Transmission Transformers Fuses & Circuit Breakers Motors Motor Controls Safety Not

More information

Howard Midstream Energy Partners LLC Contractor Covered Task List Last updated 10/11/2013

Howard Midstream Energy Partners LLC Contractor Covered Task List Last updated 10/11/2013 001 Provide Security for Pipeline Facilities 195.436 Oral 003 Test Breakout Tank Overfill Protective Devices 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective Devices 195.428 005

More information

KTD30 Digital Insulation and Continuity Tester. User Manual. kewtechcorp.com

KTD30 Digital Insulation and Continuity Tester. User Manual. kewtechcorp.com KTD30 Digital Insulation and Continuity Tester User Manual 1 kewtechcorp.com The Kewtech KTD30 Continuity Insulation Tester is designed for use by suitably qualified personnel familiar with electrical

More information

PORTAGAUGE 4 USER MANUAL

PORTAGAUGE 4 USER MANUAL PORTAGAUGE 4 USER MANUAL Contents 1. Introduction and Key Features 1.1 What does the Portagauge do? 1.2 The Portagauge 4 1.21 The Portagauge 4 Unit and Measuring Screen 1.22 The Portagauge 4 Definition

More information

Technical Service Information

Technical Service Information BMW - A4S (THM 4L30-E) DIAGNOSTIC TROUBLE CODE 40 (Pressure Control Circuit) Adapted from BMW s Service Bulletin 24 06 94 COMPLAINT: CAUSE: BMW s A4S transmission is otherwise known as the 4L30-E. This

More information

BASIC TROUBLESHOOTING START / STOP PUSHBUTTONS, PILOT LIGHTS, RELAYS, TIMER LIMIT SWITCHES, FLOW SWITCHES, THERMAL SWITCHES, AND OVERLOAD RELAYS.

BASIC TROUBLESHOOTING START / STOP PUSHBUTTONS, PILOT LIGHTS, RELAYS, TIMER LIMIT SWITCHES, FLOW SWITCHES, THERMAL SWITCHES, AND OVERLOAD RELAYS. BASIC TROUBLESHOOTING FOUR BASIC BUILDING BLOCKS OF A PLATING RECTIFIER: 1. ELECTRICAL CONTROLS 2. AC POWER CIRCUITS 3. DC POWER CIRCUITS 4. ELECTRONIC CONTROL 1. ELECTRICAL CONTROLS START / STOP PUSHBUTTONS,

More information

Installation and Maintenance Instructions. World Leader in Modular Torque Limiters. PTM-4 Load Monitor

Installation and Maintenance Instructions. World Leader in Modular Torque Limiters. PTM-4 Load Monitor World Leader in Modular Torque Limiters Installation and Maintenance Instructions PTM-4 Load Monitor 1304 Twin Oaks Street Wichita Falls, Texas 76302 (940) 723-7800 Fax: (940) 723-7888 E-mail: sales@brunelcorp.com

More information

DET3TA, DET3TC, DET3TD and DET4TD Earth Ground Electrode Testers USER MANUAL

DET3TA, DET3TC, DET3TD and DET4TD Earth Ground Electrode Testers USER MANUAL M DET3TA, DET3TC, DET3TD and DET4TD Earth Ground Electrode Testers USER MANUAL GSAFETY WARNINGS Safety Warnings and Precautions must be read and understood before the instrument is used. They must be observed

More information

Enbridge Gas Transmission and Midstream and Enbridge Liquid Pipelines (Express-Platte) Contractor Covered Task List Last updated 8/30/2018

Enbridge Gas Transmission and Midstream and Enbridge Liquid Pipelines (Express-Platte) Contractor Covered Task List Last updated 8/30/2018 001 Provide Security for Pipeline Facilities 195.436 Oral 003 Test Breakout Tank Overfill Protective Devices 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective Devices 195.428 Oral

More information

PAT120, PAT150 and PAT150R

PAT120, PAT150 and PAT150R PAT120, PAT150 and PAT150R Simple tick or cross, pass or fail indication plus measurement Battery powered with rechargeable options Safe 250 V insulation and leakage test for surge-protected and IT equipment

More information

USE AND CARE GUIDE DUALCHECK CIRCUIT TESTER

USE AND CARE GUIDE DUALCHECK CIRCUIT TESTER Item # 1002 153 664 Model #CE-VD7504GFI USE AND CARE GUIDE DUALCHECK CIRCUIT TESTER Questions, problems, missing parts? Before returning to the store, call Commercial Electric Customer Service 8 a.m. 7

More information

Y99AB-4 BASO Test Kit

Y99AB-4 BASO Test Kit Application Note Y99AB-4 Issue Date August, 8 Y99AB-4 BASO Test Kit 3 3 7 4 5 DC TCN-4 Nut 31543-3 Terminal Nut JOHNSON CONTROLS, INC WATERTOWN, WI., U.S.A 473-4 Nut Figure 1: Y99AB-4 Test Kit 64119-1D

