Cathodic Protection for AST s. Why is Cathodic Protection Important?

Size: px
Start display at page:

Download "Cathodic Protection for AST s. Why is Cathodic Protection Important?"

Transcription

1 Cathodic Protection for AST s Presented by: James T. Lary Corrpro Companies, inc West Smith Road Medina, Ohio jlary@corrpro.com Why is Cathodic Protection Important? Preserve Assets Avoid Disruption of Service Enhance Safety Prevent Leaks Governmental Regulations Reduce Maintenance Costs 1

2 Terminal age OPS Inspection No OPS Inspection Valve Product (Terminal) Product (Terminal) M Loading Terminal M Meter OPS Inspection Stops (Enforcement Policy) Main Line Breakout OPS Inspection Valve M Product (Breakout) M M Meter Main Line 2

3 Charleston, WV Spill The investigation found that two small holes ranging in size from about 0.4-inch to 0.75-inch in the bottom of the 48,000- gallon tank 396 were caused by corrosion, likely resulting from water leaking through holes in the roof and settling on the tank floor. Furthermore, the CSB inspection found a similar hole penetrating the bottom of nearby tank 397, containing the same chemical at the facility, located in Charleston. Other tanks also showed multiple signs of pitting and metallurgical damage, investigators said. The growing corrosion in these tanks went unnoticed until the bottom of 396 was breached and up to an estimated 10,000 gallons of product made their way through the underlying mixture of soil and gravel under the facility and into the Elk River on January 9, What we will cover. - Causes of Corrosion - Cathodic Protection Applications - Installation & Maintenance - Rectifier Monitoring 3

4 Early Oil s & Piping did not Employ CP IRON OXIDE REFINING MILLING STEEL CORROSION IRON OXIDE THE PROBLEM.. 4

5 External Corrosion of Bottom Anodic Area -600mV Cathodic Area -550mV SAND CURRENT FLOW MFL Floor Inspection 5

6 Corrosion Cell Caused by Foreign Material in Sand Cushion Steel Floor SAND CLAY CURRENT FLOW 6

7 Corrosion Caused by Poor Water Drainage WATER DRY SAND MOIST SAND New Steel Coupled to Old Steel New Bottom (Anode) SAND CURRENT FLOW Old Bottom (Cathode) SAND 7

8 Concrete Slab Leak detection grove under under bottom bottom required 30% floor replacement after 5 years in service Types of Cathodic Protection Galvanic: Current obtained from a metal with a higher energy level. Impressed Current: Requires external power source (transformer rectifier). 8

9 System Characteristics Galvanic No external power Fixed driving voltage Limited current Small current requirements Used in lower resistivity environment Usually negligible interference Impressed External power required Voltage can be varied Current can be varied High current requirements Used in almost any resistivity environment Must consider interference with other structures Above Ground Storage With Galvanic Anodes Anodes Anodes 9

10 Above Ground Storage With Galvanic Anodes Is Protection Being Achieved? Grounded to Other Structures Anode Uncoated Bottom Cells Test Box Anode Galvanic Anodes 10

11 With the advent of secondary containment liners for AST s, some oil companies initially installed galvanic (zinc or magnesium) anode cathodic protection systems. Many of these same companies have now abandoned this approach due to the inability to obtain effective levels of cathodic protection or limited system design life. The industry preference for cathodic protection for large AST s is now impressed current. Galvanic Anode Galvanic Anode Installation on AST. Note that anode life and current output are dependent upon sand / backfill conditions. Reference cells were rarely installed to monitor performance. (Many galvanic systems installed by tank contractor) 11

12 Recommended Practices API Cathodic Protection of Aboveground Petroleum Storage s: Galvanic anodes method is not practical for protection of large bare structures. NACE RP External Cathodic Protection of On- Grade Carbon Steel Storage Bottoms: Galvanic protection systems can be applied to tank bottoms where the metallic surface area exposed to the electrolyte can be minimized through the application of a dielectric coating or the area is small due to the tank size or configuration. Impressed Current Cathodic Protection Return (-) Rectifier (+) Anode CURRENT FLOW 12

13 Impressed Current Cathodic Protection System Anodes Rectifier Wiring s & Piping 13

14 Above Ground Storage Vertical Impressed Current Anodes - Existing s Rectifier Negative Connection Anodes + - Negative Connection Concrete Ringwall Rectifier - Sand + Anodes 14

15 Junction Box Rectifier + - Anodes Rectifier (+) (-) Deep Anode 15

16 Computer Guided Horizontally Bored Anode System Rectifier (+) Anode Pipe (-) Monitoring Pipe Anode Splice Box Anode Pipe 16

17 Aboveground Storage Test/Access Station Grade 3 PVC 20% Exposure 10 Typical Anode Material ABOVEGROUND STORAGE TANK CATHODIC PROTECTION Anode Tube 17

18 Rectifier Units Explosion or Non Explosion Proof? AC Input? AC Availability? CP Applications for Re-bottomed or New s 18

19 CP Installation on Rebottomed Above Ground Storage Bottoms with Secondary Containment 19

20 Floor Conduit Anode Liner CP Installation on Double Bottom New Construction with Liner 20

21 Rectifier Reference Cells (-) (+) Junction Box Anode Impressed Current Anode & Reference Cell Placement in High Resistance Sand 21

22 Installation of CP System on Lifted AST 22

23 Cathodic Protection Survey (When is Full) (+) -850mV Portable Reference Cell Soil?? Rim Potential Measurements 23

24 Soil Access Station (Thru Liner or Asphalt) Reference Cell Placement Under Bottom (Note obtain and store native readings) 24

25 Reference Cell Monitoring Conduit Monitoring Conduit Cathodic Protection Monitoring Read rectifiers every 30 days. Conduct annual inspection (obtain potentials) by NACE certified individuals. 25

