ANDERSON DRIVE & LANDSCAPE 10'-0" PUE SETBACK BUILDING SETBACK SIGN 20'-0" ENTRY /EXIT 71'-3" CHILD CARE CENTER 4,700 S.F. EXIT EXIT PLAYGROUND
|
|
- Stephanie Cook
- 5 years ago
- Views:
Transcription
1 SI GNAGE
2 LANDSCAPE SETBACK T COMPACT 8'-0" 16'-0" LOCATION LIGHT POST LIGHT POST NEW STREET (E) STREET RELOCATE CL 36'-0" SHARED DRIVEWAY 20'-0" 6'-0" TRASH ENCLOSURE, SEE DETAIL 1/DR '-0" 20'-0" 10'-0" 8 7 9'-0" 19'-0" NOPARKING PROPOSED SITE PLAN SCALE: 1" = 10'-0" 6' HIGH METAL FENCE DROP-OFF 66' 3,400 S.F. PLAYGROUND 4,700 S.F. CHILD CARE CENTER 71'-3" / ENTRY 10'-0" PUE & LANDSCAPE 20'-0" SIGN SETBACK BUILDING SETBACK ANDERSON DRIVE SETBACK BUILDING 10'-0" SETBACK LANDSCAPE 6'-0" SITE DATA APN: SITE AREA: 22,431 S.F. (0.51 AC.) ZONE: CG (GENERAL COMMERCIAL) BUILDING AREA: CHILD CARE CENTER 4,700 S.F COVERAGE 20.9 % PARKING REQUIRED: CHILD 1 STALL/STAFF (5) 5 SPACES PLUS 1 STALL/5 CHILDREN (50) 10 SPACES TOTAL PARKING REQUIRED 15 SPACES PARKING PROVIDED: ACCESSIBLE 1 SPACE STANDARD (9'x19') 13 SPACES COMPACT (8'x16') 1 SPACES TOTAL PARKING PROVIDED 15 SPACES PROPOSED SITE PLAN DR - 2
3 PLAN ELEVATION TUBE STEEL TO CMU CONNECTION SCALE: 3/4" = 1'-0" TRASH ENCLOSURE ROOF PLAN TRASH ENCLOSURE PLAN SIDE ELEVATION 11 FIXED BOLLARD SCALE: 1/2" = 1'-0" TRASH ENCLOSURE SECTION 8 5 SCALE: 3/4" = 1'-0" REAR ELEVATION TRASH ENCLOSURE ELEVATIONS 2 TRASH ENCLOSURE FRONT ELEVATION SECTION SITE DETAILS ELEVATION DR FENCE SCALE: 3/4" = 1'-0" 9 GATE ELEVATION SCALE: 1/2" = 1'-0" 6 GATE JAMB DETAILS SCALE: 1" = 1'-0"
4 71'-3" ENTRY / OFFICE (11.5' X 13') 146 S.F. RR CHECK-IN ELEC. ROOM INFANT / TODDLERS (33' X 20') 660 S.F. FIRE RISER STO. 44 S.F. PRE-SCHOOL (20' X 25') 500 S.F. KITCHEN (13' X 19') 250 S.F. PRE-K (20' X 25') 450 S.F. 66'-0" STO. 39 S.F. STO. 39 S.F. RR PRE-SCHOOL (30' X 18') 560 S.F. 5' CORRIDOR GIRL'S RR STO. 32 S.F. MULTI-PURPOSE (20' X 20') 400 S.F. BOY'S RR FLOOR PLAN FLOOR PLAN DR - 3
5 EXTERIOR FINISHES & COLORS SYMBOL MATERIAL MANUFACTURER/COLOR FOAM CORNICE, PAINTED ACCENT TILE WITH 2" REVEAL FABRIC AWNING TRIM, PAINTED FOAM CORNICE, PAINTED FOAM TRIM, PAINTED SIGNAGE FOAM CORNICE, PAINTED ACCENT TILE WITH 2" REVEAL FABRIC AWNING TRIM, PAINTED PAINT (BODY) PAINT (ACCENT) PAINT (CORNICE) FABRIC AWNING STONE VENEER ALUMINUM STOREFRONT SYSTEM STANDING SEAM METAL ROOF (TRASH ENCL.) SHERWIN WILLIAMS SW7011 "NATURAL CHOICE" SHERWIN WILLIAMS SW7695 "MESA TAN" SHERWIN WILLIAMS SW7547 "SANDBAR" PRE-FAB AWNING SYSTEM SUNBRELLA "MERIDIAN BRICK" EL DORADO MOUNTAIN LEDGE "YUKON" KAWNEER PERMANODIC "DARK BRONZE ANODIZED" AEP SPAN DURATECH "COOL RED" STONE VENEER DOOR, PAINTED NORTH ELEVATION (ANDERSON DRIVE) SCALE: 1/8" = 1'-0" STONE VENEER ALUMINUM STOREFRONT SYSTEM WEST ELEVATION (PARKING) SCALE: 1/8" = 1'-0" SOUTH ELEVATION (PLAYGROUND) SCALE: 1/8" = 1'-0" EXTERIOR ELEVATIONS EAST ELEVATION SCALE: 1/8" = 1'-0" DR - 4
6 GENERAL LANDSCAPE NOTES ALL LANDSCAPE AREA SHALL BE WATERED WITH A BURIED, AUTOMATICALLY CONTROLLED IRRIGATION SYSTEM. LOW VOLUME, MPR NOZZLES AND DRIP WILL BE USED WHERE APPROPRIATE FOR WATER CONSERVATION. ALL LANDSCAPE AREAS SHALL BE COVERED WITH A 3" LAYER OF BARK MULCH TOP DRESSING. ALL TREES SHALL BE INSTALLED AT A MINIMUM OF 15 GAL. SIZE. ALL SHRUBS SHALL BE INSTALLED AT A 5 GAL. SIZE, EXCEPT ACCENT AND GROUNDCOVER SHRUBS. AND EVERGREEN SHRUBS TALL NARROW TREES PISTACIA CHINENSIS CARPINUS B. 'FRANS FONTAINE' LOMANDRA LONGIFOLIA CERCIS 'OKLAHOMA' BULBINE FRUTESCENS COLEONEMA P. 