More information

Cathodic Protection Guidance? Who needs that? Aren t t NACE & STI enough? David Robinett Virginia Dept. of Environmental Quality

Cathodic Protection Guidance? Who needs that? Aren t t NACE & STI enough? David Robinett Virginia Dept. of Environmental Quality Cathodic Protection Guidance? Who needs that? Aren t t NACE & STI enough? David Robinett Virginia Dept. of Environmental Quality December 22,1998 CP required for USTs CP required for USTs Huge demand for

More information

NZQA unit standard version 8 Page 1 of 5. Apply and remove earths from conductors on electricity supply networks

NZQA unit standard version 8 Page 1 of 5. Apply and remove earths from conductors on electricity supply networks Page 1 of 5 Title Apply and remove earths from conductors on electricity supply networks Level 4 Credits 4 Purpose People credited with this unit standard are able to: demonstrate knowledge of earthing

More information

GFM-40ac COMPLIANCE WESTUSA. Ground Circuit Tester. Instruction Manual

GFM-40ac COMPLIANCE WESTUSA. Ground Circuit Tester. Instruction Manual GFM-40ac Ground Circuit Tester Instruction Manual COMPLIANCE WESTUSA Dear Customer: Congratulations! Compliance West USA is proud to present you with your Ground Fault Circuit Tester. Your instrument features

More information

Electromagnetic Induction (approx. 1.5 h) (11/9/15)

Electromagnetic Induction (approx. 1.5 h) (11/9/15) (approx. 1.5 h) (11/9/15) Introduction In 1819, during a lecture demonstration, the Danish scientist Hans Christian Oersted noticed that the needle of a compass was deflected when placed near a current-carrying

More information

INSTALLATION AND OPERATION

INSTALLATION AND OPERATION Industrial Type Turbine Flowmeter NT Hygienic Type Turbine Flowmeter BNO Low Flow Pelton Wheel Flowmeter NS INSTALLATION AND OPERATION Nixon Flowmeters Ltd. Leckhampton, Cheltenham, Glos UK Tel. 0044 (0)

More information

Portable Generator Familiarization & Troubleshooting Guide Section 3 Generator Diagnostics and Adjustments

Portable Generator Familiarization & Troubleshooting Guide Section 3 Generator Diagnostics and Adjustments Figure 3.31 Troubleshooting Flow Chart For (Brush Type) Generators With Two-Board Regulation 76 Troubleshooting Two Board Regulation Generators (Brush Type) Refer to Figure 3.31. Test 1: Check (AC) Frequency

More information

Model Insulation Tester / Megohmmeter. User Manual

Model Insulation Tester / Megohmmeter. User Manual Model 380363 Insulation Tester / Megohmmeter User Manual Introduction Congratulations on your purchase of Extech s Insulation Tester/Megohmmeter. The Model 380363 provides three test ranges plus continuity

More information

AT8060 BREATH ALCOHOL TESTER USING MANUAL. Ver: HW Catalogue

AT8060 BREATH ALCOHOL TESTER USING MANUAL. Ver: HW Catalogue AT8060 BREATH ALCOHOL TESTER USING MANUAL Ver: HW121121146 Catalogue 1.INTRODUCTION 1 2.MAIN TECHNICAL AND DATA 1 3.CONFIGURATION 2 4.OPERATION 3 1 Brief introduction AT8060 is an advanced portable breath

More information

ECET 211 Electric Machines & Controls Lecture 1-3 (Part 2) Electrical Safety in the Workplace Electrical Safety in the Workplace

ECET 211 Electric Machines & Controls Lecture 1-3 (Part 2) Electrical Safety in the Workplace Electrical Safety in the Workplace ECET 211 Electric Machines & Controls Lecture 1-3 (Part 2) Electrical Safety in the Workplace Text Book: Electric Motors and Control Systems, by Frank D. Petruzella, published by McGraw Hill, 2015. Other

More information

Instruction Manual. DMF-1-Series Coriolis Mass Flow Meter

Instruction Manual. DMF-1-Series Coriolis Mass Flow Meter 1 京制 01050054 号 Instruction Manual DMF-1-Series Coriolis Mass Flow Meter Beijing Sincerity Automatic Equipment Co., LTD Tel: +86(010)52073959/ 52073956 18600270515 2 NOTICE We thank you very much for your

More information

ELECTRICITY: INDUCTORS QUESTIONS

ELECTRICITY: INDUCTORS QUESTIONS ELECTRICITY: INDUCTORS QUESTIONS No Brain Too Small PHYSICS QUESTION TWO (2017;2) In a car engine, an induction coil is used to produce a very high voltage spark. An induction coil acts in a similar way