26 Hot Asphalt Bottoms Stray Current? 26

27 Pipeline Integrity Inspections Qualifications of the corrosion engineer Certified by N.A.C.E. (National Association of Corrosion Engineers) Experienced in Cathodic Protection Experienced in Cathodic Protection of Fuel Storage Systems 27

28 Internal Corrosion Internal Corrosion Fuel Product Water / Sediment Anode Cathode 28

29 Coating Anode Bolt Bottom 29

30 Recommended Practices API Cathodic Protection of Aboveground Petroleum Storage s: NACE RP External Cathodic Protection of On- Grade Carbon Steel Bottoms: Iron Water Fire Water Piping Pitting (concentrated) corrosion attack on ductile iron pipe. 30

31 Questions? Thank You James T Lary Corrpro Companies, Inc West Smith Road Medina, Ohio jlary@corrpro.com 31

This article discusses a tank

This article discusses a tank CASE HISTORY Hot Oil Aboveground Storage Tank Bottom Corrosion Failure and Cathodic Protection Upgrade Part 2 KEVIN C. GARRITY AND PHILIP D. SIMON, CC Technologies, Inc. Several types of anode installations

More information

Test Stations and Pipe-to-Soil Potential Measurements

Test Stations and Pipe-to-Soil Potential Measurements Test Stations and Pipe-to-Soil Potential Measurements Period #7 Practical Applications Course 2017 Mark James NACE CP II #5619, NACE CIP I #37041 1 Introduction Test Stations Wire Connection to Pipe Pipe-to-Soil

More information

Fact Sheet #4 Reducing the Risk of Groundwater Contamination by Improving Petroleum Product Storage

Fact Sheet #4 Reducing the Risk of Groundwater Contamination by Improving Petroleum Product Storage Fact Sheet #4 Reducing the Risk of Groundwater Contamination by Improving Petroleum Product Storage N E W M E X I C O FARM A SYST Farmstead Assessment System Fact Sheet #4 Reducing the Risk of Groundwater

More information

Steel Tank Maintenance. Fluid Fertilizer Foundation December 4, 2012

Steel Tank Maintenance. Fluid Fertilizer Foundation December 4, 2012 Steel Tank Maintenance Fluid Fertilizer Foundation December 4, 2012 Tank Failure History Storage tank failure is as old as storage tank usage On January 15, 1919 a U.S. Industrial Alcohol Company s tank

More information

Standard Recommended Practice. Corrosion Control of Underground Storage Tank Systems by Cathodic Protection

Standard Recommended Practice. Corrosion Control of Underground Storage Tank Systems by Cathodic Protection NACE Standard Item No. 21030 Standard Recommended Practice Corrosion Control of Underground Storage Tank Systems by Cathodic Protection This NACE International standard represents a consensus of those

More information

New UST Installation Inspection Checklist

New UST Installation Inspection Checklist Nebraska State Fire Marshal Fuels Division - FLST Section 246 South 14 TH Street - Lincoln, NE 68508-1804 (402) 471-9466 New UST Installation Inspection Checklist (Petroleum or Hazardous Substances) Inspection

More information

CONTENTS. Foreword...iii. 1. Introduction...1

CONTENTS. Foreword...iii. 1. Introduction...1 Installation of Aboveground Storage Systems for Motor-Vehicle Fueling CONTENTS Foreword...iii SECTIONS 1. Introduction...1 1.1 Background...1 1.2 Purpose...1 1.3 Scope...1 1.4 Source...1 1.5 Use of PEI/RP100...1

More information

An Introduction to Constructing and Maintaining Cathodic Protection Systems

An Introduction to Constructing and Maintaining Cathodic Protection Systems An Introduction to Constructing and Maintaining Cathodic Protection Systems Course No: T02-009 Credit: 2 PDH J. Paul Guyer, P.E., R.A., Fellow ASCE, Fellow AEI Continuing Education and Development, Inc.

More information

THE KEY RELATIONSHIPS BETWEEN FIRE CODES, NEW YORK AST REGULATIONS AND SPCC PLANS

THE KEY RELATIONSHIPS BETWEEN FIRE CODES, NEW YORK AST REGULATIONS AND SPCC PLANS THE KEY RELATIONSHIPS BETWEEN FIRE CODES, NEW YORK AST REGULATIONS AND SPCC PLANS Presented by: Joyce A. Rizzo President JD2 Environmental, Inc. 800 East Washington Street West Chester, PA 19380 www.jd2env.com

More information

Cathodic Protection Guidance? Who needs that? Aren t t NACE & STI enough? David Robinett Virginia Dept. of Environmental Quality

Cathodic Protection Guidance? Who needs that? Aren t t NACE & STI enough? David Robinett Virginia Dept. of Environmental Quality Cathodic Protection Guidance? Who needs that? Aren t t NACE & STI enough? David Robinett Virginia Dept. of Environmental Quality December 22,1998 CP required for USTs CP required for USTs Huge demand for

More information

NYSDEC CBS Compliance Requirements

NYSDEC CBS Compliance Requirements NYSDEC CBS Compliance Requirements Peter J. Petriccione, P.E. H2M - Water September 24, 2015 Introduction Definition of a Hazardous Substance and a Chemical Bulk Storage Facility Design Requirements of

More information

PEI/RP Recommended Practices for Installation of Bulk Storage Plants

PEI/RP Recommended Practices for Installation of Bulk Storage Plants PEI/RP800-08 Recommended Practices for Installation of Bulk Storage Plants Recommended Practices for Installation of Bulk Storage Plants CONTENTS Foreword...iii. SECTIONS 1. Introduction Page 1.1 Background...1

More information

Application for Permit to Install Underground Storage Tanks (Petroleum or Hazardous Substances) 1. Owner Information 2. Installation Site Information