'SUNSET GOLD' PLUMBAGO CAPENSIS HELICTOTRICHON SEMPERVIRENS SALVIA 'HEATWAVE SERIES' NARROW HORNBEAM CONCEPTUAL PLANT LIST CHINESE PISTACHE REDBUD YELLOW LEAF BREATH OF HEAVEN CAPE PLUMBAGO FLOWERING SAGE MAT RUSH BLUE OAT GRASS N.C.N. MED /.5 MED /.5 WUCOLS TO SHADE PARKING LOT LARGE SCALE TREES 8 7 COMPACT NOPARKING ACCENT PLANTS AROUND SIGN DROUGHT TOLERANT GROUND COVER FENCE AROUND PLAY AREA SIDEWALK ANDERSON DRIVE LANDSCAPE PLANS COMPLY WITH THE CRITERIA OF THE WATER EFFICIENT LANDSCAPE ORDINANCE AB1881 AND HAVE APPLIED SUCH CRITERIA FOR THE EFFICIENT USE OF WATER IN THE LANDSCAPE DESIGN. WATER USE CALCULATIONS SHALL BE SUPPLIED WITH CONSTRUCTION DOCUMENTS FLOWERING TREES ALONG PROPERTY LINE LARGE SCALE STREET TREES SMALL SCALE MULTI TRUNK TREES CONCEPTUAL LANDSCAPE PLAN SCALE: 1" = 20'-0" SYMBOL BOTANICAL NAME COMMON NAME WATER USE PHORMIUM TENAX 'JACK SPRATT' DWARF NEW ZEALAND FLAX COTINUS COGGYGRIA 'ROYAL PURPLE' SMOKE TREE CALLISTEMON V. 'LITTLE JOHN' DWARF BOTTLE BRUSH LAVANDULA A. 'BUENA VISTA' LAVANDULA A. 'BUENA VISTA' TEUCRIUM F. 'COMPACTUM' BUSH GERMANDER FRANGULA CALIFORNICA LEATHERLEAF COFFEBERRY "THE R2 STAKE" POLE STRAP-BAR. HEIGHT AS REQUIRED. SEE SPECIFICATIONS. UV RESISTANT VINYL STRAP. FOLD AND SECURE AS SHOWN. TREE TRUNK (15 GAL AND 24" BOX SIZE) 1/4" BOLTS/NUTS/WASHERS STRAP-BAR. HEIGHT AS REQUIRED. SEE SPECIFICATIONS. "THE R2 STAKE" SYSTEM. SIZE AND INSTALLATION PER SPECIFICATIONS. TAB AND ANTI-ROTATION PIN. INSTALL TAB 2-4" BELOW GRADE 2" LAYER MULCH. HOLD AWAY FROM TRUNK WATERING BASIN AT EDGE OF ROOTBALL FINISH GRADE AMENDED SOIL- AS PER SOIL REPORT SCARIFY SIDES OF PLANTING PIT AND ROOTBALL FERTILIZER TABLETS - AS NOTED IN SOIL REPORT 2 TIMES ROOTBALL UNDISTURBED NATIVE SOIL NOTES: TREE STAKE TO BE LOCATED ON PREVAILING WIND SIDE WHEN TREE IS IN LEAF. INSTALL TREE'S ROOTBALL 2" ABOVE FINISH GRADE (ROOT FLARE SHALL BE EXPOSED AT GRADE) TREE PLANTING AND STAKING DETAIL CONTACT J. R. (888) FOR TREE STAKES BORRECCO/KILIAN & ASSOCIATES, INC. LANDSCAPE ARCHITECTS 1241 Pine Street Martinez, California Phone: FAX: 925/ / CONCEPTUAL LANDSCAPE PLAN DR - 5
7 ANDERSON DRIVE SUISUN CITY, CA PRELIMINARY GRADING AND DRAINAGE PLAN
8 ANDERSON DRIVE SUISUN CITY, CA PRELIMINARY UTILITY PLAN
9 DROP-OFF ANDERSON DRIVE COMPACT NOPARKING LUM-5M-40PLED-NW-1050 MH: SIGN MH: 7 ENTRY / MH: 7 71'-3" WALL SCONCE: 7 FEET HIGH AT ENTRY/S, AND 9 FEET HIGH AT CORNERS ' CHILD CARE CENTER 4,700 S.F LUM-5M-40PLED-NW-1050 MH: T PLAYGROUND 3,400 S.F. LUM-3-40PLED MH: 15 MH: 7 MH: POLE MOUNTED FIXTURES AT 15 FEET HIGH FILE NAME: Day Care Facility_DT_ AGI CALCS BY: CAIN BOULDEN VOICE: (510) cainb@ltgsys.com PHOTOMETRIC PLAN SCALE: 1" = 10'-0" SALES CONTACT: DAN THOMPSON (510) dant@ltgsys.com PHOTOMETRIC PLAN DR - 8
BERLIN MEADOWS. Faris Planning & Design SOUTH LANDSCAPE PLAN EXHIBIT D-1 PLANT KEY TYPICALS SEE PLANT LIST FOR SPECIFIC PLANT SPECIES
ROA PRESERVE S TO FULLEST EXTENT POSSIBLE SEE DETAIL ON SHEET D- FOR TOT LOT 54 84 85 86 56 87 57 88 89 90 9 9 58 59 60 65 66 9 94 95 96 97 98 75 76 77 78 79 80 99 00 0 0 SEE DETAIL ON SHEET D- FOR TOT
More informationCODE ANALYSIS BUILDING AREA STORIES 2 BUILDING HEIGHT 25'
CODE ANALYSIS APPLICABLE CODES (*- w/ local amendments) BUILDING CODE IBC 2006 * PLUMBING CODE IPC 2006* MECHANICAL CODE IMC 2006* ELECTRICAL CODE NFPA 70 (NEC) 2008* ENERGY CONSERVATION CODE IECC 2006
More informationDUNKIN DONUTS 206 EAST STATE STREET GENEVA, ILLINOIS
PRELIMINARY ENGINEERING PLANS DUNKIN DONUTS 206 EAST STATE STREET GENEVA, ILLINOIS ERIC CARLSON ARCHITECTS LOCATION MAP DRAWINGS INDE CONTACTS REV DATE NOT TO SCALE BENCHMARKS CRISSEY AVENUE IL ROUTE 38
More informationPROJECT DATA PROJECT ADDRESS: OWNER:
AFFORABLE STORAGE 51 UNIVERSITY AVE. "L" LOS GATOS, C 95030 (408) 3952555 VICINITY MAP SITE PROJECT DIRECTORY ARCHITECT: KOHLSAAT & ASSOCIATES 51 UNIVERSITY AVENUE, SUITE L LOS GATOS, CA 95030 TEL: (408)