More information

Schmidt Mess- und Regeltechnik

Schmidt Mess- und Regeltechnik Content 1. Preface 2 2. 3. 4. 5. 6. 7. 8. 9. Safety hints 2 Principle of operation 3 Installation 3 Electrical connection 4 Switch point adjustment 7 Maintenance 7 Fault finding hints 8 Specifications

More information

Rosemount 485 Annubar Pak-Lok Assembly

Rosemount 485 Annubar Pak-Lok Assembly Quick Installation Guide 00825-0300-809, Rev EA Pak-Lok 85 Annubar Rosemount 85 Annubar Pak-Lok Assembly Start Step 1: Location and Orientation Step 2: Drill Holes into Pipe Step 3: Weld Mounting Hardware

More information

BM kv Digital Insulation Tester USER MANUAL

BM kv Digital Insulation Tester USER MANUAL M BM5200 5 kv Digital Insulation Tester USER MANUAL CONTENTS Safety warnings...3 Symbols used on instrument...4 Cleaning...4 General description...5 Insulation resistance test modes...5 Automatic discharge...5

More information

INSTRUCTION MANUAL MARTINDALE CM52 CLAMP METER. ELECTRIC Trusted by professionals. Other products from Martindale:

INSTRUCTION MANUAL MARTINDALE CM52 CLAMP METER. ELECTRIC Trusted by professionals. Other products from Martindale: Other products from Martindale: 18th Edition Testers All-in-one s Calibration Equipment Continuity Testers Electrician s Kits Full Calibration & Repair Service Fuse Finders Digital Clamp Meters Digital

More information

POOL PILOT SOFT TOUCH OPERATING, TROUBLESHOOTING AND TECHNICAL CHEAT SHEET

POOL PILOT SOFT TOUCH OPERATING, TROUBLESHOOTING AND TECHNICAL CHEAT SHEET POOL PILOT SOFT TOUCH OPERATING, TROUBLESHOOTING AND TECHNICAL CHEAT SHEET NORMAL OPERATING MODE OF SOFT TOUCH 1. Output Lights will pulsate to indicate Chlorine production. a. There are 7 lights to indicate

More information

Adam Equipment DUNE DCT SERIES. (P.N. 9384, Revision B2, June 2013)

Adam Equipment DUNE DCT SERIES. (P.N. 9384, Revision B2, June 2013) Adam Equipment DUNE DCT SERIES (P.N. 9384, Revision B2, June 2013) Adam Equipment Company 2013 Easy Reference: Model name of the scale: Serial number of the unit: Software revision number (Displayed when

More information

GUIDELINES FOR THE EVALUATION OF UNDERGROUND STORAGE TANK CATHODIC PROTECTION SYSTEMS

GUIDELINES FOR THE EVALUATION OF UNDERGROUND STORAGE TANK CATHODIC PROTECTION SYSTEMS GUIDELINES FOR THE EVALUATION OF UNDERGROUND STORAGE TANK CATHODIC PROTECTION SYSTEMS NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF WASTE MANAGEMENT UNDERGROUND STORAGE TANK SECTION 1646

More information

Initial and Periodic Inspection and Testing of Electrical Installations ( ) Sample Test

Initial and Periodic Inspection and Testing of Electrical Installations ( ) Sample Test Initial and Periodic Inspection and Testing of Electrical Installations (2391-052) Sample Test Version 1.1 January 2018 Please note this is not a complete sample theory exam, this document consists of

More information

CLASSIFIED 5 MAGNETISM ELECTROMAGNETIC INDUCTION GENERATOR MOTOR - TRANSFORMER. Mr. Hussam Samir

CLASSIFIED 5 MAGNETISM ELECTROMAGNETIC INDUCTION GENERATOR MOTOR - TRANSFORMER. Mr. Hussam Samir CLASSIFIED 5 MAGNETISM ELECTROMAGNETIC INDUCTION GENERATOR MOTOR - TRANSFORMER Mr. Hussam Samir EXAMINATION QUESTIONS (5) 1. A wire perpendicular to the page carries an electric current in a direction

More information

Safety Precautions. Damages resulting from failure to observe these safety precautions are exempt from any legal claims whatever.