Application for Permit to Install Underground Storage Tanks (Petroleum or Hazardous Substances) 1. Owner Information 2. Installation Site Information Papillion/La Vista Fire Marshal s Office Fuels Division FLST Section 146 rth Adams Street Papillion, NE 68046 (402) 829-1398 Application for Permit to Install Underground Storage Tanks (Petroleum or Hazardous

More information

PIPELINE CORROSION CONTROL

PIPELINE CORROSION CONTROL NCCER 13614 Progress Blvd, Alachua, Florida 32615 Phone: (888) 622-3720 E-mail: info@nccer.org PIPELINE CORROSION CONTROL Competencies / Objectives Level One MODULE 66101-02 INTRODUCTION TO THE PIPELINE

More information

Asset Protection Cathodic Protection Testing of Insulating Joints. Work Instruction No.:

Asset Protection Cathodic Protection Testing of Insulating Joints. Work Instruction No.: Asset Protection Cathodic Protection Testing of Insulating Joints Approved by: Manager Pipeline Standards 1 PURPOSE This work instruction describes the requirements and process for testing the integrity

More information

1) Activity Description: Management of Petroleum Storage Tanks and Containers

1) Activity Description: Management of Petroleum Storage Tanks and Containers ES-301-4.09 Management of Petroleum Storage Tanks and Containers Document Identification Number ES-301-4.09 Document Owner: John Hambright 1) Activity Description: Management of Petroleum Storage Tanks

More information

Fluid Fertilizer Foundation December 10, 2013

Fluid Fertilizer Foundation December 10, 2013 Storage Tank Inspection, Maintenance, and Failure Fluid Fertilizer Foundation December 10, 2013 1 Tank Failure History Storage Tank Failure is as old as storage tank usage http://en.wikipedia.org/wiki/boston_molasses_disaster

More information

OKLAHOMA CORPORATION COMMISSION PETROLEUM STORAGE TANK DIVISION THE ABC S OF AST S AN OVERVIEW OF ABOVEGROUND STORAGE TANK REQUIREMENTS

OKLAHOMA CORPORATION COMMISSION PETROLEUM STORAGE TANK DIVISION THE ABC S OF AST S AN OVERVIEW OF ABOVEGROUND STORAGE TANK REQUIREMENTS OKLAHOMA CORPORATION COMMISSION PETROLEUM STORAGE TANK DIVISION THE ABC S OF AST S AN OVERVIEW OF ABOVEGROUND STORAGE TANK REQUIREMENTS PO BOX 52000 OKC, OK 73152-2000 www.occeweb.com Created on 10/1/2008

More information

product catalog

product catalog Corrosion stops here! product catalog www.technoprotection.com SACRIFICIAL ANODES MAGNESIUM ANODE IN CARDBOARD TUBE Sacrificial magnesium anode in ingot form available in a cardboard tube filled with

More information

CASE STUDY ON PIPELINE UNDER-PROTECTION ALONG WITH MITIGATION METHODS. Vipul Vilas Sawant. Mahanagar Gas Ltd, Mumbai, India

CASE STUDY ON PIPELINE UNDER-PROTECTION ALONG WITH MITIGATION METHODS. Vipul Vilas Sawant. Mahanagar Gas Ltd, Mumbai, India Paper No. CAP34 CASE STUDY ON PIPELINE UNDER-PROTECTION ALONG WITH MITIGATION METHODS Vipul Vilas Sawant Mahanagar Gas Ltd, Mumbai, India vsawant@mahanagargas. com ABSTRACT Mahanagar Gas Ltd is a City

More information

DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Environmental Cleanup and Brownfields

DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Environmental Cleanup and Brownfields DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Environmental Cleanup and Brownfields DOCUMENT NUMBER: 263-####-### TITLE: EFFECTIVE DATE: Guidelines for the Evaluation of Underground Storage Tank Cathodic

More information

Howard Midstream Energy Partners LLC Contractor Covered Task List Last updated 10/11/2013

Howard Midstream Energy Partners LLC Contractor Covered Task List Last updated 10/11/2013 001 Provide Security for Pipeline Facilities 195.436 Oral 003 Test Breakout Tank Overfill Protective Devices 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective Devices 195.428 005

More information

Enbridge Gas Transmission and Midstream and Enbridge Liquid Pipelines (Express-Platte) Contractor Covered Task List Last updated 8/30/2018

Enbridge Gas Transmission and Midstream and Enbridge Liquid Pipelines (Express-Platte) Contractor Covered Task List Last updated 8/30/2018 001 Provide Security for Pipeline Facilities 195.436 Oral 003 Test Breakout Tank Overfill Protective Devices 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective Devices 195.428 Oral

More information

PENNSYLVANIA ABOVE GROUND STORAGE TANKS

PENNSYLVANIA ABOVE GROUND STORAGE TANKS PENNSYLVANIA ABOVE GROUND STORAGE TANKS GZA GeoEnvironmental Inc. by Jeffrey Knepper, LRS, CPG July 27, 2017 PA CODE Chapter 245. Administration of the Storage Tank & Spill Prevention Program AST Definition

More information

Form UST FP-290 Notification for Underground Storage Tanks Regulated Under 527 CMR 9.00

Form UST FP-290 Notification for Underground Storage Tanks Regulated Under 527 CMR 9.00 Massachusetts Department of Environmental Protection Underground Storage Tank Program Form UST FP-290 Notification for Underground Storage Tanks Regulated Under 527 CMR 9.00 Forward completed form to:

More information

DEFENDER SERIES. 5 Gallon, Double Walled, Field Replaceable Spill Container Model Series INSTALLATION, OPERATION, & MAINTENANCE

DEFENDER SERIES. 5 Gallon, Double Walled, Field Replaceable Spill Container Model Series INSTALLATION, OPERATION, & MAINTENANCE DEFENDER SERIES 5 Gallon, Double Walled, Field Replaceable Spill Container Model 705-550 Series INSTALLATION, OPERATION, & MAINTENANCE Franklin Fueling Systems 3760 Marsh Rd. Madison, WI 53718 USA Tel:

More information

Monitoring Cathodic Protection of Natural Gas Pipelines

Monitoring Cathodic Protection of Natural Gas Pipelines Monitoring Cathodic Protection of Natural Gas Pipelines Period #8 Basic Corrosion Course 2017 February 21-23, 2017 Steve Glover - Vectren 0 Chapter Objective: Introduction Reasons to monitor What to monitor

More information

ANNUAL UST SYSTEM INSPECTION CHECKLIST

ANNUAL UST SYSTEM INSPECTION CHECKLIST APPENDIX A-3: SAMPLE FORM FOR ANNUAL UNDERGROUND STORAGE SYSTEM INSPECTION CHECKLIST Page 1 ANNUAL UST SYSTEM INSPECTION CHECKLIST Facility ID# Facility Name/Address Qualified Technician Signature Date

More information

Cable Connectors & Conduit Sealing Bushings

Cable Connectors & Conduit Sealing Bushings RA1 Cable Terminators General Information Purpose: Cable Terminators and Sealing Fittings are used on conduit ends and cable ends to effectively seal the cable and conduit. Where Installed: Wherever the

More information

Cable Connectors & Conduit Sealing Bushings

Cable Connectors & Conduit Sealing Bushings RA1 Cable Terminators General Information Purpose: Cable Terminators and Sealing Fittings are used on conduit ends and cable ends to effectively seal the cable and conduit. Where Installed: Wherever the

More information

ASMECourseCatalog.

ASMECourseCatalog. ASMECourseCatalog www.energyu.org www.midwestenergy.org ASME Abnormal Operating Conditions... 6 ASME GAS01 Hazards of Natural Gas and Prevention of Accidental Ignition... 6 ASME 0001 Measure Structure-to-Electrolyte

More information

Appendix B Kinder Morgan Operator Qualification Program List of Covered Tasks Hazardous Liquid Pipelines Part 195 revised 8/24/2018

Appendix B Kinder Morgan Operator Qualification Program List of Covered Tasks Hazardous Liquid Pipelines Part 195 revised 8/24/2018 Abnormal Operating Conditions Outside of 101.01 Room Abnormal Operating Conditions Inside of 101.02 Room 102.01 Measure Structure-to-Soil Potentials 102.02 Advanced Cathodic Testing 102.03 Active Corrosion/MIC

More information

Northeast Ohio AWWA October 26, 2017

Northeast Ohio AWWA October 26, 2017 Northeast Ohio AWWA October 26, 2017 Introduction Karl Dickinson Regional Sales Manager Jack Doheny Companies Sell & Rent Vacuum Trucks, Sewer Cleaning Equipment, & Pipeline Inspection Systems 16 Service

More information

Columbia Pipeline Group Contractor Covered Task List Last updated 1/8/2018

Columbia Pipeline Group Contractor Covered Task List Last updated 1/8/2018 001 Provide Security for Pipeline Facilities 195.436 Oral 003 Test Breakout Tank Overfill Protective Devices 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective Devices 195.428 Oral

More information

Evaluation and Management of Underground Tank Systems

Evaluation and Management of Underground Tank Systems 18 TRANSPORTATION RESEARCH RECORD lll3 Evaluation and Management of Underground Tank Systems DAVID H. KROON Development of an Integrity Assurance Program for existing underground tanks Includes soil borings

More information

7. Protection System Testing

7. Protection System Testing MANUAL FOR INSTALLATION AND MONITORING OF UNDERGROUND STORAGE TANKS WITH FACTORY INSTALLED ANODES 1. SCOPE Manufactured by: Granby Industries 1020 André-Liné Granby, Québec, Canada, J2J 1J9. Telephone:

More information

Environment Canada (EC) Storage Tank System Identification Form

Environment Canada (EC) Storage Tank System Identification Form Environment Canada (EC) Storage Tank System Identification Form Identification of storage tank systems for the purpose of the Storage Tank Systems for Petroleum Products and Allied Petroleum Products Regulations

More information

Pennsylvania DEP Aboveground Storage Tank Facility Visits NISTM PA CONFERENCE Washington, PA May 18, 2017

Pennsylvania DEP Aboveground Storage Tank Facility Visits NISTM PA CONFERENCE Washington, PA May 18, 2017 Pennsylvania DEP Aboveground Storage Tank Facility Visits 2017 NISTM PA CONFERENCE Washington, PA May 18, 2017 What one may expect Documentation review Tank system visual assessment Follow-up PADEP AST

More information

Gerardo G. Clemeiia Senior Research Scientist

Gerardo G. Clemeiia Senior Research Scientist 549 INTERIM REPORT CATHODIC PROTECTION OF TWO CONCRETE BRIDGE DECKS USING TITANIUM-MESH ANODES Gerardo G. Clemeiia Senior Research Scientist (The opinions, findings, and conclusions expressed in this report

More information

Williams Contractor Covered Task List Last updated 11/7/2017

Williams Contractor Covered Task List Last updated 11/7/2017 003 Test Breakout Tank Overfill Protective Devices 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective Devices 195.428 Oral 005 Repair Breakout Tank Overfill Protective Devices 195.428

More information

Energy Transfer Partners LP Contractor Covered Task List Last updated 3/2/2018

Energy Transfer Partners LP Contractor Covered Task List Last updated 3/2/2018 001 Provide Security for Pipeline Facilities 195.436 Oral 003 Test Breakout Tank Overfill Protective Devices 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective Devices 195.428 Oral

More information

Atmos Energy DOT Report-Distribution Leaks Cause of Leak WTX LA MS CO KS KY M-TX TN VA Total