More information77'-0" 77'-0" 40'-4" 9'-0" 0'-0" 1'-4" Site Plan Maximum Impervious Coverage Scale: /2"=1'-0" SET BACK (REAR) SET BACK (FRONT) 140'-0" 60'-8" 52'-4" 27'-0" 11'-8" 11'-8" 8'-8" 1'-8" FUTURE POOL POOL DECK
More informationWESTSIDE PUMP STATION RELIABILITY IMPROVEMENTS CIVIC DESIGN REVIEW - PHASE 2 - JANUARY 23, 2017
WESTSIDE PUMP STATION RELIABILITY IMPROVEMENTS CIVIC DESIGN REVIEW - PHASE 2 - JANUARY 23, 2017 CITY & COUNTY OF SAN FRANCISCO PUBLIC UTILITIES COMMISSION WESTSIDE T/S PROJECT BACKGROUND AND OBJECTIVE
More informationM1 BANK PETITION FOR FINAL SITE PLAN APPROVAL & CONDITIONAL USE PERMIT MANCHESTER ROAD DES PERES, MO 63131
M1 BANK PETITION FOR FINAL SITE PLAN APPROVAL & CONDITIONAL USE PERMIT 11679 MANCHESTER ROAD DES PERES, MO 63131 N. BALLAS RD BOPP RD PRELIMINARY - NOT FOR CONSTRUCTION SHEET INDEX - SITEPLAN & CUP G-0
More informationMETRO Magnolia Transit Center - Bid Tab
Section A - GENERAL ITEMS A-1 01505 Mobilization LS 1 $ 100,000.00 $ 100,000.00 A-2 -- Payment and Performance Bonds LS 1 A-3 01310 Document Control LS 1 A-4 01311 CPM Schedule LS 1 A-5 01590 Engineer's
More informationANN ARBOR CITY NOTICE ORDINANCE NO. ORD OFF STREET PARKING CHAPTER 59
ANN ARBOR CITY NOTICE ORDINANCE NO. ORD-12-04 OFF STREET PARKING CHAPTER 59 AN ORDINANCE TO AMEND SECTIONS 5:168 AND 5:169 OF CHAPTER 59 (OFF- STREET PARKING) OF TITLE V OF THE CODE OF THE CITY OF ANN
More informationParking Investigation / San Antonio UDC
Parking Investigation / San Antonio UDC Parking requirements: Minimum 0.8 per room plus 1 per 800 sf of public meeting areas and restaurant space Maximum 1 per room plus 1 per 400 sf of public meeting
More information/Volumes/work-1/e+a projects/2015 Projects/15-02-013 The Metro On Manchester - Brentwood MO/02 Schematic Design/B. Drawings/A. Archicad Files/ 8019 FAWN CT MARY SUSAN WARD FA W N CO 8015 FAWN CT MALLORY
More informationProject Book Worksheet for Cost Estimation
001.01 MOBILIZATION LS $34,716.18 007 3/17/2039 001.02 INCIDENTAL LS $23,929.43 019 3/17/2039 001.03 CONSTRUCTION STAKING LS $10,504.39 201 5/9/2013 001.04 REESTABLISH PROPERTY CORNERS EA $496.08 201 5/9/2013
More informationSteese Rd - Curb & Sidewalk Improvement
REF. NO. ITEM NO. Steese Rd - Curb & Sidewalk Improvement DESCRIPTION QTY UNITS UNIT COST SUB-TOTAL 1 103.05 Requirement of Contract Bid 1 LS 24,048.00 24,048.00 2 201 Clearing and Grubbing 1 LS 11,077.00
More informationPlanning Commission Staff Report Ordinance Amendment Hearing Date: November 14, 2018
Planning Commission Staff Report Ordinance Amendment Hearing Date: November 14, 2018 ITEM # 1* Western Community Crossroads LC requests an Ordinance Text amendment to Section 14.34.350 Recreational Vehicle
More informationDESCRIPTION QUANTITY PRICE TOTAL
GENERAL 1 TRAFFIC CONTROL LS 1 $40,000 $40,000 $8,500.00 $8,500.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $15,000.00 $15,000.00 2 MOBILIZATION LS 1 $557,000 $557,000 $629,500.00 $629,500.00 $350,000.00
More informationEast Allen County Schools Facilities History Calendar Years October 5, 2015
East Allen County Schools Facilities History Calendar Years 2007 2015 October 5, 2015 Heritage Attendance Area Heritage Jr./Sr. High School (includes K-12) 2007: Repaved Front Student Parking Lot; and
More informationCertificate of Appropriateness Monthly Issuance Report March 2012
3/7/2012 852 East Ocean Blvd. Adelaide Tichenor House Upgrade electrical meter and place on west elevation of garage in a new enclosure using existing materials. 3/16/2012 5725 Corso di Napoli Replace
More informationPROPOSED 5' HIGH RETAINING KEYSTONE WALL WITH WROUGHT IRON FENCE ON TOP OF WALL PROPOSED SITE LIGHT (TYP.) PROPOSED FIRE HYDRANT 7.0' 9.