Safety Precautions. Damages resulting from failure to observe these safety precautions are exempt from any legal claims whatever. Safety Precautions This product complies with the requirements of the following European Community Directives: 2004/108/EC (Electromagnetic Compatibility) and 2006/95/EC (Low Voltage) as amended by 2004/22/EC

More information

Informational Distribution List:

Informational Distribution List: Technical Bulletin 2017 Southern Technologies Corporation (STC). All rights reserved. Bulletin Number: TB-2017198-BW01 Date Published: 07/17/2017 Summary: Instructions for mounting, aligning and setting

More information

AS RW BEC TRUCK LIPO User Manual ver 1.00

AS RW BEC TRUCK LIPO User Manual ver 1.00 ` To Receiver AS-12-40 RW BEC TRUCK LIPO User Manual ver 1.00 5-12 Cell 40 A For/Rev 2 A BEC Batt - Motor- Reverse Light Batt + Brake Light Motor+ Features: Operating Voltage: 5-12 Nimh/Nicad Cells or

More information

INDUCTIVE CONDUCTIVITY SENSOR. Instruction Manual. Bürkert 2001 Subject to technical change without notice

INDUCTIVE CONDUCTIVITY SENSOR. Instruction Manual. Bürkert 2001 Subject to technical change without notice INDUCTIVE CONDUCTIVITY SENSOR Instruction Manual Bürkert 00 Subject to technical change without notice INTRODUCTION Table of Contents. INTRODUCTION.... Symbols used.... General safety instructions....

More information

RE-PR3-E-86&105 3-Phase Panel Mount 86 and 105kW

RE-PR3-E-86&105 3-Phase Panel Mount 86 and 105kW Page 1 of 6 3-Phase Panel Mount 86 and 105kW Features: Benefits: 0-10Vdc, 0-5Vdc, 4-20mA or manual via potentiometer control input Over temperature protection with auto reset Enclosed panel mounting Efficient

More information

INSPECTOR LINE LOAD SIMULATOR INSTRUCTION MANUAL TASCO, INC.

INSPECTOR LINE LOAD SIMULATOR INSTRUCTION MANUAL TASCO, INC. INSPECTOR LINE LOAD SIMULATOR INSTRUCTION MANUAL INS120P TASCO, INC. THIS TESTER IS DESIGNED FOR USE ONLY BY QUALIFIED ELECTRICIANS. IMPORTANT SAFETY WARNINGS mwarning Read and understand this material

More information

OPERATING INSTRUCTION

OPERATING INSTRUCTION 11/05 Form #271 99 Washington Street Melrose, MA 02176 Phone 781-665-1400 Toll Free 1-800-517-8431 OPERATING INSTRUCTION Visit us at www.testequipmentdepot.com MODEL 3132 ANALOG INSULATION-CONTINUITY TESTER

More information

Appendix B Kinder Morgan Operator Qualification Program List of Covered Tasks Hazardous Liquid Pipelines Part 195 revised 8/24/2018

Appendix B Kinder Morgan Operator Qualification Program List of Covered Tasks Hazardous Liquid Pipelines Part 195 revised 8/24/2018 Abnormal Operating Conditions Outside of 101.01 Room Abnormal Operating Conditions Inside of 101.02 Room 102.01 Measure Structure-to-Soil Potentials 102.02 Advanced Cathodic Testing 102.03 Active Corrosion/MIC

More information

Experiment 6: Induction

Experiment 6: Induction Experiment 6: Induction Part 1. Faraday s Law. You will send a current which changes at a known rate through a solenoid. From this and the solenoid s dimensions you can determine the rate the flux through

More information

ASTROAI USER MANUAL DIGITAL MULTIMETER. NOTE: Fully read and understand this manual before using this instrument.

ASTROAI USER MANUAL DIGITAL MULTIMETER. NOTE: Fully read and understand this manual before using this instrument. ASTROAI USER MANUAL DIGITAL MULTIMETER NOTE: Fully read and understand this manual before using this instrument. WARNING: To avoid possible electric shock or personal injury, and to avoid possible damage

More information

MONITOR INSTALLATION AND OPERATING INSTRUCTIONS VERSION

MONITOR INSTALLATION AND OPERATING INSTRUCTIONS VERSION 2200 Simplicity 3x 2200 SURVEILLANCE SIMPLICITY 3x AIRSEEDER MONITOR INSTALLATION AND OPERATING INSTRUCTIONS VERSION 1.00 2200 Surveillance Simplicity Air Seeder Page 2 CONTENTS 1.0 INSTALLATION... 3 1.1

More information

PREVENTION OF STRAY CURRENT BY THE MAINTENANCE-OF-WAY

PREVENTION OF STRAY CURRENT BY THE MAINTENANCE-OF-WAY PREVENTION OF STRAY CURRENT BY THE MAINTENANCE-OF-WAY Eugene D. Kale Senior Corrosion Engineer Parsons Transportation Group, Inc. 12160 North Abrams Road, Suite 200 Dallas, Texas 75243 Tp: (214) 570-8590

More information

DIGITAL RCD(ELCB) TESTER

DIGITAL RCD(ELCB) TESTER INSTRUCTION MANUAL DIGITAL RCD(ELCB) TESTER KEW 5410 R KYORITSU ELECTRICAL INSTRUMENTS WORKS, LTD. Contents 1. Safety Warnings.... 1 2. Procedure of removing Cover. 3 2-1 Method of removing the Cover.

More information