Atmos Energy DOT Report-Distribution Leaks Cause of Leak WTX LA MS CO KS KY M-TX TN VA Total Atmos Energy 2017 2017 DOT Report-Distribution Leaks Cause of Leak WTX LA MS CO KS KY M-TX TN VA Total CORROSION Hazardous Main 61 10 24 13 15 5 148 2 1 279 Non-Hazardous Main 160 156 93 46 155 64 728

More information

SPCC Regulation Integrity and Leak Testing Methods

SPCC Regulation Integrity and Leak Testing Methods SPCC Regulation Integrity and Leak Testing Methods NISTM New England December 3 rd, 2015 Founded in 1988, Tanknology has grown to become one of the largest testing and inspection service companies in the

More information

WYOMING STORAGE TANK PROGRAM GALVANIC (SACRIFICIAL ANODE) CATHODIC PROTECTION SYSTEM EVALUATION

WYOMING STORAGE TANK PROGRAM GALVANIC (SACRIFICIAL ANODE) CATHODIC PROTECTION SYSTEM EVALUATION WYOMING STORAGE TANK PROGRAM GALVANIC (SACRIFICIAL ANODE) CATHODIC PROTECTION SYSTEM EVALUATION A site drawing depicting the UST Cathodic Protection (CP) system and all reference electrode placements should

More information

Mass Tank Inspection Services, LLC 29 Abbey Lane Middleboro, MA masstankinspection.com

Mass Tank Inspection Services, LLC 29 Abbey Lane Middleboro, MA masstankinspection.com June 18, 2018 Mrs. Nancy Cole Administrator Village of Eidelweiss 1680 Conway RD Madison, NH 03849 Mass Tank Inspection Services, LLC 29 Abbey Lane Middleboro, MA 02346 508-947-8826 masstankinspection.com

More information

Boardwalk Pipeline Partners, LP Contractor Covered Task List Last updated 9/17/2018

Boardwalk Pipeline Partners, LP Contractor Covered Task List Last updated 9/17/2018 003 Test Breakout Tank Overfill Protective Devices 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective Devices 195.428 Oral 005 Repair Breakout Tank Overfill Protective Devices 195.428

More information

Energy Transfer Partners LP Contractor Covered Task List Last updated 12/10/2018

Energy Transfer Partners LP Contractor Covered Task List Last updated 12/10/2018 001 Provide Security for Pipeline Facilities 195.436 Oral 003 Test Breakout Tank Overfill Protective Devices 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective Devices 195.428 005

More information

Appendix B Kinder Morgan Operator Qualification Program List of Covered Tasks Hazardous Liquid Pipelines Part 195 revised 12/12/2017

Appendix B Kinder Morgan Operator Qualification Program List of Covered Tasks Hazardous Liquid Pipelines Part 195 revised 12/12/2017 Abnormal Operating Conditions Outside of 101.01 Room Abnormal Operating Conditions Inside of 101.02 Room 102.01 Measure Structure-to-Soil Potentials 102.02 Advanced Cathodic Testing 102.03 Active Corrosion/MIC

More information

TransCanada US Contractor Covered Task List Last updated 9/27/2018

TransCanada US Contractor Covered Task List Last updated 9/27/2018 003 Test Breakout Tank Overfill Protective Devices 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective Devices 195.428 Oral 005 Repair Breakout Tank Overfill Protective Devices 195.428

More information

Northern Natural Gas Contractor Covered Task List Last updated 4/26/2018

Northern Natural Gas Contractor Covered Task List Last updated 4/26/2018 001 Provide Security for Pipeline Facilities 195.436 Oral 003 Test Breakout Tank Overfill Protective Devices 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective Devices 195.428 Oral

More information

PREVENTION OF STRAY CURRENT BY THE MAINTENANCE-OF-WAY

PREVENTION OF STRAY CURRENT BY THE MAINTENANCE-OF-WAY PREVENTION OF STRAY CURRENT BY THE MAINTENANCE-OF-WAY Eugene D. Kale Senior Corrosion Engineer Parsons Transportation Group, Inc. 12160 North Abrams Road, Suite 200 Dallas, Texas 75243 Tp: (214) 570-8590

More information

FINAL REPORT CATHODIC PROTECTION EVALUATION. 42-Inch Water Transmission Pipeline Contract 1 Station 0+00 to South Texas Water Authority

FINAL REPORT CATHODIC PROTECTION EVALUATION. 42-Inch Water Transmission Pipeline Contract 1 Station 0+00 to South Texas Water Authority FINAL REPORT CATHODIC PROTECTION EVALUATION 42-Inch Water Transmission Pipeline Contract 1 Station 0+00 to 50+00 South Texas Water Authority Prepared for: South Texas Water Authority P.O. Box 1701 Kingsville,

More information

UNDERGROUND PETROLEUM PIPING SYSTEMS

UNDERGROUND PETROLEUM PIPING SYSTEMS UNDERGROUND PETROLEUM PIPING SYSTEMS New York State Department of Environmental Conservation Bulk Storage Section March 1998 Prepared By: Paul Sausville Simon Wu I. Purpose This bulletin is written for

More information

Dominion Energy Questar Pipeline LLC Contractor Covered Task List Last updated 10/3/2017

Dominion Energy Questar Pipeline LLC Contractor Covered Task List Last updated 10/3/2017 007 Operate Valves 008 Measurement of Wall Thickness with Ultrasonic Device 103 Non-destructive Testing (Other than testing of welds) -- Mag Particle 104 Non-destructive Testing (Other than testing of

More information

Storage Tank Risk Management Solutions Leak

Storage Tank Risk Management Solutions Leak Storage Tank Risk Management Solutions Leak Prevention and Tank Integrity Inspections for ASTs Brian Pine ATC Group Services NISTM 8th Annual Pennsylvania Storage Tank Conference 1 2 ATC GROUP SERVICES