LAND USE: VACANT AND ELECTRICAL TRANSMISSION LINES GENERAL PLAN: PLANNED COMMUNITY ZONING: PC (CDP04-01) UTILITIES 3' WIDE BIOFILTRATION WITH UNDERDRAIN. TOP ELEVATION AT 3" BELOW PARKING LOT SURFACE SITE
More informationSTANDARD DRAWING INDEX
ATTACHMENT B STANDARD DRAWING INDEX DESCRIPTION EXISTING DRAWING NO. GENERAL Typical Layout for Improvement Plans City of Stockton Standard Border and Title Block for 8 1/2 x11 Sheet City of Stockton Standard
More informationGENERAL NOTES AND REQUIREMENTS FOR PLUMBING AND ELECTRICAL WORK
GENERAL NOTES AND REQUIREMENTS FOR PLUMBING AND ELECTRICAL WORK SCALE: 1"=20'-0" OUTDOOR EQUIPMENT STORAGE YARD HISTORIC SITE USE PLAN PARKING LOT AND EQUIPMENT CIRCULATION AREA 11. LOAD'G SPACE 4. 3.
More informationSUNSET BLVD. EL. 38'-0" EL. 56'-0" EL. 38'-0" ROOF TERRACE EL. 20'-0" PLAZA EL. 0'-0" PRIVATE TERRACE EL. 47'-0" POOL 3BR-UNIT A EL.
SUNSET BLVD. -2' -2'-0" (EL. +40.00') + (EL. +4000') +'-0" 0" (EL. 40.00') (N) (N) -4'-0" (EL. +40.00') +'-0" (EL. 40.00') 0.0 0' ) 0 +2'-" 2 (EL. ( 40.0') 40.0 ) (N) (EL. 4000') 4 (EL. +4000') 4 2 +2'-0"
More informationPARKING STANDARDS GENERAL DESIGN PRINCIPLES AND INTENT
West Hyattsville PARKING STANDARDS GENERAL DESIGN PRINCIPLES AND INTENT Intent To provide on-street parking and off-street surface/structured parking facilities that enhance pedestrian/motorist safety;
More informationAppendix G Aquilla Lake Pool Rise Recreational Resources
Appendix G Aquilla Lake Pool Rise Recreational Resources 1. INTRODUCTION The purpose of this appendix is to document the impacts of a 2.5 ft (Alternative A), 4.5 ft (Alternative B), and 6.5 ft. (Alternative
More informationSide. Side. This product is for a courtyard single-family condominium ownership type product. There
nterior Corner With regards to setback requirements for this planning area: Front - Garage 18 Foot Minimum Front - Residence 10 Foot Minimum Side Side Rear 4 Foot Minimum 8 Foot Minimum 8 Foot Minimum
More informationIncluded The seller reserves the right to alter and or change above stated options / Specifications at any time
SPECIFICATIONS Exterior Roofing -Malarkey 30 yr. asphalt shingles Gutters -Seamless aluminum 6 inch gutters on necessary horizontal roof lines Siding & trim -James Hardier fiber cement 8 inch reveal -Stone
More informationCode Complaint Type Section Violation description and Corrections required
1 Junk and Debris 8.04.100 VIOLATION: Outdoor storage and accumulation of miscellaneous junk, trash, rubbish and debris including dirt, sand, gravel, concrete or similar materials discarded on the premises
More informationBig Easy RV & Boat Storage A Green Energy Project Jana Lane Wildomar, California
Big Easy RV & Boat Storage A Green Energy Project 36215 Jana Lane Wildomar, California 1 PROJECT OVERVIEW Project Description The construction and operation of a solar generation facility consisting of
More informationLompa Ranch North Specific Plan
Lompa Ranch North Specific Plan Photo Credit: aroundcarson.com Prepared by: Updated: January 4, 26 Job # 27- LOMPA RANCH NORTH SPECIFIC PLAN Prepared for: Blackstone Development Group 49 W. Plumb Lane
More informationParking Survey Oct 2009 DRAFT October 2, DRAFT -- Parking Situation Current Status
DRAFT -- Parking Situation Current Status During Sept & Oct 009 members of P&Z walked much of the Town to informally survey the on-street parking situation in Dewey. This unofficial survey includes 14
More informationResolution No RECYCLING AND WASTE ENCLOSURE STANDARDS AND GUIDELINES
Resolution No. 05-001 RECYCLING AND WASTE ENCLOSURE STANDARDS AND GUIDELINES Purpose This following provides the standards and guidelines for the construction of recycling and waste container enclosures
More informationCharter Township of Plymouth Zoning Ordinance No. 99 Page 164 Article 15: VP Vehicular Parking District Amendments:
Charter Township of Plymouth Zoning Ordinance No. 99 Page 164 PURPOSE ARTICLE XV VP VEHICULAR PARKING DISTRICT Vehicular Parking Districts (VP) are designed to accommodate off-street parking for the exclusive
More informationPROPOSED AMENDMENTS TO RESIDENTIAL PARKING STANDARDS
PROPOSED AMENDMENTS TO RESIDENTIAL PARKING STANDARDS To review the proposed amendments Approval of the amendments (5-3) Ogden City Planning is proposing several amendments and clarifications to the parking
More informationNEIGHBORING BUILDING 275' - 10" TRASH & RECYCLING VAN H/C L/T T 11' - 6 1/2" 32' - 0" 32' - 0" 53' - 6" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 27' - 0"
ALLEY NEIGHBORING BUILDING 25' - 0" ' - 0" LINE OF BASEMENT BELOW LINE OF CANOY ABOVE 2" SANITARY SEWER " WATER MAIN L L/T T GRAND AVE. B R 33' - 0" 24' - 5" 2' - 4" 2' - 4" 2' - 4" 24' - 5" SITE LAN /"
More informationCITY OF STANDARD SPECIFICATIONS
CITY OF Published May 4, 2016 CALIFORNIA Stephan Kiefer, Community Development Director Cheri Sheets, City Engineer CITY OF LIVERMORE 1052 South Livermore Avenue Livermore, CA 94550 4DEV0001.doc 03/12
More informationFranklin County Engineer's Office - Highway Design ALKIRE RD & DEMOREST RD ROUNDABOUT CR NO. 11 & CR NO. 25 Bid Tabulation
7/07/2015 Page 1 of 20 Strawser Paving Co., Inc. Shelly & Sands, Inc. Double Z Construction Co Columbus Asphalt Paving, Inc. 1595 Frank Road P.O.Box 2469 2550 Harrison Road 1196 Technology Dr Columbus,
More informationDR SE WAY SOMERSIDE. C-N Neighborhood Commercial Site. R-LD - Development in accordance. Fully Landscaped Park/ Playground.