More information

PHMSA Office of Pipeline Safety Dave Mulligan Western Region

PHMSA Office of Pipeline Safety Dave Mulligan Western Region PHMSA Office of Pipeline Safety Dave Mulligan Western Region Chevron Pipeline Releases Salt Lake City, Utah June 11, 2010 & December 1, 2011 Dave Mulligan U.S. Department of Transportation (US DOT) Pipeline

More information

API 653 TANK INSPECTION, TANK MAINTENANCE, AND CAUSES OF TANK FAILURE

API 653 TANK INSPECTION, TANK MAINTENANCE, AND CAUSES OF TANK FAILURE API 653 TANK INSPECTION, TANK MAINTENANCE, AND CAUSES OF TANK FAILURE API 653 Tank Inspections Why Inspect Your Tanks? Prevent leaks into your secondary containment or to groundwater (if you do not have

More information

GUIDELINES FOR THE EVALUATION OF UNDERGROUND STORAGE TANK CATHODIC PROTECTION SYSTEMS

GUIDELINES FOR THE EVALUATION OF UNDERGROUND STORAGE TANK CATHODIC PROTECTION SYSTEMS GUIDELINES FOR THE EVALUATION OF UNDERGROUND STORAGE TANK CATHODIC PROTECTION SYSTEMS NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF WASTE MANAGEMENT UNDERGROUND STORAGE TANK SECTION 1646

More information

This publication is copyrighted and intended for the sole use of General Industries - 07/07/2016

This publication is copyrighted and intended for the sole use of General Industries - 07/07/2016 AQUASWEEP JUNE 2009 INSTALLATION INSTRUCTIONS FOR AQUASWEEP UNDERGROUND OIL WATER SEPARATORS PREFACE i. Install the AquaSweep Oil Water Separator using personnel who have knowledge and experience in procedures

More information

Underground Storage Tank Annual Compliance Inspection (Revised 1/2015)

Underground Storage Tank Annual Compliance Inspection (Revised 1/2015) Colorado Department of Labor and Employment Division of Oil and Public Safety Compliance Section 633 17 th Street, Suite 500 Denver, CO 80202-3610 Phone: 303-318-8525 Fax: 303-318-8518 Email: cdle_oil_inspection@state.co.us

More information

Field-Erected AST Secondary Containment Options. Mott-Smith Consulting Group, LLC

Field-Erected AST Secondary Containment Options. Mott-Smith Consulting Group, LLC Field-Erected AST Secondary Containment Options Mott-Smith Consulting Group, LLC Marshall T. Mott-Smith, President Mott-Smith Consulting Group, LLC National Technical Expert and Regulatory Liaison, AET

More information

Fuel Tank Management: PBS, USTs and the Energy Policy Act of 2005

Fuel Tank Management: PBS, USTs and the Energy Policy Act of 2005 Fuel Tank Management: PBS, USTs and the Energy Policy Act of 2005 Petroleum Bulk Storage 6NYCRR Part 612 614 EPA Underground Storage Tanks 40 CFR Part 280 PBS Program Overview PART 612 PART 613 PART 614

More information

Inspector's Initials: Tank Owner or Agent Signature: Title: Date:

Inspector's Initials: Tank Owner or Agent Signature: Title: Date: STATE OF TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF UNDERGROUND STORAGE TANKS 4 TH Floor, L & C Tower 401 Church Street Nashville, TN 37243-1541 UST OPERATIONS INSPECTION Mo /Day

More information

EnLink Midstream Contractor Covered Task List Last updated 11/8/2017

EnLink Midstream Contractor Covered Task List Last updated 11/8/2017 003 Test Breakout Tank Overfill Protective Devices 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective Devices 195.428 005 Repair Breakout Tank Overfill Protective Devices 195.428

More information

CELLS AND BATTERIES Understand the general features of cells and batteries Describe the relationship between cells and batteries. Describe the basic

CELLS AND BATTERIES Understand the general features of cells and batteries Describe the relationship between cells and batteries. Describe the basic Cell & Batteries CELLS AND BATTERIES Understand the general features of cells and batteries Describe the relationship between cells and batteries. Describe the basic operation of a battery. Compare between

More information

JUNCTION BOX FOR CATHODIC PROTECTION

JUNCTION BOX FOR CATHODIC PROTECTION JUNCTION BOX FOR CATHODIC PROTECTION Yuxi manufacture a serious type of junction box required for a cathodic protection system. Our junction box is designed to use reliably for onshore and marine environments

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 834 FIRE HYDRANTS

San Antonio Water System Standard Specifications for Construction ITEM NO. 834 FIRE HYDRANTS San Antonio Water System Standard Specifications for Construction ITEM NO. 834 FIRE HYDRANTS 834.1 DESCRIPTION: This item shall consist of fire hydrant installations using joint restraints in accordance

More information

COVERED TASK Conduct Cathodic Protection Surveys 1 DESCRIPTION ELEMENTS OF TASK 4 PART QUESTION NOTES ABNORMAL OPERATING CONDITIONS

COVERED TASK Conduct Cathodic Protection Surveys 1 DESCRIPTION ELEMENTS OF TASK 4 PART QUESTION NOTES ABNORMAL OPERATING CONDITIONS COVERED Conduct Cathodic Protection Surveys 1 Annual surveys are conducted for each operator s pipeline system that is under cathodic protection to ensure that the protection is adequate. This task is

More information

Saddle Butte Rockies Midstream LLC Contractor Covered Task List Last updated 12/6/2017

Saddle Butte Rockies Midstream LLC Contractor Covered Task List Last updated 12/6/2017 003 Test Breakout Tank Overfill Protective N/A 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective N/A 195.428 Oral 005 Repair Breakout Tank Overfill Protective N/A 195.428 007 Operate