LAND & BUSINESS SUPPORT DEPT Southlands Phase 6A Plan 01231 City of Medicine Hat Land & Business Support Ph (03) 52-1 Fax (03) 502-055 land_properties@medicinehat.ca updated August 20, 201 SOMERSET BAY
More informationCLOVER ESTATES - CHESTERFIELD, MI
CLOVER ESTATES - CHESTERFIELD, MI HOMES STARTING AT: FLOOR PLANS PLAN A PLAN B ROSEWOOD $204,900 2 CAR GARAGE $208,900 1,352 SQ.FT. $214,400 3 CAR GARAGE $218,400 3 BEDROOM RANCH ROSEWOOD II $227,250 2
More informationIdentify nozzle placement options
Identify nozzle placement options aves: 8-10 foot spacing is recommended Fences: 8-10 foot spacing is recommended- locate up wind nozzles high and down wind nozzles middle or low. In some cases it won
More informationOperations Center FAQs
RICHARDSON INDEPENDENT SCHOOL DISTRICT Where all students learn, grow and succeed Operations Center FAQs Richardson ISD is constructing an operations center on vacant district land between Greenville Avenue
More informationTYPICAL DRIVEWAY CONSTRUCTION PER DOUGLAS COUNTY REGULATIONS AND POLICIES
TYPICAL DRIVEWAY CONSTRUCTION PER DOUGLAS COUNTY REGULATIONS AND POLICIES This document is a summary of the Douglas County regulations and policies for constructing residential driveways. It is intended
More informationSPECIAL GRADING INTERSECTION IMPROVEMENT JOHN WARD RD AT IRWIN RD REVISION DATES
9/20/2017 2:39:11 PM GPLOT-V8 2016104_18-001.dgn Project Number Sheet Total Sheets djackson gplotborder-v8i-po.tbl X2802 30 118 966.5 21+00 L.P. EL. 966.34 L.P. EL. 966.58 0.29% 0.11% 965 H.P. EL. 966.54
More informationSITE PLANS ASSISTED LIVING REDEVELOPMENT
SITE PLANS ASSISTED LIVING REDEVELOPMENT PROJECT SUMMARY TOTAL LOT AREA - 39.0 ACRES EXISTING BUILDING FOOTPRINT 48,060 S.F. PROPOSED 25,869 S.F. TOTAL BUILDING FOOTPRINT 73,929 S.F. ZONING COMPLIANCE
More informationSPECIAL USE CRITERIA
SPECIAL USE CRITERIA Panera Bread at Deerbrook Mall Retail F 385 Lake Cook Road, Deerfield, IL 60015 Does it meet the standards for a Special Use? A Special Use shall be authorized only when the Plan Commission
More informationChapter CALIFORNIA GREEN BUILDING STANDARDS CODE. Palo Alto Municipal Code
511/2017 I Print I Chapter 16.14 CALIFORNIA GREEN BUILDING STANDARDS CODE Palo Alto Municipal Code Agenda Item H6 Staff Handout 16.14.150 Section A4.106.8 Electric vehicle (EV) charging for new construction.
More informationCity of Surrey PLANNING & DEVELOPMENT REPORT File:
City of Surrey PLANNING & DEVELOPMENT REPORT Planning Report Date: June 26, 2017 PROPOSAL: Development Variance Permit to vary the off-street parking requirement to permit placement of one portable classroom
More informationMOTOR VEHICLE ORIENTED BUSINESSES.
ARTICLE 23. MOTOR VEHICLE ORIENTED BUSINESSES. Sec. 25-23.1. Conditional Use. Motor vehicle oriented businesses (MVOB) shall require a Conditional Use Permit in all districts as indicated in Appendix B,
More informationProposed Land Use Bylaw Amendments - Skateboard and Sports Ramps
Proposed Land Use Bylaw Amendments - Skateboard and Sports Ramps To assist with readability, the amendments are in numerical order with preceding and following bylaw text where relevant for context. The
More informationCONNECTION FROM FESTIVAL DRIVE / UPTOWN BOULEVARD LANDSCAPE PLANS PW
CHIPLEY PENSACOLA FORT WALTON BEACH PANAMA CITY TALLAHASSEE LAKE CITY JACKSONVILLE ST AUGUSTINE GAINESVILLE OCALA DAYTONA BEACH DELAND CONNECTION FROM FESTIVAL DRIVE / UPTOWN BOULEVARD LANDSCAPE PLANS
More informationERUSD 2025 Board Workshop #1
The image part with relationship ID rid4 was not found in the file. ERUSD 2025 Board Workshop #1 December 12, 2017 12/5/17 1 Cabinet Meeting 12/4/2017 Cactus Group 7 School Allowance $ 1,101,039 Filed
More informationROTORS MP ROTATOR SPRAYS VALVES CONTROLLERS SENSORS CENTRAL CONTROLS MICRO NEW
PRO-SPRAY ROTORS MP ROTATOR SPRAYS VALVES CONTROLLERS SENSORS CENTRAL CONTROLS MICRO NEW Jack of all Sprays Residential or commercial? 2.1 bar or 2.8 bar? High efficiency or high performance? There s a
More informationChapter. Parking SECTION OFF STREET PARKING AND LOADING REQUIREMENTS
Chapter 14 Parking It is the purpose and intent of this Ordinance that parking and loading areas be provided and adequately maintained in every zoning district for the purposes of promoting safe and efficient
More informationSpray and Rotary Nozzles
Spray and Rotary Nozzles Introduction Spray Bodies Rotors Valves Controllers Central Controls Landscape Drip Pumps & Filtration Drainage Products Resources Major Products Water Saving Tips HE-VAN nozzles
More informationPlanning Application Drawings