More information

Steel USTs: History and Trends. Wayne Geyer, STI/SPFA August 1, 2013

Steel USTs: History and Trends. Wayne Geyer, STI/SPFA August 1, 2013 Steel USTs: History and Trends Wayne Geyer, STI/SPFA August 1, 2013 Who and What is STI/SPFA? Association of 180 fabricating and affiliate companies of steel construction products shopfab tanks, field

More information

Noble Energy Contractor Covered Task List Last updated 2/20/2019

Noble Energy Contractor Covered Task List Last updated 2/20/2019 003 Test Breakout Tank Overfill Protective Devices 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective Devices 195.428 005 Repair Breakout Tank Overfill Protective Devices 195.428

More information

Rated output 5,6 kw 5,6 kw. Max power consumption 6,7 kw 6,7 kw. Shaft speed 2890 RPM 2890 RPM

Rated output 5,6 kw 5,6 kw. Max power consumption 6,7 kw 6,7 kw. Shaft speed 2890 RPM 2890 RPM Drainage pumps H (m) 50 Major 40 30 H 20 10 N 0 0 5 10 15 20 25 30 35 40 Q (l/s) P (kw) 7 6 5 N 4 3 H 2 1 0 A B C Technical data N H Discharge connection 4 3 Rated output 5,6 kw 5,6 kw Max power consumption

More information

Changes to EPA s AST & UST Rules. Mott-Smith Consulting Group, LLC

Changes to EPA s AST & UST Rules. Mott-Smith Consulting Group, LLC Changes to EPA s AST & UST Rules Mott-Smith Consulting Group, LLC Marshall T. Mott-Smith, President Mott-Smith Consulting Group, LLC 111 North Calhoun Street, Tallahassee, FL 32301 marshall@mott-smithconsulting.com

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 834 FIRE HYDRANTS

San Antonio Water System Standard Specifications for Construction ITEM NO. 834 FIRE HYDRANTS San Antonio Water System Standard Specifications for Construction ITEM NO. 834 FIRE HYDRANTS 834.1 DESCRIPTION: This item shall consist of fire hydrant installations using joint restraints in accordance

More information

Florida City Gas Contractor Covered Task List

Florida City Gas Contractor Covered Task List 001A Abandonment and deactivation of facilities 192.727 001B 001C 001SUBA Abandonment and deactivation of facilities (service lines not in use) Abandonment and deactivation of facilities (service lines

More information

Epic Consolidated Operations LLC Contractor Covered Task List Last updated 9/6/2018

Epic Consolidated Operations LLC Contractor Covered Task List Last updated 9/6/2018 003 Test Breakout Tank Overfill Protective 195.428 Oral 004 Inspect and Calibrate Breakout Tank Overfill Protective 195.428 Oral 005 Repair Breakout Tank Overfill Protective 195.428 006 Inspection of Breakout

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE.

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE. 201-00000 Clearing and Grubbing 1 LS 202-00010 Removal of Tree 9 EA 202-00019 Removal of Inlet 8 EA 202-00034 Removal of Pipe (6 Inch) 196 LF 202-00035 Removal of Pipe (18 Inch) 10 LF 202-00036 Removal

More information

Changes to EPA s AST & UST Rules. Mott-Smith Consulting Group, LLC

Changes to EPA s AST & UST Rules. Mott-Smith Consulting Group, LLC Changes to EPA s AST & UST Rules Mott-Smith Consulting Group, LLC Marshall T. Mott-Smith, President Mott-Smith Consulting Group, LLC 111 North Calhoun Street, Tallahassee, FL 32301 marshall@mott-smithconsulting.com

More information

Southern Star Central Gas Pipeline Contractor Covered Task List Last updated 8/15/2018

Southern Star Central Gas Pipeline Contractor Covered Task List Last updated 8/15/2018 007 Operate Valves 008 Measurement of Wall Thickness with Ultrasonic Device 018 Inspect Navigable Waterway Crossing 195.412(b) 201 Abnormal Operating Conditions Related to Welding on Pipelines 192.225

More information

Code Requirements for ASTs at Motor Vehicle-Dispensing Stations

Code Requirements for ASTs at Motor Vehicle-Dispensing Stations Code Requirements for ASTs at Motor Vehicle-Dispensing Stations This table compares aboveground storage tank requirements in the 2015 edition of, to the 2015 International Fire Code (). Please note that

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS CATHODICALLY PROTECTED UNDERGROUND STORAGE TANKS R821 INSTALLATION INSTRUCTIONS JUNE 2010 1.0 EXCAVATION AND BEDDING 1.1 The bottom of the excavation shall be covered with a minimum of 12 inches (305 mm)

More information

INSTALLATION GUIDELINES

INSTALLATION GUIDELINES SUMP TANKS INSTALLATION GUIDELINES Thank you for purchasing a quality SumpTank. In order to gain the maximum benefit from your purchase, we have outlined the following instructions for the installation

More information

Santa Fe Calvada Mine. Final Closure of a Heap Leach Facility Case Study in Design and Construction of E-cells

Santa Fe Calvada Mine. Final Closure of a Heap Leach Facility Case Study in Design and Construction of E-cells Santa Fe Calvada Mine Final Closure of a Heap Leach Facility Case Study in Design and Construction of E-cells Site Location Location with Surrounding Topography Overall Site Layout Google Earth View History

More information

Above Ground Oil Tanks

Above Ground Oil Tanks Helping you identify and manage risk Above Ground Oil Tanks In many regions across Canada particularly in Québec and the Atlantic provinces above ground oil tanks are still being used to heat institutional

More information

LITHIUM / THIONYL CHLORIDE High Power Type ER18505M BRIEF SPECIFICATION

LITHIUM / THIONYL CHLORIDE High Power Type ER18505M BRIEF SPECIFICATION LITHIUM / THIONYL CHLORIDE High Power Type ER18505M BRIEF SPECIFICATION Model: ER18505M Spirally Wound Type Nominal Voltage: 3.6V Nominal Capacity: 3.2Ah Weight: 30g Stainless steel container with PVC