17 July 2017 AJ38 Lillys Farm 00 rev E Sheet Index Layout ID 00 rev E 01 rev E 02 rev E 03 rev E 04 rev E 05 rev E 06 rev E 07 rev E 08 rev E 09 rev E 10 rev E 10.1 Rev E 11 rev E 12 rev E 13 rev E 14
More informationTRAFFIC MANAGEMENT STANDARDS CITY OF GARLAND TRANSPORTATION DEPARTMENT
TRAFFIC MANAGEMENT STANDARDS CITY OF GARLAND TRANSPORTATION DEPARTMENT JUNE 1996 TABLE OF CONTENTS 1.0 Street Design Standards 1.1 Right-of-Way Requirements 1.2 Median Openings 1.3 Sidewalks 1.4 Traffic
More informationMSD OF WAYNE TOWNSHIP SUSTAINABILITY PROJECTS
MSD OF WAYNE TOWNSHIP 2017-2018 SUSTAINABILITY PROJECTS 2017 Superintendent Goals #2 Continued work towards increasing revenue and reducing expenditures including a reduction in the M.S.D. of Wayne Township
More informationCOMMUNITY DEVELOPMENT DEPARTMENT 333 Broadalbin Street SW, P.O. Box 490 Albany, OR 97321
COMMUNITY DEVELOPMENT DEPARTMENT 333 Broadalbin Street S, P.O. Box 490 Albany, OR 97321 Ph: 541-917-7550 Fax: 541-917-7598 www.cityofalbany.net STAFF REPORT Application for Site Plan Review and Adjustment
More informationSOUTH VALLEY/SOUTH PHOENIX/ SKYLINE PREP ORANGE BUS STOP LOCATION P.U. 1 41st Pl. & CITY BUS STOP 8: ND ST & SOUTHERN N.W.
ORANGE BUS STOP LOCATION P.U. 1 41st Pl. & SOUTHERN @ CITY BUS STOP 8:00 2 32ND ST & SOUTHERN N.W. CORNER 8:02 3 24TH ST & SOUTHERN N.W. CORNER @ CITY BUS STOP 8:04 4 22 ND ST & SOUTHERN 8:06 5 16TH ST
More informationCITY OF PORTSMOUTH DEPARTMENT OF PUBLIC WORKS (DPW) DRIVEWAY RULES AND PROCEDURES
CITY OF PORTSMOUTH DEPARTMENT OF PUBLIC WORKS (DPW) DRIVEWAY RULES AND PROCEDURES The purpose of a driveway permit is to secure access from a private property to the public right-of-way. It is required
More informationSpray and Rotary Nozzles
Introduction Spray Bodies Rotors Valves Controllers Central Controls Landscape Drip Pumps Drainage Products Resources Major Products Water Saving Tips HE-VAN nozzles are fully adjustable from 0 to 360
More informationQUICK START ORDERING GUIDE. Bladder Tank Quick Start Ordering Guide
QUICK START ORDERING GUIDE Bladder Tank Quick Start Ordering Guide New Bladder Tanks - Quick Start Ordering Guide The new Bladder Tanks allow a lot of flexibility in the way they can be configured to fit
More informationIncluded The seller reserves the right to alter and or change above stated options / Specifications at any time
SPECIFICATIONS Exterior Roofing -Malarkey 30 yr. asphalt shingles Gutters -Seamless aluminum 6 inch gutters on necessary horizontal roof lines Siding & trim -James Hardier fiber cement 8 inch reveal -Stone
More informationSubject: Hannaford Supermarket & Pharmacy 756 Route 1 Minor Site Plan Application for Proposed CLYNK Bottle Redemption Unit & Bicycle Rack Addition
Stantec Consulting Services Inc. 482 Payne Road Scarborough Court, Scarborough ME 04074-8929 September 8, 2017 Mr. Alexander Jaegerman, FAICP Director of Planning & Development 200 Main Street Yarmouth,
More informationENGINEERING & ENVIRONMENTAL
1-800-292-8989 www.iowaonecall.com CITY OF WEST BRANCH, IOWA THIS ENGINEERING DOCUMENT HAS BEEN REVIEWED BY THE JURISDICTION AND IS RECOMMENDED FOR FILING WITH THE CITY CLERK ENGINEERING & ENVIRONMENTAL
More information190/350/500 STANDARD ENTRANCES
APRIL, 2012 190/350/500 STANDARD ENTRANCES FEATURES 1 Features 190 narrow stile has 2-1/8" vertical stile, 2-1/4" top and 3-7/8" bottom rail 350 medium stile has 3-1/2" vertical stile, 3-1/2" top and 6-1/2"
More information2011 LOCAL STREET IMPROVEMENTS
11 LOCAL STREET IMPROVEMENTS FOR THE MARCH 11 LIST OF DRAWINGS W. MAIN STREET/STH 19 E. MAIN STREET/STH 19/STH 113 DRAWING TITLE NO. TITLE 1 PROJECT OVERVIEW 2 KLEIN DRIVE CONSTRUCTION PHASING PLAN 3 PHASE
More information380, 400 & 410 SOUTH MELROSE DRIVE, VISTA CA RENOVATIONS ARE NOW UNDER WAY! INTERIOR & EXTERIOR RENDERINGS AVAILABLE
RENOVATIONS ARE NOW UNDER WAY! INTERIOR & EXTERIOR RENDERINGS AVAILABLE HIGHLIGHTS EXTENSIVE RENOVATIONS ARE NOW UNDERWAY to make The Atrium one of Vista s most desirable office projects. FLEXIBLE LEASE
More informationIRRIGATION SUPPLIES. Kifco Water Reels. CONSERV FS IS AN AUTHORIZED KIFCO DEALER Repair Parts Available
Kifco Water Reels KIFCO: DESIGNED TO MAKE PORTABLE IRRIGATION EASY! Kifco Water-Reels are designed to make portable irrigation easy. The machines are simple to operate and provide efficient irrigation
More informationCovenant Violation Guide Book
Covenant Guide Bo Belle Creek Master HOA Version: March 04, 2013 Copyright 2013 All Rights Reserved Contents Section 1: Lawn Care... 1 Section 2: Weeds/Grass in Rock Beds... 2 Section 3: Weeds in Lawn...
More information3.1 Overview of ATCO Electric s URD System Design
Page: 3-1 3.0 URD DESIGN GUIDELINES 3.1 Overview of ATCO Electric s URD System Design The power supply to all single lot underground residential services is through front lot service. Single phase transformers
More informationBID TABULATION REPORT McKINNEY STREET DRAINAGE IMPROVEMENTS PROJECT No. PWDR10012 BID OPENED : TUESDAY, AUGUST 13, :00 P.M.
PAVING IMPROVEMENTS McKINNEY 101 Rightofway Preparation LS 1 75,000.00 75,000.00 200,000.00 200,000.00 67,000.00 67,000.00 110,000.00 110,000.00 102 12inch HMAC Street Pulvermix SY 11,650 3.00 34,950.00
More informationSPRINGWATER MISSING GAP Springwater Missing Gap Linking the Springwater on the Willamette Trail to the Springwater Corridor Trail June 2006
Springwater Missing Gap Linking the Springwater on the Willamette Trail to the Springwater Corridor Trail June 2006 METRO COUNCIL David ragdon, President Rex urkholder Carl Hostica Susan McLain Robert
More informationTemporary Sales Trailer Application
Development Services Department Building Division 311 Vernon Street Roseville, California 95678-2649 Temporary Sales Trailer Application General: Requests for temporary sales trailers, which comply with
More informationRIVERCHASE RETAIL SIGNAGE CRITERIA
RIVERCHASE RETAIL SIGNAGE CRITERIA RIVERCHASE PLANNED COMMERCIAL DISTRICT Inline Retail Outparcel/Pad Retail July 26, 2011 Page 1 GENERAL A. These Sign Criteria, developed by the Riverchase Business Association
More informationDISTRICT. Regional Commercial (RC) Light Industrial (LI) No maximum. maximum. 60 acres. Smaller areas may be added to an existing RC area.
7-16-4. Table 2, Table of Standards.,, and Special Purpose Districts. TOOELE CITY, UTAH TABLE 2 TABLE OF STANDARDS MIXED USE, COMMERCIAL, INDUSTRIAL AND SPECIAL PURPOSE S s Maximum Lot Area maximum 25,000
More informationSMRT-Y Soil Moisture Sensor Kit page 131. Medium Flow Commercial Control Zone Kit wih Pressure Regulating, Basket Filter page 202
New Products www.rainbird.com/newproducts Introducing New Rain Bird Products for 2010 Every new product for 2010 demonstrates Rain Bird s ability to deliver irrigation solutions that enhance your productivity
More informationChapter PARKING REGULATIONS
17.112.010 Chapter 17.112 PARKING REGULATIONS Sections: 17.112.010 Scope of Regulations Applicability. 17.112.020 Schedule of Off-Street Parking Requirements. 17.112.030 Off-Street Loading Requirements.
More informationMilgard Windows & Doors. Training Module Ultra and WoodClad Windows & Doors
Milgard Windows & Doors Training Module Ultra and WoodClad Windows & Doors Why Fiberglass? Structural integrity - no warping, swelling, rotting Strength - high tensile strength 8x stronger than vinyl Up
More informationDESIGN STANDARDS SECTION DS 3 STREETS
DESIGN STANDARDS SECTION DS 3 STREETS DS 3-01 GENERAL: A. INTENT: The intent of these Design Standards is to provide minimum standards for the design of public streets. These standards are intended to
More informationFLORIDA DEPARTMENT OF TRANSPORTATION
FLORIDA DEPARTMENT OF TRANSPORTATION ADDENDUM NO. 1 DATE: 3/8/2011 RE: BID/RFP #: RFP-DOT-10/11-9031-LG BID/RFP TITLE: FURNISH AND INSTALL EMERGENCY GENERATOR POWER SYSTEM AT CARYVILLE OPENING DATE: March
More informationLogistics Reststop Supply Friday Distribution Sheets with Truck Loading
Logistics Reststop Supply Friday Distribution Sheets with Truck Loading Truck loading / Unloading is covered on the next 2 pages. Gear distribution at the church starts after that. Reststop Captains updated
More informationRolling Road (Route 638) Widening Project
Rolling Road (Route 638) Widening Project From: 0.369 Mile North of Fairfax County Parkway (Route 286) To: Old Keene Mill Road (Route 644) State Project No. 0638-029-156, P104, R204, C504; UPC 5559 Public
More informationSTORE NUM.: 284 CROSS STREETS: San Pablo Ave & Monroe St. ADDRESS: 1075 Monroe St. Albany, CA
STORE NUM.: 284 CROSS STREETS: San Pablo Ave & Monroe St. ADDRESS: 1075 Monroe St. Albany, CA WALL SIGNS: Building Elevation NOTES: North South East West Area Allowed per Elevation Signs Allowed per Elevation
More informationService Requirements
Service Requirements General Contact Idaho Power before beginning work on any new service. All meter installations must meet current electrical code requirements and display the proper electrical permit.
More informationCITY OF SAN MARCOS ENGINEERING DIVISION
The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. A. AN APPLICANT S GUIDE TO PROCEDURES FOR: B. C. D.