More information

Background. AEM Tier 2 Worksheet Petroleum and Oil Product Storage. Glossary. Agricultural Water Quality Principle:

Background. AEM Tier 2 Worksheet Petroleum and Oil Product Storage. Glossary. Agricultural Water Quality Principle: AEM Tier 2 Worksheet Petroleum and Oil Product Storage Glossary Cathodically Protected: Corrosion protection for an underground metal tank or pipe by causing a continuous electric current to flow from

More information

LITHIUM / THIONYL CHLORIDE Energy Type ER10250 BRIEF SPECIFICATION

LITHIUM / THIONYL CHLORIDE Energy Type ER10250 BRIEF SPECIFICATION LITHIUM / THIONYL CHLORIDE Energy Type ER10250 BRIEF SPECIFICATION Model: ER10250 Bobbin design Nominal Voltage: 3.6V Nominal Capacity: 0.35Ah Weight: About 3.8g Stainless steel container with PVC wrap

More information

GENERAL AVIATION FUELING Arkansas Airport Operators Association Annual Meeting

GENERAL AVIATION FUELING Arkansas Airport Operators Association Annual Meeting GENERAL AVIATION FUELING Arkansas Airport Operators Association Annual Meeting PRESENTED BY: FUELING SYSTEM EXPERTS Dan Frank, P.E., P.Eng Vice President of Engineering Argus Consulting, Inc. dfrank@argusconsulting.com

More information

Mitigation of External Corrosion on Buried Carbon Steel Pipeline Systems July/2018

Mitigation of External Corrosion on Buried Carbon Steel Pipeline Systems July/2018 Best Management Practice Mitigation of External Corrosion on Buried Carbon Steel Pipeline Systems July/2018 2018-0028 The Canadian Association of Petroleum Producers (CAPP) represents companies, large

More information

National Fire Protection Association

National Fire Protection Association National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Liquefied Petroleum

More information

For Conduit Inspections

For Conduit Inspections Underground Conduit Standards - Table of Content 5/8/2017 Section S22 Underground Conduit Standard Index: Description: 00 Table of Content 01 General Notes 02 Definition of Terms 03 Primary Riser Conduit

More information

Dispenser Containment Manual. Product Manual * Publication Number: DCM-0001 * Issue Date: 05/27/09 Supercedes: 11/01/07

Dispenser Containment Manual. Product Manual * Publication Number: DCM-0001 * Issue Date: 05/27/09 Supercedes: 11/01/07 Dispenser Containment Manual Product Manual * Publication Number: DCM-0001 * Issue Date: 05/27/09 Supercedes: 11/01/07 INDEX 1.0 Introduction 1.1 General Information 1.2 Independent Testing 1.3 Liquid

More information

Operational Compliance Closure/Release Response/Corrective Action at Underground Storage Tank Facilities

Operational Compliance Closure/Release Response/Corrective Action at Underground Storage Tank Facilities Connecticut Department of Energy and Environmental Protection Operational Compliance Closure/Release Response/Corrective Action at Underground Storage Tank Facilities May 15, 2015 Peter Zack, Assistant

More information

FISC Puget Sound Manchester Fuel Department. Maintenance, Leak Detection in Large Underground Storage Tanks. Glenn E. Schmitt, P.E.

FISC Puget Sound Manchester Fuel Department. Maintenance, Leak Detection in Large Underground Storage Tanks. Glenn E. Schmitt, P.E. FISC Puget Sound Manchester Fuel Department Glenn E. Schmitt, P.E. Environmental Director Fleet and Industrial Supply Center Puget Sound Maintenance, Leak Detection in Large Underground Storage Tanks Ready.

More information

TRANSFORMER RECTIFIER

TRANSFORMER RECTIFIER TRANSFORMER RECTIFIER voltage from the commercial electrical power grid or an engine-generator. A transformer with tap adjustments in the secondary side provides a method to reduce and adjust the output

More information

New Tank Installations. Peter Rollo

New Tank Installations. Peter Rollo New Tank Installations Peter Rollo New Tank Installations What tanks are regulated? All tanks with a capacity greater than 1,100 gallons Commercial tanks, other than heating fuel tanks, with a capacity

More information

GUIDELINES FOR THE EVALUATION OF UNDERGROUND STORAGE TANK CATHODIC PROTECTION SYSTEMS

GUIDELINES FOR THE EVALUATION OF UNDERGROUND STORAGE TANK CATHODIC PROTECTION SYSTEMS GUIDELINES FOR THE EVALUATION OF UNDERGROUND STORAGE TANK CATHODIC PROTECTION SYSTEMS MISSISSIPPI DEPARTMENT OF ENVIRONMENTAL QUALITY OFFICE OF POLLUTION CONTROL UNDERGROUND STORAGE TANK BRANCH P.O. BOX

More information

County of Fresno DEPARTMENT OF PUBLIC HEALTH

County of Fresno DEPARTMENT OF PUBLIC HEALTH County of Fresno DEPARTMENT OF PUBLIC HEALTH Purpose UNDERGROUND STORAGE TANK CLOSURE GUIDELINES This document has been prepared as a guide for underground storage tank (UST) owners and other interested

More information

Model AT Linear Anode System

Model AT Linear Anode System Model T Linear node System Typical pplications: Underground and aboveground storage tanks, buried pipelines, elevator shafts, marine structures Featuring: Design flexibility - modular design permits multitude

More information

UNIT 6: BATTERIES, UPS AND CABLES

UNIT 6: BATTERIES, UPS AND CABLES UNIT 6: BATTERIES, UPS AND CABLES 6.1 Batteries 6.1.1 Introduction i. Definition of Batteries: Stores chemical energy in cells and converts them into electrical energy in the form of direct current (D.C);

More information