More information#26115 Mt. Diablo Blvd. and Dewing Ave Mt. Diablo Blvd. Lafayette, CA 94549
R2: chg new N3 letterset to approved; add N18 AWN-ATM-M-D to add. approval - 5.29.14 R4: customer drawing - update legend - 6.16.14 Initial : Page No. 1 R2: chg new N3 letterset to approved; add N18 AWN-ATM-M-D
More informationEXHIBIT C [** Subdivision Name **] (** Filing No., Phase No. '] SUMMARY
EXHIBIT C [** Subdivision Name **] (** Filing No., Phase No. '] SUMMARY DESCRIPTION QTY J ] COST/ _ ] TOTAL AMOUNT STREET IMPROVEMENTS 16,271 LF $151.6 $2,467,247 WATER DISTRIBUTION SYSTEM LF $412,110
More informationSTREET SECTION. Typical Mid-Block Street Section TODAY PROPOSED +/ / SIDEWALK PARKING/ SOUTHBOUND NORTHBOUND PARKING/ LOADING
K K STREET SECTION Typical Mid-Block Street Section TODAY 35 EUREKA Diamond Heights 8209 12 8 +/- 21.25 +/-21.25 8 12 SIDEWALK PARKING/ SOUTHBOUND NORTHBOUND PARKING/ SIDEWALK LOADING LOADING PROPOSED
More informationChapter 5. General Site and Building Elements
501 General Chapter 5. General Site and Building Elements 501.1 Scope. General site and building elements required to be accessible by the scoping provisions adopted by the administrative authority shall
More information400 SOUTH MAIN VICINITY MAP SITE PLAN ARCHITECTS ENGINEERS SURVEYORS PLANNERS FREDERICK WARD ASSOCIATES. frederickward.com 1"=2000'
M:\PROJECTS\505.0 SCHEFFENACKER 400 S MAIN ST\DESIGN\\CAD\SITE AND LANDSCAPE\SP0 - SITE PLAN.DWG, SP-4X36, /9/07 :05 PM,ddw W " = 0' DESIGNED BY: VV/DW VV/DW SHEET OF 3RD ELECTION DISTRICT SS PO Box 77,
More informationSINGLE RISER Displays
SINGLE RISER Displays 70018B 70006B 70005B 70007B H alf C irc le Sin g le Sh elf 6' Display 18" Legs Item# 70018B Lbs./Case: 68 24" Legs Item# 70024B Lbs./Case: 76 8' Display 18" Legs Item# 70118B Lbs./Case:
More informationZONED: GC - GENERAL COMMERCIAL SAN WOODED AREA A-2 OHE OHE A-13 X X CONCRETE OUTLET STRUCTURE 20' BUILDING SETBACK A-6 C-37 A-12 C-36
38.50' I U.S. 23 C-8 CL C-19 SITE PLAN SCALE: 1" = 50'-0" DESC. & M. N.00 55'26"W. A - EIING SITE FEATURES TO REMAIN N. 87-57' - 43" E. DESC. & M. 297.42' 7 07/14/15 ENGINEERING MMENTS 8 07/29/15 ENGINEERING
More informationAppendix A ILLUSTRATIONS
Appendix A ILLUSTRATIONS Part 1 - BUILDINGS Part 2 - LOTS Part 3 - PARKING Part 4 - SCREENING Part 5 - SETBACKS/YARDS Appendix 1 Appendix 2 Part 1 BUILDINGS Appendix 3 Appendix 4 FIGURE 1.1 ATTACHED DWELLINGS
More informationCHAPTER 19 PARKING TABLE OF CONTENTS
CHAPTER 19 PARKING TABLE OF CONTENTS Section Title Page 19.1 General... 19-1 19.2 On-Street Parking... 19-1 19.2.1 Parallel Parking...19-1 A. No Parking Signs...19-1 19.2.2 Non-Parallel Parking...19-1
More informationZEV COHEN & ASSOCIATES. INC. Main Office: Ormond Beach St. Augustine Amelia Island Edgewater
ZEV COHEN & ASSOCIATES. INC. Main Office: Ormond Beach St. Augustine Amelia Island Edgewater 300 Interchiange Blvd., Suite C Ormond Beach, FL 32174 386-677-2482 Fax: 386-677-2505 Website: www.zevcohen.com
More informationFOR SALE OR LEASE EBERHARDT & BARRY INC.
FOR SALE OR LEASE Property Video: https://vimeo.com/215049252/1384e4fcbe 500,000± SF Manufacturing / Distribution Facility - 25.48± Acres Formerly 1888 Mills 904 N. Hightower Street Thomaston, Upson County,
More informationC H A P T E R 45 Auto and Bicycle Parking and Loading
C H A P T E R 45 Auto and Bicycle Parking and Loading Sections 17.45.1 Purpose 17.45.2 General Requirements 17.45.3 Number of Parking Spaces Required by Use 17.45.4 Parking Lot Design Standards and Location
More informationNortheast Ohio AWWA October 26, 2017
Northeast Ohio AWWA October 26, 2017 Introduction Karl Dickinson Regional Sales Manager Jack Doheny Companies Sell & Rent Vacuum Trucks, Sewer Cleaning Equipment, & Pipeline Inspection Systems 16 Service
More informationARTICLE X OFF-STREET AUTOMOBILE PARKING AND LOADING AND UNLOADING SPACES
ARTICLE X OFF-STREET AUTOMOBILE PARKING AND LOADING AND UNLOADING SPACES Section 1000. Off-Street Automobile Parking and Loading and Unloading Spaces Required Off-street automobile parking and loading
More informationREZ Zoning A-1 R-3C A-1 C-1 A-1 R-2AC R-3C A-1 R-5C R-4C O/SC O/SC O/SC R-2AC RTHC O/SC B-2C O-2C B-2C R-6C 400 A-1. OS/C to M-1C Ac.
56 5500 5429 542 570 Shady Ridge 5420 0 207 202 2008 HOLMAN LN 203 2009 2004 2005 2000 200 5425 9 56 0 54 7 62 5904 70 5 62 8 56 2 6 6 624 67 5700 62 0 620 6 2 72 5560 OLDE COVINGTON WAY 62 4 63 2 70 5704
More informationSAN JOAQUIN COUNTY FIRE CHIEFS ASSOCIATION Fire Apparatus Access Road Standards
SAN JOAQUIN COUNTY FIRE CHIEFS ASSOCIATION Fire Apparatus Access Road Standards The California Fire Code, adopted by S.J.Co. Ordinance No. 4178 effective as of November 8, 2002 requires that fire apparatus
More information